{"updated": "2026-10-26", "scope": "The October 26, 2026 compilation lists 268 research records with the proposed label. Records can describe buildings, campuses or proposals; this is not a count of distinct operating facilities.", "records": [{"id": "rubix-ashland-works-russell-greenup-ky", "kind": "project", "name": "Rubix Ashland Works Data Center Campus (also listed as Rubix Russell Campus)", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "hyperscale AI", "counties": ["Greenup", "Boyd"], "city": "Russell (portions in Boyd County and City of Ashland)", "who": "Rubix Data Centers (subsidiary of Submer Group, Barcelona; Rubix formed June 2026, CEO John Eland, London); consultant Gateway City Energy / Gateway City Consulting (St. Louis, Chris Honstain); engineering Nuclei (Ben Mitten)", "end_user": "Undisclosed 'big-name' tenant to be determined after site purchase", "mw": 2000, "power": "first phase about 155 MW initial phase (Kentucky Power talks targeting Nov 2027), up to 2,000 MW", "power_note": "Kentucky Power (AEP) would serve; load studies not complete", "investment": "8-12 billion developer infrastructure estimate, excluding computing equipment; other published scopes differ", "jobs": "construction: 3,000 at peak (over about 5 years), permanent: 200 full-time (average salary 125,000 dollars) per company; 200-300 per Honstain", "acres": "about 500 acres (300 Russell / 110 Boyd County / 100 Ashland) per Gateway; 425-acre brownfield per Kentucky Lantern; about 450 acres per Construction Review", "utility": "Kentucky Power (AEP)", "water": "Russell or Ashland municipal supply proposed; developer describes closed-loop design, not measured consumption", "incentives": "Developer says it may seek equipment sales-tax exemption; no confirmed site-specific award recorded", "note": "", "date": "2026-10-13", "events": [["2026-07-10", "Mayor's letter to community discloses Rubix proposal and Q&A"], ["2026-07-21", "Rubix town hall in Russell: 55 million dollars Cleveland-Cliffs purchase agreement; asks city to lift moratorium by Aug 31"], ["2026-07-23", "Ashland adopts restrictive data center zoning leaving about 20 acres of its Ashland Works portion usable"], ["2026-09-04", "Cleveland-Cliffs closing deadline extended from Aug 31 to Sept 25"], ["2026-09-24", "Deadline extended again to Oct 15 ('no more extensions'); Boyd J-E Chaney says county will wait for Russell"], ["2026-10-15", "Reported final closing deadline with Cleveland-Cliffs; outcome to be confirmed"]], "timeline": [["Announced", "2026-07 (City of Russell posted company Q&A; mayor's July 10 letter; public town hall July 21)"], ["Approvals", "None. Russell 180-day moratorium in force until Dec 2026; Boyd County moratorium also covers its about 110 acres; Ashland ordinance limits its portion to about 20 developable acres; Russell zoning amendments pending"], ["Expected opening", "First about 155 MW targeted Nov 2027 (developer aspiration)"]], "sources": [{"url": "https://glasgownews1.com/2026/07/22/developer-proposes-hyperscale-data-center-at-former-eastern-kentucky-steel-mill/", "host": "glasgownews1.com", "date": "2026-07-22"}, {"url": "https://www.dailyindependent.com/news/rubix-to-russell-it-s-ultimately-up-to-you/article_eeb4e2d1-07a1-43e5-acce-38c007fefc33.html", "host": "dailyindependent.com", "date": "2026-07-22"}, {"url": "https://www.dailyindependent.com/news/rubix-deadline-pushed-to-oct-15/article_8610bab4-cddd-4daa-81d4-d3e85cf9fbbd.html", "host": "dailyindependent.com", "date": "2026-09-25"}, {"url": "https://www.dailyindependent.com/news/russell-at-standstill-in-zoning-process-mayor-adjourns-meeting-after-residents-speak-out-against-council/article_fd5f5982-14c8-4679-b3f9-93d427e229af.html", "host": "dailyindependent.com", "date": "2026-10-01"}], "loc": {"lat": 38.54579, "lng": -82.92278, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Greenup County, Boyd County · 2,000 MW · Rubix Data Centers", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21089"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "brookfield-nextera-paducah-site-mccracken-ky", "kind": "project", "name": "Paducah Site AI Data Center Campus", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "data center", "counties": ["McCracken"], "city": "Kevil", "who": "Brookfield / NextEra Energy Resources", "end_user": "", "mw": 1800, "power": "1,800 MW", "power_note": "planned AI/HPC campus; separate 2000 MW gas generation and up to 2600 MW battery storage power", "investment": "more than 100 billion, privately funded, for the whole data-center and energy project", "jobs": "construction: approximately 8,000, permanent: 600", "acres": null, "utility": "Big Rivers Electric Power Corporation / Jackson Purchase Energy Cooperative / Paducah Power System", "water": "", "incentives": "", "note": "Federal partnership announcement; no claim that all power and construction permits are approved", "date": "2026-07-29", "events": [], "timeline": [], "sources": [{"url": "https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power", "host": "energy.gov", "date": "2026-07-29"}, {"url": "https://newsroom.nexteraenergy.com/2026-07-29-DOE-Site-in-Western-Kentucky-Revitalized-with-Data-Center-Campus-and-Dedicated-Energy-Project,-Creating-Jobs-and-Protecting-Residents-and-Businesses-from-Costs", "host": "newsroom.nexteraenergy.com", "date": "2026-07-29"}], "loc": {"lat": 37.0539, "lng": -88.71243, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · McCracken County · 1,800 MW · Brookfield / NextEra Energy Resources", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21145"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "panattoni-burgin-mercer-county-ky", "kind": "project", "name": "Panattoni Burgin Data Center Campus", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "data center", "counties": ["Mercer"], "city": "Burgin", "who": "Panattoni", "end_user": "", "mw": 1300, "power": "1,300 MW", "power_note": "utility-reported proposed demand, not operational IT", "investment": "", "jobs": "", "acres": "approximately 950; annexation area described differently", "utility": "", "water": "", "incentives": "", "note": "Burgin city jurisdiction excluded from county moratorium; no verified groundbreaking", "date": "2026-08-13", "events": [], "timeline": [], "sources": [{"url": "https://kentuckylantern.com/2026/08/13/a-countys-data-center-moratorium-doesnt-include-a-small-city-considering-huge-project/", "host": "kentuckylantern.com", "date": "2026-08-13"}, {"url": "https://www.wkms.org/2026-08-17/hyperscale-data-centers-provoke-bipartisan-outrage-across-kentucky", "host": "wkms.org", "date": ""}, {"url": "https://baxtel.com/data-center/panattoni-project-bluegrass", "host": "baxtel.com", "date": ""}], "loc": {"lat": 37.81075, "lng": -84.87353, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Mercer County · 1,300 MW · Panattoni", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21167"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "terawulf-muskie-eastpark-ky", "kind": "project", "name": "Muskie Data Campus", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "hyperscale AI", "counties": ["Boyd", "Greenup"], "city": "near Ashland (unincorporated; EastPark off I-64, about 12 miles from Ashland)", "who": "TeraWulf Inc. (Nasdaq: WULF); site assembled by Industrial Equity Partners (IEP) from the Northeast Kentucky Regional Industrial Park Authority (EastPark board)", "end_user": "Undisclosed AI/HPC tenant (TeraWulf builds and owns buildings; tenant brings servers)", "mw": 1000, "power": "first phase 500 MW, up to 1,000 MW", "power_note": "Contracted gross electrical service; additional 1000 MW is aspiration; amended ESA remains subject to PSC approval", "investment": "", "jobs": "construction: Around 1,000 at peak (TeraWulf VP Pace Ralli), permanent: 80-100 in Phase 1, excluding tenant jobs", "acres": "about 285 acres owned/controlled (TeraWulf); TeraWulf website cites 308 acres; buildings on 164 acres (Lots 2B and 1A); optional adjacent acreage for expansion", "utility": "Kentucky Power (AEP), Industrial General Service large-load tariff; PJM", "water": "Ashland supply proposed; source water, cooling circuit and operational consumption need a dedicated current technical record", "incentives": "Operator proposes winter bill credits and bearing project power costs, subject to PSC approval.", "note": "", "date": "2026-10-05", "events": [["2026-07-14", "Greenup County moratorium adopted, exempting industrial parks/EastPark; Boyd County follows 2026-07-21 with EastPark exemption"], ["2026-08-05", "Q2 earnings call: CEO Paul Prager says Muskie could expand to as much as 2 GW"], ["2026-10-05", "Amended Kentucky Power ESA (executed Oct 1) doubles contracted capacity to 1 GW, moves phase 2 to 2029, adds 100 million dollars bill credits (PSC approval required)"], ["2026-10-15", "Kentucky Power open house on Muskie transmission line routes (scheduled)"], ["2026-10-29", "Kentucky Power asks landowners for route feedback by this date"]], "timeline": [["Announced", "2026-05-26"], ["Approvals", "Site already zoned industrial; ESA executed at closing (May 2026) and amended 2026-10-01; PSC approval of amended contract pending; Kentucky Power to file substation application Oct 2026 and transmission-line application early 2027, PSC decision expected spring 2027"], ["Construction", "Kentucky Power substation construction expected early 2027 if approved; transmission lines Nov 2027; campus construction date not announced"], ["Expected opening", "First 500 MW ramp 2H 2028 (Kentucky Power facilities in service Oct 2028); second 500 MW 2029"]], "sources": [{"url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-064757/wulf-20261001.htm", "host": "investors.terawulf.com", "date": "2026-10-05"}, {"url": "https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000109/wulfeasternkypr5-26x26.htm", "host": "sec.gov", "date": "2026-05-26"}, {"url": "https://www.dailyindependent.com/news/terawulf-says-it-s-eager-to-bring-in-local-workforce/article_8b27725c-8077-4429-b744-59721c5c6f14.html", "host": "dailyindependent.com", "date": "2026-06-16"}, {"url": "https://www.dailyindependent.com/news/plan-in-place-for-muskie-s-1-gigawatt-facility-kentucky-power-terawulf-announce-amended-agreement/article_1ba87f02-6f40-4852-80e9-521662ea8e2e.html", "host": "dailyindependent.com", "date": "2026-10-07"}], "loc": {"lat": 38.35933, "lng": -82.68782, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Boyd County, Greenup County · 1,000 MW · TeraWulf Inc.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21019"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "core-scientific-calvert-hpc-conversion", "kind": "project", "name": "Core Scientific Calvert City future colocation capacity", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "existing-site conversion / capacity marketing", "counties": ["Marshall"], "city": "Calvert City", "who": "Core Scientific", "end_user": "", "mw": 100, "power": "approximately 100 MW", "power_note": "operator leasable colocation power, not contracted/operating IT", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "", "date": "2026-05-06", "events": [], "timeline": [], "sources": [{"url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-031246/q1fy26earningsdeck.htm", "host": "investors.corescientific.com", "date": "2026-05-06"}], "loc": {"lat": 36.8833, "lng": -88.32918, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Marshall County · 100 MW · Core Scientific", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "county_context_only", "county_display": "21157"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "north-campbell-land-hopkinsville-50mw-christian-ky", "kind": "project", "name": "North Campbell Land Co. Hopkinsville 50 MW Data Center", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "data center", "counties": ["Christian"], "city": "Hopkinsville", "who": "North Campbell Land Co. (Sphere 3D)", "end_user": "", "mw": 50, "power": "50 MW", "power_note": "proposed campus MW", "investment": "", "jobs": "", "acres": null, "utility": "Hopkinsville Electric System (HES)", "water": "", "incentives": "", "note": "New proposed site is separate from existing mine / conversion; undisclosed parcel", "date": "2026-08-25", "events": [], "timeline": [], "sources": [{"url": "https://www.datacenterdynamics.com/en/news/residents-raise-concerns-over-proposed-50mw-data-center-in-hopkinsville-kentucky/", "host": "datacenterdynamics.com", "date": "2026-08-25"}, {"url": "https://hoptownchronicle.org/hopkinsville-weighs-limits-on-data-centers-as-crypto-mine-proposes-expansion/", "host": "hoptownchronicle.org", "date": ""}, {"url": "https://www.sec.gov/Archives/edgar/data/1591956/000106299326004391/exhibit99-1.htm", "host": "sec.gov", "date": ""}], "loc": {"lat": 36.90975, "lng": -87.508, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Christian County · 50 MW · North Campbell Land Co.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21047"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "md-squared-power-pikeville-pike-ky", "kind": "project", "name": "Kentucky Enterprise Industrial Park Data Center", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "data center", "counties": ["Pike"], "city": "Pikeville", "who": "MD Squared Power", "end_user": "", "mw": 30, "power": "25-30 MW", "power_note": "preliminary proposal MW", "investment": "250 million proposed", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "", "date": "2026-06-05", "events": [], "timeline": [], "sources": [{"url": "https://www.wymt.com/2026/06/05/pikeville-signs-agreement-explore-data-center-development/", "host": "wymt.com", "date": "2026-06-05"}, {"url": "https://www.wymt.com/2026/06/05/pikeville-signs-agreement-explore-data-center-development/", "host": "wymt.com", "date": ""}], "loc": {"lat": 37.46884, "lng": -82.39547, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Pike County · 30 MW · MD Squared Power", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21195"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "north-campbell-existing-conversion", "kind": "project", "name": "North Campbell existing-mine computing conversion", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "existing-site conversion / capacity marketing", "counties": ["Christian"], "city": "Hopkinsville", "who": "North Campbell Land Co. / Sphere 3D", "end_user": "", "mw": 15, "power": "15 MW", "power_note": "existing mine capacity", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "", "date": "2026-07-29", "events": [], "timeline": [], "sources": [{"url": "https://hoptownchronicle.org/hopkinsville-weighs-limits-on-data-centers-as-crypto-mine-proposes-expansion/", "host": "hoptownchronicle.org", "date": "2026-07-29"}], "loc": {"lat": 36.89374, "lng": -87.49052, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Christian County · 15 MW · North Campbell Land Co. / Sphere 3D", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "county_context_only", "county_display": "21047"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "deca-ghent-carroll-county-ky", "kind": "project", "name": "Carroll County Digital Campus (Ghent)", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "data center", "counties": ["Carroll"], "city": "Ghent", "who": "DECA Companies", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "Owen Electric Cooperative", "water": "Developer describes closed-loop design; actual operational consumption not measured", "incentives": "County support for incentive eligibility is not project approval", "note": "Project site says permitting in progress; distinct from Poe Carrollton campus", "date": "", "events": [], "timeline": [], "sources": [{"url": "https://carrollcountydc.com/", "host": "carrollcountydc.com", "date": ""}, {"url": "https://www.madisoncourier.com/carroll_news_democrat/news/deca-proposing-4b-data-center-in-carroll-county/article_dcc68a89-aafd-5c7e-922c-2fd96bc32921.html", "host": "madisoncourier.com", "date": ""}, {"url": "https://ghentdc.com/", "host": "ghentdc.com", "date": ""}, {"url": "https://www.yahoo.com/news/us/articles/louisville-developer-eyes-second-9-090000833.html", "host": "yahoo.com", "date": ""}], "loc": {"lat": 38.66827, "lng": -85.12349, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Carroll County · DECA Companies", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21041"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "powerhouse-poe-carrollton-industrial-campus-carroll-county-ky", "kind": "project", "name": "Carrollton Industrial Campus", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "data center", "counties": ["Carroll"], "city": "Carrollton", "who": "Poe Companies / PowerHouse", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "9.6 billion proposed investment", "jobs": "", "acres": "550", "utility": "Kentucky Utilities Company", "water": "", "incentives": "September developer-commissioned analysis projects 96.4 million annual tax revenue and 11.5 million PILOT; older homepage estimates differ", "note": "Developer proposal; economic-impact projections are not guarantees", "date": "2026-09-18", "events": [], "timeline": [], "sources": [{"url": "https://carrolltonindustrialcampus.com/poe-companies-publishes-full-economic-impact-analysis-for-carrollton-industrial-campus/", "host": "carrolltonindustrialcampus.com", "date": "2026-09-18"}, {"url": "https://finance.yahoo.com/technology/articles/louisville-based-developer-plans-9-144212137.html", "host": "finance.yahoo.com", "date": ""}, {"url": "https://www.wdrbwave.com/2026/07/25/carroll-county-residents-push-back-against-data-center-project-ghent-community/", "host": "wdrbwave.com", "date": ""}, {"url": "https://www.lpm.org/news/2026-08-24/neighbors-to-kentucky-hyperscale-data-centers-demand-transparency", "host": "lpm.org", "date": ""}], "loc": {"lat": 38.67442, "lng": -85.1302, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Carroll County · Poe Companies / PowerHouse", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21041"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "dermody-kramers-lane-louisville-jefferson-ky", "kind": "project", "name": "Dermody Properties Kramers Lane Data Center", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "data center", "counties": ["Jefferson"], "city": "Louisville", "who": "Dermody Properties (DPIF4 KY 6 KRAMERS, LLC)", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": "20", "utility": "", "water": "", "incentives": "", "note": "Warehouse-to-data-center revised plan", "date": "2026-08-12", "events": [], "timeline": [], "sources": [{"url": "https://www.lpm.org/news/2026-08-12/images-another-data-center-proposed-for-louisvilles-rubbertown-neighborhood", "host": "lpm.org", "date": "2026-08-12"}, {"url": "https://www.lpm.org/news/2026-08-13/louisville-metro-council-approves-data-center-moratorium-as-new-proposal-sparks-controversy", "host": "lpm.org", "date": ""}], "loc": {"lat": 38.20003, "lng": -85.67361, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Jefferson County · Dermody Properties", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21111"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "gateway-letcher-feasibility", "kind": "project", "name": "Gateway Business Park off-grid computing / generation feasibility project", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "data-center-linked feasibility", "counties": ["Letcher"], "city": "Jenkins", "who": "Diversified Gas and Oil / Maverick Holdings; Appalachian Industrial Development Authority", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": "roughly 100", "utility": "Proposed off-grid generation", "water": "", "incentives": "", "note": "", "date": "2026-07-17", "events": [], "timeline": [], "sources": [{"url": "https://www.wymt.com/2026/07/17/proposed-off-grid-data-center-eyeing-letcher-co-industrial-park/", "host": "wymt.com", "date": "2026-07-17"}], "loc": {"lat": 37.12144, "lng": -82.85533, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Letcher County · Diversified Gas and Oil / Maverick…", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "county_context_only", "county_display": "21133"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "western-hospitality-partners-commerce-parkway-oldham-ky", "kind": "project", "name": "Western Hospitality Partners Commerce Parkway Data Center", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "crypto": false, "type": "data center", "counties": ["Oldham"], "city": "La Grange", "who": "Western Hospitality Partners", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": "approximately 88", "utility": "", "water": "", "incentives": "", "note": "Relocated drive-in proposal remains distinct from withdrawn original Project Lincoln", "date": "", "events": [], "timeline": [], "sources": [{"url": "https://www.yahoo.com/news/oldham-county-data-center-replace-160523680.html", "host": "yahoo.com", "date": ""}, {"url": "https://kentuckylantern.com/wp-content/uploads/2026/06/EPIC-REPORT-NO-2026-001-FINAL.pdf", "host": "kentuckylantern.com", "date": ""}, {"url": "https://hoptownchronicle.org/see-where-data-center-developers-are-looking-to-build-in-kentucky", "host": "hoptownchronicle.org", "date": ""}], "loc": {"lat": 38.39994, "lng": -85.44874, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Oldham County · Western Hospitality Partners", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "21185"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "edged-gateway-prichard-al", "state": "AL", "kind": "facility", "name": "Edged Prichard Data Center (Project Gateway)", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Mobile"], "city": "Prichard", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Edged Gateway Prichard proposed building and forecast. 93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Project website identifies an Edged US proposal and explicit approval conditions. The website says details remain conditional on permitting, infrastructure, customers and regulatory approvals. Design power and water/noise promises are not operational measurements or permit findings. No capacity or parcel adopted; publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://projectgatewayal.com/", "host": "projectgatewayal.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 30.80728, "lng": -88.22571, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Edged Gateway Prichard proposed building and forecast", "fields": {"developer": "Edged US", "project": "Project Gateway", "locality": "Prichard, Alabama", "developer_described_stage": "proposed/evaluated campus", "proposed_building_power_mw": 8, "power_basis": "building capacity, not explicit critical IT", "proposed_building_sqft": 57000, "planned_investment_usd": 93000000, "expected_permanent_jobs_min_inclusive": 20}, "notes": ["93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://projectgatewayal.com/", "host": "projectgatewayal.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Project website identifies an Edged US proposal and explicit approval conditions", "fields": {"current_status": "proposed", "status_basis": "The project website calls Gateway a proposed Prichard development being evaluated by Edged US."}, "notes": ["The website says details remain conditional on permitting, infrastructure, customers and regulatory approvals. Design power and water/noise promises are not operational measurements or permit findings. No capacity or parcel adopted; publication date unknown."], "sources": [{"url": "https://projectgatewayal.com/", "host": "projectgatewayal.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "329e73d0bd598b89c4bff6047e3e5919a39b768498596db88a484026a7a90271", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Alabama · Prichard · Mobile · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "01097"}, "state_name": "Alabama", "state_path": "/alabama/"}, {"id": "nebius-bhm01-birmingham-al", "state": "AL", "kind": "facility", "name": "Nebius Birmingham AI Factory (BHM01)", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Jefferson"], "city": "Birmingham", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nebius Birmingham land, targets and fiscal scopes. SamepageFAQsayhundredsjobsversusheadline1000plus;countnotindependentlycertified.30yearincentiveoperatorclaimnotexecutedIDBagreementoractualforegone-taxsum.85.7Mcombinednotcityaloneoractualcollectedtax. TargetsQ12026permits/hearingsandQ22026constructionnotobservedoutcomes;do notcalendarpasttargetsasfutureevents. Q42026servicefutureasofOct14. No criticalITMWorfinalwaterdemand. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Operator planning statement; anticipated timeline is not an accomplished construction milestone. The anticipated Q2construction and Q4commissioning entries are forecasts subject to change, not observed starts or energization. No achieved permits, water-use measurement, tax payments, current capacity or point precision adopted. Publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://nebius.com/birminghamal", "host": "nebius.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=201+Milan+Parkway%2C+Birmingham%2C+Alabama&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Complete literal Census street response and county context"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.891120081958%2C33.424168288537544%2C-86.879279918042%2C33.43404971146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting with unknown image acquisition date"}], "loc": {"lng": -86.8852, "lat": 33.429109, "precision": "address", "basis": "The named operator Birmingham project body identifies the former bank property at 201 Milan Parkway, Birmingham, Alabama. One complete literal Census street range supplies a calculated reference in Jefferson County. It selects no existing roof, individual proposed hall or complete campus. Existing status group proposed remains unchanged. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Nebius Birmingham land, targets and fiscal scopes", "fields": {"developer": "Nebius", "address": "201 Milan Parkway, Birmingham, Alabama", "former_use": "Regions Bank back office", "operator_reported_land_acquisition_month": "2025-09", "land_acres": 75, "historic_initial_commissioning_target_quarter": "2026-Q4", "fullbuildout_target_through_year": 2028, "operator_reported_tax_incentive_term_years": 30, "estimated_average_annual_tax_usd": 85700000, "tax_forecast_scope": "Birmingham City, Jefferson County and Alabama combined", "expected_construction_jobs_min_exclusive": 1000, "estimated_construction_duration_months_approx": 30}, "notes": ["SamepageFAQsayhundredsjobsversusheadline1000plus;countnotindependentlycertified.30yearincentiveoperatorclaimnotexecutedIDBagreementoractualforegone-taxsum.85.7Mcombinednotcityaloneoractualcollectedtax. TargetsQ12026permits/hearingsandQ22026constructionnotobservedoutcomes;do notcalendarpasttargetsasfutureevents. Q42026servicefutureasofOct14. No criticalITMWorfinalwaterdemand.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://nebius.com/birminghamal", "host": "nebius.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Operator planning statement; anticipated timeline is not an accomplished construction milestone", "fields": {"current_status": "proposed", "status_basis": "Nebius explicitly describes the AI factory as being in the planning stages.", "operator_published_project_address": "201 Milan Parkway, Birmingham, Alabama"}, "notes": ["The anticipated Q2construction and Q4commissioning entries are forecasts subject to change, not observed starts or energization. No achieved permits, water-use measurement, tax payments, current capacity or point precision adopted. Publication date unknown."], "sources": [{"url": "https://nebius.com/birminghamal", "host": "nebius.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "407a6d3890e58bf706b6c3ddb59df1e3161d58e78966b8bd8400aed593ad17fb", "events": [], "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 55, October 23, 2026", "scope": "Explicit source bound reference only. Existing status group proposed remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.", "fields": {"location_review_decision": {"location": {"lng": -86.8852, "lat": 33.429109, "precision": "address", "basis": "The named operator Birmingham project body identifies the former bank property at 201 Milan Parkway, Birmingham, Alabama. One complete literal Census street range supplies a calculated reference in Jefferson County. It selects no existing roof, individual proposed hall or complete campus. Existing status group proposed remains unchanged. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "201 Milan Parkway, Birmingham, Alabama", "county_fips": ["01073"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["The operator explicitly connects the potential Birmingham AI factory with the former Regions Bank property and 201 Milan Parkway. The source labels its timeline anticipated and future dates subject to change. Listed permit, construction and commissioning periods remain forecasts and create no new physical milestones. The September 2025 land account is retained only as source context, without adopting acreage, title or legal ownership.", "Explicit source bound reference only. Existing status group proposed remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.", "A curved road and several institutional or commercial buildings with parking lie among broad wooded ground. The literal property street reference selects no individual existing roof, proposed data hall, substation or full campus.", "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official sources now support only the bounded reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, without a claim of physical relocation or a new physical milestone."], "sources": [{"url": "https://nebius.com/birminghamal", "host": "nebius.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Named computing facility or project street in original source body"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=201+Milan+Parkway%2C+Birmingham%2C+Alabama&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Complete literal Census street response and county context"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.891120081958%2C33.424168288537544%2C-86.879279918042%2C33.43404971146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting with unknown image acquisition date"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Calculated official source street reference, not a surveyed roof or parcel", "summary": "Alabama · Birmingham · Jefferson · Source context reviewed", "state_name": "Alabama", "state_path": "/alabama/"}, {"id": "cloverleaf-red-clay-lowndes-al", "state": "AL", "kind": "facility", "name": "Project Red Clay", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lowndes"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Red Clay developer project and fiscal scopes. Developer economic projections, not actual tax collections. Do not add2.8Btotal to1.6Bschoolsubset or multiply annual average into guarantee. Up-to10Mcommitment not funds disbursed. No signed CBA or regulator order read. Developer intends to find eventual operator after approvals; no named tenant inferred. Closed-loop not zero site water. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Developer description of Project Red Clay as a proposal. Projected tax revenue, job counts and developer utility commitments are forecasts and claims. This page does not prove issued permits, an executed utility agreement, construction or operation. No precise parcel or realized totals adopted; publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://redclaydatacenter.com/", "host": "redclaydatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 32.1549, "lng": -86.64989, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Red Clay developer project and fiscal scopes", "fields": {"project_name": "Project Red Clay", "locality": "Lowndes County, Alabama", "expected_construction_jobs_min_exclusive": 1000, "expected_construction_duration_years_max": 5, "expected_initial_fulltime_jobs": 225, "expected_full_scale_fulltime_jobs_min_exclusive": 300, "developer_estimated_average_annual_local_tax_usd": 124000000, "developer_estimated_local_funding_through_2050_usd_min_exclusive": 2800000000, "developer_estimated_school_funding_through_2050_usd_min_exclusive": 1600000000, "developer_community_benefits_commitment_usd_max": 10000000, "named_cba_partner": "Central Alabama Community Foundation"}, "notes": ["Developer economic projections, not actual tax collections. Do not add2.8Btotal to1.6Bschoolsubset or multiply annual average into guarantee. Up-to10Mcommitment not funds disbursed. No signed CBA or regulator order read. Developer intends to find eventual operator after approvals; no named tenant inferred. Closed-loop not zero site water.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://redclaydatacenter.com/", "host": "redclaydatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Developer description of Project Red Clay as a proposal", "fields": {"current_status": "proposed", "status_basis": "Cloverleaf explicitly identifies Project Red Clay as a proposed data center in Lowndes County."}, "notes": ["Projected tax revenue, job counts and developer utility commitments are forecasts and claims. This page does not prove issued permits, an executed utility agreement, construction or operation. No precise parcel or realized totals adopted; publication date unknown."], "sources": [{"url": "https://redclaydatacenter.com/", "host": "redclaydatacenter.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "98f75848b24fae537b835075321c018015c7c6dbd2e6edf0f2b83693a7f8f785", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Alabama · Lowndes · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "01085"}, "state_name": "Alabama", "state_path": "/alabama/"}, {"id": "meta-montgomery-al", "state": "AL", "kind": "facility", "name": "Meta Montgomery Data Center", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Montgomery"], "city": "Montgomery", "address": "", "who": "Meta", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Nearly1.3Marea and1.5B+investment cover expanded campus.3B+Alabama total includes Huntsville;227MWis supported Alabama renewable generation, not campusIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Dated expansion announcement; no fresh completion milestone. The2025 announcement describes two added buildings and future operation. It is not October 2026 status evidence. Investment and jobs remain campus forecasts, not realized spending or current employment. No status, load or parcel upgrade.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/", "host": "datacenters.atmeta.com", "date": "2025-09-23", "published": "2025-09-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://datacenters.atmeta.com/asset/montgomery-data-center-info-sheet/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 32.23889, "lng": -86.22754, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"expansion_new_buildings": 2, "resulting_planned_campus_area_sqft_approx": 1300000, "planned_campus_investment_usd_min_exclusive": 1500000000, "peak_construction_jobs_min_exclusive": 1000, "forecast_operational_jobs_min_exclusive": 100}, "notes": ["Nearly1.3Marea and1.5B+investment cover expanded campus.3B+Alabama total includes Huntsville;227MWis supported Alabama renewable generation, not campusIT.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/", "host": "datacenters.atmeta.com", "date": "2025-09-23", "published": "2025-09-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Dated expansion announcement; no fresh completion milestone", "fields": {"historical_expansion_announcement": "2025-09-23", "current_status_hold": "No subsequent operating or completed-construction milestone established in the reviewed source."}, "notes": ["The2025 announcement describes two added buildings and future operation. It is not October 2026 status evidence. Investment and jobs remain campus forecasts, not realized spending or current employment. No status, load or parcel upgrade."], "sources": [{"url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/", "host": "datacenters.atmeta.com", "date": "2025-09-23", "published": "2025-09-23", "checked": "2026-10-15", "date_kind": "publication", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "c26c0d2d243a1816028c030a16f973623b3aa0290c1e489358d05cd167a2c8a5", "events": [], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-listed development", "basis": "The current named operator factsheet describes this campus in future terms and gives operational employment only once completed.", "checked_on": "2026-10-16"}, "stage_review_limits": "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation."}, "notes": ["This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://datacenters.atmeta.com/asset/montgomery-data-center-info-sheet/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check 04, October 22, 2026", "scope": "Meta announces the expansion of its Montgomery campus and says it designs and builds its infrastructure. Developer is attributed to the provider brand. The announcement is not a current operating certification, a parcel review or an attribution of the legal property owner. No building, area, employment, investment or utility figure is promoted.", "fields": {"company_association": {"name": "Meta", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Meta announces the expansion of its Montgomery campus and says it designs and builds its infrastructure. Developer is attributed to the provider brand. The announcement is not a current operating certification, a parcel review or an attribution of the legal property owner. No building, area, employment, investment or utility figure is promoted."}, "provider_role": "developer"}, "notes": ["Meta announces the expansion of its Montgomery campus and says it designs and builds its infrastructure. Developer is attributed to the provider brand. The announcement is not a current operating certification, a parcel review or an attribution of the legal property owner. No building, area, employment, investment or utility figure is promoted.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/", "host": "datacenters.atmeta.com", "published": "2025-09-23", "date": "2025-09-23", "checked": "2026-10-22", "label": "First party named community development or operation statement"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Alabama · Montgomery · Montgomery · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet describes this campus in future terms and gives operational employment only once completed. This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "01101"}, "state_name": "Alabama", "state_path": "/alabama/"}, {"id": "deepgreen-cook-inlet-nikiski-ak", "state": "AK", "kind": "facility", "name": "Cook Inlet Subsea-Compute & Infrastructure Hub", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kenai Peninsula"], "city": "Nikiski", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Acceptance not permit issuance, project license or construction authority.100MWgeneration not exact IT;66pods not66independentlycountable campuses. ORPC expressly denies partnership; AEA says no communication. November2commentdeadline future. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Official notice says estimated annual generation would be 100 megawatts. This mixes energy and power units; retain source wording as a unit conflict, with no inferred annual MWh or critical IT. Preliminary permit if issued grants study/license-filing priority, not land-disturbance rights, construction permission or rights on others property. Deadline remains future. FERC accepted preliminary-permit application notice; printed Federal Register page 56879 read in text and pixels. A preliminary permit, if issued, grants license-application priority, not permission to disturb land or enter others’ property. The source mixes annual energy with MW; no annual MWh or IT load is inferred. No final permit, current operation or precise parcel adopted.", "date": "", "events": [["2026-11-02", "Scheduled deadline: FERC notice sets comments and competing filings for DeepGreen P-15423-000 due at 5 p.m. Eastern Time. Application acceptance is not construction permission."], ["2026-09-04", "The September 4, 2026 Federal Register publication date announces acceptance for filing of the DeepGreen preliminary permit application. Acceptance is not an issued construction permission, actual project commencement or a physical opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.peninsulaclarion.com/2026/09/14/federal-review-advances-for-subsea-data-center-off-nikiski/", "host": "peninsulaclarion.com", "date": "2026-09-14", "published": "2026-09-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf", "host": "govinfo.gov", "date": "2026-09-04", "published": "2026-09-04", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 60.17744, "lng": -150.29169, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round24-2026-10-14.json", "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.", "fields": {"reported_context": "Peninsula Clarion reports FERC accepted DeepGreen preliminary-permit application for feasibility review.", "independently_verified_current_operating_status": null}, "notes": ["Acceptance not permit issuance, project license or construction authority.100MWgeneration not exact IT;66pods not66independentlycountable campuses. ORPC expressly denies partnership; AEA says no communication. November2commentdeadline future.", "Subsequent original decisions and current operator disclosures take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.peninsulaclarion.com/2026/09/14/federal-review-advances-for-subsea-data-center-off-nikiski/", "host": "peninsulaclarion.com", "date": "2026-09-14", "published": "2026-09-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round24-2026-10-14.json", "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.", "fields": {"application_accepted_for_filing": true, "construction_authorization": false, "permit_issued_verified": false, "docket": "P-15423-000", "notice_dated": "2026-09-01", "original_application_date": "2026-02-11", "supplement_date": "2026-06-26", "comment_deadline_local": "2026-11-02T17:00:00-05:00", "proposed_pods": 66, "proposed_turbines_range": [330, 350], "canonical_annual_generation_mwh": null, "critical_it_mw": null}, "notes": ["Official notice says estimated annual generation would be 100 megawatts. This mixes energy and power units; retain source wording as a unit conflict, with no inferred annual MWh or critical IT.", "Preliminary permit if issued grants study/license-filing priority, not land-disturbance rights, construction permission or rights on others property. Deadline remains future.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf", "host": "govinfo.gov", "date": "2026-09-04", "published": "2026-09-04", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "FERC accepted preliminary-permit application notice; printed Federal Register page 56879 read in text and pixels", "fields": {"docket": "P-15423-000", "notice_dated": "2026-09-01", "comment_deadline_eastern": "2026-11-02T17:00:00-05:00", "permit_scope": "Application accepted for filing; no construction authorization established."}, "notes": ["A preliminary permit, if issued, grants license-application priority, not permission to disturb land or enter others’ property. The source mixes annual energy with MW; no annual MWh or IT load is inferred. No final permit, current operation or precise parcel adopted."], "sources": [{"url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf", "host": "govinfo.gov", "date": "2026-09-04", "published": "2026-09-04", "checked": "2026-10-15", "date_kind": "publication", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "f6fd2d84fd898077ba1b4eaa0f240994b607f93ad7615eb4793c1b9aa375cd08", "events": [{"date": "2026-11-02", "kind": "scheduled_deadline", "text": "Scheduled deadline: FERC notice sets comments and competing filings for DeepGreen P-15423-000 due at 5 p.m. Eastern Time. Application acceptance is not construction permission.", "sources": [{"url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf", "host": "govinfo.gov", "date": "2026-09-04", "published": "2026-09-04", "checked": "2026-10-15", "date_kind": "publication", "label": "Reviewed source"}]}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 43", "scope": "The original September 4 Federal Register notice identifies DeepGreen project P 15423 000 and an accepted preliminary permit application for a proposed Cook Inlet hydrokinetic and subsea computing project. Its comment and competing filing deadline is November 2, 2026. Agency listed proposal is limited to that pending study application context. Even a preliminary permit would provide study priority and would not authorize land disturbance, entry on others property, construction or computing operation. The separate existing November 2 scheduled deadline is preserved without a duplicate.", "fields": {"current_stage_evidence": {"outcome": "currently_noticed_preliminary_application_proposal", "scope": "The original September 4 Federal Register notice identifies DeepGreen project P 15423 000 and an accepted preliminary permit application for a proposed Cook Inlet hydrokinetic and subsea computing project. Its comment and competing filing deadline is November 2, 2026. Agency listed proposal is limited to that pending study application context. Even a preliminary permit would provide study priority and would not authorize land disturbance, entry on others property, construction or computing operation. The separate existing November 2 scheduled deadline is preserved without a duplicate."}, "source_read_scope": {"deepgreen_section_only": true, "adjacent_unrelated_federal_notices_excluded": true, "existing_scheduled_deadline_not_duplicated": true}}, "notes": ["The original September 4 Federal Register notice identifies DeepGreen project P 15423 000 and an accepted preliminary permit application for a proposed Cook Inlet hydrokinetic and subsea computing project. Its comment and competing filing deadline is November 2, 2026. Agency listed proposal is limited to that pending study application context. Even a preliminary permit would provide study priority and would not authorize land disturbance, entry on others property, construction or computing operation. The separate existing November 2 scheduled deadline is preserved without a duplicate.", "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."], "sources": [{"url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf", "host": "www.govinfo.gov", "published": "2026-09-04", "date": "2026-09-04", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Alaska · Nikiski · Kenai Peninsula · Source context reviewed", "event_evidence": [{"date": "2026-11-02", "kind": "scheduled_deadline", "text": "Scheduled deadline: FERC notice sets comments and competing filings for DeepGreen P-15423-000 due at 5 p.m. Eastern Time. Application acceptance is not construction permission.", "sources": [{"url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf", "host": "govinfo.gov", "date": "2026-09-04", "published": "2026-09-04", "checked": "2026-10-15", "date_kind": "publication", "label": "Reviewed source"}]}, {"date": "2026-09-04", "text": "The September 4, 2026 Federal Register publication date announces acceptance for filing of the DeepGreen preliminary permit application. Acceptance is not an issued construction permission, actual project commencement or a physical opening.", "kind": "announced", "sources": [{"url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf", "host": "www.govinfo.gov", "published": "2026-09-04", "date": "2026-09-04", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "status_scope": "The original September 4 Federal Register notice identifies DeepGreen project P 15423 000 and an accepted preliminary permit application for a proposed Cook Inlet hydrokinetic and subsea computing project. Its comment and competing filing deadline is November 2, 2026. Agency listed proposal is limited to that pending study application context. Even a preliminary permit would provide study priority and would not authorize land disturbance, entry on others property, construction or computing operation. The separate existing November 2 scheduled deadline is preserved without a duplicate.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "02122"}, "state_name": "Alaska", "state_path": "/alaska/"}, {"id": "qts-phoenix-4-tolleson-az", "state": "AZ", "kind": "facility", "name": "QTS Phoenix 4", "group": "proposed", "status": "In development", "raw_status": "in development", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Maricopa"], "city": "Tolleson", "address": "", "who": "QTS", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Generic anticipated jobs and water-free design goals are not measured outcomes or an operating-status confirmation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. The broad In development label does not distinguish permitting from construction. Corporate portfolio operational claims do not prove this site is open. Address text does not confirm inherited coordinates. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://q.com/data-centers/phoenix-4/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 33.36222, "lng": -112.80924, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"published_address": "11753 W Lower Buckeye Rd, Tolleson, AZ 85353", "operator_stage": "establishing new campus"}, "notes": ["Generic anticipated jobs and water-free design goals are not measured outcomes or an operating-status confirmation.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://q.com/data-centers/phoenix-4/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "in development", "status_basis": "The Phoenix 4 page says QTS is establishing a new data-center campus and lists a Tolleson location.", "filter_scope": "Grouped with proposed/development projects; no final permit or exact construction stage is inferred."}, "notes": ["The broad In development label does not distinguish permitting from construction. Corporate portfolio operational claims do not prove this site is open. Address text does not confirm inherited coordinates. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://q.com/data-centers/phoenix-4/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "c5bd8fa5d2c657b4bceae96ebd4faab75fd93f5826a365e6089f20801a2bafee", "events": [], "whole_record_certified": false}, {"overlay": "Company role source check45, October23,2026", "scope": "QTS identifies the named Phoenix 4 campus at its published Tolleson service street and states that it is establishing new campuses. Developer per source identifies the QTS provider brand for the planned project. The previously empty company field is populated only from this exact first party campus page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. A development statement does not establish construction, completion, commissioned operation, legal title or a future tenant. Forecast jobs, cooling claims and environmental commitments are not measured outcomes. The source publication date is unknown.", "fields": {"company_association": {"name": "QTS", "role": "developer", "identity_scope": "provider_brand_only", "scope": "QTS identifies the named Phoenix 4 campus at its published Tolleson service street and states that it is establishing new campuses. Developer per source identifies the QTS provider brand for the planned project. The previously empty company field is populated only from this exact first party campus page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. A development statement does not establish construction, completion, commissioned operation, legal title or a future tenant. Forecast jobs, cooling claims and environmental commitments are not measured outcomes. The source publication date is unknown."}, "provider_role": "developer"}, "notes": ["QTS identifies the named Phoenix 4 campus at its published Tolleson service street and states that it is establishing new campuses. Developer per source identifies the QTS provider brand for the planned project. The previously empty company field is populated only from this exact first party campus page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. A development statement does not establish construction, completion, commissioned operation, legal title or a future tenant. Forecast jobs, cooling claims and environmental commitments are not measured outcomes. The source publication date is unknown."], "sources": [{"url": "https://q.com/data-centers/phoenix-4/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arizona · Tolleson · Maricopa · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "04013"}, "state_name": "Arizona", "state_path": "/arizona/"}, {"id": "5c-data-centers-phx01-phoenix-az", "state": "AZ", "kind": "facility", "name": "5C Data Centers PHX01", "group": "proposed", "status": "City-listed planned development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Maricopa"], "city": "Phoenix", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. GPEC historical Phoenix development announcement. Historical planned2025service is not observed opening. Power density is cabinet design capability, not measured average or campus load. No street/parcel in reviewed release. Regional EDO reporting developer announcement, not independent engineering certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-01", "Phoenix City Council adopted the 5C special permit waiver item as revised by the July 1 Law Department memo. This is a scoped land use waiver action, not all permits, a construction start or an opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.gpec.org/news/5c-data-centers-new-data-center-region-in-phoenix/", "host": "gpec.org", "date": "2024-09-19", "published": "2024-09-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://webapi.legistar.com/v1/phoenix/matters/35495/texts/35595", "host": "webapi.legistar.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://webapi.legistar.com/v1/phoenix/matters/35495/histories", "host": "webapi.legistar.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2802+W.+Palm+Lane%2C+Phoenix%2C+AZ&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Complete literal Census street response and county context"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-112.12531984835196%2C33.46468728853755%2C-112.11347415164805%2C33.47456871146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting with unknown image acquisition date"}], "loc": {"lng": -112.119397, "lat": 33.469628, "precision": "address", "basis": "The original City of Phoenix matter 35495 identifies the proposed 5C data center property street at 2802 W. Palm Lane, Phoenix, Arizona. One complete literal Census street range supplies only a calculated reference in Maricopa County. It selects no individual building or complete two parcel boundary. Existing status group proposed remains unchanged. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "GPEC historical Phoenix development announcement", "fields": {"release_dateline": "2024-09-18", "page_published_date": "2024-09-19", "page_updated_date": "2025-03-31", "site_code": "PHX01", "planned_critical_it_mw": 20, "planned_area_sqft": 140000, "maximum_supported_power_density_kw_per_cabinet": 132, "historical_target_service_year": 2025}, "notes": ["Historical planned2025service is not observed opening. Power density is cabinet design capability, not measured average or campus load. No street/parcel in reviewed release. Regional EDO reporting developer announcement, not independent engineering certification.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.gpec.org/news/5c-data-centers-new-data-center-region-in-phoenix/", "host": "gpec.org", "date": "2024-09-19", "published": "2024-09-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 4", "scope": "Phoenix identifies the 5C proposal at 2802 West Palm Lane and records July 1, 2026 council adoption of a binding waiver item as revised. This establishes a city listed planned development and a scoped land use action. It does not establish construction, an opening, issued building permits or all final waiver terms. The current 5C regional capacity table is not assigned to this individual facility.", "fields": {"current_stage_evidence": {"outcome": "city_listed_planned_development", "scope": "Phoenix identifies the 5C proposal at 2802 West Palm Lane and records July 1, 2026 council adoption of a binding waiver item as revised. This establishes a city listed planned development and a scoped land use action. It does not establish construction, an opening, issued building permits or all final waiver terms. The current 5C regional capacity table is not assigned to this individual facility."}, "local_rule_context": {"matter": "26-1460", "adopted_action_on": "2026-07-01", "instrument_scope": "Waiver of special permit enforcement, adopted as revised", "final_revised_terms_reviewed": false, "all_permits_or_operation_established": false}}, "notes": ["Phoenix identifies the 5C proposal at 2802 West Palm Lane and records July 1, 2026 council adoption of a binding waiver item as revised. This establishes a city listed planned development and a scoped land use action. It does not establish construction, an opening, issued building permits or all final waiver terms. The current 5C regional capacity table is not assigned to this individual facility."], "sources": [{"url": "https://webapi.legistar.com/v1/phoenix/matters/35495/texts/35595", "host": "webapi.legistar.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://webapi.legistar.com/v1/phoenix/matters/35495/histories", "host": "webapi.legistar.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 55, October 23, 2026", "scope": "Explicit source bound reference only. Existing status group proposed remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.", "fields": {"location_review_decision": {"location": {"lng": -112.119397, "lat": 33.469628, "precision": "address", "basis": "The original City of Phoenix matter 35495 identifies the proposed 5C data center property street at 2802 W. Palm Lane, Phoenix, Arizona. One complete literal Census street range supplies only a calculated reference in Maricopa County. It selects no individual building or complete two parcel boundary. Existing status group proposed remains unchanged. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "2802 W. Palm Lane, Phoenix, AZ", "county_fips": ["04013"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["The original City matter text explicitly names 5C, its proposed data center and property at 2802 W. Palm Lane, with APNs 108 15 002D and 108 15 002B. The operator regional page does not independently publish this street. City Manager and staff recommendations on the requested waiver do not certify an issued permit, approved computing, legal owner or actual current operation. The June 16, 2026 text modification timestamp is metadata, without an invented publication or vote day. Other providers with a PHX01 code are excluded.", "Explicit source bound reference only. Existing status group proposed remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.", "Large industrial or commercial roof forms and yards lie beside dense residential blocks. The City filed property street supplies a calculated range reference only, without selecting a particular roof, full two parcel boundary or currently operating computing building.", "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official sources now support only the bounded reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, without a claim of physical relocation or a new physical milestone."], "sources": [{"url": "https://webapi.legistar.com/v1/phoenix/matters/35495/texts/35595", "host": "webapi.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Named computing facility or project street in original source body"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2802+W.+Palm+Lane%2C+Phoenix%2C+AZ&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Complete literal Census street response and county context"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-112.12531984835196%2C33.46468728853755%2C-112.11347415164805%2C33.47456871146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting with unknown image acquisition date"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Calculated official source street reference, not a surveyed roof or parcel", "summary": "Arizona · Phoenix · Maricopa · Source context reviewed", "status_scope": "Phoenix identifies the 5C proposal at 2802 West Palm Lane and records July 1, 2026 council adoption of a binding waiver item as revised. This establishes a city listed planned development and a scoped land use action. It does not establish construction, an opening, issued building permits or all final waiver terms. The current 5C regional capacity table is not assigned to this individual facility.", "event_evidence": [{"date": "2026-07-01", "text": "Phoenix City Council adopted the 5C special permit waiver item as revised by the July 1 Law Department memo. This is a scoped land use waiver action, not all permits, a construction start or an opening.", "kind": "approved", "sources": [{"url": "https://webapi.legistar.com/v1/phoenix/matters/35495/texts/35595", "host": "webapi.legistar.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://webapi.legistar.com/v1/phoenix/matters/35495/histories", "host": "webapi.legistar.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}]}], "state_name": "Arizona", "state_path": "/arizona/"}, {"id": "tract-buckeye-tech-corridor-az", "state": "AZ", "kind": "facility", "name": "Buckeye Tech Corridor", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Maricopa"], "city": "Buckeye", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. DerekStaahl AZFamily originalAugust29,2024 report, URLAugust30notvote/event. Tract2100acreroundedBuckeyepurchase/20Msf15yearbuildout and1.8GWrequiredpower werePLANSwithpowermajorunresolvedhurdle.1.8GWnotexplicitITorenergyperday; publisherdailyplantcomparison isdimensionallyambiguousandnotadopted. Mayor7yearpowerestimate/300jobsforecastnotsecuredsupplyorhiredstaff.20BfuturevalueviaWSJnotactualTractspend. NearbyAPS/newplantpossibilitynotapprovedPPA.9,700homesscrappedplan/waterlessthanhalfcomparisonsattributednotcurrentmeteredvolume. No namedGoogle/Amazon/Microsofttenantconfirmedmerelymayorexamples. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.azfamily.com/2024/08/30/developer-wants-power-future-ai-buckeye-with-new-data-center/", "host": "azfamily.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.tract.com/project/buckeye/", "host": "www.tract.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://buckeyeaz.granicus.com/services/minutes/reports/23859ad0-eafd-4e39-b582-796e20fdc9cb/attachment", "host": "buckeyeaz.granicus.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Access-check target"}], "loc": {"lat": 33.39622, "lng": -112.14103, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json", "scope": "Original reporter/issuer named-project context, with inference and stages explicit.", "fields": {}, "notes": ["DerekStaahl AZFamily originalAugust29,2024 report, URLAugust30notvote/event. Tract2100acreroundedBuckeyepurchase/20Msf15yearbuildout and1.8GWrequiredpower werePLANSwithpowermajorunresolvedhurdle.1.8GWnotexplicitITorenergyperday; publisherdailyplantcomparison isdimensionallyambiguousandnotadopted.", "Mayor7yearpowerestimate/300jobsforecastnotsecuredsupplyorhiredstaff.20BfuturevalueviaWSJnotactualTractspend. NearbyAPS/newplantpossibilitynotapprovedPPA.9,700homesscrappedplan/waterlessthanhalfcomparisonsattributednotcurrentmeteredvolume. No namedGoogle/Amazon/Microsofttenantconfirmedmerelymayorexamples.", "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."], "sources": [{"url": "https://www.azfamily.com/2024/08/30/developer-wants-power-future-ai-buckeye-with-new-data-center/", "host": "azfamily.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "operator-listed_development", "scope": "Tract currently identifies Buckeye as a development project. Its 1,800 MW figure is marketed campus capacity, not delivered IT load. The current 2,019-acre description differs from an earlier acquisition figure. Zoning and entitlement context do not establish actual construction; the municipal minutes route was access-limited. The proposed label applies to operator-listed development."}}, "notes": ["Tract currently identifies Buckeye as a development project. Its 1,800 MW figure is marketed campus capacity, not delivered IT load. The current 2,019-acre description differs from an earlier acquisition figure. Zoning and entitlement context do not establish actual construction; the municipal minutes route was access-limited. The proposed label applies to operator-listed development."], "sources": [{"url": "https://www.tract.com/project/buckeye/", "host": "www.tract.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://buckeyeaz.granicus.com/services/minutes/reports/23859ad0-eafd-4e39-b582-796e20fdc9cb/attachment", "host": "buckeyeaz.granicus.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Access-check target"}], "checked": "2026-10-17", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arizona · Buckeye · Maricopa · Source context reviewed", "status_scope": "Tract currently identifies Buckeye as a development project. Its 1,800 MW figure is marketed campus capacity, not delivered IT load. The current 2,019-acre description differs from an earlier acquisition figure. Zoning and entitlement context do not establish actual construction; the municipal minutes route was access-limited. The proposed label applies to operator-listed development.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "04013"}, "state_name": "Arizona", "state_path": "/arizona/"}, {"id": "edgecore-dobson-farms-east-florence-az", "state": "AZ", "kind": "facility", "name": "Dobson Farms East", "group": "proposed", "status": "General plan amendment approved", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Pinal"], "city": "Florence", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-10-07", "Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 766 25 for the Dobson Farms East general plan place type change. This broad land use action is not a final individual data center entitlement, construction permit or opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/", "host": "pinalpost.com", "date": "2025-10-09", "published": "2025-10-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf", "host": "www.florenceaz.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 32.90444, "lng": -111.34482, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "Pinal Post reports October 7, 2025 Florence land-use amendments for three Dobson Farms areas totaling 1,619 acres.", "independently_verified_current_operating_status": null}, "notes": ["Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/", "host": "pinalpost.com", "date": "2025-10-09", "published": "2025-10-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 18", "scope": "The October 7, 2025 Town minutes report adoption of Ordinance 766 25, changing the Dobson Farms East area from a residential general plan place type to industrial. General plan amendment approved describes that land use action. The minutes say permitted uses still require rezoning review; data centers are among several contemplated industrial uses. This is distinct from the separate Florence Tech Park PUD action and does not certify EdgeCore ownership, an individual data center permit, physical construction or operation. The minutes are retained in a later agenda packet with blank signature lines, not a separately verified executed ordinance.", "fields": {"current_stage_evidence": {"outcome": "reported_general_plan_action_not_individual_datacenter_entitlement", "scope": "The October 7, 2025 Town minutes report adoption of Ordinance 766 25, changing the Dobson Farms East area from a residential general plan place type to industrial. General plan amendment approved describes that land use action. The minutes say permitted uses still require rezoning review; data centers are among several contemplated industrial uses. This is distinct from the separate Florence Tech Park PUD action and does not certify EdgeCore ownership, an individual data center permit, physical construction or operation. The minutes are retained in a later agenda packet with blank signature lines, not a separately verified executed ordinance."}, "government_record_scope": {"minutes_pdf_pages_read": [53, 54, 55], "operative_vote_page_visually_read": 55, "executed_ordinance_independently_verified": false, "east_and_west_and_tech_park_actions_separate": true}}, "notes": ["The October 7, 2025 Town minutes report adoption of Ordinance 766 25, changing the Dobson Farms East area from a residential general plan place type to industrial. General plan amendment approved describes that land use action. The minutes say permitted uses still require rezoning review; data centers are among several contemplated industrial uses. This is distinct from the separate Florence Tech Park PUD action and does not certify EdgeCore ownership, an individual data center permit, physical construction or operation. The minutes are retained in a later agenda packet with blank signature lines, not a separately verified executed ordinance.", "Roles, locations, individual physical identity, quantities and opening fields remain exact. Source dates, check dates and physical milestones stay separate."], "sources": [{"url": "https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf", "host": "www.florenceaz.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arizona · Florence · Pinal · Source context reviewed", "status_scope": "The October 7, 2025 Town minutes report adoption of Ordinance 766 25, changing the Dobson Farms East area from a residential general plan place type to industrial. General plan amendment approved describes that land use action. The minutes say permitted uses still require rezoning review; data centers are among several contemplated industrial uses. This is distinct from the separate Florence Tech Park PUD action and does not certify EdgeCore ownership, an individual data center permit, physical construction or operation. The minutes are retained in a later agenda packet with blank signature lines, not a separately verified executed ordinance.", "event_evidence": [{"date": "2025-10-07", "text": "Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 766 25 for the Dobson Farms East general plan place type change. This broad land use action is not a final individual data center entitlement, construction permit or opening.", "kind": "approved", "sources": [{"url": "https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf", "host": "www.florenceaz.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "04021"}, "state_name": "Arizona", "state_path": "/arizona/"}, {"id": "ryan-companies-florence-tech-park-az", "state": "AZ", "kind": "facility", "name": "Florence Tech Park", "group": "proposed", "status": "PUD amendment approved", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Pinal"], "city": "Florence", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-10-07", "Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 769 25 for the Florence Tech Park PUD amendment. The action adds data centers within a broader light industrial use framework and is separate from individual building permits, utility delivery and operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/", "host": "pinalpost.com", "date": "2025-10-09", "published": "2025-10-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf", "host": "www.florenceaz.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 32.83648, "lng": -111.33885, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "Pinal Post reports October 7, 2025 Florence land-use amendments for three Dobson Farms areas totaling 1,619 acres.", "independently_verified_current_operating_status": null}, "notes": ["Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/", "host": "pinalpost.com", "date": "2025-10-09", "published": "2025-10-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 18", "scope": "Town of Florence minutes report October 7, 2025 adoption of Ordinance 769 25 for the Florence Tech Park PUD amendment, following a separate general plan action. PUD amendment approved describes this zoning context. The record names Ryan counsel and adds data centers among permitted light industrial uses, but does not certify an individual tenant, building permit, delivered power or operation. Separate Dobson Farms East and West general plan changes are not transferred to this component. The attached minutes report past votes and retain blank certification signatures; an executed ordinance was not separately reviewed.", "fields": {"current_stage_evidence": {"outcome": "reported_pud_action_not_current_physical_building_stage", "scope": "Town of Florence minutes report October 7, 2025 adoption of Ordinance 769 25 for the Florence Tech Park PUD amendment, following a separate general plan action. PUD amendment approved describes this zoning context. The record names Ryan counsel and adds data centers among permitted light industrial uses, but does not certify an individual tenant, building permit, delivered power or operation. Separate Dobson Farms East and West general plan changes are not transferred to this component. The attached minutes report past votes and retain blank certification signatures; an executed ordinance was not separately reviewed."}, "government_record_scope": {"minutes_pdf_pages_read": [56, 57, 58], "operative_vote_pages_visually_read": [57, 58], "executed_ordinance_independently_verified": false, "rezoning_distinct_from_individual_building_permits": true}}, "notes": ["Town of Florence minutes report October 7, 2025 adoption of Ordinance 769 25 for the Florence Tech Park PUD amendment, following a separate general plan action. PUD amendment approved describes this zoning context. The record names Ryan counsel and adds data centers among permitted light industrial uses, but does not certify an individual tenant, building permit, delivered power or operation. Separate Dobson Farms East and West general plan changes are not transferred to this component. The attached minutes report past votes and retain blank certification signatures; an executed ordinance was not separately reviewed.", "Roles, locations, individual physical identity, quantities and opening fields remain exact. Source dates, check dates and physical milestones stay separate."], "sources": [{"url": "https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf", "host": "www.florenceaz.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arizona · Florence · Pinal · Source context reviewed", "status_scope": "Town of Florence minutes report October 7, 2025 adoption of Ordinance 769 25 for the Florence Tech Park PUD amendment, following a separate general plan action. PUD amendment approved describes this zoning context. The record names Ryan counsel and adds data centers among permitted light industrial uses, but does not certify an individual tenant, building permit, delivered power or operation. Separate Dobson Farms East and West general plan changes are not transferred to this component. The attached minutes report past votes and retain blank certification signatures; an executed ordinance was not separately reviewed.", "event_evidence": [{"date": "2025-10-07", "text": "Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 769 25 for the Florence Tech Park PUD amendment. The action adds data centers within a broader light industrial use framework and is separate from individual building permits, utility delivery and operation.", "kind": "approved", "sources": [{"url": "https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf", "host": "www.florenceaz.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "04021"}, "state_name": "Arizona", "state_path": "/arizona/"}, {"id": "novva-mesa-az", "state": "AZ", "kind": "facility", "name": "Novva Mesa Data Center Campus", "group": "proposed", "status": "Operator-announced development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Maricopa"], "city": "Mesa", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Novva Mesa phased development forecasts. Target not observed opening.160acsite and1.3Msqftfootprint are different scopes. Water savings versus hypothetical conventional system are projections, not measured withdrawals; renewable/biofuel designs not current results.300MWheadline not all phase1IT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.novva.com/media-center/novva-data-centers-announces-new-campus-in-mesa/", "host": "novva.com", "date": "2024-08-21", "published": "2024-08-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 33.28935, "lng": -112.21974, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-discovery-review-round8-2026-10-14.json", "scope": "Novva Mesa phased development forecasts", "fields": {"original_announcement_date": "2024-08-21", "page_updated_date": "2026-01-13", "proposed_campus_acres": 160, "headline_planned_capacity_mw": 300, "headline_power_basis": "not explicit critical IT", "phase1_planned_critical_it_mw": 96, "phase1_operation_target": "late2026", "planned_investment_usd_min_exclusive": 3000000000, "planned_buildout_period": "nextdecade", "planned_data_halls": 5, "planned_total_building_footprint_sqft": 1300000, "expected_staff_approx": 200, "published_location": "northwest alignment of Ellsworth and Warner roads, southeast Mesa, Arizona"}, "notes": ["Target not observed opening.160acsite and1.3Msqftfootprint are different scopes. Water savings versus hypothetical conventional system are projections, not measured withdrawals; renewable/biofuel designs not current results.300MWheadline not all phase1IT.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.novva.com/media-center/novva-data-centers-announces-new-campus-in-mesa/", "host": "novva.com", "date": "2024-08-21", "published": "2024-08-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "Novva announces a phased data center campus in Mesa, with an initial launch forecast for late 2026.", "fields": {"current_stage_evidence": {"outcome": "operator_announced_development", "scope": "Novva announces a phased data center campus in Mesa, with an initial launch forecast for late 2026."}}, "notes": ["The forecast and proposed sustainability features do not establish actual commissioning, measured water savings or full-campus completion."], "sources": [{"url": "https://www.novva.com/media-center/novva-data-centers-announces-new-campus-in-mesa/", "host": "www.novva.com", "published": "2024-08-21", "date": "2024-08-21", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arizona · Mesa · Maricopa · Source context reviewed", "status_scope": "Novva announces a phased data center campus in Mesa, with an initial launch forecast for late 2026.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "04013"}, "state_name": "Arizona", "state_path": "/arizona/"}, {"id": "qts-phoenix-2-az", "state": "AZ", "kind": "facility", "name": "QTS Phoenix 2", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Maricopa"], "city": "Phoenix", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Multi-building campus total. Same postal address is listed for multiple buildings; no multiplication of 210 MW or automatic address-based collapsing. No commissioned-load inference. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://q.com/data-centers/phoenix-2/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 33.54795, "lng": -112.25545, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"campus_acres": 80, "advertised_critical_campus_mw_lower_bound": 210, "published_multi_building_address": "1200 N 40th St, Phoenix, AZ 85008"}, "notes": ["Multi-building campus total. Same postal address is listed for multiple buildings; no multiplication of 210 MW or automatic address-based collapsing. No commissioned-load inference.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://q.com/data-centers/phoenix-2/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "QTS explicitly lists Phoenix 2 as in development, separate from Phoenix 3 and Phoenix 4. Conflicting building-address wording in the detailed page is not promoted to a location or parcel. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "QTS explicitly lists Phoenix 2 as in development, separate from Phoenix 3 and Phoenix 4. Conflicting building-address wording in the detailed page is not promoted to a location or parcel. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["QTS explicitly lists Phoenix 2 as in development, separate from Phoenix 3 and Phoenix 4. Conflicting building-address wording in the detailed page is not promoted to a location or parcel."], "sources": [{"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arizona · Phoenix · Maricopa · Source context reviewed", "status_scope": "QTS explicitly lists Phoenix 2 as in development, separate from Phoenix 3 and Phoenix 4. Conflicting building-address wording in the detailed page is not promoted to a location or parcel. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "04013"}, "state_name": "Arizona", "state_path": "/arizona/"}, {"id": "stack-phx02-phoenix-az", "state": "AZ", "kind": "facility", "name": "STACK Infrastructure PHX02 Campus", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Maricopa"], "city": "Phoenix", "address": "", "who": "STACK Infrastructure", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Designed capacity with dedicated substation, not proof of all buildings operating. Page also uses Skyway location label; exact street and county not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.stackinfra.com/locations/americas/phoenix/phx02/", "host": "stackinfra.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 33.68501, "lng": -112.50695, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "captured-operator-review-round6-2026-10-14.json", "scope": "named operator source", "fields": {"planned_critical_capacity_mw": 250, "planned_buildings": 5, "campus_acres": 51, "published_market_location": "Central Phoenix"}, "notes": ["Designed capacity with dedicated substation, not proof of all buildings operating. Page also uses Skyway location label; exact street and county not established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/phoenix/phx02/", "host": "stackinfra.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 7", "scope": "The current STACK PHX02 campus page describes a five building campus designed to deliver future critical capacity. Developer listed development describes that named planned campus offering. Tours and the planned capacity do not establish completed buildings, occupied service, commissioning or measured demand. PHX01 remains separate.", "fields": {"current_stage_evidence": {"outcome": "developer_listed_development", "scope": "The current STACK PHX02 campus page describes a five building campus designed to deliver future critical capacity. Developer listed development describes that named planned campus offering. Tours and the planned capacity do not establish completed buildings, occupied service, commissioning or measured demand. PHX01 remains separate."}}, "notes": ["The current STACK PHX02 campus page describes a five building campus designed to deliver future critical capacity. Developer listed development describes that named planned campus offering. Tours and the planned capacity do not establish completed buildings, occupied service, commissioning or measured demand. PHX01 remains separate.", "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/phoenix/phx02/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check 17, October 23, 2026", "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. PHX02 is described as a designed five building campus in central Phoenix. The developer relationship is limited to this marketed development; a capacity design and substation description do not establish current commissioning or completed buildings.", "fields": {"company_association": {"name": "STACK Infrastructure", "role": "developer", "identity_scope": "provider_brand_only", "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. PHX02 is described as a designed five building campus in central Phoenix. The developer relationship is limited to this marketed development; a capacity design and substation description do not establish current commissioning or completed buildings."}, "provider_role": "developer"}, "notes": ["STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. PHX02 is described as a designed five building campus in central Phoenix. The developer relationship is limited to this marketed development; a capacity design and substation description do not establish current commissioning or completed buildings.", "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/phoenix/phx02/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party exact code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arizona · Phoenix · Maricopa · Source context reviewed", "status_scope": "The current STACK PHX02 campus page describes a five building campus designed to deliver future critical capacity. Developer listed development describes that named planned campus offering. Tours and the planned capacity do not establish completed buildings, occupied service, commissioning or measured demand. PHX01 remains separate.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "04013"}, "state_name": "Arizona", "state_path": "/arizona/"}, {"id": "serverfarm-clarksville-ar", "state": "AR", "kind": "facility", "name": "Serverfarm ARK Clarksville Data Center Campus", "group": "proposed", "status": "In development", "raw_status": "in development", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Johnson"], "city": "Clarksville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Serverfarm Clarksville proposed buildings and fiscal forecasts. Four108MWentriesarebuildingmarketingcapacity,notcurrentITloadorobservedenergization. RepeatedresponsiveHTMLtablesnot8buildings.558Mroundedtotalincludes548MPILOTandfees,notadditionalamount;548+3+2.1=553.1Mnot558M,remainder/scopeunresolved. Contracts/PILOTscheduleunread,notactualpublicreceipts.0Bcounteruninitializednotzero investment. CoolingcalledwaterlessbutFAQclosedloopreplacement;notzeroallsitewater.150to400jobsareINDIRECTregionalnotallsitepermanent. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. The broad In development label does not choose between permitting and construction. Renderings, building specifications and future jobs do not prove energized operation or current measured capacity. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.serverfarmllc.com/arkansas/", "host": "serverfarmllc.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 35.56977, "lng": -93.45989, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Serverfarm Clarksville proposed buildings and fiscal forecasts", "fields": {"operator": "Serverfarm", "project_codes": ["ARK1", "ARK2", "ARK3", "ARK4"], "locality": "Clarksville, Arkansas", "operator_stage": "coming soon, planned campus", "advertised_each_building_capacity_mw": 108, "power_basis": "building capacity, not explicitly critical IT", "each_building_area_sqft": 300000, "each_building_floors": 2, "design_pue_target_max": 1.3, "estimated_investment_usd": 6600000000, "developer_projected_public_benefit_through_2060_usd_approx": 558000000, "developer_projected_pilot_payments_usd": 548000000, "developer_projected_upfront_agreement_fees_usd": 3000000, "developer_projected_permit_fees_usd": 2100000, "expected_first_two_buildings_complete_target": "2028-01"}, "notes": ["Four108MWentriesarebuildingmarketingcapacity,notcurrentITloadorobservedenergization. RepeatedresponsiveHTMLtablesnot8buildings.558Mroundedtotalincludes548MPILOTandfees,notadditionalamount;548+3+2.1=553.1Mnot558M,remainder/scopeunresolved. Contracts/PILOTscheduleunread,notactualpublicreceipts.0Bcounteruninitializednotzero investment. CoolingcalledwaterlessbutFAQclosedloopreplacement;notzeroallsitewater.150to400jobsareINDIRECTregionalnotallsitepermanent.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.serverfarmllc.com/arkansas/", "host": "serverfarmllc.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "in development", "status_basis": "Serverfarm labels its Clarksville ARK campus Coming Soon and describes planned multi-building development.", "filter_scope": "Grouped with proposed/development projects; no final permit or exact construction stage is inferred."}, "notes": ["The broad In development label does not choose between permitting and construction. Renderings, building specifications and future jobs do not prove energized operation or current measured capacity. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://www.serverfarmllc.com/arkansas/", "host": "serverfarmllc.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "cde07a6db3a80007403e94122716d40994e1f7fa91e240229cecb272e5e2e034", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arkansas · Clarksville · Johnson · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "05071"}, "state_name": "Arkansas", "state_path": "/arkansas/"}, {"id": "blockops-marion-ar", "state": "AR", "kind": "facility", "name": "BlockOps Marion Bitcoin Mine (planned)", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": true, "type": "Crypto/HPC (inventory classification)", "counties": ["Crittenden"], "city": "Marion", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. BlockOps site-specific historical investment versus portfolio stages. Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/", "host": "blockopsmining.com", "date": "2026-10-08", "published": "2026-10-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 35.20541, "lng": -90.30821, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "BlockOps site-specific historical investment versus portfolio stages", "fields": {"operator": "BlockOps", "page_updated_date": "2026-10-08", "helena_site_acres": 168, "helena_former_use": "Dragon Woodland Sawmill Corporation", "historical_land_purchase_usd_approx": 300000, "helena_renovation_commitment_usd": 2000000, "helena_total_planned_investment_usd": 13500000, "helena_projected_annual_sales_tax_usd": 105000, "helena_planned_miner_count": 2900, "other_operator_described_sites": {"Russellville": "operates", "Moreland": "operates", "Marion": "further development planned"}}, "notes": ["Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/", "host": "blockopsmining.com", "date": "2026-10-08", "published": "2026-10-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 44", "scope": "The current original BlockOps page expressly describes further development planned in Marion. Company listed proposal is limited to that named forward development statement. Generic company operations, Helena approval figures and Russellville or Moreland operations do not establish Marion construction or operation. Exact premises, approvals, current build progress, quantities and an opening day remain unverified.", "fields": {"current_stage_evidence": {"outcome": "current_named_marion_development_plan", "scope": "The current original BlockOps page expressly describes further development planned in Marion. Company listed proposal is limited to that named forward development statement. Generic company operations, Helena approval figures and Russellville or Moreland operations do not establish Marion construction or operation. Exact premises, approvals, current build progress, quantities and an opening day remain unverified."}}, "notes": ["The current original BlockOps page expressly describes further development planned in Marion. Company listed proposal is limited to that named forward development statement. Generic company operations, Helena approval figures and Russellville or Moreland operations do not establish Marion construction or operation. Exact premises, approvals, current build progress, quantities and an opening day remain unverified.", "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."], "sources": [{"url": "https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/", "host": "www.blockopsmining.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arkansas · Marion · Crittenden · Source context reviewed", "status_scope": "The current original BlockOps page expressly describes further development planned in Marion. Company listed proposal is limited to that named forward development statement. Generic company operations, Helena approval figures and Russellville or Moreland operations do not establish Marion construction or operation. Exact premises, approvals, current build progress, quantities and an opening day remain unverified.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "05035"}, "state_name": "Arkansas", "state_path": "/arkansas/"}, {"id": "google-port-of-little-rock-data-center-ar", "state": "AR", "kind": "facility", "name": "Port of Little Rock Data Center", "group": "proposed", "status": "Operator-reported evaluation", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Pulaski"], "city": "Little Rock", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Lucas Dufalla, ArkansasDemocratGazette March31,2026 original Corps-application report: Willowbend/ProjectBoar PortLittleRock five industrial buildings1.43Msf plus offices/substation. Google identity reported from prior newspaper work, not company acknowledgment in this article.380-acre sale MOU/rezoning not independently inspected closing/permits.16.8acre wetland fill/mitigation proposed, not authorized discharge or observed compliance. April24commentdeadline is past publication context, no outcome inferred.1B proposed investment/50jobs forecast;300k annual+200k per additional data center/2% five-year escalation/min65%30year abatement are reported agreement terms, not paid receipts. Five industrial buildings do not automatically mean five separately billed data centers. Utility2600MWnew/1600MWrepower are system generation, not campus IT; site power/water demands and construction timeline undisclosed. Not all fields, current operation, permits, exact parcel or critical IT independently verified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.arkansasonline.com/news/2026/mar/31/googles-1b-port-of-little-rock-data-center/", "host": "arkansasonline.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.littlerockdatacenter.com/", "host": "www.littlerockdatacenter.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://lrwra.com/data-centers/", "host": "lrwra.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.arkleg.state.ar.us/Home/FTPDocument?path=%2FAssembly%2FMeeting+Attachments%2F510%2F28051%2FEXHIBIT+B+-+Meeting+Minutes+09-15-2026.pdf", "host": "www.arkleg.state.ar.us", "published": "", "date": "", "checked": "2026-10-17", "label": "Draft document; not adopted minutes"}], "loc": {"lat": 34.80613, "lng": -92.28424, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json", "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.", "fields": {}, "notes": ["Lucas Dufalla, ArkansasDemocratGazette March31,2026 original Corps-application report: Willowbend/ProjectBoar PortLittleRock five industrial buildings1.43Msf plus offices/substation. Google identity reported from prior newspaper work, not company acknowledgment in this article.380-acre sale MOU/rezoning not independently inspected closing/permits.16.8acre wetland fill/mitigation proposed, not authorized discharge or observed compliance. April24commentdeadline is past publication context, no outcome inferred.1B proposed investment/50jobs forecast;300k annual+200k per additional data center/2% five-year escalation/min65%30year abatement are reported agreement terms, not paid receipts. Five industrial buildings do not automatically mean five separately billed data centers. Utility2600MWnew/1600MWrepower are system generation, not campus IT; site power/water demands and construction timeline undisclosed.", "Not all fields, current operation, permits, exact parcel or critical IT independently verified."], "sources": [{"url": "https://www.arkansasonline.com/news/2026/mar/31/googles-1b-port-of-little-rock-data-center/", "host": "arkansasonline.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "operator-reported_evaluation", "scope": "Google’s project website describes early evaluation of a potential Port of Little Rock site, with a final build decision still ahead. Withdrawal of a wetland application for design changes is not cancellation of the whole project. LRWRA separately identifies a prospective wastewater commitment; 300,000 gallons per day is not measured water consumption or the plant’s separate 8 MGD spare capacity. September 15 legislative minutes visibly marked DRAFT are testimony context, not adopted agency findings. The proposed label rests on Google’s own project account."}}, "notes": ["Google’s project website describes early evaluation of a potential Port of Little Rock site, with a final build decision still ahead. Withdrawal of a wetland application for design changes is not cancellation of the whole project. LRWRA separately identifies a prospective wastewater commitment; 300,000 gallons per day is not measured water consumption or the plant’s separate 8 MGD spare capacity. September 15 legislative minutes visibly marked DRAFT are testimony context, not adopted agency findings. The proposed label rests on Google’s own project account."], "sources": [{"url": "https://www.littlerockdatacenter.com/", "host": "www.littlerockdatacenter.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://lrwra.com/data-centers/", "host": "lrwra.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.arkleg.state.ar.us/Home/FTPDocument?path=%2FAssembly%2FMeeting+Attachments%2F510%2F28051%2FEXHIBIT+B+-+Meeting+Minutes+09-15-2026.pdf", "host": "www.arkleg.state.ar.us", "published": "", "date": "", "checked": "2026-10-17", "label": "Draft document; not adopted minutes"}], "checked": "2026-10-17", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arkansas · Little Rock · Pulaski · Source context reviewed", "status_scope": "Google’s project website describes early evaluation of a potential Port of Little Rock site, with a final build decision still ahead. Withdrawal of a wetland application for design changes is not cancellation of the whole project. LRWRA separately identifies a prospective wastewater commitment; 300,000 gallons per day is not measured water consumption or the plant’s separate 8 MGD spare capacity. September 15 legislative minutes visibly marked DRAFT are testimony context, not adopted agency findings. The proposed label rests on Google’s own project account.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "05119"}, "state_name": "Arkansas", "state_path": "/arkansas/"}, {"id": "menlo-equities-300-holger-way-san-jose-ca", "state": "CA", "kind": "facility", "name": "300 Holger Way Data Center (Menlo Equities conversion)", "group": "proposed", "status": "City-listed planned development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Santa Clara"], "city": "San Jose", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Holger Way existing-building conversion notice. Reuse/exemption is not a new97800sqftaddition, observed opening, all permits or MW. MenloParkapplicantcontactnotfacilitylocation. Do not merge with separate888RossDriveSunnyvaleMenloproject. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-09", "San Jose signed a categorical CEQA exemption for the proposed 300 Holger Way reuse. This is an environmental review action, not issuance of every permit, observed tenant work or an opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://ceqanet.lci.ca.gov/2026070652", "host": "ceqanet.lci.ca.gov", "date": "2026-07-16", "published": "2026-07-16", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://files.ceqanet.lci.ca.gov/336867-1/attachment/vA_1jJIqvW9fLOZtHXIqFpDPTX4aqQxB-al9TUgH270N4ahzuusAZlaJskGTdoDJu21I1wdo2hIDs5Lp0", "host": "files.ceqanet.lci.ca.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=300+Holger+Way%2C+San+Jose%2C+CA+95134&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.95272888525233%2C37.41402128853755%2C-121.94028711474766%2C37.42390271146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}], "loc": {"lng": -121.946508, "lat": 37.418962, "precision": "address", "basis": "Officially filed project street 300 Holger Way, San Jose, CA 95134 matched to one calculated Census street range within the retained county. This is a street reference, not a surveyed roof, parcel, title, current operation or complete campus boundary. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Holger Way existing-building conversion notice", "fields": {"government_cases": ["SP25-029", "ER25-243"], "project_name": "300 Holger Way Data Center Project", "notice_posted_date": "2026-07-16", "address": "300 Holger Way, San Jose, California95134", "parcel": "09703132", "existing_rd_building_sqft_approx": 97800, "site_gross_acres_approx": 4.86, "applicant": "Holger Technology Partners LLC", "action": "CEQA exemption for special-use-permit data-center use in existing R&D building"}, "notes": ["Reuse/exemption is not a new97800sqftaddition, observed opening, all permits or MW. MenloParkapplicantcontactnotfacilitylocation. Do not merge with separate888RossDriveSunnyvaleMenloproject.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ceqanet.lci.ca.gov/2026070652", "host": "ceqanet.lci.ca.gov", "date": "2026-07-16", "published": "2026-07-16", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 4", "scope": "San Jose describes the proposed 300 Holger Way data center use in an existing building and signed a categorical CEQA exemption on July 9, 2026. The state index posted the notice on July 16. The reviewed notice and statements do not establish that the separate special use permit was issued, tenant work began or the facility opened. The city listed planned development label applies to the proposed use only.", "fields": {"current_stage_evidence": {"outcome": "city_listed_planned_development", "scope": "San Jose describes the proposed 300 Holger Way data center use in an existing building and signed a categorical CEQA exemption on July 9, 2026. The state index posted the notice on July 16. The reviewed notice and statements do not establish that the separate special use permit was issued, tenant work began or the facility opened. The city listed planned development label applies to the proposed use only."}, "environmental_review_context": {"signed_exemption_on": "2026-07-09", "state_index_posted_on": "2026-07-16", "older_statement_date": "2026-06-02", "separate_special_use_permit_issuance_established": false, "rendered_pdf_pages_reviewed": [4, 6, 8, 9]}}, "notes": ["San Jose describes the proposed 300 Holger Way data center use in an existing building and signed a categorical CEQA exemption on July 9, 2026. The state index posted the notice on July 16. The reviewed notice and statements do not establish that the separate special use permit was issued, tenant work began or the facility opened. The city listed planned development label applies to the proposed use only."], "sources": [{"url": "https://ceqanet.lci.ca.gov/2026070652", "host": "ceqanet.lci.ca.gov", "published": "2026-07-16", "date": "2026-07-16", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://files.ceqanet.lci.ca.gov/336867-1/attachment/vA_1jJIqvW9fLOZtHXIqFpDPTX4aqQxB-al9TUgH270N4ahzuusAZlaJskGTdoDJu21I1wdo2hIDs5Lp0", "host": "files.ceqanet.lci.ca.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 51, October 23, 2026", "scope": "Officially filed project street reference only. Existing Native status remains proposed. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.", "fields": {"location_review_decision": {"location": {"lng": -121.946508, "lat": 37.418962, "precision": "address", "basis": "Officially filed project street 300 Holger Way, San Jose, CA 95134 matched to one calculated Census street range within the retained county. This is a street reference, not a surveyed roof, parcel, title, current operation or complete campus boundary. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "300 Holger Way, San Jose, CA 95134", "county_fips": ["06085"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["Officially filed project street reference only. Existing Native status remains proposed. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.", "The calculated reference lies on a street beside low industrial or research forms and parking, with broad open ground north of the road and residential blocks farther south. No residential roof or computing equipment is selected. The image cannot confirm the later conversion, current use or physical stage. Imagery acquisition date is unknown and may predate construction.", "The earlier inherited approximate inventory point is not a reviewed destination. This explicit official project street review retains its exact predecessor and corrects only the map reference. No physical relocation, current physical milestone or surveyed boundary is inferred.", "Source Received, Posted, agenda, agreement and retrieval clocks remain separate from physical events. Corporate and agency contact addresses, generator yards, neighboring streets and map coordinates are not adopted. Canonical address and all protected Native facts remain exact."], "sources": [{"url": "https://ceqanet.lci.ca.gov/2026070652", "host": "ceqanet.lci.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact official project street and bounded facility identity"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=300+Holger+Way%2C+San+Jose%2C+CA+95134&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.95272888525233%2C37.41402128853755%2C-121.94028711474766%2C37.42390271146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Filed project street reference, not a surveyed building or parcel", "summary": "California · San Jose · Santa Clara · Source context reviewed", "status_scope": "San Jose describes the proposed 300 Holger Way data center use in an existing building and signed a categorical CEQA exemption on July 9, 2026. The state index posted the notice on July 16. The reviewed notice and statements do not establish that the separate special use permit was issued, tenant work began or the facility opened. The city listed planned development label applies to the proposed use only.", "event_evidence": [{"date": "2026-07-09", "text": "San Jose signed a categorical CEQA exemption for the proposed 300 Holger Way reuse. This is an environmental review action, not issuance of every permit, observed tenant work or an opening.", "kind": "approved", "sources": [{"url": "https://files.ceqanet.lci.ca.gov/336867-1/attachment/vA_1jJIqvW9fLOZtHXIqFpDPTX4aqQxB-al9TUgH270N4ahzuusAZlaJskGTdoDJu21I1wdo2hIDs5Lp0", "host": "files.ceqanet.lci.ca.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}]}], "state_name": "California", "state_path": "/california/"}, {"id": "avaio-perseus-pittsburg-ca", "state": "CA", "kind": "facility", "name": "AVAIO Digital Perseus", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Contra Costa"], "city": "Pittsburg", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Pittsburg approved design modification and CEQA notice. Notice of determination records specified design/CEQA approval, not all construction permits or operations. No numeric MW in reviewed notice. AVAIO applicant email supports link, not tenant lease. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://ceqanet.lci.ca.gov/2025100607/4", "host": "ceqanet.lci.ca.gov", "date": "2026-02-17", "published": "2026-02-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.avaiodigital.com/developments/pittsburg-california", "host": "www.avaiodigital.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}, {"url": "https://gis.cccounty.us/arcgis/rest/services/CCMAP/Assessment_Parcels_ArcPro/MapServer/0/query?where=APN+%3D+%27095160008%27+OR+parcel_dashes+%3D+%27095-160-008%27&outFields=OBJECTID%2CAPN%2CS_STR_NM%2CS_STR_SUF%2CS_STR_NBR%2Cfull_address_display%2Cfull_address_search%2Cparcel_dashes%2Cs_city&returnGeometry=true&outSR=4326&resultRecordCount=10&f=json", "host": "gis.cccounty.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact official source parcel or situs query"}, {"url": "https://gis.cccounty.us/arcgis/rest/services/CCMAP/Assessment_Parcels_ArcPro/MapServer/0?f=pjson", "host": "gis.cccounty.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Official public parcel layer definitions"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.91633072996447%2C38.006618444125046%2C-121.90492927003552%2C38.01560155587496&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting, acquisition date unknown"}], "loc": {"lng": -121.91063, "lat": 38.01111, "precision": "approximate", "basis": "Approximate calculated center of official Contra Costa County GIS reference parcel 095160008 for the explicitly named project street 2242 Golf Club Road, Pittsburg, CA. No surveyed boundary, roof, title, tenant, owner, independent building, current operation or complete campus is established. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Pittsburg approved design modification and CEQA notice", "fields": {"project_title": "Pittsburg Data Hub", "application": "AP-25-0113 CDR modification", "agency_approval_date": "2026-02-12", "notice_posted_date": "2026-02-17", "earlier_design_approval_date": "2025-12-11", "address": "2242 Golf Club Road, Pittsburg, California", "parcel": "095-160-008", "site_acres_approx": 22, "data_center_stories": 3, "modification": "PG&E interconnection relocation and wetland mitigation grading/site layout"}, "notes": ["Notice of determination records specified design/CEQA approval, not all construction permits or operations. No numeric MW in reviewed notice. AVAIO applicant email supports link, not tenant lease.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ceqanet.lci.ca.gov/2025100607/4", "host": "ceqanet.lci.ca.gov", "date": "2026-02-17", "published": "2026-02-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "next-status-2026-10-19", "scope": "AVAIO lists Project Perseus in Pittsburg as a development with future first occupancy and power delivery.", "fields": {"current_stage_evidence": {"outcome": "developer_listed_development", "scope": "AVAIO lists Project Perseus in Pittsburg as a development with future first occupancy and power delivery."}}, "notes": ["The developer page does not establish current operation or completed phases. Its statements about public approvals are company reports; the original agency decisions have not been read for this review. No forecast power, water or property figures are adopted."], "sources": [{"url": "https://www.avaiodigital.com/developments/pittsburg-california", "host": "www.avaiodigital.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 52, October 23, 2026", "scope": "Explicit source bound location reference only. Existing Native status remains proposed. No new physical stage, opening, current operation, title, owner, tenant, role, quantity, roof or complete campus boundary is certified.", "fields": {"location_review_decision": {"location": {"lng": -121.91063, "lat": 38.01111, "precision": "approximate", "basis": "Approximate calculated center of official Contra Costa County GIS reference parcel 095160008 for the explicitly named project street 2242 Golf Club Road, Pittsburg, CA. No surveyed boundary, roof, title, tenant, owner, independent building, current operation or complete campus is established. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Approximate county reference parcel center", "reference_parcel": {"identifier": "095160008", "identifier_field": "APN", "objectid": 219044, "agency": "Contra Costa County GIS", "reference_method": "calculated_polygon_centroid", "not_survey_quality": true, "legal_title_verified": false, "independent_building_identity": false, "full_campus_verified": false, "operator_ownership_verified": false, "geometry_acquisition_date": null}, "operator_coordinates_adopted": false, "census_range_adopted": false}}, "notes": ["The exact agency project description names2242GolfClubRoad and APN095160008. The current county parcel repeats that exact APN and street. The current operator page instead prints2232GolfClubRoad and different broader site context. The literal address conflict remains explicit. This selects one approximate agency defined parcel reference only, without silently validating or replacing the operator street or certifying its complete campus.", "Explicit source bound location reference only. Existing Native status remains proposed. No new physical stage, opening, current operation, title, owner, tenant, role, quantity, roof or complete campus boundary is certified.", "The source parcel center falls in open ground with former developed traces, a road north and residential areas outside the eastern setting. The county exact APN and2242GolfClubRoad match the agency filing. The operator2232street remains an unresolved literal difference. No residential roof, current physical stage, complete campus, acreage allocation or operator coordinate is selected. Acquisition date is unknown.", "The original inherited general area coordinate was not a reviewed physical destination. The exact independent official street and source reference join now support only the stated bounded reference. Its earlier value and complete source history remain retained, without a physical relocation or new physical milestone.", "Source registration, planning, tax, title, administrative dates and imagery setting retain their independent scopes. Acquisition dates are unknown. Canonical address, protected attributes and every existing field remain exact except the reviewed reference and provenance."], "sources": [{"url": "https://www.avaiodigital.com/developments/pittsburg-california", "host": "www.avaiodigital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal2232operatorstreet retained as a conflict, not selected"}, {"url": "https://ceqanet.lci.ca.gov/2025100607/4", "host": "ceqanet.lci.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact official named project street and scope"}, {"url": "https://gis.cccounty.us/arcgis/rest/services/CCMAP/Assessment_Parcels_ArcPro/MapServer/0/query?where=APN+%3D+%27095160008%27+OR+parcel_dashes+%3D+%27095-160-008%27&outFields=OBJECTID%2CAPN%2CS_STR_NM%2CS_STR_SUF%2CS_STR_NBR%2Cfull_address_display%2Cfull_address_search%2Cparcel_dashes%2Cs_city&returnGeometry=true&outSR=4326&resultRecordCount=10&f=json", "host": "gis.cccounty.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact official source parcel or situs query"}, {"url": "https://gis.cccounty.us/arcgis/rest/services/CCMAP/Assessment_Parcels_ArcPro/MapServer/0?f=pjson", "host": "gis.cccounty.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Official public parcel layer definitions"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.91633072996447%2C38.006618444125046%2C-121.90492927003552%2C38.01560155587496&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting, acquisition date unknown"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate official source parcel reference, not a roof or complete campus", "summary": "California · Pittsburg · Contra Costa · Source context reviewed", "status_scope": "AVAIO lists Project Perseus in Pittsburg as a development with future first occupancy and power delivery.", "state_name": "California", "state_path": "/california/"}, {"id": "beacon-golden-valley-ca", "state": "CA", "kind": "facility", "name": "Golden Valley Technology Hub", "group": "proposed", "status": "Operator-announced proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kern"], "city": "Elk Hills", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. KERO RubyRivera originalinterviews onGoldenValleyTechnologyHub nearElkHills identifyCRC'sproposal on100acreswith400000sf INCLUDINGDC,substation,officesandparking. MetadataJune23,2026publication/June24update; bodydescribesproposalrequiringadditionalreviews/approvalsbeforeconstruction. No observedcommissioning/allpermits. Existingunderutilizedpowerplantasprimarysupply isdeveloperplan, notexecutedenergizedDCITload ornewgenerationapproval. Closed-loopnotzerowaterwithdrawal; resourceconcerns/supportiveviewsattributednotactualmeasuredharm/benefit. SourceprovidesnoITMW/actualspend; Beaconpartnership/legalcounterpartyunverifiedfromthisbodyalone. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.turnto23.com/news/in-your-neighborhood/taft-maricopa/massive-ai-data-center-proposed-for-kern-countys-elk-hills", "host": "turnto23.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.goldenvalleytechhub.com/", "host": "www.goldenvalleytechhub.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}], "loc": {"lat": 35.34283, "lng": -118.72987, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-original-transactions-and-legal-stage-review-round73-2026-10-15.json", "scope": "Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.", "fields": {}, "notes": ["KERO RubyRivera originalinterviews onGoldenValleyTechnologyHub nearElkHills identifyCRC'sproposal on100acreswith400000sf INCLUDINGDC,substation,officesandparking. MetadataJune23,2026publication/June24update; bodydescribesproposalrequiringadditionalreviews/approvalsbeforeconstruction. No observedcommissioning/allpermits.", "Existingunderutilizedpowerplantasprimarysupply isdeveloperplan, notexecutedenergizedDCITload ornewgenerationapproval. Closed-loopnotzerowaterwithdrawal; resourceconcerns/supportiveviewsattributednotactualmeasuredharm/benefit. SourceprovidesnoITMW/actualspend; Beaconpartnership/legalcounterpartyunverifiedfromthisbodyalone.", "Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."], "sources": [{"url": "https://www.turnto23.com/news/in-your-neighborhood/taft-maricopa/massive-ai-data-center-proposed-for-kern-countys-elk-hills", "host": "turnto23.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "operator-announced_proposal", "scope": "The project website identifies a proposed Beacon/CRC development at Elk Hills. Proposed closed-loop cooling and existing on-site generation do not establish a completed data center, zero water use or energization. Animated zero-percent counters are not technical facts. The label describes proposed development."}}, "notes": ["The project website identifies a proposed Beacon/CRC development at Elk Hills. Proposed closed-loop cooling and existing on-site generation do not establish a completed data center, zero water use or energization. Animated zero-percent counters are not technical facts. The label describes proposed development."], "sources": [{"url": "https://www.goldenvalleytechhub.com/", "host": "www.goldenvalleytechhub.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}], "checked": "2026-10-17", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "California · Elk Hills · Kern · Source context reviewed", "status_scope": "The project website identifies a proposed Beacon/CRC development at Elk Hills. Proposed closed-loop cooling and existing on-site generation do not establish a completed data center, zero water use or energization. Animated zero-percent counters are not technical facts. The label describes proposed development.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "06029"}, "state_name": "California", "state_path": "/california/"}, {"id": "goodman-energy-park-vernon-ca", "state": "CA", "kind": "project", "name": "Goodman Energy Park Data Center", "group": "proposed", "status": "Proposal under review", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Los Angeles"], "city": "Vernon", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "CEC proposed up-to-99-MW emergency backup-generation envelope for the two-building Goodman Energy Park project. Not critical IT load, summed generator nameplates, utility service or grid export.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Goodman Energy Park backup-power review. 99MW emergency generation is not criticalIT or grid export.38times3MWplus2times1MW nameplates include operational/redundant differences; do not sum into IT. No local permits, occupancy or opening established. Addresses differ from DataBank3094EVernon announcement; do not merge solely by Goodman association. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf", "host": "energy.ca.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=25-SPPE-01", "host": "efiling.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "CEC docket 25-SPPE-01 log, metadata only"}, {"url": "https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3163+East+Vernon+Avenue%2C+Vernon%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3049+East+Vernon+Avenue%2C+Vernon%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-118.22451296427728%2C34.00060928853755%2C-118.21259303572272%2C34.01049071146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}], "loc": {"lng": -118.218553, "lat": 34.00555, "precision": "approximate", "basis": "Approximate arithmetic mean of both explicitly filed Goodman Energy Park project building streets 3163 East Vernon Avenue, Vernon, CA, 3049 East Vernon Avenue, Vernon, CA. Both street matches are calculated Census references within Los Angeles County. The unrelated DataBank LAX2 street 3094 East Vernon Avenue is excluded. No building, operator or campus merger is inferred. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Goodman Energy Park backup-power review", "fields": {"energy_docket": "25-SPPE-01", "project_owner": "GIC Vernon LLC", "energy_project_status": "under review", "proposed_backup_generation_mw_max": 99, "proposed_diesel_generators": 40, "planned_data_center_buildings": 2, "published_building_addresses": ["3163 East Vernon Avenue,Vernon,California", "3049 East Vernon Avenue,Vernon,California"]}, "notes": ["99MW emergency generation is not criticalIT or grid export.38times3MWplus2times1MW nameplates include operational/redundant differences; do not sum into IT. No local permits, occupancy or opening established. Addresses differ from DataBank3094EVernon announcement; do not merge solely by Goodman association.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf", "host": "energy.ca.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Primary-Campus-Holds-20261016", "scope": "Targeted primary campus/project stage and identity-scope review. No physical-site census, point/precision upgrade, actual delivery, metered use or legal title finding.", "fields": {"energy_project_docket": "25-SPPE-01", "project_applicant": "GIC Vernon LLC", "published_component_addresses": ["3163 East Vernon Avenue, Vernon, California", "3049 East Vernon Avenue, Vernon, California"], "proposed_building_count": 2, "emergency_generator_scope": "CEC describes up to 99 MW of emergency backup generation from 40 diesel generators. Thirty-eight 3 MW critical-load and two 1 MW house-generator nameplates are not a summed IT, utility or export capacity. The backup facility is not interconnected to the transmission grid.", "regulatory_review_scope": "CEC lists the backup-generation exemption proceeding as Under Review. Its docket log includes an October 14, 2026 applicant response. Docket metadata is not an adopted order or proof of a final permit; CEC explains that it does not permit the data center itself and an SPPE would not replace local approvals.", "vernon_identity_comparison": {"goodman_energy_park": {"record_id": "goodman-energy-park-vernon-ca", "published_building_addresses": ["3163 East Vernon Avenue, Vernon, California", "3049 East Vernon Avenue, Vernon, California"], "source_context": "CEC proposed two-building Goodman Energy Park / VBGF proceeding"}, "databank_lax2": {"record_id": "databank-vernon-la-ca", "published_address": "3094 E. Vernon Avenue - Vernon, CA 90058", "source_context": "DataBank LAX2 / Goodman LAX01 development"}, "decision": "Retain separate research identities. Different published address contexts and a shared Goodman name do not establish a same-project or physical-building relationship. No merge, new site or point movement is supported."}, "current_status_basis": "Proposed Goodman Energy Park two-building context with the associated CEC backup-generation exemption proceeding listed Under Review. This describes a regulatory proposal, not verified current construction, occupancy or operation. Final local land-use, building and air permissions are not established."}, "notes": ["Field-specific review only. Original name, approximate location and wrapper, city/county context, opening field, legacy MW, financial and ownership limits remain.", "Campus/component and regulatory proposal units are not interchangeable with separate physical sites or complete operational capacity."], "sources": [{"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf", "host": "www.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "California Energy Commission primary project record"}, {"url": "https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=25-SPPE-01", "host": "efiling.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "CEC docket 25-SPPE-01 log, metadata only"}, {"url": "https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 51, October 23, 2026", "scope": "Officially filed project street reference only. Existing Native status remains proposed. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.", "fields": {"location_review_decision": {"location": {"lng": -118.218553, "lat": 34.00555, "precision": "approximate", "basis": "Approximate arithmetic mean of both explicitly filed Goodman Energy Park project building streets 3163 East Vernon Avenue, Vernon, CA, 3049 East Vernon Avenue, Vernon, CA. Both street matches are calculated Census references within Los Angeles County. The unrelated DataBank LAX2 street 3094 East Vernon Avenue is excluded. No building, operator or campus merger is inferred. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Approximate mean of two explicitly published service street references", "published_addresses": ["3163 East Vernon Avenue, Vernon, CA", "3049 East Vernon Avenue, Vernon, CA"], "county_fips": ["06037"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["Officially filed project street reference only. Existing Native status remains proposed. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.", "The approximate mean lies on the street between large industrial forms, with rail and river infrastructure north of the source setting. It is a calculated reference for the complete pair of filed project streets, not a surveyed parcel, roof, finished campus or proof of construction. Imagery acquisition date is unknown and may predate construction.", "The earlier inherited approximate inventory point is not a reviewed destination. This explicit official project street review retains its exact predecessor and corrects only the map reference. No physical relocation, current physical milestone or surveyed boundary is inferred.", "Source Received, Posted, agenda, agreement and retrieval clocks remain separate from physical events. Corporate and agency contact addresses, generator yards, neighboring streets and map coordinates are not adopted. Canonical address and all protected Native facts remain exact.", "The CEC explicitly lists3163and3049EastVernonAvenue. The current DataBankLAX2page instead lists3094EastVernonAvenue. Its different street is not substituted, and these records are not merged or counted as separate independently verified buildings."], "sources": [{"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf", "host": "www.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact official project street and bounded facility identity"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3163+East+Vernon+Avenue%2C+Vernon%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3049+East+Vernon+Avenue%2C+Vernon%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-118.22451296427728%2C34.00060928853755%2C-118.21259303572272%2C34.01049071146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate filed project street set reference, not a roof or complete campus", "summary": "California · Vernon · Los Angeles · Source context reviewed", "status_scope": "Proposed Goodman Energy Park two-building context with the associated CEC backup-generation exemption proceeding listed Under Review. This describes a regulatory proposal, not verified current construction, occupancy or operation. Final local land-use, building and air permissions are not established.", "typed_power_facts": [{"measure": "backup_generation", "value": 99, "unit": "MW", "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "basis": "forecast", "scope": "CEC proposed up-to-99-MW emergency backup-generation envelope for the two-building Goodman Energy Park project. Not critical IT load, summed generator nameplates, utility service or grid export.", "sources": ["https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf"]}], "state_name": "California", "state_path": "/california/"}, {"id": "prologis-silver-creek-valley-san-jose-ca", "state": "CA", "kind": "facility", "name": "Prologis Silver Creek Valley Road Data Center", "group": "proposed", "status": "State environmental review", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Santa Clara"], "city": "San Jose", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower. GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them", "host": "kqed.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects", "host": "www.sanjoseca.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Access-check target"}, {"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf", "host": "www.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5977+Silver+Creek+Valley+Road%2C+San+Jose%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.79420951111057%2C37.25237528853755%2C-121.78179448888945%2C37.262256711462456&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}], "loc": {"lng": -121.788002, "lat": 37.257316, "precision": "address", "basis": "Officially filed project street 5977 Silver Creek Valley Road, San Jose, CA matched to one calculated Census street range within the retained county. This is a street reference, not a surveyed roof, parcel, title, current operation or complete campus boundary. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json", "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.", "fields": {}, "notes": ["JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower.", "GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored.", "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."], "sources": [{"url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them", "host": "kqed.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "unresolved", "scope": "The September 2026 KQED account provides Silver Creek Valley proposal context. The original city listing was access-limited. Microsoft’s Alviso construction, Google’s research proposal and STEM Park’s figures are separate projects. No technical quantity or final site decision is adopted from this news account."}}, "notes": ["The September 2026 KQED account provides Silver Creek Valley proposal context. The original city listing was access-limited. Microsoft’s Alviso construction, Google’s research proposal and STEM Park’s figures are separate projects. No technical quantity or final site decision is adopted from this news account."], "sources": [{"url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them", "host": "www.kqed.org", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects", "host": "www.sanjoseca.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Access-check target"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 16", "scope": "The CEC current page identifies the proposed data center at 5977 Silver Creek Valley Road and marks its backup generating facility exemption application Under Review. State environmental review describes this specific proposal and review process. The generators support emergency backup and their ratings are not IT capacity or actual demand. An application under review is not a granted exemption, local land use approval, construction start or operation.", "fields": {"current_stage_evidence": {"outcome": "named_proposal_in_state_environmental_review", "scope": "The CEC current page identifies the proposed data center at 5977 Silver Creek Valley Road and marks its backup generating facility exemption application Under Review. State environmental review describes this specific proposal and review process. The generators support emergency backup and their ratings are not IT capacity or actual demand. An application under review is not a granted exemption, local land use approval, construction start or operation."}, "regulatory_scope": {"cec_application_status": "Under Review", "sppe_not_final_local_construction_or_operating_approval": true, "backup_generation_not_it_capacity": true, "physical_construction_or_operation_verified": false}}, "notes": ["The CEC current page identifies the proposed data center at 5977 Silver Creek Valley Road and marks its backup generating facility exemption application Under Review. State environmental review describes this specific proposal and review process. The generators support emergency backup and their ratings are not IT capacity or actual demand. An application under review is not a granted exemption, local land use approval, construction start or operation.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf", "host": "www.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 51, October 23, 2026", "scope": "Officially filed project street reference only. Existing Native status remains proposed. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.", "fields": {"location_review_decision": {"location": {"lng": -121.788002, "lat": 37.257316, "precision": "address", "basis": "Officially filed project street 5977 Silver Creek Valley Road, San Jose, CA matched to one calculated Census street range within the retained county. This is a street reference, not a surveyed roof, parcel, title, current operation or complete campus boundary. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "5977 Silver Creek Valley Road, San Jose, CA", "county_fips": ["06085"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["Officially filed project street reference only. Existing Native status remains proposed. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.", "The calculated reference lies at a road edge beside open land and industrial forms, with residential blocks farther west. The image does not establish construction, site clearing, operation or the proposed facility footprint. No neighboring residential roof is selected. Imagery acquisition date is unknown and may predate construction.", "The earlier inherited approximate inventory point is not a reviewed destination. This explicit official project street review retains its exact predecessor and corrects only the map reference. No physical relocation, current physical milestone or surveyed boundary is inferred.", "Source Received, Posted, agenda, agreement and retrieval clocks remain separate from physical events. Corporate and agency contact addresses, generator yards, neighboring streets and map coordinates are not adopted. Canonical address and all protected Native facts remain exact."], "sources": [{"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf", "host": "www.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact official project street and bounded facility identity"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5977+Silver+Creek+Valley+Road%2C+San+Jose%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.79420951111057%2C37.25237528853755%2C-121.78179448888945%2C37.262256711462456&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Filed project street reference, not a surveyed building or parcel", "summary": "California · San Jose · Santa Clara · Source context reviewed", "status_scope": "The CEC current page identifies the proposed data center at 5977 Silver Creek Valley Road and marks its backup generating facility exemption application Under Review. State environmental review describes this specific proposal and review process. The generators support emergency backup and their ratings are not IT capacity or actual demand. An application under review is not a granted exemption, local land use approval, construction start or operation.", "state_name": "California", "state_path": "/california/"}, {"id": "prologis-stem-park-zanker-road-san-jose-ca", "state": "CA", "kind": "facility", "name": "Prologis STEM Park", "group": "proposed", "status": "Selected development proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Santa Clara"], "city": "San Jose", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower. GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified. SanJoseInside November10,2025 reproducesCITYrelease: PrologisPREFERREDdeveloper159acreSTEMbufferland Hwy237/Zanker. November18councilnegotiationagreementstillfuture, laterenvironmentalreview/publichearings/finaldevelopmentGROUNDLEASEfuture, notfullyexecutedlease/deedpurchase/operatingcampus. 6000jobs/30Mannualtaxforecast mixedDCandadvancedmanufacturingnot6000DCops. First250MWavailability andfuture496MWscope not746MWsum. Regional2000MWrequests and2000MWtransmissionexpansion notPrologisIT. Leaseproceedsintendedratepayerbenefitnotverifiedpayment.", "date": "", "events": [["2025-11-18", "San Jose Council minutes record adoption of Resolution RES2025 395 on November 18, 2025, selecting Prologis as preferred developer and authorizing exclusive negotiations for the wastewater facility buffer lands. The action includes climate, recycled water, habitat and workforce negotiation directions. This is selection and negotiation authority, not final project entitlements, construction authorization or operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them", "host": "kqed.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.sanjoseinside.com/news/prologis-inc-wins-bid-for-one-of-the-largest-economic-development-projects-in-south-bay/", "host": "sanjoseinside.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects", "host": "www.sanjoseca.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Access-check target"}, {"url": "https://sanjose.legistar.com/LegislationDetail.aspx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=80646EC3-65DB-4799-838C-78DF960F1F10&ID=7723763&Options=&Search=", "host": "sanjose.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://sanjose.legistar.com/View.ashx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=3BA48E4A-A115-4917-A5FA-E341AC37105E&ID=1328261&M=M", "host": "sanjose.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://sanjose.legistar.com/View.ashx?GUID=45941F3A-0A60-42A1-8F04-B09281C6E2F3&ID=14917877&M=F", "host": "sanjose.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 37.18006, "lng": -121.78346, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json", "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.", "fields": {}, "notes": ["JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower.", "GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored.", "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."], "sources": [{"url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them", "host": "kqed.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json", "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.", "fields": {}, "notes": ["SanJoseInside November10,2025 reproducesCITYrelease: PrologisPREFERREDdeveloper159acreSTEMbufferland Hwy237/Zanker. November18councilnegotiationagreementstillfuture, laterenvironmentalreview/publichearings/finaldevelopmentGROUNDLEASEfuture, notfullyexecutedlease/deedpurchase/operatingcampus.", "6000jobs/30Mannualtaxforecast mixedDCandadvancedmanufacturingnot6000DCops. First250MWavailability andfuture496MWscope not746MWsum. Regional2000MWrequests and2000MWtransmissionexpansion notPrologisIT. Leaseproceedsintendedratepayerbenefitnotverifiedpayment.", "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."], "sources": [{"url": "https://www.sanjoseinside.com/news/prologis-inc-wins-bid-for-one-of-the-largest-economic-development-projects-in-south-bay/", "host": "sanjoseinside.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "unresolved", "scope": "The KQED account describes exclusive negotiations for the 159-acre wastewater buffer site. Negotiations are not conveyance, a construction permit or operating service. The combined research/data-center power proposal has a different scope from another headline figure. The original city listing was access-limited; current stage remains unresolved."}}, "notes": ["The KQED account describes exclusive negotiations for the 159-acre wastewater buffer site. Negotiations are not conveyance, a construction permit or operating service. The combined research/data-center power proposal has a different scope from another headline figure. The original city listing was access-limited; current stage remains unresolved."], "sources": [{"url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them", "host": "www.kqed.org", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects", "host": "www.sanjoseca.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Access-check target"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 16", "scope": "The adopted November 18, 2025 Council action selected Prologis as the preferred developer for the regional wastewater facility buffer lands and authorized exclusive negotiations. The staff memorandum describes the selected data center and advanced manufacturing proposal. Selected development proposal describes that planning context only. The decision is a developer selection and negotiation authority, with CEQA and development agreement work described as future steps. It is not zoning approval, an executed final ground lease, completed utility capacity or operation. No new provider role is adopted.", "fields": {"current_stage_evidence": {"outcome": "selected_proposal_with_future_entitlements_and_negotiations", "scope": "The adopted November 18, 2025 Council action selected Prologis as the preferred developer for the regional wastewater facility buffer lands and authorized exclusive negotiations. The staff memorandum describes the selected data center and advanced manufacturing proposal. Selected development proposal describes that planning context only. The decision is a developer selection and negotiation authority, with CEQA and development agreement work described as future steps. It is not zoning approval, an executed final ground lease, completed utility capacity or operation. No new provider role is adopted."}, "regulatory_scope": {"preferred_proposal_selection_on": "2025-11-18", "council_minutes_pages_visually_read": [15, 16], "staff_proposal_memo_page_read": 5, "ceqa_and_final_development_agreement_remain_future_steps": true, "project_negotiation_conditions_not_citywide_or_countywide_rules": true, "negotiation_authority_not_executed_final_agreement": true}}, "notes": ["The adopted November 18, 2025 Council action selected Prologis as the preferred developer for the regional wastewater facility buffer lands and authorized exclusive negotiations. The staff memorandum describes the selected data center and advanced manufacturing proposal. Selected development proposal describes that planning context only. The decision is a developer selection and negotiation authority, with CEQA and development agreement work described as future steps. It is not zoning approval, an executed final ground lease, completed utility capacity or operation. No new provider role is adopted.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://sanjose.legistar.com/LegislationDetail.aspx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=80646EC3-65DB-4799-838C-78DF960F1F10&ID=7723763&Options=&Search=", "host": "sanjose.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://sanjose.legistar.com/View.ashx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=3BA48E4A-A115-4917-A5FA-E341AC37105E&ID=1328261&M=M", "host": "sanjose.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://sanjose.legistar.com/View.ashx?GUID=45941F3A-0A60-42A1-8F04-B09281C6E2F3&ID=14917877&M=F", "host": "sanjose.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "California · San Jose · Santa Clara · Source context reviewed", "status_scope": "The adopted November 18, 2025 Council action selected Prologis as the preferred developer for the regional wastewater facility buffer lands and authorized exclusive negotiations. The staff memorandum describes the selected data center and advanced manufacturing proposal. Selected development proposal describes that planning context only. The decision is a developer selection and negotiation authority, with CEQA and development agreement work described as future steps. It is not zoning approval, an executed final ground lease, completed utility capacity or operation. No new provider role is adopted.", "event_evidence": [{"date": "2025-11-18", "text": "San Jose Council minutes record adoption of Resolution RES2025 395 on November 18, 2025, selecting Prologis as preferred developer and authorizing exclusive negotiations for the wastewater facility buffer lands. The action includes climate, recycled water, habitat and workforce negotiation directions. This is selection and negotiation authority, not final project entitlements, construction authorization or operation.", "kind": "approved", "sources": [{"url": "https://sanjose.legistar.com/View.ashx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=3BA48E4A-A115-4917-A5FA-E341AC37105E&ID=1328261&M=M", "host": "sanjose.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "06085"}, "state_name": "California", "state_path": "/california/"}, {"id": "rb-inyokern-data-center-ca", "state": "CA", "kind": "facility", "name": "RB Inyokern Data Center", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kern"], "city": "Inyokern", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. current public docket activity, no substantive determination. Docket contains public support and opposition, not regulator findings proving commenters claims. No final approval, parcel, current site MW, hearing outcome or investment adopted from comment titles. Individual commenters not added to outreach list. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-10-20", "The October 20, 2026 docket filing date records CEC Data Requests Set 3 for RB Inyokern. Staff requested further hazards information during environmental review. This is an administrative filing date, not construction commencement, a final exemption or physical operation."], ["2026-10-12", "The October 12, 2026 docket filing date records a separate resident public comment about the RB Inyokern proposal. The comment was submitted October 11. The filing date is distinct from its submission day and from the earlier well association comment; its concerns are not agency findings or verified impacts."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=26-SPPE-01", "host": "efiling.energy.ca.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/rb-inyokern-data-center", "host": "www.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273160&DocumentContentId=120923", "host": "efiling.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273104&DocumentContentId=120831", "host": "efiling.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 35.37693, "lng": -118.76709, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "current public docket activity, no substantive determination", "fields": {"regulatory_docket": "26-SPPE-01", "project_name": "RB Inyokern Data Center", "docket_log_generated_date": "2026-10-14", "public_comments_present_through": "2026-10-12"}, "notes": ["Docket contains public support and opposition, not regulator findings proving commenters claims. No final approval, parcel, current site MW, hearing outcome or investment adopted from comment titles. Individual commenters not added to outreach list.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=26-SPPE-01", "host": "efiling.energy.ca.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 46", "scope": "The current CEC project page labels the exact RB Inyokern Small Power Plant Exemption project Under Review. Its October 20 staff data request continues review of the proposed backup generating project. Agency listed proposal is limited to the pending project and does not establish construction, operation or an approved exemption. CEC expressly distinguishes an exemption from later local and air approvals. The separate public comment is an attributed resident request, not a CEC impact finding.", "fields": {"current_stage_evidence": {"outcome": "current_exact_agency_review_of_proposed_project", "scope": "The current CEC project page labels the exact RB Inyokern Small Power Plant Exemption project Under Review. Its October 20 staff data request continues review of the proposed backup generating project. Agency listed proposal is limited to the pending project and does not establish construction, operation or an approved exemption. CEC expressly distinguishes an exemption from later local and air approvals. The separate public comment is an attributed resident request, not a CEC impact finding."}, "source_read_scope": {"current_cec_project_status_read": true, "staff_request_text_pages": [1, 2, 3, 4], "public_comment_text_pages": [1, 2, 3, 4, 5, 6, 7], "private_resident_names_and_household_details_excluded": true, "relative_staff_response_period_not_exported_as_exact_calendar_deadline": true}}, "notes": ["The current CEC project page labels the exact RB Inyokern Small Power Plant Exemption project Under Review. Its October 20 staff data request continues review of the proposed backup generating project. Agency listed proposal is limited to the pending project and does not establish construction, operation or an approved exemption. CEC expressly distinguishes an exemption from later local and air approvals. The separate public comment is an attributed resident request, not a CEC impact finding.", "Existing identities, provider roles, locations, jurisdiction, quantities and physical opening fields remain unchanged. Publication, administrative filing and withdrawal dates are not physical opening dates."], "sources": [{"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/rb-inyokern-data-center", "host": "www.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=26-SPPE-01", "host": "efiling.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273160&DocumentContentId=120923", "host": "efiling.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273104&DocumentContentId=120831", "host": "efiling.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "California · Inyokern · Kern · Source context reviewed", "status_scope": "The current CEC project page labels the exact RB Inyokern Small Power Plant Exemption project Under Review. Its October 20 staff data request continues review of the proposed backup generating project. Agency listed proposal is limited to the pending project and does not establish construction, operation or an approved exemption. CEC expressly distinguishes an exemption from later local and air approvals. The separate public comment is an attributed resident request, not a CEC impact finding.", "event_evidence": [{"date": "2026-10-20", "text": "The October 20, 2026 docket filing date records CEC Data Requests Set 3 for RB Inyokern. Staff requested further hazards information during environmental review. This is an administrative filing date, not construction commencement, a final exemption or physical operation.", "kind": "announced", "sources": [{"url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273160&DocumentContentId=120923", "host": "efiling.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2026-10-12", "text": "The October 12, 2026 docket filing date records a separate resident public comment about the RB Inyokern proposal. The comment was submitted October 11. The filing date is distinct from its submission day and from the earlier well association comment; its concerns are not agency findings or verified impacts.", "kind": "announced", "sources": [{"url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273104&DocumentContentId=120831", "host": "efiling.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "06029"}, "state_name": "California", "state_path": "/california/"}, {"id": "vantage-santa-clara-iii-ca3-ca", "state": "CA", "kind": "facility", "name": "Vantage Santa Clara III (CA3)", "group": "proposed", "status": "Operator-listed plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Santa Clara"], "city": "Santa Clara", "address": "", "who": "Vantage Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Future tense;216MWallthreeSantaClaralocations is not CA3alone. Design near-zeroWUEis not measured current usage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://vantage-dc.com/data-center/santa-clara-iii-california/", "host": "vantage-dc.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://vantage-dc.com/data-center-locations/", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact separate named campus address section"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2590+Walsh+Avenue%2C+Santa+Clara%2C+CA+95051&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Unique calculated street range and retained county match"}, {"url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Census address range method and limits"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.97800287545826%2C37.36814421975653%2C-121.97009041943974%2C37.374432397981465&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}], "loc": {"lng": -121.974047, "lat": 37.371288, "precision": "approximate", "basis": "Approximate named Vantage Santa Clara III, explicitly CA3 campus service area at 2590 Walsh Avenue, Santa Clara, CA 95051, matched to one Census street range inside the retained county. Not a confirmed parcel, independent building, tenant unit or completed full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains proposed."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"campus_acres_approx": 8, "data_centers": 1, "planned_critical_it_mw": 64, "planned_area_sqft": 486000, "published_address": "2590 Walsh Avenue, Santa Clara, CA95051"}, "notes": ["Future tense;216MWallthreeSantaClaralocations is not CA3alone. Design near-zeroWUEis not measured current usage.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://vantage-dc.com/data-center/santa-clara-iii-california/", "host": "vantage-dc.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-listed plan", "basis": "The current Santa Clara III page describes CA3 and its facilities in future terms, including capacity upon completion.", "checked_on": "2026-10-16"}, "stage_review_limits": "A current directory entry, rendering and specification envelope are not proof of construction or operation. CA1 and CA2 service does not establish CA3 completion."}, "notes": ["A current directory entry, rendering and specification envelope are not proof of construction or operation. CA1 and CA2 service does not establish CA3 completion.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://vantage-dc.com/data-center/santa-clara-iii-california/", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check 15, October 23, 2026", "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. CA3 is explicitly described as a future third site. The old singular data center URL remains reachable and is retained exactly; proposed figures are not delivered capacity.", "fields": {"company_association": {"name": "Vantage Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. CA3 is explicitly described as a future third site. The old singular data center URL remains reachable and is retained exactly; proposed figures are not delivered capacity."}, "provider_role": "developer"}, "notes": ["Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. CA3 is explicitly described as a future third site. The old singular data center URL remains reachable and is retained exactly; proposed figures are not delivered capacity.", "Publication dates and stated targets remain separate from actual physical milestones."], "sources": [{"url": "https://vantage-dc.com/data-center/santa-clara-iii-california/", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party exact campus or code text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 36, October 23, 2026", "scope": "Approximate remains approximate. Named campus service area only. Existing native status remains proposed.", "fields": {"location_review_decision": {"location": {"lng": -121.974047, "lat": 37.371288, "precision": "approximate", "basis": "Approximate named Vantage Santa Clara III, explicitly CA3 campus service area at 2590 Walsh Avenue, Santa Clara, CA 95051, matched to one Census street range inside the retained county. Not a confirmed parcel, independent building, tenant unit or completed full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains proposed."}, "reference_method": "Census interpolated street address", "published_address": "2590 Walsh Avenue, Santa Clara, CA 95051", "county_fips": ["06085"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["The current official Vantage North American data center list explicitly separates Phoenix at 45 S. Bullard Avenue, Santa Clara II at 737 Mathew Street and Santa Clara III at 2590 Walsh Avenue. This record uses only its exact corresponding named campus section. Current individual Santa Clara pages explicitly identify CA2 and CA3. CA3 is described with future wording and native proposed remains proposed. CA2 includes mixed current and future marketing, which does not establish a physical stage. Each review adopts only an approximate named campus service area at the calculated street reference. No independent building, unit, full campus boundary, commissioning date, operator quantity or native status is inferred. Company business offices and map provider coordinates are excluded.", "Raw Census input, match and coordinates remain exact. Only the public point rounds to six decimals below 0.1 metre displacement, which is not a survey accuracy claim.", "Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. No residential roof is selected."], "sources": [{"url": "https://vantage-dc.com/data-center-locations/", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact separate named campus address section"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2590+Walsh+Avenue%2C+Santa+Clara%2C+CA+95051&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Unique calculated street range and retained county match"}, {"url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Census address range method and limits"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.97800287545826%2C37.36814421975653%2C-121.97009041943974%2C37.374432397981465&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}, {"url": "https://vantage-dc.com/data-center/santa-clara-iii-california/", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Separate current CA3 future wording keeps area approximate"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate campus service area, not a confirmed parcel or building", "summary": "California · Santa Clara · Santa Clara · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current Santa Clara III page describes CA3 and its facilities in future terms, including capacity upon completion. A current directory entry, rendering and specification envelope are not proof of construction or operation. CA1 and CA2 service does not establish CA3 completion.", "state_name": "California", "state_path": "/california/"}, {"id": "ne-edge-millstone-ct", "state": "CT", "kind": "facility", "name": "NE Edge Millstone Nuclear Data Center", "group": "proposed", "status": "Announced proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["New London"], "city": "Waterford", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This is a participant opinion, not a reviewed municipal termination instrument or final judgment. End of one host agreement is not a permanent statewide ban or proof no later proposal can occur. Reactor outage, grid and developer-claim criticisms remain attributed; no independent power or emissions finding is adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://ctmirror.org/2026/04/15/tale-of-a-defeated-ct-data-center/", "host": "ctmirror.org", "date": "2026-04-15", "published": "2026-04-15", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.mclaughlinpropertiesinc.com/ne-edge", "host": "www.mclaughlinpropertiesinc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 41.51882, "lng": -72.11751, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "A CT Mirror opinion by the local opposition group's founder says NE Edge-Waterford's host-fee agreement ended by default/expiration and describes the group's campaign.", "independently_verified_current_operating_status": null}, "notes": ["This is a participant opinion, not a reviewed municipal termination instrument or final judgment. End of one host agreement is not a permanent statewide ban or proof no later proposal can occur. Reactor outage, grid and developer-claim criticisms remain attributed; no independent power or emissions finding is adopted.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ctmirror.org/2026/04/15/tale-of-a-defeated-ct-data-center/", "host": "ctmirror.org", "date": "2026-04-15", "published": "2026-04-15", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 47", "scope": "The developer current project page names NE Edge at the Millstone Nuclear Power Plant in Waterford and describes a partnership formed to acquire and develop the project. Issuer listed proposal is limited to this existing named development concept. It does not establish a completed acquisition, current construction, nuclear power supply agreement, regulatory approval or computing operation.", "fields": {"current_stage_evidence": {"outcome": "current_named_developer_project", "scope": "The developer current project page names NE Edge at the Millstone Nuclear Power Plant in Waterford and describes a partnership formed to acquire and develop the project. Issuer listed proposal is limited to this existing named development concept. It does not establish a completed acquisition, current construction, nuclear power supply agreement, regulatory approval or computing operation."