{"state":"us","name":"United States","updated":"2026-10-15","checked":"2026-10-15","records":[{"id":"aphorio-simpsonville","kind":"facility","name":"Aphorio Carter Simpsonville facility","group":"operating","status":"Operating","crypto":false,"type":"enterprise","counties":["Shelby"],"city":"Simpsonville","address":"70 Kingbrook Parkway","who":"Aphorio Carter","opened":"","tier":"","note":"Enterprise data center of 102,500 square feet with 10,000 square feet of raised floor and a 1,000 kW critical IT design, per the owner.","sources":[{"url":"https://carterfunds.com/enterprise-data-center-6/","host":"carterfunds.com","date":""},{"url":"https://365datacenters.com/365-data-centers-and-aphorio-carter-launch-200-mw-ai-ready-data-center-pipeline/","host":"365datacenters.com","date":""}],"loc":{"lat":38.218147,"lng":-85.33673,"precision":"address","basis":"U.S. Census match to the published street address: 70 Kingbrook Pkwy, Simpsonville, Ky, 40067"},"state":"KY","precision_label":"Matched to the published street address","summary":"Kentucky · Shelby County · Aphorio Carter","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"aphorio-louisville","kind":"facility","name":"Aphorio Carter enterprise facility","group":"operating","status":"Operating","crypto":false,"type":"enterprise","counties":["Jefferson"],"city":"Louisville","address":"12901 Plantside Drive","who":"Aphorio Carter","opened":"","tier":"","note":"Built in 2011: 102,500 square feet with 10,000 square feet of raised floor and a 1,000 kW critical IT design, per the owner.","sources":[{"url":"https://carterfunds.com/enterprise-data-center-5/","host":"carterfunds.com","date":""},{"url":"https://carterfunds.com/aphorio-carter/","host":"carterfunds.com","date":""}],"loc":{"lat":38.211239,"lng":-85.523366,"precision":"address","basis":"U.S. Census match to the published street address: 12901 Plantside Dr, Louisville, Ky, 40299"},"state":"KY","precision_label":"Matched to the published street address","summary":"Kentucky · Jefferson County · Aphorio Carter","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"bluegrassnet-louisville-jefferson-ky","kind":"facility","name":"BluegrassNet 321 facility","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Jefferson"],"city":"Louisville","address":"321 East Breckinridge Street","who":"BluegrassNet","opened":"","tier":"","note":"Operator separately lists fourth-street, TimeWarner and Lexington OW facilities","sources":[{"url":"https://www.bluegrass.net/about/","host":"bluegrass.net","date":""}],"loc":{"lat":38.240979,"lng":-85.750119,"precision":"address","basis":"U.S. Census match to the published street address: 321 E Breckinridge St, Louisville, Ky, 40203"},"state":"KY","precision_label":"Matched to the published street address","summary":"Kentucky · Jefferson County · BluegrassNet","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"bluegrass-fourth","kind":"facility","name":"BluegrassNet Fourth Street facility","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Jefferson"],"city":"Louisville","address":"","who":"BluegrassNet","opened":"","tier":"","note":"Operator names physical facility; street address not primary-source verified.","sources":[{"url":"https://www.bluegrass.net/data-center/","host":"bluegrass.net","date":""}],"loc":{"lat":38.1871,"lng":-85.6615,"precision":"county","basis":"Jefferson County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Jefferson County · BluegrassNet","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"bluegrass-ow","kind":"facility","name":"BluegrassNet OW facility","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Fayette"],"city":"Lexington","address":"","who":"BluegrassNet","opened":"","tier":"","note":"Operator names physical facility; street address not primary-source verified.","sources":[{"url":"https://www.bluegrass.net/data-center/","host":"bluegrass.net","date":""}],"loc":{"lat":38.03564,"lng":-84.46166,"precision":"county","basis":"Fayette County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Fayette County · BluegrassNet","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"cogent-lexington-edge","kind":"facility","name":"Cogent Lexington Edge Data Center","group":"operating","status":"Operating","crypto":false,"type":"edge","counties":["Fayette"],"city":"Lexington","address":"346 Lisle Industrial Avenue","who":"Cogent Communications","opened":"","tier":"","note":"","sources":[{"url":"https://www.cogentco.com/en/cogent-louisville","host":"cogentco.com","date":""}],"loc":{"lat":38.060092,"lng":-84.524291,"precision":"address","basis":"U.S. Census match to the published street address: 346 Lisle Industrial Ave, Lexington, Ky, 40511"},"state":"KY","precision_label":"Matched to the published street address","summary":"Kentucky · Fayette County · Cogent Communications","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"cogent-louisville","kind":"facility","name":"Cogent Louisville / 332 West Broadway carrier hotel","group":"operating","status":"Operating","crypto":false,"type":"carrier hotel","counties":["Jefferson"],"city":"Louisville","address":"332 West Broadway","who":"Cogent Communications","opened":"","tier":"","note":"Several companies list space in this same building; they are tenants here, not separate data centers.","sources":[{"url":"https://www.cogentco.com/en/cogent-louisville","host":"cogentco.com","date":""}],"loc":{"lat":38.245942,"lng":-85.757291,"precision":"address","basis":"U.S. Census match to the published street address: 332 W Broadway, Louisville, Ky, 40202"},"state":"KY","precision_label":"Matched to the published street address","summary":"Kentucky · Jefferson County · Cogent Communications","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"cogent-louisville-edge","kind":"facility","name":"Cogent Louisville Edge Data Center","group":"operating","status":"Operating","crypto":false,"type":"edge","counties":["Jefferson"],"city":"Louisville","address":"340 Baxter Avenue","who":"Cogent Communications","opened":"","tier":"","note":"","sources":[{"url":"https://www.cogentco.com/en/cogent-louisville","host":"cogentco.com","date":""}],"loc":{"lat":38.250629,"lng":-85.732415,"precision":"address","basis":"U.S. Census match to the published street address: 340 Baxter Ave, Louisville, Ky, 40204"},"state":"KY","precision_label":"Matched to the published street address","summary":"Kentucky · Jefferson County · Cogent Communications","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"core-scientific-calvert-city-ky","kind":"facility","name":"Core Scientific Calvert City Data Center (Calvert 1, 2 & 3)","group":"operating","status":"Operating","crypto":true,"type":"crypto/HPC","counties":["Marshall"],"city":"Calvert City","address":"1035 Shar-Cal Road, Calvert City","who":"Core Scientific","opened":"","tier":"","note":"Three buildings on about 15 acres, around 60,000 square feet, with 150 MW of total power capacity according to the operator.","sources":[{"url":"https://corescientific.com/high-density-data-centers/calvert-city-ky/","host":"corescientific.com","date":""},{"url":"https://www.areadevelopment.com/newsitems/11-14-2019/core-scientific-calvert-city-kentucky.shtml","host":"areadevelopment.com","date":""},{"url":"https://www.prnewswire.com/news-releases/core-scientific-opens-world-class-blockchain-hosting-facility-in-calvert-city-ky-300956631.html","host":"prnewswire.com","date":""},{"url":"https://www.datacentermap.com/usa/kentucky/calvert-city/core-scientific-calvert-city/","host":"datacentermap.com","date":""}],"loc":{"lat":37.044897,"lng":-88.417797,"precision":"address","basis":"U.S. Census match to the published street address: 1035 Shar-Cal Rd, Calvert City, Ky, 42029"},"state":"KY","precision_label":"Matched to the published street address","summary":"Kentucky · Marshall County · Core Scientific","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"cyrusone-cin6-florence-boone-ky","kind":"facility","name":"CyrusOne CIN6 Florence","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Boone"],"city":"Florence","address":"","who":"CyrusOne","opened":"","tier":"","note":"Provider descriptions of cooling water conflict; no verified zero-water claim.","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/florence-ky","host":"cyrusone.com","date":""}],"loc":{"lat":38.9813135,"lng":-84.6187219,"precision":"exact","basis":"Published operator/address matched to an OpenStreetMap building center, not a surveyed parcel","source_url":"https://www.openstreetmap.org/way/68281408","license":"ODbL 1.0"},"state":"KY","precision_label":"Mapped to the published site","summary":"Kentucky · Boone County · CyrusOne","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"east-kentucky-network-ivel-floyd-ky","kind":"facility","name":"East Kentucky Network Ivel Data Center","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Floyd"],"city":"Ivel","address":"271 Technology Trail","who":"East Kentucky Network","opened":"","tier":"","note":"Operator describes 400-mile redundant fiber ring, over 7,500 combined fiber miles and up to 100 Gbps; these are network statistics.","sources":[{"url":"https://www.ekn.com/","host":"ekn.com","date":""}],"loc":{"lat":37.6001856,"lng":-82.6787687,"precision":"exact","basis":"Published operator/address matched to an OpenStreetMap building center, not a surveyed parcel","source_url":"https://www.openstreetmap.org/way/1456953254","license":"ODbL 1.0"},"state":"KY","precision_label":"Mapped to the published site","summary":"Kentucky · Floyd County · East Kentucky Network","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"flexential-louisville-downtown-ky","kind":"facility","name":"Flexential Louisville Downtown","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Jefferson"],"city":"Louisville","address":"752 Barret Avenue","who":"Flexential","opened":"","tier":"","note":"Published critical UPS capacity; not measured utilization.","sources":[{"url":"https://www.flexential.com/system/files/file/2025-06/kentucky-state-tour-guide-hvc.pdf","host":"flexential.com","date":""}],"loc":{"lat":38.242501,"lng":-85.733336,"precision":"exact","basis":"Published operator/address matched to an OpenStreetMap building center, not a surveyed parcel","source_url":"https://www.openstreetmap.org/way/330276516","license":"ODbL 1.0"},"state":"KY","precision_label":"Mapped to the published site","summary":"Kentucky · Jefferson County · Flexential","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"flexential-louisville-east-nas-equivalent-lou-east-ky","kind":"facility","name":"Flexential Louisville East","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Jefferson"],"city":"Louisville","address":"2101 Nelson Miller Parkway","who":"Flexential","opened":"","tier":"","note":"Published critical UPS capacity; not measured utilization.","sources":[{"url":"https://www.flexential.com/system/files/file/2025-06/kentucky-state-tour-guide-hvc.pdf","host":"flexential.com","date":""}],"loc":{"lat":38.2771906,"lng":-85.5072402,"precision":"exact","basis":"Published operator/address matched to an OpenStreetMap building center, not a surveyed parcel","source_url":"https://www.openstreetmap.org/way/329551673","license":"ODbL 1.0"},"state":"KY","precision_label":"Mapped to the published site","summary":"Kentucky · Jefferson County · Flexential","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"iglou-louisville","kind":"facility","name":"IgLou data center","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Jefferson"],"city":"Louisville","address":"","who":"IgLou Internet Services","opened":"","tier":"","note":"Advertises colocation to Louisville and Lexington customers. This does not prove a separate Lexington physical facility.","sources":[{"url":"https://www.iglou.com/colocation/","host":"iglou.com","date":""}],"loc":{"lat":38.1871,"lng":-85.6615,"precision":"county","basis":"Jefferson County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Jefferson County · IgLou Internet Services","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"kusi-wilmore","kind":"facility","name":"KUSI SUBTAC","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Jessamine"],"city":"Wilmore","address":"3830 Highbridge Road","who":"Kentucky Underground Storage","opened":"","tier":"","note":"Underground data hall of about 2,300 square feet with 30 racks and 400 kW of available power, as the operator markets it.","sources":[{"url":"https://kentuckyunderground.com/services/data-center/","host":"kentuckyunderground.com","date":""},{"url":"https://www.kentuckyunderground.com/","host":"kentuckyunderground.com","date":""}],"loc":{"lat":37.827635,"lng":-84.703247,"precision":"address","basis":"U.S. Census match to the published street address: 3830 High Bridge Rd, Wilmore, Ky, 40390"},"state":"KY","precision_label":"Matched to the published street address","summary":"Kentucky · Jessamine County · Kentucky Underground Storage","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"lost-river-bowling-green","kind":"facility","name":"Lost River Data Center","group":"operating","status":"Operating","crypto":false,"type":"colocation / university","counties":["Warren"],"city":"Bowling Green","address":"","who":"BGMU / Western Kentucky University","opened":2012,"tier":"Tier II as operator description, not independently verified certification","note":"Operator describes construction completed April 2012 and Tier II design; Uptime certification not independently verified.","sources":[{"url":"https://www.bgmufiber.com/why-use-us/","host":"bgmufiber.com","date":""}],"loc":{"lat":36.99471,"lng":-86.42225,"precision":"county","basis":"Warren County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Warren County · BGMU / Western Kentucky University","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"north-campbell-land-hopkinsville-mine-christian-ky","kind":"facility","name":"North Campbell Land Co. Hopkinsville Bitcoin Mine","group":"operating","status":"Operating","crypto":true,"type":"crypto/HPC","counties":["Christian"],"city":"Hopkinsville","address":"Holland Substation, North Campbell Street, Hopkinsville","who":"North Campbell Land Co. (Sphere 3D)","opened":"","tier":"","note":"","sources":[{"url":"https://hoptownchronicle.org/hopkinsville-weighs-limits-on-data-centers-as-crypto-mine-proposes-expansion/","host":"hoptownchronicle.org","date":"2026-07-29"}],"loc":{"lat":36.8703081,"lng":-87.4798424,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Christian County · North Campbell Land Co.","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"qx-net-lexington-fayette-ky","kind":"facility","name":"QX.Net Lexington Data Center","group":"operating","status":"Operating","crypto":false,"type":"colocation","counties":["Fayette"],"city":"Lexington","address":"","who":"QX.Net","opened":"","tier":"","note":"2659 Regency Road Suite 130 is published contact office; not independently established as server-building address.","sources":[{"url":"https://www.qx.net/","host":"qx.net","date":""}],"loc":{"lat":38.047912,"lng":-84.499563,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Fayette County · QX.Net","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"soluna-project-sophie-murray-ky","kind":"facility","name":"Soluna Project Sophie","group":"operating","status":"Operating","crypto":true,"type":"crypto/HPC","counties":["Calloway"],"city":"Murray","address":"","who":"Soluna Holdings","opened":2021,"tier":"","note":"","sources":[{"url":"https://www.solunacomputing.com/projects/project-sophie/","host":"solunacomputing.com","date":""},{"url":"https://www.solunacomputing.com/projects/","host":"solunacomputing.com","date":""}],"loc":{"lat":36.61,"lng":-88.315,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Calloway County · Soluna Holdings","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"uk-coldstream","kind":"facility","name":"University of Kentucky Coldstream Data Center","group":"operating","status":"Operating","crypto":false,"type":"university","counties":["Fayette"],"city":"Lexington","address":"","who":"University of Kentucky","opened":"","tier":"","note":"Coldstream park identifies a university data center; no defensible published MW found.","sources":[{"url":"https://coldstream.uky.edu/development-opportunities/site-attributes","host":"coldstream.uky.edu","date":""}],"loc":{"lat":38.03564,"lng":-84.46166,"precision":"county","basis":"Fayette County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Fayette County · University of Kentucky","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"uofl-miller","kind":"facility","name":"University of Louisville Miller IT Center","group":"operating","status":"Operating","crypto":false,"type":"university","counties":["Jefferson"],"city":"Louisville","address":"","who":"University of Louisville","opened":"","tier":"","note":"University describes its computing infrastructure; distinct from demographic research organizations called state data centers.","sources":[{"url":"https://louisville.edu/sustainability/operations/it","host":"louisville.edu","date":""}],"loc":{"lat":38.1871,"lng":-85.6615,"precision":"county","basis":"Jefferson County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Jefferson County · University of Louisville","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"terawulf-hawesville-ky","kind":"project","name":"Justified Data Campus","group":"building","status":"Under construction","raw_status":"under construction","crypto":false,"type":"data center","counties":["Hancock"],"city":"Hawesville","who":"TeraWulf / Raylan Data","end_user":"Anthropic","mw":401,"power":"first phase 401 MW","power_note":"401 MW leased critical IT; 482 MW approved electrical service, not IT capacity","investment":"approximately 4.0 billion to 4.5 billion in site development and initial data halls, excluding customer computing equipment","jobs":"","acres":null,"utility":"Big Rivers Electric / Kenergy; market delivery through MISO","water":"","incentives":"Customer bears project-specific power supply, delivery and infrastructure costs under the approved contract. No verified site-specific tax award recorded here.","note":"PSC power agreement approval; operator describes development at former smelter","date":"2026-08-21","events":[],"timeline":[],"sources":[{"url":"https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus","host":"investors.terawulf.com","date":"2026-08-24"},{"url":"https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack","host":"investors.terawulf.com","date":"2026-07-06"}],"loc":{"lat":37.84043,"lng":-86.78092,"precision":"county","basis":"Inherited point failed aerial review. County context only until a parcel is sourced"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Hancock County · 401 MW · TeraWulf / Raylan