{"state":"sc","name":"South Carolina","updated":"2026-10-15","checked":"2026-10-15","bounds":[-83.339,32.033,-78.541,35.198],"stats":{"projects":0,"operating":0,"facilities":28,"rule_counties":0,"moratorium_counties":0,"source_records":28,"reviewed_records":28,"status_confirmed":0,"status_unknown":28,"unreviewed_excluded":4,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":32,"manual_source_context_records":28,"published_source_context_records":28,"excluded":{"no_manual_source_review":4},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"cielo-gaffney-cherokee-county-sc","state":"sc","kind":"facility","name":"Cielo Digital Infrastructure Gaffney Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cherokee"],"city":"Gaffney","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 000 is a published placeholder, not independently parcel-geocoded street number. Investment and jobs forecasts, not spend/current employment. No site MW specified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development","host":"governor.sc.gov","date":"2025-06-24","published":"2025-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.0666365,"lng":-81.5576062,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"development_announcement_date":"2025-06-24","planned_investment_usd_approx":2100000000,"expected_new_jobs":30,"planned_buildings":4,"planned_area_per_building_sqft_approx":400000,"initial_operation_target":"2028-year-end","published_location":"000 Ford Road, Gaffney, Cherokee County, South Carolina"},"notes":["000 is a published placeholder, not independently parcel-geocoded street number. Investment and jobs forecasts, not spend/current employment. No site MW specified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development","host":"governor.sc.gov","date":"2025-06-24","published":"2025-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Gaffney · Cherokee · Source context reviewed"},{"id":"dartpoints-charleston-ladson-sc","state":"sc","kind":"facility","name":"DartPoints Charleston Data Center (CHS01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Charleston"],"city":"Ladson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Utility1MW is not criticalIT0.1MW. Ladson street not provided by reviewed source. Operator explicitly locatesCHS01inCharlestonCountyPalmettoCommercePark and separatesIT/utility. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dartpoints.com/locations/chs01-charleston-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.9648939,"lng":-80.1012147,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Charleston","campus":"Palmetto Commerce Park","critical_it_capacity_mw":0.1,"utility_power_mw":1,"data_hall_sqft":15000},"notes":["Utility1MW is not criticalIT0.1MW.","Ladson street not provided by reviewed source.","Operator explicitly locatesCHS01inCharlestonCountyPalmettoCommercePark and separatesIT/utility.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dartpoints.com/locations/chs01-charleston-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ladson · Charleston · Source context reviewed"},{"id":"dartpoints-columbia-sc","state":"sc","kind":"facility","name":"DartPoints Columbia Data Center (CAE01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Richland"],"city":"Columbia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DartPoints CAE01 capacity bases and area conflict. Area categories/scopes differ and not reconciled; do not choose15000over8200as same measure.110kWITis0.11MW, not1MWutility.120tons cooling is thermal capacity, not electric load. Dallas headquarters is not site. No street address or observed opening date in reviewed body. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dartpoints.com/locations/cae01-columbia-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9873119,"lng":-81.0308106,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"DartPoints CAE01 capacity bases and area conflict","fields":{"operator_code":"CAE01","site_description":"SCRA Innovation Center, Columbia, South Carolina","headline_critical_it_kw":110,"utility_power_mw":1,"headline_data_hall_sqft":8200,"narrative_raised_floor_sqft":15000,"canonical_current_area_sqft":null},"notes":["Area categories/scopes differ and not reconciled; do not choose15000over8200as same measure.110kWITis0.11MW, not1MWutility.120tons cooling is thermal capacity, not electric load. Dallas headquarters is not site. No street address or observed opening date in reviewed body.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dartpoints.com/locations/cae01-columbia-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Columbia · Richland · Source context reviewed"},{"id":"dartpoints-greenville-sc","state":"sc","kind":"facility","name":"DartPoints Greenville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Greenville"],"city":"Greenville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Greenville state-confirmed expansion announcement. Expansion of existing facility is not a separate duplicate campus or 15MW total. July 2027 is projected, not actual operations. 