{"state":"nh","name":"New Hampshire","updated":"2026-10-15","checked":"2026-10-15","bounds":[-72.544,42.696,-70.704,45.303],"stats":{"projects":0,"operating":0,"facilities":7,"rule_counties":0,"moratorium_counties":0,"source_records":7,"reviewed_records":7,"status_confirmed":0,"status_unknown":7,"unreviewed_excluded":6,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":13,"manual_source_context_records":7,"published_source_context_records":7,"excluded":{"no_manual_source_review":6},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"dartmouth-college-data-center-lebanon-nh","state":"nh","kind":"facility","name":"Dartmouth College Data Center (Etna Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grafton"],"city":"Lebanon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Institution identity verified; Lebanon street/county/site count and MW unverified on this page. Institution confirms enterprise data-center facilities supporting academic/research systems. Selected service page does not state physical Lebanon location. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.dartmouth.edu/TDClient/1806/Portal/Requests/ServiceDet?ID=31708","host":"services.dartmouth.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.6600753,"lng":-72.2430802,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"service":"college server hosting"},"notes":["Institution identity verified; Lebanon street/county/site count and MW unverified on this page.","Institution confirms enterprise data-center facilities supporting academic/research systems. Selected service page does not state physical Lebanon location.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.dartmouth.edu/TDClient/1806/Portal/Requests/ServiceDet?ID=31708","host":"services.dartmouth.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lebanon · Grafton · Source context reviewed"},{"id":"firstlight-keene-nh","state":"nh","kind":"facility","name":"FirstLight Keene Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cheshire"],"city":"Keene","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only site evidence hold. Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.firstlight.net/keene-nh-data-center/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.9258906,"lng":-72.2672342,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-access-review-round7-2026-10-14.json","scope":"title-only site evidence hold","fields":{},"notes":["Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.firstlight.net/keene-nh-data-center/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Keene · Cheshire · Source context reviewed"},{"id":"firstlight-lebanon-nh","state":"nh","kind":"facility","name":"FirstLight Lebanon Data Center (Dartmouth Regional Technology Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grafton"],"city":"Lebanon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. FirstLight Lebanon thin source with corporate footer only. BodyonlyregionalleadformandAlbany12MetroParkcorporateheadquarters. Do notassignAlbanyaddress/fiberroute-milecounttoLebanonDC. Page date notcommissioning. No usableexactsiteaddress/MW/area. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://firstlight.net/lebanon-nh-data-center","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.6788826,"lng":-72.2561477,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"FirstLight Lebanon thin source with corporate footer only","fields":{"operator_page_title":"Lebanon, New Hampshire Data Center","page_date":"2025-10-07"},"notes":["BodyonlyregionalleadformandAlbany12MetroParkcorporateheadquarters. Do notassignAlbanyaddress/fiberroute-milecounttoLebanonDC. Page date notcommissioning. No usableexactsiteaddress/MW/area.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://firstlight.net/lebanon-nh-data-center","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lebanon · Grafton · Source context reviewed"},{"id":"firstlight-manchester-nh","state":"nh","kind":"facility","name":"FirstLight Manchester Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hillsborough"],"city":"Manchester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only site evidence hold. Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.firstlight.net/resources/data-center-manchester-nh-specifications/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.9720295,"lng":-71.4705697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-access-review-round7-2026-10-14.json","scope":"title-only site evidence hold","fields":{},"notes":["Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.firstlight.net/resources/data-center-manchester-nh-specifications/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Manchester · Hillsborough · Source context reviewed"},{"id":"firstlight-portsmouth-nh-data-center-nh","state":"nh","kind":"facility","name":"FirstLight Portsmouth, NH Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rockingham"],"city":"Portsmouth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only site evidence hold. Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.firstlight.net/resources/data-center-portsmouth-nh-specifications/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.0761287,"lng":-70.8080395,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-access-review-round7-2026-10-14.json","scope":"title-only site evidence hold","fields":{},"notes":["Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.firstlight.net/resources/data-center-portsmouth-nh-specifications/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Portsmouth · Rockingham · Source context reviewed"},{"id":"locke-road-micro-data-center-concord-nh","state":"nh","kind":"facility","name":"Locke Road Micro Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Merrimack"],"city":"Concord","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Concord microfacility application versus completeness and prior land uses. HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/","host":"concordmonitor.com","date":"2026-09-14","published":"2026-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.2441282,"lng":-71.5460077,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Concord microfacility application versus completeness and prior land uses","fields":{"project":"LockeRoad micro data center","address":"52 LockeRoad, Concord, NewHampshire","owner_applicant":"Granite Municipal Manufacturing and Sales LLC","engineer":"Northpoint Engineering LLC","proposed_building_gross_sqft":8160,"proposed_data_center_space_sqft":7220,"parent_site_acres_approx":21,"reported_buildable_acres_approx":9.3,"stage_asofreport":"application completeness/site design consideration, not final approval","scheduled_completeness_meeting":"2026-09-16T19:00:00-04:00"},"notes":["HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/","host":"concordmonitor.com","date":"2026-09-14","published":"2026-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Concord · Merrimack · Source context reviewed"},{"id":"granite-shore-merrimack-station-bow-nh","state":"nh","kind":"facility","name":"Merrimack Station Data Center (proposed, Bow)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Merrimack"],"city":"Bow","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. NHPR September1,2026 republishes ConcordMonitor original reporting on GraniteShorePower/MerrimackStation Bow discussions. April350MWviability request is not approvedinterconnection, executedpower, ITload or DCapplication;200MWfromconsumeradvocate account is differentdiscussedscope, not550MWsum.343acres is ownerlandholding, not approvedcampus. Site described likely rather than confirmed inthisearlyreport. Statewideten-count is directory-derived/notnewcensus. Governor opposition/proposedmora and tabledbill are not a currentstateban. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification. VermontPublic September23,2026 republishes KateDario/NHPR original report of Bow public-commentmeeting. Selectboardchair says no projectapplication orGraniteShorecommunication received asofmeeting; planningboard would decide a futureapplication. Publicrecords350MWviabilityassessment and200MWdiscussion do notprove commissionedIT. StorycontainsGraniteState/GraniteShore naming inconsistency; legalcounterpartyrequiresoriginalfiling, notsilentrename. Taxeffects explicitlyunknown; oldcoalplant70%historictaxshare notDCforecast. Governor2027budgetmoraproposal notadoptedlaw. Different original reporting fromSeptember1ConcordMonitor, not independentVermont onsite reporting.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center","host":"nhpr.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.vermontpublic.org/2026-09-23/were-not-willing-to-trade-lower-taxes-for-this-bow-residents-speak-out-against-proposed-data-centers","host":"vermontpublic.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.1411,"lng":-71.4692,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["NHPR September1,2026 republishes ConcordMonitor original reporting on GraniteShorePower/MerrimackStation Bow discussions. April350MWviability request is not approvedinterconnection, executedpower, ITload or DCapplication;200MWfromconsumeradvocate account is differentdiscussedscope, not550MWsum.343acres is ownerlandholding, not approvedcampus. Site described likely rather than confirmed inthisearlyreport. Statewideten-count is directory-derived/notnewcensus. Governor opposition/proposedmora and tabledbill are not a currentstateban.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center","host":"nhpr.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["VermontPublic September23,2026 republishes KateDario/NHPR original report of Bow public-commentmeeting. Selectboardchair says no projectapplication orGraniteShorecommunication received asofmeeting; planningboard would decide a futureapplication. Publicrecords350MWviabilityassessment and200MWdiscussion do notprove commissionedIT. StorycontainsGraniteState/GraniteShore naming inconsistency; legalcounterpartyrequiresoriginalfiling, notsilentrename. Taxeffects explicitlyunknown; oldcoalplant70%historictaxshare notDCforecast. Governor2027budgetmoraproposal notadoptedlaw. Different original reporting fromSeptember1ConcordMonitor, not independentVermont onsite reporting.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.vermontpublic.org/2026-09-23/were-not-willing-to-trade-lower-taxes-for-this-bow-residents-speak-out-against-proposed-data-centers","host":"vermontpublic.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Bow · Merrimack · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}