Data","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"powerhouse-louisville-ky","kind":"project","name":"PowerHouse Data Centers - Louisville (Camp Ground Road)","group":"building","status":"Under construction","raw_status":"under construction","crypto":false,"type":"data center","counties":["Jefferson"],"city":"Louisville","who":"PowerHouse Data Centers / Poe Companies","end_user":"","mw":400,"power":"first phase 130 MW, up to 400 MW","power_note":"130 MW initial utility availability forecast for October 2026; 400 MW advertised campus; 335 MW initially secured and 402 MW near-term supply are different figures","investment":"","jobs":"","acres":"153","utility":"LG&E","water":"Louisville Water","incentives":"","note":"Developer and planning approval reporting; forecast opening is not proof of operation","date":"2026-03-05","events":[],"timeline":[],"sources":[{"url":"https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus","host":"powerhousedata.com","date":"2025-01-16"},{"url":"https://www.lpm.org/news/2026-03-05/west-louisville-data-center-approved-despite-opposition","host":"lpm.org","date":"2026-03-05"}],"loc":{"lat":38.1871,"lng":-85.6615,"precision":"county","basis":"Inherited point failed aerial review. County context only until a parcel is sourced"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Jefferson County · 400 MW · PowerHouse Data Centers / Poe Companies","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"mason-county-hyperscale-campus-maysville-ky","kind":"project","name":"Mason County hyperscale data center and technology campus (Meta)","group":"approved","status":"Approved","raw_status":"approved","crypto":false,"type":"hyperscale AI","counties":["Mason"],"city":"Maysville (unincorporated Mason County outside city limits)","who":"Meta Platforms; project entity Crisham LLC (Delaware LLC) per county attorney Jim Parsons; rezoning applicant was the Maysville-Mason County Industrial Development Authority","end_user":"Meta Platforms (named 2026-10-13; previously described only as a 'Fortune 100' / 'Fortune 50' / 'Fortune 20' tech company under NDAs)","mw":396,"power":"first phase 396 MW","power_note":"Initial phase from October 6 county presentation. Earlier 1200 MW / 2200 MW requests are not a verified full-buildout commitment.","investment":"10 billion capital investment, with potential for more in future phases","jobs":"construction: over 4,000 at peak, permanent: more than 300, potentially 400; at least 100 initial phase in county summary","acres":"approximately 2,900 project acres in October summary; 2,080 acres rezoned in May","utility":"East Kentucky Power Cooperative (G&T; Spurlock Station nearby)","water":"City of Maysville / Western Mason Water District infrastructure, as proposed in county agreement summary","incentives":"Community agreement approved October 13; includes IRB/PILOT structure. Agreement summary proposes 5 million county and 2 million school annual payments per phase","note":"","date":"2026-10-13","events":[["2026-10-06","County attorney presents development/community benefits agreement: Crisham LLC, 396 MW initial phase, IRB/PILOT structure, at least 130M infrastructure"],["2026-10-13","Judge-Executive McNeill names Meta; Fiscal Court unanimously approves agreement/resolution"],["2026-10-13","WCPO reports a lawsuit has been filed over the project; no court ruling yet"]],"timeline":[["Announced","2025-05 (EKPC reported 2.2 GW request); first public IDA presentation 2025-08-12"],["Approvals","Ordinance 26-01 (data center regs) 2026-02-27; Fiscal Court rezoning of 2,080 acres 2026-05-22; development and community benefits agreement / Meta resolution approved unanimously 2026-10-13"],["Construction","Initial phase to begin within 36 months of executing the development agreement (no groundbreaking yet)"]],"sources":[{"url":"https://www.wcpo.com/news/northern-kentucky/meta-announced-as-partner-in-2-000-acre-controversial-maysville-data-center","host":"wcpo.com","date":"2026-10-13"},{"url":"https://www.maysville-online.com/news/327718/meta-announced-as-data-center-project-developer-in-mason-county","host":"maysville-online.com","date":"2026-10-13"},{"url":"https://cms3.revize.com/revize/masoncountyky/Summary%20-%20Development%20%26%20Community%20Benefits%20Agreement%20-%20Mason%20Co.%20Fiscal%20Court%20Meeting%20%2810.05.2026%29%20%5BFINAL%5D.pdf","host":"cms3.revize.com","date":"2026-10-06"},{"url":"https://www.weku.org/the-commonwealth/2026-05-26/mason-county-gives-final-approval-on-rezoning-properties-for-data-center-construction","host":"weku.org","date":"2026-05-26"}],"loc":{"lat":38.6856147,"lng":-83.8517119,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Mason County · 396 MW · Meta Platforms","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"tenkey-franklin-ky","kind":"project","name":"TenKey LandCo Project Lionsgate - Franklin Data Center","group":"approved","status":"Approved","raw_status":"approved","crypto":false,"type":"data center","counties":["Simpson"],"city":"Franklin","who":"TenKey LandCo I LLC","end_user":"","mw":null,"power":"","power_note":"","investment":"nearly 5 billion for total campus","jobs":"","acres":null,"utility":"Warren Rural Electric Co-op Corp","water":"","incentives":"Local conditional-use ordinance under litigation","note":"Preliminary development plan approval only","date":"2026-04-14","events":[],"timeline":[],"sources":[{"url":"https://www.wkyufm.org/news/2026-04-14/second-lawsuit-filed-over-proposed-data-center-in-simpson-county","host":"wkyufm.org","date":"2026-04-14"},{"url":"https://www.lpm.org/news/2026-01-28/data-center-developer-sues-simpson-county-government-over-land-use-ordinance","host":"lpm.org","date":""}],"loc":{"lat":36.703,"lng":-86.591,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Simpson County · TenKey LandCo I LLC","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"rubix-ashland-works-russell-greenup-ky","kind":"project","name":"Rubix Ashland Works Data Center Campus (also listed as Rubix Russell Campus)","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"hyperscale AI","counties":["Greenup","Boyd"],"city":"Russell (portions in Boyd County and City of Ashland)","who":"Rubix Data Centers (subsidiary of Submer Group, Barcelona; Rubix formed June 2026, CEO John Eland, London); consultant Gateway City Energy / Gateway City Consulting (St. Louis, Chris Honstain); engineering Nuclei (Ben Mitten)","end_user":"Undisclosed 'big-name' tenant to be determined after site purchase","mw":2000,"power":"first phase about 155 MW initial phase (Kentucky Power talks targeting Nov 2027), up to 2,000 MW","power_note":"Kentucky Power (AEP) would serve; load studies not complete","investment":"8-12 billion developer infrastructure estimate, excluding computing equipment; other published scopes differ","jobs":"construction: 3,000 at peak (over about 5 years), permanent: 200 full-time (average salary 125,000 dollars) per company; 200-300 per Honstain","acres":"about 500 acres (300 Russell / 110 Boyd County / 100 Ashland) per Gateway; 425-acre brownfield per Kentucky Lantern; about 450 acres per Construction Review","utility":"Kentucky Power (AEP)","water":"Russell or Ashland municipal supply proposed; developer describes closed-loop design, not measured consumption","incentives":"Developer says it may seek equipment sales-tax exemption; no confirmed site-specific award recorded","note":"","date":"2026-10-13","events":[["2026-07-10","Mayor's letter to community discloses Rubix proposal and Q&A"],["2026-07-21","Rubix town hall in Russell: 55 million dollars Cleveland-Cliffs purchase agreement; asks city to lift moratorium by Aug 31"],["2026-07-23","Ashland adopts restrictive data center zoning leaving about 20 acres of its Ashland Works portion usable"],["2026-09-04","Cleveland-Cliffs closing deadline extended from Aug 31 to Sept 25"],["2026-09-24","Deadline extended again to Oct 15 ('no more extensions'); Boyd J-E Chaney says county will wait for Russell"],["2026-10-15","Reported final closing deadline with Cleveland-Cliffs; outcome to be confirmed"]],"timeline":[["Announced","2026-07 (City of Russell posted company Q&A; mayor's July 10 letter; public town hall July 21)"],["Approvals","None. Russell 180-day moratorium in force until Dec 2026; Boyd County moratorium also covers its about 110 acres; Ashland ordinance limits its portion to about 20 developable acres; Russell zoning amendments pending"],["Expected opening","First about 155 MW targeted Nov 2027 (developer aspiration)"]],"sources":[{"url":"https://glasgownews1.com/2026/07/22/developer-proposes-hyperscale-data-center-at-former-eastern-kentucky-steel-mill/","host":"glasgownews1.com","date":"2026-07-22"},{"url":"https://www.dailyindependent.com/news/rubix-to-russell-it-s-ultimately-up-to-you/article_eeb4e2d1-07a1-43e5-acce-38c007fefc33.html","host":"dailyindependent.com","date":"2026-07-22"},{"url":"https://www.dailyindependent.com/news/rubix-deadline-pushed-to-oct-15/article_8610bab4-cddd-4daa-81d4-d3e85cf9fbbd.html","host":"dailyindependent.com","date":"2026-09-25"},{"url":"https://www.dailyindependent.com/news/russell-at-standstill-in-zoning-process-mayor-adjourns-meeting-after-residents-speak-out-against-council/article_fd5f5982-14c8-4679-b3f9-93d427e229af.html","host":"dailyindependent.com","date":"2026-10-01"}],"loc":{"lat":38.5173028,"lng":-82.6976631,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Greenup County, Boyd County · 2,000 MW · Rubix Data Centers","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"brookfield-nextera-paducah-site-mccracken-ky","kind":"project","name":"Paducah Site AI Data Center Campus","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"data center","counties":["McCracken"],"city":"Kevil","who":"Brookfield / NextEra Energy Resources","end_user":"","mw":1800,"power":"1,800 MW","power_note":"planned AI/HPC campus; separate 2000 MW gas generation and up to 2600 MW battery storage power","investment":"more than 100 billion, privately funded, for the whole data-center and energy project","jobs":"construction: approximately 8,000, permanent: 600","acres":null,"utility":"Big Rivers Electric Power Corporation / Jackson Purchase Energy Cooperative / Paducah Power System","water":"","incentives":"","note":"Federal partnership announcement; no claim that all power and construction permits are approved","date":"2026-07-29","events":[],"timeline":[],"sources":[{"url":"https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power","host":"energy.gov","date":"2026-07-29"},{"url":"https://newsroom.nexteraenergy.com/2026-07-29-DOE-Site-in-Western-Kentucky-Revitalized-with-Data-Center-Campus-and-Dedicated-Energy-Project,-Creating-Jobs-and-Protecting-Residents-and-Businesses-from-Costs","host":"newsroom.nexteraenergy.com","date":"2026-07-29"}],"loc":{"lat":37.11389,"lng":-88.81028,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · McCracken County · 1,800 MW · Brookfield / NextEra Energy Resources","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"panattoni-burgin-mercer-county-ky","kind":"project","name":"Panattoni Burgin Data Center Campus","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"data center","counties":["Mercer"],"city":"Burgin","who":"Panattoni","end_user":"","mw":1300,"power":"1,300 MW","power_note":"utility-reported proposed demand, not operational IT","investment":"","jobs":"","acres":"approximately 950; annexation area described differently","utility":"","water":"","incentives":"","note":"Burgin city jurisdiction excluded from county moratorium; no verified groundbreaking","date":"2026-08-13","events":[],"timeline":[],"sources":[{"url":"https://kentuckylantern.com/2026/08/13/a-countys-data-center-moratorium-doesnt-include-a-small-city-considering-huge-project/","host":"kentuckylantern.com","date":"2026-08-13"},{"url":"https://www.wkms.org/2026-08-17/hyperscale-data-centers-provoke-bipartisan-outrage-across-kentucky","host":"wkms.org","date":""},{"url":"https://baxtel.com/data-center/panattoni-project-bluegrass","host":"baxtel.com","date":""}],"loc":{"lat":37.75444,"lng":-84.76333,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Mercer County · 1,300 MW · Panattoni","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"terawulf-muskie-eastpark-ky","kind":"project","name":"Muskie Data Campus","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"hyperscale AI","counties":["Boyd","Greenup"],"city":"near Ashland (unincorporated; EastPark off I-64, about 12 miles from Ashland)","who":"TeraWulf Inc. (Nasdaq: WULF); site assembled by Industrial Equity Partners (IEP) from the Northeast Kentucky Regional Industrial Park Authority (EastPark board)","end_user":"Undisclosed AI/HPC tenant (TeraWulf builds and owns buildings; tenant brings servers)","mw":1000,"power":"first phase 500 MW, up to 1,000 MW","power_note":"Contracted gross electrical service; additional 1000 MW is aspiration; amended ESA remains subject to PSC approval","investment":"","jobs":"construction: Around 1,000 at peak (TeraWulf VP Pace Ralli), permanent: 80-100 in Phase 1, excluding tenant jobs","acres":"about 285 acres owned/controlled (TeraWulf); TeraWulf website cites 308 acres; buildings on 164 acres (Lots 2B and 1A); optional adjacent acreage for expansion","utility":"Kentucky Power (AEP), Industrial General Service large-load tariff; PJM","water":"Ashland supply proposed; source water, cooling circuit and operational consumption need a dedicated current technical record","incentives":"Operator proposes winter bill credits and bearing project power costs, subject to PSC approval.","note":"","date":"2026-10-05","events":[["2026-07-14","Greenup County moratorium adopted, exempting industrial parks/EastPark; Boyd County follows 2026-07-21 with EastPark exemption"],["2026-08-05","Q2 earnings call: CEO Paul Prager says Muskie could expand to as much as 2 GW"],["2026-10-05","Amended Kentucky Power ESA (executed Oct 1) doubles contracted capacity to 1 GW, moves phase 2 to 2029, adds 100 million dollars bill credits (PSC approval required)"],["2026-10-15","Kentucky Power open house on Muskie transmission line routes (scheduled)"],["2026-10-29","Kentucky Power asks landowners for route feedback by this date"]],"timeline":[["Announced","2026-05-26"],["Approvals","Site already zoned industrial; ESA executed at closing (May 2026) and amended 2026-10-01; PSC approval of amended contract pending; Kentucky Power to file substation application Oct 2026 and transmission-line application early 2027, PSC decision expected spring 2027"],["Construction","Kentucky Power substation construction expected early 2027 if approved; transmission lines Nov 2027; campus construction date not announced"],["Expected opening","First 500 MW ramp 2H 2028 (Kentucky Power facilities in service Oct 2028); second 500 MW 2029"]],"sources":[{"url":"https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-064757/wulf-20261001.htm","host":"investors.terawulf.com","date":"2026-10-05"},{"url":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000109/wulfeasternkypr5-26x26.htm","host":"sec.gov","date":"2026-05-26"},{"url":"https://www.dailyindependent.com/news/terawulf-says-it-s-eager-to-bring-in-local-workforce/article_8b27725c-8077-4429-b744-59721c5c6f14.html","host":"dailyindependent.com","date":"2026-06-16"},{"url":"https://www.dailyindependent.com/news/plan-in-place-for-muskie-s-1-gigawatt-facility-kentucky-power-terawulf-announce-amended-agreement/article_1ba87f02-6f40-4852-80e9-521662ea8e2e.html","host":"dailyindependent.com","date":"2026-10-07"}],"loc":{"lat":38.4042,"lng":-82.79,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Boyd County, Greenup County · 1,000 MW · TeraWulf Inc.","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"core-scientific-calvert-hpc-conversion","kind":"project","name":"Core Scientific Calvert City future colocation capacity","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"existing-site conversion / capacity marketing","counties":["Marshall"],"city":"Calvert City","who":"Core Scientific","end_user":"","mw":100,"power":"approximately 100 MW","power_note":"operator leasable colocation power, not contracted/operating IT","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"","date":"2026-05-06","events":[],"timeline":[],"sources":[{"url":"https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-031246/q1fy26earningsdeck.htm","host":"investors.corescientific.com","date":"2026-05-06"}],"loc":{"lat":36.87953,"lng":-88.33084,"precision":"county","basis":"Marshall County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Marshall County · 100 MW · Core Scientific","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"north-campbell-land-hopkinsville-50mw-christian-ky","kind":"project","name":"North Campbell Land Co. Hopkinsville 50 MW Data Center","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"data center","counties":["Christian"],"city":"Hopkinsville","who":"North Campbell Land Co. (Sphere 3D)","end_user":"","mw":50,"power":"50 MW","power_note":"proposed campus MW","investment":"","jobs":"","acres":null,"utility":"Hopkinsville Electric System (HES)","water":"","incentives":"","note":"New proposed site is separate from existing mine / conversion; undisclosed parcel","date":"2026-08-25","events":[],"timeline":[],"sources":[{"url":"https://www.datacenterdynamics.com/en/news/residents-raise-concerns-over-proposed-50mw-data-center-in-hopkinsville-kentucky/","host":"datacenterdynamics.com","date":"2026-08-25"},{"url":"https://hoptownchronicle.org/hopkinsville-weighs-limits-on-data-centers-as-crypto-mine-proposes-expansion/","host":"hoptownchronicle.org","date":""},{"url":"https://www.sec.gov/Archives/edgar/data/1591956/000106299326004391/exhibit99-1.htm","host":"sec.gov","date":""}],"loc":{"lat":36.8657852,"lng":-87.489412,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Christian County · 50 MW · North Campbell Land Co.","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"md-squared-power-pikeville-pike-ky","kind":"project","name":"Kentucky Enterprise Industrial Park Data Center","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"data center","counties":["Pike"],"city":"Pikeville","who":"MD Squared Power","end_user":"","mw":30,"power":"25-30 MW","power_note":"preliminary proposal MW","investment":"250 million proposed","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"","date":"2026-06-05","events":[],"timeline":[],"sources":[{"url":"https://www.wymt.com/2026/06/05/pikeville-signs-agreement-explore-data-center-development/","host":"wymt.com","date":"2026-06-05"},{"url":"https://www.wymt.com/2026/06/05/pikeville-signs-agreement-explore-data-center-development/","host":"wymt.com","date":""}],"loc":{"lat":37.4792672,"lng":-82.5187629,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Pike