}}, "notes": ["The developer current project page names NE Edge at the Millstone Nuclear Power Plant in Waterford and describes a partnership formed to acquire and develop the project. Issuer listed proposal is limited to this existing named development concept. It does not establish a completed acquisition, current construction, nuclear power supply agreement, regulatory approval or computing operation.", "Existing identities, provider roles, locations, jurisdiction, quantities and physical opening fields remain unchanged. Publication, administrative filing and withdrawal dates are not physical opening dates."], "sources": [{"url": "https://www.mclaughlinpropertiesinc.com/ne-edge", "host": "www.mclaughlinpropertiesinc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Connecticut · Waterford · New London · Source context reviewed", "status_scope": "The developer current project page names NE Edge at the Millstone Nuclear Power Plant in Waterford and describes a partnership formed to acquire and develop the project. Issuer listed proposal is limited to this existing named development concept. It does not establish a completed acquisition, current construction, nuclear power supply agreement, regulatory approval or computing operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "09180"}, "state_name": "Connecticut", "state_path": "/connecticut/"}, {"id": "metrobloks-mia-a1-miami-fl", "state": "FL", "kind": "facility", "name": "Metrobloks MIA-A1 (MB01)", "group": "proposed", "status": "In development", "raw_status": "in development", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Miami-Dade"], "city": "Miami", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Metrobloks Miami planned IT, utility and area conflicts. Two15200suitessum30400not40500;scopeunresolved,donotsilentfix.22utilitynot15.8ITor37.8total. Will-serveletternotinspectedorenergizationproof.6percentFLsalestaxabatementoperatorclaimnotindependentlaw/awardreview. UptimeTierIIIdesignand99.999availabilitymarketingnotindependentcertification/observeduptime.0.21mslatencynotmethodverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Coming soon supports broad development context without choosing an exact permit/construction stage. Scalable hall designs are not operating load, and the advertised street does not validate the inherited point. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.metrobloks.com/sites/mia-mb01", "host": "metrobloks.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 25.60353, "lng": -80.63693, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Metrobloks Miami planned IT, utility and area conflicts", "fields": {"developer": "Metrobloks", "site_code": "MIA A1", "address": "500 Northwest137thAvenue, Miami, Florida", "operator_status": "coming soon", "planned_critical_it_mw": 15.8, "claimed_utility_power_secured_mw": 22, "claimed_utility_document": "FloridaPowerandLightwill-serveletteranddeposits", "site_acres": 4.1, "buildings": 1, "floors": 2, "published_whitespace_sqft": 40500, "data_suites": 2, "published_each_suite_sqft": 15200, "canonical_current_whitespace_sqft": null}, "notes": ["Two15200suitessum30400not40500;scopeunresolved,donotsilentfix.22utilitynot15.8ITor37.8total. Will-serveletternotinspectedorenergizationproof.6percentFLsalestaxabatementoperatorclaimnotindependentlaw/awardreview. UptimeTierIIIdesignand99.999availabilitymarketingnotindependentcertification/observeduptime.0.21mslatencynotmethodverified.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.metrobloks.com/sites/mia-mb01", "host": "metrobloks.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "in development", "status_basis": "The operator lists its Miami site as Data center coming soon.", "filter_scope": "Grouped with proposed/development projects; no final permit or exact construction stage is inferred."}, "notes": ["Coming soon supports broad development context without choosing an exact permit/construction stage. Scalable hall designs are not operating load, and the advertised street does not validate the inherited point. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://www.metrobloks.com/sites/mia-mb01", "host": "metrobloks.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "35c0bc434025cd53039fd69776a6107121f9f18fd9e98828188cc0a8fae81a4d", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Florida · Miami · Miami-Dade · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "12086"}, "state_name": "Florida", "state_path": "/florida/"}, {"id": "dc-blox-palm-coast-cable-landing-station-fl", "state": "FL", "kind": "facility", "name": "DC BLOX Palm Coast Cable Landing Station", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Flagler"], "city": "Palm Coast", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Current page says comingQ12027. Critical capacity is combined committed/planned, not all delivered. Subsea cable pairs and cable systems are different units. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.dcblox.com/data-centers/palm-coast-fl-cable-landing-station/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 29.46152, "lng": -81.3134, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"initial_operation_target": "2027-Q1", "planned_area_sqft": 100000, "critical_capacity_committed_and_planned_mw": 10, "campus_acres_min_exclusive": 20, "planned_subsea_cables": 6}, "notes": ["Current page says comingQ12027. Critical capacity is combined committed/planned, not all delivered. Subsea cable pairs and cable systems are different units.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.dcblox.com/data-centers/palm-coast-fl-cable-landing-station/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "DC BLOX explicitly describes the Palm Coast cable landing station as a new development with the initial phase expected in the first quarter of 2027. Current services boilerplate does not establish this facility operating. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "DC BLOX explicitly describes the Palm Coast cable landing station as a new development with the initial phase expected in the first quarter of 2027. Current services boilerplate does not establish this facility operating. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["DC BLOX explicitly describes the Palm Coast cable landing station as a new development with the initial phase expected in the first quarter of 2027. Current services boilerplate does not establish this facility operating."], "sources": [{"url": "https://www.dcblox.com/data-centers/palm-coast-fl-cable-landing-station/", "host": "www.dcblox.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Florida · Palm Coast · Flagler · Source context reviewed", "status_scope": "DC BLOX explicitly describes the Palm Coast cable landing station as a new development with the initial phase expected in the first quarter of 2027. Current services boilerplate does not establish this facility operating. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "12035"}, "state_name": "Florida", "state_path": "/florida/"}, {"id": "north-port-holdings-300-deep-park-north-port-fl", "state": "FL", "kind": "facility", "name": "Deep Park Data Center (North Port 300)", "group": "proposed", "status": "Application under review", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Sarasota"], "city": "North Port", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. North Port pending application versus broader mixed-use concept. City map explicitly approximate, not exact coordinates. 282 acres and 112-acre pod include multiple uses, not exclusive DC footprint. Application receipt and voluntary master concept plan are not approval. Linked meetings do not establish enacted moratorium or exact expiry from this text. Legislative summaries are contextual agency explanations, not independent statute interpretation. No critical IT MW, final outcome or operations inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3", "host": "engage.zencity.io", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 27.18444, "lng": -82.33153, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "North Port pending application versus broader mixed-use concept", "fields": {"agency": "City of North Port, Florida", "applicant": "North Port300", "application_received_date": "2026-07-20", "stage_as_reported": "awaiting applicant response to staff sufficiency issues", "location": "Yorkshire area north of Interstate75 and south of Yorkshire Street", "proposed_building_area_sqft": 896000, "included_office_sqft_approx": 123200, "broader_mixed_use_site_acres": 282, "broader_plan_pods_acres_approx": {"commercial": 62, "residential": 107, "retail_office_storage_data_center": 112}}, "notes": ["City map explicitly approximate, not exact coordinates. 282 acres and 112-acre pod include multiple uses, not exclusive DC footprint. Application receipt and voluntary master concept plan are not approval. Linked meetings do not establish enacted moratorium or exact expiry from this text. Legislative summaries are contextual agency explanations, not independent statute interpretation. No critical IT MW, final outcome or operations inferred.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3", "host": "engage.zencity.io", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 38", "scope": "The current City project information account explicitly identifies North Port 300 and says its July 20, 2026 data center application underwent sufficiency review, with applicant responses to insufficiencies still awaited. Application under review is limited to that named workflow. The broader mixed use voluntary concept plan is distinct from an approved data center, and the source labels its map approximate. Discussion of a moratorium, general zoning and summaries of state law are not a signed current moratorium instrument, final project disposition, building work or computing operation.", "fields": {"current_stage_evidence": {"outcome": "named_north_port_300_application_sufficiency_review", "scope": "The current City project information account explicitly identifies North Port 300 and says its July 20, 2026 data center application underwent sufficiency review, with applicant responses to insufficiencies still awaited. Application under review is limited to that named workflow. The broader mixed use voluntary concept plan is distinct from an approved data center, and the source labels its map approximate. Discussion of a moratorium, general zoning and summaries of state law are not a signed current moratorium instrument, final project disposition, building work or computing operation."}}, "notes": ["The current City project information account explicitly identifies North Port 300 and says its July 20, 2026 data center application underwent sufficiency review, with applicant responses to insufficiencies still awaited. Application under review is limited to that named workflow. The broader mixed use voluntary concept plan is distinct from an approved data center, and the source labels its map approximate. Discussion of a moratorium, general zoning and summaries of state law are not a signed current moratorium instrument, final project disposition, building work or computing operation.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3", "host": "engage.zencity.io", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Florida · North Port · Sarasota · Source context reviewed", "status_scope": "The current City project information account explicitly identifies North Port 300 and says its July 20, 2026 data center application underwent sufficiency review, with applicant responses to insufficiencies still awaited. Application under review is limited to that named workflow. The broader mixed use voluntary concept plan is distinct from an approved data center, and the source labels its map approximate. Discussion of a moratorium, general zoning and summaries of state law are not a signed current moratorium instrument, final project disposition, building work or computing operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "12115"}, "state_name": "Florida", "state_path": "/florida/"}, {"id": "silver-fox-606-indiantown-fl", "state": "FL", "kind": "facility", "name": "Silver Fox 606 AI Data Center Campus", "group": "proposed", "status": "Reported revised proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Martin"], "city": "Indiantown", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Record both withdrawal and later revival; do not leave permanently withdrawn or mark approved. Council decision remains future in the report; earliest phased construction in 2027 is conditional. Developer waterless, no-vibration, code-compliant noise and no-pressure-impact statements are proposed/attributed commitments, not independently measured impacts or final permit conditions. Billion-dollar investment is a projection, not spent capital or guaranteed tax revenue. Prior power-plant use and industrial zoning are not all necessary DC approvals. No confirmed tenant/MW/RFS. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wflx.com/2026/09/22/indiantown-project-silver-fox-data-center-plan-returns-with-changes-resident-concerns-remain/", "host": "wflx.com", "date": "2026-09-22", "published": "2026-09-22", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 27.07758, "lng": -80.43128, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round32-2026-10-14.json", "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.", "fields": {"reported_context": "WFLX reports Project Silver Fox returned with a revised 606-acre Indiantown proposal following an April withdrawal, presented at a public open house.", "independently_verified_current_operating_status": null}, "notes": ["Record both withdrawal and later revival; do not leave permanently withdrawn or mark approved. Council decision remains future in the report; earliest phased construction in 2027 is conditional. Developer waterless, no-vibration, code-compliant noise and no-pressure-impact statements are proposed/attributed commitments, not independently measured impacts or final permit conditions. Billion-dollar investment is a projection, not spent capital or guaranteed tax revenue. Prior power-plant use and industrial zoning are not all necessary DC approvals. No confirmed tenant/MW/RFS.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wflx.com/2026/09/22/indiantown-project-silver-fox-data-center-plan-returns-with-changes-resident-concerns-remain/", "host": "wflx.com", "date": "2026-09-22", "published": "2026-09-22", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-F1-label-review-2026-10-20", "scope": "WFLX reports that Project Silver Fox returned with a revised Indiantown proposal in September 2026 after an earlier April withdrawal. This label describes the reported revised proposal, not an approval, construction start or verification of company water and noise assurances.", "fields": {"identity_label_context": {"previous_name": "Silver Fox 606 AI Data Center Campus (withdrawn)", "plain_name": "Silver Fox 606 AI Data Center Campus", "interpretation": "WFLX reports that Project Silver Fox returned with a revised Indiantown proposal in September 2026 after an earlier April withdrawal. This label describes the reported revised proposal, not an approval, construction start or verification of company water and noise assurances.", "outcome_wording_is_not_identity": true}, "current_stage_evidence": {"outcome": "reported_revised_proposal", "scope": "WFLX reports that Project Silver Fox returned with a revised Indiantown proposal in September 2026 after an earlier April withdrawal. This label describes the reported revised proposal, not an approval, construction start or verification of company water and noise assurances."}}, "notes": ["WFLX reports that Project Silver Fox returned with a revised Indiantown proposal in September 2026 after an earlier April withdrawal. This label describes the reported revised proposal, not an approval, construction start or verification of company water and noise assurances.", "Inherited inventory name: Silver Fox 606 AI Data Center Campus (withdrawn). The wording is retained as provenance, not as an independently verified outcome.", "An application decision is separate from a current physical stage. No coordinate, address, parcel, company role, technical figure or physical milestone date is changed."], "sources": [{"url": "https://www.wflx.com/2026/09/22/indiantown-project-silver-fox-data-center-plan-returns-with-changes-resident-concerns-remain/", "host": "www.wflx.com", "published": "2026-09-22", "date": "2026-09-22", "checked": "2026-10-20", "label": "WFLX"}], "checked": "2026-10-20", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Florida · Indiantown · Martin · Source context reviewed", "status_scope": "WFLX reports that Project Silver Fox returned with a revised Indiantown proposal in September 2026 after an earlier April withdrawal. This label describes the reported revised proposal, not an approval, construction start or verification of company water and noise assurances.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "12085"}, "state_name": "Florida", "state_path": "/florida/"}, {"id": "prime-storage-powers-ferry-place-marietta-ga", "state": "GA", "kind": "facility", "name": "1155 Powers Ferry Place Data Center (Prime Storage conversion)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cobb"], "city": "Marietta", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 90,000-square-foot storage property is not all confirmed DC floor area. Prime Storage/Prime Group Holdings is not Prime Data Centers. The existing 1130 Powers Ferry site and other Marietta proposals are separate. Opponents' corruption/health allegations are attributed, not findings; no later vote or moratorium adoption is assumed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/", "host": "atlpresscollective.com", "date": "2026-07-08", "published": "2026-07-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.mariettaga.gov/AgendaCenter/ViewFile/Agenda/_07012026-2982?packet=true", "host": "www.mariettaga.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 33.91783, "lng": -84.57459, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round30-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Atlanta Community Press Collective reports a four-three planning recommendation for Prime Storage's requested conversion of part of its Powers Ferry facility, with council action still pending.", "independently_verified_current_operating_status": null}, "notes": ["The 90,000-square-foot storage property is not all confirmed DC floor area. Prime Storage/Prime Group Holdings is not Prime Data Centers. The existing 1130 Powers Ferry site and other Marietta proposals are separate. Opponents' corruption/health allegations are attributed, not findings; no later vote or moratorium adoption is assumed.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/", "host": "atlpresscollective.com", "date": "2026-07-08", "published": "2026-07-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 56", "scope": "The original July 1, 2026 Planning Commission agenda lists Prime Storage Powers Ferry Place Marietta LLC request Z2026 12 for an additional data infrastructure facility use at 1155 Powers Ferry Place. This supports a named formal listed proposal at the scheduled agenda scope. The agenda alone does not establish that the hearing occurred, any recommendation or Council vote, issued building permits, physical conversion or current computing operation. The existing storage use is separate from computing service, and Prime Storage is not treated as Prime Data Centers.", "fields": {"current_stage_evidence": {"outcome": "original_named_conversion_application", "scope": "The original July 1, 2026 Planning Commission agenda lists Prime Storage Powers Ferry Place Marietta LLC request Z2026 12 for an additional data infrastructure facility use at 1155 Powers Ferry Place. This supports a named formal listed proposal at the scheduled agenda scope. The agenda alone does not establish that the hearing occurred, any recommendation or Council vote, issued building permits, physical conversion or current computing operation. The existing storage use is separate from computing service, and Prime Storage is not treated as Prime Data Centers."}, "source_read_scope": {"selected_physical_text_page": 3, "agenda_date_and_requested_additional_use_read": true, "agenda_not_completed_vote": true, "storage_conversion_not_compute_opening": true, "distinct_provider_brands_not_joined": true}}, "notes": ["The original July 1, 2026 Planning Commission agenda lists Prime Storage Powers Ferry Place Marietta LLC request Z2026 12 for an additional data infrastructure facility use at 1155 Powers Ferry Place. This supports a named formal listed proposal at the scheduled agenda scope. The agenda alone does not establish that the hearing occurred, any recommendation or Council vote, issued building permits, physical conversion or current computing operation. The existing storage use is separate from computing service, and Prime Storage is not treated as Prime Data Centers.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.mariettaga.gov/AgendaCenter/ViewFile/Agenda/_07012026-2982?packet=true", "host": "www.mariettaga.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Marietta · Cobb · Source context reviewed", "status_scope": "The original July 1, 2026 Planning Commission agenda lists Prime Storage Powers Ferry Place Marietta LLC request Z2026 12 for an additional data infrastructure facility use at 1155 Powers Ferry Place. This supports a named formal listed proposal at the scheduled agenda scope. The agenda alone does not establish that the hearing occurred, any recommendation or Council vote, issued building permits, physical conversion or current computing operation. The existing storage use is separate from computing service, and Prime Storage is not treated as Prime Data Centers.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13067"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "aws-butts-county-ga", "state": "GA", "kind": "facility", "name": "AWS Butts County Data Center Campus", "group": "proposed", "status": "Project listed for development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Butts"], "city": "Jackson", "address": "", "who": "Amazon", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AWS combined Georgia investment statement. Do not assign full two-county investment or all550jobs to Butts County alone. Amazon statewide workforce, solar household-equivalents and GDP are other scopes. Announcement is planned investment, not actual expenditure or per-campus IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-01-07", "Amazon published its Georgia infrastructure investment announcement January 7, 2025 and explicitly named Butts County. This is the source announcement day, not a physical construction or opening date."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure", "host": "aboutamazon.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 33.28715, "lng": -83.95669, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "AWS combined Georgia investment statement", "fields": {"investment_scope": "Butts and Douglas counties, Georgia, combined", "planned_investment_usd": 11000000000, "expected_direct_jobs_min_inclusive": 550}, "notes": ["Do not assign full two-county investment or all550jobs to Butts County alone. Amazon statewide workforce, solar household-equivalents and GDP are other scopes. Announcement is planned investment, not actual expenditure or per-campus IT MW.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure", "host": "aboutamazon.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Company role source check 04, October 22, 2026", "scope": "Amazon identifies AWS as developing data center infrastructure in Butts County. Developer is the provider brand role for the existing county research context. The announcement does not independently identify a parcel, a specific building, a legal ownership entity or current construction or operation. No announced investment or employment figure is promoted.", "fields": {"company_association": {"name": "Amazon", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Amazon identifies AWS as developing data center infrastructure in Butts County. Developer is the provider brand role for the existing county research context. The announcement does not independently identify a parcel, a specific building, a legal ownership entity or current construction or operation. No announced investment or employment figure is promoted."}, "provider_role": "developer"}, "notes": ["Amazon identifies AWS as developing data center infrastructure in Butts County. Developer is the provider brand role for the existing county research context. The announcement does not independently identify a parcel, a specific building, a legal ownership entity or current construction or operation. No announced investment or employment figure is promoted.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure", "host": "www.aboutamazon.com", "published": "2025-01-07", "date": "2025-01-07", "checked": "2026-10-22", "label": "First party named community development or operation statement"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 37", "scope": "Amazon original January 7, 2025 announcement explicitly names Butts County among the selected Georgia locations for new AWS data centers. Project listed for development is limited to that named investment plan. Its statewide investment and job forecasts and existing Amazon logistics facilities do not establish current construction, commissioned computing, delivered jobs or an exact campus opening. No statewide quantity is assigned to this component.", "fields": {"current_stage_evidence": {"outcome": "named_butts_county_development_announcement", "scope": "Amazon original January 7, 2025 announcement explicitly names Butts County among the selected Georgia locations for new AWS data centers. Project listed for development is limited to that named investment plan. Its statewide investment and job forecasts and existing Amazon logistics facilities do not establish current construction, commissioned computing, delivered jobs or an exact campus opening. No statewide quantity is assigned to this component."}}, "notes": ["Amazon original January 7, 2025 announcement explicitly names Butts County among the selected Georgia locations for new AWS data centers. Project listed for development is limited to that named investment plan. Its statewide investment and job forecasts and existing Amazon logistics facilities do not establish current construction, commissioned computing, delivered jobs or an exact campus opening. No statewide quantity is assigned to this component.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure", "host": "www.aboutamazon.com", "published": "2025-01-07", "date": "2025-01-07", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Jackson · Butts · Source context reviewed", "status_scope": "Amazon original January 7, 2025 announcement explicitly names Butts County among the selected Georgia locations for new AWS data centers. Project listed for development is limited to that named investment plan. Its statewide investment and job forecasts and existing Amazon logistics facilities do not establish current construction, commissioned computing, delivered jobs or an exact campus opening. No statewide quantity is assigned to this component.", "event_evidence": [{"date": "2025-01-07", "text": "Amazon published its Georgia infrastructure investment announcement January 7, 2025 and explicitly named Butts County. This is the source announcement day, not a physical construction or opening date.", "kind": "announced", "sources": [{"url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure", "host": "www.aboutamazon.com", "published": "2025-01-07", "date": "2025-01-07", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13035"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "dc-blox-atlanta-west-ga", "state": "GA", "kind": "facility", "name": "DC BLOX Atlanta West (ATL1)", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Douglas"], "city": "Lithia Springs", "address": "", "who": "DC BLOX", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. August11,2025original release body takes precedence over September16,2026updated header. Financing is not spent campus capex. Company-wide470criticalMWfooter and previous265Mloan excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/", "host": "dcblox.com", "date": "2025-08-11", "published": "2025-08-11", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.dcblox.com/data-centers/atlanta-data-centers/douglas-county-ga-hyperscale-data-center-campus/", "host": "www.dcblox.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}, {"url": "https://www.dcblox.com/dc-blox-acquires-55-acres-construction-180mw-data-center-douglasville-ga/", "host": "www.dcblox.com", "published": "2023-10-31", "date": "2023-10-31", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "loc": {"lat": 33.70219, "lng": -84.76811, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"construction_green_loan_usd": 1150000000, "initial_planned_capacity_mw": 120, "additional_planned_capacity_mw": 80, "additional_capacity_earliest_target": "2027", "power_basis": "release capacity; critical IT versus gross not specified"}, "notes": ["August11,2025original release body takes precedence over September16,2026updated header. Financing is not spent campus capex. Company-wide470criticalMWfooter and previous265Mloan excluded.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/", "host": "dcblox.com", "date": "2025-08-11", "published": "2025-08-11", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "DC BLOX offers the Atlanta West campus for hyperscale development while retaining prospective and mixed-stage descriptions.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "DC BLOX offers the Atlanta West campus for hyperscale development while retaining prospective and mixed-stage descriptions."}}, "notes": ["An earlier release reports construction commencement, but neither a past move-in forecast nor the mixed-stage headline establishes which buildings are operating. Current completion remains unestablished."], "sources": [{"url": "https://www.dcblox.com/data-centers/atlanta-data-centers/douglas-county-ga-hyperscale-data-center-campus/", "host": "www.dcblox.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}, {"url": "https://www.dcblox.com/dc-blox-acquires-55-acres-construction-180mw-data-center-douglasville-ga/", "host": "www.dcblox.com", "published": "2023-10-31", "date": "2023-10-31", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check68, October24,2026", "scope": "The October 31, 2023 announcement identifies DC BLOX development of the Douglasville campus. The later displayed September 16, 2026 update and current leasing profile do not establish a new completion day. Acreage and power figures vary across versions and measures, so none is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.", "fields": {"company_association": {"name": "DC BLOX", "role": "developer", "identity_scope": "provider_brand_only", "scope": "The October 31, 2023 announcement identifies DC BLOX development of the Douglasville campus. The later displayed September 16, 2026 update and current leasing profile do not establish a new completion day. Acreage and power figures vary across versions and measures, so none is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."}, "provider_role": "developer"}, "notes": ["The October 31, 2023 announcement identifies DC BLOX development of the Douglasville campus. The later displayed September 16, 2026 update and current leasing profile do not establish a new completion day. Acreage and power figures vary across versions and measures, so none is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."], "sources": [{"url": "https://www.dcblox.com/dc-blox-acquires-55-acres-construction-180mw-data-center-douglasville-ga/", "host": "www.dcblox.com", "published": "2023-10-31", "date": "2023-10-31", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.dcblox.com/data-centers/atlanta-data-centers/douglas-county-ga-hyperscale-data-center-campus/", "host": "www.dcblox.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Lithia Springs · Douglas · Source context reviewed", "status_scope": "DC BLOX offers the Atlanta West campus for hyperscale development while retaining prospective and mixed-stage descriptions.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13097"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "google-columbia-county-ga", "state": "GA", "kind": "project", "name": "Google Evans Data Center", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Columbia"], "city": "Evans", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.google/locations/georgia/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/georgia/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 33.55592, "lng": -82.27695, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "Georgia statewide page, separate location milestones", "fields": {"douglas_county_opening_year": 2007, "announced_new_locations_year": 2026, "new_locations": ["LaGrange", "Columbia County"], "regional_committed_investment_usd_min_exclusive": 3000000000, "investment_scope": "Georgia statewide"}, "notes": ["2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.google/locations/georgia/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Columbia County, Georgia is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "Google names Columbia County and dates the development announcement to 2026.", "current_status_basis": "Google’s current location page names Columbia County, Georgia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/georgia/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Evans · Columbia · Source context reviewed", "status_scope": "Google’s current location page names Columbia County, Georgia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13073"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "google-lagrange-ga", "state": "GA", "kind": "project", "name": "Google LaGrange Data Center", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Troup"], "city": "LaGrange", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.google/locations/georgia/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/georgia/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 33.03319, "lng": -85.02857, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "Georgia statewide page, separate location milestones", "fields": {"douglas_county_opening_year": 2007, "announced_new_locations_year": 2026, "new_locations": ["LaGrange", "Columbia County"], "regional_committed_investment_usd_min_exclusive": 3000000000, "investment_scope": "Georgia statewide"}, "notes": ["2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.google/locations/georgia/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "LaGrange, Georgia is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "Google names LaGrange and dates the development announcement to 2026.", "current_status_basis": "Google’s current location page names LaGrange, Georgia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/georgia/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · LaGrange · Troup · Source context reviewed", "status_scope": "Google’s current location page names LaGrange, Georgia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13285"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "thor-equities-kingston-technology-hub-bartow-ga", "state": "GA", "kind": "facility", "name": "Kingston Technology Hub (Thor Equities)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Bartow"], "city": "Kingston", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/", "host": "newslinelocal.com", "date": "2026-09-08", "published": "2026-09-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.kingstongadatacenter.com/", "host": "www.kingstongadatacenter.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.cityofkingstonga.org/", "host": "www.cityofkingstonga.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 34.27727, "lng": -84.85076, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round33-2026-10-14.json", "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.", "fields": {"reported_context": "Center Square reporting republished by Newsline Local describes Thor Equities’ proposed Kingston DRI, quoting 350,000 squarefeet,559 acres and 150 MW peak power.", "independently_verified_current_operating_status": null}, "notes": ["DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions.", "Later original decisions and observed outcomes take precedence; future events have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/", "host": "newslinelocal.com", "date": "2026-09-08", "published": "2026-09-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 56", "scope": "The current original Kingston Technology Hub project site explicitly describes the Thor Equities project as proposed and in its early stages. The City original page links that project site and schedules an October 27, 2026 developer open house. It expressly says publication is for awareness without City endorsement or approval. This supports a named listed proposal rather than approved permitting, observed construction or computing operation. Project claims about economic benefits, electricity rates, water, noise and environmental performance remain attributed expectations without independent studies, contracts or measured findings, and are not exported as verified quantities or rules.", "fields": {"current_stage_evidence": {"outcome": "current_named_proposal_not_city_approval", "scope": "The current original Kingston Technology Hub project site explicitly describes the Thor Equities project as proposed and in its early stages. The City original page links that project site and schedules an October 27, 2026 developer open house. It expressly says publication is for awareness without City endorsement or approval. This supports a named listed proposal rather than approved permitting, observed construction or computing operation. Project claims about economic benefits, electricity rates, water, noise and environmental performance remain attributed expectations without independent studies, contracts or measured findings, and are not exported as verified quantities or rules."}, "source_read_scope": {"original_project_overview_and_city_notice_read": true, "official_city_link_confirms_selected_project_site": true, "developer_openhouse_not_hearing_or_endorsement": true, "prospective_benefits_and_assurances_not_findings": true, "project_faq_not_measured_impacts_or_final_local_law": true}}, "notes": ["The current original Kingston Technology Hub project site explicitly describes the Thor Equities project as proposed and in its early stages. The City original page links that project site and schedules an October 27, 2026 developer open house. It expressly says publication is for awareness without City endorsement or approval. This supports a named listed proposal rather than approved permitting, observed construction or computing operation. Project claims about economic benefits, electricity rates, water, noise and environmental performance remain attributed expectations without independent studies, contracts or measured findings, and are not exported as verified quantities or rules.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.kingstongadatacenter.com/", "host": "www.kingstongadatacenter.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.cityofkingstonga.org/", "host": "www.cityofkingstonga.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Kingston · Bartow · Source context reviewed", "status_scope": "The current original Kingston Technology Hub project site explicitly describes the Thor Equities project as proposed and in its early stages. The City original page links that project site and schedules an October 27, 2026 developer open house. It expressly says publication is for awareness without City endorsement or approval. This supports a named listed proposal rather than approved permitting, observed construction or computing operation. Project claims about economic benefits, electricity rates, water, noise and environmental performance remain attributed expectations without independent studies, contracts or measured findings, and are not exported as verified quantities or rules.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13015"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "eagle-rock-pine-ridge-tech-park-twiggs-ga", "state": "GA", "kind": "facility", "name": "Pine Ridge Tech Park", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Twiggs"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Claims about notice and regional review are plaintiffs allegations; article expressly says county had not responded. No court ruling, injunction or current case outcome established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans", "host": "govtech.com", "date": "2025-09-29", "published": "2025-09-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.twiggscounty.us/planning-and-zoning/", "host": "www.twiggscounty.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.twiggscounty.us/notice-data-center-application-hearing-documents/", "host": "www.twiggscounty.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 32.66693, "lng": -83.42697, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-outcomes-review-round20-2026-10-14.json", "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.", "fields": {"reported_action_type": "rezoning-litigation-reported", "reported_finding": "Macon Telegraph reporting syndicated by GovTech describes residents suit challenging Twiggs County rezoning for Eagle Rock.", "report_display_date": "2025-09-29", "independently_verified_current_status": null}, "notes": ["Claims about notice and regional review are plaintiffs allegations; article expressly says county had not responded. No court ruling, injunction or current case outcome established.", "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans", "host": "govtech.com", "date": "2025-09-29", "published": "2025-09-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 56", "scope": "The current original Twiggs County planning page lists proposed data center development information and a named Pine Ridge Technology Park environmental package. Its original public notice identifies Eaglerock participant requested information sessions in September 2025. These support a named listed proposal and historical notice scope, without establishing current construction, computing service, a court outcome or the substantive final conditional use instrument. The linked ordinance and hearing PDF paths were disallowed by robots and no body was requested. An ordinance link title or private lawsuit report is not promoted into final legal conditions or physical closure.", "fields": {"current_stage_evidence": {"outcome": "official_named_project_listing_not_physical_operation", "scope": "The current original Twiggs County planning page lists proposed data center development information and a named Pine Ridge Technology Park environmental package. Its original public notice identifies Eaglerock participant requested information sessions in September 2025. These support a named listed proposal and historical notice scope, without establishing current construction, computing service, a court outcome or the substantive final conditional use instrument. The linked ordinance and hearing PDF paths were disallowed by robots and no body was requested. An ordinance link title or private lawsuit report is not promoted into final legal conditions or physical closure."}, "source_read_scope": {"original_planning_project_listing_and_public_notice_main_body_read": true, "environmental_package_title_not_full_study_review": true, "linked_ordinance_body_robots_disallowed": true, "historical_session_schedule_not_verified_occurrence": true, "no_legal_litigation_outcome_inferred": true}}, "notes": ["The current original Twiggs County planning page lists proposed data center development information and a named Pine Ridge Technology Park environmental package. Its original public notice identifies Eaglerock participant requested information sessions in September 2025. These support a named listed proposal and historical notice scope, without establishing current construction, computing service, a court outcome or the substantive final conditional use instrument. The linked ordinance and hearing PDF paths were disallowed by robots and no body was requested. An ordinance link title or private lawsuit report is not promoted into final legal conditions or physical closure.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.twiggscounty.us/planning-and-zoning/", "host": "www.twiggscounty.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.twiggscounty.us/notice-data-center-application-hearing-documents/", "host": "www.twiggscounty.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Twiggs · Source context reviewed", "status_scope": "The current original Twiggs County planning page lists proposed data center development information and a named Pine Ridge Technology Park environmental package. Its original public notice identifies Eaglerock participant requested information sessions in September 2025. These support a named listed proposal and historical notice scope, without establishing current construction, computing service, a court outcome or the substantive final conditional use instrument. The linked ordinance and hearing PDF paths were disallowed by robots and no body was requested. An ordinance link title or private lawsuit report is not promoted into final legal conditions or physical closure.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13289"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "openai-project-camellia-effingham-ga", "state": "GA", "kind": "facility", "name": "Project Camellia (OpenAI Effingham County Campus)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Effingham"], "city": "Rincon", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Camellia county forecasts, benefit scopes and incomplete review. County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center", "host": "effinghamcounty.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 32.36712, "lng": -81.34137, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Camellia county forecasts, benefit scopes and incomplete review", "fields": {"agency": "Effingham County, Georgia", "project": "Project Camellia", "named_company": "OpenAI", "review_stage": "initial requirements met; county/state reviews, permits and inspections remain", "planned_phases": 5, "minimum_required_investment_basis_usd": 20000000000, "openai_community_commitment_lifetime_usd": 80000000, "included_school_meal_grant_2026_27_usd": 4300000, "ecida_tax_relief_commitment_annual_usd": 30000000, "ecida_tax_relief_years": 3, "forecast_pilot_2032_annual_usd": {"county": 27000000, "schools": 39000000}, "forecast_buildout_year": 2032, "planned_nonindustrial_neighbor_buffer_feet_min": 300, "cooling_plan": "closed loop; treated surface water, not Floridan aquifer groundwater"}, "notes": ["County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center", "host": "effinghamcounty.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 37", "scope": "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service.", "fields": {"current_stage_evidence": {"outcome": "county_named_camellia_initial_consideration_not_completed_review", "scope": "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service."}}, "notes": ["The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center", "host": "www.effinghamcounty.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Rincon · Effingham · Source context reviewed", "status_scope": "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13103"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "prologis-project-sail-coweta-ga", "state": "GA", "kind": "facility", "name": "Project Sail - Prologis Data Center Campus", "group": "proposed", "status": "Project listed for development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Coweta"], "city": "Newnan", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Coweta Project Sail nine-building concept and fiscal estimate. 100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.cowetaprojectsail.com/coweta-lp/", "host": "cowetaprojectsail.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 33.37558, "lng": -84.74691, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Coweta Project Sail nine-building concept and fiscal estimate", "fields": {"project": "Project Sail", "county": "Coweta County, Georgia", "planned_buildings": 9, "planned_data_center_area_sqft": 4340000, "estimated_annual_tax_at_fullbuildout_usd_approx": 100000000, "tax_forecast_condition": "fully assessed, completed buildout in roughly10years", "site_view_reference": "Wagers Mill Road"}, "notes": ["100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.cowetaprojectsail.com/coweta-lp/", "host": "cowetaprojectsail.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 37", "scope": "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted.", "fields": {"current_stage_evidence": {"outcome": "named_project_sail_planned_campus_account", "scope": "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted."}}, "notes": ["The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://www.cowetaprojectsail.com/coweta-lp/", "host": "www.cowetaprojectsail.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Newnan · Coweta · Source context reviewed", "status_scope": "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13077"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "project-turbo-okelly-road-gainesville-ga", "state": "GA", "kind": "facility", "name": "Project Turbo (Gainesville Data Center)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Hall"], "city": "Gainesville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-09-15", "Hall County staff account records five people speaking in opposition at the September 15, 2025 Planning Commission public hearing on Project Turbo. This dates the recorded hearing episode rather than the first concern, a final project disposition or measured impacts."], ["2025-10-06", "Hall County staff account records an October 6, 2025 Planning Commission recommendation for Project Turbo with ten conditions by three affirmative votes, with one recusal and one absence. The recommendation does not establish a final Board approval or computing commissioning."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html", "host": "yahoo.com", "date": "2025-08-26", "published": "2025-08-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf", "host": "nyc3.digitaloceanspaces.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 34.31718, "lng": -83.81975, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round35-2026-10-14.json", "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.", "fields": {"reported_context": "WSBTV story syndicated onYahoo describes ProjectTurbo proposed atOkellyRoad GainesvilleHallCounty,900000squarefeet/threebuildings/substation, USD1.2billionproposedvalue and developer-requested delay to aSeptember15planning meeting. Headline says plans abandoned while body still says proposed.", "independently_verified_current_operating_status": null, "canonical_current_status": null, "headline_body_stage_conflict": true}, "notes": ["Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified.", "Historical observations and forecasts are dated; no later outcome assumed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html", "host": "yahoo.com", "date": "2025-08-26", "published": "2025-08-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 56", "scope": "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance.", "fields": {"current_stage_evidence": {"outcome": "original_named_special_use_proposal", "scope": "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance."}, "source_read_scope": {"original_memo_all_two_text_pages_read": true, "header_and_footer_dates_retained": true, "planning_recommendation_not_final_board_action": true, "proposed_conditions_not_final_ordinance": true, "public_opposition_not_measured_harm": true}}, "notes": ["The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf", "host": "nyc3.digitaloceanspaces.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Gainesville · Hall · Source context reviewed", "status_scope": "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance.", "event_evidence": [{"date": "2025-09-15", "text": "Hall County staff account records five people speaking in opposition at the September 15, 2025 Planning Commission public hearing on Project Turbo. This dates the recorded hearing episode rather than the first concern, a final project disposition or measured impacts.", "kind": "hearing", "sources": [{"url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf", "host": "nyc3.digitaloceanspaces.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2025-10-06", "text": "Hall County staff account records an October 6, 2025 Planning Commission recommendation for Project Turbo with ten conditions by three affirmative votes, with one recusal and one absence. The recommendation does not establish a final Board approval or computing commissioning.", "kind": "hearing", "sources": [{"url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf", "host": "nyc3.digitaloceanspaces.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13139"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "diode-ventures-gemstone-kuna-id", "state": "ID", "kind": "facility", "name": "Gemstone Technology Park", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Ada"], "city": "Kuna", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. No operating status, MW or investment established by this page. Developer explicitly calls Gemstone a proposed620-acre site in early development. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.diodeventures.com/projects/kuna-idaho-usa", "host": "diodeventures.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 43.46917, "lng": -116.26112, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "field-verification-2026-10-14.json", "scope": "Field or source context only", "fields": {"project_status": "proposed, early development", "site_acres": 620, "city": "Kuna"}, "notes": ["No operating status, MW or investment established by this page.", "Developer explicitly calls Gemstone a proposed620-acre site in early development.", "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.diodeventures.com/projects/kuna-idaho-usa", "host": "diodeventures.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 42", "scope": "Diode Ventures current project page explicitly names Gemstone Technology Park at Kuna and calls it a proposed data center site in early development. Company listed proposal records that current original project description. It does not establish a conditional use approval, construction start, delivered utility service, operating computers, final tenant or current property title.", "fields": {"current_stage_evidence": {"outcome": "current_named_gemstone_early_development_proposal", "scope": "Diode Ventures current project page explicitly names Gemstone Technology Park at Kuna and calls it a proposed data center site in early development. Company listed proposal records that current original project description. It does not establish a conditional use approval, construction start, delivered utility service, operating computers, final tenant or current property title."}}, "notes": ["Diode Ventures current project page explicitly names Gemstone Technology Park at Kuna and calls it a proposed data center site in early development. Company listed proposal records that current original project description. It does not establish a conditional use approval, construction start, delivered utility service, operating computers, final tenant or current property title.", "Identity, organization roles, locations, jurisdictions, quantities and physical opening fields stay unchanged. Source checks and prospective dates never establish an opening."], "sources": [{"url": "https://www.diodeventures.com/projects/kuna-idaho-usa", "host": "www.diodeventures.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Idaho · Kuna · Ada · Source context reviewed", "status_scope": "Diode Ventures current project page explicitly names Gemstone Technology Park at Kuna and calls it a proposed data center site in early development. Company listed proposal records that current original project description. It does not establish a conditional use approval, construction start, delivered utility service, operating computers, final tenant or current property title.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "16001"}, "state_name": "Idaho", "state_path": "/idaho/"}, {"id": "hut8-logan-prairie-latham-il", "state": "IL", "kind": "facility", "name": "Logan Prairie Data Center", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Logan"], "city": "Latham", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hut8 Logan Prairie proposed phases and fiscal forecast. 500MWnot provenIT or energized load.65Mannualupperestimate uses2023valuation inputs and official assessment still future; no guaranteed1.95Btaxpayment.50acfootprintnotverifiedlargerlandholdings.18monthsafterapprovalnotfixedstart/opening. Water for domestic/landscape not cooling; finalpermitcapnotread. No later CUP decision or interconnection clearance established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Its development steps and conditional construction timeline are not achieved milestones. Forecast jobs, investment, water use and capacity remain separate from realized figures. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.hut8.com/data-centers/logan-prairie", "host": "hut8.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 40.12456, "lng": -89.36757, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Hut8 Logan Prairie proposed phases and fiscal forecast", "fields": {"project_name": "Logan Prairie", "county": "Logan County, Illinois", "developer_described_stage": "early development, local approvals required", "published_capacity_mw": 500, "power_basis": "capacity, not explicitly critical IT", "site_footprint_acres": 50, "planned_data_halls": 3, "planned_investment_usd_min_exclusive": 5000000000, "expected_construction_jobs_min_exclusive": 1500, "expected_fullbuildout_permanent_jobs_max": 200, "conditional_construction_duration_months_approx": 18, "developer_estimated_average_annual_property_tax_usd_max": 65000000, "tax_forecast_period_years": 30, "projected_domestic_landscape_water_gallons_per_day_max_approx": 9000, "community_open_house_date": "2026-02-04"}, "notes": ["500MWnot provenIT or energized load.65Mannualupperestimate uses2023valuation inputs and official assessment still future; no guaranteed1.95Btaxpayment.50acfootprintnotverifiedlargerlandholdings.18monthsafterapprovalnotfixedstart/opening. Water for domestic/landscape not cooling; finalpermitcapnotread. No later CUP decision or interconnection clearance established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.hut8.com/data-centers/logan-prairie", "host": "hut8.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "proposed", "status_basis": "Hut 8 explicitly describes Logan Prairie as an early proposal still requiring local approvals."}, "notes": ["Its development steps and conditional construction timeline are not achieved milestones. Forecast jobs, investment, water use and capacity remain separate from realized figures. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://www.hut8.com/data-centers/logan-prairie", "host": "hut8.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "4c21925b3767418c364ff8e4f72eda9a9a33fe953e099bd3b7bfb1899158a834", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Latham · Logan · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17107"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "aligned-coal-city-il", "state": "IL", "kind": "facility", "name": "Aligned Coal City Campus", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Grundy"], "city": "Coal City", "address": "", "who": "Aligned Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CoalCity nonbinding inducement versus final TIF award. Original resolutions andredevelopmentagreementnotread; blog expressly saysinducementsnonbinding. Does notguaranteeTIFdistrict,extension,finalagreement orzoning.2Kconstructionand300permanentforecastsnotcurrentemployees.55to65dBnotexplicitAweighted,andatnearestresidencenotpropertyline; do notadoptcomplianceconclusion. No numericITMW or actualoperation.100Ktradefoundationdonationcorporateclaimnotadditionalcampsubsidy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://hs.getobedio.com/blog/a-multi-billion-dollar-data-center-takes-a-step-forward-in-coal-city", "host": "hs.getobedio.com", "date": "2026-06-30", "published": "2026-06-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://aligneddc.com/coal-city-il-data-center/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 41.28528, "lng": -88.4185, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round13-2026-10-14.json", "scope": "CoalCity nonbinding inducement versus final TIF award", "fields": {"publisher_role": "Obedio land-use research/vendor blog", "project": "Aligned CoalCity, GrundyCounty, Illinois", "reported_site_acres_approx": 305, "reported_inducement_resolutions": ["26-09", "26-10"], "reported_action_date": "2026-06-24", "reported_expected_construction_jobs_approx": 2000, "reported_expected_permanent_jobs_approx": 300, "reported_expected_water_gallons_per_day_approx": 41500}, "notes": ["Original resolutions andredevelopmentagreementnotread; blog expressly saysinducementsnonbinding. Does notguaranteeTIFdistrict,extension,finalagreement orzoning.2Kconstructionand300permanentforecastsnotcurrentemployees.55to65dBnotexplicitAweighted,andatnearestresidencenotpropertyline; do notadoptcomplianceconclusion. No numericITMW or actualoperation.100Ktradefoundationdonationcorporateclaimnotadditionalcampsubsidy.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://hs.getobedio.com/blog/a-multi-billion-dollar-data-center-takes-a-step-forward-in-coal-city", "host": "hs.getobedio.com", "date": "2026-06-30", "published": "2026-06-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 60", "scope": "The current original Aligned page expressly describes a proposed Coal City campus. This supports a listed proposal within the issuer account. Expected employment, tax benefits, prospective cooling and acoustic performance, industrywide energy cost assurances and a separate Northlake operating example are not measured Coal City outcomes, final permits or commissioned service. Founding dates and a staff biography are not exact project opening or announcement dates.", "fields": {"current_stage_evidence": {"outcome": "original_named_coal_city_proposal", "scope": "The current original Aligned page expressly describes a proposed Coal City campus. This supports a listed proposal within the issuer account. Expected employment, tax benefits, prospective cooling and acoustic performance, industrywide energy cost assurances and a separate Northlake operating example are not measured Coal City outcomes, final permits or commissioned service. Founding dates and a staff biography are not exact project opening or announcement dates."}, "source_read_scope": {"original_complete_project_main_body_and_faq_read": true, "issuer_assurances_not_measured_performance": true, "separate_northlake_example_not_coalcity": true, "no_quantity_role_or_location_export": true}}, "notes": ["The current original Aligned page expressly describes a proposed Coal City campus. This supports a listed proposal within the issuer account. Expected employment, tax benefits, prospective cooling and acoustic performance, industrywide energy cost assurances and a separate Northlake operating example are not measured Coal City outcomes, final permits or commissioned service. Founding dates and a staff biography are not exact project opening or announcement dates.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://aligneddc.com/coal-city-il-data-center/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check46, October23,2026", "scope": "Aligned identifies its proposed Coal City campus in the main body of its own project page. Developer per source is the Aligned Data Centers provider brand for that stated proposal. Promised energy payments, design water use, noise control, jobs and tax benefits are attributed intentions, not measured or independently certified outcomes. The previously empty company field is populated only from this exact first party page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Provider brand is distinct from a parent company, tenant and property owner. The source publication date is unknown.", "fields": {"company_association": {"name": "Aligned Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Aligned identifies its proposed Coal City campus in the main body of its own project page. Developer per source is the Aligned Data Centers provider brand for that stated proposal. Promised energy payments, design water use, noise control, jobs and tax benefits are attributed intentions, not measured or independently certified outcomes. The previously empty company field is populated only from this exact first party page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Provider brand is distinct from a parent company, tenant and property owner. The source publication date is unknown."}, "provider_role": "developer"}, "notes": ["Aligned identifies its proposed Coal City campus in the main body of its own project page. Developer per source is the Aligned Data Centers provider brand for that stated proposal. Promised energy payments, design water use, noise control, jobs and tax benefits are attributed intentions, not measured or independently certified outcomes. The previously empty company field is populated only from this exact first party page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Provider brand is distinct from a parent company, tenant and property owner. The source publication date is unknown."], "sources": [{"url": "https://aligneddc.com/coal-city-il-data-center/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Coal City · Grundy · Source context reviewed", "status_scope": "The current original Aligned page expressly describes a proposed Coal City campus. This supports a listed proposal within the issuer account. Expected employment, tax benefits, prospective cooling and acoustic performance, industrywide energy cost assurances and a separate Northlake operating example are not measured Coal City outcomes, final permits or commissioned service. Founding dates and a staff biography are not exact project opening or announcement dates.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17063"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "cloudhq-mount-prospect-ord-il", "state": "IL", "kind": "facility", "name": "CloudHQ Mount Prospect (ORD) Campus", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cook"], "city": "Mount Prospect", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. Daily Energy Insider August 26, 2022 utility/developer reporting identifies CloudHQ ORD at the former United Airlines headquarters in Mount Prospect. Groundbreaking that week and planned $2.5 billion, 1.5 million square feet and three buildings are historical announcement context, not current completion/spend. First phase 2024 and remaining three-to-five-year demand-driven phases are old targets. Planned ComEd substation and line extensions are not executed power terms or energized IT MW. Local-government approval does not prove every permit or occupancy certificate. 100-plus jobs were forecast; ComEd's 70 other data centers is a service-area marketing count, not an independently verified census. Previously gated Daily Herald bodies were not decoded. No complete record/current operating status, signed instruments, measured impacts or all-field certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://dailyenergyinsider.com/innovation/36434-comed-joins-with-cloudhq-to-build-2-5b-data-center-in-northern-illinois/", "host": "dailyenergyinsider.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://cloudhq.com/campus/ord-campus/", "host": "cloudhq.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}], "loc": {"lat": 41.83992, "lng": -87.81695, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json", "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.", "fields": {}, "notes": ["Daily Energy Insider August 26, 2022 utility/developer reporting identifies CloudHQ ORD at the former United Airlines headquarters in Mount Prospect. Groundbreaking that week and planned $2.5 billion, 1.5 million square feet and three buildings are historical announcement context, not current completion/spend.", "First phase 2024 and remaining three-to-five-year demand-driven phases are old targets. Planned ComEd substation and line extensions are not executed power terms or energized IT MW. Local-government approval does not prove every permit or occupancy certificate. 100-plus jobs were forecast; ComEd's 70 other data centers is a service-area marketing count, not an independently verified census. Previously gated Daily Herald bodies were not decoded.", "No complete record/current operating status, signed instruments, measured impacts or all-field certification."], "sources": [{"url": "https://dailyenergyinsider.com/innovation/36434-comed-joins-with-cloudhq-to-build-2-5b-data-center-in-northern-illinois/", "host": "dailyenergyinsider.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "operator-listed_development", "scope": "CloudHQ currently markets the ORD campus as a development with future availability. The 252 MW critical headline and up-to-300 MW narrative are different advertised scopes and are not reconciled into current capacity. The relative ready-for-service forecast lacks an anchored date. Published campus coordinates are not adopted in this batch. The proposed label does not assert construction or energization."}}, "notes": ["CloudHQ currently markets the ORD campus as a development with future availability. The 252 MW critical headline and up-to-300 MW narrative are different advertised scopes and are not reconciled into current capacity. The relative ready-for-service forecast lacks an anchored date. Published campus coordinates are not adopted in this batch. The proposed label does not assert construction or energization."], "sources": [{"url": "https://cloudhq.com/campus/ord-campus/", "host": "cloudhq.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}], "checked": "2026-10-17", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Mount Prospect · Cook · Source context reviewed", "status_scope": "CloudHQ currently markets the ORD campus as a development with future availability. The 252 MW critical headline and up-to-300 MW narrative are different advertised scopes and are not reconciled into current capacity. The relative ready-for-service forecast lacks an anchored date. Published campus coordinates are not adopted in this batch. The proposed label does not assert construction or energization.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17031"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "cyrusone-sangamon-talkington-township-il", "state": "IL", "kind": "facility", "name": "CyrusOne Sangamon County Data Center Campus", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Sangamon"], "city": "", "address": "", "who": "CyrusOne", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. CyrusOne spokesperson claims incentive grandfathering; original agreement not reviewed.630MWundefined operating requirement not current IT. Summer2026start/four-yearbuild forecasts unobserved;65-million Hut8 promise not CyrusOne incentive. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.illinoistimes.com/news/area-data-center-updates/", "host": "illinoistimes.com", "date": "2026-06-10", "published": "2026-06-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.cyrusone.com/data-centers/north-america/sangamon-county-data-center", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.cyrusone.com/data-centers", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 39.75818, "lng": -89.65875, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round24-2026-10-14.json", "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.", "fields": {"reported_context": "Illinois Times distinguishes Sangamon CyrusOne approved proposal from early Christian County EagleRock and paused Logan Hut8.", "independently_verified_current_operating_status": null}, "notes": ["CyrusOne spokesperson claims incentive grandfathering; original agreement not reviewed.630MWundefined operating requirement not current IT. Summer2026start/four-yearbuild forecasts unobserved;65-million Hut8 promise not CyrusOne incentive.", "Subsequent original decisions and current operator disclosures take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.illinoistimes.com/news/area-data-center-updates/", "host": "illinoistimes.com", "date": "2026-06-10", "published": "2026-06-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 60", "scope": "The current original project page explicitly says CyrusOne is proposing a Sangamon County campus and the current portfolio lists it in development. This supports a listed proposal. Statements about future benefits, cooling, health, electric costs and regulatory compliance are attributed issuer plans and assurances, not independently measured effects or completed legal approvals. Existing computing service across the company portfolio is not transferred to this proposed facility. No exact construction or computing start is verified.", "fields": {"current_stage_evidence": {"outcome": "original_named_sangamon_proposal", "scope": "The current original project page explicitly says CyrusOne is proposing a Sangamon County campus and the current portfolio lists it in development. This supports a listed proposal. Statements about future benefits, cooling, health, electric costs and regulatory compliance are attributed issuer plans and assurances, not independently measured effects or completed legal approvals. Existing computing service across the company portfolio is not transferred to this proposed facility. No exact construction or computing start is verified."}, "source_read_scope": {"complete_original_named_project_main_body_read": true, "current_portfolio_development_listing_read": true, "prospective_assurances_not_measured_or_final_legal_outcomes": true, "no_quantity_role_or_location_export": true}}, "notes": ["The current original project page explicitly says CyrusOne is proposing a Sangamon County campus and the current portfolio lists it in development. This supports a listed proposal. Statements about future benefits, cooling, health, electric costs and regulatory compliance are attributed issuer plans and assurances, not independently measured effects or completed legal approvals. Existing computing service across the company portfolio is not transferred to this proposed facility. No exact construction or computing start is verified.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/sangamon-county-data-center", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.cyrusone.com/data-centers", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check46, October23,2026", "scope": "CyrusOne identifies its proposed Sangamon County campus in the main body of its own project page. Developer per source is the CyrusOne provider brand. This company relationship does not newly establish the township boundary, a street, acreage, a parcel or an opening. Announced investment, jobs, tax and community commitments are forecasts or company statements, not completed outcomes. The previously empty company field is populated only from this exact first party page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Provider brand is distinct from a parent company, tenant and property owner. The source publication date is unknown.", "fields": {"company_association": {"name": "CyrusOne", "role": "developer", "identity_scope": "provider_brand_only", "scope": "CyrusOne identifies its proposed Sangamon County campus in the main body of its own project page. Developer per source is the CyrusOne provider brand. This company relationship does not newly establish the township boundary, a street, acreage, a parcel or an opening. Announced investment, jobs, tax and community commitments are forecasts or company statements, not completed outcomes. The previously empty company field is populated only from this exact first party page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Provider brand is distinct from a parent company, tenant and property owner. The source publication date is unknown."}, "provider_role": "developer"}, "notes": ["CyrusOne identifies its proposed Sangamon County campus in the main body of its own project page. Developer per source is the CyrusOne provider brand. This company relationship does not newly establish the township boundary, a street, acreage, a parcel or an opening. Announced investment, jobs, tax and community commitments are forecasts or company statements, not completed outcomes. The previously empty company field is populated only from this exact first party page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Provider brand is distinct from a parent company, tenant and property owner. The source publication date is unknown."], "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/sangamon-county-data-center", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Sangamon · Source context reviewed", "status_scope": "The current original project page explicitly says CyrusOne is proposing a Sangamon County campus and the current portfolio lists it in development. This supports a listed proposal. Statements about future benefits, cooling, health, electric costs and regulatory compliance are attributed issuer plans and assurances, not independently measured effects or completed legal approvals. Existing computing service across the company portfolio is not transferred to this proposed facility. No exact construction or computing start is verified.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17167"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "hut8-batavia-il", "state": "IL", "kind": "facility", "name": "Hut 8 Batavia Data Center", "group": "proposed", "status": "City listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kane"], "city": "Batavia", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. City of Batavia August31,2026 update explicitly names Hut8proposal at1780HubbardAvenue. It says updatedprojectmaterial addresses closed-loopcooling, municipalwaterlimits, noise, projectedutility/fundrevenue and infrastructurecost/reimbursement. No exact limits, MW, money or signedagreement printed in thisannouncement; those remain unverified here. City describes proposal andfutureperformance rules, not an observedenergization/occupancycertificate. Currentmainpage returnedonlynavigation. No questionformsubmitted, videoswatched or imaginedcontents of absentagreement adopted. Publicworks/city-officeaddress100NIslandAvenue is NOTthedata-centeraddress. Not full-field, exact parcel, currentoperations or independently audited numerical certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.bataviail.gov/o/ed/article/3102661", "host": "bataviail.gov", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1780+Hubbard+Ave%2C+Batavia%2C+IL&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Complete literal published street query; calculated range only"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-88.27670176102897%2C41.85460828853755%2C-88.26343423897102%2C41.864489711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Actually viewed source street setting; acquisition date unknown"}], "loc": {"lng": -88.270068, "lat": 41.859549, "precision": "address", "basis": "The original City of Batavia computing source identifies 1780 Hubbard Ave, Batavia, IL. One complete literal Census street query uniquely supports this calculated street reference inside the unchanged county. The proposed computing street is distinct from City offices at 100 N. Island Avenue. The August 31, 2026 page publication is not a physical event. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json", "scope": "Named municipal/limited original-witness or operator context; dates and source origins explicit.", "fields": {}, "notes": ["City of Batavia August31,2026 update explicitly names Hut8proposal at1780HubbardAvenue. It says updatedprojectmaterial addresses closed-loopcooling, municipalwaterlimits, noise, projectedutility/fundrevenue and infrastructurecost/reimbursement. No exact limits, MW, money or signedagreement printed in thisannouncement; those remain unverified here.", "City describes proposal andfutureperformance rules, not an observedenergization/occupancycertificate. Currentmainpage returnedonlynavigation. No questionformsubmitted, videoswatched or imaginedcontents of absentagreement adopted. Publicworks/city-officeaddress100NIslandAvenue is NOTthedata-centeraddress.", "Not full-field, exact parcel, currentoperations or independently audited numerical certification."], "sources": [{"url": "https://www.bataviail.gov/o/ed/article/3102661", "host": "bataviail.gov", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 22", "scope": "Batavia current economic development update describes the Hut 8 facility at Hubbard Avenue as proposed. City listed proposal describes that project account. The update discusses future noise standards, cooling, water limits and projected utility or general fund revenue; those statements do not establish measured effects, completed electrical service, construction or operation. The separate current project route returned a page shell without substantive project body in this capture, so no uncaptured FAQ detail is adopted.", "fields": {"current_stage_evidence": {"outcome": "city_named_proposal_not_forecast_revenue_or_current_service", "scope": "Batavia current economic development update describes the Hut 8 facility at Hubbard Avenue as proposed. City listed proposal describes that project account. The update discusses future noise standards, cooling, water limits and projected utility or general fund revenue; those statements do not establish measured effects, completed electrical service, construction or operation. The separate current project route returned a page shell without substantive project body in this capture, so no uncaptured FAQ detail is adopted."}}, "notes": ["Batavia current economic development update describes the Hut 8 facility at Hubbard Avenue as proposed. City listed proposal describes that project account. The update discusses future noise standards, cooling, water limits and projected utility or general fund revenue; those statements do not establish measured effects, completed electrical service, construction or operation. The separate current project route returned a page shell without substantive project body in this capture, so no uncaptured FAQ detail is adopted.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.bataviail.gov/o/ed/article/3102661", "host": "www.bataviail.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 72, 2026-10-24", "scope": "Exact original named computing source street and one complete literal Census query only. Every original group, role, quantity, name, address, county and source version stays exact. No roof, tenant floor, legal title, actual construction stage, operating event or complete campus is certified.", "fields": {"location_review_decision": {"location": {"lng": -88.270068, "lat": 41.859549, "precision": "address", "basis": "The original City of Batavia computing source identifies 1780 Hubbard Ave, Batavia, IL. One complete literal Census street query uniquely supports this calculated street reference inside the unchanged county. The proposed computing street is distinct from City offices at 100 N. Island Avenue. The August 31, 2026 page publication is not a physical event. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "1780 Hubbard Ave, Batavia, IL", "county_fips": ["17089"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["Exact original named computing source street and one complete literal Census query only. Every original group, role, quantity, name, address, county and source version stays exact. No roof, tenant floor, legal title, actual construction stage, operating event or complete campus is certified.", "The inherited general area coordinate was not independently admitted as a reviewed computing street reference. The original City of Batavia source explicitly identifies 1780 Hubbard Ave, Batavia, IL as the named computing location. One complete literal Census query returns a unique calculated street range inside unchanged county 17089. The measured correction is 413.0 metres. Exact original named computing facility street, not city or publisher mail. Every original group, role, quantity, name, address, county and source version remains unchanged. The source street and calculated Census range do not establish a roof, title, actual construction stage, operating event or complete campus. This is a source reference correction, not physical relocation.", "Exact original named computing facility street, not city or publisher mail. Every original group, role, quantity, name, address, county and source version remains unchanged. The source street and calculated Census range do not establish a roof, title, actual construction stage, operating event or complete campus.", "The street setting shows substantial buildings, parking, a curved road and rail corridor beside open fields. No computing roof, current construction stage or source parcel boundary is selected. Imagery acquisition date is unknown and may predate the proposal."], "sources": [{"url": "https://www.bataviail.gov/o/ed/article/3102661", "host": "www.bataviail.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Exact original named computing street, distinct from contacts and technical fields"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1780+Hubbard+Ave%2C+Batavia%2C+IL&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Complete literal published street query; calculated range only"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-88.27670176102897%2C41.85460828853755%2C-88.26343423897102%2C41.864489711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Actually viewed source street setting; acquisition date unknown"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Calculated street reference, not a roof or tenant floor", "summary": "Illinois · Batavia · Kane · Source context reviewed", "status_scope": "Batavia current economic development update describes the Hut 8 facility at Hubbard Avenue as proposed. City listed proposal describes that project account. The update discusses future noise standards, cooling, water limits and projected utility or general fund revenue; those statements do not establish measured effects, completed electrical service, construction or operation. The separate current project route returned a page shell without substantive project body in this capture, so no uncaptured FAQ detail is adopted.", "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "project-cardinal-yorkville-il", "state": "IL", "kind": "facility", "name": "Project Cardinal Data Center Campus", "group": "proposed", "status": "City listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kendall"], "city": "Yorkville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Yorkville Cardinal proposal identity and stale hearing language. City project index describes submitted applications, not final adopted annexation/PUD or all permits. 2025 hearing dates are historical, not upcoming2026. June11hearing continued toJuly9 after lack of quorum; linked later studies throughMarch2026 do not prove approval. Buildings and area are proposal and subject to revisions. No numeric critical IT MW, actual operations or final current outcome adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-06-10", "Yorkville Project Cardinal page explicitly records the June 10, 2025 annexation agreement public hearing as held, with public comments taken and the hearing closed. This is the hearing outcome only, not annexation approval, a building permit, a site closure or physical construction."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne", "host": "yorkville.il.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.59977, "lng": -88.43866, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Yorkville Cardinal proposal identity and stale hearing language", "fields": {"agency": "City of Yorkville, Illinois", "project": "Project Cardinal", "case": "PZC2025-08", "petitioner_contract_purchaser": "Pioneer Development LLC", "proposed_site_acres_approx": 1037, "proposed_parcels": 20, "proposed_data_center_buildings": 14, "proposed_area_sqft_min_exclusive": 17000000, "proposed_substations": 2, "location": "northwest of Route47 and GalenaRoad, south of BaselineRoad, east of AsheRoad"}, "notes": ["City project index describes submitted applications, not final adopted annexation/PUD or all permits. 2025 hearing dates are historical, not upcoming2026. June11hearing continued toJuly9 after lack of quorum; linked later studies throughMarch2026 do not prove approval. Buildings and area are proposal and subject to revisions. No numeric critical IT MW, actual operations or final current outcome adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne", "host": "yorkville.il.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 22", "scope": "Yorkville current Project Cardinal page describes applications for annexation, rezoning, special use and preliminary planned development approval, with later revised supporting materials. City listed proposal describes those application records. Its June 10, 2025 annexation agreement public hearing is explicitly marked held with public comments and then closed. Closing a hearing is not a final permit approval, site closure or completed construction. Other schedule entries and updated study dates do not prove final decisions or measured impacts.", "fields": {"current_stage_evidence": {"outcome": "current_cardinal_application_record_not_hearing_closure_as_permit", "scope": "Yorkville current Project Cardinal page describes applications for annexation, rezoning, special use and preliminary planned development approval, with later revised supporting materials. City listed proposal describes those application records. Its June 10, 2025 annexation agreement public hearing is explicitly marked held with public comments and then closed. Closing a hearing is not a final permit approval, site closure or completed construction. Other schedule entries and updated study dates do not prove final decisions or measured impacts."}}, "notes": ["Yorkville current Project Cardinal page describes applications for annexation, rezoning, special use and preliminary planned development approval, with later revised supporting materials. City listed proposal describes those application records. Its June 10, 2025 annexation agreement public hearing is explicitly marked held with public comments and then closed. Closing a hearing is not a final permit approval, site closure or completed construction. Other schedule entries and updated study dates do not prove final decisions or measured impacts.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne", "host": "www.yorkville.il.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Yorkville · Kendall · Source context reviewed", "status_scope": "Yorkville current Project Cardinal page describes applications for annexation, rezoning, special use and preliminary planned development approval, with later revised supporting materials. City listed proposal describes those application records. Its June 10, 2025 annexation agreement public hearing is explicitly marked held with public comments and then closed. Closing a hearing is not a final permit approval, site closure or completed construction. Other schedule entries and updated study dates do not prove final decisions or measured impacts.", "event_evidence": [{"date": "2025-06-10", "text": "Yorkville Project Cardinal page explicitly records the June 10, 2025 annexation agreement public hearing as held, with public comments taken and the hearing closed. This is the hearing outcome only, not annexation approval, a building permit, a site closure or physical construction.", "kind": "hearing", "sources": [{"url": "https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne", "host": "www.yorkville.il.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17093"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "white-rose-project-kilo-south-elgin-il", "state": "IL", "kind": "facility", "name": "Project Kilo Data Center (South Elgin)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kane"], "city": "South Elgin", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. July 15 meeting was cancelled and previously suggestedAugust 19 review was no longer scheduled; do not publish either as an observed approval. Developer seeks to buy land, not verified closed purchase. Several-million annual taxes and infrastructure funding are projections/promises, not signed payments or tariff protection. Half-Olympic-pool initial fill/two-household ongoing water and whisper-level modeled noise are nonquantified developer analogies, not metered impact or adopted permit limits.8347 petition signatures are dated online tally, not unique local residents or survey result. NoITMW, tenant or RFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.shawlocal.com/kane-county-chronicle/2026/07/28/data-center-developer-launches-website-to-allay-south-elgins-fears/", "host": "shawlocal.com", "date": "2026-07-28", "published": "2026-07-28", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.southelgin-projectkilo.com/", "host": "www.southelgin-projectkilo.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 41.91318, "lng": -88.4264, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "ShawLocal reports WhiteRose launched a public ProjectKilo website for a proposed 20 acreSouthElgin annexation/data center, with concept-review meeting date now undetermined.", "independently_verified_current_operating_status": null}, "notes": ["July 15 meeting was cancelled and previously suggestedAugust 19 review was no longer scheduled; do not publish either as an observed approval. Developer seeks to buy land, not verified closed purchase. Several-million annual taxes and infrastructure funding are projections/promises, not signed payments or tariff protection. Half-Olympic-pool initial fill/two-household ongoing water and whisper-level modeled noise are nonquantified developer analogies, not metered impact or adopted permit limits.8347 petition signatures are dated online tally, not unique local residents or survey result. NoITMW, tenant or RFSverified.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.shawlocal.com/kane-county-chronicle/2026/07/28/data-center-developer-launches-website-to-allay-south-elgins-fears/", "host": "shawlocal.com", "date": "2026-07-28", "published": "2026-07-28", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 60", "scope": "The current original Project Kilo page explicitly describes potential development in South Elgin and conditional plans if developed. This supports a listed proposal. Its July 22, 2026 update label is not independently the first publication or announcement day. Conceptual acoustic modeling, projected benefits, utility arrangements, design descriptions, other city examples and issuer assertions about environmental regulation are not independently measured operating impacts, executed permits or commissioned computing. No quantity or location field is changed.", "fields": {"current_stage_evidence": {"outcome": "original_named_south_elgin_conditional_proposal", "scope": "The current original Project Kilo page explicitly describes potential development in South Elgin and conditional plans if developed. This supports a listed proposal. Its July 22, 2026 update label is not independently the first publication or announcement day. Conceptual acoustic modeling, projected benefits, utility arrangements, design descriptions, other city examples and issuer assertions about environmental regulation are not independently measured operating impacts, executed permits or commissioned computing. No quantity or location field is changed."}, "source_read_scope": {"original_project_introduction_planning_and_selected_noise_sections_read": true, "updated_label_not_first_publication": true, "model_not_actual_operating_noise": true, "other_city_examples_not_project_outcomes": true, "no_quantity_role_or_location_export": true}}, "notes": ["The current original Project Kilo page explicitly describes potential development in South Elgin and conditional plans if developed. This supports a listed proposal. Its July 22, 2026 update label is not independently the first publication or announcement day. Conceptual acoustic modeling, projected benefits, utility arrangements, design descriptions, other city examples and issuer assertions about environmental regulation are not independently measured operating impacts, executed permits or commissioned computing. No quantity or location field is changed.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.southelgin-projectkilo.com/", "host": "www.southelgin-projectkilo.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · South Elgin · Kane · Source context reviewed", "status_scope": "The current original Project Kilo page explicitly describes potential development in South Elgin and conditional plans if developed. This supports a listed proposal. Its July 22, 2026 update label is not independently the first publication or announcement day. Conceptual acoustic modeling, projected benefits, utility arrangements, design descriptions, other city examples and issuer assertions about environmental regulation are not independently measured operating impacts, executed permits or commissioned computing. No quantity or location field is changed.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17089"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "prologis-project-steel-yorkville-il", "state": "IL", "kind": "facility", "name": "Project Steel Data Center Campus", "group": "proposed", "status": "City listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kendall"], "city": "Yorkville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Yorkville Steel revision supersedes stale18building narrative. Explicit March2026 revision supersedes18building headline with16. Older over9Marea not independently confirmed for revised plan. Proposal/application index is not final approval or current construction. August13,2025 hearing schedule not future2026 hearing. No critical IT MW or actual service proven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.yorkville.il.us/905/Project-Steel-Data-Center-Campus-Annex-A", "host": "yorkville.il.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.57188, "lng": -88.42714, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Yorkville Steel revision supersedes stale18building narrative", "fields": {"agency": "City of Yorkville, Illinois", "project": "Project Steel", "case": "2025-07", "petitioner_contract_purchaser": "Prologis LP", "proposed_site_acres_approx": 540, "proposed_parcels": 16, "latest_index_revision_date": "2026-03-18", "latest_index_proposed_data_center_buildings": 16, "older_proposed_buildings": 18, "older_proposed_area_sqft_min_exclusive": 9000000, "proposed_substations": 3, "location": "east of EldamainRoad, between CorneilsRoad and GalenaRoad"}, "notes": ["Explicit March2026 revision supersedes18building headline with16. Older over9Marea not independently confirmed for revised plan. Proposal/application index is not final approval or current construction. August13,2025 hearing schedule not future2026 hearing. No critical IT MW or actual service proven.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.yorkville.il.us/905/Project-Steel-Data-Center-Campus-Annex-A", "host": "yorkville.il.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 22", "scope": "Yorkville current Project Steel page describes the Prologis applications and subsequent plan revisions, including a March 18, 2026 revision that changes its proposed building count. City listed proposal describes that application context. Older scheduled hearings are not treated as accomplished final approvals, and a closed application packet or revised acoustic study is not an operating facility. No new building quantity, physical phase, current entitlement outcome or opening day is adopted.", "fields": {"current_stage_evidence": {"outcome": "current_steel_application_and_plan_revisions_not_final_operating_phase", "scope": "Yorkville current Project Steel page describes the Prologis applications and subsequent plan revisions, including a March 18, 2026 revision that changes its proposed building count. City listed proposal describes that application context. Older scheduled hearings are not treated as accomplished final approvals, and a closed application packet or revised acoustic study is not an operating facility. No new building quantity, physical phase, current entitlement outcome or opening day is adopted."}, "source_scope": {"latest_explicit_plan_revision_on": "2026-03-18", "older_building_count_not_promoted": true, "scheduled_hearings_not_final_decisions": true}}, "notes": ["Yorkville current Project Steel page describes the Prologis applications and subsequent plan revisions, including a March 18, 2026 revision that changes its proposed building count. City listed proposal describes that application context. Older scheduled hearings are not treated as accomplished final approvals, and a closed application packet or revised acoustic study is not an operating facility. No new building quantity, physical phase, current entitlement outcome or opening day is adopted.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.yorkville.il.us/905/Project-Steel-Data-Center-Campus-Annex-A", "host": "www.yorkville.il.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Yorkville · Kendall · Source context reviewed", "status_scope": "Yorkville current Project Steel page describes the Prologis applications and subsequent plan revisions, including a March 18, 2026 revision that changes its proposed building count. City listed proposal describes that application context. Older scheduled hearings are not treated as accomplished final approvals, and a closed application packet or revised acoustic study is not an operating facility. No new building quantity, physical phase, current entitlement outcome or opening day is adopted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17093"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "related-digital-8080-lake-shore-chicago-il", "state": "IL", "kind": "facility", "name": "Related Digital South Works Campus (8080 S DuSable Lake Shore Drive)", "group": "proposed", "status": "Announced development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cook"], "city": "Chicago", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. March27,2025 issuer launch explicitly identifies8080LakeShoreDrive Chicago formerSouthWorks site and proposes1GWundefined-basis data center on its north side. Over400acmasterproperty and128acIQMP quantum project are distinct scopes; PsiQuantum is not confirmed tenant of the1GWgeneralDC. 45Bnear-termpipeline, at least500Msponsorcommitments and up to8Bcapitalraise are different financing/project scopes, not45Bspent or8Bclosed. More than5GWpipeline includes US AND CANADA.64MWOntario expansion is notUS capacity. Additional Illinois1000+MW/Missouri1200MW/Wyoming250MW pipeline bullets have no exact parcels; possible overlap with Chicago not resolved. No additionalpins/ITMW/currentRFS certified. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.", "date": "", "events": [["2025-03-27", "Related published its northern South Works data center proposal on March 27, 2025 within a wider master plan. This is the release date, not construction, financing close, the southern quantum campus milestone or an opening of this data center."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.related.com/press-releases/2025-03-27/related-companies-accelerates-push-data-centers-capitalization-related", "host": "related.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.80425, "lng": -87.87851, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-states-and-named-operator-review-round53-2026-10-15.json", "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.", "fields": {}, "notes": ["March27,2025 issuer launch explicitly identifies8080LakeShoreDrive Chicago formerSouthWorks site and proposes1GWundefined-basis data center on its north side. Over400acmasterproperty and128acIQMP quantum project are distinct scopes; PsiQuantum is not confirmed tenant of the1GWgeneralDC.", "45Bnear-termpipeline, at least500Msponsorcommitments and up to8Bcapitalraise are different financing/project scopes, not45Bspent or8Bclosed. More than5GWpipeline includes US AND CANADA.64MWOntario expansion is notUS capacity.", "Additional Illinois1000+MW/Missouri1200MW/Wyoming250MW pipeline bullets have no exact parcels; possible overlap with Chicago not resolved. No additionalpins/ITMW/currentRFS certified.", "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."], "sources": [{"url": "https://www.related.com/press-releases/2025-03-27/related-companies-accelerates-push-data-centers-capitalization-related", "host": "related.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 17", "scope": "Related March 27, 2025 release explicitly proposes a north side data center within the wider South Works master plan at 8080 Lake Shore Drive. Announced development describes that dated proposal only. It is separate from the southern Illinois Quantum and Microelectronics Park, its anchor tenants and other planned uses. No broader campus construction milestone, quantum facility opening, planned capacity, financing commitment or acreage is transferred to the individual northern data center. Its later physical construction and operation remain unverified.", "fields": {"current_stage_evidence": {"outcome": "dated_north_side_development_proposal_distinct_from_quantum_component", "scope": "Related March 27, 2025 release explicitly proposes a north side data center within the wider South Works master plan at 8080 Lake Shore Drive. Announced development describes that dated proposal only. It is separate from the southern Illinois Quantum and Microelectronics Park, its anchor tenants and other planned uses. No broader campus construction milestone, quantum facility opening, planned capacity, financing commitment or acreage is transferred to the individual northern data center. Its later physical construction and operation remain unverified."}, "component_scope": {"release_on": "2025-03-27", "north_side_datacenter_distinct_from_southern_quantum_park": true, "wider_masterplan_not_datacenter_footprint": true, "no_current_physical_milestone_verified": true}}, "notes": ["Related March 27, 2025 release explicitly proposes a north side data center within the wider South Works master plan at 8080 Lake Shore Drive. Announced development describes that dated proposal only. It is separate from the southern Illinois Quantum and Microelectronics Park, its anchor tenants and other planned uses. No broader campus construction milestone, quantum facility opening, planned capacity, financing commitment or acreage is transferred to the individual northern data center. Its later physical construction and operation remain unverified.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.related.com/press-releases/2025-03-27/related-companies-accelerates-push-data-centers-capitalization-related", "host": "www.related.com", "published": "2025-03-27", "date": "2025-03-27", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Chicago · Cook · Source context reviewed", "status_scope": "Related March 27, 2025 release explicitly proposes a north side data center within the wider South Works master plan at 8080 Lake Shore Drive. Announced development describes that dated proposal only. It is separate from the southern Illinois Quantum and Microelectronics Park, its anchor tenants and other planned uses. No broader campus construction milestone, quantum facility opening, planned capacity, financing commitment or acreage is transferred to the individual northern data center. Its later physical construction and operation remain unverified.", "event_evidence": [{"date": "2025-03-27", "text": "Related published its northern South Works data center proposal on March 27, 2025 within a wider master plan. This is the release date, not construction, financing close, the southern quantum campus milestone or an opening of this data center.", "kind": "announced", "sources": [{"url": "https://www.related.com/press-releases/2025-03-27/related-companies-accelerates-push-data-centers-capitalization-related", "host": "www.related.com", "published": "2025-03-27", "date": "2025-03-27", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17031"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "t5-chicago-v-elk-grove-village-il", "state": "IL", "kind": "facility", "name": "T5 @ Chicago V (CHI V)", "group": "proposed", "status": "Announced development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cook"], "city": "Elk Grove Village", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical acquisition announcement and future delivery target. Separate Grayslake 1.2 GW campus excluded. Utility secured does not prove construction started or commissioned. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-03-26", "T5 published its CHI V acquisition and planned development announcement on March 26, 2025. Construction is described prospectively and 2028 occupancy is a target. The publication date is not an exact construction start, utility energization or opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html", "host": "prnewswire.com", "date": "2025-03-26", "published": "2025-03-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 41.84342, "lng": -87.90156, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"acquired_site_acres": 7, "planned_building_sqft": 220000, "planned_critical_it_mw": 36, "occupancy_target_year": 2028}, "notes": ["Historical acquisition announcement and future delivery target. Separate Grayslake 1.2 GW campus excluded. Utility secured does not prove construction started or commissioned.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html", "host": "prnewswire.com", "date": "2025-03-26", "published": "2025-03-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 17", "scope": "T5 March 26, 2025 release announces acquisition of the CHI V site in Elk Grove Village and describes a planned new facility with occupancy targeted in 2028. Announced development describes this dated proposal. The release says construction will begin shortly, which is future intent rather than evidence that it began. The current directory render did not contain individual Chicago cards. Neither the historical acquisition nor the future occupancy target establishes current physical construction, complete commissioning or operation.", "fields": {"current_stage_evidence": {"outcome": "dated_chiv_acquisition_and_future_development_not_operation", "scope": "T5 March 26, 2025 release announces acquisition of the CHI V site in Elk Grove Village and describes a planned new facility with occupancy targeted in 2028. Announced development describes this dated proposal. The release says construction will begin shortly, which is future intent rather than evidence that it began. The current directory render did not contain individual Chicago cards. Neither the historical acquisition nor the future occupancy target establishes current physical construction, complete commissioning or operation."}, "date_scope": {"announcement_on": "2025-03-26", "occupancy_target_year": "2028", "forecast_occurrence_verified": false, "current_directory_missing_cards_not_closure": true}}, "notes": ["T5 March 26, 2025 release announces acquisition of the CHI V site in Elk Grove Village and describes a planned new facility with occupancy targeted in 2028. Announced development describes this dated proposal. The release says construction will begin shortly, which is future intent rather than evidence that it began. The current directory render did not contain individual Chicago cards. Neither the historical acquisition nor the future occupancy target establishes current physical construction, complete commissioning or operation.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html", "host": "www.prnewswire.com", "published": "2025-03-26", "date": "2025-03-26", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Elk Grove Village · Cook · Source context reviewed", "status_scope": "T5 March 26, 2025 release announces acquisition of the CHI V site in Elk Grove Village and describes a planned new facility with occupancy targeted in 2028. Announced development describes this dated proposal. The release says construction will begin shortly, which is future intent rather than evidence that it began. The current directory render did not contain individual Chicago cards. Neither the historical acquisition nor the future occupancy target establishes current physical construction, complete commissioning or operation.", "event_evidence": [{"date": "2025-03-26", "text": "T5 published its CHI V acquisition and planned development announcement on March 26, 2025. Construction is described prospectively and 2028 occupancy is a target. The publication date is not an exact construction start, utility energization or opening.", "kind": "announced", "sources": [{"url": "https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html", "host": "www.prnewswire.com", "published": "2025-03-26", "date": "2025-03-26", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17031"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "t5-chicago-iv-grayslake-il", "state": "IL", "kind": "facility", "name": "T5 Chicago IV (CHI IV)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lake"], "city": "Grayslake", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2024-05-02", "T5 published its May 2, 2024 original Grayslake campus announcement. Development and the stated fourth quarter 2027 capacity target were prospective; this dates the issuer publication rather than an accomplished construction or computing start."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://t5datacenters.com/resources/t5-data-centers-announces-further-expansion-into-chicago-suburbs-with-new-480-mw-data-center-campus/", "host": "t5datacenters.com", "published": "2024-05-02", "date": "2024-05-02", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 42.33479, "lng": -88.01649, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations", "fields": {"program_report_year": 2025, "program_register_as_of": "2025-12-31", "applications_received": 35, "approved_owner_operator_applications": 34, "operator_certificates_issued": 34, "tenant_certificates_issued": 91, "construction_credit_certificates_issued": 0, "total_investment_commitments_usd": 10665815092, "estimated_tax_benefits_usd": 666613443, "estimated_tax_benefit_calculation_percent": 6.25, "listed_new_job_commitments": 731, "investment_commitment_period_months": 60}, "notes": ["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S3-Illinois-DCEO-2025-20261015", "scope": "Illinois DCEO 2025 program entry for T5@Chicago IV, LP in Grayslake. The source reports an MOU/certificate context as of December 31, 2025, not actual payments, current certificate eligibility or a physical-site census.", "fields": {"reported_program_party": "T5@Chicago IV, LP", "reported_program_locality": "Grayslake", "mou_year_reported": 2025, "program_report_as_of": "2025-12-31", "investment_commitment_usd": 250000000, "formula_based_tax_benefit_estimate_usd": 15625000, "new_jobs_in_program_table": 20, "financial_scope": "Investment is a reported commitment within an agreed 60-month window. Tax benefit is an estimate at 6.25% of commitment, not paid benefits or verified savings. Reported job counts do not independently establish actual hiring or payroll. No amount is added to legacy investment/jobs fields.", "program_identity_scope": "Explicit facility designation or company/locality association with the existing T5 Chicago IV (CHI IV) research record. The relationship is a scoped research inference, not proof of a distinct campus, parcel, current operator role or exact certificate footprint."}, "notes": ["The report combines owners and operators; no specific party role, legal ownership, tax performance, recapture status or current certificate eligibility is inferred. The report gives a year, not an exact MOU execution or opening date.", "Current operating stage needs separate primary evidence. A tax-program approval is not a construction approval, an operating building or proof of an exact parcel. Original coordinates, precision, opening, locality and legacy financial/power figures remain unchanged.", "The source table row estimates sum to $1 more than the printed aggregate. Both are retained as published. This record uses its printed row value, with no correction or aggregate allocation."], "sources": [{"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}], "checked": "2026-10-15", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 60", "scope": "The original May 2, 2024 T5 release announces a planned Grayslake campus, says development will begin and gives a future fourth quarter 2027 capacity target. This supports a listed proposal, without independently accomplished construction or computing service. The State 2025 annual report table separately names T5 at Chicago IV in Grayslake, which is an incentive program record and not operation. Chicago III in Northlake is a distinct project and is not merged. Investment commitments, estimated tax benefits, employment and target capacity remain prospective or administrative rather than achieved physical outcomes.", "fields": {"current_stage_evidence": {"outcome": "original_named_grayslake_planned_campus", "scope": "The original May 2, 2024 T5 release announces a planned Grayslake campus, says development will begin and gives a future fourth quarter 2027 capacity target. This supports a listed proposal, without independently accomplished construction or computing service. The State 2025 annual report table separately names T5 at Chicago IV in Grayslake, which is an incentive program record and not operation. Chicago III in Northlake is a distinct project and is not merged. Investment commitments, estimated tax benefits, employment and target capacity remain prospective or administrative rather than achieved physical outcomes."}, "source_read_scope": {"complete_original_dated_issuer_main_body_read": true, "state_annual_report_table_physical_pages8and9_read_and_viewed": true, "table_underserved_flag_not_operating_flag": true, "separate_chicagoiii_northlake_not_grayslake": true, "no_quantity_role_or_location_export": true}}, "notes": ["The original May 2, 2024 T5 release announces a planned Grayslake campus, says development will begin and gives a future fourth quarter 2027 capacity target. This supports a listed proposal, without independently accomplished construction or computing service. The State 2025 annual report table separately names T5 at Chicago IV in Grayslake, which is an incentive program record and not operation. Chicago III in Northlake is a distinct project and is not merged. Investment commitments, estimated tax benefits, employment and target capacity remain prospective or administrative rather than achieved physical outcomes.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://t5datacenters.com/resources/t5-data-centers-announces-further-expansion-into-chicago-suburbs-with-new-480-mw-data-center-campus/", "host": "t5datacenters.com", "published": "2024-05-02", "date": "2024-05-02", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Grayslake · Lake · Source context reviewed", "status_scope": "The original May 2, 2024 T5 release announces a planned Grayslake campus, says development will begin and gives a future fourth quarter 2027 capacity target. This supports a listed proposal, without independently accomplished construction or computing service. The State 2025 annual report table separately names T5 at Chicago IV in Grayslake, which is an incentive program record and not operation. Chicago III in Northlake is a distinct project and is not merged. Investment commitments, estimated tax benefits, employment and target capacity remain prospective or administrative rather than achieved physical outcomes.", "event_evidence": [{"date": "2024-05-02", "text": "T5 published its May 2, 2024 original Grayslake campus announcement. Development and the stated fourth quarter 2027 capacity target were prospective; this dates the issuer publication rather than an accomplished construction or computing start.", "kind": "announced", "sources": [{"url": "https://t5datacenters.com/resources/t5-data-centers-announces-further-expansion-into-chicago-suburbs-with-new-480-mw-data-center-campus/", "host": "t5datacenters.com", "published": "2024-05-02", "date": "2024-05-02", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17097"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "dc-blox-warren-township-marion-county-in", "state": "IN", "kind": "facility", "name": "DC BLOX Warren Township Data Center", "group": "proposed", "status": "Evaluation", "raw_status": "evaluation", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Marion"], "city": "Warren Township", "address": "", "who": "DC BLOX", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer page describes a reduced design; 28 MW is a reduction, not resulting capacity. Construction cost and labor subset are not extra investment. Schedule conditional on variance/replat approval; no opening date or approval outcome inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Evaluation sits in the proposed/development filter; it is not final approval, an issued permit or construction. Planned phases and capital/jobs forecasts are not achieved outcomes. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.dcblox.com/indianapolisdatacenter/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 39.79165, "lng": -86.14931, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"developer_current_stage": "evaluation, permitting and public engagement", "planned_capital_investment_usd_range": [1800000000, 2000000000], "peak_construction_jobs_up_to": 600, "planned_phases": 2, "building1_sqft": 70000, "building2_sqft": 250000, "building1_target_months_after_approval": 24, "construction_cost_estimate_usd": 800000000, "labor_cost_subset_usd_approx": 320000000, "revised_it_load_reduction_mw": 28}, "notes": ["Developer page describes a reduced design; 28 MW is a reduction, not resulting capacity. Construction cost and labor subset are not extra investment. Schedule conditional on variance/replat approval; no opening date or approval outcome inferred.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.dcblox.com/indianapolisdatacenter/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "evaluation", "status_basis": "DC BLOX explicitly labels the Indianapolis project Evaluation/permitting/public engagement and says evaluation continues.", "filter_scope": "Grouped with proposed/development projects; no final permit or exact construction stage is inferred."}, "notes": ["Evaluation sits in the proposed/development filter; it is not final approval, an issued permit or construction. Planned phases and capital/jobs forecasts are not achieved outcomes. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://www.dcblox.com/indianapolisdatacenter/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "b70010ee8b53d785cb2a62ff39eee84b2fdca6236a2d650f0753e683bb431525", "events": [], "whole_record_certified": false}, {"overlay": "Company role source check68, October24,2026", "scope": "The current project page identifies DC BLOX planning at Thunderbird Commerce Center in Warren Township. Design revisions, relative equipment reductions and phased forecasts do not establish an approved final design, commissioning, actual generator totals or present power demand. Company environmental and rate statements remain attributed leads for separate review. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.", "fields": {"company_association": {"name": "DC BLOX", "role": "developer", "identity_scope": "provider_brand_only", "scope": "The current project page identifies DC BLOX planning at Thunderbird Commerce Center in Warren Township. Design revisions, relative equipment reductions and phased forecasts do not establish an approved final design, commissioning, actual generator totals or present power demand. Company environmental and rate statements remain attributed leads for separate review. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."}, "provider_role": "developer"}, "notes": ["The current project page identifies DC BLOX planning at Thunderbird Commerce Center in Warren Township. Design revisions, relative equipment reductions and phased forecasts do not establish an approved final design, commissioning, actual generator totals or present power demand. Company environmental and rate statements remain attributed leads for separate review. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."], "sources": [{"url": "https://www.dcblox.com/indianapolisdatacenter/", "host": "www.dcblox.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Warren Township · Marion · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18097"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "decennial-akron-fulton-county-in", "state": "IN", "kind": "facility", "name": "Decennial Group Akron Data Center", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Fulton"], "city": "Akron", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval. $100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation. No complete record/current operating status, signed instruments, measured impacts or all-field certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns", "host": "abc57.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_02102026-349", "host": "www.co.fulton.in.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_03022026-368", "host": "www.co.fulton.in.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Agenda/_10262026-415", "host": "www.co.fulton.in.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.04695, "lng": -86.26349, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json", "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.", "fields": {}, "notes": ["ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval.", "$100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation.", "No complete record/current operating status, signed instruments, measured impacts or all-field certification."], "sources": [{"url": "https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns", "host": "abc57.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 63", "scope": "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation.", "fields": {"current_stage_evidence": {"outcome": "official_named_decennial_exploratory_proposal", "scope": "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation."}, "source_read_scope": {"all12_original_feb10_scan_pages_actually_viewed": true, "decennial_accounts_on_pages6and7_read": true, "no_selected_site_signed_agreement_or_verified_power": true, "feb10_recommendation_not_commissioners_adoption": true, "march2_physical_page1_text_read_and_viewed": true, "oct26_complete_original_agenda_text_read_and_viewed": true, "private_resident_names_and_addresses_excluded": true}}, "notes": ["All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_02102026-349", "host": "www.co.fulton.in.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_03022026-368", "host": "www.co.fulton.in.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Agenda/_10262026-415", "host": "www.co.fulton.in.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Akron · Fulton · Source context reviewed", "status_scope": "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18049"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "google-michigan-city-in", "state": "IN", "kind": "project", "name": "Google Michigan City Data Center", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["LaPorte"], "city": "Michigan City", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Indiana regional page with named stages. FortWayne2Blink is not MichiganCityinvestment. Regional page supplies no exact MichiganCityopening/MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.google/locations/indiana/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/michigan-city-indiana/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/indiana/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 41.546, "lng": -86.74018, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "Indiana regional page with named stages", "fields": {"michigan_city_announcement_year": 2026, "michigan_city_stage_at_page": "in development", "other_named_location_stages": {"Fort Wayne": "operational", "Morgan County": "in development"}}, "notes": ["FortWayne2Blink is not MichiganCityinvestment. Regional page supplies no exact MichiganCityopening/MW.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.google/locations/indiana/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Michigan City, Indiana is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "The named page says In development and describes a property acquisition for potential future development. General staffing and future operational language do not establish construction or operation.", "current_status_basis": "Google’s current location page names Michigan City, Indiana as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/michigan-city-indiana/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check 35, October 23, 2026", "scope": "Google identifies its own Michigan City, Indiana data center community in the body of its regional location page, separately from the global location menu. The developer per source relationship records its expressly described campus establishment or development, not completion, current computing or a final approval. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown.", "fields": {"company_association": {"name": "Google", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Google identifies its own Michigan City, Indiana data center community in the body of its regional location page, separately from the global location menu. The developer per source relationship records its expressly described campus establishment or development, not completion, current computing or a final approval. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."}, "provider_role": "developer"}, "notes": ["Google identifies its own Michigan City, Indiana data center community in the body of its regional location page, separately from the global location menu. The developer per source relationship records its expressly described campus establishment or development, not completion, current computing or a final approval. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."], "sources": [{"url": "https://www.datacenters.google/locations/indiana/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Michigan City · LaPorte · Source context reviewed", "status_scope": "Google’s current location page names Michigan City, Indiana as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18091"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "heartland-industrial-park-sullivan-county-in", "state": "IN", "kind": "facility", "name": "Heartland Industrial Park (Fluidstack Sullivan County Campus)", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Sullivan"], "city": "Merom", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fluidstack Sullivan large planned valuation and scoped commitments. 65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.sullivanfluidstack.io/", "host": "sullivanfluidstack.io", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 39.10114, "lng": -87.42718, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Fluidstack Sullivan large planned valuation and scoped commitments", "fields": {"developer": "Fluidstack", "project": "Sullivan County Data Center", "state": "Indiana", "planned_development_value_usd": 65000000000, "forecast_operations_start_year": 2027, "community_enhancement_commitment_usd": 50000000, "named_community_program_subset_usd": 4500000, "land_donation_commitment_acres": 15, "operator_named_power_provider": "WIN Energy REMC", "voluntary_nearest_dwelling_sound_limit_db": 55, "developer_claims_no_local_property_tax_incentives_sought": true}, "notes": ["65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.sullivanfluidstack.io/", "host": "sullivanfluidstack.io", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 23", "scope": "The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.", "fields": {"current_stage_evidence": {"outcome": "current_sullivan_project_proposal_not_future_benefits_as_actual_outcomes", "scope": "The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed."}}, "notes": ["The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.sullivanfluidstack.io/", "host": "www.sullivanfluidstack.io", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Merom · Sullivan · Source context reviewed", "status_scope": "The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18153"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "meta-jeffersonville-in", "state": "IN", "kind": "facility", "name": "Meta Jeffersonville Data Center", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Clark"], "city": "Jeffersonville", "address": "", "who": "Meta", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical operator announcement. No completion date or delivered renewable supply established by an intent to build and match electricity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/", "host": "datacenters.atmeta.com", "date": "2024-01-25", "published": "2024-01-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://datacenters.atmeta.com/asset/jeffersonville-data-center/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}, {"url": "https://www.riverridgecc.com/choose-river-ridge/sites-buildings/", "host": "www.riverridgecc.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Authority published link to the public property map"}, {"url": "https://services7.arcgis.com/o2lKcq2uliF8aljX/arcgis/rest/services/Parcels_(Public)/FeatureServer/0/query?where=Tract_ID+LIKE+%2719B%25%27+OR+UPPER%28Project_Name%29+LIKE+%27%25META%25%27+OR+UPPER%28Purch_Alias%29+LIKE+%27%25META%25%27&outFields=OBJECTID%2CTract_ID%2CProp_Acres%2CParcel_No%2CAdd_Even%2CAdd_Odd%2CProject_Name%2CPurch_Alias%2CDate_Sold%2CEditDate%2CYear&returnGeometry=true&outSR=4326&orderByFields=OBJECTID&resultRecordCount=100&f=json", "host": "services7.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Public Tract 19B and separate Meta associated property references"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-85.6662%2C38.36302%2C-85.6542%2C38.371019999999994&bboxSR=4326&imageSR=3857&size=1200%2C900&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Aerial reference context; acquisition date unknown"}], "loc": {"lng": -85.6602, "lat": 38.36702, "precision": "approximate", "basis": "Approximate reference center inside Tract 19B in the River Ridge Development Authority public property map at 300 International Drive. This references the named tract, not a roof, surveyed parcel, legal title or complete campus boundary. The separately listed small Meta associated feature is excluded. Aerial imagery may predate construction."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"announcement_date": "2024-01-25", "planned_campus_sqft_approx": 700000, "forecast_investment_usd_lower_bound": 800000000, "forecast_operational_jobs_approx": 100, "forecast_peak_construction_workers_lower_bound": 1250}, "notes": ["Historical operator announcement. No completion date or delivered renewable supply established by an intent to build and match electricity.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/", "host": "datacenters.atmeta.com", "date": "2024-01-25", "published": "2024-01-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-listed development", "basis": "The current named operator factsheet describes this campus in future terms and gives operational employment only once completed.", "checked_on": "2026-10-16"}, "stage_review_limits": "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation."}, "notes": ["This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://datacenters.atmeta.com/asset/jeffersonville-data-center/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "K2 River Ridge tract review October 22, 2026", "scope": "Approximate reference inside the authority listed Meta tract only. No present operating stage, opening day, legal title, surveyed parcel, whole campus boundary, company role or technical quantity is adopted.", "fields": {"location_review_decision": {"location": {"lng": -85.6602, "lat": 38.36702, "precision": "approximate", "basis": "Approximate reference center inside Tract 19B in the River Ridge Development Authority public property map at 300 International Drive. This references the named tract, not a roof, surveyed parcel, legal title or complete campus boundary. The separately listed small Meta associated feature is excluded. Aerial imagery may predate construction."}, "reference_tract": {"agency_objectid": 448, "tract": "19B", "agency_listed_parcel_reference": "10-42-02-600-010.000-039", "agency_reference_address": "300 International Drive", "purchaser_alias": "Meta", "project_name": "Slugger", "calculated_acres": 613.2075820680872, "excluded_objectids": [364], "legal_parcel_or_title_verified": false}, "prior_inherited_reference": "rejected, retained only in native history"}}, "notes": ["The authority site directly links a public ArcGIS app, web map and parcel layer. Exact Tract 19B, Meta purchaser alias and 300 International Drive select OBJECTID 448.", "OBJECTID 364 is separately associated with Meta and is excluded. Its 6.38 acres are not merged with the main tract. The 613.20758 calculated acres differ from earlier printed approximate 619 acres and a separate 623.20 acre transaction scope.", "The original USGS and Indiana source images were actually viewed. The state catalog includes a Clark 2022 tile; overview image year fields are null. Imagery does not establish current development, absence, operation or severity of any concern.", "The earlier inherited point is rejected and retained in native history. It is not included as a current public destination."], "sources": [{"url": "https://www.riverridgecc.com/choose-river-ridge/sites-buildings/", "host": "www.riverridgecc.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Authority published link to the public property map"}, {"url": "https://services7.arcgis.com/o2lKcq2uliF8aljX/arcgis/rest/services/Parcels_(Public)/FeatureServer/0/query?where=Tract_ID+LIKE+%2719B%25%27+OR+UPPER%28Project_Name%29+LIKE+%27%25META%25%27+OR+UPPER%28Purch_Alias%29+LIKE+%27%25META%25%27&outFields=OBJECTID%2CTract_ID%2CProp_Acres%2CParcel_No%2CAdd_Even%2CAdd_Odd%2CProject_Name%2CPurch_Alias%2CDate_Sold%2CEditDate%2CYear&returnGeometry=true&outSR=4326&orderByFields=OBJECTID&resultRecordCount=100&f=json", "host": "services7.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Public Tract 19B and separate Meta associated property references"}, {"url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-21", "label": "Reviewed company identity source"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-85.6662%2C38.36302%2C-85.6542%2C38.371019999999994&bboxSR=4326&imageSR=3857&size=1200%2C900&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Aerial reference context; acquisition date unknown"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "K3 company role review October22,2026", "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.", "fields": {"company_association": {"name": "Meta", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."}, "provider_role": "developer"}, "notes": ["Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.", "A source read is not a construction, opening, transaction-closing or operating date."], "sources": [{"url": "https://datacenters.atmeta.com/asset/jeffersonville-data-center/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed company identity source"}, {"url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/", "host": "datacenters.atmeta.com", "published": "2024-01-25", "date": "2024-01-25", "checked": "2026-10-22", "label": "Reviewed company identity source"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate River Ridge Tract 19B reference", "summary": "Indiana · Jeffersonville · Clark · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet describes this campus in future terms and gives operational employment only once completed. This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.", "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "meta-lebanon-in", "state": "IN", "kind": "facility", "name": "Meta Lebanon (Project Domino)", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Boone"], "city": "Lebanon", "address": "", "who": "Meta", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Meta original dated February11,2026 says it is breaking ground on LebanonIndiana/BooneCounty campus designed for1GW when operational. Basis undefined; not commissionedITMW or observed2026 operation. Over10B planned infrastructure/community investment is not proven spending to date. More than4,000 peak construction jobs and about300operational jobs are forecasts, not current payroll. 1Mannually20years toBooneREMCfund, more than120Mwater/public-infrastructure investments and200Mgal/year watershed-restoration project for10years are stated commitments. They are not verified paid totals, campus water consumption or additional DC capacity. Annual clean-energy matching is not hourly physical supply. Zero water for MAJORITY of year is not zero annual use; LEEDGold is future once-operational claim. No executedESA or measured rate impact verified. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/", "host": "about.fb.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://datacenters.atmeta.com/asset/meta-lebanon-data-center-info-sheet/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 40.05087, "lng": -86.46871, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-states-and-named-operator-review-round53-2026-10-15.json", "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.", "fields": {}, "notes": ["Meta original dated February11,2026 says it is breaking ground on LebanonIndiana/BooneCounty campus designed for1GW when operational. Basis undefined; not commissionedITMW or observed2026 operation.", "Over10B planned infrastructure/community investment is not proven spending to date. More than4,000 peak construction jobs and about300operational jobs are forecasts, not current payroll.", "1Mannually20years toBooneREMCfund, more than120Mwater/public-infrastructure investments and200Mgal/year watershed-restoration project for10years are stated commitments. They are not verified paid totals, campus water consumption or additional DC capacity.", "Annual clean-energy matching is not hourly physical supply. Zero water for MAJORITY of year is not zero annual use; LEEDGold is future once-operational claim. No executedESA or measured rate impact verified.", "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."], "sources": [{"url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/", "host": "about.fb.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-listed development", "basis": "The current named operator factsheet describes this campus in future terms and gives operational employment only once completed.", "checked_on": "2026-10-16"}, "stage_review_limits": "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation."}, "notes": ["This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://datacenters.atmeta.com/asset/meta-lebanon-data-center-info-sheet/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check61, October24,2026", "scope": "Meta identifies its Lebanon, Indiana campus in the February11,2026 announcement. The reported groundbreaking and designed1GWcapacity do not prove current service or delivered power. Employment, infrastructure investment, cooling and water restoration promises remain attributed forecasts and commitments. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.", "fields": {"company_association": {"name": "Meta", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Meta identifies its Lebanon, Indiana campus in the February11,2026 announcement. The reported groundbreaking and designed1GWcapacity do not prove current service or delivered power. Employment, infrastructure investment, cooling and water restoration promises remain attributed forecasts and commitments. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."}, "provider_role": "developer"}, "notes": ["Meta identifies its Lebanon, Indiana campus in the February11,2026 announcement. The reported groundbreaking and designed1GWcapacity do not prove current service or delivered power. Employment, infrastructure investment, cooling and water restoration promises remain attributed forecasts and commitments. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."], "sources": [{"url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/", "host": "about.fb.com", "published": "2026-02-11", "date": "2026-02-11", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Lebanon · Boone · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet describes this campus in future terms and gives operational employment only once completed. This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18011"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "metrobloks-martindale-brightwood-indianapolis-in", "state": "IN", "kind": "facility", "name": "Metrobloks Martindale-Brightwood Data Center", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Marion"], "city": "Indianapolis", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. The Indiana Lawyer May 13, 2026 republishes Taylor Wooten/Indianapolis Business Journal reporting. It reports five residents/property owners and Hoosier Environmental Council filed May 1 challenging MDC's earlier Metrobloks rezoning. Alleged environmental-justice and review failures are plaintiffs' allegations, not a ruling or adjudicated harm. Underlying complaint/docket/current disposition unread; other cited Sabey and Virginia cases are different projects. $500 million, 14 acres and 75 MW are reported project descriptions, with MW basis unspecified. Generator testing 20-to-30 hours, approximately 60,000 gallons initial cooling fill and 5,000 gallons annual top-off are reported developer/filing commitments, not measured use. WFYI's two-building fill figures differ; do not silently choose or add them. Utility-upgrade cost commitment is not proof of actual payment or executed service agreement. No complete record/current operating status, signed instruments, measured impacts or all-field certification. WFYI Farrah Anderson May 4, 2026 original reporting describes City-County Council approval of Metrobloks rezoning for nearly 14 acres at 2505 N. Sherman Ave., a former drive-in. This is a later procedural stage than MDC approval, not construction approval, occupancy or operation. Same meeting's temporary-stay resolution was explicitly NON-BINDING, not an enacted moratorium. Reported letter describes AES contracts, not an inspected executed agreement; no implication that physical residential infrastructure is unaffected. Closed-loop claim is not zero consumption. About 19,000 gallons for building one plus 47,500 for building two are initial fills, not annual consumption. Their 66,500-gallon derived sum differs from IBJ's approximate 60,000 figure; scopes/version unresolved. Community concerns retain attribution. A reported shooting is not evidence identifying who committed it, and is not generalized to opponents.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.theindianalawyer.com/articles/martindale-brightwood-residents-cite-environmental-concerns-in-suit-against-data-center-plan", "host": "theindianalawyer.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood", "host": "wfyi.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.metrobloks.com/sites/indianapolis", "host": "www.metrobloks.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 39.76091, "lng": -86.13661, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json", "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.", "fields": {}, "notes": ["The Indiana Lawyer May 13, 2026 republishes Taylor Wooten/Indianapolis Business Journal reporting. It reports five residents/property owners and Hoosier Environmental Council filed May 1 challenging MDC's earlier Metrobloks rezoning. Alleged environmental-justice and review failures are plaintiffs' allegations, not a ruling or adjudicated harm. Underlying complaint/docket/current disposition unread; other cited Sabey and Virginia cases are different projects.", "$500 million, 14 acres and 75 MW are reported project descriptions, with MW basis unspecified. Generator testing 20-to-30 hours, approximately 60,000 gallons initial cooling fill and 5,000 gallons annual top-off are reported developer/filing commitments, not measured use. WFYI's two-building fill figures differ; do not silently choose or add them. Utility-upgrade cost commitment is not proof of actual payment or executed service agreement.", "No complete record/current operating status, signed instruments, measured impacts or all-field certification."], "sources": [{"url": "https://www.theindianalawyer.com/articles/martindale-brightwood-residents-cite-environmental-concerns-in-suit-against-data-center-plan", "host": "theindianalawyer.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json", "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.", "fields": {}, "notes": ["WFYI Farrah Anderson May 4, 2026 original reporting describes City-County Council approval of Metrobloks rezoning for nearly 14 acres at 2505 N. Sherman Ave., a former drive-in. This is a later procedural stage than MDC approval, not construction approval, occupancy or operation. Same meeting's temporary-stay resolution was explicitly NON-BINDING, not an enacted moratorium.", "Reported letter describes AES contracts, not an inspected executed agreement; no implication that physical residential infrastructure is unaffected. Closed-loop claim is not zero consumption. About 19,000 gallons for building one plus 47,500 for building two are initial fills, not annual consumption. Their 66,500-gallon derived sum differs from IBJ's approximate 60,000 figure; scopes/version unresolved. Community concerns retain attribution. A reported shooting is not evidence identifying who committed it, and is not generalized to opponents.", "No complete record/current operating status, signed instruments, measured impacts or all-field certification."], "sources": [{"url": "https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood", "host": "wfyi.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 63", "scope": "The complete original Metrobloks Indianapolis facility body expressly says the data center is coming soon and describes developing IND A1. This supports a listed proposal. Specification cards, uptime marketing, carrier links and closed cooling assurances do not independently establish commissioned service, measured use, a final permit or actual benefits. The raw capacity text differs from discovery excerpts and no quantity is exported.", "fields": {"current_stage_evidence": {"outcome": "original_metrobloks_explicit_coming_soon_proposal", "scope": "The complete original Metrobloks Indianapolis facility body expressly says the data center is coming soon and describes developing IND A1. This supports a listed proposal. Specification cards, uptime marketing, carrier links and closed cooling assurances do not independently establish commissioned service, measured use, a final permit or actual benefits. The raw capacity text differs from discovery excerpts and no quantity is exported."}, "source_read_scope": {"complete_original_provider_body_read": true, "explicit_coming_soon_not_compute_service": true, "raw_specification_and_search_excerpt_conflict_not_exported": true, "no_roles_locations_or_quantities_changed": true}}, "notes": ["The complete original Metrobloks Indianapolis facility body expressly says the data center is coming soon and describes developing IND A1. This supports a listed proposal. Specification cards, uptime marketing, carrier links and closed cooling assurances do not independently establish commissioned service, measured use, a final permit or actual benefits. The raw capacity text differs from discovery excerpts and no quantity is exported.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://www.metrobloks.com/sites/indianapolis", "host": "www.metrobloks.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Indianapolis · Marion · Source context reviewed", "status_scope": "The complete original Metrobloks Indianapolis facility body expressly says the data center is coming soon and describes developing IND A1. This supports a listed proposal. Specification cards, uptime marketing, carrier links and closed cooling assurances do not independently establish commissioned service, measured use, a final permit or actual benefits. The raw capacity text differs from discovery excerpts and no quantity is exported.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18097"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "powerhouse-hobart-lake-county-in", "state": "IN", "kind": "facility", "name": "PowerHouse Hobart", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lake"], "city": "Hobart", "address": "", "who": "PowerHouse Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW. DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.powerhousedata.com/data-center/powerhouse-hobart", "host": "powerhousedata.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.powerhousedata.com/", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 41.43828, "lng": -87.36586, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-states-and-named-operator-review-round53-2026-10-15.json", "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.", "fields": {}, "notes": ["Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW.", "DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued.", "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."], "sources": [{"url": "https://www.powerhousedata.com/data-center/powerhouse-hobart", "host": "powerhousedata.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 1", "scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.", "fields": {"current_stage_evidence": {"outcome": "developer_listed_development", "scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."}}, "notes": ["PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."], "sources": [{"url": "https://www.powerhousedata.com/data-center/powerhouse-hobart", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check72, October24,2026", "scope": "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.", "fields": {"company_association": {"name": "PowerHouse Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."}, "provider_role": "developer"}, "notes": ["The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."], "sources": [{"url": "https://www.powerhousedata.com/data-center/powerhouse-hobart", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.powerhousedata.com/", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Hobart · Lake · Source context reviewed", "status_scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18089"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "project-shirley-eagle-creek-township-lake-county-in", "state": "IN", "kind": "facility", "name": "Project Shirley", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lake"], "city": "Eagle Creek Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/", "host": "latitudemedia.com", "date": "2026-05-01", "published": "2026-05-01", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://lakecountyin.gov/departments/council/meeting-minutes-c/2026/2026-04-14_meeting%20minutes.pdf", "host": "lakecountyin.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.41176, "lng": -87.4124, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round30-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Latitude Media discusses Sentinel's proposed Eagle Creek Project Shirley and a postponed rezoning vote, saying no executed IURC service agreement had been filed at publication.", "independently_verified_current_operating_status": null}, "notes": ["A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/", "host": "latitudemedia.com", "date": "2026-05-01", "published": "2026-05-01", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 63", "scope": "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts.", "fields": {"current_stage_evidence": {"outcome": "official_named_project_shirley_proposal", "scope": "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts."}, "source_read_scope": {"original_april14_physical_page24_text_read": true, "no_open_house_occurrence_or_outcome_inferred": true, "unrelated_fiscal_audit_not_project_concern": true}}, "notes": ["Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://lakecountyin.gov/departments/council/meeting-minutes-c/2026/2026-04-14_meeting%20minutes.pdf", "host": "lakecountyin.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Eagle Creek Township · Lake · Source context reviewed", "status_scope": "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18089"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "qlevr-charlestown-clark-county-in", "state": "IN", "kind": "facility", "name": "QLEVR Charlestown Data Center", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Clark"], "city": "Charlestown", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public introduction was read. Encoded premium body was not decoded. The economic summary's 105-million-USD and fourteen-to-sixteen-month schedule are proposal claims, not spending or observed completion. A future plan-commission hearing is not approval; original filing and power basis remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.newsandtribune.com/news/data-center-proposed-for-charlestowns-shadow-lake-park/article_b0967582-6664-4499-a2b4-44dfcfa4702a.html", "host": "newsandtribune.com", "date": "2026-05-27", "published": "2026-05-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.cityofcharlestown.com/202/Advisory-Plan-Commission", "host": "www.cityofcharlestown.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.cityofcharlestown.com/DocumentCenter/View/2143/Data-Center---Community-Presentation---Slideshow", "host": "www.cityofcharlestown.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.cityofcharlestown.com/AgendaCenter/ViewFile/Item/944?fileID=3292", "host": "www.cityofcharlestown.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 38.47784, "lng": -85.70716, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round30-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "The News and Tribune's public introduction identifies QLEVR LLC's Shadow Lake request, with 12 acres, about 55,000 square feet and a proposed 3 MW facility.", "independently_verified_current_operating_status": null}, "notes": ["Only the public introduction was read. Encoded premium body was not decoded. The economic summary's 105-million-USD and fourteen-to-sixteen-month schedule are proposal claims, not spending or observed completion. A future plan-commission hearing is not approval; original filing and power basis remain unreviewed.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.newsandtribune.com/news/data-center-proposed-for-charlestowns-shadow-lake-park/article_b0967582-6664-4499-a2b4-44dfcfa4702a.html", "host": "newsandtribune.com", "date": "2026-05-27", "published": "2026-05-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 63", "scope": "The original City planning body and selected hosted forum and economic report pages identify a proposed QLEVR Charlestown computing facility. This supports a listed proposal. The economic study uses a three MW scenario while the forum uses five MW; neither figure is silently selected or exported. Forecast jobs, tax revenue, construction timing, closed cooling and noise assurances are not actual performance or accomplished benefits. A generic Fortune 50 description is not a named tenant, and a separate Project Bedrock noise report is not used to change inherited roles or identity.", "fields": {"current_stage_evidence": {"outcome": "official_named_qlevr_proposal_with_conflicting_scenarios", "scope": "The original City planning body and selected hosted forum and economic report pages identify a proposed QLEVR Charlestown computing facility. This supports a listed proposal. The economic study uses a three MW scenario while the forum uses five MW; neither figure is silently selected or exported. Forecast jobs, tax revenue, construction timing, closed cooling and noise assurances are not actual performance or accomplished benefits. A generic Fortune 50 description is not a named tenant, and a separate Project Bedrock noise report is not used to change inherited roles or identity."