{"state":"pa","name":"Pennsylvania","updated":"2026-10-15","checked":"2026-10-15","bounds":[-80.519,39.722,-74.697,42.269],"stats":{"projects":0,"operating":0,"facilities":60,"rule_counties":0,"moratorium_counties":0,"source_records":60,"reviewed_records":60,"status_confirmed":0,"status_unknown":60,"unreviewed_excluded":10,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":70,"manual_source_context_records":60,"published_source_context_records":60,"excluded":{"no_manual_source_review":10},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"four-three-glenbrook-salem-township-luzerne-pa","state":"pa","kind":"facility","name":"4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Salem Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The potential 1.2-billion-USD purchase is neither a closed transaction nor construction spending. Proposed demand is not secured IT. The earlier QTS closing is separate. The buyer is undisclosed and the expected community agreement is not executed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.timesleader.com/news/1745226/1-2-billion-land-deal-for-second-data-center-project-in-salem-township-announced-by-4-3-group","host":"timesleader.com","date":"2026-06-13","published":"2026-06-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.1078249,"lng":-76.1791155,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Times Leader describes prospective Glen Brook land assembly, a 39-building concept and intended zoning applications.","independently_verified_current_operating_status":null},"notes":["The potential 1.2-billion-USD purchase is neither a closed transaction nor construction spending. Proposed demand is not secured IT. The earlier QTS closing is separate. The buyer is undisclosed and the expected community agreement is not executed.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.timesleader.com/news/1745226/1-2-billion-land-deal-for-second-data-center-project-in-salem-township-announced-by-4-3-group","host":"timesleader.com","date":"2026-06-13","published":"2026-06-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Salem Township · Luzerne · Source context reviewed"},{"id":"aws-falls-township-pa","state":"pa","kind":"facility","name":"Amazon Web Services Innovation Campus, Falls Township","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bucks"],"city":"Falls Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Falls municipal Amazon announcement and land-plan scopes. 20Band1250jobs statewide not Falls-only.1800ac entire redevelopment not DC footprint. Existingbuilding6distributionplan modified and247acphase2separate scopes;do not call all structures operating DCs. Preliminary/final land-development plans not observed customer service. No numeric ITMW, final current service date or actual spend. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fallstwp.com/resources/news/article/?id=10070","host":"fallstwp.com","date":"2025-06-09","published":"2025-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.1545,"lng":-74.7882,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Falls municipal Amazon announcement and land-plan scopes","fields":{"agency":"Falls Township, Pennsylvania","announcement_date":"2025-06-09","operator":"Amazon","regional_planned_investment_usd":20000000000,"regional_expected_jobs":1250,"regional_scope":"Pennsylvania multiple campuses","broader_keystone_trade_center_acres":1800,"phase2_digital_infrastructure_parcel_acres":247,"modified_existing_plan_addresses":["1 Ben Fairless Drive","700 SouthPortRoad"],"phase2_planned_structures":10,"phase2_total_planned_area_sqft_min_exclusive":2000000,"phase2_individual_structure_sqft_range":[112000,217000],"agency_described_plan_change_month":"2025-03"},"notes":["20Band1250jobs statewide not Falls-only.1800ac entire redevelopment not DC footprint. Existingbuilding6distributionplan modified and247acphase2separate scopes;do not call all structures operating DCs. Preliminary/final land-development plans not observed customer service. No numeric ITMW, final current service date or actual spend.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fallstwp.com/resources/news/article/?id=10070","host":"fallstwp.com","date":"2025-06-09","published":"2025-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Falls Township · Bucks · Source context reviewed"},{"id":"archbald-i-campus-1-eynon-jermyn-road-lackawanna-pa","state":"pa","kind":"facility","name":"Archbald I Campus 1 Data Center (Eynon Jermyn Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Archbald","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","host":"yahoo.com","date":"2025-11-01","published":"2025-11-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5095,"lng":-75.5661,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheTimes-Tribune viaYahoo describes ArchbaldILLCOctober 22 applications for two distinct campuses:18 buildings onroughly 408 acres andfourbuildings onroughly 66 acres, with corporate/end-user identity undisclosed.","independently_verified_current_operating_status":null},"notes":["22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","host":"yahoo.com","date":"2025-11-01","published":"2025-11-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Archbald · Lackawanna · Source context reviewed"},{"id":"archbald-i-campus-2-washington-avenue-lackawanna-pa","state":"pa","kind":"facility","name":"Archbald I Campus 2 Data Center (Eynon Jermyn Road at Washington Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Archbald","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","host":"yahoo.com","date":"2025-11-01","published":"2025-11-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5149,"lng":-75.5554,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheTimes-Tribune viaYahoo describes ArchbaldILLCOctober 22 applications for two distinct campuses:18 buildings onroughly 408 acres andfourbuildings onroughly 66 acres, with corporate/end-user identity undisclosed.","independently_verified_current_operating_status":null},"notes":["22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","host":"yahoo.com","date":"2025-11-01","published":"2025-11-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Archbald · Lackawanna · Source context reviewed"},{"id":"ardent-pittsburgh-mckees-rocks-pa","state":"pa","kind":"facility","name":"Ardent Data Centers Pittsburgh (McKees Rocks)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"McKees Rocks","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Limited named street-label/service context or issuer acquisition statement.. Original NorthernData issuer release January22,2024 states completed acquisition of McKeesRocks Pittsburgh7.5-acre/41000sf facility. Price undisclosed; no closing deed or exact parcel survey inspected. Existing5MW to full20MW targetH22025, with retrofit completionQ42024 separately targeted; not25MW additive or observed2026 energization. No explicitITbasis. PUE1.2orless is a target, not measured annual efficiency or independent most-efficient ranking. Under10ms regional latency/favorablepricing claims not audited currentperformance/all-in tariff. EuropeanBoden site is separate. Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.co.uk/news-releases/ardent-data-centers-a-northern-data-group-company-completes-acquisition-of-pennsylvania-data-center-302040653.html","host":"prnewswire.co.uk","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.4646,"lng":-80.081,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-management-system-scope-and-acquisition-stages-round88-2026-10-15.json","scope":"Limited named street-label/service context or issuer acquisition statement.","fields":{},"notes":["Original NorthernData issuer release January22,2024 states completed acquisition of McKeesRocks Pittsburgh7.5-acre/41000sf facility. Price undisclosed; no closing deed or exact parcel survey inspected. Existing5MW to full20MW targetH22025, with retrofit completionQ42024 separately targeted; not25MW additive or observed2026 energization. No explicitITbasis.","PUE1.2orless is a target, not measured annual efficiency or independent most-efficient ranking. Under10ms regional latency/favorablepricing claims not audited currentperformance/all-in tariff. EuropeanBoden site is separate.","Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied."],"sources":[{"url":"https://www.prnewswire.co.uk/news-releases/ardent-data-centers-a-northern-data-group-company-completes-acquisition-of-pennsylvania-data-center-302040653.html","host":"prnewswire.co.uk","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"McKees Rocks · Allegheny · Source context reviewed"},{"id":"aws-cumulus-salem-township-pa","state":"pa","kind":"facility","name":"AWS Cumulus Data Center Campus, Salem Township","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Salem Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Statewide exemption-cost estimates are not a known Amazon award amount. Two-campus commitment is not per-site spending; labor and energy claims remain attributed and dated. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://technical.ly/civics/amazon-data-centers-tax-break/","host":"technical.ly","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.0949,"lng":-76.1452,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Spotlight PA reporting via Technical.ly describes Salem Township and Falls Township AWS investments, state sales-tax exemption and workforce support.","independently_verified_current_operating_status":null},"notes":["Statewide exemption-cost estimates are not a known Amazon award amount. Two-campus commitment is not per-site spending; labor and energy claims remain attributed and dated.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://technical.ly/civics/amazon-data-centers-tax-break/","host":"technical.ly","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Salem Township · Luzerne · Source context reviewed"},{"id":"aws-kline-township-schuylkill-pa","state":"pa","kind":"facility","name":"AWS Kline Township Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Schuylkill"],"city":"Kline Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Extension is not preliminary/final land-development approval. Later deadline outcome remains unobserved; unrelated municipal spending in article is not project incentive. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://shensentinel.com/news/kline-supervisors-grant-extension-for-consideration-of-amazon-data-center-plans/","host":"shensentinel.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8699957,"lng":-76.0215859,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Shenandoah Sentinel reports AWS Kline plan consideration deadline extended to September 30, 2026.","independently_verified_current_operating_status":null},"notes":["Extension is not preliminary/final land-development approval. Later deadline outcome remains unobserved; unrelated municipal spending in article is not project incentive.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://shensentinel.com/news/kline-supervisors-grant-extension-for-consideration-of-amazon-data-center-plans/","host":"shensentinel.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kline Township · Schuylkill · Source context reviewed"},{"id":"switch-big-beaver-pa","state":"pa","kind":"facility","name":"Big Beaver Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Beaver"],"city":"Big Beaver","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Planned development, no site MW, capital amount or opening date supplied. Zero server-cooling water explicitly allows office/warehouse water connection. Ratepayer protection statement not independent tariff review. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/","host":"switch.com","date":"2026-04-30","published":"2026-04-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.75,"lng":-80.33,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"development_announcement_date":"2026-04-30","planned_campus_acres":382,"published_municipality":"Big Beaver Borough","published_county":"Beaver, Pennsylvania"},"notes":["Planned development, no site MW, capital amount or opening date supplied. Zero server-cooling water explicitly allows office/warehouse water connection. Ratepayer protection statement not independent tariff review.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/","host":"switch.com","date":"2026-04-30","published":"2026-04-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Big Beaver · Beaver · Source context reviewed"},{"id":"bitfarms-sharon-pa","state":"pa","kind":"facility","name":"Bitfarms Sharon Facility (former Westinghouse plant)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Mercer"],"city":"Sharon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.2334,"lng":-80.497,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Campus-level issuer context, not proof every imported plant/building ID is independently energized.","fields":{"announcement_date":"2026-05-11","quarter_ended":"2026-03-31","company_claim":"Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.","redomiciliation_parent_transaction_date":"2026-04-01"},"notes":["Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sharon · Mercer · Source context reviewed"},{"id":"blakely-borough-data-center-lackawanna-pa","state":"pa","kind":"facility","name":"Blakely Borough Data Center (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Blakely","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Proposed land clearing/storage remained disputed; withdrawal does not resolve legality of other uses or imply all activity ceased. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds","host":"fox56.com","date":"2025-09-15","published":"2025-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.4809,"lng":-75.5946,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"WOLF reports Blakely rezoning application withdrawal and cancelled hearing; developer said data center no longer moving ahead.","independently_verified_current_operating_status":null},"notes":["Proposed land clearing/storage remained disputed; withdrawal does not resolve legality of other uses or imply all activity ceased.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds","host":"fox56.com","date":"2025-09-15","published":"2025-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Blakely · Lackawanna · Source context reviewed"},{"id":"pennsylvania-glacial-till-caughbaugh-road-tobyhanna-monroe-pa","state":"pa","kind":"facility","name":"Caughbaugh Road Data Center (Pennsylvania Glacial Till site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monroe"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Overlay adoption is not all construction/environmental permits; the developer counsel acknowledged more reviews. Proposed closed-loop cooling and described noise limits are not measured operation. No 2026 opening, IT MW or new building count inferred, and the generic legal duty to allow DCs is not adopted as independent legal analysis. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fox56.com/news/local/tobyhanna-township-approves-second-data-center-zoning-overlay","host":"fox56.com","date":"2025-12-15","published":"2025-12-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.1345,"lng":-75.6185,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WOLF reports a December 15 Tobyhanna overlay vote for the Pennsylvania Glacial Till property along Caughbaugh Road, separate from the December 11 Pocono Manor ordinance.","independently_verified_current_operating_status":null},"notes":["Overlay adoption is not all construction/environmental permits; the developer counsel acknowledged more reviews. Proposed closed-loop cooling and described noise limits are not measured operation. No 2026 opening, IT MW or new building count inferred, and the generic legal duty to allow DCs is not adopted as independent legal analysis.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fox56.com/news/local/tobyhanna-township-approves-second-data-center-zoning-overlay","host":"fox56.com","date":"2025-12-15","published":"2025-12-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Monroe · Source context reviewed"},{"id":"air-products-cetronia-road-upper-macungie-pa","state":"pa","kind":"facility","name":"Cetronia Road Data Center (former Air Products site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lehigh"],"city":"Trexlertown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. LehighValleyNews originalNov12/13,2025report:AirProducts194acformerHQproposal2.6Msf,applicationstillprocessed/notpublicthen. Originalwarehouse2023approvalnotDCpermit.22.2Mtaxassessedvalue notsaleprice/capex. Generic500000homescomparisonnotmeasuredsiteMW. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations. WFMZMay27,2026hearingreportnames7300Cetronia/3buildings,denialofcontinuance andsimilar-use relief. OralhearingdenialdistinctfromwrittenJulydecision;45daywrittendecision/30dayappealreportedprocedure,notindependentlegaldeadlinecalculation. NoactualMWwaterorpermitcertification. Aug12,2026LehighValleyPublicMediaquotesAirProductsspokesman:companydidnotappeal,andhasnofuturepropertyuse/ownershipdecisiontoannounce. ReportedAug5appealdeadline,notcomputedlegaladvice;writtenJulydecisionafterMay27hearing.194ac2.6MsfDCproposalabandoned,notdemolitionofoperatingcampus. PrologisdealwasearlierWAREHOUSEplanandneverclosed,notDCoperator.95000gpd/930cars19truckstrafficwereSTUDYPROJECTIONSnotmeasureduse;23.2Massessmentnotcapex.22.2Moldassessmentdifferentdate.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lehighvalleynews.com/business/giant-data-center-proposal-in-upper-macungie-township-is-in-the-works","host":"lehighvalleynews.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.wfmz.com/news/area/lehighvalley/lehigh-county/western-lehigh-county/upper-macungie-zoners-reject-appeal-for-massive-data-center-campus-on-former-air-products-site/article_c531b72e-e928-4562-bcbf-3dbc7e9ce3e8.html","host":"wfmz.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.lehighvalleypublicmedia.org/news/all/air-products-abandons-plan-for-data-center-at-former-upper-macungie-headquarters/","host":"lehighvalleypublicmedia.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5510536,"lng":-75.5965424,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"LehighValleyNews originalNov12/13,2025report:AirProducts194acformerHQproposal2.6Msf,applicationstillprocessed/notpublicthen. Originalwarehouse2023approvalnotDCpermit.22.2Mtaxassessedvalue notsaleprice/capex. Generic500000homescomparisonnotmeasuredsiteMW."},"notes":["LehighValleyNews originalNov12/13,2025report:AirProducts194acformerHQproposal2.6Msf,applicationstillprocessed/notpublicthen. Originalwarehouse2023approvalnotDCpermit.22.2Mtaxassessedvalue notsaleprice/capex. Generic500000homescomparisonnotmeasuredsiteMW.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.lehighvalleynews.com/business/giant-data-center-proposal-in-upper-macungie-township-is-in-the-works","host":"lehighvalleynews.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"WFMZMay27,2026hearingreportnames7300Cetronia/3buildings,denialofcontinuance andsimilar-use relief. OralhearingdenialdistinctfromwrittenJulydecision;45daywrittendecision/30dayappealreportedprocedure,notindependentlegaldeadlinecalculation. NoactualMWwaterorpermitcertification."},"notes":["WFMZMay27,2026hearingreportnames7300Cetronia/3buildings,denialofcontinuance andsimilar-use relief. OralhearingdenialdistinctfromwrittenJulydecision;45daywrittendecision/30dayappealreportedprocedure,notindependentlegaldeadlinecalculation. NoactualMWwaterorpermitcertification.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.wfmz.com/news/area/lehighvalley/lehigh-county/western-lehigh-county/upper-macungie-zoners-reject-appeal-for-massive-data-center-campus-on-former-air-products-site/article_c531b72e-e928-4562-bcbf-3dbc7e9ce3e8.html","host":"wfmz.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"Aug12,2026LehighValleyPublicMediaquotesAirProductsspokesman:companydidnotappeal,andhasnofuturepropertyuse/ownershipdecisiontoannounce. ReportedAug5appealdeadline,notcomputedlegaladvice;writtenJulydecisionafterMay27hearing.194ac2.6MsfDCproposalabandoned,notdemolitionofoperatingcampus. PrologisdealwasearlierWAREHOUSEplanandneverclosed,notDCoperator.95000gpd/930cars19truckstrafficwereSTUDYPROJECTIONSnotmeasureduse;23.2Massessmentnotcapex.22.2Moldassessmentdifferentdate."},"notes":["Aug12,2026LehighValleyPublicMediaquotesAirProductsspokesman:companydidnotappeal,andhasnofuturepropertyuse/ownershipdecisiontoannounce. ReportedAug5appealdeadline,notcomputedlegaladvice;writtenJulydecisionafterMay27hearing.194ac2.6MsfDCproposalabandoned,notdemolitionofoperatingcampus. PrologisdealwasearlierWAREHOUSEplanandneverclosed,notDCoperator.95000gpd/930cars19truckstrafficwereSTUDYPROJECTIONSnotmeasureduse;23.2Massessmentnotcapex.22.2Moldassessmentdifferentdate.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.lehighvalleypublicmedia.org/news/all/air-products-abandons-plan-for-data-center-at-former-upper-macungie-headquarters/","host":"lehighvalleypublicmedia.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Trexlertown · Lehigh · Source context reviewed"},{"id":"coreweave-lancaster-pa","state":"pa","kind":"facility","name":"CoreWeave Lancaster Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lancaster"],"city":"Lancaster","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. LancasterAIHub CBA summary andconditionalcommunity commitments. Officialsummary not fullsignedCBAor actualpayments. Twofunds10Meach not10Mperbuilding. Clean-energyrequirement expresslyallows lowerpercentlongtermcontracts with significantfundcontributions, not unqualified100percentrenewable.20kgpd is percampus cap, not measuredtotalwithdrawal. LocalnoLERTA not allstate/federalincentives. No newsiteMWoropening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityoflancasterpa.gov/wp-content/uploads/2025/11/Community-Benefits-Agreement-Summary-1-1.pdf","host":"cityoflancasterpa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.0379,"lng":-76.3055,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"LancasterAIHub CBA summary andconditionalcommunity commitments","fields":{"described_water_cap_gallons_per_day_per_campus":20000,"described_community_funds":2,"described_contribution_usd_each_fund":10000000,"payment_milestones":"construction financing andwithin30days ofoperations,phasedperbuilding","city_tax_breaks_description":"ChirisaTechnologyParks affiliates not receivingCityofLancastertaxbreaks includingLERTA"},"notes":["Officialsummary not fullsignedCBAor actualpayments. Twofunds10Meach not10Mperbuilding. Clean-energyrequirement expresslyallows lowerpercentlongtermcontracts with significantfundcontributions, not unqualified100percentrenewable.20kgpd is percampus cap, not measuredtotalwithdrawal. LocalnoLERTA not allstate/federalincentives. No newsiteMWoropening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cityoflancasterpa.gov/wp-content/uploads/2025/11/Community-Benefits-Agreement-Summary-1-1.pdf","host":"cityoflancasterpa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lancaster · Lancaster · Source context reviewed"},{"id":"databank-pit1-pittsburgh-pa","state":"pa","kind":"facility","name":"DataBank PIT1 (Downtown Pittsburgh)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Pittsburgh","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 6.9MW market total covers both sites; notPIT1. Operator separates downtownPIT1 fromPIT2SummitPark. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.4479,"lng":-80.0086,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"100 S Commons #126","city":"Pittsburgh","critical_it_capacity_mw":1.9,"it_area_sqft":30760},"notes":["6.9MW market total covers both sites; notPIT1.","Operator separates downtownPIT1 fromPIT2SummitPark.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pittsburgh · Allegheny · Source context reviewed"},{"id":"databank-pit2-summit-park-pittsburgh-pa","state":"pa","kind":"facility","name":"DataBank PIT2 (Summit Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Pittsburgh","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.4433,"lng":-80.1697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"PIT2","street":"35 SummitParkDr","city":"Pittsburgh","critical_it_capacity_mw":5,"it_area_sqft":47100,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pittsburgh · Allegheny · Source context reviewed"},{"id":"expedient-pit1-green-tree-pittsburgh-south-pa","state":"pa","kind":"facility","name":"Expedient PIT1 (Green Tree / Pittsburgh South)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Pittsburgh","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Pittsburgh regional header and distinct site tables. BoundpreferredIDnamesPIT1,soPIT2is separate contextual site, notPIT1expansion.6MWregional total not each site. Generator3/8MW separate from IT. Exact municipal GreenTree jurisdiction not independently established by Pittsburgh postal label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.expedient.com/data-centers/pittsburgh/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.427371,"lng":-80.0425212,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Expedient Pittsburgh regional header and distinct site tables","fields":{"sites":[{"code":"PIT1","address":"810 Parish Street, Pittsburgh, PA15220","critical_it_mw":1.8,"total_area_sqft":26000,"raised_floor_sqft":12000},{"code":"PIT2","address":"100 S Commons, Suite001, Pittsburgh, PA15212","critical_it_mw":4.2,"total_area_sqft":50700,"raised_floor_sqft":26000}],"regional_critical_it_mw":6},"notes":["BoundpreferredIDnamesPIT1,soPIT2is separate contextual site, notPIT1expansion.6MWregional total not each site. Generator3/8MW separate from IT. Exact municipal GreenTree jurisdiction not independently established by Pittsburgh postal label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.expedient.com/data-centers/pittsburgh/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pittsburgh · Allegheny · Source context reviewed"},{"id":"flexential-allentown-data-center-abe01-pa","state":"pa","kind":"facility","name":"Flexential Allentown Data Center (ABE01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lehigh"],"city":"Allentown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Historical operator specification sheet; named Allentown facility, no address on these two pages.. Historical brochure remains publicly served; it does not independently verify October 2026 operations, current certification or actual annual PUE. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2020-02/allentown-data-center-sheet.pdf","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.6356953,"lng":-75.4575733,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Historical operator specification sheet; named Allentown facility, no address on these two pages.","fields":{"publisher_reported_footprint_sqft":46800,"publisher_reported_critical_power_mw":0.849,"original_power_value":{"value":849,"unit":"kW","conversion":"849 / 1000 = 0.849 MW"},"publisher_pue_rating":1.8,"current_measured_demand_mw":null,"commissioning_date":null},"notes":["Historical brochure remains publicly served; it does not independently verify October 2026 operations, current certification or actual annual PUE.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2020-02/allentown-data-center-sheet.pdf","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Allentown · Lehigh · Source context reviewed"},{"id":"flexential-philadelphia-collegeville-phl01-pa","state":"pa","kind":"facility","name":"Flexential Philadelphia - Collegeville (PHL01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Collegeville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1522366,"lng":-75.4776181,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Philadelphia - Collegeville (PHL01)","publisher_reported_footprint_sqft":203703,"publisher_reported_critical_power_mw":7.2,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Collegeville · Montgomery · Source context reviewed"},{"id":"gouldsboro-project-gold-clifton-covington-lackawanna-pa","state":"pa","kind":"facility","name":"Gouldsboro Data Center Campus (Project Gold)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Clifton Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. WVIA KatBolus January3,2026 original report of Cliftonsettlement approvedpreviousFriday describes1778RichPikeLLCProjectGold. SettlementgovernsZONINGonly; land-developmentstudies/approvals remain and solicitor saysitdoesNOTendunderlyingzoninglitigation. Residents' promisedlawsuit isnot filedcase/ruling. Jan2vote date isdated-articleweekdayinference,notoriginalminutesverification. Atleastsevenpropertiesbroaderproject vsTHREECliftonpropertiesinsettlement,390acres+144reportedpropertyscopes notallbuildableDCfootprint. Equitableownership isnotverifieddeedclosing. Fivebuildings/threeCliftonsubcampuses notnewindependentcompanypins.65ftbuilding+15ftequipment=80fttotal limits,85ftwatertanks separate;100ftparcel/400fthomes setbacks proposedconditionsnotasbuilt. 65/55dBAreportedday/night limits are two-decibel reductions from67/57, not2%lessnoise ormeasuredcompliance. No privatewellCOOLING whilewellDRINKINGallowed doesnotmeanzerogroundwater. Offsitewastewater/nuclear-gasabandonmentconditions on southeastcampus notstatewideenergyban. Covingtondifferentjurisdiction; proposedNDAenduserunnamed. Exactexecutedsettlement/currentcourtoutcome unread. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.195,"lng":-75.595,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["WVIA KatBolus January3,2026 original report of Cliftonsettlement approvedpreviousFriday describes1778RichPikeLLCProjectGold. SettlementgovernsZONINGonly; land-developmentstudies/approvals remain and solicitor saysitdoesNOTendunderlyingzoninglitigation. Residents' promisedlawsuit isnot filedcase/ruling. Jan2vote date isdated-articleweekdayinference,notoriginalminutesverification.","Atleastsevenpropertiesbroaderproject vsTHREECliftonpropertiesinsettlement,390acres+144reportedpropertyscopes notallbuildableDCfootprint. Equitableownership isnotverifieddeedclosing. Fivebuildings/threeCliftonsubcampuses notnewindependentcompanypins.65ftbuilding+15ftequipment=80fttotal limits,85ftwatertanks separate;100ftparcel/400fthomes setbacks proposedconditionsnotasbuilt.","65/55dBAreportedday/night limits are two-decibel reductions from67/57, not2%lessnoise ormeasuredcompliance. No privatewellCOOLING whilewellDRINKINGallowed doesnotmeanzerogroundwater. Offsitewastewater/nuclear-gasabandonmentconditions on southeastcampus notstatewideenergyban. Covingtondifferentjurisdiction; proposedNDAenduserunnamed. Exactexecutedsettlement/currentcourtoutcome unread.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Clifton Township · Lackawanna · Source context reviewed"},{"id":"pa-data-center-partners-granville-township-mifflin-pa","state":"pa","kind":"facility","name":"Granville Township Data Center Campus (Loop Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mifflin"],"city":"Lewistown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Filing and solicitor interpretation are not final site approval, construction or court ruling. Planned Sunday action, July15zoning meeting and July21townhall have no assumed outcomes. USD22.5millionproject tax forecast has no verified period and is neither annual collected taxes nor public subsidy. Proposed buffers/noise rules not adopted from this story; no actual water, IT or secured power. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/us/articles/plans-filed-mifflin-county-data-011151924.html","host":"yahoo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5656,"lng":-77.6176,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"ABC27/WHTM report quotes GranvilleTownship solicitor saying PADataCenterPartners filed LoopRoad plans Friday before planned curative-amendment action, so review would proceed under current zoning. Public rendering depicts six proposed buildings.","independently_verified_current_operating_status":null},"notes":["Filing and solicitor interpretation are not final site approval, construction or court ruling. Planned Sunday action, July15zoning meeting and July21townhall have no assumed outcomes. USD22.5millionproject tax forecast has no verified period and is neither annual collected taxes nor public subsidy. Proposed buffers/noise rules not adopted from this story; no actual water, IT or secured power.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/us/articles/plans-filed-mifflin-county-data-011151924.html","host":"yahoo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lewistown · Mifflin · Source context reviewed"},{"id":"homer-city-energy-campus-pa","state":"pa","kind":"facility","name":"Homer City Energy Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Indiana"],"city":"Homer City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Homer City redevelopment site and agency permit index. 2GW is decommissioned coal generation, not proposed IT capacity. Air-permit and demolition indexes do not establish completed new natural-gas plant or operational data-center buildings. No blanket environmental clearance from one listed permit. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment","host":"pa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5383,"lng":-79.1542,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Homer City redevelopment site and agency permit index","fields":{"agency_page_updated":"2026-10-05","published_site_address":"1750 Powerplant Road,HomerCity,PA15748","published_municipality_county":"Center Township,IndianaCounty,Pennsylvania","redevelopment_site_acres_min_exclusive":3200,"former_coal_generation_gw":2,"former_coal_plant_ceased_operations_year":2023,"listed_air_plan_approval_date":"2025-11-18","listed_titlev_renewal_date":"2026-02-26"},"notes":["2GW is decommissioned coal generation, not proposed IT capacity. Air-permit and demolition indexes do not establish completed new natural-gas plant or operational data-center buildings. No blanket environmental clearance from one listed permit.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment","host":"pa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Homer City · Indiana · Source context reviewed"},{"id":"iron-city-wells-karthaus-township-clearfield-pa","state":"pa","kind":"facility","name":"Iron City Wells A.I. Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clearfield"],"city":"Karthaus Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Original Pennsylvania Bulletin volume 56 number 5, January 31, 2026: only PDF page 89/printed page 671 read in text and pixels. DEP plan approval 17-00078A issued January 16, 2026, application received June 23, 2025, expiry July 15, 2027, for construction of FIFTEEN natural-gas engine-gensets powering Iron City No. 1 Power Generator and Compute Center, Karthaus Township/Clearfield County. Not an operating certificate, all-site permits, installed/energized engines or 15 MW. Frenchville PO Box is company mailing address, not verified facility parcel. Notice says conditions include emissions/monitoring/testing, but contains NO numeric emissions table; blog amounts are not silently promoted to this original. Full underlying approval not inspected. Other 207 PDF pages not reviewed. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-5/56-5.pdf","host":"pacodeandbulletin.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1420054,"lng":-78.1040324,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Original Pennsylvania Bulletin volume 56 number 5, January 31, 2026: only PDF page 89/printed page 671 read in text and pixels. DEP plan approval 17-00078A issued January 16, 2026, application received June 23, 2025, expiry July 15, 2027, for construction of FIFTEEN natural-gas engine-gensets powering Iron City No. 1 Power Generator and Compute Center, Karthaus Township/Clearfield County. Not an operating certificate, all-site permits, installed/energized engines or 15 MW. Frenchville PO Box is company mailing address, not verified facility parcel. Notice says conditions include emissions/monitoring/testing, but contains NO numeric emissions table; blog amounts are not silently promoted to this original. Full underlying approval not inspected. Other 207 PDF pages not reviewed.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-5/56-5.pdf","host":"pacodeandbulletin.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Karthaus Township · Clearfield · Source context reviewed"},{"id":"iron-mountain-wpa-1-boyers-butler-county-pa","state":"pa","kind":"facility","name":"Iron Mountain WPA-1 (Boyers underground data center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butler"],"city":"Boyers","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Marketing landing page includes company-wide 20 locations / 3 continents / 3.5 million sq ft, not WPA1-only metrics. Current date, exact street, metered capacity, actual efficiency and independently verified certifications not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenter.ironmountain.com/western-pennsylvania-data-center","host":"datacenter.ironmountain.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.0956,"lng":-79.9128,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_named_facility":"WPA1 near Boyers, Pennsylvania","publisher_area_sqft":333000,"total_potential_capacity_mw":40,"capacity_basis":"Potential, explicit critical IT basis not supplied","operator_campus_acres":200,"operator_underground_depth_feet":220,"source_copyright_year":2023,"current_operational_capacity_mw":null},"notes":["Marketing landing page includes company-wide 20 locations / 3 continents / 3.5 million sq ft, not WPA1-only metrics. Current date, exact street, metered capacity, actual efficiency and independently verified certifications not established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenter.ironmountain.com/western-pennsylvania-data-center","host":"datacenter.ironmountain.