County · 30 MW · MD Squared Power","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"north-campbell-existing-conversion","kind":"project","name":"North Campbell existing-mine computing conversion","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"existing-site conversion / capacity marketing","counties":["Christian"],"city":"Hopkinsville","who":"North Campbell Land Co. / Sphere 3D","end_user":"","mw":15,"power":"15 MW","power_note":"existing mine capacity","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"","date":"2026-07-29","events":[],"timeline":[],"sources":[{"url":"https://hoptownchronicle.org/hopkinsville-weighs-limits-on-data-centers-as-crypto-mine-proposes-expansion/","host":"hoptownchronicle.org","date":"2026-07-29"}],"loc":{"lat":36.8939,"lng":-87.48962,"precision":"county","basis":"Christian County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Christian County · 15 MW · North Campbell Land Co. / Sphere 3D","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"deca-ghent-carroll-county-ky","kind":"project","name":"Carroll County Digital Campus (Ghent)","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"data center","counties":["Carroll"],"city":"Ghent","who":"DECA Companies","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"Owen Electric Cooperative","water":"Developer describes closed-loop design; actual operational consumption not measured","incentives":"County support for incentive eligibility is not project approval","note":"Project site says permitting in progress; distinct from Poe Carrollton campus","date":"","events":[],"timeline":[],"sources":[{"url":"https://carrollcountydc.com/","host":"carrollcountydc.com","date":""},{"url":"https://www.madisoncourier.com/carroll_news_democrat/news/deca-proposing-4b-data-center-in-carroll-county/article_dcc68a89-aafd-5c7e-922c-2fd96bc32921.html","host":"madisoncourier.com","date":""},{"url":"https://ghentdc.com/","host":"ghentdc.com","date":""},{"url":"https://www.yahoo.com/news/us/articles/louisville-developer-eyes-second-9-090000833.html","host":"yahoo.com","date":""}],"loc":{"lat":38.7375625,"lng":-85.0582835,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Carroll County · DECA Companies","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"powerhouse-poe-carrollton-industrial-campus-carroll-county-ky","kind":"project","name":"Carrollton Industrial Campus","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"data center","counties":["Carroll"],"city":"Carrollton","who":"Poe Companies / PowerHouse","end_user":"","mw":null,"power":"","power_note":"","investment":"9.6 billion proposed investment","jobs":"","acres":"550","utility":"Kentucky Utilities Company","water":"","incentives":"September developer-commissioned analysis projects 96.4 million annual tax revenue and 11.5 million PILOT; older homepage estimates differ","note":"Developer proposal; economic-impact projections are not guarantees","date":"2026-09-18","events":[],"timeline":[],"sources":[{"url":"https://carrolltonindustrialcampus.com/poe-companies-publishes-full-economic-impact-analysis-for-carrollton-industrial-campus/","host":"carrolltonindustrialcampus.com","date":"2026-09-18"},{"url":"https://finance.yahoo.com/technology/articles/louisville-based-developer-plans-9-144212137.html","host":"finance.yahoo.com","date":""},{"url":"https://www.wdrbwave.com/2026/07/25/carroll-county-residents-push-back-against-data-center-project-ghent-community/","host":"wdrbwave.com","date":""},{"url":"https://www.lpm.org/news/2026-08-24/neighbors-to-kentucky-hyperscale-data-centers-demand-transparency","host":"lpm.org","date":""}],"loc":{"lat":38.68,"lng":-85.16583,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Carroll County · Poe Companies / PowerHouse","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"dermody-kramers-lane-louisville-jefferson-ky","kind":"project","name":"Dermody Properties Kramers Lane Data Center","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"data center","counties":["Jefferson"],"city":"Louisville","who":"Dermody Properties (DPIF4 KY 6 KRAMERS, LLC)","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":"20","utility":"","water":"","incentives":"","note":"Warehouse-to-data-center revised plan","date":"2026-08-12","events":[],"timeline":[],"sources":[{"url":"https://www.lpm.org/news/2026-08-12/images-another-data-center-proposed-for-louisvilles-rubbertown-neighborhood","host":"lpm.org","date":"2026-08-12"},{"url":"https://www.lpm.org/news/2026-08-13/louisville-metro-council-approves-data-center-moratorium-as-new-proposal-sparks-controversy","host":"lpm.org","date":""}],"loc":{"lat":38.2044592,"lng":-85.8420564,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Jefferson County · Dermody Properties","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"gateway-letcher-feasibility","kind":"project","name":"Gateway Business Park off-grid computing / generation feasibility project","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"data-center-linked feasibility","counties":["Letcher"],"city":"Jenkins","who":"Diversified Gas and Oil / Maverick Holdings; Appalachian Industrial Development Authority","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":"roughly 100","utility":"Proposed off-grid generation","water":"","incentives":"","note":"","date":"2026-07-17","events":[],"timeline":[],"sources":[{"url":"https://www.wymt.com/2026/07/17/proposed-off-grid-data-center-eyeing-letcher-co-industrial-park/","host":"wymt.com","date":"2026-07-17"}],"loc":{"lat":37.12212,"lng":-82.85393,"precision":"county","basis":"Letcher County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Letcher County · Diversified Gas and Oil / Maverick…","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"western-hospitality-partners-commerce-parkway-oldham-ky","kind":"project","name":"Western Hospitality Partners Commerce Parkway Data Center","group":"proposed","status":"Proposed","raw_status":"proposed","crypto":false,"type":"data center","counties":["Oldham"],"city":"La Grange","who":"Western Hospitality Partners","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":"approximately 88","utility":"","water":"","incentives":"","note":"Relocated drive-in proposal remains distinct from withdrawn original Project Lincoln","date":"","events":[],"timeline":[],"sources":[{"url":"https://www.yahoo.com/news/oldham-county-data-center-replace-160523680.html","host":"yahoo.com","date":""},{"url":"https://kentuckylantern.com/wp-content/uploads/2026/06/EPIC-REPORT-NO-2026-001-FINAL.pdf","host":"kentuckylantern.com","date":""},{"url":"https://hoptownchronicle.org/see-where-data-center-developers-are-looking-to-build-in-kentucky","host":"hoptownchronicle.org","date":""}],"loc":{"lat":38.3939431,"lng":-85.4092775,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Oldham County · Western Hospitality Partners","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"kentucky-industrial-alliance-cave-point-cave-city-ky","kind":"project","name":"Cave Point Commerce Center","group":"paused","status":"Paused","raw_status":"paused","crypto":false,"type":"data center","counties":["Barren"],"city":"Cave City","who":"Kentucky Industrial Alliance","end_user":"","mw":1200,"power":"1,200 MW","power_note":"developer proposal reported by WBKO, not committed supply","investment":"","jobs":"permanent: 360 direct jobs projected, including 60 power-generation jobs","acres":null,"utility":"","water":"","incentives":"","note":"Cave City moratorium and zoning litigation; annexation suit consolidated, not project approved","date":"2026-08-27","events":[],"timeline":[],"sources":[{"url":"https://bgdailynews.com/2026/08/27/barren-data-center-suits-proceed/","host":"bgdailynews.com","date":"2026-08-27"},{"url":"https://www.wbko.com/2026/06/10/kentucky-industrial-alliance-says-proposed-cave-city-data-center-could-bring-millions-tax-revenue/","host":"wbko.com","date":""},{"url":"https://www.wbko.com/2026/06/09/developer-sues-cave-city-over-data-center-zoning-moratorium/","host":"wbko.com","date":""}],"loc":{"lat":37.1367544,"lng":-85.9562169,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Barren County · 1,200 MW · Kentucky Industrial Alliance","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"dartpoints-lexington-fayette-ky","kind":"project","name":"DartPoints Lexington Data Center Campus","group":"paused","status":"Paused","raw_status":"paused","crypto":false,"type":"data center","counties":["Fayette"],"city":"Lexington","who":"DartPoints","end_user":"","mw":70,"power":"first phase 20-30 MW, up to 70 MW","power_note":"developer expansion potential, not operating load","investment":"29 million acquisition price; not total development investment","jobs":"","acres":"29.5","utility":"Kentucky Utilities (KU)","water":"","incentives":"","note":"Acquired former Lexmark campus; expansion subject to Fayette moratorium through October 31, 2027","date":"2026-10-08","events":[],"timeline":[],"sources":[{"url":"https://www.prnewswire.com/news-releases/dartpoints-acquires-lexington-kentucky-data-center-campus-to-support-ai-neo-cloud-hyperscale-and-enterprise-demand-302782916.html","host":"prnewswire.com","date":"2026-05-27"},{"url":"https://www.weku.org/lexington-richmond/2026-06-04/data-center-company-plans-to-expand-former-lexmark-property-for-cloud-ai-computing","host":"weku.org","date":""},{"url":"https://smileypete.com/business/dartpoints-acquires-lexington-data-center-campus/","host":"smileypete.com","date":""},{"url":"https://www.wkyt.com/2026/06/08/dartpoints-data-center-coming-lexington-wont-get-city-incentives/","host":"wkyt.com","date":""}],"loc":{"lat":38.0747519,"lng":-84.4876212,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Fayette County · 70 MW · DartPoints","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"murray-industries-pineville-bell-ky","kind":"project","name":"Murray Industries Pineville Data Center","group":"paused","status":"Paused","raw_status":"paused","crypto":false,"type":"data center","counties":["Bell"],"city":"Pineville","who":"Murray Industries","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"Louisville Gas and Electric and Kentucky Utilities (LG&E and KU)","water":"","incentives":"","note":"Bell County two-year moratorium; proposed Highway 92 land near Bell/Knox line","date":"2026-07-02","events":[],"timeline":[],"sources":[{"url":"https://kentuckylantern.com/2026/08/04/bell-county-passed-a-data-center-moratorium-resident-worry-that-work-continues/","host":"kentuckylantern.com","date":"2026-08-04"},{"url":"https://www.wymt.com/2026/06/26/bell-county-residents-pack-courthouse-oppose-data-center-construction/","host":"wymt.com","date":""},{"url":"https://www.yahoo.com/news/us/articles/bell-county-passed-data-center-093027684.html","host":"yahoo.com","date":""},{"url":"https://www.yahoo.com/news/us/articles/bell-county-residents-pack-courthouse-184600018.html","host":"yahoo.com","date":""}],"loc":{"lat":36.7620301,"lng":-83.6949176,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Bell County · Murray Industries","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"western-hospitality-partners-project-lincoln-oldham-county-ky","kind":"project","name":"Project Lincoln: OC Data Center","group":"stopped","status":"Denied, withdrawn or closed","raw_status":"withdrawn","crypto":false,"type":"data center","counties":["Oldham"],"city":"La Grange","who":"Western Hospitality Partners","end_user":"","mw":600,"power":"600 MW","power_note":"withdrawn proposal; historical only","investment":"6 billion original proposal","jobs":"","acres":"267","utility":"","water":"","incentives":"","note":"Original Highway 53 filing withdrawn; this does not close relocated successor","date":"2025-07-02","events":[],"timeline":[],"sources":[{"url":"https://www.lpm.org/news/2025-07-02/oldham-county-passes-sweeping-data-center-moratorium-executive-fired-over-recording","host":"lpm.org","date":"2025-07-02"},{"url":"https://www.pmg-ky1.com/oldham_era/news/6-billion-oc-data-center-planned-on-highway-53/article_af7b318a-fb9e-58fb-9b6f-c86c63b14f4d.html","host":"pmg-ky1.com","date":""},{"url":"https://baxtel.com/data-center/project-lincoln","host":"baxtel.com","date":""}],"loc":{"lat":38.39861,"lng":-85.375,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Oldham County · 600 MW · Western Hospitality Partners","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"ebon-international-big-sandy-lawrence-ky","kind":"project","name":"Ebon International Big Sandy cryptomining / data processing complex","group":"stopped","status":"Denied, withdrawn or closed","raw_status":"denied","crypto":true,"type":"crypto/HPC","counties":["Lawrence"],"city":"Louisa","who":"Ebon International (part of Singapore-based Ebang International Holdings)","end_user":"Ebon International (self-mining: Bitcoin/Ethereum, blockchain and data processing)","mw":250,"power":"250 MW (225 MW interruptible under demand-response terms)","power_note":"10-year discounted power contract with Kentucky Power (PSC Case No. 2022-00387)","investment":"250 million dollars (LPM / Kentucky Public Radio); about 50 million dollars on the facility (Utility Dive, citing Kentucky Power)","jobs":"permanent: Up to 100","acres":null,"utility":"Kentucky Power (AEP)","water":"","incentives":"Discounted economic-development / demand-response electric rate contract with Kentucky Power (rejected); state crypto sales-tax exemptions available","note":"","date":"2023-08-28","events":[["2022-08","Kentucky Power and Ebon execute 250 MW discounted supply contract"],["2022-10","Contract filed for PSC approval; opposed by Attorney General, KIUC and environmental groups"],["2023-07","PSC hearing: Kentucky Power witness concedes capacity shortfall from 2026"],["2023-08-28","PSC rejects the contract, citing ratepayer risk"],["2024-11","Kentucky Lantern reports Kentucky Power is asking Franklin Circuit Court to overturn the PSC decision"]],"timeline":[["Announced","2022-08 (contract executed); filed with PSC 2022-10"],["Approvals","PSC rejected contract 2023-08-28"]],"sources":[{"url":"https://lpm.org/news/2023-08-29/regulators-reject-kentucky-power-contract-for-250m-cryptomining-facility","host":"lpm.org","date":"2023-08-29"},{"url":"https://www.utilitydive.com/news/kentucky-psc-aep-kentucky-power-cryptomining-power-supply-ebon/692237/","host":"utilitydive.com","date":"2023-08-30"},{"url":"https://www.kentuckynewera.com/cadiz_record/news/article_0865bed4-2e61-5d2b-9b99-fb842319238f.html","host":"kentuckynewera.com","date":"2024-11-28"}],"loc":{"lat":38.1144867,"lng":-82.6030988,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Lawrence County · 250 MW · Ebon International","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"artemis-power-tech-wolfe-ky","kind":"project","name":"Artemis Power Tech Wolfe County Data Center","group":"stopped","status":"Denied, withdrawn or closed","raw_status":"closed","crypto":true,"type":"crypto/HPC","counties":["Wolfe"],"city":"","who":"Artemis Power Tech","end_user":"","mw":null,"power":"","power_note":"closed site; no present producing capacity","investment":"","jobs":"","acres":null,"utility":"East Kentucky Power Cooperative","water":"","incentives":"","note":"Previously operating crypto mine shut down; closure month reported approximately July 2026, no exact day verified","date":"","events":[],"timeline":[],"sources":[{"url":"https://www.lex18.com/news/lex-18-investigates/the-market-collapsed-after-3-years-of-operation-wolfe-county-bitcoin-operation-shuts-down","host":"lex18.com","date":""},{"url":"https://lexingtonky.news/2023/10/10/in-a-rural-kentucky-community-the-roar-of-a-suspected-crypto-mine-never-ends/","host":"lexingtonky.news","date":""}],"loc":{"lat":37.7074,"lng":-83.7256,"precision":"approximate","basis":"Inventory point for the general area; the parcel has not been verified"},"state":"KY","precision_label":"Approximate location, not the exact parcel","summary":"Kentucky · Wolfe County · Artemis Power Tech","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"meade-ekron-rezoning-denied","kind":"project","name":"Ekron Joe Prather Highway data center proposal","group":"stopped","status":"Denied, withdrawn or closed","raw_status":"denied","crypto":false,"type":"data center","counties":["Meade"],"city":"Ekron","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":"138","utility":"","water":"","incentives":"","note":"","date":"2025-10-14","events":[],"timeline":[],"sources":[{"url":"https://www.datacenterdynamics.com/en/news/officials-in-meade-county-kentucky-reject-data-center-rezoning-plan/","host":"datacenterdynamics.com","date":"2025-10-20"}],"loc":{"lat":37.95868,"lng":-86.20469,"precision":"county","basis":"Meade County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Meade County","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"horizon-mining-elliott-county","kind":"project","name":"Elliott County Bitcoin mining operation near Little Sandy Correctional Complex","group":"unknown","status":"Status unclear","raw_status":"unknown","crypto":true,"type":"crypto/HPC","counties":["Elliott"],"city":"Sandy Hook area","who":"Hensyn Resources (Ashland-based host/site company)","end_user":"Horizon Mining (Bitcoin miner)","mw":null,"power":"","power_note":"Capacity not reported","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"","date":"","events":[],"timeline":[],"sources":[{"url":"https://www.kentuckynewera.com/cadiz_record/news/article_0865bed4-2e61-5d2b-9b99-fb842319238f.html","host":"kentuckynewera.com","date":"2024-11-28"}],"loc":{"lat":38.11869,"lng":-83.09529,"precision":"county","basis":"Elliott County centroid"},"state":"KY","precision_label":"Exact site not published; shown at county level","summary":"Kentucky · Elliott County · Hensyn Resources","state_name":"Kentucky","state_path":"/kentucky/"},{"id":"alabama-supercomputer-center-huntsville-al","state":"AL","kind":"facility","name":"Alabama Supercomputer Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Huntsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Nearly24000squarefeet is not white-space area; no MW stated. Institution explicitly places facility in Cummings Research Park and recounts installation history. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://asc.edu/alabama-supercomputer-center","host":"asc.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.73652,"lng":-86.6731271,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Huntsville","campus":"Cummings Research Park","area_sqft_approx":24000,"area_basis":"whole facility including SOC,NOC,offices,data center","building_completed":"1987-10","latest_supercomputer_installation":"2023-10"},"notes":["Nearly24000squarefeet is not white-space area; no MW stated.","Institution explicitly places facility in Cummings Research Park and recounts installation history.