{"state":"tx","name":"Texas","updated":"2026-10-15","checked":"2026-10-15","bounds":[-106.644,25.888,-93.526,36.502],"stats":{"projects":0,"operating":0,"facilities":95,"rule_counties":0,"moratorium_counties":0,"source_records":95,"reviewed_records":95,"status_confirmed":0,"status_unknown":95,"unreviewed_excluded":36,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":131,"manual_source_context_records":95,"published_source_context_records":95,"excluded":{"no_manual_source_review":36},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"canaan-alborz-happy-tx","state":"tx","kind":"facility","name":"Alborz Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Randall"],"city":"Happy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-project portfolio, no per-site allocation. 120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.012,"lng":-101.9165,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"three-project portfolio, no per-site allocation","fields":{"acquisition_announced_date":"2026-02-23","acquired_equity_percent":49,"continuing_windhq_equity_percent":51,"portfolio_projects":["Alborz","Bear","Chief Mountain"],"portfolio_operational_power_mw":120,"portfolio_transaction_consideration_usd_approx":39750000,"transaction_consideration_basis":"49percent joint-venture interests plus6840mining rigs, funded with shares"},"notes":["120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Happy · Randall · Source context reviewed"},{"id":"aligned-project-caprock-hale-county-tx","state":"tx","kind":"facility","name":"Aligned Data Centers Project Caprock","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hale"],"city":"Abernathy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 540MWnot explicitcriticalIT.5Bexpected regionaleconomic impact is not audited spend. Operator ratepayer/water protection statements not approved tariff or measured water findings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/","host":"aligneddc.com","date":"2026-04-09","published":"2026-04-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.84,"lng":-101.84,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"planned_campus_power_mw":540,"campus_acres":313,"planned_area_sqft":1650000,"planned_facilities":6,"first_facility_code":"LBB01","first_service_target":"2027-Q1","expected_regional_economic_investment_usd":5000000000},"notes":["540MWnot explicitcriticalIT.5Bexpected regionaleconomic impact is not audited spend. Operator ratepayer/water protection statements not approved tariff or measured water findings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/","host":"aligneddc.com","date":"2026-04-09","published":"2026-04-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Abernathy · Hale · Source context reviewed"},{"id":"aligned-dfw-01-tx","state":"tx","kind":"facility","name":"Aligned DFW-01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Plano","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus/buildinggroup needed to avoid duplicated19acres. Per-unit3MWgenerator/2MWUPS are notcampus totals. Operator listsDFW01and02samePlanoaddress;DFW03inMansfield and04atdifferentPlanoaddress. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/dallas-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.0093142,"lng":-96.6765617,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"2800 Summit Ave","city":"Plano","campus_acres":19},"notes":["Campus/buildinggroup needed to avoid duplicated19acres.","Per-unit3MWgenerator/2MWUPS are notcampus totals.","Operator listsDFW01and02samePlanoaddress;DFW03inMansfield and04atdifferentPlanoaddress.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/dallas-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Plano · Collin · Source context reviewed"},{"id":"aligned-dfw-03-tx","state":"tx","kind":"facility","name":"Aligned DFW-03","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tarrant"],"city":"Mansfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Company5000+MWfuturecapacity not DFW03. Rack350kWdensity not siteMW. No completed opening inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/","host":"aligneddc.com","date":"2025-02-19","published":"2025-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.5498227,"lng":-97.0748553,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"site_acres":27,"initial_capacity_availability_earliest_target":"2025-Q4","onsite_substation_statement":true},"notes":["Company5000+MWfuturecapacity not DFW03. Rack350kWdensity not siteMW. No completed opening inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/","host":"aligneddc.com","date":"2025-02-19","published":"2025-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mansfield · Tarrant · Source context reviewed"},{"id":"amazon-pecos-county-data-center-tx","state":"tx","kind":"facility","name":"Amazon Pecos County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pecos"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Amazon Pecos County statement. No numeric IT MW, investment, opening date or permanent-versus-construction job split in reviewed statement. Solar/battery/produced-water options exploratory. Statement about ratepayer effects is developer claim, not adjudicated tariff finding. Publication day not present in saved body; metadata candidate not treated as event date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.8981,"lng":-102.8779,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Amazon Pecos County statement","fields":{"project_county":"Pecos County, Texas","developer_described_initial_power":"new on-site generation with intended later grid connection","water_plan":"non-potable water; exploring produced-water use","operator_expected_jobs_description":"thousands of new jobs"},"notes":["No numeric IT MW, investment, opening date or permanent-versus-construction job split in reviewed statement. Solar/battery/produced-water options exploratory. Statement about ratepayer effects is developer claim, not adjudicated tariff finding. Publication day not present in saved body; metadata candidate not treated as event date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pecos · Source context reviewed"},{"id":"edgeconnex-cedar-creek-tx","state":"tx","kind":"facility","name":"AUS02 / Cedar Creek Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bastrop"],"city":"Cedar Creek","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Texas construction registration, not operational certificate. Architectural accessibility review complete is not construction/occupancy completion. Registered dates and estimated cost are plans, not actual spend or observed energization. Source concatenates two street references; parcel/geocode held pending exact address verification. No MW from area. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025023484","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.139438,"lng":-97.565051,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Texas construction registration, not operational certificate","fields":{"architectural_barriers_project_id":"TABS2025023484","facility_name":"AUS02","owner_entity":"DFW33220N LLC","registration_date":"2025-07-14","reported_location_county":"Bastrop, Texas","published_location_address_verbatim":"8001 WOLF LN BLDG2 6752 FM535, Cedar Creek, TX78612","registered_scheduled_start":"2025-08-01","registered_scheduled_completion":"2026-06-14","registered_estimated_cost_usd":440000000,"registered_area_sqft":578000,"work_description":"new two-story data-center facility"},"notes":["Architectural accessibility review complete is not construction/occupancy completion. Registered dates and estimated cost are plans, not actual spend or observed energization. Source concatenates two street references; parcel/geocode held pending exact address verification. No MW from area.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025023484","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Cedar Creek · Bastrop · Source context reviewed"},{"id":"aws-project-eagle-boling-wharton-county-tx","state":"tx","kind":"facility","name":"AWS Project Eagle (Wharton County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wharton"],"city":"Boling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. TDLR accessibility project registrations are not localbuildingpermits,groundbreakingprooforcompletion. Fourx300million=1.2billionestimatedconstructioncost,notspendingcommitmentorIT-inclusivecapex.2700acreslandbanknotallDCfootprint;756240squarefeetderivedsumoffourfloorareas,notland. 1587USDpersquarefootderivednotpaidcost. OtherBastrop,DeSoto/Spectrum andnuclearadjacencyprojectsareseparate;noenergysupply,ITorwaterverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original TDLR architectural-barriers project registrations; estimated costs and filed timelines, not measured operating census.. ReviewCompleteisaccessibilityplan-reviewstatus,notcommissioning,occupancycertification,localbuildingpermitorutilityagreement. Allstart/completiondatesarefiledplans,noteventsverifiedonthosedates. BuildingBisAugust2027,whileA/C/DareJanuary2027;donotassignlaterdatetoDbecauseitisthefourthletter. AandDshare244EaglewoodbuthaveuniqueregistrationIDs;donotdeduplicatebyaddressaloneorcreatetwoindependentlyoperatingcampuses. Fourestimated300millioncostsarenotauditedspendingorIT-inclusivecampuscapex. No2700acrefootprint,MW,water,incentivesorendcustomerfromtheseregistrations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://usdatacenterprojects.com/texas/aws-files-1-2-billion-permit-for-four-building-data-center-campus-in-wharton-county-texas","host":"usdatacenterprojects.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.3167,"lng":-96.0553,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.","fields":{"reported_context":"USDataCenterProjects reports four TexasTDLR filings forAWSProjectEagle nearBoling, each189060squarefeet/USD300millionestimatedcost, with August1,2026plannedstart and January/August2027completiontargets.","independently_verified_current_operating_status":null},"notes":["TDLR accessibility project registrations are not localbuildingpermits,groundbreakingprooforcompletion. Fourx300million=1.2billionestimatedconstructioncost,notspendingcommitmentorIT-inclusivecapex.2700acreslandbanknotallDCfootprint;756240squarefeetderivedsumoffourfloorareas,notland. 1587USDpersquarefootderivednotpaidcost. OtherBastrop,DeSoto/Spectrum andnuclearadjacencyprojectsareseparate;noenergysupply,ITorwaterverified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://usdatacenterprojects.com/texas/aws-files-1-2-billion-permit-for-four-building-data-center-campus-in-wharton-county-texas","host":"usdatacenterprojects.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Original TDLR architectural-barriers project registrations; estimated costs and filed timelines, not measured operating census.","fields":{"registered_buildings":[{"building":"A","registration_number":"TABS2026023825","registration_date":"2026-06-25","registered_owner":"AMAZON DATA SERVICES, INC","listed_tenant":"Not Assigned","address_as_filed":"244 Eaglewood Road, Boling, Texas77420","county":"Wharton","filed_start_date":"2026-08-01","filed_completion_date":"2027-01-01","estimated_cost_usd":300000000,"filed_building_sqft":189060,"architectural_barriers_review_status":"Review Complete","funding":"Privately funded, private land for private use","source":{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825","sha256":"007491f5007d3713e5e6533bdbf675c24947787295f603617946ae1ae634add7","publication_date":null,"publisher":"Texas Department of Licensing and Regulation"}},{"building":"B","registration_number":"TABS2026023826","registration_date":"2026-06-25","registered_owner":"AMAZON DATA SERVICES, INC","listed_tenant":"Not Assigned","address_as_filed":"258 Eaglewood Road, Boling, Texas77420","county":"Wharton","filed_start_date":"2026-08-01","filed_completion_date":"2027-08-01","estimated_cost_usd":300000000,"filed_building_sqft":189060,"architectural_barriers_review_status":"Review Complete","funding":"Privately funded, private land for private use","source":{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826","sha256":"44e02d9a4610e9a1d7923405be3f1f4fd587301bc84b858bb3fac88dd3d596ce","publication_date":null,"publisher":"Texas Department of Licensing and Regulation"}},{"building":"C","registration_number":"TABS2026023832","registration_date":"2026-06-25","registered_owner":"AMAZON DATA SERVICES, INC","listed_tenant":"Not Assigned","address_as_filed":"240 Eaglewood Road, Boling, Texas77420","county":"Wharton","filed_start_date":"2026-08-01","filed_completion_date":"2027-01-01","estimated_cost_usd":300000000,"filed_building_sqft":189060,"architectural_barriers_review_status":"Review Complete","funding":"Privately funded, private land for private use","source":{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832","sha256":"4502ce87801efc4ad7651df66d2b5d5c77cbdcd826670251e00f07cb30d6d62f","publication_date":null,"publisher":"Texas Department of Licensing and Regulation"}},{"building":"D","registration_number":"TABS2026023834","registration_date":"2026-06-25","registered_owner":"AMAZON DATA SERVICES, INC","listed_tenant":"Not Assigned","address_as_filed":"244 Eaglewood Road, Boling, Texas77420","county":"Wharton","filed_start_date":"2026-08-01","filed_completion_date":"2027-01-01","estimated_cost_usd":300000000,"filed_building_sqft":189060,"architectural_barriers_review_status":"Review Complete","funding":"Privately funded, private land for private use","source":{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834","sha256":"be57dbfec270f9f66815efc0df1378bda308c3b877871f4460073d1e7f182443","publication_date":null,"publisher":"Texas Department of Licensing and Regulation"}}],"derived_estimated_construction_cost_sum_usd":1200000000,"derived_filed_building_area_sum_sqft":756240,"campus_building_permit_verified":false,"actual_construction_start_verified":false,"actual_completion_verified":false,"critical_it_mw":null,"secured_utility_mw":null},"notes":["ReviewCompleteisaccessibilityplan-reviewstatus,notcommissioning,occupancycertification,localbuildingpermitorutilityagreement. Allstart/completiondatesarefiledplans,noteventsverifiedonthosedates. BuildingBisAugust2027,whileA/C/DareJanuary2027;donotassignlaterdatetoDbecauseitisthefourthletter. AandDshare244EaglewoodbuthaveuniqueregistrationIDs;donotdeduplicatebyaddressaloneorcreatetwoindependentlyoperatingcampuses. Fourestimated300millioncostsarenotauditedspendingorIT-inclusivecampuscapex. No2700acrefootprint,MW,water,incentivesorendcustomerfromtheseregistrations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Boling · Wharton · Source context reviewed"},{"id":"aws-project-spectrum-somervell-county-tx","state":"tx","kind":"facility","name":"AWS Project Spectrum (Somervell/Hood County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Somervell"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 435 acres/up-to 18 two-storybuildings/5 billioninvestment are proposals, not built/leasedcapacity or actualspending.2.4 GWComanchePeak is existingGENERATION, not campuscriticalITor dedicatedsupply/PPA; article’s 1974 plantlaunchdate not adopted without originalhistory.2.5 milliongroundbreakingpayment and 300,000 perbuildingannually are contingent terms, not receivedtaxes or paidincentives. HoodCounty 1265 acreaddress andSailfish 2000 acres/5 GWare distinct/uncrosswalked development scopes, not automaticadditions.2027 start is forecast. Readercommentcease-and-desistclaim is not independent recordevidence. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://constructionreviewonline.com/amazon-to-collocate-5-billion-project-spectrum-data-center-campus-in-texas-with-nuclear-power-plant/","host":"constructionreviewonline.com","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.2373,"lng":-97.7561,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ConstructionReview summarizes AmazonDataServices’ proposed ProjectSpectrum onVistra land byComanchePeak, withSomervell development-agreement motion and lease terms still unfinished.","independently_verified_current_operating_status":null},"notes":["435 acres/up-to 18 two-storybuildings/5 billioninvestment are proposals, not built/leasedcapacity or actualspending.2.4 GWComanchePeak is existingGENERATION, not campuscriticalITor dedicatedsupply/PPA; article’s 1974 plantlaunchdate not adopted without originalhistory.2.5 milliongroundbreakingpayment and 300,000 perbuildingannually are contingent terms, not receivedtaxes or paidincentives. HoodCounty 1265 acreaddress andSailfish 2000 acres/5 GWare distinct/uncrosswalked development scopes, not automaticadditions.2027 start is forecast. Readercommentcease-and-desistclaim is not independent recordevidence.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://constructionreviewonline.com/amazon-to-collocate-5-billion-project-spectrum-data-center-campus-in-texas-with-nuclear-power-plant/","host":"constructionreviewonline.com","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Somervell · Source context reviewed"},{"id":"barrio-energy-tyler-smith-county-tx","state":"tx","kind":"facility","name":"Barrio Energy Tyler Data Center (West Erwin Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Smith"],"city":"Tyler","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Not a final project cancellation. Source calls applicant Barrio Resources LLC, while baseline operator label uses Barrio Energy; corporate equivalence not established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kltv.com/2026/09/03/proposed-tyler-cryptocurrency-mining-center-denied-again/","host":"kltv.com","date":"2026-09-03","published":"2026-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.351,"lng":-95.3127,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"appeal-jurisdiction-denial","reported_finding":"Tyler board unanimously found it lacked jurisdiction over a late zoning-classification appeal. A separate timely special-use-permit appeal remained available.","report_display_date":"2026-09-03","independently_verified_current_status":null},"notes":["Not a final project cancellation. Source calls applicant Barrio Resources LLC, while baseline operator label uses Barrio Energy; corporate equivalence not established.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kltv.com/2026/09/03/proposed-tyler-cryptocurrency-mining-center-denied-again/","host":"kltv.com","date":"2026-09-03","published":"2026-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tyler · Smith · Source context reviewed"},{"id":"canaan-bear-andrews-tx","state":"tx","kind":"facility","name":"Bear Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Andrews"],"city":"Andrews","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-project portfolio, no per-site allocation. 120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.2691,"lng":-102.6042,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"three-project portfolio, no per-site allocation","fields":{"acquisition_announced_date":"2026-02-23","acquired_equity_percent":49,"continuing_windhq_equity_percent":51,"portfolio_projects":["Alborz","Bear","Chief Mountain"],"portfolio_operational_power_mw":120,"portfolio_transaction_consideration_usd_approx":39750000,"transaction_consideration_basis":"49percent joint-venture interests plus6840mining rigs, funded with shares"},"notes":["120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Andrews · Andrews · Source context reviewed"},{"id":"canaan-chief-mountain-andrews-tx","state":"tx","kind":"facility","name":"Chief Mountain Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Andrews"],"city":"Andrews","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-project portfolio, no per-site allocation. 120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.285,"lng":-102.625,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"three-project portfolio, no per-site allocation","fields":{"acquisition_announced_date":"2026-02-23","acquired_equity_percent":49,"continuing_windhq_equity_percent":51,"portfolio_projects":["Alborz","Bear","Chief Mountain"],"portfolio_operational_power_mw":120,"portfolio_transaction_consideration_usd_approx":39750000,"transaction_consideration_basis":"49percent joint-venture interests plus6840mining rigs, funded with shares"},"notes":["120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Andrews · Andrews · Source context reviewed"},{"id":"cipher-colchis-tom-green-tx","state":"tx","kind":"facility","name":"Cipher Colchis Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tom Green"],"city":"San Angelo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization. Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate","host":"sanangelolive.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.5290977,"lng":-100.3212098,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization.","Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate","host":"sanangelolive.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"San Angelo · Tom Green · Source context reviewed"},{"id":"cipher-mclennan-county-tx","state":"tx","kind":"facility","name":"Cipher McLennan HPC Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["McLennan"],"city":"Waco","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. SamShaw WacoBridge May27updatedJune18,2026 original companyemail/landrecordreport: McLennanCipher300acres nearRattlesnakeRoad/Riesel, up500MWprojectrequestedgridaccess. No explicitITbasis or Juneexpectedapprovalobserved; existing900MWcoalplantnotcampusITtoadd. Water/coolingnotchosen; noRieselcitywater promise doesnotmeanzerowater. NearbyLakeCreek10000acrefeet/year/9MGDpotential not ownedrightsoractualdata-centeruse.13Maveragetax/yearoverdecade lacks jurisdictionbreakdown, notpaidreceipt.300acreland dealsOctober/Februaryreferencesnotoneinventedclosingday.13Mnotcapex. Originalreportedsectionsread; embeddedrepublishcopyignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","host":"wacobridge.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.474088,"lng":-96.96261,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["SamShaw WacoBridge May27updatedJune18,2026 original companyemail/landrecordreport: McLennanCipher300acres nearRattlesnakeRoad/Riesel, up500MWprojectrequestedgridaccess. No explicitITbasis or Juneexpectedapprovalobserved; existing900MWcoalplantnotcampusITtoadd.","Water/coolingnotchosen; noRieselcitywater promise doesnotmeanzerowater. NearbyLakeCreek10000acrefeet/year/9MGDpotential not ownedrightsoractualdata-centeruse.13Maveragetax/yearoverdecade lacks jurisdictionbreakdown, notpaidreceipt.300acreland dealsOctober/Februaryreferencesnotoneinventedclosingday.13Mnotcapex. Originalreportedsectionsread; embeddedrepublishcopyignored.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","host":"wacobridge.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Waco · McLennan · Source context reviewed"},{"id":"cleanspark-austin-county-tx","state":"tx","kind":"facility","name":"CleanSpark Austin County AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Austin"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Do not confuse Austin County/Sealy with City of Austin. Acquisition date is not October29 announcement date. Later Texas exclusivity is a LOI, not a definitive tenant lease or operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.9508,"lng":-96.2661,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"land_acquisition_reported_date":"2025-10-27","land_area_acres":271,"power_agreements_mw":285,"power_scope":"Long-term supply for future campus, not current IT draw","campus_name_in_later_release":"Sealy"},"notes":["Do not confuse Austin County/Sealy with City of Austin. Acquisition date is not October29 announcement date. Later Texas exclusivity is a LOI, not a definitive tenant lease or operating proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Austin · Source context reviewed"},{"id":"cleanspark-brazoria-county-tx","state":"tx","kind":"facility","name":"CleanSpark Brazoria County (Second Texas) Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Brazoria"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 600 includes initial300, not900. Demand/transmission capacity is not criticalIT or energized load. No final property-close day or original utility approval adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-reports-second-fiscal-quarter-2026-results-302768585.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.1694,"lng":-95.431,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"announcement_date":"2026-01-14","land_under_definitive_agreement_up_to_acres":447,"initial_demand_load_mw":300,"total_potential_mw":600,"initial_closing_target":"2026-Q1, conditional","ercot_approval_claim":"Company May11 release reports300MW approval; original ERCOT document not inspected."},"notes":["600 includes initial300, not900. Demand/transmission capacity is not criticalIT or energized load. No final property-close day or original utility approval adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-reports-second-fiscal-quarter-2026-results-302768585.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Brazoria · Source context reviewed"},{"id":"cloudburst-san-marcos-tx","state":"tx","kind":"facility","name":"CloudBurst San Marcos GigaCenter","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hays"],"city":"San Marcos","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. Evolve project-participant page posted November24,2025 reproduces November5 issuer announcement of CloudBurst SanMarcosDataCenterI groundbreaking. Located in Hays/Guadalupe corridor, not the Houston design-firm office. Independent parcel/title/permit and current construction outcome unread. Participant company names are not two independent confirmations. Up to1.2GW AI/HPC capacity has no explicit criticalITbasis; first50MWQ42026 is a target included in campus total, not1.25GW or observedenergization.450000MMBtu/day gas-supply claim and potential1.8GWgeneration are different units/systems, not extraIT to addto1.2GW. Underlying gas agreement unread, and gas access is not electrical interconnection/air-permit approval. Qualitative water-efficiency promises notmeasuredconsumption. Other Oklahoma plans/200worldwideprojects experience not newUSoperatingcensus. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas","host":"evolveincorporated.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.88,"lng":-97.94,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["Evolve project-participant page posted November24,2025 reproduces November5 issuer announcement of CloudBurst SanMarcosDataCenterI groundbreaking. Located in Hays/Guadalupe corridor, not the Houston design-firm office. Independent parcel/title/permit and current construction outcome unread. Participant company names are not two independent confirmations.","Up to1.2GW AI/HPC capacity has no explicit criticalITbasis; first50MWQ42026 is a target included in campus total, not1.25GW or observedenergization.450000MMBtu/day gas-supply claim and potential1.8GWgeneration are different units/systems, not extraIT to addto1.2GW. Underlying gas agreement unread, and gas access is not electrical interconnection/air-permit approval. Qualitative water-efficiency promises notmeasuredconsumption. Other Oklahoma plans/200worldwideprojects experience not newUSoperatingcensus.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas","host":"evolveincorporated.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"San Marcos · Hays · Source context reviewed"},{"id":"comanche-circle-sailfish-hood-county-tx","state":"tx","kind":"facility","name":"Comanche Circle","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hood"],"city":"Tolar","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Failed pause is not adoption or approval of any project. County authority arguments and residents water concerns are attributed; not a court holding or verified site consumption. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/","host":"texastribune.org","date":"2026-02-10","published":"2026-02-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.35,"lng":-97.83,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"moratorium-proposal-rejected","reported_finding":"Texas Tribune reports Hood County voted 3-2 against a proposed six-month industrial-development pause. Comanche Circle / Sailfish is one proposal discussed.","report_display_date":"2026-02-10","independently_verified_current_status":null},"notes":["Failed pause is not adoption or approval of any project. County authority arguments and residents water concerns are attributed; not a court holding or verified site consumption.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/","host":"texastribune.org","date":"2026-02-10","published":"2026-02-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tolar · Hood · Source context reviewed"},{"id":"core-scientific-austin-tx","state":"tx","kind":"facility","name":"Core Scientific Austin Data Center (Austin 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Travis"],"city":"Austin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Publishedpostalcode/citycombinationrequiresgeographicverification; retainverbatimandholdcanonicalcounty/coordinate. AdvertisedcapacitynotmeasuredIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corescientific.com/high-density-data-centers/austin-tx/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.214,"lng":-97.622,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"advertised_total_power_capacity_mw":20,"campus_acres":38,"total_area_sqft":312000,"published_address_verbatim":"3301 Hibbetts Rd, Austin, TX78275","power_basis":"totalpowercapacity, not explicitlycriticalIT"},"notes":["Publishedpostalcode/citycombinationrequiresgeographicverification; retainverbatimandholdcanonicalcounty/coordinate. AdvertisedcapacitynotmeasuredIT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://corescientific.com/high-density-data-centers/austin-tx/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Austin · Travis · Source context reviewed"},{"id":"core-scientific-denton-tx","state":"tx","kind":"facility","name":"Core Scientific Denton Data Center (Denton 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Denton"],"city":"Denton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. FuturelargeAIcomputerexpectationnotproofall394MWconvertedfromminingoroperatingAI. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corescientific.com/high-density-data-centers/denton-texas/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.1932,"lng":-97.1276,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"8171 Jim Christal Rd, Denton, TX76207","advertised_total_power_capacity_mw":394,"campus_acres":78,"total_area_sqft":423831,"power_basis":"totalpowercapacity, not explicitlycriticalIT"},"notes":["FuturelargeAIcomputerexpectationnotproofall394MWconvertedfromminingoroperatingAI.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://corescientific.com/high-density-data-centers/denton-texas/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Denton · Denton · Source context reviewed"},{"id":"core-scientific-pecos-tx","state":"tx","kind":"facility","name":"Core Scientific Pecos AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Reeves"],"city":"Pecos","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Core Scientific two-site gross power increment, no Pecos split. NoPecos-onlysplitinreviewedpassage. HuntCounty430MWseparateproject.350energizedand590MWearly2027deliveryCoreWeaveportfoliofiguresnotPecos-only. Corporatefinancials/1.5GWpipelinecannotbecountedagainasindividualcampusload. NooriginalPecosopeningorexactparceladopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results","host":"investors.corescientific.com","date":"2026-03-02","published":"2026-03-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.44,"lng":-103.58,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Core Scientific two-site gross power increment, no Pecos split","fields":{"issuer":"Core Scientific","release_date":"2026-03-02","combined_dalton_pecos_gross_power_increase_mw_approx":300,"power_basis":"combined gross power increase across Georgia and Texas sites","pecos_specific_increment_mw":null},"notes":["NoPecos-onlysplitinreviewedpassage. HuntCounty430MWseparateproject.350energizedand590MWearly2027deliveryCoreWeaveportfoliofiguresnotPecos-only. Corporatefinancials/1.5GWpipelinecannotbecountedagainasindividualcampusload. NooriginalPecosopeningorexactparceladopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results","host":"investors.corescientific.com","date":"2026-03-02","published":"2026-03-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pecos · Reeves · Source context reviewed"},{"id":"crow-holdings-cleanarc-stemmons-dallas-tx","state":"tx","kind":"facility","name":"Crow Holdings Stemmons Corridor Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Dallas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Crow CleanArc Dallas planned campus versus first building. 245includesinitial70not315.1950StemmonsInfomartand2323Bryanareproximityhubsnotcampusaddresses. National3GWpotentialunderreviewandVirginia1GWdifferentprojects. Design/procurementinprogressnotoperatingorallpermits. Noactualcapexinreviewedannouncement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.crowholdings.com/insights/crow-holdings-announces-245mw-flagship-data-center-campus-in-central-dallas/","host":"crowholdings.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.7762719,"lng":-96.7968559,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Crow CleanArc Dallas planned campus versus first building","fields":{"developers":["Crow Holdings","CleanArc"],"announcement_date":"2026-01-20","campus_locality":"Stemmons Corridor, Dallas, Texas","campus_acres_approx":40,"planned_campus_power_mw_max":245,"initial_building_power_mw":70,"initial_delivery_target":"late2027","power_basis":"turnkey campus/building capacity, not explicitly critical IT"},"notes":["245includesinitial70not315.1950StemmonsInfomartand2323Bryanareproximityhubsnotcampusaddresses. National3GWpotentialunderreviewandVirginia1GWdifferentprojects. Design/procurementinprogressnotoperatingorallpermits. Noactualcapexinreviewedannouncement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.crowholdings.com/insights/crow-holdings-announces-245mw-flagship-data-center-campus-in-central-dallas/","host":"crowholdings.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Dallas · Dallas · Source context reviewed"},{"id":"crusoe-nolan-county-tx","state":"tx","kind":"facility","name":"Crusoe Nolan County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nolan"],"city":"Sweetwater","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Seven-billion investment and200MW are proposed. Commissioner safeguards/own-generation statements not measured performance or executed contract review. Construction jobs temporary; PILOT and charity distinct from tax receipts. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ktxs.com/news/local/it-will-change-our-rural-town-tax-abatement-for-7-billion-texas-data-center-approved","host":"ktxs.com","date":"2026-04-13","published":"2026-04-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.4709519,"lng":-100.405938,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"KTXS reports Nolan County approved ten-year abatement for Crusoe proposal and quoted future PILOT/charitable payments.","independently_verified_current_operating_status":null},"notes":["Seven-billion investment and200MW are proposed. Commissioner safeguards/own-generation statements not measured performance or executed contract review. Construction jobs temporary; PILOT and charity distinct from tax receipts.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ktxs.com/news/local/it-will-change-our-rural-town-tax-abatement-for-7-billion-texas-data-center-approved","host":"ktxs.com","date":"2026-04-13","published":"2026-04-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sweetwater · Nolan · Source context reviewed"},{"id":"crusoe-blue-energy-victoria-tx","state":"tx","kind":"facility","name":"Crusoe Victoria AI Factory","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Victoria"],"city":"Victoria","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blue Energy and Crusoe proposed gas-to-nuclear campus. 1.5GW is planned nuclear generation, not IT or current operating power. Port name is not proof campus lies in Victoria County; page explicitly names Calhoun. Gas bridge2028and nuclear2031are forecasts, not licensed/energized. Original date and secondary page/template date differ; do not reset announcement to template date. No site exact parcel or NRC construction license read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center","host":"crusoe.ai","date":"2025-10-30","published":"2025-10-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":28.8053,"lng":-97.0036,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Blue Energy and Crusoe proposed gas-to-nuclear campus","fields":{"project_region":"Port of Victoria, Texas","operator_named_campus_county":"Calhoun County, Texas","planned_crusoe_campus_acres":1600,"planned_nuclear_plant_generation_gw_max":1.5,"early_gas_powered_service_target_year":2028,"nuclear_generation_target_year":2031,"partners":["Blue Energy","Crusoe"],"original_heading_date":"2025-10-30","secondary_template_date":"2026-08-18"},"notes":["1.5GW is planned nuclear generation, not IT or current operating power. Port name is not proof campus lies in Victoria County; page explicitly names Calhoun. Gas bridge2028and nuclear2031are forecasts, not licensed/energized. Original date and secondary page/template date differ; do not reset announcement to template date. No site exact parcel or NRC construction license read.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center","host":"crusoe.ai","date":"2025-10-30","published":"2025-10-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Victoria · Victoria · Source context reviewed"},{"id":"cyrusone-bosque-county-thad-hill-tx","state":"tx","kind":"facility","name":"CyrusOne Bosque County Campus (Thad Hill Energy Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bosque"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two distinct Texas project power-agreement scopes. Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.9243,"lng":-97.6564,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"two distinct Texas project power-agreement scopes","fields":{"freestone_phase1_contracted_power_mw":380,"freestone_phase2_exclusive_power_agreement_mw":380,"thad_hill_bosque_previously_announced_power_agreements_mw":400,"power_basis":"electric-supply/development agreements, not explicit critical IT or energized load","announcement_date":"2026-02-09"},"notes":["Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Bosque · Source context reviewed"},{"id":"cyrusone-dfw3-dfw5-allen-tx","state":"tx","kind":"facility","name":"CyrusOne DFW3-DFW5 (Allen)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Allen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Record ID includes DFW5, but reviewed text expressly attributes 77 MW to DFW3 and DFW4. Campus buildout area is planned; do not assign these values to an additional DFW5 building. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/allen-texas","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.1385206,"lng":-96.6599516,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_dfw3_dfw4_it_capacity_mw":77,"full_buildout_technical_space_sqft":976000,"campus_acres":90},"notes":["Record ID includes DFW5, but reviewed text expressly attributes 77 MW to DFW3 and DFW4. Campus buildout area is planned; do not assign these values to an additional DFW5 building.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/allen-texas","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Allen · Collin · Source context reviewed"},{"id":"cyrusone-freestone-energy-center-fairfield-tx","state":"tx","kind":"facility","name":"CyrusOne Freestone Energy Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Freestone"],"city":"Fairfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Phase2exclusiveagreementnotallenergized; no760MWoperatingclaim.1100+MWTexasagreementsinclude400MWBosqueCounty, notFreestonealone. Generatorcapacity/global55GWportfolioexcluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. two distinct Texas project power-agreement scopes. Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.7285,"lng":-96.1611,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"agreement_date":"2026-02-09","initial_power_agreement_mw":380,"phase2_exclusive_power_grid_land_agreement_mw":380,"published_county":"Freestone, Texas","power_basis":"power/grid/site service agreement, not IT"},"notes":["Phase2exclusiveagreementnotallenergized; no760MWoperatingclaim.1100+MWTexasagreementsinclude400MWBosqueCounty, notFreestonealone. Generatorcapacity/global55GWportfolioexcluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"two distinct Texas project power-agreement scopes","fields":{"freestone_phase1_contracted_power_mw":380,"freestone_phase2_exclusive_power_agreement_mw":380,"thad_hill_bosque_previously_announced_power_agreements_mw":400,"power_basis":"electric-supply/development agreements, not explicit critical IT or energized load","announcement_date":"2026-02-09"},"notes":["Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Fairfield · Freestone · Source context reviewed"},{"id":"cyrusone-sat2-sat4-san-antonio-tx","state":"tx","kind":"facility","name":"CyrusOne SAT2-SAT4 (San Antonio)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bexar"],"city":"San Antonio","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus combines multiple facilities. The separate 18 MW distributed redundant configuration has a different/unclear scope and is not added to the 36 MW key feature. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. unmatched fifth San Antonio campus, not approved SAT2-SAT4 field merge. Reviewed source concerns a new fifth campus in TexasResearchPark, not an independently matched SAT2-SAT4 expansion. Keep new-campus context separate until exact identity is established. One-billion-dollar SanAntonio investment statement is cumulative across the market, not this campus.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","host":"cyrusone.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":29.4708878,"lng":-98.6730474,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_campus_total_it_capacity_mw":36,"campus_technical_space_sqft":295785,"separate_source_power_configuration_mw":18},"notes":["Campus combines multiple facilities. The separate 18 MW distributed redundant configuration has a different/unclear scope and is not added to the 36 MW key feature.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"unmatched fifth San Antonio campus, not approved SAT2-SAT4 field merge","fields":{"historical_event":"groundbreaking of a fifth San Antonio campus","planned_buildings":2,"planned_building_area_sqft":276000,"planned_it_capacity_mw":36},"notes":["Reviewed source concerns a new fifth campus in TexasResearchPark, not an independently matched SAT2-SAT4 expansion. Keep new-campus context separate until exact identity is established. One-billion-dollar SanAntonio investment statement is cumulative across the market, not this campus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","host":"cyrusone.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"San Antonio · Bexar · Source context reviewed"},{"id":"data-city-energy-abundance-laredo-tx","state":"tx","kind":"facility","name":"Data City, Texas","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Webb"],"city":"Laredo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. Body5GWversusimage6GWconflict held, no headline canonical total. CorrectedMarch21release refers priorMarch20image correction, not new project. Initial300MWincluded in full build, not extra.100percentgreenmarketing does not erase initial naturalgas or prove actual emissions. No exact current delivery or investment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html","host":"prnewswire.com","date":"2025-03-21","published":"2025-03-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.5306,"lng":-99.4803,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"planned_hub_acres":50000,"body_full_build_planned_power_gw":5,"image_caption_power_gw":6,"initial_phase_planned_power_mw":300,"initial_phase_planned_area_sqft":1000000,"initial_launch_target_year":2026,"full_build_leasable_area_sqft_min_exclusive":15000000,"initial_fuel_transition":"natural gas initially; proposed later green hydrogen","grid_mode_proposed":"islanded from ERCOT"},"notes":["Body5GWversusimage6GWconflict held, no headline canonical total. CorrectedMarch21release refers priorMarch20image correction, not new project. Initial300MWincluded in full build, not extra.100percentgreenmarketing does not erase initial naturalgas or prove actual emissions. No exact current delivery or investment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html","host":"prnewswire.com","date":"2025-03-21","published":"2025-03-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Laredo · Webb · Source context reviewed"},{"id":"digital-realty-aus11-tx","state":"tx","kind":"facility","name":"Digital Realty AUS11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Travis"],"city":"Austin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/austin/aus11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.212156,"lng":-97.6957555,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"AUS11","published_address":"7500 Metro Center Drive, Austin, TX 78744","advertised_building_sqft":85500},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/austin/aus11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Austin · Travis · Source context reviewed"},{"id":"edged-dallas-irving-tx","state":"tx","kind":"facility","name":"Edged Dallas (Irving)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Irving","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Pasttargetnotcurrentopeningproof. Operatorreportofcouncilsupportnotindependentreviewedsignedpermit. Nozero-waterwhole-siteclaimfromwaterlesscooling. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edged.us/news/edged-dallas-irving","host":"edged.us","date":"2024-04-12","published":"2024-04-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.8211516,"lng":-96.9169508,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"development_announcement":"2024-04-12","operator_reported_city_council_support_date":"2024-04-11","published_address":"505 N Wildwood Drive, Irving, Texas","planned_critical_capacity_mw":24,"opening_target":"fall2024"},"notes":["Pasttargetnotcurrentopeningproof. Operatorreportofcouncilsupportnotindependentreviewedsignedpermit. Nozero-waterwhole-siteclaimfromwaterlesscooling.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edged.us/news/edged-dallas-irving","host":"edged.us","date":"2024-04-12","published":"2024-04-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Irving · Dallas · Source context reviewed"},{"id":"element-critical-austin-one-tx","state":"tx","kind":"facility","name":"Element Critical Austin One","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Travis"],"city":"Austin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator identifies AustinOne at8025NorthInterstateHwy35,Austin78753;62,300sf property and seven-acre private campus are distinct area measures. Power specification explicitly states9.5MW TOTAL UTILITY power, not criticalIT or measured load. FourMW dedicated halls and20kW/rack options are nested/configurable offerings, not additional campusMW. Closed-loop air-cooled system described as limiting evaporation, not zero water. Uptime/SLA, floodplain and certification claims remain operator descriptions; independent audit and site water meter not checked. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://elementcritical.com/data-centers/austin-data-center/","host":"elementcritical.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.3428035,"lng":-97.6961735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Operator identifies AustinOne at8025NorthInterstateHwy35,Austin78753;62,300sf property and seven-acre private campus are distinct area measures.","Power specification explicitly states9.5MW TOTAL UTILITY power, not criticalIT or measured load. FourMW dedicated halls and20kW/rack options are nested/configurable offerings, not additional campusMW.","Closed-loop air-cooled system described as limiting evaporation, not zero water. Uptime/SLA, floodplain and certification claims remain operator descriptions; independent audit and site water meter not checked.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://elementcritical.com/data-centers/austin-data-center/","host":"elementcritical.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Austin · Travis · Source context reviewed"},{"id":"energy-vault-snyder-scurry-county-tx","state":"tx","kind":"facility","name":"Energy Vault Snyder AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Scurry"],"city":"Snyder","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Powered shell is not critical IT or actual computing load. The 25 MW phase and possible 500 MW site expansion are not additive. Ten modular units are not ten campuses. A later search excerpt gives a broader target, but its original body was unavailable. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas","host":"usdatacenterprojects.com","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.7138,"lng":-100.9112,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"US Data Center Projects reports Energy Vault Snyder groundbreaking and an initial eight MW of powered shell targeted for early 2027.","independently_verified_current_operating_status":null},"notes":["Powered shell is not critical IT or actual computing load. The 25 MW phase and possible 500 MW site expansion are not additive. Ten modular units are not ten campuses. A later search excerpt gives a broader target, but its original body was unavailable.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas","host":"usdatacenterprojects.com","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Snyder · Scurry · Source context reviewed"},{"id":"equinix-dallas-da11-tx","state":"tx","kind":"facility","name":"Equinix Dallas DA11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Dallas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Exact named provider/street context; DA11 code and suite not independently given by carrier list. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8017196,"lng":-96.8243167,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Equinix","listed_address":"1990 N Stemmons Fwy","listed_city":"Dallas","listed_state":"TX"},"notes":["Exact named provider/street context; DA11 code and suite not independently given by carrier list.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Dallas · Dallas · Source context reviewed"},{"id":"flexential-dallas-downtown-dallas-tx","state":"tx","kind":"facility","name":"Flexential Dallas - Downtown Dallas","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Dallas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8004101,"lng":-96.8193707,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Dallas - Downtown Dallas","publisher_reported_footprint_sqft":80447,"publisher_reported_critical_power_mw":6.66,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Dallas · Dallas · Source context reviewed"},{"id":"flexential-dallas-plano-tx","state":"tx","kind":"facility","name":"Flexential Dallas - Plano","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Plano","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.007033,"lng":-96.6663507,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Dallas - Plano","publisher_reported_footprint_sqft":261425,"publisher_reported_critical_power_mw":18,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Plano · Collin · Source context reviewed"},{"id":"flexential-dallas-richardson-tx","state":"tx","kind":"facility","name":"Flexential Dallas - Richardson","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Richardson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.9948122,"lng":-96.7524974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Dallas - Richardson","publisher_reported_footprint_sqft":100807,"publisher_reported_critical_power_mw":3.75,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Richardson · Dallas · Source context reviewed"},{"id":"flexential-kaufman-county-talty-tx","state":"tx","kind":"facility","name":"Flexential Kaufman County Campus (Talty)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kaufman"],"city":"Talty","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer-issued release. These are development targets, not measured utilization or water consumption. Its DFW market and company portfolio numbers are excluded from the site record. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/flexential-to-build-new-dallas-area-data-center-campus-on-110-acres-in-kaufman-county-302836104.html","host":"prnewswire.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.689,"lng":-96.3378,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Kaufman","city":"Talty","status_as_of_source":"planned","campus_acres":110,"phase1_building_sqft":375000,"phase1_power_capacity_mw":36,"future_buildings_possible":3,"full_campus_capacity_mw_potential":108,"site_work_target":"early 2027","customer_availability_target":"late 2028","wue_target":0,"cooling_design":"closed loop"},"notes":["Developer-issued release. These are development targets, not measured utilization or water consumption. Its DFW market and company portfolio numbers are excluded from the site record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/flexential-to-build-new-dallas-area-data-center-campus-on-110-acres-in-kaufman-county-302836104.html","host":"prnewswire.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Talty · Kaufman · Source context reviewed"},{"id":"fluidstack-abernathy-tx","state":"tx","kind":"facility","name":"Fluidstack Abernathy AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hale"],"city":"Abernathy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. TeraWulf separate Abernathy sale and Hancock tenant announcement. 168MWTexas and401MWKentucky are separate projects.450Minvestment not reported sale price or total Abernathy campus capex. Signed transaction agreement does not prove later closing. Issuer reports executed Anthropic lease, but signed lease itself not inspected.19Bforecast lease revenue is neither construction investment nor tax incentive/payment.482MWKentucky utility demand remains separate from401IT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://investors.terawulf.com/news-events/press-releases/detail/142/","host":"investors.terawulf.com","date":"2026-07-06","published":"2026-07-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.84,"lng":-101.84,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"TeraWulf separate Abernathy sale and Hancock tenant announcement","fields":{"release_date":"2026-07-06","abernathy_project_critical_it_mw":168,"abernathy_jv_established_year":2025,"terawulf_stake_sale_percent":50.1,"terawulf_investment_being_monetized_usd_approx":450000000,"abernathy_transaction_stage":"definitive sale agreement, closing not observed in this source","kentucky_separate_project":{"name":"Justified Data, Hawesville","announced_lease_tenant":"Anthropic","announced_executed_lease_years":20,"critical_it_mw":401,"initial_service_target":"2027-H2","full_capacity_target":"early 2028","forecast_initial_term_contract_revenue_usd_approx":19000000000}},"notes":["168MWTexas and401MWKentucky are separate projects.450Minvestment not reported sale price or total Abernathy campus capex. Signed transaction agreement does not prove later closing. Issuer reports executed Anthropic lease, but signed lease itself not inspected.19Bforecast lease revenue is neither construction investment nor tax incentive/payment.482MWKentucky utility demand remains separate from401IT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://investors.terawulf.com/news-events/press-releases/detail/142/","host":"investors.terawulf.com","date":"2026-07-06","published":"2026-07-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Abernathy · Hale · Source context reviewed"},{"id":"fort-spunky-pacifico-energy-hood-county-tx","state":"tx","kind":"facility","name":"Fort Spunky","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hood"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Grid requests and water forecasts are not actual demand. Requested court relief is not an award. Comanche Circle water figures are separate and disputed. Hood moratorium votes failed. Round twenty's later Hill County rescission reporting takes precedence over this older account. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.texastribune.org/2026/06/02/texas-data-centers-hood-county-local-control-rural-water-power/","host":"texastribune.org","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.42,"lng":-97.78,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Texas Tribune reports Fort Spunky's concept approval was revoked after a water request was denied, followed by Pacifico litigation.","independently_verified_current_operating_status":null},"notes":["Grid requests and water forecasts are not actual demand. Requested court relief is not an award. Comanche Circle water figures are separate and disputed. Hood moratorium votes failed. Round twenty's later Hill County rescission reporting takes precedence over this older account.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.texastribune.org/2026/06/02/texas-data-centers-hood-county-local-control-rural-water-power/","host":"texastribune.org","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hood · Source context reviewed"},{"id":"galaxy-helios-dickens-county-tx","state":"tx","kind":"facility","name":"Galaxy Helios Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dickens"],"city":"Afton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. A contractor project description does not prove readiness for service or independently define critical IT. A future gigawatt buildout is not operating capacity. Power assemblies and chillers are not extra data centers, and project area is not the entire campus. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://claycorp.com/project/galaxy-digital-helios-renovation","host":"claycorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.72,"lng":-100.84,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Clayco describes an initial Helios liquid-cooled installation rated at 133 MW and its 133,000-square-foot project scope.","independently_verified_current_operating_status":null},"notes":["A contractor project description does not prove readiness for service or independently define critical IT. A future gigawatt buildout is not operating capacity. Power assemblies and chillers are not extra data centers, and project area is not the entire campus.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://claycorp.com/project/galaxy-digital-helios-renovation","host":"claycorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Afton · Dickens · Source context reviewed"},{"id":"google-armstrong-county-tx","state":"tx","kind":"facility","name":"Goodnight Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Armstrong"],"city":"Claude","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Armstrong Goodnight county-signed owner-blank tax agreement and identity hold. Partially executed retained copy: county signed, ownerblank, so full effectiveness not established. Do not call forecast14.6Bspent,100percentalltaxexemption,orPILOTactuallycollected.530MWwholephase not400ITinferredfromhallarithmetic orcurrentenergization.2027deadlineconditional andextendable,nottargetverifiedopening. Googletenant/ownershipnotnamed;preferredGoogleArmstrongrecordneedsCrusoe/GNDC1crosswalk,notduplicatecampusautomaticmerge.75iscontractobligationnotcurrentheadcount. No signedfinalownerpage/actualabatementcommencementcertificateobserved. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Tax%20Abatement%20Agreement%202%20Phase%201.pdf","host":"co.armstrong.tx.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.973,"lng":-101.367,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Armstrong Goodnight county-signed owner-blank tax agreement and identity hold","fields":{"agreement_parties":["Armstrong County, Texas","GN DC1 LLC"],"project_name":"Goodnight Data Center Phase1","county_signature_date":"2024-11-12","owner_signature_and_date":"blank on page26","effective_date":null,"effectiveness_condition":"final signature by both parties","phase1_planned_acres_approx":350,"anticipated_buildings":4,"phase1_expected_electrical_consumption_mw_max":530,"power_basis":"whole phase electrical demand, not critical IT","proposed_each_building_data_halls":4,"proposed_each_hall_capacity_mw":25,"anticipated_initial_phase_capital_usd":14600000000,"county_eligible_property_abatement_percent":100,"abatement_calendar_years_max":10,"annual_pilot_floor_usd":5441499,"pilot_period":"10calendar years while abatement in effect","initial_commercial_operation_deadline":"2027-12-31","possible_owner_elected_extensions_years_max":5,"project_fulltime_worker_obligation":75,"obligation_worker_scope":"collective owner/affiliates/contractors/tenants, not75each","owner_notice_recipient":"Crusoe Energy Systems LLC"},"notes":["Partially executed retained copy: county signed, ownerblank, so full effectiveness not established. Do not call forecast14.6Bspent,100percentalltaxexemption,orPILOTactuallycollected.530MWwholephase not400ITinferredfromhallarithmetic orcurrentenergization.2027deadlineconditional andextendable,nottargetverifiedopening. Googletenant/ownershipnotnamed;preferredGoogleArmstrongrecordneedsCrusoe/GNDC1crosswalk,notduplicatecampusautomaticmerge.75iscontractobligationnotcurrentheadcount. No signedfinalownerpage/actualabatementcommencementcertificateobserved.