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Boyers · Butler · Source context reviewed"},{"id":"klondike-wyalusing-data-center-bradford-pa","state":"pa","kind":"facility","name":"Klondike Wyalusing Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bradford"],"city":"Wyalusing","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 248 MW turbine sum and 218 MW described electric delivery are not critical IT and must not be added. Original permit has not been read. Emissions allowances are not actual emissions. Reported July 9 county ordinance adoption and unsigned development/community-benefit templates do not prove this project's applicability or executed commitments. Prior LNG approval and other withdrawn projects are separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.northcentralpa.com/business/bradford-county-adopts-data-center-rules-wyalusing-hyperscale-projects-air-permit-issued/article_b09783c0-fc03-416b-b0a7-c6881f9616fd.html","host":"northcentralpa.com","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6966,"lng":-76.244,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"NorthcentralPA reports an October 9, 2025 DEP plan approval for Klondike's gas-generation project, nominally eight 31 MW turbines with up to 218 MW electric delivery to a future Wyalusing data center.","independently_verified_current_operating_status":null},"notes":["The 248 MW turbine sum and 218 MW described electric delivery are not critical IT and must not be added. Original permit has not been read. Emissions allowances are not actual emissions. Reported July 9 county ordinance adoption and unsigned development/community-benefit templates do not prove this project's applicability or executed commitments. Prior LNG approval and other withdrawn projects are separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.northcentralpa.com/business/bradford-county-adopts-data-center-rules-wyalusing-hyperscale-projects-air-permit-issued/article_b09783c0-fc03-416b-b0a7-c6881f9616fd.html","host":"northcentralpa.com","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyalusing · Bradford · Source context reviewed"},{"id":"mcd7-limerick-township-montgomery-county-pa","state":"pa","kind":"facility","name":"Limerick Township Data Center Campus (MCD 7)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Limerick Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The automated excerpt selected an unrelated October website notice; the retained main article was read separately. This association brief cites January 12 Pottstown Mercury reporting. Up to 750 MW has no critical-IT basis; 1.3 MGD is projected cooling demand, not measured use. Tax and jobs are developer forecasts; presentation is not approval. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.suburbanrealtorsalliance.com/news/2026/01/16/montgomery-county/limerick-gets-first-look-at-1.4m-square-foot-data-center-proposal/","host":"suburbanrealtorsalliance.com","date":"2026-01-16","published":"2026-01-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2447,"lng":-75.573,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Suburban Realtors Alliance summarizes a Limerick proposal by MCD 7 LLC: eight server buildings on 192 acres, replacing a warehouse concept.","independently_verified_current_operating_status":null},"notes":["The automated excerpt selected an unrelated October website notice; the retained main article was read separately. This association brief cites January 12 Pottstown Mercury reporting. Up to 750 MW has no critical-IT basis; 1.3 MGD is projected cooling demand, not measured use. Tax and jobs are developer forecasts; presentation is not approval.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.suburbanrealtorsalliance.com/news/2026/01/16/montgomery-county/limerick-gets-first-look-at-1.4m-square-foot-data-center-proposal/","host":"suburbanrealtorsalliance.com","date":"2026-01-16","published":"2026-01-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Limerick Township · Montgomery · Source context reviewed"},{"id":"diversified-longhorn-pad-a-horton-township-elk-pa","state":"pa","kind":"facility","name":"Longhorn Pad A Wellhead Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Elk"],"city":"Horton Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. LonghornPadC separate. Violations and permit conditions based on reporting, not independently retained original orders. Predicted67foldemissions not measuredactual/noisehealthcausation. No present operational certification. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://capitalandmain.com/in-rural-pennsylvania-crypto-mining-offers-a-lifeline-for-dying-gas-wells","host":"capitalandmain.com","date":"2024-06-03","published":"2024-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.2816445,"lng":-78.7281388,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Capital and Main reports LonghornPadA historic unpermitted operation followed byDecember permit, with full-time operation awaiting noise mitigation at report date.","independently_verified_current_operating_status":null},"notes":["LonghornPadC separate. Violations and permit conditions based on reporting, not independently retained original orders. Predicted67foldemissions not measuredactual/noisehealthcausation. No present operational certification.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://capitalandmain.com/in-rural-pennsylvania-crypto-mining-offers-a-lifeline-for-dying-gas-wells","host":"capitalandmain.com","date":"2024-06-03","published":"2024-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Horton Township · Elk · Source context reviewed"},{"id":"prospect-rd-misty-hollow-forward-township-butler-pa","state":"pa","kind":"facility","name":"Misty Hollow Energy and Data Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butler"],"city":"Prospect","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Visible publication is September 19, not the URL's September 18. Data-center footprint, separate treatment/office areas and possible future expansion are different scopes. Water/discharge design was still being developed, and no tenant was named. A prospective November SALDO vote and assumptions about prior submission are not adopted law or a final grandfathering decision. No creek withdrawals or exact capacity inferred. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.butlereagle.com/20260918/massive-data-center-proposed-in-forward-township/","host":"butlereagle.com","date":"2026-09-19","published":"2026-09-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8079,"lng":-80.0558,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Butler Eagle describes Misty Hollow's preliminary Forward Township plan and a developer target for approval in early 2027 and possible mid-2029 completion.","independently_verified_current_operating_status":null},"notes":["Visible publication is September 19, not the URL's September 18. Data-center footprint, separate treatment/office areas and possible future expansion are different scopes. Water/discharge design was still being developed, and no tenant was named. A prospective November SALDO vote and assumptions about prior submission are not adopted law or a final grandfathering decision. No creek withdrawals or exact capacity inferred.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.butlereagle.com/20260918/massive-data-center-proposed-in-forward-township/","host":"butlereagle.com","date":"2026-09-19","published":"2026-09-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Prospect · Butler · Source context reviewed"},{"id":"mlp-ventures-plymouth-township-conshohocken-pa","state":"pa","kind":"facility","name":"MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Conshohocken","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Participant status and a contingent property sale are not project approval or a closed acquisition. Other O'Neill proposals across the river are separate. Protest signs' diesel equivalence and neighbors' health concerns are not measured emissions or established causation. Future July hearing dates have no assumed outcome; tax-payment allegations are not adopted as findings. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://metrophiladelphia.com/stories/plymouth-township-data-center-proposal,145572","host":"metrophiladelphia.com","date":"2026-06-29","published":"2026-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.086,"lng":-75.312,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Metro Philadelphia reports a new MLP Ventures zoning application after an earlier withdrawal for the former Cleveland-Cliffs property at 900 Conshohocken Road, with June 25 proceedings granting participant status.","independently_verified_current_operating_status":null},"notes":["Participant status and a contingent property sale are not project approval or a closed acquisition. Other O'Neill proposals across the river are separate. Protest signs' diesel equivalence and neighbors' health concerns are not measured emissions or established causation. Future July hearing dates have no assumed outcome; tax-payment allegations are not adopted as findings.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://metrophiladelphia.com/stories/plymouth-township-data-center-proposal,145572","host":"metrophiladelphia.com","date":"2026-06-29","published":"2026-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Conshohocken · Montgomery · Source context reviewed"},{"id":"mudiita-ransom-township-lackawanna-pa","state":"pa","kind":"facility","name":"Mudiita Ransom Township Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Ransom Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This is not a formal countywide denial or verified permanent abandonment. Scranton Materials' separate quarry overlay denial/appeal and a pumped-storage study are other proceedings. Mudiita's 930-plus-acre marketing and a smaller acquired land area are not reconciled. Property price is not DC capex; no current tenant, service agreement or approval is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-07-27/future-of-ransom-twp-property-uncertain-as-carbon-county-developer-says-no-plans-for-data-center-campus","host":"wvia.org","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.4483,"lng":-75.7375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WVIA reports uncertainty at Mudiita's Ransom Township property: a former shareholder says there are no present data-center plans, websites are down and current shareholders are unidentified.","independently_verified_current_operating_status":null},"notes":["This is not a formal countywide denial or verified permanent abandonment. Scranton Materials' separate quarry overlay denial/appeal and a pumped-storage study are other proceedings. Mudiita's 930-plus-acre marketing and a smaller acquired land area are not reconciled. Property price is not DC capex; no current tenant, service agreement or approval is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvia.org/news/local/2026-07-27/future-of-ransom-twp-property-uncertain-as-carbon-county-developer-says-no-plans-for-data-center-campus","host":"wvia.org","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ransom Township · Lackawanna · Source context reviewed"},{"id":"muncy-data-center-lycoming-county-pa","state":"pa","kind":"facility","name":"Muncy Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lycoming"],"city":"Muncy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. PatCrossley SunGazette July18,2026 originalreportquotes developerlegalnotice CLAIMING deemedapproval ofconditionaluse onYetterRoad. This is applicantposition afterallegedmissedhearingdeadline, not inspectedcourtjudgment or automaticall-permitcertification. Originalnotice/currentMPC/courtdocketunread; do notgivepresentlegaladvice. ArticleinitialApril28filingvs laterApril22applicationdates remainunresolved; do notinventoneprecisestartutorydeadline. Townshipmoratorium/curativeamendmentdisputes notverifiedcurrentlaw. Litigationanticipatednotprovedfiled/ruling. No ITMW/capex/currentoperations established. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sungazette.com/news/top-news/2026/07/legal-notice-claims-deemed-approval-for-muncy-township-data-center/","host":"sungazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.23,"lng":-76.804,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["PatCrossley SunGazette July18,2026 originalreportquotes developerlegalnotice CLAIMING deemedapproval ofconditionaluse onYetterRoad. This is applicantposition afterallegedmissedhearingdeadline, not inspectedcourtjudgment or automaticall-permitcertification. Originalnotice/currentMPC/courtdocketunread; do notgivepresentlegaladvice.","ArticleinitialApril28filingvs laterApril22applicationdates remainunresolved; do notinventoneprecisestartutorydeadline. Townshipmoratorium/curativeamendmentdisputes notverifiedcurrentlaw. Litigationanticipatednotprovedfiled/ruling. No ITMW/capex/currentoperations established.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.sungazette.com/news/top-news/2026/07/legal-notice-claims-deemed-approval-for-muncy-township-data-center/","host":"sungazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Muncy · Lycoming · Source context reviewed"},{"id":"netrality-401-north-broad-philadelphia-pa","state":"pa","kind":"facility","name":"Netrality 401 North Broad","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Philadelphia"],"city":"Philadelphia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Named provider/address context; no current title, capacity, exact suite or whole-building owner independently inspected. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.9601,"lng":-75.1619,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Netrality","listed_address":"401 N Broad St","listed_city":"Philadelphia","listed_state":"PA"},"notes":["Named provider/address context; no current title, capacity, exact suite or whole-building owner independently inspected.