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://asc.edu/alabama-supercomputer-center","host":"asc.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Huntsville · Madison · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"applied-digital-delta-forge-2-brookwood-al","state":"AL","kind":"facility","name":"Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tuscaloosa"],"city":"Brookwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer announcement republished by telecom newswire, with planned quantities.. Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed. Company report of lease, not original confidential instrument.. Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Reporter account of operator presentation, not observed water use or signed permit.. Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified. Public index and short banner used for discovery, not independent site verification.. Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/","host":"tuscaloosathread.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/","host":"newswire.telecomramblings.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2","host":"ir.applieddigital.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://tuscaloosathread.com/applied-digital-brookwood-town-hall/","host":"tuscaloosathread.com","date":"2026-10-02","published":"2026-10-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.applieddigital.com/insights/july-site-update","host":"applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2556719,"lng":-87.3208336,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported TCEDA incentive vote for Brookwood Delta Forge 2, including projected abatements and community benefit commitments.","independently_verified_current_operating_status":null},"notes":["Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/","host":"tuscaloosathread.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer announcement republished by telecom newswire, with planned quantities.","fields":{"announcement_date":"2026-09-24","location":"Brookwood, Tuscaloosa County, Alabama","planned_combined_developer_tenant_investment_usd_more_than":3200000000,"leased_critical_it_load_mw":210,"anticipated_operations_year":2028,"community_benefit_commitment_usd":270000000,"community_benefit_term_years":20},"notes":["Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/","host":"newswire.telecomramblings.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Company report of lease, not original confidential instrument.","fields":{"announcement_date":"2026-06-08","company_reported_signed_critical_it_load_mw":210,"base_lease_years":15,"expected_base_lease_revenue_usd_approx":5200000000,"all_options_total_lease_years":30,"all_options_lease_revenue_usd_approx":12700000000,"initial_operations_forecast":"2028-Q1"},"notes":["Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2","host":"ir.applieddigital.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Reporter account of operator presentation, not observed water use or signed permit.","fields":{"report_date":"2026-10-02","developer_initial_water_fill_gallons_approx":1400000,"fill_components_gallons":{"fire_tank":500000,"cooling_loop":900000},"developer_ongoing_annual_water_gallons_approx":750000,"reported_permit_stage":"Packages submitted to city, under review."},"notes":["Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tuscaloosathread.com/applied-digital-brookwood-town-hall/","host":"tuscaloosathread.com","date":"2026-10-02","published":"2026-10-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Public index and short banner used for discovery, not independent site verification.","fields":{},"notes":["Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.applieddigital.com/insights/july-site-update","host":"applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Brookwood · Tuscaloosa · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"beacon-calvert-al","state":"AL","kind":"facility","name":"Calvert Infrastructure Hub","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mobile"],"city":"Calvert","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Developer claims about utilities, buffers, water and jobs are forecasts. Water supply and sewer quantities are separate, not additive consumption; no commissioned capacity established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact","host":"utv44.com","date":"2026-07-03","published":"2026-07-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.1551748,"lng":-88.0099997,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"UTV44 reports Beacon Calvert proposal, first-building 2027 target and pending studies, design and permitting.","independently_verified_current_operating_status":null},"notes":["Developer claims about utilities, buffers, water and jobs are forecasts. Water supply and sewer quantities are separate, not additive consumption; no commissioned capacity established.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact","host":"utv44.com","date":"2026-07-03","published":"2026-07-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Calvert · Mobile · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"construction-partners-dothan-al","state":"AL","kind":"facility","name":"Construction Partners Corporate Headquarters and Data Processing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Houston"],"city":"Dothan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Dothan combined headquarters and data-processing proposal. Mixed headquarters and data-processing budget is not exclusively data-center capex. New-position capacity is a forecast, not current hires. Company founding in 2001 and corporate value of 3.5B do not date or price this facility. Construction expected to begin soon; no exact opening, parcel or IT MW established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/","host":"madeinalabama.com","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.2237285,"lng":-85.3934375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Dothan combined headquarters and data-processing proposal","fields":{"agency":"Alabama Department of Commerce","announcement_date":"2026-03-19","company":"Construction Partners Inc.","city":"Dothan","project":"new corporate headquarters and data processing center","planned_combined_investment_usd":20000000,"capacity_for_new_professional_positions_min_exclusive":60,"existing_area_employees_approx":50},"notes":["Mixed headquarters and data-processing budget is not exclusively data-center capex. New-position capacity is a forecast, not current hires. Company founding in 2001 and corporate value of 3.5B do not date or price this facility. Construction expected to begin soon; no exact opening, parcel or IT MW established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/","host":"madeinalabama.com","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Dothan · Houston · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"core-scientific-auburn-al","state":"AL","kind":"facility","name":"Core Scientific Auburn Data Center (AUBix)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lee"],"city":"Auburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. AIenabledoperatorofferingnotindependentall50MWenergized/currentNVIDIAcertificatereview. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corescientific.com/high-density-data-centers/auburn-al/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.6089,"lng":-85.4879,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"1571 W Samford Ave, Auburn, AL36832","advertised_total_power_capacity_mw":50,"campus_acres":6,"total_area_sqft":39202,"power_basis":"totalpowercapacity, not explicitlycriticalIT"},"notes":["AIenabledoperatorofferingnotindependentall50MWenergized/currentNVIDIAcertificatereview.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://corescientific.com/high-density-data-centers/auburn-al/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Auburn · Lee · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"dc-blox-birmingham-al","state":"AL","kind":"facility","name":"DC BLOX Birmingham Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Birmingham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Pageheader294karea/49MWcommittedplanned/4centersdiffersfromlegacy200k/60MWexpansionlabels. Initialphaseandnewbuildableshellkeptseparate; no canonicalcurrentcampusMWorallphasesoperatingclaim. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-centers/birmingham/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5006652,"lng":-86.8208315,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"433 6th Street South, Birmingham, AL35233","initial_facility_area_sqft":31000,"initial_critical_load_mw_max":5,"expansion_buildable_area_sqft":263000},"notes":["Pageheader294karea/49MWcommittedplanned/4centersdiffersfromlegacy200k/60MWexpansionlabels. Initialphaseandnewbuildableshellkeptseparate; no canonicalcurrentcampusMWorallphasesoperatingclaim.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/birmingham/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Birmingham · Jefferson · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"dc-blox-huntsville-al","state":"AL","kind":"facility","name":"DC BLOX Huntsville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Huntsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Header38karea/9MWcommittedplanned/2centersandlegacyexpansionfiguresdifferentversions/scopes. Notall9MWoperationalandnot13.5MWplus9. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-centers/huntsville/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.7104202,"lng":-86.6921561,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"333 Diamond Drive NW, Huntsville, AL35806","initial_area_sqft":9000,"potential_expanded_area_sqft":52400,"potential_expanded_critical_load_mw_max":13.5},"notes":["Header38karea/9MWcommittedplanned/2centersandlegacyexpansionfiguresdifferentversions/scopes. Notall9MWoperationalandnot13.5MWplus9.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/huntsville/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Huntsville · Madison · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"dc-blox-montgomery-al","state":"AL","kind":"facility","name":"DC BLOX Montgomery Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Montgomery","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. regional map mismatch. Regional12campuses/470MWcommittedplannednotMontgomerysite. DoesnotresolveexactMontgomeryaddressorcapacity; separateNovember14,2024releaseprovidesnameddevelopmentcontext. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-center-map/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3777111,"lng":-86.3090775,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"regional map mismatch","fields":{},"notes":["Regional12campuses/470MWcommittedplannednotMontgomerysite. DoesnotresolveexactMontgomeryaddressorcapacity; separateNovember14,2024releaseprovidesnameddevelopmentcontext.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-center-map/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Montgomery · Montgomery · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"edged-gateway-prichard-al","state":"AL","kind":"facility","name":"Edged Prichard Data Center (Project Gateway)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mobile"],"city":"Prichard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Edged Gateway Prichard proposed building and forecast. 93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://projectgatewayal.com/","host":"projectgatewayal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.7387998,"lng":-88.0788889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Edged Gateway Prichard proposed building and forecast","fields":{"developer":"Edged US","project":"Project Gateway","locality":"Prichard, Alabama","developer_described_stage":"proposed/evaluated campus","proposed_building_power_mw":8,"power_basis":"building capacity, not explicit critical IT","proposed_building_sqft":57000,"planned_investment_usd":93000000,"expected_permanent_jobs_min_inclusive":20},"notes":["93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://projectgatewayal.com/","host":"projectgatewayal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Prichard · Mobile · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"google-jackson-county-stevenson-al","state":"AL","kind":"facility","name":"Google Jackson County Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jackson"],"city":"Stevenson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. Stevenson/Bridgeport/JacksonCounty aliases need parcelboundarycomparison; no independentcoordinatecorrection. USD1.5billionannouncedexpansion notspent or additivefirstphasewithoutscopecheck. TVAgridconnected not dedicatedrenewablehourly supply; countypermitstatement needsoriginaljurisdictionlaw. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.8842,"lng":-85.755,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.","fields":{"reported_context":"Local reporting describes Google at48809AlabamaHighway277Bridgeport, two buildings270000squarefeet on600acres,2019opening/initialUSD600million and later announcedUSD1.5billionthirdbuilding. Named localdevelopmentofficial describes approximately250workers.","independently_verified_current_operating_status":null},"notes":["Stevenson/Bridgeport/JacksonCounty aliases need parcelboundarycomparison; no independentcoordinatecorrection. USD1.5billionannouncedexpansion notspent or additivefirstphasewithoutscopecheck. TVAgridconnected not dedicatedrenewablehourly supply; countypermitstatement needsoriginaljurisdictionlaw.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Stevenson · Jackson · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"meta-huntsville-al","state":"AL","kind":"facility","name":"Meta Huntsville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Huntsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.726,"lng":-86.647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"groundbreaking_year":2018,"investment_usd_min":1500000000,"investment_scope":"Huntsville, Alabama","operator_reported_operational_jobs_min":300,"peak_construction_workers":1200,"local_school_nonprofit_funding_usd_min":4500000,"jobs_qualification":"once completed"},"notes":["Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Huntsville · Madison · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"meta-montgomery-al","state":"AL","kind":"facility","name":"Meta Montgomery Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Montgomery","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Nearly1.3Marea and1.5B+investment cover expanded campus.3B+Alabama total includes Huntsville;227MWis supported Alabama renewable generation, not campusIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2025/09/montgomery-were-growing/","host":"datacenters.atmeta.com","date":"2025-09-23","published":"2025-09-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.185,"lng":-86.273,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"expansion_new_buildings":2,"resulting_planned_campus_area_sqft_approx":1300000,"planned_campus_investment_usd_min_exclusive":1500000000,"peak_construction_jobs_min_exclusive":1000,"forecast_operational_jobs_min_exclusive":100},"notes":["Nearly1.3Marea and1.5B+investment cover expanded campus.3B+Alabama total includes Huntsville;227MWis supported Alabama renewable generation, not campusIT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2025/09/montgomery-were-growing/","host":"datacenters.atmeta.com","date":"2025-09-23","published":"2025-09-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Montgomery · Montgomery · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"nebius-bhm01-birmingham-al","state":"AL","kind":"facility","name":"Nebius Birmingham AI Factory (BHM01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Birmingham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nebius Birmingham land, targets and fiscal scopes. SamepageFAQsayhundredsjobsversusheadline1000plus;countnotindependentlycertified.30yearincentiveoperatorclaimnotexecutedIDBagreementoractualforegone-taxsum.85.7Mcombinednotcityaloneoractualcollectedtax. TargetsQ12026permits/hearingsandQ22026constructionnotobservedoutcomes;do notcalendarpasttargetsasfutureevents. Q42026servicefutureasofOct14. No criticalITMWorfinalwaterdemand. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nebius.com/birminghamal","host":"nebius.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4556,"lng":-86.8131,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Nebius Birmingham land, targets and fiscal scopes","fields":{"developer":"Nebius","address":"201 Milan Parkway, Birmingham, Alabama","former_use":"Regions Bank back office","operator_reported_land_acquisition_month":"2025-09","land_acres":75,"historic_initial_commissioning_target_quarter":"2026-Q4","fullbuildout_target_through_year":2028,"operator_reported_tax_incentive_term_years":30,"estimated_average_annual_tax_usd":85700000,"tax_forecast_scope":"Birmingham City, Jefferson County and Alabama combined","expected_construction_jobs_min_exclusive":1000,"estimated_construction_duration_months_approx":30},"notes":["SamepageFAQsayhundredsjobsversusheadline1000plus;countnotindependentlycertified.30yearincentiveoperatorclaimnotexecutedIDBagreementoractualforegone-taxsum.85.7Mcombinednotcityaloneoractualcollectedtax. TargetsQ12026permits/hearingsandQ22026constructionnotobservedoutcomes;do notcalendarpasttargetsasfutureevents. Q42026servicefutureasofOct14. No criticalITMWorfinalwaterdemand.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://nebius.com/birminghamal","host":"nebius.