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Tax%20Abatement%20Agreement%202%20Phase%201.pdf","host":"co.armstrong.tx.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Claude · Armstrong · Source context reviewed"},{"id":"google-haskell-county-tx","state":"tx","kind":"facility","name":"Google Haskell County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Haskell"],"city":"Haskell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator reports construction beganNovember2025, not completion/opening. Vendor inquiry form was not submitted; no siteMWorinvestmentamount here. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/haskell-county/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.1576,"lng":-99.7337,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"construction_groundbreaking_month":"2025-11"},"notes":["Operator reports construction beganNovember2025, not completion/opening. Vendor inquiry form was not submitted; no siteMWorinvestmentamount here.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/haskell-county/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Haskell · Haskell · Source context reviewed"},{"id":"google-meitner-pampa-tx","state":"tx","kind":"facility","name":"Google Meitner Energy Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Gray"],"city":"Pampa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The article implies an already completed Intersect acquisition; the original seller instead dates completion to March 10, 2026. A parent transaction does not prove site tenant identity. Direct and broader jobs differ, and off-grid or cooling assertions are not verified permit terms. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Transaction price is company acquisition consideration, not Pampa construction spending. This does not independently establish end tenant at Meitner. Existing grid-tied assets spun into IPX Power. Do not label all former Intersect generation/storage assets Google-owned;4.4GWsolar and8.8GWhstorage use different units and belong to described IPX portfolio.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newschannel10.com/2026/01/17/pampas-3-billion-ai-data-center-signals-new-era-growth-gray-county/","host":"newschannel10.com","date":"2026-01-16","published":"2026-01-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.tpg.com/news-and-insights/tpg-announces-completion-of-4-75-billion-sale-of-intersect-to-google-launches-ipx-power-as-independent-power-producer","host":"tpg.com","date":"2026-03-10","published":"2026-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.5365,"lng":-100.9609,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"KFDA reports December groundbreaking for Meitner in Pampa and three planned 750,000-square-foot buildings.","independently_verified_current_operating_status":null},"notes":["The article implies an already completed Intersect acquisition; the original seller instead dates completion to March 10, 2026. A parent transaction does not prove site tenant identity. Direct and broader jobs differ, and off-grid or cooling assertions are not verified permit terms.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newschannel10.com/2026/01/17/pampas-3-billion-ai-data-center-signals-new-era-growth-gray-county/","host":"newschannel10.com","date":"2026-01-16","published":"2026-01-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Original seller announcement dates completion of Google acquisition of Intersect digital power business to March10,2026; agreement announced December22,2025.","parent_transaction_completion_announcement_date":"2026-03-10","parent_transaction_agreement_announcement_date":"2025-12-22","sale_price_usd_excluding_assumed_debt":4750000000},"notes":["Transaction price is company acquisition consideration, not Pampa construction spending. This does not independently establish end tenant at Meitner.","Existing grid-tied assets spun into IPX Power. Do not label all former Intersect generation/storage assets Google-owned;4.4GWsolar and8.8GWhstorage use different units and belong to described IPX portfolio.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tpg.com/news-and-insights/tpg-announces-completion-of-4-75-billion-sale-of-intersect-to-google-launches-ipx-power-as-independent-power-producer","host":"tpg.com","date":"2026-03-10","published":"2026-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pampa · Gray · Source context reviewed"},{"id":"google-red-oak-tx","state":"tx","kind":"facility","name":"Google Red Oak Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ellis"],"city":"Red Oak","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Texas statewide page. 40Bnot RedOak-onlybudget.2009Texasoffices/presence not openingdata-center. CampusannouncementlabelsincludePampaandWilbarger2026but do not establish exactphysicalsitecoordinates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/texas/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.5163,"lng":-96.8011,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Texas statewide page","fields":{"red_oak_announcement_year":2023,"regional_cloud_ai_infrastructure_investment_usd":40000000000,"regional_investment_through_year":2027,"investment_scope":"Texas statewide"},"notes":["40Bnot RedOak-onlybudget.2009Texasoffices/presence not openingdata-center. CampusannouncementlabelsincludePampaandWilbarger2026but do not establish exactphysicalsitecoordinates.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/texas/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Red Oak · Ellis · Source context reviewed"},{"id":"google-wilbarger-vernon-tx","state":"tx","kind":"facility","name":"Google Wilbarger County Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wilbarger"],"city":"Vernon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Google Wilbarger construction announcement and generation scope. 7800MWcontracted generation is Texas portfolio, not campus IT or current site power.40Binvestment through2027and30Mfund are statewide scopes. Air-cooled does not mean zero domestic water. No exact service date, parcel, street address or numeric IT in this announcement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/","host":"blog.google","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.1551,"lng":-99.294,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Google Wilbarger construction announcement and generation scope","fields":{"operator_statement_date":"2026-02-24","project_county":"Wilbarger County, Texas","operator_reported_stage":"under construction","cooling_plan":"air cooling with water for critical campus operations","energy_partner":"AES"},"notes":["7800MWcontracted generation is Texas portfolio, not campus IT or current site power.40Binvestment through2027and30Mfund are statewide scopes. Air-cooled does not mean zero domestic water. No exact service date, parcel, street address or numeric IT in this announcement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/","host":"blog.google","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vernon · Wilbarger · Source context reviewed"},{"id":"gw-ranch-pacifico-energy-pecos-county-tx","state":"tx","kind":"facility","name":"GW Ranch","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pecos"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 7.65 GW figure describes planned gas generation, not operating or critical IT demand. Permit emissions ceilings are not actual emissions. Solar MW and battery power are not energy in MWh. Future grid and produced-water options are not secured service or perpetual off-grid commitments. Original transaction and air permit remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://constructionreviewonline.com/amazon-backs-7-65-gw-gas-plant-in-texas-to-power-new-ai-data-center-campus/","host":"constructionreviewonline.com","date":"2026-08-08","published":"2026-08-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.05,"lng":-102.88,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Construction Review reports an Amazon-planned Pecos County campus at GW Ranch with Pacifico Energy generation, quoting Amazon confirmation.","independently_verified_current_operating_status":null},"notes":["The 7.65 GW figure describes planned gas generation, not operating or critical IT demand. Permit emissions ceilings are not actual emissions. Solar MW and battery power are not energy in MWh. Future grid and produced-water options are not secured service or perpetual off-grid commitments. Original transaction and air permit remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://constructionreviewonline.com/amazon-backs-7-65-gw-gas-plant-in-texas-to-power-new-ai-data-center-campus/","host":"constructionreviewonline.com","date":"2026-08-08","published":"2026-08-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pecos · Source context reviewed"},{"id":"hut8-beacon-point-robstown-tx","state":"tx","kind":"facility","name":"Hut 8 Beacon Point AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nueces"],"city":"Robstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Initial fill is not daily water use; under 10,000 gallons per day describes local domestic demand. Lease revenue and financing are not capex. June 9 bond closing was a forecast, not an observed closing. Incentive statements conflict between the article body and fact box, so the canonical incentive field stays unknown. No identified tenant or actual commissioning date. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/calallen/beacon-point-ai-massive-data-center-planned-for-nueces-county","host":"kristv.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.7897,"lng":-97.6689,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KRIS reports Hut 8 Beacon Point's planned 352 MW critical IT inside a 1,000 MW AEP interconnection plan, with an initial 1.8-million-gallon cooling fill trucked from outside the county.","independently_verified_current_operating_status":null,"planned_critical_it_mw":352,"planned_interconnection_mw":1000,"initial_cooling_fill_gallons":1800000,"incentives":null},"notes":["Initial fill is not daily water use; under 10,000 gallons per day describes local domestic demand. Lease revenue and financing are not capex. June 9 bond closing was a forecast, not an observed closing. Incentive statements conflict between the article body and fact box, so the canonical incentive field stays unknown. No identified tenant or actual commissioning date.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/calallen/beacon-point-ai-massive-data-center-planned-for-nueces-county","host":"kristv.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Robstown · Nueces · Source context reviewed"},{"id":"hut8-salt-creek-culberson-tx","state":"tx","kind":"facility","name":"Hut 8 Salt Creek Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Culberson"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Hut8 original Form10-K transition report filed March28,2024, covering July1-December31,2023 with later developments. Server sent gzip-encoded PDF: raw transport retained, ordinary gzip decoding saved as a separate hashed PDF. Only cover and PDF pages8/65/124 fully read; cover/8/124 viewed. December29,2023 purchase of substation and1.9acres for$7.1M CASH CONSIDERATION; no cash paid as ofDecember31. Not whole-campus acreage, verified paid capex or total build cost. February2024 SaltCreek construction began;63MW/3.6EH/s are then-future design/conditional miner assumptions, not measured current IT or verified commissioning. Other203-page filing sections unreviewed. Ontario310MW generation and managed Ionic sites are separate. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cdn.kscope.io/4a3545ac7cd83ed5809d42e808998efa.pdf","host":"cdn.kscope.io","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.825,"lng":-103.909,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Hut8 original Form10-K transition report filed March28,2024, covering July1-December31,2023 with later developments. Server sent gzip-encoded PDF: raw transport retained, ordinary gzip decoding saved as a separate hashed PDF. Only cover and PDF pages8/65/124 fully read; cover/8/124 viewed. December29,2023 purchase of substation and1.9acres for$7.1M CASH CONSIDERATION; no cash paid as ofDecember31. Not whole-campus acreage, verified paid capex or total build cost. February2024 SaltCreek construction began;63MW/3.6EH/s are then-future design/conditional miner assumptions, not measured current IT or verified commissioning. Other203-page filing sections unreviewed. Ontario310MW generation and managed Ionic sites are separate.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://cdn.kscope.io/4a3545ac7cd83ed5809d42e808998efa.pdf","host":"cdn.kscope.io","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Culberson · Source context reviewed"},{"id":"hyperdatagrid-lufkin-angelina-county-tx","state":"tx","kind":"facility","name":"HyperDataGrid Lufkin Data Center (Former Timber Mill Site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Angelina"],"city":"Lufkin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The company's generic 20 MW, twelve-month template is not verified Lufkin capacity or timing. Rack kW is not campus MW. Parsons and the separate AmpZ paper-mill project must not be merged. Full project scope and current operation remain unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://usdatacenterprojects.com/texas/hyperdatagrid-plans-data-center-on-former-timber-mill-site-near-lufkin-texas","host":"usdatacenterprojects.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.3383,"lng":-94.7292,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"US Data Center Projects reports agreements and land clearing for HyperDataGrid's roughly 40-acre former Northern Chip Mill site near Lufkin.","independently_verified_current_operating_status":null},"notes":["The company's generic 20 MW, twelve-month template is not verified Lufkin capacity or timing. Rack kW is not campus MW. Parsons and the separate AmpZ paper-mill project must not be merged. Full project scope and current operation remain unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://usdatacenterprojects.com/texas/hyperdatagrid-plans-data-center-on-former-timber-mill-site-near-lufkin-texas","host":"usdatacenterprojects.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lufkin · Angelina · Source context reviewed"},{"id":"iren-horizon-childress-tx","state":"tx","kind":"facility","name":"IREN Horizon  -  Childress, TX","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Childress"],"city":"Childress","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. IREN Childress whole-campus power and land. 750MWwholecampusnotHorizon-onlyphasecriticalIToractualconsumption. No datedcurrentenergizedsplit,tenantleaseorexactsiteparcel. Renewableaccessnot100percenthourlyrenewablematchingproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://iren.com/data-centers/childress","host":"iren.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.4276,"lng":-100.2046,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"IREN Childress whole-campus power and land","fields":{"operator":"IREN","campus":"Childress, Texas","campus_power_capacity_mw":750,"campus_land_acres":576,"operator_described_tenure":"freehold","operator_described_grid":"ERCOT, onsite substations owned by IREN"},"notes":["750MWwholecampusnotHorizon-onlyphasecriticalIToractualconsumption. No datedcurrentenergizedsplit,tenantleaseorexactsiteparcel. Renewableaccessnot100percenthourlyrenewablematchingproof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://iren.com/data-centers/childress","host":"iren.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Childress · Childress · Source context reviewed"},{"id":"lancium-crusoe-abilene-tx","state":"tx","kind":"facility","name":"Lancium Clean Campus (Crusoe / Stargate Site 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Taylor"],"city":"Abilene","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The interview's speculation that all workloads are ChatGPT is not confirmation. Company-reported construction workforce is not permanent employment. Cooling descriptions are attributed engineering claims, not a complete water-meter audit. Future expansion is not completed or approved infrastructure. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ktxs.com/news/local/lancium-crusoe-executives-brief-abilene-leaders-on-major-northside-investment","host":"ktxs.com","date":"2026-03-05","published":"2026-03-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.502213,"lng":-99.788717,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KTXS distinguishes Lancium's land/power infrastructure, Crusoe's data-center ownership and operation, and Oracle as customer at the Abilene campus, with eight buildings forecast through first-quarter 2027.","independently_verified_current_operating_status":null},"notes":["The interview's speculation that all workloads are ChatGPT is not confirmation. Company-reported construction workforce is not permanent employment. Cooling descriptions are attributed engineering claims, not a complete water-meter audit. Future expansion is not completed or approved infrastructure.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ktxs.com/news/local/lancium-crusoe-executives-brief-abilene-leaders-on-major-northside-investment","host":"ktxs.com","date":"2026-03-05","published":"2026-03-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Abilene · Taylor · Source context reviewed"},{"id":"lancium-fort-stockton-tx","state":"tx","kind":"facility","name":"Lancium Fort Stockton Clean Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Pecos"],"city":"Fort Stockton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. Historical completion targets not delivery evidence2026. Hundreds of millions and dozens jobs not exact values. Grid-flexible load is not proof carbon-free generation or current AI hosting.25MWis nested in325MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","host":"prnewswire.com","date":"2021-09-15","published":"2021-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.894,"lng":-102.879,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"groundbreaking_announcement":"2021-09-15","first_stage_planned_power_mw":25,"first_stage_completion_target":"2022-Q1","full_capacity_target_mw":325,"full_capacity_target_year":2022,"initial_planned_area_sqft_min_exclusive":100000,"initial_computing_use":"bitcoin mining and other high-throughput computing"},"notes":["Historical completion targets not delivery evidence2026. Hundreds of millions and dozens jobs not exact values. Grid-flexible load is not proof carbon-free generation or current AI hosting.25MWis nested in325MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","host":"prnewswire.com","date":"2021-09-15","published":"2021-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Fort Stockton · Pecos · Source context reviewed"},{"id":"mara-flared-gas-fleet-tx-nd","state":"tx","kind":"facility","name":"MARA Flared/Stranded-Gas Mining Fleet (TX + ND)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":[],"city":"Midland/Odessa area (representative)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. MARAissuerMay5,2025 reports25MWgas-to-poweraggregateacrosswellheadsitesinNorthDakotaandTexas,fullyenergizedasreportedthen. Not25MWperstate,oneparcel/physicalDCorallAIIT. CheapestBTC/methanemitigationclaimsnotindependentlymeasured;hashrateEH/snotMW. SeparateunnamedOhioexpansion50MWincrementto100,200designmaximumnotgasfleet. NoexactTXNDlocationsconfirmed. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1394/mara-announces-bitcoin-production-and-mining-operation-updates-for-april-2025","host":"ir.mara.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.87,"lng":-102.37,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"MARAissuerMay5,2025 reports25MWgas-to-poweraggregateacrosswellheadsitesinNorthDakotaandTexas,fullyenergizedasreportedthen. Not25MWperstate,oneparcel/physicalDCorallAIIT. CheapestBTC/methanemitigationclaimsnotindependentlymeasured;hashrateEH/snotMW. SeparateunnamedOhioexpansion50MWincrementto100,200designmaximumnotgasfleet. NoexactTXNDlocationsconfirmed."