125M and 10 jobs are commitments, not actual spend or employment. Four operator facilities in South Carolina are not four Greenville buildings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sccommerce.com/news/dartpoints-expands-greenville-county-operations","host":"sccommerce.com","date":"2025-11-12","published":"2025-11-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.8075277,"lng":-82.3434922,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Greenville state-confirmed expansion announcement","fields":{"agency":"South Carolina Department of Commerce","announcement_date":"2025-11-12","operator":"DartPoints","address":"78 Global Drive, Greenville, South Carolina","planned_expansion_investment_usd":125000000,"planned_new_jobs":10,"capacity_before_mw":2.5,"capacity_after_mw":12.5,"power_basis":"agency-reported capacity; critical IT mentioned in quote but technical boundary not specified","added_high_density_space_sqft":88000,"agency_reported_stage":"construction underway","operations_target_month":"2027-07"},"notes":["Expansion of existing facility is not a separate duplicate campus or 15MW total. July 2027 is projected, not actual operations. 125M and 10 jobs are commitments, not actual spend or employment. Four operator facilities in South Carolina are not four Greenville buildings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sccommerce.com/news/dartpoints-expands-greenville-county-operations","host":"sccommerce.com","date":"2025-11-12","published":"2025-11-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Greenville · Greenville · Source context reviewed"},{"id":"dartpoints-spartanburg-sc","state":"sc","kind":"facility","name":"DartPoints Spartanburg Data Center (SPA01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spartanburg"],"city":"Spartanburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DartPoints SPA01 explicit IT versus utility power. Cooling tons not electric IT.21kplusheadlineconsistentwith21400notadditionalarea. Dallas headquarters not site. SLA100percent is contractual promise, not observed historical uptime or independent certification. No exact street/parcel in body. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dartpoints.com/locations/spa01-spartanburg-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.9965845,"lng":-82.034841,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"DartPoints SPA01 explicit IT versus utility power","fields":{"operator_code":"SPA01","locality":"Spartanburg, South Carolina","critical_it_mw":0.8,"utility_power_mw":1.5,"raised_floor_sqft":21400,"headline_data_hall_sqft_min_exclusive":21000,"cooling_tons":200},"notes":["Cooling tons not electric IT.21kplusheadlineconsistentwith21400notadditionalarea. Dallas headquarters not site. SLA100percent is contractual promise, not observed historical uptime or independent certification. No exact street/parcel in body.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dartpoints.com/locations/spa01-spartanburg-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spartanburg · Spartanburg · Source context reviewed"},{"id":"dc-blox-camp-hall-berkeley-county-sc","state":"sc","kind":"facility","name":"DC BLOX Camp Hall Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berkeley"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Dated preliminary plan; current construction/opening not established. Corporate footer is not this site capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/","host":"dcblox.com","date":"2023-09-27","published":"2023-09-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.1595951,"lng":-79.9070461,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"purchased_land_acres":27.5,"preliminary_buildings":4,"preliminary_area_sqft":200000,"preliminary_capacity_mw":45,"power_basis":"planned power, unspecified IT versus gross"},"notes":["Dated preliminary plan; current construction/opening not established. Corporate footer is not this site capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/","host":"dcblox.com","date":"2023-09-27","published":"2023-09-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Berkeley · Source context reviewed"},{"id":"dc-blox-greenville-sc","state":"sc","kind":"facility","name":"DC BLOX Greenville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Greenville"],"city":"Greenville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Header8MWcommittedplanned/36493sqft/3centersdiffersfromlegacy54kdatahalland18MWfuture. Keep sourcecontexts, notall8MWenergized. Captiondateisceremony, notexactfirstoperation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-centers/greenville/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.80455191966,"lng":-82.342676840132,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"33 Global Drive, Greenville, SC29607","phase1_critical_load_mw_max":3,"expansion_potential_critical_load_mw_max":18,"ribbon_cutting_month_caption":"2022-04"},"notes":["Header8MWcommittedplanned/36493sqft/3centersdiffersfromlegacy54kdatahalland18MWfuture. Keep sourcecontexts, notall8MWenergized. Captiondateisceremony, notexactfirstoperation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/greenville/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Greenville · Greenville · Source context reviewed"},{"id":"dc-blox-myrtle-beach-cls-sc","state":"sc","kind":"facility","name":"DC BLOX Myrtle Beach Cable Landing Station","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Horry"],"city":"Myrtle Beach","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Opening is supported by dated operator release; full-build design is not measured energized capacity. UpdatedJuly30,2024header is not opening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Potential expansion adjacent to MYR1, not a second operating building or completed20MW. Power comes from existing substation; no double count against full-buildMYR1.