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Philadelphia · Philadelphia · Source context reviewed"},{"id":"nova-energy-cryptomine-frenchcreek-venango-county-pa","state":"pa","kind":"facility","name":"Nova Energy Natural Gas-Powered Cryptomine (Frenchcreek Township)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Venango"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Preview only: original permit number, exact location, conditions and Bulletin not inspected. Air permit is not operating proof, all environmental approvals or executed utility service. No MW, actual water, investment, construction or current operation adopted; subscriber material not accessed or decoded. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://marcellusdrilling.com/2025/03/gas-fired-cryptocurrency-data-center-coming-to-venango-county-pa/","host":"marcellusdrilling.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.44,"lng":-79.82,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Public Marcellus Drilling News preview reports Pennsylvania DEP air-quality permit for Nova Energy LLC cryptocurrency data center, FrenchcreekTownship, VenangoCounty, announced inMarch1PennsylvaniaBulletin.","independently_verified_current_operating_status":null},"notes":["Preview only: original permit number, exact location, conditions and Bulletin not inspected. Air permit is not operating proof, all environmental approvals or executed utility service. No MW, actual water, investment, construction or current operation adopted; subscriber material not accessed or decoded.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://marcellusdrilling.com/2025/03/gas-fired-cryptocurrency-data-center-coming-to-venango-county-pa/","host":"marcellusdrilling.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Venango · Source context reviewed"},{"id":"panther-creek-hpc-ai-campus-nesquehoning-pa","state":"pa","kind":"facility","name":"Panther Creek HPC/AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carbon"],"city":"Nesquehoning","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8564,"lng":-75.8283,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Campus-level issuer context, not proof every imported plant/building ID is independently energized.","fields":{"announcement_date":"2026-05-11","quarter_ended":"2026-03-31","company_claim":"Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.","redomiciliation_parent_transaction_date":"2026-04-01"},"notes":["Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nesquehoning · Carbon · Source context reviewed"},{"id":"bitfarms-panther-creek-nesquehoning-pa","state":"pa","kind":"facility","name":"Panther Creek Plant","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Carbon"],"city":"Nesquehoning","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8557,"lng":-75.828,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Campus-level issuer context, not proof every imported plant/building ID is independently energized.","fields":{"announcement_date":"2026-05-11","quarter_ended":"2026-03-31","company_claim":"Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.","redomiciliation_parent_transaction_date":"2026-04-01"},"notes":["Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nesquehoning · Carbon · Source context reviewed"},{"id":"powerhouse-pax-carlisle-pa","state":"pa","kind":"facility","name":"PAX  -  Pennsylvania Digital I","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"Carlisle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Original adopted instruments not reviewed here. By-right use and laydown-yard action are not full campus building permit, utility agreement or operation. Site figures694/700/715acres represent differing source scopes; no single canonical parcel footprint selected. Three450MWsubstations/1.35GWinitial/1.8GWexpandable are planned infrastructure figures, not verified criticalIT. USD44millionland purchase not USD15billionbuildout spending; regional USD90billion summit not project capex. September future2025meetings have no assumed outcome; advocacy concerns are attributed. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://protectcumberlandcountypa.org/middlesex/","host":"protectcumberlandcountypa.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.2015,"lng":-77.1889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Protect Cumberland County advocacy page reports May30,2025 unanimous3-0 Ordinance3-2025 data-center overlay and September3 comprehensive zoning action for ProjectBolt/PennsylvaniaDigitalI. August11 sketch discussion had no formal submission/no action; August25 recommendation concerned PPLsubstation laydown yard only.","independently_verified_current_operating_status":null},"notes":["Original adopted instruments not reviewed here. By-right use and laydown-yard action are not full campus building permit, utility agreement or operation. Site figures694/700/715acres represent differing source scopes; no single canonical parcel footprint selected. Three450MWsubstations/1.35GWinitial/1.8GWexpandable are planned infrastructure figures, not verified criticalIT. USD44millionland purchase not USD15billionbuildout spending; regional USD90billion summit not project capex. September future2025meetings have no assumed outcome; advocacy concerns are attributed.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://protectcumberlandcountypa.org/middlesex/","host":"protectcumberlandcountypa.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Carlisle · Cumberland · Source context reviewed"},{"id":"stonebridge-powder-mills-lawrence-county-pa","state":"pa","kind":"facility","name":"Powder Mills Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lawrence"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. One assessor parcel, not the whole proposed campus.. County GIS returns control 26132000 / tax map 26-1409-102, Powder Mill Works LLC, situs 3478 Howard, assessed acreage 297.06 and calculated acreage 299.12982886. These are different measures on one parcel; neither independently verifies or disproves the inherited 569-acre combined campus. Assessor fields show nominal sale price 1, total assessed value 728000, year built 1967 and square feet 312. Do not promote these to campus acquisition price, investment, data-center opening year or total proposed floor space. No deed, assessment methodology, second parcel, Stonebridge corporate relationship, zoning ruling, remediation clearance or construction approval inspected. Original coordinate system is Pennsylvania State Plane 2272; no unverified conversion or replacement map pin made. Limited context, not full technical or current operating verification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.leoc.net:6443/arcgis/rest/services/LAWRENCEGIS/TaxParcelCAMA/MapServer/1/query?where=CONTROLNUM%3D%2726132000%27&outFields=*&f=json","host":"gis.leoc.net:6443","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.9915328,"lng":-80.4272333,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json","scope":"One assessor parcel, not the whole proposed campus.","fields":{},"notes":["County GIS returns control 26132000 / tax map 26-1409-102, Powder Mill Works LLC, situs 3478 Howard, assessed acreage 297.06 and calculated acreage 299.12982886. These are different measures on one parcel; neither independently verifies or disproves the inherited 569-acre combined campus.","Assessor fields show nominal sale price 1, total assessed value 728000, year built 1967 and square feet 312. Do not promote these to campus acquisition price, investment, data-center opening year or total proposed floor space. No deed, assessment methodology, second parcel, Stonebridge corporate relationship, zoning ruling, remediation clearance or construction approval inspected.","Original coordinate system is Pennsylvania State Plane 2272; no unverified conversion or replacement map pin made.","Limited context, not full technical or current operating verification."],"sources":[{"url":"https://gis.leoc.net:6443/arcgis/rest/services/LAWRENCEGIS/TaxParcelCAMA/MapServer/1/query?where=CONTROLNUM%3D%2726132000%27&outFields=*&f=json","host":"gis.leoc.net:6443","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lawrence · Source context reviewed"},{"id":"cde-acquisitions-project-atlas-south-whitehall-lehigh-pa","state":"pa","kind":"facility","name":"Project Atlas Data Center Campus (South Whitehall Township)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lehigh"],"city":"South Whitehall Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Introductory presentation is not approval; nine-billion-USD investment and sixteen-million annual tax are projections. Claimed avoided cooling water is a modeled comparison, not measured water use; no-cost-to-ratepayer promise not executed utility terms. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lehighvalleypublicmedia.org/news/local/residents-push-for-public-hearing-as-south-whitehall-takes-new-look-at-hyperscale-data-center/","host":"lehighvalleypublicmedia.org","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.6400848,"lng":-75.5443246,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Lehigh Valley Public Media reports revised South Whitehall Atlas concept of three roughly500000-square-foot buildings instead of six.","independently_verified_current_operating_status":null},"notes":["Introductory presentation is not approval; nine-billion-USD investment and sixteen-million annual tax are projections. Claimed avoided cooling water is a modeled comparison, not measured water use; no-cost-to-ratepayer promise not executed utility terms.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lehighvalleypublicmedia.org/news/local/residents-push-for-public-hearing-as-south-whitehall-takes-new-look-at-hyperscale-data-center/","host":"lehighvalleypublicmedia.org","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Whitehall Township · Lehigh · Source context reviewed"},{"id":"project-gravity-archbald-lackawanna-county-pa","state":"pa","kind":"facility","name":"Project Gravity","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Archbald","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. KatBolus WVIA January8,2026 originalDEPmeetingreport identifiesArchbald25ProjectGravity; developerNOtenantyet andwouldnotconstructwithoutone. Seven135000sftwo-storybuildings/186acres areoneproposedcampus, notsevennewfacilityIDs. TuesdayJanuary6meetingdateinferredfromdatedreport. SeptemberpreliminaryCONDITIONALplanningapproval differsfromfinalconstructionauthorization. Chapter105administrativelycomplete/technicalreview,Chapter102completenessreview,404pending; AIRAPPLICATIONNOTYETRECEIVEDperDEPatmeeting. Laterapproval/currenttenantstatusunknown. Underlyingapplications/minutesnotdirectlyread. 360000gpd isdeveloperESTIMATE, utilityabilitytosupplynotapprovedwithdrawal/actualconsumption. LakeScrantonwater/pumpimprovementsconditional;coolingsystemtenant-specific/notchosen.55/45dBAdeveloperpromise notmeasurednoise.7wetlands/2streams/31waterbodies/2.25acrewetlandsare overlappinglandfeatures, notadditivecampusareas. Mine-spoiledlanddoesnotmeanhazardfree; noactualgroundwater/wildlifeharm inferred. CorporateoldWesternHospitalityPartners-Jermynname notsameascanceledKYproject. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5,"lng":-75.55,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["KatBolus WVIA January8,2026 originalDEPmeetingreport identifiesArchbald25ProjectGravity; developerNOtenantyet andwouldnotconstructwithoutone. Seven135000sftwo-storybuildings/186acres areoneproposedcampus, notsevennewfacilityIDs. TuesdayJanuary6meetingdateinferredfromdatedreport.","SeptemberpreliminaryCONDITIONALplanningapproval differsfromfinalconstructionauthorization. Chapter105administrativelycomplete/technicalreview,Chapter102completenessreview,404pending; AIRAPPLICATIONNOTYETRECEIVEDperDEPatmeeting. Laterapproval/currenttenantstatusunknown. Underlyingapplications/minutesnotdirectlyread.","360000gpd isdeveloperESTIMATE, utilityabilitytosupplynotapprovedwithdrawal/actualconsumption. LakeScrantonwater/pumpimprovementsconditional;coolingsystemtenant-specific/notchosen.55/45dBAdeveloperpromise notmeasurednoise.7wetlands/2streams/31waterbodies/2.25acrewetlandsare overlappinglandfeatures, notadditivecampusareas. Mine-spoiledlanddoesnotmeanhazardfree; noactualgroundwater/wildlifeharm inferred. CorporateoldWesternHospitalityPartners-Jermynname notsameascanceledKYproject.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Archbald · Lackawanna · Source context reviewed"},{"id":"project-hazelnut-hazle-township-pa","state":"pa","kind":"facility","name":"Project Hazelnut","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Hazle Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hazelnut contingent developer community funding and jobs conflict. 45+15+105=165Mpledgecomponentsnot330M. Fundsnotpaid/grantsnotuniversallyeligible. Jobheadlineversusdetailedtotalconflict,holdcanonical. Noobservedconservationdeed,currentoperations,ITMWorbuildingarea. Eventyearnotinbanner;do notcalendarOctober22,2026withoutdatedcorroborationorcallitgovernmenthearing. No RSVP/petition/formsubmitted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://projecthazelnut.com/","host":"projecthazelnut.