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Birmingham · Jefferson · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"patmos-fairfield-al","state":"AL","kind":"facility","name":"Patmos Fairfield Colocation Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Fairfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The report says the local temporary ban excluded Patmos; exclusion is not project approval. Utility assurances and quieter-than-Walmart or water-only-impact claims are attributed, not independent environmental findings. Colocation is not inherently small. No later approval, construction or metered capacity is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wbrc.com/2026/08/13/hundreds-pack-fairfield-town-hall-over-proposed-data-center-inside-former-walmart/","host":"wbrc.com","date":"2026-08-13","published":"2026-08-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4916836,"lng":-86.9150283,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WBRC reports Patmos' former-Walmart Fairfield proposal, with city approval still needed and construction/phase openings forecast for 2026 to 2028.","independently_verified_current_operating_status":null},"notes":["The report says the local temporary ban excluded Patmos; exclusion is not project approval. Utility assurances and quieter-than-Walmart or water-only-impact claims are attributed, not independent environmental findings. Colocation is not inherently small. No later approval, construction or metered capacity is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wbrc.com/2026/08/13/hundreds-pack-fairfield-town-hall-over-proposed-data-center-inside-former-walmart/","host":"wbrc.com","date":"2026-08-13","published":"2026-08-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Fairfield · Jefferson · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"youngwoo-project-brookwood-al","state":"AL","kind":"facility","name":"Project Brookwood Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tuscaloosa"],"city":"Brookwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Recommendation and future council hearing are not final approval.200 acresalreadyowned,374 acresundercontract and anotherowner’s 680 acres are overlapping/different land scopes, not automatically one summed campus. AppliedDigital’s 1300 acres/two-million-square-footproject is explicitly separate developer and property; never assign itsIT, lease or investment toYoungwoo. Petition names DataCenterCampus despite counsel saying future uses uncertain. No disclosedITMW, capex, tenant, current construction or observedSeptember 15 outcome. School-relocation suggestion is not adopted relocation plan or proven impact. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://tuscaloosathread.com/second-brookwood-data-center/","host":"tuscaloosathread.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.2112238,"lng":-87.2715693,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TuscaloosaThread reports planning commission unanimously recommended 374 acreannexation/rezoning for Youngwoo’sProjectBrookwoodLLC, with council final vote scheduledSeptember 15.","independently_verified_current_operating_status":null},"notes":["Recommendation and future council hearing are not final approval.200 acresalreadyowned,374 acresundercontract and anotherowner’s 680 acres are overlapping/different land scopes, not automatically one summed campus. AppliedDigital’s 1300 acres/two-million-square-footproject is explicitly separate developer and property; never assign itsIT, lease or investment toYoungwoo. Petition names DataCenterCampus despite counsel saying future uses uncertain. No disclosedITMW, capex, tenant, current construction or observedSeptember 15 outcome. School-relocation suggestion is not adopted relocation plan or proven impact.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tuscaloosathread.com/second-brookwood-data-center/","host":"tuscaloosathread.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Brookwood · Tuscaloosa · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"cloverleaf-red-clay-lowndes-al","state":"AL","kind":"facility","name":"Project Red Clay","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lowndes"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Red Clay developer project and fiscal scopes. Developer economic projections, not actual tax collections. Do not add2.8Btotal to1.6Bschoolsubset or multiply annual average into guarantee. Up-to10Mcommitment not funds disbursed. No signed CBA or regulator order read. Developer intends to find eventual operator after approvals; no named tenant inferred. Closed-loop not zero site water. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://redclaydatacenter.com/","host":"redclaydatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.2700221,"lng":-86.5128035,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Red Clay developer project and fiscal scopes","fields":{"project_name":"Project Red Clay","locality":"Lowndes County, Alabama","expected_construction_jobs_min_exclusive":1000,"expected_construction_duration_years_max":5,"expected_initial_fulltime_jobs":225,"expected_full_scale_fulltime_jobs_min_exclusive":300,"developer_estimated_average_annual_local_tax_usd":124000000,"developer_estimated_local_funding_through_2050_usd_min_exclusive":2800000000,"developer_estimated_school_funding_through_2050_usd_min_exclusive":1600000000,"developer_community_benefits_commitment_usd_max":10000000,"named_cba_partner":"Central Alabama Community Foundation"},"notes":["Developer economic projections, not actual tax collections. Do not add2.8Btotal to1.6Bschoolsubset or multiply annual average into guarantee. Up-to10Mcommitment not funds disbursed. No signed CBA or regulator order read. Developer intends to find eventual operator after approvals; no named tenant inferred. Closed-loop not zero site water.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://redclaydatacenter.com/","host":"redclaydatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Lowndes · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"qts-marvel-bessemer-al","state":"AL","kind":"facility","name":"QTS Bessemer (Project Marvel)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Bessemer","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This is2025reporting, not a2026vote. QTS is not identified in the readable body. The claimed100-acre site and other land/building descriptions are inconsistent and not reconciled. Opponents' water, power, incentives and environmental claims are not approved amounts, measured impacts or current IT demand. No later rezoning result adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://tuscaloosathread.com/bessemer-data-center-concerns/","host":"tuscaloosathread.com","date":"2025-10-14","published":"2025-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.44,"lng":-86.97,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Tuscaloosa Thread describes Project Marvel's October7 zoning-use action and a future November18 rezoning hearing, with local opposition and developer details incomplete.","independently_verified_current_operating_status":null,"operator_or_exact_site_identity_needs_crosswalk":true},"notes":["This is2025reporting, not a2026vote. QTS is not identified in the readable body. The claimed100-acre site and other land/building descriptions are inconsistent and not reconciled. Opponents' water, power, incentives and environmental claims are not approved amounts, measured impacts or current IT demand. No later rezoning result adopted.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tuscaloosathread.com/bessemer-data-center-concerns/","host":"tuscaloosathread.com","date":"2025-10-14","published":"2025-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Bessemer · Jefferson · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"rsa-dexter-avenue-montgomery-al","state":"AL","kind":"facility","name":"RSA Dexter Avenue Datacenter","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Montgomery","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RSA Dexter Avenue colocation facility and internal specification conflicts. Six internal spaces not six distinct physical buildings. Area nearly42000versus44000sqft and UPS2times1.6MWversus2MWtotal conflict; canonical area/ITcapacity held. Backup generators not usable ITMW. Footer201SUnion isRSAoffice not independently site street. Operator compliance statement not underlying audit review. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.rsa-al.gov/real-estate/office-building-portfolio/rsa-datacenter/","host":"rsa-al.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.37803,"lng":-86.303007,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"RSA Dexter Avenue colocation facility and internal specification conflicts","fields":{"operator_reported_opening_date":"2012-10-04","operator_reported_manager":"NTTData","advertised_internal_colocation_spaces":6,"advertised_racks_min_exclusive":300,"backup_generators":2,"backup_generator_rating_mw_each":2.5},"notes":["Six internal spaces not six distinct physical buildings. Area nearly42000versus44000sqft and UPS2times1.6MWversus2MWtotal conflict; canonical area/ITcapacity held. Backup generators not usable ITMW. Footer201SUnion isRSAoffice not independently site street. Operator compliance statement not underlying audit review.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.rsa-al.gov/real-estate/office-building-portfolio/rsa-datacenter/","host":"rsa-al.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Montgomery · Montgomery · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"simple-helix-huntsville-al","state":"AL","kind":"facility","name":"Simple Helix Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Huntsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. 1.1MWwholefacility not perhall. Historical opening not independent2026operating verification. TierIIIis issuer label, not reviewed current certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://prnewswire.com/news-releases/simple-helix-announces-opening-of-new-tier-iii-data-center-in-huntsville-alabama-300488165.html","host":"prnewswire.com","date":"2017-07-14","published":"2017-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.744816340398,"lng":-86.691765682048,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"opening_announcement":"2017-07-14","advertised_capacity_mw":1.1,"data_halls":2,"power_basis":"facility capacity, not explicitly critical IT"},"notes":["1.1MWwholefacility not perhall. Historical opening not independent2026operating verification. TierIIIis issuer label, not reviewed current certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://prnewswire.com/news-releases/simple-helix-announces-opening-of-new-tier-iii-data-center-in-huntsville-alabama-300488165.html","host":"prnewswire.com","date":"2017-07-14","published":"2017-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Huntsville · Madison · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"sovereign-gazelle-somerville-al","state":"AL","kind":"facility","name":"Sovereign Gazelle Bitcoin Mining Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Morgan"],"city":"Somerville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. County attorney/chair and developer counsel positions are attributed legal opinions, not a court ruling or independently examined statewide law. Do not map as a verified legally effective construction ban or erase the reported resolution. Utility says no permit application was submitted; preliminary route discussion/locates are not route approval or executed service. 50 MW is proposed electrical supply, not critical IT/current draw. Fifteen-acre $300,000 land purchase by affiliate is separate from planned ten-acre footprint and project capex. Sovereign Gazelle April 2026 incorporation does not change affiliate August 2025 land acquisition chronology. No RFS or approved noise limit. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hartselleenquirer.com/2026/08/17/morgan-county-says-cannot-stop-proposed-data-center/","host":"hartselleenquirer.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.457,"lng":-86.7603,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Hartselle Enquirer reports Sovereign Gazelle’s proposed 50 MW bitcoin site at 369 Union Road, with county officials describing an adopted 12-month unincorporated-area resolution as lacking an enforcement mechanism.","independently_verified_current_operating_status":null,"reported_moratorium_months":12,"legally_effective_moratorium_verified":false,"no_court_outcome_adopted":true},"notes":["County attorney/chair and developer counsel positions are attributed legal opinions, not a court ruling or independently examined statewide law. Do not map as a verified legally effective construction ban or erase the reported resolution. Utility says no permit application was submitted; preliminary route discussion/locates are not route approval or executed service. 50 MW is proposed electrical supply, not critical IT/current draw. Fifteen-acre $300,000 land purchase by affiliate is separate from planned ten-acre footprint and project capex. Sovereign Gazelle April 2026 incorporation does not change affiliate August 2025 land acquisition chronology. No RFS or approved noise limit.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hartselleenquirer.com/2026/08/17/morgan-county-says-cannot-stop-proposed-data-center/","host":"hartselleenquirer.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Somerville · Morgan · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"swift-willow-westover-al","state":"AL","kind":"facility","name":"Swift Willow Westover Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Westover","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Possible withdrawal was not observed. MOU difficulties do not prove legal termination. Exact ordinance terms/expiry and later August 20 meeting outcome remain open. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wbrc.com/2026/08/19/westover-approves-6-month-moratorium-data-centers/","host":"wbrc.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.3596201,"lng":-86.5102435,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"six-month-moratorium-reported","reported_finding":"WBRC reports unanimous Westover six-month pause on August 18; developer might withdraw according to city attorney.","report_display_date":"2026-08-18","independently_verified_current_status":null},"notes":["Possible withdrawal was not observed. MOU difficulties do not prove legal termination. Exact ordinance terms/expiry and later August 20 meeting outcome remain open.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wbrc.com/2026/08/19/westover-approves-6-month-moratorium-data-centers/","host":"wbrc.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Westover · Shelby · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"synergy-south-russellville-al","state":"AL","kind":"facility","name":"Synergy South Russellville Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Franklin"],"city":"Russellville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Operator website says neither of its two North Alabama facilities exceeds 12 MW; that is an upper-bound statement, not exactly 12 MW, current load or critical IT at Russellville. Proposed 50 MW belongs to Somerville. Residents’50 to 95 dB comparisons and forecasts of amplified noise are not measured Russellville or future Somerville impacts. Police saying no complaints filed does not establish absence of environmental/health effects. VoltCore involvement is reported development history, not proof of current ownership. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.waff.com/2026/09/01/somerville-homeowners-compare-russellville-bitcoin-mining-site-their-proposed-local-facility/","host":"waff.com","date":"2026-09-01","published":"2026-09-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.5041961,"lng":-87.7300015,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"WAFF reports Synergy South operates a bitcoin facility on Jackson Avenue in Russellville, compared by opponents with a separate proposed Somerville mine.","independently_verified_current_operating_status":null},"notes":["Operator website says neither of its two North Alabama facilities exceeds 12 MW; that is an upper-bound statement, not exactly 12 MW, current load or critical IT at Russellville. Proposed 50 MW belongs to Somerville. Residents’50 to 95 dB comparisons and forecasts of amplified noise are not measured Russellville or future Somerville impacts. Police saying no complaints filed does not establish absence of environmental/health effects. VoltCore involvement is reported development history, not proof of current ownership.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.waff.com/2026/09/01/somerville-homeowners-compare-russellville-bitcoin-mining-site-their-proposed-local-facility/","host":"waff.com","date":"2026-09-01","published":"2026-09-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Russellville · Franklin · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"tallassee-mill-data-center-al","state":"AL","kind":"facility","name":"Tallassee 1852 Mill Data Center Proposal","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Elmore"],"city":"Tallassee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No adopted moratorium or permanent legal prohibition established. Historic mill potential location is not operating data center; future Tallapoosa projects not this site. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wsfa.com/2026/05/18/tallassee-pulls-plug-data-center-plan-now/","host":"wsfa.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.5333016,"lng":-85.8901615,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"mayoral-project-pause","reported_finding":"WSFA reports Tallassee mayor and council not moving forward for now, citing need for information and public process.","report_display_date":"2026-05-18","independently_verified_current_status":null},"notes":["No adopted moratorium or permanent legal prohibition established. Historic mill potential location is not operating data center; future Tallapoosa projects not this site.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wsfa.com/2026/05/18/tallassee-pulls-plug-data-center-plan-now/","host":"wsfa.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Tallassee · Elmore · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"university-of-alabama-hpc-tuscaloosa-al","state":"AL","kind":"facility","name":"University of Alabama High Performance Computing and Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tuscaloosa"],"city":"Tuscaloosa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Alabama future facility with unresolved capacity units/boundary. Internal power scope/unit conflict:14.6MWmasterplan versus5/16mWplus and cabinet ratings; no single canonical criticalITMW adopted. Do not multiply83rated350kWcabinets into actual facility demand.96Mforecastnotactualspent. Adjacent22500GSFsubstation not additional data hall. Early2027future, not operating now. Tier2plus wording not independent certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hpc.ua.edu/about/","host":"hpc.ua.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2120822,"lng":-87.5396735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Alabama future facility with unresolved capacity units/boundary","fields":{"institution":"University of Alabama","facility":"High Performance Computing and Data Center","address":"709 Johnny Stallings Drive, Tuscaloosa, Alabama","planned_gross_sqft":40000,"included_data_hall_sqft":10000,"planned_project_investment_usd":96000000,"opening_target":"early2027","published_masterplanned_computing_mw":14.6,"other_published_capacity_text":"5 mW+ available, scalable to16 mW+"},"notes":["Internal power scope/unit conflict:14.6MWmasterplan versus5/16mWplus and cabinet ratings; no single canonical criticalITMW adopted. Do not multiply83rated350kWcabinets into actual facility demand.96Mforecastnotactualspent. Adjacent22500GSFsubstation not additional data hall. Early2027future, not operating now. Tier2plus wording not independent certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hpc.ua.edu/about/","host":"hpc.ua.