}, "source_read_scope": {"complete_original_city_planning_body_read": true, "selected_forum_proposal_and_design_sections_read": true, "economic_report_descriptive_page1_read": true, "complete_one_page_forum_faq_actually_viewed": true, "three_and_five_mw_scenarios_not_merged": true, "june8_packet_oversize_hold_retained": true, "no_named_tenant_role_or_quantity_export": true}}, "notes": ["The original City planning body and selected hosted forum and economic report pages identify a proposed QLEVR Charlestown computing facility. This supports a listed proposal. The economic study uses a three MW scenario while the forum uses five MW; neither figure is silently selected or exported. Forecast jobs, tax revenue, construction timing, closed cooling and noise assurances are not actual performance or accomplished benefits. A generic Fortune 50 description is not a named tenant, and a separate Project Bedrock noise report is not used to change inherited roles or identity.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://www.cityofcharlestown.com/202/Advisory-Plan-Commission", "host": "www.cityofcharlestown.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.cityofcharlestown.com/DocumentCenter/View/2143/Data-Center---Community-Presentation---Slideshow", "host": "www.cityofcharlestown.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.cityofcharlestown.com/AgendaCenter/ViewFile/Item/944?fileID=3292", "host": "www.cityofcharlestown.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Charlestown · Clark · Source context reviewed", "status_scope": "The original City planning body and selected hosted forum and economic report pages identify a proposed QLEVR Charlestown computing facility. This supports a listed proposal. The economic study uses a three MW scenario while the forum uses five MW; neither figure is silently selected or exported. Forecast jobs, tax revenue, construction timing, closed cooling and noise assurances are not actual performance or accomplished benefits. A generic Fortune 50 description is not a named tenant, and a separate Project Bedrock noise report is not used to change inherited roles or identity.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18019"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "radiusdc-plainfield-hendricks-county-in", "state": "IN", "kind": "facility", "name": "RadiusDC Plainfield Campus (Indy I / Indy II)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Hendricks"], "city": "Plainfield", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT. Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.", "date": "", "events": [["2026-01-12", "RadiusDC announced its Indianapolis colocation development on January 12, 2026. The original issuer account distinguishes planned Indy I from future Indy II. The announcement does not establish accomplished construction, actual utility load or a computing opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.radius-dc.com/location/indianapolis", "host": "radius-dc.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in", "host": "www.radius-dc.com", "published": "2026-01-12", "date": "2026-01-12", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 39.76952, "lng": -86.51, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-states-and-named-operator-review-round53-2026-10-15.json", "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.", "fields": {}, "notes": ["RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT.", "Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating.", "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."], "sources": [{"url": "https://www.radius-dc.com/location/indianapolis", "host": "radius-dc.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 63", "scope": "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls.", "fields": {"current_stage_evidence": {"outcome": "original_radius_indianapolis_development_proposal", "scope": "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls."}, "source_read_scope": {"complete_original_announcement_platform_and_current_facility_bodies_read": true, "indy1_and_future_indy2_not_both_operating": true, "nashville_building_statement_not_indianapolis": true, "utility_in_service_specification_not_computing_service": true}}, "notes": ["The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in", "host": "www.radius-dc.com", "published": "2026-01-12", "date": "2026-01-12", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.radius-dc.com/location/indianapolis", "host": "www.radius-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Plainfield · Hendricks · Source context reviewed", "status_scope": "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls.", "event_evidence": [{"date": "2026-01-12", "text": "RadiusDC announced its Indianapolis colocation development on January 12, 2026. The original issuer account distinguishes planned Indy I from future Indy II. The announcement does not establish accomplished construction, actual utility load or a computing opening.", "kind": "announced", "sources": [{"url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in", "host": "www.radius-dc.com", "published": "2026-01-12", "date": "2026-01-12", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18063"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "blue-ladder-wolcott-white-county-in", "state": "IN", "kind": "facility", "name": "Wolcott Data Center", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["White"], "city": "Wolcott", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wolcott developer concept and conflicting buildout timing. Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wolcottdatacenter.com/", "host": "wolcottdatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 40.74982, "lng": -86.86526, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Wolcott developer concept and conflicting buildout timing", "fields": {"project_name": "Wolcott Data Center", "county": "White County, Indiana", "proposed_campus_acres": 322, "planned_data_center_buildings": 4, "planned_each_data_building_footprint_sqft": 327612, "planned_office_sqft": 50000, "planned_warehouse_sqft": 100000, "expected_construction_jobs_approx": 1000, "developer_community_enhancement_commitment_usd": 35000000, "developer_claims_no_incentives_sought": true, "full_buildout_year_conflict": [2029, 2030]}, "notes": ["Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wolcottdatacenter.com/", "host": "wolcottdatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 63", "scope": "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes.", "fields": {"current_stage_evidence": {"outcome": "original_wolcott_project_portal_proposal", "scope": "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes."}, "source_read_scope": {"complete_original_project_portal_text_body_read": true, "illustrative_concept_and_final_engineering_limits_retained": true, "year2029_prose_and2030_chart_years_not_accomplished": true, "no_benefit_quantity_role_or_location_export": true}}, "notes": ["The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://www.wolcottdatacenter.com/", "host": "www.wolcottdatacenter.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Wolcott · White · Source context reviewed", "status_scope": "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18181"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "qts-clinton-clinton-county-ia", "state": "IA", "kind": "facility", "name": "QTS Clinton Data Center Campus", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Clinton"], "city": "Clinton", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Page describes exploration, not project approval, construction or operation. General company environmental claims do not establish a site permit or measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Portfolio-wide operating or sustainability statements do not establish this proposal is operating. No construction, permit completion, technical total or precise point adopted. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://q.com/data-centers/clinton/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.898, "lng": -90.53233, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"operator_stage": "exploring development, very early plans"}, "notes": ["Page describes exploration, not project approval, construction or operation. General company environmental claims do not establish a site permit or measured water use.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://q.com/data-centers/clinton/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "proposed", "status_basis": "QTS describes a proposed Clinton campus and very early planning; the initial site plan is not final."}, "notes": ["Portfolio-wide operating or sustainability statements do not establish this proposal is operating. No construction, permit completion, technical total or precise point adopted. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://q.com/data-centers/clinton/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "cec23c91c64b499f3f7e678e5b057015b52b851b0a6e062cc73a8e95c10fa34c", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · Clinton · Clinton · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19045"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "google-cedar-rapids-ia", "state": "IA", "kind": "project", "name": "Google Cedar Rapids Data Center Campus", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Linn"], "city": "Cedar Rapids", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. statewide incentive guidance, campus qualification unverified. Iowa statewide tax guidance not a Google Cedar Rapids registration, paid incentive amount, actual site investment or operating date. November3,2025publication is policy-document date. Program electricity/fuel duration varies by property start and location; do not apply generic lifetime exemption to this campus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://revenue.iowa.gov/taxes/tax-guidance/sales-use-excise-tax/data-centers", "host": "revenue.iowa.gov", "date": "2025-11-03", "published": "2025-11-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/iowa/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 42.07889, "lng": -91.59915, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "statewide incentive guidance, campus qualification unverified", "fields": {}, "notes": ["Iowa statewide tax guidance not a Google Cedar Rapids registration, paid incentive amount, actual site investment or operating date. November3,2025publication is policy-document date. Program electricity/fuel duration varies by property start and location; do not apply generic lifetime exemption to this campus.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://revenue.iowa.gov/taxes/tax-guidance/sales-use-excise-tax/data-centers", "host": "revenue.iowa.gov", "date": "2025-11-03", "published": "2025-11-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Cedar Rapids, Iowa is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "Google describes establishing a new Cedar Rapids campus and its 2025 announcement. The inherited Palo record is not merged or assigned this campus evidence.", "current_status_basis": "Google’s current location page names Cedar Rapids, Iowa as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/iowa/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check 35, October 23, 2026", "scope": "Google identifies its own Cedar Rapids, Iowa data center community in the body of its regional location page, separately from the global location menu. The developer per source relationship records its expressly described campus establishment or development, not completion, current computing or a final approval. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown.", "fields": {"company_association": {"name": "Google", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Google identifies its own Cedar Rapids, Iowa data center community in the body of its regional location page, separately from the global location menu. The developer per source relationship records its expressly described campus establishment or development, not completion, current computing or a final approval. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."}, "provider_role": "developer"}, "notes": ["Google identifies its own Cedar Rapids, Iowa data center community in the body of its regional location page, separately from the global location menu. The developer per source relationship records its expressly described campus establishment or development, not completion, current computing or a final approval. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."], "sources": [{"url": "https://www.datacenters.google/locations/iowa/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · Cedar Rapids · Linn · Source context reviewed", "status_scope": "Google’s current location page names Cedar Rapids, Iowa as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19113"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "lightedge-ames-ia", "state": "IA", "kind": "facility", "name": "LightEdge Ames Edge Colocation Data Center", "group": "proposed", "status": "Operator-listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Story"], "city": "Ames", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lightedge Ames proposal and stale public calendar. Page still calls pastJuly28upcoming; current approval/outcome unknown. Do not infer2026construction from stale relative schedule. Altoona1267gallons/day and2000to3000gallonloop are other facility, not measured Ames data. Near-zero cooling water not zero domestic use. Proposed45to55dBAproperty-line range not measured compliance; generic7m-generator-enclosure ratings not whole-campus boundary noise. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://lightedge.com/ames/", "host": "lightedge.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 42.04794, "lng": -93.47786, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Lightedge Ames proposal and stale public calendar", "fields": {"operator": "Lightedge", "locality": "airport land on Aviation Way, Ames, Iowa", "proposed_site_acres_approx": 10.86, "planned_building_stories": 1, "planned_power_phases_mw": [3, 6, 25], "power_basis": "phased power draw, not explicit critical IT", "approx_fullbuildout_years": 10, "historical_next_council_date_in_stale_page": "2026-07-28"}, "notes": ["Page still calls pastJuly28upcoming; current approval/outcome unknown. Do not infer2026construction from stale relative schedule. Altoona1267gallons/day and2000to3000gallonloop are other facility, not measured Ames data. Near-zero cooling water not zero domestic use. Proposed45to55dBAproperty-line range not measured compliance; generic7m-generator-enclosure ratings not whole-campus boundary noise.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://lightedge.com/ames/", "host": "lightedge.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "Lightedge explicitly describes its Ames airport-land facility as a proposal under City review. Phased power, cooling, cost and benefit statements are company plans, not measured use or approved outcomes. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_proposal", "scope": "Lightedge explicitly describes its Ames airport-land facility as a proposal under City review. Phased power, cooling, cost and benefit statements are company plans, not measured use or approved outcomes. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["Lightedge explicitly describes its Ames airport-land facility as a proposal under City review. Phased power, cooling, cost and benefit statements are company plans, not measured use or approved outcomes."], "sources": [{"url": "https://lightedge.com/ames/", "host": "lightedge.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · Ames · Story · Source context reviewed", "status_scope": "Lightedge explicitly describes its Ames airport-land facility as a proposal under City review. Phased power, cooling, cost and benefit statements are company plans, not measured use or approved outcomes. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19169"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "microsoft-ruthenium-west-des-moines-ia", "state": "IA", "kind": "facility", "name": "Microsoft Project Ruthenium Data Center", "group": "proposed", "status": "City-listed planned development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Madison"], "city": "West Des Moines", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Ruthenium proposed project and county identity. Sixth campus in West Des Moines is not six buildings on this site. City crosses four counties; this site is specifically Madison County. Size listed TBD. No critical IT MW, final permit, current construction or actual opening established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/", "host": "gowestdesmoines.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.33074, "lng": -94.01553, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Ruthenium proposed project and county identity", "fields": {"publisher": "West Des Moines economic development", "project": "Microsoft Ruthenium", "stage_as_published": "Proposed", "location": "Veterans Parkway at Woodland Avenue", "county": "Madison, Iowa", "reported_city_microsoft_campus_ordinal": 6}, "notes": ["Sixth campus in West Des Moines is not six buildings on this site. City crosses four counties; this site is specifically Madison County. Size listed TBD. No critical IT MW, final permit, current construction or actual opening established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/", "host": "gowestdesmoines.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 12", "scope": "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity.", "fields": {"current_stage_evidence": {"outcome": "city_listed_proposed_development", "scope": "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity."}}, "notes": ["The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/", "host": "gowestdesmoines.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · West Des Moines · Madison · Source context reviewed", "status_scope": "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19121"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "oppidan-cedar-rapids-ia", "state": "IA", "kind": "facility", "name": "Oppidan Cedar Rapids Data Center", "group": "proposed", "status": "Application under review", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Linn"], "city": "Cedar Rapids", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. RichardPratt CorridorBusinessJournal July9,2026 originalmunicipal-recordreport identifies CLOPLLC/Oppidan1515-33rdAveSWCedarRapids, buildingpermitapprovedJune22,98695sf/justover101MlistedVALUATION/up10MWfacilityDRAW. Originalpermitnotdirectlyread; constructiontimelinenotshown. Valuationnotauditedpaidcapex;10MWnotexplicitcriticalIT. Nearby4.5MWAlliantsolargardennotfacilityITorcontractedsolar. DesMoines60000sf5MW2024openingbelongsOTHERfacility. QTS10Beconomicimpactnotcampuscapex. DataCenterMap112Iowasites/14markets andotherfacilityhistory arederivative, notcreditednewcensus. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/", "host": "corridorbusiness.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.govonlinesaas.com/LCPH/EasyAir/public/Client/IA_EASY/Public/Pages/PublicApplicationList.aspx", "host": "www.govonlinesaas.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 42.04795, "lng": -91.59644, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json", "scope": "Named original reporter/issuer context with current versus historical stage explicit.", "fields": {}, "notes": ["RichardPratt CorridorBusinessJournal July9,2026 originalmunicipal-recordreport identifies CLOPLLC/Oppidan1515-33rdAveSWCedarRapids, buildingpermitapprovedJune22,98695sf/justover101MlistedVALUATION/up10MWfacilityDRAW. Originalpermitnotdirectlyread; constructiontimelinenotshown.", "Valuationnotauditedpaidcapex;10MWnotexplicitcriticalIT. Nearby4.5MWAlliantsolargardennotfacilityITorcontractedsolar. DesMoines60000sf5MW2024openingbelongsOTHERfacility. QTS10Beconomicimpactnotcampuscapex. DataCenterMap112Iowasites/14markets andotherfacilityhistory arederivative, notcreditednewcensus.", "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."], "sources": [{"url": "https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/", "host": "corridorbusiness.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "unresolved", "scope": "The July 2026 article names CLOP LLC/Oppidan and reports a building permit, but the original municipal record was not reviewed. Other Cedar Rapids developers and Oppidan’s Des Moines project are separate identities. The news figure has an unclear capacity basis and is not adopted as a typed fact. Current stage remains unresolved pending primary confirmation."}}, "notes": ["The July 2026 article names CLOP LLC/Oppidan and reports a building permit, but the original municipal record was not reviewed. Other Cedar Rapids developers and Oppidan’s Des Moines project are separate identities. The news figure has an unclear capacity basis and is not adopted as a typed fact. Current stage remains unresolved pending primary confirmation."], "sources": [{"url": "https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/", "host": "corridorbusiness.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 36", "scope": "The original agency public application list explicitly names Oppidan Cedar Rapids Data Center, facility 57 01 254, with an authorization to install application under technical review and a July 30, 2026 submitted date. Application under review applies to that named agency workflow. A submitted air application and its program label Construction Program are not an issued final permit, actual data hall construction, computing operation or a verified IT capacity. The similarly named retail property is not substituted for this facility. No applicant contact, address or advertised quantity is promoted.", "fields": {"current_stage_evidence": {"outcome": "named_oppidan_air_application_in_technical_review", "scope": "The original agency public application list explicitly names Oppidan Cedar Rapids Data Center, facility 57 01 254, with an authorization to install application under technical review and a July 30, 2026 submitted date. Application under review applies to that named agency workflow. A submitted air application and its program label Construction Program are not an issued final permit, actual data hall construction, computing operation or a verified IT capacity. The similarly named retail property is not substituted for this facility. No applicant contact, address or advertised quantity is promoted."}}, "notes": ["The original agency public application list explicitly names Oppidan Cedar Rapids Data Center, facility 57 01 254, with an authorization to install application under technical review and a July 30, 2026 submitted date. Application under review applies to that named agency workflow. A submitted air application and its program label Construction Program are not an issued final permit, actual data hall construction, computing operation or a verified IT capacity. The similarly named retail property is not substituted for this facility. No applicant contact, address or advertised quantity is promoted.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.govonlinesaas.com/LCPH/EasyAir/public/Client/IA_EASY/Public/Pages/PublicApplicationList.aspx", "host": "www.govonlinesaas.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · Cedar Rapids · Linn · Source context reviewed", "status_scope": "The original agency public application list explicitly names Oppidan Cedar Rapids Data Center, facility 57 01 254, with an authorization to install application under technical review and a July 30, 2026 submitted date. Application under review applies to that named agency workflow. A submitted air application and its program label Construction Program are not an issued final permit, actual data hall construction, computing operation or a verified IT capacity. The similarly named retail property is not substituted for this facility. No applicant contact, address or advertised quantity is promoted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19113"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "salix-data-center-site-ia", "state": "IA", "kind": "facility", "name": "Salix Data Center Site (Midwest Capital Group)", "group": "proposed", "status": "Proposal discussed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Woodbury"], "city": "Salix", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Agreement enables exploration and is not an executed power-service contract. Google says it will not seek local real-estate abatements or rebates; this does not exclude all state/federal incentives or establish paid tax revenue. More than $20 billion is statewide historical Iowa investment, not Salix spending. July 8 vote directs drafting of a possible moratorium; August 12 adoption outcome is not observed in this source. Annexation is not DC construction approval. Other Norwalk investment and statewide counts must not be attributed to Salix. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.ktiv.com/2026/08/03/google-considering-data-center-salix-iowa-according-midamerican-energy/", "host": "ktiv.com", "date": "2026-08-03", "published": "2026-08-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.midamericanenergy.com/iowa", "host": "www.midamericanenergy.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 42.40141, "lng": -96.05745, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round32-2026-10-14.json", "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.", "fields": {"reported_context": "KTIV reports Google and MidAmerican publicly identified exploratory interest in a potential 900-acre Salix site, explicitly describing no formal project announcement, development agreement or filed rezoning/application as of August 3.", "independently_verified_current_operating_status": null, "reported_stage": "exploratory interest; no formal application as of source date", "executed_utility_agreement_verified": false}, "notes": ["Agreement enables exploration and is not an executed power-service contract. Google says it will not seek local real-estate abatements or rebates; this does not exclude all state/federal incentives or establish paid tax revenue. More than $20 billion is statewide historical Iowa investment, not Salix spending. July 8 vote directs drafting of a possible moratorium; August 12 adoption outcome is not observed in this source. Annexation is not DC construction approval. Other Norwalk investment and statewide counts must not be attributed to Salix.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.ktiv.com/2026/08/03/google-considering-data-center-salix-iowa-according-midamerican-energy/", "host": "ktiv.com", "date": "2026-08-03", "published": "2026-08-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 36", "scope": "The utility current original Salix section names Google as a prospective customer learning from the community before creating a possible future data center proposal. Proposal discussed is limited to that explicit early site interest. It is not a formal application, selected final layout, executed service agreement, construction or operation. The linked informational site robots response redirected and its target body is unread. No new customer role, land quantity, location or corporate ownership is promoted.", "fields": {"current_stage_evidence": {"outcome": "named_salix_early_compute_site_interest_before_formal_application", "scope": "The utility current original Salix section names Google as a prospective customer learning from the community before creating a possible future data center proposal. Proposal discussed is limited to that explicit early site interest. It is not a formal application, selected final layout, executed service agreement, construction or operation. The linked informational site robots response redirected and its target body is unread. No new customer role, land quantity, location or corporate ownership is promoted."}}, "notes": ["The utility current original Salix section names Google as a prospective customer learning from the community before creating a possible future data center proposal. Proposal discussed is limited to that explicit early site interest. It is not a formal application, selected final layout, executed service agreement, construction or operation. The linked informational site robots response redirected and its target body is unread. No new customer role, land quantity, location or corporate ownership is promoted.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.midamericanenergy.com/iowa", "host": "www.midamericanenergy.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · Salix · Woodbury · Source context reviewed", "status_scope": "The utility current original Salix section names Google as a prospective customer learning from the community before creating a possible future data center proposal. Proposal discussed is limited to that explicit early site interest. It is not a formal application, selected final layout, executed service agreement, construction or operation. The linked informational site robots response redirected and its target body is unread. No new customer role, land quantity, location or corporate ownership is promoted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19193"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "tract-altoona-ia", "state": "IA", "kind": "facility", "name": "Tract Altoona Technology Park", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Polk"], "city": "Altoona", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Altoona announced entitled land campus and future capacity. Headline450acre approximation versus body453ac retained as different precision. Fully entitled marketing does not establish all individual building permits or energization. More than1GW expected, not existing load or committed tenant. Actual signed development agreement/incentives and spending not inspected. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-10-01", "The City of Altoona economic development site published its Tract campus announcement on October 1, 2025. The account describes planned development and prior land use work without independently establishing actual computing construction or service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/", "host": "altoonanow.org", "date": "2025-10-01", "published": "2025-10-01", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 41.63098, "lng": -93.54798, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Altoona announced entitled land campus and future capacity", "fields": {"publisher": "City of Altoona economic development", "company": "Tract", "announcement_date": "2025-10-01", "reported_entitled_acres": 453, "expected_capacity_gw_min_exclusive": 1, "power_basis": "campus capacity, not explicit critical IT", "city_reported_processes": ["annexation", "rezoning", "development agreement"]}, "notes": ["Headline450acre approximation versus body453ac retained as different precision. Fully entitled marketing does not establish all individual building permits or energization. More than1GW expected, not existing load or committed tenant. Actual signed development agreement/incentives and spending not inspected.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/", "host": "altoonanow.org", "date": "2025-10-01", "published": "2025-10-01", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 65", "scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host.", "fields": {"current_stage_evidence": {"outcome": "city_named_tract_altoona_proposal", "scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host."}, "source_read_scope": {"complete_original_visible_text_bodies_read": true}}, "notes": ["The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host.", "Existing roles, locations, jurisdiction assignments, quantities, identities and first physical opening dates remain unchanged. Source retrieval does not date commissioning."], "sources": [{"url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/", "host": "altoonanow.org", "published": "2025-10-01", "date": "2025-10-01", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · Altoona · Polk · Source context reviewed", "status_scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host.", "event_evidence": [{"date": "2025-10-01", "text": "The City of Altoona economic development site published its Tract campus announcement on October 1, 2025. The account describes planned development and prior land use work without independently establishing actual computing construction or service.", "kind": "announced", "sources": [{"url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/", "host": "altoonanow.org", "published": "2025-10-01", "date": "2025-10-01", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19153"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "kanza-park-flint-hills-emporia-ks", "state": "KS", "kind": "facility", "name": "Flint Hills Digital Campus", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lyon"], "city": "Emporia", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Gigawatt-scale language supplies no exact critical IT MW. Economic-development endorsement is not a permit, identified tenant, groundbreaking or observed hearing outcome. Forecast spending and jobs are not measured benefits. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-22", "The current City of Emporia account reports establishment of its Digital Infrastructure Overlay and Kanza Park zoning actions on July 22, 2026. It expressly distinguishes these actions from approval of a data center for construction or current computing service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wibw.com/2026/06/02/flint-hills-digital-campus-proposed-emporia/", "host": "wibw.com", "date": "2026-06-02", "published": "2026-06-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.emporiaks.gov/m/NewsFlash/Home/Detail/535", "host": "www.emporiaks.gov", "published": "2026-10-16", "date": "2026-10-16", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.emporiaks.gov/1602/Proposed-Data-Center-Development-Guideli", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.emporiaks.gov/1600/2026-City-of-Emporia-Ballot-Information", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.emporiaks.gov/DocumentCenter/View/8935", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Original explicit computing project location, separate from mail"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=600+Road+190%2C+Emporia%2C+Kansas&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Complete literal original street query, calculated range only"}, {"url": "https://www.emporiarda.org/news-and-media/news-archive/p/item/67803/flint-hills-digital-campus-initiative-signals-major-economic-development-opportunity-for-emporia-and-lyon-county", "host": "www.emporiarda.org", "published": "", "date": "", "checked": "2026-10-24", "label": "Original project association only; no operator role or computing approval inferred"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-96.26874036833472%2C38.42914828853755%2C-96.25612563166528%2C38.43902971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Actually viewed source setting; imagery acquisition date unknown"}], "loc": {"lng": -96.262433, "lat": 38.434089, "precision": "approximate", "basis": "The original City of Emporia source names 600 Road 190, Emporia, Kansas. One complete literal Census query uniquely supports this approximate component tract street reference. The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "WIBW reports Kanza Park Place predevelopment near Emporia and a scheduled June 23 hearing.", "independently_verified_current_operating_status": null}, "notes": ["Gigawatt-scale language supplies no exact critical IT MW. Economic-development endorsement is not a permit, identified tenant, groundbreaking or observed hearing outcome. Forecast spending and jobs are not measured benefits.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wibw.com/2026/06/02/flint-hills-digital-campus-proposed-emporia/", "host": "wibw.com", "date": "2026-06-02", "published": "2026-06-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 65", "scope": "The complete original City overlay account identifies Kanza Park Place planned digital infrastructure and July 22, 2026 zoning actions, and expressly says no data center has been approved for construction. This supports a listed proposal without treating zoning as construction or service. The October 16 notice schedules a past October 21 guideline study session but does not establish its outcome. The separate November 3 City ballot proposes a general high impact computing ban subject to laws and court orders, rather than enacted law or an accomplished project denial. Full controlling resolution and court instruments remain unread after source transport holds.", "fields": {"current_stage_evidence": {"outcome": "city_named_kanza_proposal_with_separate_zoning_and_ballot", "scope": "The complete original City overlay account identifies Kanza Park Place planned digital infrastructure and July 22, 2026 zoning actions, and expressly says no data center has been approved for construction. This supports a listed proposal without treating zoning as construction or service. The October 16 notice schedules a past October 21 guideline study session but does not establish its outcome. The separate November 3 City ballot proposes a general high impact computing ban subject to laws and court orders, rather than enacted law or an accomplished project denial. Full controlling resolution and court instruments remain unread after source transport holds."}, "source_read_scope": {"complete_original_overlay_guideline_notice_resource_and_ballot_bodies_read": true, "no_construction_approval_explicit": true, "past_study_session_notice_not_outcome": true, "november3_question2_proposal_not_enacted": true, "strict_electrical_or_water_thresholds_not_conjoined": true, "full_resolution_and_court_records_unread_transport_holds": true}}, "notes": ["The complete original City overlay account identifies Kanza Park Place planned digital infrastructure and July 22, 2026 zoning actions, and expressly says no data center has been approved for construction. This supports a listed proposal without treating zoning as construction or service. The October 16 notice schedules a past October 21 guideline study session but does not establish its outcome. The separate November 3 City ballot proposes a general high impact computing ban subject to laws and court orders, rather than enacted law or an accomplished project denial. Full controlling resolution and court instruments remain unread after source transport holds.", "Existing roles, locations, jurisdiction assignments, quantities, identities and first physical opening dates remain unchanged. Source retrieval does not date commissioning."], "sources": [{"url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.emporiaks.gov/m/NewsFlash/Home/Detail/535", "host": "www.emporiaks.gov", "published": "2026-10-16", "date": "2026-10-16", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.emporiaks.gov/1602/Proposed-Data-Center-Development-Guideli", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.emporiaks.gov/1600/2026-City-of-Emporia-Ballot-Information", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 74, 2026-10-24", "scope": "The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.", "fields": {"location_review_decision": {"location": {"lng": -96.262433, "lat": 38.434089, "precision": "approximate", "basis": "The original City of Emporia source names 600 Road 190, Emporia, Kansas. One complete literal Census query uniquely supports this approximate component tract street reference. The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "600 Road 190, Emporia, Kansas", "county_fips": ["20111"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.", "The inherited general area coordinate was not independently admitted as a reviewed source reference. The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. The complete literal query and its independently checked calculated reference are inside the unchanged retained county 20111. The measured correction from the prior Native context is 7794.5 metres. This is a source reference review, not a physical relocation. No source setting pixel supplies coordinates or construction stage.", "The source setting shows a rural road crossing, fields, wooded edges, ponds and scattered houses or outbuildings. The calculated range selects no computing roof. This is one original project tract street reference and no complete campus boundary is inferred. Acquisition date is unknown."], "sources": [{"url": "https://www.emporiaks.gov/DocumentCenter/View/8935", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Original explicit computing project location, separate from mail"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=600+Road+190%2C+Emporia%2C+Kansas&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Complete literal original street query, calculated range only"}, {"url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Original project association only; no operator role or computing approval inferred"}, {"url": "https://www.emporiarda.org/news-and-media/news-archive/p/item/67803/flint-hills-digital-campus-initiative-signals-major-economic-development-opportunity-for-emporia-and-lyon-county", "host": "www.emporiarda.org", "published": "", "date": "", "checked": "2026-10-24", "label": "Original project association only; no operator role or computing approval inferred"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-96.26874036833472%2C38.42914828853755%2C-96.25612563166528%2C38.43902971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Actually viewed source setting; imagery acquisition date unknown"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate project tract street, not a building or complete campus", "summary": "Kansas · Emporia · Lyon · Source context reviewed", "status_scope": "The complete original City overlay account identifies Kanza Park Place planned digital infrastructure and July 22, 2026 zoning actions, and expressly says no data center has been approved for construction. This supports a listed proposal without treating zoning as construction or service. The October 16 notice schedules a past October 21 guideline study session but does not establish its outcome. The separate November 3 City ballot proposes a general high impact computing ban subject to laws and court orders, rather than enacted law or an accomplished project denial. Full controlling resolution and court instruments remain unread after source transport holds.", "event_evidence": [{"date": "2026-07-22", "text": "The current City of Emporia account reports establishment of its Digital Infrastructure Overlay and Kanza Park zoning actions on July 22, 2026. It expressly distinguishes these actions from approval of a data center for construction or current computing service.", "kind": "approved", "sources": [{"url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District", "host": "www.emporiaks.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "state_name": "Kansas", "state_path": "/kansas/"}, {"id": "cloverleaf-bluestem-tonganoxie-ks", "state": "KS", "kind": "facility", "name": "Project Bluestem", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Leavenworth"], "city": "Tonganoxie", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bluestem conceptual developer statement. Undated no-application statement is not independently current local docket check. Generic building-size FAQ not actual campus plan. Closed-loop cooling still has initial fill and domestic water. Ratepayer promises not signed tariff or independent finding. Frenchtown Michigan image attribution does not relocate Kansas project. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://bluestemdatacenter.com/", "host": "bluestemdatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.tonganoxie.org/sites/g/files/vyhlif7461/f/agendas/notice_of_public_meeting_tonganoxie_community_open_house_event_v2.pdf", "host": "www.tonganoxie.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 39.19998, "lng": -95.03824, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Bluestem conceptual developer statement", "fields": {"project_name": "Project Bluestem", "locality": "near Tonganoxie Business Park, Leavenworth County, Kansas", "developer": "Cloverleaf Infrastructure", "source_described_stage": "conceptual, no formal local approval or permit requests submitted at time of undated text", "expected_phase1_construction_years_min_exclusive": 2, "expected_construction_jobs_min_exclusive": 1000, "expected_initial_fulltime_jobs_min_exclusive": 50, "expected_full_buildout_fulltime_jobs_min_exclusive": 200}, "notes": ["Undated no-application statement is not independently current local docket check. Generic building-size FAQ not actual campus plan. Closed-loop cooling still has initial fill and domestic water. Ratepayer promises not signed tariff or independent finding. Frenchtown Michigan image attribution does not relocate Kansas project.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://bluestemdatacenter.com/", "host": "bluestemdatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 65", "scope": "The complete original project portal describes a conceptual data center proposal and states no formal requests have been filed, without a verified publication day. This supports a listed proposal without establishing current entitlement, construction or service. The complete original City notice describes a privately hosted Cloverleaf June 9, 2026 open house and expressly excludes a City presentation, agenda, decisions and City organized public comment. That prospective past notice does not establish an accomplished City vote, a new upcoming hearing or measured benefits.", "fields": {"current_stage_evidence": {"outcome": "original_bluestem_conceptual_proposal", "scope": "The complete original project portal describes a conceptual data center proposal and states no formal requests have been filed, without a verified publication day. This supports a listed proposal without establishing current entitlement, construction or service. The complete original City notice describes a privately hosted Cloverleaf June 9, 2026 open house and expressly excludes a City presentation, agenda, decisions and City organized public comment. That prospective past notice does not establish an accomplished City vote, a new upcoming hearing or measured benefits."}, "source_read_scope": {"complete_original_project_portal_body_read": true, "complete_original_city_openhouse_notice_text_read": true, "private_openhouse_not_city_council_decision": true, "undated_no_formal_filing_account_not_current_legal_disposition": true}}, "notes": ["The complete original project portal describes a conceptual data center proposal and states no formal requests have been filed, without a verified publication day. This supports a listed proposal without establishing current entitlement, construction or service. The complete original City notice describes a privately hosted Cloverleaf June 9, 2026 open house and expressly excludes a City presentation, agenda, decisions and City organized public comment. That prospective past notice does not establish an accomplished City vote, a new upcoming hearing or measured benefits.", "Existing roles, locations, jurisdiction assignments, quantities, identities and first physical opening dates remain unchanged. Source retrieval does not date commissioning."], "sources": [{"url": "https://bluestemdatacenter.com/", "host": "bluestemdatacenter.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.tonganoxie.org/sites/g/files/vyhlif7461/f/agendas/notice_of_public_meeting_tonganoxie_community_open_house_event_v2.pdf", "host": "www.tonganoxie.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Kansas · Tonganoxie · Leavenworth · Source context reviewed", "status_scope": "The complete original project portal describes a conceptual data center proposal and states no formal requests have been filed, without a verified publication day. This supports a listed proposal without establishing current entitlement, construction or service. The complete original City notice describes a privately hosted Cloverleaf June 9, 2026 open house and expressly excludes a City presentation, agenda, decisions and City organized public comment. That prospective past notice does not establish an accomplished City vote, a new upcoming hearing or measured benefits.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "20103"}, "state_name": "Kansas", "state_path": "/kansas/"}, {"id": "powertransitions-project-yardbird-ks", "state": "KS", "kind": "facility", "name": "Project Yardbird", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Wyandotte"], "city": "Kansas City", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Issuer marketing and conceptual plan, not executed land/tenant/utility agreement, current operating campus or delivered criticalIT.161kVtransmission voltage is not MW; new150MWon-siteGENis not additive IT or proof built. StateSB98policy eligibility is not site-specific tax award. PartnersGroup170billionAUM and team50billionexperience are not campus capex. Planned demolition/permits and power-ready dates remain forecasts. Publicly served flipbook has confidentiality/distribution notice; retained for internal source evaluation, do not redistribute presentation/media as press asset or imply NDA execution. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City", "host": "wsp.cld.bz", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 39.11479, "lng": -94.76502, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round35-2026-10-14.json", "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.", "fields": {"reported_context": "Public PowerTransitions Quindaro presentation markets40acres at3601North12thStreet KansasCityKansas and option to purchase/lease, with150MWgridpower targetedQ1-2027 and150plusadditionalMWtargetedQ1-2028, totaling300plusMWGROSS. Presentation states nonbinding until definitive written agreement.", "independently_verified_current_operating_status": null, "issuer_planned_gross_grid_mw_phase1": 150, "issuer_planned_gross_grid_mw_phase2_lower_bound": 150, "issuer_planned_gross_grid_mw_total_lower_bound": 300, "phase1_power_target": "Q1 2027", "phase2_power_target": "Q1 2028", "critical_it_mw": null, "executed_utility_agreement_verified": false}, "notes": ["Issuer marketing and conceptual plan, not executed land/tenant/utility agreement, current operating campus or delivered criticalIT.161kVtransmission voltage is not MW; new150MWon-siteGENis not additive IT or proof built. StateSB98policy eligibility is not site-specific tax award. PartnersGroup170billionAUM and team50billionexperience are not campus capex. Planned demolition/permits and power-ready dates remain forecasts. Publicly served flipbook has confidentiality/distribution notice; retained for internal source evaluation, do not redistribute presentation/media as press asset or imply NDA execution.", "Historical observations and forecasts are dated; no later outcome assumed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City", "host": "wsp.cld.bz", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 65", "scope": "The complete original publicly served PowerTransitions Quindaro offering names PT Yardbird and describes a future data center opportunity at the former power station. This supports a listed proposal. Its November 2025 month label is not an exact publication day. Conceptual preparation dates, future power availability and infrastructure marketing do not independently establish current computing construction, delivered IT load or commissioned service. The public document invitation for further confidential material was not followed, and no contact or agreement was made.", "fields": {"current_stage_evidence": {"outcome": "original_quindaro_yardbird_marketed_proposal", "scope": "The complete original publicly served PowerTransitions Quindaro offering names PT Yardbird and describes a future data center opportunity at the former power station. This supports a listed proposal. Its November 2025 month label is not an exact publication day. Conceptual preparation dates, future power availability and infrastructure marketing do not independently establish current computing construction, delivered IT load or commissioned service. The public document invitation for further confidential material was not followed, and no contact or agreement was made."}, "source_read_scope": {"all6_publicly_served_visible_offering_pages_read": true, "month_only_not_invented_exact_day": true, "conceptual_timeline_not_actual_preparation": true, "power_generation_not_computing_load": true, "no_contact_nda_or_private_material_requested": true}}, "notes": ["The complete original publicly served PowerTransitions Quindaro offering names PT Yardbird and describes a future data center opportunity at the former power station. This supports a listed proposal. Its November 2025 month label is not an exact publication day. Conceptual preparation dates, future power availability and infrastructure marketing do not independently establish current computing construction, delivered IT load or commissioned service. The public document invitation for further confidential material was not followed, and no contact or agreement was made.", "Existing roles, locations, jurisdiction assignments, quantities, identities and first physical opening dates remain unchanged. Source retrieval does not date commissioning."], "sources": [{"url": "https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City", "host": "wsp.cld.bz", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Kansas · Kansas City · Wyandotte · Source context reviewed", "status_scope": "The complete original publicly served PowerTransitions Quindaro offering names PT Yardbird and describes a future data center opportunity at the former power station. This supports a listed proposal. Its November 2025 month label is not an exact publication day. Conceptual preparation dates, future power availability and infrastructure marketing do not independently establish current computing construction, delivered IT load or commissioned service. The public document invitation for further confidential material was not followed, and no contact or agreement was made.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "20209"}, "state_name": "Kansas", "state_path": "/kansas/"}, {"id": "millcompute-bates-mill-lewiston-me", "state": "ME", "kind": "facility", "name": "MillCompute Bates Mill No. 3 AI Data Center", "group": "proposed", "status": "Provider listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Androscoggin"], "city": "Lewiston", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The requested 20-year TIF/credit-enhancement terms were not awarded. Developer claims about utility prices and water were not independently verified. Rejection of this proposal is not a citywide moratorium or permanent prohibition on all later proposals. No operating facility is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal", "host": "mainepublic.org", "date": "2025-12-17", "published": "2025-12-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.millcompute.com/faq", "host": "www.millcompute.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 44.16548, "lng": -70.20676, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Maine Public reports unanimous Lewiston council rejection on December 16 of MillCompute's Bates Mill No. 3 proposal.", "independently_verified_current_operating_status": null, "reported_proposal_status": "rejected", "reported_rejection_date": "2025-12-16"}, "notes": ["The requested 20-year TIF/credit-enhancement terms were not awarded. Developer claims about utility prices and water were not independently verified. Rejection of this proposal is not a citywide moratorium or permanent prohibition on all later proposals. No operating facility is established.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal", "host": "mainepublic.org", "date": "2025-12-17", "published": "2025-12-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 66", "scope": "The complete original public MillCompute questions and answers body describes planned computing space, future phases, intended approvals and projected benefits at Bates Mill 3. This supports a provider listed proposal without independently establishing construction, issued environmental permissions, commissioned workloads or current legal eligibility. The undated body retains a December 2 meeting reference and a 2025 copyright; neither is an exact publication day. The much larger original December 16 City packet exceeded the capture limit and remains unread, as do the exact official meeting outcome and later disposition. A data room and request access route were not opened.", "fields": {"current_stage_evidence": {"outcome": "original_millcompute_public_proposal_current_legal_outcome_held", "scope": "The complete original public MillCompute questions and answers body describes planned computing space, future phases, intended approvals and projected benefits at Bates Mill 3. This supports a provider listed proposal without independently establishing construction, issued environmental permissions, commissioned workloads or current legal eligibility. The undated body retains a December 2 meeting reference and a 2025 copyright; neither is an exact publication day. The much larger original December 16 City packet exceeded the capture limit and remains unread, as do the exact official meeting outcome and later disposition. A data room and request access route were not opened."}, "source_read_scope": {"complete_original_public_faq_text_body_read": true, "undated_december2_reference_not_current_scheduled_day": true, "original_city_packet_oversize_hold_retained": true, "private_reported_city_rejection_not_adopted": true, "marketing_mitigation_not_independently_verified": true, "no_data_room_access_or_contact": true}}, "notes": ["The complete original public MillCompute questions and answers body describes planned computing space, future phases, intended approvals and projected benefits at Bates Mill 3. This supports a provider listed proposal without independently establishing construction, issued environmental permissions, commissioned workloads or current legal eligibility. The undated body retains a December 2 meeting reference and a 2025 copyright; neither is an exact publication day. The much larger original December 16 City packet exceeded the capture limit and remains unread, as do the exact official meeting outcome and later disposition. A data room and request access route were not opened.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."], "sources": [{"url": "https://www.millcompute.com/faq", "host": "www.millcompute.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Maine · Lewiston · Androscoggin · Source context reviewed", "status_scope": "The complete original public MillCompute questions and answers body describes planned computing space, future phases, intended approvals and projected benefits at Bates Mill 3. This supports a provider listed proposal without independently establishing construction, issued environmental permissions, commissioned workloads or current legal eligibility. The undated body retains a December 2 meeting reference and a 2025 copyright; neither is an exact publication day. The much larger original December 16 City packet exceeded the capture limit and remains unread, as do the exact official meeting outcome and later disposition. A data room and request access route were not opened.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "23001"}, "state_name": "Maine", "state_path": "/maine/"}, {"id": "terawulf-morgantown-charles-county-md", "state": "MD", "kind": "facility", "name": "TeraWulf Morgantown Generating Station AI Campus", "group": "proposed", "status": "Permitting", "raw_status": "permitting", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Charles"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. This is the operator’s development-stage label, not a government permit finding or operation. No projected generation or IT capacity is treated as energized load. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.terawulf.com/our-sites", "host": "terawulf.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 38.5069, "lng": -76.99218, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-events-round3-2026-10-14.json", "scope": "Field or source context only", "fields": {"county": "Charles", "operator_status": "Permitting", "critical_it_total_mw": 800, "critical_it_contracted_mw": 0, "critical_it_open_mw": 800}, "notes": ["Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.terawulf.com/our-sites", "host": "terawulf.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "permitting", "status_basis": "TeraWulf labels Chesapeake Data & Energy in Charles County, Maryland as Permitting.", "filter_scope": "Grouped with proposed/development projects; no final permit or exact construction stage is inferred."}, "notes": ["This is the operator’s development-stage label, not a government permit finding or operation. No projected generation or IT capacity is treated as energized load. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://www.terawulf.com/our-sites", "host": "terawulf.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "9679cb0785478c67bd8607fa55ff831728a7642e1004484300bf1bc31332eb84", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Maryland · Charles · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "24017"}, "state_name": "Maryland", "state_path": "/maryland/"}, {"id": "natelli-appeal-digital-park-lusby-md", "state": "MD", "kind": "facility", "name": "Appeal Digital Park", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Calvert"], "city": "Lusby", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Calvert county policy and withdrawn AWS application, not operating campus. County summary not separately read signed ordinance or termination instruments. Exact legal moratorium expiry remains unknown; do not calculate it. August4 is withdrawal announcement, not independently exact filing date. ENRA expiry does not prove all possible private proposals permanently cancelled. Generic jobs examples not local forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-04-06", "The County original account reports that Natelli hosted an Appeal Digital Park public information meeting on April 6, 2026. This dates the reported outreach meeting, not a County approval, executed property acquisition, construction or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.calvertcountymd.gov/3880/Data-Centers", "host": "calvertcountymd.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.choosecalvert.com/4058/Natelli-Holdings", "host": "www.choosecalvert.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 38.55473, "lng": -76.58073, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Calvert county policy and withdrawn AWS application, not operating campus", "fields": {"county_reported_moratorium_adoption_date": "2026-08-18", "moratorium_duration_months": 6, "ordinance_identifier": "42-26", "county_reported_aws_withdrawal_public_update_date": "2026-08-04", "county_reported_latest_enra_expiration": "2026-05-17", "current_county_statement": "no data-center site applications pending"}, "notes": ["County summary not separately read signed ordinance or termination instruments. Exact legal moratorium expiry remains unknown; do not calculate it. August4 is withdrawal announcement, not independently exact filing date. ENRA expiry does not prove all possible private proposals permanently cancelled. Generic jobs examples not local forecasts.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.calvertcountymd.gov/3880/Data-Centers", "host": "calvertcountymd.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 50", "scope": "The current County original Natelli page expressly describes Appeal Digital Park as a proposed data center development and reports its April 6, 2026 public information meeting. Listed proposal is limited to this named concept. The separate County moratorium and the unrelated AWS withdrawal do not establish Natelli cancellation, a land purchase completion, final project permission, construction or computing operation.", "fields": {"current_stage_evidence": {"outcome": "current_named_county_documented_proposal", "scope": "The current County original Natelli page expressly describes Appeal Digital Park as a proposed data center development and reports its April 6, 2026 public information meeting. Listed proposal is limited to this named concept. The separate County moratorium and the unrelated AWS withdrawal do not establish Natelli cancellation, a land purchase completion, final project permission, construction or computing operation."}}, "notes": ["The current County original Natelli page expressly describes Appeal Digital Park as a proposed data center development and reports its April 6, 2026 public information meeting. Listed proposal is limited to this named concept. The separate County moratorium and the unrelated AWS withdrawal do not establish Natelli cancellation, a land purchase completion, final project permission, construction or computing operation.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.choosecalvert.com/4058/Natelli-Holdings", "host": "www.choosecalvert.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.calvertcountymd.gov/3880/Data-Centers", "host": "www.calvertcountymd.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Maryland · Lusby · Calvert · Source context reviewed", "status_scope": "The current County original Natelli page expressly describes Appeal Digital Park as a proposed data center development and reports its April 6, 2026 public information meeting. Listed proposal is limited to this named concept. The separate County moratorium and the unrelated AWS withdrawal do not establish Natelli cancellation, a land purchase completion, final project permission, construction or computing operation.", "event_evidence": [{"date": "2026-04-06", "text": "The County original account reports that Natelli hosted an Appeal Digital Park public information meeting on April 6, 2026. This dates the reported outreach meeting, not a County approval, executed property acquisition, construction or computing operation.", "kind": "announced", "sources": [{"url": "https://www.choosecalvert.com/4058/Natelli-Holdings", "host": "www.choosecalvert.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "24009"}, "state_name": "Maryland", "state_path": "/maryland/"}, {"id": "servistar-westfield-ma", "state": "MA", "kind": "facility", "name": "Servistar Realties Westfield Data Center Campus", "group": "proposed", "status": "Proposal documented in City agenda", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Hampden"], "city": "Westfield", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. NBC Boston August22,2025 republishes State House News Service reporting on Servistar Realties in Westfield. Officials describe a roughly120acre,10 to 14building proposal,2.5 to 4B investment estimate,400operations jobs and1800 to 2000construction jobs over8 to 10years, not completed spending/current employment. Reported2021 local approval does not establish all subsequent permits. Tenant still being sought; Microsoft/Google are examples, not signed occupants. Predevelopment in about six months and construction in12months are historical contingent forecasts, not October2026 construction observations. Article discusses proposed incentive regulations at a hearing; no final enacted rule or project certification independently checked. No committed IT MW, current power agreement or measured impacts verified. Statewide facility count attributed to another newspaper is not an independent census adopted here. Not whole-record or current operating-census certification.", "date": "", "events": [["2026-10-07", "The original City of Westfield archive records October 7, 2026 posting of the special October 13 Planning Board agenda listing the Servistar permit extension request. This dates the official notice account without independently establishing the meeting outcome, current permit force or physical facility closure."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.nbcboston.com/news/local/massive-multi-billion-dollar-data-center-campus-planned-in-western-massachusetts/3795016/", "host": "nbcboston.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.cityofwestfield.org/AgendaCenter", "host": "www.cityofwestfield.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.cityofwestfield.org/AgendaCenter/ViewFile/Agenda/_10132026-8701", "host": "www.cityofwestfield.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 42.14696, "lng": -72.6443, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-and-original-local-reporting-round57-2026-10-15.json", "scope": "Operator or original local-reporting context; source dates and proposal stages retained.", "fields": {}, "notes": ["NBC Boston August22,2025 republishes State House News Service reporting on Servistar Realties in Westfield. Officials describe a roughly120acre,10 to 14building proposal,2.5 to 4B investment estimate,400operations jobs and1800 to 2000construction jobs over8 to 10years, not completed spending/current employment. Reported2021 local approval does not establish all subsequent permits.", "Tenant still being sought; Microsoft/Google are examples, not signed occupants. Predevelopment in about six months and construction in12months are historical contingent forecasts, not October2026 construction observations. Article discusses proposed incentive regulations at a hearing; no final enacted rule or project certification independently checked. No committed IT MW, current power agreement or measured impacts verified. Statewide facility count attributed to another newspaper is not an independent census adopted here.", "Not whole-record or current operating-census certification."], "sources": [{"url": "https://www.nbcboston.com/news/local/massive-multi-billion-dollar-data-center-campus-planned-in-western-massachusetts/3795016/", "host": "nbcboston.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 66", "scope": "The original City archive and selected one page October 13, 2026 agenda identify Servistar Realties requesting extension of the computing permit originally granted October 19, 2021. This supports a proposal documented in the City agenda without independently establishing an accomplished extension vote, current permit force, actual construction or computing service. The private later denial account is not substituted for unread official minutes. The much larger original older application exceeded the bounded capture limit and was not read. No general pause or permit deadline becomes physical shutdown.", "fields": {"current_stage_evidence": {"outcome": "official_named_servistar_permit_extension_proposal", "scope": "The original City archive and selected one page October 13, 2026 agenda identify Servistar Realties requesting extension of the computing permit originally granted October 19, 2021. This supports a proposal documented in the City agenda without independently establishing an accomplished extension vote, current permit force, actual construction or computing service. The private later denial account is not substituted for unread official minutes. The much larger original older application exceeded the bounded capture limit and was not read. No general pause or permit deadline becomes physical shutdown."}, "source_read_scope": {"original_current_planning_board_archive_section_read": true, "original_one_page_agenda_selected_project_paragraph_read": true, "posted_oct7_not_oct13_vote_result": true, "public_remote_join_details_not_exported": true, "older_application_oversize_hold_not_captured_or_read": true, "private_extension_denial_not_adopted": true}}, "notes": ["The original City archive and selected one page October 13, 2026 agenda identify Servistar Realties requesting extension of the computing permit originally granted October 19, 2021. This supports a proposal documented in the City agenda without independently establishing an accomplished extension vote, current permit force, actual construction or computing service. The private later denial account is not substituted for unread official minutes. The much larger original older application exceeded the bounded capture limit and was not read. No general pause or permit deadline becomes physical shutdown.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."], "sources": [{"url": "https://www.cityofwestfield.org/AgendaCenter", "host": "www.cityofwestfield.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.cityofwestfield.org/AgendaCenter/ViewFile/Agenda/_10132026-8701", "host": "www.cityofwestfield.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Massachusetts · Westfield · Hampden · Source context reviewed", "status_scope": "The original City archive and selected one page October 13, 2026 agenda identify Servistar Realties requesting extension of the computing permit originally granted October 19, 2021. This supports a proposal documented in the City agenda without independently establishing an accomplished extension vote, current permit force, actual construction or computing service. The private later denial account is not substituted for unread official minutes. The much larger original older application exceeded the bounded capture limit and was not read. No general pause or permit deadline becomes physical shutdown.", "event_evidence": [{"date": "2026-10-07", "text": "The original City of Westfield archive records October 7, 2026 posting of the special October 13 Planning Board agenda listing the Servistar permit extension request. This dates the official notice account without independently establishing the meeting outcome, current permit force or physical facility closure.", "kind": "announced", "sources": [{"url": "https://www.cityofwestfield.org/AgendaCenter", "host": "www.cityofwestfield.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.cityofwestfield.org/AgendaCenter/ViewFile/Agenda/_10132026-8701", "host": "www.cityofwestfield.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "25013"}, "state_name": "Massachusetts", "state_path": "/massachusetts/"}, {"id": "cloverleaf-ironwood-dundee-township-mi", "state": "MI", "kind": "facility", "name": "Project Ironwood", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Monroe"], "city": "Dundee", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Ironwood FAQ generic versus project-specific sections. Generic400000to1000000sqftperbuilding and50to300jobs are not approved project-specific quantities. Developer describes future425Agreement as conditional; no executed annexation/revenue-sharing agreement read. Claims on legally binding promises not independent legal finding. No exact MW, permit approval date or named end-user adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Developer site preparation and its search for a future operator do not establish construction, issued permits or operation. No selected tenant or capacity is inferred. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://ironwooddatacenter.com/faqs/", "host": "ironwooddatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.94081, "lng": -83.55168, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Ironwood FAQ generic versus project-specific sections", "fields": {"project_name": "Project Ironwood", "developer": "Cloverleaf Infrastructure", "locality": "Dundee Township, Michigan", "developer_described_stage": "proposed development", "northern_boundary_description": "Day Road"}, "notes": ["Generic400000to1000000sqftperbuilding and50to300jobs are not approved project-specific quantities. Developer describes future425Agreement as conditional; no executed annexation/revenue-sharing agreement read. Claims on legally binding promises not independent legal finding. No exact MW, permit approval date or named end-user adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ironwooddatacenter.com/faqs/", "host": "ironwooddatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "proposed", "status_basis": "Cloverleaf calls Ironwood a proposed development in Dundee Township and says it is in the development phase."}, "notes": ["Developer site preparation and its search for a future operator do not establish construction, issued permits or operation. No selected tenant or capacity is inferred. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://ironwooddatacenter.com/faqs/", "host": "ironwooddatacenter.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "abf808ff3f3b336e9b59cb44d26983dbcbd1266cc520cb57d07c8aef064ed615", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Michigan · Dundee · Monroe · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "26115"}, "state_name": "Michigan", "state_path": "/michigan/"}, {"id": "microsoft-lowell-township-mi", "state": "MI", "kind": "facility", "name": "Microsoft Lowell Township Data Center", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kent"], "city": "Lowell Township", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/", "host": "gandernewsroom.com", "date": "2026-10-08", "published": "2026-10-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://local.microsoft.com/wp-content/uploads/2026/03/202603_Boards_Lowell_Charter_Township.pdf", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}, {"url": "https://local.microsoft.com/blog/lowell-charter-township-public-meeting/", "host": "local.microsoft.com", "published": "2026-03-10", "date": "2026-03-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 43.04839, "lng": -85.56704, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.", "independently_verified_current_operating_status": null, "site_stage_scope": "Municipal service/development talks suspended, not project withdrawal"}, "notes": ["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/", "host": "gandernewsroom.com", "date": "2026-10-08", "published": "2026-10-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 14", "scope": "Microsoft community boards explicitly describe a proposed data center in Lowell Charter Township and say the programme is early in planning, with rezoning intended after community consultation. Operator listed development describes that proposal only. No exact meeting day is established from the PDF filename, and the boards do not prove approved zoning, current physical construction or operation. The township homepage robots redirect remains an access route hold, not evidence that no municipal records exist.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_early_planning_proposal", "scope": "Microsoft community boards explicitly describe a proposed data center in Lowell Charter Township and say the programme is early in planning, with rezoning intended after community consultation. Operator listed development describes that proposal only. No exact meeting day is established from the PDF filename, and the boards do not prove approved zoning, current physical construction or operation. The township homepage robots redirect remains an access route hold, not evidence that no municipal records exist."}, "date_and_approval_scope": {"pdf_first_page_visually_read": true, "exact_meeting_day_established": false, "operator_intention_to_seek_rezoning_not_actual_approval": true}}, "notes": ["Microsoft community boards explicitly describe a proposed data center in Lowell Charter Township and say the programme is early in planning, with rezoning intended after community consultation. Operator listed development describes that proposal only. No exact meeting day is established from the PDF filename, and the boards do not prove approved zoning, current physical construction or operation. The township homepage robots redirect remains an access route hold, not evidence that no municipal records exist.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://local.microsoft.com/wp-content/uploads/2026/03/202603_Boards_Lowell_Charter_Township.pdf", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check69, October24,2026", "scope": "The Microsoft recap identifies prospective datacenter planning in Lowell Charter Township. Microsoft says it is considering a land purchase; no completed acquisition is established. The March 5, 2026 community meeting and March 10, 2026 publisher metadata are distinct clocks. Developer per source is a prospective project association, not a rezoning approval or current construction finding. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "The Microsoft recap identifies prospective datacenter planning in Lowell Charter Township. Microsoft says it is considering a land purchase; no completed acquisition is established. The March 5, 2026 community meeting and March 10, 2026 publisher metadata are distinct clocks. Developer per source is a prospective project association, not a rezoning approval or current construction finding. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."}, "provider_role": "developer"}, "notes": ["The Microsoft recap identifies prospective datacenter planning in Lowell Charter Township. Microsoft says it is considering a land purchase; no completed acquisition is established. The March 5, 2026 community meeting and March 10, 2026 publisher metadata are distinct clocks. Developer per source is a prospective project association, not a rezoning approval or current construction finding. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."], "sources": [{"url": "https://local.microsoft.com/blog/lowell-charter-township-public-meeting/", "host": "local.microsoft.com", "published": "2026-03-10", "date": "2026-03-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Michigan · Lowell Township · Kent · Source context reviewed", "status_scope": "Microsoft community boards explicitly describe a proposed data center in Lowell Charter Township and say the programme is early in planning, with rezoning intended after community consultation. Operator listed development describes that proposal only. No exact meeting day is established from the PDF filename, and the boards do not prove approved zoning, current physical construction or operation. The township homepage robots redirect remains an access route hold, not evidence that no municipal records exist.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "26081"}, "state_name": "Michigan", "state_path": "/michigan/"}, {"id": "oakland-university-computing-auburn-hills-mi", "state": "MI", "kind": "facility", "name": "Oakland University Campus Computing Facility", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Oakland"], "city": "Auburn Hills", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/", "host": "gandernewsroom.com", "date": "2026-10-08", "published": "2026-10-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.oakland.edu/data-infrastructure/", "host": "www.oakland.edu", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 42.69182, "lng": -83.36168, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.", "independently_verified_current_operating_status": null, "site_stage_scope": "Trustees authorized due diligence, not final construction"}, "notes": ["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/", "host": "gandernewsroom.com", "date": "2026-10-08", "published": "2026-10-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 51", "scope": "The current original University account calls the Campus Computing Facility proposed and says the project is entering due diligence, with design and construction described as later phases. Its June 2026 authorization to move forward is not a report that physical construction began. Existing computing rooms in Dodge Hall and North Foundation Hall are separate from this proposed facility and do not make it operating. No campus power, predicted revenue, future construction duration or tenant allocation becomes an accomplished facility fact.", "fields": {"current_stage_evidence": {"outcome": "current_university_named_proposal", "scope": "The current original University account calls the Campus Computing Facility proposed and says the project is entering due diligence, with design and construction described as later phases. Its June 2026 authorization to move forward is not a report that physical construction began. Existing computing rooms in Dodge Hall and North Foundation Hall are separate from this proposed facility and do not make it operating. No campus power, predicted revenue, future construction duration or tenant allocation becomes an accomplished facility fact."}, "source_read_scope": {"selected_sections": ["Campus Computing Facility", "Frequently Asked Questions introduction", "Project Timeline", "Steering Committee due diligence schedule"], "existing_computing_rooms_not_joined": true, "no_calendar_entry_from_month_only_forecast": true}}, "notes": ["The current original University account calls the Campus Computing Facility proposed and says the project is entering due diligence, with design and construction described as later phases. Its June 2026 authorization to move forward is not a report that physical construction began. Existing computing rooms in Dodge Hall and North Foundation Hall are separate from this proposed facility and do not make it operating. No campus power, predicted revenue, future construction duration or tenant allocation becomes an accomplished facility fact.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.oakland.edu/data-infrastructure/", "host": "www.oakland.edu", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Michigan · Auburn Hills · Oakland · Source context reviewed", "status_scope": "The current original University account calls the Campus Computing Facility proposed and says the project is entering due diligence, with design and construction described as later phases. Its June 2026 authorization to move forward is not a report that physical construction began. Existing computing rooms in Dodge Hall and North Foundation Hall are separate from this proposed facility and do not make it operating. No campus power, predicted revenue, future construction duration or tenant allocation becomes an accomplished facility fact.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "26125"}, "state_name": "Michigan", "state_path": "/michigan/"}, {"id": "cloverleaf-cherry-blossom-frenchtown-mi", "state": "MI", "kind": "facility", "name": "Project Cherry Blossom", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Monroe"], "city": "Frenchtown Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cherry Blossom developer concept and fiscal forecasts. Forecast tax categories may overlap capture/district structures; not summed or recorded as actual payments. No executed CBA, independent permit approval, numeric IT MW or observed groundbreaking. Developer describes eventual end-user selection after approvals and power, so do not invent hyperscaler. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://cherryblossomdatacenter.com/", "host": "cherryblossomdatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.92829, "lng": -83.53801, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Cherry Blossom developer concept and fiscal forecasts", "fields": {"project_name": "Project Cherry Blossom", "locality": "former ProMedica Hospital site off I-75 and North Dixie Highway, Frenchtown Township, Michigan", "proposed_site_acres_approx": 200, "expected_construction_jobs_min_exclusive": 1000, "expected_longterm_fulltime_jobs_min_exclusive": 100, "developer_estimated_annual_local_government_tax_usd": 14800000, "developer_estimated_annual_college_tax_usd": 2100000, "developer_estimated_annual_monroe_isd_technology_tax_usd": 4700000, "developer_estimated_annual_jefferson_school_tax_usd": 1500000, "community_benefits_agreement_stage": "negotiating"}, "notes": ["Forecast tax categories may overlap capture/district structures; not summed or recorded as actual payments. No executed CBA, independent permit approval, numeric IT MW or observed groundbreaking. Developer describes eventual end-user selection after approvals and power, so do not invent hyperscaler.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://cherryblossomdatacenter.com/", "host": "cherryblossomdatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 51", "scope": "The current original developer page expressly calls Project Cherry Blossom a proposed data center in Frenchtown Township at the former ProMedica Hospital site. It describes approvals and power confirmation before later selection of a computing end user. This supports a listed proposal only. Developer forecasts, claimed benefits, planned cooling and a benefits agreement under negotiation are not accomplished construction, payments, a signed tenant or computing operation.", "fields": {"current_stage_evidence": {"outcome": "current_original_named_proposal", "scope": "The current original developer page expressly calls Project Cherry Blossom a proposed data center in Frenchtown Township at the former ProMedica Hospital site. It describes approvals and power confirmation before later selection of a computing end user. This supports a listed proposal only. Developer forecasts, claimed benefits, planned cooling and a benefits agreement under negotiation are not accomplished construction, payments, a signed tenant or computing operation."}}, "notes": ["The current original developer page expressly calls Project Cherry Blossom a proposed data center in Frenchtown Township at the former ProMedica Hospital site. It describes approvals and power confirmation before later selection of a computing end user. This supports a listed proposal only. Developer forecasts, claimed benefits, planned cooling and a benefits agreement under negotiation are not accomplished construction, payments, a signed tenant or computing operation.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://cherryblossomdatacenter.com/", "host": "cherryblossomdatacenter.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Michigan · Frenchtown Township · Monroe · Source context reviewed", "status_scope": "The current original developer page expressly calls Project Cherry Blossom a proposed data center in Frenchtown Township at the former ProMedica Hospital site. It describes approvals and power confirmation before later selection of a computing end user. This supports a listed proposal only. Developer forecasts, claimed benefits, planned cooling and a benefits agreement under negotiation are not accomplished construction, payments, a signed tenant or computing operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "26115"}, "state_name": "Michigan", "state_path": "/michigan/"}, {"id": "umich-lanl-research-computing-ypsilanti-township-mi", "state": "MI", "kind": "facility", "name": "U-M / Los Alamos Research Computing Center", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Washtenaw"], "city": "Ypsilanti", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. One proposed facility with two computing centers not automatically two physical buildings.15Mfiveyearresearchcontract is existing collaboration funding, not facility construction budget. Lab NewMexico footer not Michigan site address; specificYpsilantiTownship location not established in this release. No completion, MW or exact site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2024-12-06", "Los Alamos National Laboratory published its Michigan partnership announcement on December 6, 2024, describing a planned research computing development. This dates publication of the plan, not an executed building approval, physical start or current computing operation."], ["2026-03-31", "The certified Township Resolution 2026 05 records approval at the March 31, 2026 Special Meeting and formal opposition to siting the proposed Los Alamos facility. Its security and environmental justice allegations are attributed Board positions, not an independent threat classification, a court finding, permit denial or physical closure."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.lanl.gov/media/news/1206-university-of-michigan-collaboration", "host": "lanl.gov", "date": "2024-12-06", "published": "2024-12-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://files.ypsitownship.org/government/boards___commissions/board_of_trustees/data_center_information.php", "host": "files.ypsitownship.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://files.ypsitownship.org/Documents/Departments/Clerks-Office/Ordinances-Resolutions/2026/2026-Resolutions/Resolution-No.-2026-05-Data-Center-High-Value-Target-Risk.pdf?t=202606301548230", "host": "files.ypsitownship.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://files.ypsitownship.org/Documents/Departments/Clerks-Office/Ordinances-Resolutions/2026/2026-Resolutions/Resolution-No.-2026-08-Data-Center-YCUA-Moratorium.pdf?t=202604161122310&t=202604161122310", "host": "files.ypsitownship.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 42.24691, "lng": -83.87461, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "named government source", "fields": {"partnership_facility_announcement_date": "2024-12-06", "proposed_facility_county": "Washtenaw,Michigan", "proposed_computing_centers": 2, "facility_funding_status_as_of_release": "not finalized"}, "notes": ["One proposed facility with two computing centers not automatically two physical buildings.15Mfiveyearresearchcontract is existing collaboration funding, not facility construction budget. Lab NewMexico footer not Michigan site address; specificYpsilantiTownship location not established in this release. No completion, MW or exact site.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.lanl.gov/media/news/1206-university-of-michigan-collaboration", "host": "lanl.gov", "date": "2024-12-06", "published": "2024-12-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 52", "scope": "The current original Township project account identifies the University of Michigan and Los Alamos planned research computing center at Bridge and Textile Roads and announces a later panel about that proposal. LANL original December 6, 2024 account describes a planned pair of computing centers. This supports a current listed proposal only. Township formal opposition and its separate request for a utility service pause do not establish final project denial, an enacted YCUA pause, physical closure or commissioned computing. The selected University FAQ returned HTTP 403 and was not used as evidence. No alternate identity or access route was used for that denied page.", "fields": {"current_stage_evidence": {"outcome": "current_original_named_research_proposal", "scope": "The current original Township project account identifies the University of Michigan and Los Alamos planned research computing center at Bridge and Textile Roads and announces a later panel about that proposal. LANL original December 6, 2024 account describes a planned pair of computing centers. This supports a current listed proposal only. Township formal opposition and its separate request for a utility service pause do not establish final project denial, an enacted YCUA pause, physical closure or commissioned computing. The selected University FAQ returned HTTP 403 and was not used as evidence. No alternate identity or access route was used for that denied page."}, "source_read_scope": {"township_current_project_and_new_panel_sections_read": true, "opposition_resolution_text_pages": [1, 2, 3, 4, 5, 6, 7, 8, 9, 10], "opposition_certification_visual_pages": [10], "utility_request_selected_text_pages": [1, 2, 3, 4, 5, 6, 7, 8, 9], "utility_request_certification_visual_pages": [9], "future_panel_not_accomplished": true, "university_403_body_not_adopted": true}}, "notes": ["The current original Township project account identifies the University of Michigan and Los Alamos planned research computing center at Bridge and Textile Roads and announces a later panel about that proposal. LANL original December 6, 2024 account describes a planned pair of computing centers. This supports a current listed proposal only. Township formal opposition and its separate request for a utility service pause do not establish final project denial, an enacted YCUA pause, physical closure or commissioned computing. The selected University FAQ returned HTTP 403 and was not used as evidence. No alternate identity or access route was used for that denied page.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://files.ypsitownship.org/government/boards___commissions/board_of_trustees/data_center_information.php", "host": "files.ypsitownship.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.lanl.gov/media/news/1206-university-of-michigan-collaboration", "host": "www.lanl.gov", "published": "2024-12-06", "date": "2024-12-06", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://files.ypsitownship.org/Documents/Departments/Clerks-Office/Ordinances-Resolutions/2026/2026-Resolutions/Resolution-No.-2026-05-Data-Center-High-Value-Target-Risk.pdf?t=202606301548230", "host": "files.ypsitownship.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://files.ypsitownship.org/Documents/Departments/Clerks-Office/Ordinances-Resolutions/2026/2026-Resolutions/Resolution-No.-2026-08-Data-Center-YCUA-Moratorium.pdf?t=202604161122310&t=202604161122310", "host": "files.ypsitownship.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Michigan · Ypsilanti · Washtenaw · Source context reviewed", "status_scope": "The current original Township project account identifies the University of Michigan and Los Alamos planned research computing center at Bridge and Textile Roads and announces a later panel about that proposal. LANL original December 6, 2024 account describes a planned pair of computing centers. This supports a current listed proposal only. Township formal opposition and its separate request for a utility service pause do not establish final project denial, an enacted YCUA pause, physical closure or commissioned computing. The selected University FAQ returned HTTP 403 and was not used as evidence. No alternate identity or access route was used for that denied page.", "event_evidence": [{"date": "2024-12-06", "text": "Los Alamos National Laboratory published its Michigan partnership announcement on December 6, 2024, describing a planned research computing development. This dates publication of the plan, not an executed building approval, physical start or current computing operation.", "kind": "announced", "sources": [{"url": "https://www.lanl.gov/media/news/1206-university-of-michigan-collaboration", "host": "www.lanl.gov", "published": "2024-12-06", "date": "2024-12-06", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2026-03-31", "text": "The certified Township Resolution 2026 05 records approval at the March 31, 2026 Special Meeting and formal opposition to siting the proposed Los Alamos facility. Its security and environmental justice allegations are attributed Board positions, not an independent threat classification, a court finding, permit denial or physical closure.", "kind": "announced", "sources": [{"url": "https://files.ypsitownship.org/Documents/Departments/Clerks-Office/Ordinances-Resolutions/2026/2026-Resolutions/Resolution-No.-2026-05-Data-Center-High-Value-Target-Risk.pdf?t=202606301548230", "host": "files.ypsitownship.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "26161"}, "state_name": "Michigan", "state_path": "/michigan/"}, {"id": "aaim-data-centers-hutchinson-mn", "state": "MN", "kind": "facility", "name": "AAIM Data Centers  -  Hutchinson (Minnesota 2 Energy Park)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": true, "type": "Crypto/HPC (inventory classification)", "counties": ["McLeod"], "city": "Hutchinson", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hutchinson city/utility FAQ,all five pages text reviewed. FAQ not underlying signed permit or PPA. Future expansion requires newCUP.20MWexpectedpeak not actual metered demand; no opening date. Document also usesMWperhour wording incorrectly, no energy calculation adopted. Utility-tariff and collateral descriptions not actual customer invoices or ratepayer-outcome measurement. UndatedJune2026file path not exact publication date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-08-26", "The City of Hutchinson FAQ reports that Council approved the named data center project final permits August 26, 2025. This dates the City administrative account, without independent certification of an issued building permit, physical construction or computing service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf", "host": "hutchinsonmn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.aaimdc.com/data-centers/minnesota-2/", "host": "www.aaimdc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1025+5th+Avenue+SE%2C+Hutchinson%2C+Minnesota&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Complete literal original street query, calculated range only"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-94.358715482445%2C44.88206728853755%2C-94.344768517555%2C44.891948711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Actually viewed source setting; imagery acquisition date unknown"}], "loc": {"lng": -94.351742, "lat": 44.887008, "precision": "address", "basis": "The original City of Hutchinson source names 1025 5th Avenue SE, Hutchinson, Minnesota. One complete literal Census query uniquely supports this calculated street reference. The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Hutchinson city/utility FAQ,all five pages text reviewed", "fields": {"published_address": "1025 FifthAvenueSE,Hutchinson,Minnesota", "city_reported_final_permit_approval_date": "2025-08-26", "city_reported_power_agreement_date": "2025-09-24", "developer_entity": "B-MNDataCentersInc,dbaAAIMDataCenters", "initial_building_area_sqft": 7500, "potential_expanded_area_sqft": 15000, "expected_peak_power_mw": 20, "power_basis": "expected customer load,not explicitly criticalIT", "expected_jobs_less_than": 5, "city_reported_local_financial_assistance": "none"}, "notes": ["FAQ not underlying signed permit or PPA. Future expansion requires newCUP.20MWexpectedpeak not actual metered demand; no opening date. Document also usesMWperhour wording incorrectly, no energy calculation adopted. Utility-tariff and collateral descriptions not actual customer invoices or ratepayer-outcome measurement. UndatedJune2026file path not exact publication date.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf", "host": "hutchinsonmn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 58", "scope": "The original City FAQ names the AAIM and BMN data center project and describes approved plans and future compliance, including analysis after the facility is running. It supports a named listed proposal within the City planning account. The original Minnesota 2 company page says its facility is in design and targeted for a future quarter but identifies only Minnesota rather than an exact City; that generic location is not newly certified as a precise crosswalk. The City account of final permits on August 26, 2025 does not independently certify an issued building permit, construction start or computing operation. A September power purchase agreement also does not prove service. Expected noise, water and utility behavior remain prospective institutional or issuer accounts, without new technical fields.", "fields": {"current_stage_evidence": {"outcome": "original_named_city_planning_account_not_compute", "scope": "The original City FAQ names the AAIM and BMN data center project and describes approved plans and future compliance, including analysis after the facility is running. It supports a named listed proposal within the City planning account. The original Minnesota 2 company page says its facility is in design and targeted for a future quarter but identifies only Minnesota rather than an exact City; that generic location is not newly certified as a precise crosswalk. The City account of final permits on August 26, 2025 does not independently certify an issued building permit, construction start or computing operation. A September power purchase agreement also does not prove service. Expected noise, water and utility behavior remain prospective institutional or issuer accounts, without new technical fields."}, "source_read_scope": {"city_faq_selected_text_pages": [1, 2, 3], "full_five_page_faq_not_claimed_read": true, "issuer_minnesota2_body_read": true, "issuer_exact_city_crosswalk_not_newly_certified": true, "prospective_compliance_not_observed_measurement": true, "future_expansion_requires_additional_permission": true, "file_path_month_not_publication_day": true, "utility_mw_per_hour_wording_not_normalized_or_exported": true}}, "notes": ["The original City FAQ names the AAIM and BMN data center project and describes approved plans and future compliance, including analysis after the facility is running. It supports a named listed proposal within the City planning account. The original Minnesota 2 company page says its facility is in design and targeted for a future quarter but identifies only Minnesota rather than an exact City; that generic location is not newly certified as a precise crosswalk. The City account of final permits on August 26, 2025 does not independently certify an issued building permit, construction start or computing operation. A September power purchase agreement also does not prove service. Expected noise, water and utility behavior remain prospective institutional or issuer accounts, without new technical fields.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf", "host": "hutchinsonmn.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.aaimdc.com/data-centers/minnesota-2/", "host": "www.aaimdc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 74, 2026-10-24", "scope": "The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.", "fields": {"location_review_decision": {"location": {"lng": -94.351742, "lat": 44.887008, "precision": "address", "basis": "The original City of Hutchinson source names 1025 5th Avenue SE, Hutchinson, Minnesota. One complete literal Census query uniquely supports this calculated street reference. The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "1025 5th Avenue SE, Hutchinson, Minnesota", "county_fips": ["27085"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.", "The inherited general area coordinate was not independently admitted as a reviewed source reference. The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. The complete literal query and its independently checked calculated reference are inside the unchanged retained county 27085. The measured correction from the prior Native context is 2.8 metres. This is a source reference review, not a physical relocation. No source setting pixel supplies coordinates or construction stage.", "The source setting shows a broad street bordered by substantial buildings, parking, open land, planted trees, water and residential blocks. The street reference selects no computing roof, room, present construction stage or complete campus. Acquisition date is unknown."], "sources": [{"url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf", "host": "hutchinsonmn.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Original explicit computing project location, separate from mail"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1025+5th+Avenue+SE%2C+Hutchinson%2C+Minnesota&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Complete literal original street query, calculated range only"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-94.358715482445%2C44.88206728853755%2C-94.344768517555%2C44.891948711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Actually viewed source setting; imagery acquisition date unknown"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Calculated street reference, not a roof or tenant floor", "summary": "Minnesota · Hutchinson · McLeod · Source context reviewed", "status_scope": "The original City FAQ names the AAIM and BMN data center project and describes approved plans and future compliance, including analysis after the facility is running. It supports a named listed proposal within the City planning account. The original Minnesota 2 company page says its facility is in design and targeted for a future quarter but identifies only Minnesota rather than an exact City; that generic location is not newly certified as a precise crosswalk. The City account of final permits on August 26, 2025 does not independently certify an issued building permit, construction start or computing operation. A September power purchase agreement also does not prove service. Expected noise, water and utility behavior remain prospective institutional or issuer accounts, without new technical fields.", "event_evidence": [{"date": "2025-08-26", "text": "The City of Hutchinson FAQ reports that Council approved the named data center project final permits August 26, 2025. This dates the City administrative account, without independent certification of an issued building permit, physical construction or computing service.", "kind": "approved", "sources": [{"url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf", "host": "hutchinsonmn.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "state_name": "Minnesota", "state_path": "/minnesota/"}, {"id": "archer-datacenter-faribault-mn", "state": "MN", "kind": "facility", "name": "Archer Datacenter Faribault", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Rice"], "city": "Faribault", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Faribault official project and review chronology. City reports no formal development applications or city financial-assistance requests yet, not no possible state exemption. Court ruling summarized by city, underlying order not independently read here. July7work session not signed resolution date. 2025negative EIS decision does not establish final 2026 environmental clearance. No MW adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.faribaultmn.gov/815/Archer-Datacenters", "host": "faribaultmn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 44.35423, "lng": -93.29673, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Faribault official project and review chronology", "fields": {"proposed_building_area_sqft_max": 500000, "site_acres_approx": 87, "proposed_buildings_max": 6, "land_purchase_month": "2024-11", "city_reported_court_environmental_review_order_date": "2026-06-08", "city_reported_supplemental_review_extension_resolution_date": "2026-07-14", "supplemental_review_deadline": "2027-03-31", "status": "proposed; supplemental environmental review"}, "notes": ["City reports no formal development applications or city financial-assistance requests yet, not no possible state exemption. Court ruling summarized by city, underlying order not independently read here. July7work session not signed resolution date. 2025negative EIS decision does not establish final 2026 environmental clearance. No MW adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.faribaultmn.gov/815/Archer-Datacenters", "host": "faribaultmn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 58", "scope": "The current original City Archer page explicitly describes a proposed development and states that no formal City applications have been submitted. This supports a listed proposal within the City review account. The City chronology records an August 12, 2025 environmental review determination and reports a June 8, 2026 appellate return for additional information or an impact statement, followed by a July 14 extension with supplemental review due March 31, 2027. The underlying court opinion was not independently read. None of those legal or review steps proves construction, operation, final approval or physical closure. The existing Native concern finding already covers this environmental review and appeal episode, so no duplicate concern is added.", "fields": {"current_stage_evidence": {"outcome": "original_city_explicit_proposal_no_formal_applications", "scope": "The current original City Archer page explicitly describes a proposed development and states that no formal City applications have been submitted. This supports a listed proposal within the City review account. The City chronology records an August 12, 2025 environmental review determination and reports a June 8, 2026 appellate return for additional information or an impact statement, followed by a July 14 extension with supplemental review due March 31, 2027. The underlying court opinion was not independently read. None of those legal or review steps proves construction, operation, final approval or physical closure. The existing Native concern finding already covers this environmental review and appeal episode, so no duplicate concern is added."}, "source_read_scope": {"original_city_current_intro_and_selected_environmental_chronology_read": true, "court_outcome_attributed_to_city_not_underlying_opinion": true, "supplemental_review_deadline_not_physical_schedule": true, "existing_concern_id": "concern:mn-faribault-environmental-review-appeal-record-2026", "existing_concern_not_duplicated": true}}, "notes": ["The current original City Archer page explicitly describes a proposed development and states that no formal City applications have been submitted. This supports a listed proposal within the City review account. The City chronology records an August 12, 2025 environmental review determination and reports a June 8, 2026 appellate return for additional information or an impact statement, followed by a July 14 extension with supplemental review due March 31, 2027. The underlying court opinion was not independently read. None of those legal or review steps proves construction, operation, final approval or physical closure. The existing Native concern finding already covers this environmental review and appeal episode, so no duplicate concern is added.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.faribaultmn.gov/815/Archer-Datacenters", "host": "www.faribaultmn.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Minnesota · Faribault · Rice · Source context reviewed", "status_scope": "The current original City Archer page explicitly describes a proposed development and states that no formal City applications have been submitted. This supports a listed proposal within the City review account. The City chronology records an August 12, 2025 environmental review determination and reports a June 8, 2026 appellate return for additional information or an impact statement, followed by a July 14 extension with supplemental review due March 31, 2027. The underlying court opinion was not independently read. None of those legal or review steps proves construction, operation, final approval or physical closure. The existing Native concern finding already covers this environmental review and appeal episode, so no duplicate concern is added.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "27131"}, "state_name": "Minnesota", "state_path": "/minnesota/"}, {"id": "cloudhq-msp-campus-chaska-mn", "state": "MN", "kind": "facility", "name": "CloudHQ MSP Campus (Chaska)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Carver"], "city": "Chaska", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chaska project review and design forecasts. No final site/plat approval or energization established. City local tax relief statement not all state/federal incentives. Water forecast not measured consumption. Undated six-month study estimate cannot produce exact completion date; proposed substation not site IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.chaskamn.gov/841/Cloud-HQ", "host": "chaskamn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 44.82064, "lng": -93.80225, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Chaska project review and design forecasts", "fields": {"published_address": "2007 Schoolmaster Drive, Chaska, Minnesota", "planned_area_sqft_approx": 1500000, "city_council_preliminary_approval_date": "2024-10-21", "city_council_conditional_use_approval_date": "2023-10-16", "current_city_reported_status": "final application not submitted; no final review timeline", "forecast_water_gallons_per_year": 14000000, "city_reported_local_tax_relief_status": "none applied for or offered"}, "notes": ["No final site/plat approval or energization established. City local tax relief statement not all state/federal incentives. Water forecast not measured consumption. Undated six-month study estimate cannot produce exact completion date; proposed substation not site IT MW.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.chaskamn.gov/841/Cloud-HQ", "host": "chaskamn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 58", "scope": "The current original City CloudHQ page labels the development proposed and describes preliminary approval in October 2024, with no final application and no timeline for final review. This supports a listed proposal within the City account. Environmental review, conditional use and preliminary planning steps do not establish construction or computing operation. A relative forecast about a power study is not converted to an exact future date. City technical assurances about planned noise, cooling and electricity remain prospective rather than measured facility performance.", "fields": {"current_stage_evidence": {"outcome": "original_city_proposed_no_final_application", "scope": "The current original City CloudHQ page labels the development proposed and describes preliminary approval in October 2024, with no final application and no timeline for final review. This supports a listed proposal within the City account. Environmental review, conditional use and preliminary planning steps do not establish construction or computing operation. A relative forecast about a power study is not converted to an exact future date. City technical assurances about planned noise, cooling and electricity remain prospective rather than measured facility performance."}, "source_read_scope": {"complete_city_project_main_body_read": true, "preliminary_approval_not_final_or_operation": true, "no_final_application_or_timeline_retained": true, "relative_power_study_estimate_not_exact_day": true, "no_technical_financial_export": true}}, "notes": ["The current original City CloudHQ page labels the development proposed and describes preliminary approval in October 2024, with no final application and no timeline for final review. This supports a listed proposal within the City account. Environmental review, conditional use and preliminary planning steps do not establish construction or computing operation. A relative forecast about a power study is not converted to an exact future date. City technical assurances about planned noise, cooling and electricity remain prospective rather than measured facility performance.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.chaskamn.gov/841/Cloud-HQ", "host": "www.chaskamn.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Minnesota · Chaska · Carver · Source context reviewed", "status_scope": "The current original City CloudHQ page labels the development proposed and describes preliminary approval in October 2024, with no final application and no timeline for final review. This supports a listed proposal within the City account. Environmental review, conditional use and preliminary planning steps do not establish construction or computing operation. A relative forecast about a power study is not converted to an exact future date. City technical assurances about planned noise, cooling and electricity remain prospective rather than measured facility performance.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "27019"}, "state_name": "Minnesota", "state_path": "/minnesota/"}, {"id": "tract-farmington-technology-park-mn", "state": "MN", "kind": "facility", "name": "Farmington Technology Park (Tract)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Dakota"], "city": "Farmington", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Farmington city planning chronology and qualified litigation update. City is a litigant; filed dismissals not independently read final court dismissal order. AUAR andpreliminarydevelopment approvals not specific operatingtenant or building occupancy. November13,2025no-specific-application statement not automatically refreshed toOctober14,2026. No currentMWorcapexadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-04-20", "The City Farmington chronology records April 20, 2026 Council approval of dividing the Technology Park final plat into two additions and of updated development contracts. This dates the recorded planning action, without proving an individual computing building permit, construction start or operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park", "host": "farmingtonmn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 44.66408, "lng": -93.1097, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Farmington city planning chronology and qualified litigation update", "fields": {"city_reported_litigation_update_date": "2026-09-16", "city_reported_litigation_status": "plaintiffs filed dismissals; final directions from court awaited", "published_case_number": "19HA-CV-25-992", "city_council_final_auar_adoption_date": "2024-11-04", "city_council_preliminary_pud_plat_approval_date": "2024-11-04"}, "notes": ["City is a litigant; filed dismissals not independently read final court dismissal order. AUAR andpreliminarydevelopment approvals not specific operatingtenant or building occupancy. November13,2025no-specific-application statement not automatically refreshed toOctober14,2026. No currentMWorcapexadopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park", "host": "farmingtonmn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 58", "scope": "The current original City Farmington Technology Park page identifies Tract and describes planning and development approvals while retaining the statement that no specific development application had been received in its November 2025 update. Its April 20, 2026 chronology records approval of dividing the final plat into two additions and updated development contracts. These are named development planning steps and support a listed proposal, without observed construction or computing service. The September 16, 2026 update reports plaintiffs filed dismissals that await final court directions. Those filings do not independently establish final judgments, resolution of concerns, construction authorization or physical computing closure.", "fields": {"current_stage_evidence": {"outcome": "original_named_development_planning_not_physical_service", "scope": "The current original City Farmington Technology Park page identifies Tract and describes planning and development approvals while retaining the statement that no specific development application had been received in its November 2025 update. Its April 20, 2026 chronology records approval of dividing the final plat into two additions and updated development contracts. These are named development planning steps and support a listed proposal, without observed construction or computing service. The September 16, 2026 update reports plaintiffs filed dismissals that await final court directions. Those filings do not independently establish final judgments, resolution of concerns, construction authorization or physical computing closure."}, "source_read_scope": {"original_city_current_updates_and_selected_project_chronology_read": true, "november2025_no_specific_application_statement_not_undated_current_claim": true, "plaintiff_filing_not_final_court_dismissal": true, "plat_and_development_contract_not_compute": true}}, "notes": ["The current original City Farmington Technology Park page identifies Tract and describes planning and development approvals while retaining the statement that no specific development application had been received in its November 2025 update. Its April 20, 2026 chronology records approval of dividing the final plat into two additions and updated development contracts. These are named development planning steps and support a listed proposal, without observed construction or computing service. The September 16, 2026 update reports plaintiffs filed dismissals that await final court directions. Those filings do not independently establish final judgments, resolution of concerns, construction authorization or physical computing closure.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park", "host": "www.farmingtonmn.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Minnesota · Farmington · Dakota · Source context reviewed", "status_scope": "The current original City Farmington Technology Park page identifies Tract and describes planning and development approvals while retaining the statement that no specific development application had been received in its November 2025 update. Its April 20, 2026 chronology records approval of dividing the final plat into two additions and updated development contracts. These are named development planning steps and support a listed proposal, without observed construction or computing service. The September 16, 2026 update reports plaintiffs filed dismissals that await final court directions. Those filings do not independently establish final judgments, resolution of concerns, construction authorization or physical computing closure.", "event_evidence": [{"date": "2026-04-20", "text": "The City Farmington chronology records April 20, 2026 Council approval of dividing the Technology Park final plat into two additions and of updated development contracts. This dates the recorded planning action, without proving an individual computing building permit, construction start or operation.", "kind": "approved", "sources": [{"url": "https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park", "host": "www.farmingtonmn.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "27037"}, "state_name": "Minnesota", "state_path": "/minnesota/"}, {"id": "google-hermantown-mn", "state": "MN", "kind": "project", "name": "Google Hermantown Data Center", "group": "proposed", "status": "Service agreement under review", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["St. Louis"], "city": "Hermantown", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Minnesota PUC named ESA index, no final order reviewed. Captured PUCpage says agreement under review, but passed comment deadline not a final decision. Generic statutory annual2to5Mfee is demand-dependent policy, not an awarded/paid site amount. Separate PineIsland EchoZone docket26-170 not Hermantown. No site MW from backup-generation permit thresholds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/", "host": "mn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 47.60297, "lng": -92.47061, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Minnesota PUC named ESA index, no final order reviewed", "fields": {"hermantown_service_applicant": "Harmony Group LLC,Alphabet/Google subsidiary", "hermantown_esa_filing_date": "2026-03-26", "hermantown_utility_docket": "26-159", "hermantown_comment_deadline": "2026-08-28"}, "notes": ["Captured PUCpage says agreement under review, but passed comment deadline not a final decision. Generic statutory annual2to5Mfee is demand-dependent policy, not an awarded/paid site amount. Separate PineIsland EchoZone docket26-170 not Hermantown. No site MW from backup-generation permit thresholds.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/", "host": "mn.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Pending-20261016", "scope": "Scoped Google regional identity and lifecycle review; existing approximate points, jurisdiction, legacy totals and opening fields are retained.", "fields": {"record_association_scope": "Explicit association of the existing named Google Hermantown, Minnesota research context with the primary named location. This does not resolve a parcel, building allocation or distinct physical-site census; inherited project-code aliases are retained rather than independently certified.", "electric_service_agreement_review": {"utility": "Minnesota Power", "named_counterparty": "Harmony Group, LLC", "reported_affiliation": "Alphabet/Google subsidiary, as identified by the PUC", "docket": "26-159", "filed_on": "2026-03-26", "status": "Under review on the cited PUC summary", "scope": "Public regulatory context only; no legal entity/ownership crosswalk or load figure is inferred."}, "current_status_basis": "The Minnesota PUC currently lists Minnesota Power/Harmony Group LLC’s Hermantown electric service agreement as under review, filed March26,2026. The regulator identifies the Google affiliation. A filed agreement is not PUC approval, a construction permit, an energized facility or commissioned power; the page’s elapsed comment deadline does not prove a decision."}, "notes": ["Partial record/field review only. No point movement, exact opening day, commissioned IT capacity, or whole-state freshness certification."], "sources": [{"url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/", "host": "mn.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Minnesota Public Utilities Commission reviewed primary source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Minnesota · Hermantown · St. Louis · Source context reviewed", "status_scope": "The Minnesota PUC currently lists Minnesota Power/Harmony Group LLC’s Hermantown electric service agreement as under review, filed March26,2026. The regulator identifies the Google affiliation. A filed agreement is not PUC approval, a construction permit, an energized facility or commissioned power; the page’s elapsed comment deadline does not prove a decision.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "27137"}, "state_name": "Minnesota", "state_path": "/minnesota/"}, {"id": "meta-rosemount-mn", "state": "MN", "kind": "facility", "name": "Meta Rosemount Data Center", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Dakota"], "city": "Rosemount", "address": "", "who": "Meta", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Announcement forecasts once completed; no exact opening or measured load.19thUSand23rdglobal are historical company fleet rankings, not current national counts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.atmeta.com/2024/03/hello-rosemount/", "host": "datacenters.atmeta.com", "date": "2024-03-14", "published": "2024-03-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://datacenters.atmeta.com/asset/rosemount-data-center-info-sheet/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 44.6401, "lng": -93.06238, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"planned_campus_area_sqft": 715000, "planned_investment_usd_min_exclusive": 800000000, "forecast_operational_jobs_approx": 100, "forecast_peak_construction_jobs_min_exclusive": 1000}, "notes": ["Announcement forecasts once completed; no exact opening or measured load.19thUSand23rdglobal are historical company fleet rankings, not current national counts.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.atmeta.com/2024/03/hello-rosemount/", "host": "datacenters.atmeta.com", "date": "2024-03-14", "published": "2024-03-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-listed development", "basis": "The current named operator factsheet describes this campus in future terms and gives operational employment only once completed.", "checked_on": "2026-10-16"}, "stage_review_limits": "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation."}, "notes": ["This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://datacenters.atmeta.com/asset/rosemount-data-center-info-sheet/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check61, October24,2026", "scope": "Meta identifies the Rosemount project in its March14,2024 announcement and links Mortenson construction information. Its future service, floor area, investment, staffing, renewable matching and certification descriptions are not adopted as verified outcomes. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.", "fields": {"company_association": {"name": "Meta", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Meta identifies the Rosemount project in its March14,2024 announcement and links Mortenson construction information. Its future service, floor area, investment, staffing, renewable matching and certification descriptions are not adopted as verified outcomes. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."}, "provider_role": "developer"}, "notes": ["Meta identifies the Rosemount project in its March14,2024 announcement and links Mortenson construction information. Its future service, floor area, investment, staffing, renewable matching and certification descriptions are not adopted as verified outcomes. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."], "sources": [{"url": "https://datacenters.atmeta.com/2024/03/hello-rosemount/", "host": "datacenters.atmeta.com", "published": "2024-03-14", "date": "2024-03-14", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Minnesota · Rosemount · Dakota · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet describes this campus in future terms and gives operational employment only once completed. This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "27037"}, "state_name": "Minnesota", "state_path": "/minnesota/"}, {"id": "aws-project-steamboat-warren-county-ms", "state": "MS", "kind": "facility", "name": "AWS Project Steamboat - Warren County Data Center Campus", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Warren"], "city": "Vicksburg", "address": "", "who": "Amazon", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AWS Mississippi statewide and county-specific investment scopes. 25B and2000jobs are Mississippi totals, not Warren-only. State totals include previously announced amounts; do not add25Bto its components. Canton2027recycled-water transition and83millionannualgallons are future other-campus plans. Renewable616MW is generation, not IT. Ratepayer/grid/water claims remain attributed forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-11-20", "The original Amazon Warren County release has publication metadata dated November 20, 2025 and announces plans for the campus. This is an issuer statement date rather than computing commissioning, installed capacity or an independently verified construction start."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers", "host": "aboutamazon.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment", "host": "www.aboutamazon.com", "published": "2025-11-20", "date": "2025-11-20", "checked": "2026-10-22", "label": "Company announced Warren County campus"}], "loc": {"lat": 32.35656, "lng": -90.85175, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "AWS Mississippi statewide and county-specific investment scopes", "fields": {"statewide_total_planned_investment_usd": 25000000000, "statewide_expected_jobs": 2000, "warren_previously_announced_planned_investment_usd": 3000000000, "additional_madison_planned_investment_usd": 11000000000, "hinds_planned_investment_usd": 1000000000, "hinds_reuse": "former Delphi manufacturing plant"}, "notes": ["25B and2000jobs are Mississippi totals, not Warren-only. State totals include previously announced amounts; do not add25Bto its components. Canton2027recycled-water transition and83millionannualgallons are future other-campus plans. Renewable616MW is generation, not IT. Ratepayer/grid/water claims remain attributed forecasts.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers", "host": "aboutamazon.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Company role source check, October 22, 2026", "scope": "Amazon identifies itself as the developer of a planned data center campus in Warren County. This supports the provider brand association for the existing county level research context. The source does not independently verify the legacy project code name, a parcel, legal ownership or current physical stage.", "fields": {"company_association": {"name": "Amazon", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Amazon identifies itself as the developer of a planned data center campus in Warren County. This supports the provider brand association for the existing county level research context. The source does not independently verify the legacy project code name, a parcel, legal ownership or current physical stage."}, "provider_role": "developer"}, "notes": ["Amazon identifies itself as the developer of a planned data center campus in Warren County. This supports the provider brand association for the existing county level research context. The source does not independently verify the legacy project code name, a parcel, legal ownership or current physical stage.", "Source retrieval and document metadata do not establish a physical milestone date."], "sources": [{"url": "https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment", "host": "www.aboutamazon.com", "published": "2025-11-20", "date": "2025-11-20", "checked": "2026-10-22", "label": "Company announced Warren County campus"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 75", "scope": "The complete original issuer Warren County release explicitly announces plans for a new computing campus, and its later statewide update retains that planned investment. This supports a company listed proposal at the county campus scope. Regional computing infrastructure, job training and an unrelated Rainier story link are not this campus computing commissioning. Announced future investment, employment and community fund amounts do not establish current physical construction, actual jobs or measured economic benefits. Original publication metadata dates the release November 20, 2025, distinct from its current capture.", "fields": {"current_stage_evidence": {"outcome": "issuer_named_warren_campus_proposal", "scope": "The complete original issuer Warren County release explicitly announces plans for a new computing campus, and its later statewide update retains that planned investment. This supports a company listed proposal at the county campus scope. Regional computing infrastructure, job training and an unrelated Rainier story link are not this campus computing commissioning. Announced future investment, employment and community fund amounts do not establish current physical construction, actual jobs or measured economic benefits. Original publication metadata dates the release November 20, 2025, distinct from its current capture."}, "source_read_scope": {"complete_original_warren_and_later_statewide_bodies_read": true, "original_jsonld_date_published20251120_read": true, "linked_rainier_story_not_warren_commissioning": true, "planned_investment_not_actual_operation_or_measured_benefit": true}}, "notes": ["The complete original issuer Warren County release explicitly announces plans for a new computing campus, and its later statewide update retains that planned investment. This supports a company listed proposal at the county campus scope. Regional computing infrastructure, job training and an unrelated Rainier story link are not this campus computing commissioning. Announced future investment, employment and community fund amounts do not establish current physical construction, actual jobs or measured economic benefits. Original publication metadata dates the release November 20, 2025, distinct from its current capture.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment", "host": "www.aboutamazon.com", "published": "2025-11-20", "date": "2025-11-20", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers", "host": "www.aboutamazon.com", "published": "2026-04-09", "date": "2026-04-09", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Mississippi · Vicksburg · Warren · Source context reviewed", "status_scope": "The complete original issuer Warren County release explicitly announces plans for a new computing campus, and its later statewide update retains that planned investment. This supports a company listed proposal at the county campus scope. Regional computing infrastructure, job training and an unrelated Rainier story link are not this campus computing commissioning. Announced future investment, employment and community fund amounts do not establish current physical construction, actual jobs or measured economic benefits. Original publication metadata dates the release November 20, 2025, distinct from its current capture.", "event_evidence": [{"date": "2025-11-20", "text": "The original Amazon Warren County release has publication metadata dated November 20, 2025 and announces plans for the campus. This is an issuer statement date rather than computing commissioning, installed capacity or an independently verified construction start.", "kind": "announced", "sources": [{"url": "https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment", "host": "www.aboutamazon.com", "published": "2025-11-20", "date": "2025-11-20", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "28149"}, "state_name": "Mississippi", "state_path": "/mississippi/"}, {"id": "compass-lauderdale-meridian-ms", "state": "MS", "kind": "facility", "name": "Compass Datacenters Lauderdale County Hyperscale Campus", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lauderdale"], "city": "Meridian", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 500MW utility supply, not explicit IT. Eight-year buildout not all operating. Thousands of jobs are unspecified direct/indirect total, not exact permanent onsite employment. Certification and tax exemption described prospectively, not actual dollar tax expenditure. Quoted4Msite grant not independently executed award reviewed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-01-09", "The original Mississippi Governor January 9, 2025 release announces the Meridian Compass campus and its future building program. This is an announcement date rather than computing operation, completed incentive certification or an accomplished building start."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/", "host": "governorreeves.ms.gov", "date": "2025-01-09", "published": "2025-01-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 32.41627, "lng": -88.67553, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "named government source", "fields": {"announcement_date": "2025-01-09", "planned_buildings": 8, "expected_construction_program_years": 8, "estimated_investment_at_occupancy_usd": 10000000000, "investment_basis": "campus plus future tenant information-technology equipment", "planned_utility_supply_mw_approx": 500, "announced_income_franchise_exemption_years": 10}, "notes": ["500MW utility supply, not explicit IT. Eight-year buildout not all operating. Thousands of jobs are unspecified direct/indirect total, not exact permanent onsite employment. Certification and tax exemption described prospectively, not actual dollar tax expenditure. Quoted4Msite grant not independently executed award reviewed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/", "host": "governorreeves.ms.gov", "date": "2025-01-09", "published": "2025-01-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 75", "scope": "The complete original Governor release identifies the proposed Meridian Compass campus and an eight year future building program. This supports an agency listed proposal. Incentive certification, site preparation assistance and a planned utility supply do not independently establish computing operation, completed buildings or current physical construction. Future tenant equipment is not all developer construction investment, and projected direct and indirect jobs are not actual operating employment. No installed power or exact opening is inferred.", "fields": {"current_stage_evidence": {"outcome": "state_named_meridian_compass_future_campus", "scope": "The complete original Governor release identifies the proposed Meridian Compass campus and an eight year future building program. This supports an agency listed proposal. Incentive certification, site preparation assistance and a planned utility supply do not independently establish computing operation, completed buildings or current physical construction. Future tenant equipment is not all developer construction investment, and projected direct and indirect jobs are not actual operating employment. No installed power or exact opening is inferred."}, "source_read_scope": {"complete_original_governor_release_body_read": true, "eight_year_future_program_not_all_built": true, "tax_certification_and_planned_power_not_operation": true, "no_investment_jobs_capacity_or_role_changes": true}}, "notes": ["The complete original Governor release identifies the proposed Meridian Compass campus and an eight year future building program. This supports an agency listed proposal. Incentive certification, site preparation assistance and a planned utility supply do not independently establish computing operation, completed buildings or current physical construction. Future tenant equipment is not all developer construction investment, and projected direct and indirect jobs are not actual operating employment. No installed power or exact opening is inferred.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/", "host": "governorreeves.ms.gov", "published": "2025-01-09", "date": "2025-01-09", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Mississippi · Meridian · Lauderdale · Source context reviewed", "status_scope": "The complete original Governor release identifies the proposed Meridian Compass campus and an eight year future building program. This supports an agency listed proposal. Incentive certification, site preparation assistance and a planned utility supply do not independently establish computing operation, completed buildings or current physical construction. Future tenant equipment is not all developer construction investment, and projected direct and indirect jobs are not actual operating employment. No installed power or exact opening is inferred.", "event_evidence": [{"date": "2025-01-09", "text": "The original Mississippi Governor January 9, 2025 release announces the Meridian Compass campus and its future building program. This is an announcement date rather than computing operation, completed incentive certification or an accomplished building start.", "kind": "announced", "sources": [{"url": "https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/", "host": "governorreeves.ms.gov", "published": "2025-01-09", "date": "2025-01-09", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "28075"}, "state_name": "Mississippi", "state_path": "/mississippi/"}, {"id": "crg-festus-data-center-mo", "state": "MO", "kind": "facility", "name": "Festus Data Center Campus", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Jefferson"], "city": "Festus", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-10-14", "The original Festus October 14, 2026 notice publishes a qualification based request for project communication, permit review and coordination assistance for the CRG computing proposal. This is a procurement notice rather than final computing permission, construction or operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.festusmo.gov/", "host": "festusmo.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.festusmo.gov/CivicAlerts.aspx?AID=235", "host": "www.festusmo.gov", "published": "2026-10-14", "date": "2026-10-14", "checked": "2026-10-17", "label": "Reviewed primary source"}, {"url": "https://www.festusmo.gov/m/newsflash/home/detail/235", "host": "www.festusmo.gov", "published": "2026-10-14", "date": "2026-10-14", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 38.261, "lng": -90.53768, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {}, "notes": ["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.festusmo.gov/", "host": "festusmo.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch1", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "unresolved", "scope": "Festus’s October 14, 2026 RFQ notice identifies CRG and an existing development agreement while seeking permit-review and coordination support. This supports an identified development context, not actual construction, full permit issuance or operation."}}, "notes": ["Festus’s October 14, 2026 RFQ notice identifies CRG and an existing development agreement while seeking permit-review and coordination support. This supports an identified development context, not actual construction, full permit issuance or operation."], "sources": [{"url": "https://www.festusmo.gov/CivicAlerts.aspx?AID=235", "host": "www.festusmo.gov", "published": "2026-10-14", "date": "2026-10-14", "checked": "2026-10-17", "label": "Reviewed primary source"}, {"url": "https://www.festusmo.gov/", "host": "www.festusmo.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed primary source"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 74", "scope": "The complete original City notice identifies its development agreement with CRG for a computing project and requests qualified assistance with public communication, permit review and coordination. This supports an agency listed proposal. The procurement does not independently establish completed construction permission, actual construction, commissioned computing or resolution of public concerns. The observed same host canonical redirect was followed without bypassing a denial. General October 26 City meetings do not independently establish computing consideration.", "fields": {"current_stage_evidence": {"outcome": "city_named_crg_project_and_permit_review_proposal", "scope": "The complete original City notice identifies its development agreement with CRG for a computing project and requests qualified assistance with public communication, permit review and coordination. This supports an agency listed proposal. The procurement does not independently establish completed construction permission, actual construction, commissioned computing or resolution of public concerns. The observed same host canonical redirect was followed without bypassing a denial. General October 26 City meetings do not independently establish computing consideration."}, "source_read_scope": {"complete_original_city_notice_body_read": true, "observed_same_host_canonical_redirect_only": true, "procurement_and_development_agreement_not_computing_operation": true, "generic_october26_meetings_not_computing_hearing": true}}, "notes": ["The complete original City notice identifies its development agreement with CRG for a computing project and requests qualified assistance with public communication, permit review and coordination. This supports an agency listed proposal. The procurement does not independently establish completed construction permission, actual construction, commissioned computing or resolution of public concerns. The observed same host canonical redirect was followed without bypassing a denial. General October 26 City meetings do not independently establish computing consideration.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.festusmo.gov/m/newsflash/home/detail/235", "host": "www.festusmo.gov", "published": "2026-10-14", "date": "2026-10-14", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Missouri · Festus · Jefferson · Source context reviewed", "status_scope": "The complete original City notice identifies its development agreement with CRG for a computing project and requests qualified assistance with public communication, permit review and coordination. This supports an agency listed proposal. The procurement does not independently establish completed construction permission, actual construction, commissioned computing or resolution of public concerns. The observed same host canonical redirect was followed without bypassing a denial. General October 26 City meetings do not independently establish computing consideration.", "event_evidence": [{"date": "2026-10-14", "text": "The original Festus October 14, 2026 notice publishes a qualification based request for project communication, permit review and coordination assistance for the CRG computing proposal. This is a procurement notice rather than final computing permission, construction or operation.", "kind": "announced", "sources": [{"url": "https://www.festusmo.gov/m/newsflash/home/detail/235", "host": "www.festusmo.gov", "published": "2026-10-14", "date": "2026-10-14", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "29099"}, "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "google-hunt-midwest-kc-northland-mo", "state": "MO", "kind": "project", "name": "Google Kansas City Data Center (Hunt Midwest Business Center)", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center development", "counties": ["Clay"], "city": "Kansas City", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The 400 MW statement concerns new-to-grid carbon-free electricity capacity associated with regional opportunity, not facility IT or utility service load. Excluded from site power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2024-03-20", "Hunt Midwest announced Google at Hunt Midwest Business Center and identified JE Dunn as construction partner. This is a project announcement, not a confirmed construction start, actual investment spend or opening."], ["2024-03-20", "The original Hunt Midwest March 20, 2024 release announces the Google proposal at Hunt Midwest Business Center. This is an announcement day rather than an exact construction start or computing opening, and current regional development wording does not commission the campus."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.google/locations/kansas-city-missouri/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/", "host": "huntmidwest.com", "published": "2024-03-20", "date": "2024-03-20", "checked": "2026-10-16", "label": "Original Hunt Midwest Google project announcement"}, {"url": "https://www.datacenters.google/kansas-city-missouri/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google Kansas City page: two facilities, unnamed campus allocation"}], "loc": {"lat": 39.31062, "lng": -94.42099, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"current_operator_location_listing": "Kansas City, Missouri"}, "notes": ["The 400 MW statement concerns new-to-grid carbon-free electricity capacity associated with regional opportunity, not facility IT or utility service load. Excluded from site power.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.google/locations/kansas-city-missouri/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Lea County and Kansas City identity and financing review October 16", "scope": "Source-specific exploration, planned-development identity or financing context. No precise point, physical-site census, site IT figure, actual construction, opening or realized incentive amount is established.", "fields": {"identity_bridge": "Hunt Midwest explicitly names Google and Hunt Midwest Business Center in its March 20, 2024 announcement. The existing record is retained; the first-party release is distinct from syndicated news on the same host.", "historical_announcement_scope": "The announcement describes a planned $1 billion Google project and names JE Dunn as construction partner. This is a historical announcement scope, not an actual cost, construction start, present physical stage or completed opening.", "current_regional_scope": "Google currently describes two Kansas City facilities in development, without mapping those facilities to Hunt Midwest and Project Mica. The Hunt Midwest identity bridge alone does not resolve that regional two-project allocation or present status.", "grid_scope": "The 400 MW Beavertail solar agreement concerns new grid generation. It is not Google campus IT load or a campus utility-service authorization.", "provider_roles": [{"name": "Google", "role": "planned operator"}], "location_scope": "The industrial park name and historical release are not a surveyed parcel. Inherited approximate point, address, municipality and county context remain unchanged."}, "notes": ["Separate a prospective project, a financing vote and actual physical construction. Follow each finding to its own sources.", "All existing location fields, jurisdictions, addresses, legacy quantities and opening dates remain unchanged."], "sources": [{"url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/", "host": "huntmidwest.com", "published": "2024-03-20", "date": "2024-03-20", "checked": "2026-10-16", "label": "Original Hunt Midwest Google project announcement"}, {"url": "https://www.datacenters.google/kansas-city-missouri/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google Kansas City page: two facilities, unnamed campus allocation"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 74", "scope": "The complete original current Google location body labels Kansas City In development and describes two facilities. The original Hunt Midwest release identifies the inherited Business Center campus proposal. Together these support company listed development, without independently assigning all regional facilities to this exact campus or certifying completed computing service. The earlier announcement, power purchase, career training and future benefits are not installed project capacity or operation. No additional campus, project role or current water and energy measurement is inferred.", "fields": {"current_stage_evidence": {"outcome": "current_google_development_and_named_campus_proposal", "scope": "The complete original current Google location body labels Kansas City In development and describes two facilities. The original Hunt Midwest release identifies the inherited Business Center campus proposal. Together these support company listed development, without independently assigning all regional facilities to this exact campus or certifying completed computing service. The earlier announcement, power purchase, career training and future benefits are not installed project capacity or operation. No additional campus, project role or current water and energy measurement is inferred."}, "source_read_scope": {"complete_original_google_location_and_hunt_release_bodies_read": true, "two_regional_facilities_not_merged_into_one_campus": true, "in_development_not_computing_operation": true, "no_power_purchase_capacity_or_role_changes": true}}, "notes": ["The complete original current Google location body labels Kansas City In development and describes two facilities. The original Hunt Midwest release identifies the inherited Business Center campus proposal. Together these support company listed development, without independently assigning all regional facilities to this exact campus or certifying completed computing service. The earlier announcement, power purchase, career training and future benefits are not installed project capacity or operation. No additional campus, project role or current water and energy measurement is inferred.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://datacenters.google/locations/kansas-city-missouri/", "host": "datacenters.google", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/", "host": "huntmidwest.com", "published": "2024-03-20", "date": "2024-03-20", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Missouri · Kansas City · Clay · Source context reviewed", "event_evidence": [{"date": "2024-03-20", "text": "Hunt Midwest announced Google at Hunt Midwest Business Center and identified JE Dunn as construction partner. This is a project announcement, not a confirmed construction start, actual investment spend or opening.", "kind": "announced", "sources": [{"url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/", "host": "huntmidwest.com", "published": "2024-03-20", "date": "2024-03-20", "checked": "2026-10-16", "label": "Original Hunt Midwest Google project announcement"}]}, {"date": "2024-03-20", "text": "The original Hunt Midwest March 20, 2024 release announces the Google proposal at Hunt Midwest Business Center. This is an announcement day rather than an exact construction start or computing opening, and current regional development wording does not commission the campus.", "kind": "announced", "sources": [{"url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/", "host": "huntmidwest.com", "published": "2024-03-20", "date": "2024-03-20", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "status_scope": "The complete original current Google location body labels Kansas City In development and describes two facilities. The original Hunt Midwest release identifies the inherited Business Center campus proposal. Together these support company listed development, without independently assigning all regional facilities to this exact campus or certifying completed computing service. The earlier announcement, power purchase, career training and future benefits are not installed project capacity or operation. No additional campus, project role or current water and energy measurement is inferred.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "29047"}, "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "google-spade-new-florence-mo", "state": "MO", "kind": "project", "name": "Google Project Spade Campus", "group": "proposed", "status": "Development announced", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Montgomery"], "city": "New Florence", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-05-20", "Missouri’s governor reported Google’s New Florence infrastructure/data-center investment announcement. Announced development and future jobs; exact construction-start, completion and opening dates are not established."