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dc-blox-opens-myrtle-beach-cable-landing-station/","host":"dcblox.com","date":"2023-10-10","published":"2023-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.dcblox.com/dc-blox-to-expand-myrtle-beach-cable-landing-station/","host":"dcblox.com","date":"2025-10-14","published":"2025-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.6746096,"lng":-78.9440697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"opening_announcement":"2023-10-10","full_build_design_area_sqft":125000,"full_build_design_capacity_mw":19,"power_basis":"design power, not explicitly critical IT"},"notes":["Opening is supported by dated operator release; full-build design is not measured energized capacity. UpdatedJuly30,2024header is not opening date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-opens-myrtle-beach-cable-landing-station/","host":"dcblox.com","date":"2023-10-10","published":"2023-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"expansion_site_code":"MYR2","adjacent_land_acres_approx":20,"potential_additional_power_mw":20,"construction_condition":"pending additional demand"},"notes":["Potential expansion adjacent to MYR1, not a second operating building or completed20MW. Power comes from existing substation; no double count against full-buildMYR1.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-to-expand-myrtle-beach-cable-landing-station/","host":"dcblox.com","date":"2025-10-14","published":"2025-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Myrtle Beach · Horry · Source context reviewed"},{"id":"dc-blox-north-augusta-sc","state":"sc","kind":"facility","name":"DC BLOX North Augusta Hyper Edge Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Aiken"],"city":"North Augusta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NorthAugusta-specific section within4-site announcement. Four-site25MWinitialand160MWpotentialforadditionaltenantsnotNorthAugusta-only. Montgomery5initial/40expandandHuntsville5aredifferentlocations. Statusdeveloping2024notcurrentlyonlineproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/","host":"dcblox.com","date":"2024-11-14","published":"2024-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4838645,"lng":-81.9141182,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"NorthAugusta-specific section within4-site announcement","fields":{"north_augusta_planned_anchor_power_mw":5,"north_augusta_county_quote":"Aiken County, South Carolina","power_basis":"dedicatedhyperscaleclientpower, not explicitIT"},"notes":["Four-site25MWinitialand160MWpotentialforadditionaltenantsnotNorthAugusta-only. Montgomery5initial/40expandandHuntsville5aredifferentlocations. Statusdeveloping2024notcurrentlyonlineproof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/","host":"dcblox.com","date":"2024-11-14","published":"2024-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Augusta · Aiken · Source context reviewed"},{"id":"genesis-digital-assets-anderson-sc","state":"sc","kind":"facility","name":"Genesis Digital Assets Anderson Bitcoin Mining Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Anderson"],"city":"Anderson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/","host":"scbiz.com","date":"2023-08-01","published":"2023-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.5068601,"lng":-82.6506264,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"SCBiz reports Genesis's Anderson site opened in February 2023 and two Union or Lockhart sites ran from March 2023.","independently_verified_current_operating_status":null},"notes":["Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/","host":"scbiz.com","date":"2023-08-01","published":"2023-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Anderson · Anderson · Source context reviewed"},{"id":"genesis-digital-assets-union-lockhart-sc","state":"sc","kind":"facility","name":"Genesis Digital Assets Union-Lockhart Bitcoin Mining Data Centers","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Union"],"city":"Lockhart","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/","host":"scbiz.com","date":"2023-08-01","published":"2023-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.7865238,"lng":-81.4620402,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"SCBiz reports Genesis's Anderson site opened in February 2023 and two Union or Lockhart sites ran from March 2023.","independently_verified_current_operating_status":null},"notes":["Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/","host":"scbiz.com","date":"2023-08-01","published":"2023-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lockhart · Union · Source context reviewed"},{"id":"google-moncks-corner-sc","state":"sc","kind":"facility","name":"Google Berkeley County Data Center (Moncks Corner)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berkeley"],"city":"Moncks Corner","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. South Carolina statewide redirect. PreferredBerkeleyURLredirectsstatewide.13B+not MoncksCorner-onlyinvestment; Dorchester2024opening not Berkeley date.225MWrenewabledeal is generation, not facilityIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. three-campus regional historical investment allocation. Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/berkeley-county-south-carolina/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","host":"governor.sc.gov","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.072101,"lng":-80.039105,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"South Carolina statewide redirect","fields":{"named_locations":["Moncks Corner","Summerville","St. George"],"regional_investment_usd_min_exclusive":13000000000,"investment_scope":"South Carolina statewide","dorchester_newest_opening_year":2024},"notes":["PreferredBerkeleyURLredirectsstatewide.13B+not MoncksCorner-onlyinvestment; Dorchester2024opening not Berkeley date.225MWrenewabledeal is generation, not facilityIT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/berkeley-county-south-carolina/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"three-campus regional historical investment allocation","fields":{"historical_expansion_announcement":"2024-09-26","combined_regional_planned_investment_usd":3300000000,"dorchester_two_new_campuses_combined_investment_usd":2000000000,"dorchester_two_new_campuses_expected_operational_jobs":200,"berkeley_existing_campus_expansion_planned_investment_usd":1300000000,"named_dorchester_locations":["Pine Hill Business Campus,Ridgeville","Winding Woods Commerce Park,StGeorge"],"named_berkeley_location":"Mount Holly Commerce Park,MoncksCorner"},"notes":["Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","host":"governor.sc.gov","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Moncks Corner · Berkeley · Source context reviewed"},{"id":"google-ridgeville-sc","state":"sc","kind":"facility","name":"Google Ridgeville Data Center (Project Dawson)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dorchester"],"city":"Ridgeville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-campus regional historical investment allocation. Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","host":"governor.sc.gov","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.096,"lng":-80.3239,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"three-campus regional historical investment allocation","fields":{"historical_expansion_announcement":"2024-09-26","combined_regional_planned_investment_usd":3300000000,"dorchester_two_new_campuses_combined_investment_usd":2000000000,"dorchester_two_new_campuses_expected_operational_jobs":200,"berkeley_existing_campus_expansion_planned_investment_usd":1300000000,"named_dorchester_locations":["Pine Hill Business Campus,Ridgeville","Winding Woods Commerce Park,StGeorge"],"named_berkeley_location":"Mount Holly Commerce Park,MoncksCorner"},"notes":["Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","host":"governor.sc.gov","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ridgeville · Dorchester · Source context reviewed"},{"id":"greenidge-spartanburg-sc","state":"sc","kind":"facility","name":"Greenidge Spartanburg (South Carolina)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Spartanburg"],"city":"Spartanburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. South Carolina Department of Commerce, January25,2022 original announcement: Greenidge proposed175acres/300JonesRoad Spartanburg crypto facility,264M announced investment/40future jobs/at least100MW fully developed DATACENTER CAPACITY, basis not explicit critical IT. Second-half2022 first phase and expansion through2025 are historical targets, not completed operating proof. Carbon-neutral commitment and local energy mix statements are issuer claims, not verified measured emissions. No grant/payment amount or current owner inferred; historical Greenidge identity does not automatically establish current Lighthouse conversion. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sccommerce.com/news/greenidge-generation-establishing-operations-spartanburg-county","host":"sccommerce.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.9494,"lng":-81.925,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["South Carolina Department of Commerce, January25,2022 original announcement: Greenidge proposed175acres/300JonesRoad Spartanburg crypto facility,264M announced investment/40future jobs/at least100MW fully developed DATACENTER CAPACITY, basis not explicit critical IT.","Second-half2022 first phase and expansion through2025 are historical targets, not completed operating proof. Carbon-neutral commitment and local energy mix statements are issuer claims, not verified measured emissions. No grant/payment amount or current owner inferred; historical Greenidge identity does not automatically establish current Lighthouse conversion.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://www.sccommerce.com/news/greenidge-generation-establishing-operations-spartanburg-county","host":"sccommerce.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spartanburg · Spartanburg · Source context reviewed"},{"id":"lighthouse-data-centers-spartanburg-sc","state":"sc","kind":"facility","name":"LightHouse Data Centers Spartanburg (300 Jones Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spartanburg"],"city":"Spartanburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. RipLey Simone, WSPA original report; article metadata published August 26, 2026 at 23:36:24 UTC, modified 23:40:43 UTC. Photo/body identify the August 25 appeals meeting. Names Lighthouse at 300 Jones Road, 200,000 square feet/60 MW undefined power basis: this resolves the earlier held operator/address crosswalk. Appeals board upheld the June 26 application denial; not proof no judicial appeal is possible or all county development is permanently banned. Underlying ordinance, application, decision and current litigation not inspected. $28 million spent is the developer representative claim, not an audited receipt. Representative named Sam Outten; no OpenAI-CEO identity inference. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/amp/","host":"wspa.