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alabama · Tuscaloosa · Tuscaloosa · Source context reviewed","state_name":"Alabama","state_path":"/alabama/"},{"id":"alasconnect-anchorage-ak","state":"AK","kind":"facility","name":"AlasConnect Anchorage Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Anchorage Municipality"],"city":"Anchorage","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Generic service page cannot independently confirm two city-specific sites. Current page establishes Alasconnect operates Alaska data-center services, but does not identify Anchorage versus Fairbanks in the reviewed content. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Alasconnect service page and office-address mismatch. Alaska hosting services advertised, but Anchorage/Palmer/Fairbanks addresses explicitly labelled offices. They are not independently matched data-center locations. No site MW, area or opening adopted. Generic redundant infrastructure language does not prove each office is server facility.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://alasconnect.com/services/data-center-hosting-services/","host":"alasconnect.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":61.189365,"lng":-149.912829,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Generic service page cannot independently confirm two city-specific sites.","Current page establishes Alasconnect operates Alaska data-center services, but does not identify Anchorage versus Fairbanks in the reviewed content.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://alasconnect.com/services/data-center-hosting-services/","host":"alasconnect.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Alasconnect service page and office-address mismatch","fields":{},"notes":["Alaska hosting services advertised, but Anchorage/Palmer/Fairbanks addresses explicitly labelled offices. They are not independently matched data-center locations. No site MW, area or opening adopted. Generic redundant infrastructure language does not prove each office is server facility.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://alasconnect.com/services/data-center-hosting-services/","host":"alasconnect.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alaska · Anchorage · Anchorage Municipality · Source context reviewed","state_name":"Alaska","state_path":"/alaska/"},{"id":"alasconnect-fairbanks-ak","state":"AK","kind":"facility","name":"AlasConnect Fairbanks Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairbanks North Star"],"city":"Fairbanks","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Alasconnect service page and office-address mismatch. Alaska hosting services advertised, but Anchorage/Palmer/Fairbanks addresses explicitly labelled offices. They are not independently matched data-center locations. No site MW, area or opening adopted. Generic redundant infrastructure language does not prove each office is server facility. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://alasconnect.com/services/data-center-hosting-services/","host":"alasconnect.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":64.851425,"lng":-147.718958,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Alasconnect service page and office-address mismatch","fields":{},"notes":["Alaska hosting services advertised, but Anchorage/Palmer/Fairbanks addresses explicitly labelled offices. They are not independently matched data-center locations. No site MW, area or opening adopted. Generic redundant infrastructure language does not prove each office is server facility.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://alasconnect.com/services/data-center-hosting-services/","host":"alasconnect.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alaska · Fairbanks · Fairbanks North Star · Source context reviewed","state_name":"Alaska","state_path":"/alaska/"},{"id":"deepgreen-cook-inlet-nikiski-ak","state":"AK","kind":"facility","name":"Cook Inlet Subsea-Compute & Infrastructure Hub","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kenai Peninsula"],"city":"Nikiski","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Acceptance not permit issuance, project license or construction authority.100MWgeneration not exact IT;66pods not66independentlycountable campuses. ORPC expressly denies partnership; AEA says no communication. November2commentdeadline future. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Official notice says estimated annual generation would be 100 megawatts. This mixes energy and power units; retain source wording as a unit conflict, with no inferred annual MWh or critical IT. Preliminary permit if issued grants study/license-filing priority, not land-disturbance rights, construction permission or rights on others property. Deadline remains future.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.peninsulaclarion.com/2026/09/14/federal-review-advances-for-subsea-data-center-off-nikiski/","host":"peninsulaclarion.com","date":"2026-09-14","published":"2026-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf","host":"govinfo.gov","date":"2026-09-04","published":"2026-09-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":60.6903,"lng":-151.2889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Peninsula Clarion reports FERC accepted DeepGreen preliminary-permit application for feasibility review.","independently_verified_current_operating_status":null},"notes":["Acceptance not permit issuance, project license or construction authority.100MWgeneration not exact IT;66pods not66independentlycountable campuses. ORPC expressly denies partnership; AEA says no communication. November2commentdeadline future.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.peninsulaclarion.com/2026/09/14/federal-review-advances-for-subsea-data-center-off-nikiski/","host":"peninsulaclarion.com","date":"2026-09-14","published":"2026-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"application_accepted_for_filing":true,"construction_authorization":false,"permit_issued_verified":false,"docket":"P-15423-000","notice_dated":"2026-09-01","original_application_date":"2026-02-11","supplement_date":"2026-06-26","comment_deadline_local":"2026-11-02T17:00:00-05:00","proposed_pods":66,"proposed_turbines_range":[330,350],"canonical_annual_generation_mwh":null,"critical_it_mw":null},"notes":["Official notice says estimated annual generation would be 100 megawatts. This mixes energy and power units; retain source wording as a unit conflict, with no inferred annual MWh or critical IT.","Preliminary permit if issued grants study/license-filing priority, not land-disturbance rights, construction permission or rights on others property. Deadline remains future.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf","host":"govinfo.gov","date":"2026-09-04","published":"2026-09-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alaska · Nikiski · Kenai Peninsula · Source context reviewed","state_name":"Alaska","state_path":"/alaska/"},{"id":"ta-infrastructure-endicott-ak","state":"AK","kind":"facility","name":"Endicott Bitcoin Mining Pilot","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["North Slope"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Alaska trial cryptocurrency module permit application. Permit application/public notice is not granted permit or proof trial began.1.4MWexplicitlybitcoincomputers, separate from AI/cloud power and existing generator capacity. Anchorage office is notice administration, not project address. Future final decision and actual current operations unknown. Proposed term is not actual energization period. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=217467","host":"aws.state.ak.us","date":"2024-11-15","published":"2024-11-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":70.326677,"lng":-148.9432527,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Alaska trial cryptocurrency module permit application","fields":{"agency":"Alaska DNR","applicant":"TA Infrastructure Management LLC","case":"LAS35307","application_received_date":"2024-11-05","notice_publication_date":"2024-11-15","location":"Duck Island Unit Satellite Drilling Island, North Slope","proposed_trial_bitcoin_computer_load_mw":1.4,"power_source":"existing Hilcorp Alaska generation using produced natural gas","proposed_term_start_month":"2024-11","proposed_term_end_month":"2028-11","comment_deadline":"2024-11-29T16:30:00-09:00"},"notes":["Permit application/public notice is not granted permit or proof trial began.1.4MWexplicitlybitcoincomputers, separate from AI/cloud power and existing generator capacity. Anchorage office is notice administration, not project address. Future final decision and actual current operations unknown. Proposed term is not actual energization period.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=217467","host":"aws.state.ak.us","date":"2024-11-15","published":"2024-11-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alaska · North Slope · Source context reviewed","state_name":"Alaska","state_path":"/alaska/"},{"id":"greensparc-cordova-ak","state":"AK","kind":"facility","name":"Greensparc Cordova Data Center (Humpback Creek Hydro)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chugach"],"city":"Cordova","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cordova deployed computing pilot and grid/efficiency boundaries. Institution-authored republished account supports historical pilot, not freshOctoberoperation/loadtest.170kWcomputing distinct from powerplantgeneration. PUEnear1isdesigngoal not measuredannualPUE. Utility83percenthydro2025not24/7allrenewableDCguarantee; winterdieselpossible.20to25percentunusedhydroestimate not contractedavailablecapacityforothers. Microgrid2017to2023development dates not exactpilotopening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cleantechnica.com/2026/03/09/in-alaska-a-data-center-inside-a-power-plant-inside-a-microgrid/","host":"cleantechnica.com","date":"2026-03-09","published":"2026-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":60.6099,"lng":-145.644,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Cordova deployed computing pilot and grid/efficiency boundaries","fields":{"credited_author":"Connor ONeil, national laboratory/DOE article republished by CleanTechnica","project_company":"Greensparc","utility":"Cordova Electric Cooperative","facility":"pilot inside HumpbackCreek hydroelectric facility, Cordova, Alaska","reported_computing_capacity_kw":170,"reported_stage":"pilot deployment provided computing for controls and local businesses","publication_date":"2026-03-09"},"notes":["Institution-authored republished account supports historical pilot, not freshOctoberoperation/loadtest.170kWcomputing distinct from powerplantgeneration. PUEnear1isdesigngoal not measuredannualPUE. Utility83percenthydro2025not24/7allrenewableDCguarantee; winterdieselpossible.20to25percentunusedhydroestimate not contractedavailablecapacityforothers. Microgrid2017to2023development dates not exactpilotopening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cleantechnica.com/2026/03/09/in-alaska-a-data-center-inside-a-power-plant-inside-a-microgrid/","host":"cleantechnica.com","date":"2026-03-09","published":"2026-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alaska · Cordova · Chugach · Source context reviewed","state_name":"Alaska","state_path":"/alaska/"},{"id":"stak-energy-north-slope-ak","state":"AK","kind":"facility","name":"Stak Energy North Slope Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["North Slope"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. STAK signed preliminary land-lease finding, not final permit. Signed preliminary finding advances to public notice; it is not final lease issuance or construction/air/wetlands permits. Proposed5yearentry authorization is included in50yearlease, not55years. Document claim first data center inAlaska is not accepted statewide census claim; known other facilities make scope uncertain. Future final finding, rent and actual operations not established. State gas-generation infrastructure not automatically critical IT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161957","host":"aws.state.ak.us","date":"2026-05-12","published":"2026-05-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":69.84,"lng":-148.5,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"STAK signed preliminary land-lease finding, not final permit","fields":{"agency":"Alaska DNR Division of Oil and Gas","applicant":"STAK Energy Corporation","case":"ADL422741","document_stage":"signed Preliminary Decision","decision_date":"2026-05-12","original_application_date":"2025-11-21","revised_application_date":"2026-03-12","proposed_lease_years":50,"location":"approximately1mile west of DaltonHighway milepost390","borough":"North Slope","proposal":"modular data centers with on-site natural-gas power and supporting infrastructure","comment_deadline":"2026-06-15T16:30:00-08:00"},"notes":["Signed preliminary finding advances to public notice; it is not final lease issuance or construction/air/wetlands permits. Proposed5yearentry authorization is included in50yearlease, not55years. Document claim first data center inAlaska is not accepted statewide census claim; known other facilities make scope uncertain. Future final finding, rent and actual operations not established. State gas-generation infrastructure not automatically critical IT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161957","host":"aws.state.ak.us","date":"2026-05-12","published":"2026-05-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alaska · North Slope · Source context reviewed","state_name":"Alaska","state_path":"/alaska/"},{"id":"grandilla-foot-creek-491st-thomas-tonopah-az","state":"AZ","kind":"facility","name":"491st Avenue and Thomas Road Data Center / Solar Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Tonopah","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The report explicitly says no formal data-center development plan. Rezoning and conceptual switchyard/solar/storage uses are not construction, tenant, electrical-service or IT-capacity confirmation. Lack of opposition in submitted materials is not universal public support. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbex.com/planning-development/maricopa-county-board-approves-rezoning-for-638-acre-data-center-solar-site/","host":"azbex.com","date":"2026-02-18","published":"2026-02-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.481,"lng":-113.134,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"AZBEX reports rezoning of about 638 acres owned by Grandilla and Foot Creek near 491st Avenue and Thomas Road in the Tonopah area, with a conceptual nine-building, 2.25-million-square-foot data-center layout.","independently_verified_current_operating_status":null},"notes":["The report explicitly says no formal data-center development plan. Rezoning and conceptual switchyard/solar/storage uses are not construction, tenant, electrical-service or IT-capacity confirmation. Lack of opposition in submitted materials is not universal public support.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbex.com/planning-development/maricopa-county-board-approves-rezoning-for-638-acre-data-center-solar-site/","host":"azbex.com","date":"2026-02-18","published":"2026-02-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Tonopah · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"5c-data-centers-phx01-phoenix-az","state":"AZ","kind":"facility","name":"5C Data Centers PHX01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Phoenix","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. GPEC historical Phoenix development announcement. Historical planned2025service is not observed opening. Power density is cabinet design capability, not measured average or campus load. No street/parcel in reviewed release. Regional EDO reporting developer announcement, not independent engineering certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.gpec.org/news/5c-data-centers-new-data-center-region-in-phoenix/","host":"gpec.org","date":"2024-09-19","published":"2024-09-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4703256,"lng":-112.1204899,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"GPEC historical Phoenix development announcement","fields":{"release_dateline":"2024-09-18","page_published_date":"2024-09-19","page_updated_date":"2025-03-31","site_code":"PHX01","planned_critical_it_mw":20,"planned_area_sqft":140000,"maximum_supported_power_density_kw_per_cabinet":132,"historical_target_service_year":2025},"notes":["Historical planned2025service is not observed opening. Power density is cabinet design capability, not measured average or campus load. No street/parcel in reviewed release. Regional EDO reporting developer announcement, not independent engineering certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.gpec.org/news/5c-data-centers-new-data-center-region-in-phoenix/","host":"gpec.org","date":"2024-09-19","published":"2024-09-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Phoenix · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"aligned-peoria-campus-az","state":"AZ","kind":"facility","name":"Aligned Data Centers Peoria Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Peoria","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Aligned Peoria planning report. Syndicated PhoenixBusinessJournal report not adopted city permit. Existing district permits data-center uses, but no specific final site approval/commissioning proven. No explicit critical IT MW, full capex or current construction adopted. Publication day absent from retained body; not inferred from other outlets. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.abc15.com/news/business/aligned-data-centers-moves-ahead-with-two-building-campus-in-peoria","host":"abc15.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5594634,"lng":-112.2201382,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Aligned Peoria planning report","fields":{"project":"Aligned Peoria campus","location":"75th Avenue and ButlerDrive, Peoria, Arizona","reported_site_acres":95,"reported_proposed_buildings":2,"reported_combined_area_sqft_approx":916000,"reported_stage":"planning documents filed"},"notes":["Syndicated PhoenixBusinessJournal report not adopted city permit. Existing district permits data-center uses, but no specific final site approval/commissioning proven. No explicit critical IT MW, full capex or current construction adopted. Publication day absent from retained body; not inferred from other outlets.