},"notes":["MARAissuerMay5,2025 reports25MWgas-to-poweraggregateacrosswellheadsitesinNorthDakotaandTexas,fullyenergizedasreportedthen. Not25MWperstate,oneparcel/physicalDCorallAIIT. CheapestBTC/methanemitigationclaimsnotindependentlymeasured;hashrateEH/snotMW. SeparateunnamedOhioexpansion50MWincrementto100,200designmaximumnotgasfleet. NoexactTXNDlocationsconfirmed.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1394/mara-announces-bitcoin-production-and-mining-operation-updates-for-april-2025","host":"ir.mara.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Midland/Odessa area (representative) · Source context reviewed"},{"id":"mara-granbury-hood-tx","state":"tx","kind":"facility","name":"MARA Granbury Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hood"],"city":"Granbury","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Colleen DeGuzman, TexasTribune October9,2025, clarification14:50Central, original onsite/company/county reporting: Granbury-area MARA noise dispute and then-future MitchellBend incorporation vote. No2025 election result/current2026 ordinance inferred.67% immersion conversion is company claim; resident readings and county-funded October2024 study use different protocols/locations. Report quotes study caveat that typical mine operation during monitoring could not be confirmed. No measured universal85dB breach or medical causation adopted.1.2B investment is company TEXAS-SITES total, not this mine alone. Statewide counts, legal/tax shortcuts and household equivalences not current census/legal advice. Republish copies are duplicate text, not extra sources. Not all fields, current operation, permits, exact parcel or critical IT independently verified. Original historical acoustic-study method, metric and operational/source-attribution limits.. Not current noise, causal health evidence or an applicable-law compliance judgment.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.texastribune.org/2025/10/09/texas-hood-county-crypto-noise-incorporate-city/","host":"texastribune.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://hoodcountytx.documents-on-demand.com/document/446290f6-6aa7-ef11-a428-000c29a59557/2024.11.01%20Cryptocurrency%20Mine%20Sound%20Level%20Investigation","host":"hoodcountytx.documents-on-demand.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.4427,"lng":-97.7871,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Colleen DeGuzman, TexasTribune October9,2025, clarification14:50Central, original onsite/company/county reporting: Granbury-area MARA noise dispute and then-future MitchellBend incorporation vote. No2025 election result/current2026 ordinance inferred.67% immersion conversion is company claim; resident readings and county-funded October2024 study use different protocols/locations. Report quotes study caveat that typical mine operation during monitoring could not be confirmed. No measured universal85dB breach or medical causation adopted.1.2B investment is company TEXAS-SITES total, not this mine alone. Statewide counts, legal/tax shortcuts and household equivalences not current census/legal advice. Republish copies are duplicate text, not extra sources.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.texastribune.org/2025/10/09/texas-hood-county-crypto-noise-incorporate-city/","host":"texastribune.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-original-noise-and-water-reporting-review-round86-2026-10-15.json","scope":"Original historical acoustic-study method, metric and operational/source-attribution limits.","fields":{},"notes":["Not current noise, causal health evidence or an applicable-law compliance judgment."],"sources":[{"url":"https://hoodcountytx.documents-on-demand.com/document/446290f6-6aa7-ef11-a428-000c29a59557/2024.11.01%20Cryptocurrency%20Mine%20Sound%20Level%20Investigation","host":"hoodcountytx.documents-on-demand.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Granbury · Hood · Source context reviewed"},{"id":"marathon-digital-garden-city-tx","state":"tx","kind":"facility","name":"Marathon Digital Garden City Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Glasscock"],"city":"Garden City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Agreement is not observed closing; gross 97.3 million before adjustments is not additive consideration. Site power is not critical IT demand. The article incorrectly places Ellendale in Texas in one passage; no location or outage event is transferred between the sites. Current operation remains unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theminermag.com/news/2024-03-15/marathon-bitcoin-mining-applied-digital-garden-city-acquire","host":"theminermag.com","date":"2024-03-15","published":"2024-03-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.8724,"lng":-101.4849,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Miner Mag reports Marathon's agreement to acquire Applied Digital's 200 MW Garden City mining site, with an adjusted 87.3-million-USD price and a second-quarter closing target.","independently_verified_current_operating_status":null},"notes":["Agreement is not observed closing; gross 97.3 million before adjustments is not additive consideration. Site power is not critical IT demand. The article incorrectly places Ellendale in Texas in one passage; no location or outage event is transferred between the sites. Current operation remains unverified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theminermag.com/news/2024-03-15/marathon-bitcoin-mining-applied-digital-garden-city-acquire","host":"theminermag.com","date":"2024-03-15","published":"2024-03-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Garden City · Glasscock · Source context reviewed"},{"id":"meta-el-paso-tx","state":"tx","kind":"facility","name":"Meta El Paso AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["El Paso"],"city":"El Paso","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Expansion announcement, not full energization. Completion date absent. Texas renewable projects exceeding 5000 MW are statewide generation, not campus IT. Water restoration and 2030 targets are goals, not measured annual withdrawals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/","host":"datacenters.atmeta.com","date":"2026-03-26","published":"2026-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.81,"lng":-106.55,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"planned_capacity_mw":1000,"power_basis":"not explicitly critical IT","planned_investment_usd_min_exclusive":10000000000,"operational_jobs_once_completed_min_exclusive":300,"peak_construction_jobs_min_exclusive":4000,"groundbreaking_year":2025},"notes":["Expansion announcement, not full energization. Completion date absent. Texas renewable projects exceeding 5000 MW are statewide generation, not campus IT. Water restoration and 2030 targets are goals, not measured annual withdrawals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/","host":"datacenters.atmeta.com","date":"2026-03-26","published":"2026-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"El Paso · El Paso · Source context reviewed"},{"id":"meta-fort-worth-tx","state":"tx","kind":"facility","name":"Meta Fort Worth Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tarrant"],"city":"Fort Worth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/fort-worth-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.9844048,"lng":-97.2617581,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"operator_labeled_data_center_investment_usd":1500000000,"investment_is_lower_bound":true,"investment_geographic_label":"Fort Worth, Texas","historic_groundbreaking_year":2015,"peak_construction_workers":1200,"operator_reported_operational_jobs_lower_bound":200,"local_school_nonprofit_direct_funding_usd_lower_bound":5200000,"direct_funding_county_scope":"Tarrant"},"notes":["Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/fort-worth-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Fort Worth · Tarrant · Source context reviewed"},{"id":"meta-temple-tx","state":"tx","kind":"facility","name":"Meta Temple Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bell"],"city":"Temple","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The page body retains future operational/certification language despite the completed status label. Contractor completion is not metered operation. Peak 1,200 tradespeople are not permanent employment; intended renewable matching and LEED Gold are not independently verified performance/certification. Publication/update dates are not a physical completion day. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://jedunn.com/projects/meta-temple-data-center/","host":"jedunn.com","date":"2024-09-13","published":"2024-09-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.1399225,"lng":-97.3812992,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"JE Dunn's Temple project page labels the three-building Meta campus completed and describes roughly 750,000 square feet of data-center/admin space on 386 acres and 152 MW of unspecified basis.","independently_verified_current_operating_status":null},"notes":["The page body retains future operational/certification language despite the completed status label. Contractor completion is not metered operation. Peak 1,200 tradespeople are not permanent employment; intended renewable matching and LEED Gold are not independently verified performance/certification. Publication/update dates are not a physical completion day.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://jedunn.com/projects/meta-temple-data-center/","host":"jedunn.com","date":"2024-09-13","published":"2024-09-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Temple · Bell · Source context reviewed"},{"id":"microsoft-pecos-tx","state":"tx","kind":"facility","name":"Microsoft Pecos Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Reeves"],"city":"Pecos","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity. Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions. No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/","host":"blogs.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.42,"lng":-103.49,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"announcement_date":"2026-06-22","announced_capacity_mw":2000,"capacity_basis":"Approximately2GW datacenter capacity; explicit criticalIT basis not stated.","current_verified_it_mw":null,"investment":"Multibillion dollar campus planned over five to seven years; no exact total.","construction_jobs_forecast_peak":"More than6000","permanent_jobs_forecast":"Hundreds, no exact count","initial_power_strategy":"Proposed behind-the-meter natural gas generation funded by Microsoft; later grid connection anticipated","cooling":"Planned closed-loop design; cooling initial fill distinct from all-site lifecycle use."},"notes":["Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity.","Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions.","No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/","host":"blogs.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pecos · Reeves · Source context reviewed"},{"id":"microsoft-san-antonio-expansion-tx","state":"tx","kind":"facility","name":"Microsoft San Antonio SAT89/SAT90 Data Centers","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Medina"],"city":"Castroville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge every parcel into one building or treat land counts as operating-site counts. Original filings, abatement agreement and water service were not read. The regional water number and claimed percentage appear inconsistent and are excluded; speculative worldwide-power forecasts and the article's Binghamton geography error are not adopted. No critical IT MW established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sanantonioreport.org/medina-county-farmland-data-centers-strain/","host":"sanantonioreport.org","date":"2024-08-25","published":"2024-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":29.35,"lng":-98.88,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"San Antonio Report distinguishes Microsoft's SAT82 expansion from SAT80-1, SAT80-2 and other Medina/Bexar sites, reporting a nearly 500-million-USD filing and a county official's 15-year, 80-percent abatement description.","independently_verified_current_operating_status":null},"notes":["Do not merge every parcel into one building or treat land counts as operating-site counts. Original filings, abatement agreement and water service were not read. The regional water number and claimed percentage appear inconsistent and are excluded; speculative worldwide-power forecasts and the article's Binghamton geography error are not adopted. No critical IT MW established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sanantonioreport.org/medina-county-farmland-data-centers-strain/","host":"sanantonioreport.org","date":"2024-08-25","published":"2024-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Castroville · Medina · Source context reviewed"},{"id":"nexus-hubbard-campus-hill-county-tx","state":"tx","kind":"facility","name":"Nexus Hubbard Data Center & Power Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hill"],"city":"Hubbard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. generic state air-permit instructions hold. General Texas natural-gas generating-unit standard permit instructions, not an approved Nexus/Hubbard registration, site permit, generation capacity or IT load. Rule effective date and page modification date not project milestones. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tceq.texas.gov/permitting/air/newsourcereview/combustion/ng-egu-sp","host":"tceq.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.824001,"lng":-96.776243,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"generic state air-permit instructions hold","fields":{},"notes":["General Texas natural-gas generating-unit standard permit instructions, not an approved Nexus/Hubbard registration, site permit, generation capacity or IT load. Rule effective date and page modification date not project milestones.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tceq.texas.gov/permitting/air/newsourcereview/combustion/ng-egu-sp","host":"tceq.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hubbard · Hill · Source context reviewed"},{"id":"peak-mining-texas-1-corpus-christi-tx","state":"tx","kind":"facility","name":"Peak Mining Texas 1 (Saxet Energy Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Nueces"],"city":"Corpus Christi","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Saxet BuildingC construction registration and alias hold. Administrative registration closed does not mean physical data center closed or mining stopped. Single building cost/area not entire mining campus. Source owner address incorrectly labels Dallas as Tennessee; that field quarantined. Registered dates not observed completion. PeakMining alias/ownership not independently established here. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023019972","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.8487,"lng":-97.4263,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Saxet BuildingC construction registration and alias hold","fields":{"architectural_barriers_registration_id":"TABS2023019972","registered_project_name":"Saxet Energy Park,Data Center BuildingC","published_site_address":"1102 McKinzie Road,BuildingC,CorpusChristi,TX78410","registered_county":"Nueces","registered_area_sqft":37813,"registered_estimated_cost_usd":1200000,"registered_scheduled_start":"2023-06-19","registered_scheduled_completion":"2023-10-27","registered_use":"data centers/mining equipment","registration_status":"Project Closed"},"notes":["Administrative registration closed does not mean physical data center closed or mining stopped. Single building cost/area not entire mining campus. Source owner address incorrectly labels Dallas as Tennessee; that field quarantined. Registered dates not observed completion. PeakMining alias/ownership not independently established here.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023019972","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Corpus Christi · Nueces · Source context reviewed"},{"id":"peak-mining-texas-2-corpus-christi-tx","state":"tx","kind":"facility","name":"Peak Mining Texas 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Nueces"],"city":"Corpus Christi","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. NorthernData originalMARannouncement datelineJanuary12,2026 00:10CET, landingpageJanuary11timezone difference. OptiontoreacquireandsellCorpusChristiHPCsite EXPIRESWITHOUTFINALIZEDTRANSACTION; notsuccessfullysoldforHPCoroperatingminestopped. Latercurrentownershipunverified. Up150Mearnoutfromminingprofits andup95%decliningnetsaleparticipation areCONTINGENTRIGHTS, notreceivedsaleprice/campuscapex. Five-yearperiodnotfive-yearlease. Separateup200Mshareholdercashpotentialbecomeszeroafterfailedtransaction, notfacilityspend. Rumbletenderconditionalnotcompletedacquisitionproof. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://northerndata.de/en/investor-relations/news/northern-data-announces-expiry-of-option-to-sell-corpus-christi-site-to-global-infrastructure-asset-management-firm","host":"northerndata.de","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.852,"lng":-97.421,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["NorthernData originalMARannouncement datelineJanuary12,2026 00:10CET, landingpageJanuary11timezone difference. OptiontoreacquireandsellCorpusChristiHPCsite EXPIRESWITHOUTFINALIZEDTRANSACTION; notsuccessfullysoldforHPCoroperatingminestopped. Latercurrentownershipunverified.","Up150Mearnoutfromminingprofits andup95%decliningnetsaleparticipation areCONTINGENTRIGHTS, notreceivedsaleprice/campuscapex. Five-yearperiodnotfive-yearlease. Separateup200Mshareholdercashpotentialbecomeszeroafterfailedtransaction, notfacilityspend. Rumbletenderconditionalnotcompletedacquisitionproof.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://northerndata.de/en/investor-relations/news/northern-data-announces-expiry-of-option-to-sell-corpus-christi-site-to-global-infrastructure-asset-management-firm","host":"northerndata.de","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Corpus Christi · Nueces · Source context reviewed"},{"id":"poolside-project-horizon-pecos-county-tx","state":"tx","kind":"facility","name":"Poolside Project Horizon AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pecos"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Paul Ciampoli, APPA October15,2025 reproduces Poolside founders public announcement:2GW campus planned in eight250MW phases on568acres; CoreWeave anchor250MW15yearlease/500MWreserved future expansion is nested in overall plan, not2750MW. Immediate40000+GPUs coming viaCoreWeave beginningDecember2025 not proved installed atHorizon. Behind-meter aero-derivative/SCR/gridbackup/BESS designs not air permits, measured emissions or energization. Source saysWestTexas, not exact Pecos parcel. Founder statement as reproduced, not APPA regulator approval or independent completed-site audit. Not all fields, current operation, permits, exact parcel or critical IT independently verified. AirStreetPress/NathanBenaich October27,2025 firsthand investor perspective explicitly discloses Poolside portfolio affiliation. Names partofLongfellowRanch, planned2GW/eightphases/250MWCoreWeave anchor. Ranchname not exact campus boundary/county certification; no signed lease/ESA/airpermit or completedphase inspected. Investor advocacy is not independent confirmation of issuerclaims. Gridbackup/generation/BESS and existingwateraccess not proof zero water or carbon.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas","host":"publicpower.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://press.airstreet.com/p/poolside-launches-project-horizon-ai-compute","host":"press.airstreet.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.8938,"lng":-102.8796,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Paul Ciampoli, APPA October15,2025 reproduces Poolside founders public announcement:2GW campus planned in eight250MW phases on568acres; CoreWeave anchor250MW15yearlease/500MWreserved future expansion is nested in overall plan, not2750MW. Immediate40000+GPUs coming viaCoreWeave beginningDecember2025 not proved installed atHorizon. Behind-meter aero-derivative/SCR/gridbackup/BESS designs not air permits, measured emissions or energization. Source saysWestTexas, not exact Pecos parcel. Founder statement as reproduced, not APPA regulator approval or independent completed-site audit.