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county", "host": "governor.mo.gov", "date": "2026-05-20", "published": "2026-05-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 38.95439, "lng": -91.48456, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"county": "Montgomery", "city": "New Florence", "announced_planned_infrastructure_investment_usd": 15000000000, "energy_impact_fund_usd": 20000000, "additional_power_generation_support_mw_lower_bound": 500}, "notes": ["State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county", "host": "governor.mo.gov", "date": "2026-05-20", "published": "2026-05-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Pending-20261016", "scope": "Scoped Google regional identity and lifecycle review; existing approximate points, jurisdiction, legacy totals and opening fields are retained.", "fields": {"record_association_scope": "Explicit association of the existing named Google New Florence, Missouri research context with the primary named location. This does not resolve a parcel, building allocation or distinct physical-site census; inherited project-code aliases are retained rather than independently certified.", "announced_investment_scope": "The governor announces a $15 billion New Florence infrastructure investment. Scope includes supporting infrastructure and programs; the amount is not normalized as installed data center value, current spending or a building-specific amount.", "planned_cooling_scope": "The governor says the future Montgomery County data center will use air cooling. Future design statement; no measured water total, permit limit or zero total water use is inferred.", "regional_generation_not_it_capacity": "The governor’s contracted new generation and additional Ameren capacity are grid-supply context. They are not New Florence IT load or commissioned data center capacity.", "current_status_basis": "Missouri’s governor reports Google’s May20,2026 New Florence infrastructure/data-center announcement. The published account describes planned facilities and future jobs; it supports an announced development, not a specific construction permit, completed building or operation. The inherited Spade project-code alias and approximate location remain unverified."}, "notes": ["Partial record/field review only. No point movement, exact opening day, commissioned IT capacity, or whole-state freshness certification."], "sources": [{"url": "https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county", "host": "governor.mo.gov", "published": "2026-05-20", "date": "2026-05-20", "checked": "2026-10-16", "label": "Office of the Governor of Missouri reviewed primary source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Missouri · New Florence · Montgomery · Source context reviewed", "status_scope": "Missouri’s governor reports Google’s May20,2026 New Florence infrastructure/data-center announcement. The published account describes planned facilities and future jobs; it supports an announced development, not a specific construction permit, completed building or operation. The inherited Spade project-code alias and approximate location remain unverified.", "event_evidence": [{"date": "2026-05-20", "text": "Missouri’s governor reported Google’s New Florence infrastructure/data-center investment announcement. Announced development and future jobs; exact construction-start, completion and opening dates are not established.", "kind": "announced", "sources": [{"url": "https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county", "host": "governor.mo.gov", "published": "2026-05-20", "date": "2026-05-20", "checked": "2026-10-16", "label": "Office of the Governor of Missouri reviewed primary source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "29139"}, "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "lambda-kansas-city-mo", "state": "MO", "kind": "facility", "name": "Lambda Kansas City AI Supercomputer", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Platte"], "city": "Kansas City", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-10-28", "The original Missouri and Lambda October 28, 2025 releases announce a proposed Kansas City factory conversion and forecast an early 2026 launch. This dates the proposal announcement without certifying the forecast was accomplished or particular computing equipment was installed."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city", "host": "ded.mo.gov", "date": "2025-10-28", "published": "2025-10-28", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo", "host": "lambda.ai", "published": "2025-10-28", "date": "2025-10-28", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 39.38017, "lng": -94.7737, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"historical_status": "planned conversion of unoccupied building", "existing_building_year": 2009, "initial_power_mw": 24, "initial_power_basis": "capacity, not independently defined as gross or critical IT", "future_power_mw_lower_bound": 100, "launch_target": "early 2026", "initial_phase_investment_usd_lower_bound": 500000000, "state_program_as_reported": "Data Center Sales Tax Exemption Program"}, "notes": ["Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city", "host": "ded.mo.gov", "date": "2025-10-28", "published": "2025-10-28", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 74", "scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted.", "fields": {"current_stage_evidence": {"outcome": "state_and_issuer_named_kansascity_conversion_proposal", "scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted."}, "source_read_scope": {"complete_original_state_and_issuer_release_bodies_read": true, "early2026_forecast_not_actual_launch": true, "incentive_not_operation": true, "no_gpu_tenant_capacity_or_role_changes": true}}, "notes": ["The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city", "host": "ded.mo.gov", "published": "2025-10-28", "date": "2025-10-28", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo", "host": "lambda.ai", "published": "2025-10-28", "date": "2025-10-28", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Missouri · Kansas City · Platte · Source context reviewed", "status_scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted.", "event_evidence": [{"date": "2025-10-28", "text": "The original Missouri and Lambda October 28, 2025 releases announce a proposed Kansas City factory conversion and forecast an early 2026 launch. This dates the proposal announcement without certifying the forecast was accomplished or particular computing equipment was installed.", "kind": "announced", "sources": [{"url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city", "host": "ded.mo.gov", "published": "2025-10-28", "date": "2025-10-28", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo", "host": "lambda.ai", "published": "2025-10-28", "date": "2025-10-28", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "29165"}, "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "metrobloks-liberty-mo", "state": "MO", "kind": "facility", "name": "Metrobloks Liberty Campus", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Clay"], "city": "Liberty", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Metrobloks Liberty proposed three-building campus. Up-to1.4Bfutureinvestmentnotactual.150MWcampusnotperbuilding. Hundredsotherjobsincludeconstruction/security/maintenance,notsameas30directfulltime. No exactparcel,RFSdateorapprovedpermitsread. Linkedstateannouncementnotadditionalindependentsourceunlessread. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-03-24", "The original Metrobloks March 24, 2026 release announces the Liberty computing campus proposal. This is the issuer announcement date rather than completed investment, construction, installed capacity or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri", "host": "metrobloks.com", "date": "2026-03-24", "published": "2026-03-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 39.33443, "lng": -94.40273, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Metrobloks Liberty proposed three-building campus", "fields": {"developer": "Metrobloks", "announcement_date": "2026-03-24", "locality": "Liberty, Missouri", "planned_investment_usd_max": 1400000000, "planned_campus_power_mw": 150, "power_basis": "power, not explicit critical IT", "planned_campus_sqft_approx": 568800, "planned_buildings": 3, "expected_fulltime_jobs_min_inclusive": 30}, "notes": ["Up-to1.4Bfutureinvestmentnotactual.150MWcampusnotperbuilding. Hundredsotherjobsincludeconstruction/security/maintenance,notsameas30directfulltime. No exactparcel,RFSdateorapprovedpermitsread. Linkedstateannouncementnotadditionalindependentsourceunlessread.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri", "host": "metrobloks.com", "date": "2026-03-24", "published": "2026-03-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 74", "scope": "The complete original issuer body announces plans for the Liberty campus. This supports a company listed proposal. Prospective investment, buildings, power, employment, tax revenue and low water claims are design or benefit expectations rather than accomplished construction, commissioned computing or measured community effects. No independently read current permission, installed capacity or exact first opening is inferred.", "fields": {"current_stage_evidence": {"outcome": "issuer_named_liberty_development_proposal", "scope": "The complete original issuer body announces plans for the Liberty campus. This supports a company listed proposal. Prospective investment, buildings, power, employment, tax revenue and low water claims are design or benefit expectations rather than accomplished construction, commissioned computing or measured community effects. No independently read current permission, installed capacity or exact first opening is inferred."}, "source_read_scope": {"complete_original_issuer_release_body_read": true, "future_investment_jobs_water_and_power_not_accomplished": true, "no_capacity_role_or_location_changes": true}}, "notes": ["The complete original issuer body announces plans for the Liberty campus. This supports a company listed proposal. Prospective investment, buildings, power, employment, tax revenue and low water claims are design or benefit expectations rather than accomplished construction, commissioned computing or measured community effects. No independently read current permission, installed capacity or exact first opening is inferred.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri", "host": "www.metrobloks.com", "published": "2026-03-24", "date": "2026-03-24", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Missouri · Liberty · Clay · Source context reviewed", "status_scope": "The complete original issuer body announces plans for the Liberty campus. This supports a company listed proposal. Prospective investment, buildings, power, employment, tax revenue and low water claims are design or benefit expectations rather than accomplished construction, commissioned computing or measured community effects. No independently read current permission, installed capacity or exact first opening is inferred.", "event_evidence": [{"date": "2026-03-24", "text": "The original Metrobloks March 24, 2026 release announces the Liberty computing campus proposal. This is the issuer announcement date rather than completed investment, construction, installed capacity or computing operation.", "kind": "announced", "sources": [{"url": "https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri", "host": "www.metrobloks.com", "published": "2026-03-24", "date": "2026-03-24", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "29047"}, "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "shenandoah-project-kestrel-kc-northland-mo", "state": "MO", "kind": "facility", "name": "Project Kestrel", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Platte"], "city": "Kansas City", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Port KC Kestrel source arithmetic and project-identity limits. Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-08-26", "The original Port KC August 26, 2025 release announces the planned Kestrel Northland campus and forecasts first phase construction in 2026. This is an announcement date without proof the future construction start, full buildout or computing operation occurred."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/", "host": "portkc.com", "date": "2025-08-26", "published": "2025-08-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 39.39301, "lng": -94.78771, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Port KC Kestrel source arithmetic and project-identity limits", "fields": {"agency": "Port KC", "project": "Project Kestrel", "announcement_date": "2025-08-26", "site": "KCI-29 industrial mega site, Kansas City, Missouri", "planned_site_acres": 379, "planned_hyperscale_buildings": 6, "planned_full_buildout_sqft_max": 1800000, "headline_projected_investment_usd": 100000000000, "expected_jobs_per_phase_approx": 50, "first_phase_construction_target_year": 2026, "forecast_new_tax_revenue_over_bond_term_usd_min_exclusive": 110000000, "stated_workforce_fee_usd_per_sqft": 0.25, "stated_workforce_forecast_usd": 15750000}, "notes": ["Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/", "host": "portkc.com", "date": "2025-08-26", "published": "2025-08-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 74", "scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance.", "fields": {"current_stage_evidence": {"outcome": "public_port_named_kestrel_campus_proposal", "scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance."}, "source_read_scope": {"complete_original_public_port_release_body_read": true, "forecast2026_construction_not_accomplished": true, "unnamed_end_user_not_inferred": true, "no_jobs_tax_water_energy_or_capacity_fields_changed": true}}, "notes": ["The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/", "host": "portkc.com", "published": "2025-08-26", "date": "2025-08-26", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Missouri · Kansas City · Platte · Source context reviewed", "status_scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance.", "event_evidence": [{"date": "2025-08-26", "text": "The original Port KC August 26, 2025 release announces the planned Kestrel Northland campus and forecasts first phase construction in 2026. This is an announcement date without proof the future construction start, full buildout or computing operation occurred.", "kind": "announced", "sources": [{"url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/", "host": "portkc.com", "published": "2025-08-26", "date": "2025-08-26", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "29165"}, "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "tierpoint-st-louis-locust-mo", "state": "MO", "kind": "facility", "name": "TierPoint St. Louis - Locust", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["St. Louis city"], "city": "Saint Louis", "address": "", "who": "TierPoint", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/", "host": "tierpoint.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2300+Locust+Street%2C+St.+Louis%2C+MO+63103&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Calculated Census street range and county context"}, {"url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Census address range method and limits"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-90.21623955265295%2C38.63059811374853%2C-90.20818968429504%2C38.63688629197347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Viewed aerial setting only, acquisition date unknown"}], "loc": {"lng": -90.212214618474, "lat": 38.633742202861, "precision": "approximate", "basis": "Approximate planned facility area based on the published TierPoint service address 2300 Locust Street, St. Louis, MO 63103 and one Census street range inside the existing county. This is not a surveyed roof, confirmed parcel, full campus or ownership finding. Existing native status remains proposed."}, "reviewed_evidence": [{"overlay": "operator-specifications-round3-2026-10-14.json", "scope": "Field or source context only", "fields": {"gross_area_sqft": 135840, "gross_area_is_lower_bound": true, "raised_floor_sqft": 22640, "raised_floor_is_lower_bound": false, "raised_floor_basis": "phase 1", "expansion_area_sqft": 45000, "backup_generator_configuration_source_statement": "Four 2.0 MW redundant generators", "current_operator_listing": "Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."}, "notes": ["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/", "host": "tierpoint.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "TierPoint describes its St. Louis Locust facility as currently under development. This supports an operator-listed development plan, not verified construction, opening, energized capacity or operation.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "TierPoint describes its St. Louis Locust facility as currently under development. This supports an operator-listed development plan, not verified construction, opening, energized capacity or operation."}}, "notes": ["Named main-body introduction, current product-availability passage and physical-location block. Promotional guarantees, technical totals and certifications were not adopted."], "sources": [{"url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/", "host": "www.tierpoint.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 06, October 23, 2026", "scope": "TierPoint describes the named St. Louis Locust facility as under development on its own page. Developer is the attributed provider brand role. This source does not establish current operation, completion, a legal property owner or the stage of any other St. Louis facility. No status, location, physical date, technical figure or environmental outcome is promoted.", "fields": {"company_association": {"name": "TierPoint", "role": "developer", "identity_scope": "provider_brand_only", "scope": "TierPoint describes the named St. Louis Locust facility as under development on its own page. Developer is the attributed provider brand role. This source does not establish current operation, completion, a legal property owner or the stage of any other St. Louis facility. No status, location, physical date, technical figure or environmental outcome is promoted."}, "provider_role": "developer"}, "notes": ["TierPoint describes the named St. Louis Locust facility as under development on its own page. Developer is the attributed provider brand role. This source does not establish current operation, completion, a legal property owner or the stage of any other St. Louis facility. No status, location, physical date, technical figure or environmental outcome is promoted.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/", "host": "www.tierpoint.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party named facility page, reviewed named service or development context"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 22, October 23, 2026", "scope": "Named operator service street reference only. Existing native status remains proposed. Protected facts and canonical address remain exact.", "fields": {"location_review_decision": {"location": {"lng": -90.212214618474, "lat": 38.633742202861, "precision": "approximate", "basis": "Approximate planned facility area based on the published TierPoint service address 2300 Locust Street, St. Louis, MO 63103 and one Census street range inside the existing county. This is not a surveyed roof, confirmed parcel, full campus or ownership finding. Existing native status remains proposed."}, "reference_method": "Census interpolated street address", "published_address": "2300 Locust Street, St. Louis, MO 63103", "county_fips": ["29510"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["The named official numeric facility section binds this one service street to the existing research record. Company offices, related facility cards, embedded map coordinates and source quantities remain excluded.", "The unique Census street range agrees with the existing county and retained display polygon. The calculated reference does not establish a surveyed roof, parcel, tenant, suite, floor, full campus, legal title or current operation.", "The canonical address remains blank. All status, physical date, quantity, role, identity and jurisdiction wrappers remain exact. Existing native status remains proposed.", "The existing record remains proposed. This service street identifies only an approximate planned facility area. No parcel, operating building or solid project site point is certified. The current operator marketing does not change stage, roles, quantity or opening dates."], "sources": [{"url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/", "host": "www.tierpoint.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Official named St. Louis Locust facility street section"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2300+Locust+Street%2C+St.+Louis%2C+MO+63103&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Calculated Census street range and county context"}, {"url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Census address range method and limits"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-90.21623955265295%2C38.63059811374853%2C-90.20818968429504%2C38.63688629197347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Viewed aerial setting only, acquisition date unknown"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate planned facility area, not a confirmed parcel", "summary": "Missouri · Saint Louis · St. Louis city · Source context reviewed", "status_scope": "TierPoint describes its St. Louis Locust facility as currently under development. This supports an operator-listed development plan, not verified construction, opening, energized capacity or operation.", "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "quantica-bsdi-billings-mt", "state": "MT", "kind": "facility", "name": "Big Sky Digital Infrastructure Campus", "group": "proposed", "status": "Operator-listed plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Yellowstone"], "city": "Billings", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Quantica undisclosed laborMOU and divergent power horizons. MOU text not supplied to reporter, no guaranteedjobcount/unionfraction adopted. Laborframework not signed constructionpermit, interconnection or financingclose.1.1GWnearand7GWpossiblelongterm not8.1GWcurrent. ExactBillingsmunicipal/parcelmatchnotproven; report locates outsideBroadview30milesnorth. Publicenvironmentalconcerns not actualharmfindings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-10-29", "Scheduled event: Montana DEQ lists October 29, 2026 as the public-comment deadline for the proposed Big Sky Campus well and associated environmental review. This is not a hearing, an approval or proof of construction."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://montanafreepress.org/2026/06/17/agreement-between-data-center-developer-and-union-federation-thin-on-details/", "host": "montanafreepress.org", "date": "2026-06-17", "published": "2026-06-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://bigskydigitalinfra.com/", "host": "bigskydigitalinfra.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}, {"url": "https://deq.mt.gov/News/pressrelease-folder/Big-Sky-Campus-well-09-29-2026", "host": "deq.mt.gov", "published": "2026-09-29", "date": "2026-09-29", "checked": "2026-10-16", "label": "Reviewed government evidence"}], "loc": {"lat": 45.97264, "lng": -108.31248, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round13-2026-10-14.json", "scope": "Quantica undisclosed laborMOU and divergent power horizons", "fields": {"developer": "Quantica Infrastructure", "project": "BigSkyCampus nearBroadview, Montana", "reported_planned_site_acres_approx": 5000, "reported_buildings_range": [12, 16], "reported_each_building_sqft_range": [200000, 300000], "near_term_expected_power_mw": 1100, "longterm_possible_power_mw": 7000, "power_basis": "developer expected/potential power, not explicit critical IT or energized", "reported_agreement_type": "MOUwithSoutheasternMontanaBuildingandConstructionTradesCouncil", "source_update_date": "2026-06-18"}, "notes": ["MOU text not supplied to reporter, no guaranteedjobcount/unionfraction adopted. Laborframework not signed constructionpermit, interconnection or financingclose.1.1GWnearand7GWpossiblelongterm not8.1GWcurrent. ExactBillingsmunicipal/parcelmatchnotproven; report locates outsideBroadview30milesnorth. Publicenvironmentalconcerns not actualharmfindings.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://montanafreepress.org/2026/06/17/agreement-between-data-center-developer-and-union-federation-thin-on-details/", "host": "montanafreepress.org", "date": "2026-06-17", "published": "2026-06-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-listed plan", "basis": "The current Big Sky developer page lists first-phase construction as planned in 2026. Montana DEQ’s September 29, 2026 notice describes a proposed well and public comment through October 29.", "checked_on": "2026-10-16"}, "stage_review_limits": "A planned construction year and pending well review do not establish physical construction, approved water use or operation. The Broadview office footer address is not promoted to the campus. Water forecasts and power horizons remain separate from actual use."}, "notes": ["A planned construction year and pending well review do not establish physical construction, approved water use or operation. The Broadview office footer address is not promoted to the campus. Water forecasts and power horizons remain separate from actual use.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://bigskydigitalinfra.com/", "host": "bigskydigitalinfra.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}, {"url": "https://deq.mt.gov/News/pressrelease-folder/Big-Sky-Campus-well-09-29-2026", "host": "deq.mt.gov", "published": "2026-09-29", "date": "2026-09-29", "checked": "2026-10-16", "label": "Reviewed government evidence"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Montana · Billings · Yellowstone · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current Big Sky developer page lists first-phase construction as planned in 2026. Montana DEQ’s September 29, 2026 notice describes a proposed well and public comment through October 29. A planned construction year and pending well review do not establish physical construction, approved water use or operation. The Broadview office footer address is not promoted to the campus. Water forecasts and power horizons remain separate from actual use.", "event_evidence": [{"date": "2026-10-29", "text": "Scheduled event: Montana DEQ lists October 29, 2026 as the public-comment deadline for the proposed Big Sky Campus well and associated environmental review. This is not a hearing, an approval or proof of construction.", "kind": "scheduled_event", "sources": [{"url": "https://deq.mt.gov/News/pressrelease-folder/Big-Sky-Campus-well-09-29-2026", "host": "deq.mt.gov", "published": "2026-09-29", "date": "2026-09-29", "checked": "2026-10-16", "label": "Reviewed government evidence"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "30111"}, "state_name": "Montana", "state_path": "/montana/"}, {"id": "clop-omaha-papillion-ne", "state": "NE", "kind": "facility", "name": "CLOP Omaha NE Data Center (5 MW)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Sarpy"], "city": "Papillion", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical state air-construction permit notice. Proposed construction permit notice, not issued permit or operating proof in2026. Seven engines not seven new data centers. No current consumed MW or investment adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://dwee.nebraska.gov/node/5401", "host": "dwee.nebraska.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://dwee.nebraska.gov/news-events/public-notices/clop-omaha-ne-llc", "host": "dwee.nebraska.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 41.1131, "lng": -96.1117, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "historical state air-construction permit notice", "fields": {"proposed_power_mw": 5, "power_basis": "data center power, not explicitly IT", "published_address": "11684 S158th Street, Papillion, Sarpy County, Nebraska68138", "air_facility_id": "122487", "proposed_emergency_diesel_generators": 7, "historical_comment_start": "2025-10-06", "historical_comment_end": "2025-11-07"}, "notes": ["Proposed construction permit notice, not issued permit or operating proof in2026. Seven engines not seven new data centers. No current consumed MW or investment adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://dwee.nebraska.gov/node/5401", "host": "dwee.nebraska.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 73", "scope": "The complete original State public notice identifies a proposed CLOP computing facility in Papillion and a proposed air construction permit. This supports an agency listed proposal at the notice scope. The comment window is October 6 through November 7, 2025. The notice does not independently establish issuance of the final permit, completed construction or computing service. Its generator and emissions estimates are prospective permit descriptions, not installed equipment or measured pollution. A possible hearing upon petition is not a granted hearing or a new future event.", "fields": {"current_stage_evidence": {"outcome": "agency_named_clop_proposed_permit_account", "scope": "The complete original State public notice identifies a proposed CLOP computing facility in Papillion and a proposed air construction permit. This supports an agency listed proposal at the notice scope. The comment window is October 6 through November 7, 2025. The notice does not independently establish issuance of the final permit, completed construction or computing service. Its generator and emissions estimates are prospective permit descriptions, not installed equipment or measured pollution. A possible hearing upon petition is not a granted hearing or a new future event."}, "source_read_scope": {"complete_original_state_notice_body_read": true, "observed_exact_301_canonical_redirect_only": true, "proposed_permit_not_issued_permission_or_operation": true, "historical_comment_window_not_new_future_hearing": true, "no_c4_quantity_or_air_measurement_adopted": true}}, "notes": ["The complete original State public notice identifies a proposed CLOP computing facility in Papillion and a proposed air construction permit. This supports an agency listed proposal at the notice scope. The comment window is October 6 through November 7, 2025. The notice does not independently establish issuance of the final permit, completed construction or computing service. Its generator and emissions estimates are prospective permit descriptions, not installed equipment or measured pollution. A possible hearing upon petition is not a granted hearing or a new future event.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://dwee.nebraska.gov/news-events/public-notices/clop-omaha-ne-llc", "host": "dwee.nebraska.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Nebraska · Papillion · Sarpy · Source context reviewed", "status_scope": "The complete original State public notice identifies a proposed CLOP computing facility in Papillion and a proposed air construction permit. This supports an agency listed proposal at the notice scope. The comment window is October 6 through November 7, 2025. The notice does not independently establish issuance of the final permit, completed construction or computing service. Its generator and emissions estimates are prospective permit descriptions, not installed equipment or measured pollution. A possible hearing upon petition is not a granted hearing or a new future event.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "31153"}, "state_name": "Nebraska", "state_path": "/nebraska/"}, {"id": "crusoe-monolith-hallam-lancaster-ne", "state": "NE", "kind": "facility", "name": "Crusoe Hallam Data Center (Monolith Olive Creek campus)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lancaster"], "city": "Hallam", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No construction date released. Original approval conditions and power basis not reviewed; public reaction is not unanimous support. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-08-19", "The original Hallam August 19, 2026 Planning Commission minutes record a unanimous pause to obtain further information and the discussed sound study. This is a procedural action rather than a general enacted Village moratorium or a final computing permit decision."], ["2026-09-16", "The original Hallam September 16, 2026 Planning Commission minutes record four members supporting a recommendation on the revised computing application to the Board. A recommendation is separate from a completed final Board permit vote or computing construction."], ["2026-09-14", "The original Hallam September 14, 2026 Board minutes record all five trustees voting to table a resident proposal for a single facility limit until further planning information and the October Board meeting. This is postponement rather than enactment of a Village computing ban or numerical limit."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wowt.com/2026/10/06/hallam-village-board-approves-zoning-rights-data-center/", "host": "wowt.com", "date": "2026-10-05", "published": "2026-10-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/8-19-26-Planning-Commision-minutes.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-16-2026-Planning-Commision-minutes.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-14-26-minutes.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/October-Agenda-2026-R.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 40.7993, "lng": -96.70435, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round24-2026-10-14.json", "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.", "fields": {"reported_context": "KOLN report carried by WOWT says Hallam board approved zoning rights Monday following July special-permit step with Monolith.", "independently_verified_current_operating_status": null}, "notes": ["No construction date released. Original approval conditions and power basis not reviewed; public reaction is not unanimous support.", "Subsequent original decisions and current operator disclosures take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wowt.com/2026/10/06/hallam-village-board-approves-zoning-rights-data-center/", "host": "wowt.com", "date": "2026-10-05", "published": "2026-10-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 73", "scope": "Selected original Village minutes and the complete October 5 agenda explicitly identify the proposed Monolith and Crusoe computing project at the existing Olive Creek property. This supports an agency listed proposal. August 19 minutes record a pause for further information; September 16 minutes record a four member recommendation to the Board; September 14 Board minutes table a separate resident proposal to limit facilities. These are distinct actions. The October 5 agenda is planned consideration, without an independently read completed October decision. Neither recommendation nor an agenda establishes current construction or service. Private resident names and addresses are omitted from research prose, and projected noise, water and financial benefits remain attributed claims.", "fields": {"current_stage_evidence": {"outcome": "village_named_olive_creek_proposal_recommendation_not_final_vote", "scope": "Selected original Village minutes and the complete October 5 agenda explicitly identify the proposed Monolith and Crusoe computing project at the existing Olive Creek property. This supports an agency listed proposal. August 19 minutes record a pause for further information; September 16 minutes record a four member recommendation to the Board; September 14 Board minutes table a separate resident proposal to limit facilities. These are distinct actions. The October 5 agenda is planned consideration, without an independently read completed October decision. Neither recommendation nor an agenda establishes current construction or service. Private resident names and addresses are omitted from research prose, and projected noise, water and financial benefits remain attributed claims."}, "source_read_scope": {"original_august_minutes_selected_physical_pages1_3_4_5_6_14_16_21_read": true, "original_september_planning_minutes_selected_physical_pages1_4_5_read": true, "original_september_board_selected_resolution_and_vote_passages_read": true, "complete_original_october_agenda_text_read": true, "no_unread_october_vote_or_current_operation_adopted": true, "private_resident_names_and_addresses_omitted": true}}, "notes": ["Selected original Village minutes and the complete October 5 agenda explicitly identify the proposed Monolith and Crusoe computing project at the existing Olive Creek property. This supports an agency listed proposal. August 19 minutes record a pause for further information; September 16 minutes record a four member recommendation to the Board; September 14 Board minutes table a separate resident proposal to limit facilities. These are distinct actions. The October 5 agenda is planned consideration, without an independently read completed October decision. Neither recommendation nor an agenda establishes current construction or service. Private resident names and addresses are omitted from research prose, and projected noise, water and financial benefits remain attributed claims.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/8-19-26-Planning-Commision-minutes.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-16-2026-Planning-Commision-minutes.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-14-26-minutes.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/October-Agenda-2026-R.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Nebraska · Hallam · Lancaster · Source context reviewed", "status_scope": "Selected original Village minutes and the complete October 5 agenda explicitly identify the proposed Monolith and Crusoe computing project at the existing Olive Creek property. This supports an agency listed proposal. August 19 minutes record a pause for further information; September 16 minutes record a four member recommendation to the Board; September 14 Board minutes table a separate resident proposal to limit facilities. These are distinct actions. The October 5 agenda is planned consideration, without an independently read completed October decision. Neither recommendation nor an agenda establishes current construction or service. Private resident names and addresses are omitted from research prose, and projected noise, water and financial benefits remain attributed claims.", "event_evidence": [{"date": "2026-08-19", "text": "The original Hallam August 19, 2026 Planning Commission minutes record a unanimous pause to obtain further information and the discussed sound study. This is a procedural action rather than a general enacted Village moratorium or a final computing permit decision.", "kind": "announced", "sources": [{"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/8-19-26-Planning-Commision-minutes.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}]}, {"date": "2026-09-16", "text": "The original Hallam September 16, 2026 Planning Commission minutes record four members supporting a recommendation on the revised computing application to the Board. A recommendation is separate from a completed final Board permit vote or computing construction.", "kind": "announced", "sources": [{"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-16-2026-Planning-Commision-minutes.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}]}, {"date": "2026-09-14", "text": "The original Hallam September 14, 2026 Board minutes record all five trustees voting to table a resident proposal for a single facility limit until further planning information and the October Board meeting. This is postponement rather than enactment of a Village computing ban or numerical limit.", "kind": "announced", "sources": [{"url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-14-26-minutes.pdf", "host": "villageofhallamnebraska.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "31109"}, "state_name": "Nebraska", "state_path": "/nebraska/"}, {"id": "starwood-project-horizon-kearney-ne", "state": "NE", "kind": "facility", "name": "Project Horizon (Tech oNE Crossing)", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Buffalo"], "city": "Kearney", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Starwood/Project Horizon identity is not named in this source and needs crosswalk before adopting developer identity. Proposed 368 MW is ultimate campus electrical demand, not additional to reused 100 MW, critical IT or current load. Council vote was future later September 8 in this account; no outcome assumed. First phase late 2027/full 2030 are forecasts. August zoning ordinance/report’s 55 dB average needs original measurement/time/scope definitions; code adoption is not site CUP. Small separate 5 MW proposal is not this campus. No end-user identity known. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wowt.com/2026/09/08/kearney-poised-go-all-data-centers-even-many-nebraska-towns-throttle-back/", "host": "wowt.com", "date": "2026-09-08", "published": "2026-09-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.projecthorizonkearney.com/", "host": "www.projecthorizonkearney.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 40.82718, "lng": -99.07269, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round33-2026-10-14.json", "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.", "fields": {"reported_context": "Flatwater Free Press reporting republished by WOWT describes Worldwide Mission Critical’s Tech One Crossing proposal to replace a 100 MW Marathon bitcoin mine with eventual 368 MW development under Kearney’s new code.", "independently_verified_current_operating_status": null, "developer_identity_from_this_source": "Worldwide Mission Critical; Starwood not named here", "reported_ultimate_electrical_mw": 368, "critical_it_mw": null, "reported_retired_mining_power_reuse_mw": 100}, "notes": ["Starwood/Project Horizon identity is not named in this source and needs crosswalk before adopting developer identity. Proposed 368 MW is ultimate campus electrical demand, not additional to reused 100 MW, critical IT or current load. Council vote was future later September 8 in this account; no outcome assumed. First phase late 2027/full 2030 are forecasts. August zoning ordinance/report’s 55 dB average needs original measurement/time/scope definitions; code adoption is not site CUP. Small separate 5 MW proposal is not this campus. No end-user identity known.", "Later original decisions and observed outcomes take precedence; future events have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wowt.com/2026/09/08/kearney-poised-go-all-data-centers-even-many-nebraska-towns-throttle-back/", "host": "wowt.com", "date": "2026-09-08", "published": "2026-09-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 73", "scope": "The complete original project body identifies Project Horizon as a proposed campus at Tech oNE Crossing in Buffalo County. This supports a company listed proposal at the inherited campus scope. Claims about existing adjacent mining power, future phases, planned certification, water savings, noise, rates, jobs and tax revenue are attributed design and future benefit assertions, not commissioned campus capacity or measured outcomes. The page is not independently read City approval or proof that the adjacent mine and proposed campus are the same facility. No organization role, quantity or location is changed.", "fields": {"current_stage_evidence": {"outcome": "project_original_named_horizon_proposal", "scope": "The complete original project body identifies Project Horizon as a proposed campus at Tech oNE Crossing in Buffalo County. This supports a company listed proposal at the inherited campus scope. Claims about existing adjacent mining power, future phases, planned certification, water savings, noise, rates, jobs and tax revenue are attributed design and future benefit assertions, not commissioned campus capacity or measured outcomes. The page is not independently read City approval or proof that the adjacent mine and proposed campus are the same facility. No organization role, quantity or location is changed."}, "source_read_scope": {"complete_original_current_project_body_read": true, "adjacent_existing_mining_not_proposed_campus_operation": true, "no_independent_legal_approval_or_measured_environmental_benefit": true, "no_capacity_role_or_location_changes": true, "no_contact_form_submission": true}}, "notes": ["The complete original project body identifies Project Horizon as a proposed campus at Tech oNE Crossing in Buffalo County. This supports a company listed proposal at the inherited campus scope. Claims about existing adjacent mining power, future phases, planned certification, water savings, noise, rates, jobs and tax revenue are attributed design and future benefit assertions, not commissioned campus capacity or measured outcomes. The page is not independently read City approval or proof that the adjacent mine and proposed campus are the same facility. No organization role, quantity or location is changed.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.projecthorizonkearney.com/", "host": "www.projecthorizonkearney.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Nebraska · Kearney · Buffalo · Source context reviewed", "status_scope": "The complete original project body identifies Project Horizon as a proposed campus at Tech oNE Crossing in Buffalo County. This supports a company listed proposal at the inherited campus scope. Claims about existing adjacent mining power, future phases, planned certification, water savings, noise, rates, jobs and tax revenue are attributed design and future benefit assertions, not commissioned campus capacity or measured outcomes. The page is not independently read City approval or proof that the adjacent mine and proposed campus are the same facility. No organization role, quantity or location is changed.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "31019"}, "state_name": "Nebraska", "state_path": "/nebraska/"}, {"id": "sequitor-edge-kearney-ne", "state": "NE", "kind": "facility", "name": "Sequitor Edge Kearney Data Center", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Buffalo"], "city": "Kearney", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Sequitor Kearney proposed site, land sale and LOIs. Approvedlandsaleoperatoraccountnotreadcitysignedcontract/deed. NotallDCpermitsorenergization. NonbindingLOIsnotexecutedleases.40kplannednotcurrentoperatingfloor. No numericITMWoractualcurrentheadcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-09-19", "The original Sequitor Edge September 19, 2025 release announces its Kearney development proposal and reports parcel sale approval. This is the issuer publication day rather than a verified earlier City vote, completed sale, construction or the forecast early 2027 computing opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/", "host": "sequitoredge.com", "date": "2025-09-19", "published": "2025-09-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 40.86834, "lng": -99.08969, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Sequitor Kearney proposed site, land sale and LOIs", "fields": {"developer": "Sequitor Edge", "land_buyer": "Shamrock Data LLC", "location": "Tech One Crossing, Kearney, Nebraska", "land_sale_approved_acres_approx": 16, "planned_facility_sqft": 40000, "operator_reported_council_land_sale_approval": "announcedSeptember19,2025", "service_target": "early2027", "tenant_commitment_stage": "nonbinding letters of intent from local organizations"}, "notes": ["Approvedlandsaleoperatoraccountnotreadcitysignedcontract/deed. NotallDCpermitsorenergization. NonbindingLOIsnotexecutedleases.40kplannednotcurrentoperatingfloor. No numericITMWoractualcurrentheadcount.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/", "host": "sequitoredge.com", "date": "2025-09-19", "published": "2025-09-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 73", "scope": "The complete original September 19, 2025 issuer release identifies the Kearney proposal and reports City approval of a parcel sale for development. This supports a company listed proposal. Its early 2027 service forecast, prospective tenants and nonbinding letters are not computing operation, completed construction or independently verified tenants. The issuer account is not an independently read City deed or a precise earlier Council vote day. Tier and energy claims remain attributed descriptions.", "fields": {"current_stage_evidence": {"outcome": "issuer_named_kearney_development_proposal", "scope": "The complete original September 19, 2025 issuer release identifies the Kearney proposal and reports City approval of a parcel sale for development. This supports a company listed proposal. Its early 2027 service forecast, prospective tenants and nonbinding letters are not computing operation, completed construction or independently verified tenants. The issuer account is not an independently read City deed or a precise earlier Council vote day. Tier and energy claims remain attributed descriptions."}, "source_read_scope": {"complete_original_issuer_release_body_read": true, "publication_not_city_vote_or_deed_completion": true, "nonbinding_letters_not_verified_tenants": true, "forecast2027_not_operation": true}}, "notes": ["The complete original September 19, 2025 issuer release identifies the Kearney proposal and reports City approval of a parcel sale for development. This supports a company listed proposal. Its early 2027 service forecast, prospective tenants and nonbinding letters are not computing operation, completed construction or independently verified tenants. The issuer account is not an independently read City deed or a precise earlier Council vote day. Tier and energy claims remain attributed descriptions.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/", "host": "sequitoredge.com", "published": "2025-09-19", "date": "2025-09-19", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Nebraska · Kearney · Buffalo · Source context reviewed", "status_scope": "The complete original September 19, 2025 issuer release identifies the Kearney proposal and reports City approval of a parcel sale for development. This supports a company listed proposal. Its early 2027 service forecast, prospective tenants and nonbinding letters are not computing operation, completed construction or independently verified tenants. The issuer account is not an independently read City deed or a precise earlier Council vote day. Tier and energy claims remain attributed descriptions.", "event_evidence": [{"date": "2025-09-19", "text": "The original Sequitor Edge September 19, 2025 release announces its Kearney development proposal and reports parcel sale approval. This is the issuer publication day rather than a verified earlier City vote, completed sale, construction or the forecast early 2027 computing opening.", "kind": "announced", "sources": [{"url": "https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/", "host": "sequitoredge.com", "published": "2025-09-19", "date": "2025-09-19", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "31019"}, "state_name": "Nebraska", "state_path": "/nebraska/"}, {"id": "manse-technology-campus-pahrump-nv", "state": "NV", "kind": "facility", "name": "Manse Technology Campus", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Nye"], "city": "Pahrump", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manse developer fullbuildout and postabatement tax forecast. Developerfinancial/engineeringprojectionsnotactualexpenditure,taxes,jobsorwaterwithdrawals.91.8+22.4=114.2Mroundstoheadline114M,not228M. Claimedpostabatementnettaxnotindependentapprovedabatementreview. Landscapingwaiverconditional. No numericITMW,exactparcelorservice date. Petition/feedbacknotused. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. The proposal is not proof of final county approval, construction or operation. No projected economic or technical total was adopted. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://mansetechcampus.com/", "host": "mansetechcampus.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 38.04196, "lng": -116.4718, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Manse developer fullbuildout and postabatement tax forecast", "fields": {"project": "Manse Technology Campus", "locality": "Manse Road corridor, Pahrump, Nye County, Nevada", "developer_described_stage": "proposed, county approval future", "planned_fullbuildout_capital_usd": 18400000000, "estimated_annual_property_tax_usd_approx": 114000000, "estimated_real_property_tax_component_usd": 91800000, "estimated_personal_property_tax_component_usd": 22400000, "estimated_onetime_impact_fees_usd": 12700000, "expected_peak_construction_jobs": 1600, "expected_permanent_jobs": 380, "projected_annual_water_acre_feet_max_exclusive": 300}, "notes": ["Developerfinancial/engineeringprojectionsnotactualexpenditure,taxes,jobsorwaterwithdrawals.91.8+22.4=114.2Mroundstoheadline114M,not228M. Claimedpostabatementnettaxnotindependentapprovedabatementreview. Landscapingwaiverconditional. No numericITMW,exactparcelorservice date. Petition/feedbacknotused.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://mansetechcampus.com/", "host": "mansetechcampus.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "proposed", "status_basis": "The project website describes Manse as a proposed development in Pahrump, Nye County."}, "notes": ["The proposal is not proof of final county approval, construction or operation. No projected economic or technical total was adopted. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://mansetechcampus.com/", "host": "mansetechcampus.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "e6843ae58ede55a37ca30bc89e78aed5c9a48ce472cdd5f9a2cf07f4331ed88d", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Nevada · Pahrump · Nye · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "32023"}, "state_name": "Nevada", "state_path": "/nevada/"}, {"id": "vantage-nv1-storey-county-nv", "state": "NV", "kind": "facility", "name": "Vantage Data Centers NV1", "group": "proposed", "status": "Provider listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Storey"], "city": "McCarran", "address": "", "who": "Vantage Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Past target is not proof opening. Lease status does not mean delivered. Investment nearly3Bnot actualspend. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-07-15", "Vantage dated its original NV1 campus announcement July 15, 2025. The announcement projects a first building opening in the second quarter of 2026. This records the announcement day without treating that forecast as an accomplished opening or commissioning."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/", "host": "vantage-dc.com", "date": "2025-07-15", "published": "2025-07-15", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 39.50668, "lng": -119.51037, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"planned_capacity_mw": 224, "power_basis": "campus capacity, IT versus gross unspecified in release", "planned_investment_usd_approx": 3000000000, "campus_acres_approx": 137, "planned_buildings": 4, "planned_area_sqft_min_exclusive": 1000000, "first_building_opening_target": "2026-Q2", "first_two_buildings_lease_status": "fully leased at announcement", "forecast_combined_construction_operations_jobs_min_exclusive": 1200}, "notes": ["Past target is not proof opening. Lease status does not mean delivered. Investment nearly3Bnot actualspend.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/", "host": "vantage-dc.com", "date": "2025-07-15", "published": "2025-07-15", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Company role source check 15, October 23, 2026", "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The July 15, 2025 NV1 announcement names Storey County and a first building target in the second quarter of 2026. A past target and reported leasing do not establish actual current operation.", "fields": {"company_association": {"name": "Vantage Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The July 15, 2025 NV1 announcement names Storey County and a first building target in the second quarter of 2026. A past target and reported leasing do not establish actual current operation."}, "provider_role": "developer"}, "notes": ["Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The July 15, 2025 NV1 announcement names Storey County and a first building target in the second quarter of 2026. A past target and reported leasing do not establish actual current operation.", "Publication dates and stated targets remain separate from actual physical milestones."], "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/", "host": "vantage-dc.com", "published": "2025-07-15", "date": "2025-07-15", "checked": "2026-10-23", "label": "First party exact campus or code text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 67", "scope": "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted.", "fields": {"current_stage_evidence": {"outcome": "provider_listed_nv1_proposal", "scope": "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted."}, "source_read_scope": {"complete_original_announcement_body_read": true, "forecast_opening_not_current_completion": true, "leased_capacity_not_operational_capacity": true}}, "notes": ["The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."], "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/", "host": "vantage-dc.com", "published": "2025-07-15", "date": "2025-07-15", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Nevada · McCarran · Storey · Source context reviewed", "status_scope": "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted.", "event_evidence": [{"date": "2025-07-15", "text": "Vantage dated its original NV1 campus announcement July 15, 2025. The announcement projects a first building opening in the second quarter of 2026. This records the announcement day without treating that forecast as an accomplished opening or commissioning.", "kind": "announced", "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/", "host": "vantage-dc.com", "published": "2025-07-15", "date": "2025-07-15", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "32029"}, "state_name": "Nevada", "state_path": "/nevada/"}, {"id": "locke-road-micro-data-center-concord-nh", "state": "NH", "kind": "facility", "name": "Locke Road Micro Data Center", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Merrimack"], "city": "Concord", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Concord microfacility application versus completeness and prior land uses. HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-10-19", "The original City of Concord Planning Board agenda bears an October 19, 2026 print date and lists the requested Locke Road micro data center for October 21 review. This dates the document account without independently establishing first publication, an accomplished hearing outcome, a later scheduled decision day or computing service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/", "host": "concordmonitor.com", "date": "2026-09-14", "published": "2026-09-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C", "host": "concordnh.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://concordnh.legistar.com/Calendar.aspx", "host": "concordnh.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 43.31766, "lng": -71.70251, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round13-2026-10-14.json", "scope": "Concord microfacility application versus completeness and prior land uses", "fields": {"project": "LockeRoad micro data center", "address": "52 LockeRoad, Concord, NewHampshire", "owner_applicant": "Granite Municipal Manufacturing and Sales LLC", "engineer": "Northpoint Engineering LLC", "proposed_building_gross_sqft": 8160, "proposed_data_center_space_sqft": 7220, "parent_site_acres_approx": 21, "reported_buildable_acres_approx": 9.3, "stage_asofreport": "application completeness/site design consideration, not final approval", "scheduled_completeness_meeting": "2026-09-16T19:00:00-04:00"}, "notes": ["HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/", "host": "concordmonitor.com", "date": "2026-09-14", "published": "2026-09-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 66", "scope": "The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.", "fields": {"current_stage_evidence": {"outcome": "official_named_locke_road_micro_compute_proposal", "scope": "The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day."}, "source_read_scope": {"original_current_calendar_selected_oct21_row_read": true, "original_agenda_physical_page9_item7L_complete_text_read": true, "full_agenda_review_not_claimed": true, "october19_is_print_date_not_first_publication": true, "private_november18_account_not_officially_verified": true, "unrelated_private_property_details_excluded": true}}, "notes": ["The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."], "sources": [{"url": "https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C", "host": "concordnh.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://concordnh.legistar.com/Calendar.aspx", "host": "concordnh.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New Hampshire · Concord · Merrimack · Source context reviewed", "status_scope": "The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.", "event_evidence": [{"date": "2026-10-19", "text": "The original City of Concord Planning Board agenda bears an October 19, 2026 print date and lists the requested Locke Road micro data center for October 21 review. This dates the document account without independently establishing first publication, an accomplished hearing outcome, a later scheduled decision day or computing service.", "kind": "announced", "sources": [{"url": "https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C", "host": "concordnh.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "33013"}, "state_name": "New Hampshire", "state_path": "/new-hampshire/"}, {"id": "bell-works-holmdel-data-center-nj", "state": "NJ", "kind": "facility", "name": "Bell Works Data Center (101 Crawfords Corner Road)", "group": "proposed", "status": "Application under review", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Monmouth"], "city": "Holmdel", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Attorney’s grandfathering interpretation is attributed, not examined ordinance/court ruling or projectapproval. July 21 introduction is not adoption/effectivedate; exactfinalbantext still needed. Proposedtwo-story 40 MWbasisundefined, not criticalIT/currentload. Marketingcomparison to 300 to 500 MWis not a reliable one-tenth equivalence. Closed-loop/no-added-traffic/isolatedlocation claims are developer plans, not measuredimpacts.2012 redevelopmentpermitteduse is not a newbuildingpermit. No RFS/tenant/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://patch.com/new-jersey/holmdel-hazlet/data-center-proposed-bell-works-see-details", "host": "patch.com", "date": "2026-08-20", "published": "2026-08-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://bell.works/lp/holmdel-data-center-faq/", "host": "bell.works", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 40.26031, "lng": -74.22097, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "Patch reports InspiredbySomerset’sJuly 24 BellWorks data-center application preceded Holmdel’slaterban, with township attorney saying priorzoning applies but site-plan review remains required.", "independently_verified_current_operating_status": null, "reported_application_filed": "2026-07-24", "grandfathering_claim_attributed_to_township_attorney": true, "final_site_plan_approval_verified": false}, "notes": ["Attorney’s grandfathering interpretation is attributed, not examined ordinance/court ruling or projectapproval. July 21 introduction is not adoption/effectivedate; exactfinalbantext still needed. Proposedtwo-story 40 MWbasisundefined, not criticalIT/currentload. Marketingcomparison to 300 to 500 MWis not a reliable one-tenth equivalence. Closed-loop/no-added-traffic/isolatedlocation claims are developer plans, not measuredimpacts.2012 redevelopmentpermitteduse is not a newbuildingpermit. No RFS/tenant/ESAverified.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://patch.com/new-jersey/holmdel-hazlet/data-center-proposed-bell-works-see-details", "host": "patch.com", "date": "2026-08-20", "published": "2026-08-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 32", "scope": "Bell Works current original August 2026 FAQ says its data center proposal is before the Holmdel Planning Board and requires its own full review. Application under review is limited to that developer account. A permitted use in the 2012 redevelopment plan, a reported earlier filing and general policy action do not independently establish final site approval, a vested right, construction or operation. Claimed water use, utility headroom, noise compliance, future taxes and absence of neighborhood impacts are attributed forecasts, not measured outcomes. The existing mixed use Bell Works building is not the proposed data center.", "fields": {"current_stage_evidence": {"outcome": "developer_reported_current_planning_application_not_mixed_building_operation", "scope": "Bell Works current original August 2026 FAQ says its data center proposal is before the Holmdel Planning Board and requires its own full review. Application under review is limited to that developer account. A permitted use in the 2012 redevelopment plan, a reported earlier filing and general policy action do not independently establish final site approval, a vested right, construction or operation. Claimed water use, utility headroom, noise compliance, future taxes and absence of neighborhood impacts are attributed forecasts, not measured outcomes. The existing mixed use Bell Works building is not the proposed data center."}}, "notes": ["Bell Works current original August 2026 FAQ says its data center proposal is before the Holmdel Planning Board and requires its own full review. Application under review is limited to that developer account. A permitted use in the 2012 redevelopment plan, a reported earlier filing and general policy action do not independently establish final site approval, a vested right, construction or operation. Claimed water use, utility headroom, noise compliance, future taxes and absence of neighborhood impacts are attributed forecasts, not measured outcomes. The existing mixed use Bell Works building is not the proposed data center.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://bell.works/lp/holmdel-data-center-faq/", "host": "bell.works", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New Jersey · Holmdel · Monmouth · Source context reviewed", "status_scope": "Bell Works current original August 2026 FAQ says its data center proposal is before the Holmdel Planning Board and requires its own full review. Application under review is limited to that developer account. A permitted use in the 2012 redevelopment plan, a reported earlier filing and general policy action do not independently establish final site approval, a vested right, construction or operation. Claimed water use, utility headroom, noise compliance, future taxes and absence of neighborhood impacts are attributed forecasts, not measured outcomes. The existing mixed use Bell Works building is not the proposed data center.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "34025"}, "state_name": "New Jersey", "state_path": "/new-jersey/"}, {"id": "hekemian-montvale-kpmg-site-data-center-nj", "state": "NJ", "kind": "facility", "name": "Montvale KPMG Site Data Center (3 Chestnut Ridge Road)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Bergen"], "city": "Montvale", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. No final court judgment, executed PILOT, data-center permit or tenant is established. A photograph's 48 MW Yondr facility is in Loudoun, not Montvale. Competing alternatives are not two approved projects; constitutional arguments remain attributed positions. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://thepressgroup.net/data-center-option-at-former-kpmg-site-montvales-mayor-affordable-housing-group-clash/", "host": "thepressgroup.net", "date": "2026-03-04", "published": "2026-03-04", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.montvalenj.gov/news/the-borough-of-montvale-offices-and-the-recycling-center-will-be-closed-on-monday-october-12th-in-observance-of-columbus-day-curbside-pick-up-will-remain-on-a-normal-schedule/notice-of-fairness-hearing-november-18-2026/", "host": "www.montvalenj.gov", "published": "2026-09-04", "date": "2026-09-04", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.9598, "lng": -74.07428, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Pascack Press describes competing housing and data-center alternatives for the 34-acre former KPMG site in Montvale and a complaint filed March 2, 2026.", "independently_verified_current_operating_status": null}, "notes": ["No final court judgment, executed PILOT, data-center permit or tenant is established. A photograph's 48 MW Yondr facility is in Loudoun, not Montvale. Competing alternatives are not two approved projects; constitutional arguments remain attributed positions.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://thepressgroup.net/data-center-option-at-former-kpmg-site-montvales-mayor-affordable-housing-group-clash/", "host": "thepressgroup.net", "date": "2026-03-04", "published": "2026-03-04", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 62", "scope": "The complete original Borough notice describes a proposed affordable housing settlement amendment retaining a KPMG site data center alternative with fifty affordable units. This supports a listed proposal within that conditional legal framework. Its November 18, 2026 fairness hearing is prospective and addresses the housing amendment rather than final facility permission, construction or commissioned service. The September 25 objection deadline is past and does not establish an accomplished hearing outcome. No separate KPMG office at another address, named party role, ownership or technical quantity is assigned.", "fields": {"current_stage_evidence": {"outcome": "official_named_kpmg_computing_alternative_proposal", "scope": "The complete original Borough notice describes a proposed affordable housing settlement amendment retaining a KPMG site data center alternative with fifty affordable units. This supports a listed proposal within that conditional legal framework. Its November 18, 2026 fairness hearing is prospective and addresses the housing amendment rather than final facility permission, construction or commissioned service. The September 25 objection deadline is past and does not establish an accomplished hearing outcome. No separate KPMG office at another address, named party role, ownership or technical quantity is assigned."}, "source_read_scope": {"complete_original_fairness_notice_body_read": true, "ordinary_observed_301_redirect_followed_once_to200": true, "conditional_housing_settlement_not_final_project_permission": true, "future_november18_hearing_not_accomplished": true, "no_roles_locations_or_quantities_changed": true}}, "notes": ["The complete original Borough notice describes a proposed affordable housing settlement amendment retaining a KPMG site data center alternative with fifty affordable units. This supports a listed proposal within that conditional legal framework. Its November 18, 2026 fairness hearing is prospective and addresses the housing amendment rather than final facility permission, construction or commissioned service. The September 25 objection deadline is past and does not establish an accomplished hearing outcome. No separate KPMG office at another address, named party role, ownership or technical quantity is assigned.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://www.montvalenj.gov/news/the-borough-of-montvale-offices-and-the-recycling-center-will-be-closed-on-monday-october-12th-in-observance-of-columbus-day-curbside-pick-up-will-remain-on-a-normal-schedule/notice-of-fairness-hearing-november-18-2026/", "host": "www.montvalenj.gov", "published": "2026-09-04", "date": "2026-09-04", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New Jersey · Montvale · Bergen · Source context reviewed", "status_scope": "The complete original Borough notice describes a proposed affordable housing settlement amendment retaining a KPMG site data center alternative with fifty affordable units. This supports a listed proposal within that conditional legal framework. Its November 18, 2026 fairness hearing is prospective and addresses the housing amendment rather than final facility permission, construction or commissioned service. The September 25 objection deadline is past and does not establish an accomplished hearing outcome. No separate KPMG office at another address, named party role, ownership or technical quantity is assigned.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "34003"}, "state_name": "New Jersey", "state_path": "/new-jersey/"}, {"id": "prism-on3-nutley-data-center-nj", "state": "NJ", "kind": "facility", "name": "ON3 Data Center (275 Kingsland Street)", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Essex"], "city": "Nutley", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. An allowed use is not a committed tenant or construction approval. The campus's 10 MW cogeneration and broader mixed-use spending, housing, retail, R&D and PILOT arrangements are not the DC component's capacity, budget or incentives. Withdrawal of the warehouse is not withdrawal of all redevelopment; current DC operation is not established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-09-25", "Nutley published its ON3 potential data center FAQ September 25, 2026, reporting that no construction application had been received. This is the government publication and its bounded receipt account, not a future absence finding or an individual permit decision."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://patch.com/new-jersey/belleville/major-data-center-may-be-coming-on3-site-nutley-other-updates-announced", "host": "patch.com", "date": "2025-07-21", "published": "2025-07-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.nutleynj.org/news/post/23273/", "host": "www.nutleynj.org", "published": "2026-09-25", "date": "2026-09-25", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.78746, "lng": -74.24709, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round30-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Patch quotes Prism on redevelopment-plan approvals allowing a possible data center at 275 Kingsland Street within ON3 after a warehouse application withdrawal.", "independently_verified_current_operating_status": null}, "notes": ["An allowed use is not a committed tenant or construction approval. The campus's 10 MW cogeneration and broader mixed-use spending, housing, retail, R&D and PILOT arrangements are not the DC component's capacity, budget or incentives. Withdrawal of the warehouse is not withdrawal of all redevelopment; current DC operation is not established.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://patch.com/new-jersey/belleville/major-data-center-may-be-coming-on3-site-nutley-other-updates-announced", "host": "patch.com", "date": "2025-07-21", "published": "2025-07-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 32", "scope": "Nutley September 25, 2026 official FAQ describes 275 Kingsland Street as a marketed data center option within a settlement that also permits other uses, and expressly says no construction application had been received. Project listed development applies to that named potential use. The statement about receipt is bounded to its publication day and is not extended to every later filing. The settlement, marketing sign and general statewide policy initiatives are not an approved individual data center, construction, a delivered project or an enacted statewide requirement.", "fields": {"current_stage_evidence": {"outcome": "official_named_marketed_development_option_not_received_site_application", "scope": "Nutley September 25, 2026 official FAQ describes 275 Kingsland Street as a marketed data center option within a settlement that also permits other uses, and expressly says no construction application had been received. Project listed development applies to that named potential use. The statement about receipt is bounded to its publication day and is not extended to every later filing. The settlement, marketing sign and general statewide policy initiatives are not an approved individual data center, construction, a delivered project or an enacted statewide requirement."}}, "notes": ["Nutley September 25, 2026 official FAQ describes 275 Kingsland Street as a marketed data center option within a settlement that also permits other uses, and expressly says no construction application had been received. Project listed development applies to that named potential use. The statement about receipt is bounded to its publication day and is not extended to every later filing. The settlement, marketing sign and general statewide policy initiatives are not an approved individual data center, construction, a delivered project or an enacted statewide requirement.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.nutleynj.org/news/post/23273/", "host": "www.nutleynj.org", "published": "2026-09-25", "date": "2026-09-25", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New Jersey · Nutley · Essex · Source context reviewed", "status_scope": "Nutley September 25, 2026 official FAQ describes 275 Kingsland Street as a marketed data center option within a settlement that also permits other uses, and expressly says no construction application had been received. Project listed development applies to that named potential use. The statement about receipt is bounded to its publication day and is not extended to every later filing. The settlement, marketing sign and general statewide policy initiatives are not an approved individual data center, construction, a delivered project or an enacted statewide requirement.", "event_evidence": [{"date": "2026-09-25", "text": "Nutley published its ON3 potential data center FAQ September 25, 2026, reporting that no construction application had been received. This is the government publication and its bounded receipt account, not a future absence finding or an individual permit decision.", "kind": "announced", "sources": [{"url": "https://www.nutleynj.org/news/post/23273/", "host": "www.nutleynj.org", "published": "2026-09-25", "date": "2026-09-25", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "34013"}, "state_name": "New Jersey", "state_path": "/new-jersey/"}, {"id": "new-era-energy-digital-lea-county-data-center-nm", "state": "NM", "kind": "project", "name": "Lea County Data Center", "group": "proposed", "status": "Operator-listed plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center development", "counties": ["Lea"], "city": "", "address": "", "who": "New Era Energy & Digital", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "County-only New Era project context. The inherited Lovington label and approximate point are retained in location and field history but are not verified as this project location. Current company wording supports an Operator-listed plan, not construction, energization, tenants, ownership or operation. Its 7+ GW energy-integrated pipeline is not normalized critical IT or approved service. Texas and company-wide pipeline figures remain separate; Google Lea County evaluation is a different record.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.newerainfra.ai/", "host": "newerainfra.ai", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 32.81782, "lng": -103.44057, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "New Era Lea County planned pipeline versus Texas project", "fields": {"developer": "New Era Energy and Digital", "project": "Lea County, New Mexico", "planned_capacity_gw_min_exclusive": 7, "power_basis": "planned energy-integrated pipeline, not explicit critical IT", "planned_land_acres": 3500, "separate_texas_tcdc_planned_capacity_gw_min_exclusive": 1.4, "texas_acreage_conflict": [493, 492]}, "notes": ["7GWLeaCountyand1.4GWTexasseparateprojects,notsite-leveloperatingIT. Company8plusGWpipelineincludesprojectsnotadditionalcapacity. Generic12to15monthmodulardeploymenttargetnotdatedLeaCountyRFS. No exactparcel,energization/permitsorconfirmedtenant.493/492Texasacredifferenceheldforlatercrosswalk.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.newerainfra.ai/", "host": "newerainfra.ai", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Lea County and Kansas City identity and financing review October 16", "scope": "Source-specific exploration, planned-development identity or financing context. No precise point, physical-site census, site IT figure, actual construction, opening or realized incentive amount is established.", "fields": {"project_identity": "New Era Energy & Digital currently lists a Lea County, New Mexico pipeline project. This review uses the existing record and does not merge it with Google exploration in the same county.", "current_plan_scope": "The company portfolio supports an Operator-listed plan label for a development-stage project, not current construction, energization, tenants or an operating data center. New Era is the project developer brand, not a verified property owner or current tenant.", "advertised_envelope": {"planned_capacity_literal": "7+ GW", "planned_acres_literal": "3500 acres", "scope": "Advertised energy-integrated pipeline envelope. Capacity is not explicitly critical IT or approved utility service. Land is a plan/option context, not a surveyed owned parcel."}, "separate_texas_scope": "The separately advertised Texas Critical Data Centers project and company-wide 8+ GW pipeline are not additive Lea County figures. The homepage Texas acreage variants 493/492 and modular 12-15-month targets do not date or quantify Lea County completion.", "location_scope": "Lovington and the inherited approximate point remain legacy research context. A county-level portfolio label does not certify municipality, parcel, roof, street or a Google relationship.", "provider_roles": [{"name": "New Era Energy & Digital", "role": "developer"}]}, "notes": ["Separate a prospective project, a financing vote and actual physical construction. Follow each finding to its own sources.", "All existing location fields, jurisdictions, addresses, legacy quantities and opening dates remain unchanged."], "sources": [{"url": "https://www.newerainfra.ai/", "host": "www.newerainfra.ai", "published": "", "date": "", "checked": "2026-10-16", "label": "Current New Era project portfolio"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Primary project scope and county-only location review, October 16, 2026", "scope": "Bounded primary-source planning and location review; current physical activity is separately sourced.", "fields": {"location_review_decision": {"decision": "county_only_no_point", "county": "Lea", "county_fips": "35025", "municipality": null, "street_address": null, "precise_parcel": null, "reason": "Current issuer location section identifies Lea County, New Mexico only. The inherited Lovington label and approximate point are not supported as the project location by this source; remove them from current location fields without declaring the project absent from Lovington."}, "planned_pipeline_scope": {"issuer_display": "7+ GW planned capacity; 3500 acres and energy-integrated pipeline", "normalized_it_mw": null, "approved_service_mw": null, "operating_capacity_mw": null, "land_title_verified": false, "scope": "Company plan, not construction, parcel ownership, a confirmed tenant or delivered capacity."}, "separate_project_contexts": "Texas Critical Data Centers and company-wide 8+ GW pipeline are separate scopes. Google Lea County evaluation remains a separate research record; no shared parcel, operator relationship or capacity addition is established."}, "notes": ["County-wide display only, with no invented site, street, municipality or aerial destination.", "Review date is October 16 in America/New_York; UTC retrieval is October 17. The undated page has no inferred publication date."], "sources": [{"url": "https://www.newerainfra.ai/", "host": "www.newerainfra.ai", "published": "", "date": "", "checked": "2026-10-16", "label": "New Era current Lea County planned pipeline; county-only location"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New Mexico · Lea County · Exact site location unconfirmed", "status_scope": "The company portfolio supports an Operator-listed plan label for a development-stage project, not current construction, energization, tenants or an operating data center. New Era is the project developer brand, not a verified property owner or current tenant.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "no_site_point", "county_display": "35025"}, "state_name": "New Mexico", "state_path": "/new-mexico/"}, {"id": "teraplex-gallup-tradeport-mckinley-county-nm", "state": "NM", "kind": "facility", "name": "Teraplex Gallup Tradeport Data Center", "group": "proposed", "status": "City listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["McKinley"], "city": "Gallup", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originalcityagenda,draftthirdamendment,signedhistoricaloption/assignmentandtariff; conditional/historycontextnotcurrentexecution/operationcertification.. NoApril28vote/minutesor laterexecutedthirdamendment read; agendadoesnotprove deferral/adoption. Secondarydeferralclaims remainseparate. Nooptionexercise/paymentreceipt,landclosing,constructionpermit,effluentdeliverymetering or currentoperationproof. No MW/generation/tenant/capex/jobs certified. The2023signedoption doesnot establish that2026draftterms arebinding;first/secondamendments notindependentlyreadinthispass. Noexactparcelcoordinates or boundary merged.330approximateacresversus324.787LOIarea requiresscope/revisioncrosswalk. Originaldeliverysystem allocated planning/permitting/design/construction/operationexpensestodeveloper; notreceipt,publicsubsidyaward orproofall permitsgranted. Consultrecord-leveldate-role,signature,water-optionandareaholds.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15084", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15085", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15088", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15089", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 35.58062, "lng": -108.26222, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "gallup-effluent-originals-round45-2026-10-14.json", "scope": "Originalcityagenda,draftthirdamendment,signedhistoricaloption/assignmentandtariff; conditional/historycontextnotcurrentexecution/operationcertification.", "fields": {"proposal_identity_context": {"source": "gallup-original", "pages": [1, 2, 9, 10], "value": "April28,2026 city agenda names Teraplex and Gutami potential GallupTradeport project; presentation only. ItemF5 proposes effluent option amendment forTeraplexDataCentersLLC,notsiteapproval."}, "water_option_context": {"sources": ["gallup-original", "gallup-third", "gallup-original-agreement", "gallup-rate"], "value": {"proposed_annual_effluent_gallons": 109500000, "printed_approximate_acre_feet": 336, "basis": "Annual fiscal-year option/right quantity, not actual withdrawals/consumption, not potable-source measurement", "annual_quantity_carry_forward": false, "additional_surplus_possible": "Subject to city commitments; not unlimited guaranteed water", "proposed_rate_usd_per_1000_gallons": 5.66, "rate_basis": "FY26reclaimedwastewater tariff attachment, not fresh potable tariff or executedTeraplexbill", "third_amendment_execution_status": "Supplied draft date/day,payment deadline and signatures blank", "effectiveness_fee_usd": 5000, "effectiveness_basis": "Proposed collectedfundsbydeadline plusCouncilapproval; no paidreceipt/approvalverified", "proposed_purchase_deadline_years": 4, "proposed_construction_start_deadline_years": 5, "proposed_take_or_pay_start_year": 7, "printed_minimum_take_or_pay_percent": 33.33, "termination_basis": "Mayterminate,with15-day exercise windows; not automatic cancellation merely from target elapsed", "proposed_rate_lock_years": 15, "next_rate_reference_year": 2041, "fixed_calendar_deadlines": null, "critical_it_mw": null}}, "original_option_history": {"sources": ["gallup-original-agreement", "gallup-third"], "value": {"original_printed_effective_date": "2023-07-25", "city_signature_date_visually_read": "2023-07-27", "developer_signature_date_visually_read": "2023-08-01", "initial_use": "Recycling/manufacturing complex, not original2023data-centeroperation", "original_land_intention_acres_approx": 330, "original_plant_effluent_million_gallons_per_day": 2.33, "plant_effluent_measure": "Historical2023plant-output description, notTeraplexusage or currentmeasured2026plantoutput", "term_scope": "Original20-yearterm references definedOptionExerciseDate;10-yearextension requiresnotice andUSD5000payment. Not automatically30yearsfromApril28."}}, "assignment_history": {"source": "gallup-assignment", "value": {"body_date": "2026-03-03", "third_amendment_recital_date": "2026-03-06", "exact_assignment_execution_date": null, "date_hold": "BodydatedasofMarch3 versuslaterrecitalMarch6; signaturesbothpresentbutpageundated. No automatic reconciliation.", "loi_printed_date": "2025-07-28", "loi_recited_execution_date": "2025-07-29", "loi_acres_approx": 324.787, "land_closed": null, "basis": "Assignment of effluent-option andexclusiveLOIrights, notdeed/landclosing. OriginalLOIexhibit is onlycoverinthisfile. Financialterms partlyredacted;no recoveryor inference."}}}, "notes": ["NoApril28vote/minutesor laterexecutedthirdamendment read; agendadoesnotprove deferral/adoption. Secondarydeferralclaims remainseparate.", "Nooptionexercise/paymentreceipt,landclosing,constructionpermit,effluentdeliverymetering or currentoperationproof. No MW/generation/tenant/capex/jobs certified.", "The2023signedoption doesnot establish that2026draftterms arebinding;first/secondamendments notindependentlyreadinthispass.", "Noexactparcelcoordinates or boundary merged.330approximateacresversus324.787LOIarea requiresscope/revisioncrosswalk.", "Originaldeliverysystem allocated planning/permitting/design/construction/operationexpensestodeveloper; notreceipt,publicsubsidyaward orproofall permitsgranted.", "Consultrecord-leveldate-role,signature,water-optionandareaholds."], "sources": [{"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15084", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15085", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15088", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15089", "host": "gallupnm.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 72", "scope": "Selected original City agenda pages explicitly identify the Teraplex and Gutami potential Tradeport project and a proposed effluent option amendment. This supports a City documented proposal. The agenda describes effectiveness as contingent on Council approval and a required payment, and land acquisition, exercising an effluent option and construction as later conditions. It is not an independently read accomplished Council vote, executed amendment, delivered water or operating computing facility. A presentation only item is not project approval, and an option quantity is not actual consumption.", "fields": {"current_stage_evidence": {"outcome": "city_named_teraplex_tradeport_proposal", "scope": "Selected original City agenda pages explicitly identify the Teraplex and Gutami potential Tradeport project and a proposed effluent option amendment. This supports a City documented proposal. The agenda describes effectiveness as contingent on Council approval and a required payment, and land acquisition, exercising an effluent option and construction as later conditions. It is not an independently read accomplished Council vote, executed amendment, delivered water or operating computing facility. A presentation only item is not project approval, and an option quantity is not actual consumption."}, "source_read_scope": {"original_eleven_page_agenda_selected_physical_pages1_2_9_10_read": true, "presentation_only_not_approval": true, "contingent_option_not_executed_agreement_or_actual_water_use": true, "no_capacity_role_or_location_changes": true}}, "notes": ["Selected original City agenda pages explicitly identify the Teraplex and Gutami potential Tradeport project and a proposed effluent option amendment. This supports a City documented proposal. The agenda describes effectiveness as contingent on Council approval and a required payment, and land acquisition, exercising an effluent option and construction as later conditions. It is not an independently read accomplished Council vote, executed amendment, delivered water or operating computing facility. A presentation only item is not project approval, and an option quantity is not actual consumption.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450", "host": "www.gallupnm.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New Mexico · Gallup · McKinley · Source context reviewed", "status_scope": "Selected original City agenda pages explicitly identify the Teraplex and Gutami potential Tradeport project and a proposed effluent option amendment. This supports a City documented proposal. The agenda describes effectiveness as contingent on Council approval and a required payment, and land acquisition, exercising an effluent option and construction as later conditions. It is not an independently read accomplished Council vote, executed amendment, delivered water or operating computing facility. A presentation only item is not project approval, and an option quantity is not actual consumption.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "35031"}, "state_name": "New Mexico", "state_path": "/new-mexico/"}, {"power": "", "power_note": "", "investment": "", "jobs": "", "utility": "", "water": "", "incentives": "", "date": "", "opened": "", "tier": "", "id": "google-lea-county-evaluation-nm", "state": "NM", "kind": "project", "name": "Google Lea County evaluation", "group": "proposed", "status": "Evaluation", "crypto": false, "type": "Potential data center project", "counties": ["Lea"], "city": "", "address": "", "who": "Google", "end_user": "", "mw": null, "acres": null, "note": "Google describes an exploratory county-level proposal. New Era has a separate Lea County project; no relationship, shared parcel, current construction, operating load or precise location is established.", "events": [["2026-09-14", "Google publicly announced that it was exploring a potential Lea County, New Mexico data center. Discussions and details remained open; this is not an approval, construction start or opening."]], "timeline": [], "sources": [{"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/lea-county-new-mexico/", "host": "blog.google", "published": "2026-09-14", "date": "2026-09-14", "checked": "2026-10-16", "label": "Google potential Lea County project announcement"}], "loc": {"lat": 32.79208, "lng": -103.41248, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": false, "precision_label": "Exact site not published; shown at county level", "summary": "New Mexico · Lea County, New Mexico potential project", "reviewed_evidence": [{"overlay": "Lea County and Kansas City identity and financing review October 16", "scope": "Source-specific exploration, planned-development identity or financing context. No precise point, physical-site census, site IT figure, actual construction, opening or realized incentive amount is established.", "fields": {"identity_scope": "Google publicly names Lea County, New Mexico as a potential data-center location. Complete canonical/original New Mexico and exclusion checks found no Google Lea County record. The separate New Era Lea County record is retained without a demonstrated Google relationship.", "evaluation_scope": "Google describes an early potential project with discussions ongoing and details outstanding. Evaluation is a company-stated exploration stage, not a permit, committed construction project, site acquisition or operating facility.", "energy_water_pledges": "The announcement gives responsibility and cost-coverage pledges. It publishes no site MW, water quantity, signed utility/water agreement, cooling specification, parcel or construction date.", "location_scope": "Only Lea County is used. No city, street, parcel, coordinate or municipality is inferred from an unrelated proposal or self-attributed microsite.", "provider_roles": [{"name": "Google", "role": "developer"}]}, "notes": ["Separate a prospective project, a financing vote and actual physical construction. Follow each finding to its own sources.", "All existing location fields, jurisdictions, addresses, legacy quantities and opening dates remain unchanged."], "sources": [{"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/lea-county-new-mexico/", "host": "blog.google", "published": "2026-09-14", "date": "2026-09-14", "checked": "2026-10-16", "label": "Google potential Lea County project announcement"}], "checked": "2026-10-16", "whole_record_certified": false}], "raw_status": "proposed", "status_field": "current_status", "status_scope": "Google describes an early potential project with discussions ongoing and details outstanding. Evaluation is a company-stated exploration stage, not a permit, committed construction project, site acquisition or operating facility.", "event_evidence": [{"date": "2026-09-14", "text": "Google publicly announced that it was exploring a potential Lea County, New Mexico data center. Discussions and details remained open; this is not an approval, construction start or opening.", "kind": "announced", "sources": [{"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/lea-county-new-mexico/", "host": "blog.google", "published": "2026-09-14", "date": "2026-09-14", "checked": "2026-10-16", "label": "Google potential Lea County project announcement"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "no_site_point", "county_display": "35025"}, "state_name": "New Mexico", "state_path": "/new-mexico/"}, {"id": "terawulf-lansing-ny", "state": "NY", "kind": "facility", "name": "TeraWulf AI Data Center Campus, Lansing", "group": "proposed", "status": "Permitting", "raw_status": "permitting", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Tompkins"], "city": "Lansing", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Permitting is a development stage, not an issued construction permit or operation. No capacity, lease-term or point precision upgrade. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.terawulf.com/our-sites", "host": "terawulf.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 42.45187, "lng": -76.47317, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-events-round3-2026-10-14.json", "scope": "Field or source context only", "fields": {"operator_status": "Permitting", "critical_it_total_mw": 320, "critical_it_contracted_mw": 0, "critical_it_open_mw": 320, "former_industrial_site_acres": 183}, "notes": ["Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.terawulf.com/our-sites", "host": "terawulf.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "permitting", "status_basis": "TeraWulf labels Lake Hawkeye at the former Cayuga plant in Lansing as Permitting.", "filter_scope": "Grouped with proposed/development projects; no final permit or exact construction stage is inferred."}, "notes": ["Permitting is a development stage, not an issued construction permit or operation. No capacity, lease-term or point precision upgrade. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://www.terawulf.com/our-sites", "host": "terawulf.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "9679cb0785478c67bd8607fa55ff831728a7642e1004484300bf1bc31332eb84", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New York · Lansing · Tompkins · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "36109"}, "state_name": "New York", "state_path": "/new-york/"}, {"id": "wf-industrial-yaphank-ny", "state": "NY", "kind": "facility", "name": "Brookhaven Digital Infrastructure Facility (WF Industrial / Wildflower, Yaphank)", "group": "proposed", "status": "Proposal discussed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Suffolk"], "city": "Yaphank", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Brookhaven draft minutes and unrelated fiscal-action separation. Actualpages10and11haveDRAFTwatermarkabsentfromtext extraction. Do not report draftdiscussionasfinalapprovedminutes/J uly15decision, taxbenefittermination, issuedrecaptureorapprovedDCconversion.20yearPILOT/129Macquisition/14MrenovationonthesamepagebelongdifferentLakeRonkonkomahousingproject,notWFIndustrial. WFIndustrialXIIIpickleballcasealsoseparate.50FTEproposalnotcurrentemployment. Original4MBpartialpreserved;complete14.8MB270pagepacketrecoveredordinaryHTTP. No numericITMWorfinallateroutcomeadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://brookhavenida.org/files/7-15-26%20IDA%20Packet.pdf", "host": "brookhavenida.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 40.88879, "lng": -72.87889, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Brookhaven draft minutes and unrelated fiscal-action separation", "fields": {"agency": "Town of Brookhaven Industrial Development Agency", "packet_date": "2026-07-15", "reviewed_component": "June17,2026DRAFTmeetingminutes", "project": "WF Industrial XII LLC", "draft_minutes_described_proposal": "convert all three buildings to data centers", "proposed_fulltime_equivalent_jobs": 50, "draft_minutes_described_disposition": "reviewpendingstudiesbeforedecision", "final_termination_or_approval_from_this_component": null}, "notes": ["Actualpages10and11haveDRAFTwatermarkabsentfromtext extraction. Do not report draftdiscussionasfinalapprovedminutes/J uly15decision, taxbenefittermination, issuedrecaptureorapprovedDCconversion.20yearPILOT/129Macquisition/14MrenovationonthesamepagebelongdifferentLakeRonkonkomahousingproject,notWFIndustrial. WFIndustrialXIIIpickleballcasealsoseparate.50FTEproposalnotcurrentemployment. Original4MBpartialpreserved;complete14.8MB270pagepacketrecoveredordinaryHTTP. No numericITMWorfinallateroutcomeadopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://brookhavenida.org/files/7-15-26%20IDA%20Packet.pdf", "host": "brookhavenida.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 31", "scope": "The original July 15, 2026 Agency packet includes June 17 draft minutes explicitly discussing the WF Industrial XII proposal to convert the Yaphank warehouse buildings into data centers. Proposal discussed is limited to that published draft record. The minutes say studies would be reviewed before a decision, and do not establish final approved minutes, a data center permit, actual retrofit construction or operation. Existing warehouse use and financial assistance proceedings are distinct from the computing proposal.", "fields": {"current_stage_evidence": {"outcome": "agency_published_draft_record_of_named_warehouse_conversion_proposal", "scope": "The original July 15, 2026 Agency packet includes June 17 draft minutes explicitly discussing the WF Industrial XII proposal to convert the Yaphank warehouse buildings into data centers. Proposal discussed is limited to that published draft record. The minutes say studies would be reviewed before a decision, and do not establish final approved minutes, a data center permit, actual retrofit construction or operation. Existing warehouse use and financial assistance proceedings are distinct from the computing proposal."}}, "notes": ["The original July 15, 2026 Agency packet includes June 17 draft minutes explicitly discussing the WF Industrial XII proposal to convert the Yaphank warehouse buildings into data centers. Proposal discussed is limited to that published draft record. The minutes say studies would be reviewed before a decision, and do not establish final approved minutes, a data center permit, actual retrofit construction or operation. Existing warehouse use and financial assistance proceedings are distinct from the computing proposal.", "Source dates, physical milestones, legal dispositions and current facility phase remain distinct. No identity, role, location, jurisdiction, quantity or exact opening field is promoted."], "sources": [{"url": "https://brookhavenida.org/files/7-15-26%20IDA%20Packet.pdf", "host": "brookhavenida.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New York · Yaphank · Suffolk · Source context reviewed", "status_scope": "The original July 15, 2026 Agency packet includes June 17 draft minutes explicitly discussing the WF Industrial XII proposal to convert the Yaphank warehouse buildings into data centers. Proposal discussed is limited to that published draft record. The minutes say studies would be reviewed before a decision, and do not establish final approved minutes, a data center permit, actual retrofit construction or operation. Existing warehouse use and financial assistance proceedings are distinct from the computing proposal.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "36103"}, "state_name": "New York", "state_path": "/new-york/"}, {"id": "holtec-hi-cloud-indian-point-buchanan-ny", "state": "NY", "kind": "facility", "name": "Holtec HI-CLOUD Indian Point data center campus (proposed)", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Westchester"], "city": "Buchanan", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Holtec July31,2025 HI-CLOUD announcement identifies Indian Point as an anchor with an initial200MW target of unspecified basis. The broader up-to2000MW delivery-infrastructure concept is not certified Indian Point IT capacity. Retained nuclear licenses do not authorize a data center or new SMR operation. Water access, dark fiber and future heat/storage technologies are opportunities and issuer claims, not measured impacts or issued permits. Other cities under evaluation have no mapped project locations here. No current construction or tenant verified. Not whole-record or current operating-census certification.", "date": "", "events": [["2025-07-31", "Holtec published its HI CLOUD redevelopment announcement July 31, 2025. This is the company publication date, not an exact construction start, data center opening or new reactor licensing event."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://holtecinternational.com/hh-40-16/", "host": "holtecinternational.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.17821, "lng": -73.7738, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-and-original-local-reporting-round57-2026-10-15.json", "scope": "Operator or original local-reporting context; source dates and proposal stages retained.", "fields": {}, "notes": ["Holtec July31,2025 HI-CLOUD announcement identifies Indian Point as an anchor with an initial200MW target of unspecified basis. The broader up-to2000MW delivery-infrastructure concept is not certified Indian Point IT capacity. Retained nuclear licenses do not authorize a data center or new SMR operation. Water access, dark fiber and future heat/storage technologies are opportunities and issuer claims, not measured impacts or issued permits. Other cities under evaluation have no mapped project locations here. No current construction or tenant verified.", "Not whole-record or current operating-census certification."], "sources": [{"url": "https://holtecinternational.com/hh-40-16/", "host": "holtecinternational.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 31", "scope": "Holtec original HI CLOUD announcement names Indian Point as the intended anchor campus and describes redevelopment plans and potential future reactor support. Project listed development applies to that named proposal. The nuclear site history, retained nuclear licenses, existing power infrastructure, cooling access and projected capacity do not establish a constructed or operating data center, completed environmental review or a new reactor authorization.", "fields": {"current_stage_evidence": {"outcome": "named_hi_cloud_development_proposal_not_nuclear_or_compute_operation", "scope": "Holtec original HI CLOUD announcement names Indian Point as the intended anchor campus and describes redevelopment plans and potential future reactor support. Project listed development applies to that named proposal. The nuclear site history, retained nuclear licenses, existing power infrastructure, cooling access and projected capacity do not establish a constructed or operating data center, completed environmental review or a new reactor authorization."}}, "notes": ["Holtec original HI CLOUD announcement names Indian Point as the intended anchor campus and describes redevelopment plans and potential future reactor support. Project listed development applies to that named proposal. The nuclear site history, retained nuclear licenses, existing power infrastructure, cooling access and projected capacity do not establish a constructed or operating data center, completed environmental review or a new reactor authorization.", "Source dates, physical milestones, legal dispositions and current facility phase remain distinct. No identity, role, location, jurisdiction, quantity or exact opening field is promoted."], "sources": [{"url": "https://holtecinternational.com/hh-40-16/", "host": "holtecinternational.com", "published": "2025-07-31", "date": "2025-07-31", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New York · Buchanan · Westchester · Source context reviewed", "status_scope": "Holtec original HI CLOUD announcement names Indian Point as the intended anchor campus and describes redevelopment plans and potential future reactor support. Project listed development applies to that named proposal. The nuclear site history, retained nuclear licenses, existing power infrastructure, cooling access and projected capacity do not establish a constructed or operating data center, completed environmental review or a new reactor authorization.", "event_evidence": [{"date": "2025-07-31", "text": "Holtec published its HI CLOUD redevelopment announcement July 31, 2025. This is the company publication date, not an exact construction start, data center opening or new reactor licensing event.", "kind": "announced", "sources": [{"url": "https://holtecinternational.com/hh-40-16/", "host": "holtecinternational.com", "published": "2025-07-31", "date": "2025-07-31", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "36119"}, "state_name": "New York", "state_path": "/new-york/"}, {"id": "stream-stamp-alabama-ny", "state": "NY", "kind": "facility", "name": "STREAM U.S. Data Centers at STAMP", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Genesee"], "city": "Alabama", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. June 4 legislative passage still awaited governor signature in this account; do not treat bill passage or related-story headlines as an effective signed moratorium. Planned 19.5 billion cost and requested 1.46 billion sales/mortgage-tax relief are not spent capital or granted incentives. Forecast 550 million taxes is OVER 30 YEARS, not annual.125 permanent jobs and construction positions are forecasts disputed by an opposition-commissioned analysis. Critic-attributed 500 MW is not verified critical IT;25-to-1 benefit ratio is contested advocacy analysis, not an adjudicated result. No operating/RFS/utility contract verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://rbj.net/2026/06/15/new-york-moratorium-genesee-county-data-center/", "host": "rbj.net", "date": "2026-06-15", "published": "2026-06-15", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://townofalabamany.gov/wp-content/uploads/2026/06/NMZ-5DRAFT-AlabamaPB-Findings-Form-STREAM-06082026.pdf", "host": "townofalabamany.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.gcedc.com/stamp", "host": "www.gcedc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 43.00128, "lng": -78.19392, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round33-2026-10-14.json", "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.", "fields": {"reported_context": "Rochester Business Journal reports Stream’s proposed three-building,2.2-million-square-foot STAMP campus on roughly 90 acres and the legislative debate over a statewide pause.", "independently_verified_current_operating_status": null}, "notes": ["June 4 legislative passage still awaited governor signature in this account; do not treat bill passage or related-story headlines as an effective signed moratorium. Planned 19.5 billion cost and requested 1.46 billion sales/mortgage-tax relief are not spent capital or granted incentives. Forecast 550 million taxes is OVER 30 YEARS, not annual.125 permanent jobs and construction positions are forecasts disputed by an opposition-commissioned analysis. Critic-attributed 500 MW is not verified critical IT;25-to-1 benefit ratio is contested advocacy analysis, not an adjudicated result. No operating/RFS/utility contract verified.", "Later original decisions and observed outcomes take precedence; future events have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://rbj.net/2026/06/15/new-york-moratorium-genesee-county-data-center/", "host": "rbj.net", "date": "2026-06-15", "published": "2026-06-15", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 61", "scope": "The original Town hosted draft explicitly names a proposed STREAM data center at STAMP and describes planned computing buildings. This supports a listed proposal within the draft project description, without certifying a final legal outcome. Physical pages one and three show a draft watermark, unfilled execution fields and date placeholders. The cover also retains a November 20, 2023 Edwards Vacuum decision sentence, which is not a STREAM approval. The separate official park page describes infrastructure and a 2026 substation energization forecast, not completed STREAM computing. No draft findings or estimated technical figures are promoted as accomplished approvals, construction or operation.", "fields": {"current_stage_evidence": {"outcome": "original_named_stream_draft_project_description", "scope": "The original Town hosted draft explicitly names a proposed STREAM data center at STAMP and describes planned computing buildings. This supports a listed proposal within the draft project description, without certifying a final legal outcome. Physical pages one and three show a draft watermark, unfilled execution fields and date placeholders. The cover also retains a November 20, 2023 Edwards Vacuum decision sentence, which is not a STREAM approval. The separate official park page describes infrastructure and a 2026 substation energization forecast, not completed STREAM computing. No draft findings or estimated technical figures are promoted as accomplished approvals, construction or operation."}, "source_read_scope": {"original_draft_selected_intro_and_project_description_read": true, "physical_pages1and3_draft_watermark_and_blank_execution_viewed": true, "copied_edwards_vacuum_decision_not_stream_approval": true, "complete_original_park_main_body_read": true, "park_substation_forecast_not_computing": true, "no_location_role_or_quantity_export": true}}, "notes": ["The original Town hosted draft explicitly names a proposed STREAM data center at STAMP and describes planned computing buildings. This supports a listed proposal within the draft project description, without certifying a final legal outcome. Physical pages one and three show a draft watermark, unfilled execution fields and date placeholders. The cover also retains a November 20, 2023 Edwards Vacuum decision sentence, which is not a STREAM approval. The separate official park page describes infrastructure and a 2026 substation energization forecast, not completed STREAM computing. No draft findings or estimated technical figures are promoted as accomplished approvals, construction or operation.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://townofalabamany.gov/wp-content/uploads/2026/06/NMZ-5DRAFT-AlabamaPB-Findings-Form-STREAM-06082026.pdf", "host": "townofalabamany.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.gcedc.com/stamp", "host": "www.gcedc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New York · Alabama · Genesee · Source context reviewed", "status_scope": "The original Town hosted draft explicitly names a proposed STREAM data center at STAMP and describes planned computing buildings. This supports a listed proposal within the draft project description, without certifying a final legal outcome. Physical pages one and three show a draft watermark, unfilled execution fields and date placeholders. The cover also retains a November 20, 2023 Edwards Vacuum decision sentence, which is not a STREAM approval. The separate official park page describes infrastructure and a 2026 substation energization forecast, not completed STREAM computing. No draft findings or estimated technical figures are promoted as accomplished approvals, construction or operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "36037"}, "state_name": "New York", "state_path": "/new-york/"}, {"id": "four-winds-sugar-hill-portland-ny", "state": "NY", "kind": "facility", "name": "Sugar Hill Data Center (proposed, former Sugar Hill Golf Course)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Chautauqua"], "city": "Portland", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Support does not establish development approval or operation. Four Winds is not named. Generic water, utility-bill and Virginia tax statistics are not local impacts. A statewide moratorium proposal is not an enacted restriction. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-03-11", "Portland Town Board adopted resolution 25 on March 11, 2026 expressing general concept approval of the proposed Sugar Hill Golf Course data center, subject to further plans, environmental assessment and regulatory review. This conditional concept action is not final development permission, construction or commissioned service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.observertoday.com/news/top-stories/2026/07/area-fully-plugged-in-to-data-center-debate/", "host": "observertoday.com", "date": "2026-07-10", "published": "2026-07-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://static1.squarespace.com/static/648bc60c3305335b28132299/t/69e8c1f6d49cfe289dd24ce5/1776861686169/Meeting+Min+Mar.pdf", "host": "static1.squarespace.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 42.22792, "lng": -79.36641, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "An Observer editorial reports a Portland board resolution supporting a possible Sugar Hill golf-course development.", "independently_verified_current_operating_status": null, "operator_or_site_identity_needs_crosswalk": true}, "notes": ["Support does not establish development approval or operation. Four Winds is not named. Generic water, utility-bill and Virginia tax statistics are not local impacts. A statewide moratorium proposal is not an enacted restriction.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.observertoday.com/news/top-stories/2026/07/area-fully-plugged-in-to-data-center-debate/", "host": "observertoday.com", "date": "2026-07-10", "published": "2026-07-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 61", "scope": "All five original March 11, 2026 Town Board minute pages were visually read. They identify a proposed data center at the former Sugar Hill Golf Course on Route 5 and adopt resolution 25 expressing general concept approval subject to further details, site plans, environmental assessments and regulatory review. This supports a listed proposal and a bounded conditional concept milestone, without final project permits, construction or computing service. The selected source does not independently certify the inherited Four Winds legal identity or provider role. Unrelated later budget and local law notices are not computing approvals or hearings.", "fields": {"current_stage_evidence": {"outcome": "original_named_sugarhill_conditional_concept_proposal", "scope": "All five original March 11, 2026 Town Board minute pages were visually read. They identify a proposed data center at the former Sugar Hill Golf Course on Route 5 and adopt resolution 25 expressing general concept approval subject to further details, site plans, environmental assessments and regulatory review. This supports a listed proposal and a bounded conditional concept milestone, without final project permits, construction or computing service. The selected source does not independently certify the inherited Four Winds legal identity or provider role. Unrelated later budget and local law notices are not computing approvals or hearings."}, "source_read_scope": {"all_five_original_march_minute_pages_visually_read": true, "conditional_general_support_not_final_permit": true, "exact_sugarhill_site_match_not_fourwinds_role_certification": true, "no_location_role_or_quantity_export": true}}, "notes": ["All five original March 11, 2026 Town Board minute pages were visually read. They identify a proposed data center at the former Sugar Hill Golf Course on Route 5 and adopt resolution 25 expressing general concept approval subject to further details, site plans, environmental assessments and regulatory review. This supports a listed proposal and a bounded conditional concept milestone, without final project permits, construction or computing service. The selected source does not independently certify the inherited Four Winds legal identity or provider role. Unrelated later budget and local law notices are not computing approvals or hearings.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://static1.squarespace.com/static/648bc60c3305335b28132299/t/69e8c1f6d49cfe289dd24ce5/1776861686169/Meeting+Min+Mar.pdf", "host": "static1.squarespace.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New York · Portland · Chautauqua · Source context reviewed", "status_scope": "All five original March 11, 2026 Town Board minute pages were visually read. They identify a proposed data center at the former Sugar Hill Golf Course on Route 5 and adopt resolution 25 expressing general concept approval subject to further details, site plans, environmental assessments and regulatory review. This supports a listed proposal and a bounded conditional concept milestone, without final project permits, construction or computing service. The selected source does not independently certify the inherited Four Winds legal identity or provider role. Unrelated later budget and local law notices are not computing approvals or hearings.", "event_evidence": [{"date": "2026-03-11", "text": "Portland Town Board adopted resolution 25 on March 11, 2026 expressing general concept approval of the proposed Sugar Hill Golf Course data center, subject to further plans, environmental assessment and regulatory review. This conditional concept action is not final development permission, construction or commissioned service.", "kind": "approved", "sources": [{"url": "https://static1.squarespace.com/static/648bc60c3305335b28132299/t/69e8c1f6d49cfe289dd24ce5/1776861686169/Meeting+Min+Mar.pdf", "host": "static1.squarespace.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "36013"}, "state_name": "New York", "state_path": "/new-york/"}, {"id": "turin-hoefler-ilion-ny", "state": "NY", "kind": "facility", "name": "Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Herkimer"], "city": "Ilion", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Reported 635 MW and 200 MW are proposals without verified critical-IT basis. Ilion employment spans the whole mixed use. Brownfield application is not cleanup completion or construction approval. The state's bill is described as awaiting the governor as of June; it must not be labeled enacted from this account. Other local moratorium and statewide bill summaries require original texts and later outcomes. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/", "host": "rockinst.org", "date": "2026-06-10", "published": "2026-06-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://extapps.dec.ny.gov/data/DecDocs/C622036C/Application.BCP.C622036C.2026-01-12.BCP%20Application.pdf", "host": "extapps.dec.ny.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 43.41927, "lng": -74.96235, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "The Rockefeller Institute discusses Massena's proposed three-building campus near Alcoa East and Turin Hoefler's revised brownfield application for an Ilion mixed-use redevelopment.", "independently_verified_current_operating_status": null}, "notes": ["Reported 635 MW and 200 MW are proposals without verified critical-IT basis. Ilion employment spans the whole mixed use. Brownfield application is not cleanup completion or construction approval. The state's bill is described as awaiting the governor as of June; it must not be labeled enacted from this account. Other local moratorium and statewide bill summaries require original texts and later outcomes.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/", "host": "rockinst.org", "date": "2026-06-10", "published": "2026-06-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 61", "scope": "The original revised applicant submission dated January 12, 2026 explicitly proposes a data center and AI computing use after remediation at the former Remington Site C. This supports a listed proposal. Selected cover and physical pages 26, 29, 87 and 89 were read, with the project description and current use pages visually checked. This is an applicant account hosted by the State, not a verified final permit, cleanup certificate, completed construction or operating computing facility. Its anticipated project schedule does not establish actual review deadlines or accomplished work. Legacy manufacturing closure and fill contamination are not caused by proposed computing. No forecast capacity, expected employment, financial benefit or health improvement is exported as achieved.", "fields": {"current_stage_evidence": {"outcome": "original_named_ilion_postremediation_computing_proposal", "scope": "The original revised applicant submission dated January 12, 2026 explicitly proposes a data center and AI computing use after remediation at the former Remington Site C. This supports a listed proposal. Selected cover and physical pages 26, 29, 87 and 89 were read, with the project description and current use pages visually checked. This is an applicant account hosted by the State, not a verified final permit, cleanup certificate, completed construction or operating computing facility. Its anticipated project schedule does not establish actual review deadlines or accomplished work. Legacy manufacturing closure and fill contamination are not caused by proposed computing. No forecast capacity, expected employment, financial benefit or health improvement is exported as achieved."}, "source_read_scope": {"original99page_document_selected_cover_and_pages26_29_87_89_read": true, "physical_pages26and29_project_and_use_context_viewed": true, "applicant_submission_not_state_final_approval": true, "anticipated_schedule_not_actual_events_or_notices": true, "legacy_industrial_pollution_not_datacenter_causation": true, "one_40mb_bound_captured_34618365_bytes": true, "no_role_location_or_quantity_export": true}}, "notes": ["The original revised applicant submission dated January 12, 2026 explicitly proposes a data center and AI computing use after remediation at the former Remington Site C. This supports a listed proposal. Selected cover and physical pages 26, 29, 87 and 89 were read, with the project description and current use pages visually checked. This is an applicant account hosted by the State, not a verified final permit, cleanup certificate, completed construction or operating computing facility. Its anticipated project schedule does not establish actual review deadlines or accomplished work. Legacy manufacturing closure and fill contamination are not caused by proposed computing. No forecast capacity, expected employment, financial benefit or health improvement is exported as achieved.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://extapps.dec.ny.gov/data/DecDocs/C622036C/Application.BCP.C622036C.2026-01-12.BCP%20Application.pdf", "host": "extapps.dec.ny.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New York · Ilion · Herkimer · Source context reviewed", "status_scope": "The original revised applicant submission dated January 12, 2026 explicitly proposes a data center and AI computing use after remediation at the former Remington Site C. This supports a listed proposal. Selected cover and physical pages 26, 29, 87 and 89 were read, with the project description and current use pages visually checked. This is an applicant account hosted by the State, not a verified final permit, cleanup certificate, completed construction or operating computing facility. Its anticipated project schedule does not establish actual review deadlines or accomplished work. Legacy manufacturing closure and fill contamination are not caused by proposed computing. No forecast capacity, expected employment, financial benefit or health improvement is exported as achieved.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "36043"}, "state_name": "New York", "state_path": "/new-york/"}, {"id": "microsoft-person-county-roxboro-nc", "state": "NC", "kind": "facility", "name": "Microsoft Person County Mega Park", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Person"], "city": "Roxboro", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. EricMiller WRAL June30,2026 originalcommunitymeetingreport (updatedJuly1) identifies MicrosoftPersonCountyWoodsdale/Virginiaborder mega-site;1385acres and28.85M2024landpurchase reported, notcurrentconstructionspending. Pay-own-way/lowwater promises remainvoluntary assertions inarticle, notexecutedtariff/PPA/abatement/currentmeasuredwater. No ITMW or building approval/operatingdeadline. LaterSeptemberparagraph lacks independenteventdate and doesnotmoveJune30meetingtoSeptember. Localconcerns/poll notmeasuredcampusharm. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/", "host": "wral.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://local.microsoft.com/blog/person-county-datacenter-project/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "loc": {"lat": 36.39002, "lng": -78.97174, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json", "scope": "Named original reporter/issuer context with current versus historical stage explicit.", "fields": {}, "notes": ["EricMiller WRAL June30,2026 originalcommunitymeetingreport (updatedJuly1) identifies MicrosoftPersonCountyWoodsdale/Virginiaborder mega-site;1385acres and28.85M2024landpurchase reported, notcurrentconstructionspending.", "Pay-own-way/lowwater promises remainvoluntary assertions inarticle, notexecutedtariff/PPA/abatement/currentmeasuredwater. No ITMW or building approval/operatingdeadline. LaterSeptemberparagraph lacks independenteventdate and doesnotmoveJune30meetingtoSeptember. Localconcerns/poll notmeasuredcampusharm.", "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."], "sources": [{"url": "https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/", "host": "wral.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 13", "scope": "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_planning_with_preliminary_preparation", "scope": "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation."}, "phase_scope": {"source_update_period": "April 2026", "operator_explicit_phase": "planning", "road_work_forecast_is_not_completed_occurrence": true, "vertical_datacenter_construction_verified": false}}, "notes": ["Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://local.microsoft.com/blog/person-county-datacenter-project/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check59, October24,2026", "scope": "Microsoft identifies its own Person County data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The page describes planning and early site preparation and road work. An expected reduction in water use from the described cooling design is not a measured quantity or a zero water finding; no actual road closure outcome is newly established.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies its own Person County data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The page describes planning and early site preparation and road work. An expected reduction in water use from the described cooling design is not a measured quantity or a zero water finding; no actual road closure outcome is newly established."}, "provider_role": "developer"}, "notes": ["Microsoft identifies its own Person County data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The page describes planning and early site preparation and road work. An expected reduction in water use from the described cooling design is not a measured quantity or a zero water finding; no actual road closure outcome is newly established."], "sources": [{"url": "https://local.microsoft.com/blog/person-county-datacenter-project/", "host": "local.microsoft.com", "published": "2026-05-01", "date": "2026-05-01", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "North Carolina · Roxboro · Person · Source context reviewed", "status_scope": "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "37145"}, "state_name": "North Carolina", "state_path": "/north-carolina/"}, {"id": "terra-nexus-rockingham-richmond-county-nc", "state": "NC", "kind": "facility", "name": "Terra Nexus Rockingham Data Center (Old Cheraw Highway)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Richmond"], "city": "Rockingham", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Council-hearing chronology is inconsistent: article publishedAugust 13 uses futureTuesday while caption citesAugust 11 packet; do not invent exact hearing/result. Initial 75,000 gallons/day is explicitly superseded by a proposed lower-water cooling design, but revised exact demand is unknown;1000 gallons/daysewer is distinct not additive consumption.48.4 dB is model output, not measurement. Staff claim no air permit needed despite backup generators is not adopted legal conclusion.30 jobs and 9 to 12 monthfirst-phase timing lack an observed start.824.3 million is whole-city existing taxable value, not project investment. No city incentives statement does not exclude all state/federal assistance. Project Blue Marlin/Amazon is separate. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.yourdailyjournal.com/news/265529/rockingham-council-to-hold-public-hearing-on-data-center-rezoning", "host": "yourdailyjournal.com", "date": "2026-08-13", "published": "2026-08-13", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://img1.wsimg.com/blobby/go/b2b3cb0c-2c60-4ad2-90bc-2c01c4adfee4/downloads/84474868-d2c5-42ae-9e19-65736f6b2a31/Terra%20Nexus%20Rockingham%20Operational%20Noise%20Study.pdf?ver=1792020521238", "host": "img1.wsimg.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gorockingham.com/city-council-agendas", "host": "gorockingham.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 35.0058, "lng": -79.74793, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round33-2026-10-14.json", "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.", "fields": {"reported_context": "Richmond County Daily Journal reports Terra Nexus’s 165-acre conditional-rezoning proposal at 316 OldCherawHighway, with planning recommendation onAugust 4 and a proposed phased 1.2 billion-dollar data center.", "independently_verified_current_operating_status": null, "original_water_design_gallons_per_day": 75000, "original_water_design_superseded_by_revised_proposal": true, "revised_water_design_gallons_per_day": null}, "notes": ["Council-hearing chronology is inconsistent: article publishedAugust 13 uses futureTuesday while caption citesAugust 11 packet; do not invent exact hearing/result. Initial 75,000 gallons/day is explicitly superseded by a proposed lower-water cooling design, but revised exact demand is unknown;1000 gallons/daysewer is distinct not additive consumption.48.4 dB is model output, not measurement. Staff claim no air permit needed despite backup generators is not adopted legal conclusion.30 jobs and 9 to 12 monthfirst-phase timing lack an observed start.824.3 million is whole-city existing taxable value, not project investment. No city incentives statement does not exclude all state/federal assistance. Project Blue Marlin/Amazon is separate.", "Later original decisions and observed outcomes take precedence; future events have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.yourdailyjournal.com/news/265529/rockingham-council-to-hold-public-hearing-on-data-center-rezoning", "host": "yourdailyjournal.com", "date": "2026-08-13", "published": "2026-08-13", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 57", "scope": "The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts.", "fields": {"current_stage_evidence": {"outcome": "original_named_engineering_proposal_not_operating_noise_measurement", "scope": "The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts."}, "source_read_scope": {"original_city_index_and_selected_study_text_pages": [1, 2, 3, 4], "full_32_page_study_not_claimed_read": true, "predicted_operational_noise_not_observed_computing": true, "ferc_comparison_not_binding_city_rule": true, "exact_old_cheraw_street_or_parcel_not_newly_certified": true, "city_of_rockingham_in_richmond_county_not_rockingham_county": true, "unread_scanned_agendas_not_final_vote": true, "no_technical_quantity_export": true}}, "notes": ["The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://img1.wsimg.com/blobby/go/b2b3cb0c-2c60-4ad2-90bc-2c01c4adfee4/downloads/84474868-d2c5-42ae-9e19-65736f6b2a31/Terra%20Nexus%20Rockingham%20Operational%20Noise%20Study.pdf?ver=1792020521238", "host": "img1.wsimg.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gorockingham.com/city-council-agendas", "host": "gorockingham.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "North Carolina · Rockingham · Richmond · Source context reviewed", "status_scope": "The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "37153"}, "state_name": "North Carolina", "state_path": "/north-carolina/"}, {"id": "aligned-pataskala-licking-oh", "state": "OH", "kind": "facility", "name": "Aligned Data Centers  -  Pataskala", "group": "proposed", "status": "Operator listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Licking"], "city": "Pataskala", "address": "", "who": "Aligned Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Neither recommendation is council decision; August 25 hearing andJuly 6 petition submission were future.200 MWbasis is undefined, not criticalIT/currentload or an executed electricity agreement. Fuel-cell/closed-loop claims are proposed design, not hydrogen supply contract or zero-water guarantee.110 jobs andJEDDincome-tax estimates are forecasts;300,000 dollarpostconstructionperiod is not explicit annual revenue. Four-to-three redesign is not sevenbuildings. Proposedcharter 25 MWthreshold is not adopted law. Directory 139 regional/224 statecounts are not independently verified operating census. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.aol.com/articles/pataskala-allow-data-center-industrial-180844000.html", "host": "aol.com", "date": "2026-06-30", "published": "2026-06-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://aligneddc.com/pataskala-oh-data-center/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 40.09155, "lng": -82.48306, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "NewarkAdvocate viaAOL reports Aligned’s revised three-building 89-acre Pataskala 200 MWproposal with staff recommendation in favor but planning commission 5 to 2 recommendation to reject.", "independently_verified_current_operating_status": null}, "notes": ["Neither recommendation is council decision; August 25 hearing andJuly 6 petition submission were future.200 MWbasis is undefined, not criticalIT/currentload or an executed electricity agreement. Fuel-cell/closed-loop claims are proposed design, not hydrogen supply contract or zero-water guarantee.110 jobs andJEDDincome-tax estimates are forecasts;300,000 dollarpostconstructionperiod is not explicit annual revenue. Four-to-three redesign is not sevenbuildings. Proposedcharter 25 MWthreshold is not adopted law. Directory 139 regional/224 statecounts are not independently verified operating census.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.aol.com/articles/pataskala-allow-data-center-industrial-180844000.html", "host": "aol.com", "date": "2026-06-30", "published": "2026-06-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 19", "scope": "Aligned current Pataskala page describes a proposed campus and proposed site plan. Operator listed development describes that proposal only. Cooling, jobs and dedicated power infrastructure are company plans or commitments, not measured effects, delivered utility capacity, completed construction or operation. No exact construction start, current permit or opening day is established.", "fields": {"current_stage_evidence": {"outcome": "current_operator_proposal_not_accomplished_construction", "scope": "Aligned current Pataskala page describes a proposed campus and proposed site plan. Operator listed development describes that proposal only. Cooling, jobs and dedicated power infrastructure are company plans or commitments, not measured effects, delivered utility capacity, completed construction or operation. No exact construction start, current permit or opening day is established."}}, "notes": ["Aligned current Pataskala page describes a proposed campus and proposed site plan. Operator listed development describes that proposal only. Cooling, jobs and dedicated power infrastructure are company plans or commitments, not measured effects, delivered utility capacity, completed construction or operation. No exact construction start, current permit or opening day is established.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://aligneddc.com/pataskala-oh-data-center/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check 13, October 23, 2026", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted.", "fields": {"company_association": {"name": "Aligned Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted."}, "provider_role": "developer"}, "notes": ["Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://aligneddc.com/pataskala-oh-data-center/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party exact named code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Pataskala · Licking · Source context reviewed", "status_scope": "Aligned current Pataskala page describes a proposed campus and proposed site plan. Operator listed development describes that proposal only. Cooling, jobs and dedicated power infrastructure are company plans or commitments, not measured effects, delivered utility capacity, completed construction or operation. No exact construction start, current permit or opening day is established.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39089"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "aligned-conesville-oh", "state": "OH", "kind": "facility", "name": "Aligned Data Centers - Conesville Industrial Park", "group": "proposed", "status": "Operator-announced development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Coshocton"], "city": "Conesville", "address": "", "who": "Aligned Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Multi-billion wording supplies no exact investment amount; no MW in release. Past target does not establish delivered. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. TIF is not no taxes; future capacity/opening are not delivered. Original executed approvals, current operator disclosures and subsequent decisions take precedence.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/", "host": "aligneddc.com", "date": "2025-07-24", "published": "2025-07-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://athensindependent.com/data-centers-across-appalachian-ohio/", "host": "athensindependent.com", "date": "2026-08-06", "published": "2026-08-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 40.30172, "lng": -81.92013, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"planned_development_acres": 197, "initial_capacity_delivery_target": "mid2026", "initial_customer_status": "foundational customer secured at announcement"}, "notes": ["Multi-billion wording supplies no exact investment amount; no MW in release. Past target does not establish delivered.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/", "host": "aligneddc.com", "date": "2025-07-24", "published": "2025-07-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.", "fields": {"reported_context": "Conesville Aligned Data Centers project described separately, including tax-increment arrangement and future opening.", "independently_verified_current_operating_status": null}, "notes": ["TIF is not no taxes; future capacity/opening are not delivered.", "Original executed approvals, current operator disclosures and subsequent decisions take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://athensindependent.com/data-centers-across-appalachian-ohio/", "host": "athensindependent.com", "date": "2026-08-06", "published": "2026-08-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "Aligned announces planned development of a data center campus inside Conesville Industrial Park.", "fields": {"current_stage_evidence": {"outcome": "operator_announced_development", "scope": "Aligned announces planned development of a data center campus inside Conesville Industrial Park."}}, "notes": ["The original delivery target has passed, but a target is not a completion report. Current commissioning and an exact physical-stage date remain unestablished."], "sources": [{"url": "https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/", "host": "aligneddc.com", "published": "2025-07-24", "date": "2025-07-24", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 13, October 23, 2026", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The July 24, 2025 announcement reports planned development and a mid 2026 target. The target is not adopted as an event that happened or a current service date.", "fields": {"company_association": {"name": "Aligned Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The July 24, 2025 announcement reports planned development and a mid 2026 target. The target is not adopted as an event that happened or a current service date."}, "provider_role": "developer"}, "notes": ["Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The July 24, 2025 announcement reports planned development and a mid 2026 target. The target is not adopted as an event that happened or a current service date.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/", "host": "aligneddc.com", "published": "2025-07-24", "date": "2025-07-24", "checked": "2026-10-23", "label": "First party exact named code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Conesville · Coshocton · Source context reviewed", "status_scope": "Aligned announces planned development of a data center campus inside Conesville Industrial Park.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39031"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "aws-wilmington-clinton-oh", "state": "OH", "kind": "facility", "name": "AWS Wilmington Data Center Campus", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Clinton"], "city": "Wilmington", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wilmington official project site and separate annexation petition. Separate545acJanuary15,2026annexation petition by four owners not automatically this471acAWSsite. Developer infrastructure25Mplus forecast not actual completed upgrades or money paid to county. Entitlement/annexation not energization. Nine planned data buildings not operational building census. Quoted current code requirements from FAQ not independent signed ordinance inspection. No ITMW or exact customer service date adopted. School compensation approval reported by agency, but executed signed agreement not independently read. Promised upfront/annual payments not actual receipts. Water6M is ANNUAL, not daily, and not guaranteed peak demand. One-million-gallon PUBLIC water tower is storage capacity, not annual DC consumption. State tax award reported but underlying award not inspected; no local CRA percentage/term guessed from first reading. Distribution/transmission assurances explicitly do not cover generation rates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-08-07", "The Port Authority FAQ reports City Council approval of project site annexation August 7, 2025. This is its bounded government account of that municipal action, not approval or operation of the data center, certification of every annexed parcel or a change to Atlas jurisdiction fields."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.chooseclintoncountyoh.org/news/data-center-faqs", "host": "chooseclintoncountyoh.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 39.42665, "lng": -83.8212, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Wilmington official project site and separate annexation petition", "fields": {"publisher_role": "Clinton County Port Authority economic-development FAQ", "project_operator": "AWS", "address": "1488 SouthUS68, Wilmington, Ohio45177", "project_site_acres": 471, "planned_principal_data_center_buildings": 9, "total_planned_building_sqft": 1920299, "individual_building_sqft_range": [162787, 219689], "agency_reported_annexation_approval_date": "2025-08-07", "agency_reported_light_industrial_zoning_approval_date": "2025-08-07", "agency_reported_dc_code_requirements_approval_date": "2025-07-17", "faq_location_zoning_updated_date": "2026-03-25", "developer_paid_public_infrastructure_capex_usd_min_exclusive": 25000000, "minimum_expected_permanent_jobs": 100, "expected_construction_jobs_min_exclusive": 200, "construction_duration_years_min_inclusive": 5, "expected_school_annual_revenue_usd": 1000000, "agency_reported_school_compensation_approval_date": "2025-11-19", "promised_upfront_city_payment_usd": 1500000, "separate_port_authority_payment_usd": 350000, "expected_annual_city_pilot_plus_income_tax_usd_min_exclusive": 1000000, "estimated_annual_water_gallons": 6000000, "water_basis": "developer projection quoted in FAQ, not metered actual", "water_service_agreement_stage": "being pursued", "city_public_water_tower_planned_gallons": 1000000}, "notes": ["Separate545acJanuary15,2026annexation petition by four owners not automatically this471acAWSsite. Developer infrastructure25Mplus forecast not actual completed upgrades or money paid to county. Entitlement/annexation not energization. Nine planned data buildings not operational building census. Quoted current code requirements from FAQ not independent signed ordinance inspection. No ITMW or exact customer service date adopted.", "School compensation approval reported by agency, but executed signed agreement not independently read. Promised upfront/annual payments not actual receipts. Water6M is ANNUAL, not daily, and not guaranteed peak demand. One-million-gallon PUBLIC water tower is storage capacity, not annual DC consumption. State tax award reported but underlying award not inspected; no local CRA percentage/term guessed from first reading. Distribution/transmission assurances explicitly do not cover generation rates.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.chooseclintoncountyoh.org/news/data-center-faqs", "host": "chooseclintoncountyoh.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 33", "scope": "The Port Authority current FAQ explicitly names the AWS Wilmington campus proposal and the South US 68 project site, separately distinguishing other land petitions and their unidentified prospective end users. Agency listed proposal is limited to the named AWS account. Its August 7, 2025 annexation statement is not data center commissioning, individual site plan approval or a new jurisdiction edit. Water use, utility effects and community benefits remain attributed design estimates and explanations, not measured outcomes. A future design or service agreement is not delivered infrastructure.", "fields": {"current_stage_evidence": {"outcome": "named_aws_wilmington_proposal_separate_from_other_land_petitions", "scope": "The Port Authority current FAQ explicitly names the AWS Wilmington campus proposal and the South US 68 project site, separately distinguishing other land petitions and their unidentified prospective end users. Agency listed proposal is limited to the named AWS account. Its August 7, 2025 annexation statement is not data center commissioning, individual site plan approval or a new jurisdiction edit. Water use, utility effects and community benefits remain attributed design estimates and explanations, not measured outcomes. A future design or service agreement is not delivered infrastructure."}}, "notes": ["The Port Authority current FAQ explicitly names the AWS Wilmington campus proposal and the South US 68 project site, separately distinguishing other land petitions and their unidentified prospective end users. Agency listed proposal is limited to the named AWS account. Its August 7, 2025 annexation statement is not data center commissioning, individual site plan approval or a new jurisdiction edit. Water use, utility effects and community benefits remain attributed design estimates and explanations, not measured outcomes. A future design or service agreement is not delivered infrastructure.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.chooseclintoncountyoh.org/news/data-center-faqs", "host": "www.chooseclintoncountyoh.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Wilmington · Clinton · Source context reviewed", "status_scope": "The Port Authority current FAQ explicitly names the AWS Wilmington campus proposal and the South US 68 project site, separately distinguishing other land petitions and their unidentified prospective end users. Agency listed proposal is limited to the named AWS account. Its August 7, 2025 annexation statement is not data center commissioning, individual site plan approval or a new jurisdiction edit. Water use, utility effects and community benefits remain attributed design estimates and explanations, not measured outcomes. A future design or service agreement is not delivered infrastructure.", "event_evidence": [{"date": "2025-08-07", "text": "The Port Authority FAQ reports City Council approval of project site annexation August 7, 2025. This is its bounded government account of that municipal action, not approval or operation of the data center, certification of every annexed parcel or a change to Atlas jurisdiction fields.", "kind": "approved", "sources": [{"url": "https://www.chooseclintoncountyoh.org/news/data-center-faqs", "host": "www.chooseclintoncountyoh.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39027"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "cologix-col4-columbus-oh", "state": "OH", "kind": "facility", "name": "Cologix COL4 (Columbus)", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Franklin"], "city": "Columbus", "address": "", "who": "Cologix", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a Columbus market page. Current text does not establish COL4 site capacity or status; linked site-specific specification needs a separate review. Corporate financing headlines are unrelated. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Cologix four named Columbus sites and regional context. Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://cologix.com/data-centers/columbus/", "host": "cologix.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://cologix.com/data-centers/columbus/col4/", "host": "cologix.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}, {"url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID+IN+%28%27610-207094%27%2C%27610207094%27%29&outFields=OBJECTID%2CPARCELID%2CLOWPARCELID%2CSITEADDRESS%2CZIPCD&returnGeometry=true&outSR=4326&f=json", "host": "gis.franklincountyohio.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official reference tax parcel polygon and exact address identifier"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-83.00355144026356%2C40.115015910887536%2C-82.99532855973645%2C40.12130408911247&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting context only, acquisition date unknown"}, {"url": "https://gis.franklincountyohio.gov/hosting/rest/services/Addressing/LBRS/FeatureServer/0/query?where=ADDR_NUM%3D%277500%27+AND+UPPER%28STR_NAME%29+LIKE+%27%25ALTA%25VIEW%25%27&outFields=OBJECTID%2CADDR_NUM%2CPRE_DIR%2CSTR_NAME%2CSTR_TYPE%2CSUF_DIR%2CCITY%2CUSPS_CITY%2CCOUNTY%2CSTATE%2CZIP%2CPID%2CGIS_MAINT_AUTH%2CSOURCE&returnGeometry=true&outSR=4326&f=json", "host": "gis.franklincountyohio.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official reference parcel method, address corroboration or dataset limits"}, {"url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0?f=pjson", "host": "gis.franklincountyohio.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official reference parcel method, address corroboration or dataset limits"}, {"url": "https://gis.franklincountyohio.gov/hosting/rest/services/Addressing/LBRS/FeatureServer/0?f=pjson", "host": "gis.franklincountyohio.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official reference parcel method, address corroboration or dataset limits"}, {"url": "https://cologix.com/news/cologix-first-colocation-provider-to-complete-ai-ready-data-center-columbus/", "host": "cologix.com", "published": "2024-05-23", "date": "2024-05-23", "checked": "2026-10-23", "label": "First party exact code or campus text, scoped provider relationship reviewed"}], "loc": {"lng": -82.99944, "lat": 40.11816, "precision": "approximate", "basis": "Approximate reference parcel center for the published Cologix address 7500 Alta View, Columbus, Ohio. Official tax map reference 610-207094 only, not a roof, surveyed title, tenant floor or full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains proposed."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {}, "notes": ["Preferred source is a Columbus market page. Current text does not establish COL4 site capacity or status; linked site-specific specification needs a separate review. Corporate financing headlines are unrelated.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://cologix.com/data-centers/columbus/", "host": "cologix.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "operator-discovery-review-round8-2026-10-14.json", "scope": "Cologix four named Columbus sites and regional context", "fields": {"named_sites": [{"code": "COL1", "address": "535 Scherers Court, Columbus, Ohio"}, {"code": "COL2", "address": "555 Scherers Court, Columbus, Ohio"}, {"code": "COL3", "address": "585 Scherers Court, Columbus, Ohio", "published_area_sqft": 160000, "advertised_capacity_mw_min_exclusive": 18, "power_basis": "not explicit critical IT"}, {"code": "COL4", "address": "7500 Alta View, Columbus, Ohio"}]}, "notes": ["Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://cologix.com/data-centers/columbus/", "host": "cologix.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "Cologix lists COL4 as a development whose capacity will be offered. Current support boilerplate does not establish physical construction or commissioning. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "Cologix lists COL4 as a development whose capacity will be offered. Current support boilerplate does not establish physical construction or commissioning. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["Cologix lists COL4 as a development whose capacity will be offered. Current support boilerplate does not establish physical construction or commissioning."], "sources": [{"url": "https://cologix.com/data-centers/columbus/col4/", "host": "cologix.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 20, October 23, 2026", "scope": "Approximate remains approximate. This is a reference to the published service address and county tax map parcel only. No legal title, property ownership, independent roof, complete campus, tenant unit, floor or current operation is certified. Existing native status remains proposed.", "fields": {"location_review_decision": {"location": {"lng": -82.99944, "lat": 40.11816, "precision": "approximate", "basis": "Approximate reference parcel center for the published Cologix address 7500 Alta View, Columbus, Ohio. Official tax map reference 610-207094 only, not a roof, surveyed title, tenant floor or full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains proposed."}, "reference_method": "Approximate county reference parcel center", "reference_parcel": {"identifier": "610-207094", "objectid": 438186, "agency": "Franklin County Auditor and Engineer", "reference_method": "calculated_polygon_centroid", "not_survey_quality": true, "legal_title_verified": false, "independent_building_identity": false, "full_campus_verified": false, "operator_ownership_verified": false}, "operator_coordinates_adopted": false, "census_range_adopted": false}}, "notes": ["The current named operator address is joined to an exact official government reference parcel address and identifier. The reference remains approximate; county map geometry is not a legal survey or a completed project finding.", "Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. No operator template coordinate, Census street range coordinate, residential roof, tenant suite or floor is selected.", "All original identity, status, physical dates, quantity, roles, canonical address and jurisdiction wrappers remain exact. All inherited location and source history remains retained. Raw parcel geometry is not exported.", "The operator publishes 7500 Alta View without a street type. A single official county physical address explicitly gives 7500 Alta View Boulevard, Columbus, Ohio 43085 and parcel PID 610-207094. That physical address point is inside the exact same county parcel. The parcel area center is used only as an approximate reference. The earlier ambiguous street matches remain excluded. Existing native status remains proposed; no opening or current operation is inferred."], "sources": [{"url": "https://cologix.com/data-centers/columbus/col4/", "host": "cologix.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Current named official facility service address"}, {"url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID+IN+%28%27610-207094%27%2C%27610207094%27%29&outFields=OBJECTID%2CPARCELID%2CLOWPARCELID%2CSITEADDRESS%2CZIPCD&returnGeometry=true&outSR=4326&f=json", "host": "gis.franklincountyohio.