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0151258,"lng":-81.8838447,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["RipLey Simone, WSPA original report; article metadata published August 26, 2026 at 23:36:24 UTC, modified 23:40:43 UTC. Photo/body identify the August 25 appeals meeting. Names Lighthouse at 300 Jones Road, 200,000 square feet/60 MW undefined power basis: this resolves the earlier held operator/address crosswalk. Appeals board upheld the June 26 application denial; not proof no judicial appeal is possible or all county development is permanently banned. Underlying ordinance, application, decision and current litigation not inspected. $28 million spent is the developer representative claim, not an audited receipt. Representative named Sam Outten; no OpenAI-CEO identity inference.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/amp/","host":"wspa.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spartanburg · Spartanburg · Source context reviewed"},{"id":"meta-aiken-county-sc","state":"sc","kind":"facility","name":"Meta Aiken Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Aiken"],"city":"Graniteville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Historical announced scope, not completed2026capacity. No site MW specified. Renewable matching and plannedLEEDGold do not prove continuous clean supply or current achieved certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center","host":"governor.sc.gov","date":"2024-08-29","published":"2024-08-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.5629,"lng":-81.8287,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"development_announcement_date":"2024-08-29","planned_investment_usd":800000000,"expected_operational_jobs":100,"planned_data_center_area_sqft":715000,"operation_target":"spring2027","published_location":"Sage Mill Industrial Park,AikenCounty,SouthCarolina"},"notes":["Historical announced scope, not completed2026capacity. No site MW specified. Renewable matching and plannedLEEDGold do not prove continuous clean supply or current achieved certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center","host":"governor.sc.gov","date":"2024-08-29","published":"2024-08-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Graniteville · Aiken · Source context reviewed"},{"id":"northmark-valara-spartanburg-sc","state":"sc","kind":"facility","name":"NorthMark Strategies Spartanburg High-Performance Computing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spartanburg"],"city":"Spartanburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Valara siteidentity andproposed onsitegeneration modification. Applicationcopy/digitalsignaturenotapprovalofnewturbines orcurrentoperations. Existing24times2MWenginesandrequestedgenerationnotcriticalIT,donotsumasenergizedcampuscapacity. Northmarkoperatoraliasnotindependentlyestablishedinthisform. Noexactcompletionorcapitalvalue. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf","host":"des.sc.gov","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.923066,"lng":-81.851905,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Valara siteidentity andproposed onsitegeneration modification","fields":{"application_copy_of_record_date":"2026-04-23","facility_name":"ValaraHoldingsHighPerformanceComputeCenter","published_physical_address":"4000 SouthPineStreet,Spartanburg,SC29302","applicant_reported_facility_point":{"latitude":34.923,"longitude":-81.8519,"geo_precision":"applicant-reported permitted-process center,notparcelcentroid"},"referenced_existing_air_permit":"CP-50000316v1.0","referenced_existing_permit_issue_date":"2025-09-17","requested_additional_generation":[{"units":5,"mw_each":17,"fuel":"naturalgas"},{"units":6,"mw_each":54,"fuel":"naturalgas"}]},"notes":["Applicationcopy/digitalsignaturenotapprovalofnewturbines orcurrentoperations. Existing24times2MWenginesandrequestedgenerationnotcriticalIT,donotsumasenergizedcampuscapacity. Northmarkoperatoraliasnotindependentlyestablishedinthisform. Noexactcompletionorcapitalvalue.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf","host":"des.sc.gov","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spartanburg · Spartanburg · Source context reviewed"},{"id":"pollard-mccormick-county-data-center-sc","state":"sc","kind":"facility","name":"Pollard Data Center Site (McCormick County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["McCormick"],"city":"McCormick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Original publication metadata is July 28, with an August 12 update and an August 18 future council date; the exact information-session date is not established. Planning denial/recommendations are separate from council law. Pipeline cost is not DC capex, and a proposed gas-powered system is not critical IT or an executed fuel contract. Unrelated inserted political material is excluded. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wrdw.com/2026/08/12/hundreds-gather-debate-proposed-mccormick-county-data-center/","host":"wrdw.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.8992855,"lng":-82.2674735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WRDW reports Pollard's McCormick informational proposal with a gas pipeline, planned water use and a planning recommendation for a pause, while county action remained future.","independently_verified_current_operating_status":null},"notes":["Original publication metadata is July 28, with an August 12 update and an August 18 future council date; the exact information-session date is not established. Planning denial/recommendations are separate from council law. Pipeline cost is not DC capex, and a proposed gas-powered system is not critical IT or an executed fuel contract. Unrelated inserted political material is excluded.