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.985,"lng":-75.955,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Hazelnut contingent developer community funding and jobs conflict","fields":{"developer":"NorthPoint","project":"Project Hazelnut","location":"Hazle Township, Pennsylvania","community_benefit_commitment_total_usd":165000000,"resident_grant_fund_usd":45000000,"per_eligible_household_grant_usd":10000,"community_support_fund_usd":15000000,"longterm_community_commitment_usd":105000000,"annual_longterm_component_usd":7000000,"longterm_years":15,"benefit_availability_trigger":"first building operational","planned_conserved_forest_open_space_acres_approx":1100,"jobs_forecast_conflict":["2000constructionandoperationalcombined","1300plusconstructionand950pluspermanent"],"undated_event_banner":{"month_day":"10-22","time":"17:00to19:00","venue":"Maple Manor Elementary School","event_type":"community open house","year":null}},"notes":["45+15+105=165Mpledgecomponentsnot330M. Fundsnotpaid/grantsnotuniversallyeligible. Jobheadlineversusdetailedtotalconflict,holdcanonical. Noobservedconservationdeed,currentoperations,ITMWorbuildingarea. Eventyearnotinbanner;do notcalendarOctober22,2026withoutdatedcorroborationorcallitgovernmenthearing. No RSVP/petition/formsubmitted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://projecthazelnut.com/","host":"projecthazelnut.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hazle Township · Luzerne · Source context reviewed"},{"id":"iep-hummingbird-data-center-campus-greene-county-pa","state":"pa","kind":"facility","name":"Project Hummingbird Data Center Campus (former Robena Mine)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Greene"],"city":"Greensboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Observed earthwork is described as ordinary owner reclamation, not data-center construction. The 910 MW figure is planned generation; 18 MGD is treatment capacity serving generation and computing, not measured DC consumption. The community-benefit agreement is unfinished and no end tenant is identified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.observer-reporter.com/news/local-news/2026/sep/25/monongahela-township-residents-seek-more-chances-for-input-on-data-center-project/","host":"observer-reporter.com","date":"2026-09-25","published":"2026-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.79,"lng":-79.92,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Observer-Reporter reports the Hummingbird proposal at the Robena Mine property, while the township says project work has not advanced since the December reclamation approval.","independently_verified_current_operating_status":null},"notes":["Observed earthwork is described as ordinary owner reclamation, not data-center construction. The 910 MW figure is planned generation; 18 MGD is treatment capacity serving generation and computing, not measured DC consumption. The community-benefit agreement is unfinished and no end tenant is identified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.observer-reporter.com/news/local-news/2026/sep/25/monongahela-township-residents-seek-more-chances-for-input-on-data-center-project/","host":"observer-reporter.com","date":"2026-09-25","published":"2026-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Greensboro · Greene · Source context reviewed"},{"id":"prologis-allen-township-northampton-pa","state":"pa","kind":"facility","name":"Prologis Allen Township Data Center (2500 Liberty Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Northampton"],"city":"Allen Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The regional letter recommendation is not the same vote or all permits. Existing warehouse floor area does not establish powered/occupied DC area. Water, cooling, noise and electrical demands were still questions. A likely-first regional description is not an independently verified superlative or operating status. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lehighvalleypublicmedia.org/northampton-county/allen-township-warehouse-could-become-lehigh-valleys-first-hyperscale-data-center","host":"lehighvalleypublicmedia.org","date":"2026-04-22","published":"2026-04-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.7017264,"lng":-75.4801064,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Lehigh Valley Public Media reports Allen Township's March approval for a Prologis warehouse conversion and a regional planning committee's request for more operational/resource details.","independently_verified_current_operating_status":null},"notes":["The regional letter recommendation is not the same vote or all permits. Existing warehouse floor area does not establish powered/occupied DC area. Water, cooling, noise and electrical demands were still questions. A likely-first regional description is not an independently verified superlative or operating status.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lehighvalleypublicmedia.org/northampton-county/allen-township-warehouse-could-become-lehigh-valleys-first-hyperscale-data-center","host":"lehighvalleypublicmedia.org","date":"2026-04-22","published":"2026-04-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Allen Township · Northampton · Source context reviewed"},{"id":"qts-salem-township-luzerne-pa","state":"pa","kind":"facility","name":"QTS Salem Township Data Center Campus (Salem 2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Salem Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. The reported more-than500-million-USD Salem2land proceeds are not full construction cost or Salem3spending. Salem3land-value descriptions differ at1.2/1.4billion; retain conflict. Developer survey results are self-reported from78respondents, not an independent regional economic-impact study. Generic pay ranges and statewide forecasts are not actual site jobs. Later hearing outcomes, critical IT and contractual nuclear supply are not independently verified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project","host":"timesleader.com","date":"2026-08-22","published":"2026-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.1078249,"lng":-76.1791155,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"The Times Leader separates Salem's AWS campus, QTS/4-3Salem2land transaction and proposed4-3GlennbrookSalem3campus, with the latter awaiting an overlay decision.","independently_verified_current_operating_status":null},"notes":["The reported more-than500-million-USD Salem2land proceeds are not full construction cost or Salem3spending. Salem3land-value descriptions differ at1.2/1.4billion; retain conflict. Developer survey results are self-reported from78respondents, not an independent regional economic-impact study. Generic pay ranges and statewide forecasts are not actual site jobs. Later hearing outcomes, critical IT and contractual nuclear supply are not independently verified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project","host":"timesleader.com","date":"2026-08-22","published":"2026-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Salem Township · Luzerne · Source context reviewed"},{"id":"renaissance-park-upper-merion-king-of-prussia-pa","state":"pa","kind":"facility","name":"Renaissance Park and Innovation Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"King of Prussia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. LelandPinder WPVI July23,2026 originalUpperMerionmeetingreport: Renaissancefive-site4.6Msfproposal,THREErevisedapplicationsreviewedWednesdayJuly22,remainingtwoAugust12future. Notfiveapprovedcampuses/permits/RFS. TownshipmanagerassertsapplicationsvestedbeforeMarchordinance; originalfilings/ordinance/courtvalidityunread, notcurrentlegalcertification. Publicoppositiondoesnotestablishhealthharm. No ITMW/capex/nameenduserconfirmed. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://6abc.com/post/proposed-king-prussia-data-center-campus-faces-renewed-scrutiny-review-continues/19560357/","host":"6abc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.092,"lng":-75.347,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["LelandPinder WPVI July23,2026 originalUpperMerionmeetingreport: Renaissancefive-site4.6Msfproposal,THREErevisedapplicationsreviewedWednesdayJuly22,remainingtwoAugust12future. Notfiveapprovedcampuses/permits/RFS.","TownshipmanagerassertsapplicationsvestedbeforeMarchordinance; originalfilings/ordinance/courtvalidityunread, notcurrentlegalcertification. Publicoppositiondoesnotestablishhealthharm. No ITMW/capex/nameenduserconfirmed.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://6abc.com/post/proposed-king-prussia-data-center-campus-faces-renewed-scrutiny-review-continues/19560357/","host":"6abc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"King of Prussia · Montgomery · Source context reviewed"},{"id":"bitfarms-scrubgrass-kennerdell-pa","state":"pa","kind":"facility","name":"Scrubgrass Generating Plant","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Venango"],"city":"Kennerdell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Potential expansion, studies and behind-the-meter generation are not energized AI capacity. September2026 ash-removal deadline is not proof completion; issuer original sources reviewed separately. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Potential operator development scale, not actual critical IT demand.. Scrubgrass page repeats project-update cards explicitly labelled Moses Lake or Sharon. Those concrete pours, piping and equipment deliveries are not Scrubgrass milestones. No project partners announced in this page.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/","host":"exploreclarion.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.keelinfra.com/campuses/scrubgrass","host":"keelinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.2306,"lng":-79.8517,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"ExploreClarion describes Keel/Bitfarms Scrubgrass AI development opportunity alongside existing crypto/power activity.","independently_verified_current_operating_status":null},"notes":["Potential expansion, studies and behind-the-meter generation are not energized AI capacity. September2026 ash-removal deadline is not proof completion; issuer original sources reviewed separately.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/","host":"exploreclarion.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Potential operator development scale, not actual critical IT demand.","fields":{"operator_advertised_expansion_capacity_gw_up_to":1.3,"advertised_site_acres":650,"stage":"Long-term pre-development and power planning","current_commissioned_hpc_capacity_mw":null},"notes":["Scrubgrass page repeats project-update cards explicitly labelled Moses Lake or Sharon. Those concrete pours, piping and equipment deliveries are not Scrubgrass milestones. No project partners announced in this page.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.keelinfra.com/campuses/scrubgrass","host":"keelinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kennerdell · Venango · Source context reviewed"},{"id":"sentinel-east-whiteland-chester-county-pa","state":"pa","kind":"facility","name":"Sentinel East Whiteland Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chester"],"city":"East Whiteland Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Brooke Schultz, Inquirer June 11, 2026 original court/developer reporting: two appeals over East Whiteland 2018 zoning and 2024 plans quashed as untimely/nonappealable; not a merits finding of no environmental risk or every permit approved. Original orders/case numbers not inspected. 1.5 million square feet is a proposal; former attempt to add 600,000 square feet was abandoned, not additive current floor space. Stormwater work in adjacent West Whiteland and perimeter work do not establish all building construction complete. July 30 follow-up source 27 changes the work-stage narrative. Not all fields, current operation, precise parcel or critical IT independently certified. Brooke Schultz, Inquirer July 30, 2026 original township/developer interviews: work RESUMED Wednesday July 29 (calendar inference), following a temporary July stop. Township erosion/sedimentation permit allows EARTHMOVING with monitoring/dust/remedy conditions; footing/foundation construction permits still needed. No blanket all-construction approval. Possible redesign from 1.5 million to 536,000 square feet and lower-water air chillers was TABLED July 8; August 19 future meeting, not an adopted redesign/outcome. 