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official reference tax parcel polygon and exact address identifier"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-83.00355144026356%2C40.115015910887536%2C-82.99532855973645%2C40.12130408911247&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting context only, acquisition date unknown"}, {"url": "https://gis.franklincountyohio.gov/hosting/rest/services/Addressing/LBRS/FeatureServer/0/query?where=ADDR_NUM%3D%277500%27+AND+UPPER%28STR_NAME%29+LIKE+%27%25ALTA%25VIEW%25%27&outFields=OBJECTID%2CADDR_NUM%2CPRE_DIR%2CSTR_NAME%2CSTR_TYPE%2CSUF_DIR%2CCITY%2CUSPS_CITY%2CCOUNTY%2CSTATE%2CZIP%2CPID%2CGIS_MAINT_AUTH%2CSOURCE&returnGeometry=true&outSR=4326&f=json", "host": "gis.franklincountyohio.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official reference parcel method, address corroboration or dataset limits"}, {"url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0?f=pjson", "host": "gis.franklincountyohio.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official reference parcel method, address corroboration or dataset limits"}, {"url": "https://gis.franklincountyohio.gov/hosting/rest/services/Addressing/LBRS/FeatureServer/0?f=pjson", "host": "gis.franklincountyohio.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official reference parcel method, address corroboration or dataset limits"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check 16, October 23, 2026", "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. The May 23, 2024 announcement explicitly reports Cologix development completion of COL4. Only that dated developer relationship is adopted; the current specification retains future capacity wording and different quantities. No new completion event, operating stage or delivered power is asserted.", "fields": {"company_association": {"name": "Cologix", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. The May 23, 2024 announcement explicitly reports Cologix development completion of COL4. Only that dated developer relationship is adopted; the current specification retains future capacity wording and different quantities. No new completion event, operating stage or delivered power is asserted."}, "provider_role": "developer"}, "notes": ["Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. The May 23, 2024 announcement explicitly reports Cologix development completion of COL4. Only that dated developer relationship is adopted; the current specification retains future capacity wording and different quantities. No new completion event, operating stage or delivered power is asserted.", "Publication dates, retrieval dates, targets and physical milestones stay separate. Raw response hashes remain original; gzip text derivatives are retained separately."], "sources": [{"url": "https://cologix.com/news/cologix-first-colocation-provider-to-complete-ai-ready-data-center-columbus/", "host": "cologix.com", "published": "2024-05-23", "date": "2024-05-23", "checked": "2026-10-23", "label": "First party exact code or campus text, scoped provider relationship reviewed"}, {"url": "https://cologix.com/data-centers/columbus/col4/", "host": "cologix.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party exact code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate reference parcel, not a surveyed building, status remains proposed", "summary": "Ohio · Columbus · Franklin · Source context reviewed", "status_scope": "Cologix lists COL4 as a development whose capacity will be offered. Current support boilerplate does not establish physical construction or commissioning. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "cologix-col5-orange-township-delaware-county-oh", "state": "OH", "kind": "facility", "name": "Cologix COL5", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Delaware"], "city": "Lewis Center", "address": "", "who": "Cologix", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cologix COL5 county-hosted secondary report. Countyhostingdoesnotmakethisprimarypermit/engineeringrecord. Newspaperreportquotescompanyforecasts;notactualspent,currentRFSorcurrenttenantlease.120MWcampusnotperbuilding. Separate154acJohnstownandfourpriorColumbuscentersotherprojects. DelawareCOUNTYOhio notDelawarestate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://regionalplanning.co.delaware.oh.us/wp-content/uploads/sites/17/2025/06/ORA-Cologix-starts-work-06.18.25.pdf", "host": "regionalplanning.co.delaware.oh.us", "date": "2025-06-18", "published": "2025-06-18", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://cologix.com/data-centers/columbus/col5/", "host": "cologix.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 40.27844, "lng": -83.00484, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Cologix COL5 county-hosted secondary report", "fields": {"publisher_role": "Columbus Dispatch newspaper article hosted by county planning agency", "article_author": "Jim Weiker", "article_updated_date": "2025-06-18", "project": "Cologix COL5", "locality": "Green MeadowsDrive and HomeRoad, Orange Township, Delaware County, Ohio", "reported_site_acres": 28, "reported_planned_investment_usd": 1000000000, "reported_eventual_capacity_mw": 120, "power_basis": "reported capacity, not explicitly critical IT", "reported_initial_phase_sqft": 135000, "reported_initial_phase_completion_target": "fall2026"}, "notes": ["Countyhostingdoesnotmakethisprimarypermit/engineeringrecord. Newspaperreportquotescompanyforecasts;notactualspent,currentRFSorcurrenttenantlease.120MWcampusnotperbuilding. Separate154acJohnstownandfourpriorColumbuscentersotherprojects. DelawareCOUNTYOhio notDelawarestate.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://regionalplanning.co.delaware.oh.us/wp-content/uploads/sites/17/2025/06/ORA-Cologix-starts-work-06.18.25.pdf", "host": "regionalplanning.co.delaware.oh.us", "date": "2025-06-18", "published": "2025-06-18", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "Cologix lists COL5 with an expected ready-for-service target of the third quarter of 2026 and future service wording. That elapsed target is not proof of commissioning; actual operation remains unverified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "Cologix lists COL5 with an expected ready-for-service target of the third quarter of 2026 and future service wording. That elapsed target is not proof of commissioning; actual operation remains unverified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["Cologix lists COL5 with an expected ready-for-service target of the third quarter of 2026 and future service wording. That elapsed target is not proof of commissioning; actual operation remains unverified."], "sources": [{"url": "https://cologix.com/data-centers/columbus/col5/", "host": "cologix.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 16, October 23, 2026", "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. Current COL5 text forecasts service in the third quarter of 2026. That elapsed target does not establish actual delivery or operation. The proposed additional facility and current COL7 or COL8 marketing are not transferred to this record.", "fields": {"company_association": {"name": "Cologix", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. Current COL5 text forecasts service in the third quarter of 2026. That elapsed target does not establish actual delivery or operation. The proposed additional facility and current COL7 or COL8 marketing are not transferred to this record."}, "provider_role": "developer"}, "notes": ["Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. Current COL5 text forecasts service in the third quarter of 2026. That elapsed target does not establish actual delivery or operation. The proposed additional facility and current COL7 or COL8 marketing are not transferred to this record.", "Publication dates, retrieval dates, targets and physical milestones stay separate. Raw response hashes remain original; gzip text derivatives are retained separately."], "sources": [{"url": "https://cologix.com/data-centers/columbus/col5/", "host": "cologix.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party exact code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Lewis Center · Delaware · Source context reviewed", "status_scope": "Cologix lists COL5 with an expected ready-for-service target of the third quarter of 2026 and future service wording. That elapsed target is not proof of commissioning; actual operation remains unverified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39041"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "cologix-johnstown-oh", "state": "OH", "kind": "facility", "name": "Cologix Johnstown AI-Ready Campus", "group": "proposed", "status": "Announced development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Licking"], "city": "Johnstown", "address": "", "who": "Cologix", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Potential800MWnot energized. ExistingColumbus500k/80MWportfolio not Johnstowncampus.525Msecuritizationnav not siteinvestment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2024-11-20", "Cologix published its Johnstown land acquisition and planned campus release on November 20, 2024. The anticipated 2025 first phase development remains a forecast in that source. This is the release date, not an exact construction start, power delivery or opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/", "host": "cologix.com", "date": "2024-11-20", "published": "2024-11-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 40.06972, "lng": -82.44875, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"planned_investment_usd_min_exclusive": 7000000000, "land_acres_approx": 154, "full_build_planned_buildings": 8, "potential_campus_capacity_mw": 800, "power_basis": "potential capacity, not explicitlyIT", "planned_campus_area_sqft": 2000000, "first_phase_development_start_target_year": 2025}, "notes": ["Potential800MWnot energized. ExistingColumbus500k/80MWportfolio not Johnstowncampus.525Msecuritizationnav not siteinvestment.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/", "host": "cologix.com", "date": "2024-11-20", "published": "2024-11-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 19", "scope": "Cologix November 20, 2024 release announces a Johnstown land acquisition and planned data center campus. Announced development describes that dated proposal. Its anticipated 2025 first phase development is a forecast, not evidence that construction occurred. Existing Columbus operations and facilities completed elsewhere are separate. The current Johnstown physical stage and operation remain unverified.", "fields": {"current_stage_evidence": {"outcome": "dated_johnstown_acquisition_not_current_columbus_operation", "scope": "Cologix November 20, 2024 release announces a Johnstown land acquisition and planned data center campus. Announced development describes that dated proposal. Its anticipated 2025 first phase development is a forecast, not evidence that construction occurred. Existing Columbus operations and facilities completed elsewhere are separate. The current Johnstown physical stage and operation remain unverified."}, "source_read_scope": {"raw_response_gzip_decoded_locally": true, "decode_receipt": "cohort-19-captures/cologix.com/c19-johnstown-f53d5bbc.decode-receipt.json", "original_capture_preserved": true, "columbus_existing_service_not_johnstown_operation": true}}, "notes": ["Cologix November 20, 2024 release announces a Johnstown land acquisition and planned data center campus. Announced development describes that dated proposal. Its anticipated 2025 first phase development is a forecast, not evidence that construction occurred. Existing Columbus operations and facilities completed elsewhere are separate. The current Johnstown physical stage and operation remain unverified.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/", "host": "cologix.com", "published": "2024-11-20", "date": "2024-11-20", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check 16, October 23, 2026", "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. The November 20, 2024 company announcement names land acquisition and planned Johnstown campus development. Its 2025 start target, eight building plan, potential capacity and seller identity do not establish actual current construction, legal title, complete boundaries or equivalence with COL7 and COL8.", "fields": {"company_association": {"name": "Cologix", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. The November 20, 2024 company announcement names land acquisition and planned Johnstown campus development. Its 2025 start target, eight building plan, potential capacity and seller identity do not establish actual current construction, legal title, complete boundaries or equivalence with COL7 and COL8."}, "provider_role": "developer"}, "notes": ["Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. The November 20, 2024 company announcement names land acquisition and planned Johnstown campus development. Its 2025 start target, eight building plan, potential capacity and seller identity do not establish actual current construction, legal title, complete boundaries or equivalence with COL7 and COL8.", "Publication dates, retrieval dates, targets and physical milestones stay separate. Raw response hashes remain original; gzip text derivatives are retained separately."], "sources": [{"url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/", "host": "cologix.com", "published": "2024-11-20", "date": "2024-11-20", "checked": "2026-10-23", "label": "First party exact code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Johnstown · Licking · Source context reviewed", "status_scope": "Cologix November 20, 2024 release announces a Johnstown land acquisition and planned data center campus. Announced development describes that dated proposal. Its anticipated 2025 first phase development is a forecast, not evidence that construction occurred. Existing Columbus operations and facilities completed elsewhere are separate. The current Johnstown physical stage and operation remain unverified.", "event_evidence": [{"date": "2024-11-20", "text": "Cologix published its Johnstown land acquisition and planned campus release on November 20, 2024. The anticipated 2025 first phase development remains a forecast in that source. This is the release date, not an exact construction start, power delivery or opening.", "kind": "announced", "sources": [{"url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/", "host": "cologix.com", "published": "2024-11-20", "date": "2024-11-20", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39089"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "logistix-hamilton-innovation-center-butler-county-oh", "state": "OH", "kind": "facility", "name": "Hamilton Innovation Center", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Butler"], "city": "Hamilton", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Providing design and will-feature language describe a plan. The over-100-MW basis is unspecified. Tier III/N+1 concept is not independent certification or readiness. Logistix is not established as operator in this source, and no actual opening is given. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://waremalcomb.com/projects/hamilton-innovation-center/", "host": "waremalcomb.com", "date": "2025-12-10", "published": "2025-12-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 39.44869, "lng": -84.58651, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Ware Malcomb describes its design work for Hamilton Innovation Center, planned at about 310,000 square feet on 15 acres with a two-acre substation inside the site.", "independently_verified_current_operating_status": null, "operator_or_site_identity_needs_crosswalk": true}, "notes": ["Providing design and will-feature language describe a plan. The over-100-MW basis is unspecified. Tier III/N+1 concept is not independent certification or readiness. Logistix is not established as operator in this source, and no actual opening is given.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://waremalcomb.com/projects/hamilton-innovation-center/", "host": "waremalcomb.com", "date": "2025-12-10", "published": "2025-12-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 54", "scope": "The current original project architect page identifies Hamilton Innovation Center in Hamilton Ohio and says it is providing architecture services for a data center. Its will feature and conceptualized language describe a design proposal. This supports a listed named proposal only, without inferring accomplished construction, independent tier certification, current computing service or Logistix as an operator. Advertised design quantities are not adopted as observed load or technical capacity.", "fields": {"current_stage_evidence": {"outcome": "current_named_architect_design_proposal", "scope": "The current original project architect page identifies Hamilton Innovation Center in Hamilton Ohio and says it is providing architecture services for a data center. Its will feature and conceptualized language describe a design proposal. This supports a listed named proposal only, without inferring accomplished construction, independent tier certification, current computing service or Logistix as an operator. Advertised design quantities are not adopted as observed load or technical capacity."}, "source_read_scope": {"project_main_description_read": true, "architect_as_direct_project_participant_not_operator": true, "design_not_observed_construction": true, "unrelated_completed_projects_not_transferred": true}}, "notes": ["The current original project architect page identifies Hamilton Innovation Center in Hamilton Ohio and says it is providing architecture services for a data center. Its will feature and conceptualized language describe a design proposal. This supports a listed named proposal only, without inferring accomplished construction, independent tier certification, current computing service or Logistix as an operator. Advertised design quantities are not adopted as observed load or technical capacity.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://waremalcomb.com/projects/hamilton-innovation-center/", "host": "waremalcomb.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Hamilton · Butler · Source context reviewed", "status_scope": "The current original project architect page identifies Hamilton Innovation Center in Hamilton Ohio and says it is providing architecture services for a data center. Its will feature and conceptualized language describe a design proposal. This supports a listed named proposal only, without inferring accomplished construction, independent tier certification, current computing service or Logistix as an operator. Advertised design quantities are not adopted as observed load or technical capacity.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39017"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "meta-prometheus-new-albany-oh", "state": "OH", "kind": "facility", "name": "Meta Prometheus", "group": "proposed", "status": "AI expansion planned", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Licking"], "city": "New Albany", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The visible publication date is November 17, not the November 13 URL. Gigawatt-scale, world-first, no-grid-use and no-rate-impact statements are plans or attributed claims, not verified operating metrics or guarantees. Temporary construction jobs are not permanent jobs; no completed generation or power agreement is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-", "host": "spectrumnews1.com", "date": "2025-11-17", "published": "2025-11-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 40.10919, "lng": -82.43475, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Spectrum News reports ongoing Prometheus construction and officials' plans for on-site gas generation at Meta's New Albany campus.", "independently_verified_current_operating_status": null}, "notes": ["The visible publication date is November 17, not the November 13 URL. Gigawatt-scale, world-first, no-grid-use and no-rate-impact statements are plans or attributed claims, not verified operating metrics or guarantees. Temporary construction jobs are not permanent jobs; no completed generation or power agreement is established.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-", "host": "spectrumnews1.com", "date": "2025-11-17", "published": "2025-11-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "AI expansion planned", "basis": "The current New Albany factsheet specifically names Prometheus and describes its AI role and delivery in future terms.", "checked_on": "2026-10-16"}, "stage_review_limits": "Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted."}, "notes": ["Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · New Albany · Licking · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current New Albany factsheet specifically names Prometheus and describes its AI role and delivery in future terms. Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39089"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "new-day-ports-technology-campus-piketon-oh", "state": "OH", "kind": "facility", "name": "PORTS-Pike Technology Campus", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Pike"], "city": "Piketon", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. DOENov17,2025NEPAwebentrydescribesPROPOSEDlease189acBatch1PORTS. Pagealoneisnotexecutedlease,wholecampusenvironmentalapproval/constructionpermitorcurrentoperation. UnderlyinglinkedPDFnotreadinthispass. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol. DOEApr29,2026NEPAwebentrysaysPikeCountyPortsmouthDCLLC hasLEASEDapprox189acforAI/cloudandancillaryuses,phasedBatch1premises. Evidenceofreportedleasebydate,notexactclosingday/deed/newwholecampusarea. ESAinthistitlemeansEnvironmentalSiteAssessment,notElectricalServiceAgreement. UnderlyingPDFnotread. DOEMar20,2026factsheetdescribesplanned10GWdatacenterdevelopmentplus10GWNEWGENERATIONincludingatleast9.2GWgas;not20GWIT. Italso says10GWcomputepowerincluding9.2GWgen,soheadlineterminologyinconsistent;noITcertification.33.3BJapanese fundingforgeneration,4.2Bfuturetransmission,40Mcommunitycommitmentnotadditivewholecampuscapexorpaidfunds.765kVvoltage/foursubstationsnotMW. Dedicatedratestructurewillbeagreed,notexecutedtarifforprooflowerratepayerbills.10000constructionover4yr/2000+operationsregionalwholeprogramforecastsnot189acdirectsitepayroll. DOEMar24,2026EMphotocaptionreportsMar20groundbreaking;189acinitialphasewithdevelopmentexpected2026. Ceremonydoesnotproveconstruction/airpermit,RFSorallsitecleanupfinished.10GWgeneration/data-centerfiguresnot20GWIT;worldlargestclaimunverified. Leaseisgovernmentreported,notclosedlandpurchase. PermittingCouncilJune16,2026FAST41coverage forSBPORTSTechnologyCampus;USACEleadagency. Coverageprovidescoordinatedreview/timetable,notallpermitsapproved,NEPAcompletionorenergization.10GWcomplexincludesseparategasgen/gridupgrades;33Bquoteunclearscopenotnewpaidcampuscapex. NoexactnewRFS.", "date": "", "events": [["2025-11-17", "DOE signed its Batch 1 Portsmouth proposed property lease categorical exclusion determination November 17, 2025. This dates the agency property transfer review, not an executed computing lease, construction approval or operating campus."], ["2026-04-29", "DOE signed its Batch 1 Portsmouth environmental site assessment categorical exclusion determination April 29, 2026. The described first phase concerns assessment for a planned AI and cloud campus, not completed campus review, physical construction or computing service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.energy.gov/nepa/articles/cx-270875-4511a-086-lease-real-property-batch-1-property-portsmouth-gaseous-diffusion", "host": "energy.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.energy.gov/nepa/articles/cx-270956-environmental-site-assessment-esa-batch-1-leased-property-portsmouth", "host": "energy.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.energy.gov/articles/fact-sheet-department-energy-ensuring-affordable-energy-access-ohio-while-powering-future", "host": "energy.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.energy.gov/em/articles/partnership-ensures-affordable-energy-powers-ai-future-portsmouth-site", "host": "energy.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.permitting.gov/newsroom/press-releases/ports-technology-campus-latest-gain-fast-41-coverage", "host": "permitting.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.energy.gov/sites/default/files/2025-11/CX-270875.pdf", "host": "www.energy.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.energy.gov/sites/default/files/2026-04/CX-270956.pdf", "host": "www.energy.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 39.07716, "lng": -83.06665, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-and-government-review-round46-2026-10-14.json", "scope": "Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.", "fields": {"named_original_context": "DOENov17,2025NEPAwebentrydescribesPROPOSEDlease189acBatch1PORTS. Pagealoneisnotexecutedlease,wholecampusenvironmentalapproval/constructionpermitorcurrentoperation. UnderlyinglinkedPDFnotreadinthispass."}, "notes": ["DOENov17,2025NEPAwebentrydescribesPROPOSEDlease189acBatch1PORTS. Pagealoneisnotexecutedlease,wholecampusenvironmentalapproval/constructionpermitorcurrentoperation. UnderlyinglinkedPDFnotreadinthispass.", "Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."], "sources": [{"url": "https://www.energy.gov/nepa/articles/cx-270875-4511a-086-lease-real-property-batch-1-property-portsmouth-gaseous-diffusion", "host": "energy.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "operator-and-government-review-round46-2026-10-14.json", "scope": "Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.", "fields": {"named_original_context": "DOEApr29,2026NEPAwebentrysaysPikeCountyPortsmouthDCLLC hasLEASEDapprox189acforAI/cloudandancillaryuses,phasedBatch1premises. Evidenceofreportedleasebydate,notexactclosingday/deed/newwholecampusarea. ESAinthistitlemeansEnvironmentalSiteAssessment,notElectricalServiceAgreement. UnderlyingPDFnotread."}, "notes": ["DOEApr29,2026NEPAwebentrysaysPikeCountyPortsmouthDCLLC hasLEASEDapprox189acforAI/cloudandancillaryuses,phasedBatch1premises. Evidenceofreportedleasebydate,notexactclosingday/deed/newwholecampusarea. ESAinthistitlemeansEnvironmentalSiteAssessment,notElectricalServiceAgreement. UnderlyingPDFnotread.", "Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."], "sources": [{"url": "https://www.energy.gov/nepa/articles/cx-270956-environmental-site-assessment-esa-batch-1-leased-property-portsmouth", "host": "energy.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "operator-and-government-review-round46-2026-10-14.json", "scope": "Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.", "fields": {"named_original_context": "DOEMar20,2026factsheetdescribesplanned10GWdatacenterdevelopmentplus10GWNEWGENERATIONincludingatleast9.2GWgas;not20GWIT. Italso says10GWcomputepowerincluding9.2GWgen,soheadlineterminologyinconsistent;noITcertification.33.3BJapanese fundingforgeneration,4.2Bfuturetransmission,40Mcommunitycommitmentnotadditivewholecampuscapexorpaidfunds.765kVvoltage/foursubstationsnotMW. Dedicatedratestructurewillbeagreed,notexecutedtarifforprooflowerratepayerbills.10000constructionover4yr/2000+operationsregionalwholeprogramforecastsnot189acdirectsitepayroll."}, "notes": ["DOEMar20,2026factsheetdescribesplanned10GWdatacenterdevelopmentplus10GWNEWGENERATIONincludingatleast9.2GWgas;not20GWIT. Italso says10GWcomputepowerincluding9.2GWgen,soheadlineterminologyinconsistent;noITcertification.33.3BJapanese fundingforgeneration,4.2Bfuturetransmission,40Mcommunitycommitmentnotadditivewholecampuscapexorpaidfunds.765kVvoltage/foursubstationsnotMW. Dedicatedratestructurewillbeagreed,notexecutedtarifforprooflowerratepayerbills.10000constructionover4yr/2000+operationsregionalwholeprogramforecastsnot189acdirectsitepayroll.", "Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."], "sources": [{"url": "https://www.energy.gov/articles/fact-sheet-department-energy-ensuring-affordable-energy-access-ohio-while-powering-future", "host": "energy.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "operator-and-government-review-round46-2026-10-14.json", "scope": "Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.", "fields": {"named_original_context": "DOEMar24,2026EMphotocaptionreportsMar20groundbreaking;189acinitialphasewithdevelopmentexpected2026. Ceremonydoesnotproveconstruction/airpermit,RFSorallsitecleanupfinished.10GWgeneration/data-centerfiguresnot20GWIT;worldlargestclaimunverified. Leaseisgovernmentreported,notclosedlandpurchase."}, "notes": ["DOEMar24,2026EMphotocaptionreportsMar20groundbreaking;189acinitialphasewithdevelopmentexpected2026. Ceremonydoesnotproveconstruction/airpermit,RFSorallsitecleanupfinished.10GWgeneration/data-centerfiguresnot20GWIT;worldlargestclaimunverified. Leaseisgovernmentreported,notclosedlandpurchase.", "Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."], "sources": [{"url": "https://www.energy.gov/em/articles/partnership-ensures-affordable-energy-powers-ai-future-portsmouth-site", "host": "energy.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "operator-and-government-review-round46-2026-10-14.json", "scope": "Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.", "fields": {"named_original_context": "PermittingCouncilJune16,2026FAST41coverage forSBPORTSTechnologyCampus;USACEleadagency. Coverageprovidescoordinatedreview/timetable,notallpermitsapproved,NEPAcompletionorenergization.10GWcomplexincludesseparategasgen/gridupgrades;33Bquoteunclearscopenotnewpaidcampuscapex. NoexactnewRFS."}, "notes": ["PermittingCouncilJune16,2026FAST41coverage forSBPORTSTechnologyCampus;USACEleadagency. Coverageprovidescoordinatedreview/timetable,notallpermitsapproved,NEPAcompletionorenergization.10GWcomplexincludesseparategasgen/gridupgrades;33Bquoteunclearscopenotnewpaidcampuscapex. NoexactnewRFS.", "Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."], "sources": [{"url": "https://www.permitting.gov/newsroom/press-releases/ports-technology-campus-latest-gain-fast-41-coverage", "host": "permitting.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 54", "scope": "The original DOE April 29, 2026 assessment determination identifies leased Batch 1 property at Portsmouth in Piketon and its intended AI and cloud campus. Phase 1 assessment activities are to establish feasibility, permitting, design and construction requirements. The November 17, 2025 determination concerns a proposed property transfer. The retained current agency project records support a listed campus proposal only. Neither categorical exclusion certifies completed campus environmental review, a construction permit, completed assessment, physical construction or computing operation. No New Day ownership, tenant, quantity or parcel field is certified or changed.", "fields": {"current_stage_evidence": {"outcome": "agency_listed_campus_assessment_proposal", "scope": "The original DOE April 29, 2026 assessment determination identifies leased Batch 1 property at Portsmouth in Piketon and its intended AI and cloud campus. Phase 1 assessment activities are to establish feasibility, permitting, design and construction requirements. The November 17, 2025 determination concerns a proposed property transfer. The retained current agency project records support a listed campus proposal only. Neither categorical exclusion certifies completed campus environmental review, a construction permit, completed assessment, physical construction or computing operation. No New Day ownership, tenant, quantity or parcel field is certified or changed."}, "source_read_scope": {"lease_determination_text_and_visual_pages": [1], "assessment_determination_text_and_visual_pages": [1], "actual_digital_signature_dates_read": true, "web_entries_main_descriptions_read": true, "assessment_scope_not_entire_campus_approval": true}}, "notes": ["The original DOE April 29, 2026 assessment determination identifies leased Batch 1 property at Portsmouth in Piketon and its intended AI and cloud campus. Phase 1 assessment activities are to establish feasibility, permitting, design and construction requirements. The November 17, 2025 determination concerns a proposed property transfer. The retained current agency project records support a listed campus proposal only. Neither categorical exclusion certifies completed campus environmental review, a construction permit, completed assessment, physical construction or computing operation. No New Day ownership, tenant, quantity or parcel field is certified or changed.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.energy.gov/nepa/articles/cx-270875-4511a-086-lease-real-property-batch-1-property-portsmouth-gaseous-diffusion", "host": "www.energy.gov", "published": "2025-11-17", "date": "2025-11-17", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.energy.gov/nepa/articles/cx-270956-environmental-site-assessment-esa-batch-1-leased-property-portsmouth", "host": "www.energy.gov", "published": "2026-04-29", "date": "2026-04-29", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.energy.gov/sites/default/files/2025-11/CX-270875.pdf", "host": "www.energy.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.energy.gov/sites/default/files/2026-04/CX-270956.pdf", "host": "www.energy.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Piketon · Pike · Source context reviewed", "status_scope": "The original DOE April 29, 2026 assessment determination identifies leased Batch 1 property at Portsmouth in Piketon and its intended AI and cloud campus. Phase 1 assessment activities are to establish feasibility, permitting, design and construction requirements. The November 17, 2025 determination concerns a proposed property transfer. The retained current agency project records support a listed campus proposal only. Neither categorical exclusion certifies completed campus environmental review, a construction permit, completed assessment, physical construction or computing operation. No New Day ownership, tenant, quantity or parcel field is certified or changed.", "event_evidence": [{"date": "2025-11-17", "text": "DOE signed its Batch 1 Portsmouth proposed property lease categorical exclusion determination November 17, 2025. This dates the agency property transfer review, not an executed computing lease, construction approval or operating campus.", "kind": "announced", "sources": [{"url": "https://www.energy.gov/nepa/articles/cx-270875-4511a-086-lease-real-property-batch-1-property-portsmouth-gaseous-diffusion", "host": "www.energy.gov", "published": "2025-11-17", "date": "2025-11-17", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.energy.gov/sites/default/files/2025-11/CX-270875.pdf", "host": "www.energy.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2026-04-29", "text": "DOE signed its Batch 1 Portsmouth environmental site assessment categorical exclusion determination April 29, 2026. The described first phase concerns assessment for a planned AI and cloud campus, not completed campus review, physical construction or computing service.", "kind": "announced", "sources": [{"url": "https://www.energy.gov/nepa/articles/cx-270956-environmental-site-assessment-esa-batch-1-leased-property-portsmouth", "host": "www.energy.gov", "published": "2026-04-29", "date": "2026-04-29", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.energy.gov/sites/default/files/2026-04/CX-270956.pdf", "host": "www.energy.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39131"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "prologis-mila-trenton-oh", "state": "OH", "kind": "facility", "name": "Prologis Project Mila", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Butler"], "city": "Trenton", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Secondary stage lead only, original deed/siteplan/adoption/conditions unreviewed. Site-plan approval is not final building permit or operation; fall2026construction/early2029firstservice are forecasts, not observed.250MWdemandbasisnotcriticalIT.140jobs/120000USDannualutilityfees are developer forecasts, utilitychargesnotpropertytax or netpublicbenefit. Threepercentyearwatercooling not gallons/actualwithdrawal. Tracker applies AEPOhiotariff without inspected site-specific utility territory/account; do not assume applicability.85percentminimum-bill terms not proof100percentinfrastructurefunded. Risk84/100is tracker score, not scientificrisk. City-versus-countyauthorityneedslawrecord; signaturecollectionnotadoptedballotban. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-03-19", "The original Trenton staff report records Council approval of the Prologis commercial and industrial fence permit on March 19, 2026. This dates the limited fence action, without final whole campus permission, vertical construction or commissioned service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://stopohiodatacenters.org/butler-county", "host": "stopohiodatacenters.org", "date": "2026-04-26", "published": "2026-04-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.ci.trenton.oh.us/AgendaCenter/ViewFile/Agenda/_03302026-550", "host": "www.ci.trenton.oh.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://trentonoh.gov/DocumentCenter/View/2403/Prologis-and-Staff-Public-Forum-Agenda-?bidId=", "host": "trentonoh.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://ci.trenton.oh.us/AgendaCenter/ViewFile/Minutes/_04022026-551", "host": "ci.trenton.oh.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 39.41756, "lng": -84.57365, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round35-2026-10-14.json", "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.", "fields": {"reported_context": "Commercial Ohio tracker reports TrentonPlanningCommission approved ProjectMila site plan March30,2026 on already-industrial141acres sold toPrologis forUSD7.75million inOctober2025. Four220353squarefootbuildings plus16150utility/1503security sum899065squarefeet.", "independently_verified_current_operating_status": null}, "notes": ["Secondary stage lead only, original deed/siteplan/adoption/conditions unreviewed. Site-plan approval is not final building permit or operation; fall2026construction/early2029firstservice are forecasts, not observed.250MWdemandbasisnotcriticalIT.140jobs/120000USDannualutilityfees are developer forecasts, utilitychargesnotpropertytax or netpublicbenefit. Threepercentyearwatercooling not gallons/actualwithdrawal. Tracker applies AEPOhiotariff without inspected site-specific utility territory/account; do not assume applicability.85percentminimum-bill terms not proof100percentinfrastructurefunded. Risk84/100is tracker score, not scientificrisk. City-versus-countyauthorityneedslawrecord; signaturecollectionnotadoptedballotban.", "Historical observations and forecasts are dated; no later outcome assumed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://stopohiodatacenters.org/butler-county", "host": "stopohiodatacenters.org", "date": "2026-04-26", "published": "2026-04-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 62", "scope": "The original City staff report and hosted Prologis presentation explicitly identify the proposed Mila campus. This supports a listed proposal without certifying present vertical construction or computing operation. The presentation reports electrical yard grading and expressly says this does not indicate vertical construction. Its undated schedule graphic and preliminary financial and water tables are forecasts. The March 30 packet records a March 16 fence recommendation and March 19 Council fence permit approval, while detailed engineering review and whole site permission remain separate. Design models and public assurances are not measured noise, water use or accomplished benefits.", "fields": {"current_stage_evidence": {"outcome": "official_named_mila_proposal_and_limited_infrastructure_context", "scope": "The original City staff report and hosted Prologis presentation explicitly identify the proposed Mila campus. This supports a listed proposal without certifying present vertical construction or computing operation. The presentation reports electrical yard grading and expressly says this does not indicate vertical construction. Its undated schedule graphic and preliminary financial and water tables are forecasts. The March 30 packet records a March 16 fence recommendation and March 19 Council fence permit approval, while detailed engineering review and whole site permission remain separate. Design models and public assurances are not measured noise, water use or accomplished benefits."}, "source_read_scope": {"original_march30_packet_selected_physical_pages1through9_read": true, "complete29page_forum_text_read": true, "physical_page10_forecast_timeline_viewed": true, "stepdown_yard_grading_explicitly_not_vertical_construction": true, "original_april2_selected_pages5_6_7_9_read": true, "physical_april2_page5_group_account_viewed": true, "private_resident_details_excluded": true, "no_financial_technical_role_or_location_export": true}}, "notes": ["The original City staff report and hosted Prologis presentation explicitly identify the proposed Mila campus. This supports a listed proposal without certifying present vertical construction or computing operation. The presentation reports electrical yard grading and expressly says this does not indicate vertical construction. Its undated schedule graphic and preliminary financial and water tables are forecasts. The March 30 packet records a March 16 fence recommendation and March 19 Council fence permit approval, while detailed engineering review and whole site permission remain separate. Design models and public assurances are not measured noise, water use or accomplished benefits.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://www.ci.trenton.oh.us/AgendaCenter/ViewFile/Agenda/_03302026-550", "host": "www.ci.trenton.oh.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://trentonoh.gov/DocumentCenter/View/2403/Prologis-and-Staff-Public-Forum-Agenda-?bidId=", "host": "trentonoh.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://ci.trenton.oh.us/AgendaCenter/ViewFile/Minutes/_04022026-551", "host": "ci.trenton.oh.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Trenton · Butler · Source context reviewed", "status_scope": "The original City staff report and hosted Prologis presentation explicitly identify the proposed Mila campus. This supports a listed proposal without certifying present vertical construction or computing operation. The presentation reports electrical yard grading and expressly says this does not indicate vertical construction. Its undated schedule graphic and preliminary financial and water tables are forecasts. The March 30 packet records a March 16 fence recommendation and March 19 Council fence permit approval, while detailed engineering review and whole site permission remain separate. Design models and public assurances are not measured noise, water use or accomplished benefits.", "event_evidence": [{"date": "2026-03-19", "text": "The original Trenton staff report records Council approval of the Prologis commercial and industrial fence permit on March 19, 2026. This dates the limited fence action, without final whole campus permission, vertical construction or commissioned service.", "kind": "approved", "sources": [{"url": "https://www.ci.trenton.oh.us/AgendaCenter/ViewFile/Agenda/_03302026-550", "host": "www.ci.trenton.oh.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39017"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "qts-new-albany-1-franklin-county-oh", "state": "OH", "kind": "facility", "name": "QTS New Albany 1", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Licking"], "city": "New Albany", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. No exact MW, opening event or site capital value adopted. Three-million-dollar electricity-assistance commitment is across Ohio over three years, not this individual campus. County conflict remains in the separate cadastral review.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-106404-00.011'&outFields=*&f=json&returnGeometry=true&outSR=4326", "host": "gis.lickingcounty.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/new-albany-1/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 40.14909, "lng": -82.46501, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"cadastral_response_features": 1, "cadastral_error": null, "parcel_assertions": [{"PID": 98685, "Parcel": "094-106404-00.011", "OwnerName": "QTS NEW ALBANY I DC1 LLC", "SiteAddress": "1235 BEECH RD SW", "SitePostalCity": "NEW ALBANY", "Jurisdiction": "New Albany City", "Municipality": "New Albany", "Township": "Jersey", "TaxAcres": 18.1}]}, "notes": ["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.", "Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-106404-00.011'&outFields=*&f=json&returnGeometry=true&outSR=4326", "host": "gis.lickingcounty.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "direct-operators-round5-2026-10-14.json", "scope": "named operator source", "fields": {"operator_named_listing": "New Albany1"}, "notes": ["No exact MW, opening event or site capital value adopted. Three-million-dollar electricity-assistance commitment is across Ohio over three years, not this individual campus. County conflict remains in the separate cadastral review.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://q.com/data-centers/new-albany-1/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review."], "sources": [{"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · New Albany · Licking · Source context reviewed", "status_scope": "QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39089"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "qts-new-albany-2-franklin-county-oh", "state": "OH", "kind": "facility", "name": "QTS New Albany 2", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Licking"], "city": "New Albany", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. No exact MW, opening event or site capital value adopted. Shared statewide assistance commitment cannot be counted again for this campus. County conflict remains unresolved.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-107502-00.003'&outFields=*&f=json&returnGeometry=true&outSR=4326", "host": "gis.lickingcounty.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/new-albany-2/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 40.05996, "lng": -82.53757, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"cadastral_response_features": 1, "cadastral_error": null, "parcel_assertions": [{"PID": 96153, "Parcel": "094-107502-00.003", "OwnerName": "QTS NEW ALBANY II DC1 LLC", "SiteAddress": "BEECH RD SW", "SitePostalCity": "NEW ALBANY", "Jurisdiction": "New Albany City", "Municipality": "New Albany", "Township": "Jersey", "TaxAcres": 18.85}]}, "notes": ["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.", "Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-107502-00.003'&outFields=*&f=json&returnGeometry=true&outSR=4326", "host": "gis.lickingcounty.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "direct-operators-round5-2026-10-14.json", "scope": "named operator source", "fields": {"operator_named_listing": "New Albany2"}, "notes": ["No exact MW, opening event or site capital value adopted. Shared statewide assistance commitment cannot be counted again for this campus. County conflict remains unresolved.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://q.com/data-centers/new-albany-2/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review."], "sources": [{"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · New Albany · Licking · Source context reviewed", "status_scope": "QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39089"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "qts-van-wert-oh", "state": "OH", "kind": "facility", "name": "QTS Van Wert Data Center Campus", "group": "proposed", "status": "Operator-listed planning", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Van Wert"], "city": "Van Wert", "address": "", "who": "QTS", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer-issued release. Revenue/jobs are forecasts. Cooling no-consumption claim describes future cooling operations, not all facility water use or measured WUE. Its June 11 event is historical by check date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://q.com/news/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/", "host": "q.com", "date": "2026-05-29", "published": "2026-05-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/van-wert/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 40.85543, "lng": -84.58613, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"planned_capital_investment_usd_approx": 10000000000, "forecast_tax_revenue_usd": 200000000, "forecast_tax_revenue_period_years": 20, "forecast_construction_jobs_lower_bound": 1500, "forecast_full_time_qts_jobs_approx": 200, "initial_career_training_commitment_usd": 100000, "planned_cooling_design": "closed loop"}, "notes": ["Developer-issued release. Revenue/jobs are forecasts. Cooling no-consumption claim describes future cooling operations, not all facility water use or measured WUE. Its June 11 event is historical by check date.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://q.com/news/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/", "host": "q.com", "date": "2026-05-29", "published": "2026-05-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "QTS explicitly describes its Van Wert campus as early planning with a concept that is not final. Copied Richmond County wording is excluded; no projected investment, tax receipt or construction outcome is adopted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_planning", "scope": "QTS explicitly describes its Van Wert campus as early planning with a concept that is not final. Copied Richmond County wording is excluded; no projected investment, tax receipt or construction outcome is adopted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["QTS explicitly describes its Van Wert campus as early planning with a concept that is not final. Copied Richmond County wording is excluded; no projected investment, tax receipt or construction outcome is adopted."], "sources": [{"url": "https://q.com/data-centers/van-wert/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 09, October 23, 2026", "scope": "QTS announces plans for this named data center campus in its own dated release. Developer is the attributed provider brand role for the announced project, not proof of construction, operating service, current delivery, legal ownership or a confirmed parcel. The source publication date is not a physical milestone. No status, location, technical figure, investment, jobs, water use, utility cost or environmental outcome is promoted.", "fields": {"company_association": {"name": "QTS", "role": "developer", "identity_scope": "provider_brand_only", "scope": "QTS announces plans for this named data center campus in its own dated release. Developer is the attributed provider brand role for the announced project, not proof of construction, operating service, current delivery, legal ownership or a confirmed parcel. The source publication date is not a physical milestone. No status, location, technical figure, investment, jobs, water use, utility cost or environmental outcome is promoted."}, "provider_role": "developer"}, "notes": ["QTS announces plans for this named data center campus in its own dated release. Developer is the attributed provider brand role for the announced project, not proof of construction, operating service, current delivery, legal ownership or a confirmed parcel. The source publication date is not a physical milestone. No status, location, technical figure, investment, jobs, water use, utility cost or environmental outcome is promoted.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://q.com/news/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/", "host": "q.com", "published": "2026-05-29", "date": "2026-05-29", "checked": "2026-10-23", "label": "Dated first party named campus announcement, planned developer role only"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Van Wert · Van Wert · Source context reviewed", "status_scope": "QTS explicitly describes its Van Wert campus as early planning with a concept that is not final. Copied Richmond County wording is excluded; no projected investment, tax receipt or construction outcome is adopted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39161"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "vantage-oh2-millersport-fairfield-oh", "state": "OH", "kind": "facility", "name": "Vantage Data Centers OH2 (Millersport Campus)", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Fairfield"], "city": "Millersport", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Vantage Millersport explicit IT and building/job categories. 2550headlinejobscombinesconstructionandoperations,not2550permanent.7totalbuildingsnot7DCs;up-to4DCs.696ITnotgasplantnameplate/currentenergizedIT.2.1Bplannedinfrastructureinvestmentnotactualspent/tenantcomputeinvestment. NoRFSdayorsignedpermits/sourceplantapprovalread. Ratepayerclaimnotindependentutilityfinding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://vantagemillersportcampus.com/", "host": "vantagemillersportcampus.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://vantagemillersportcampus.com/construction-updates/", "host": "vantagemillersportcampus.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 39.76468, "lng": -82.64493, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Vantage Millersport explicit IT and building/job categories", "fields": {"developer": "Vantage", "project": "OH2 Millersport campus", "location": "Lancaster Newark Road and Blacklick Road, Village of Millersport, Ohio", "planned_critical_it_mw": 696, "campus_acres": 352, "total_planned_buildings": 7, "data_center_buildings_max": 4, "planned_data_center_area_sqft": 2500000, "planned_investment_usd_min_exclusive": 2100000000, "expected_construction_jobs_min_exclusive": 2500, "expected_vantage_permanent_fulltime_positions_min_exclusive": 50, "power_plan": "adjacent natural gas facility"}, "notes": ["2550headlinejobscombinesconstructionandoperations,not2550permanent.7totalbuildingsnot7DCs;up-to4DCs.696ITnotgasplantnameplate/currentenergizedIT.2.1Bplannedinfrastructureinvestmentnotactualspent/tenantcomputeinvestment. NoRFSdayorsignedpermits/sourceplantapprovalread. Ratepayerclaimnotindependentutilityfinding.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://vantagemillersportcampus.com/", "host": "vantagemillersportcampus.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 33", "scope": "The current named Millersport site describes a campus being developed and publishes a monthly activity calendar through December 2026. Project listed development applies to that explicit company proposal. The calendar mixes elapsed, current and future planned grading, utility and foundation activities; it is not a certified completed work log. No listed month becomes an accomplished construction start or completion day. The adjacent proposed gas generation facility, future benefits and forecast costs are separate from data center operation.", "fields": {"current_stage_evidence": {"outcome": "current_named_millersport_development_and_planned_activity_calendar", "scope": "The current named Millersport site describes a campus being developed and publishes a monthly activity calendar through December 2026. Project listed development applies to that explicit company proposal. The calendar mixes elapsed, current and future planned grading, utility and foundation activities; it is not a certified completed work log. No listed month becomes an accomplished construction start or completion day. The adjacent proposed gas generation facility, future benefits and forecast costs are separate from data center operation."}}, "notes": ["The current named Millersport site describes a campus being developed and publishes a monthly activity calendar through December 2026. Project listed development applies to that explicit company proposal. The calendar mixes elapsed, current and future planned grading, utility and foundation activities; it is not a certified completed work log. No listed month becomes an accomplished construction start or completion day. The adjacent proposed gas generation facility, future benefits and forecast costs are separate from data center operation.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://vantagemillersportcampus.com/", "host": "vantagemillersportcampus.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://vantagemillersportcampus.com/construction-updates/", "host": "vantagemillersportcampus.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Millersport · Fairfield · Source context reviewed", "status_scope": "The current named Millersport site describes a campus being developed and publishes a monthly activity calendar through December 2026. Project listed development applies to that explicit company proposal. The calendar mixes elapsed, current and future planned grading, utility and foundation activities; it is not a certified completed work log. No listed month becomes an accomplished construction start or completion day. The adjacent proposed gas generation facility, future benefits and forecast costs are separate from data center operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39045"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "iren-woods-county-ok", "state": "OK", "kind": "facility", "name": "IREN Woods County Campus", "group": "proposed", "status": "In development", "raw_status": "in development", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Woods"], "city": "Alva", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. IREN Oklahoma future grid ramp and geographic gap. 1600MWfuturesecuredpowernotIT/currentenergization. State-onlypagewithoutWoodsCountyexactpoint;countyrequiresotherprimarysource. Under6mslatencymarketingnotmethod/endpoints/independentnetworktest. No exactopeningday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. The 2028 substation energization date is a forecast. Capacity and acreage are development specifications; they are not measured IT load or a newly validated parcel. No current operation inferred. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://iren.com/data-centers/oklahoma", "host": "iren.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 36.76691, "lng": -98.86452, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "IREN Oklahoma future grid ramp and geographic gap", "fields": {"operator": "IREN", "campus_label": "Oklahoma", "planned_power_secured_mw": 1600, "land_acres": 2000, "operator_described_stage": "in development", "substation_energization_target_year": 2028}, "notes": ["1600MWfuturesecuredpowernotIT/currentenergization. State-onlypagewithoutWoodsCountyexactpoint;countyrequiresotherprimarysource. Under6mslatencymarketingnotmethod/endpoints/independentnetworktest. No exactopeningday.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://iren.com/data-centers/oklahoma", "host": "iren.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "in development", "status_basis": "IREN explicitly labels the Oklahoma campus In Development.", "filter_scope": "Grouped with proposed/development projects; no final permit or exact construction stage is inferred."}, "notes": ["The 2028 substation energization date is a forecast. Capacity and acreage are development specifications; they are not measured IT load or a newly validated parcel. No current operation inferred. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://iren.com/data-centers/oklahoma", "host": "iren.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "91ffa2e80a5ee4d5847d0706655faaf350080ca0f9310cd6d4d61282ae9b322c", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Alva · Woods · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40151"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "beltline-piedmont-kingfisher-county-ok", "state": "OK", "kind": "facility", "name": "Beltline Energy Piedmont Site", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kingfisher"], "city": "Piedmont", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. 321-acre Beltline proposal is distinct from 630-acre Cloverleaf. Do not assign Cloverleaf power, jobs or water claims to Beltline; council disposition not established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://okcfox.com/news/local/commission-urges-council-to-deny-cloverleaf-plan-beltline-energy-vote-delayed-for-review", "host": "okcfox.com", "date": "2026-06-01", "published": "2026-06-01", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://piedmont-ok.gov/323/Data-Center-Transparency-Portal", "host": "piedmont-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://piedmont-ok.gov/DocumentCenter/View/950/Ordinance-2026-003", "host": "piedmont-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 35.94554, "lng": -97.94174, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-outcomes-review-round20-2026-10-14.json", "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.", "fields": {"reported_action_type": "planning-recommendation-and-deferral", "reported_finding": "Piedmont planning commission recommended denying Cloverleaf, but deferred action on BLE Landholdings / Beltline Energy.", "report_display_date": "2026-06-01", "independently_verified_current_status": null}, "notes": ["321-acre Beltline proposal is distinct from 630-acre Cloverleaf. Do not assign Cloverleaf power, jobs or water claims to Beltline; council disposition not established.", "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://okcfox.com/news/local/commission-urges-council-to-deny-cloverleaf-plan-beltline-energy-vote-delayed-for-review", "host": "okcfox.com", "date": "2026-06-01", "published": "2026-06-01", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage.", "fields": {"current_stage_evidence": {"outcome": "city_named_piedmont_project_listed_draft_legal_force_held", "scope": "The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage."}, "source_read_scope": {"complete_original_city_portal_body_read": true, "all_original_six_page_ordinance_text_read": true, "original_ordinance_physical_page6_actually_viewed": true, "adoption_day_and_signatures_blank": true, "portal_updated_drafts_not_completed_vote": true, "oversized_oct22_cloverleaf_document_not_read_or_replaced": true, "no_site_location_jurisdiction_or_role_change": true}}, "notes": ["The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://piedmont-ok.gov/323/Data-Center-Transparency-Portal", "host": "piedmont-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://piedmont-ok.gov/DocumentCenter/View/950/Ordinance-2026-003", "host": "piedmont-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Piedmont · Kingfisher · Source context reviewed", "status_scope": "The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40073"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "oklahoma-ai-ventures-black-bear-noble-county-ok", "state": "OK", "kind": "facility", "name": "Black Bear AI Data Center Campus", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Noble"], "city": "Perry", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Jericho describes Oklahoma AI Ventures launched April2025 and Black Bear as its flagship development between Oklahoma City and Tulsa. The roughly47000acres describe a subsurface oil/gas JV portfolio, not the data center parcel or fee-simple campus. Noble County identity is not established by this page. Existing infrastructure network and planned grid/gas/hydrogen resilience are not completed campus infrastructure, zero-emission operation or an executed utility agreement. No IT MW, tenant or ready-for-service date verified. Not whole-record or current operating-census certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.jerichoenergyventures.com/aidatacenter", "host": "jerichoenergyventures.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 36.3885, "lng": -97.2306, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-and-original-local-reporting-round57-2026-10-15.json", "scope": "Operator or original local-reporting context; source dates and proposal stages retained.", "fields": {}, "notes": ["Jericho describes Oklahoma AI Ventures launched April2025 and Black Bear as its flagship development between Oklahoma City and Tulsa. The roughly47000acres describe a subsurface oil/gas JV portfolio, not the data center parcel or fee-simple campus. Noble County identity is not established by this page. Existing infrastructure network and planned grid/gas/hydrogen resilience are not completed campus infrastructure, zero-emission operation or an executed utility agreement. No IT MW, tenant or ready-for-service date verified.", "Not whole-record or current operating-census certification."], "sources": [{"url": "https://www.jerichoenergyventures.com/aidatacenter", "host": "jerichoenergyventures.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "The complete original issuer page explicitly describes Black Bear as its flagship computing campus development and offers future build to suit facilities. This supports a company listed proposal. Producing oil and gas infrastructure, available energy and deployment readiness are not proof of computing construction or operation at this campus. The broad subsurface portfolio is separate from the physical campus area. The venture account gives April 2025 without an exact day, so no exact announcement event is invented.", "fields": {"current_stage_evidence": {"outcome": "issuer_named_black_bear_development", "scope": "The complete original issuer page explicitly describes Black Bear as its flagship computing campus development and offers future build to suit facilities. This supports a company listed proposal. Producing oil and gas infrastructure, available energy and deployment readiness are not proof of computing construction or operation at this campus. The broad subsurface portfolio is separate from the physical campus area. The venture account gives April 2025 without an exact day, so no exact announcement event is invented."}, "source_read_scope": {"complete_original_issuer_computing_page_body_read": true, "energy_assets_and_readiness_not_computing_operation": true, "portfolio_land_not_specific_campus_boundary": true, "month_only_not_invented_exact_event_day": true}}, "notes": ["The complete original issuer page explicitly describes Black Bear as its flagship computing campus development and offers future build to suit facilities. This supports a company listed proposal. Producing oil and gas infrastructure, available energy and deployment readiness are not proof of computing construction or operation at this campus. The broad subsurface portfolio is separate from the physical campus area. The venture account gives April 2025 without an exact day, so no exact announcement event is invented.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.jerichoenergyventures.com/aidatacenter", "host": "www.jerichoenergyventures.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Perry · Noble · Source context reviewed", "status_scope": "The complete original issuer page explicitly describes Black Bear as its flagship computing campus development and offers future build to suit facilities. This supports a company listed proposal. Producing oil and gas infrastructure, available energy and deployment readiness are not proof of computing construction or operation at this campus. The broad subsurface portfolio is separate from the physical campus area. The venture account gives April 2025 without an exact day, so no exact announcement event is invented.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40103"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "cerebras-oklahoma-city-ok", "state": "OK", "kind": "facility", "name": "Cerebras Oklahoma City Data Center", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Oklahoma"], "city": "Oklahoma City", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not certify actual opening from dated forecast. Publication date and June/Q3forecast conflict; need newer release. 20x/40milliontokens capacity is portfolio compute throughput, not site MW. Release contains conflicting publication labels and commissioning forecasts: headerFeb11, bodyMarch11; listQ3, narrativeJune2025. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.cerebras.ai/press-release/cerebras-announces-six-new-ai-datacenters-across-north-america-and-europe-to-deliver-industry-s", "host": "cerebras.ai", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 35.5269, "lng": -97.40504, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "field-verification-2026-10-14.json", "scope": "Field or source context only", "fields": {"city": "Oklahoma City", "operator": "Cerebras", "planned_systems_min": 300, "system_basis": "CS3 systems planned for ScaleDataCenter"}, "notes": ["Do not certify actual opening from dated forecast.", "Publication date and June/Q3forecast conflict; need newer release.", "20x/40milliontokens capacity is portfolio compute throughput, not site MW.", "Release contains conflicting publication labels and commissioning forecasts: headerFeb11, bodyMarch11; listQ3, narrativeJune2025.", "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.cerebras.ai/press-release/cerebras-announces-six-new-ai-datacenters-across-north-america-and-europe-to-deliver-industry-s", "host": "cerebras.ai", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "The complete original issuer expansion release identifies Oklahoma City in its proposed computing expansion and gives future start forecasts. This supports a company listed proposal at that statement scope. Its February 11, 2025 header conflicts with the March 11, 2025 dateline, and its third quarter forecast conflicts with the June forecast elsewhere in the same body. These dates remain separate and no exact publication event or actual commissioned operation is inferred from the elapsed forecasts. Generic multi center launch language is not exact Oklahoma City service.", "fields": {"current_stage_evidence": {"outcome": "issuer_named_okc_future_expansion_with_date_conflicts", "scope": "The complete original issuer expansion release identifies Oklahoma City in its proposed computing expansion and gives future start forecasts. This supports a company listed proposal at that statement scope. Its February 11, 2025 header conflicts with the March 11, 2025 dateline, and its third quarter forecast conflicts with the June forecast elsewhere in the same body. These dates remain separate and no exact publication event or actual commissioned operation is inferred from the elapsed forecasts. Generic multi center launch language is not exact Oklahoma City service."}, "source_read_scope": {"complete_original_release_body_read": true, "header_feb11_and_dateline_mar11_not_harmonized": true, "q3_and_june_forecasts_not_harmonized_or_accomplished": true, "generic_launch_not_exact_okc_commissioning": true}}, "notes": ["The complete original issuer expansion release identifies Oklahoma City in its proposed computing expansion and gives future start forecasts. This supports a company listed proposal at that statement scope. Its February 11, 2025 header conflicts with the March 11, 2025 dateline, and its third quarter forecast conflicts with the June forecast elsewhere in the same body. These dates remain separate and no exact publication event or actual commissioned operation is inferred from the elapsed forecasts. Generic multi center launch language is not exact Oklahoma City service.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.cerebras.ai/press-release/cerebras-announces-six-new-ai-datacenters-across-north-america-and-europe-to-deliver-industry-s", "host": "www.cerebras.ai", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Oklahoma City · Oklahoma · Source context reviewed", "status_scope": "The complete original issuer expansion release identifies Oklahoma City in its proposed computing expansion and gives future start forecasts. This supports a company listed proposal at that statement scope. Its February 11, 2025 header conflicts with the March 11, 2025 dateline, and its third quarter forecast conflicts with the June forecast elsewhere in the same body. These dates remain separate and no exact publication event or actual commissioned operation is inferred from the elapsed forecasts. Generic multi center launch language is not exact Oklahoma City service.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40109"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "cloverleaf-project-open-sky-piedmont-ok", "state": "OK", "kind": "facility", "name": "Cloverleaf Project Open Sky", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Canadian"], "city": "Piedmont", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Not a vote result. July 27 year confirmed by page publication metadata. Developer forecasts in article are not current load, delivered jobs, annual receipts or verified water use. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.radiooklahomanews.com/post/piedmont-data-center-proposal-heads-to-city-council-vote-tonight", "host": "radiooklahomanews.com", "date": "2026-07-27", "published": "2026-07-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://piedmont-ok.gov/323/Data-Center-Transparency-Portal", "host": "piedmont-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://piedmont-ok.gov/DocumentCenter/View/950/Ordinance-2026-003", "host": "piedmont-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 35.54234, "lng": -97.98216, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-outcomes-review-round20-2026-10-14.json", "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.", "fields": {"reported_action_type": "scheduled-council-vote", "reported_finding": "Radio Oklahoma says Project Open Sky / Cloverleaf rezoning would be considered that evening.", "report_display_date": "2026-07-27", "independently_verified_current_status": null}, "notes": ["Not a vote result. July 27 year confirmed by page publication metadata. Developer forecasts in article are not current load, delivered jobs, annual receipts or verified water use.", "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.radiooklahomanews.com/post/piedmont-data-center-proposal-heads-to-city-council-vote-tonight", "host": "radiooklahomanews.com", "date": "2026-07-27", "published": "2026-07-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage.", "fields": {"current_stage_evidence": {"outcome": "city_named_piedmont_project_listed_draft_legal_force_held", "scope": "The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage."}, "source_read_scope": {"complete_original_city_portal_body_read": true, "all_original_six_page_ordinance_text_read": true, "original_ordinance_physical_page6_actually_viewed": true, "adoption_day_and_signatures_blank": true, "portal_updated_drafts_not_completed_vote": true, "oversized_oct22_cloverleaf_document_not_read_or_replaced": true, "no_site_location_jurisdiction_or_role_change": true}}, "notes": ["The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://piedmont-ok.gov/323/Data-Center-Transparency-Portal", "host": "piedmont-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://piedmont-ok.gov/DocumentCenter/View/950/Ordinance-2026-003", "host": "piedmont-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Piedmont · Canadian · Source context reviewed", "status_scope": "The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40017"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "fluidstack-okmulgee-county-ok", "state": "OK", "kind": "facility", "name": "Fluidstack Okmulgee County Data Center", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Okmulgee"], "city": "Okmulgee", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fluidstack Okmulgee forecast, tenant claim and voluntary commitments. 7McommitmentnotactualpaymentorsignedCBAschedule. No executedtenantleaseorMWread. Statutorycompliance/ratepayerprotectionclaimsnotindependentlegalfinding;SB259textnotinspectedhere.60decibelsnotexplicitAweighting/timebasisoractualmeasurement. Olympic-poolcomparisonnotnumericverifiedwaterconsumption. Noon-siteinspection,approvalorenergizationconfirmed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.okmulgeefluidstack.io/", "host": "okmulgeefluidstack.io", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 35.64659, "lng": -95.96425, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Fluidstack Okmulgee forecast, tenant claim and voluntary commitments", "fields": {"developer": "Fluidstack", "locality": "Okmulgee County, Oklahoma", "first_phase_service_target": "2027-09", "final_phase_service_target": "2028-09", "developer_named_first_tenant": "Jane Street", "joint_education_commitment_usd": 7000000, "developer_claims_no_local_property_tax_incentives_sought": true, "operator_named_power_provider": "AEP-PSO", "voluntary_boundary_noise_limit_db": 60}, "notes": ["7McommitmentnotactualpaymentorsignedCBAschedule. No executedtenantleaseorMWread. Statutorycompliance/ratepayerprotectionclaimsnotindependentlegalfinding;SB259textnotinspectedhere.60decibelsnotexplicitAweighting/timebasisoractualmeasurement. Olympic-poolcomparisonnotnumericverifiedwaterconsumption. Noon-siteinspection,approvalorenergizationconfirmed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.okmulgeefluidstack.io/", "host": "okmulgeefluidstack.io", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "The complete original named project page describes a computing campus being developed and targets its first operating phase in September 2027 and final phase in September 2028. This supports a company listed proposal without independently verified construction or operation. Prospective tenant descriptions, cooling commitments, voluntary sound limits, ratepayer promises and asserted statutory compliance are attributed project claims rather than measured performance or a verified legal determination. No technical quantities, investment, tenant roles or resource findings are adopted.", "fields": {"current_stage_evidence": {"outcome": "issuer_named_okmulgee_future_development", "scope": "The complete original named project page describes a computing campus being developed and targets its first operating phase in September 2027 and final phase in September 2028. This supports a company listed proposal without independently verified construction or operation. Prospective tenant descriptions, cooling commitments, voluntary sound limits, ratepayer promises and asserted statutory compliance are attributed project claims rather than measured performance or a verified legal determination. No technical quantities, investment, tenant roles or resource findings are adopted."}, "source_read_scope": {"complete_original_project_page_body_read": true, "years2027_and2028_forecasts_not_accomplished": true, "developer_compliance_assertions_not_independent_legal_finding": true, "no_resource_or_capacity_fields_changed": true}}, "notes": ["The complete original named project page describes a computing campus being developed and targets its first operating phase in September 2027 and final phase in September 2028. This supports a company listed proposal without independently verified construction or operation. Prospective tenant descriptions, cooling commitments, voluntary sound limits, ratepayer promises and asserted statutory compliance are attributed project claims rather than measured performance or a verified legal determination. No technical quantities, investment, tenant roles or resource findings are adopted.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.okmulgeefluidstack.io/", "host": "www.okmulgeefluidstack.io", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Okmulgee · Okmulgee · Source context reviewed", "status_scope": "The complete original named project page describes a computing campus being developed and targets its first operating phase in September 2027 and final phase in September 2028. This supports a company listed proposal without independently verified construction or operation. Prospective tenant descriptions, cooling commitments, voluntary sound limits, ratepayer promises and asserted statutory compliance are attributed project claims rather than measured performance or a verified legal determination. No technical quantities, investment, tenant roles or resource findings are adopted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40111"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "google-muskogee-county-ok", "state": "OK", "kind": "project", "name": "Google Muskogee County Data Center Campuses", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Muskogee"], "city": "Council Hill", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The statewide program is not nine billion per campus. Renewable-generation agreements are not site IT demand. Construction dates were not released, and infrastructure-cost promises are not a retained executed agreement. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.newson6.com/technology/google-data-centers-muskogee-county-oklahoma", "host": "newson6.com", "date": "2025-11-20", "published": "2025-11-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/oklahoma/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 35.63652, "lng": -95.40172, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "NewsOn6 describes Google's announced Summit and Council Hill campuses within a nine-billion-USD Oklahoma investment program.", "independently_verified_current_operating_status": null}, "notes": ["The statewide program is not nine billion per campus. Renewable-generation agreements are not site IT demand. Construction dates were not released, and infrastructure-cost promises are not a retained executed agreement.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.newson6.com/technology/google-data-centers-muskogee-county-oklahoma", "host": "newson6.com", "date": "2025-11-20", "published": "2025-11-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Muskogee County, Oklahoma is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "Google describes Muskogee County as in development and dates its campus announcement to 2025; this is not proof of issued permits, construction or operation.", "current_status_basis": "Google’s current location page names Muskogee County, Oklahoma as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/oklahoma/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Council Hill · Muskogee · Source context reviewed", "status_scope": "Google’s current location page names Muskogee County, Oklahoma as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40101"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "google-stillwater-ok", "state": "OK", "kind": "project", "name": "Google Stillwater Data Center Campus", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Payne"], "city": "Stillwater", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public introduction and caption were read; no email gate was submitted and the full article was not reviewed. The introduction's next-two-years window differs from the caption. Construction does not establish operating IT capacity. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.thestillwegian.news/2025-storylines-big-tech-comes-to-town/", "host": "thestillwegian.news", "date": "2025-12-29", "published": "2025-12-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/oklahoma/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 36.07733, "lng": -96.97547, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "The Stillwegian's public introduction and December 24 construction caption describe Google's Stillwater campus, a first-phase 2026 target and a three-billion-USD plan.", "independently_verified_current_operating_status": null}, "notes": ["Only the public introduction and caption were read; no email gate was submitted and the full article was not reviewed. The introduction's next-two-years window differs from the caption. Construction does not establish operating IT capacity.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.thestillwegian.news/2025-storylines-big-tech-comes-to-town/", "host": "thestillwegian.news", "date": "2025-12-29", "published": "2025-12-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Stillwater, Oklahoma is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "Google describes Stillwater as in development and dates its campus announcement to 2025; this is not proof of issued permits, construction or operation.", "current_status_basis": "Google’s current location page names Stillwater, Oklahoma as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/oklahoma/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Stillwater · Payne · Source context reviewed", "status_scope": "Google’s current location page names Stillwater, Oklahoma as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40119"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "lambda-midamerica-industrial-park-chouteau-ok", "state": "OK", "kind": "facility", "name": "Lambda MidAmerica Industrial Park Data Center", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Mayes"], "city": "Chouteau", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lambda Mayes planned development and tax forecast. 500Mtaxforecastnotcapexoractualcollectionandnotautomatically50Mguaranteedeachyear. No numericITMW,exactparcelorRFSinreviewedannouncementsections. Statutoryratepayercomplianceandfederalpledgeclaimsnotindependentlyverifiedlegalorregulatoryfinding. Closedloopnotzero domesticwater. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-09-27", "The original Lambda September 27, 2026 release announces the Chouteau campus development. This dates the issuer statement rather than an exact first construction day, installed computing hardware or commissioned service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://lambda.ai/blog/new-lambda-data-center-in-oklahoma", "host": "lambda.ai", "date": "2026-09-27", "published": "2026-09-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 36.31666, "lng": -95.24668, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Lambda Mayes planned development and tax forecast", "fields": {"operator": "Lambda", "announcement_date": "2026-09-27", "project_location": "south section MidAmerica Industrial Park, Chouteau, Mayes County, Oklahoma", "school_tax_boundary": "Chouteau-Mazie Public School District", "estimated_tenyear_taxes_usd": 500000000, "tax_estimate_basis": "current rates, future tenyear period", "expected_construction_jobs_max": 1000, "expected_permanent_positions_max": 100, "cooling_plan": "closed loop"}, "notes": ["500Mtaxforecastnotcapexoractualcollectionandnotautomatically50Mguaranteedeachyear. No numericITMW,exactparcelorRFSinreviewedannouncementsections. Statutoryratepayercomplianceandfederalpledgeclaimsnotindependentlyverifiedlegalorregulatoryfinding. Closedloopnotzero domesticwater.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://lambda.ai/blog/new-lambda-data-center-in-oklahoma", "host": "lambda.ai", "date": "2026-09-27", "published": "2026-09-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "The complete original September 27, 2026 issuer announcement describes plans and development of the Chouteau computing campus. This supports a company listed proposal. Future construction staffing, site preparation and phrasing about construction getting underway do not independently establish completed building work or computing service. Cooling and ratepayer pledges are prospective claims, and no future hardware or customer is treated as installed operation.", "fields": {"current_stage_evidence": {"outcome": "issuer_named_chouteau_campus_plans", "scope": "The complete original September 27, 2026 issuer announcement describes plans and development of the Chouteau computing campus. This supports a company listed proposal. Future construction staffing, site preparation and phrasing about construction getting underway do not independently establish completed building work or computing service. Cooling and ratepayer pledges are prospective claims, and no future hardware or customer is treated as installed operation."}, "source_read_scope": {"complete_original_release_body_read": true, "plans_and_forward_construction_language_not_commissioned": true, "no_site_preparation_as_operating_role": true, "no_hardware_power_water_or_job_quantities_adopted": true}}, "notes": ["The complete original September 27, 2026 issuer announcement describes plans and development of the Chouteau computing campus. This supports a company listed proposal. Future construction staffing, site preparation and phrasing about construction getting underway do not independently establish completed building work or computing service. Cooling and ratepayer pledges are prospective claims, and no future hardware or customer is treated as installed operation.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://lambda.ai/blog/new-lambda-data-center-in-oklahoma", "host": "lambda.ai", "published": "2026-09-27", "date": "2026-09-27", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Chouteau · Mayes · Source context reviewed", "status_scope": "The complete original September 27, 2026 issuer announcement describes plans and development of the Chouteau computing campus. This supports a company listed proposal. Future construction staffing, site preparation and phrasing about construction getting underway do not independently establish completed building work or computing service. Cooling and ratepayer pledges are prospective claims, and no future hardware or customer is treated as installed operation.", "event_evidence": [{"date": "2026-09-27", "text": "The original Lambda September 27, 2026 release announces the Chouteau campus development. This dates the issuer statement rather than an exact first construction day, installed computing hardware or commissioned service.", "kind": "announced", "sources": [{"url": "https://lambda.ai/blog/new-lambda-data-center-in-oklahoma", "host": "lambda.ai", "published": "2026-09-27", "date": "2026-09-27", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40097"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "beltline-luther-horizon-technology-park-ok", "state": "OK", "kind": "facility", "name": "Luther Horizon Technology Park", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Oklahoma"], "city": "Luther", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Investment/jobs/payroll/noise limits and utility protections are proposals, not measured impacts or executed agreements. Will-serve letter is still required; no current supply agreement inferred. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://lutherhorizontechnologypark.com/", "host": "lutherhorizontechnologypark.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 35.55149, "lng": -97.40719, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.", "fields": {"reported_context": "Luther Horizon operator project site explicitly says current details are design intentions under community/regulatory review, with final terms to be set.", "independently_verified_current_operating_status": null}, "notes": ["Investment/jobs/payroll/noise limits and utility protections are proposals, not measured impacts or executed agreements. Will-serve letter is still required; no current supply agreement inferred.", "Original executed approvals, current operator disclosures and subsequent decisions take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://lutherhorizontechnologypark.com/", "host": "lutherhorizontechnologypark.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "The complete original project page explicitly states that the campus is in community input and regulatory review and that final terms remain for the Town approval process. This supports a company listed proposal. Claimed buffers, future utility letters, contemplated written agreements, sound limits and environmental studies are attributed proposed standards rather than verified enacted law, executed obligations or achieved compliance. Adjacent energy infrastructure, revenue estimates and future jobs are not computing construction or operation.", "fields": {"current_stage_evidence": {"outcome": "original_luther_project_explicit_regulatory_review", "scope": "The complete original project page explicitly states that the campus is in community input and regulatory review and that final terms remain for the Town approval process. This supports a company listed proposal. Claimed buffers, future utility letters, contemplated written agreements, sound limits and environmental studies are attributed proposed standards rather than verified enacted law, executed obligations or achieved compliance. Adjacent energy infrastructure, revenue estimates and future jobs are not computing construction or operation."}, "source_read_scope": {"complete_original_project_page_body_read": true, "explicit_review_process_and_future_final_terms_read": true, "claimed_town_standards_not_independently_verified_enactment": true, "no_energy_adjacency_as_computing_operation": true}}, "notes": ["The complete original project page explicitly states that the campus is in community input and regulatory review and that final terms remain for the Town approval process. This supports a company listed proposal. Claimed buffers, future utility letters, contemplated written agreements, sound limits and environmental studies are attributed proposed standards rather than verified enacted law, executed obligations or achieved compliance. Adjacent energy infrastructure, revenue estimates and future jobs are not computing construction or operation.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://lutherhorizontechnologypark.com/", "host": "lutherhorizontechnologypark.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Luther · Oklahoma · Source context reviewed", "status_scope": "The complete original project page explicitly states that the campus is in community input and regulatory review and that final terms remain for the Town approval process. This supports a company listed proposal. Claimed buffers, future utility letters, contemplated written agreements, sound limits and environmental studies are attributed proposed standards rather than verified enacted law, executed obligations or achieved compliance. Adjacent energy infrastructure, revenue estimates and future jobs are not computing construction or operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40109"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "beale-project-atlas-coweta-ok", "state": "OK", "kind": "facility", "name": "Project Atlas at Coweta", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Wagoner"], "city": "Coweta", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Report is secondary commentary, not originalwithdrawalletter or finalcourt/permitrecord.270 acres is Atlasproposal, notIRENcampus. IREN 2000 acres/50 billion/1.2 GWandChildress 750 MW/Sweetwater 1.4 GWare otherprojects withdifferentgeneration/load/energizationstages. HB 2992/SB 259 legalstatusandscope are not independently reviewed here. Author’s single-week framing spansweeks/months, and no actualweek,lawdate,watercontractoutcomeorassetvaluationinferenceadopted. NoAtlascriticalIT/ESA/currentbuildverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-03-20", "The original Coweta City March 20, 2026 notice publishes procedures for a scheduled April 6 Project Atlas hearing. This dates publication of the procedures rather than an accomplished hearing, vote, approval or physical stage. The December 2025 newsletter supplies no exact publication day."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://infrathesis.substack.com/p/oklahoma-is-walling-off-data-centers", "host": "infrathesis.substack.com", "date": "2026-05-30", "published": "2026-05-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.cityofcoweta-ok.gov/ArchiveCenter/ViewFile/Item/1158", "host": "www.cityofcoweta-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.cityofcoweta-ok.gov/m/newsflash/Archive/Item/569?arcId=816", "host": "www.cityofcoweta-ok.gov", "published": "2026-03-20", "date": "2026-03-20", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 35.96155, "lng": -95.52118, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "InfraThesis investment commentary reports Beale withdrew CowetaProjectAtlas onMarch 30 after opposition, while primarily arguing implications forIREN’sseparateOklahoma/Texasportfolio.", "independently_verified_current_operating_status": null}, "notes": ["Report is secondary commentary, not originalwithdrawalletter or finalcourt/permitrecord.270 acres is Atlasproposal, notIRENcampus. IREN 2000 acres/50 billion/1.2 GWandChildress 750 MW/Sweetwater 1.4 GWare otherprojects withdifferentgeneration/load/energizationstages. HB 2992/SB 259 legalstatusandscope are not independently reviewed here. Author’s single-week framing spansweeks/months, and no actualweek,lawdate,watercontractoutcomeorassetvaluationinferenceadopted. NoAtlascriticalIT/ESA/currentbuildverified.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://infrathesis.substack.com/p/oklahoma-is-walling-off-data-centers", "host": "infrathesis.substack.com", "date": "2026-05-30", "published": "2026-05-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-F1-label-review-2026-10-20", "scope": "InfraThesis investment commentary describes a Project Atlas withdrawal while discussing a different IREN project. This pass does not adopt that commentary as an independently verified current application outcome. Exact original company or city confirmation remains a separate lead.", "fields": {"identity_label_context": {"previous_name": "Project Atlas (Coweta)  -  withdrawn", "plain_name": "Project Atlas at Coweta", "interpretation": "InfraThesis investment commentary describes a Project Atlas withdrawal while discussing a different IREN project. This pass does not adopt that commentary as an independently verified current application outcome. Exact original company or city confirmation remains a separate lead.", "outcome_wording_is_not_identity": true}}, "notes": ["InfraThesis investment commentary describes a Project Atlas withdrawal while discussing a different IREN project. This pass does not adopt that commentary as an independently verified current application outcome. Exact original company or city confirmation remains a separate lead.", "Inherited inventory name: Project Atlas (Coweta)  -  withdrawn. The wording is retained as provenance, not as an independently verified outcome.", "An application decision is separate from a current physical stage. No coordinate, address, parcel, company role, technical figure or physical milestone date is changed."], "sources": [{"url": "https://infrathesis.substack.com/p/oklahoma-is-walling-off-data-centers", "host": "infrathesis.substack.com", "published": "2026-05-30", "date": "2026-05-30", "checked": "2026-10-20", "label": "The Infrastructure Thesis"}], "checked": "2026-10-20", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "Selected original December 2025 City Manager newsletter physical page 3 explicitly identifies the Beale Project Atlas proposal. The complete original March 20, 2026 City notice supplies procedures for a scheduled April 6 public hearing. Together these support an agency listed proposal at the statement scope. A historical schedule and public comment procedures do not establish that the hearing occurred, a vote outcome, permission, current construction or computing operation. The original project page returned 404 and was not supplied by an alternate copy. Future community revenue and environmental assurances are not accomplished benefits or measured harm.", "fields": {"current_stage_evidence": {"outcome": "original_city_named_coweta_atlas_proposal", "scope": "Selected original December 2025 City Manager newsletter physical page 3 explicitly identifies the Beale Project Atlas proposal. The complete original March 20, 2026 City notice supplies procedures for a scheduled April 6 public hearing. Together these support an agency listed proposal at the statement scope. A historical schedule and public comment procedures do not establish that the hearing occurred, a vote outcome, permission, current construction or computing operation. The original project page returned 404 and was not supplied by an alternate copy. Future community revenue and environmental assurances are not accomplished benefits or measured harm."}, "source_read_scope": {"original_newsletter_selected_physical_page3_text_read": true, "complete_original_march20_speaker_procedure_body_read": true, "historical_schedule_not_actual_hearing_or_vote": true, "original_project_page404_not_replaced": true, "no_month_only_date_as_exact_event": true}}, "notes": ["Selected original December 2025 City Manager newsletter physical page 3 explicitly identifies the Beale Project Atlas proposal. The complete original March 20, 2026 City notice supplies procedures for a scheduled April 6 public hearing. Together these support an agency listed proposal at the statement scope. A historical schedule and public comment procedures do not establish that the hearing occurred, a vote outcome, permission, current construction or computing operation. The original project page returned 404 and was not supplied by an alternate copy. Future community revenue and environmental assurances are not accomplished benefits or measured harm.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.cityofcoweta-ok.gov/ArchiveCenter/ViewFile/Item/1158", "host": "www.cityofcoweta-ok.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.cityofcoweta-ok.gov/m/newsflash/Archive/Item/569?arcId=816", "host": "www.cityofcoweta-ok.gov", "published": "2026-03-20", "date": "2026-03-20", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Coweta · Wagoner · Source context reviewed", "status_scope": "Selected original December 2025 City Manager newsletter physical page 3 explicitly identifies the Beale Project Atlas proposal. The complete original March 20, 2026 City notice supplies procedures for a scheduled April 6 public hearing. Together these support an agency listed proposal at the statement scope. A historical schedule and public comment procedures do not establish that the hearing occurred, a vote outcome, permission, current construction or computing operation. The original project page returned 404 and was not supplied by an alternate copy. Future community revenue and environmental assurances are not accomplished benefits or measured harm.", "event_evidence": [{"date": "2026-03-20", "text": "The original Coweta City March 20, 2026 notice publishes procedures for a scheduled April 6 Project Atlas hearing. This dates publication of the procedures rather than an accomplished hearing, vote, approval or physical stage. The December 2025 newsletter supplies no exact publication day.", "kind": "announced", "sources": [{"url": "https://www.cityofcoweta-ok.gov/m/newsflash/Archive/Item/569?arcId=816", "host": "www.cityofcoweta-ok.gov", "published": "2026-03-20", "date": "2026-03-20", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40145"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "beale-project-mustang-claremore-ok", "state": "OK", "kind": "facility", "name": "Project Mustang", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Rogers"], "city": "Claremore", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Noformalcommitment, approval, landclosing or executedutilitycontract established. CityofClaremore/GRDA supplydescription is anticipatedarrangement, not verifiedreservedcapacity. Air-coolingclaim is design, not zeroactualwater certification. Clydesdale 1 billion/506 acres, CowetaAtlas andotherBealeprojects are distinct; nofigures transferredtoMustang. January 26 update is not a newpermit/actiondate. NoMWorcurrentRFSadopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://constructionreviewonline.com/beale-infrastructure-in-talks-to-build-project-mustang-data-center-campus-outside-tulsa-oklahoma/", "host": "constructionreviewonline.com", "date": "2026-01-06", "published": "2026-01-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://bealeinfra.com/location/claremore/", "host": "bealeinfra.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 36.37159, "lng": -95.60426, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "ConstructionReview reports Beale’s preliminary ProjectMustang discussions and due diligence for ClaremoreIndustrialPark, with numberofbuildingsundisclosed andfirst-phase 2028 target.", "independently_verified_current_operating_status": null}, "notes": ["Noformalcommitment, approval, landclosing or executedutilitycontract established. CityofClaremore/GRDA supplydescription is anticipatedarrangement, not verifiedreservedcapacity. Air-coolingclaim is design, not zeroactualwater certification. Clydesdale 1 billion/506 acres, CowetaAtlas andotherBealeprojects are distinct; nofigures transferredtoMustang. January 26 update is not a newpermit/actiondate. NoMWorcurrentRFSadopted.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://constructionreviewonline.com/beale-infrastructure-in-talks-to-build-project-mustang-data-center-campus-outside-tulsa-oklahoma/", "host": "constructionreviewonline.com", "date": "2026-01-06", "published": "2026-01-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "The complete original developer page identifies the planned Claremore campus and a future phase program. This supports a company listed proposal at the named developer campus scope. Its seasonal Fall 2026 construction timeline does not independently establish that work began, and no exact construction day is invented. Prospective completion, incentive approvals, workforce partnerships and mitigation claims are not commissioned computing, delivered benefits or measured compliance. The unnamed computing customer is not inferred.", "fields": {"current_stage_evidence": {"outcome": "developer_named_claremore_planned_campus", "scope": "The complete original developer page identifies the planned Claremore campus and a future phase program. This supports a company listed proposal at the named developer campus scope. Its seasonal Fall 2026 construction timeline does not independently establish that work began, and no exact construction day is invented. Prospective completion, incentive approvals, workforce partnerships and mitigation claims are not commissioned computing, delivered benefits or measured compliance. The unnamed computing customer is not inferred."}, "source_read_scope": {"complete_original_claremore_project_page_body_read": true, "seasonal2026_start_target_not_accomplished_construction": true, "unnamed_customer_not_inferred": true, "no_incentive_or_workforce_pledge_as_operation": true, "no_location_role_capacity_or_resource_changes": true}}, "notes": ["The complete original developer page identifies the planned Claremore campus and a future phase program. This supports a company listed proposal at the named developer campus scope. Its seasonal Fall 2026 construction timeline does not independently establish that work began, and no exact construction day is invented. Prospective completion, incentive approvals, workforce partnerships and mitigation claims are not commissioned computing, delivered benefits or measured compliance. The unnamed computing customer is not inferred.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://bealeinfra.com/location/claremore/", "host": "bealeinfra.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Claremore · Rogers · Source context reviewed", "status_scope": "The complete original developer page identifies the planned Claremore campus and a future phase program. This supports a company listed proposal at the named developer campus scope. Its seasonal Fall 2026 construction timeline does not independently establish that work began, and no exact construction day is invented. Prospective completion, incentive approvals, workforce partnerships and mitigation claims are not commissioned computing, delivered benefits or measured compliance. The unnamed computing customer is not inferred.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40131"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "google-spring-sand-springs-ok", "state": "OK", "kind": "facility", "name": "Project Spring (Sand Springs)", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Osage"], "city": "Sand Springs", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Project Spring developer-stage Google interest and site scale. Consideringpurchase/proposeddevelopmentnotexecutedGoogleownershiporoperatingDC. Baselinepropertytaxunder3000notprojecttaxpayment.65dBboundary/codeand100generatorhourslegalclaimsrequireactualordinance/permitnotindependentlyadopted. JanuaryupdatecannotguaranteecurrentOctoberstatus;noMWorseparateapprovalverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-01-14", "The original Project Spring page labels its account updated January 14, 2026 and describes potential development and preliminary review. This dates the project update rather than a completed land purchase, rezoning vote, physical construction or computing opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.projectspringok.com/", "host": "projectspringok.com", "date": "2026-01-14", "published": "2026-01-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 36.62932, "lng": -96.39863, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Project Spring developer-stage Google interest and site scale", "fields": {"project": "Project Spring", "page_update_date": "2026-01-14", "locality": "Sand Springs, Oklahoma", "address": "5615 Oklahoma97, Sand Springs, Oklahoma74063", "site_acres": 827, "developer": "White Rose Partners", "potential_buyer": "Google considering purchase", "planned_building_footprint_site_share_max_exclusive_percent": 10, "planned_vegetative_open_space_percent_range": [30, 40]}, "notes": ["Consideringpurchase/proposeddevelopmentnotexecutedGoogleownershiporoperatingDC. Baselinepropertytaxunder3000notprojecttaxpayment.65dBboundary/codeand100generatorhourslegalclaimsrequireactualordinance/permitnotindependentlyadopted. JanuaryupdatecannotguaranteecurrentOctoberstatus;noMWorseparateapprovalverified.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.projectspringok.com/", "host": "projectspringok.com", "date": "2026-01-14", "published": "2026-01-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 76", "scope": "Selected original Project Spring overview, environmental and process questions describe a potential Sand Springs campus, Google interest in purchasing the project, preliminary site design and an application for rezoning. This supports a company listed proposal at the January 14, 2026 updated account scope. Proposed January and February hearings are historical schedules rather than verified meetings or completed votes, and the page does not independently identify their year in the selected process paragraph. Claims about future noise, water and electricity protections remain attributed design intentions rather than independently measured results or current legal compliance. The interested end user is not an accomplished acquisition or operating role.", "fields": {"current_stage_evidence": {"outcome": "original_spring_potential_development_and_rezoning", "scope": "Selected original Project Spring overview, environmental and process questions describe a potential Sand Springs campus, Google interest in purchasing the project, preliminary site design and an application for rezoning. This supports a company listed proposal at the January 14, 2026 updated account scope. Proposed January and February hearings are historical schedules rather than verified meetings or completed votes, and the page does not independently identify their year in the selected process paragraph. Claims about future noise, water and electricity protections remain attributed design intentions rather than independently measured results or current legal compliance. The interested end user is not an accomplished acquisition or operating role."}, "source_read_scope": {"selected_original_overview_environment_and_process_faq_text_read": true, "explicit_jan14_update_not_invented_first_publication_day": true, "interested_purchase_not_accomplished_acquisition": true, "historical_january_february_schedule_not_completed_vote": true, "not_entire_linked_studies_or_permit_review": true}}, "notes": ["Selected original Project Spring overview, environmental and process questions describe a potential Sand Springs campus, Google interest in purchasing the project, preliminary site design and an application for rezoning. This supports a company listed proposal at the January 14, 2026 updated account scope. Proposed January and February hearings are historical schedules rather than verified meetings or completed votes, and the page does not independently identify their year in the selected process paragraph. Claims about future noise, water and electricity protections remain attributed design intentions rather than independently measured results or current legal compliance. The interested end user is not an accomplished acquisition or operating role.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.projectspringok.com/", "host": "www.projectspringok.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oklahoma · Sand Springs · Osage · Source context reviewed", "status_scope": "Selected original Project Spring overview, environmental and process questions describe a potential Sand Springs campus, Google interest in purchasing the project, preliminary site design and an application for rezoning. This supports a company listed proposal at the January 14, 2026 updated account scope. Proposed January and February hearings are historical schedules rather than verified meetings or completed votes, and the page does not independently identify their year in the selected process paragraph. Claims about future noise, water and electricity protections remain attributed design intentions rather than independently measured results or current legal compliance. The interested end user is not an accomplished acquisition or operating role.", "event_evidence": [{"date": "2026-01-14", "text": "The original Project Spring page labels its account updated January 14, 2026 and describes potential development and preliminary review. This dates the project update rather than a completed land purchase, rezoning vote, physical construction or computing opening.", "kind": "announced", "sources": [{"url": "https://www.projectspringok.com/", "host": "www.projectspringok.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "40113"}, "state_name": "Oklahoma", "state_path": "/oklahoma/"}, {"id": "crane-pdx02-forest-grove-or", "state": "OR", "kind": "facility", "name": "Crane PDX02", "group": "proposed", "status": "Provider listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Washington"], "city": "Forest Grove", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Crane Forest Grove site phases and campus mismatch. NamedPDX02notwholecampus100plus.24+24+48=96doesnotreconcileheadline100plus,phase/scoperoundingheld. PowerbasisnotexplicitcriticalITforcapacities. Q32026targetnotobservedservice. PUEdesignnotmeasuredannualaverage. Incentive/LEEDclaimsnotindependentapprovedaward/certifierinspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.cranedc.com/data-centers/oregon-data-center", "host": "cranedc.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 45.52756, "lng": -123.0961, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Crane Forest Grove site phases and campus mismatch", "fields": {"operator": "Crane Data Centers", "market": "Forest Grove, Oregon", "named_phases": [{"site": "PDX01 phase1", "capacity_mw": 24, "whitespace_sqft": 36000, "adjacent_flex_sqft": 6400}, {"site": "PDX01 phase2", "additional_capacity_mw": 24, "additional_whitespace_sqft": 36000, "additional_flex_sqft": 6400}, {"site": "PDX02", "capacity_mw_approx": 48, "area_sqft_approx": 150000}], "campus_headline_capacity_mw_min_exclusive": 100, "historical_service_target_quarter": "2026-Q3", "design_pue_at_full_it_load": 1.3}, "notes": ["NamedPDX02notwholecampus100plus.24+24+48=96doesnotreconcileheadline100plus,phase/scoperoundingheld. PowerbasisnotexplicitcriticalITforcapacities. Q32026targetnotobservedservice. PUEdesignnotmeasuredannualaverage. Incentive/LEEDclaimsnotindependentapprovedaward/certifierinspection.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.cranedc.com/data-centers/oregon-data-center", "host": "cranedc.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 69", "scope": "The complete original provider page labels its Forest Grove campus active development and specifically lists PDX02 separately from PDX01 phases. This supports a provider listed proposal for the named component. The displayed third quarter of 2026 ready for service forecast does not independently establish accomplished commissioning, actual construction completion or existing computing service. No PDX01 phase or technical design quantity is transferred to PDX02.", "fields": {"current_stage_evidence": {"outcome": "provider_listed_specific_pdx02_proposal", "scope": "The complete original provider page labels its Forest Grove campus active development and specifically lists PDX02 separately from PDX01 phases. This supports a provider listed proposal for the named component. The displayed third quarter of 2026 ready for service forecast does not independently establish accomplished commissioning, actual construction completion or existing computing service. No PDX01 phase or technical design quantity is transferred to PDX02."}, "source_read_scope": {"complete_original_oregon_campus_body_read": true, "pdx01_phases_and_pdx02_separate": true, "passed_ready_for_service_forecast_not_completion": true, "no_measured_capacity_or_first_opening_export": true}}, "notes": ["The complete original provider page labels its Forest Grove campus active development and specifically lists PDX02 separately from PDX01 phases. This supports a provider listed proposal for the named component. The displayed third quarter of 2026 ready for service forecast does not independently establish accomplished commissioning, actual construction completion or existing computing service. No PDX01 phase or technical design quantity is transferred to PDX02.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."], "sources": [{"url": "https://www.cranedc.com/data-centers/oregon-data-center", "host": "www.cranedc.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oregon · Forest Grove · Washington · Source context reviewed", "status_scope": "The complete original provider page labels its Forest Grove campus active development and specifically lists PDX02 separately from PDX01 phases. This supports a provider listed proposal for the named component. The displayed third quarter of 2026 ready for service forecast does not independently establish accomplished commissioning, actual construction completion or existing computing service. No PDX01 phase or technical design quantity is transferred to PDX02.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "41067"}, "state_name": "Oregon", "state_path": "/oregon/"}, {"id": "qts-hillsboro-3-or", "state": "OR", "kind": "facility", "name": "QTS Hillsboro 3", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Washington"], "city": "Hillsboro", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Planned campus. Separate solar generation and company portfolio figures excluded; no site MW or commissioned status established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://q.com/data-centers/hillsboro-3/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 45.51996, "lng": -123.16835, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"planned_campus_acres": 44, "planned_buildings": 2}, "notes": ["Planned campus. Separate solar generation and company portfolio figures excluded; no site MW or commissioned status established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://q.com/data-centers/hillsboro-3/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "QTS explicitly lists Hillsboro 3 as in development, separate from Hillsboro 1 and Hillsboro 2. Shared regional operations and solar-project text do not establish this campus operating. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "QTS explicitly lists Hillsboro 3 as in development, separate from Hillsboro 1 and Hillsboro 2. Shared regional operations and solar-project text do not establish this campus operating. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["QTS explicitly lists Hillsboro 3 as in development, separate from Hillsboro 1 and Hillsboro 2. Shared regional operations and solar-project text do not establish this campus operating."], "sources": [{"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oregon · Hillsboro · Washington · Source context reviewed", "status_scope": "QTS explicitly lists Hillsboro 3 as in development, separate from Hillsboro 1 and Hillsboro 2. Shared regional operations and solar-project text do not establish this campus operating. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "41067"}, "state_name": "Oregon", "state_path": "/oregon/"}, {"id": "sabey-umatilla-or", "state": "OR", "kind": "facility", "name": "SDC Umatilla Campus", "group": "proposed", "status": "Operator-listed preleasing", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Umatilla"], "city": "Umatilla", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Projected schedule, not delivered phases; shell delivery does not mean operating data hall. Power is aggregate, not explicitlyIT. Page1.3estimated versus1.25projectedPUElabels remain forecasts. Enterprise-zone and state tax marketing requires current government evidence; no award value adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://sabeydatacenters.com/locations/sdc-umatilla", "host": "sabeydatacenters.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 45.66069, "lng": -118.68391, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"planned_aggregate_power_mw_min_exclusive": 120, "projected_schedule": {"groundbreaking_year": 2024, "core_shell_delivery_year": 2026, "first_data_hall_online_year": 2027, "first_data_hall_mw": 9, "second_data_hall_online_year": 2028, "second_data_hall_mw": 9, "later_halls_and_building2_year_min": 2029}}, "notes": ["Projected schedule, not delivered phases; shell delivery does not mean operating data hall. Power is aggregate, not explicitlyIT. Page1.3estimated versus1.25projectedPUElabels remain forecasts. Enterprise-zone and state tax marketing requires current government evidence; no award value adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://sabeydatacenters.com/locations/sdc-umatilla", "host": "sabeydatacenters.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "Sabey explicitly invites preleasing and describes power as coming to its new Umatilla campus. Shared service-menu text does not establish commissioned operation or physical completion. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_preleasing", "scope": "Sabey explicitly invites preleasing and describes power as coming to its new Umatilla campus. Shared service-menu text does not establish commissioned operation or physical completion. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["Sabey explicitly invites preleasing and describes power as coming to its new Umatilla campus. Shared service-menu text does not establish commissioned operation or physical completion."], "sources": [{"url": "https://sabeydatacenters.com/locations/sdc-umatilla", "host": "sabeydatacenters.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Oregon · Umatilla · Umatilla · Source context reviewed", "status_scope": "Sabey explicitly invites preleasing and describes power as coming to its new Umatilla campus. Shared service-menu text does not establish commissioned operation or physical completion. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "41059"}, "state_name": "Oregon", "state_path": "/oregon/"}, {"id": "aws-kline-township-schuylkill-pa", "state": "PA", "kind": "facility", "name": "AWS Kline Township Data Center Campus", "group": "proposed", "status": "Permit review underway", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Schuylkill"], "city": "Kline Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Extension is not preliminary/final land-development approval. Later deadline outcome remains unobserved; unrelated municipal spending in article is not project incentive. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-03-02", "Pennsylvania Office of Open Records issued its Kline Township records appeal determination March 2, 2026. It grants the appeal in part and dismisses part as moot. This is the dated records decision account, not an environmental permit ruling, project denial or proof of later compliance."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://shensentinel.com/news/kline-supervisors-grant-extension-for-consideration-of-amazon-data-center-plans/", "host": "shensentinel.com", "date": "2026-08-17", "published": "2026-08-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.openrecords.pa.gov/Appeals/DocketGetFile.cfm?id=257197", "host": "www.openrecords.pa.gov", "published": "2026-03-02", "date": "2026-03-02", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.70567, "lng": -76.21613, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.", "fields": {"reported_context": "Shenandoah Sentinel reports AWS Kline plan consideration deadline extended to September 30, 2026.", "independently_verified_current_operating_status": null}, "notes": ["Extension is not preliminary/final land-development approval. Later deadline outcome remains unobserved; unrelated municipal spending in article is not project incentive.", "Original executed approvals, current operator disclosures and subsequent decisions take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://shensentinel.com/news/kline-supervisors-grant-extension-for-consideration-of-amazon-data-center-plans/", "host": "shensentinel.com", "date": "2026-08-17", "published": "2026-08-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 28", "scope": "The current DEP tracker original project CSV identifies Kline Township Data Center Development as project 10000004 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.", "fields": {"current_stage_evidence": {"outcome": "current_named_dep_project_permit_review_not_physical_operation", "scope": "The current DEP tracker original project CSV identifies Kline Township Data Center Development as project 10000004 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed."}, "tracker_scope": {"project_id": "10000004", "project_and_permit_csv_read_together": true, "aggregate_status_not_every_permit_complete": true, "source_coordinates_not_promoted": true, "submitted_day_not_issued_day": true}}, "notes": ["The current DEP tracker original project CSV identifies Kline Township Data Center Development as project 10000004 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.openrecords.pa.gov/Appeals/DocketGetFile.cfm?id=257197", "host": "www.openrecords.pa.gov", "published": "2026-03-02", "date": "2026-03-02", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Kline Township · Schuylkill · Source context reviewed", "status_scope": "The current DEP tracker original project CSV identifies Kline Township Data Center Development as project 10000004 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.", "event_evidence": [{"date": "2026-03-02", "text": "Pennsylvania Office of Open Records issued its Kline Township records appeal determination March 2, 2026. It grants the appeal in part and dismisses part as moot. This is the dated records decision account, not an environmental permit ruling, project denial or proof of later compliance.", "kind": "announced", "sources": [{"url": "https://www.openrecords.pa.gov/Appeals/DocketGetFile.cfm?id=257197", "host": "www.openrecords.pa.gov", "published": "2026-03-02", "date": "2026-03-02", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42107"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "switch-big-beaver-pa", "state": "PA", "kind": "facility", "name": "Big Beaver Campus", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Beaver"], "city": "Big Beaver", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Planned development, no site MW, capital amount or opening date supplied. Zero server-cooling water explicitly allows office/warehouse water connection. Ratepayer protection statement not independent tariff review. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-04-30", "Switch published its Big Beaver Borough campus development announcement April 30, 2026. The release describes planned facilities and company commitments, not completed construction or operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/", "host": "switch.com", "date": "2026-04-30", "published": "2026-04-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 40.69498, "lng": -80.36328, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "captured-operator-review-round6-2026-10-14.json", "scope": "named operator source", "fields": {"development_announcement_date": "2026-04-30", "planned_campus_acres": 382, "published_municipality": "Big Beaver Borough", "published_county": "Beaver, Pennsylvania"}, "notes": ["Planned development, no site MW, capital amount or opening date supplied. Zero server-cooling water explicitly allows office/warehouse water connection. Ratepayer protection statement not independent tariff review.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/", "host": "switch.com", "date": "2026-04-30", "published": "2026-04-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 27", "scope": "Switch April 30, 2026 announcement describes plans to develop the named Big Beaver Borough campus in Beaver County. Proposed records that company development announcement. Existing Switch Prime campuses elsewhere do not establish operation here. Funding, cooling designs, future environmental benefits and local partnership commitments are company statements, not independently verified outcomes or current construction. No forecast quantities, role or location fields are promoted.", "fields": {"current_stage_evidence": {"outcome": "named_company_development_announcement_not_construction_or_operation", "scope": "Switch April 30, 2026 announcement describes plans to develop the named Big Beaver Borough campus in Beaver County. Proposed records that company development announcement. Existing Switch Prime campuses elsewhere do not establish operation here. Funding, cooling designs, future environmental benefits and local partnership commitments are company statements, not independently verified outcomes or current construction. No forecast quantities, role or location fields are promoted."}}, "notes": ["Switch April 30, 2026 announcement describes plans to develop the named Big Beaver Borough campus in Beaver County. Proposed records that company development announcement. Existing Switch Prime campuses elsewhere do not establish operation here. Funding, cooling designs, future environmental benefits and local partnership commitments are company statements, not independently verified outcomes or current construction. No forecast quantities, role or location fields are promoted.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/", "host": "www.switch.com", "published": "2026-04-30", "date": "2026-04-30", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Big Beaver · Beaver · Source context reviewed", "status_scope": "Switch April 30, 2026 announcement describes plans to develop the named Big Beaver Borough campus in Beaver County. Proposed records that company development announcement. Existing Switch Prime campuses elsewhere do not establish operation here. Funding, cooling designs, future environmental benefits and local partnership commitments are company statements, not independently verified outcomes or current construction. No forecast quantities, role or location fields are promoted.", "event_evidence": [{"date": "2026-04-30", "text": "Switch published its Big Beaver Borough campus development announcement April 30, 2026. The release describes planned facilities and company commitments, not completed construction or operation.", "kind": "announced", "sources": [{"url": "https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/", "host": "www.switch.com", "published": "2026-04-30", "date": "2026-04-30", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42007"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "gouldsboro-project-gold-clifton-covington-lackawanna-pa", "state": "PA", "kind": "facility", "name": "Gouldsboro Data Center Campus (Project Gold)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lackawanna"], "city": "Clifton Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. WVIA KatBolus January3,2026 original report of Cliftonsettlement approvedpreviousFriday describes1778RichPikeLLCProjectGold. SettlementgovernsZONINGonly; land-developmentstudies/approvals remain and solicitor saysitdoesNOTendunderlyingzoninglitigation. Residents' promisedlawsuit isnot filedcase/ruling. Jan2vote date isdated-articleweekdayinference,notoriginalminutesverification. Atleastsevenpropertiesbroaderproject vsTHREECliftonpropertiesinsettlement,390acres+144reportedpropertyscopes notallbuildableDCfootprint. Equitableownership isnotverifieddeedclosing. Fivebuildings/threeCliftonsubcampuses notnewindependentcompanypins.65ftbuilding+15ftequipment=80fttotal limits,85ftwatertanks separate;100ftparcel/400fthomes setbacks proposedconditionsnotasbuilt. 65/55dBAreportedday/night limits are two-decibel reductions from67/57, not2%lessnoise ormeasuredcompliance. No privatewellCOOLING whilewellDRINKINGallowed doesnotmeanzerogroundwater. Offsitewastewater/nuclear-gasabandonmentconditions on southeastcampus notstatewideenergyban. Covingtondifferentjurisdiction; proposedNDAenduserunnamed. Exactexecutedsettlement/currentcourtoutcome unread. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation", "host": "wvia.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.46345, "lng": -75.58851, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-original-transactions-and-legal-stage-review-round73-2026-10-15.json", "scope": "Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.", "fields": {}, "notes": ["WVIA KatBolus January3,2026 original report of Cliftonsettlement approvedpreviousFriday describes1778RichPikeLLCProjectGold. SettlementgovernsZONINGonly; land-developmentstudies/approvals remain and solicitor saysitdoesNOTendunderlyingzoninglitigation. Residents' promisedlawsuit isnot filedcase/ruling. Jan2vote date isdated-articleweekdayinference,notoriginalminutesverification.", "Atleastsevenpropertiesbroaderproject vsTHREECliftonpropertiesinsettlement,390acres+144reportedpropertyscopes notallbuildableDCfootprint. Equitableownership isnotverifieddeedclosing. Fivebuildings/threeCliftonsubcampuses notnewindependentcompanypins.65ftbuilding+15ftequipment=80fttotal limits,85ftwatertanks separate;100ftparcel/400fthomes setbacks proposedconditionsnotasbuilt.", "65/55dBAreportedday/night limits are two-decibel reductions from67/57, not2%lessnoise ormeasuredcompliance. No privatewellCOOLING whilewellDRINKINGallowed doesnotmeanzerogroundwater. Offsitewastewater/nuclear-gasabandonmentconditions on southeastcampus notstatewideenergyban. Covingtondifferentjurisdiction; proposedNDAenduserunnamed. Exactexecutedsettlement/currentcourtoutcome unread.", "Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."], "sources": [{"url": "https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation", "host": "wvia.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 29", "scope": "The DEP row explicitly identifies Gouldsboro and Project Gold in Clifton and Covington. Its proposal listing does not determine a separate settlement, zoning appeal or current entitlement. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "fields": {"current_stage_evidence": {"outcome": "exact_named_dep_proposal_account_not_physical_commissioning", "scope": "The DEP row explicitly identifies Gouldsboro and Project Gold in Clifton and Covington. Its proposal listing does not determine a separate settlement, zoning appeal or current entitlement. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged."}, "tracker_scope": {"project_id": "10000031", "original_project_and_related_permit_csv_read": true, "no_data_center_operation_inferred": true, "no_coordinate_or_role_promotion": true}}, "notes": ["The DEP row explicitly identifies Gouldsboro and Project Gold in Clifton and Covington. Its proposal listing does not determine a separate settlement, zoning appeal or current entitlement. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Clifton Township · Lackawanna · Source context reviewed", "status_scope": "The DEP row explicitly identifies Gouldsboro and Project Gold in Clifton and Covington. Its proposal listing does not determine a separate settlement, zoning appeal or current entitlement. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42069"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "pa-data-center-partners-granville-township-mifflin-pa", "state": "PA", "kind": "facility", "name": "Granville Township Data Center Campus (Loop Road)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Mifflin"], "city": "Lewistown", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Filing and solicitor interpretation are not final site approval, construction or court ruling. Planned Sunday action, July15zoning meeting and July21townhall have no assumed outcomes. USD22.5millionproject tax forecast has no verified period and is neither annual collected taxes nor public subsidy. Proposed buffers/noise rules not adopted from this story; no actual water, IT or secured power. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-16", "The original signed Granville Township letter dated July 16, 2026 informs the applicant that its submission is incomplete for a missing traffic study certification and requests another filing. This dates the official letter account rather than a merits denial, physical closure or computing opening."], ["2026-09-28", "The original signed and sealed Township attestation certifies adoption of Ordinance 2026 03 at the September 28, 2026 public hearing. This dates the separate general zoning action without certifying complete review of its legal provisions, exact current property eligibility or a computing opening."], ["2026-10-26", "Scheduled event: The original Granville Township calendar schedules the named zoning appeal hearing for October 26, 2026 at six PM. Its event fields list an end of nine PM and Granville Event Center. This is a scheduled appeal, without an accomplished decision, construction or service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.yahoo.com/news/us/articles/plans-filed-mifflin-county-data-011151924.html", "host": "yahoo.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://granvilletwp.org/", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://granvilletwp.org/wp-content/uploads/2026/07/Giorgione.pdf", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://granvilletwp.org/wp-content/uploads/2026/07/Granville-Cond-Use-Narrative-v0.1.pdf", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://granvilletwp.org/wp-content/uploads/2026/09/Ordinance-2026-3-Attested.pdf", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://granvilletwp.org/events/event/zoning-hearing-board-appeal-lewistown-developers-llc/", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.61061, "lng": -77.61663, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round35-2026-10-14.json", "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.", "fields": {"reported_context": "ABC27/WHTM report quotes GranvilleTownship solicitor saying PADataCenterPartners filed LoopRoad plans Friday before planned curative-amendment action, so review would proceed under current zoning. Public rendering depicts six proposed buildings.", "independently_verified_current_operating_status": null}, "notes": ["Filing and solicitor interpretation are not final site approval, construction or court ruling. Planned Sunday action, July15zoning meeting and July21townhall have no assumed outcomes. USD22.5millionproject tax forecast has no verified period and is neither annual collected taxes nor public subsidy. Proposed buffers/noise rules not adopted from this story; no actual water, IT or secured power.", "Historical observations and forecasts are dated; no later outcome assumed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.yahoo.com/news/us/articles/plans-filed-mifflin-county-data-011151924.html", "host": "yahoo.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 64", "scope": "The complete original Township project index and five page applicant narrative identify the Granville computing proposal and its conditional use submission. This supports a listed proposal. The original signed July 16, 2026 letter returns the submission as incomplete for a missing traffic study certification and requests refiling; this is not a merits denial or physical closure. Original ordinance page one and signed attestation page twenty one establish the separate September 28 ordinance adoption, without a claim that all legal provisions were read. The official October 26 appeal notice remains prospective. Applicant compliance assertions and infrastructure forecasts are not independently verified performance or final permission. Developer and Developers wording variants in the official index and notice are retained without changing roles.", "fields": {"current_stage_evidence": {"outcome": "official_named_granville_compute_proposal_and_distinct_administrative_actions", "scope": "The complete original Township project index and five page applicant narrative identify the Granville computing proposal and its conditional use submission. This supports a listed proposal. The original signed July 16, 2026 letter returns the submission as incomplete for a missing traffic study certification and requests refiling; this is not a merits denial or physical closure. Original ordinance page one and signed attestation page twenty one establish the separate September 28 ordinance adoption, without a claim that all legal provisions were read. The official October 26 appeal notice remains prospective. Applicant compliance assertions and infrastructure forecasts are not independently verified performance or final permission. Developer and Developers wording variants in the official index and notice are retained without changing roles."}, "source_read_scope": {"complete_original_home_and_appeal_notice_bodies_read": true, "complete_original_five_page_narrative_text_read": true, "complete_original_signed_july16_letter_scan_actually_viewed": true, "ordinance_physical_pages_actually_viewed": [1, 21], "remaining_ordinance_pages_not_claimed_read": true, "attestation_signature_and_seal_read": true, "private_landowner_details_excluded": true, "applicant_compliance_claim_not_final_official_approval": true, "official_development_developers_wording_variants_retained": true}}, "notes": ["The complete original Township project index and five page applicant narrative identify the Granville computing proposal and its conditional use submission. This supports a listed proposal. The original signed July 16, 2026 letter returns the submission as incomplete for a missing traffic study certification and requests refiling; this is not a merits denial or physical closure. Original ordinance page one and signed attestation page twenty one establish the separate September 28 ordinance adoption, without a claim that all legal provisions were read. The official October 26 appeal notice remains prospective. Applicant compliance assertions and infrastructure forecasts are not independently verified performance or final permission. Developer and Developers wording variants in the official index and notice are retained without changing roles.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://granvilletwp.org/", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://granvilletwp.org/wp-content/uploads/2026/07/Giorgione.pdf", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://granvilletwp.org/wp-content/uploads/2026/07/Granville-Cond-Use-Narrative-v0.1.pdf", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://granvilletwp.org/wp-content/uploads/2026/09/Ordinance-2026-3-Attested.pdf", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://granvilletwp.org/events/event/zoning-hearing-board-appeal-lewistown-developers-llc/", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Lewistown · Mifflin · Source context reviewed", "status_scope": "The complete original Township project index and five page applicant narrative identify the Granville computing proposal and its conditional use submission. This supports a listed proposal. The original signed July 16, 2026 letter returns the submission as incomplete for a missing traffic study certification and requests refiling; this is not a merits denial or physical closure. Original ordinance page one and signed attestation page twenty one establish the separate September 28 ordinance adoption, without a claim that all legal provisions were read. The official October 26 appeal notice remains prospective. Applicant compliance assertions and infrastructure forecasts are not independently verified performance or final permission. Developer and Developers wording variants in the official index and notice are retained without changing roles.", "event_evidence": [{"date": "2026-07-16", "text": "The original signed Granville Township letter dated July 16, 2026 informs the applicant that its submission is incomplete for a missing traffic study certification and requests another filing. This dates the official letter account rather than a merits denial, physical closure or computing opening.", "kind": "announced", "sources": [{"url": "https://granvilletwp.org/wp-content/uploads/2026/07/Giorgione.pdf", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2026-09-28", "text": "The original signed and sealed Township attestation certifies adoption of Ordinance 2026 03 at the September 28, 2026 public hearing. This dates the separate general zoning action without certifying complete review of its legal provisions, exact current property eligibility or a computing opening.", "kind": "approved", "sources": [{"url": "https://granvilletwp.org/wp-content/uploads/2026/09/Ordinance-2026-3-Attested.pdf", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2026-10-26", "text": "Scheduled event: The original Granville Township calendar schedules the named zoning appeal hearing for October 26, 2026 at six PM. Its event fields list an end of nine PM and Granville Event Center. This is a scheduled appeal, without an accomplished decision, construction or service.", "kind": "scheduled_event", "sources": [{"url": "https://granvilletwp.org/events/event/zoning-hearing-board-appeal-lewistown-developers-llc/", "host": "granvilletwp.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42087"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "iron-city-wells-karthaus-township-clearfield-pa", "state": "PA", "kind": "facility", "name": "Iron City Wells A.I. Data Center", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Clearfield"], "city": "Karthaus Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Original Pennsylvania Bulletin volume 56 number 5, January 31, 2026: only PDF page 89/printed page 671 read in text and pixels. DEP plan approval 17-00078A issued January 16, 2026, application received June 23, 2025, expiry July 15, 2027, for construction of FIFTEEN natural-gas engine-gensets powering Iron City No. 1 Power Generator and Compute Center, Karthaus Township/Clearfield County. Not an operating certificate, all-site permits, installed/energized engines or 15 MW. Frenchville PO Box is company mailing address, not verified facility parcel. Notice says conditions include emissions/monitoring/testing, but contains NO numeric emissions table; blog amounts are not silently promoted to this original. Full underlying approval not inspected. Other 207 PDF pages not reviewed. Not all fields, current operation, precise parcel or critical IT independently certified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-5/56-5.pdf", "host": "pacodeandbulletin.gov", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://clearfieldcountypa.gov/AgendaCenter/ViewFile/Agenda/_05282025-332", "host": "clearfieldcountypa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.00017, "lng": -78.47429, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json", "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.", "fields": {}, "notes": ["Original Pennsylvania Bulletin volume 56 number 5, January 31, 2026: only PDF page 89/printed page 671 read in text and pixels. DEP plan approval 17-00078A issued January 16, 2026, application received June 23, 2025, expiry July 15, 2027, for construction of FIFTEEN natural-gas engine-gensets powering Iron City No. 1 Power Generator and Compute Center, Karthaus Township/Clearfield County. Not an operating certificate, all-site permits, installed/energized engines or 15 MW. Frenchville PO Box is company mailing address, not verified facility parcel. Notice says conditions include emissions/monitoring/testing, but contains NO numeric emissions table; blog amounts are not silently promoted to this original. Full underlying approval not inspected. Other 207 PDF pages not reviewed.", "Not all fields, current operation, precise parcel or critical IT independently certified."], "sources": [{"url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-5/56-5.pdf", "host": "pacodeandbulletin.gov", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 64", "scope": "Selected original May 28, 2025 County agenda pages five and six identify Iron City Wells and a new DEP air authorization for Iron City number one Power Generator and Compute Center in Karthaus Township. This supports a listed computing proposal. The separately listed Beccaria number two and Woodward number three projects are not merged. The agenda is a prospective meeting record and does not establish an accomplished County vote, current permit disposition, commissioned computing or actual generator operation. The original later Pennsylvania Bulletin remains held by robots restrictions.", "fields": {"current_stage_evidence": {"outcome": "official_named_karthaus_ironcity1_compute_proposal", "scope": "Selected original May 28, 2025 County agenda pages five and six identify Iron City Wells and a new DEP air authorization for Iron City number one Power Generator and Compute Center in Karthaus Township. This supports a listed computing proposal. The separately listed Beccaria number two and Woodward number three projects are not merged. The agenda is a prospective meeting record and does not establish an accomplished County vote, current permit disposition, commissioned computing or actual generator operation. The original later Pennsylvania Bulletin remains held by robots restrictions."}, "source_read_scope": {"original_agenda_selected_pages5and6_text_read": true, "karthaus_number1_not_beccaria2_or_woodward3": true, "prospective_agenda_not_accomplished_vote": true, "air_authorization_not_computing_operation": true, "original_later_bulletin_access_hold_retained": true}}, "notes": ["Selected original May 28, 2025 County agenda pages five and six identify Iron City Wells and a new DEP air authorization for Iron City number one Power Generator and Compute Center in Karthaus Township. This supports a listed computing proposal. The separately listed Beccaria number two and Woodward number three projects are not merged. The agenda is a prospective meeting record and does not establish an accomplished County vote, current permit disposition, commissioned computing or actual generator operation. The original later Pennsylvania Bulletin remains held by robots restrictions.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://clearfieldcountypa.gov/AgendaCenter/ViewFile/Agenda/_05282025-332", "host": "clearfieldcountypa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Karthaus Township · Clearfield · Source context reviewed", "status_scope": "Selected original May 28, 2025 County agenda pages five and six identify Iron City Wells and a new DEP air authorization for Iron City number one Power Generator and Compute Center in Karthaus Township. This supports a listed computing proposal. The separately listed Beccaria number two and Woodward number three projects are not merged. The agenda is a prospective meeting record and does not establish an accomplished County vote, current permit disposition, commissioned computing or actual generator operation. The original later Pennsylvania Bulletin remains held by robots restrictions.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42033"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "klondike-wyalusing-data-center-bradford-pa", "state": "PA", "kind": "facility", "name": "Klondike Wyalusing Data Center", "group": "proposed", "status": "Permit review underway", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Bradford"], "city": "Wyalusing", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 248 MW turbine sum and 218 MW described electric delivery are not critical IT and must not be added. Original permit has not been read. Emissions allowances are not actual emissions. Reported July 9 county ordinance adoption and unsigned development/community-benefit templates do not prove this project's applicability or executed commitments. Prior LNG approval and other withdrawn projects are separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.northcentralpa.com/business/bradford-county-adopts-data-center-rules-wyalusing-hyperscale-projects-air-permit-issued/article_b09783c0-fc03-416b-b0a7-c6881f9616fd.html", "host": "northcentralpa.com", "date": "2026-07-20", "published": "2026-07-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.78871, "lng": -76.51554, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "NorthcentralPA reports an October 9, 2025 DEP plan approval for Klondike's gas-generation project, nominally eight 31 MW turbines with up to 218 MW electric delivery to a future Wyalusing data center.", "independently_verified_current_operating_status": null}, "notes": ["The 248 MW turbine sum and 218 MW described electric delivery are not critical IT and must not be added. Original permit has not been read. Emissions allowances are not actual emissions. Reported July 9 county ordinance adoption and unsigned development/community-benefit templates do not prove this project's applicability or executed commitments. Prior LNG approval and other withdrawn projects are separate.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.northcentralpa.com/business/bradford-county-adopts-data-center-rules-wyalusing-hyperscale-projects-air-permit-issued/article_b09783c0-fc03-416b-b0a7-c6881f9616fd.html", "host": "northcentralpa.com", "date": "2026-07-20", "published": "2026-07-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 29", "scope": "The DEP row explicitly identifies Wyalusing Energy Center and Klondike Digital Infrastructure in Wyalusing Township. Power plant activity and individual issued permits do not establish a commissioned computing campus. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "fields": {"current_stage_evidence": {"outcome": "exact_named_dep_proposal_account_not_physical_commissioning", "scope": "The DEP row explicitly identifies Wyalusing Energy Center and Klondike Digital Infrastructure in Wyalusing Township. Power plant activity and individual issued permits do not establish a commissioned computing campus. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged."}, "tracker_scope": {"project_id": "10000016", "original_project_and_related_permit_csv_read": true, "no_data_center_operation_inferred": true, "no_coordinate_or_role_promotion": true}}, "notes": ["The DEP row explicitly identifies Wyalusing Energy Center and Klondike Digital Infrastructure in Wyalusing Township. Power plant activity and individual issued permits do not establish a commissioned computing campus. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Wyalusing · Bradford · Source context reviewed", "status_scope": "The DEP row explicitly identifies Wyalusing Energy Center and Klondike Digital Infrastructure in Wyalusing Township. Power plant activity and individual issued permits do not establish a commissioned computing campus. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42015"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "mcd7-limerick-township-montgomery-county-pa", "state": "PA", "kind": "facility", "name": "Limerick Township Data Center Campus (MCD 7)", "group": "proposed", "status": "Application under review", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Montgomery"], "city": "Limerick Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The automated excerpt selected an unrelated October website notice; the retained main article was read separately. This association brief cites January 12 Pottstown Mercury reporting. Up to 750 MW has no critical-IT basis; 1.3 MGD is projected cooling demand, not measured use. Tax and jobs are developer forecasts; presentation is not approval. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-04-14", "The Township May 5 agenda packet includes April 14, 2026 minutes reporting that the MCD 7 conditional use hearing opened and would continue later. This records that published minutes account, not certification of later approved minutes, a final permit vote or full testimony."], ["2026-10-27", "Scheduled event: Limerick Township lists an MCD 7 conditional use hearing continuation October 27, 2026. The future date remains scheduled at this check and is not an accomplished hearing, approval or construction milestone."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.suburbanrealtorsalliance.com/news/2026/01/16/montgomery-county/limerick-gets-first-look-at-1.4m-square-foot-data-center-proposal/", "host": "suburbanrealtorsalliance.com", "date": "2026-01-16", "published": "2026-01-16", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.limerickpa.org/437/Conditional-Use-Hearings", "host": "www.limerickpa.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.limerickpa.org/AgendaCenter/ViewFile/Agenda/_05052026-625", "host": "www.limerickpa.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.21085, "lng": -75.36727, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "The Suburban Realtors Alliance summarizes a Limerick proposal by MCD 7 LLC: eight server buildings on 192 acres, replacing a warehouse concept.", "independently_verified_current_operating_status": null}, "notes": ["The automated excerpt selected an unrelated October website notice; the retained main article was read separately. This association brief cites January 12 Pottstown Mercury reporting. Up to 750 MW has no critical-IT basis; 1.3 MGD is projected cooling demand, not measured use. Tax and jobs are developer forecasts; presentation is not approval.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.suburbanrealtorsalliance.com/news/2026/01/16/montgomery-county/limerick-gets-first-look-at-1.4m-square-foot-data-center-proposal/", "host": "suburbanrealtorsalliance.com", "date": "2026-01-16", "published": "2026-01-16", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 29", "scope": "Limerick Township current hearing page explicitly lists MCD 7 application CU 25 04 with an October 27, 2026 continuation, and separately lists the later MCD 7 phased applications CU 26 05 and CU 26 06 as pending. Application under review describes these named proceedings, not a final conditional use approval, land development approval, construction or service. The separate Limerick Town Center applicant CU 26 03 and its cooling description are not merged with MCD 7. The May 5 agenda packet includes April 14 meeting minutes reporting the opening of the MCD 7 hearing; the reviewed packet is not certification of later adopted minutes or complete hearing testimony. An attempted larger engineering packet exceeded both local document byte limits, so its technical findings are not adopted from cached search text.", "fields": {"current_stage_evidence": {"outcome": "current_named_mcd7_conditional_use_proceedings_not_final_approval", "scope": "Limerick Township current hearing page explicitly lists MCD 7 application CU 25 04 with an October 27, 2026 continuation, and separately lists the later MCD 7 phased applications CU 26 05 and CU 26 06 as pending. Application under review describes these named proceedings, not a final conditional use approval, land development approval, construction or service. The separate Limerick Town Center applicant CU 26 03 and its cooling description are not merged with MCD 7. The May 5 agenda packet includes April 14 meeting minutes reporting the opening of the MCD 7 hearing; the reviewed packet is not certification of later adopted minutes or complete hearing testimony. An attempted larger engineering packet exceeded both local document byte limits, so its technical findings are not adopted from cached search text."}, "source_read_scope": {"current_application_ids": ["CU 25 04", "CU 26 05", "CU 26 06"], "separate_cu26_03_applicant_not_merged": true, "may5_packet_minutes_pdf_pages_read": [15, 16], "larger_technical_packet_local_byte_holds_retained": true, "later_minutes_adoption_and_transcript_not_verified": true}}, "notes": ["Limerick Township current hearing page explicitly lists MCD 7 application CU 25 04 with an October 27, 2026 continuation, and separately lists the later MCD 7 phased applications CU 26 05 and CU 26 06 as pending. Application under review describes these named proceedings, not a final conditional use approval, land development approval, construction or service. The separate Limerick Town Center applicant CU 26 03 and its cooling description are not merged with MCD 7. The May 5 agenda packet includes April 14 meeting minutes reporting the opening of the MCD 7 hearing; the reviewed packet is not certification of later adopted minutes or complete hearing testimony. An attempted larger engineering packet exceeded both local document byte limits, so its technical findings are not adopted from cached search text.