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas","host":"publicpower.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["AirStreetPress/NathanBenaich October27,2025 firsthand investor perspective explicitly discloses Poolside portfolio affiliation. Names partofLongfellowRanch, planned2GW/eightphases/250MWCoreWeave anchor. Ranchname not exact campus boundary/county certification; no signed lease/ESA/airpermit or completedphase inspected. Investor advocacy is not independent confirmation of issuerclaims. Gridbackup/generation/BESS and existingwateraccess not proof zero water or carbon.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://press.airstreet.com/p/poolside-launches-project-horizon-ai-compute","host":"press.airstreet.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pecos · Source context reviewed"},{"id":"powerhouse-uhland-caldwell-county-tx","state":"tx","kind":"facility","name":"PowerHouse Caldwell County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caldwell"],"city":"Uhland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Alexis Kramer, Bisnow May 5, 2026: Uhland administrator directly confirms resident pushback and county pathway for PowerHouse. Proposed 500 acres within 3,600-acre Caldwell Valley park/petition details are credited to Austin Business Journal, not independently filed documents read here. Petition is not verified release approval; no MW supplied. Texas county-authority summary is reported historical context, not current legal advice or proof every permit must issue. Regional 7.8 GW/120-company-project claims not campus capacity or operating counts. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.87,"lng":-97.85,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Alexis Kramer, Bisnow May 5, 2026: Uhland administrator directly confirms resident pushback and county pathway for PowerHouse. Proposed 500 acres within 3,600-acre Caldwell Valley park/petition details are credited to Austin Business Journal, not independently filed documents read here. Petition is not verified release approval; no MW supplied. Texas county-authority summary is reported historical context, not current legal advice or proof every permit must issue. Regional 7.8 GW/120-company-project claims not campus capacity or operating counts.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Uhland · Caldwell · Source context reviewed"},{"id":"powerhouse-provident-grand-prairie-tx","state":"tx","kind":"facility","name":"PowerHouse Grand Prairie Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ellis"],"city":"Grand Prairie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Research targets and proof-of-concept schedules do not establish deployed technology or measured performance at this campus. Other developments and their MW are separate. The Grand Prairie and Wilmer paragraphs repeat the same size/value/schedule; original project records are needed before treating those as independently confirmed. No current IT MW or construction outcome is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/","host":"dallasinnovates.com","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.62,"lng":-97.02,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Dallas Innovates mentions a proposed 360,000-square-foot, 300-million-USD PowerHouse/Provident Grand Prairie building and 2027 completion while covering university cooling research.","independently_verified_current_operating_status":null},"notes":["Research targets and proof-of-concept schedules do not establish deployed technology or measured performance at this campus. Other developments and their MW are separate. The Grand Prairie and Wilmer paragraphs repeat the same size/value/schedule; original project records are needed before treating those as independently confirmed. No current IT MW or construction outcome is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/","host":"dallasinnovates.com","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Grand Prairie · Ellis · Source context reviewed"},{"id":"rcm-hill-project-aquila-hill-county-tx","state":"tx","kind":"facility","name":"Project Aquila","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hill"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Rescission is not project approval and is not a court ruling that law was invalid. June 4 agenda and library record are procedural evidence only; later reporting adds replacement checklist. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. County procedural context, not recorded meeting outcome or executed agreement.. Library index description does not turn agenda into rescission order. Abbott Land Holdings 270-acre C.R.3106 waiver attachment is a separate proposal; do not assign its land, escrow or obligations to RCM Hill / Aquila. No draft fee or waiver adopted as operative law. Texas Tribune secondary corroboration, not signed county order.. Requested damages are not awarded damages. Reporter federal-court location differs from county agenda; primary agenda names Waco. Scope/legality of replacement checklist not established from unsigned packet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kwtx.com/2026/06/04/hill-county-commissioners-court-rescinds-moratorium-data-center-wake-lawsuit/","host":"kwtx.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.co.hill.tx.us/upload/template/28749/docs/CC%202026/ccagenda_06042026.pdf","host":"co.hill.tx.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://lrl.texas.gov/currentissues/clips/resultsLinkclip.cfm?clipID=450110&headline=Hays+County+backs+off+data+center+pause+again+as+Texas+water+concerns+grow","host":"lrl.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.texastribune.org/2026/06/05/texas-hill-county-moratorium-rescinded-data-centers/","host":"texastribune.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.03,"lng":-97.13,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"moratorium-rescinded-reported","reported_finding":"KWTX reports unanimous June 4 rescission of Hill County moratorium after developer suit.","report_display_date":"2026-06-04","independently_verified_current_status":null},"notes":["Rescission is not project approval and is not a court ruling that law was invalid. June 4 agenda and library record are procedural evidence only; later reporting adds replacement checklist.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kwtx.com/2026/06/04/hill-county-commissioners-court-rescinds-moratorium-data-center-wake-lawsuit/","host":"kwtx.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"County procedural context, not recorded meeting outcome or executed agreement.","fields":{"meeting_scheduled":"2026-06-04","document_type":"Filed meeting agenda and draft attachments","case_number_referenced":"6:26-CV-00340","court_referenced":"Western District of Texas, Waco Division","attachment_signature_status":"Draft proclamation and separate Abbott waiver signature blocks blank."},"notes":["Library index description does not turn agenda into rescission order. Abbott Land Holdings 270-acre C.R.3106 waiver attachment is a separate proposal; do not assign its land, escrow or obligations to RCM Hill / Aquila. No draft fee or waiver adopted as operative law.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.co.hill.tx.us/upload/template/28749/docs/CC%202026/ccagenda_06042026.pdf","host":"co.hill.tx.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://lrl.texas.gov/currentissues/clips/resultsLinkclip.cfm?clipID=450110&headline=Hays+County+backs+off+data+center+pause+again+as+Texas+water+concerns+grow","host":"lrl.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Texas Tribune secondary corroboration, not signed county order.","fields":{"report_date":"2026-06-05","reported_action":"Unanimous rescission June 4 and adoption of developer checklist."},"notes":["Requested damages are not awarded damages. Reporter federal-court location differs from county agenda; primary agenda names Waco. Scope/legality of replacement checklist not established from unsigned packet.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.texastribune.org/2026/06/05/texas-hill-county-moratorium-rescinded-data-centers/","host":"texastribune.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hill · Source context reviewed"},{"id":"fermi-matador-amarillo-tx","state":"tx","kind":"facility","name":"Project Matador","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carson"],"city":"Amarillo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. Original FederalRegister91FR64702-64703/2026-20742 publishedOctober9,2026, datedOctober5/filedOctober8. NRCdraftEISforFOURPROPOSEDAP1000reactorsProjectMatadorNuclearUnits1-4inCARSONCOUNTYadjacentPantex; AmarillomarketlabelnotPotterCountyproof. Dockets05200051-54/NRC2026-0100. PreliminaryrecommendationtoissueCOLisCONTINGENTONSUCCESSFULSAFETYREVIEW, notissuedconstruction/operatinglicense/energizedreactorsorITcapacity. Applicant-preparedEISunderNRCsupervisionandagencyindependentreview; completeEISML26261A417NOTread. InitialJune17,2025application/Aug20supplement/Sep5acceptanceareseparatestages. PUBLICCOMMENTDEADLINENovember23,2026, NOtimeorphysicalhearingstated. Commentslaterconsideredifpractical; do notinventautomaticbanatmidnight. No submissions/emails/registrationperformed. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govinfo.gov/content/pkg/FR-2026-10-09/html/2026-20742.htm","host":"govinfo.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.396,"lng":-101.543,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["Original FederalRegister91FR64702-64703/2026-20742 publishedOctober9,2026, datedOctober5/filedOctober8. NRCdraftEISforFOURPROPOSEDAP1000reactorsProjectMatadorNuclearUnits1-4inCARSONCOUNTYadjacentPantex; AmarillomarketlabelnotPotterCountyproof. Dockets05200051-54/NRC2026-0100.","PreliminaryrecommendationtoissueCOLisCONTINGENTONSUCCESSFULSAFETYREVIEW, notissuedconstruction/operatinglicense/energizedreactorsorITcapacity. Applicant-preparedEISunderNRCsupervisionandagencyindependentreview; completeEISML26261A417NOTread. InitialJune17,2025application/Aug20supplement/Sep5acceptanceareseparatestages.","PUBLICCOMMENTDEADLINENovember23,2026, NOtimeorphysicalhearingstated. Commentslaterconsideredifpractical; do notinventautomaticbanatmidnight. No submissions/emails/registrationperformed.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.govinfo.gov/content/pkg/FR-2026-10-09/html/2026-20742.htm","host":"govinfo.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Amarillo · Carson · Source context reviewed"},{"id":"galaxy-digital-mcgregor-tx","state":"tx","kind":"facility","name":"Project Merlin (Helios II)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["McLennan"],"city":"McGregor","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Current construction and IT capacity are unverified. Water is stated per building, without a whole-campus count. A noise design limit is not a measurement. Helios is separate, and utility promises are not verified contract terms. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theenergymag.com/news/2026-06-25/galaxy-digital-ai-data-center-mcgregor-texas","host":"theenergymag.com","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.44,"lng":-97.4,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"EnergyMag, citing KWTX, reports an early McGregor Project Merlin council approval and Galaxy's investment plan.","independently_verified_current_operating_status":null},"notes":["Current construction and IT capacity are unverified. Water is stated per building, without a whole-campus count. A noise design limit is not a measurement. Helios is separate, and utility promises are not verified contract terms.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theenergymag.com/news/2026-06-25/galaxy-digital-ai-data-center-mcgregor-texas","host":"theenergymag.com","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"McGregor · McLennan · Source context reviewed"},{"id":"prometheus-hyperscale-kaufman-county-tx","state":"tx","kind":"facility","name":"Prometheus Hyperscale Kaufman County Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kaufman"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Utility load is not critical IT. The story incorrectly places the Talty/Post Oak Bend area west of Dallas; no coordinates or boundary are inferred. Conduit's wider 300 MW generation plan and Prometheus' multistate gigawatt ambition are not extra campus IT. First-facility 2026 targets do not establish this site's commissioning or an executed power agreement. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.greenvillechronicle.com/s/4925/Prometheus-Hyperscale-Plans-200MW-AI-Data-Center-Campus-in-Kaufman-County.php","host":"greenvillechronicle.com","date":"2026-05-22","published":"2026-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.65,"lng":-96.36,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Greenville Chronicle reports Prometheus' Kaufman concept with up to 200 MW utility load, on-site gas and a nearby storage connection discussed by company leadership.","independently_verified_current_operating_status":null},"notes":["Utility load is not critical IT. The story incorrectly places the Talty/Post Oak Bend area west of Dallas; no coordinates or boundary are inferred. Conduit's wider 300 MW generation plan and Prometheus' multistate gigawatt ambition are not extra campus IT. First-facility 2026 targets do not establish this site's commissioning or an executed power agreement.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.greenvillechronicle.com/s/4925/Prometheus-Hyperscale-Plans-200MW-AI-Data-Center-Campus-in-Kaufman-County.php","host":"greenvillechronicle.com","date":"2026-05-22","published":"2026-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kaufman · Source context reviewed"},{"id":"qts-irving-1-tx","state":"tx","kind":"facility","name":"QTS Irving 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Irving","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus totals, not Irving 1 building alone. Master plan does not establish six completed buildings; Texas-wide water pledge excluded from site investment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/irving/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8972479,"lng":-96.9826475,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":56,"advertised_critical_campus_mw_lower_bound":165,"master_planned_facilities":6},"notes":["Campus totals, not Irving 1 building alone. Master plan does not establish six completed buildings; Texas-wide water pledge excluded from site investment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/irving/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Irving · Dallas · Source context reviewed"},{"id":"qts-lancium-hall-county-tx","state":"tx","kind":"facility","name":"QTS-Lancium Hall County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hall"],"city":"Turkey","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. QTS and Lancium Hall County roles and forecasts. Not10Bspent,current350QTSemployees or7000permanentjobs. No ITMWor observed opening adopted. Cooling-water claim excludes domestic use and external generation impacts. Private infrastructure funding commitment not executed municipal agreement reviewed; linkedOctober9communityagreement is a later lead. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/","host":"q.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.394,"lng":-100.8954,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"QTS and Lancium Hall County roles and forecasts","fields":{"announcement_date":"2026-07-13","planned_regional_capital_investment_usd_min_exclusive":10000000000,"expected_peak_construction_jobs_max":7000,"expected_permanent_jobs_approx":350,"permanent_jobs_scope":"QTS,maintenance,security andtenant positions combined","site_owner_infrastructure_developer":"Lancium","data_center_developer_operator":"QTS","published_location":"near Turkey, Hall County, Texas"},"notes":["Not10Bspent,current350QTSemployees or7000permanentjobs. No ITMWor observed opening adopted. Cooling-water claim excludes domestic use and external generation impacts. Private infrastructure funding commitment not executed municipal agreement reviewed; linkedOctober9communityagreement is a later lead.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/","host":"q.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Turkey · Hall · Source context reviewed"},{"id":"compass-red-oak-tx","state":"tx","kind":"facility","name":"Red Oak Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ellis"],"city":"Red Oak","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No exact vote day or executed ordinance retained. State official call for moratorium is not enacted statewide restriction. DataBank financing refers to separate company/projects. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://desototribune.com/2026/05/27/red-oak-data-center-sparks-controversy-as-expansion-moves-forward/","host":"desototribune.com","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.537981,"lng":-96.804371,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"DeSoto Tribune reports4to1 Red Oak rezoning for830-acre Compass proposal amid opposition.","independently_verified_current_operating_status":null},"notes":["No exact vote day or executed ordinance retained. State official call for moratorium is not enacted statewide restriction. DataBank financing refers to separate company/projects.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://desototribune.com/2026/05/27/red-oak-data-center-sparks-controversy-as-expansion-moves-forward/","host":"desototribune.com","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Red Oak · Ellis · Source context reviewed"},{"id":"databank-red-oak-tx","state":"tx","kind":"facility","name":"Red Oak Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ellis"],"city":"Red Oak","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not sum400MWsubstation,300MWITpotential,240MWfourcards and480MWfullprogram. Wholecampus record must be parent of individualbuildings;8buildings are futureprogram. Operator describes292-acreRedOakcampus with futureeightbuildingprogram; listedfirstfour60MWbuildings are not automatically proof240MWcommissioned. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. reposted news summary, duplicate event. Operator news summary credits the DallasMorningNews and repeats the April21construction financing event. Use the separate original operator release for facts; no second financing or project count. Updated-dateApril22is not a new project event. named source. Loan is financing, not total campus capital spent or an incentive. Combined capacity applies to first three, not each building or all eight. Fully leased is not commissioned or operating. Other company credit/securitization amounts excluded.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/dallas/red-oak-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/","host":"databank.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.5135,"lng":-96.7282,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Red Oak","campus_acres":292,"phase1_substation_mw":400,"phase1_critical_it_potential_mw_max":300,"full_program_critical_it_potential_mw":480,"listed_buildings":["DFW9","DFW10","DFW11","DFW12"],"advertised_each_building_it_mw":60,"power_basis":"design/marketing potential; commissioning not verified"},"notes":["Do not sum400MWsubstation,300MWITpotential,240MWfourcards and480MWfullprogram.","Wholecampus record must be parent of individualbuildings;8buildings are futureprogram.","Operator describes292-acreRedOakcampus with futureeightbuildingprogram; listedfirstfour60MWbuildings are not automatically proof240MWcommissioned.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/dallas/red-oak-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"reposted news summary, duplicate event","fields":{},"notes":["Operator news summary credits the DallasMorningNews and repeats the April21construction financing event. Use the separate original operator release for facts; no second financing or project count. Updated-dateApril22is not a new project event.