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wrdw.com/2026/08/12/hundreds-gather-debate-proposed-mccormick-county-data-center/","host":"wrdw.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"McCormick · McCormick · Source context reviewed"},{"id":"clarendon-county-ram-bay-data-center-manning-sc","state":"sc","kind":"facility","name":"Potential Data Center, Ram Bay Industrial Park (Clarendon County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clarendon"],"city":"Manning","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Clarendon early proposal, first reading and water-fill scope. Secondary account of countyfactsheet, not signedutilityagreement. Firstreading not effective moratorium; thirdreading/outcome unknown.40Kcoolingfill not gallonsperday or nofuturewateruse guarantee.4.5Mannualforecast not actualpaidtax. Officials noharm/nojurisdiction statements not independent legal or environmental finding. No named operator, exactparcel, ITMW or operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wistv.com/2026/08/19/clarendon-county-administration-responds-pushback-proposed-data-center/","host":"wistv.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6382891,"lng":-80.2708259,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Clarendon early proposal, first reading and water-fill scope","fields":{"county":"Clarendon, SouthCarolina","project_location":"RamBayIndustrialPark","report_date_as_url":"2026-08-19","reported_stage":"potential site secured through SanteeElectric contract; formal plans not official","reported_moratorium_first_reading_date":"2026-08-10","reported_projected_tax_revenue_annual_usd":4500000,"reported_initial_cooling_water_gallons_approx":40000},"notes":["Secondary account of countyfactsheet, not signedutilityagreement. Firstreading not effective moratorium; thirdreading/outcome unknown.40Kcoolingfill not gallonsperday or nofuturewateruse guarantee.4.5Mannualforecast not actualpaidtax. Officials noharm/nojurisdiction statements not independent legal or environmental finding. No named operator, exactparcel, ITMW or operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wistv.com/2026/08/19/clarendon-county-administration-responds-pushback-proposed-data-center/","host":"wistv.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Manning · Clarendon · Source context reviewed"},{"id":"volt-edge-project-alpaca-union-county-sc","state":"sc","kind":"facility","name":"Project Alpaca (Midway Green Industrial Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Union"],"city":"Union","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original participant/economic-development presentation for proposal and claims, not independent performance validation.. Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation. USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts. Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established. Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset. A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf","host":"gearupunionsc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.708932747649,"lng":-81.662386821414,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round39-2026-10-14.json","scope":"Original participant/economic-development presentation for proposal and claims, not independent performance validation.","fields":{"issuer_presentation_date":"2026-04","issuer_proposed_fixed_asset_investment_usd":410000000,"issuer_proposed_permanent_jobs_lower_bound":50,"issuer_proposed_construction_jobs_lower_bound":500,"issuer_mw_label":49,"issuer_mw_basis":"Presentation says existing transmission and generation capacity, not explicitly criticalIT","critical_it_mw":null,"issuer_construction_target":"2026","issuer_operating_target":"2027/2028","executed_utility_agreement_verified":false,"incentive_award_verified":false},"notes":["Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation.","USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts.","Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established.","Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset.","A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf","host":"gearupunionsc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Union · Union · Source context reviewed"},{"id":"project-altair-newberry-county-sc","state":"sc","kind":"facility","name":"Project Altair (Mid-Carolina Commerce Park II)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Newberry"],"city":"Prosperity","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Newberry County due-diligence proposal status. Option/due-diligence proposal not finalized sale, construction approval, cancellation or operating campus. Informational session has no confirmed date. No MW, budget, tax incentive amount or exact parcel adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers","host":"newberrycounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.2098669,"lng":-81.5338576,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Newberry County due-diligence proposal status","fields":{"project_name":"Altair","county_public_hearing_date":"2026-04-15","ordinance_id":"03-01-2026","reported_review_stage":"third reading delayed; community information session to be scheduled","published_location":"remaining acreage,MidCarolinaCommerceParkII","utility_feasibility_review":"SanteeCooper