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.limerickpa.org/437/Conditional-Use-Hearings", "host": "www.limerickpa.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.limerickpa.org/AgendaCenter/ViewFile/Agenda/_05052026-625", "host": "www.limerickpa.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Limerick Township · Montgomery · Source context reviewed", "status_scope": "Limerick Township current hearing page explicitly lists MCD 7 application CU 25 04 with an October 27, 2026 continuation, and separately lists the later MCD 7 phased applications CU 26 05 and CU 26 06 as pending. Application under review describes these named proceedings, not a final conditional use approval, land development approval, construction or service. The separate Limerick Town Center applicant CU 26 03 and its cooling description are not merged with MCD 7. The May 5 agenda packet includes April 14 meeting minutes reporting the opening of the MCD 7 hearing; the reviewed packet is not certification of later adopted minutes or complete hearing testimony. An attempted larger engineering packet exceeded both local document byte limits, so its technical findings are not adopted from cached search text.", "event_evidence": [{"date": "2026-04-14", "text": "The Township May 5 agenda packet includes April 14, 2026 minutes reporting that the MCD 7 conditional use hearing opened and would continue later. This records that published minutes account, not certification of later approved minutes, a final permit vote or full testimony.", "kind": "hearing", "sources": [{"url": "https://www.limerickpa.org/AgendaCenter/ViewFile/Agenda/_05052026-625", "host": "www.limerickpa.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2026-10-27", "text": "Scheduled event: Limerick Township lists an MCD 7 conditional use hearing continuation October 27, 2026. The future date remains scheduled at this check and is not an accomplished hearing, approval or construction milestone.", "kind": "scheduled_event", "sources": [{"url": "https://www.limerickpa.org/437/Conditional-Use-Hearings", "host": "www.limerickpa.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42091"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "mlp-ventures-plymouth-township-conshohocken-pa", "state": "PA", "kind": "facility", "name": "MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Montgomery"], "city": "Conshohocken", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Participant status and a contingent property sale are not project approval or a closed acquisition. Other O'Neill proposals across the river are separate. Protest signs' diesel equivalence and neighbors' health concerns are not measured emissions or established causation. Future July hearing dates have no assumed outcome; tax-payment allegations are not adopted as findings. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-05-01", "Plymouth Township published its receipt of the new 900 Conshohocken Road data center application May 1, 2026. It distinguishes an earlier withdrawn application and describes further review requirements. The publication date is not a permit approval, an exact application filing day or current construction."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://metrophiladelphia.com/stories/plymouth-township-data-center-proposal,145572", "host": "metrophiladelphia.com", "date": "2026-06-29", "published": "2026-06-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.plymouthtownship.org/plymouth-township-receives-zoning-hearing-board-application-for-proposed-data-center/", "host": "www.plymouthtownship.org", "published": "2026-05-01", "date": "2026-05-01", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.22673, "lng": -75.3846, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Metro Philadelphia reports a new MLP Ventures zoning application after an earlier withdrawal for the former Cleveland-Cliffs property at 900 Conshohocken Road, with June 25 proceedings granting participant status.", "independently_verified_current_operating_status": null}, "notes": ["Participant status and a contingent property sale are not project approval or a closed acquisition. Other O'Neill proposals across the river are separate. Protest signs' diesel equivalence and neighbors' health concerns are not measured emissions or established causation. Future July hearing dates have no assumed outcome; tax-payment allegations are not adopted as findings.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://metrophiladelphia.com/stories/plymouth-township-data-center-proposal,145572", "host": "metrophiladelphia.com", "date": "2026-06-29", "published": "2026-06-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 29", "scope": "The DEP row explicitly identifies the MLP Ventures proposal at 900 Conshohocken Road in Plymouth Township. It does not establish a completed conversion of every former steel plant structure. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged. An original Township May 1, 2026 notice independently identifies the former steel mill at 900 Conshohocken Road and a second application after a prior withdrawal. The earlier application withdrawal is not applied to the new proposal. The notice says land development review would still be required after any special exception approval.", "fields": {"current_stage_evidence": {"outcome": "exact_named_dep_proposal_account_not_physical_commissioning", "scope": "The DEP row explicitly identifies the MLP Ventures proposal at 900 Conshohocken Road in Plymouth Township. It does not establish a completed conversion of every former steel plant structure. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged. An original Township May 1, 2026 notice independently identifies the former steel mill at 900 Conshohocken Road and a second application after a prior withdrawal. The earlier application withdrawal is not applied to the new proposal. The notice says land development review would still be required after any special exception approval."}, "tracker_scope": {"project_id": "10000059", "original_project_and_related_permit_csv_read": true, "no_data_center_operation_inferred": true, "no_coordinate_or_role_promotion": true}, "municipal_scope": {"original_page_published_on": "2026-05-01", "publication_metadata_read": true, "former_steel_plant_crosswalk_explicit": true, "prior_application_withdrawal_not_new_proposal_withdrawal": true, "further_land_development_review_after_special_exception": true, "independent_full_statutory_audit": false}}, "notes": ["The DEP row explicitly identifies the MLP Ventures proposal at 900 Conshohocken Road in Plymouth Township. It does not establish a completed conversion of every former steel plant structure. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged. An original Township May 1, 2026 notice independently identifies the former steel mill at 900 Conshohocken Road and a second application after a prior withdrawal. The earlier application withdrawal is not applied to the new proposal. The notice says land development review would still be required after any special exception approval.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.plymouthtownship.org/plymouth-township-receives-zoning-hearing-board-application-for-proposed-data-center/", "host": "www.plymouthtownship.org", "published": "2026-05-01", "date": "2026-05-01", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Conshohocken · Montgomery · Source context reviewed", "status_scope": "The DEP row explicitly identifies the MLP Ventures proposal at 900 Conshohocken Road in Plymouth Township. It does not establish a completed conversion of every former steel plant structure. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "event_evidence": [{"date": "2026-05-01", "text": "Plymouth Township published its receipt of the new 900 Conshohocken Road data center application May 1, 2026. It distinguishes an earlier withdrawn application and describes further review requirements. The publication date is not a permit approval, an exact application filing day or current construction.", "kind": "announced", "sources": [{"url": "https://www.plymouthtownship.org/plymouth-township-receives-zoning-hearing-board-application-for-proposed-data-center/", "host": "www.plymouthtownship.org", "published": "2026-05-01", "date": "2026-05-01", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42091"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "powerhouse-pax-carlisle-pa", "state": "PA", "kind": "facility", "name": "PAX  -  Pennsylvania Digital I", "group": "proposed", "status": "Operator listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cumberland"], "city": "Carlisle", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Original adopted instruments not reviewed here. By-right use and laydown-yard action are not full campus building permit, utility agreement or operation. Site figures694/700/715acres represent differing source scopes; no single canonical parcel footprint selected. Three450MWsubstations/1.35GWinitial/1.8GWexpandable are planned infrastructure figures, not verified criticalIT. USD44millionland purchase not USD15billionbuildout spending; regional USD90billion summit not project capex. September future2025meetings have no assumed outcome; advocacy concerns are attributed. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://protectcumberlandcountypa.org/middlesex/", "host": "protectcumberlandcountypa.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.powerhousedata.com/data-center/pax-1", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.cumberlandcountypa.gov/DocumentCenter/View/54948/Pennsylvania-Digital-PAX-1-Final-SD-Review-Report-2026-03-05", "host": "www.cumberlandcountypa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.16353, "lng": -77.26513, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round35-2026-10-14.json", "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.", "fields": {"reported_context": "Protect Cumberland County advocacy page reports May30,2025 unanimous3-0 Ordinance3-2025 data-center overlay and September3 comprehensive zoning action for ProjectBolt/PennsylvaniaDigitalI. August11 sketch discussion had no formal submission/no action; August25 recommendation concerned PPLsubstation laydown yard only.", "independently_verified_current_operating_status": null}, "notes": ["Original adopted instruments not reviewed here. By-right use and laydown-yard action are not full campus building permit, utility agreement or operation. Site figures694/700/715acres represent differing source scopes; no single canonical parcel footprint selected. Three450MWsubstations/1.35GWinitial/1.8GWexpandable are planned infrastructure figures, not verified criticalIT. USD44millionland purchase not USD15billionbuildout spending; regional USD90billion summit not project capex. September future2025meetings have no assumed outcome; advocacy concerns are attributed.", "Historical observations and forecasts are dated; no later outcome assumed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://protectcumberlandcountypa.org/middlesex/", "host": "protectcumberlandcountypa.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 20", "scope": "The current PowerHouse PAX 1 page describes a development timeline, prospective construction and delivery quarters and a future power delivery target. Operator listed development describes that planning claim. Past timeline quarters are not proof that physical construction began. The County subdivision review received March 5, 2026 and reviewed March 16 lists recommendations; Final identifies plan type and does not establish municipal approval or a building permit. No exact current physical building phase, utility delivery or operation is certified.", "fields": {"current_stage_evidence": {"outcome": "operator_timeline_and_subdivision_review_not_accomplished_construction", "scope": "The current PowerHouse PAX 1 page describes a development timeline, prospective construction and delivery quarters and a future power delivery target. Operator listed development describes that planning claim. Past timeline quarters are not proof that physical construction began. The County subdivision review received March 5, 2026 and reviewed March 16 lists recommendations; Final identifies plan type and does not establish municipal approval or a building permit. No exact current physical building phase, utility delivery or operation is certified."}, "source_scope": {"county_plan_number": "P26 147", "county_received_on": "2026-03-05", "county_reviewed_on": "2026-03-16", "filename_date_not_review_date": true, "county_report_pages_read": [1, 2], "county_report_page_visually_read": 1, "final_plan_type_not_final_approval": true, "expired_forecast_not_accomplished_phase": true}}, "notes": ["The current PowerHouse PAX 1 page describes a development timeline, prospective construction and delivery quarters and a future power delivery target. Operator listed development describes that planning claim. Past timeline quarters are not proof that physical construction began. The County subdivision review received March 5, 2026 and reviewed March 16 lists recommendations; Final identifies plan type and does not establish municipal approval or a building permit. No exact current physical building phase, utility delivery or operation is certified.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.powerhousedata.com/data-center/pax-1", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.cumberlandcountypa.gov/DocumentCenter/View/54948/Pennsylvania-Digital-PAX-1-Final-SD-Review-Report-2026-03-05", "host": "www.cumberlandcountypa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Carlisle · Cumberland · Source context reviewed", "status_scope": "The current PowerHouse PAX 1 page describes a development timeline, prospective construction and delivery quarters and a future power delivery target. Operator listed development describes that planning claim. Past timeline quarters are not proof that physical construction began. The County subdivision review received March 5, 2026 and reviewed March 16 lists recommendations; Final identifies plan type and does not establish municipal approval or a building permit. No exact current physical building phase, utility delivery or operation is certified.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42041"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "cde-acquisitions-project-atlas-south-whitehall-lehigh-pa", "state": "PA", "kind": "facility", "name": "Project Atlas Data Center Campus (South Whitehall Township)", "group": "proposed", "status": "Permit review underway", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lehigh"], "city": "South Whitehall Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Introductory presentation is not approval; nine-billion-USD investment and sixteen-million annual tax are projections. Claimed avoided cooling water is a modeled comparison, not measured water use; no-cost-to-ratepayer promise not executed utility terms. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.lehighvalleypublicmedia.org/news/local/residents-push-for-public-hearing-as-south-whitehall-takes-new-look-at-hyperscale-data-center/", "host": "lehighvalleypublicmedia.org", "date": "2026-07-14", "published": "2026-07-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.6251, "lng": -75.60603, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round24-2026-10-14.json", "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.", "fields": {"reported_context": "Lehigh Valley Public Media reports revised South Whitehall Atlas concept of three roughly500000-square-foot buildings instead of six.", "independently_verified_current_operating_status": null}, "notes": ["Introductory presentation is not approval; nine-billion-USD investment and sixteen-million annual tax are projections. Claimed avoided cooling water is a modeled comparison, not measured water use; no-cost-to-ratepayer promise not executed utility terms.", "Subsequent original decisions and current operator disclosures take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.lehighvalleypublicmedia.org/news/local/residents-push-for-public-hearing-as-south-whitehall-takes-new-look-at-hyperscale-data-center/", "host": "lehighvalleypublicmedia.org", "date": "2026-07-14", "published": "2026-07-14", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 29", "scope": "The DEP row explicitly identifies Project Atlas, Edged US and CDE Acquisitions in South Whitehall. Pending environmental review is distinct from final local land use action. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "fields": {"current_stage_evidence": {"outcome": "exact_named_dep_proposal_account_not_physical_commissioning", "scope": "The DEP row explicitly identifies Project Atlas, Edged US and CDE Acquisitions in South Whitehall. Pending environmental review is distinct from final local land use action. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged."}, "tracker_scope": {"project_id": "10000006", "original_project_and_related_permit_csv_read": true, "no_data_center_operation_inferred": true, "no_coordinate_or_role_promotion": true}}, "notes": ["The DEP row explicitly identifies Project Atlas, Edged US and CDE Acquisitions in South Whitehall. Pending environmental review is distinct from final local land use action. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · South Whitehall Township · Lehigh · Source context reviewed", "status_scope": "The DEP row explicitly identifies Project Atlas, Edged US and CDE Acquisitions in South Whitehall. Pending environmental review is distinct from final local land use action. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42077"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "project-gravity-archbald-lackawanna-county-pa", "state": "PA", "kind": "facility", "name": "Project Gravity", "group": "proposed", "status": "Permit review underway", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lackawanna"], "city": "Archbald", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. KatBolus WVIA January8,2026 originalDEPmeetingreport identifiesArchbald25ProjectGravity; developerNOtenantyet andwouldnotconstructwithoutone. Seven135000sftwo-storybuildings/186acres areoneproposedcampus, notsevennewfacilityIDs. TuesdayJanuary6meetingdateinferredfromdatedreport. SeptemberpreliminaryCONDITIONALplanningapproval differsfromfinalconstructionauthorization. Chapter105administrativelycomplete/technicalreview,Chapter102completenessreview,404pending; AIRAPPLICATIONNOTYETRECEIVEDperDEPatmeeting. Laterapproval/currenttenantstatusunknown. Underlyingapplications/minutesnotdirectlyread. 360000gpd isdeveloperESTIMATE, utilityabilitytosupplynotapprovedwithdrawal/actualconsumption. LakeScrantonwater/pumpimprovementsconditional;coolingsystemtenant-specific/notchosen.55/45dBAdeveloperpromise notmeasurednoise.7wetlands/2streams/31waterbodies/2.25acrewetlandsare overlappinglandfeatures, notadditivecampusareas. Mine-spoiledlanddoesnotmeanhazardfree; noactualgroundwater/wildlifeharm inferred. CorporateoldWesternHospitalityPartners-Jermynname notsameascanceledKYproject. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.", "date": "", "events": [["2025-12-22", "Pennsylvania DEP published its Project Gravity informational meeting notice December 22, 2025. The notice scheduled a January 6, 2026 meeting and a comment deadline. A past scheduled date does not establish that the meeting occurred or that permits were approved."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting", "host": "wvia.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.pa.gov/agencies/dep/newsroom/2025-12-22-dep-to-host-informational-public-meeting-for-project-gravity-data-center-in-lackawanna-county", "host": "www.pa.gov", "published": "2025-12-22", "date": "2025-12-22", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.41276, "lng": -75.57211, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json", "scope": "Named original reporter/issuer context with current versus historical stage explicit.", "fields": {}, "notes": ["KatBolus WVIA January8,2026 originalDEPmeetingreport identifiesArchbald25ProjectGravity; developerNOtenantyet andwouldnotconstructwithoutone. Seven135000sftwo-storybuildings/186acres areoneproposedcampus, notsevennewfacilityIDs. TuesdayJanuary6meetingdateinferredfromdatedreport.", "SeptemberpreliminaryCONDITIONALplanningapproval differsfromfinalconstructionauthorization. Chapter105administrativelycomplete/technicalreview,Chapter102completenessreview,404pending; AIRAPPLICATIONNOTYETRECEIVEDperDEPatmeeting. Laterapproval/currenttenantstatusunknown. Underlyingapplications/minutesnotdirectlyread.", "360000gpd isdeveloperESTIMATE, utilityabilitytosupplynotapprovedwithdrawal/actualconsumption. LakeScrantonwater/pumpimprovementsconditional;coolingsystemtenant-specific/notchosen.55/45dBAdeveloperpromise notmeasurednoise.7wetlands/2streams/31waterbodies/2.25acrewetlandsare overlappinglandfeatures, notadditivecampusareas. Mine-spoiledlanddoesnotmeanhazardfree; noactualgroundwater/wildlifeharm inferred. CorporateoldWesternHospitalityPartners-Jermynname notsameascanceledKYproject.", "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."], "sources": [{"url": "https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting", "host": "wvia.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 28", "scope": "The current DEP tracker original project CSV identifies Project Gravity as project 10000003 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.", "fields": {"current_stage_evidence": {"outcome": "current_named_dep_project_permit_review_not_physical_operation", "scope": "The current DEP tracker original project CSV identifies Project Gravity as project 10000003 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed."}, "tracker_scope": {"project_id": "10000003", "project_and_permit_csv_read_together": true, "aggregate_status_not_every_permit_complete": true, "source_coordinates_not_promoted": true, "submitted_day_not_issued_day": true}}, "notes": ["The current DEP tracker original project CSV identifies Project Gravity as project 10000003 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.pa.gov/agencies/dep/newsroom/2025-12-22-dep-to-host-informational-public-meeting-for-project-gravity-data-center-in-lackawanna-county", "host": "www.pa.gov", "published": "2025-12-22", "date": "2025-12-22", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Archbald · Lackawanna · Source context reviewed", "status_scope": "The current DEP tracker original project CSV identifies Project Gravity as project 10000003 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.", "event_evidence": [{"date": "2025-12-22", "text": "Pennsylvania DEP published its Project Gravity informational meeting notice December 22, 2025. The notice scheduled a January 6, 2026 meeting and a comment deadline. A past scheduled date does not establish that the meeting occurred or that permits were approved.", "kind": "announced", "sources": [{"url": "https://www.pa.gov/agencies/dep/newsroom/2025-12-22-dep-to-host-informational-public-meeting-for-project-gravity-data-center-in-lackawanna-county", "host": "www.pa.gov", "published": "2025-12-22", "date": "2025-12-22", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42069"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "project-hazelnut-hazle-township-pa", "state": "PA", "kind": "facility", "name": "Project Hazelnut", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Luzerne"], "city": "Hazle Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hazelnut contingent developer community funding and jobs conflict. 45+15+105=165Mpledgecomponentsnot330M. Fundsnotpaid/grantsnotuniversallyeligible. Jobheadlineversusdetailedtotalconflict,holdcanonical. Noobservedconservationdeed,currentoperations,ITMWorbuildingarea. Eventyearnotinbanner;do notcalendarOctober22,2026withoutdatedcorroborationorcallitgovernmenthearing. No RSVP/petition/formsubmitted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://projecthazelnut.com/", "host": "projecthazelnut.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.13993, "lng": -75.98592, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Hazelnut contingent developer community funding and jobs conflict", "fields": {"developer": "NorthPoint", "project": "Project Hazelnut", "location": "Hazle Township, Pennsylvania", "community_benefit_commitment_total_usd": 165000000, "resident_grant_fund_usd": 45000000, "per_eligible_household_grant_usd": 10000, "community_support_fund_usd": 15000000, "longterm_community_commitment_usd": 105000000, "annual_longterm_component_usd": 7000000, "longterm_years": 15, "benefit_availability_trigger": "first building operational", "planned_conserved_forest_open_space_acres_approx": 1100, "jobs_forecast_conflict": ["2000constructionandoperationalcombined", "1300plusconstructionand950pluspermanent"], "undated_event_banner": {"month_day": "10-22", "time": "17:00to19:00", "venue": "Maple Manor Elementary School", "event_type": "community open house", "year": null}}, "notes": ["45+15+105=165Mpledgecomponentsnot330M. Fundsnotpaid/grantsnotuniversallyeligible. Jobheadlineversusdetailedtotalconflict,holdcanonical. Noobservedconservationdeed,currentoperations,ITMWorbuildingarea. Eventyearnotinbanner;do notcalendarOctober22,2026withoutdatedcorroborationorcallitgovernmenthearing. No RSVP/petition/formsubmitted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://projecthazelnut.com/", "host": "projecthazelnut.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 27", "scope": "The current Project Hazelnut site describes the NorthPoint campus project and future community benefits that would begin when its first building becomes operational. Proposed records that named development account, not actual commissioning, grant payments or independently measured water, forest or jobs outcomes. An October 22 open house banner is not proof the event occurred and supplies no year in the captured substantive banner. No accomplished hearing, opening or precise physical start is inferred.", "fields": {"current_stage_evidence": {"outcome": "current_named_hazelnut_development_account_with_conditional_future_benefits", "scope": "The current Project Hazelnut site describes the NorthPoint campus project and future community benefits that would begin when its first building becomes operational. Proposed records that named development account, not actual commissioning, grant payments or independently measured water, forest or jobs outcomes. An October 22 open house banner is not proof the event occurred and supplies no year in the captured substantive banner. No accomplished hearing, opening or precise physical start is inferred."}}, "notes": ["The current Project Hazelnut site describes the NorthPoint campus project and future community benefits that would begin when its first building becomes operational. Proposed records that named development account, not actual commissioning, grant payments or independently measured water, forest or jobs outcomes. An October 22 open house banner is not proof the event occurred and supplies no year in the captured substantive banner. No accomplished hearing, opening or precise physical start is inferred.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://projecthazelnut.com/", "host": "projecthazelnut.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Hazle Township · Luzerne · Source context reviewed", "status_scope": "The current Project Hazelnut site describes the NorthPoint campus project and future community benefits that would begin when its first building becomes operational. Proposed records that named development account, not actual commissioning, grant payments or independently measured water, forest or jobs outcomes. An October 22 open house banner is not proof the event occurred and supplies no year in the captured substantive banner. No accomplished hearing, opening or precise physical start is inferred.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42079"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "iep-hummingbird-data-center-campus-greene-county-pa", "state": "PA", "kind": "facility", "name": "Project Hummingbird Data Center Campus (former Robena Mine)", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Greene"], "city": "Greensboro", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Observed earthwork is described as ordinary owner reclamation, not data-center construction. The 910 MW figure is planned generation; 18 MGD is treatment capacity serving generation and computing, not measured DC consumption. The community-benefit agreement is unfinished and no end tenant is identified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.observer-reporter.com/news/local-news/2026/sep/25/monongahela-township-residents-seek-more-chances-for-input-on-data-center-project/", "host": "observer-reporter.com", "date": "2026-09-25", "published": "2026-09-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://iepwr.com/227-2/", "host": "iepwr.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 39.85382, "lng": -80.22282, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "The Observer-Reporter reports the Hummingbird proposal at the Robena Mine property, while the township says project work has not advanced since the December reclamation approval.", "independently_verified_current_operating_status": null}, "notes": ["Observed earthwork is described as ordinary owner reclamation, not data-center construction. The 910 MW figure is planned generation; 18 MGD is treatment capacity serving generation and computing, not measured DC consumption. The community-benefit agreement is unfinished and no end tenant is identified.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.observer-reporter.com/news/local-news/2026/sep/25/monongahela-township-residents-seek-more-chances-for-input-on-data-center-project/", "host": "observer-reporter.com", "date": "2026-09-25", "published": "2026-09-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 28", "scope": "International Electric Power current Hummingbird page describes future data center and power development with later power and turbine delivery targets. DEP original project CSV identifies project 10000017 as proposed with no applications received in that tracker account. Proposed records that specific company and agency proposal account. The tracker does not establish absence of every local or other agency application. Future delivery, grid reliability, utility cost and job claims are not accomplished outcomes. Exact phase, coordinates, end user, provider roles and technical quantities are not promoted from marketing.", "fields": {"current_stage_evidence": {"outcome": "named_hummingbird_proposal_with_bounded_dep_no_application_account", "scope": "International Electric Power current Hummingbird page describes future data center and power development with later power and turbine delivery targets. DEP original project CSV identifies project 10000017 as proposed with no applications received in that tracker account. Proposed records that specific company and agency proposal account. The tracker does not establish absence of every local or other agency application. Future delivery, grid reliability, utility cost and job claims are not accomplished outcomes. Exact phase, coordinates, end user, provider roles and technical quantities are not promoted from marketing."}}, "notes": ["International Electric Power current Hummingbird page describes future data center and power development with later power and turbine delivery targets. DEP original project CSV identifies project 10000017 as proposed with no applications received in that tracker account. Proposed records that specific company and agency proposal account. The tracker does not establish absence of every local or other agency application. Future delivery, grid reliability, utility cost and job claims are not accomplished outcomes. Exact phase, coordinates, end user, provider roles and technical quantities are not promoted from marketing.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://iepwr.com/227-2/", "host": "iepwr.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Greensboro · Greene · Source context reviewed", "status_scope": "International Electric Power current Hummingbird page describes future data center and power development with later power and turbine delivery targets. DEP original project CSV identifies project 10000017 as proposed with no applications received in that tracker account. Proposed records that specific company and agency proposal account. The tracker does not establish absence of every local or other agency application. Future delivery, grid reliability, utility cost and job claims are not accomplished outcomes. Exact phase, coordinates, end user, provider roles and technical quantities are not promoted from marketing.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42059"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "qts-salem-township-luzerne-pa", "state": "PA", "kind": "facility", "name": "QTS Salem Township Data Center Campus (Salem 2)", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Luzerne"], "city": "Salem Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. The reported more-than500-million-USD Salem2land proceeds are not full construction cost or Salem3spending. Salem3land-value descriptions differ at1.2/1.4billion; retain conflict. Developer survey results are self-reported from78respondents, not an independent regional economic-impact study. Generic pay ranges and statewide forecasts are not actual site jobs. Later hearing outcomes, critical IT and contractual nuclear supply are not independently verified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project", "host": "timesleader.com", "date": "2026-08-22", "published": "2026-08-22", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/salem-township/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "loc": {"lat": 41.21295, "lng": -75.96152, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round32-2026-10-14.json", "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.", "fields": {"reported_context": "The Times Leader separates Salem's AWS campus, QTS/4-3Salem2land transaction and proposed4-3GlennbrookSalem3campus, with the latter awaiting an overlay decision.", "independently_verified_current_operating_status": null}, "notes": ["The reported more-than500-million-USD Salem2land proceeds are not full construction cost or Salem3spending. Salem3land-value descriptions differ at1.2/1.4billion; retain conflict. Developer survey results are self-reported from78respondents, not an independent regional economic-impact study. Generic pay ranges and statewide forecasts are not actual site jobs. Later hearing outcomes, critical IT and contractual nuclear supply are not independently verified.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project", "host": "timesleader.com", "date": "2026-08-22", "published": "2026-08-22", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 5", "scope": "QTS describes its named Salem Township campus as proposed and in early planning. This is the QTS proposal only, separate from the AWS campus and the 4 3 Glenbrook proposal. It does not establish final permitting, a construction start, operation or the fulfillment of forecast investment and jobs.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_proposal", "scope": "QTS describes its named Salem Township campus as proposed and in early planning. This is the QTS proposal only, separate from the AWS campus and the 4 3 Glenbrook proposal. It does not establish final permitting, a construction start, operation or the fulfillment of forecast investment and jobs."}}, "notes": ["QTS describes its named Salem Township campus as proposed and in early planning. This is the QTS proposal only, separate from the AWS campus and the 4 3 Glenbrook proposal. It does not establish final permitting, a construction start, operation or the fulfillment of forecast investment and jobs.", "An agency decision or a source publication date does not certify an opening, a physical site count or a technical quantity."], "sources": [{"url": "https://q.com/data-centers/salem-township/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Salem Township · Luzerne · Source context reviewed", "status_scope": "QTS describes its named Salem Township campus as proposed and in early planning. This is the QTS proposal only, separate from the AWS campus and the 4 3 Glenbrook proposal. It does not establish final permitting, a construction start, operation or the fulfillment of forecast investment and jobs.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42079"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "bitfarms-scrubgrass-kennerdell-pa", "state": "PA", "kind": "facility", "name": "Scrubgrass Generating Plant", "group": "proposed", "status": "AI redevelopment planned", "raw_status": "proposed", "status_field": "current_status", "crypto": true, "type": "Crypto/HPC (inventory classification)", "counties": ["Venango"], "city": "Kennerdell", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Potential expansion, studies and behind-the-meter generation are not energized AI capacity. September2026 ash-removal deadline is not proof completion; issuer original sources reviewed separately. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Potential operator development scale, not actual critical IT demand.. Scrubgrass page repeats project-update cards explicitly labelled Moses Lake or Sharon. Those concrete pours, piping and equipment deliveries are not Scrubgrass milestones. No project partners announced in this page.", "date": "", "events": [["2026-06-29", "Keel’s second-quarter filing reports that Bitcoin mining at Scrubgrass ceased on June 29, 2026 while energy sales continued. This closes the mining activity, not the entire power site; future HPC/AI development is separate."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/", "host": "exploreclarion.com", "date": "2026-06-02", "published": "2026-06-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.keelinfra.com/campuses/scrubgrass", "host": "keelinfra.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a", "host": "ir.keelinfra.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed primary filing"}], "loc": {"lat": 41.40074, "lng": -79.75779, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.", "fields": {"reported_context": "ExploreClarion describes Keel/Bitfarms Scrubgrass AI development opportunity alongside existing crypto/power activity.", "independently_verified_current_operating_status": null}, "notes": ["Potential expansion, studies and behind-the-meter generation are not energized AI capacity. September2026 ash-removal deadline is not proof completion; issuer original sources reviewed separately.", "Original executed approvals, current operator disclosures and subsequent decisions take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/", "host": "exploreclarion.com", "date": "2026-06-02", "published": "2026-06-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Potential operator development scale, not actual critical IT demand.", "fields": {"operator_advertised_expansion_capacity_gw_up_to": 1.3, "advertised_site_acres": 650, "stage": "Long-term pre-development and power planning", "current_commissioned_hpc_capacity_mw": null}, "notes": ["Scrubgrass page repeats project-update cards explicitly labelled Moses Lake or Sharon. Those concrete pours, piping and equipment deliveries are not Scrubgrass milestones. No project partners announced in this page.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.keelinfra.com/campuses/scrubgrass", "host": "keelinfra.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "AI redevelopment planned", "basis": "Keel’s current Scrubgrass page describes pre-development and power planning for future HPC/AI infrastructure. Its signed second-quarter filing states that Scrubgrass Bitcoin mining ceased on June 29, 2026 while energy sales continued.", "checked_on": "2026-10-16"}, "stage_review_limits": "The mining cessation is not closure of the entire power site. Energy-generation capacity is not IT capacity, and the long-term expansion envelope is not operating AI service. The older Bitfarms label remains in identity history; no physical-site merge or provider-role promotion is made."}, "notes": ["The mining cessation is not closure of the entire power site. Energy-generation capacity is not IT capacity, and the long-term expansion envelope is not operating AI service. The older Bitfarms label remains in identity history; no physical-site merge or provider-role promotion is made.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://www.keelinfra.com/campuses/scrubgrass", "host": "www.keelinfra.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}, {"url": "https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a", "host": "ir.keelinfra.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed primary filing"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Kennerdell · Venango · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. Keel’s current Scrubgrass page describes pre-development and power planning for future HPC/AI infrastructure. Its signed second-quarter filing states that Scrubgrass Bitcoin mining ceased on June 29, 2026 while energy sales continued. The mining cessation is not closure of the entire power site. Energy-generation capacity is not IT capacity, and the long-term expansion envelope is not operating AI service. The older Bitfarms label remains in identity history; no physical-site merge or provider-role promotion is made.", "event_evidence": [{"date": "2026-06-29", "text": "Keel’s second-quarter filing reports that Bitcoin mining at Scrubgrass ceased on June 29, 2026 while energy sales continued. This closes the mining activity, not the entire power site; future HPC/AI development is separate.", "kind": "closed", "sources": [{"url": "https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a", "host": "ir.keelinfra.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed primary filing"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42121"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "aligned-shippingport-pa", "state": "PA", "kind": "facility", "name": "Shippingport Industrial Park", "group": "proposed", "status": "Permit review underway", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Beaver"], "city": "Shippingport", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Shippingport guest opinion source-role correction. Opinionarticleisnotagencyapproval/order. Claimedthreeapprovals requireoriginalpermitinspection; no adopteddate/powerbasisfromopinion. Generalhealthrisksnotproofsite-specificillness,airviolation oractualbills. No exactAlignedoperatorcrosswalk,currentcommissioning orcriticalITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-09-10", "Aligned published its Project Phoenix Shippingport groundbreaking announcement September 10, 2026. This records the dated company announcement and ceremony account, not independent verification of excavation, completion of planned blasting or operating data center service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://community.triblive.com/news/3990268", "host": "community.triblive.com", "date": "2026-02-26", "published": "2026-02-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://aligneddc.com/press-release/project-phoenix-data-center-shippingport-pa/", "host": "aligneddc.com", "published": "2026-09-10", "date": "2026-09-10", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://aligneddc.com/shippingport-pa-data-center/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 40.68235, "lng": -80.34949, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round13-2026-10-14.json", "scope": "Shippingport guest opinion source-role correction", "fields": {"publisher_role": "guest opinion by EnvironmentalHealthProject communications manager", "reported_project_location": "nearformerBruceMansfieldplant, Shippingport, BeaverCounty, Pennsylvania", "reported_proposed_buildings_max": 3, "reported_each_building_sqft_min_exclusive": 600000, "reported_components": ["data centers", "warehouse", "natural-gas generation pad"]}, "notes": ["Opinionarticleisnotagencyapproval/order. Claimedthreeapprovals requireoriginalpermitinspection; no adopteddate/powerbasisfromopinion. Generalhealthrisksnotproofsite-specificillness,airviolation oractualbills. No exactAlignedoperatorcrosswalk,currentcommissioning orcriticalITMW.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://community.triblive.com/news/3990268", "host": "community.triblive.com", "date": "2026-02-26", "published": "2026-02-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 28", "scope": "DEP original project CSV separately lists Aligned Shippingport Phase 1 and Phase 2 under permit review. The company September 10, 2026 release announces a groundbreaking, while its current construction update provides a rescheduled blasting look ahead. Permit review underway describes that documented regulatory stage for the new campus proposals. The ceremony and passed forecast dates do not independently verify actual excavation, completion of any listed blast, delivered power or operating service. Two tracker phases are not merged into a claim that every campus building has the same physical status. Advertised water, power and community benefits are not measured outcomes.", "fields": {"current_stage_evidence": {"outcome": "named_shippingport_phase_permit_review_and_company_schedule_not_accomplished_work", "scope": "DEP original project CSV separately lists Aligned Shippingport Phase 1 and Phase 2 under permit review. The company September 10, 2026 release announces a groundbreaking, while its current construction update provides a rescheduled blasting look ahead. Permit review underway describes that documented regulatory stage for the new campus proposals. The ceremony and passed forecast dates do not independently verify actual excavation, completion of any listed blast, delivered power or operating service. Two tracker phases are not merged into a claim that every campus building has the same physical status. Advertised water, power and community benefits are not measured outcomes."}, "tracker_scope": {"project_ids": ["10000014", "10000068"], "different_phases_not_collapsed": true, "future_or_passed_schedule_not_accomplished_work": true}}, "notes": ["DEP original project CSV separately lists Aligned Shippingport Phase 1 and Phase 2 under permit review. The company September 10, 2026 release announces a groundbreaking, while its current construction update provides a rescheduled blasting look ahead. Permit review underway describes that documented regulatory stage for the new campus proposals. The ceremony and passed forecast dates do not independently verify actual excavation, completion of any listed blast, delivered power or operating service. Two tracker phases are not merged into a claim that every campus building has the same physical status. Advertised water, power and community benefits are not measured outcomes.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://aligneddc.com/press-release/project-phoenix-data-center-shippingport-pa/", "host": "aligneddc.com", "published": "2026-09-10", "date": "2026-09-10", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://aligneddc.com/shippingport-pa-data-center/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Shippingport · Beaver · Source context reviewed", "status_scope": "DEP original project CSV separately lists Aligned Shippingport Phase 1 and Phase 2 under permit review. The company September 10, 2026 release announces a groundbreaking, while its current construction update provides a rescheduled blasting look ahead. Permit review underway describes that documented regulatory stage for the new campus proposals. The ceremony and passed forecast dates do not independently verify actual excavation, completion of any listed blast, delivered power or operating service. Two tracker phases are not merged into a claim that every campus building has the same physical status. Advertised water, power and community benefits are not measured outcomes.", "event_evidence": [{"date": "2026-09-10", "text": "Aligned published its Project Phoenix Shippingport groundbreaking announcement September 10, 2026. This records the dated company announcement and ceremony account, not independent verification of excavation, completion of planned blasting or operating data center service.", "kind": "announced", "sources": [{"url": "https://aligneddc.com/press-release/project-phoenix-data-center-shippingport-pa/", "host": "aligneddc.com", "published": "2026-09-10", "date": "2026-09-10", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42007"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "slate-belt-holdings-upper-mount-bethel-northampton-pa", "state": "PA", "kind": "facility", "name": "Slate Belt Holdings Data Center Campus (Upper Mount Bethel)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Northampton"], "city": "Upper Mount Bethel Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported 754-acre purchase and submitted plans are not approved data center construction. Planned 480 MW SUBSTATION is not critical IT; nearby Talen 607 MW natural-gas plant is separate generation. Historical 15-building/six-million-square-foot and 168 MW descriptions concern prior development scope, not additive current campus capacity. Amazon’s prior reported discussions and withdrawal of interest do not establish a committed tenant. Other Susquehanna/Amazon operating campus and Montour denial are separate projects. Court challenge is not a ruling; no approval/RFS adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.bicmagazine.com/departments/AI-Infrastructure/talen-looks-to-develop-23-building-data-center-campus-in-pennsylvania/", "host": "bicmagazine.com", "date": "2026-08-10", "published": "2026-08-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.umbt.org/", "host": "www.umbt.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.umbt.org/wp-content/uploads/Memorandum-of-Understanding-4908-3404-7178-v1.pdf", "host": "www.umbt.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.umbt.org/wp-content/uploads/UMBT-ZoningAmend-DataCntrs-DRAFT2.pdf", "host": "www.umbt.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.umbt.org/wp-content/uploads/RPL-Data-Center-Validity-Challenge-Submission-Letter.pdf", "host": "www.umbt.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.76912, "lng": -75.32339, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round32-2026-10-14.json", "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.", "fields": {"reported_context": "BIC republishes trade/local reporting on Slate Belt Holdings’ proposed up-to-23-building Upper Mount Bethel campus and zoning challenge.", "independently_verified_current_operating_status": null}, "notes": ["Reported 754-acre purchase and submitted plans are not approved data center construction. Planned 480 MW SUBSTATION is not critical IT; nearby Talen 607 MW natural-gas plant is separate generation. Historical 15-building/six-million-square-foot and 168 MW descriptions concern prior development scope, not additive current campus capacity. Amazon’s prior reported discussions and withdrawal of interest do not establish a committed tenant. Other Susquehanna/Amazon operating campus and Montour denial are separate projects. Court challenge is not a ruling; no approval/RFS adopted.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.bicmagazine.com/departments/AI-Infrastructure/talen-looks-to-develop-23-building-data-center-campus-in-pennsylvania/", "host": "bicmagazine.com", "date": "2026-08-10", "published": "2026-08-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 64", "scope": "The complete original six page posted memorandum names Slate Belt Holdings and a proposed data center campus. This supports a listed proposal. Its date and signature fields remain blank, and community payments, rule changes, litigation resolution, cooling commitments and later approvals remain conditional. Selected original draft ordinance pages one through three and thirty one retain a blank adoption day and execution fields. The independent October 8 RPL East letter concerns a separate property and is not assigned to this Slate Belt campus. The original July filing packet returned HTTP 404. No current final ordinance, executed agreement, construction, service or measured benefit is established by these bodies.", "fields": {"current_stage_evidence": {"outcome": "official_named_slatebelt_proposal_draft_agreements_and_separate_rpl_east", "scope": "The complete original six page posted memorandum names Slate Belt Holdings and a proposed data center campus. This supports a listed proposal. Its date and signature fields remain blank, and community payments, rule changes, litigation resolution, cooling commitments and later approvals remain conditional. Selected original draft ordinance pages one through three and thirty one retain a blank adoption day and execution fields. The independent October 8 RPL East letter concerns a separate property and is not assigned to this Slate Belt campus. The original July filing packet returned HTTP 404. No current final ordinance, executed agreement, construction, service or measured benefit is established by these bodies."}, "source_read_scope": {"complete_original_home_body_read": true, "complete_original_six_page_mou_text_read": true, "mou_date_and_execution_fields_blank": true, "selected31page_draft_text_pages_read": [1, 2, 3, 31], "complete31page_review_not_claimed": true, "complete_original_two_page_rpl_east_letter_text_read": true, "separate_rpl_east_not_forced_slatebelt_property": true, "conditional_donation_not_actual_payment": true, "original_july_packet404_retained": true}}, "notes": ["The complete original six page posted memorandum names Slate Belt Holdings and a proposed data center campus. This supports a listed proposal. Its date and signature fields remain blank, and community payments, rule changes, litigation resolution, cooling commitments and later approvals remain conditional. Selected original draft ordinance pages one through three and thirty one retain a blank adoption day and execution fields. The independent October 8 RPL East letter concerns a separate property and is not assigned to this Slate Belt campus. The original July filing packet returned HTTP 404. No current final ordinance, executed agreement, construction, service or measured benefit is established by these bodies.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://www.umbt.org/", "host": "www.umbt.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.umbt.org/wp-content/uploads/Memorandum-of-Understanding-4908-3404-7178-v1.pdf", "host": "www.umbt.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.umbt.org/wp-content/uploads/UMBT-ZoningAmend-DataCntrs-DRAFT2.pdf", "host": "www.umbt.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.umbt.org/wp-content/uploads/RPL-Data-Center-Validity-Challenge-Submission-Letter.pdf", "host": "www.umbt.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Upper Mount Bethel Township · Northampton · Source context reviewed", "status_scope": "The complete original six page posted memorandum names Slate Belt Holdings and a proposed data center campus. This supports a listed proposal. Its date and signature fields remain blank, and community payments, rule changes, litigation resolution, cooling commitments and later approvals remain conditional. Selected original draft ordinance pages one through three and thirty one retain a blank adoption day and execution fields. The independent October 8 RPL East letter concerns a separate property and is not assigned to this Slate Belt campus. The original July filing packet returned HTTP 404. No current final ordinance, executed agreement, construction, service or measured benefit is established by these bodies.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42095"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "depg-smithfield-gateway-data-center-monroe-pa", "state": "PA", "kind": "facility", "name": "Smithfield Gateway Data Center", "group": "proposed", "status": "Application under review", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Monroe"], "city": "East Stroudsburg", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Smithfield agency future hearing schedule and conditional-use limits. Both meetings are future as of October 14 and subject to postponement if review deadline extended. Recommendation is separate from Board hearing. Conditional-use application is not land-development approval; final engineering and land development still required before construction. Older sketch phases are not approved additional data-center buildings. No hearing outcome, numeric IT MW or current operations inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-10-28", "Scheduled event: A Smithfield Gateway conditional use hearing is scheduled to begin October 28, 2026 for party status and scheduling, according to the Township published October 21 procedural correspondence. The date remains future at this review and does not establish an accomplished hearing, substantive permit approval or construction."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://smithfieldtownship.com/odp/gatewaydc/", "host": "smithfieldtownship.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://smithfieldtownship.com/wp-content/uploads/2026/09/Smithfield-Gateway-Data-Center_Conditional-Use-Review-No.-2.pdf", "host": "smithfieldtownship.com", "published": "2026-09-11", "date": "2026-09-11", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://smithfieldtownship.com/wp-content/uploads/2026/10/2026.10.21-Response-to-Applicant.pdf", "host": "smithfieldtownship.com", "published": "2026-10-21", "date": "2026-10-21", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.05822, "lng": -75.3396, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Smithfield agency future hearing schedule and conditional-use limits", "fields": {"agency": "Smithfield Township, Pennsylvania", "page_updated": "2026-10-07", "applicants": ["DEPG Mosier Associates LP", "DEPG of Shawnee II LP"], "project": "Smithfield Gateway conditional use", "proposed_buildings": 1, "proposed_stories": 2, "proposed_area_sqft": 250000, "application_date": "2026-04-03", "resubmission_date": "2026-08-11", "scheduled_planning_recommendation_meeting": "2026-10-21T19:00:00-04:00", "scheduled_conditional_use_hearing": "2026-10-28T18:00:00-04:00", "scheduled_venue": "J.T. Lambert Intermediate School, 2000 Milford Road, East Stroudsburg, PA18301", "party_status_email_deadline_date": "2026-10-27"}, "notes": ["Both meetings are future as of October 14 and subject to postponement if review deadline extended. Recommendation is separate from Board hearing. Conditional-use application is not land-development approval; final engineering and land development still required before construction. Older sketch phases are not approved additional data-center buildings. No hearing outcome, numeric IT MW or current operations inferred.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://smithfieldtownship.com/odp/gatewaydc/", "host": "smithfieldtownship.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 27", "scope": "The Township published consulting engineer September 11, 2026 review explicitly concerns the named Smithfield Gateway data center conditional use application. October 21 published correspondence confirms agreement to open the October 28 hearing for party status and later scheduling, with substantive review to follow after revised plans and engineering review. Proposed records this active named application, not an issued conditional use approval, land development approval, a completed future hearing or current construction. Applicant counsel statements about legal rights and zoning effects are attributed positions, not court findings. Unrelated pharmacy strings in the captured website navigation are excluded; the original dated project PDFs are the evidence used here.", "fields": {"current_stage_evidence": {"outcome": "dated_original_conditional_use_review_and_future_procedural_hearing", "scope": "The Township published consulting engineer September 11, 2026 review explicitly concerns the named Smithfield Gateway data center conditional use application. October 21 published correspondence confirms agreement to open the October 28 hearing for party status and later scheduling, with substantive review to follow after revised plans and engineering review. Proposed records this active named application, not an issued conditional use approval, land development approval, a completed future hearing or current construction. Applicant counsel statements about legal rights and zoning effects are attributed positions, not court findings. Unrelated pharmacy strings in the captured website navigation are excluded; the original dated project PDFs are the evidence used here."}, "source_read_scope": {"technical_review_pdf_pages_visually_read": [1, 7], "technical_noise_pages_text_read": [9, 10], "procedural_pdf_pages_visually_read": [1, 2], "future_hearing_not_accomplished": true, "applicant_legal_positions_not_adjudicated": true, "unrelated_navigation_strings_excluded": true}}, "notes": ["The Township published consulting engineer September 11, 2026 review explicitly concerns the named Smithfield Gateway data center conditional use application. October 21 published correspondence confirms agreement to open the October 28 hearing for party status and later scheduling, with substantive review to follow after revised plans and engineering review. Proposed records this active named application, not an issued conditional use approval, land development approval, a completed future hearing or current construction. Applicant counsel statements about legal rights and zoning effects are attributed positions, not court findings. Unrelated pharmacy strings in the captured website navigation are excluded; the original dated project PDFs are the evidence used here.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://smithfieldtownship.com/wp-content/uploads/2026/09/Smithfield-Gateway-Data-Center_Conditional-Use-Review-No.-2.pdf", "host": "smithfieldtownship.com", "published": "2026-09-11", "date": "2026-09-11", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://smithfieldtownship.com/wp-content/uploads/2026/10/2026.10.21-Response-to-Applicant.pdf", "host": "smithfieldtownship.com", "published": "2026-10-21", "date": "2026-10-21", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · East Stroudsburg · Monroe · Source context reviewed", "status_scope": "The Township published consulting engineer September 11, 2026 review explicitly concerns the named Smithfield Gateway data center conditional use application. October 21 published correspondence confirms agreement to open the October 28 hearing for party status and later scheduling, with substantive review to follow after revised plans and engineering review. Proposed records this active named application, not an issued conditional use approval, land development approval, a completed future hearing or current construction. Applicant counsel statements about legal rights and zoning effects are attributed positions, not court findings. Unrelated pharmacy strings in the captured website navigation are excluded; the original dated project PDFs are the evidence used here.", "event_evidence": [{"date": "2026-10-28", "text": "Scheduled event: A Smithfield Gateway conditional use hearing is scheduled to begin October 28, 2026 for party status and scheduling, according to the Township published October 21 procedural correspondence. The date remains future at this review and does not establish an accomplished hearing, substantive permit approval or construction.", "kind": "scheduled_event", "sources": [{"url": "https://smithfieldtownship.com/wp-content/uploads/2026/10/2026.10.21-Response-to-Applicant.pdf", "host": "smithfieldtownship.com", "published": "2026-10-21", "date": "2026-10-21", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42089"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "allegheny-dc-springdale-cheswick-pa", "state": "PA", "kind": "facility", "name": "Springdale Data Center (former Cheswick Generating Station)", "group": "proposed", "status": "Permit review underway", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Allegheny"], "city": "Springdale", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Springdale reported conditional-use approval and soundmodel limits. Conditionaluseapprovalreported, actualfinalpermitconditions andlaterappealsnotinspected. Existingcoalplantclosed/notoperationofnewDC.140000homepoweranalogy notnumericITMW.85decibelreportedboroughthresholdnotverifiedweighting/measurementpoint/timebasisoractualsitelevel. Soundmodelnotmeasuredoperatingcompliance. No constructioncompletion, customerenergization oractualtaxreceipt. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.alleghenyfront.org/springdale-allegheny-county-data-center-approval/", "host": "alleghenyfront.org", "date": "2025-12-17", "published": "2025-12-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.46887, "lng": -79.98146, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round13-2026-10-14.json", "scope": "Springdale reported conditional-use approval and soundmodel limits", "fields": {"company": "Allegheny DC Property Company", "site": "formerCheswickGeneratingStation, Springdale, AlleghenyCounty, Pennsylvania", "reported_conditional_use_approval_date": "2025-12-16", "reported_vote": "5-2", "proposed_building_area_sqft": 565000, "proposed_height_stories_approx": 7}, "notes": ["Conditionaluseapprovalreported, actualfinalpermitconditions andlaterappealsnotinspected. Existingcoalplantclosed/notoperationofnewDC.140000homepoweranalogy notnumericITMW.85decibelreportedboroughthresholdnotverifiedweighting/measurementpoint/timebasisoractualsitelevel. Soundmodelnotmeasuredoperatingcompliance. No constructioncompletion, customerenergization oractualtaxreceipt.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.alleghenyfront.org/springdale-allegheny-county-data-center-approval/", "host": "alleghenyfront.org", "date": "2025-12-17", "published": "2025-12-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 28", "scope": "The current DEP tracker original project CSV identifies Springdale Data Center as project 10000019 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.", "fields": {"current_stage_evidence": {"outcome": "current_named_dep_project_permit_review_not_physical_operation", "scope": "The current DEP tracker original project CSV identifies Springdale Data Center as project 10000019 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed."}, "tracker_scope": {"project_id": "10000019", "project_and_permit_csv_read_together": true, "aggregate_status_not_every_permit_complete": true, "source_coordinates_not_promoted": true, "submitted_day_not_issued_day": true}}, "notes": ["The current DEP tracker original project CSV identifies Springdale Data Center as project 10000019 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Springdale · Allegheny · Source context reviewed", "status_scope": "The current DEP tracker original project CSV identifies Springdale Data Center as project 10000019 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42003"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "tecfusions-keystone-connect-upper-burrell-pa", "state": "PA", "kind": "facility", "name": "TECfusions Keystone Connect", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Westmoreland"], "city": "Upper Burrell Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. MiaHollie PublicSource September3updated4,2026 originalUpperBurrellmeetingreport:180dayMaymoratorium reportedlyexpiresNovember2, but EXCLUDESpreviousBuildingJpermits. August5planapprovalcoversJinterior/mechanical/electricalalterations, notentire1400acre/3GWfuturecampus. PartialBuildingJliveclaimattributedtoTribLive/companyrelease, notindependentlyinspectedcurrentservice. LanduseappealProtectPT/residentsinWestmorelandCommonPleas ALLEGESspecialexceptionproceduremissing, notcourtwin/currentinjunction. Case number/unreadoriginalpleading/finaloutcomeunknown. Newdraftbaseloadgenerationrequirement notenactedlaw; September15reviewfutureinreportnotobservedoutcome. Moratoriumnotproofallcurrentworkillegal. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.publicsource.org/upper-burrell-data-center-transparency-backlash/", "host": "publicsource.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://tecfusions.com/wp-content/uploads/2025/11/KEYSTONE-CONNECT-FLYER.pdf", "host": "tecfusions.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 40.31081, "lng": -79.46689, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json", "scope": "Original reporter/issuer named-project context, with inference and stages explicit.", "fields": {}, "notes": ["MiaHollie PublicSource September3updated4,2026 originalUpperBurrellmeetingreport:180dayMaymoratorium reportedlyexpiresNovember2, but EXCLUDESpreviousBuildingJpermits. August5planapprovalcoversJinterior/mechanical/electricalalterations, notentire1400acre/3GWfuturecampus. PartialBuildingJliveclaimattributedtoTribLive/companyrelease, notindependentlyinspectedcurrentservice.", "LanduseappealProtectPT/residentsinWestmorelandCommonPleas ALLEGESspecialexceptionproceduremissing, notcourtwin/currentinjunction. Case number/unreadoriginalpleading/finaloutcomeunknown. Newdraftbaseloadgenerationrequirement notenactedlaw; September15reviewfutureinreportnotobservedoutcome. Moratoriumnotproofallcurrentworkillegal.", "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."], "sources": [{"url": "https://www.publicsource.org/upper-burrell-data-center-transparency-backlash/", "host": "publicsource.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 28", "scope": "The current DEP original project CSV identifies Keystone Connect as project 10000020 with aggregate DEP Review Complete wording, while its related original permit rows include a pending item as well as issued items. That aggregate label is not certified as every approval complete. The company flyer describes adaptive reuse development and claimed leasing and future deployment timing. Project listed development records the named proposal account, not verified live service, a completed conversion or delivery of its advertised capacity. The flyer file path month is not its publication date, and stock photographs do not establish current facility operation.", "fields": {"current_stage_evidence": {"outcome": "named_keystone_development_with_aggregate_and_individual_permit_difference", "scope": "The current DEP original project CSV identifies Keystone Connect as project 10000020 with aggregate DEP Review Complete wording, while its related original permit rows include a pending item as well as issued items. That aggregate label is not certified as every approval complete. The company flyer describes adaptive reuse development and claimed leasing and future deployment timing. Project listed development records the named proposal account, not verified live service, a completed conversion or delivery of its advertised capacity. The flyer file path month is not its publication date, and stock photographs do not establish current facility operation."}, "tracker_scope": {"project_id": "10000020", "aggregate_review_complete_does_not_clear_pending_related_row": true, "flyer_first_page_visually_read": true, "leasing_claim_not_commissioning": true}}, "notes": ["The current DEP original project CSV identifies Keystone Connect as project 10000020 with aggregate DEP Review Complete wording, while its related original permit rows include a pending item as well as issued items. That aggregate label is not certified as every approval complete. The company flyer describes adaptive reuse development and claimed leasing and future deployment timing. Project listed development records the named proposal account, not verified live service, a completed conversion or delivery of its advertised capacity. The flyer file path month is not its publication date, and stock photographs do not establish current facility operation.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://tecfusions.com/wp-content/uploads/2025/11/KEYSTONE-CONNECT-FLYER.pdf", "host": "tecfusions.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Upper Burrell Township · Westmoreland · Source context reviewed", "status_scope": "The current DEP original project CSV identifies Keystone Connect as project 10000020 with aggregate DEP Review Complete wording, while its related original permit rows include a pending item as well as issued items. That aggregate label is not certified as every approval complete. The company flyer describes adaptive reuse development and claimed leasing and future deployment timing. Project listed development records the named proposal account, not verified live service, a completed conversion or delivery of its advertised capacity. The flyer file path month is not its publication date, and stock photographs do not establish current facility operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42129"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "triboro-industrial-park-jessup-olyphant-lackawanna-county-pa", "state": "PA", "kind": "facility", "name": "Triboro Industrial Park / Triboro Commerce Park", "group": "proposed", "status": "Permit review underway", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lackawanna"], "city": "Jessup / Olyphant", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash. PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county", "host": "wvia.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.48297, "lng": -75.62178, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json", "scope": "Original reporter/issuer named-project context, with inference and stages explicit.", "fields": {}, "notes": ["KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash.", "PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting.", "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."], "sources": [{"url": "https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county", "host": "wvia.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 29", "scope": "The DEP row names Triboro Industrial Park with Jessup, Olyphant and Throop context. That agency context does not change the inherited project jurisdiction wrapper or establish a common physical phase for every tract. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "fields": {"current_stage_evidence": {"outcome": "exact_named_dep_proposal_account_not_physical_commissioning", "scope": "The DEP row names Triboro Industrial Park with Jessup, Olyphant and Throop context. That agency context does not change the inherited project jurisdiction wrapper or establish a common physical phase for every tract. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged."}, "tracker_scope": {"project_id": "10000069", "original_project_and_related_permit_csv_read": true, "no_data_center_operation_inferred": true, "no_coordinate_or_role_promotion": true}}, "notes": ["The DEP row names Triboro Industrial Park with Jessup, Olyphant and Throop context. That agency context does not change the inherited project jurisdiction wrapper or establish a common physical phase for every tract. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Jessup / Olyphant · Lackawanna · Source context reviewed", "status_scope": "The DEP row names Triboro Industrial Park with Jessup, Olyphant and Throop context. That agency context does not change the inherited project jurisdiction wrapper or establish a common physical phase for every tract. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42069"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "wildcat-ridge-archbald-lackawanna-county-pa", "state": "PA", "kind": "facility", "name": "Wildcat Ridge AI Data Center Campus", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lackawanna"], "city": "Archbald", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash. PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county", "host": "wvia.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.39016, "lng": -75.63327, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json", "scope": "Original reporter/issuer named-project context, with inference and stages explicit.", "fields": {}, "notes": ["KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash.", "PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting.", "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."], "sources": [{"url": "https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county", "host": "wvia.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 29", "scope": "The DEP row explicitly names Wildcat Ridge and Pine Line in Archbald. A named proposal and its current tracker account do not establish current construction or a power delivery milestone. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "fields": {"current_stage_evidence": {"outcome": "exact_named_dep_proposal_account_not_physical_commissioning", "scope": "The DEP row explicitly names Wildcat Ridge and Pine Line in Archbald. A named proposal and its current tracker account do not establish current construction or a power delivery milestone. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged."}, "tracker_scope": {"project_id": "10000027", "original_project_and_related_permit_csv_read": true, "no_data_center_operation_inferred": true, "no_coordinate_or_role_promotion": true}}, "notes": ["The DEP row explicitly names Wildcat Ridge and Pine Line in Archbald. A named proposal and its current tracker account do not establish current construction or a power delivery milestone. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · Archbald · Lackawanna · Source context reviewed", "status_scope": "The DEP row explicitly names Wildcat Ridge and Pine Line in Archbald. A named proposal and its current tracker account do not establish current construction or a power delivery milestone. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42069"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "cnx-zediker-station-south-strabane-washington-county-pa", "state": "PA", "kind": "facility", "name": "Zediker Station Data Center Site", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Washington"], "city": "South Strabane Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Marketing release dateOct24 differs body datelineOct20. Generation is not critical IT; net-zero claim is broker/fuel-accounting assertion, not audited emissions. Available industrial site is not an operating data center. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.jll.com/en-us/newsroom/jll-announces-major-data-center-development-site-in-washington", "host": "jll.com", "date": "2025-10-24", "published": "2025-10-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 40.18942, "lng": -80.24855, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round24-2026-10-14.json", "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.", "fields": {"reported_context": "JLL markets CNX Zediker Station1500-acre property with400buildable acres and potential500to700MW gas generation.", "independently_verified_current_operating_status": null}, "notes": ["Marketing release dateOct24 differs body datelineOct20. Generation is not critical IT; net-zero claim is broker/fuel-accounting assertion, not audited emissions. Available industrial site is not an operating data center.", "Subsequent original decisions and current operator disclosures take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.jll.com/en-us/newsroom/jll-announces-major-data-center-development-site-in-washington", "host": "jll.com", "date": "2025-10-24", "published": "2025-10-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 28", "scope": "JLL describes marketing Zediker Station for future data center development. DEP original project CSV identifies the named CNX project 10000057 as proposed with no applications received in that tracker account and an approximate location classification. Proposed is limited to this marketed development account, not delivered carbon neutral power, a lease, physical construction or current computing service. The JLL page header says October 24, 2025 while its dateline says October 20; neither becomes an exact physical milestone here. Source coordinates, ownership assertions, roles and technical quantities are not promoted.", "fields": {"current_stage_evidence": {"outcome": "current_named_market_listing_and_bounded_dep_proposal_account", "scope": "JLL describes marketing Zediker Station for future data center development. DEP original project CSV identifies the named CNX project 10000057 as proposed with no applications received in that tracker account and an approximate location classification. Proposed is limited to this marketed development account, not delivered carbon neutral power, a lease, physical construction or current computing service. The JLL page header says October 24, 2025 while its dateline says October 20; neither becomes an exact physical milestone here. Source coordinates, ownership assertions, roles and technical quantities are not promoted."}}, "notes": ["JLL describes marketing Zediker Station for future data center development. DEP original project CSV identifies the named CNX project 10000057 as proposed with no applications received in that tracker account and an approximate location classification. Proposed is limited to this marketed development account, not delivered carbon neutral power, a lease, physical construction or current computing service. The JLL page header says October 24, 2025 while its dateline says October 20; neither becomes an exact physical milestone here. Source coordinates, ownership assertions, roles and technical quantities are not promoted.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv", "host": "gis.dep.pa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.jll.com/en-us/newsroom/jll-announces-major-data-center-development-site-in-washington", "host": "www.jll.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Pennsylvania · South Strabane Township · Washington · Source context reviewed", "status_scope": "JLL describes marketing Zediker Station for future data center development. DEP original project CSV identifies the named CNX project 10000057 as proposed with no applications received in that tracker account and an approximate location classification. Proposed is limited to this marketed development account, not delivered carbon neutral power, a lease, physical construction or current computing service. The JLL page header says October 24, 2025 while its dateline says October 20; neither becomes an exact physical milestone here. Source coordinates, ownership assertions, roles and technical quantities are not promoted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "42125"}, "state_name": "Pennsylvania", "state_path": "/pennsylvania/"}, {"id": "cielo-gaffney-cherokee-county-sc", "state": "SC", "kind": "facility", "name": "Cielo Digital Infrastructure Gaffney Campus", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cherokee"], "city": "Gaffney", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 000 is a published placeholder, not independently parcel-geocoded street number. Investment and jobs forecasts, not spend/current employment. No site MW specified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-06-24", "The Governor June 24, 2025 release announces the named Cielo Gaffney development. This dates the public announcement rather than physical construction or computing commissioning."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development", "host": "governor.sc.gov", "date": "2025-06-24", "published": "2025-06-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 35.04828, "lng": -81.62031, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "named government source", "fields": {"development_announcement_date": "2025-06-24", "planned_investment_usd_approx": 2100000000, "expected_new_jobs": 30, "planned_buildings": 4, "planned_area_per_building_sqft_approx": 400000, "initial_operation_target": "2028-year-end", "published_location": "000 Ford Road, Gaffney, Cherokee County, South Carolina"}, "notes": ["000 is a published placeholder, not independently parcel-geocoded street number. Investment and jobs forecasts, not spend/current employment. No site MW specified.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development", "host": "governor.sc.gov", "date": "2025-06-24", "published": "2025-06-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 79", "scope": "The complete original Governor June 24, 2025 release names the planned Cielo Gaffney development on Ford Road. This supports an agency listed proposal. Its first operating forecast for the end of 2028, planned facilities, investment and jobs are prospective rather than commissioned computing, physical construction or delivered benefits. No exact future opening day or installed capacity is inferred.", "fields": {"current_stage_evidence": {"outcome": "agency_named_gaffney_proposal", "scope": "The complete original Governor June 24, 2025 release names the planned Cielo Gaffney development on Ford Road. This supports an agency listed proposal. Its first operating forecast for the end of 2028, planned facilities, investment and jobs are prospective rather than commissioned computing, physical construction or delivered benefits. No exact future opening day or installed capacity is inferred."}, "source_read_scope": {"complete_original_governor_release_body_read": true, "forecast_not_actual_operation": true}}, "notes": ["The complete original Governor June 24, 2025 release names the planned Cielo Gaffney development on Ford Road. This supports an agency listed proposal. Its first operating forecast for the end of 2028, planned facilities, investment and jobs are prospective rather than commissioned computing, physical construction or delivered benefits. No exact future opening day or installed capacity is inferred.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development", "host": "governor.sc.gov", "published": "2025-06-24", "date": "2025-06-24", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "South Carolina · Gaffney · Cherokee · Source context reviewed", "status_scope": "The complete original Governor June 24, 2025 release names the planned Cielo Gaffney development on Ford Road. This supports an agency listed proposal. Its first operating forecast for the end of 2028, planned facilities, investment and jobs are prospective rather than commissioned computing, physical construction or delivered benefits. No exact future opening day or installed capacity is inferred.", "event_evidence": [{"date": "2025-06-24", "text": "The Governor June 24, 2025 release announces the named Cielo Gaffney development. This dates the public announcement rather than physical construction or computing commissioning.", "kind": "announced", "sources": [{"url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development", "host": "governor.sc.gov", "published": "2025-06-24", "date": "2025-06-24", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "45021"}, "state_name": "South Carolina", "state_path": "/south-carolina/"}, {"id": "northmark-valara-spartanburg-sc", "state": "SC", "kind": "facility", "name": "NorthMark Strategies Spartanburg High-Performance Computing Center", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Spartanburg"], "city": "Spartanburg", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Valara siteidentity andproposed onsitegeneration modification. Applicationcopy/digitalsignaturenotapprovalofnewturbines orcurrentoperations. Existing24times2MWenginesandrequestedgenerationnotcriticalIT,donotsumasenergizedcampuscapacity. Northmarkoperatoraliasnotindependentlyestablishedinthisform. Noexactcompletionorcapitalvalue. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf", "host": "des.sc.gov", "date": "2026-04-23", "published": "2026-04-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 34.89506, "lng": -81.9877, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Valara siteidentity andproposed onsitegeneration modification", "fields": {"application_copy_of_record_date": "2026-04-23", "facility_name": "ValaraHoldingsHighPerformanceComputeCenter", "published_physical_address": "4000 SouthPineStreet,Spartanburg,SC29302", "applicant_reported_facility_point": {"latitude": 34.923, "longitude": -81.8519, "geo_precision": "applicant-reported permitted-process center,notparcelcentroid"}, "referenced_existing_air_permit": "CP-50000316v1.0", "referenced_existing_permit_issue_date": "2025-09-17", "requested_additional_generation": [{"units": 5, "mw_each": 17, "fuel": "naturalgas"}, {"units": 6, "mw_each": 54, "fuel": "naturalgas"}]}, "notes": ["Applicationcopy/digitalsignaturenotapprovalofnewturbines orcurrentoperations. Existing24times2MWenginesandrequestedgenerationnotcriticalIT,donotsumasenergizedcampuscapacity. Northmarkoperatoraliasnotindependentlyestablishedinthisform. Noexactcompletionorcapitalvalue.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf", "host": "des.sc.gov", "date": "2026-04-23", "published": "2026-04-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 79", "scope": "Selected physical pages 1 through 4 of the original sixteen page Valara application identify the named High Performance Compute Center and planned onsite generation. The record describes a computing project and already permitted generator installation, without proving that equipment was installed, computing construction began or the center operates. This supports an agency listed proposal. The April 23, 2026 signed digital record copy is not independently verified as first submission or web publication day. The exact NorthMark legal role and the inherited project crosswalk are not changed. Neither generation permitting nor an application narrative establishes installed computing capacity.", "fields": {"current_stage_evidence": {"outcome": "agency_named_valara_computing_application", "scope": "Selected physical pages 1 through 4 of the original sixteen page Valara application identify the named High Performance Compute Center and planned onsite generation. The record describes a computing project and already permitted generator installation, without proving that equipment was installed, computing construction began or the center operates. This supports an agency listed proposal. The April 23, 2026 signed digital record copy is not independently verified as first submission or web publication day. The exact NorthMark legal role and the inherited project crosswalk are not changed. Neither generation permitting nor an application narrative establishes installed computing capacity."}, "source_read_scope": {"original_application_selected_physical_pages1_through4_text_read": true, "not_entire_sixteen_page_application_read": true, "digital_record_copy_signature_not_verified_submission_or_publication_day": true, "generator_permission_not_physical_installation_or_computing_operation": true, "no_legal_role_crosswalk_or_capacity_change": true}}, "notes": ["Selected physical pages 1 through 4 of the original sixteen page Valara application identify the named High Performance Compute Center and planned onsite generation. The record describes a computing project and already permitted generator installation, without proving that equipment was installed, computing construction began or the center operates. This supports an agency listed proposal. The April 23, 2026 signed digital record copy is not independently verified as first submission or web publication day. The exact NorthMark legal role and the inherited project crosswalk are not changed. Neither generation permitting nor an application narrative establishes installed computing capacity.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf", "host": "des.sc.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "South Carolina · Spartanburg · Spartanburg · Source context reviewed", "status_scope": "Selected physical pages 1 through 4 of the original sixteen page Valara application identify the named High Performance Compute Center and planned onsite generation. The record describes a computing project and already permitted generator installation, without proving that equipment was installed, computing construction began or the center operates. This supports an agency listed proposal. The April 23, 2026 signed digital record copy is not independently verified as first submission or web publication day. The exact NorthMark legal role and the inherited project crosswalk are not changed. Neither generation permitting nor an application narrative establishes installed computing capacity.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "45083"}, "state_name": "South Carolina", "state_path": "/south-carolina/"}, {"id": "volt-edge-project-alpaca-union-county-sc", "state": "SC", "kind": "facility", "name": "Project Alpaca (Midway Green Industrial Park)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Union"], "city": "Union", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original participant/economic-development presentation for proposal and claims, not independent performance validation.. Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation. USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts. Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established. Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset. A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf", "host": "gearupunionsc.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://gearupunionsc.com/public-notices/", "host": "gearupunionsc.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Public-Hearing-Ordinance-413_Project-Alpaca.docx.pdf", "host": "gearupunionsc.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 34.70482, "lng": -81.63498, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round39-2026-10-14.json", "scope": "Original participant/economic-development presentation for proposal and claims, not independent performance validation.", "fields": {"issuer_presentation_date": "2026-04", "issuer_proposed_fixed_asset_investment_usd": 410000000, "issuer_proposed_permanent_jobs_lower_bound": 50, "issuer_proposed_construction_jobs_lower_bound": 500, "issuer_mw_label": 49, "issuer_mw_basis": "Presentation says existing transmission and generation capacity, not explicitly criticalIT", "critical_it_mw": null, "issuer_construction_target": "2026", "issuer_operating_target": "2027/2028", "executed_utility_agreement_verified": false, "incentive_award_verified": false}, "notes": ["Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation.", "USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts.", "Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established.", "Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset.", "A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf", "host": "gearupunionsc.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 79", "scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings.", "fields": {"current_stage_evidence": {"outcome": "county_hosted_named_alpaca_proposal", "scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings."}, "source_read_scope": {"original_current_public_notice_index_selected_alpaca_rows_read": true, "original_presentation_selected_physical_pages1_through3_text_read": true, "not_entire_four_page_presentation_visual_review": true, "complete_original_linked_single_page_notice_text_read": true, "current_index_cancellation_and_historical_notice_conflict_retained": true, "no_actual_hearing_vote_or_cancellation_day_invented": true, "no_promotional_resource_or_benefit_claim_as_measured_result": true}}, "notes": ["The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://gearupunionsc.com/public-notices/", "host": "gearupunionsc.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf", "host": "gearupunionsc.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Public-Hearing-Ordinance-413_Project-Alpaca.docx.pdf", "host": "gearupunionsc.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "South Carolina · Union · Union · Source context reviewed", "status_scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "45087"}, "state_name": "South Carolina", "state_path": "/south-carolina/"}, {"id": "project-altair-newberry-county-sc", "state": "SC", "kind": "facility", "name": "Project Altair (Mid-Carolina Commerce Park II)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Newberry"], "city": "Prosperity", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Newberry County due-diligence proposal status. Option/due-diligence proposal not finalized sale, construction approval, cancellation or operating campus. Informational session has no confirmed date. No MW, budget, tax incentive amount or exact parcel adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-04-15", "The original County account explicitly reports that Council held a Project Altair public hearing April 15, 2026. A delayed third reading and unconfirmed separate information session are not final approval or physical construction."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers", "host": "newberrycounty.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 34.28992, "lng": -81.60001, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Newberry County due-diligence proposal status", "fields": {"project_name": "Altair", "county_public_hearing_date": "2026-04-15", "ordinance_id": "03-01-2026", "reported_review_stage": "third reading delayed; community information session to be scheduled", "published_location": "remaining acreage,MidCarolinaCommerceParkII", "utility_feasibility_review": "SanteeCooper grid study"}, "notes": ["Option/due-diligence proposal not finalized sale, construction approval, cancellation or operating campus. Informational session has no confirmed date. No MW, budget, tax incentive amount or exact parcel adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers", "host": "newberrycounty.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 79", "scope": "The complete original County account describes Project Altair as a proposed computing development associated with a land option at Mid Carolina Commerce Park II. It explicitly reports that Council held a public hearing April 15, 2026 and that a third reading was delayed for utility feasibility and due diligence. A separate community information session had no confirmed date in the account. This supports an agency listed proposal. The selected account does not establish a completed land sale, final project approval, physical construction, present cancellation or operation. The publication day is unverified and is not invented from the hearing day.", "fields": {"current_stage_evidence": {"outcome": "agency_named_altair_proposal_and_past_hearing", "scope": "The complete original County account describes Project Altair as a proposed computing development associated with a land option at Mid Carolina Commerce Park II. It explicitly reports that Council held a public hearing April 15, 2026 and that a third reading was delayed for utility feasibility and due diligence. A separate community information session had no confirmed date in the account. This supports an agency listed proposal. The selected account does not establish a completed land sale, final project approval, physical construction, present cancellation or operation. The publication day is unverified and is not invented from the hearing day."}, "source_read_scope": {"complete_original_county_project_account_body_read": true, "explicit_past_hearing_distinct_from_future_unconfirmed_information_session": true, "delayed_third_reading_not_completed_approval_or_cancellation": true, "no_unverified_publication_day_invented": true}}, "notes": ["The complete original County account describes Project Altair as a proposed computing development associated with a land option at Mid Carolina Commerce Park II. It explicitly reports that Council held a public hearing April 15, 2026 and that a third reading was delayed for utility feasibility and due diligence. A separate community information session had no confirmed date in the account. This supports an agency listed proposal. The selected account does not establish a completed land sale, final project approval, physical construction, present cancellation or operation. The publication day is unverified and is not invented from the hearing day.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers", "host": "www.newberrycounty.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "South Carolina · Prosperity · Newberry · Source context reviewed", "status_scope": "The complete original County account describes Project Altair as a proposed computing development associated with a land option at Mid Carolina Commerce Park II. It explicitly reports that Council held a public hearing April 15, 2026 and that a third reading was delayed for utility feasibility and due diligence. A separate community information session had no confirmed date in the account. This supports an agency listed proposal. The selected account does not establish a completed land sale, final project approval, physical construction, present cancellation or operation. The publication day is unverified and is not invented from the hearing day.", "event_evidence": [{"date": "2026-04-15", "text": "The original County account explicitly reports that Council held a Project Altair public hearing April 15, 2026. A delayed third reading and unconfirmed separate information session are not final approval or physical construction.", "kind": "hearing", "sources": [{"url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers", "host": "www.newberrycounty.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "45071"}, "state_name": "South Carolina", "state_path": "/south-carolina/"}, {"id": "qts-york-county-sc", "state": "SC", "kind": "facility", "name": "QTS York County Data Center Campus", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["York"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Four buildings is the first phase, nine is the three-phase plan, not a numerical conflict. Later land beyond approved campus would require additional investment; current estimate is not all spent. Per-billion tax examples are estimates, not guaranteed annual collections. Old May event has no verified current upcoming date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "http://q.com/data-centers/york/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/york/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "loc": {"lat": 34.97497, "lng": -81.18444, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "direct-operators-round5-2026-10-14.json", "scope": "named operator source", "fields": {"planned_total_buildings": 9, "planned_phases": 3, "first_phase_buildings": 4, "first_phase_acres_approx": 109, "second_phase_construction_target": "early2027", "planned_approved_campus_investment_usd_approx": 8000000000, "forecast_construction_jobs": 1000, "forecast_permanent_jobs": 200}, "notes": ["Four buildings is the first phase, nine is the three-phase plan, not a numerical conflict. Later land beyond approved campus would require additional investment; current estimate is not all spent. Per-billion tax examples are estimates, not guaranteed annual collections. Old May event has no verified current upcoming date.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "http://q.com/data-centers/york/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 5", "scope": "QTS says it is developing the named York County campus. The developer listed development label describes that proposal and phased planning. The page does not independently establish an observed construction start, completion of all planned buildings or operation. Its May event listing has no verified occurrence in this review.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "QTS says it is developing the named York County campus. The developer listed development label describes that proposal and phased planning. The page does not independently establish an observed construction start, completion of all planned buildings or operation. Its May event listing has no verified occurrence in this review."}}, "notes": ["QTS says it is developing the named York County campus. The developer listed development label describes that proposal and phased planning. The page does not independently establish an observed construction start, completion of all planned buildings or operation. Its May event listing has no verified occurrence in this review.", "An agency decision or a source publication date does not certify an opening, a physical site count or a technical quantity."], "sources": [{"url": "https://q.com/data-centers/york/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "South Carolina · York · Source context reviewed", "status_scope": "QTS says it is developing the named York County campus. The developer listed development label describes that proposal and phased planning. The page does not independently establish an observed construction start, completion of all planned buildings or operation. Its May event listing has no verified occurrence in this review.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "45091"}, "state_name": "South Carolina", "state_path": "/south-carolina/"}, {"id": "srs-ai-data-center-savannah-river-site-sc", "state": "SC", "kind": "facility", "name": "Savannah River Site AI Data Center (Amentum)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Barnwell"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Savannah River federal negotiation selection, not awarded operating campus. Selection explicitly not final lease award. Subject to negotiations, permits,safety/security and federal approvals. Data-center1GWand onsitegeneration2GWnot3GWIT. No executed lease, operating date or investment value established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-20", "The original NNSA July 20, 2026 release selects Amentum for Savannah River Site lease negotiations and explicitly distinguishes selection from a final lease award. This dates the agency account rather than executed leasing or commissioned computing."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site", "host": "energy.gov", "date": "2026-07-20", "published": "2026-07-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 33.26606, "lng": -81.4351, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Savannah River federal negotiation selection, not awarded operating campus", "fields": {"developer_selection_for_negotiations_announcement": "2026-07-20", "selected_negotiating_party": "Amentum", "proposed_data_center_power_gw": 1, "data_center_power_basis": "not explicitly criticalIT", "proposed_dedicated_generation_gw_approx": 2, "proposed_generation_transition": "natural gas bridging to nuclear"}, "notes": ["Selection explicitly not final lease award. Subject to negotiations, permits,safety/security and federal approvals. Data-center1GWand onsitegeneration2GWnot3GWIT. No executed lease, operating date or investment value established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site", "host": "energy.gov", "date": "2026-07-20", "published": "2026-07-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 79", "scope": "The complete original NNSA July 20, 2026 release selects Amentum for negotiations concerning a phased AI computing and onsite energy lease at Savannah River Site. It explicitly says that selection is not a final lease award and retains future permitting, safety, security and federal review conditions. This supports an agency listed proposal. Selection is not executed leasing, computing construction, installed generation or computing operation. No new legal company role, exact parcel, technical quantity or delivered benefit is adopted.", "fields": {"current_stage_evidence": {"outcome": "agency_preliminary_amentum_lease_negotiation_selection", "scope": "The complete original NNSA July 20, 2026 release selects Amentum for negotiations concerning a phased AI computing and onsite energy lease at Savannah River Site. It explicitly says that selection is not a final lease award and retains future permitting, safety, security and federal review conditions. This supports an agency listed proposal. Selection is not executed leasing, computing construction, installed generation or computing operation. No new legal company role, exact parcel, technical quantity or delivered benefit is adopted."}, "source_read_scope": {"complete_original_nnsa_release_body_read": true, "explicit_not_final_lease_award": true, "no_selection_as_executed_lease_construction_or_operation": true}}, "notes": ["The complete original NNSA July 20, 2026 release selects Amentum for negotiations concerning a phased AI computing and onsite energy lease at Savannah River Site. It explicitly says that selection is not a final lease award and retains future permitting, safety, security and federal review conditions. This supports an agency listed proposal. Selection is not executed leasing, computing construction, installed generation or computing operation. No new legal company role, exact parcel, technical quantity or delivered benefit is adopted.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site", "host": "www.energy.gov", "published": "2026-07-20", "date": "2026-07-20", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "South Carolina · Barnwell · Source context reviewed", "status_scope": "The complete original NNSA July 20, 2026 release selects Amentum for negotiations concerning a phased AI computing and onsite energy lease at Savannah River Site. It explicitly says that selection is not a final lease award and retains future permitting, safety, security and federal review conditions. This supports an agency listed proposal. Selection is not executed leasing, computing construction, installed generation or computing operation. No new legal company role, exact parcel, technical quantity or delivered benefit is adopted.", "event_evidence": [{"date": "2026-07-20", "text": "The original NNSA July 20, 2026 release selects Amentum for Savannah River Site lease negotiations and explicitly distinguishes selection from a final lease award. This dates the agency account rather than executed leasing or commissioned computing.", "kind": "announced", "sources": [{"url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site", "host": "www.energy.gov", "published": "2026-07-20", "date": "2026-07-20", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "45011"}, "state_name": "South Carolina", "state_path": "/south-carolina/"}, {"id": "dcblox-nashville-grassmere-tn", "state": "TN", "kind": "facility", "name": "DC BLOX Nashville (Grassmere Park)", "group": "proposed", "status": "Evaluation", "raw_status": "evaluation", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Davidson"], "city": "Nashville", "address": "", "who": "DC BLOX", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer plan. Data-center use being permitted in the zoning district does not prove project approval or construction start. Do not infer permanent jobs from a generic multiplier. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. This development-stage label does not establish issued permits, construction, operation or achieved employment. Utility-policy claims are not independently audited rate outcomes. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.dcblox.com/nashville-data-center/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 36.18411, "lng": -86.80056, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"developer_current_stage": "evaluation", "planned_building_sqft": 69200, "advertised_building_power_mw": 10, "power_basis": "not separately defined as utility or critical IT in this statement", "planned_capital_investment_usd_lower_bound": 380000000, "county": "Davidson"}, "notes": ["Developer plan. Data-center use being permitted in the zoning district does not prove project approval or construction start. Do not infer permanent jobs from a generic multiplier.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.dcblox.com/nashville-data-center/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "evaluation", "status_basis": "DC BLOX says its Nashville project is currently in the evaluation phase.", "filter_scope": "Grouped with proposed/development projects; no final permit or exact construction stage is inferred."}, "notes": ["This development-stage label does not establish issued permits, construction, operation or achieved employment. Utility-policy claims are not independently audited rate outcomes. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://www.dcblox.com/nashville-data-center/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "33ab7270d3e156858085b142280880a18447e6119015abdd3a61d58d561d21b8", "events": [], "whole_record_certified": false}, {"overlay": "Company role source check68, October24,2026", "scope": "The current project page names DC BLOX planning at Grassmere Business Park. Its sound, water, utility rate, health and environmental commitments do not establish measured outcomes or verified legal requirements. The proposed new building remains separate from the already existing computing space described on the page. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.", "fields": {"company_association": {"name": "DC BLOX", "role": "developer", "identity_scope": "provider_brand_only", "scope": "The current project page names DC BLOX planning at Grassmere Business Park. Its sound, water, utility rate, health and environmental commitments do not establish measured outcomes or verified legal requirements. The proposed new building remains separate from the already existing computing space described on the page. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."}, "provider_role": "developer"}, "notes": ["The current project page names DC BLOX planning at Grassmere Business Park. Its sound, water, utility rate, health and environmental commitments do not establish measured outcomes or verified legal requirements. The proposed new building remains separate from the already existing computing space described on the page. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."], "sources": [{"url": "https://www.dcblox.com/nashville-data-center/", "host": "www.dcblox.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Tennessee · Nashville · Davidson · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "47037"}, "state_name": "Tennessee", "state_path": "/tennessee/"}, {"id": "exoticridge-bulls-gap-tn", "state": "TN", "kind": "facility", "name": "ExoticRidge Bulls Gap Bitcoin Mine", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": true, "type": "Crypto/HPC (inventory classification)", "counties": ["Hawkins"], "city": "Bulls Gap", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Plaintiff allegations are not court findings. The reported state permit was not retained as an original. Two unnamed Kentucky operations are discovery leads, without locations or new pins. Constitutional conclusions and no-harm claims remain attributed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-04-01", "The Beacon Center published its ExoticRidge Hawkins County case account April 1, 2026, describing the proposed cryptocurrency facility and a legal challenge. This dates the counsel publication, not a separately verified court filing day, judgment, physical start or operating mine."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.beacontn.org/exoticridge-v-hawkins-county-fighting-back-against-an-arbitrary-data-center-ban-in-east-tennessee/", "host": "beacontn.org", "date": "2026-04-01", "published": "2026-04-01", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 36.44158, "lng": -82.94505, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "Beacon's counsel page describes ExoticRidge's intended ethane-powered Hawkins County facility and its federal challenge to a county ban.", "independently_verified_current_operating_status": null}, "notes": ["Plaintiff allegations are not court findings. The reported state permit was not retained as an original. Two unnamed Kentucky operations are discovery leads, without locations or new pins. Constitutional conclusions and no-harm claims remain attributed.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.beacontn.org/exoticridge-v-hawkins-county-fighting-back-against-an-arbitrary-data-center-ban-in-east-tennessee/", "host": "beacontn.org", "date": "2026-04-01", "published": "2026-04-01", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 55", "scope": "The original April 1, 2026 project counsel account identifies ExoticRidge proposed Hawkins County cryptocurrency development and its challenge to a County data center prohibition. It describes a business that wants to operate, rather than commissioned mining. This supports a named listed proposal within the counsel reported scope. Its arguments about County authority, project effects and self supplied energy are attributed legal and development positions, not an independent court holding, measured effect or physical construction. The exact Bulls Gap parcel and any later court disposition remain unverified and unchanged.", "fields": {"current_stage_evidence": {"outcome": "counsel_listed_named_project_proposal", "scope": "The original April 1, 2026 project counsel account identifies ExoticRidge proposed Hawkins County cryptocurrency development and its challenge to a County data center prohibition. It describes a business that wants to operate, rather than commissioned mining. This supports a named listed proposal within the counsel reported scope. Its arguments about County authority, project effects and self supplied energy are attributed legal and development positions, not an independent court holding, measured effect or physical construction. The exact Bulls Gap parcel and any later court disposition remain unverified and unchanged."}, "source_read_scope": {"counsel_original_executive_summary_and_project_description_read": true, "party_arguments_not_court_findings": true, "underlying_complete_court_record_not_read": true, "planned_self_generation_not_power_or_it_fact": true}}, "notes": ["The original April 1, 2026 project counsel account identifies ExoticRidge proposed Hawkins County cryptocurrency development and its challenge to a County data center prohibition. It describes a business that wants to operate, rather than commissioned mining. This supports a named listed proposal within the counsel reported scope. Its arguments about County authority, project effects and self supplied energy are attributed legal and development positions, not an independent court holding, measured effect or physical construction. The exact Bulls Gap parcel and any later court disposition remain unverified and unchanged.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.beacontn.org/exoticridge-v-hawkins-county-fighting-back-against-an-arbitrary-data-center-ban-in-east-tennessee/", "host": "www.beacontn.org", "published": "2026-04-01", "date": "2026-04-01", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Tennessee · Bulls Gap · Hawkins · Source context reviewed", "status_scope": "The original April 1, 2026 project counsel account identifies ExoticRidge proposed Hawkins County cryptocurrency development and its challenge to a County data center prohibition. It describes a business that wants to operate, rather than commissioned mining. This supports a named listed proposal within the counsel reported scope. Its arguments about County authority, project effects and self supplied energy are attributed legal and development positions, not an independent court holding, measured effect or physical construction. The exact Bulls Gap parcel and any later court disposition remain unverified and unchanged.", "event_evidence": [{"date": "2026-04-01", "text": "The Beacon Center published its ExoticRidge Hawkins County case account April 1, 2026, describing the proposed cryptocurrency facility and a legal challenge. This dates the counsel publication, not a separately verified court filing day, judgment, physical start or operating mine.", "kind": "announced", "sources": [{"url": "https://www.beacontn.org/exoticridge-v-hawkins-county-fighting-back-against-an-arbitrary-data-center-ban-in-east-tennessee/", "host": "www.beacontn.org", "published": "2026-04-01", "date": "2026-04-01", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "47073"}, "state_name": "Tennessee", "state_path": "/tennessee/"}, {"id": "fisk-quantum-leap-nashville-tn", "state": "TN", "kind": "facility", "name": "Fisk University Quantum Leap Innovation & Technology Center", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Davidson"], "city": "Nashville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The billion-dollar initiative is broader than the data center. The proposed 30 MW is not measured IT demand. Future LEED certification is not an existing certification, generic water comparisons are not site consumption, and petitions are not legal denial. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-05-14", "Fisk University published its Quantum Leap campus master plan announcement May 14, 2026. This records the institution announcement and proposed technology center, not an exact construction start for that component or operation of a data center."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wsmv.com/2026/06/08/what-know-about-data-center-planned-nashville-hbcu-fisk-universitys-campus/", "host": "wsmv.com", "date": "2026-06-08", "published": "2026-06-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.fisk.edu/main-featured/fisk-university-unveils-1-billion-master-plan-launching-new-era-of-innovation-and-sustainability/", "host": "www.fisk.edu", "published": "2026-05-14", "date": "2026-05-14", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.fisk.edu/wp-content/uploads/2026/07/Fact-Sheet-re-Innovation-Center_Fisk-6.24.261.pdf", "host": "www.fisk.edu", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.fisk.edu/quantumleap/", "host": "www.fisk.edu", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 36.19939, "lng": -86.76139, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "WSMV describes Fisk Quantum Leap's proposed 100,000-square-foot building, split between innovation and academic space, pending Metro review.", "independently_verified_current_operating_status": null}, "notes": ["The billion-dollar initiative is broader than the data center. The proposed 30 MW is not measured IT demand. Future LEED certification is not an existing certification, generic water comparisons are not site consumption, and petitions are not legal denial.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wsmv.com/2026/06/08/what-know-about-data-center-planned-nashville-hbcu-fisk-universitys-campus/", "host": "wsmv.com", "date": "2026-06-08", "published": "2026-06-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 34", "scope": "The University current Quantum Leap page links its original fact sheet, which expressly calls the Innovation and Technology Center proposed and describes space for a data and technology center alongside academic space. Project listed development applies to that named proposal. The May 14 announcement immediate symbolic construction concerns the separate John Lewis Center expansion and is not transferred to this technology component. Broad present tense campaign language and environmental commitments are not actual data hall construction, certification or delivered computing. No revised campaign totals or current partner role is promoted.", "fields": {"current_stage_evidence": {"outcome": "current_institutional_proposal_with_explicit_data_center_component", "scope": "The University current Quantum Leap page links its original fact sheet, which expressly calls the Innovation and Technology Center proposed and describes space for a data and technology center alongside academic space. Project listed development applies to that named proposal. The May 14 announcement immediate symbolic construction concerns the separate John Lewis Center expansion and is not transferred to this technology component. Broad present tense campaign language and environmental commitments are not actual data hall construction, certification or delivered computing. No revised campaign totals or current partner role is promoted."}}, "notes": ["The University current Quantum Leap page links its original fact sheet, which expressly calls the Innovation and Technology Center proposed and describes space for a data and technology center alongside academic space. Project listed development applies to that named proposal. The May 14 announcement immediate symbolic construction concerns the separate John Lewis Center expansion and is not transferred to this technology component. Broad present tense campaign language and environmental commitments are not actual data hall construction, certification or delivered computing. No revised campaign totals or current partner role is promoted.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.fisk.edu/main-featured/fisk-university-unveils-1-billion-master-plan-launching-new-era-of-innovation-and-sustainability/", "host": "www.fisk.edu", "published": "2026-05-14", "date": "2026-05-14", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.fisk.edu/wp-content/uploads/2026/07/Fact-Sheet-re-Innovation-Center_Fisk-6.24.261.pdf", "host": "www.fisk.edu", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.fisk.edu/quantumleap/", "host": "www.fisk.edu", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Tennessee · Nashville · Davidson · Source context reviewed", "status_scope": "The University current Quantum Leap page links its original fact sheet, which expressly calls the Innovation and Technology Center proposed and describes space for a data and technology center alongside academic space. Project listed development applies to that named proposal. The May 14 announcement immediate symbolic construction concerns the separate John Lewis Center expansion and is not transferred to this technology component. Broad present tense campaign language and environmental commitments are not actual data hall construction, certification or delivered computing. No revised campaign totals or current partner role is promoted.", "event_evidence": [{"date": "2026-05-14", "text": "Fisk University published its Quantum Leap campus master plan announcement May 14, 2026. This records the institution announcement and proposed technology center, not an exact construction start for that component or operation of a data center.", "kind": "announced", "sources": [{"url": "https://www.fisk.edu/main-featured/fisk-university-unveils-1-billion-master-plan-launching-new-era-of-innovation-and-sustainability/", "host": "www.fisk.edu", "published": "2026-05-14", "date": "2026-05-14", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "47037"}, "state_name": "Tennessee", "state_path": "/tennessee/"}, {"id": "hixson-data-center-mcminnville-tn", "state": "TN", "kind": "facility", "name": "Hixson Data Center (McMinnville)", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Warren"], "city": "McMinnville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. Hixson operator's undated public concept page explicitly places its proposal in McMinnville, Warren County, Tennessee and targets Q1 2028 tenant readiness. Operator lists site acquisition, FEED-LITE/Class 5 estimate, Phase I ESA and Bloom Energy power agreement as progress; financing/tenant, detailed design, permitting and construction remain in its future sequence. Underlying title, agreement and studies unread. No exact address/parcel pin established. 25 MW SELLABLE IT is explicit. 33.15 MW Bloom SOFC nameplate, 30 MW firm generation, 25 MW battery POWER and eight 4.4 MW diesel generators are separate systems, not additive IT or storage MWh. Grid-islanded/no utility intertie is a concept basis, not verified operating independence. 1.15 PUE is a design target, not measured efficiency. Approximately 96,064 square feet is a two-level concept. Rack 132 kVA is not automatically kW. Planned SOC 2/ISO/NIST/ITAR readiness is not current certification, and named counterparties do not establish independently confirmed commitments. No data-room login or request-access form used. No complete record/current operating status, signed instruments, measured impacts or all-field certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://hixsondc.com/", "host": "hixsondc.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://engage.zencity.io/mcminnville-tn/en-US/pages/data-centers-cryptocurrency-mining-and-high-impact-emerging-facilities-3b3", "host": "engage.zencity.io", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 35.67884, "lng": -85.77891, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json", "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.", "fields": {}, "notes": ["Hixson operator's undated public concept page explicitly places its proposal in McMinnville, Warren County, Tennessee and targets Q1 2028 tenant readiness. Operator lists site acquisition, FEED-LITE/Class 5 estimate, Phase I ESA and Bloom Energy power agreement as progress; financing/tenant, detailed design, permitting and construction remain in its future sequence. Underlying title, agreement and studies unread. No exact address/parcel pin established.", "25 MW SELLABLE IT is explicit. 33.15 MW Bloom SOFC nameplate, 30 MW firm generation, 25 MW battery POWER and eight 4.4 MW diesel generators are separate systems, not additive IT or storage MWh. Grid-islanded/no utility intertie is a concept basis, not verified operating independence. 1.15 PUE is a design target, not measured efficiency. Approximately 96,064 square feet is a two-level concept. Rack 132 kVA is not automatically kW. Planned SOC 2/ISO/NIST/ITAR readiness is not current certification, and named counterparties do not establish independently confirmed commitments. No data-room login or request-access form used.", "No complete record/current operating status, signed instruments, measured impacts or all-field certification."], "sources": [{"url": "https://hixsondc.com/", "host": "hixsondc.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 34", "scope": "The named project site describes a proposed McMinnville facility with financing and tenant work and a first quarter 2028 opening target. Project listed development records that proposal. The City current public project page reports an eighteen month moratorium during its review of emerging computing uses. The selected ordinance packet path is robots disallowed, so exact adoption, effective and expiry days, exemptions and individual entitlement consequences remain unverified. A site forecast, preparatory studies and the City policy review do not establish construction or operation.", "fields": {"current_stage_evidence": {"outcome": "named_hixson_proposal_and_bounded_city_policy_context", "scope": "The named project site describes a proposed McMinnville facility with financing and tenant work and a first quarter 2028 opening target. Project listed development records that proposal. The City current public project page reports an eighteen month moratorium during its review of emerging computing uses. The selected ordinance packet path is robots disallowed, so exact adoption, effective and expiry days, exemptions and individual entitlement consequences remain unverified. A site forecast, preparatory studies and the City policy review do not establish construction or operation."}, "local_rule_context": {"jurisdiction": "City of McMinnville", "source_report": "The City public project page reports an eighteen month moratorium while staff reviews data centers and similar emerging uses.", "adopted_on": null, "effective_on": null, "expires_on": null, "individual_applicability": "Exact final ordinance, exceptions, vested rights and this individual project determination were not verified. The City account is not applied throughout Warren County."}}, "notes": ["The named project site describes a proposed McMinnville facility with financing and tenant work and a first quarter 2028 opening target. Project listed development records that proposal. The City current public project page reports an eighteen month moratorium during its review of emerging computing uses. The selected ordinance packet path is robots disallowed, so exact adoption, effective and expiry days, exemptions and individual entitlement consequences remain unverified. A site forecast, preparatory studies and the City policy review do not establish construction or operation.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://hixsondc.com/", "host": "hixsondc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://engage.zencity.io/mcminnville-tn/en-US/pages/data-centers-cryptocurrency-mining-and-high-impact-emerging-facilities-3b3", "host": "engage.zencity.io", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Tennessee · McMinnville · Warren · Source context reviewed", "status_scope": "The named project site describes a proposed McMinnville facility with financing and tenant work and a first quarter 2028 opening target. Project listed development records that proposal. The City current public project page reports an eighteen month moratorium during its review of emerging computing uses. The selected ordinance packet path is robots disallowed, so exact adoption, effective and expiry days, exemptions and individual entitlement consequences remain unverified. A site forecast, preparatory studies and the City policy review do not establish construction or operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "47177"}, "state_name": "Tennessee", "state_path": "/tennessee/"}, {"id": "doe-oak-ridge-reservation-ai-data-centers-tn", "state": "TN", "kind": "facility", "name": "Oak Ridge Reservation AI Data Center Sites (DOE land lease)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Roane"], "city": "Oak Ridge", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Solicitation is not an awarded or built facility. Both dates are historical, not upcoming 2026 hearings. Project applicants must arrange interconnection; capacity/end user/award outcome remain unknown. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-09-30", "DOE published its Oak Ridge AI infrastructure solicitation September 30, 2025. A request for proposals and its later response deadline are not a lease award, construction start or operating facility."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge", "host": "energy.gov", "date": "2025-09-30", "published": "2025-09-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.energy.gov/em/land-transfers-leases", "host": "www.energy.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 35.84766, "lng": -84.52343, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"historical_event": "request for proposals issued", "available_site_candidates": ["East Tennessee Technology Park", "land adjacent to Oak Ridge National Laboratory"], "proposal_deadline": "2025-12-01", "industry_day": "2025-10-15"}, "notes": ["Solicitation is not an awarded or built facility. Both dates are historical, not upcoming 2026 hearings. Project applicants must arrange interconnection; capacity/end user/award outcome remain unknown.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge", "host": "energy.gov", "date": "2025-09-30", "published": "2025-09-30", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 34", "scope": "DOE September 30, 2025 solicitation and its current land reuse account identify proposed AI infrastructure at Oak Ridge Reservation. Agency listed proposal is limited to that federal solicitation context. Two candidate areas, a past proposal deadline and possible future leases do not establish a selected developer, executed lease, completed permitting, current construction or operating data halls. Other nuclear and industrial reuse projects and existing Frontier research are separate. No absence of an award is asserted from this bounded source review.", "fields": {"current_stage_evidence": {"outcome": "federal_solicitation_and_current_oak_ridge_development_context", "scope": "DOE September 30, 2025 solicitation and its current land reuse account identify proposed AI infrastructure at Oak Ridge Reservation. Agency listed proposal is limited to that federal solicitation context. Two candidate areas, a past proposal deadline and possible future leases do not establish a selected developer, executed lease, completed permitting, current construction or operating data halls. Other nuclear and industrial reuse projects and existing Frontier research are separate. No absence of an award is asserted from this bounded source review."}}, "notes": ["DOE September 30, 2025 solicitation and its current land reuse account identify proposed AI infrastructure at Oak Ridge Reservation. Agency listed proposal is limited to that federal solicitation context. Two candidate areas, a past proposal deadline and possible future leases do not establish a selected developer, executed lease, completed permitting, current construction or operating data halls. Other nuclear and industrial reuse projects and existing Frontier research are separate. No absence of an award is asserted from this bounded source review.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge", "host": "www.energy.gov", "published": "2025-09-30", "date": "2025-09-30", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.energy.gov/em/land-transfers-leases", "host": "www.energy.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Tennessee · Oak Ridge · Roane · Source context reviewed", "status_scope": "DOE September 30, 2025 solicitation and its current land reuse account identify proposed AI infrastructure at Oak Ridge Reservation. Agency listed proposal is limited to that federal solicitation context. Two candidate areas, a past proposal deadline and possible future leases do not establish a selected developer, executed lease, completed permitting, current construction or operating data halls. Other nuclear and industrial reuse projects and existing Frontier research are separate. No absence of an award is asserted from this bounded source review.", "event_evidence": [{"date": "2025-09-30", "text": "DOE published its Oak Ridge AI infrastructure solicitation September 30, 2025. A request for proposals and its later response deadline are not a lease award, construction start or operating facility.", "kind": "announced", "sources": [{"url": "https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge", "host": "www.energy.gov", "published": "2025-09-30", "date": "2025-09-30", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "47145"}, "state_name": "Tennessee", "state_path": "/tennessee/"}, {"id": "radiusdc-nashville-i-tn", "state": "TN", "kind": "facility", "name": "RadiusDC Nashville I", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Davidson"], "city": "Nashville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nashville utility reported Radius groundbreaking. Utility attendance confirms reported groundbreaking ceremony, not final customer energization or opening. No exact parcel, critical IT MW, approved investment or current completion established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-09-04", "RadiusDC published its Nashville I announcement September 4, 2025, reporting a ceremony that day. This records that dated company account and planned development, not independent proof of physical excavation or fulfillment of its 2026 opening forecast."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://nespowernews.com/radiusdc-celebrates-its-new-data-center-with-groundbreaking/", "host": "nespowernews.com", "date": "2025-09-17", "published": "2025-09-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.radius-dc.com/location/nashville", "host": "www.radius-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-breaks-ground-on-largest-data-center-in-nashville", "host": "www.radius-dc.com", "published": "2025-09-04", "date": "2025-09-04", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 36.19055, "lng": -86.72634, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Nashville utility reported Radius groundbreaking", "fields": {"utility": "Nashville Electric Service", "developer": "RadiusDC", "location": "Brick Church Pike, Nashville, Tennessee", "reported_groundbreaking_date": "2025-09-04", "publication_date": "2025-09-17"}, "notes": ["Utility attendance confirms reported groundbreaking ceremony, not final customer energization or opening. No exact parcel, critical IT MW, approved investment or current completion established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://nespowernews.com/radiusdc-celebrates-its-new-data-center-with-groundbreaking/", "host": "nespowernews.com", "date": "2025-09-17", "published": "2025-09-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 34", "scope": "The current named Nashville page describes RadiusDC expanding with Nashville I, while its September 4, 2025 announcement reports a groundbreaking ceremony and a 2026 opening plan. Project listed development applies to that named company account. The technical heading In Service Data Hall Details and marketed specifications do not expressly establish actual current customer service. A ceremony, past leasing target, tour invitation and forecast opening year do not certify accomplished construction or operation. Advertised dimensions and power are not changed.", "fields": {"current_stage_evidence": {"outcome": "named_nashville_development_without_explicit_completed_customer_service", "scope": "The current named Nashville page describes RadiusDC expanding with Nashville I, while its September 4, 2025 announcement reports a groundbreaking ceremony and a 2026 opening plan. Project listed development applies to that named company account. The technical heading In Service Data Hall Details and marketed specifications do not expressly establish actual current customer service. A ceremony, past leasing target, tour invitation and forecast opening year do not certify accomplished construction or operation. Advertised dimensions and power are not changed."}}, "notes": ["The current named Nashville page describes RadiusDC expanding with Nashville I, while its September 4, 2025 announcement reports a groundbreaking ceremony and a 2026 opening plan. Project listed development applies to that named company account. The technical heading In Service Data Hall Details and marketed specifications do not expressly establish actual current customer service. A ceremony, past leasing target, tour invitation and forecast opening year do not certify accomplished construction or operation. Advertised dimensions and power are not changed.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.radius-dc.com/location/nashville", "host": "www.radius-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-breaks-ground-on-largest-data-center-in-nashville", "host": "www.radius-dc.com", "published": "2025-09-04", "date": "2025-09-04", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Tennessee · Nashville · Davidson · Source context reviewed", "status_scope": "The current named Nashville page describes RadiusDC expanding with Nashville I, while its September 4, 2025 announcement reports a groundbreaking ceremony and a 2026 opening plan. Project listed development applies to that named company account. The technical heading In Service Data Hall Details and marketed specifications do not expressly establish actual current customer service. A ceremony, past leasing target, tour invitation and forecast opening year do not certify accomplished construction or operation. Advertised dimensions and power are not changed.", "event_evidence": [{"date": "2025-09-04", "text": "RadiusDC published its Nashville I announcement September 4, 2025, reporting a ceremony that day. This records that dated company account and planned development, not independent proof of physical excavation or fulfillment of its 2026 opening forecast.", "kind": "announced", "sources": [{"url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-breaks-ground-on-largest-data-center-in-nashville", "host": "www.radius-dc.com", "published": "2025-09-04", "date": "2025-09-04", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "47037"}, "state_name": "Tennessee", "state_path": "/tennessee/"}, {"id": "aligned-dfw-03-tx", "state": "TX", "kind": "facility", "name": "Aligned DFW-03", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Tarrant"], "city": "Mansfield", "address": "", "who": "Aligned Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Company5000+MWfuturecapacity not DFW03. Rack350kWdensity not siteMW. No completed opening inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/", "host": "aligneddc.com", "date": "2025-02-19", "published": "2025-02-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://data.texas.gov/resource/t34q-qzi3.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000", "host": "data.texas.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Texas Commission on Environmental Quality source context"}, {"url": "https://aligneddc.com/dallas-data-centers/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "loc": {"lat": 32.77193, "lng": -97.29111, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"site_acres": 27, "initial_capacity_availability_earliest_target": "2025-Q4", "onsite_substation_statement": true}, "notes": ["Company5000+MWfuturecapacity not DFW03. Rack350kWdensity not siteMW. No completed opening inferred.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/", "host": "aligneddc.com", "date": "2025-02-19", "published": "2025-02-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "texas-registry-2026-10-17", "scope": "Official Texas registry source context, with initial eligibility and component triage. Not a physical-site census or current-stage review.", "fields": {"texas_registry_air_context": {"regulated_entity": "RN112264718", "registry_name": ["ADC DFW03"], "program_contexts": [{"program": "AIRNSR", "identifiers": ["182341"]}], "association_scope": "ADC DFW03 and Aligned Mansfield Propco with Mansfield address support existing Aligned DFW03 research context, without ownership or construction-stage certification.", "limits": "Registry authorizations, emissions reporting and historical customer affiliations can overlap. ACTIVE is a registry value, not proof of signed permit issuance, current operation, title or complete campus buildout. No generator MW, coordinates, street address or physical stage is promoted."}}, "notes": ["AIRNSR and AIROP entries are registry contexts, not substitutes for signed permits. AIREI is emissions reporting, not a permit. Customer and status dates are not opening, completion or current ownership dates.", "The extract is a selected portion of Central Registry and the name/industry query is incomplete for all generator permits. Nonmatches are not evidence of absence."], "sources": [{"url": "https://data.texas.gov/resource/t34q-qzi3.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000", "host": "data.texas.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Texas Commission on Environmental Quality source context"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "next-status-2026-10-19", "scope": "Aligned lists DFW-03 in Mansfield and separately announced development of the campus.", "fields": {"current_stage_evidence": {"outcome": "developer_listed_development", "scope": "Aligned lists DFW-03 in Mansfield and separately announced development of the campus."}}, "notes": ["The older availability target has passed, but a forecast is not a completion report. The current accessibility and uptime promises do not establish commissioning. No reliability measure, certification or physical stage date is adopted."], "sources": [{"url": "https://aligneddc.com/dallas-data-centers/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}, {"url": "https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/", "host": "aligneddc.com", "published": "2025-02-19", "date": "2025-02-19", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 13, October 23, 2026", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The February 19, 2025 source reports a Mansfield development and an anticipated capacity date. That target does not establish current commissioning or completed campus works.", "fields": {"company_association": {"name": "Aligned Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The February 19, 2025 source reports a Mansfield development and an anticipated capacity date. That target does not establish current commissioning or completed campus works."}, "provider_role": "developer"}, "notes": ["Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The February 19, 2025 source reports a Mansfield development and an anticipated capacity date. That target does not establish current commissioning or completed campus works.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/", "host": "aligneddc.com", "published": "2025-02-19", "date": "2025-02-19", "checked": "2026-10-23", "label": "First party exact named code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Mansfield · Tarrant · Source context reviewed", "status_scope": "Aligned lists DFW-03 in Mansfield and separately announced development of the campus.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48439"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "amazon-pecos-county-data-center-tx", "state": "TX", "kind": "facility", "name": "Amazon Pecos County Data Center Campus", "group": "proposed", "status": "Operator-announced campus", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Pecos"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Amazon Pecos County statement. No numeric IT MW, investment, opening date or permanent-versus-construction job split in reviewed statement. Solar/battery/produced-water options exploratory. Statement about ratepayer effects is developer claim, not adjudicated tariff finding. Publication day not present in saved body; metadata candidate not treated as event date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs", "host": "aboutamazon.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 30.78087, "lng": -102.72358, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Amazon Pecos County statement", "fields": {"project_county": "Pecos County, Texas", "developer_described_initial_power": "new on-site generation with intended later grid connection", "water_plan": "non-potable water; exploring produced-water use", "operator_expected_jobs_description": "thousands of new jobs"}, "notes": ["No numeric IT MW, investment, opening date or permanent-versus-construction job split in reviewed statement. Solar/battery/produced-water options exploratory. Statement about ratepayer effects is developer claim, not adjudicated tariff finding. Publication day not present in saved body; metadata candidate not treated as event date.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs", "host": "aboutamazon.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "Amazon describes a planned data center campus in Pecos County.", "fields": {"current_stage_evidence": {"outcome": "operator_announced_campus", "scope": "Amazon describes a planned data center campus in Pecos County."}}, "notes": ["This supports the announced project only. Promised energy, water, rate and employment outcomes are not measured facts or evidence of operation."], "sources": [{"url": "https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs", "host": "www.aboutamazon.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Pecos · Source context reviewed", "status_scope": "Amazon describes a planned data center campus in Pecos County.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48371"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "cipher-colchis-tom-green-tx", "state": "TX", "kind": "project", "name": "Cipher Colchis Campus", "group": "proposed", "status": "In development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Tom Green"], "city": "San Angelo", "address": "", "who": "Cipher Digital", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization. Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.", "date": "", "events": [["2026-10-13", "Cipher furnished a Colchis update describing conditional Batch Zero status in an ERCOT audit process and future energization targets. This disclosure is not a final regulator approval or operating milestone."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate", "host": "sanangelolive.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://cipherdigital.com/infrastructure/", "host": "cipherdigital.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm", "host": "www.sec.gov", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Reviewed company source"}], "loc": {"lat": 31.42547, "lng": -100.48531, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json", "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.", "fields": {}, "notes": ["JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization.", "Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted.", "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."], "sources": [{"url": "https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate", "host": "sanangelolive.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S2-Texas-Comptroller-20261015", "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.", "fields": {"provider_brand": "Cipher Digital", "provider_role": "developer", "current_stage": "Colchis is a named development-pipeline site. Future energization/capacity is conditional and does not establish construction completion, final regulatory approval or operating service.", "regulatory_scope": "October 13 furnished update describes 1 GW conditional Batch Zero base-load status within an ERCOT audit process, land secured/deposits funded and a 2028 target. This is issuer disclosure, not a final ERCOT decision or energized IT load."}, "notes": ["This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."], "sources": [{"url": "https://cipherdigital.com/infrastructure/", "host": "cipherdigital.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm", "host": "www.sec.gov", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Reviewed company source"}], "checked": "2026-10-15", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · San Angelo · Tom Green · Source context reviewed", "status_scope": "Development pipeline only. Gross targets and energization forecasts remain conditional, with no operating or actual construction-completion claim.", "event_evidence": [{"date": "2026-10-13", "text": "Cipher furnished a Colchis update describing conditional Batch Zero status in an ERCOT audit process and future energization targets. This disclosure is not a final regulator approval or operating milestone.", "kind": "announced", "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48451"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "cipher-mclennan-county-tx", "state": "TX", "kind": "project", "name": "Cipher McLennan HPC Data Center", "group": "proposed", "status": "In development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["McLennan"], "city": "Waco", "address": "", "who": "Cipher Digital", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. SamShaw WacoBridge May27updatedJune18,2026 original companyemail/landrecordreport: McLennanCipher300acres nearRattlesnakeRoad/Riesel, up500MWprojectrequestedgridaccess. No explicitITbasis or Juneexpectedapprovalobserved; existing900MWcoalplantnotcampusITtoadd. Water/coolingnotchosen; noRieselcitywater promise doesnotmeanzerowater. NearbyLakeCreek10000acrefeet/year/9MGDpotential not ownedrightsoractualdata-centeruse.13Maveragetax/yearoverdecade lacks jurisdictionbreakdown, notpaidreceipt.300acreland dealsOctober/Februaryreferencesnotoneinventedclosingday.13Mnotcapex. Originalreportedsectionsread; embeddedrepublishcopyignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/", "host": "wacobridge.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://cipherdigital.com/infrastructure/", "host": "cipherdigital.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm", "host": "www.sec.gov", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}], "loc": {"lat": 31.55244, "lng": -97.20197, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json", "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.", "fields": {}, "notes": ["SamShaw WacoBridge May27updatedJune18,2026 original companyemail/landrecordreport: McLennanCipher300acres nearRattlesnakeRoad/Riesel, up500MWprojectrequestedgridaccess. No explicitITbasis or Juneexpectedapprovalobserved; existing900MWcoalplantnotcampusITtoadd.", "Water/coolingnotchosen; noRieselcitywater promise doesnotmeanzerowater. NearbyLakeCreek10000acrefeet/year/9MGDpotential not ownedrightsoractualdata-centeruse.13Maveragetax/yearoverdecade lacks jurisdictionbreakdown, notpaidreceipt.300acreland dealsOctober/Februaryreferencesnotoneinventedclosingday.13Mnotcapex. Originalreportedsectionsread; embeddedrepublishcopyignored.", "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."], "sources": [{"url": "https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/", "host": "wacobridge.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S2-Texas-Comptroller-20261015", "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.", "fields": {"provider_brand": "Cipher Digital", "provider_role": "developer", "current_stage": "McLennan is a named development-pipeline site. Future energization/capacity is conditional and does not establish construction completion, final regulatory approval or operating service.", "pipeline_scope": "Issuer identifies 500 MW gross target capacity and future energization, subject to the ERCOT process. Company pipeline totals are not assigned to this site as current IT load or approved utility service."}, "notes": ["This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."], "sources": [{"url": "https://cipherdigital.com/infrastructure/", "host": "cipherdigital.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm", "host": "www.sec.gov", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}], "checked": "2026-10-15", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Waco · McLennan · Source context reviewed", "status_scope": "Development pipeline only. Gross targets and energization forecasts remain conditional, with no operating or actual construction-completion claim.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48309"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "cleanspark-austin-county-tx", "state": "TX", "kind": "facility", "name": "CleanSpark Austin County AI Data Center Campus", "group": "proposed", "status": "Operator-reported development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Austin"], "city": "", "address": "", "who": "CleanSpark", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Do not confuse Austin County/Sealy with City of Austin. Acquisition date is not October29 announcement date. Later Texas exclusivity is a LOI, not a definitive tenant lease or operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf", "host": "s21.q4cdn.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html", "host": "prnewswire.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.sec.gov/Archives/edgar/data/827876/000119312525297510/clsk-20250930.htm", "host": "www.sec.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "CleanSpark reviewed source"}, {"url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm", "host": "www.sec.gov", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-enters-texas-market-with-land-and-large-scale-power-acquisition-to-rapidly-deploy-an-ai-data-center-in-greater-houston-302598051.html", "host": "www.prnewswire.com", "published": "2025-10-29", "date": "2025-10-29", "checked": "2026-10-22", "label": "Company issued county development release"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html", "host": "www.prnewswire.com", "published": "2026-10-09", "date": "2026-10-09", "checked": "2026-10-22", "label": "Issuer operational update, context only"}], "loc": {"lat": 29.88687, "lng": -96.27789, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "issuer-primary-review-round17-2026-10-14.json", "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.", "fields": {"land_acquisition_reported_date": "2025-10-27", "land_area_acres": 271, "power_agreements_mw": 285, "power_scope": "Long-term supply for future campus, not current IT draw", "campus_name_in_later_release": "Sealy"}, "notes": ["Do not confuse Austin County/Sealy with City of Austin. Acquisition date is not October29 announcement date. Later Texas exclusivity is a LOI, not a definitive tenant lease or operating proof.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf", "host": "s21.q4cdn.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html", "host": "prnewswire.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-discovery-2026-10-17", "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.", "fields": {"issuer_annual_property_context": {"issuer": "CleanSpark", "reporting_period": "2025-09-30", "source_name": "Austin County, Texas", "scope": "October 27, 2025 acquisition and power agreement support future campus development; not an operating data center or Brazoria County."}}, "notes": ["No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."], "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/827876/000119312525297510/clsk-20250930.htm", "host": "www.sec.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "CleanSpark reviewed source"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "next-status-2026-10-19", "scope": "CleanSpark describes its Austin County property as part of its Texas data center development in its quarterly filing for June 30, 2026.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_development", "scope": "CleanSpark describes its Austin County property as part of its Texas data center development in its quarterly filing for June 30, 2026."