{"state":"nm","name":"New Mexico","updated":"2026-10-15","checked":"2026-10-15","bounds":[-109.048,31.332,-103.001,37.0],"stats":{"projects":0,"operating":0,"facilities":15,"rule_counties":0,"moratorium_counties":0,"source_records":15,"reviewed_records":15,"status_confirmed":0,"status_unknown":15,"unreviewed_excluded":0,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":15,"manual_source_context_records":15,"published_source_context_records":15,"excluded":{},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"atterix-raton-digital-hub-nm","state":"nm","kind":"facility","name":"Atterix Raton Advanced Digital Hub","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Colfax"],"city":"Raton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. MOU/study is not development approval or operation. Initial five MW is included in possible total fifty MW, not fifty-five. Deferred moratorium vote is not adopted pause. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kob.com/news/top-news/raton-residents-push-back-on-proposed-data-center-plans/","host":"kob.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.9033,"lng":-104.4392,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"KOB describes Atterix Raton MOU for a six-month feasibility study and possible phased digital hub.","independently_verified_current_operating_status":null},"notes":["MOU/study is not development approval or operation. Initial five MW is included in possible total fifty MW, not fifty-five. Deferred moratorium vote is not adopted pause.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kob.com/news/top-news/raton-residents-push-back-on-proposed-data-center-plans/","host":"kob.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Raton · Colfax · Source context reviewed"},{"id":"centersquare-abq1-albuquerque-nm","state":"nm","kind":"facility","name":"Centersquare ABQ1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Utility8.6MW is not ITload; advertisedarea not explicitlyraisedfloor. Operator PDF identifies ABQ1 and distinct utility/UPS/generator ratings. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://csquare.com/hubfs/CenterSquare/docs/Centersquare-ABQ-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0844,"lng":-106.6504,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"400 Tijeras Avenue Northwest","city":"Albuquerque","utility_power_mw":8.6,"ups_capacity_mw":1.8,"generator_capacity_mw":5,"advertised_area_sqft":12921},"notes":["Utility8.6MW is not ITload; advertisedarea not explicitlyraisedfloor.","Operator PDF identifies ABQ1 and distinct utility/UPS/generator ratings.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://csquare.com/hubfs/CenterSquare/docs/Centersquare-ABQ-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Albuquerque · Bernalillo · Source context reviewed"},{"id":"connect-data-centers-albuquerque-nm","state":"nm","kind":"facility","name":"Connect Albuquerque (Westpointe 40)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Signed municipal site-plan decision and separate contractor project section; not full operating-site certification.. Site-plan approval has water/sewer, infrastructure-list, recorded improvement-agreement and plat conditions. Notice expressly separates later building permits from site approval; satisfaction, actual permit issuance and appeal outcome not verified. The operative notice states July31; the signature-audit document title says July24 while signature audit is August1. Preserve different date roles and document-label discrepancy. Printed appeal deadline August16 is not independently recalculated or certified as statutory deadline. 90301squarefeet includes the6800office component; do not add them. Legal tract7.9830acres, requested11.5acreplat and directory10acres are different scopes, not interchangeable exact footprints. City calls it10MW without specifying criticalIT. Utility adequacy finding is not executed10MWservice agreement. Water-meter design conditions and exterior tanks are not measured consumption. PowerDesign participant page labels completion January2026; this is a contractor project milestone claim, not occupancy or tenant-service certificate. Only this project section was read, not the large unrelated portfolio list. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf","host":"documents.cabq.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.powerdesigninc.us/projects/10mw-albq-data-center","host":"powerdesigninc.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0881581,"lng":-106.7353893,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round39-2026-10-14.json","scope":"Signed municipal site-plan decision and separate contractor project section; not full operating-site certification.","fields":{"city_project":"PR-2020-004747","site_plan_application":"SI-2024-00451","decision_date_in_operative_notice":"2024-07-31","signature_audit_date":"2024-08-01","approved_building_sqft":90301,"office_component_sqft":6800,"printed_legal_tract_acres":7.983,"requested_adjusted_plat_acres":11.5,"planned_mw_with_unspecified_basis":10,"critical_it_mw":null,"contractor_published_completion_month":"2026-01","independently_verified_current_operating_status":null},"notes":["Site-plan approval has water/sewer, infrastructure-list, recorded improvement-agreement and plat