grid study"},"notes":["Option/due-diligence proposal not finalized sale, construction approval, cancellation or operating campus. Informational session has no confirmed date. No MW, budget, tax incentive amount or exact parcel adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers","host":"newberrycounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Prosperity · Newberry · Source context reviewed"},{"id":"project-boulder-colleton-county-sc","state":"sc","kind":"facility","name":"Project Boulder","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Colleton"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This is counsel/advocacy, not an adopted zoning finding or permit outcome. The approximately 850-acre project, wetlands and larger 2,600-acre tract have different scopes. Generic power/water/health impacts, the separate Canadys plant and its pipeline are not measured site consumption, actual emissions or committed project infrastructure. No original application was read in this pass. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.scelp.org/news/colleton-data-center","host":"scelp.org","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.7,"lng":-80.62,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"SCELP describes Thomas and Hutton/Eagle Rock's proposed Colleton campus and need for a special exception, with a hearing not yet scheduled in its account.","independently_verified_current_operating_status":null},"notes":["This is counsel/advocacy, not an adopted zoning finding or permit outcome. The approximately 850-acre project, wetlands and larger 2,600-acre tract have different scopes. Generic power/water/health impacts, the separate Canadys plant and its pipeline are not measured site consumption, actual emissions or committed project infrastructure. No original application was read in this pass.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.scelp.org/news/colleton-data-center","host":"scelp.org","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colleton · Source context reviewed"},{"id":"stream-data-centers-project-liberty-marion-county-sc","state":"sc","kind":"facility","name":"Project Liberty (Stream Data Centers, Marion County Industrial Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Marion","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Community funding commitments reportedly continue but no recipients, amounts or disbursements established. County approval did not guarantee power or construction. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wmbfnews.com/2026/06/11/stream-data-centers-pulls-out-controversial-marion-county-project/","host":"wmbfnews.com","date":"2026-06-11","published":"2026-06-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.1782,"lng":-79.4006,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"developer-withdrawal-reported","reported_finding":"WMBF reports Stream no longer proceeding with Marion Project Liberty due to utility timing, despite earlier county approval.","report_display_date":"2026-06-11","independently_verified_current_status":null},"notes":["Community funding commitments reportedly continue but no recipients, amounts or disbursements established. County approval did not guarantee power or construction.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wmbfnews.com/2026/06/11/stream-data-centers-pulls-out-controversial-marion-county-project/","host":"wmbfnews.com","date":"2026-06-11","published":"2026-06-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Marion · Marion · Source context reviewed"},{"id":"tigerdc-project-spero-spartanburg-county-sc","state":"sc","kind":"facility","name":"Project Spero (TigerDC), Tyger River Industrial Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spartanburg"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. County explicitly did not close door to all data centers. Existing TigerDC presence since 2022 is not operation of withdrawn Spero; technology/water claims remain company assertions. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.foxcarolina.com/2026/02/27/company-withdraws-ai-data-center-spartanburg-county-consideration/","host":"foxcarolina.com","date":"2026-02-27","published":"2026-02-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.9109275,"lng":-82.092603,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"developer-withdrawal-after-incentive-rejection","reported_finding":"FOX Carolina reports TigerDC formally withdrew Project Spero and would seek other communities after county declined tax incentive.","report_display_date":"2026-02-27","independently_verified_current_status":null},"notes":["County explicitly did not close door to all data centers. Existing TigerDC presence since 2022 is not operation of withdrawn Spero; technology/water claims remain company assertions.