3 million gallons/day belongs to the earlier water-cooled design, not measured current use or final new design. No implication Superfund cleanup or health impacts independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-judge-denial-challenges-20260611.html","host":"inquirer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-project-20260730.html","host":"inquirer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.041,"lng":-75.545,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Brooke Schultz, Inquirer June 11, 2026 original court/developer reporting: two appeals over East Whiteland 2018 zoning and 2024 plans quashed as untimely/nonappealable; not a merits finding of no environmental risk or every permit approved. Original orders/case numbers not inspected. 1.5 million square feet is a proposal; former attempt to add 600,000 square feet was abandoned, not additive current floor space. Stormwater work in adjacent West Whiteland and perimeter work do not establish all building construction complete. July 30 follow-up source 27 changes the work-stage narrative.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-judge-denial-challenges-20260611.html","host":"inquirer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Brooke Schultz, Inquirer July 30, 2026 original township/developer interviews: work RESUMED Wednesday July 29 (calendar inference), following a temporary July stop. Township erosion/sedimentation permit allows EARTHMOVING with monitoring/dust/remedy conditions; footing/foundation construction permits still needed. No blanket all-construction approval. Possible redesign from 1.5 million to 536,000 square feet and lower-water air chillers was TABLED July 8; August 19 future meeting, not an adopted redesign/outcome. 3 million gallons/day belongs to the earlier water-cooled design, not measured current use or final new design. No implication Superfund cleanup or health impacts independently certified.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-project-20260730.html","host":"inquirer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"East Whiteland Township · Chester · Source context reviewed"},{"id":"aligned-shippingport-pa","state":"pa","kind":"facility","name":"Shippingport Industrial Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Beaver"],"city":"Shippingport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Shippingport guest opinion source-role correction. Opinionarticleisnotagencyapproval/order. Claimedthreeapprovals requireoriginalpermitinspection; no adopteddate/powerbasisfromopinion. Generalhealthrisksnotproofsite-specificillness,airviolation oractualbills. No exactAlignedoperatorcrosswalk,currentcommissioning orcriticalITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://community.triblive.com/news/3990268","host":"community.triblive.com","date":"2026-02-26","published":"2026-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.63,"lng":-80.44,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Shippingport guest opinion source-role correction","fields":{"publisher_role":"guest opinion by EnvironmentalHealthProject communications manager","reported_project_location":"nearformerBruceMansfieldplant, Shippingport, BeaverCounty, Pennsylvania","reported_proposed_buildings_max":3,"reported_each_building_sqft_min_exclusive":600000,"reported_components":["data centers","warehouse","natural-gas generation pad"]},"notes":["Opinionarticleisnotagencyapproval/order. Claimedthreeapprovals requireoriginalpermitinspection; no adopteddate/powerbasisfromopinion. Generalhealthrisksnotproofsite-specificillness,airviolation oractualbills. No exactAlignedoperatorcrosswalk,currentcommissioning orcriticalITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://community.triblive.com/news/3990268","host":"community.triblive.com","date":"2026-02-26","published":"2026-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Shippingport · Beaver · Source context reviewed"},{"id":"slate-belt-holdings-upper-mount-bethel-northampton-pa","state":"pa","kind":"facility","name":"Slate Belt Holdings Data Center Campus (Upper Mount Bethel)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Northampton"],"city":"Upper Mount Bethel Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported 754-acre purchase and submitted plans are not approved data center construction. Planned 480 MW SUBSTATION is not critical IT; nearby Talen 607 MW natural-gas plant is separate generation. Historical 15-building/six-million-square-foot and 168 MW descriptions concern prior development scope, not additive current campus capacity. Amazon’s prior reported discussions and withdrawal of interest do not establish a committed tenant. Other Susquehanna/Amazon operating campus and Montour denial are separate projects. Court challenge is not a ruling; no approval/RFS adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bicmagazine.com/departments/AI-Infrastructure/talen-looks-to-develop-23-building-data-center-campus-in-pennsylvania/","host":"bicmagazine.com","date":"2026-08-10","published":"2026-08-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.9,"lng":-75.13,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"BIC republishes trade/local reporting on Slate Belt Holdings’ proposed up-to-23-building Upper Mount Bethel campus and zoning challenge.","independently_verified_current_operating_status":null},"notes":["Reported 754-acre purchase and submitted plans are not approved data center construction. Planned 480 MW SUBSTATION is not critical IT; nearby Talen 607 MW natural-gas plant is separate generation. Historical 15-building/six-million-square-foot and 168 MW descriptions concern prior development scope, not additive current campus capacity. Amazon’s prior reported discussions and withdrawal of interest do not establish a committed tenant. Other Susquehanna/Amazon operating campus and Montour denial are separate projects. Court challenge is not a ruling; no approval/RFS adopted.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bicmagazine.com/departments/AI-Infrastructure/talen-looks-to-develop-23-building-data-center-campus-in-pennsylvania/","host":"bicmagazine.com","date":"2026-08-10","published":"2026-08-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Upper Mount Bethel Township · Northampton · Source context reviewed"},{"id":"depg-smithfield-gateway-data-center-monroe-pa","state":"pa","kind":"facility","name":"Smithfield Gateway Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monroe"],"city":"East Stroudsburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Smithfield agency future hearing schedule and conditional-use limits. Both meetings are future as of October 14 and subject to postponement if review deadline extended. Recommendation is separate from Board hearing. Conditional-use application is not land-development approval; final engineering and land development still required before construction. Older sketch phases are not approved additional data-center buildings. No hearing outcome, numeric IT MW or current operations inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://smithfieldtownship.com/odp/gatewaydc/","host":"smithfieldtownship.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.0206,"lng":-75.1778,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Smithfield agency future hearing schedule and conditional-use limits","fields":{"agency":"Smithfield Township, Pennsylvania","page_updated":"2026-10-07","applicants":["DEPG Mosier Associates LP","DEPG of Shawnee II LP"],"project":"Smithfield Gateway conditional use","proposed_buildings":1,"proposed_stories":2,"proposed_area_sqft":250000,"application_date":"2026-04-03","resubmission_date":"2026-08-11","scheduled_planning_recommendation_meeting":"2026-10-21T19:00:00-04:00","scheduled_conditional_use_hearing":"2026-10-28T18:00:00-04:00","scheduled_venue":"J.T. Lambert Intermediate School, 2000 Milford Road, East Stroudsburg, PA18301","party_status_email_deadline_date":"2026-10-27"},"notes":["Both meetings are future as of October 14 and subject to postponement if review deadline extended. Recommendation is separate from Board hearing. Conditional-use application is not land-development approval; final engineering and land development still required before construction. Older sketch phases are not approved additional data-center buildings. No hearing outcome, numeric IT MW or current operations inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://smithfieldtownship.com/odp/gatewaydc/","host":"smithfieldtownship.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"East Stroudsburg · Monroe · Source context reviewed"},{"id":"inch-eastern-land-south-annville-lebanon-pa","state":"pa","kind":"facility","name":"South Annville Township Data Center Campus (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lebanon"],"city":"South Annville Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The May 5 planning recommendation to deny was not a final board denial. A withdrawn site application is not a township-wide ban. The former investment and floor-area proposal was not constructed; the original withdrawal letter is not separately retained. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://lebtown.com/2026/05/13/south-annville-twp-data-center-project-scrapped-after-grass-roots-opposition/","host":"lebtown.com","date":"2026-05-13","published":"2026-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.290713,"lng":-76.5192514,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"LebTown quotes the developer attorney's May 12 withdrawal of the South Annville rezoning application and intention to stop pursuing a data center at the Martina Drive property.","independently_verified_current_operating_status":null,"reported_application_status":"withdrawn","reported_withdrawal_date":"2026-05-12"},"notes":["The May 5 planning recommendation to deny was not a final board denial. A withdrawn site application is not a township-wide ban. The former investment and floor-area proposal was not constructed; the original withdrawal letter is not separately retained.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://lebtown.com/2026/05/13/south-annville-twp-data-center-project-scrapped-after-grass-roots-opposition/","host":"lebtown.com","date":"2026-05-13","published":"2026-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Annville Township · Lebanon · Source context reviewed"},{"id":"allegheny-dc-springdale-cheswick-pa","state":"pa","kind":"facility","name":"Springdale Data Center (former Cheswick Generating Station)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Springdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Springdale reported conditional-use approval and soundmodel limits. Conditionaluseapprovalreported, actualfinalpermitconditions andlaterappealsnotinspected. Existingcoalplantclosed/notoperationofnewDC.140000homepoweranalogy notnumericITMW.85decibelreportedboroughthresholdnotverifiedweighting/measurementpoint/timebasisoractualsitelevel. Soundmodelnotmeasuredoperatingcompliance. No constructioncompletion, customerenergization oractualtaxreceipt. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.alleghenyfront.org/springdale-allegheny-county-data-center-approval/","host":"alleghenyfront.org","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.5425,"lng":-79.7844,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Springdale reported conditional-use approval and soundmodel limits","fields":{"company":"Allegheny DC Property Company","site":"formerCheswickGeneratingStation, Springdale, AlleghenyCounty, Pennsylvania","reported_conditional_use_approval_date":"2025-12-16","reported_vote":"5-2","proposed_building_area_sqft":565000,"proposed_height_stories_approx":7},"notes":["Conditionaluseapprovalreported, actualfinalpermitconditions andlaterappealsnotinspected. Existingcoalplantclosed/notoperationofnewDC.140000homepoweranalogy notnumericITMW.85decibelreportedboroughthresholdnotverifiedweighting/measurementpoint/timebasisoractualsitelevel. Soundmodelnotmeasuredoperatingcompliance. No constructioncompletion, customerenergization oractualtaxreceipt.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.alleghenyfront.org/springdale-allegheny-county-data-center-approval/","host":"alleghenyfront.org","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Springdale · Allegheny · Source context reviewed"},{"id":"suncap-stowe-township-allegheny-county-pa","state":"pa","kind":"facility","name":"Stowe Township Data Center (former railcar plant)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Stowe Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Advertising is not ordinance adoption, rezoning or site construction approval; next-month vote outcome is unobserved. Report expressly says amendment would enable a future developer, not immediately start a project. Unknown operator, utility arrangement, power, capital and RFS remain unknown. Commissioners’ statements about environmental regulators are assurances, not examined permit findings. This is 2025 reporting, not anOctober 2026 action. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wpxi.com/news/local/stowe-township-community-expresses-concerns-over-data-center-proposal/F3UN7MXY3RD2DMMTPZDZR6VVXM/","host":"wpxi.com","date":"2025-10-15","published":"2025-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.469,"lng":-80.064,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"WPXI reports Stowe commissioners authorized advertising a proposed ordinance amendment after SunCap’s presentation about allowing a potential Nichol Avenue railcar-site data center.","independently_verified_current_operating_status":null},"notes":["Advertising is not ordinance adoption, rezoning or site construction approval; next-month vote outcome is unobserved. Report expressly says amendment would enable a future developer, not immediately start a project. Unknown operator, utility arrangement, power, capital and RFS remain unknown. Commissioners’ statements about environmental regulators are assurances, not examined permit findings. This is 2025 reporting, not anOctober 2026 action.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wpxi.com/news/local/stowe-township-community-expresses-concerns-over-data-center-proposal/F3UN7MXY3RD2DMMTPZDZR6VVXM/","host":"wpxi.com","date":"2025-10-15","published":"2025-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Stowe Township · Allegheny · Source context reviewed"},{"id":"talen-montour-data-center-campus-montour-county-pa","state":"pa","kind":"facility","name":"Talen Energy Montour Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montour"],"city":"Washingtonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Discussion and future hearing are not rezoning approval. About twelve buildings of 2 to 3 acres each are preliminary concept, not built floor area or final parcel count. Data centers and generation are distinct; no electrical MW or water volume established. Developer environmental/lake-level assurances and intended public review are not measured impacts or permit findings. This 2025 stage must not override later reported denial or original decisions. No unrelated land offers are assigned to Talen. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.northcentralpa.com/business/talen-energy-officials-address-community-concerns-about-rezoning/article_18cf27f5-6015-4978-a910-593e02b43c79.html","host":"northcentralpa.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.05,"lng":-76.67,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"NorthcentralPA relays Talen’s virtual community session ahead of a planning hearing for a roughly 1,000-acre agricultural-to-industrial rezoning in northern Montour County.","independently_verified_current_operating_status":null},"notes":["Discussion and future hearing are not rezoning approval. About twelve buildings of 2 to 3 acres each are preliminary concept, not built floor area or final parcel count. Data centers and generation are distinct; no electrical MW or water volume established. Developer environmental/lake-level assurances and intended public review are not measured impacts or permit findings. This 2025 stage must not override later reported denial or original decisions. No unrelated land offers are assigned to Talen.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.northcentralpa.com/business/talen-energy-officials-address-community-concerns-about-rezoning/article_18cf27f5-6015-4978-a910-593e02b43c79.html","host":"northcentralpa.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washingtonville · Montour · Source context reviewed"},{"id":"tecfusions-keystone-connect-upper-burrell-pa","state":"pa","kind":"facility","name":"TECfusions Keystone Connect","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Westmoreland"],"city":"Upper Burrell Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. MiaHollie PublicSource September3updated4,2026 originalUpperBurrellmeetingreport:180dayMaymoratorium reportedlyexpiresNovember2, but EXCLUDESpreviousBuildingJpermits. August5planapprovalcoversJinterior/mechanical/electricalalterations, notentire1400acre/3GWfuturecampus. PartialBuildingJliveclaimattributedtoTribLive/companyrelease, notindependentlyinspectedcurrentservice. LanduseappealProtectPT/residentsinWestmorelandCommonPleas ALLEGESspecialexceptionproceduremissing, notcourtwin/currentinjunction. Case number/unreadoriginalpleading/finaloutcomeunknown. Newdraftbaseloadgenerationrequirement notenactedlaw; September15reviewfutureinreportnotobservedoutcome. Moratoriumnotproofallcurrentworkillegal. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.publicsource.org/upper-burrell-data-center-transparency-backlash/","host":"publicsource.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5817,"lng":-79.705,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["MiaHollie PublicSource September3updated4,2026 originalUpperBurrellmeetingreport:180dayMaymoratorium reportedlyexpiresNovember2, but EXCLUDESpreviousBuildingJpermits. August5planapprovalcoversJinterior/mechanical/electricalalterations, notentire1400acre/3GWfuturecampus. PartialBuildingJliveclaimattributedtoTribLive/companyrelease, notindependentlyinspectedcurrentservice.","LanduseappealProtectPT/residentsinWestmorelandCommonPleas ALLEGESspecialexceptionproceduremissing, notcourtwin/currentinjunction. Case number/unreadoriginalpleading/finaloutcomeunknown. Newdraftbaseloadgenerationrequirement notenactedlaw; September15reviewfutureinreportnotobservedoutcome. Moratoriumnotproofallcurrentworkillegal.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.publicsource.org/upper-burrell-data-center-transparency-backlash/","host":"publicsource.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Upper Burrell Township · Westmoreland · Source context reviewed"},{"id":"tierpoint-allentown-tekpark-breinigsville-pa","state":"pa","kind":"facility","name":"TierPoint Allentown TekPark","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lehigh"],"city":"Breinigsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/tekpark-campus/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5384,"lng":-75.6288,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/tekpark-campus/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Breinigsville · Lehigh · Source context reviewed"},{"id":"tierpoint-valley-forge-pa","state":"pa","kind":"facility","name":"TierPoint Valley Forge","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Norristown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/valley-forge/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1218812,"lng":-75.4208776,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":137000,"gross_area_is_lower_bound":true,"raised_floor_sqft":61000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Nine 2.5 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/valley-forge/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Norristown · Montgomery · Source context reviewed"},{"id":"triboro-industrial-park-jessup-olyphant-lackawanna-county-pa","state":"pa","kind":"facility","name":"Triboro Industrial Park / Triboro Commerce Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Jessup / Olyphant","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash. PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.45,"lng":-75.58,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash.","PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Jessup / Olyphant · Lackawanna · Source context reviewed"},{"id":"tron-usa-ai-campus-titus-station-cumru-berks-pa","state":"pa","kind":"facility","name":"TRON USA AI Campus (former Titus Station)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berks"],"city":"Reading","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. 200 MWbasis is undefined and proposed, not critical IT/current operation. Potential future generation is separate; no MWaddition inferred. Existing industrial zoning, study activity and grant-related work are not final development/interconnection approval or awarded incentives. Investment, construction timeline and engineering details are explicitly pending.2014 coal-plant decommissioning is not newDCopening. Strategic developer agreement is not an executed tenant lease or utility ESA; TRONname does not independently identify a blockchain affiliate or crypto workload. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://berksweekly.com/news/titus-station-redevelopment-project-in-berks-county-planned-as-ai-infrastructure-campus/","host":"berksweekly.com","date":"2026-05-19","published":"2026-05-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2839,"lng":-75.9372,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Berks Weekly reports Titus Development announced a strategic agreement with Go Energy Group for a proposedTRONUSA AIcampus on about 196 acres at former TitusStation, initially described as 200 MW.","independently_verified_current_operating_status":null},"notes":["200 MWbasis is undefined and proposed, not critical IT/current operation. Potential future generation is separate; no MWaddition inferred. Existing industrial zoning, study activity and grant-related work are not final development/interconnection approval or awarded incentives. Investment, construction timeline and engineering details are explicitly pending.2014 coal-plant decommissioning is not newDCopening. Strategic developer agreement is not an executed tenant lease or utility ESA; TRONname does not independently identify a blockchain affiliate or crypto workload.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://berksweekly.com/news/titus-station-redevelopment-project-in-berks-county-planned-as-ai-infrastructure-campus/","host":"berksweekly.com","date":"2026-05-19","published":"2026-05-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Reading · Berks · Source context reviewed"},{"id":"wildcat-ridge-archbald-lackawanna-county-pa","state":"pa","kind":"facility","name":"Wildcat Ridge AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Archbald","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash. PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.51,"lng":-75.54,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash.","PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Archbald · Lackawanna · Source context reviewed"},{"id":"ecp-york-2-energy-center-data-center-peach-bottom-york-pa","state":"pa","kind":"facility","name":"York 2 Energy Center Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["York"],"city":"Peach Bottom Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The proposed five-billion-USD project and 2,500 construction jobs are forecasts. The power station's 828 MW generation is not data-center IT. The article's much smaller statewide investment figure is inconsistent and excluded. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cpbj.com/5b-data-center-coming-to-york-county-energy-site/","host":"cpbj.com","date":"2025-07-21","published":"2025-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.75,"lng":-76.35,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Central Penn Business Journal reports an ECP plan for a data center at Calpine's York 2 Energy Center in Peach Bottom.","independently_verified_current_operating_status":null},"notes":["The proposed five-billion-USD project and 2,500 construction jobs are forecasts. The power station's 828 MW generation is not data-center IT. The article's much smaller statewide investment figure is inconsistent and excluded.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cpbj.com/5b-data-center-coming-to-york-county-energy-site/","host":"cpbj.com","date":"2025-07-21","published":"2025-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Peach Bottom Township · York · Source context reviewed"},{"id":"cnx-zediker-station-south-strabane-washington-county-pa","state":"pa","kind":"facility","name":"Zediker Station Data Center Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"South Strabane Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Marketing release dateOct24 differs body datelineOct20. Generation is not critical IT; net-zero claim is broker/fuel-accounting assertion, not audited emissions. Available industrial site is not an operating data center. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.jll.com/en-us/newsroom/jll-announces-major-data-center-development-site-in-washington","host":"jll.com","date":"2025-10-24","published":"2025-10-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.156,"lng":-80.19,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"JLL markets CNX Zediker Station1500-acre property with400buildable acres and potential500to700MW gas generation.","independently_verified_current_operating_status":null},"notes":["Marketing release dateOct24 differs body datelineOct20. Generation is not critical IT; net-zero claim is broker/fuel-accounting assertion, not audited emissions. Available industrial site is not an operating data center.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.jll.com/en-us/newsroom/jll-announces-major-data-center-development-site-in-washington","host":"jll.com","date":"2025-10-24","published":"2025-10-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Strabane Township · Washington · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}