conditions. Notice expressly separates later building permits from site approval; satisfaction, actual permit issuance and appeal outcome not verified.","The operative notice states July31; the signature-audit document title says July24 while signature audit is August1. Preserve different date roles and document-label discrepancy. Printed appeal deadline August16 is not independently recalculated or certified as statutory deadline.","90301squarefeet includes the6800office component; do not add them. Legal tract7.9830acres, requested11.5acreplat and directory10acres are different scopes, not interchangeable exact footprints.","City calls it10MW without specifying criticalIT. Utility adequacy finding is not executed10MWservice agreement. Water-meter design conditions and exterior tanks are not measured consumption.","PowerDesign participant page labels completion January2026; this is a contractor project milestone claim, not occupancy or tenant-service certificate. Only this project section was read, not the large unrelated portfolio list.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf","host":"documents.cabq.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.powerdesigninc.us/projects/10mw-albq-data-center","host":"powerdesigninc.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Albuquerque · Bernalillo · Source context reviewed"},{"id":"green-data-socorro-county-nm","state":"nm","kind":"facility","name":"Green Data Socorro Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Socorro"],"city":"Socorro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Jessica Carranza Pino, El Defensor Chieftain original interviews syndicated by Albuquerque Journal April 15, 2026: Green Data CEO describes a Socorro proposal with 2 GW baseload GENERATION and a monthly delivery goal. No critical IT basis, secured interconnection, binding NMT partnership, construction start or largest-in-world certification. Atmospheric-water/renewable/minimal-grid-use statements are developer design aspirations, not measured consumption or zero-impact findings. Spaceport America 50 MW solar/5 MW continuous concept is another project; neither is additive Socorro IT. The Illinois mayor and developer disagree about an earlier failed venture; reported past conduct is not a verified financing outcome for Socorro. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420","host":"abqjournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0584,"lng":-106.8914,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Jessica Carranza Pino, El Defensor Chieftain original interviews syndicated by Albuquerque Journal April 15, 2026: Green Data CEO describes a Socorro proposal with 2 GW baseload GENERATION and a monthly delivery goal. No critical IT basis, secured interconnection, binding NMT partnership, construction start or largest-in-world certification. Atmospheric-water/renewable/minimal-grid-use statements are developer design aspirations, not measured consumption or zero-impact findings. Spaceport America 50 MW solar/5 MW continuous concept is another project; neither is additive Socorro IT. The Illinois mayor and developer disagree about an earlier failed venture; reported past conduct is not a verified financing outcome for Socorro.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420","host":"abqjournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Socorro · Socorro · Source context reviewed"},{"id":"green-data-spaceport-america-sierra-county-nm","state":"nm","kind":"facility","name":"Green Data Spaceport America Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sierra"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Green Data proposal requires state land commissioner sublease consent, undecided in report. Do not tag this state-land project cancelled by county resolution. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.abqjournal.com/news/sierra-county-enacts-18-month-data-center-moratorium/3086595","host":"abqjournal.com","date":"2026-07-21","published":"2026-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.9903,"lng":-106.9698,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"moratorium-with-jurisdiction-limit","reported_finding":"Albuquerque Journal reports unanimous 18-month Sierra County moratorium, but explicitly says resolution does not apply on state land at Spaceport America.","report_display_date":"2026-07-21","independently_verified_current_status":null},"notes":["Green Data proposal requires state land commissioner sublease consent, undecided in report. Do not tag this state-land project cancelled by county resolution.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.abqjournal.com/news/sierra-county-enacts-18-month-data-center-moratorium/3086595","host":"abqjournal.com","date":"2026-07-21","published":"2026-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sierra · Source context reviewed"},{"id":"h5-data-centers-albuquerque-nm","state":"nm","kind":"facility","name":"H5 Data Centers Albuquerque","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical announcement. Whole mixed-use building area is not H5 white space; present tenancy/operation requires current evidence. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/h5-Albuquerque.html","host":"h5datacenters.com","date":"2018-03-26","published":"2018-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.0862,"lng":-106.6512,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_expansion_announcement_date":"2018-03-26","published_address":"505 Marquette Avenue NW, Albuquerque, New Mexico","mixed_use_carrier_hotel_office_building_sqft":225000},"notes":["Historical announcement. Whole mixed-use building area is not H5 white space; present tenancy/operation requires current evidence.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/h5-Albuquerque.html","host":"h5datacenters.com","date":"2018-03-26","published":"2018-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Albuquerque · Bernalillo · Source context reviewed"},{"id":"nova-innova-data-center-albuquerque-nm","state":"nm","kind":"facility","name":"Innova Data Center (Mesa del Sol)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 130,000-square-foot building, 6,000 delivered first-phase data space and potential 80,000 data space are different scopes. The inherited 8 MW power and 100-to-150-million-USD full-campus expectation are not current critical IT or completed spending. A ten-year lease with purchase option is not verified ownership today. Largest-in-state was an operator claim, not independently established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterknowledge.com/archives/2015/06/29/navajo-owned-data-center-offers-way-to-diversify-tribes-revenue-base-beyond-casinos","host":"datacenterknowledge.com","date":"2015-06-29","published":"2015-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35,"lng":-106.63,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Data Center Knowledge reports Innava/Nova's launched first phase at a former solar-panel plant in Albuquerque, separate from an earlier proposed site about a mile away.","independently_verified_current_operating_status":null},"notes":["The 130,000-square-foot building, 6,000 delivered first-phase data space and potential 80,000 data space are different scopes. The inherited 8 MW power and 100-to-150-million-USD full-campus expectation are not current critical IT or completed spending. A ten-year lease with purchase option is not verified ownership today. Largest-in-state was an operator claim, not independently established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterknowledge.com/archives/2015/06/29/navajo-owned-data-center-offers-way-to-diversify-tribes-revenue-base-beyond-casinos","host":"datacenterknowledge.com","date":"2015-06-29","published":"2015-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Albuquerque · Bernalillo · Source context reviewed"},{"id":"new-era-energy-digital-lea-county-data-center-nm","state":"nm","kind":"facility","name":"Lea County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lea"],"city":"Lovington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. New Era Lea County planned pipeline versus Texas project. 7GWLeaCountyand1.4GWTexasseparateprojects,notsite-leveloperatingIT. Company8plusGWpipelineincludesprojectsnotadditionalcapacity. Generic12to15monthmodulardeploymenttargetnotdatedLeaCountyRFS. No exactparcel,energization/permitsorconfirmedtenant.493/492Texasacredifferenceheldforlatercrosswalk. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newerainfra.ai/","host":"newerainfra.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.7,"lng":-103.3,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"New Era Lea County planned pipeline versus Texas project","fields":{"developer":"New Era Energy and Digital","project":"Lea County, New Mexico","planned_capacity_gw_min_exclusive":7,"power_basis":"planned energy-integrated pipeline, not explicit critical IT","planned_land_acres":3500,"separate_texas_tcdc_planned_capacity_gw_min_exclusive":1.4,"texas_acreage_conflict":[493,492]},"notes":["7GWLeaCountyand1.4GWTexasseparateprojects,notsite-leveloperatingIT. Company8plusGWpipelineincludesprojectsnotadditionalcapacity. Generic12to15monthmodulardeploymenttargetnotdatedLeaCountyRFS. No exactparcel,energization/permitsorconfirmedtenant.493/492Texasacredifferenceheldforlatercrosswalk.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newerainfra.ai/","host":"newerainfra.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lovington · Lea · Source context reviewed"},{"id":"meta-los-lunas-ai-nm","state":"nm","kind":"facility","name":"Meta Los Lunas AI Expansion","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Valencia"],"city":"Los Lunas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Secondary consultant compilation only, not original permits, audited spending, signed IRBs, water records or utility contract. Internal timeline describes spring2025 groundbreaking as future in March2026 and alternates six/eight completed structures and phase milestones; current building count held. Generic40MWperbuilding/80MWexpansion not adopted as criticalIT. USD30billion and series IRB ceilings are not grants, public debt or capex spent; 145million cumulative GRT cannot be annualized or netted against incomparable PILOT schedules. 283ML2023consumption, allocations up to4.5MGD, 885MWrenewable procurement and100MWbattery are distinct measures, not current campus IT, actual water withdrawal or continuous renewable supply. Photo-based commissioning/tier/power inferences and asserted population causation remain unverified; original sources needed. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","host":"mmcginvest.com","date":"2026-03-07","published":"2026-03-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.8083,"lng":-106.7296,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"MMCG commercial analysis describes Meta Los Lunas phased expansion and reports an approximately USD3.3billion completed-buildout investment, eight completed buildings and later AI-building plans.","independently_verified_current_operating_status":null},"notes":["Secondary consultant compilation only, not original permits, audited spending, signed IRBs, water records or utility contract. Internal timeline describes spring2025 groundbreaking as future in March2026 and alternates six/eight completed structures and phase milestones; current building count held. Generic40MWperbuilding/80MWexpansion not adopted as criticalIT. USD30billion and series IRB ceilings are not grants, public debt or capex spent; 145million cumulative GRT cannot be annualized or netted against incomparable PILOT schedules. 283ML2023consumption, allocations up to4.5MGD, 885MWrenewable procurement and100MWbattery are distinct measures, not current campus IT, actual water withdrawal or continuous renewable supply. Photo-based commissioning/tier/power inferences and asserted population causation remain unverified; original sources needed.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","host":"mmcginvest.com","date":"2026-03-07","published":"2026-03-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Los Lunas · Valencia · Source context reviewed"},{"id":"roswell-information-park-chaves-county-nm","state":"nm","kind":"facility","name":"Roswell Information Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chaves"],"city":"Roswell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Lease rights are not DC commissioning or construction approval. Management fees on gas and excess electricity are not taxes or incentives. An off-grid description alongside grid-export provisions does not establish permanent disconnection. Limited water rights are unquantified; produced-water treatment and the fourteen-acre battery plant are prospective. Support letters are not permits or awarded funds, and the changed site requires a geographic crosswalk. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.thenewswire.com/press-releases/1A0vFwYPV-desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer.html","host":"thenewswire.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.3943,"lng":-104.523,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Issuer-distributed release says Desert Mountain Energy signed a25-year Roswell Information Park lease with a five-year option, while a separate long-term gas contract and new pipeline route remained to be developed.","independently_verified_current_operating_status":null},"notes":["Lease rights are not DC commissioning or construction approval. Management fees on gas and excess electricity are not taxes or incentives. An off-grid description alongside grid-export provisions does not establish permanent disconnection. Limited water rights are unquantified; produced-water treatment and the fourteen-acre battery plant are prospective. Support letters are not permits or awarded funds, and the changed site requires a geographic crosswalk.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.thenewswire.com/press-releases/1A0vFwYPV-desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer.html","host":"thenewswire.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Roswell · Chaves · Source context reviewed"},{"id":"sandia-725e-hpc-data-center-albuquerque-nm","state":"nm","kind":"facility","name":"Sandia National Laboratories 725E High-Performance Computing Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Completion month not precise public-opening day. Certification source is lab announcement, not independentUSGBCregistry review.250kWsolar not criticalITcapacity. Cooling savings over initial sixmonths not current annual measured water withdrawal. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/","host":"sandia.gov","date":"2020-06-19","published":"2020-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.05,"lng":-106.54,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"operator_reported_building_completion_month":"2018-10","building_identifier":"725E","reported_use":"HPC addition,Albuquerque campus","operator_reported_certification":"LEEDv4GoldBD+C,DataCenter","certification_announcement_date":"2020-06-19"},"notes":["Completion month not precise public-opening day. Certification source is lab announcement, not independentUSGBCregistry review.250kWsolar not criticalITcapacity. Cooling savings over initial sixmonths not current annual measured water withdrawal.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/","host":"sandia.gov","date":"2020-06-19","published":"2020-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Albuquerque · Bernalillo · Source context reviewed"},{"id":"stargate-project-jupiter-dona-ana-nm","state":"nm","kind":"facility","name":"Stargate Project Jupiter","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dona Ana"],"city":"Santa Teresa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition. 