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.foxcarolina.com/2026/02/27/company-withdraws-ai-data-center-spartanburg-county-consideration/","host":"foxcarolina.com","date":"2026-02-27","published":"2026-02-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spartanburg · Source context reviewed"},{"id":"qts-york-county-sc","state":"sc","kind":"facility","name":"QTS York County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["York"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Four buildings is the first phase, nine is the three-phase plan, not a numerical conflict. Later land beyond approved campus would require additional investment; current estimate is not all spent. Per-billion tax examples are estimates, not guaranteed annual collections. Old May event has no verified current upcoming date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"http://q.com/data-centers/york/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0046528,"lng":-81.1001847,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_total_buildings":9,"planned_phases":3,"first_phase_buildings":4,"first_phase_acres_approx":109,"second_phase_construction_target":"early2027","planned_approved_campus_investment_usd_approx":8000000000,"forecast_construction_jobs":1000,"forecast_permanent_jobs":200},"notes":["Four buildings is the first phase, nine is the three-phase plan, not a numerical conflict. Later land beyond approved campus would require additional investment; current estimate is not all spent. Per-billion tax examples are estimates, not guaranteed annual collections. Old May event has no verified current upcoming date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"http://q.com/data-centers/york/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"York · Source context reviewed"},{"id":"eagle-rock-rhodes-technology-park-colleton-county-sc","state":"sc","kind":"facility","name":"Rhodes Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Colleton"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The proposed 1,000 MW, investment, jobs and tax benefits are forecasts. Construction was expected in 2028 or 2029. No tenant was identified; named technology companies were examples. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/","host":"live5news.com","date":"2026-09-22","published":"2026-09-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.0509477,"lng":-80.7911503,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"WCSC reports a Rhodes Technology Park information session after overlay passage, with the development agreement and energy studies pending.","independently_verified_current_operating_status":null},"notes":["The proposed 1,000 MW, investment, jobs and tax benefits are forecasts. Construction was expected in 2028 or 2029. No tenant was identified; named technology companies were examples.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/","host":"live5news.com","date":"2026-09-22","published":"2026-09-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colleton · Source context reviewed"},{"id":"srs-ai-data-center-savannah-river-site-sc","state":"sc","kind":"facility","name":"Savannah River Site AI Data Center (Amentum)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Barnwell"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Savannah River federal negotiation selection, not awarded operating campus. Selection explicitly not final lease award. Subject to negotiations, permits,safety/security and federal approvals. Data-center1GWand onsitegeneration2GWnot3GWIT. No executed lease, operating date or investment value established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site","host":"energy.gov","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.2122041,"lng":-81.6223727,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Savannah River federal negotiation selection, not awarded operating campus","fields":{"developer_selection_for_negotiations_announcement":"2026-07-20","selected_negotiating_party":"Amentum","proposed_data_center_power_gw":1,"data_center_power_basis":"not explicitly criticalIT","proposed_dedicated_generation_gw_approx":2,"proposed_generation_transition":"natural gas bridging to nuclear"},"notes":["Selection explicitly not final lease award. Subject to negotiations, permits,safety/security and federal approvals. Data-center1GWand onsitegeneration2GWnot3GWIT. No executed lease, operating date or investment value established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site","host":"energy.gov","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Barnwell · Source context reviewed"},{"id":"terra-nexus-camden-kershaw-county-sc","state":"sc","kind":"facility","name":"Terra Nexus Ventures Camden Data Center (771 Park Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kershaw"],"city":"Camden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. LenahAllen WIS mainbodypublishedSeptember23,2025 despiteURL24. September8planningrecommendationrezoning161acres771ParkRdTerraNexusstillneededcountyfinalapproval.2warehouses/10-15jobsproposalnotnew2pins/hiredstaff. Garbledwordnotincompanysentence notadopted; sourceendexplicitTerraNexuscontact. CountyOctoberdiscussionfuturethen, currentvote/constructionunverified. No ITMW/capex/actualwater established. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wistv.com/2025/09/24/questions-concerns-raised-about-planned-kershaw-county-data-center/","host":"wistv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.3084326,"lng":-80.5392422,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["LenahAllen WIS mainbodypublishedSeptember23,2025 despiteURL24. September8planningrecommendationrezoning161acres771ParkRdTerraNexusstillneededcountyfinalapproval.2warehouses/10-15jobsproposalnotnew2pins/hiredstaff. Garbledwordnotincompanysentence notadopted; sourceendexplicitTerraNexuscontact. CountyOctoberdiscussionfuturethen, currentvote/constructionunverified. No ITMW/capex/actualwater established.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wistv.com/2025/09/24/questions-concerns-raised-about-planned-kershaw-county-data-center/","host":"wistv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Camden · Kershaw · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}