}}, "notes": ["This is the issuer's development account, not an SEC certification of a facility. Land rights and planned power agreements do not establish completed construction, commissioning or an operating AI campus. No land, power or financial quantity is adopted."], "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm", "host": "www.sec.gov", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check, October 22, 2026", "scope": "CleanSpark announced the named county data center development in its own issuer release, linked from its investor site to its public distributor. Developer is the provider brand role, not a property ownership or completed transaction finding. Announced development, grid classification and financing do not establish current construction or operation. No status, date, address, map point or quantity is promoted.", "fields": {"company_association": {"name": "CleanSpark", "role": "developer", "identity_scope": "provider_brand_only", "scope": "CleanSpark announced the named county data center development in its own issuer release, linked from its investor site to its public distributor. Developer is the provider brand role, not a property ownership or completed transaction finding. Announced development, grid classification and financing do not establish current construction or operation. No status, date, address, map point or quantity is promoted."}, "provider_role": "developer"}, "notes": ["CleanSpark announced the named county data center development in its own issuer release, linked from its investor site to its public distributor. Developer is the provider brand role, not a property ownership or completed transaction finding. Announced development, grid classification and financing do not establish current construction or operation. No status, date, address, map point or quantity is promoted.", "Source retrieval and document metadata do not establish a physical milestone date."], "sources": [{"url": "https://www.prnewswire.com/news-releases/cleanspark-enters-texas-market-with-land-and-large-scale-power-acquisition-to-rapidly-deploy-an-ai-data-center-in-greater-houston-302598051.html", "host": "www.prnewswire.com", "published": "2025-10-29", "date": "2025-10-29", "checked": "2026-10-22", "label": "Company issued county development release"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html", "host": "www.prnewswire.com", "published": "2026-10-09", "date": "2026-10-09", "checked": "2026-10-22", "label": "Issuer operational update, context only"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Austin · Source context reviewed", "status_scope": "CleanSpark describes its Austin County property as part of its Texas data center development in its quarterly filing for June 30, 2026.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48015"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "cleanspark-brazoria-county-tx", "state": "TX", "kind": "facility", "name": "CleanSpark Brazoria County (Second Texas) Campus", "group": "proposed", "status": "Operator-reported development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Brazoria"], "city": "", "address": "", "who": "CleanSpark", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 600 includes initial300, not900. Demand/transmission capacity is not criticalIT or energized load. No final property-close day or original utility approval adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html", "host": "prnewswire.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-reports-second-fiscal-quarter-2026-results-302768585.html", "host": "prnewswire.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html", "host": "prnewswire.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm", "host": "www.sec.gov", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-releases-january-2026-operational-update-302678881.html", "host": "www.prnewswire.com", "published": "2026-02-04", "date": "2026-02-04", "checked": "2026-10-22", "label": "Company issued county development release"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html", "host": "www.prnewswire.com", "published": "2026-10-09", "date": "2026-10-09", "checked": "2026-10-22", "label": "Issuer operational update, context only"}], "loc": {"lat": 29.18959, "lng": -95.45127, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "issuer-primary-review-round17-2026-10-14.json", "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.", "fields": {"announcement_date": "2026-01-14", "land_under_definitive_agreement_up_to_acres": 447, "initial_demand_load_mw": 300, "total_potential_mw": 600, "initial_closing_target": "2026-Q1, conditional", "ercot_approval_claim": "Company May11 release reports300MW approval; original ERCOT document not inspected."}, "notes": ["600 includes initial300, not900. Demand/transmission capacity is not criticalIT or energized load. No final property-close day or original utility approval adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html", "host": "prnewswire.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-reports-second-fiscal-quarter-2026-results-302768585.html", "host": "prnewswire.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html", "host": "prnewswire.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "next-status-2026-10-19", "scope": "CleanSpark describes its Brazoria County property as part of its Texas data center development in its quarterly filing for June 30, 2026.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_development", "scope": "CleanSpark describes its Brazoria County property as part of its Texas data center development in its quarterly filing for June 30, 2026."}}, "notes": ["This is the issuer's development account, not an SEC certification of a facility. Land rights and planned power agreements do not establish completed construction, commissioning or an operating AI campus. No land, power or financial quantity is adopted."], "sources": [{"url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm", "host": "www.sec.gov", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check, October 22, 2026", "scope": "CleanSpark announced the named county data center development in its own issuer release, linked from its investor site to its public distributor. Developer is the provider brand role, not a property ownership or completed transaction finding. Announced development, grid classification and financing do not establish current construction or operation. No status, date, address, map point or quantity is promoted.", "fields": {"company_association": {"name": "CleanSpark", "role": "developer", "identity_scope": "provider_brand_only", "scope": "CleanSpark announced the named county data center development in its own issuer release, linked from its investor site to its public distributor. Developer is the provider brand role, not a property ownership or completed transaction finding. Announced development, grid classification and financing do not establish current construction or operation. No status, date, address, map point or quantity is promoted."}, "provider_role": "developer"}, "notes": ["CleanSpark announced the named county data center development in its own issuer release, linked from its investor site to its public distributor. Developer is the provider brand role, not a property ownership or completed transaction finding. Announced development, grid classification and financing do not establish current construction or operation. No status, date, address, map point or quantity is promoted.", "Source retrieval and document metadata do not establish a physical milestone date."], "sources": [{"url": "https://www.prnewswire.com/news-releases/cleanspark-releases-january-2026-operational-update-302678881.html", "host": "www.prnewswire.com", "published": "2026-02-04", "date": "2026-02-04", "checked": "2026-10-22", "label": "Company issued county development release"}, {"url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html", "host": "www.prnewswire.com", "published": "2026-10-09", "date": "2026-10-09", "checked": "2026-10-22", "label": "Issuer operational update, context only"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Brazoria · Source context reviewed", "status_scope": "CleanSpark describes its Brazoria County property as part of its Texas data center development in its quarterly filing for June 30, 2026.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48039"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "cyrusone-bosque-county-thad-hill-tx", "state": "TX", "kind": "facility", "name": "CyrusOne Bosque County Campus (Thad Hill Energy Center)", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Bosque"], "city": "", "address": "", "who": "CyrusOne", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two distinct Texas project power-agreement scopes. Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas", "host": "cyrusone.com", "date": "2026-02-09", "published": "2026-02-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.cyrusone.com/data-centers/north-america/bosque-county-tx?hsLang=en", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 31.90042, "lng": -97.63462, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-discovery-review-round8-2026-10-14.json", "scope": "two distinct Texas project power-agreement scopes", "fields": {"freestone_phase1_contracted_power_mw": 380, "freestone_phase2_exclusive_power_agreement_mw": 380, "thad_hill_bosque_previously_announced_power_agreements_mw": 400, "power_basis": "electric-supply/development agreements, not explicit critical IT or energized load", "announcement_date": "2026-02-09"}, "notes": ["Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas", "host": "cyrusone.com", "date": "2026-02-09", "published": "2026-02-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "CyrusOne describes development of the named Bosque County campus with a future delivery target. Its on-site employment and general Texas operations are not proof that this new campus is commissioned. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "CyrusOne describes development of the named Bosque County campus with a future delivery target. Its on-site employment and general Texas operations are not proof that this new campus is commissioned. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["CyrusOne describes development of the named Bosque County campus with a future delivery target. Its on-site employment and general Texas operations are not proof that this new campus is commissioned."], "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/bosque-county-tx?hsLang=en", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 11, October 23, 2026", "scope": "CyrusOne expressly describes development of a data center campus in this named county on its own project page. Developer is the attributed provider brand relationship for that county campus context, not an independently established legal owner, observed construction stage or current operating service. No status, location, physical date, technical quantity, utility price, legal partner role or environmental outcome is promoted. Publication date is unknown; dated community stories do not supply the page date. No resident names, personal stories or private contact information are reproduced. The source is the Bosque County page. It does not independently resolve the retained Thad Hill alias, a particular parcel, phase or power plant relationship. Freestone facts are not transferred to this record.", "fields": {"company_association": {"name": "CyrusOne", "role": "developer", "identity_scope": "provider_brand_only", "scope": "CyrusOne expressly describes development of a data center campus in this named county on its own project page. Developer is the attributed provider brand relationship for that county campus context, not an independently established legal owner, observed construction stage or current operating service. No status, location, physical date, technical quantity, utility price, legal partner role or environmental outcome is promoted. Publication date is unknown; dated community stories do not supply the page date. No resident names, personal stories or private contact information are reproduced. The source is the Bosque County page. It does not independently resolve the retained Thad Hill alias, a particular parcel, phase or power plant relationship. Freestone facts are not transferred to this record."}, "provider_role": "developer"}, "notes": ["CyrusOne expressly describes development of a data center campus in this named county on its own project page. Developer is the attributed provider brand relationship for that county campus context, not an independently established legal owner, observed construction stage or current operating service. No status, location, physical date, technical quantity, utility price, legal partner role or environmental outcome is promoted. Publication date is unknown; dated community stories do not supply the page date. No resident names, personal stories or private contact information are reproduced. The source is the Bosque County page. It does not independently resolve the retained Thad Hill alias, a particular parcel, phase or power plant relationship. Freestone facts are not transferred to this record.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/bosque-county-tx?hsLang=en", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party named county campus page, scoped developer relationship only"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Bosque · Source context reviewed", "status_scope": "CyrusOne describes development of the named Bosque County campus with a future delivery target. Its on-site employment and general Texas operations are not proof that this new campus is commissioned. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48035"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "cyrusone-freestone-energy-center-fairfield-tx", "state": "TX", "kind": "facility", "name": "CyrusOne Freestone Energy Center Campus", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Freestone"], "city": "Fairfield", "address": "", "who": "CyrusOne", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Phase2exclusiveagreementnotallenergized; no760MWoperatingclaim.1100+MWTexasagreementsinclude400MWBosqueCounty, notFreestonealone. Generatorcapacity/global55GWportfolioexcluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. two distinct Texas project power-agreement scopes. Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas", "host": "cyrusone.com", "date": "2026-02-09", "published": "2026-02-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.cyrusone.com/data-centers/north-america/freestone-county-texas?hsLang=en", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 31.70501, "lng": -96.14927, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "captured-operator-review-round6-2026-10-14.json", "scope": "named operator source", "fields": {"agreement_date": "2026-02-09", "initial_power_agreement_mw": 380, "phase2_exclusive_power_grid_land_agreement_mw": 380, "published_county": "Freestone, Texas", "power_basis": "power/grid/site service agreement, not IT"}, "notes": ["Phase2exclusiveagreementnotallenergized; no760MWoperatingclaim.1100+MWTexasagreementsinclude400MWBosqueCounty, notFreestonealone. Generatorcapacity/global55GWportfolioexcluded.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas", "host": "cyrusone.com", "date": "2026-02-09", "published": "2026-02-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "operator-discovery-review-round8-2026-10-14.json", "scope": "two distinct Texas project power-agreement scopes", "fields": {"freestone_phase1_contracted_power_mw": 380, "freestone_phase2_exclusive_power_agreement_mw": 380, "thad_hill_bosque_previously_announced_power_agreements_mw": 400, "power_basis": "electric-supply/development agreements, not explicit critical IT or energized load", "announcement_date": "2026-02-09"}, "notes": ["Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas", "host": "cyrusone.com", "date": "2026-02-09", "published": "2026-02-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "CyrusOne describes development of the named Freestone County campus with a future delivery target. Neither the energy-center agreement nor current company hiring establishes this campus operating. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "CyrusOne describes development of the named Freestone County campus with a future delivery target. Neither the energy-center agreement nor current company hiring establishes this campus operating. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["CyrusOne describes development of the named Freestone County campus with a future delivery target. Neither the energy-center agreement nor current company hiring establishes this campus operating."], "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/freestone-county-texas?hsLang=en", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 11, October 23, 2026", "scope": "CyrusOne expressly describes development of a data center campus in this named county on its own project page. Developer is the attributed provider brand relationship for that county campus context, not an independently established legal owner, observed construction stage or current operating service. No status, location, physical date, technical quantity, utility price, legal partner role or environmental outcome is promoted. Publication date is unknown; dated community stories do not supply the page date. No resident names, personal stories or private contact information are reproduced. The source explicitly names Freestone County and proximity to the Freestone Energy Center, with multiple proposed phases and future approval context. Bosque facts are not transferred and no phase is represented as commissioned.", "fields": {"company_association": {"name": "CyrusOne", "role": "developer", "identity_scope": "provider_brand_only", "scope": "CyrusOne expressly describes development of a data center campus in this named county on its own project page. Developer is the attributed provider brand relationship for that county campus context, not an independently established legal owner, observed construction stage or current operating service. No status, location, physical date, technical quantity, utility price, legal partner role or environmental outcome is promoted. Publication date is unknown; dated community stories do not supply the page date. No resident names, personal stories or private contact information are reproduced. The source explicitly names Freestone County and proximity to the Freestone Energy Center, with multiple proposed phases and future approval context. Bosque facts are not transferred and no phase is represented as commissioned."}, "provider_role": "developer"}, "notes": ["CyrusOne expressly describes development of a data center campus in this named county on its own project page. Developer is the attributed provider brand relationship for that county campus context, not an independently established legal owner, observed construction stage or current operating service. No status, location, physical date, technical quantity, utility price, legal partner role or environmental outcome is promoted. Publication date is unknown; dated community stories do not supply the page date. No resident names, personal stories or private contact information are reproduced. The source explicitly names Freestone County and proximity to the Freestone Energy Center, with multiple proposed phases and future approval context. Bosque facts are not transferred and no phase is represented as commissioned.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/freestone-county-texas?hsLang=en", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party named county campus page, scoped developer relationship only"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Fairfield · Freestone · Source context reviewed", "status_scope": "CyrusOne describes development of the named Freestone County campus with a future delivery target. Neither the energy-center agreement nor current company hiring establishes this campus operating. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48161"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "data-city-energy-abundance-laredo-tx", "state": "TX", "kind": "facility", "name": "Data City, Texas", "group": "proposed", "status": "Operator-listed plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Webb"], "city": "Laredo", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. Body5GWversusimage6GWconflict held, no headline canonical total. CorrectedMarch21release refers priorMarch20image correction, not new project. Initial300MWincluded in full build, not extra.100percentgreenmarketing does not erase initial naturalgas or prove actual emissions. No exact current delivery or investment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html", "host": "prnewswire.com", "date": "2025-03-21", "published": "2025-03-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.energyabundance.com/homepage/data-city", "host": "www.energyabundance.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 27.761, "lng": -99.33186, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "issuer-release-review-round6-2026-10-14.json", "scope": "named issuer release", "fields": {"planned_hub_acres": 50000, "body_full_build_planned_power_gw": 5, "image_caption_power_gw": 6, "initial_phase_planned_power_mw": 300, "initial_phase_planned_area_sqft": 1000000, "initial_launch_target_year": 2026, "full_build_leasable_area_sqft_min_exclusive": 15000000, "initial_fuel_transition": "natural gas initially; proposed later green hydrogen", "grid_mode_proposed": "islanded from ERCOT"}, "notes": ["Body5GWversusimage6GWconflict held, no headline canonical total. CorrectedMarch21release refers priorMarch20image correction, not new project. Initial300MWincluded in full build, not extra.100percentgreenmarketing does not erase initial naturalgas or prove actual emissions. No exact current delivery or investment.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html", "host": "prnewswire.com", "date": "2025-03-21", "published": "2025-03-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-listed plan", "basis": "The current Data City project page markets a future build-to-suit, behind-the-meter development near Laredo. Its initial-power timing is expressed as a lead time after development, rather than a completed delivery.", "checked_on": "2026-10-16"}, "stage_review_limits": "No construction or current service is established. A rolling nine-month marketing lead time is not converted into an opening date. The older release’s body/image capacity discrepancy remains in source history."}, "notes": ["No construction or current service is established. A rolling nine-month marketing lead time is not converted into an opening date. The older release’s body/image capacity discrepancy remains in source history.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://www.energyabundance.com/homepage/data-city", "host": "www.energyabundance.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Laredo · Webb · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current Data City project page markets a future build-to-suit, behind-the-meter development near Laredo. Its initial-power timing is expressed as a lead time after development, rather than a completed delivery. No construction or current service is established. A rolling nine-month marketing lead time is not converted into an opening date. The older release’s body/image capacity discrepancy remains in source history.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48479"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "energy-vault-snyder-scurry-county-tx", "state": "TX", "kind": "facility", "name": "Energy Vault Snyder AI Campus", "group": "proposed", "status": "Operator listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Scurry"], "city": "Snyder", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Powered shell is not critical IT or actual computing load. The 25 MW phase and possible 500 MW site expansion are not additive. Ten modular units are not ten campuses. A later search excerpt gives a broader target, but its original body was unavailable. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas", "host": "usdatacenterprojects.com", "date": "2026-07-27", "published": "2026-07-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.energyvault.com/projects/snyder-ai", "host": "www.energyvault.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.energyvault.com/hubfs/EV_one-pager_Snyder-AI_v11-1.pdf", "host": "www.energyvault.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 32.74616, "lng": -100.91639, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "US Data Center Projects reports Energy Vault Snyder groundbreaking and an initial eight MW of powered shell targeted for early 2027.", "independently_verified_current_operating_status": null}, "notes": ["Powered shell is not critical IT or actual computing load. The 25 MW phase and possible 500 MW site expansion are not additive. Ten modular units are not ten campuses. A later search excerpt gives a broader target, but its original body was unavailable.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas", "host": "usdatacenterprojects.com", "date": "2026-07-27", "published": "2026-07-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 21", "scope": "Energy Vault current Snyder AI project page describes a modular campus and targets initial commercial operation in the first quarter of 2027. Its linked undated fact sheet calls the deployment proposed and contains an older 2026 first capacity target. Operator listed development describes the named project listing, not an actual physical construction phase. The July 27 company release linked through its newsroom could not be captured after robots transport failure. Forecasts, modular delivery descriptions and rendered images do not establish operation, actual water use or an exact construction start.", "fields": {"current_stage_evidence": {"outcome": "current_named_project_development_with_forecast_and_source_version_limits", "scope": "Energy Vault current Snyder AI project page describes a modular campus and targets initial commercial operation in the first quarter of 2027. Its linked undated fact sheet calls the deployment proposed and contains an older 2026 first capacity target. Operator listed development describes the named project listing, not an actual physical construction phase. The July 27 company release linked through its newsroom could not be captured after robots transport failure. Forecasts, modular delivery descriptions and rendered images do not establish operation, actual water use or an exact construction start."}, "source_scope": {"current_phase_one_target": "Q1 2027", "undated_sheet_target": "2026", "forecast_conflict_not_reconciled_as_actual_delivery": true, "linked_release_access_held": true, "rendered_images_not_site_inspection": true}}, "notes": ["Energy Vault current Snyder AI project page describes a modular campus and targets initial commercial operation in the first quarter of 2027. Its linked undated fact sheet calls the deployment proposed and contains an older 2026 first capacity target. Operator listed development describes the named project listing, not an actual physical construction phase. The July 27 company release linked through its newsroom could not be captured after robots transport failure. Forecasts, modular delivery descriptions and rendered images do not establish operation, actual water use or an exact construction start.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.energyvault.com/projects/snyder-ai", "host": "www.energyvault.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.energyvault.com/hubfs/EV_one-pager_Snyder-AI_v11-1.pdf", "host": "www.energyvault.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Snyder · Scurry · Source context reviewed", "status_scope": "Energy Vault current Snyder AI project page describes a modular campus and targets initial commercial operation in the first quarter of 2027. Its linked undated fact sheet calls the deployment proposed and contains an older 2026 first capacity target. Operator listed development describes the named project listing, not an actual physical construction phase. The July 27 company release linked through its newsroom could not be captured after robots transport failure. Forecasts, modular delivery descriptions and rendered images do not establish operation, actual water use or an exact construction start.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48415"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "google-armstrong-county-tx", "state": "TX", "kind": "project", "name": "Goodnight Campus", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Armstrong"], "city": "Claude", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Armstrong Goodnight county-signed owner-blank tax agreement and identity hold. Partially executed retained copy: county signed, ownerblank, so full effectiveness not established. Do not call forecast14.6Bspent,100percentalltaxexemption,orPILOTactuallycollected.530MWwholephase not400ITinferredfromhallarithmetic orcurrentenergization.2027deadlineconditional andextendable,nottargetverifiedopening. Googletenant/ownershipnotnamed;preferredGoogleArmstrongrecordneedsCrusoe/GNDC1crosswalk,notduplicatecampusautomaticmerge.75iscontractobligationnotcurrentheadcount. No signedfinalownerpage/actualabatementcommencementcertificateobserved. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Tax%20Abatement%20Agreement%202%20Phase%201.pdf", "host": "co.armstrong.tx.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/texas/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 34.96491, "lng": -101.35743, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Armstrong Goodnight county-signed owner-blank tax agreement and identity hold", "fields": {"agreement_parties": ["Armstrong County, Texas", "GN DC1 LLC"], "project_name": "Goodnight Data Center Phase1", "county_signature_date": "2024-11-12", "owner_signature_and_date": "blank on page26", "effective_date": null, "effectiveness_condition": "final signature by both parties", "phase1_planned_acres_approx": 350, "anticipated_buildings": 4, "phase1_expected_electrical_consumption_mw_max": 530, "power_basis": "whole phase electrical demand, not critical IT", "proposed_each_building_data_halls": 4, "proposed_each_hall_capacity_mw": 25, "anticipated_initial_phase_capital_usd": 14600000000, "county_eligible_property_abatement_percent": 100, "abatement_calendar_years_max": 10, "annual_pilot_floor_usd": 5441499, "pilot_period": "10calendar years while abatement in effect", "initial_commercial_operation_deadline": "2027-12-31", "possible_owner_elected_extensions_years_max": 5, "project_fulltime_worker_obligation": 75, "obligation_worker_scope": "collective owner/affiliates/contractors/tenants, not75each", "owner_notice_recipient": "Crusoe Energy Systems LLC"}, "notes": ["Partially executed retained copy: county signed, ownerblank, so full effectiveness not established. Do not call forecast14.6Bspent,100percentalltaxexemption,orPILOTactuallycollected.530MWwholephase not400ITinferredfromhallarithmetic orcurrentenergization.2027deadlineconditional andextendable,nottargetverifiedopening. Googletenant/ownershipnotnamed;preferredGoogleArmstrongrecordneedsCrusoe/GNDC1crosswalk,notduplicatecampusautomaticmerge.75iscontractobligationnotcurrentheadcount. No signedfinalownerpage/actualabatementcommencementcertificateobserved.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Tax%20Abatement%20Agreement%202%20Phase%201.pdf", "host": "co.armstrong.tx.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Armstrong County, Texas is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "Google names Armstrong County among announced new Texas campuses; the regional investment is not a per-campus amount or proof of construction.", "current_status_basis": "Google’s current location page names Armstrong County, Texas as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/texas/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Claude · Armstrong · Source context reviewed", "status_scope": "Google’s current location page names Armstrong County, Texas as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48011"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "google-haskell-county-tx", "state": "TX", "kind": "project", "name": "Google Haskell County Data Center Campus", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Haskell"], "city": "Haskell", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator reports construction beganNovember2025, not completion/opening. Vendor inquiry form was not submitted; no siteMWorinvestmentamount here. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.google/haskell-county/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/texas/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 33.17828, "lng": -99.73039, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"construction_groundbreaking_month": "2025-11"}, "notes": ["Operator reports construction beganNovember2025, not completion/opening. Vendor inquiry form was not submitted; no siteMWorinvestmentamount here.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.google/haskell-county/", "host": "datacenters.google", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Haskell County, Texas is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "The Texas page names Haskell County among announced future campuses. Statewide $40 billion through 2027 is not a Haskell-specific investment or commissioned capacity.", "current_status_basis": "Google’s current location page names Haskell County, Texas as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/texas/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Haskell · Haskell · Source context reviewed", "status_scope": "Google’s current location page names Haskell County, Texas as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48207"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "google-wilbarger-vernon-tx", "state": "TX", "kind": "project", "name": "Google Wilbarger County Campus", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Wilbarger"], "city": "Vernon", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Google Wilbarger construction announcement and generation scope. 7800MWcontracted generation is Texas portfolio, not campus IT or current site power.40Binvestment through2027and30Mfund are statewide scopes. Air-cooled does not mean zero domestic water. No exact service date, parcel, street address or numeric IT in this announcement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/", "host": "blog.google", "date": "2026-02-24", "published": "2026-02-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/texas/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 34.08086, "lng": -99.24103, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Google Wilbarger construction announcement and generation scope", "fields": {"operator_statement_date": "2026-02-24", "project_county": "Wilbarger County, Texas", "operator_reported_stage": "under construction", "cooling_plan": "air cooling with water for critical campus operations", "energy_partner": "AES"}, "notes": ["7800MWcontracted generation is Texas portfolio, not campus IT or current site power.40Binvestment through2027and30Mfund are statewide scopes. Air-cooled does not mean zero domestic water. No exact service date, parcel, street address or numeric IT in this announcement.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/", "host": "blog.google", "date": "2026-02-24", "published": "2026-02-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Wilbarger County, Texas is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "The Texas page describes the Wilbarger campus development announcement in 2026. It does not independently establish individual approvals, construction completion or operation.", "current_status_basis": "Google’s current location page names Wilbarger County, Texas as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/texas/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Vernon · Wilbarger · Source context reviewed", "status_scope": "Google’s current location page names Wilbarger County, Texas as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48487"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "microsoft-pecos-tx", "state": "TX", "kind": "facility", "name": "Microsoft Pecos Data Center Campus", "group": "proposed", "status": "Operator-announced plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Reeves"], "city": "Pecos", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity. Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions. No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/", "host": "blogs.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 31.35984, "lng": -103.7334, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round16-2026-10-14.json", "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.", "fields": {"announcement_date": "2026-06-22", "announced_capacity_mw": 2000, "capacity_basis": "Approximately2GW datacenter capacity; explicit criticalIT basis not stated.", "current_verified_it_mw": null, "investment": "Multibillion dollar campus planned over five to seven years; no exact total.", "construction_jobs_forecast_peak": "More than6000", "permanent_jobs_forecast": "Hundreds, no exact count", "initial_power_strategy": "Proposed behind-the-meter natural gas generation funded by Microsoft; later grid connection anticipated", "cooling": "Planned closed-loop design; cooling initial fill distinct from all-site lifecycle use."}, "notes": ["Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity.", "Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions.", "No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/", "host": "blogs.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-announced plan", "basis": "Microsoft’s June 22, 2026 announcement says it will build the Pecos campus over a multi-year period.", "checked_on": "2026-10-16"}, "stage_review_limits": "The announcement establishes the named plan, not accomplished construction, energized IT or operation. The Arizona illustration and existing San Antonio activity do not establish Pecos activity. Water and power design claims remain prospective."}, "notes": ["The announcement establishes the named plan, not accomplished construction, energized IT or operation. The Arizona illustration and existing San Antonio activity do not establish Pecos activity. Water and power design claims remain prospective.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/", "host": "blogs.microsoft.com", "published": "2026-06-22", "date": "2026-06-22", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "K3 company role review October22,2026", "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."}, "provider_role": "developer"}, "notes": ["Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.", "A source read is not a construction, opening, transaction-closing or operating date."], "sources": [{"url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/", "host": "blogs.microsoft.com", "published": "2026-06-22", "date": "2026-06-22", "checked": "2026-10-22", "label": "Reviewed company identity source"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Pecos · Reeves · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. Microsoft’s June 22, 2026 announcement says it will build the Pecos campus over a multi-year period. The announcement establishes the named plan, not accomplished construction, energized IT or operation. The Arizona illustration and existing San Antonio activity do not establish Pecos activity. Water and power design claims remain prospective.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48389"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "powerhouse-provident-grand-prairie-tx", "state": "TX", "kind": "facility", "name": "PowerHouse Grand Prairie Campus", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Ellis"], "city": "Grand Prairie", "address": "", "who": "PowerHouse Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Research targets and proof-of-concept schedules do not establish deployed technology or measured performance at this campus. Other developments and their MW are separate. The Grand Prairie and Wilmer paragraphs repeat the same size/value/schedule; original project records are needed before treating those as independently confirmed. No current IT MW or construction outcome is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/", "host": "dallasinnovates.com", "date": "2025-09-29", "published": "2025-09-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.powerhousedata.com/data-center/powerhouse-grand-prairie", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}, {"url": "https://www.powerhousedata.com/news/powerhouse-and-provident-rewrite-the-data-center-playbook-with-new-texas-hyperscale-campus", "host": "www.powerhousedata.com", "published": "2025-02-25", "date": "2025-02-25", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.powerhousedata.com/", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 32.33979, "lng": -96.84357, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round30-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Dallas Innovates mentions a proposed 360,000-square-foot, 300-million-USD PowerHouse/Provident Grand Prairie building and 2027 completion while covering university cooling research.", "independently_verified_current_operating_status": null}, "notes": ["Research targets and proof-of-concept schedules do not establish deployed technology or measured performance at this campus. Other developments and their MW are separate. The Grand Prairie and Wilmer paragraphs repeat the same size/value/schedule; original project records are needed before treating those as independently confirmed. No current IT MW or construction outcome is established.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/", "host": "dallasinnovates.com", "date": "2025-09-29", "published": "2025-09-29", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 1", "scope": "PowerHouse currently lists a Grand Prairie development and prospective delivery and power schedules. This supports the named development only. The earlier small building news context is not silently reconciled with the larger campus specification. No quantity, parcel, role, construction milestone or operating service is promoted.", "fields": {"current_stage_evidence": {"outcome": "developer_listed_development", "scope": "PowerHouse currently lists a Grand Prairie development and prospective delivery and power schedules. This supports the named development only. The earlier small building news context is not silently reconciled with the larger campus specification. No quantity, parcel, role, construction milestone or operating service is promoted."}}, "notes": ["PowerHouse currently lists a Grand Prairie development and prospective delivery and power schedules. This supports the named development only. The earlier small building news context is not silently reconciled with the larger campus specification. No quantity, parcel, role, construction milestone or operating service is promoted."], "sources": [{"url": "https://www.powerhousedata.com/data-center/powerhouse-grand-prairie", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check72, October24,2026", "scope": "The February 25, 2025 first party announcement identifies PowerHouse and Provident as joint development partners outside Grand Prairie in northern Ellis County. This is not exclusive ownership or the unrelated Caldwell County proposal. The announcement and current project page show different acreage, phase and delivery scopes; no combined quantity or completion day is adopted. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.", "fields": {"company_association": {"name": "PowerHouse Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "The February 25, 2025 first party announcement identifies PowerHouse and Provident as joint development partners outside Grand Prairie in northern Ellis County. This is not exclusive ownership or the unrelated Caldwell County proposal. The announcement and current project page show different acreage, phase and delivery scopes; no combined quantity or completion day is adopted. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."}, "provider_role": "developer"}, "notes": ["The February 25, 2025 first party announcement identifies PowerHouse and Provident as joint development partners outside Grand Prairie in northern Ellis County. This is not exclusive ownership or the unrelated Caldwell County proposal. The announcement and current project page show different acreage, phase and delivery scopes; no combined quantity or completion day is adopted. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."], "sources": [{"url": "https://www.powerhousedata.com/news/powerhouse-and-provident-rewrite-the-data-center-playbook-with-new-texas-hyperscale-campus", "host": "www.powerhousedata.com", "published": "2025-02-25", "date": "2025-02-25", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.powerhousedata.com/data-center/powerhouse-grand-prairie", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.powerhousedata.com/", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Grand Prairie · Ellis · Source context reviewed", "status_scope": "PowerHouse currently lists a Grand Prairie development and prospective delivery and power schedules. This supports the named development only. The earlier small building news context is not silently reconciled with the larger campus specification. No quantity, parcel, role, construction milestone or operating service is promoted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48139"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "galaxy-digital-mcgregor-tx", "state": "TX", "kind": "facility", "name": "Project Merlin (Helios II)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["McLennan"], "city": "McGregor", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Current construction and IT capacity are unverified. Water is stated per building, without a whole-campus count. A noise design limit is not a measurement. Helios is separate, and utility promises are not verified contract terms. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-28", "Galaxy published its McGregor campus acquisition and development announcement July 28, 2026. The reported land and development agreements and conditional future power schedule do not certify an exact construction start or current computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://theenergymag.com/news/2026-06-25/galaxy-digital-ai-data-center-mcgregor-texas", "host": "theenergymag.com", "date": "2026-06-25", "published": "2026-06-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.galaxy.com/newsroom/galaxy-expands-data-center-footprint-with-acquisition-of-500-acre-campus-in-mcgregor-texas", "host": "www.galaxy.com", "published": "2026-07-28", "date": "2026-07-28", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 31.50884, "lng": -97.19814, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "EnergyMag, citing KWTX, reports an early McGregor Project Merlin council approval and Galaxy's investment plan.", "independently_verified_current_operating_status": null}, "notes": ["Current construction and IT capacity are unverified. Water is stated per building, without a whole-campus count. A noise design limit is not a measurement. Helios is separate, and utility promises are not verified contract terms.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://theenergymag.com/news/2026-06-25/galaxy-digital-ai-data-center-mcgregor-texas", "host": "theenergymag.com", "date": "2026-06-25", "published": "2026-06-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 53", "scope": "Galaxy original July 28, 2026 account identifies its McGregor campus as a proposed AI and high performance computing development following land acquisition and a City development agreement. It targets initial power in 2028 and operations thereafter subject to milestones. The current original listing supports a proposal only. Land, utility works, agreements and another Galaxy campus do not certify McGregor computing operation or physical construction. A later investor host had unavailable robots and no body was requested or adopted.", "fields": {"current_stage_evidence": {"outcome": "original_named_campus_proposal", "scope": "Galaxy original July 28, 2026 account identifies its McGregor campus as a proposed AI and high performance computing development following land acquisition and a City development agreement. It targets initial power in 2028 and operations thereafter subject to milestones. The current original listing supports a proposal only. Land, utility works, agreements and another Galaxy campus do not certify McGregor computing operation or physical construction. A later investor host had unavailable robots and no body was requested or adopted."}, "source_read_scope": {"selected_sections": ["July 28 release main project account", "Conditional development and power schedule"], "other_helios_campus_not_transferred": true, "investor_host_unavailable_robots_body_not_adopted": true}}, "notes": ["Galaxy original July 28, 2026 account identifies its McGregor campus as a proposed AI and high performance computing development following land acquisition and a City development agreement. It targets initial power in 2028 and operations thereafter subject to milestones. The current original listing supports a proposal only. Land, utility works, agreements and another Galaxy campus do not certify McGregor computing operation or physical construction. A later investor host had unavailable robots and no body was requested or adopted.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.galaxy.com/newsroom/galaxy-expands-data-center-footprint-with-acquisition-of-500-acre-campus-in-mcgregor-texas", "host": "www.galaxy.com", "published": "2026-07-28", "date": "2026-07-28", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · McGregor · McLennan · Source context reviewed", "status_scope": "Galaxy original July 28, 2026 account identifies its McGregor campus as a proposed AI and high performance computing development following land acquisition and a City development agreement. It targets initial power in 2028 and operations thereafter subject to milestones. The current original listing supports a proposal only. Land, utility works, agreements and another Galaxy campus do not certify McGregor computing operation or physical construction. A later investor host had unavailable robots and no body was requested or adopted.", "event_evidence": [{"date": "2026-07-28", "text": "Galaxy published its McGregor campus acquisition and development announcement July 28, 2026. The reported land and development agreements and conditional future power schedule do not certify an exact construction start or current computing operation.", "kind": "announced", "sources": [{"url": "https://www.galaxy.com/newsroom/galaxy-expands-data-center-footprint-with-acquisition-of-500-acre-campus-in-mcgregor-texas", "host": "www.galaxy.com", "published": "2026-07-28", "date": "2026-07-28", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48309"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "qts-lancium-hall-county-tx", "state": "TX", "kind": "facility", "name": "QTS-Lancium Hall County Data Center Campus", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Hall"], "city": "Turkey", "address": "", "who": "QTS", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. QTS and Lancium Hall County roles and forecasts. Not10Bspent,current350QTSemployees or7000permanentjobs. No ITMWor observed opening adopted. Cooling-water claim excludes domestic use and external generation impacts. Private infrastructure funding commitment not executed municipal agreement reviewed; linkedOctober9communityagreement is a later lead. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/", "host": "q.com", "date": "2026-07-13", "published": "2026-07-13", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 34.53074, "lng": -100.68135, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-discovery-review-round8-2026-10-14.json", "scope": "QTS and Lancium Hall County roles and forecasts", "fields": {"announcement_date": "2026-07-13", "planned_regional_capital_investment_usd_min_exclusive": 10000000000, "expected_peak_construction_jobs_max": 7000, "expected_permanent_jobs_approx": 350, "permanent_jobs_scope": "QTS,maintenance,security andtenant positions combined", "site_owner_infrastructure_developer": "Lancium", "data_center_developer_operator": "QTS", "published_location": "near Turkey, Hall County, Texas"}, "notes": ["Not10Bspent,current350QTSemployees or7000permanentjobs. No ITMWor observed opening adopted. Cooling-water claim excludes domestic use and external generation impacts. Private infrastructure funding commitment not executed municipal agreement reviewed; linkedOctober9communityagreement is a later lead.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/", "host": "q.com", "date": "2026-07-13", "published": "2026-07-13", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "QTS explicitly lists Hall County in Texas as in development. The existing named QTS and Lancium research context is retained; partnership, land and power plans do not establish commissioned operation. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "QTS explicitly lists Hall County in Texas as in development. The existing named QTS and Lancium research context is retained; partnership, land and power plans do not establish commissioned operation. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["QTS explicitly lists Hall County in Texas as in development. The existing named QTS and Lancium research context is retained; partnership, land and power plans do not establish commissioned operation."], "sources": [{"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 09, October 23, 2026", "scope": "QTS announces plans for this named data center campus in its own dated release. Developer is the attributed provider brand role for the announced project, not proof of construction, operating service, current delivery, legal ownership or a confirmed parcel. The source publication date is not a physical milestone. No status, location, technical figure, investment, jobs, water use, utility cost or environmental outcome is promoted. The Hall County announcement assigns planned data center building design and construction to QTS, while describing Lancium separately as campus and infrastructure partner. Only the QTS developer role is adopted here; the source does not establish that either party has completed those works.", "fields": {"company_association": {"name": "QTS", "role": "developer", "identity_scope": "provider_brand_only", "scope": "QTS announces plans for this named data center campus in its own dated release. Developer is the attributed provider brand role for the announced project, not proof of construction, operating service, current delivery, legal ownership or a confirmed parcel. The source publication date is not a physical milestone. No status, location, technical figure, investment, jobs, water use, utility cost or environmental outcome is promoted. The Hall County announcement assigns planned data center building design and construction to QTS, while describing Lancium separately as campus and infrastructure partner. Only the QTS developer role is adopted here; the source does not establish that either party has completed those works."}, "provider_role": "developer"}, "notes": ["QTS announces plans for this named data center campus in its own dated release. Developer is the attributed provider brand role for the announced project, not proof of construction, operating service, current delivery, legal ownership or a confirmed parcel. The source publication date is not a physical milestone. No status, location, technical figure, investment, jobs, water use, utility cost or environmental outcome is promoted. The Hall County announcement assigns planned data center building design and construction to QTS, while describing Lancium separately as campus and infrastructure partner. Only the QTS developer role is adopted here; the source does not establish that either party has completed those works.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/", "host": "q.com", "published": "2026-07-13", "date": "2026-07-13", "checked": "2026-10-23", "label": "Dated first party named campus announcement, planned developer role only"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Turkey · Hall · Source context reviewed", "status_scope": "QTS explicitly lists Hall County in Texas as in development. The existing named QTS and Lancium research context is retained; partnership, land and power plans do not establish commissioned operation. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48191"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "rowan-temple-tx", "state": "TX", "kind": "facility", "name": "Rowan Project Temple", "group": "proposed", "status": "City-listed planned development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Bell"], "city": "Temple", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Temple official first-Rowan water-limit and revenue forecast summary. 4000gpd is city-described contractual domestic cap, not consumption estimate or independently read executed utility agreement.2Mone-time staged initialfill separate.7M/12Mcity tax-and-related revenue forecasts perproject not perbuilding or incentive dollars received. OtherTempleprojects require own limits; no blanket4000gpd. No current MW or opening proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.templetx.gov/community/faq__data_center_development_.php", "host": "templetx.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 31.05648, "lng": -97.49963, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Temple official first-Rowan water-limit and revenue forecast summary", "fields": {"city_reported_first_rowan_project_domestic_water_contract_cap_gallons_per_day": 4000, "planned_initial_closed_loop_water_fill_gallons_approx": 2000000, "city_projected_annual_city_revenue_during_abatement_usd_approx": 7000000, "city_projected_annual_city_revenue_full_tax_roll_usd_approx": 12000000}, "notes": ["4000gpd is city-described contractual domestic cap, not consumption estimate or independently read executed utility agreement.2Mone-time staged initialfill separate.7M/12Mcity tax-and-related revenue forecasts perproject not perbuilding or incentive dollars received. OtherTempleprojects require own limits; no blanket4000gpd. No current MW or opening proof.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.templetx.gov/community/faq__data_center_development_.php", "host": "templetx.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 9", "scope": "The current City of Temple FAQ identifies Project Temple as the first Rowan hyperscale development and describes planned development controls. City listed planned development describes that municipal project context. Contractual water limits, required noise studies and future occupancy safeguards do not establish actual water demand, final compliance, a construction start or operation.", "fields": {"current_stage_evidence": {"outcome": "city_listed_planned_development", "scope": "The current City of Temple FAQ identifies Project Temple as the first Rowan hyperscale development and describes planned development controls. City listed planned development describes that municipal project context. Contractual water limits, required noise studies and future occupancy safeguards do not establish actual water demand, final compliance, a construction start or operation."}, "local_rule_context": {"jurisdiction": "City of Temple", "project_named": "Project Temple, first Rowan hyperscale project", "agency_described_domestic_water_cap_gallons_per_day": 4000, "measure": "agency described contractual limit, not measured withdrawal", "noise_scope": "The FAQ describes required study, mitigation and a post construction acoustical report before occupancy. Original agreement text and present compliance were not independently reviewed.", "jurisdiction_limit": "The city distinguishes its local development controls from ERCOT, Oncor and state grid authority. No Bell County wide requirement or electricity rate outcome is inferred.", "complete_current_code_or_contract_audit": false}}, "notes": ["The current City of Temple FAQ identifies Project Temple as the first Rowan hyperscale development and describes planned development controls. City listed planned development describes that municipal project context. Contractual water limits, required noise studies and future occupancy safeguards do not establish actual water demand, final compliance, a construction start or operation.", "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."], "sources": [{"url": "https://www.templetx.gov/community/faq__data_center_development_.php", "host": "www.templetx.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Temple · Bell · Source context reviewed", "status_scope": "The current City of Temple FAQ identifies Project Temple as the first Rowan hyperscale development and describes planned development controls. City listed planned development describes that municipal project context. Contractual water limits, required noise studies and future occupancy safeguards do not establish actual water demand, final compliance, a construction start or operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48027"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "mara-site-mat-1177-matagorda-tx", "state": "TX", "kind": "facility", "name": "Site MAT 1177", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Matagorda"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The purchase amount is not upfront payment or construction spending. First and second gigawatt targets in October 2027 and April 2028 are future, conditional and not critical IT demand. A Starwood partnership does not establish an executed tenant lease for the full site. The later issuer quarterly filing was found in search but its body returned 403; do not claim full original review. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-02", "MARA Note 18 records execution and simultaneous closing of its MAT 1177 LLC membership acquisition on July 2, 2026. The acquired rights include owned land, land under contract and a utility agreement, with later development milestones. This is a reported company transaction, not completed campus construction or computing service."], ["2026-07-09", "MARA published its Matagorda planned campus acquisition announcement July 9, 2026. The planned computing uses and future power dates do not establish an operating campus or an executed tenant lease."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://cryptobriefing.com/marathon-digital-holdings-600m-texas-ai-bitcoin-campus/", "host": "cryptobriefing.com", "date": "2026-07-09", "published": "2026-07-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.mara.com/news-events/press-releases/detail/1424/mara-signs-agreement-with-hif-to-acquire-strategic-powered-land-site-in-texas", "host": "ir.mara.com", "published": "2026-07-09", "date": "2026-07-09", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000022/mara-20260630.htm", "host": "ir.mara.com", "published": "2026-08-06", "date": "2026-08-06", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 28.82096, "lng": -96.0111, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Crypto Briefing reports MARA's agreement concerning MAT 1177 and a Matagorda site, with up to 600 million USD of milestone-contingent consideration and a 2 GW power target.", "independently_verified_current_operating_status": null}, "notes": ["The purchase amount is not upfront payment or construction spending. First and second gigawatt targets in October 2027 and April 2028 are future, conditional and not critical IT demand. A Starwood partnership does not establish an executed tenant lease for the full site. The later issuer quarterly filing was found in search but its body returned 403; do not claim full original review.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://cryptobriefing.com/marathon-digital-holdings-600m-texas-ai-bitcoin-campus/", "host": "cryptobriefing.com", "date": "2026-07-09", "published": "2026-07-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 53", "scope": "MARA original July 9 release and August 6 quarterly filing identify a planned Matagorda digital infrastructure campus. Note 18 records a July 2, 2026 agreement and simultaneous acquisition closing for MAT 1177 LLC, which holds a mix of an owned parcel, land purchase contract rights and utility agreement rights. Closing of the company acquisition does not mean all land contracts, development milestones, power authorization or a tenant lease are complete. The filing expressly describes intended campus development. Current status is a listed proposal only, without changes to ownership, roles, land identity or technical quantities.", "fields": {"current_stage_evidence": {"outcome": "original_named_planned_campus", "scope": "MARA original July 9 release and August 6 quarterly filing identify a planned Matagorda digital infrastructure campus. Note 18 records a July 2, 2026 agreement and simultaneous acquisition closing for MAT 1177 LLC, which holds a mix of an owned parcel, land purchase contract rights and utility agreement rights. Closing of the company acquisition does not mean all land contracts, development milestones, power authorization or a tenant lease are complete. The filing expressly describes intended campus development. Current status is a listed proposal only, without changes to ownership, roles, land identity or technical quantities."}, "source_read_scope": {"release_project_and_transaction_sections_read": true, "quarterly_selected_sections": ["Note 18 Subsequent Events MAT 1177 transaction", "Matagorda discussion in liquidity and business overview"], "simultaneous_company_closing_not_all_land_closing": true, "other_long_ridge_transaction_not_transferred": true, "earlier_access_hold_not_retroactively_removed": true}}, "notes": ["MARA original July 9 release and August 6 quarterly filing identify a planned Matagorda digital infrastructure campus. Note 18 records a July 2, 2026 agreement and simultaneous acquisition closing for MAT 1177 LLC, which holds a mix of an owned parcel, land purchase contract rights and utility agreement rights. Closing of the company acquisition does not mean all land contracts, development milestones, power authorization or a tenant lease are complete. The filing expressly describes intended campus development. Current status is a listed proposal only, without changes to ownership, roles, land identity or technical quantities.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://ir.mara.com/news-events/press-releases/detail/1424/mara-signs-agreement-with-hif-to-acquire-strategic-powered-land-site-in-texas", "host": "ir.mara.com", "published": "2026-07-09", "date": "2026-07-09", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000022/mara-20260630.htm", "host": "ir.mara.com", "published": "2026-08-06", "date": "2026-08-06", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Matagorda · Source context reviewed", "status_scope": "MARA original July 9 release and August 6 quarterly filing identify a planned Matagorda digital infrastructure campus. Note 18 records a July 2, 2026 agreement and simultaneous acquisition closing for MAT 1177 LLC, which holds a mix of an owned parcel, land purchase contract rights and utility agreement rights. Closing of the company acquisition does not mean all land contracts, development milestones, power authorization or a tenant lease are complete. The filing expressly describes intended campus development. Current status is a listed proposal only, without changes to ownership, roles, land identity or technical quantities.", "event_evidence": [{"date": "2026-07-02", "text": "MARA Note 18 records execution and simultaneous closing of its MAT 1177 LLC membership acquisition on July 2, 2026. The acquired rights include owned land, land under contract and a utility agreement, with later development milestones. This is a reported company transaction, not completed campus construction or computing service.", "kind": "announced", "sources": [{"url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000022/mara-20260630.htm", "host": "ir.mara.com", "published": "2026-08-06", "date": "2026-08-06", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2026-07-09", "text": "MARA published its Matagorda planned campus acquisition announcement July 9, 2026. The planned computing uses and future power dates do not establish an operating campus or an executed tenant lease.", "kind": "announced", "sources": [{"url": "https://ir.mara.com/news-events/press-releases/detail/1424/mara-signs-agreement-with-hif-to-acquire-strategic-powered-land-site-in-texas", "host": "ir.mara.com", "published": "2026-07-09", "date": "2026-07-09", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48321"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "soluna-project-annie-paris-tx", "state": "TX", "kind": "facility", "name": "Soluna Project Annie", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lamar"], "city": "Paris", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. Soluna originalMay22,2025 Annie announcement:75MWDATACENTERproject co-located114MWsolarGEN, not189MWIT. NortheastTexasregion named, exactParis/Lamarparcelunverified. SignedTERM SHEET, definitivePPA/land/ERCOTplanning stillfuture; noexecutedenergizeddelivery.773MWcompanyPIPELINEmixesoperating/construction/development, notoperatingfleet. Queryp15253redirectstoexplicitAnnieURL withsameprojectbody. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.", "date": "", "events": [["2026-06-09", "Soluna published its monthly update on June 9, 2026 and described Annie development for a potential customer, with capital formation and modular construction design underway. This dates the report and design work, not a physical construction start or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.solunacomputing.com/?post_type=news&p=15253", "host": "solunacomputing.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.solunacomputing.com/projects/", "host": "www.solunacomputing.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.solunacomputing.com/news/monthly-update-june-2026/", "host": "www.solunacomputing.com", "published": "2026-06-09", "date": "2026-06-09", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 33.66699, "lng": -95.57118, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json", "scope": "Original reporter/issuer named-project context, with inference and stages explicit.", "fields": {}, "notes": ["Soluna originalMay22,2025 Annie announcement:75MWDATACENTERproject co-located114MWsolarGEN, not189MWIT. NortheastTexasregion named, exactParis/Lamarparcelunverified. SignedTERM SHEET, definitivePPA/land/ERCOTplanning stillfuture; noexecutedenergizeddelivery.773MWcompanyPIPELINEmixesoperating/construction/development, notoperatingfleet. Queryp15253redirectstoexplicitAnnieURL withsameprojectbody.", "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."], "sources": [{"url": "https://www.solunacomputing.com/?post_type=news&p=15253", "host": "solunacomputing.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 53", "scope": "The current original Soluna project listing identifies Annie as a planned Bitcoin and AI computing development. Its June 9, 2026 update says it is being developed for a potential customer, with capital formation and modular construction design activities commenced and interconnection studies nearing completion. Design activity is not an accomplished physical construction start. The current page Status value is empty and its operating statistics heading supplies no independent service value for Annie. The inherited Paris geography and differing advertised quantities are not certified or changed.", "fields": {"current_stage_evidence": {"outcome": "current_named_project_listing_and_design_proposal", "scope": "The current original Soluna project listing identifies Annie as a planned Bitcoin and AI computing development. Its June 9, 2026 update says it is being developed for a potential customer, with capital formation and modular construction design activities commenced and interconnection studies nearing completion. Design activity is not an accomplished physical construction start. The current page Status value is empty and its operating statistics heading supplies no independent service value for Annie. The inherited Paris geography and differing advertised quantities are not certified or changed."}, "source_read_scope": {"selected_sections": ["Current About Project Annie and empty Status value", "June 9 publication and Pipeline Highlights"], "june_url_month_not_publication_day_substitute": true, "operating_statistics_header_not_operation": true, "advertised_quantity_difference_not_exported": true}}, "notes": ["The current original Soluna project listing identifies Annie as a planned Bitcoin and AI computing development. Its June 9, 2026 update says it is being developed for a potential customer, with capital formation and modular construction design activities commenced and interconnection studies nearing completion. Design activity is not an accomplished physical construction start. The current page Status value is empty and its operating statistics heading supplies no independent service value for Annie. The inherited Paris geography and differing advertised quantities are not certified or changed.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.solunacomputing.com/projects/", "host": "www.solunacomputing.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.solunacomputing.com/news/monthly-update-june-2026/", "host": "www.solunacomputing.com", "published": "2026-06-09", "date": "2026-06-09", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Paris · Lamar · Source context reviewed", "status_scope": "The current original Soluna project listing identifies Annie as a planned Bitcoin and AI computing development. Its June 9, 2026 update says it is being developed for a potential customer, with capital formation and modular construction design activities commenced and interconnection studies nearing completion. Design activity is not an accomplished physical construction start. The current page Status value is empty and its operating statistics heading supplies no independent service value for Annie. The inherited Paris geography and differing advertised quantities are not certified or changed.", "event_evidence": [{"date": "2026-06-09", "text": "Soluna published its monthly update on June 9, 2026 and described Annie development for a potential customer, with capital formation and modular construction design underway. This dates the report and design work, not a physical construction start or computing operation.", "kind": "announced", "sources": [{"url": "https://www.solunacomputing.com/news/monthly-update-june-2026/", "host": "www.solunacomputing.com", "published": "2026-06-09", "date": "2026-06-09", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48277"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "stack-dfw02-lancaster-tx", "state": "TX", "kind": "facility", "name": "STACK DFW02 (Lancaster)", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Dallas"], "city": "Lancaster", "address": "", "who": "STACK Infrastructure", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two named Dallas market campuses. Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/", "host": "stackinfra.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/dfw02/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed operator source"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}], "loc": {"lat": 32.7399, "lng": -96.73584, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "captured-operator-review-round6-2026-10-14.json", "scope": "two named Dallas market campuses", "fields": {"dfw01_plano": {"advertised_total_power_mw": 80, "operational_buildings": 2, "expansion_capacity_mw": 48}, "dfw02_lancaster": {"advertised_maximum_power_mw": 500, "campus_acres": 193}, "regional_power_mw": 580, "regional_campuses": 2, "regional_acres": 240}, "notes": ["Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/", "host": "stackinfra.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S2-Texas-Comptroller-20261015", "scope": "STACK Lancaster DFW02 planned-campus identity and program context.", "fields": {"current_source_scope": "The operator describes a Lancaster campus with planned critical capacity. The source does not separately establish an operating date or an accomplished construction milestone.", "texas_program_entries": [{"registered_name": "DFW02 LANCASTER (STACK)", "program": "qualifying large data center project", "registration_anchor": "LD112589-OW1", "program_effective_on": "2025-10-31", "exemption_end_on": null, "listed_owner_names": ["SI DFW02A, LLC"], "listed_occupant_names": ["SI DFW02A, LLC"], "listed_operator_names": ["SI DFW02A, LLC", "Stack Infrastructure III TRC, LLC"]}], "provider_brand": "STACK Infrastructure"}, "notes": ["Planned campus capacity and an incentive registration do not certify operation; current status remains unclear. No construction status is inferred from a rendered campus image.", "Program effective and exemption-end dates are not physical opening, energization or closure dates. Listed program participants do not independently verify parcel title, legal corporate relationships or current tenant occupancy.", "No new map coordinates, precise pins, metered use or legacy MW totals are adopted."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/dfw02/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed operator source"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}], "checked": "2026-10-15", "whole_record_certified": false}, {"overlay": "S2-Texas-Comptroller-20261015", "scope": "Provider-role display refinement: the source establishes a developer brand, not current operating service.", "fields": {"provider_role": "developer"}, "notes": ["The main provider fact is labeled Developer. The source does not resolve the campus operating stage; status remains unclear."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/dfw02/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed operator source"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}], "checked": "2026-10-15", "whole_record_certified": false}, {"overlay": "overnight-discovery-2026-10-17", "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.", "fields": {"texas_current_program_contexts": {"checked": "2026-10-17", "reference_rows": [{"association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.", "registered_name": "DFW02 LANCASTER (STACK)", "program": "Qualifying large data center project", "registration_number": "LD112589-OW1"}], "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."}}, "notes": ["No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."], "sources": [{"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Current qualifying data-center and large-project registered lists"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "STACK lists DFW02 in Lancaster as planned development. Conflicting planned-capacity totals are not adopted, and physical construction or commissioning is not verified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "STACK lists DFW02 in Lancaster as planned development. Conflicting planned-capacity totals are not adopted, and physical construction or commissioning is not verified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["STACK lists DFW02 in Lancaster as planned development. Conflicting planned-capacity totals are not adopted, and physical construction or commissioning is not verified."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/dfw02/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Lancaster · Dallas · Source context reviewed", "status_scope": "STACK lists DFW02 in Lancaster as planned development. Conflicting planned-capacity totals are not adopted, and physical construction or commissioning is not verified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48113"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "switch-the-rock-round-rock-tx", "state": "TX", "kind": "facility", "name": "Switch: The Rock (Round Rock)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Williamson"], "city": "Round Rock", "address": "", "who": "Switch", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 185MWnot RoundRock-onlycapacity.60MWand500karea belong acquiredDataFoundryproperties. Announced2021sitework not currentdeliveredstatus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.", "date": "", "events": [["2021-06-02", "Switch published its planned Rock campus announcement on June 2, 2021. The original account describes a planned campus and anticipated site preparation, without independently establishing accomplished construction, computing service or a first opening day."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/", "host": "switch.com", "date": "2021-06-02", "published": "2021-06-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.switch.com/sustainable-data-center-designs/", "host": "switch.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.switch.com/austin/", "host": "www.switch.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 30.66469, "lng": -97.61875, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"historical_planned_round_rock_area_sqft_min_exclusive": 1500000, "historical_site_preparation_target": "2021summer", "regional_power_mw": 185, "regional_power_scope": "Texas ecosystem including acquired Austin and Houston properties"}, "notes": ["185MWnot RoundRock-onlycapacity.60MWand500karea belong acquiredDataFoundryproperties. Announced2021sitework not currentdeliveredstatus.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/", "host": "switch.com", "date": "2021-06-02", "published": "2021-06-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "captured-operator-review-round6-2026-10-14.json", "scope": "corporate energy context only", "fields": {}, "notes": ["Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.switch.com/sustainable-data-center-designs/", "host": "switch.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Company role source check 14, October 23, 2026", "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The June 2, 2021 announcement names The Rock beside Dell headquarters in Round Rock. Its site preparation and future capacity targets are historical intentions, not events verified to have happened. Austin is a marketed region and the Data Foundry acquisition is a separate component.", "fields": {"company_association": {"name": "Switch", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The June 2, 2021 announcement names The Rock beside Dell headquarters in Round Rock. Its site preparation and future capacity targets are historical intentions, not events verified to have happened. Austin is a marketed region and the Data Foundry acquisition is a separate component."}, "provider_role": "developer"}, "notes": ["Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The June 2, 2021 announcement names The Rock beside Dell headquarters in Round Rock. Its site preparation and future capacity targets are historical intentions, not events verified to have happened. Austin is a marketed region and the Data Foundry acquisition is a separate component.", "Source publication and retrieval dates remain separate from physical milestones."], "sources": [{"url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/", "host": "www.switch.com", "published": "2021-06-02", "date": "2021-06-02", "checked": "2026-10-23", "label": "First party exact campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 64", "scope": "The complete original June 2, 2021 Switch announcement identifies the planned Rock campus at the Dell headquarters area. The current Austin page repeats the Rock identity and anticipated growth, separately describing acquired Data Foundry Austin and Houston service. This supports a listed proposal without independently establishing current Rock construction, commissioned computing or a first opening day. Existing Data Foundry operations and undated power, security and connectivity specifications are not transferred to the Rock. The older summer site preparation forecast is not an accomplished event.", "fields": {"current_stage_evidence": {"outcome": "original_named_rock_proposal_not_datafoundry_operation", "scope": "The complete original June 2, 2021 Switch announcement identifies the planned Rock campus at the Dell headquarters area. The current Austin page repeats the Rock identity and anticipated growth, separately describing acquired Data Foundry Austin and Houston service. This supports a listed proposal without independently establishing current Rock construction, commissioned computing or a first opening day. Existing Data Foundry operations and undated power, security and connectivity specifications are not transferred to the Rock. The older summer site preparation forecast is not an accomplished event."}, "source_read_scope": {"complete_original2021_announcement_body_read": true, "selected_original_current_austin_body_read": true, "datafoundry_operations_not_forced_rock_service": true, "summer2021_forecast_not_accomplished": true}}, "notes": ["The complete original June 2, 2021 Switch announcement identifies the planned Rock campus at the Dell headquarters area. The current Austin page repeats the Rock identity and anticipated growth, separately describing acquired Data Foundry Austin and Houston service. This supports a listed proposal without independently establishing current Rock construction, commissioned computing or a first opening day. Existing Data Foundry operations and undated power, security and connectivity specifications are not transferred to the Rock. The older summer site preparation forecast is not an accomplished event.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."], "sources": [{"url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/", "host": "www.switch.com", "published": "2021-06-02", "date": "2021-06-02", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.switch.com/austin/", "host": "www.switch.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Round Rock · Williamson · Source context reviewed", "status_scope": "The complete original June 2, 2021 Switch announcement identifies the planned Rock campus at the Dell headquarters area. The current Austin page repeats the Rock identity and anticipated growth, separately describing acquired Data Foundry Austin and Houston service. This supports a listed proposal without independently establishing current Rock construction, commissioned computing or a first opening day. Existing Data Foundry operations and undated power, security and connectivity specifications are not transferred to the Rock. The older summer site preparation forecast is not an accomplished event.", "event_evidence": [{"date": "2021-06-02", "text": "Switch published its planned Rock campus announcement on June 2, 2021. The original account describes a planned campus and anticipated site preparation, without independently establishing accomplished construction, computing service or a first opening day.", "kind": "announced", "sources": [{"url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/", "host": "www.switch.com", "published": "2021-06-02", "date": "2021-06-02", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48491"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "pronghorn-antelope-cedar-city-ut", "state": "UT", "kind": "facility", "name": "Antelope Data Center (Project Antelope)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Iron"], "city": "Cedar City", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Iron County Antelope discussion and outstanding water rights. Meeting minutes do not grant CUP or water withdrawal rights. Entire 640-acre parcel is not established as campus footprint. Applicant water estimates changed with projected staffing; figures are forecasts and conflict with a separately discussed example, so no single measured water figure adopted. CUP discussion is separate from any UIPA incentives and other state/federal permits. County statement about gas bills is not an independently verified rate guarantee. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://secure.utah.gov/pmn-admin/files/1431597.pdf", "host": "secure.utah.gov", "date": "2026-04-02", "published": "2026-04-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 37.88208, "lng": -113.31459, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Iron County Antelope discussion and outstanding water rights", "fields": {"meeting_date": "2026-04-02", "agenda_project": "Antelope Data Center", "meeting_stage": "discussion only; no action, public hearing or public comment", "proposed_land_scope": "portion of a 640-acre parcel", "applicant_reported_power_mode": "own natural-gas supply, not connection to local supply lines", "county_reported_water_rights_status": "applicant did not yet hold water rights", "potential_source_basin": "Beryl/Escalante Water Basin", "required_water_rights_priority_year_max": 1945}, "notes": ["Meeting minutes do not grant CUP or water withdrawal rights. Entire 640-acre parcel is not established as campus footprint. Applicant water estimates changed with projected staffing; figures are forecasts and conflict with a separately discussed example, so no single measured water figure adopted. CUP discussion is separate from any UIPA incentives and other state/federal permits. County statement about gas bills is not an independently verified rate guarantee.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://secure.utah.gov/pmn-admin/files/1431597.pdf", "host": "secure.utah.gov", "date": "2026-04-02", "published": "2026-04-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 41", "scope": "The original April 2, 2026 County minutes identify the Antelope proposal and explicitly describe the item as discussion only, with no action and no public hearing for that item. Agency listed proposal is limited to that recorded planning context. Draft mitigation examples, expected fiscal benefits and possible water requirements are not approved final conditions, acquired water rights, County funding, a construction start or commissioned operation. The separate vehicle storage recommendation immediately above the item is not transferred to this project.", "fields": {"current_stage_evidence": {"outcome": "named_antelope_discussion_only_not_cup_approval", "scope": "The original April 2, 2026 County minutes identify the Antelope proposal and explicitly describe the item as discussion only, with no action and no public hearing for that item. Agency listed proposal is limited to that recorded planning context. Draft mitigation examples, expected fiscal benefits and possible water requirements are not approved final conditions, acquired water rights, County funding, a construction start or commissioned operation. The separate vehicle storage recommendation immediately above the item is not transferred to this project."}, "planning_conditions_context": {"discussion_on": "2026-04-02", "action_taken": false, "public_hearing_for_this_item": false, "conditions": "Draft examples only, not adopted final project conditions.", "water_rights_approval_verified": false}}, "notes": ["The original April 2, 2026 County minutes identify the Antelope proposal and explicitly describe the item as discussion only, with no action and no public hearing for that item. Agency listed proposal is limited to that recorded planning context. Draft mitigation examples, expected fiscal benefits and possible water requirements are not approved final conditions, acquired water rights, County funding, a construction start or commissioned operation. The separate vehicle storage recommendation immediately above the item is not transferred to this project.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://secure.utah.gov/pmn-admin/files/1431597.pdf", "host": "secure.utah.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Cedar City · Iron · Source context reviewed", "status_scope": "The original April 2, 2026 County minutes identify the Antelope proposal and explicitly describe the item as discussion only, with no action and no public hearing for that item. Agency listed proposal is limited to that recorded planning context. Draft mitigation examples, expected fiscal benefits and possible water requirements are not approved final conditions, acquired water rights, County funding, a construction start or commissioned operation. The separate vehicle storage recommendation immediately above the item is not transferred to this project.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49021"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "cirrus-data-services-midvale-ut", "state": "UT", "kind": "facility", "name": "CirrusDS View 78 Data Center", "group": "proposed", "status": "Project listed for development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Salt Lake"], "city": "Midvale", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. generic redevelopment source hold. Generic Midvale RDA history, budgets and tax-increment framework do not identify Cirrus Data Services. 1982is agency establishment, not facility opening. City offices not facility address. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.midvale.utah.gov/government/departments/redevelopment_agency/index.php", "host": "midvale.utah.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.cirrusds.com/", "host": "www.cirrusds.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 40.68389, "lng": -111.94264, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "generic redevelopment source hold", "fields": {}, "notes": ["Generic Midvale RDA history, budgets and tax-increment framework do not identify Cirrus Data Services. 1982is agency establishment, not facility opening. City offices not facility address.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.midvale.utah.gov/government/departments/redevelopment_agency/index.php", "host": "midvale.utah.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch1", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "unresolved", "scope": "Midvale’s redevelopment-agency overview describes agency functions and project areas. It does not identify Cirrus Data Services premises, an award or current operation. The agency office is not a data-center address."}}, "notes": ["Midvale’s redevelopment-agency overview describes agency functions and project areas. It does not identify Cirrus Data Services premises, an award or current operation. The agency office is not a data-center address."], "sources": [{"url": "https://www.midvale.utah.gov/government/departments/redevelopment_agency/index.php", "host": "www.midvale.utah.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed primary source"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 41", "scope": "The current original company account names View 78 and offers a phased build to suit design alongside professional development advisory services. Project listed for development is limited to that named offering. Architectural renderings, design modules and future facility service descriptions do not establish current tenant computing, built capacity, technical certification, commissioned power or operation. The company advisory business is not treated as an operating data center.", "fields": {"current_stage_evidence": {"outcome": "named_view78_build_to_suit_development_offer", "scope": "The current original company account names View 78 and offers a phased build to suit design alongside professional development advisory services. Project listed for development is limited to that named offering. Architectural renderings, design modules and future facility service descriptions do not establish current tenant computing, built capacity, technical certification, commissioned power or operation. The company advisory business is not treated as an operating data center."}}, "notes": ["The current original company account names View 78 and offers a phased build to suit design alongside professional development advisory services. Project listed for development is limited to that named offering. Architectural renderings, design modules and future facility service descriptions do not establish current tenant computing, built capacity, technical certification, commissioned power or operation. The company advisory business is not treated as an operating data center.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://www.cirrusds.com/", "host": "www.cirrusds.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Midvale · Salt Lake · Source context reviewed", "status_scope": "The current original company account names View 78 and offers a phased build to suit design alongside professional development advisory services. Project listed for development is limited to that named offering. Architectural renderings, design modules and future facility service descriptions do not establish current tenant computing, built capacity, technical certification, commissioned power or operation. The company advisory business is not treated as an operating data center.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49035"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "google-eagle-mountain-ut", "state": "UT", "kind": "facility", "name": "Google Eagle Mountain Site", "group": "proposed", "status": "City-listed planned development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Utah"], "city": "Eagle Mountain", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The eBay mention identifies only a company and county, so Topaz receives no named-site credit. Regional project counts derived from another map are not independent census evidence. Generation and backup equipment are not computing demand. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/", "host": "grist.org", "date": "2026-02-24", "published": "2026-02-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://eaglemountain.gov/data-centers-in-eagle-mountain/", "host": "eaglemountain.gov", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "loc": {"lat": 40.1199, "lng": -111.67026, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "Grist reports Google Eagle Mountain delayed awaiting power, alongside regional gas and backup-generator plans.", "independently_verified_current_operating_status": null}, "notes": ["The eBay mention identifies only a company and county, so Topaz receives no named-site credit. Regional project counts derived from another map are not independent census evidence. Generation and backup equipment are not computing demand.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/", "host": "grist.org", "date": "2026-02-24", "published": "2026-02-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "service-status-2026-10-19", "scope": "Eagle Mountain City lists the Google project as planned development that has not started, and says it has not received building plans.", "fields": {"current_stage_evidence": {"outcome": "city_listed_planned_development", "scope": "Eagle Mountain City lists the Google project as planned development that has not started, and says it has not received building plans."}}, "notes": ["The city summary does not establish construction, operation, denial or abandonment. Building plans, capacity, ownership and the exact parcel remain unverified."], "sources": [{"url": "https://eaglemountain.gov/data-centers-in-eagle-mountain/", "host": "eaglemountain.gov", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Eagle Mountain · Utah · Source context reviewed", "status_scope": "Eagle Mountain City lists the Google project as planned development that has not started, and says it has not received building plans.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49049"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "joule-millard-county-ut", "state": "UT", "kind": "facility", "name": "Joule Energy and Data Center Campus", "group": "proposed", "status": "Project listed for development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Millard"], "city": "Holden", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. AmyJoiODonoghue DeseretNews October21,2025 originalJoulefounderinterviews:4000acreMillardfamilyland/ownwaterrightsandplannedclosedloop; existingrightnotproofnewusezeroimpactorindependentallocation.1.3GW FIRSTPHASEPOWERGENERATION, notcriticalIToradditionalcampusload. Founderssaycountyconditionalusepermitunanimouslygranted; underlyingpermit/airlicense/currentcompletionnotread. Groundbreakingfutureinreportnotobserved. Amazon/Google/Oracle/OpenAI/xAIarepotentialcustomerexamplesnotconfirmedtenants. Baxtel47Utahfacilities/600MWderivativemixedbasisnotadoptedcensus. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.deseret.com/utah/2025/10/21/millard-county-data-center-to-break-ground-and-bring-promise-to-rural-utah/", "host": "deseret.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://joulepower.ai/", "host": "joulepower.ai", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 39.00413, "lng": -113.09443, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json", "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.", "fields": {}, "notes": ["AmyJoiODonoghue DeseretNews October21,2025 originalJoulefounderinterviews:4000acreMillardfamilyland/ownwaterrightsandplannedclosedloop; existingrightnotproofnewusezeroimpactorindependentallocation.1.3GW FIRSTPHASEPOWERGENERATION, notcriticalIToradditionalcampusload.", "Founderssaycountyconditionalusepermitunanimouslygranted; underlyingpermit/airlicense/currentcompletionnotread. Groundbreakingfutureinreportnotobserved. Amazon/Google/Oracle/OpenAI/xAIarepotentialcustomerexamplesnotconfirmedtenants. Baxtel47Utahfacilities/600MWderivativemixedbasisnotadoptedcensus.", "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."], "sources": [{"url": "https://www.deseret.com/utah/2025/10/21/millard-county-data-center-to-break-ground-and-bring-promise-to-rural-utah/", "host": "deseret.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 41", "scope": "The current original Joule account explicitly describes master planning of its Millard County energy and computing campus and claims an executed conditional use permit and generation equipment on order and in production. Project listed for development applies to that named campus plan. Equipment manufacturing, an executed permit claim and a future onsite power model do not independently establish data hall construction, delivered generation, commissioned computing, actual grid effects or measured environmental results.", "fields": {"current_stage_evidence": {"outcome": "current_named_millard_master_planned_energy_and_compute_campus", "scope": "The current original Joule account explicitly describes master planning of its Millard County energy and computing campus and claims an executed conditional use permit and generation equipment on order and in production. Project listed for development applies to that named campus plan. Equipment manufacturing, an executed permit claim and a future onsite power model do not independently establish data hall construction, delivered generation, commissioned computing, actual grid effects or measured environmental results."}}, "notes": ["The current original Joule account explicitly describes master planning of its Millard County energy and computing campus and claims an executed conditional use permit and generation equipment on order and in production. Project listed for development applies to that named campus plan. Equipment manufacturing, an executed permit claim and a future onsite power model do not independently establish data hall construction, delivered generation, commissioned computing, actual grid effects or measured environmental results.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://joulepower.ai/", "host": "joulepower.ai", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Holden · Millard · Source context reviewed", "status_scope": "The current original Joule account explicitly describes master planning of its Millard County energy and computing campus and claims an executed conditional use permit and generation equipment on order and in production. Project listed for development applies to that named campus plan. Equipment manufacturing, an executed permit claim and a future onsite power model do not independently establish data hall construction, delivered generation, commissioned computing, actual grid effects or measured environmental results.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49027"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "setsquare-nebo-north-mona-juab-county-ut", "state": "UT", "kind": "facility", "name": "Nebo North Data Center Campus (Project Nebo)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Juab"], "city": "Mona", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. April15notice not hearing outcome or approved permit. Two parcel identifiers end with hyphens; completeness not independently resolved in parcel registry, do not append guessed digits. Meeting160NMainNephi not campus address. Exact developer alias/coordinate/MW/investment not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-04-15", "Scheduled event: The County April 2 notice schedules a hearing on Nebo North LLC data center application April 15, 2026. The passed date is retained as a schedule, without a verified hearing result or an accomplished decision."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/", "host": "juabcounty.gov", "date": "2026-04-02", "published": "2026-04-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 39.65364, "lng": -112.78049, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "named government source", "fields": {"historical_hearing_scheduled_date": "2026-04-15", "historical_hearing_scheduled_local_time": "19:00", "applicant": "NeboNorthLLC", "printed_parcel_identifiers": ["XC00-2715-1", "XC00-2710-", "XC00-2705-"], "printed_legal_location": "Sections13and14,Township11South,Range1West,SLBM"}, "notes": ["April15notice not hearing outcome or approved permit. Two parcel identifiers end with hyphens; completeness not independently resolved in parcel registry, do not append guessed digits. Meeting160NMainNephi not campus address. Exact developer alias/coordinate/MW/investment not established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/", "host": "juabcounty.gov", "date": "2026-04-02", "published": "2026-04-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 41", "scope": "The original April 2, 2026 County notice identifies Nebo North LLC application to construct and operate a data center campus and schedules April 15 consideration. Agency listed proposal is limited to that named application notice. The passed hearing day does not establish that a hearing occurred, a final vote, issued permission, physical construction or operation. No permit expiration, exact site reference or quantity is promoted.", "fields": {"current_stage_evidence": {"outcome": "named_nebo_north_application_notice_without_verified_final_result", "scope": "The original April 2, 2026 County notice identifies Nebo North LLC application to construct and operate a data center campus and schedules April 15 consideration. Agency listed proposal is limited to that named application notice. The passed hearing day does not establish that a hearing occurred, a final vote, issued permission, physical construction or operation. No permit expiration, exact site reference or quantity is promoted."}}, "notes": ["The original April 2, 2026 County notice identifies Nebo North LLC application to construct and operate a data center campus and schedules April 15 consideration. Agency listed proposal is limited to that named application notice. The passed hearing day does not establish that a hearing occurred, a final vote, issued permission, physical construction or operation. No permit expiration, exact site reference or quantity is promoted.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/", "host": "juabcounty.gov", "published": "2026-04-02", "date": "2026-04-02", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Mona · Juab · Source context reviewed", "status_scope": "The original April 2, 2026 County notice identifies Nebo North LLC application to construct and operate a data center campus and schedules April 15 consideration. Agency listed proposal is limited to that named application notice. The passed hearing day does not establish that a hearing occurred, a final vote, issued permission, physical construction or operation. No permit expiration, exact site reference or quantity is promoted.", "event_evidence": [{"date": "2026-04-15", "text": "Scheduled event: The County April 2 notice schedules a hearing on Nebo North LLC data center application April 15, 2026. The passed date is retained as a schedule, without a verified hearing result or an accomplished decision.", "kind": "scheduled_event", "sources": [{"url": "https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/", "host": "juabcounty.gov", "published": "2026-04-02", "date": "2026-04-02", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49023"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "nine-mile-data-myton-duchesne-county-ut", "state": "UT", "kind": "facility", "name": "Nine Mile Data Center (Uinta Basin Data Center Project)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Duchesne"], "city": "Myton", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NineMiledata-centerland-use staff report,notfinalpermit. RecommendationanddraftmotionnotPlanningCommissionvotedpermit. Solar/naturalgaspowerplantsreviewedunderseparateapplications,notincludedinthisCUPscope.18monthinactivityrule dependsactualissuance,notautomaticallyexpiryOctober2027. NoITMWorbuildingcompletioninreviewedfindingpages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf", "host": "duchesne.utah.gov", "date": "2026-04-02", "published": "2026-04-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 40.29811, "lng": -110.42598, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "NineMiledata-centerland-use staff report,notfinalpermit", "fields": {"staff_findings_report_date": "2026-04-02", "applicant_represented_entity": "EnergenceUtahLLC", "application_complete_date": "2026-03-11", "data_center_project_acres": 960.32, "published_project_parcels": ["00-0009-5871", "00-0027-8311", "00-0034-9496", "00-0009-5947"], "published_location_description": "offWellsDrawRoad,southeastofBridgeland,southwestofSouthMytonBench", "review_stage": "staffrecommendationforconditionaluseapproval"}, "notes": ["RecommendationanddraftmotionnotPlanningCommissionvotedpermit. Solar/naturalgaspowerplantsreviewedunderseparateapplications,notincludedinthisCUPscope.18monthinactivityrule dependsactualissuance,notautomaticallyexpiryOctober2027. NoITMWorbuildingcompletioninreviewedfindingpages.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf", "host": "duchesne.utah.gov", "date": "2026-04-02", "published": "2026-04-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 41", "scope": "The April 2, 2026 original staff findings report explicitly identifies the proposed Nine Mile Data computing development and its March 11 complete application. Agency listed proposal is limited to that staff review. The report contains a recommended approval motion and an unsigned recommendation line, rather than a recorded Planning Commission vote or issued final permit. Solar and gas facilities are separate applications. Staff quotations of County and state rules do not establish current statutory compliance, a verified permit issue day, actual construction or computing operation.", "fields": {"current_stage_evidence": {"outcome": "named_nine_mile_staff_recommendation_not_final_cup_or_operation", "scope": "The April 2, 2026 original staff findings report explicitly identifies the proposed Nine Mile Data computing development and its March 11 complete application. Agency listed proposal is limited to that staff review. The report contains a recommended approval motion and an unsigned recommendation line, rather than a recorded Planning Commission vote or issued final permit. Solar and gas facilities are separate applications. Staff quotations of County and state rules do not establish current statutory compliance, a verified permit issue day, actual construction or computing operation."}}, "notes": ["The April 2, 2026 original staff findings report explicitly identifies the proposed Nine Mile Data computing development and its March 11 complete application. Agency listed proposal is limited to that staff review. The report contains a recommended approval motion and an unsigned recommendation line, rather than a recorded Planning Commission vote or issued final permit. Solar and gas facilities are separate applications. Staff quotations of County and state rules do not establish current statutory compliance, a verified permit issue day, actual construction or computing operation.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf", "host": "duchesne.utah.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Myton · Duchesne · Source context reviewed", "status_scope": "The April 2, 2026 original staff findings report explicitly identifies the proposed Nine Mile Data computing development and its March 11 complete application. Agency listed proposal is limited to that staff review. The report contains a recommended approval motion and an unsigned recommendation line, rather than a recorded Planning Commission vote or issued final permit. Solar and gas facilities are separate applications. Staff quotations of County and state rules do not establish current statutory compliance, a verified permit issue day, actual construction or computing operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49013"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "qts-eagle-mountain-ut", "state": "UT", "kind": "facility", "name": "QTS Eagle Mountain Data Center Campus", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Utah"], "city": "Eagle Mountain", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Future campus and reported construction stages, not completed operation. Cooling savings are a developer design comparison to a traditional baseline, not measured water consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. QTS proposed administrative amendment with separate CRA context. Blankvotechecklist/signaturelines do notproveadoption. TripleTailCRA1170.44acres isseparateprojectareaagenda item, not automaticallyTractdatacenterfootprintorQTSsite. QTSIparticipationpapers notproofnewFairfieldQTSIIsite. No proposedreimbursementformulaasactualpaymentor currentaward. Full132pagePDFrecoverednormally after4MBhold.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://q.com/data-centers/eagle-mountain/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.utah.gov/pmn/files/1158232.pdf", "host": "utah.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "loc": {"lat": 40.1749, "lng": -111.6281, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "direct-operators-round5-2026-10-14.json", "scope": "named operator source", "fields": {"first_phase_acres_approx": 193, "first_phase_buildings": 5, "announced_planned_investment_usd": 6000000000, "forecast_construction_jobs_lower_bound": 2000, "forecast_permanent_positions_approx": 100, "permanent_position_scope": "QTS, tenant and contractors", "operator_reported_buildings_under_construction": [1, 2, 3], "completion_target_calendar_date": null, "completion_target_source_basis": "end of the year, undated page; calendar year not independently anchored"}, "notes": ["Future campus and reported construction stages, not completed operation. Cooling savings are a developer design comparison to a traditional baseline, not measured water consumption.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://q.com/data-centers/eagle-mountain/", "host": "q.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "QTS proposed administrative amendment with separate CRA context", "fields": {"qts_proposed_amendment_agenda_date": "2024-08-20", "qts_proposed_amendment_subject": "permitcustomerpersonalpropertytaxreimbursementdirectlytoendclients", "document_status": "agenda,staffrecommendation,draftresolution andproposedamendment; executionnotestablished"}, "notes": ["Blankvotechecklist/signaturelines do notproveadoption. TripleTailCRA1170.44acres isseparateprojectareaagenda item, not automaticallyTractdatacenterfootprintorQTSsite. QTSIparticipationpapers notproofnewFairfieldQTSIIsite. No proposedreimbursementformulaasactualpaymentor currentaward. Full132pagePDFrecoverednormally after4MBhold.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.utah.gov/pmn/files/1158232.pdf", "host": "utah.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "QTS explicitly lists its named Eagle Mountain campus as in development. This does not adopt a Fairfield alias, verify the separate Eagle Mountain II research context, or certify a construction or commissioning outcome. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development", "scope": "QTS explicitly lists its named Eagle Mountain campus as in development. This does not adopt a Fairfield alias, verify the separate Eagle Mountain II research context, or certify a construction or commissioning outcome. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["QTS explicitly lists its named Eagle Mountain campus as in development. This does not adopt a Fairfield alias, verify the separate Eagle Mountain II research context, or certify a construction or commissioning outcome."], "sources": [{"url": "https://q.com/data-centers/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Eagle Mountain · Utah · Source context reviewed", "status_scope": "QTS explicitly lists its named Eagle Mountain campus as in development. This does not adopt a Fairfield alias, verify the separate Eagle Mountain II research context, or certify a construction or commissioning outcome. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49049"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "brightnight-red-butte-newcastle-ut", "state": "UT", "kind": "facility", "name": "Red Butte Energy and Data Center Campus", "group": "proposed", "status": "Agency listed proposal on hold", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Iron"], "city": "Newcastle", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Iron County official application and moratorium summary. Signed ordinance and precise effective/expiry not independently reviewed. Do not calculate a legal expiry from adoption. Separate Antelope June4planning review explicitly not public hearing and not Red Butte hearing. No MW or investment adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-05-22", "The original Iron County project page records that the Red Butte application was deemed incomplete on May 22, 2026. This is an application review event rather than approval, physical construction or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://ironcountyut.gov/planning/data-center-projects", "host": "ironcountyut.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://ironcountyut.gov/files/planning/data-center-solar-moratorium.pdf", "host": "ironcountyut.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 37.85931, "lng": -113.28973, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Iron County official application and moratorium summary", "fields": {"county_reported_moratorium_adoption_date": "2026-05-26", "moratorium_duration_days": 180, "red_butte_application_submitted_date": "2026-05-04", "red_butte_application_incomplete_date": "2026-05-22", "county_reported_red_butte_status": "on hold under moratorium"}, "notes": ["Signed ordinance and precise effective/expiry not independently reviewed. Do not calculate a legal expiry from adoption. Separate Antelope June4planning review explicitly not public hearing and not Red Butte hearing. No MW or investment adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ironcountyut.gov/planning/data-center-projects", "host": "ironcountyut.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 71", "scope": "The complete original County project page identifies the Red Butte application as submitted May 4, 2026, deemed incomplete May 22 and on hold subject to a computing application moratorium. This supports an agency listed proposal on hold rather than computing construction or operation. The webpage reports May 26 adoption, while the complete linked three page ordinance 2026 13 has a June 8 adoption recital and blank signature, attestation and vote fields. Its effective clause requires passage and publication. These conflicts remain unresolved; no legal commencement, calculated expiration or exact property exception is certified. The separate Antelope June 4 meeting notice is not this project hearing or proof that the meeting occurred.", "fields": {"current_stage_evidence": {"outcome": "agency_named_redbutte_incomplete_proposal_on_hold", "scope": "The complete original County project page identifies the Red Butte application as submitted May 4, 2026, deemed incomplete May 22 and on hold subject to a computing application moratorium. This supports an agency listed proposal on hold rather than computing construction or operation. The webpage reports May 26 adoption, while the complete linked three page ordinance 2026 13 has a June 8 adoption recital and blank signature, attestation and vote fields. Its effective clause requires passage and publication. These conflicts remain unresolved; no legal commencement, calculated expiration or exact property exception is certified. The separate Antelope June 4 meeting notice is not this project hearing or proof that the meeting occurred."}, "source_read_scope": {"complete_original_current_county_project_body_and_three_page_ordinance_text_read": true, "may26_webpage_and_june8_unsigned_ordinance_conflict_retained": true, "conditional_publication_unverified": true, "complete_application_exception_and_incomplete_application_suspension_read": true, "no_calculated_180_day_expiration": true, "antelope_notice_not_redbutte_hearing": true}}, "notes": ["The complete original County project page identifies the Red Butte application as submitted May 4, 2026, deemed incomplete May 22 and on hold subject to a computing application moratorium. This supports an agency listed proposal on hold rather than computing construction or operation. The webpage reports May 26 adoption, while the complete linked three page ordinance 2026 13 has a June 8 adoption recital and blank signature, attestation and vote fields. Its effective clause requires passage and publication. These conflicts remain unresolved; no legal commencement, calculated expiration or exact property exception is certified. The separate Antelope June 4 meeting notice is not this project hearing or proof that the meeting occurred.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://ironcountyut.gov/planning/data-center-projects", "host": "ironcountyut.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://ironcountyut.gov/files/planning/data-center-solar-moratorium.pdf", "host": "ironcountyut.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Newcastle · Iron · Source context reviewed", "status_scope": "The complete original County project page identifies the Red Butte application as submitted May 4, 2026, deemed incomplete May 22 and on hold subject to a computing application moratorium. This supports an agency listed proposal on hold rather than computing construction or operation. The webpage reports May 26 adoption, while the complete linked three page ordinance 2026 13 has a June 8 adoption recital and blank signature, attestation and vote fields. Its effective clause requires passage and publication. These conflicts remain unresolved; no legal commencement, calculated expiration or exact property exception is certified. The separate Antelope June 4 meeting notice is not this project hearing or proof that the meeting occurred.", "event_evidence": [{"date": "2026-05-22", "text": "The original Iron County project page records that the Red Butte application was deemed incomplete on May 22, 2026. This is an application review event rather than approval, physical construction or computing operation.", "kind": "announced", "sources": [{"url": "https://ironcountyut.gov/planning/data-center-projects", "host": "ironcountyut.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49021"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "stratos-box-elder-ut", "state": "UT", "kind": "facility", "name": "Stratos AI Data Center Campus", "group": "proposed", "status": "Agency described proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Box Elder"], "city": "Lucin", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Stratos county project claims with forecast limits. County promotional forecasts, not audited collections, secured financing, approved environmental findings or guaranteed no-rate-increase. Permanent jobs include later businesses over decade, not quantified onsite DCjobs. Salinewater andclosedloop claims not withdrawal permits or zero ecological impacts. No current siteMW or opening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet", "host": "boxeldercountyut.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.52096, "lng": -113.08211, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Stratos county project claims with forecast limits", "fields": {"county_projected_annual_tax_revenue_at_later_buildout_usd": 108000000, "county_described_proposed_generation_fuel": "natural gas fromRubyPipeline", "county_described_proposed_cooling_water_source": "onsite saline water andclosedloop cooling"}, "notes": ["County promotional forecasts, not audited collections, secured financing, approved environmental findings or guaranteed no-rate-increase. Permanent jobs include later businesses over decade, not quantified onsite DCjobs. Salinewater andclosedloop claims not withdrawal permits or zero ecological impacts. No current siteMW or opening date.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet", "host": "boxeldercountyut.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 71", "scope": "The complete original County Stratos fact sheet describes a future phased project and responds to supportive and critical public submissions. This supports an agency described proposal rather than proof of construction or computing operation. Future jobs, tax receipts, water suitability, closed cooling, onsite power and rate assurances remain attributed County claims without independent measurements or an executed site approval. The count of submissions is not a count of unique residents or a verified representative opinion. No developer role, capacity or exact first opening is changed.", "fields": {"current_stage_evidence": {"outcome": "agency_described_stratos_future_proposal", "scope": "The complete original County Stratos fact sheet describes a future phased project and responds to supportive and critical public submissions. This supports an agency described proposal rather than proof of construction or computing operation. Future jobs, tax receipts, water suitability, closed cooling, onsite power and rate assurances remain attributed County claims without independent measurements or an executed site approval. The count of submissions is not a count of unique residents or a verified representative opinion. No developer role, capacity or exact first opening is changed."}, "source_read_scope": {"complete_original_county_fact_sheet_body_read": true, "county_reassurances_not_measured_impacts": true, "submission_count_not_unique_residents": true, "no_operator_response_or_role_inferred": true, "no_capacity_jobs_or_tax_forecast_export": true}}, "notes": ["The complete original County Stratos fact sheet describes a future phased project and responds to supportive and critical public submissions. This supports an agency described proposal rather than proof of construction or computing operation. Future jobs, tax receipts, water suitability, closed cooling, onsite power and rate assurances remain attributed County claims without independent measurements or an executed site approval. The count of submissions is not a count of unique residents or a verified representative opinion. No developer role, capacity or exact first opening is changed.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet", "host": "www.boxeldercountyut.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Lucin · Box Elder · Source context reviewed", "status_scope": "The complete original County Stratos fact sheet describes a future phased project and responds to supportive and critical public submissions. This supports an agency described proposal rather than proof of construction or computing operation. Future jobs, tax receipts, water suitability, closed cooling, onsite power and rate assurances remain attributed County claims without independent measurements or an executed site approval. The count of submissions is not a count of unique residents or a verified representative opinion. No developer role, capacity or exact first opening is changed.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49003"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "volition-spanish-fork-ut", "state": "UT", "kind": "facility", "name": "Volition Spanish Fork Data Center", "group": "proposed", "status": "City listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Utah"], "city": "Spanish Fork", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Primary municipal proposal context plus corporate marketing limitations, not approval or current capacity.. Adopted minutes summarize a proposal discussed in work session; adopting minutes does not approve the campus. Only pages1-3 of35 reviewed for this topic. Estimated equipment value nearing USD1billion is not total project capital or committed spending. Minutes do not substantiate directory400MW or1million-squarefoot headline. OpenAI is a prospective example, not a contracted tenant. Fuel-cell gas, water recirculation, minimal emissions, reliability and Enbridge infrastructure support are presentation/discussion claims, not signed fuel contracts, permits, measured emissions or actual water records. On-site natural gas generation is not renewable by definition. Volition compute page is general company marketing, not this campus status: text alternates650times and65times gas-versus-grid reliability and says both retrofit and never-retrofitted. Do not adopt those unsourced inconsistent metrics. Provo SierraVista30-to40MW concept is separate from SpanishFork; no power or location copied between them. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-04-21", "The original Spanish Fork City minutes record April 21, 2026 work session discussion of the Volition proposal and further ordinance and documentation steps. The source explicitly says work sessions take no formal actions. This is a proposal discussion rather than approval, construction or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.utah.gov/pmn/files/1430163.pdf", "host": "utah.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://volition.eco/compute", "host": "volition.eco", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 40.21455, "lng": -111.6957, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round39-2026-10-14.json", "scope": "Primary municipal proposal context plus corporate marketing limitations, not approval or current capacity.", "fields": {"official_discussion_date": "2026-04-21", "meeting_stage": "Work session, expressly no formal actions", "equipment_value_estimate_usd_approximate": 1000000000, "critical_it_mw": null, "verified_building_sqft": null, "confirmed_tenant": null, "project_approval_verified": false, "independently_verified_current_operating_status": null}, "notes": ["Adopted minutes summarize a proposal discussed in work session; adopting minutes does not approve the campus. Only pages1-3 of35 reviewed for this topic.", "Estimated equipment value nearing USD1billion is not total project capital or committed spending. Minutes do not substantiate directory400MW or1million-squarefoot headline. OpenAI is a prospective example, not a contracted tenant.", "Fuel-cell gas, water recirculation, minimal emissions, reliability and Enbridge infrastructure support are presentation/discussion claims, not signed fuel contracts, permits, measured emissions or actual water records. On-site natural gas generation is not renewable by definition.", "Volition compute page is general company marketing, not this campus status: text alternates650times and65times gas-versus-grid reliability and says both retrofit and never-retrofitted. Do not adopt those unsourced inconsistent metrics.", "Provo SierraVista30-to40MW concept is separate from SpanishFork; no power or location copied between them.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.utah.gov/pmn/files/1430163.pdf", "host": "utah.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://volition.eco/compute", "host": "volition.eco", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 72", "scope": "Selected original City minutes dated April 21, 2026 explicitly describe the Volition Spanish Fork proposal in a work session where no formal actions are taken. This supports a City documented proposal. Future ordinance updates, environmental documentation, pipeline planning, projected revenues, prospective customer names and provider forecasts for first capacity do not establish accomplished entitlement, construction or computing service. The current original provider page gives general designs without independently commissioning this exact city site. Claimed grid reliability, water use, emissions and generation capacity are not measured or certified.", "fields": {"current_stage_evidence": {"outcome": "city_named_volition_spanishfork_work_session_proposal", "scope": "Selected original City minutes dated April 21, 2026 explicitly describe the Volition Spanish Fork proposal in a work session where no formal actions are taken. This supports a City documented proposal. Future ordinance updates, environmental documentation, pipeline planning, projected revenues, prospective customer names and provider forecasts for first capacity do not establish accomplished entitlement, construction or computing service. The current original provider page gives general designs without independently commissioning this exact city site. Claimed grid reliability, water use, emissions and generation capacity are not measured or certified."}, "source_read_scope": {"original_35_page_city_minutes_selected_physical_pages2_3_4_read": true, "complete_original_current_provider_compute_body_read": true, "work_session_no_formal_action_not_final_permission": true, "prospective_customers_not_verified_tenants": true, "no_measured_rates_emissions_water_or_reliability_claims": true}}, "notes": ["Selected original City minutes dated April 21, 2026 explicitly describe the Volition Spanish Fork proposal in a work session where no formal actions are taken. This supports a City documented proposal. Future ordinance updates, environmental documentation, pipeline planning, projected revenues, prospective customer names and provider forecasts for first capacity do not establish accomplished entitlement, construction or computing service. The current original provider page gives general designs without independently commissioning this exact city site. Claimed grid reliability, water use, emissions and generation capacity are not measured or certified.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.utah.gov/pmn/files/1430163.pdf", "host": "www.utah.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://volition.eco/compute", "host": "volition.eco", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Spanish Fork · Utah · Source context reviewed", "status_scope": "Selected original City minutes dated April 21, 2026 explicitly describe the Volition Spanish Fork proposal in a work session where no formal actions are taken. This supports a City documented proposal. Future ordinance updates, environmental documentation, pipeline planning, projected revenues, prospective customer names and provider forecasts for first capacity do not establish accomplished entitlement, construction or computing service. The current original provider page gives general designs without independently commissioning this exact city site. Claimed grid reliability, water use, emissions and generation capacity are not measured or certified.", "event_evidence": [{"date": "2026-04-21", "text": "The original Spanish Fork City minutes record April 21, 2026 work session discussion of the Volition proposal and further ordinance and documentation steps. The source explicitly says work sessions take no formal actions. This is a proposal discussion rather than approval, construction or computing operation.", "kind": "announced", "sources": [{"url": "https://www.utah.gov/pmn/files/1430163.pdf", "host": "www.utah.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49049"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "adp-ladysmith-data-hub-caroline-va", "state": "VA", "kind": "facility", "name": "ADP Ladysmith Data Hub", "group": "proposed", "status": "County-listed application", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Caroline"], "city": "Ruther Glen", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Caroline three distinct application identities and review stages. Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings", "host": "co.caroline.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 38.02672, "lng": -77.3477, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Caroline three distinct application identities and review stages", "fields": {"county": "Caroline, Virginia", "project_applications": [{"project": "Thornberry Data Center Campus", "case": "RZ-03-2025", "parcel": "84-A-1", "parent_parcel_acres": 1001.5, "requested_rezoning_acres": 657, "address": "23202 Carneal Lane", "source_stage": "complete submission forwarded for review; hearing date undetermined"}, {"project": "ADP Ladysmith Data Hub", "cases": ["RZ-02-2025", "SPEX-06-2025"], "parcel": "53-A-65", "requested_rezoning_acres": 140.38, "address": "18577 Green Road", "source_stage": "complete submission forwarded for review; hearing date undetermined"}, {"project": "Bull Church Data Center", "case": "RZ-04-2024", "parcel": "53-A-66", "owner": "Mid Atlantic State Fund LLC", "applicant": "NRD Retail LLC", "location": "Bull Church Road east of I-95, adjacent to Virginia Bazaar south boundary", "source_stage": "technical review; hearing date undetermined"}]}, "notes": ["Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings", "host": "co.caroline.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "Caroline County lists the ADP Ladysmith data center application under RZ-02-2025 and SPEX-06-2025 as under review.", "fields": {"current_stage_evidence": {"outcome": "county_listed_application", "scope": "Caroline County lists the ADP Ladysmith data center application under RZ-02-2025 and SPEX-06-2025 as under review."}}, "notes": ["The listing does not establish final approval, a construction start or an operating facility. No physical-stage date is established."], "sources": [{"url": "https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings", "host": "co.caroline.va.us", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Ruther Glen · Caroline · Source context reviewed", "status_scope": "Caroline County lists the ADP Ladysmith data center application under RZ-02-2025 and SPEX-06-2025 as under review.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51033"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "avaio-appomattox-va", "state": "VA", "kind": "facility", "name": "AVAIO Appomattox Data Center Campus", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Appomattox"], "city": "Appomattox", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Developer tax benefit claim is a projection, not annual revenue received. No project opening, construction start or all permits established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wdbj7.com/2026/03/24/board-answers-questions-future-data-center/", "host": "wdbj7.com", "date": "2026-03-23", "published": "2026-03-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.avaiodigital.com/developments/appomattox-virginia", "host": "www.avaiodigital.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "loc": {"lat": 37.37259, "lng": -78.81292, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.", "fields": {"reported_context": "WDBJ reports AVAIO proposed Appomattox campus with initial construction and partial substation work planned for 2027 to 2028.", "independently_verified_current_operating_status": null}, "notes": ["Developer tax benefit claim is a projection, not annual revenue received. No project opening, construction start or all permits established.", "Original executed approvals, current operator disclosures and subsequent decisions take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wdbj7.com/2026/03/24/board-answers-questions-future-data-center/", "host": "wdbj7.com", "date": "2026-03-23", "published": "2026-03-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "next-status-2026-10-19", "scope": "AVAIO lists Project Hercules in Appomattox as construction-ready, with initial power delivery planned for 2027.", "fields": {"current_stage_evidence": {"outcome": "developer_listed_development", "scope": "AVAIO lists Project Hercules in Appomattox as construction-ready, with initial power delivery planned for 2027."}}, "notes": ["Construction-ready does not establish actual construction or operation. The page does not certify current land ownership, every required permit or measured capacity. The older announcement and current page describe different acreage; neither figure is adopted."], "sources": [{"url": "https://www.avaiodigital.com/developments/appomattox-virginia", "host": "www.avaiodigital.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Appomattox · Appomattox · Source context reviewed", "status_scope": "AVAIO lists Project Hercules in Appomattox as construction-ready, with initial power delivery planned for 2027.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51011"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "bull-church-data-center-caroline-va", "state": "VA", "kind": "facility", "name": "Bull Church Data Center", "group": "proposed", "status": "County-listed application", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Caroline"], "city": "Ruther Glen", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Caroline three distinct application identities and review stages. Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings", "host": "co.caroline.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 37.99322, "lng": -77.34476, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Caroline three distinct application identities and review stages", "fields": {"county": "Caroline, Virginia", "project_applications": [{"project": "Thornberry Data Center Campus", "case": "RZ-03-2025", "parcel": "84-A-1", "parent_parcel_acres": 1001.5, "requested_rezoning_acres": 657, "address": "23202 Carneal Lane", "source_stage": "complete submission forwarded for review; hearing date undetermined"}, {"project": "ADP Ladysmith Data Hub", "cases": ["RZ-02-2025", "SPEX-06-2025"], "parcel": "53-A-65", "requested_rezoning_acres": 140.38, "address": "18577 Green Road", "source_stage": "complete submission forwarded for review; hearing date undetermined"}, {"project": "Bull Church Data Center", "case": "RZ-04-2024", "parcel": "53-A-66", "owner": "Mid Atlantic State Fund LLC", "applicant": "NRD Retail LLC", "location": "Bull Church Road east of I-95, adjacent to Virginia Bazaar south boundary", "source_stage": "technical review; hearing date undetermined"}]}, "notes": ["Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings", "host": "co.caroline.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "Caroline County lists the Bull Church data center application under RZ-04-2024 as under review.", "fields": {"current_stage_evidence": {"outcome": "county_listed_application", "scope": "Caroline County lists the Bull Church data center application under RZ-04-2024 as under review."}}, "notes": ["The listing does not establish final approval, a construction start or an operating facility. No physical-stage date is established."], "sources": [{"url": "https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings", "host": "co.caroline.va.us", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Ruther Glen · Caroline · Source context reviewed", "status_scope": "Caroline County lists the Bull Church data center application under RZ-04-2024 as under review.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51033"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "rck-crossroads-technology-campus-spotsylvania-va", "state": "VA", "kind": "facility", "name": "Crossroads Technology Campus", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Spotsylvania"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RCK Crossroads signed application, not final permit. SignedownerapplicationnotapprovedSUP;applicationnumberboxblank. McLeanandRestoncontactaddressesnotcampus. OCRcheckedagainstactualpageimage. No numeric MW, building count or operator tenant in form. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-08-26", "The currently linked Crossroads applicant narrative is dated August 26, 2026 and requests a special use permit and a separate public utility conformity review. This dates the document, not its receipt, a hearing, approval, construction or operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.spotsylvania.va.us/DocumentCenter/View/40291/SUP-Application", "host": "spotsylvania.va.us", "date": "2026-03-11", "published": "2026-03-11", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.spotsylvania.va.us/DocumentCenter/View/40289/5th-Submission-Narrative-?bidId=", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.spotsylvania.va.us/3241/Data-Center-FAQs", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 38.13924, "lng": -77.67937, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "RCK Crossroads signed application, not final permit", "fields": {"applicant": "RCK Digital Crossroads LLC", "owner_signatory": "Sean H. Curtin", "owner_signature_date": "2026-03-11", "application_requested_use": "industrial data center campus and light public utilities", "site_acres": 633.28, "tax_map_parcels": ["37-A-20", "37-A-21", "37-A-17D", "37-A-64"], "county": "Spotsylvania, Virginia", "permit_application_number": null, "permit_approval_date": null}, "notes": ["SignedownerapplicationnotapprovedSUP;applicationnumberboxblank. McLeanandRestoncontactaddressesnotcampus. OCRcheckedagainstactualpageimage. No numeric MW, building count or operator tenant in form.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.spotsylvania.va.us/DocumentCenter/View/40291/SUP-Application", "host": "spotsylvania.va.us", "date": "2026-03-11", "published": "2026-03-11", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 49", "scope": "The currently linked County hosted August 26, 2026 applicant narrative requests a special use permit for Crossroads Technology Campus and a separate public utility conformity review. This supports a named proposal only. The requested permit, the narrative position on previous entitlements and nearby approved campuses do not establish a grant of approval, construction or computing operation.", "fields": {"current_stage_evidence": {"outcome": "current_named_special_use_proposal", "scope": "The currently linked County hosted August 26, 2026 applicant narrative requests a special use permit for Crossroads Technology Campus and a separate public utility conformity review. This supports a named proposal only. The requested permit, the narrative position on previous entitlements and nearby approved campuses do not establish a grant of approval, construction or computing operation."}, "source_read_scope": {"current_narrative_selected_text_pages": [1, 2, 3], "redirect_to_fifth_submission_preserved": true}}, "notes": ["The currently linked County hosted August 26, 2026 applicant narrative requests a special use permit for Crossroads Technology Campus and a separate public utility conformity review. This supports a named proposal only. The requested permit, the narrative position on previous entitlements and nearby approved campuses do not establish a grant of approval, construction or computing operation.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.spotsylvania.va.us/DocumentCenter/View/40289/5th-Submission-Narrative-?bidId=", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.spotsylvania.va.us/3241/Data-Center-FAQs", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Spotsylvania · Source context reviewed", "status_scope": "The currently linked County hosted August 26, 2026 applicant narrative requests a special use permit for Crossroads Technology Campus and a separate public utility conformity review. This supports a named proposal only. The requested permit, the narrative position on previous entitlements and nearby approved campuses do not establish a grant of approval, construction or computing operation.", "event_evidence": [{"date": "2026-08-26", "text": "The currently linked Crossroads applicant narrative is dated August 26, 2026 and requests a special use permit and a separate public utility conformity review. This dates the document, not its receipt, a hearing, approval, construction or operation.", "kind": "announced", "sources": [{"url": "https://www.spotsylvania.va.us/DocumentCenter/View/40289/5th-Submission-Narrative-?bidId=", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51177"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "edgecore-culpeper-tech-zone-va", "state": "VA", "kind": "project", "name": "EdgeCore Culpeper Data Center Campus", "group": "proposed", "status": "Operator-listed plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Hyperscale data center campus", "counties": ["Culpeper"], "city": "Culpeper", "address": "", "who": "EdgeCore Digital Infrastructure", "end_user": "", "mw": null, "power": "", "power_note": "Current initial two-building forecast with mid-2029 capacity target. Historical initial 216/potential 432 MW plans overlap and are not added. Technical as-of date is not published. No utility, backup-generation or metered-use figure is inferred.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Initial capacity is inside the ultimate plan. Early 2028 power delivery remains a forecast. The water-efficiency benchmark is not measured consumption, and the wider technology zone is not the owned campus. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2024-07-18", "EdgeCore announced its Culpeper land purchase and then-current initial 216/potential 432 MW plan. Early 2028 power delivery was a forecast; the current page advertises a different 196 MW plan and mid-2029 capacity target."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia", "host": "edgecore.com", "date": "2024-07-18", "published": "2024-07-18", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://edgecore.com/locations/culpeper-data-centers", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed operator campus page"}], "loc": {"lat": 38.4989, "lng": -77.96984, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "EdgeCore announces a 120-acre Culpeper purchase, initially 216 MW of critical IT and potential expansion to 432 MW.", "independently_verified_current_operating_status": null, "planned_initial_critical_it_mw": 216, "potential_critical_it_mw": 432, "planned_initial_power_delivery": "early 2028"}, "notes": ["Initial capacity is inside the ultimate plan. Early 2028 power delivery remains a forecast. The water-efficiency benchmark is not measured consumption, and the wider technology zone is not the owned campus.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia", "host": "edgecore.com", "date": "2024-07-18", "published": "2024-07-18", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "edgecore-depth-2026-10-16", "scope": "Selected operator campus/phase and technical-envelope review; no whole-state refresh, exact location, legal ownership or physical-site count certification.", "fields": {"market_identity": "EdgeCore Culpeper remains distinct from DataBank Culpeper, Brandy Station and the wider Technology Zone. A shared county or zone is not a same-site identity.", "current_initial_plan": {"critical_it_mw": 196, "building_count_claim": 2, "gross_square_feet_claim": 920000, "acres_claim": 93, "capacity_availability_target": "mid-2029"}, "historical_2024_plan": {"announcement_date": "2024-07-18", "initial_it_mw": 216, "potential_it_mw": 432, "gross_square_feet_claim": 1400000, "purchased_acres_claim": 120, "initial_power_delivery_target": "early 2028"}, "plan_revision_scope": "The current page differs from the 2024 initial/expansion plan and power target. No dated redesign, disposal of land, canceled buildings or accomplished power delivery is established. Historical and current envelopes overlap and are not added.", "water_scope": "Below .01 L/kWh is a design WUE rating; no measured use, full-year consumption or independently established operating period is claimed.", "identity_review_scope": "Existing named campus matched by brand and published locality/context only. No precise address, title, physical-site census or point correction is adopted."}, "notes": ["Campus figures overlap with their components and older plans. Do not sum them or call them available, energized, approved or metered power.", "Published/review dates and forecasts are not accomplished construction or opening dates. Existing coordinates and location precision remain unverified and unchanged."], "sources": [{"url": "https://edgecore.com/locations/culpeper-data-centers", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed operator campus page"}, {"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia", "host": "edgecore.com", "published": "2024-07-18", "date": "2024-07-18", "checked": "2026-10-16", "label": "Dated operator announcement"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check 20, October 23, 2026", "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The page explicitly says EdgeCore is developing this campus in the Culpeper Technology Zone. The larger Technology Zone is not the project parcel. Initial availability beginning in mid 2029 is a future company target, not an opening event or inferred exact date.", "fields": {"company_association": {"name": "EdgeCore Digital Infrastructure", "role": "developer", "identity_scope": "provider_brand_only", "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The page explicitly says EdgeCore is developing this campus in the Culpeper Technology Zone. The larger Technology Zone is not the project parcel. Initial availability beginning in mid 2029 is a future company target, not an opening event or inferred exact date."}, "provider_role": "developer"}, "notes": ["EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The page explicitly says EdgeCore is developing this campus in the Culpeper Technology Zone. The larger Technology Zone is not the project parcel. Initial availability beginning in mid 2029 is a future company target, not an opening event or inferred exact date.", "First publication dates are not established. Current retrieval and advertised build out are not physical milestones."], "sources": [{"url": "https://edgecore.com/locations/culpeper-data-centers", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party explicitly named campus, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Culpeper · Culpeper · Source context reviewed", "status_scope": "Current operator describes an initial two-building development with capacity availability beginning mid-2029. This is an operator-listed plan, not verified zoning, air or building approval, construction, current service or delivered capacity. Exact technical revision and construction/opening dates are unknown.", "event_evidence": [{"date": "2024-07-18", "text": "EdgeCore announced its Culpeper land purchase and then-current initial 216/potential 432 MW plan. Early 2028 power delivery was a forecast; the current page advertises a different 196 MW plan and mid-2029 capacity target.", "kind": "announced", "sources": [{"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia", "host": "edgecore.com", "published": "2024-07-18", "date": "2024-07-18", "checked": "2026-10-16", "label": "Dated operator announcement"}]}], "typed_power_facts": [{"measure": "it_capacity", "value": 196, "unit": "MW", "as_of": null, "basis": "forecast", "scope": "Current initial two-building forecast with mid-2029 capacity target. Historical initial 216/potential 432 MW plans overlap and are not added.", "observed_on": "2026-10-16", "as_of_basis": "not_published", "sources": ["https://edgecore.com/locations/culpeper-data-centers"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51047"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "edgecore-shannon-hill-louisa-va", "state": "VA", "kind": "project", "name": "EdgeCore Shannon Hill Data Center Campus", "group": "proposed", "status": "Operator-listed plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Hyperscale data center campus", "counties": ["Louisa"], "city": "", "address": "", "who": "EdgeCore Digital Infrastructure", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 2025 sale announcement, last updated July 3. Purchase price, prior public utilities, grants and debt are different transactions, not development capex or a current incentive award. Claimed WUE below .01 is a design benchmark, not measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.louisacounty.gov/CivicAlerts.aspx?AID=470", "host": "louisacounty.gov", "date": "2025-06-24", "published": "2025-06-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://edgecore.com/locations/louisa-county-data-center", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed operator campus page"}], "loc": {"lat": 37.94919, "lng": -77.9603, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"county_announced_sale_date": "2025-06-24", "property_acres": 697, "property_purchase_price_usd": 42000000, "county_prior_utility_infrastructure_investment_usd": 29500000, "county_prior_park_purchase_usd": 2600000, "county_prior_park_purchase_year": 2018}, "notes": ["2025 sale announcement, last updated July 3. Purchase price, prior public utilities, grants and debt are different transactions, not development capex or a current incentive award. Claimed WUE below .01 is a design benchmark, not measured water use.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.louisacounty.gov/CivicAlerts.aspx?AID=470", "host": "louisacounty.gov", "date": "2025-06-24", "published": "2025-06-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "edgecore-depth-2026-10-16", "scope": "Selected operator campus/phase and technical-envelope review; no whole-state refresh, exact location, legal ownership or physical-site count certification.", "fields": {"market_identity": "The current operator identifies Shannon Hill Regional Business Park in Louisa County; preserve this existing research record and do not equate the entire business park with an owned or surveyed campus.", "campus_envelope": {"critical_it_capacity_literal": "1.1+ GW; FAQ says more than 1.1 GW", "building_count_claim": "minimum six planned", "gross_square_feet_claim": 3100000, "acres_claim": 697}, "capacity_boundary": "More than 1.1 GW is a full-buildout lower-bound forecast. It is retained as literal sourced evidence, not forced into an exact 1100 MW fact, approved utility allocation or metered load.", "water_scope": "Below .01 L/kWh is a forecast design WUE rating, not measured water consumption or an established operating period.", "identity_review_scope": "Existing named campus matched by brand and published locality/context only. No precise address, title, physical-site census or point correction is adopted."}, "notes": ["Campus figures overlap with their components and older plans. Do not sum them or call them available, energized, approved or metered power.", "Published/review dates and forecasts are not accomplished construction or opening dates. Existing coordinates and location precision remain unverified and unchanged."], "sources": [{"url": "https://edgecore.com/locations/louisa-county-data-center", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed operator campus page"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check 20, October 23, 2026", "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The page explicitly identifies Shannon Hill Regional Business Park in Louisa County and says EdgeCore is developing the campus. Planned build out and promised low water use remain attributed future claims; neither revenue, community benefit nor environmental performance is established.", "fields": {"company_association": {"name": "EdgeCore Digital Infrastructure", "role": "developer", "identity_scope": "provider_brand_only", "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The page explicitly identifies Shannon Hill Regional Business Park in Louisa County and says EdgeCore is developing the campus. Planned build out and promised low water use remain attributed future claims; neither revenue, community benefit nor environmental performance is established."