360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification. Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement. No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/","host":"elpasomatters.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/","host":"oracle.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.8636,"lng":-106.6895,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition.","360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/","host":"elpasomatters.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement.","No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/","host":"oracle.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Santa Teresa · Dona Ana · Source context reviewed"},{"id":"teraplex-gallup-tradeport-mckinley-county-nm","state":"nm","kind":"facility","name":"Teraplex Gallup Tradeport Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["McKinley"],"city":"Gallup","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originalcityagenda,draftthirdamendment,signedhistoricaloption/assignmentandtariff; conditional/historycontextnotcurrentexecution/operationcertification.. NoApril28vote/minutesor laterexecutedthirdamendment read; agendadoesnotprove deferral/adoption. Secondarydeferralclaims remainseparate. Nooptionexercise/paymentreceipt,landclosing,constructionpermit,effluentdeliverymetering or currentoperationproof. No MW/generation/tenant/capex/jobs certified. The2023signedoption doesnot establish that2026draftterms arebinding;first/secondamendments notindependentlyreadinthispass. Noexactparcelcoordinates or boundary merged.330approximateacresversus324.787LOIarea requiresscope/revisioncrosswalk. Originaldeliverysystem allocated planning/permitting/design/construction/operationexpensestodeveloper; notreceipt,publicsubsidyaward orproofall permitsgranted. Consultrecord-leveldate-role,signature,water-optionandareaholds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15084","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15085","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15088","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15089","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.5203,"lng":-108.8367,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"gallup-effluent-originals-round45-2026-10-14.json","scope":"Originalcityagenda,draftthirdamendment,signedhistoricaloption/assignmentandtariff; conditional/historycontextnotcurrentexecution/operationcertification.","fields":{"proposal_identity_context":{"source":"gallup-original","pages":[1,2,9,10],"value":"April28,2026 city agenda names Teraplex and Gutami potential GallupTradeport project; presentation only. ItemF5 proposes effluent option amendment forTeraplexDataCentersLLC,notsiteapproval."},"water_option_context":{"sources":["gallup-original","gallup-third","gallup-original-agreement","gallup-rate"],"value":{"proposed_annual_effluent_gallons":109500000,"printed_approximate_acre_feet":336,"basis":"Annual fiscal-year option/right quantity, not actual withdrawals/consumption, not potable-source measurement","annual_quantity_carry_forward":false,"additional_surplus_possible":"Subject to city commitments; not unlimited guaranteed water","proposed_rate_usd_per_1000_gallons":5.66,"rate_basis":"FY26reclaimedwastewater tariff attachment, not fresh potable tariff or executedTeraplexbill","third_amendment_execution_status":"Supplied draft date/day,payment deadline and signatures blank","effectiveness_fee_usd":5000,"effectiveness_basis":"Proposed collectedfundsbydeadline plusCouncilapproval; no paidreceipt/approvalverified","proposed_purchase_deadline_years":4,"proposed_construction_start_deadline_years":5,"proposed_take_or_pay_start_year":7,"printed_minimum_take_or_pay_percent":33.33,"termination_basis":"Mayterminate,with15-day exercise windows; not automatic cancellation merely from target elapsed","proposed_rate_lock_years":15,"next_rate_reference_year":2041,"fixed_calendar_deadlines":null,"critical_it_mw":null}},"original_option_history":{"sources":["gallup-original-agreement","gallup-third"],"value":{"original_printed_effective_date":"2023-07-25","city_signature_date_visually_read":"2023-07-27","developer_signature_date_visually_read":"2023-08-01","initial_use":"Recycling/manufacturing complex, not original2023data-centeroperation","original_land_intention_acres_approx":330,"original_plant_effluent_million_gallons_per_day":2.33,"plant_effluent_measure":"Historical2023plant-output description, notTeraplexusage or currentmeasured2026plantoutput","term_scope":"Original20-yearterm references definedOptionExerciseDate;10-yearextension requiresnotice andUSD5000payment. Not automatically30yearsfromApril28."}},"assignment_history":{"source":"gallup-assignment","value":{"body_date":"2026-03-03","third_amendment_recital_date":"2026-03-06","exact_assignment_execution_date":null,"date_hold":"BodydatedasofMarch3 versuslaterrecitalMarch6; signaturesbothpresentbutpageundated. No automatic reconciliation.","loi_printed_date":"2025-07-28","loi_recited_execution_date":"2025-07-29","loi_acres_approx":324.787,"land_closed":null,"basis":"Assignment of effluent-option andexclusiveLOIrights, notdeed/landclosing. OriginalLOIexhibit is onlycoverinthisfile. Financialterms partlyredacted;no recoveryor inference."