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"construction_loan_usd":2000000000,"financed_initial_buildings":["DFW9","DFW10","DFW11"],"planned_campus_buildings":8,"initial_three_buildings_combined_area_sqft":600000,"initial_three_buildings_combined_capacity_mw":180,"power_basis":"release says power; critical IT versus gross not independently defined","initial_three_buildings_lease_status":"leased as of release"},"notes":["Loan is financing, not total campus capital spent or an incentive. Combined capacity applies to first three, not each building or all eight. Fully leased is not commissioned or operating. Other company credit/securitization amounts excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/","host":"databank.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Red Oak · Ellis · Source context reviewed"},{"id":"rellis-data-research-center-bryan-brazos-county-tx","state":"tx","kind":"facility","name":"RELLIS Data and Research Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Brazos"],"city":"Bryan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Agreement transfer does not prove closed bankruptcy acquisition or operating facility. Fifty-percent taxable-value treatment for ten years and full value for thirty more are not a40-year50-percentabatement or cash grant. Original leasehold/land tax mechanism and actual receipts remain unreviewed;700millionUSD is project scope, not paid taxes. Legal audit/order claims require original authority. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kbtx.com/2026/08/18/brazos-county-commissioners-approve-new-owner-rellis-data-center-heres-what-it-means-your-wallet/","host":"kbtx.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.6013,"lng":-96.3589,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"KBTX reports a four-zero Brazos County vote transferring RELLIS tax-agreement rights to ThisWay Global, with prior approvals reported from the university system and Bryan.","independently_verified_current_operating_status":null},"notes":["Agreement transfer does not prove closed bankruptcy acquisition or operating facility. Fifty-percent taxable-value treatment for ten years and full value for thirty more are not a40-year50-percentabatement or cash grant. Original leasehold/land tax mechanism and actual receipts remain unreviewed;700millionUSD is project scope, not paid taxes. Legal audit/order claims require original authority.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kbtx.com/2026/08/18/brazos-county-commissioners-approve-new-owner-rellis-data-center-heres-what-it-means-your-wallet/","host":"kbtx.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Bryan · Brazos · Source context reviewed"},{"id":"riot-platforms-corsicana-tx","state":"tx","kind":"facility","name":"Riot Platforms Corsicana Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Navarro"],"city":"Corsicana","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.. Cover saysMarch11,2024 but signedresolution and countyagreement signatures printOctober15,2024. Use documentrole/date, not filepath or coveralone. Resolution is visiblysigned/sealedcountyapproval and auth toexecute, not proofcompanycounterpart execution. County signatures visiblepage9; companyBy/Name/Title blankpage10, plusauthorizationdateblanks. A separatelyexecutedcounterpart couldexist but is not inthiscopy; fullyexecutedagreement remains unverified, not declaredneverexecuted/invalid. Agreementbody50%abatement ofspecifiedeligibleincrementalreal/personalproperty countyadvaloremtaxes for10years; not all taxes or automaticcashgrant. Section3.2 saysbegin2025taxyear; ExhibitDlabels2025year0/2026year1/2035year10. Schedulingmismatch unresolved; no definitiveenddate or sumoftaxsavings derived. Paragraph2.2 has minimum380Minitialbook investment/310106147taxablevalue byJanuary1,2025 and15FTEjobs bythen,140TOTALbyJanuary1,2026, withforcemajeureextension language. Bookvalue/taxablevalue/640Moldcoverproposal and estimatedcumulativeinvestment are different measures, not additive paidcapex. Conditions/default clause includesnotice/cure andpossibletermination/recapture. No compliancecertificates,actualcollections,abatementledger,recapture/defaultfinding or deliveredMWchecked. Passageoftargetdeadlines alone is not a violationfinding. Not whole record/current operating census, legal compliance or independent meter certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://navarro.easydocs.us/minutes/LinkedDir/2024/Links%202024-10-15-Regular/Item%2016%20Approve%20Resolution%20for%20Tax%20Abatement%20Navarro%20County%20and%20Riot%20Corsicana%20LLC.pdf","host":"navarro.easydocs.us","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.09,"lng":-96.47,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-originals-model-and-approval-stages-round55-2026-10-15.json","scope":"Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.","fields":{},"notes":["Cover saysMarch11,2024 but signedresolution and countyagreement signatures printOctober15,2024. Use documentrole/date, not filepath or coveralone. Resolution is visiblysigned/sealedcountyapproval and auth toexecute, not proofcompanycounterpart execution.","County signatures visiblepage9; companyBy/Name/Title blankpage10, plusauthorizationdateblanks. A separatelyexecutedcounterpart couldexist but is not inthiscopy; fullyexecutedagreement remains unverified, not declaredneverexecuted/invalid.","Agreementbody50%abatement ofspecifiedeligibleincrementalreal/personalproperty countyadvaloremtaxes for10years; not all taxes or automaticcashgrant. Section3.2 saysbegin2025taxyear; ExhibitDlabels2025year0/2026year1/2035year10. Schedulingmismatch unresolved; no definitiveenddate or sumoftaxsavings derived.","Paragraph2.2 has minimum380Minitialbook investment/310106147taxablevalue byJanuary1,2025 and15FTEjobs bythen,140TOTALbyJanuary1,2026, withforcemajeureextension language. Bookvalue/taxablevalue/640Moldcoverproposal and estimatedcumulativeinvestment are different measures, not additive paidcapex.","Conditions/default clause includesnotice/cure andpossibletermination/recapture. No compliancecertificates,actualcollections,abatementledger,recapture/defaultfinding or deliveredMWchecked. Passageoftargetdeadlines alone is not a violationfinding.","Not whole record/current operating census, legal compliance or independent meter certification."],"sources":[{"url":"https://navarro.easydocs.us/minutes/LinkedDir/2024/Links%202024-10-15-Regular/Item%2016%20Approve%20Resolution%20for%20Tax%20Abatement%20Navarro%20County%20and%20Riot%20Corsicana%20LLC.pdf","host":"navarro.easydocs.us","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Corsicana · Navarro · Source context reviewed"},{"id":"rowan-temple-tx","state":"tx","kind":"facility","name":"Rowan Project Temple","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bell"],"city":"Temple","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Temple official first-Rowan water-limit and revenue forecast summary. 4000gpd is city-described contractual domestic cap, not consumption estimate or independently read executed utility agreement.2Mone-time staged initialfill separate.7M/12Mcity tax-and-related revenue forecasts perproject not perbuilding or incentive dollars received. OtherTempleprojects require own limits; no blanket4000gpd. No current MW or opening proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.templetx.gov/community/faq__data_center_development_.php","host":"templetx.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.0982,"lng":-97.3428,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Temple official first-Rowan water-limit and revenue forecast summary","fields":{"city_reported_first_rowan_project_domestic_water_contract_cap_gallons_per_day":4000,"planned_initial_closed_loop_water_fill_gallons_approx":2000000,"city_projected_annual_city_revenue_during_abatement_usd_approx":7000000,"city_projected_annual_city_revenue_full_tax_roll_usd_approx":12000000},"notes":["4000gpd is city-described contractual domestic cap, not consumption estimate or independently read executed utility agreement.2Mone-time staged initialfill separate.7M/12Mcity tax-and-related revenue forecasts perproject not perbuilding or incentive dollars received. OtherTempleprojects require own limits; no blanket4000gpd. No current MW or opening proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.templetx.gov/community/faq__data_center_development_.php","host":"templetx.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Temple · Bell · Source context reviewed"},{"id":"sangha-renewables-ector-county-tx","state":"tx","kind":"facility","name":"Sangha Renewables Ector County Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Ector"],"city":"Odessa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported mining capacity is not independently verified critical IT, current measured load or AI hosting. The 150 MW solar farm is separate generation, not additional mining capacity. Supplemental grid power during non-solar hours is expressly included, so no claim of continuous solar-only or fully off-grid operation. Original partner agreement and current operating status were not independently examined. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bitcoinmagazine.com/news/sangha-energizes-20-bitcoin-mining","host":"bitcoinmagazine.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.8633,"lng":-102.3656,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Bitcoin Magazine reports Sangha’s announced energization and ribbon cutting for a 19.9 MW bitcoin mining facility in Ector County with TotalEnergies and Links Genco.","independently_verified_current_operating_status":null},"notes":["Reported mining capacity is not independently verified critical IT, current measured load or AI hosting. The 150 MW solar farm is separate generation, not additional mining capacity. Supplemental grid power during non-solar hours is expressly included, so no claim of continuous solar-only or fully off-grid operation. Original partner agreement and current operating status were not independently examined.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bitcoinmagazine.com/news/sangha-energizes-20-bitcoin-mining","host":"bitcoinmagazine.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Odessa · Ector · Source context reviewed"},{"id":"mara-site-mat-1177-matagorda-tx","state":"tx","kind":"facility","name":"Site MAT 1177","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Matagorda"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The purchase amount is not upfront payment or construction spending. First and second gigawatt targets in October 2027 and April 2028 are future, conditional and not critical IT demand. A Starwood partnership does not establish an executed tenant lease for the full site. The later issuer quarterly filing was found in search but its body returned 403; do not claim full original review. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cryptobriefing.com/marathon-digital-holdings-600m-texas-ai-bitcoin-campus/","host":"cryptobriefing.com","date":"2026-07-09","published":"2026-07-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":28.95,"lng":-95.97,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Crypto Briefing reports MARA's agreement concerning MAT 1177 and a Matagorda site, with up to 600 million USD of milestone-contingent consideration and a 2 GW power target.","independently_verified_current_operating_status":null},"notes":["The purchase amount is not upfront payment or construction spending. First and second gigawatt targets in October 2027 and April 2028 are future, conditional and not critical IT demand. A Starwood partnership does not establish an executed tenant lease for the full site. The later issuer quarterly filing was found in search but its body returned 403; do not claim full original review.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cryptobriefing.com/marathon-digital-holdings-600m-texas-ai-bitcoin-campus/","host":"cryptobriefing.com","date":"2026-07-09","published":"2026-07-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Matagorda · Source context reviewed"},{"id":"skybox-houston-one-tx","state":"tx","kind":"facility","name":"Skybox Houston One","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Harris"],"city":"Katy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. 1.2 MW applies to Shell’s tenant installation, NOT the entire campus or additional Skybox building capacity. Per-system 200 kW and per-rack 100 kW cooling ratings cannot be multiplied into campus IT without an examined equipment count. Warm/chilled water performance statements are vendor descriptions, not audited site PUE, annual water use or renewable supply guarantee. Metadata includes a later September 30, 2026 modification; neither proves physical installation date. Supplier case study is primary for its own installation claims, not independent certification. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.grcooling.com/customer-successes/shells-skybox-houston-one-data-center/","host":"grcooling.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":29.802893,"lng":-95.7553386,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"GRC supplier case study describes Shell’s immersion-cooled HPC deployment at Element Critical/Skybox Houston One in Katy, stating 1.2 MW of immersed compute.","independently_verified_current_operating_status":null,"supplier_reported_tenant_compute_mw":1.2,"capacity_scope":"Shell tenant installation; not entire Skybox Houston One campus"},"notes":["1.2 MW applies to Shell’s tenant installation, NOT the entire campus or additional Skybox building capacity. Per-system 200 kW and per-rack 100 kW cooling ratings cannot be multiplied into campus IT without an examined equipment count. Warm/chilled water performance statements are vendor descriptions, not audited site PUE, annual water use or renewable supply guarantee. Metadata includes a later September 30, 2026 modification; neither proves physical installation date. Supplier case study is primary for its own installation claims, not independent certification.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.grcooling.com/customer-successes/shells-skybox-houston-one-data-center/","host":"grcooling.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Katy · Harris · Source context reviewed"},{"id":"soluna-project-annie-paris-tx","state":"tx","kind":"facility","name":"Soluna Project Annie","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lamar"],"city":"Paris","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. Soluna originalMay22,2025 Annie announcement:75MWDATACENTERproject co-located114MWsolarGEN, not189MWIT. NortheastTexasregion named, exactParis/Lamarparcelunverified. SignedTERM SHEET, definitivePPA/land/ERCOTplanning stillfuture; noexecutedenergizeddelivery.773MWcompanyPIPELINEmixesoperating/construction/development, notoperatingfleet. Queryp15253redirectstoexplicitAnnieURL withsameprojectbody. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.solunacomputing.com/?post_type=news&p=15253","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6609,"lng":-95.5555,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["Soluna originalMay22,2025 Annie announcement:75MWDATACENTERproject co-located114MWsolarGEN, not189MWIT. NortheastTexasregion named, exactParis/Lamarparcelunverified. SignedTERM SHEET, definitivePPA/land/ERCOTplanning stillfuture; noexecutedenergizeddelivery.773MWcompanyPIPELINEmixesoperating/construction/development, notoperatingfleet. Queryp15253redirectstoexplicitAnnieURL withsameprojectbody.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.solunacomputing.com/?post_type=news&p=15253","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Paris · Lamar · Source context reviewed"},{"id":"soluna-project-ellen-rio-hondo-tx","state":"tx","kind":"facility","name":"Soluna Project Ellen","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cameron"],"city":"Rio Hondo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. Soluna originalApril17,2025 Ellen announcement:100MWproject TWO50MWphases included in100, co-located145MWwindGEN not245MWIT. SouthTexasregion only, preciseRioHondolocationunverified. PowerTERM SHEET/definitivePPA/land/ERCOTplanningfuture.698MWmixedcompanypipeline notinstalledcapacity; laterAnnie773includesprojectsnotincremental773new. PowerbasisnotexplicitcriticalIT. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.solunacomputing.com/news/project-ellen-term-sheet/","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.2373,"lng":-97.5814,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["Soluna originalApril17,2025 Ellen announcement:100MWproject TWO50MWphases included in100, co-located145MWwindGEN not245MWIT. SouthTexasregion only, preciseRioHondolocationunverified. PowerTERM SHEET/definitivePPA/land/ERCOTplanningfuture.698MWmixedcompanypipeline notinstalledcapacity; laterAnnie773includesprojectsnotincremental773new. PowerbasisnotexplicitcriticalIT.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.solunacomputing.com/news/project-ellen-term-sheet/","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Rio Hondo · Cameron · Source context reviewed"},{"id":"soluna-project-fei-childress-tx","state":"tx","kind":"facility","name":"Soluna Project Fei","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Childress"],"city":"Childress","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Soluna Fei early development and generation separation. 100FeiDCand240solargenerationnot340IT. Gladysseparateproject.1GWportfolioincludesoperating/construction/developmentnotallonline.2.8GWlongtermpowerpipelineisotherbasisnotadditionaloperatingIT. Definitivepower/landagreementsnotyetcompleteinsource. NoexactChildressparcelmatch;48MmetrictonavoidedCO2lifetimeforecastnotactualverifiedemissions. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.solunacomputing.com/news/1gw/","host":"solunacomputing.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.4262,"lng":-100.2013,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Soluna Fei early development and generation separation","fields":{"issuer":"Soluna","release_date":"2025-08-26","project":"Fei","project_region":"northern Texas","planned_data_center_capacity_mw":100,"power_basis":"planned computing/data-center capacity, not explicit critical IT","colocated_solar_generation_mw":240,"developer_stage":"land acquisition, power-contract negotiation and ERCOT planning","separate_gladys_planned_dc_mw":150,"separate_gladys_wind_generation_mw":226},"notes":["100FeiDCand240solargenerationnot340IT. Gladysseparateproject.1GWportfolioincludesoperating/construction/developmentnotallonline.2.8GWlongtermpowerpipelineisotherbasisnotadditionaloperatingIT. Definitivepower/landagreementsnotyetcompleteinsource. NoexactChildressparcelmatch;48MmetrictonavoidedCO2lifetimeforecastnotactualverifiedemissions.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.solunacomputing.com/news/1gw/","host":"solunacomputing.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Childress · Childress · Source context reviewed"},{"id":"soluna-project-grace-silverton-tx","state":"tx","kind":"facility","name":"Soluna Project Grace","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Briscoe"],"city":"Silverton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Soluna Grace pilot versus portfolio totals and timestamp limits. TimestampwithoutyearandpageartifactEDT52notcurrentOct14measurement. Grace2MWseparatefrom123MWportfolio;windgenerationnotextraIT. OtherprojecttablesreuseOperatinglabelwhileRosanarrativeindevelopment;statuslabelsnotuniversallyreliable. NoexactSilvertonsitepointorindependentRFS/certification. Sophie25MWKentuckyandDorothy50/48Texasareotherprojects,notGrace. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.solunacomputing.com/projects/","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.4692,"lng":-101.3082,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Soluna Grace pilot versus portfolio totals and timestamp limits","fields":{"issuer":"Soluna","project":"Grace","state":"Texas","published_pilot_capacity_mw":2,"capacity_basis":"AI/cloud pilot capacity, not explicit critical IT","page_status_label":"Operating","statistics_timestamp_without_year":"8/26at9:51amEDT","portfolio_header_energized_compute_mw":123,"portfolio_header_power_pipeline_gw":2.8},"notes":["TimestampwithoutyearandpageartifactEDT52notcurrentOct14measurement. Grace2MWseparatefrom123MWportfolio;windgenerationnotextraIT. OtherprojecttablesreuseOperatinglabelwhileRosanarrativeindevelopment;statuslabelsnotuniversallyreliable. NoexactSilvertonsitepointorindependentRFS/certification. Sophie25MWKentuckyandDorothy50/48Texasareotherprojects,notGrace.