}, "provider_role": "developer"}, "notes": ["EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The page explicitly identifies Shannon Hill Regional Business Park in Louisa County and says EdgeCore is developing the campus. Planned build out and promised low water use remain attributed future claims; neither revenue, community benefit nor environmental performance is established.", "First publication dates are not established. Current retrieval and advertised build out are not physical milestones."], "sources": [{"url": "https://edgecore.com/locations/louisa-county-data-center", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party explicitly named campus, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Louisa · Source context reviewed", "status_scope": "Current operator describes a planned full-buildout development in Shannon Hill Regional Business Park. The plan is not proof of all permissions, physical construction, current service, delivered power or occupancy. No exact construction or opening day is established.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51109"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "google-botetourt-greenfield-va", "state": "VA", "kind": "facility", "name": "Google Botetourt Center at Greenfield Data Center Campus", "group": "proposed", "status": "Announced campus development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Botetourt"], "city": "Daleville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County photos and grading information support physical site work, not commissioned operation. Land purchase and county contribution are separate transactions, not total data-center capital investment. No opening date established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.botetourtva.gov/1021/Google-Data-Center", "host": "botetourtva.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.botetourtva.gov/m/newsflash/home/detail/1084", "host": "www.botetourtva.gov", "published": "2026-03-25", "date": "2026-03-25", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "loc": {"lat": 37.55675, "lng": -79.81202, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"county_construction_photo_date": "2026-10-09", "grading_application_month": "2026-02", "land_purchase_month": "2025-06", "land_purchase_price_usd": 14055406.37, "county_project_contribution_usd": 4000000}, "notes": ["County photos and grading information support physical site work, not commissioned operation. Land purchase and county contribution are separate transactions, not total data-center capital investment. No opening date established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.botetourtva.gov/1021/Google-Data-Center", "host": "botetourtva.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "Botetourt County and its reproduced Google release describe plans to develop a data center campus at the Botetourt Center at Greenfield.", "fields": {"current_stage_evidence": {"outcome": "announced_campus_development", "scope": "Botetourt County and its reproduced Google release describe plans to develop a data center campus at the Botetourt Center at Greenfield."}}, "notes": ["The announcement establishes a named development plan, not a completed facility, a construction start or current operation. Financial and environmental forecasts are not adopted."], "sources": [{"url": "https://www.botetourtva.gov/m/newsflash/home/detail/1084", "host": "www.botetourtva.gov", "published": "2026-03-25", "date": "2026-03-25", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Daleville · Botetourt · Source context reviewed", "status_scope": "Botetourt County and its reproduced Google release describe plans to develop a data center campus at the Botetourt Center at Greenfield.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51023"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "google-loch-midlothian-va", "state": "VA", "kind": "project", "name": "Google Project Loch", "group": "proposed", "status": "Development listed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Chesterfield"], "city": "Midlothian", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County article is about Bermuda Hundred, whereas this imported identifier suggests a Loch/Midlothian project. Resolve identity before merging. Virginia investment is regional, not this single campus; separate 200 MW fusion purchase is not facility load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.chesterfield.gov/m/newsflash/Home/Detail/6383", "host": "chesterfield.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/virginia/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 37.37867, "lng": -77.58714, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"county_reported_status_event": "Google has broken ground at Bermuda Hundred site", "site_acres_lower_bound": 300, "regional_virginia_investment_usd": 9000000000, "regional_investment_target_end_year": 2026}, "notes": ["County article is about Bermuda Hundred, whereas this imported identifier suggests a Loch/Midlothian project. Resolve identity before merging. Virginia investment is regional, not this single campus; separate 200 MW fusion purchase is not facility load.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.chesterfield.gov/m/newsflash/Home/Detail/6383", "host": "chesterfield.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Chesterfield County, Virginia is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "Google explicitly describes a new campus under development in Chesterfield County. This record association preserves the inherited Project Loch context; exact project-code alias, parcel and individual approvals remain unverified.", "current_status_basis": "Google’s current location page names Chesterfield County, Virginia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/virginia/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Midlothian · Chesterfield · Source context reviewed", "status_scope": "Google’s current location page names Chesterfield County, Virginia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51041"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "westdulles-iron-horse-hanover-va", "state": "VA", "kind": "facility", "name": "Iron Horse Data Center Campus", "group": "proposed", "status": "County-listed application review", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Hanover"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Deferral is not denial or approval.2024 TownofAshland approval andHanover denial concern different jurisdictions/earlier plan; do not merge them into one current approval. Proposed 75-footheight is a requested allowance, not built condition. Other MountainRoad denial/HickoryHill approval are separate projects. Resident emissions/well-impact concerns are not measured findings. NoMW, issued utility service, current construction or laterJulyoutcome adopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/", "host": "12onyourside.com", "date": "2026-06-19", "published": "2026-06-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.hanovercounty.gov/m/newsflash/Home/Detail/1010", "host": "www.hanovercounty.gov", "published": "2025-10-20", "date": "2025-10-20", "checked": "2026-10-19", "label": "Original county or city record for the qualified stage"}], "loc": {"lat": 37.72675, "lng": -77.48846, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "WWBT reports developer-requested deferral of IronHorse’s revised 78-acre Hanover rezoning/height request, with a July 16 planning hearing expected.", "independently_verified_current_operating_status": null}, "notes": ["Deferral is not denial or approval.2024 TownofAshland approval andHanover denial concern different jurisdictions/earlier plan; do not merge them into one current approval. Proposed 75-footheight is a requested allowance, not built condition. Other MountainRoad denial/HickoryHill approval are separate projects. Resident emissions/well-impact concerns are not measured findings. NoMW, issued utility service, current construction or laterJulyoutcome adopted.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/", "host": "12onyourside.com", "date": "2026-06-19", "published": "2026-06-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "county-status-2026-10-19", "scope": "Hanover County lists the Tradeport Hanover Land Iron Horse application as under review, with a future Board hearing.", "fields": {"current_stage_evidence": {"outcome": "county_listed_application_review", "scope": "Hanover County lists the Tradeport Hanover Land Iron Horse application as under review, with a future Board hearing."}}, "notes": ["This is the REZ2025-00010/SE2025-00009 application, separate from the earlier REZ2022-00008 case and an Ashland town approval. The October 28, 2026 hearing is scheduled, not an accomplished decision. Construction or completed buildings are not established."], "sources": [{"url": "https://www.hanovercounty.gov/m/newsflash/Home/Detail/1010", "host": "www.hanovercounty.gov", "published": "2025-10-20", "date": "2025-10-20", "checked": "2026-10-19", "label": "Original county or city record for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Hanover · Source context reviewed", "status_scope": "Hanover County lists the Tradeport Hanover Land Iron Horse application as under review, with a future Board hearing.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51085"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "lavue-massaponax-tech-campus-spotsylvania-va", "state": "VA", "kind": "facility", "name": "Massaponax Tech Campus", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Spotsylvania"], "city": "Massaponax", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Massaponax official case index. Application-materials index not final vote, all permits or MW. Linked proffers/GDP/TIA not read through this landing page. County contact headquarters is not campus address. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.spotsylvania.va.us/3138/R25-0004-Massaponax-Tech-Campus", "host": "spotsylvania.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.spotsylvania.va.us/DocumentCenter/View/40289/5th-Submission-Narrative-?bidId=", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 38.16147, "lng": -77.61921, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Massaponax official case index", "fields": {"government_case": "R25-0004", "project_name": "Massaponax Tech Campus", "government_indexed_submission": "4th submission", "county": "Spotsylvania, Virginia"}, "notes": ["Application-materials index not final vote, all permits or MW. Linked proffers/GDP/TIA not read through this landing page. County contact headquarters is not campus address.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.spotsylvania.va.us/3138/R25-0004-Massaponax-Tech-Campus", "host": "spotsylvania.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 49", "scope": "The current County application materials page lists Massaponax Tech Campus as case R25 0004, and the currently linked August 26 Crossroads narrative explicitly describes it as a pending data center reclassification application. Listed proposal refers to this currently documented application only. The separate scanned application was captured but not substantively read, and no approval, construction or operation is inferred.", "fields": {"current_stage_evidence": {"outcome": "current_named_pending_reclassification_proposal", "scope": "The current County application materials page lists Massaponax Tech Campus as case R25 0004, and the currently linked August 26 Crossroads narrative explicitly describes it as a pending data center reclassification application. Listed proposal refers to this currently documented application only. The separate scanned application was captured but not substantively read, and no approval, construction or operation is inferred."}, "source_read_scope": {"scanned_application_29_pages_not_read_or_adopted": true, "neighbor_narrative_attributed_to_applicant": true}}, "notes": ["The current County application materials page lists Massaponax Tech Campus as case R25 0004, and the currently linked August 26 Crossroads narrative explicitly describes it as a pending data center reclassification application. Listed proposal refers to this currently documented application only. The separate scanned application was captured but not substantively read, and no approval, construction or operation is inferred.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.spotsylvania.va.us/3138/R25-0004-Massaponax-Tech-Campus", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.spotsylvania.va.us/DocumentCenter/View/40289/5th-Submission-Narrative-?bidId=", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Massaponax · Spotsylvania · Source context reviewed", "status_scope": "The current County application materials page lists Massaponax Tech Campus as case R25 0004, and the currently linked August 26 Crossroads narrative explicitly describes it as a pending data center reclassification application. Listed proposal refers to this currently documented application only. The separate scanned application was captured but not substantively read, and no approval, construction or operation is inferred.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51177"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "menlo-digital-jamestown-drive-petersburg-va", "state": "VA", "kind": "facility", "name": "Menlo Digital Richmond Virginia Data Center (Jamestown Drive)", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": [], "city": "Petersburg", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The substation and proposed computing figures are different bases, not 404 MW. By-right zoning is not all approvals, construction or commissioning. Later round-twenty-four reporting on abandoned Project Flash talks takes precedence over this story's earlier regional discussion. State-law, tax and statewide-moratorium assertions are not adopted without original legislation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.datacenterfrontier.com/site-selection/article/55395571/navigating-virginias-data-center-boom-policy-shifts-local-projects-and-future-challenges", "host": "datacenterfrontier.com", "date": "2026-08-05", "published": "2026-08-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://menlo-digital.com/portfolio/md-va3/", "host": "menlo-digital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 37.20395, "lng": -77.39194, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Data Center Frontier describes Menlo Digital's proposed four-building campus on 74 acres at 2255 Jamestown Drive, with 104 MW planned through a 300 MW substation.", "independently_verified_current_operating_status": null}, "notes": ["The substation and proposed computing figures are different bases, not 404 MW. By-right zoning is not all approvals, construction or commissioning. Later round-twenty-four reporting on abandoned Project Flash talks takes precedence over this story's earlier regional discussion. State-law, tax and statewide-moratorium assertions are not adopted without original legislation.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.datacenterfrontier.com/site-selection/article/55395571/navigating-virginias-data-center-boom-policy-shifts-local-projects-and-future-challenges", "host": "datacenterfrontier.com", "date": "2026-08-05", "published": "2026-08-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 49", "scope": "The current Menlo Digital portfolio identifies MD VA3 at Jamestown Drive in Petersburg under new developments and says Coming Soon, with a conceptual campus plan. This supports a current named proposal only. Secured power advertising, planned buildings and the conceptual diagram do not establish actual physical construction, delivered utility service or computing operation.", "fields": {"current_stage_evidence": {"outcome": "current_named_developer_proposal", "scope": "The current Menlo Digital portfolio identifies MD VA3 at Jamestown Drive in Petersburg under new developments and says Coming Soon, with a conceptual campus plan. This supports a current named proposal only. Secured power advertising, planned buildings and the conceptual diagram do not establish actual physical construction, delivered utility service or computing operation."}}, "notes": ["The current Menlo Digital portfolio identifies MD VA3 at Jamestown Drive in Petersburg under new developments and says Coming Soon, with a conceptual campus plan. This supports a current named proposal only. Secured power advertising, planned buildings and the conceptual diagram do not establish actual physical construction, delivered utility service or computing operation.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://menlo-digital.com/portfolio/md-va3/", "host": "menlo-digital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Petersburg · Source context reviewed", "status_scope": "The current Menlo Digital portfolio identifies MD VA3 at Jamestown Drive in Petersburg under new developments and says Coming Soon, with a conceptual campus plan. This supports a current named proposal only. Secured power advertising, planned buildings and the conceptual diagram do not establish actual physical construction, delivered utility service or computing operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51730"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "eagle-rock-pairmont-data-center-campus-spotsylvania-va", "state": "VA", "kind": "facility", "name": "Pairmont Data Center Campus", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Spotsylvania"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Pairmont official case identity and document index. Index links sound, fiscal and hydrogeology studies but their contents not read in this source. Case page is application-materials index, not final rezoning vote, numeric power or building permit. Filename dates not event dates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-06-12", "The linked Pairmont impact statement is dated June 12, 2026 and describes a proposed conditional rezoning. This dates the applicant document, not a County receipt, hearing, approval, construction or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.spotsylvania.va.us/3137/R25-0014-Pairmont-Data-Center-Campus", "host": "spotsylvania.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.spotsylvania.va.us/DocumentCenter/View/35471/3rd-Submission-Impact-Statement-", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 38.21135, "lng": -77.63534, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Pairmont official case identity and document index", "fields": {"government_case": "R25-0014", "project_name": "Pairmont Data Center Campus", "government_indexed_submission": "3rd submission", "county": "Spotsylvania, Virginia"}, "notes": ["Index links sound, fiscal and hydrogeology studies but their contents not read in this source. Case page is application-materials index, not final rezoning vote, numeric power or building permit. Filename dates not event dates.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.spotsylvania.va.us/3137/R25-0014-Pairmont-Data-Center-Campus", "host": "spotsylvania.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 49", "scope": "The current County application page links the June 12, 2026 Pairmont impact statement, which expressly requests conditional rezoning for a data center campus. Listed proposal is limited to this named application. The applicant discussion of a separate utility property in Caroline County is not an approved substation or current computing stage. No final land use action, construction or operation is inferred.", "fields": {"current_stage_evidence": {"outcome": "current_named_conditional_rezoning_proposal", "scope": "The current County application page links the June 12, 2026 Pairmont impact statement, which expressly requests conditional rezoning for a data center campus. Listed proposal is limited to this named application. The applicant discussion of a separate utility property in Caroline County is not an approved substation or current computing stage. No final land use action, construction or operation is inferred."}, "source_read_scope": {"impact_statement_selected_text_pages": [1, 2], "remaining_25_page_content_not_adopted": true}}, "notes": ["The current County application page links the June 12, 2026 Pairmont impact statement, which expressly requests conditional rezoning for a data center campus. Listed proposal is limited to this named application. The applicant discussion of a separate utility property in Caroline County is not an approved substation or current computing stage. No final land use action, construction or operation is inferred.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.spotsylvania.va.us/3137/R25-0014-Pairmont-Data-Center-Campus", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.spotsylvania.va.us/DocumentCenter/View/35471/3rd-Submission-Impact-Statement-", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Spotsylvania · Source context reviewed", "status_scope": "The current County application page links the June 12, 2026 Pairmont impact statement, which expressly requests conditional rezoning for a data center campus. Listed proposal is limited to this named application. The applicant discussion of a separate utility property in Caroline County is not an approved substation or current computing stage. No final land use action, construction or operation is inferred.", "event_evidence": [{"date": "2026-06-12", "text": "The linked Pairmont impact statement is dated June 12, 2026 and describes a proposed conditional rezoning. This dates the applicant document, not a County receipt, hearing, approval, construction or computing operation.", "kind": "announced", "sources": [{"url": "https://www.spotsylvania.va.us/DocumentCenter/View/35471/3rd-Submission-Impact-Statement-", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51177"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "powerhouse-95-spotsylvania-va", "state": "VA", "kind": "facility", "name": "PowerHouse 95", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Spotsylvania"], "city": "Spotsylvania", "address": "", "who": "PowerHouse Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. PowerHouse hosts a DCD article republication; ReadMore points to the original DCD story. Distinguish operator-hosted reporting from a new issuer announcement. Page has no explicit article date; October2025 target is historical, not upcoming from October2026. Named PowerHouse95/PH95North campus: reported completed145acre purchase and construction start, up to800MW ACROSS THREE SUBSTATIONS and up toeight three-story buildings/3.5Msf planned. First300MW substation was TARGETED October2025; actual delivery not established. No criticalIT basis, executed service agreement or current ready-for-service established. The separate SpotsyTechno/Tributary and Amazon/HuntersRidge references are other projects; do not transfer their approvals, SCC delivery terms or capacities to PowerHouse95. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia", "host": "powerhousedata.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.powerhousedata.com/data-center/powerhouse-95", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}, {"url": "https://www.powerhousedata.com/", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 38.23054, "lng": -77.66807, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-states-and-named-operator-review-round53-2026-10-15.json", "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.", "fields": {}, "notes": ["PowerHouse hosts a DCD article republication; ReadMore points to the original DCD story. Distinguish operator-hosted reporting from a new issuer announcement. Page has no explicit article date; October2025 target is historical, not upcoming from October2026.", "Named PowerHouse95/PH95North campus: reported completed145acre purchase and construction start, up to800MW ACROSS THREE SUBSTATIONS and up toeight three-story buildings/3.5Msf planned. First300MW substation was TARGETED October2025; actual delivery not established.", "No criticalIT basis, executed service agreement or current ready-for-service established. The separate SpotsyTechno/Tributary and Amazon/HuntersRidge references are other projects; do not transfer their approvals, SCC delivery terms or capacities to PowerHouse95.", "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."], "sources": [{"url": "https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia", "host": "powerhousedata.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "PowerHouse lists PowerHouse 95 as a development with a construction and delivery schedule.", "fields": {"current_stage_evidence": {"outcome": "developer_listed_development", "scope": "PowerHouse lists PowerHouse 95 as a development with a construction and delivery schedule."}}, "notes": ["The page gives different delivery and power-delivery forecasts. None establishes actual operation or a completed physical milestone."], "sources": [{"url": "https://www.powerhousedata.com/data-center/powerhouse-95", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check72, October24,2026", "scope": "The original PowerHouse 95 project and market pages identify its Spotsylvania development association. The project headline delivery quarter and power timeline differ; neither an elapsed forecast nor a design figure becomes verified current operation or measured load. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.", "fields": {"company_association": {"name": "PowerHouse Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "The original PowerHouse 95 project and market pages identify its Spotsylvania development association. The project headline delivery quarter and power timeline differ; neither an elapsed forecast nor a design figure becomes verified current operation or measured load. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."}, "provider_role": "developer"}, "notes": ["The original PowerHouse 95 project and market pages identify its Spotsylvania development association. The project headline delivery quarter and power timeline differ; neither an elapsed forecast nor a design figure becomes verified current operation or measured load. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."], "sources": [{"url": "https://www.powerhousedata.com/data-center/powerhouse-95", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.powerhousedata.com/", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Spotsylvania · Spotsylvania · Source context reviewed", "status_scope": "PowerHouse lists PowerHouse 95 as a development with a construction and delivery schedule.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51177"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "powerhouse-ctp-02-va", "state": "VA", "kind": "facility", "name": "PowerHouse CTP-02", "group": "proposed", "status": "Developer-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Chesterfield"], "city": "Chester", "address": "", "who": "PowerHouse Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article. Not all fields, current operation, precise parcel or critical IT independently certified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230", "host": "bisnow.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.powerhousedata.com/data-center/ctp-2", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}, {"url": "https://www.powerhousedata.com/", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 37.37263, "lng": -77.62127, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json", "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.", "fields": {}, "notes": ["Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article.", "Not all fields, current operation, precise parcel or critical IT independently certified."], "sources": [{"url": "https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230", "host": "bisnow.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "PowerHouse lists CTP-02 and CTP-03 as a development with a construction and delivery schedule.", "fields": {"current_stage_evidence": {"outcome": "developer_listed_development", "scope": "PowerHouse lists CTP-02 and CTP-03 as a development with a construction and delivery schedule."}}, "notes": ["Calendar ranges and delivery forecasts do not establish actual construction progress or commissioning. The combined CTP page does not establish a separate completed stage for each building."], "sources": [{"url": "https://www.powerhousedata.com/data-center/ctp-2", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check72, October24,2026", "scope": "The original project page groups CTP02 and CTP03 under a developer portfolio. This association applies only to the retained CTP02 record; no second record, merged campus or allocation of combined building count or power is created. Fully leased and forecast delivery do not certify completed tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.", "fields": {"company_association": {"name": "PowerHouse Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "The original project page groups CTP02 and CTP03 under a developer portfolio. This association applies only to the retained CTP02 record; no second record, merged campus or allocation of combined building count or power is created. Fully leased and forecast delivery do not certify completed tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."}, "provider_role": "developer"}, "notes": ["The original project page groups CTP02 and CTP03 under a developer portfolio. This association applies only to the retained CTP02 record; no second record, merged campus or allocation of combined building count or power is created. Fully leased and forecast delivery do not certify completed tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."], "sources": [{"url": "https://www.powerhousedata.com/data-center/ctp-2", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.powerhousedata.com/", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Chester · Chesterfield · Source context reviewed", "status_scope": "PowerHouse lists CTP-02 and CTP-03 as a development with a construction and delivery schedule.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51041"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "takanock-project-tallmadge-strasburg-va", "state": "VA", "kind": "facility", "name": "Project Tallmadge", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Shenandoah"], "city": "Strasburg", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Expected mid 2025 site approval/May land purchase,late 2027 construction and 2030 completion were forecasts, not observed outcomes. Takanock is not necessarily the eventual builder/operator. Early 4000 gallons/day estimate and derived 1.46 million/year are the SAME scenario, not additive; statewide 6.7 million/year benchmark is not site usage. Hydrogen-ready describes future optional backup-turbine capability, not present hydrogen fuel or zero-emission generation. Near-waterless cooling is attributed planned design subject to eventual operator. No exact MW, issued air permit or signed power agreement verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.nvdaily.com/nvdaily/strasburg-data-center-proposal-prompts-questions-on-water-use-hydrogen-oversight/article_de441640-97e6-528b-a0e8-74085176ceb3.html", "host": "nvdaily.com", "date": "2025-04-24", "published": "2025-04-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.projecttallmadge.com/", "host": "www.projecttallmadge.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://permits.virginia.gov/Permit/Details/167267", "host": "permits.virginia.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 38.85806, "lng": -78.57064, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round33-2026-10-14.json", "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.", "fields": {"reported_context": "Northern Virginia Daily describes Takanock’s proposed 87-acre Strasburg land-entitlement project, expected to be sold to an unnamed future operator for a two-million-square-foot data center.", "independently_verified_current_operating_status": null}, "notes": ["Expected mid 2025 site approval/May land purchase,late 2027 construction and 2030 completion were forecasts, not observed outcomes. Takanock is not necessarily the eventual builder/operator. Early 4000 gallons/day estimate and derived 1.46 million/year are the SAME scenario, not additive; statewide 6.7 million/year benchmark is not site usage. Hydrogen-ready describes future optional backup-turbine capability, not present hydrogen fuel or zero-emission generation. Near-waterless cooling is attributed planned design subject to eventual operator. No exact MW, issued air permit or signed power agreement verified.", "Later original decisions and observed outcomes take precedence; future events have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.nvdaily.com/nvdaily/strasburg-data-center-proposal-prompts-questions-on-water-use-hydrogen-oversight/article_de441640-97e6-528b-a0e8-74085176ceb3.html", "host": "nvdaily.com", "date": "2025-04-24", "published": "2025-04-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 49", "scope": "The current original Project Tallmadge page expressly describes a proposed campus with expected construction in 2027 through 2030. The current agency record identifies the same named campus with a plan review modification application in progress. Listed proposal is limited to that proposal. Agency target completion dates and applicant response targets are administrative forecasts, not public hearings, final permits, construction or computing operation.", "fields": {"current_stage_evidence": {"outcome": "current_named_developer_proposal", "scope": "The current original Project Tallmadge page expressly describes a proposed campus with expected construction in 2027 through 2030. The current agency record identifies the same named campus with a plan review modification application in progress. Listed proposal is limited to that proposal. Agency target completion dates and applicant response targets are administrative forecasts, not public hearings, final permits, construction or computing operation."}}, "notes": ["The current original Project Tallmadge page expressly describes a proposed campus with expected construction in 2027 through 2030. The current agency record identifies the same named campus with a plan review modification application in progress. Listed proposal is limited to that proposal. Agency target completion dates and applicant response targets are administrative forecasts, not public hearings, final permits, construction or computing operation.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.projecttallmadge.com/", "host": "www.projecttallmadge.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://permits.virginia.gov/Permit/Details/167267", "host": "permits.virginia.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Strasburg · Shenandoah · Source context reviewed", "status_scope": "The current original Project Tallmadge page expressly describes a proposed campus with expected construction in 2027 through 2030. The current agency record identifies the same named campus with a plan review modification application in progress. Listed proposal is limited to that proposal. Agency target completion dates and applicant response targets are administrative forecasts, not public hearings, final permits, construction or computing operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51171"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "sabey-intergate-ashburn-building-a-va", "state": "VA", "kind": "facility", "name": "Sabey Intergate.Ashburn (Building A)", "group": "proposed", "status": "Operator-listed delivery plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Loudoun"], "city": "Ashburn", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. campus page with BuildingA future phase. Page also advertises85MWcampus capacity and70+MWaggregate delivered. These labels do not reconcile simply with36+54; preserve different scopes and do not sum or certify85MWIT. BuildingA2026target is not proof online. Virginia tax exemption marketing is not an individual award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://sabeydatacenters.com/locations/ashburn-data-center", "host": "sabeydatacenters.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 39.16626, "lng": -77.6121, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "campus page with BuildingA future phase", "fields": {"campus_acres": 38, "campus_buildings": 3, "completed_buildings_at_page": 2, "completed_buildings_power_mw_min_exclusive": 36, "building_a_leasable_power_mw": 54, "building_a_online_earliest_target": "2026", "campus_mission_critical_area_sqft": 645000, "published_address": "21741 Red Rum Dr, Ashburn, VA20147"}, "notes": ["Page also advertises85MWcampus capacity and70+MWaggregate delivered. These labels do not reconcile simply with36+54; preserve different scopes and do not sum or certify85MWIT. BuildingA2026target is not proof online. Virginia tax exemption marketing is not an individual award.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://sabeydatacenters.com/locations/ashburn-data-center", "host": "sabeydatacenters.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "Sabey identifies Ashburn Building A as an additional delivery planned starting as soon as 2026, distinct from two completed buildings on the campus. The target does not verify Building A commissioning or its precise physical construction stage. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_delivery_plan", "scope": "Sabey identifies Ashburn Building A as an additional delivery planned starting as soon as 2026, distinct from two completed buildings on the campus. The target does not verify Building A commissioning or its precise physical construction stage. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["Sabey identifies Ashburn Building A as an additional delivery planned starting as soon as 2026, distinct from two completed buildings on the campus. The target does not verify Building A commissioning or its precise physical construction stage."], "sources": [{"url": "https://sabeydatacenters.com/locations/ashburn-data-center", "host": "sabeydatacenters.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Ashburn · Loudoun · Source context reviewed", "status_scope": "Sabey identifies Ashburn Building A as an additional delivery planned starting as soon as 2026, distinct from two completed buildings on the campus. The target does not verify Building A commissioning or its precise physical construction stage. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51107"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "solis-arx-progress-park-wythe-va", "state": "VA", "kind": "facility", "name": "Solis Arx Progress Park Data Center Campus", "group": "proposed", "status": "County listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Wythe"], "city": "Max Meadows", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wythe county SolisArx identity and Fluidstack update. Presentation about acquisition is not independently inspected executed closing document. Data-center-ready marketing of park for decade does not establish completed facility or critical IT service. No quantitative tax award, IT MW, actual capex or exact operations date adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-12-05", "Wythe County current project page identifies December 5, 2025 as the Solis Arx Progress Park project announcement day. The account is a development announcement, not a construction start, final building permit or data center opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wytheco.org/418/Solis-Arx", "host": "wytheco.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.wytheco.org/418/Solis-ArxFluidstack", "host": "www.wytheco.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.wytheco.org/m/faq", "host": "www.wytheco.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.wytheco.org/AgendaCenter/ViewFile/Minutes/_06092026-147", "host": "www.wytheco.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 36.91686, "lng": -81.07906, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Wythe county SolisArx identity and Fluidstack update", "fields": {"agency": "Wythe County, Virginia", "project": "Solis Arx / Fluidstack", "location": "Progress Park", "planned_tract_acres": 99, "announcement_date": "2025-12-05", "county_reported_fluidstack_acquisition_presentation_date": "2026-06-09", "development": "multiple phases"}, "notes": ["Presentation about acquisition is not independently inspected executed closing document. Data-center-ready marketing of park for decade does not establish completed facility or critical IT service. No quantitative tax award, IT MW, actual capex or exact operations date adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wytheco.org/418/Solis-Arx", "host": "wytheco.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 20", "scope": "Wythe County current Solis Arx and Fluidstack page describes a Progress Park development announced December 5, 2025 and a June 9, 2026 presentation about future plans. County listed development describes that project context. The County FAQ says it does not yet have construction plans for review. Progress Park covenants and the separate proposed County zoning process are not universal countywide data center standards. The documents do not establish current physical construction or operation, and their acquisition account does not change the inherited name or provider role.", "fields": {"current_stage_evidence": {"outcome": "county_listed_park_development_not_construction_or_countywide_permission", "scope": "Wythe County current Solis Arx and Fluidstack page describes a Progress Park development announced December 5, 2025 and a June 9, 2026 presentation about future plans. County listed development describes that project context. The County FAQ says it does not yet have construction plans for review. Progress Park covenants and the separate proposed County zoning process are not universal countywide data center standards. The documents do not establish current physical construction or operation, and their acquisition account does not change the inherited name or provider role."}, "regulatory_scope": {"park_covenants_not_countywide_zoning": true, "faq_no_construction_plans_statement_not_site_inspection": true, "separate_county_zoning_proposal_not_enacted_from_this_review": true, "june09_minutes_project_section_visually_read": 31, "provider_role_and_project_identity_unchanged": true}}, "notes": ["Wythe County current Solis Arx and Fluidstack page describes a Progress Park development announced December 5, 2025 and a June 9, 2026 presentation about future plans. County listed development describes that project context. The County FAQ says it does not yet have construction plans for review. Progress Park covenants and the separate proposed County zoning process are not universal countywide data center standards. The documents do not establish current physical construction or operation, and their acquisition account does not change the inherited name or provider role.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.wytheco.org/418/Solis-ArxFluidstack", "host": "www.wytheco.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.wytheco.org/m/faq", "host": "www.wytheco.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.wytheco.org/AgendaCenter/ViewFile/Minutes/_06092026-147", "host": "www.wytheco.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Max Meadows · Wythe · Source context reviewed", "status_scope": "Wythe County current Solis Arx and Fluidstack page describes a Progress Park development announced December 5, 2025 and a June 9, 2026 presentation about future plans. County listed development describes that project context. The County FAQ says it does not yet have construction plans for review. Progress Park covenants and the separate proposed County zoning process are not universal countywide data center standards. The documents do not establish current physical construction or operation, and their acquisition account does not change the inherited name or provider role.", "event_evidence": [{"date": "2025-12-05", "text": "Wythe County current project page identifies December 5, 2025 as the Solis Arx Progress Park project announcement day. The account is a development announcement, not a construction start, final building permit or data center opening.", "kind": "announced", "sources": [{"url": "https://www.wytheco.org/418/Solis-ArxFluidstack", "host": "www.wytheco.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51197"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "stack-nva01a-va", "state": "VA", "kind": "facility", "name": "STACK NVA01A", "group": "proposed", "status": "Operator-listed delivery plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Loudoun"], "city": "Sterling", "address": "", "who": "STACK Infrastructure", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus and its one building describe the same 17 MW, not 34 MW. Available dedicated capacity is not contracted or measured consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva01/", "host": "stackinfra.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 39.0722, "lng": -77.55171, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"campus_critical_capacity_mw": 17, "buildings": 1, "campus_acres": 16, "nva01a_building_sqft": 180000}, "notes": ["Campus and its one building describe the same 17 MW, not 34 MW. Available dedicated capacity is not contracted or measured consumption.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva01/", "host": "stackinfra.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "STACK lists NVA01A early access in the third quarter and full commissioning targeted for the fourth quarter of 2026. These are delivery targets, not verified outcomes; actual commissioning and the precise physical construction phase remain unverified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_delivery_plan", "scope": "STACK lists NVA01A early access in the third quarter and full commissioning targeted for the fourth quarter of 2026. These are delivery targets, not verified outcomes; actual commissioning and the precise physical construction phase remain unverified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["STACK lists NVA01A early access in the third quarter and full commissioning targeted for the fourth quarter of 2026. These are delivery targets, not verified outcomes; actual commissioning and the precise physical construction phase remain unverified."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva01/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 17, October 23, 2026", "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current NVA01 text explicitly identifies NVA01A in Sterling and forecasts early access in the third quarter of 2026 and full commissioning in the fourth. An elapsed or current quarter target is not an event verified to have happened or current operating service.", "fields": {"company_association": {"name": "STACK Infrastructure", "role": "developer", "identity_scope": "provider_brand_only", "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current NVA01 text explicitly identifies NVA01A in Sterling and forecasts early access in the third quarter of 2026 and full commissioning in the fourth. An elapsed or current quarter target is not an event verified to have happened or current operating service."}, "provider_role": "developer"}, "notes": ["STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current NVA01 text explicitly identifies NVA01A in Sterling and forecasts early access in the third quarter of 2026 and full commissioning in the fourth. An elapsed or current quarter target is not an event verified to have happened or current operating service.", "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva01/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party exact code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Sterling · Loudoun · Source context reviewed", "status_scope": "STACK lists NVA01A early access in the third quarter and full commissioning targeted for the fourth quarter of 2026. These are delivery targets, not verified outcomes; actual commissioning and the precise physical construction phase remain unverified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51107"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "stack-stafford-technology-campus-va", "state": "VA", "kind": "facility", "name": "Stafford Technology Campus", "group": "proposed", "status": "Operator listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Stafford"], "city": "Falmouth", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-01-16", "STACK published its Stafford Technology Campus development announcement on January 16, 2025. Planned data centers, substations and projected benefits remain proposal context in that source. The release day is not a physical construction start or opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.staffordcountyva.gov", "host": "staffordcountyva.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.stackinfra.com/locations/americas/northern-virginia/stc/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/", "host": "www.stackinfra.com", "published": "2025-01-16", "date": "2025-01-16", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 38.42075, "lng": -77.45779, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {}, "notes": ["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.staffordcountyva.gov", "host": "staffordcountyva.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "unresolved", "scope": "STACK currently markets the Stafford Technology Campus across four subcampuses. Its 1.1 GW headline, six 300 MW substations and conflicting 500/526-acre descriptions do not establish present construction, operation or delivered IT capacity. The reviewed page supplies no explicit stage milestone or technical as-of date. Current stage remains unresolved."}}, "notes": ["STACK currently markets the Stafford Technology Campus across four subcampuses. Its 1.1 GW headline, six 300 MW substations and conflicting 500/526-acre descriptions do not establish present construction, operation or delivered IT capacity. The reviewed page supplies no explicit stage milestone or technical as-of date. Current stage remains unresolved."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/northern-virginia/stc/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 20", "scope": "The current STACK STC page markets the Stafford Technology Campus and the January 16, 2025 release describes a planned multi campus development. Operator listed development describes that current project listing. Advertised power, planned substations, a tour invitation and regional operations do not establish delivered capacity, current individual construction stages or operation of this campus. Future tax, jobs and water infrastructure commitments are not actual project outcomes.", "fields": {"current_stage_evidence": {"outcome": "current_named_campus_listing_not_delivered_substations_or_operation", "scope": "The current STACK STC page markets the Stafford Technology Campus and the January 16, 2025 release describes a planned multi campus development. Operator listed development describes that current project listing. Advertised power, planned substations, a tour invitation and regional operations do not establish delivered capacity, current individual construction stages or operation of this campus. Future tax, jobs and water infrastructure commitments are not actual project outcomes."}}, "notes": ["The current STACK STC page markets the Stafford Technology Campus and the January 16, 2025 release describes a planned multi campus development. Operator listed development describes that current project listing. Advertised power, planned substations, a tour invitation and regional operations do not establish delivered capacity, current individual construction stages or operation of this campus. Future tax, jobs and water infrastructure commitments are not actual project outcomes.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.stackinfra.com/locations/americas/northern-virginia/stc/", "host": "www.stackinfra.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/", "host": "www.stackinfra.com", "published": "2025-01-16", "date": "2025-01-16", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Falmouth · Stafford · Source context reviewed", "status_scope": "The current STACK STC page markets the Stafford Technology Campus and the January 16, 2025 release describes a planned multi campus development. Operator listed development describes that current project listing. Advertised power, planned substations, a tour invitation and regional operations do not establish delivered capacity, current individual construction stages or operation of this campus. Future tax, jobs and water infrastructure commitments are not actual project outcomes.", "event_evidence": [{"date": "2025-01-16", "text": "STACK published its Stafford Technology Campus development announcement on January 16, 2025. Planned data centers, substations and projected benefits remain proposal context in that source. The release day is not a physical construction start or opening.", "kind": "announced", "sources": [{"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/", "host": "www.stackinfra.com", "published": "2025-01-16", "date": "2025-01-16", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51179"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "thornberry-data-center-campus-caroline-va", "state": "VA", "kind": "facility", "name": "Thornberry Data Center Campus", "group": "proposed", "status": "County-listed application", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Caroline"], "city": "Ruther Glen", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Caroline three distinct application identities and review stages. Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings", "host": "co.caroline.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 38.01844, "lng": -77.39453, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Caroline three distinct application identities and review stages", "fields": {"county": "Caroline, Virginia", "project_applications": [{"project": "Thornberry Data Center Campus", "case": "RZ-03-2025", "parcel": "84-A-1", "parent_parcel_acres": 1001.5, "requested_rezoning_acres": 657, "address": "23202 Carneal Lane", "source_stage": "complete submission forwarded for review; hearing date undetermined"}, {"project": "ADP Ladysmith Data Hub", "cases": ["RZ-02-2025", "SPEX-06-2025"], "parcel": "53-A-65", "requested_rezoning_acres": 140.38, "address": "18577 Green Road", "source_stage": "complete submission forwarded for review; hearing date undetermined"}, {"project": "Bull Church Data Center", "case": "RZ-04-2024", "parcel": "53-A-66", "owner": "Mid Atlantic State Fund LLC", "applicant": "NRD Retail LLC", "location": "Bull Church Road east of I-95, adjacent to Virginia Bazaar south boundary", "source_stage": "technical review; hearing date undetermined"}]}, "notes": ["Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings", "host": "co.caroline.va.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "Caroline County lists the Thornberry data center application under RZ-03-2025 as under review.", "fields": {"current_stage_evidence": {"outcome": "county_listed_application", "scope": "Caroline County lists the Thornberry data center application under RZ-03-2025 as under review."}}, "notes": ["The listing does not establish final approval, a construction start or an operating facility. No physical-stage date is established."], "sources": [{"url": "https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings", "host": "co.caroline.va.us", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Ruther Glen · Caroline · Source context reviewed", "status_scope": "Caroline County lists the Thornberry data center application under RZ-03-2025 as under review.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51033"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "thornburg-business-park-data-center-spotsylvania-va", "state": "VA", "kind": "facility", "name": "Thornburg Business Park", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Spotsylvania"], "city": "Thornburg", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Thornburg Business Park applicant forecast and internal job conflict. Applicantforecastsnotactualcapex/jobs/taxreceiptsorapprovedincentive.8.6Btotalincludes4.8Band3.8Bcomponents. Samepage11has216jobsinbodyand75insummary;holdcanonical. Fiscalmodelassumes20percentequipmentreplacementannually,notcontractualrevenueguarantee. Parcel63-A-27excludedretainedcommercialarea;do not add to campus. Firstsubmission/unassignedcasenumbernotfinalrezoning. SelectedPDFpages1/11/16visuallychecked;p16blankinretainedPDF,notsupportingfiscalexhibit. NoITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.spotsylvania.va.us/DocumentCenter/View/35424/Impact-Statement---Thornburg-Business-Park-First-Submission-236905321", "host": "spotsylvania.va.us", "date": "2025-09-11", "published": "2025-09-11", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.spotsylvania.va.us/3136/R25-0013-Thornburg-Business-Park", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 38.20352, "lng": -77.60429, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Thornburg Business Park applicant forecast and internal job conflict", "fields": {"project_name": "Thornburg Business Park", "document_date": "2025-09-11", "document_stage": "applicant first-submission rezoning impact statement, case number unassigned", "county": "Spotsylvania, Virginia", "site_acres_approx": 200.35, "planned_data_center_building_area_sqft_approx": 2000000, "tax_map_parcels": ["63-12-E", "63-12-D", "63-12-C", "63-A-33", "63-A-32", "63-A-37", "76-A-5", "76-A-5A", "76-A-6"], "applicant_estimated_completion_cost_usd": 8600000000, "estimated_computer_equipment_usd": 4800000000, "estimated_buildings_fixed_equipment_usd": 3800000000, "expected_operational_jobs_conflict": [216, 75], "canonical_expected_jobs": null, "fiscal_forecast_first_operation_year": 2028, "forecast_first_year_county_tax_usd": 5400000, "forecast_2037_county_tax_usd": 51700000, "forecast_2042_stable_annual_county_tax_usd": 50400000}, "notes": ["Applicantforecastsnotactualcapex/jobs/taxreceiptsorapprovedincentive.8.6Btotalincludes4.8Band3.8Bcomponents. Samepage11has216jobsinbodyand75insummary;holdcanonical. Fiscalmodelassumes20percentequipmentreplacementannually,notcontractualrevenueguarantee. Parcel63-A-27excludedretainedcommercialarea;do not add to campus. Firstsubmission/unassignedcasenumbernotfinalrezoning. SelectedPDFpages1/11/16visuallychecked;p16blankinretainedPDF,notsupportingfiscalexhibit. NoITMW.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.spotsylvania.va.us/DocumentCenter/View/35424/Impact-Statement---Thornburg-Business-Park-First-Submission-236905321", "host": "spotsylvania.va.us", "date": "2025-09-11", "published": "2025-09-11", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 50", "scope": "The current County case page lists Thornburg Business Park application materials and the linked applicant narrative expressly proposes data center uses. Listed proposal refers to the named application and intended use only. The older September 11, 2025 narrative has an unassigned case number, while the current page identifies R25 0013. Neither the proposed program nor the page navigation establishes final rezoning, construction or computing operation.", "fields": {"current_stage_evidence": {"outcome": "current_named_rezoning_proposal", "scope": "The current County case page lists Thornburg Business Park application materials and the linked applicant narrative expressly proposes data center uses. Listed proposal refers to the named application and intended use only. The older September 11, 2025 narrative has an unassigned case number, while the current page identifies R25 0013. Neither the proposed program nor the page navigation establishes final rezoning, construction or computing operation."}, "source_read_scope": {"current_case_materials_section_read": true, "narrative_selected_text_pages": [1], "remaining_17_page_narrative_not_substantively_reviewed": true}}, "notes": ["The current County case page lists Thornburg Business Park application materials and the linked applicant narrative expressly proposes data center uses. Listed proposal refers to the named application and intended use only. The older September 11, 2025 narrative has an unassigned case number, while the current page identifies R25 0013. Neither the proposed program nor the page navigation establishes final rezoning, construction or computing operation.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.spotsylvania.va.us/3136/R25-0013-Thornburg-Business-Park", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.spotsylvania.va.us/DocumentCenter/View/35424/Impact-Statement---Thornburg-Business-Park-First-Submission-236905321", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Thornburg · Spotsylvania · Source context reviewed", "status_scope": "The current County case page lists Thornburg Business Park application materials and the linked applicant narrative expressly proposes data center uses. Listed proposal refers to the named application and intended use only. The older September 11, 2025 narrative has an unassigned case number, while the current page identifies R25 0013. Neither the proposed program nor the page navigation establishes final rezoning, construction or computing operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51177"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "thornburg-industrial-park-data-center-spotsylvania-va", "state": "VA", "kind": "facility", "name": "Thornburg Industrial Park Data Center Campus", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Spotsylvania"], "city": "Thornburg", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Thornburg Industrial Park2 unsigned draft proffers. Unsigneddraftproffersarenotenactedcountyconditionsoractualnoisecompliance. Exceptionscontinuepage8;do notdescribe60dBAuniversalallconditions. One-million-sqfttransporttriggernotactualapprovedbuildingarea.200acThornburgBusinessParkand49.6826acIndustrialPark2distinctprojects,donotmergebyThornburgname. NoMW,executedapproval,paidfeesorrevenueinthisdocument. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.spotsylvania.va.us/DocumentCenter/View/35205/1st-Submission-Proffers-71525", "host": "spotsylvania.va.us", "date": "2025-06-27", "published": "2025-06-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.spotsylvania.va.us/3127/R25-0011-Thornburg-Industrial-Park-2", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 38.20689, "lng": -77.70946, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Thornburg Industrial Park2 unsigned draft proffers", "fields": {"project_name": "Thornburg Industrial Park2", "document_date": "2025-06-27", "document_stage": "unsigned voluntary proffer statement, case number to be assigned", "applicants": ["South Roxbury Mill LLC", "Grindstone VA LLC"], "county": "Spotsylvania, Virginia", "site_acres_approx": 49.6826, "parcel": "63-5-C1", "rezoning_request": "A-2 to I-1 for data center and light public utility uses", "proposed_residential_boundary_sound_limit_dba": 60, "proposed_commercial_boundary_sound_limit_dba": 65, "proposed_measurement_height_m": 1.5, "sound_condition_timing": "analysis before final certificate of occupancy per building", "owner_signature_fields": "blank on pages10and11", "approved_date": null}, "notes": ["Unsigneddraftproffersarenotenactedcountyconditionsoractualnoisecompliance. Exceptionscontinuepage8;do notdescribe60dBAuniversalallconditions. One-million-sqfttransporttriggernotactualapprovedbuildingarea.200acThornburgBusinessParkand49.6826acIndustrialPark2distinctprojects,donotmergebyThornburgname. NoMW,executedapproval,paidfeesorrevenueinthisdocument.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.spotsylvania.va.us/DocumentCenter/View/35205/1st-Submission-Proffers-71525", "host": "spotsylvania.va.us", "date": "2025-06-27", "published": "2025-06-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 50", "scope": "The current County case page identifies Thornburg Industrial Park 2 as R25 0011 and links the proffer statement, which expressly describes an industrial data center campus. The selected initial proffer page makes its conditions dependent on final unappealable rezoning. Listed proposal is limited to this current named application. The July 15 file label does not replace the June 27, 2025 date printed on the document. No final approval, construction or operation is inferred.", "fields": {"current_stage_evidence": {"outcome": "current_named_conditional_rezoning_proposal", "scope": "The current County case page identifies Thornburg Industrial Park 2 as R25 0011 and links the proffer statement, which expressly describes an industrial data center campus. The selected initial proffer page makes its conditions dependent on final unappealable rezoning. Listed proposal is limited to this current named application. The July 15 file label does not replace the June 27, 2025 date printed on the document. No final approval, construction or operation is inferred."}, "source_read_scope": {"current_case_materials_section_read": true, "proffer_selected_text_pages": [1], "remaining_12_page_proffer_not_substantively_reviewed": true}}, "notes": ["The current County case page identifies Thornburg Industrial Park 2 as R25 0011 and links the proffer statement, which expressly describes an industrial data center campus. The selected initial proffer page makes its conditions dependent on final unappealable rezoning. Listed proposal is limited to this current named application. The July 15 file label does not replace the June 27, 2025 date printed on the document. No final approval, construction or operation is inferred.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.spotsylvania.va.us/3127/R25-0011-Thornburg-Industrial-Park-2", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.spotsylvania.va.us/DocumentCenter/View/35205/1st-Submission-Proffers-71525", "host": "www.spotsylvania.va.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Thornburg · Spotsylvania · Source context reviewed", "status_scope": "The current County case page identifies Thornburg Industrial Park 2 as R25 0011 and links the proffer statement, which expressly describes an industrial data center campus. The selected initial proffer page makes its conditions dependent on final unappealable rezoning. Listed proposal is limited to this current named application. The July 15 file label does not replace the June 27, 2025 date printed on the document. No final approval, construction or operation is inferred.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51177"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "tract-tuckahoe-technology-park-goochland-county-va", "state": "VA", "kind": "facility", "name": "Tuckahoe Technology Park", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Goochland"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Goochland formal application versus preapplication and unresolved completeness. Development areas are not seven buildings or operating centers. County page contains preapplication and formal sections; formal submission does not equal complete application or approved CUP. Draft conditions/noise studies not enacted limits or measured compliance. October calendar has no published events, not proof future hearing cannot be added. No critical IT MW, final outcome or commissioning adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-08-05", "The current County account records receipt of the formal Tuckahoe Technology Park conditional use application on August 5, 2026. This dates the reported submission, not acceptance as complete, approval, construction or computing operation."], ["2026-08-20", "The County completeness letter dated August 20, 2026 requests additional information for the named Tuckahoe application. This dates the agency letter, not an application denial, a measured noise impact or physical construction."], ["2026-08-25", "The County published correspondence dated August 25, 2026 corrects a stated noise reference in its August 20 Tuckahoe completeness letter. This dates that clarification, not a measured impact, enacted project condition or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park", "host": "goochlandva.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.goochlandva.us/1490/2026-Ordinance-Update", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.goochlandva.us/DocumentCenter/View/13953/Completeness-Review-Letter---82026", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.goochlandva.us/DocumentCenter/View/13962/82026-Completeness-Letter-Clarification---Proposed--Revised-Noise-Limits", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 37.72228, "lng": -77.91567, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Goochland formal application versus preapplication and unresolved completeness", "fields": {"agency": "Goochland County, Virginia", "project": "Tuckahoe Technology Park", "applicant": "VALCO2 Goochland LLC (Tract)", "case": "CU-2026-00014", "formal_cup_application_received": "2026-08-05", "staff_completeness_letter_date": "2026-08-20", "revision_posted_date": "2026-09-01", "proposed_site_acres": 871, "proposed_development_areas": 7, "location": "Technology Overlay District TODWest eastern designated growth area"}, "notes": ["Development areas are not seven buildings or operating centers. County page contains preapplication and formal sections; formal submission does not equal complete application or approved CUP. Draft conditions/noise studies not enacted limits or measured compliance. October calendar has no published events, not proof future hearing cannot be added. No critical IT MW, final outcome or commissioning adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park", "host": "goochlandva.us", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 50", "scope": "The current County project page identifies Tuckahoe Technology Park application materials and separate general ordinance changes. Its update says the County received a formal conditional use application on August 5, 2026, while the August 20 letter requests outstanding information and the August 25 clarification corrects a stated noise value. Listed proposal is limited to this named review process. General zoning amendments, revised submissions and a completeness letter do not establish a project approval, physical construction or computing operation.", "fields": {"current_stage_evidence": {"outcome": "current_named_conditional_use_proposal", "scope": "The current County project page identifies Tuckahoe Technology Park application materials and separate general ordinance changes. Its update says the County received a formal conditional use application on August 5, 2026, while the August 20 letter requests outstanding information and the August 25 clarification corrects a stated noise value. Listed proposal is limited to this named review process. General zoning amendments, revised submissions and a completeness letter do not establish a project approval, physical construction or computing operation."}, "source_read_scope": {"letter_selected_sections_pages": [1, 2, 3, 9], "clarification_text_pages": [1], "remaining_letter_sections_and_later_revised_studies_not_substantively_reviewed": true}}, "notes": ["The current County project page identifies Tuckahoe Technology Park application materials and separate general ordinance changes. Its update says the County received a formal conditional use application on August 5, 2026, while the August 20 letter requests outstanding information and the August 25 clarification corrects a stated noise value. Listed proposal is limited to this named review process. General zoning amendments, revised submissions and a completeness letter do not establish a project approval, physical construction or computing operation.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.goochlandva.us/1490/2026-Ordinance-Update", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.goochlandva.us/DocumentCenter/View/13953/Completeness-Review-Letter---82026", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.goochlandva.us/DocumentCenter/View/13962/82026-Completeness-Letter-Clarification---Proposed--Revised-Noise-Limits", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Goochland · Source context reviewed", "status_scope": "The current County project page identifies Tuckahoe Technology Park application materials and separate general ordinance changes. Its update says the County received a formal conditional use application on August 5, 2026, while the August 20 letter requests outstanding information and the August 25 clarification corrects a stated noise value. Listed proposal is limited to this named review process. General zoning amendments, revised submissions and a completeness letter do not establish a project approval, physical construction or computing operation.", "event_evidence": [{"date": "2026-08-05", "text": "The current County account records receipt of the formal Tuckahoe Technology Park conditional use application on August 5, 2026. This dates the reported submission, not acceptance as complete, approval, construction or computing operation.", "kind": "announced", "sources": [{"url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2026-08-20", "text": "The County completeness letter dated August 20, 2026 requests additional information for the named Tuckahoe application. This dates the agency letter, not an application denial, a measured noise impact or physical construction.", "kind": "announced", "sources": [{"url": "https://www.goochlandva.us/DocumentCenter/View/13953/Completeness-Review-Letter---82026", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}, {"date": "2026-08-25", "text": "The County published correspondence dated August 25, 2026 corrects a stated noise reference in its August 20 Tuckahoe completeness letter. This dates that clarification, not a measured impact, enacted project condition or computing operation.", "kind": "announced", "sources": [{"url": "https://www.goochlandva.us/DocumentCenter/View/13962/82026-Completeness-Letter-Clarification---Proposed--Revised-Noise-Limits", "host": "www.goochlandva.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51075"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "vantage-stafford-va4-va", "state": "VA", "kind": "facility", "name": "Vantage Data Centers VA4 Stafford Campus", "group": "proposed", "status": "Operator listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Stafford"], "city": "", "address": "", "who": "Vantage Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Fredericksburgregion is not municipalityassignment.782MW/8Bstatewide totals excluded. Target is future, not operating. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-11-06", "Vantage published its VA4 campus announcement on November 6, 2025 and reported a groundbreaking celebration held that day. This records the company release and ceremony account, not an independently verified physical construction start, completed phase or data center opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/", "host": "vantage-dc.com", "date": "2025-11-06", "published": "2025-11-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/?trk=article-ssr-frontend-pulse_little-text-block", "host": "vantage-dc.com", "published": "2025-11-06", "date": "2025-11-06", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://vantage-dc.com/data-center-locations/north-america/fredericksburg-va", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://vantage-dc.com/data-center-locations/", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact current VA4 campus service street"}, {"url": "https://services1.arcgis.com/qKiA6JuCrE2l72iL/arcgis/rest/services/Parcels/FeatureServer/0/query?where=STNO+%3D+%27225%27+AND+UPPER%28STNAME%29+LIKE+%27%25CENTREPORT%25%27&outFields=%2A&returnGeometry=true&outSR=4326&f=json", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-23", "label": "One exact complete service street county reference parcel"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.47239037696575%2C38.38428844412504%2C-77.46092962303426%2C38.39327155587495&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}, {"url": "https://services1.arcgis.com/qKiA6JuCrE2l72iL/arcgis/rest/services/Parcels/FeatureServer/0?f=pjson", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact public parcel layer fields and reference mapping"}, {"url": "https://staffordva-gis.maps.arcgis.com/sharing/rest/portals/self?f=pjson", "host": "staffordva-gis.maps.arcgis.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact public county portal identity and general reference disclaimer"}, {"url": "https://staffordcountyva.gov/government/gis_(maps)/index.php", "host": "staffordcountyva.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official county GIS page links the same Stafford GIS public portal"}], "loc": {"lng": -77.46666, "lat": 38.38878, "precision": "approximate", "basis": "Approximate mathematical center of the exact Stafford County parcel at the current named Vantage VA4 service street 225 Centreport Parkway, Fredericksburg, VA 22406. Parcel OBJECTID 47128, raw PRCLID 37        30 and normalized agency PARCEL_ID_NSP 3730 remain explicit. County reference mapping only, not a surveyed boundary, roof, future hall or completed full campus. Postal city does not override Stafford County. Aerial date is unknown and may predate development. Existing native status remains proposed."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"groundbreaking_date": "2025-11-06", "county": "Stafford", "planned_investment_usd": 2000000000, "planned_it_capacity_mw": 192, "campus_acres": 82, "planned_buildings": 3, "planned_area_sqft_approx": 929000, "first_building_opening_target": "late2027", "forecast_construction_jobs": 1100, "forecast_permanent_operations_jobs_min": 50}, "notes": ["Fredericksburgregion is not municipalityassignment.782MW/8Bstatewide totals excluded. Target is future, not operating.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/", "host": "vantage-dc.com", "date": "2025-11-06", "published": "2025-11-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 20", "scope": "The current Vantage VA4 page describes the Fredericksburg region campus in future terms, with a first building target in late 2027. Operator listed development describes that current listing. The November 6, 2025 release reports a groundbreaking celebration that day; a ceremony does not independently certify current excavation, individual building completion or operational service. Future phase targets, planned utility infrastructure and design specifications are not actual delivered quantities or opening dates.", "fields": {"current_stage_evidence": {"outcome": "current_development_listing_and_historical_ceremony_not_operation", "scope": "The current Vantage VA4 page describes the Fredericksburg region campus in future terms, with a first building target in late 2027. Operator listed development describes that current listing. The November 6, 2025 release reports a groundbreaking celebration that day; a ceremony does not independently certify current excavation, individual building completion or operational service. Future phase targets, planned utility infrastructure and design specifications are not actual delivered quantities or opening dates."}, "source_scope": {"current_first_building_target": "late 2027", "target_occurrence_not_verified": true, "groundbreaking_celebration_not_excavation_verification": true}}, "notes": ["The current Vantage VA4 page describes the Fredericksburg region campus in future terms, with a first building target in late 2027. Operator listed development describes that current listing. The November 6, 2025 release reports a groundbreaking celebration that day; a ceremony does not independently certify current excavation, individual building completion or operational service. Future phase targets, planned utility infrastructure and design specifications are not actual delivered quantities or opening dates.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/?trk=article-ssr-frontend-pulse_little-text-block", "host": "vantage-dc.com", "published": "2025-11-06", "date": "2025-11-06", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://vantage-dc.com/data-center-locations/north-america/fredericksburg-va", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check 15, October 23, 2026", "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The November 6, 2025 VA4 source names Stafford County within the marketed Fredericksburg region. Late 2027 is a future target, and neither the regional label nor a reported ceremony changes jurisdiction, stage or milestones here.", "fields": {"company_association": {"name": "Vantage Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The November 6, 2025 VA4 source names Stafford County within the marketed Fredericksburg region. Late 2027 is a future target, and neither the regional label nor a reported ceremony changes jurisdiction, stage or milestones here."}, "provider_role": "developer"}, "notes": ["Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The November 6, 2025 VA4 source names Stafford County within the marketed Fredericksburg region. Late 2027 is a future target, and neither the regional label nor a reported ceremony changes jurisdiction, stage or milestones here.", "Publication dates and stated targets remain separate from actual physical milestones."], "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/", "host": "vantage-dc.com", "published": "2025-11-06", "date": "2025-11-06", "checked": "2026-10-23", "label": "First party exact campus or code text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 39, October 23, 2026", "scope": "Approximate remains approximate. One bounded county reference parcel only. Existing native status remains proposed.", "fields": {"location_review_decision": {"location": {"lng": -77.46666, "lat": 38.38878, "precision": "approximate", "basis": "Approximate mathematical center of the exact Stafford County parcel at the current named Vantage VA4 service street 225 Centreport Parkway, Fredericksburg, VA 22406. Parcel OBJECTID 47128, raw PRCLID 37        30 and normalized agency PARCEL_ID_NSP 3730 remain explicit. County reference mapping only, not a surveyed boundary, roof, future hall or completed full campus. Postal city does not override Stafford County. Aerial date is unknown and may predate development. Existing native status remains proposed."}, "reference_method": "Approximate county reference parcel center", "reference_parcel": {"identifier": " 37        30", "identifier_field": "PRCLID", "normalized_agency_identifier": "3730", "objectid": 47128, "agency": "Stafford County GIS", "reference_method": "calculated_polygon_centroid", "not_survey_quality": true, "legal_title_verified": false, "independent_building_identity": false, "full_campus_verified": false, "operator_ownership_verified": false, "county_codes_inferred": false}, "operator_coordinates_adopted": false, "census_range_adopted": false}}, "notes": ["The current operator VA4 campus section gives 225 Centreport Parkway, Fredericksburg, Virginia 22406. One current Stafford county parcel has FULLADD 225 CENTREPORT PKWY, STNO 225, STNAME CENTREPORT, suffix PKWY and postal city FREDERICKSBURG ZIP 22406. The official county GIS page links the Stafford GIS portal, whose org id qKiA6JuCrE2l72iL is the exact parcel service org. The retained Stafford county is corroborated by polygon containment. Postal Fredericksburg does not become the independent city jurisdiction. No owner, future building, technical or physical marketing claim is adopted.", "The earlier inherited inventory reference was not verified and is about 6.15 km from the exact current VA4 operator street and unique county parcel. Current named operator street and county situs fields agree on 225 Centreport Parkway, and the calculated parcel center lies inside retained Stafford County. This evidence replaces only the unsupported inherited reference with an approximate county parcel area; no future hall, roof, full campus extent or physical stage is certified.", "Actually viewed wooded and open ground with streets and nearby commercial forms. Acquisition date is unknown and may predate the planned development. No particular residence, future roof, current physical stage or full campus boundary is selected.", "Raw parcel and component codes have no invented legal, title, ownership, unit or physical meanings. Only the mathematical center is used. Raw polygon geometry is retained in research and not exported as a full campus boundary."], "sources": [{"url": "https://vantage-dc.com/data-center-locations/", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact current VA4 campus service street"}, {"url": "https://services1.arcgis.com/qKiA6JuCrE2l72iL/arcgis/rest/services/Parcels/FeatureServer/0/query?where=STNO+%3D+%27225%27+AND+UPPER%28STNAME%29+LIKE+%27%25CENTREPORT%25%27&outFields=%2A&returnGeometry=true&outSR=4326&f=json", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-23", "label": "One exact complete service street county reference parcel"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.47239037696575%2C38.38428844412504%2C-77.46092962303426%2C38.39327155587495&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}, {"url": "https://services1.arcgis.com/qKiA6JuCrE2l72iL/arcgis/rest/services/Parcels/FeatureServer/0?f=pjson", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact public parcel layer fields and reference mapping"}, {"url": "https://staffordva-gis.maps.arcgis.com/sharing/rest/portals/self?f=pjson", "host": "staffordva-gis.maps.arcgis.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact public county portal identity and general reference disclaimer"}, {"url": "https://staffordcountyva.gov/government/gis_(maps)/index.php", "host": "staffordcountyva.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Official county GIS page links the same Stafford GIS public portal"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate county reference parcel, not a confirmed building or full campus", "summary": "Virginia · Stafford · Source context reviewed", "status_scope": "The current Vantage VA4 page describes the Fredericksburg region campus in future terms, with a first building target in late 2027. Operator listed development describes that current listing. The November 6, 2025 release reports a groundbreaking celebration that day; a ceremony does not independently certify current excavation, individual building completion or operational service. Future phase targets, planned utility infrastructure and design specifications are not actual delivered quantities or opening dates.", "event_evidence": [{"date": "2025-11-06", "text": "Vantage published its VA4 campus announcement on November 6, 2025 and reported a groundbreaking celebration held that day. This records the company release and ceremony account, not an independently verified physical construction start, completed phase or data center opening.", "kind": "announced", "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/?trk=article-ssr-frontend-pulse_little-text-block", "host": "vantage-dc.com", "published": "2025-11-06", "date": "2025-11-06", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "yondr-cerberus-manassas-va", "state": "VA", "kind": "facility", "name": "Yondr Manassas Data Center Campus", "group": "proposed", "status": "Announced development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": [], "city": "Manassas", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cerberus Yondr Manassas acquired land and future campus. Landacquisitionnotcommissioning/allpermits.72MWfuture notobservedenergization. CorporateCerberus72Bassetsnot72Bcampusinvestment. No exactparcel/streetorcapitalexpenditurefigureinreviewedannouncement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-08-03", "Yondr published its Manassas site acquisition and planned campus announcement on August 3, 2026. The source describes expected operation in 2029. This is the release date and acquisition account, not an actual construction start or opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.cerberus.com/media/cerberus-and-yondr-acquire-40-acres-in-northern-virginia-to-build-72mw-data-center/", "host": "cerberus.com", "date": "2026-08-03", "published": "2026-08-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.yondrgroup.com/newsroom/press-release/yondr-and-cerberus-acquire-40-acre-site-for-72mw-northern-virginia-data-center/", "host": "www.yondrgroup.com", "published": "2026-08-03", "date": "2026-08-03", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 38.74606, "lng": -77.48585, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Cerberus Yondr Manassas acquired land and future campus", "fields": {"developers": ["Cerberus", "Yondr"], "announcement_date": "2026-08-03", "locality": "Manassas, Virginia", "acquired_site_acres": 40, "planned_campus_capacity_mw": 72, "power_basis": "campus capacity, not explicitly critical IT", "service_target_year": 2029}, "notes": ["Landacquisitionnotcommissioning/allpermits.72MWfuture notobservedenergization. CorporateCerberus72Bassetsnot72Bcampusinvestment. No exactparcel/streetorcapitalexpenditurefigureinreviewedannouncement.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.cerberus.com/media/cerberus-and-yondr-acquire-40-acres-in-northern-virginia-to-build-72mw-data-center/", "host": "cerberus.com", "date": "2026-08-03", "published": "2026-08-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 20", "scope": "Yondr August 3, 2026 release announces acquisition of a Manassas site with Cerberus for a planned campus. Announced development describes that dated proposal. Expected operation in 2029 is a forecast and the acquisition does not establish actual construction, completed financing for every phase, delivered power or operation. No precise parcel, county assignment, quantity or provider role is adopted.", "fields": {"current_stage_evidence": {"outcome": "dated_site_acquisition_not_completed_or_operating_campus", "scope": "Yondr August 3, 2026 release announces acquisition of a Manassas site with Cerberus for a planned campus. Announced development describes that dated proposal. Expected operation in 2029 is a forecast and the acquisition does not establish actual construction, completed financing for every phase, delivered power or operation. No precise parcel, county assignment, quantity or provider role is adopted."}}, "notes": ["Yondr August 3, 2026 release announces acquisition of a Manassas site with Cerberus for a planned campus. Announced development describes that dated proposal. Expected operation in 2029 is a forecast and the acquisition does not establish actual construction, completed financing for every phase, delivered power or operation. No precise parcel, county assignment, quantity or provider role is adopted.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.yondrgroup.com/newsroom/press-release/yondr-and-cerberus-acquire-40-acre-site-for-72mw-northern-virginia-data-center/", "host": "www.yondrgroup.com", "published": "2026-08-03", "date": "2026-08-03", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Manassas · Source context reviewed", "status_scope": "Yondr August 3, 2026 release announces acquisition of a Manassas site with Cerberus for a planned campus. Announced development describes that dated proposal. Expected operation in 2029 is a forecast and the acquisition does not establish actual construction, completed financing for every phase, delivered power or operation. No precise parcel, county assignment, quantity or provider role is adopted.", "event_evidence": [{"date": "2026-08-03", "text": "Yondr published its Manassas site acquisition and planned campus announcement on August 3, 2026. The source describes expected operation in 2029. This is the release date and acquisition account, not an actual construction start or opening.", "kind": "announced", "sources": [{"url": "https://www.yondrgroup.com/newsroom/press-release/yondr-and-cerberus-acquire-40-acre-site-for-72mw-northern-virginia-data-center/", "host": "www.yondrgroup.com", "published": "2026-08-03", "date": "2026-08-03", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51683"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "dallesport-server-farm-webster-orchards-wa", "state": "WA", "kind": "facility", "name": "Dallesport Server Farm (Webster Orchards / Williams Ranch site)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Klickitat"], "city": "Dallesport", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Lakeside1260MWline-load request not delivered critical IT; combined2260MWpotential not eachsite. Conditional-use process and power still needed; acquired regional14900acre-feetright not campus water consumption. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.columbiagorgenews.com/news/another-data-center/article_e81e8737-9db6-49c5-bd3e-594e8976cdd4.html", "host": "columbiagorgenews.com", "date": "2026-08-26", "published": "2026-08-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx", "host": "www.bpa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.bpa.gov/energy-and-services/transmission/interconnection", "host": "www.bpa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 45.87379, "lng": -120.78895, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round24-2026-10-14.json", "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.", "fields": {"reported_context": "Columbia Gorge News identifies separate Lakeside434-acre proposal and ScottWebster orchard Dallesport Server Farm.", "independently_verified_current_operating_status": null}, "notes": ["Lakeside1260MWline-load request not delivered critical IT; combined2260MWpotential not eachsite. Conditional-use process and power still needed; acquired regional14900acre-feetright not campus water consumption.", "Subsequent original decisions and current operator disclosures take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.columbiagorgenews.com/news/another-data-center/article_e81e8737-9db6-49c5-bd3e-594e8976cdd4.html", "host": "columbiagorgenews.com", "date": "2026-08-26", "published": "2026-08-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 35", "scope": "The original BPA workbook displayed October 22, 2026 names Dallesport Server Farm as line and load request L0664 in Klickitat County, with queue status STUDY. Agency listed proposal applies only to that exact named request. A power study, an agreed or requested in service date and requested load are not data center construction, delivered computing, an executed power sale or project commissioning. The requester is a utility and is not promoted into a developer or operator role. No queue quantity, interconnection point or parcel is adopted.", "fields": {"current_stage_evidence": {"outcome": "named_dallesport_line_load_request_not_delivered_compute", "scope": "The original BPA workbook displayed October 22, 2026 names Dallesport Server Farm as line and load request L0664 in Klickitat County, with queue status STUDY. Agency listed proposal applies only to that exact named request. A power study, an agreed or requested in service date and requested load are not data center construction, delivered computing, an executed power sale or project commissioning. The requester is a utility and is not promoted into a developer or operator role. No queue quantity, interconnection point or parcel is adopted."}}, "notes": ["The original BPA workbook displayed October 22, 2026 names Dallesport Server Farm as line and load request L0664 in Klickitat County, with queue status STUDY. Agency listed proposal applies only to that exact named request. A power study, an agreed or requested in service date and requested load are not data center construction, delivered computing, an executed power sale or project commissioning. The requester is a utility and is not promoted into a developer or operator role. No queue quantity, interconnection point or parcel is adopted.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx", "host": "www.bpa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.bpa.gov/energy-and-services/transmission/interconnection", "host": "www.bpa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Washington · Dallesport · Klickitat · Source context reviewed", "status_scope": "The original BPA workbook displayed October 22, 2026 names Dallesport Server Farm as line and load request L0664 in Klickitat County, with queue status STUDY. Agency listed proposal applies only to that exact named request. A power study, an agreed or requested in service date and requested load are not data center construction, delivered computing, an executed power sale or project commissioning. The requester is a utility and is not promoted into a developer or operator role. No queue quantity, interconnection point or parcel is adopted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "53039"}, "state_name": "Washington", "state_path": "/washington/"}, {"id": "energizer-data-center-hoctor-road-klickitat-wa", "state": "WA", "kind": "facility", "name": "Energizer Data Center (BPA L0493 / L0497)", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Klickitat"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Exact Energizer locations are unknown. A transmission easement does not locate a data center. No site permits or construction were reported. A September moratorium motion died without a second, and possible October 20 ordinance action remains future. Regional requests are not delivered IT. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/", "host": "spokesman.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx", "host": "www.bpa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.bpa.gov/energy-and-services/transmission/interconnection", "host": "www.bpa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 45.88859, "lng": -120.80511, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "Washington State Standard names Shell and Savion applications for Energizer, Energizer II and Vines Rest, plus a Lakeside proposal.", "independently_verified_current_operating_status": null}, "notes": ["Exact Energizer locations are unknown. A transmission easement does not locate a data center. No site permits or construction were reported. A September moratorium motion died without a second, and possible October 20 ordinance action remains future. Regional requests are not delivered IT.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/", "host": "spokesman.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 35", "scope": "The original BPA workbook names Energizer Data Center L0493 and Expanded Capacity L0497, each with status STUDY COMPLETED. Agency listed proposal applies to that named request context. Completion of an interconnection study is not completion of an individual data hall or proof of current computing operation. Its forecast in service entries, requested load and utility requester remain separate from commissioned capacity, developer roles and exact geography. Other projects sharing the Energizer substation are not merged.", "fields": {"current_stage_evidence": {"outcome": "named_energizer_load_requests_and_completed_studies_not_data_hall_operation", "scope": "The original BPA workbook names Energizer Data Center L0493 and Expanded Capacity L0497, each with status STUDY COMPLETED. Agency listed proposal applies to that named request context. Completion of an interconnection study is not completion of an individual data hall or proof of current computing operation. Its forecast in service entries, requested load and utility requester remain separate from commissioned capacity, developer roles and exact geography. Other projects sharing the Energizer substation are not merged."}}, "notes": ["The original BPA workbook names Energizer Data Center L0493 and Expanded Capacity L0497, each with status STUDY COMPLETED. Agency listed proposal applies to that named request context. Completion of an interconnection study is not completion of an individual data hall or proof of current computing operation. Its forecast in service entries, requested load and utility requester remain separate from commissioned capacity, developer roles and exact geography. Other projects sharing the Energizer substation are not merged.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx", "host": "www.bpa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.bpa.gov/energy-and-services/transmission/interconnection", "host": "www.bpa.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Washington · Klickitat · Source context reviewed", "status_scope": "The original BPA workbook names Energizer Data Center L0493 and Expanded Capacity L0497, each with status STUDY COMPLETED. Agency listed proposal applies to that named request context. Completion of an interconnection study is not completion of an individual data hall or proof of current computing operation. Its forecast in service entries, requested load and utility requester remain separate from commissioned capacity, developer roles and exact geography. Other projects sharing the Energizer substation are not merged.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "53039"}, "state_name": "Washington", "state_path": "/washington/"}, {"id": "microsoft-malaga-wa", "state": "WA", "kind": "facility", "name": "Microsoft Malaga Campus", "group": "proposed", "status": "Operator-listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Chelan"], "city": "Malaga", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Old first-phase forecast is not observed completion or2026 operation. Operator explicitly separates construction from operability. Three campus buildings are not three commissioned buildings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://local.microsoft.com/blog/malaga-datacenter-project-overview/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://local.microsoft.com/communities/americas/quincy/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 47.86883, "lng": -120.61872, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round16-2026-10-14.json", "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.", "fields": {"campus_corridor": "Malaga-Alcoa Highway", "first_building_construction_start_forecast": "2023-06", "first_building_completion_forecast": "Early2026", "additional_buildings": 2, "additional_timing": "Driven by demand", "historical_community_session": "2023-03-29", "actual_operational_date": null}, "notes": ["Old first-phase forecast is not observed completion or2026 operation. Operator explicitly separates construction from operability. Three campus buildings are not three commissioned buildings.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://local.microsoft.com/blog/malaga-datacenter-project-overview/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "K3 company role review October22,2026", "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."}, "provider_role": "developer"}, "notes": ["Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.", "A source read is not a construction, opening, transaction-closing or operating date."], "sources": [{"url": "https://local.microsoft.com/blog/malaga-datacenter-project-overview/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed company identity source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 15", "scope": "Microsoft current Washington community page explicitly says it is developing data centers in Malaga. Operator listed development describes this named programme. The older project page forecasts June 2023 site work, May 2024 building work and completion in early 2026. Those future tense historical forecasts and the passed target date do not establish actual construction completion or operation, and the source explicitly separates construction completion from availability.", "fields": {"current_stage_evidence": {"outcome": "operator_listed_development_with_expired_forecasts_unverified", "scope": "Microsoft current Washington community page explicitly says it is developing data centers in Malaga. Operator listed development describes this named programme. The older project page forecasts June 2023 site work, May 2024 building work and completion in early 2026. Those future tense historical forecasts and the passed target date do not establish actual construction completion or operation, and the source explicitly separates construction completion from availability."}, "date_scope": {"old_first_construction_target": "June 2023", "old_building_start_target": "May 2024", "old_completion_target": "early 2026", "forecast_occurrences_verified": false, "exact_physical_day_established": false}}, "notes": ["Microsoft current Washington community page explicitly says it is developing data centers in Malaga. Operator listed development describes this named programme. The older project page forecasts June 2023 site work, May 2024 building work and completion in early 2026. Those future tense historical forecasts and the passed target date do not establish actual construction completion or operation, and the source explicitly separates construction completion from availability.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://local.microsoft.com/communities/americas/quincy/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://local.microsoft.com/blog/malaga-datacenter-project-overview/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Washington · Malaga · Chelan · Source context reviewed", "status_scope": "Microsoft current Washington community page explicitly says it is developing data centers in Malaga. Operator listed development describes this named programme. The older project page forecasts June 2023 site work, May 2024 building work and completion in early 2026. Those future tense historical forecasts and the passed target date do not establish actual construction completion or operation, and the source explicitly separates construction completion from availability.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "53007"}, "state_name": "Washington", "state_path": "/washington/"}, {"id": "bitfarms-moses-lake-wa", "state": "WA", "kind": "facility", "name": "Moses Lake Facility", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": true, "type": "Crypto/HPC (inventory classification)", "counties": ["Grant"], "city": "Moses Lake", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-08-10", "Keel published its second quarter update August 10, 2026, reporting the named Moses Lake mining shutdown during April and prospective HPC conversion work. This is the publication day, not an invented exact shutdown date or HPC opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results", "host": "ir.keelinfra.com", "date": "2026-05-11", "published": "2026-05-11", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results", "host": "ir.keelinfra.com", "published": "2026-08-10", "date": "2026-08-10", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 47.20559, "lng": -119.45182, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Campus-level issuer context, not proof every imported plant/building ID is independently energized.", "fields": {"announcement_date": "2026-05-11", "quarter_ended": "2026-03-31", "company_claim": "Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.", "redomiciliation_parent_transaction_date": "2026-04-01"}, "notes": ["Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results", "host": "ir.keelinfra.com", "date": "2026-05-11", "published": "2026-05-11", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 35", "scope": "The August 10, 2026 company update expressly reports shutdown of Moses Lake cryptocurrency mining during April 2026 and describes prospective HPC development and delivered modules at the named site. Project listed development applies to the proposed HPC conversion. Module delivery, permitting progress, commercial negotiation and a future service year do not establish completed HPC construction or operation. The historic mining phase is not described as continuing, and the whole property is not declared permanently closed. The source provides a month for mining shutdown, so no exact cessation day is invented. Existing identity, crypto flag and roles remain unchanged.", "fields": {"current_stage_evidence": {"outcome": "named_moses_lake_hpc_conversion_separate_from_stopped_legacy_mining", "scope": "The August 10, 2026 company update expressly reports shutdown of Moses Lake cryptocurrency mining during April 2026 and describes prospective HPC development and delivered modules at the named site. Project listed development applies to the proposed HPC conversion. Module delivery, permitting progress, commercial negotiation and a future service year do not establish completed HPC construction or operation. The historic mining phase is not described as continuing, and the whole property is not declared permanently closed. The source provides a month for mining shutdown, so no exact cessation day is invented. Existing identity, crypto flag and roles remain unchanged."}}, "notes": ["The August 10, 2026 company update expressly reports shutdown of Moses Lake cryptocurrency mining during April 2026 and describes prospective HPC development and delivered modules at the named site. Project listed development applies to the proposed HPC conversion. Module delivery, permitting progress, commercial negotiation and a future service year do not establish completed HPC construction or operation. The historic mining phase is not described as continuing, and the whole property is not declared permanently closed. The source provides a month for mining shutdown, so no exact cessation day is invented. Existing identity, crypto flag and roles remain unchanged.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results", "host": "ir.keelinfra.com", "published": "2026-08-10", "date": "2026-08-10", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results", "host": "ir.keelinfra.com", "published": "2026-05-11", "date": "2026-05-11", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Washington · Moses Lake · Grant · Source context reviewed", "status_scope": "The August 10, 2026 company update expressly reports shutdown of Moses Lake cryptocurrency mining during April 2026 and describes prospective HPC development and delivered modules at the named site. Project listed development applies to the proposed HPC conversion. Module delivery, permitting progress, commercial negotiation and a future service year do not establish completed HPC construction or operation. The historic mining phase is not described as continuing, and the whole property is not declared permanently closed. The source provides a month for mining shutdown, so no exact cessation day is invented. Existing identity, crypto flag and roles remain unchanged.", "event_evidence": [{"date": "2026-08-10", "text": "Keel published its second quarter update August 10, 2026, reporting the named Moses Lake mining shutdown during April and prospective HPC conversion work. This is the publication day, not an invented exact shutdown date or HPC opening.", "kind": "announced", "sources": [{"url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results", "host": "ir.keelinfra.com", "published": "2026-08-10", "date": "2026-08-10", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "53025"}, "state_name": "Washington", "state_path": "/washington/"}, {"id": "stack-infrastructure-goldendale-data-center-wa", "state": "WA", "kind": "facility", "name": "STACK Infrastructure Goldendale Data Center", "group": "proposed", "status": "Agency documented proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Klickitat"], "city": "Goldendale", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported 958 MW interconnection request was in study phase, not executed service, commissioned critical IT or a binding power purchase. Social-profile 1 GW-plus aspiration is not separately additive capacity. Goldendale 1,200 MW is pumped-storage output, not sustained net generation or DC IT; the 80% comparison cannot prove contracted supply or annual energy. Roughly 700 acres and billions of gallons concern storage project, not automatically campus footprint or daily cooling demand. FERC hydro license and May 26 review petitions do not establish a court ruling, final DC permit or signed buyer. Owner did not disclose buyers; reporter’s inference of Stack as buyer remains attributed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-10-30", "The original Washington Department of Ecology site register dated October 30, 2025 describes prospective purchaser cleanup negotiations with STACK for proposed computing reuse at Columbia Gorge Aluminum. This dates the agency publication rather than an executed decree, completed cleanup, construction start or computing opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site", "host": "tricitiesbusinessnews.com", "date": "2026-05-28", "published": "2026-05-28", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://apps.ecology.wa.gov/publications/documents/2509041v.pdf", "host": "apps.ecology.wa.gov", "published": "2025-10-30", "date": "2025-10-30", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 45.86615, "lng": -120.83212, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round32-2026-10-14.json", "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.", "fields": {"reported_context": "Oregon Capital Chronicle reporting republished by Tri-Cities Area Journal of Business links a potential Stack Goldendale campus to planned pumped storage and documents Yakama cultural-resource opposition and federal appeals.", "independently_verified_current_operating_status": null}, "notes": ["Reported 958 MW interconnection request was in study phase, not executed service, commissioned critical IT or a binding power purchase. Social-profile 1 GW-plus aspiration is not separately additive capacity. Goldendale 1,200 MW is pumped-storage output, not sustained net generation or DC IT; the 80% comparison cannot prove contracted supply or annual energy. Roughly 700 acres and billions of gallons concern storage project, not automatically campus footprint or daily cooling demand. FERC hydro license and May 26 review petitions do not establish a court ruling, final DC permit or signed buyer. Owner did not disclose buyers; reporter’s inference of Stack as buyer remains attributed.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site", "host": "tricitiesbusinessnews.com", "date": "2026-05-28", "published": "2026-05-28", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 68", "scope": "Selected original October 30, 2025 State site register text explicitly names STACK Infrastructure USA III and a proposed purchase, cleanup and computing campus reuse of part of the former Columbia Gorge Aluminum smelter. This supports an agency documented proposal rather than construction or commissioned computing. The agency describes historical smelter contamination and planned negotiations, not pollution caused by computing or a completed cleanup. Expected negotiations ending in March 2026 and possible later comment opportunities do not establish an accomplished consent decree or an exact future hearing. The separate Goldendale energy storage project is not merged into this proposal.", "fields": {"current_stage_evidence": {"outcome": "agency_documented_named_goldendale_compute_reuse_proposal", "scope": "Selected original October 30, 2025 State site register text explicitly names STACK Infrastructure USA III and a proposed purchase, cleanup and computing campus reuse of part of the former Columbia Gorge Aluminum smelter. This supports an agency documented proposal rather than construction or commissioned computing. The agency describes historical smelter contamination and planned negotiations, not pollution caused by computing or a completed cleanup. Expected negotiations ending in March 2026 and possible later comment opportunities do not establish an accomplished consent decree or an exact future hearing. The separate Goldendale energy storage project is not merged into this proposal."}, "source_read_scope": {"original_register_physical_pages": [1, 5], "complete_ten_page_register_review_not_claimed": true, "historical_smelter_contamination_not_computing_finding": true, "negotiation_forecast_and_possible_comment_period_not_accomplished": true, "separate_energy_storage_project_not_merged": true}}, "notes": ["Selected original October 30, 2025 State site register text explicitly names STACK Infrastructure USA III and a proposed purchase, cleanup and computing campus reuse of part of the former Columbia Gorge Aluminum smelter. This supports an agency documented proposal rather than construction or commissioned computing. The agency describes historical smelter contamination and planned negotiations, not pollution caused by computing or a completed cleanup. Expected negotiations ending in March 2026 and possible later comment opportunities do not establish an accomplished consent decree or an exact future hearing. The separate Goldendale energy storage project is not merged into this proposal.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."], "sources": [{"url": "https://apps.ecology.wa.gov/publications/documents/2509041v.pdf", "host": "apps.ecology.wa.gov", "published": "2025-10-30", "date": "2025-10-30", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Washington · Goldendale · Klickitat · Source context reviewed", "status_scope": "Selected original October 30, 2025 State site register text explicitly names STACK Infrastructure USA III and a proposed purchase, cleanup and computing campus reuse of part of the former Columbia Gorge Aluminum smelter. This supports an agency documented proposal rather than construction or commissioned computing. The agency describes historical smelter contamination and planned negotiations, not pollution caused by computing or a completed cleanup. Expected negotiations ending in March 2026 and possible later comment opportunities do not establish an accomplished consent decree or an exact future hearing. The separate Goldendale energy storage project is not merged into this proposal.", "event_evidence": [{"date": "2025-10-30", "text": "The original Washington Department of Ecology site register dated October 30, 2025 describes prospective purchaser cleanup negotiations with STACK for proposed computing reuse at Columbia Gorge Aluminum. This dates the agency publication rather than an executed decree, completed cleanup, construction start or computing opening.", "kind": "announced", "sources": [{"url": "https://apps.ecology.wa.gov/publications/documents/2509041v.pdf", "host": "apps.ecology.wa.gov", "published": "2025-10-30", "date": "2025-10-30", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "53039"}, "state_name": "Washington", "state_path": "/washington/"}, {"id": "google-putnam-county-campus-wv", "state": "WV", "kind": "facility", "name": "Google Putnam County Data Center", "group": "proposed", "status": "Proposed", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Putnam"], "city": "Buffalo", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Google Buffalo proposed campus identity without generic-stat transfer. 688Mannualstateactivity/9supportedjobsperdirect/1000plusconstruction/examples are generic comparison scopes, not approved Buffalo campus estimates. No exact numeric IT, capex, opening date, final permit or historic-preservation clearance in reviewed project text. Claims about rate effects not independent tariff findings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Historic-preservation coordination and a proposed site plan are not final approval, construction or operation. Analogous projects’ employment and salary figures are not this project’s realized totals. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://buffalowvdatacenter.com/", "host": "buffalowvdatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.buffalowvdatacenter.com/", "host": "buffalowvdatacenter.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 38.50868, "lng": -81.90895, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Google Buffalo proposed campus identity without generic-stat transfer", "fields": {"operator": "Google", "project_locality": "Buffalo, Putnam County, West Virginia", "developer_described_stage": "early-stage campus planning with historic-preservation coordination"}, "notes": ["688Mannualstateactivity/9supportedjobsperdirect/1000plusconstruction/examples are generic comparison scopes, not approved Buffalo campus estimates. No exact numeric IT, capex, opening date, final permit or historic-preservation clearance in reviewed project text. Claims about rate effects not independent tariff findings.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://buffalowvdatacenter.com/", "host": "buffalowvdatacenter.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "proposed", "status_basis": "The Google project site says it is advancing early plans for the Buffalo/Putnam County campus."}, "notes": ["Historic-preservation coordination and a proposed site plan are not final approval, construction or operation. Analogous projects’ employment and salary figures are not this project’s realized totals. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://www.buffalowvdatacenter.com/", "host": "buffalowvdatacenter.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "a2e02ccfab712feb846af8ed4359dce8b5b6a660871b8240de6ba09174c66ba2", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "West Virginia · Buffalo · Putnam · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "54079"}, "state_name": "West Virginia", "state_path": "/west-virginia/"}, {"id": "penzance-bedington-berkeley-county-wv", "state": "WV", "kind": "facility", "name": "Bedington Campus", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Berkeley"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Governor announcement. Designation threshold above 90 MW is not the project capacity. Planned private capital and jobs are not spent/actual. No-state-funding statement does not establish absence of all tax benefits. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-02-26", "The original Governor February 26, 2026 release announces Penzance Bedington Campus and reports a State designation. This dates the public account, without establishing an exact certificate execution day, physical construction, commissioned computing or delivered community benefits."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact", "host": "governor.wv.gov", "date": "2026-02-26", "published": "2026-02-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 39.46426, "lng": -78.02721, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"county": "Berkeley", "district": "Falling Waters", "planned_campus_acres": 548, "full_buildout_capital_usd": 4000000000, "full_buildout_sqft_approx": 1900000, "full_buildout_critical_it_mw": 600, "forecast_construction_jobs_approx": 1000, "forecast_permanent_jobs": 125, "designation": "High Impact Intelligence Center", "state_funding_statement": "No state funding used to secure the development"}, "notes": ["Governor announcement. Designation threshold above 90 MW is not the project capacity. Planned private capital and jobs are not spent/actual. No-state-funding statement does not establish absence of all tax benefits.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact", "host": "governor.wv.gov", "date": "2026-02-26", "published": "2026-02-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 78", "scope": "The complete original Governor February 26, 2026 release names Penzance Bedington Campus and describes a future computing development and approved High Impact Intelligence Center designation. This supports an agency listed proposal. Certification, projected load, reviewed engineering plans and future utility milestones are not computing construction or operation. The prospective investment, jobs, revenue allocations, reclaimed water opportunity and private funding assertions are attributed plans rather than independently measured delivered results. No legal site eligibility, installed capacity or corporate role is changed.", "fields": {"current_stage_evidence": {"outcome": "governor_named_bedington_future_campus", "scope": "The complete original Governor February 26, 2026 release names Penzance Bedington Campus and describes a future computing development and approved High Impact Intelligence Center designation. This supports an agency listed proposal. Certification, projected load, reviewed engineering plans and future utility milestones are not computing construction or operation. The prospective investment, jobs, revenue allocations, reclaimed water opportunity and private funding assertions are attributed plans rather than independently measured delivered results. No legal site eligibility, installed capacity or corporate role is changed."}, "source_read_scope": {"complete_original_named_governor_release_body_read": true, "certification_not_computing_construction_or_operation": true, "no_projected_load_finance_jobs_or_water_as_measured_results": true, "no_exact_legal_certificate_execution_day_invented": true}}, "notes": ["The complete original Governor February 26, 2026 release names Penzance Bedington Campus and describes a future computing development and approved High Impact Intelligence Center designation. This supports an agency listed proposal. Certification, projected load, reviewed engineering plans and future utility milestones are not computing construction or operation. The prospective investment, jobs, revenue allocations, reclaimed water opportunity and private funding assertions are attributed plans rather than independently measured delivered results. No legal site eligibility, installed capacity or corporate role is changed.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact", "host": "governor.wv.gov", "published": "2026-02-26", "date": "2026-02-26", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "West Virginia · Berkeley · Source context reviewed", "status_scope": "The complete original Governor February 26, 2026 release names Penzance Bedington Campus and describes a future computing development and approved High Impact Intelligence Center designation. This supports an agency listed proposal. Certification, projected load, reviewed engineering plans and future utility milestones are not computing construction or operation. The prospective investment, jobs, revenue allocations, reclaimed water opportunity and private funding assertions are attributed plans rather than independently measured delivered results. No legal site eligibility, installed capacity or corporate role is changed.", "event_evidence": [{"date": "2026-02-26", "text": "The original Governor February 26, 2026 release announces Penzance Bedington Campus and reports a State designation. This dates the public account, without establishing an exact certificate execution day, physical construction, commissioned computing or delivered community benefits.", "kind": "announced", "sources": [{"url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact", "host": "governor.wv.gov", "published": "2026-02-26", "date": "2026-02-26", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "54003"}, "state_name": "West Virginia", "state_path": "/west-virginia/"}, {"id": "nscale-monarch-mason-county-wv", "state": "WV", "kind": "facility", "name": "Monarch Compute Campus", "group": "proposed", "status": "Operator-listed plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Mason"], "city": "Point Pleasant", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nscale Monarch date conflict, LOI and separate generation scope. HeadingOctober14andbodyMarch16datesdiffer;donotclaimalltransactionsnewOct14orchoosedatewithoutcorroboration. LOInotexecutedbindingcomputeleaseorenergization.8GWpowerpotentialand2GWgenerationnotaddedto1.35compute. State-certifiedmicrogridclaimnotcertificatedocumentinspection. MasonWVnotMasonKYandnotsameMasonlawsuit. No currentlypaidincentivesorobservedgeneration. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory", "host": "nscale.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.nscale.com/ai-infrastructure", "host": "www.nscale.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 38.76978, "lng": -82.02652, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Nscale Monarch date conflict, LOI and separate generation scope", "fields": {"developer": "Nscale", "project": "Monarch Compute Campus", "county": "Mason County, West Virginia", "page_heading_date": "2026-10-14", "release_body_dateline": "2026-03-16", "publication_date_conflict": true, "announced_acquisition": "American Intelligence and Power Corporation, including Monarch campus", "site_acres_max": 2250, "microsoft_capacity_loi_gw_max": 1.35, "capacity_basis": "AI compute under letter of intent, not verified current critical IT", "onsite_microgrid_potential_gw_min_exclusive": 8, "first_tranche_target": "late2027", "caterpillar_natural_gas_generation_target_gw": 2, "generation_target_period": "2028-H1"}, "notes": ["HeadingOctober14andbodyMarch16datesdiffer;donotclaimalltransactionsnewOct14orchoosedatewithoutcorroboration. LOInotexecutedbindingcomputeleaseorenergization.8GWpowerpotentialand2GWgenerationnotaddedto1.35compute. State-certifiedmicrogridclaimnotcertificatedocumentinspection. MasonWVnotMasonKYandnotsameMasonlawsuit. No currentlypaidincentivesorobservedgeneration.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory", "host": "nscale.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-listed plan", "basis": "The current named Monarch section describes a phased AI development with first-phase delivery targeted for early 2028. The March 16, 2026 release describes planned tranches beginning in late 2027 and a Microsoft letter of intent.", "checked_on": "2026-10-16"}, "stage_review_limits": "These are distinct dated targets and a letter of intent, not accomplished service or proven construction. The AI deployment and potential microgrid generation remain separate; prior date and power-scope conflicts are retained."}, "notes": ["These are distinct dated targets and a letter of intent, not accomplished service or proven construction. The AI deployment and potential microgrid generation remain separate; prior date and power-scope conflicts are retained.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://www.nscale.com/ai-infrastructure", "host": "www.nscale.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}, {"url": "https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory", "host": "www.nscale.com", "published": "2026-03-16", "date": "2026-03-16", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "West Virginia · Point Pleasant · Mason · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current named Monarch section describes a phased AI development with first-phase delivery targeted for early 2028. The March 16, 2026 release describes planned tranches beginning in late 2027 and a Microsoft letter of intent. These are distinct dated targets and a letter of intent, not accomplished service or proven construction. The AI deployment and potential microgrid generation remain separate; prior date and power-scope conflicts are retained.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "54053"}, "state_name": "West Virginia", "state_path": "/west-virginia/"}, {"id": "starwood-tamarack-west-columbia-mason-wv", "state": "WV", "kind": "facility", "name": "Project Tamarack", "group": "proposed", "status": "Company listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Mason"], "city": "West Columbia", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. State-program certification is not every construction/environmental permit, executed electricity service or operation. Twelve-billion-dollar plan and over 1,000 construction/300 permanent jobs are forecasts, not spending/employment. Governor statement about no bill increases is a policy assurance, not independent tariff or economic proof. Closed-loop cooling has no quantified consumption here. Nscale’s separate 2027 completion target is not Tamarack RFS. Mason County is West Virginia, not Kentucky. Article inconsistently refers to HB 2024 and HB 2014; legal scope requires original law, not corrected by inference. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wdtv.com/2026/09/03/starwood-digital-ventures-announces-data-center-mason-county/", "host": "wdtv.com", "date": "2026-09-03", "published": "2026-09-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://projecttamarack.com/", "host": "projecttamarack.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://governor.wv.gov/article/governor-morrisey-announces-more-81-billion-new-investment-west-virginia-business-summit", "host": "governor.wv.gov", "published": "2026-09-03", "date": "2026-09-03", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 38.78494, "lng": -82.04306, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round33-2026-10-14.json", "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.", "fields": {"reported_context": "WSAZ reporting republished by WDTV says Starwood received West Virginia high-impact certification for Project Tamarack in Mason County, with announced investment and employment plans.", "independently_verified_current_operating_status": null}, "notes": ["State-program certification is not every construction/environmental permit, executed electricity service or operation. Twelve-billion-dollar plan and over 1,000 construction/300 permanent jobs are forecasts, not spending/employment. Governor statement about no bill increases is a policy assurance, not independent tariff or economic proof. Closed-loop cooling has no quantified consumption here. Nscale’s separate 2027 completion target is not Tamarack RFS. Mason County is West Virginia, not Kentucky. Article inconsistently refers to HB 2024 and HB 2014; legal scope requires original law, not corrected by inference.", "Later original decisions and observed outcomes take precedence; future events have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wdtv.com/2026/09/03/starwood-digital-ventures-announces-data-center-mason-county/", "host": "wdtv.com", "date": "2026-09-03", "published": "2026-09-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 78", "scope": "The complete original Project Tamarack page explicitly describes a planned computing development in West Columbia, and the complete original Governor release describes a Starwood project designation in Mason County. This supports a company listed proposal without computing construction or operation. The project page distinguishes the former Clements State Tree Nursery as a separate property outside its ownership and control; no neighboring site is merged. Certification, ratepayer pledges, proposed cooling, sound studies, potential tax receipts and future employment are attributed plans rather than measured outcomes or verified legal compliance. The Governor statement day is not an independently established exact Tamarack certificate execution or groundbreaking day.", "fields": {"current_stage_evidence": {"outcome": "original_named_tamarack_planned_campus", "scope": "The complete original Project Tamarack page explicitly describes a planned computing development in West Columbia, and the complete original Governor release describes a Starwood project designation in Mason County. This supports a company listed proposal without computing construction or operation. The project page distinguishes the former Clements State Tree Nursery as a separate property outside its ownership and control; no neighboring site is merged. Certification, ratepayer pledges, proposed cooling, sound studies, potential tax receipts and future employment are attributed plans rather than measured outcomes or verified legal compliance. The Governor statement day is not an independently established exact Tamarack certificate execution or groundbreaking day."}, "source_read_scope": {"complete_original_current_project_and_governor_release_bodies_read": true, "state_designation_and_pledges_not_computing_operation": true, "former_tree_nursery_expressly_separate_not_merged": true, "no_water_noise_tax_jobs_or_utility_measurements_adopted": true, "governor_statement_not_exact_project_certificate_execution_day": true}}, "notes": ["The complete original Project Tamarack page explicitly describes a planned computing development in West Columbia, and the complete original Governor release describes a Starwood project designation in Mason County. This supports a company listed proposal without computing construction or operation. The project page distinguishes the former Clements State Tree Nursery as a separate property outside its ownership and control; no neighboring site is merged. Certification, ratepayer pledges, proposed cooling, sound studies, potential tax receipts and future employment are attributed plans rather than measured outcomes or verified legal compliance. The Governor statement day is not an independently established exact Tamarack certificate execution or groundbreaking day.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://projecttamarack.com/", "host": "projecttamarack.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://governor.wv.gov/article/governor-morrisey-announces-more-81-billion-new-investment-west-virginia-business-summit", "host": "governor.wv.gov", "published": "2026-09-03", "date": "2026-09-03", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "West Virginia · West Columbia · Mason · Source context reviewed", "status_scope": "The complete original Project Tamarack page explicitly describes a planned computing development in West Columbia, and the complete original Governor release describes a Starwood project designation in Mason County. This supports a company listed proposal without computing construction or operation. The project page distinguishes the former Clements State Tree Nursery as a separate property outside its ownership and control; no neighboring site is merged. Certification, ratepayer pledges, proposed cooling, sound studies, potential tax receipts and future employment are attributed plans rather than measured outcomes or verified legal compliance. The Governor statement day is not an independently established exact Tamarack certificate execution or groundbreaking day.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "54053"}, "state_name": "West Virginia", "state_path": "/west-virginia/"}, {"id": "menomonie-data-center-wi", "state": "WI", "kind": "facility", "name": "Menomonie Data Center Campus", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Dunn"], "city": "Menomonie", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The statement explicitly says annexation/rezoning would not guarantee construction. The proposed 75,000 gallons per day of municipal water/wastewater is not two additive withdrawals or measured operation. Closed-loop language does not mean zero water use. Working with Xcel and the PSC is not executed power service; later votes remain unobserved. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-06-30", "The City published its June 30, 2026 Mayor statement about the proposed Menomonie data center and ordinance work, distinguishing the earlier tax incentive negotiation pause from stopping the project. This dates the official statement, not an exact land closing, original concern day, completed ordinance adoption or computing opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://menomonienewsnet.org/3707/city/proposed-data-center/", "host": "menomonienewsnet.org", "date": "2025-07-24", "published": "2025-07-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://menomonie-wi.gov/527/Potential-Data-Center-FAQ", "host": "menomonie-wi.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://menomonie-wi.gov/DocumentCenter/View/2963/63026-Press-Release-Data-Center-Ordinance-Update-PDF", "host": "menomonie-wi.gov", "published": "2026-06-30", "date": "2026-06-30", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.menomonie-wi.gov/DocumentCenter/View/2569/-92325-Press-Release-Mayor-Randy-Knaack-on-Data-Center-PDF", "host": "www.menomonie-wi.gov", "published": "2025-09-23", "date": "2025-09-23", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 44.94668, "lng": -91.89632, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Menomonie's city administrator describes Balloonist's proposed annexation/rezoning near County Highway B and hearings scheduled for July 28 and August 4, 2025.", "independently_verified_current_operating_status": null}, "notes": ["The statement explicitly says annexation/rezoning would not guarantee construction. The proposed 75,000 gallons per day of municipal water/wastewater is not two additive withdrawals or measured operation. Closed-loop language does not mean zero water use. Working with Xcel and the PSC is not executed power service; later votes remain unobserved.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://menomonienewsnet.org/3707/city/proposed-data-center/", "host": "menomonienewsnet.org", "date": "2025-07-24", "published": "2025-07-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 59", "scope": "The current original City FAQ describes a potential project in early stages. The original June 30, 2026 Mayor statement names Balloonist LLC and expressly distinguishes pausing tax incentive negotiations from stopping the proposed project. It describes further ordinance work and a future introduction without a vote, then a possible later project rezoning application. These bodies support a listed proposal within the City planning account, without construction, computing operation or final present property permission. The older September 2025 statement about refusing further development agreement or tax district negotiations does not independently establish physical closure. The Mayor legal opinion about banning industries is not certified as a complete statement of current law.", "fields": {"current_stage_evidence": {"outcome": "original_city_proposal_incentive_pause_not_project_closure", "scope": "The current original City FAQ describes a potential project in early stages. The original June 30, 2026 Mayor statement names Balloonist LLC and expressly distinguishes pausing tax incentive negotiations from stopping the proposed project. It describes further ordinance work and a future introduction without a vote, then a possible later project rezoning application. These bodies support a listed proposal within the City planning account, without construction, computing operation or final present property permission. The older September 2025 statement about refusing further development agreement or tax district negotiations does not independently establish physical closure. The Mayor legal opinion about banning industries is not certified as a complete statement of current law."}, "source_read_scope": {"current_faq_main_body_and_complete_two_page_june_statement_read": true, "older_september_statement_complete_one_page_text_read": true, "tax_negotiation_pause_not_project_stop": true, "proposed_august_introduction_explicitly_no_vote": true, "future_rezoning_not_completed": true, "mayor_legal_opinion_not_certified_general_law": true, "no_financial_or_resource_quantities_exported": true}}, "notes": ["The current original City FAQ describes a potential project in early stages. The original June 30, 2026 Mayor statement names Balloonist LLC and expressly distinguishes pausing tax incentive negotiations from stopping the proposed project. It describes further ordinance work and a future introduction without a vote, then a possible later project rezoning application. These bodies support a listed proposal within the City planning account, without construction, computing operation or final present property permission. The older September 2025 statement about refusing further development agreement or tax district negotiations does not independently establish physical closure. The Mayor legal opinion about banning industries is not certified as a complete statement of current law.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://menomonie-wi.gov/527/Potential-Data-Center-FAQ", "host": "menomonie-wi.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://menomonie-wi.gov/DocumentCenter/View/2963/63026-Press-Release-Data-Center-Ordinance-Update-PDF", "host": "menomonie-wi.gov", "published": "2026-06-30", "date": "2026-06-30", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.menomonie-wi.gov/DocumentCenter/View/2569/-92325-Press-Release-Mayor-Randy-Knaack-on-Data-Center-PDF", "host": "www.menomonie-wi.gov", "published": "2025-09-23", "date": "2025-09-23", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Wisconsin · Menomonie · Dunn · Source context reviewed", "status_scope": "The current original City FAQ describes a potential project in early stages. The original June 30, 2026 Mayor statement names Balloonist LLC and expressly distinguishes pausing tax incentive negotiations from stopping the proposed project. It describes further ordinance work and a future introduction without a vote, then a possible later project rezoning application. These bodies support a listed proposal within the City planning account, without construction, computing operation or final present property permission. The older September 2025 statement about refusing further development agreement or tax district negotiations does not independently establish physical closure. The Mayor legal opinion about banning industries is not certified as a complete statement of current law.", "event_evidence": [{"date": "2026-06-30", "text": "The City published its June 30, 2026 Mayor statement about the proposed Menomonie data center and ordinance work, distinguishing the earlier tax incentive negotiation pause from stopping the project. This dates the official statement, not an exact land closing, original concern day, completed ordinance adoption or computing opening.", "kind": "announced", "sources": [{"url": "https://menomonie-wi.gov/DocumentCenter/View/2963/63026-Press-Release-Data-Center-Ordinance-Update-PDF", "host": "menomonie-wi.gov", "published": "2026-06-30", "date": "2026-06-30", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "55033"}, "state_name": "Wisconsin", "state_path": "/wisconsin/"}, {"id": "oppidan-beaver-dam-edge-wi", "state": "WI", "kind": "facility", "name": "Oppidan Beaver Dam Edge Data Center", "group": "proposed", "status": "Listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Dodge"], "city": "Beaver Dam", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Sale approval is not proof of closed conveyance, construction commencement or commissioning. The 407,340 USD figure is land price, not build cost. Nearby Meta acreage, scale and project attributes are separate. Summer construction and 2028 opening were forecasts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://dailydodge.com/beaver-dam-common-council-approves-second-data-center/", "host": "dailydodge.com", "date": "2026-04-07", "published": "2026-04-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ci.beaverdam.wi.gov/DocumentCenter/View/2564/Oppidan-Data-Center?bidId=", "host": "ci.beaverdam.wi.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 43.43106, "lng": -88.7236, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round30-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Daily Dodge reports an eleven-three council vote on sale of just over 14 Beaver Dam acres to Oppidan for a proposed 90,000-square-foot edge facility, targeting 2028 operation.", "independently_verified_current_operating_status": null}, "notes": ["Sale approval is not proof of closed conveyance, construction commencement or commissioning. The 407,340 USD figure is land price, not build cost. Nearby Meta acreage, scale and project attributes are separate. Summer construction and 2028 opening were forecasts.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://dailydodge.com/beaver-dam-common-council-approves-second-data-center/", "host": "dailydodge.com", "date": "2026-04-07", "published": "2026-04-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 59", "scope": "The original City project information sheet explicitly labels the Oppidan edge data center proposed and gives the Highway 151 and Hemlock Road planning context. This supports a listed proposal, without a verified completed building, construction start or computing service. City statements about anticipated utility use, future revenue, incentives and employment remain prospective institutional accounts and are not exported as measured outcomes or new technical and financial fields. No project location precision or provider role is changed.", "fields": {"current_stage_evidence": {"outcome": "original_city_explicit_edge_proposal", "scope": "The original City project information sheet explicitly labels the Oppidan edge data center proposed and gives the Highway 151 and Hemlock Road planning context. This supports a listed proposal, without a verified completed building, construction start or computing service. City statements about anticipated utility use, future revenue, incentives and employment remain prospective institutional accounts and are not exported as measured outcomes or new technical and financial fields. No project location precision or provider role is changed."}, "source_read_scope": {"complete_one_page_original_city_project_sheet_text_read": true, "project_proposed_not_operating": true, "expected_utility_and_revenue_not_measured": true, "street_context_not_location_edit": true, "no_quantity_export": true}}, "notes": ["The original City project information sheet explicitly labels the Oppidan edge data center proposed and gives the Highway 151 and Hemlock Road planning context. This supports a listed proposal, without a verified completed building, construction start or computing service. City statements about anticipated utility use, future revenue, incentives and employment remain prospective institutional accounts and are not exported as measured outcomes or new technical and financial fields. No project location precision or provider role is changed.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://ci.beaverdam.wi.gov/DocumentCenter/View/2564/Oppidan-Data-Center?bidId=", "host": "ci.beaverdam.wi.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Wisconsin · Beaver Dam · Dodge · Source context reviewed", "status_scope": "The original City project information sheet explicitly labels the Oppidan edge data center proposed and gives the Highway 151 and Hemlock Road planning context. This supports a listed proposal, without a verified completed building, construction start or computing service. City statements about anticipated utility use, future revenue, incentives and employment remain prospective institutional accounts and are not exported as measured outcomes or new technical and financial fields. No project location precision or provider role is changed.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "55027"}, "state_name": "Wisconsin", "state_path": "/wisconsin/"}, {"id": "cambrin-project-cornmaze-town-of-beloit-wi", "state": "WI", "kind": "facility", "name": "Project Cornmaze Data Center (Town of Beloit)", "group": "proposed", "status": "Project listed development", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Rock"], "city": "Beloit", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No applications/site plans submitted at report date. Up-to175000 USD reimburses town costs, not a grant paid to developer. Shared DNR contact with Degas does not establish Meta identity. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.wpr.org/news/town-of-beloit-pre-development-agreement-develop-data-center", "host": "wpr.org", "date": "2026-03-05", "published": "2026-03-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.panattoni.com/cornmaze/", "host": "www.panattoni.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 42.67125, "lng": -89.07141, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round24-2026-10-14.json", "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.", "fields": {"reported_context": "WPR reports July15,2025 Cambrin predevelopment cost-recovery agreement for possible Beloit Cornmaze project.", "independently_verified_current_operating_status": null}, "notes": ["No applications/site plans submitted at report date. Up-to175000 USD reimburses town costs, not a grant paid to developer. Shared DNR contact with Degas does not establish Meta identity.", "Subsequent original decisions and current operator disclosures take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.wpr.org/news/town-of-beloit-pre-development-agreement-develop-data-center", "host": "wpr.org", "date": "2026-03-05", "published": "2026-03-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 25", "scope": "Panattoni current Cornmaze page explicitly describes a potential campus in the Town of Beloit and Town of Turtle, early planning, no final decisions and required local review before development can proceed. Proposed describes that current named project account, not a permit, entitlement to build during any moratorium, current construction or an operating facility. Panattoni naming does not change the inherited Cambrin identity, provider roles, municipality wrapper, end user or quantities. Promised jobs, utility arrangements and environmental benefits are not accomplished outcomes.", "fields": {"current_stage_evidence": {"outcome": "current_named_cornmaze_early_planning_no_final_decision", "scope": "Panattoni current Cornmaze page explicitly describes a potential campus in the Town of Beloit and Town of Turtle, early planning, no final decisions and required local review before development can proceed. Proposed describes that current named project account, not a permit, entitlement to build during any moratorium, current construction or an operating facility. Panattoni naming does not change the inherited Cambrin identity, provider roles, municipality wrapper, end user or quantities. Promised jobs, utility arrangements and environmental benefits are not accomplished outcomes."}}, "notes": ["Panattoni current Cornmaze page explicitly describes a potential campus in the Town of Beloit and Town of Turtle, early planning, no final decisions and required local review before development can proceed. Proposed describes that current named project account, not a permit, entitlement to build during any moratorium, current construction or an operating facility. Panattoni naming does not change the inherited Cambrin identity, provider roles, municipality wrapper, end user or quantities. Promised jobs, utility arrangements and environmental benefits are not accomplished outcomes.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.panattoni.com/cornmaze/", "host": "www.panattoni.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Wisconsin · Beloit · Rock · Source context reviewed", "status_scope": "Panattoni current Cornmaze page explicitly describes a potential campus in the Town of Beloit and Town of Turtle, early planning, no final decisions and required local review before development can proceed. Proposed describes that current named project account, not a permit, entitlement to build during any moratorium, current construction or an operating facility. Panattoni naming does not change the inherited Cambrin identity, provider roles, municipality wrapper, end user or quantities. Promised jobs, utility arrangements and environmental benefits are not accomplished outcomes.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "55105"}, "state_name": "Wisconsin", "state_path": "/wisconsin/"}, {"id": "prometheus-hyperscale-evanston-wy", "state": "WY", "kind": "facility", "name": "Prometheus Hyperscale Atlas Industrial Park Data Center Campus", "group": "proposed", "status": "Agency listed proposal", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Uinta"], "city": "Evanston", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming distinct recipient/type/capacity scopes. SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf", "host": "wyoleg.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf", "host": "wyoleg.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 41.28764, "lng": -110.54755, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Wyoming distinct recipient/type/capacity scopes", "fields": {"lunavi_government_described_use": "Cheyennecolocation", "h6coin_government_described_use": "NewcastleBitcoinmining", "prometheus_evanston_planned_power_gw": 1.2, "prometheus_evanston_power_basis": "notexplicitcriticalIT", "related_digital_cheyenne_planned_critical_it_mw_max": 302, "related_digital_campus_acres": 115, "related_digital_planned_capex_usd": 1200000000, "related_digital_first_building_area_sqft": 184000, "related_digital_first_building_completion_target": "late2026", "related_digital_anchor_tenant": "CoreWeave"}, "notes": ["SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf", "host": "wyoleg.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 71", "scope": "The selected original State program report explicitly describes a prospective Evanston computing campus separately from a planned Casper operation. This supports an agency listed proposal at the named city scope. Earlier tax exemption certification and a planned buildout do not establish actual construction, commissioned capacity or current computing operation. Private later permit accounts, carbon claims and the exact industrial park corporate crosswalk are not independently verified here.", "fields": {"current_stage_evidence": {"outcome": "agency_named_evanston_proposal", "scope": "The selected original State program report explicitly describes a prospective Evanston computing campus separately from a planned Casper operation. This supports an agency listed proposal at the named city scope. Earlier tax exemption certification and a planned buildout do not establish actual construction, commissioned capacity or current computing operation. Private later permit accounts, carbon claims and the exact industrial park corporate crosswalk are not independently verified here."}, "source_read_scope": {"original_state_reports_physical_pages8_9_read": true, "evanston_and_casper_separate": true, "tax_certification_not_construction_or_operation": true, "no_capacity_carbon_or_role_changes": true}}, "notes": ["The selected original State program report explicitly describes a prospective Evanston computing campus separately from a planned Casper operation. This supports an agency listed proposal at the named city scope. Earlier tax exemption certification and a planned buildout do not establish actual construction, commissioned capacity or current computing operation. Private later permit accounts, carbon claims and the exact industrial park corporate crosswalk are not independently verified here.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf", "host": "wyoleg.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf", "host": "wyoleg.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Wyoming · Evanston · Uinta · Source context reviewed", "status_scope": "The selected original State program report explicitly describes a prospective Evanston computing campus separately from a planned Casper operation. This supports an agency listed proposal at the named city scope. Earlier tax exemption certification and a planned buildout do not establish actual construction, commissioned capacity or current computing operation. Private later permit accounts, carbon claims and the exact industrial park corporate crosswalk are not independently verified here.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "56041"}, "state_name": "Wyoming", "state_path": "/wyoming/"}, {"id": "prometheus-hyperscale-casper-wy", "state": "WY", "kind": "facility", "name": "Prometheus Hyperscale Falls Ranch Data Center Campus", "group": "proposed", "status": "Operator-listed plan", "raw_status": "proposed", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Converse"], "city": "Glenrock", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming named recipient histories and planned project scopes. Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf", "host": "wyoleg.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.prometheushyperscale.com/projects", "host": "www.prometheushyperscale.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 42.97213, "lng": -105.50755, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Wyoming named recipient histories and planned project scopes", "fields": {"echostar_first_sales_tax_certification_year": 2011, "microsoft_cheyenne_certified_campuses": 3, "meta_cheyenne_first_sales_tax_certification_month": "2022-10", "meta_cheyenne_reported_phase1_planned_capex_usd_approx": 800000000, "meta_cheyenne_reported_phase1_expected_direct_nonconstruction_jobs": 60, "prometheus_casper_planned_power_gw": 1.5, "prometheus_casper_power_basis": "notexplicitIT"}, "notes": ["Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf", "host": "wyoleg.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Operator-listed plan", "basis": "The current operator projects page separately names Casper as an expansion development with Spiritus and Casper Carbon Capture and describes expected multi-phase delivery.", "checked_on": "2026-10-16"}, "stage_review_limits": "Casper is separate from the Evanston flagship and Texas projects on the same page. Expected capacity and partnership language do not establish current construction, energization or carbon performance."}, "notes": ["Casper is separate from the Evanston flagship and Texas projects on the same page. Expected capacity and partnership language do not establish current construction, energization or carbon performance.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://www.prometheushyperscale.com/projects", "host": "www.prometheushyperscale.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Wyoming · Glenrock · Converse · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current operator projects page separately names Casper as an expansion development with Spiritus and Casper Carbon Capture and describes expected multi-phase delivery. Casper is separate from the Evanston flagship and Texas projects on the same page. Expected capacity and partnership language do not establish current construction, energization or carbon performance.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "56009"}, "state_name": "Wyoming", "state_path": "/wyoming/"}]}