}}},"notes":["NoApril28vote/minutesor laterexecutedthirdamendment read; agendadoesnotprove deferral/adoption. Secondarydeferralclaims remainseparate.","Nooptionexercise/paymentreceipt,landclosing,constructionpermit,effluentdeliverymetering or currentoperationproof. No MW/generation/tenant/capex/jobs certified.","The2023signedoption doesnot establish that2026draftterms arebinding;first/secondamendments notindependentlyreadinthispass.","Noexactparcelcoordinates or boundary merged.330approximateacresversus324.787LOIarea requiresscope/revisioncrosswalk.","Originaldeliverysystem allocated planning/permitting/design/construction/operationexpensestodeveloper; notreceipt,publicsubsidyaward orproofall permitsgranted.","Consultrecord-leveldate-role,signature,water-optionandareaholds."],"sources":[{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15084","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15085","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15088","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15089","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Gallup · McKinley · Source context reviewed"},{"id":"westblock-shiprock-nm","state":"nm","kind":"facility","name":"WestBlock Capital Bitcoin Mine (Shiprock)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["San Juan"],"city":"Shiprock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Historical claimed 23 to 25 bitcoin/month and 1.4 to 1.6 million-dollarvalue are 2021 commodity/revenue context, not current revenue, profit or site capex. Reported 48,000 dollartaxoverthree years is cumulative;60,000 landlease payment period is not clear, so never label annual. CEO’s 6 percenttaxonpower/services and 6 to 10 staff are attributed, not current audited totals or a reviewed tribal tax instrument. Criticism of resource access is not an adjudicated legal violation or measured site water impact. No MW,currentownership or operating status independently verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://futurism.com/navajo-bitcoin-mine-startup","host":"futurism.com","date":"2021-11-10","published":"2021-11-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.7867,"lng":-108.6866,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Futurism relays Vice/Grist reporting about WestBlock’s bitcoin mine near Shiprock on Navajo Nation land and community concerns over distribution of benefits.","independently_verified_current_operating_status":null},"notes":["Historical claimed 23 to 25 bitcoin/month and 1.4 to 1.6 million-dollarvalue are 2021 commodity/revenue context, not current revenue, profit or site capex. Reported 48,000 dollartaxoverthree years is cumulative;60,000 landlease payment period is not clear, so never label annual. CEO’s 6 percenttaxonpower/services and 6 to 10 staff are attributed, not current audited totals or a reviewed tribal tax instrument. Criticism of resource access is not an adjudicated legal violation or measured site water impact. No MW,currentownership or operating status independently verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://futurism.com/navajo-bitcoin-mine-startup","host":"futurism.com","date":"2021-11-10","published":"2021-11-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Shiprock · San Juan · Source context reviewed"},{"id":"zenith-volts-roswell-chaves-county-data-center-nm","state":"nm","kind":"facility","name":"Zenith Volts Roswell / Chaves County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chaves"],"city":"Roswell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chaves combined solar/storage/DC summary power-basis correction. Economic-development summary not original signed permit or independent inspection.1265MWisSOLARgeneration, not data-center IT or battery energy.300/250acare different uses, not550acDC.6Bcombined project estimate not actual DC-onlycapex. Roswell publisher office not project city/location. No current construction or actual opening verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility","host":"chavescounty.net","date":"2025-08-22","published":"2025-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.14,"lng":-104.52,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Chaves combined solar/storage/DC summary power-basis correction","fields":{"publisher_role":"Roswell Chaves County Economic Development Corporation summary linking original article","publication_date":"2025-08-22","developer":"Zenith Volts Corp.","reported_action":"county approved special use permit","proposed_solar_generation_mw":1265,"proposed_data_center_acres":300,"proposed_battery_storage_acres":250,"combined_estimated_project_cost_usd":6000000000,"location":"north side of700/800block WestPearsonRoad near LakeArthur, Chaves/Eddy boundary"},"notes":["Economic-development summary not original signed permit or independent inspection.1265MWisSOLARgeneration, not data-center IT or battery energy.300/250acare different uses, not550acDC.6Bcombined project estimate not actual DC-onlycapex. Roswell publisher office not project city/location. No current construction or actual opening verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility","host":"chavescounty.net","date":"2025-08-22","published":"2025-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Roswell · Chaves · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}