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.solunacomputing.com/projects/","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Silverton · Briscoe · Source context reviewed"},{"id":"stack-dfw01-plano-tx","state":"tx","kind":"facility","name":"STACK DFW01 (Plano)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Plano","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two named Dallas market campuses. Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.0136764,"lng":-96.6925096,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"two named Dallas market campuses","fields":{"dfw01_plano":{"advertised_total_power_mw":80,"operational_buildings":2,"expansion_capacity_mw":48},"dfw02_lancaster":{"advertised_maximum_power_mw":500,"campus_acres":193},"regional_power_mw":580,"regional_campuses":2,"regional_acres":240},"notes":["Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Plano · Collin · Source context reviewed"},{"id":"stack-dfw02-lancaster-tx","state":"tx","kind":"facility","name":"STACK DFW02 (Lancaster)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Lancaster","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two named Dallas market campuses. Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.5920798,"lng":-96.7561083,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"two named Dallas market campuses","fields":{"dfw01_plano":{"advertised_total_power_mw":80,"operational_buildings":2,"expansion_capacity_mw":48},"dfw02_lancaster":{"advertised_maximum_power_mw":500,"campus_acres":193},"regional_power_mw":580,"regional_campuses":2,"regional_acres":240},"notes":["Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lancaster · Dallas · Source context reviewed"},{"id":"stargate-abilene-tx","state":"tx","kind":"facility","name":"Stargate Abilene","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Taylor"],"city":"Abilene","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. SarahAsch TexasStandard January26,2026 originalinterview with TexasMonthlyreporter ChristopherCollins: Abileneconstruction/YE2026target, not observedcompletedcampus. CorrectedarticleexplicitlyWITHIN CITY, notunincorporatedassumption.4M sf/1000+acres and3.5Bprojectclaimhistorical;500BnationalStargateoverlapnotAbileneprice.85%10yrpropertytaxabatement reportedagreement, originalunread/not85%alltaxes orcashgrant.6000fluctuatingconstruction/300projectedpermanentjobs not6300netpermanent.4B20yrlocalimpactmodelmethodologyunprovided, notactualcapex. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","host":"texasstandard.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.4487,"lng":-99.7331,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["SarahAsch TexasStandard January26,2026 originalinterview with TexasMonthlyreporter ChristopherCollins: Abileneconstruction/YE2026target, not observedcompletedcampus. CorrectedarticleexplicitlyWITHIN CITY, notunincorporatedassumption.4M sf/1000+acres and3.5Bprojectclaimhistorical;500BnationalStargateoverlapnotAbileneprice.85%10yrpropertytaxabatement reportedagreement, originalunread/not85%alltaxes orcashgrant.6000fluctuatingconstruction/300projectedpermanentjobs not6300netpermanent.4B20yrlocalimpactmodelmethodologyunprovided, notactualcapex.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","host":"texasstandard.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Abilene · Taylor · Source context reviewed"},{"id":"switch-the-rock-round-rock-tx","state":"tx","kind":"facility","name":"Switch: The Rock (Round Rock)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Williamson"],"city":"Round Rock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 185MWnot RoundRock-onlycapacity.60MWand500karea belong acquiredDataFoundryproperties. Announced2021sitework not currentdeliveredstatus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/","host":"switch.com","date":"2021-06-02","published":"2021-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.4880189,"lng":-97.6725256,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"historical_planned_round_rock_area_sqft_min_exclusive":1500000,"historical_site_preparation_target":"2021summer","regional_power_mw":185,"regional_power_scope":"Texas ecosystem including acquired Austin and Houston properties"},"notes":["185MWnot RoundRock-onlycapacity.60MWand500karea belong acquiredDataFoundryproperties. Announced2021sitework not currentdeliveredstatus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/","host":"switch.com","date":"2021-06-02","published":"2021-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"corporate energy context only","fields":{},"notes":["Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Round Rock · Williamson · Source context reviewed"},{"id":"tesla-cortex-2-giga-texas-austin-tx","state":"tx","kind":"facility","name":"Tesla Cortex 2.0 AI Training Cluster (Giga Texas)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Travis"],"city":"Austin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Late 2025/early 2026 operation and expansion through 2026 were forecasts, not observed current RFS. NoGPU count orMW for Cortex 2 is established. Cortex 1’s 50,000 H 100 deployment/350,000 aspiration and xAIColossus 200,000/one-million plans are separate clusters and cannot size Cortex 2 or identify its tenant contracts. Robotaxi/Optimus expected business use is not an independently verified physical capacity. Main retained body read after automated related-story selection was corrected. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://interestingengineering.com/innovation/tesla-supercomputer-cortex-2-texas","host":"interestingengineering.com","date":"2025-05-15","published":"2025-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.2223,"lng":-97.6171,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Interesting Engineering describes reported construction of Tesla Cortex 2 on the north side of GigaTexas, relying on observer/social reporting and a Teslarati account.","independently_verified_current_operating_status":null},"notes":["Late 2025/early 2026 operation and expansion through 2026 were forecasts, not observed current RFS. NoGPU count orMW for Cortex 2 is established. Cortex 1’s 50,000 H 100 deployment/350,000 aspiration and xAIColossus 200,000/one-million plans are separate clusters and cannot size Cortex 2 or identify its tenant contracts. Robotaxi/Optimus expected business use is not an independently verified physical capacity. Main retained body read after automated related-story selection was corrected.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://interestingengineering.com/innovation/tesla-supercomputer-cortex-2-texas","host":"interestingengineering.com","date":"2025-05-15","published":"2025-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Austin · Travis · Source context reviewed"},{"id":"tcdc-ector-county-tx","state":"tx","kind":"facility","name":"Texas Critical Data Centers (TCDC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ector"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Sharon TCDC historical engineering, LOI land and power stage. 235securedplus203nonbindingLOI=438POTENTIALnot438closedland.250gasgenerationnotITnoradditionalto1GWmasterplan. Power/land/fiberlettersnonbindingnotexecutedfirmcapacity. Airpermitbeingobtainednotissued;initialfeasibilitynotallregulatoryapproval. UpdatedNewErahomepage492/493acand1.4GWlaterdifferentstage,do notmergeundatedscopesasonecurrentfact. Carboncredits/digitalcertificatesnotzeroactualonsiteemissions. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sharonai.com/press-releases/sharon-ai-completes-phase-one-engineering-for-flagship-ai-data-center-campus-joint-venture-in-texas/","host":"sharonai.com","date":"2025-09-30","published":"2025-09-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.87,"lng":-102.54,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Sharon TCDC historical engineering, LOI land and power stage","fields":{"issuer":"Sharon AI","project":"Texas Critical Data Centers, Ector County, Texas","report_date":"2025-09-30","joint_venture_partner":"New Era Energy and Digital","reported_jv_ownership_percent_each":50,"already_secured_land_acres":235,"additional_land_acres_under_nonbinding_loi":203,"potential_combined_land_acres":438,"planned_power_capacity_gw":1,"power_basis":"ultimate power, not explicit IT","nonbinding_gas_generation_letter_mw":250,"generator_deployment_target_duration_months":18,"deployment_condition":"endcustomer offtake","reported_engineering_stage":"phase1complete, phase2commenced"},"notes":["235securedplus203nonbindingLOI=438POTENTIALnot438closedland.250gasgenerationnotITnoradditionalto1GWmasterplan. Power/land/fiberlettersnonbindingnotexecutedfirmcapacity. Airpermitbeingobtainednotissued;initialfeasibilitynotallregulatoryapproval. UpdatedNewErahomepage492/493acand1.4GWlaterdifferentstage,do notmergeundatedscopesasonecurrentfact. Carboncredits/digitalcertificatesnotzeroactualonsiteemissions.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sharonai.com/press-releases/sharon-ai-completes-phase-one-engineering-for-flagship-ai-data-center-campus-joint-venture-in-texas/","host":"sharonai.com","date":"2025-09-30","published":"2025-09-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ector · Source context reviewed"},{"id":"tierpoint-dallas-tx","state":"tx","kind":"facility","name":"TierPoint Dallas","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Dallas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8079818,"lng":-96.8573889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":68000,"gross_area_is_lower_bound":true,"raised_floor_sqft":51000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Six 2.0 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Dallas · Dallas · Source context reviewed"},{"id":"tierpoint-dallas-allen-tx","state":"tx","kind":"facility","name":"TierPoint Dallas-Allen","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Allen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas-allen/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.1379102,"lng":-96.657329,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":29000,"gross_area_is_lower_bound":true,"raised_floor_sqft":16000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2 MW redundant generators and one 1 MW generator","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas-allen/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Allen · Collin · Source context reviewed"},{"id":"tract-caldwell-valley-uhland-tx","state":"tx","kind":"facility","name":"Tract Caldwell Valley Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caldwell"],"city":"Uhland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Corrected named-site crosswalk; source does not verify PowerHouse Uhland.. Water1.5-to16.6MGDisMinnesotaproxy, notTexasdisclosure; missingreturnflowisnot100percentconsumption. Originalutilitycontract,sitepermits,currentconstructionandwaterplanunreviewed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. Automaticexcerptselectedunrelatedrealestatestory;actualmainbodyread.800jobsarefullbuildoutforecast,nothires.4GWpotentialnotadditive2plus4orcriticalIT/contractedservice. Initial360notobserveduse. Closed-loopwaterefficiencyintentionnotgallonallocation/zerowater. No-incentiverequestclaimsdatedMay2025city/countyonly,notalltimeallgovernmentawardabsence. NeighborUSD4billionPrimeprojectisnotTract/PowerHouse. USD1.7billionfundraise25GWportfolioandPhoenix20billionnotCaldwellcapex. Later2026landexpansionrequireseparatesource.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://centexdatacenters.org/projects/tract-caldwell-county","host":"centexdatacenters.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/","host":"muskin-elam.com","date":"2025-05-08","published":"2025-05-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":29.9499,"lng":-97.7889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Corrected named-site crosswalk; source does not verify PowerHouse Uhland.","fields":{"reported_context":"Tracker describes Tract Caldwell Valley land expansion inJanuary2026 toward2973acres and4GWultimate masterplan; initial360MWdesign and250MWcontracted timeline conflict in scope.","critical_it_mw":null,"verified_texas_water_use_gpd":null},"notes":["Water1.5-to16.6MGDisMinnesotaproxy, notTexasdisclosure; missingreturnflowisnot100percentconsumption. Originalutilitycontract,sitepermits,currentconstructionandwaterplanunreviewed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://centexdatacenters.org/projects/tract-caldwell-county","host":"centexdatacenters.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.","fields":{"reported_context":"Public MuskinElam syndication ofJustinSayers/AustinBusinessJournal reporting quotesTractCIO:1515acresacquired,initial360MWplanned2028,2GWconservativeandapproximately4GWconditionalonrighton-siteenergymixovertenyears. HorizontalinfrastructureestimatedUSD50-to100million;fullcapexnotreleased.","independently_verified_current_operating_status":null},"notes":["Automaticexcerptselectedunrelatedrealestatestory;actualmainbodyread.800jobsarefullbuildoutforecast,nothires.4GWpotentialnotadditive2plus4orcriticalIT/contractedservice. Initial360notobserveduse. Closed-loopwaterefficiencyintentionnotgallonallocation/zerowater. No-incentiverequestclaimsdatedMay2025city/countyonly,notalltimeallgovernmentawardabsence. NeighborUSD4billionPrimeprojectisnotTract/PowerHouse. USD1.7billionfundraise25GWportfolioandPhoenix20billionnotCaldwellcapex. Later2026landexpansionrequireseparatesource.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/","host":"muskin-elam.com","date":"2025-05-08","published":"2025-05-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Uhland · Caldwell · Source context reviewed"},{"id":"vantage-frontier-shackelford-county-tx","state":"tx","kind":"facility","name":"Vantage Frontier Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shackelford"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","host":"vantage-dc.com","date":"2025-08-19","published":"2025-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.7272,"lng":-99.2987,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_investment_usd_min_exclusive":25000000000,"planned_gpu_compute_capacity_gw":1.4,"campus_acres":1200,"planned_buildings":10,"planned_area_sqft":3700000,"construction_stage_at_release":"begun","first_building_delivery_target":"2026-H2","forecast_jobs_construction_and_operations_min_exclusive":5000},"notes":["Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","host":"vantage-dc.com","date":"2025-08-19","published":"2025-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Shackelford · Source context reviewed"},{"id":"beacon-westline-dove-creek-san-angelo-tx","state":"tx","kind":"facility","name":"Westline Site / Dove Creek Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tom Green"],"city":"San Angelo (Tankersley area, unincorporated)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. Will McDaniel, Concho Observer, June26,2026 report identifies Beacon/Westline and links the original TCEQ plain-language application summary. Its claim of about1177tons/year CARBON DIOXIDE conflicts with the original table, which labels1177.2 as CARBON MONOXIDE. Do not copy CO2, gasoline/coal equivalents or the internally inconsistent concrete-volume analogy. Narrative permit-will-authorize wording describes application purpose, not an issued construction permit. Expedited review and lawyer jurisdiction assertions do not establish final approval or current legal authority. Original summary is reviewed separately below. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification. Lucas Banda, San Angelo LIVE, June2,2026 original meeting report says commissioners chose NOT TO ADVANCE proposed12month Precinct4 moratorium. This is not a countywide enacted moratorium, project approval, or independent current legal opinion. Draft thresholds5MW storage/generation and1000sf data-center area were not enacted by this vote. Original minutes/road-use contract unread. Developer describes about1240buildable acres near FM2335/US67, spring/summer2027 start and2-4year construction,1200construction/300+operations-maintenance jobs. All plans/forecasts, not actual spending, hiring or delivered IT. Closed-loop, potable well and possible desalination do not mean zero water; claims of no rate effects/noise mitigation are unverified promises. Backup grid/coordination in interview differs from no-grid-reliance wording in application; no executed connection/ESA inspected. Original TCEQ-hosted public application summary, English page1 of2 visually read; Spanish page2 not read. Westline TX Holdings LLC, CN606525921, Westline2335 RN112471305; initial permit applications184380/GHGPSDTX275/PSDTX1710. Location FM2335 about0.25mi south ofUS67, Tom Green County. No exact surveyed parcel inferred. It explicitly describes submitted APPLICATION/PROPOSED annual emissions, onsite natural-gas RICE generation and diesel outage generators, with expedited PROCESSING. It is not an issued permit, current measured emissions or critical IT capacity. CO is1177.2tons/year; CO2 is NOT quantified in this table. Particulate total, PM10 andPM2.5 overlap and must not be added. SCR/oxidation systems and fuel descriptions are proposed mitigation, not inspected compliance. No PDF text/OCR extracted.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","host":"conchoobserver.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://sanangelolive.com/news/county/2026-06-02/tom-green-county-commissioners-reject-data-center-moratorium","host":"sanangelolive.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf","host":"tceq.texas.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.335,"lng":-100.478,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Will McDaniel, Concho Observer, June26,2026 report identifies Beacon/Westline and links the original TCEQ plain-language application summary. Its claim of about1177tons/year CARBON DIOXIDE conflicts with the original table, which labels1177.2 as CARBON MONOXIDE. Do not copy CO2, gasoline/coal equivalents or the internally inconsistent concrete-volume analogy.","Narrative permit-will-authorize wording describes application purpose, not an issued construction permit. Expedited review and lawyer jurisdiction assertions do not establish final approval or current legal authority. Original summary is reviewed separately below.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","host":"conchoobserver.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Lucas Banda, San Angelo LIVE, June2,2026 original meeting report says commissioners chose NOT TO ADVANCE proposed12month Precinct4 moratorium. This is not a countywide enacted moratorium, project approval, or independent current legal opinion. Draft thresholds5MW storage/generation and1000sf data-center area were not enacted by this vote. Original minutes/road-use contract unread.","Developer describes about1240buildable acres near FM2335/US67, spring/summer2027 start and2-4year construction,1200construction/300+operations-maintenance jobs. All plans/forecasts, not actual spending, hiring or delivered IT. Closed-loop, potable well and possible desalination do not mean zero water; claims of no rate effects/noise mitigation are unverified promises. Backup grid/coordination in interview differs from no-grid-reliance wording in application; no executed connection/ESA inspected.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://sanangelolive.com/news/county/2026-06-02/tom-green-county-commissioners-reject-data-center-moratorium","host":"sanangelolive.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Original TCEQ-hosted public application summary, English page1 of2 visually read; Spanish page2 not read. Westline TX Holdings LLC, CN606525921, Westline2335 RN112471305; initial permit applications184380/GHGPSDTX275/PSDTX1710. Location FM2335 about0.25mi south ofUS67, Tom Green County. No exact surveyed parcel inferred.","It explicitly describes submitted APPLICATION/PROPOSED annual emissions, onsite natural-gas RICE generation and diesel outage generators, with expedited PROCESSING. It is not an issued permit, current measured emissions or critical IT capacity. CO is1177.2tons/year; CO2 is NOT quantified in this table. Particulate total, PM10 andPM2.5 overlap and must not be added. SCR/oxidation systems and fuel descriptions are proposed mitigation, not inspected compliance. No PDF text/OCR extracted.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf","host":"tceq.texas.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"San Angelo (Tankersley area, unincorporated) · Tom Green · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}