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.abc15.com/news/business/aligned-data-centers-moves-ahead-with-two-building-campus-in-peoria","host":"abc15.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Peoria · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"aligned-phx-01-02-03-az","state":"AZ","kind":"facility","name":"Aligned PHX-01/02/03","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Phoenix","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Generator/UPS component ratings are not facility-wide MW. Shared address with PHX05 requires campus/building deduplication. Operator groups PHX01/02/03 at one address and lists PHX05 at the same address. Establish campus relationship before counting. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Microgridgeneration63MWnotdata-centerIT. Voltage69kVisnotcapacity.2016nearlycomplete/soonstatementsnotcurrentstatus.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/phoenix/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://aligneddc.com/power-reliability-is-a-big-driver-for-aligned-data-centers-in-phoenix/","host":"aligneddc.com","date":"2016-03-16","published":"2016-03-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.6590546,"lng":-112.1111595,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"2500 W Union Hills Drive","city":"Phoenix","campus_acres":55},"notes":["Generator/UPS component ratings are not facility-wide MW.","Shared address with PHX05 requires campus/building deduplication.","Operator groups PHX01/02/03 at one address and lists PHX05 at the same address. Establish campus relationship before counting.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/phoenix/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"historical_substation_voltage_kv":69,"historical_microgrid_project_mw":63,"historical_location":"Union Hills Drive and I17"},"notes":["Microgridgeneration63MWnotdata-centerIT. Voltage69kVisnotcapacity.2016nearlycomplete/soonstatementsnotcurrentstatus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/power-reliability-is-a-big-driver-for-aligned-data-centers-in-phoenix/","host":"aligneddc.com","date":"2016-03-16","published":"2016-03-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Phoenix · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"aligned-phx13-glendale-az","state":"AZ","kind":"facility","name":"Aligned PHX-13","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Glendale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. Glendale Star May12,2025, updatedJune10, reproduces city-submitted PHX13 groundbreaking context.72MW is this planned facility, one of four on100acre campus; no explicit criticalITbasis and no72times4 inference.230kV is transmission voltage. This is groundbreaking, not energization.73%water reduction against formerrosefarm, renewablepower andclosedloop statements are promoter claims, not audited annual usage. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.glendalestar.com/news/aligned-data-centers-breaks-ground/article_4c7a2620-ccc3-4821-a236-dbfedb40ae85.html","host":"glendalestar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5387,"lng":-112.186,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["Glendale Star May12,2025, updatedJune10, reproduces city-submitted PHX13 groundbreaking context.72MW is this planned facility, one of four on100acre campus; no explicit criticalITbasis and no72times4 inference.230kV is transmission voltage. This is groundbreaking, not energization.73%water reduction against formerrosefarm, renewablepower andclosedloop statements are promoter claims, not audited annual usage.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.glendalestar.com/news/aligned-data-centers-breaks-ground/article_4c7a2620-ccc3-4821-a236-dbfedb40ae85.html","host":"glendalestar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Glendale · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"apple-mesa-az","state":"AZ","kind":"facility","name":"Apple Mesa Data Center (Global Command Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Mesa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical industrial trade-zone application only. Foreign-trade subzone application for an Apple facility does not identify 2014data-center use, current operating status, ITMW or incentive amount received. No data-center opening inferred from industrial application. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.federalregister.gov/documents/full_text/text/2014/01/23/2014-01296.txt","host":"federalregister.gov","date":"2014-01-23","published":"2014-01-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.3615205,"lng":-111.6012177,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical industrial trade-zone application only","fields":{"historical_apple_site_address":"3740 SSignal Butte Road, Mesa, Arizona","historical_ftz_application_area_acres":83.17,"foreign_trade_zone_application_docket_date":"2014-01-14"},"notes":["Foreign-trade subzone application for an Apple facility does not identify 2014data-center use, current operating status, ITMW or incentive amount received. No data-center opening inferred from industrial application.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.federalregister.gov/documents/full_text/text/2014/01/23/2014-01296.txt","host":"federalregister.gov","date":"2014-01-23","published":"2014-01-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Mesa · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"zinke-arizona-independent-technology-campus-pinal-az","state":"AZ","kind":"facility","name":"Arizona Independent Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 956 acresnewland-use amendment plus 561 previouslydesignatedEmploymentacres yields 1517 plannedrezoningarea, which includes manufacturing/warehousing/energy and is NOT all DCfootprint. Land-use amendment still needed approval before rezoning; no DCbuilding authorization, ESA or current operation. CityofMaricopageneralplaninterest does not place site in city jurisdiction. Supervisor’s reference to earlier 500 acres does not by itself crosswalk this concept to another W-Holdings record; parcel/project identities require originalcase comparison before counting distinct campuses. NoMW/capex/waterquantity/RFSverified. Automated comment extraction corrected from retained public main body. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/data-center-south-of-maricopa-tech-campus-2026-september-worksession/","host":"pinalpost.com","date":"2026-09-05","published":"2026-09-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.9229,"lng":-112.0148,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"PinalPost reports Zinke’sPZ-PA-015-26 conceptual ArizonaIndependentTechnologyCampus request was discussed atAugust 20 andSeptember 2 work sessions, with NO VOTE at either.","independently_verified_current_operating_status":null,"reported_work_sessions":["2026-08-20","2026-09-02"],"source_says_no_vote_at_either":true,"amendment_acres":956,"previous_employment_designation_acres":561,"combined_potential_rezoning_acres":1517,"all_1517_acres_are_dc_footprint":false},"notes":["956 acresnewland-use amendment plus 561 previouslydesignatedEmploymentacres yields 1517 plannedrezoningarea, which includes manufacturing/warehousing/energy and is NOT all DCfootprint. Land-use amendment still needed approval before rezoning; no DCbuilding authorization, ESA or current operation. CityofMaricopageneralplaninterest does not place site in city jurisdiction. Supervisor’s reference to earlier 500 acres does not by itself crosswalk this concept to another W-Holdings record; parcel/project identities require originalcase comparison before counting distinct campuses. NoMW/capex/waterquantity/RFSverified. Automated comment extraction corrected from retained public main body.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/data-center-south-of-maricopa-tech-campus-2026-september-worksession/","host":"pinalpost.com","date":"2026-09-05","published":"2026-09-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Pinal · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"aws-laveen-az","state":"AZ","kind":"facility","name":"AWS Laveen Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Laveen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Reported 277 million USD is land transaction, not project capex or commissioned facility. Other Valley acquisitions and market MW totals do not belong to this site. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aztechcouncil.org/amazon-buys-massive-valley-site-for-potential-data-center/","host":"aztechcouncil.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.3727,"lng":-112.1669,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Phoenix Business Journal reporting republished by Arizona Technology Council describes Amazon Laveen acquisition and potential data center use.","independently_verified_current_operating_status":null},"notes":["Reported 277 million USD is land transaction, not project capex or commissioned facility. Other Valley acquisitions and market MW totals do not belong to this site.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aztechcouncil.org/amazon-buys-massive-valley-site-for-potential-data-center/","host":"aztechcouncil.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Laveen · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"arizona-land-consulting-balterra-tonopah-az","state":"AZ","kind":"facility","name":"Balterra","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Tonopah","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Combined development estimate includes entertainment, residential and other uses. No dedicated data-center capex or tenant inferred. Later approval-stage account supersedes August planning-stage article. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbex.com/planning-development/tonopah-mixed-use-development-rezoning/","host":"azbex.com","date":"2026-09-09","published":"2026-09-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.508197,"lng":-112.9369267,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"AZBEX reports September 2 mixed-use plan/rezoning approvals for Balterra and Camelback Creek; site plans still required.","independently_verified_current_operating_status":null},"notes":["Combined development estimate includes entertainment, residential and other uses. No dedicated data-center capex or tenant inferred. Later approval-stage account supersedes August planning-stage article.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbex.com/planning-development/tonopah-mixed-use-development-rezoning/","host":"azbex.com","date":"2026-09-09","published":"2026-09-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Tonopah · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"tract-buckeye-tech-corridor-az","state":"AZ","kind":"facility","name":"Buckeye Tech Corridor","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Buckeye","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. DerekStaahl AZFamily originalAugust29,2024 report, URLAugust30notvote/event. Tract2100acreroundedBuckeyepurchase/20Msf15yearbuildout and1.8GWrequiredpower werePLANSwithpowermajorunresolvedhurdle.1.8GWnotexplicitITorenergyperday; publisherdailyplantcomparison isdimensionallyambiguousandnotadopted. Mayor7yearpowerestimate/300jobsforecastnotsecuredsupplyorhiredstaff.20BfuturevalueviaWSJnotactualTractspend. NearbyAPS/newplantpossibilitynotapprovedPPA.9,700homesscrappedplan/waterlessthanhalfcomparisonsattributednotcurrentmeteredvolume. No namedGoogle/Amazon/Microsofttenantconfirmedmerelymayorexamples. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.azfamily.com/2024/08/30/developer-wants-power-future-ai-buckeye-with-new-data-center/","host":"azfamily.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4136,"lng":-112.7203,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["DerekStaahl AZFamily originalAugust29,2024 report, URLAugust30notvote/event. Tract2100acreroundedBuckeyepurchase/20Msf15yearbuildout and1.8GWrequiredpower werePLANSwithpowermajorunresolvedhurdle.1.8GWnotexplicitITorenergyperday; publisherdailyplantcomparison isdimensionallyambiguousandnotadopted.","Mayor7yearpowerestimate/300jobsforecastnotsecuredsupplyorhiredstaff.20BfuturevalueviaWSJnotactualTractspend. NearbyAPS/newplantpossibilitynotapprovedPPA.9,700homesscrappedplan/waterlessthanhalfcomparisonsattributednotcurrentmeteredvolume. No namedGoogle/Amazon/Microsofttenantconfirmedmerelymayorexamples.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.azfamily.com/2024/08/30/developer-wants-power-future-ai-buckeye-with-new-data-center/","host":"azfamily.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Buckeye · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"arizona-land-consulting-camelback-creek-tonopah-az","state":"AZ","kind":"facility","name":"Camelback Creek","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Tonopah","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. September 9 article reports later rezoning approval, not a finalized site plan or secured energized power. General mixed-use allowances are not a tenant commitment. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbex.com/planning-development/320-acre-warehouse-data-center-master-plan-proposed-in-far-west-valley/","host":"azbex.com","date":"2026-08-04","published":"2026-08-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.509,"lng":-112.962,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"AZBEX describes Camelback Creek planning request with no end users secured and utility extensions/feasibility studies needed.","independently_verified_current_operating_status":null},"notes":["September 9 article reports later rezoning approval, not a finalized site plan or secured energized power. General mixed-use allowances are not a tenant commitment.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbex.com/planning-development/320-acre-warehouse-data-center-master-plan-proposed-in-far-west-valley/","host":"azbex.com","date":"2026-08-04","published":"2026-08-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Tonopah · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"centersquare-phx3-az","state":"AZ","kind":"facility","name":"Centersquare PHX3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Mesa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. PhoenixmarketlabelnotcityPhoenix. PHX1section40546area/13.3MWUPSnotPHX3. RatingsdifferentbasesnotIToradditive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/phoenix","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4212542,"lng":-111.8590191,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"PHX3","published_city":"Mesa, Arizona","raised_floor_sqft":50256,"utility_power_mw":17.3,"ups_capacity_mw":8,"generator_capacity_mw":11.5},"notes":["PhoenixmarketlabelnotcityPhoenix. PHX1section40546area/13.3MWUPSnotPHX3. RatingsdifferentbasesnotIToradditive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/phoenix","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Mesa · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"compass-goodyear-campus-az","state":"AZ","kind":"facility","name":"Compass Datacenters Goodyear Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Goodyear","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Historical Q42019 delivery forecast is not observed opening. Initial72MW lies within full campus, not422MW.230kV substation voltage not MW; ultimate350MW basis not explicitly critical IT. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbigmedia.com/business/economic-development/compass-datacenters-will-build-225-acre-goodyear-campus/","host":"azbigmedia.com","date":"2019-07-11","published":"2019-07-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4354446,"lng":-112.3756856,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"AZ Big Media reports Compass Goodyear agreement and first-phase72MW IT target, with350MW ultimate eight-building campus.","independently_verified_current_operating_status":null},"notes":["Historical Q42019 delivery forecast is not observed opening. Initial72MW lies within full campus, not422MW.230kV substation voltage not MW; ultimate350MW basis not explicitly critical IT.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbigmedia.com/business/economic-development/compass-datacenters-will-build-225-acre-goodyear-campus/","host":"azbigmedia.com","date":"2019-07-11","published":"2019-07-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Goodyear · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"cyrusone-chandler-phx1-phx8-az","state":"AZ","kind":"facility","name":"CyrusOne Chandler Campus (PHX1-PHX8)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Chandler","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Multi-building Chandler campus values; not individual building totals or measured operating load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/chandler-arizona","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2709074,"lng":-111.8819248,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_campus_technical_it_space_sqft":2000000,"advertised_campus_total_it_capacity_mw":169},"notes":["Multi-building Chandler campus values; not individual building totals or measured operating load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/chandler-arizona","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Chandler · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"digital-realty-phx-tempe-az","state":"AZ","kind":"facility","name":"Digital Realty PHX (Tempe)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Tempe","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Regional page lists Phoenix PHX10 and Chandler PHX15, not a named Tempe facility. Do not copy their area/power to the imported Tempe record. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/phoenix","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.3446197,"lng":-111.8992189,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Regional page lists Phoenix PHX10 and Chandler PHX15, not a named Tempe facility. Do not copy their area/power to the imported Tempe record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/phoenix","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Tempe · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"digital-realty-phx15-az","state":"AZ","kind":"facility","name":"Digital Realty PHX15","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Chandler","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/phoenix/phx15","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2749228,"lng":-111.8866379,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"PHX15","published_address":"2121 South Price Road Chandler, AZ 85286","advertised_building_sqft":508000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/phoenix/phx15","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Chandler · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"edgecore-dobson-farms-east-florence-az","state":"AZ","kind":"facility","name":"Dobson Farms East","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.1183,"lng":-111.4733,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Pinal Post reports October 7, 2025 Florence land-use amendments for three Dobson Farms areas totaling 1,619 acres.","independently_verified_current_operating_status":null},"notes":["Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Florence · Pinal · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"edgecore-mesa-az","state":"AZ","kind":"facility","name":"EdgeCore Mesa Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Mesa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. A quote combines constructing and commissioning 206 MW while the body says one building operates and two are being built. Do not call all 206 MW operating. The additional capacity lies inside the ultimate plan. Designed-to-earn labels are not completed certifications. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbigmedia.com/real-estate/edgecore-expands-mesa-data-center-campus-to-over-450-mw/","host":"azbigmedia.com","date":"2025-05-27","published":"2025-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.375,"lng":-111.6497,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"AZ Big Media reproduces EdgeCore's Mesa land expansion and ultimate capacity plan above 450 MW.","independently_verified_current_operating_status":null},"notes":["A quote combines constructing and commissioning 206 MW while the body says one building operates and two are being built. Do not call all 206 MW operating. The additional capacity lies inside the ultimate plan. Designed-to-earn labels are not completed certifications.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbigmedia.com/real-estate/edgecore-expands-mesa-data-center-campus-to-over-450-mw/","host":"azbigmedia.com","date":"2025-05-27","published":"2025-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Mesa · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"edged-mesa-az","state":"AZ","kind":"facility","name":"Edged Mesa Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Mesa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. ReleaseApril2saysunveiledyesterday.138Mgallonsforecastwatersavingsnotmeasuredconsumption. Phoenixmarketlabelnotcity; mayorzero-waterquotenotproofnopotable/domesticuse. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor","host":"edged.us","date":"2026-04-02","published":"2026-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4152,"lng":-111.8315,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"opening_event_date":"2026-04-01","published_city":"Mesa, Arizona","critical_capacity_mw":36},"notes":["ReleaseApril2saysunveiledyesterday.138Mgallonsforecastwatersavingsnotmeasuredconsumption. Phoenixmarketlabelnotcity; mayorzero-waterquotenotproofnopotable/domesticuse.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor","host":"edged.us","date":"2026-04-02","published":"2026-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Mesa · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"w-holdings-energy-generation-technology-campus-maricopa-az","state":"AZ","kind":"facility","name":"Energy Generation and Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Maricopa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Land-use amendment is not all DC/gas-plant/storage permits or current operation.10 billion-dollarvalue covers integrated construction/equipment plans, not solely DCcapex or actual spending.1000 regionalpermanentjobs and quoted 500 direct example have different scopes; no single current employment total certified. Campus abuts Ak-Chin community, not proved to occupy tribal land; cultural-resource concerns are attributed and no final mitigation/consultation finding reviewed. Other two county projects approved thatday are separate. No MW or executed utility agreement verified. Article wasNov 24 local/Nov 25 UTC, not theJuly 2026 commentdate. Automated comment-only extraction corrected from retained main body. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://inmaricopa.com/data-center-okd/","host":"inmaricopa.com","date":"2025-11-24","published":"2025-11-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.945,"lng":-112.035,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"InMaricopa reports Pinal supervisors unanimously approved a land-use amendment for W Holdings’ proposed 500-acre EnergyGenerationandTechnologyCampus south of Maricopa.","independently_verified_current_operating_status":null},"notes":["Land-use amendment is not all DC/gas-plant/storage permits or current operation.10 billion-dollarvalue covers integrated construction/equipment plans, not solely DCcapex or actual spending.1000 regionalpermanentjobs and quoted 500 direct example have different scopes; no single current employment total certified. Campus abuts Ak-Chin community, not proved to occupy tribal land; cultural-resource concerns are attributed and no final mitigation/consultation finding reviewed. Other two county projects approved thatday are separate. No MW or executed utility agreement verified. Article wasNov 24 local/Nov 25 UTC, not theJuly 2026 commentdate. Automated comment-only extraction corrected from retained main body.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://inmaricopa.com/data-center-okd/","host":"inmaricopa.com","date":"2025-11-24","published":"2025-11-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Maricopa · Pinal · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"flexential-phoenix-deer-valley-az","state":"AZ","kind":"facility","name":"Flexential Phoenix - Deer Valley","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Phoenix","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6846775,"lng":-112.0983398,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Phoenix - Deer Valley","publisher_reported_footprint_sqft":109476,"publisher_reported_critical_power_mw":5.02,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Phoenix · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"ryan-companies-florence-tech-park-az","state":"AZ","kind":"facility","name":"Florence Tech Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.1477,"lng":-111.4733,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Pinal Post reports October 7, 2025 Florence land-use amendments for three Dobson Farms areas totaling 1,619 acres.","independently_verified_current_operating_status":null},"notes":["Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Florence · Pinal · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"google-redhawk-mesa-az","state":"AZ","kind":"facility","name":"Google Redhawk Mesa Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Mesa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Mesa RedHawk unexecuted city-signature development draft. Boilerplateexecutedlanguageanddatedfilenamecannotoverrideblankexecutionfields. Recitalownershipnotindependentrecordeddeedproof. No numericITMW,currentGoogletenant/parceloroperatingstatusestablishedbyreviewedsections. Otherlease/deedtemplatesin99pagepacketnotexecutedsalesorincentives. Proposedwater/leaseprivilegesnotcurrentapprovedbenefitsfromthiscopy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://legistar1.granicus.com/Mesa/attachments/e2e1b966-a066-4ba7-b9a6-ec11167a332d.pdf","host":"legistar1.granicus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.3764,"lng":-111.6199,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Mesa RedHawk unexecuted city-signature development draft","fields":{"document":"City of Mesa and Stone Applications LLC development agreement","county":"Maricopa, Arizona","recital_property_acres_approx":186,"property_use":"proposed data/information processing center","document_year_template":2019,"city_signature_and_notary_fields":"blank on PDFpage35","execution_proven":false,"effective_date":null},"notes":["Boilerplateexecutedlanguageanddatedfilenamecannotoverrideblankexecutionfields. Recitalownershipnotindependentrecordeddeedproof. No numericITMW,currentGoogletenant/parceloroperatingstatusestablishedbyreviewedsections. Otherlease/deedtemplatesin99pagepacketnotexecutedsalesorincentives. Proposedwater/leaseprivilegesnotcurrentapprovedbenefitsfromthiscopy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://legistar1.granicus.com/Mesa/attachments/e2e1b966-a066-4ba7-b9a6-ec11167a332d.pdf","host":"legistar1.granicus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Mesa · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"h5-data-centers-chandler-az","state":"AZ","kind":"facility","name":"H5 Data Centers Phoenix (Chandler)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Chandler","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Source says20watts/cabinet density. This implausible unit is quarantined; never silently convert to20kW. Arizona tax program eligibility is marketing, not a site award or actual benefit. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/phoenix-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2769786,"lng":-111.8860302,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"2600 W Germann Rd, Chandler, AZ 85286","advertised_colocation_facility_sqft":180000,"advertised_capacity_mw":26,"power_basis":"capacity; not explicitly gross or critical IT"},"notes":["Source says20watts/cabinet density. This implausible unit is quarantined; never silently convert to20kW. Arizona tax program eligibility is marketing, not a site award or actual benefit.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/phoenix-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Chandler · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"arizona-land-consulting-hassayampa-ranch-tonopah-az","state":"AZ","kind":"facility","name":"Hassayampa Ranch Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Tonopah","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. Dec12,2025BerryRiddellrepublicationcreditsazcentralJohnLeosandquotesitsownclientrepresentative. Dec10countyland-usechange2000unincorporatedacnearTonopahoutsideBuckeye;subsequentrezoning/siteplanningstillneeded.25B/1GWproposalundefinedbasis,51Mlanddealseparate. NotfullyapprovedconstructionorESA.2008unbuilt5700homesplanhistoricalnotDCsize. PinalEloy33B3300acVermaSrprojectSEPARATE;no58Bcombinedcampus. Opposition100signaturesreportednotrepresentativesurvey. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://berryriddell.com/25b-data-center-planned-west-of-phoenix-wins-key-approval-from-county/","host":"berryriddell.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.511576,"lng":-112.769387,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"Dec12,2025BerryRiddellrepublicationcreditsazcentralJohnLeosandquotesitsownclientrepresentative. Dec10countyland-usechange2000unincorporatedacnearTonopahoutsideBuckeye;subsequentrezoning/siteplanningstillneeded.25B/1GWproposalundefinedbasis,51Mlanddealseparate. NotfullyapprovedconstructionorESA.2008unbuilt5700homesplanhistoricalnotDCsize. PinalEloy33B3300acVermaSrprojectSEPARATE;no58Bcombinedcampus. Opposition100signaturesreportednotrepresentativesurvey."},"notes":["Dec12,2025BerryRiddellrepublicationcreditsazcentralJohnLeosandquotesitsownclientrepresentative. Dec10countyland-usechange2000unincorporatedacnearTonopahoutsideBuckeye;subsequentrezoning/siteplanningstillneeded.25B/1GWproposalundefinedbasis,51Mlanddealseparate. NotfullyapprovedconstructionorESA.2008unbuilt5700homesplanhistoricalnotDCsize. PinalEloy33B3300acVermaSrprojectSEPARATE;no58Bcombinedcampus. Opposition100signaturesreportednotrepresentativesurvey.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://berryriddell.com/25b-data-center-planned-west-of-phoenix-wins-key-approval-from-county/","host":"berryriddell.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Tonopah · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"vermaland-la-osa-eloy-az","state":"AZ","kind":"facility","name":"La Osa Data Center Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Eloy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. URL datedAugust 26 but body says updatedSeptember 29; preserve update provenance and distinguish new denial section from older future-hearing paragraph still on page. Reported denial is not independently examined original resolution, appeal judgment or permanent prohibition. Same update says Pima adopted 120 daypauseSeptember 22 andTucsonnewrulesAugust 5; those are different jurisdictions and require original scope/exception review. This later-dated Pima claim differs from round 32 Sept 24 story’s future-meeting wording; exact signed county instrument remains a follow-up, not a calendar-inferred resolution. No La Osa MW/approved water/operation inferred. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sonorandesert.org/2026/08/26/data-centers-update/","host":"sonorandesert.org","date":"2026-09-29","published":"2026-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.75,"lng":-111.55,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Coalition for Sonoran Desert Protection’s update explicitly reports Pinal supervisors denied La Osa rezoning onAugust 26,2026, after conservation-group opposition.","independently_verified_current_operating_status":null,"advocacy_reported_rezoning_denial_date":"2026-08-26","original_decision_verified":false},"notes":["URL datedAugust 26 but body says updatedSeptember 29; preserve update provenance and distinguish new denial section from older future-hearing paragraph still on page. Reported denial is not independently examined original resolution, appeal judgment or permanent prohibition. Same update says Pima adopted 120 daypauseSeptember 22 andTucsonnewrulesAugust 5; those are different jurisdictions and require original scope/exception review. This later-dated Pima claim differs from round 32 Sept 24 story’s future-meeting wording; exact signed county instrument remains a follow-up, not a calendar-inferred resolution. No La Osa MW/approved water/operation inferred.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sonorandesert.org/2026/08/26/data-centers-update/","host":"sonorandesert.org","date":"2026-09-29","published":"2026-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Eloy · Pinal · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"fremont-peak-luckett-road-marana-az","state":"AZ","kind":"facility","name":"Luckett Road Data Centers (Fremont Peak Properties)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pima"],"city":"Marana","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The proposed demand is not secured IT; service agreements and utility approval were still ahead. The claimed water-reduction percentage does not reconcile with printed volumes, so no canonical percentage is selected. Tucson Project Blue is separate. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://tucson.com/news/local/environment/article_52f0d4ba-aa9e-4c17-b290-ca3c2ad8d011.html","host":"tucson.com","date":"2026-01-09","published":"2026-01-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.495,"lng":-111.198,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Arizona Daily Star reports Marana rezoned two Beale-related properties by six-zero vote, with an owner-councilmember recused.","independently_verified_current_operating_status":null},"notes":["The proposed demand is not secured IT; service agreements and utility approval were still ahead. The claimed water-reduction percentage does not reconcile with printed volumes, so no canonical percentage is selected. Tucson Project Blue is separate.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tucson.com/news/local/environment/article_52f0d4ba-aa9e-4c17-b290-ca3c2ad8d011.html","host":"tucson.com","date":"2026-01-09","published":"2026-01-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Marana · Pima · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"meta-mesa-az","state":"AZ","kind":"facility","name":"Meta Mesa Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Mesa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use. PDF retains a once-completed jobs qualifier while page2states the center went online in2025. Do not present the full-build jobs forecast as measured current staffing. Page2online-year statement was text-reviewed separately; no exact opening day established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/mesa-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.3375358,"lng":-111.6355386,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"operator_labeled_data_center_investment_usd":1200000000,"investment_is_lower_bound":false,"investment_geographic_label":"Arizona","historic_groundbreaking_year":2021,"peak_construction_workers":2000,"operator_reported_operational_jobs_lower_bound":200,"local_school_nonprofit_direct_funding_usd_lower_bound":2400000,"direct_funding_county_scope":"Maricopa","operational_jobs_qualifier":"once completed","operator_reported_first_online_year":2025},"notes":["Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.","PDF retains a once-completed jobs qualifier while page2states the center went online in2025. Do not present the full-build jobs forecast as measured current staffing. Page2online-year statement was text-reviewed separately; no exact opening day established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/mesa-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Mesa · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"microsoft-el-mirage-az","state":"AZ","kind":"facility","name":"Microsoft El Mirage Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"El Mirage","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Preferred historical link redirects to Arizona regional operator page. It says datacenters operate in both cities, but does not verify individual expansion parcels, size, opening or investment. Global community commitments are not project-specific executed agreements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/communities/americas/greater-phoenix/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5695,"lng":-112.3204,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"operator_named_operating_market":"El Mirage","county_context":"Maricopa","current_exact_building_status":null,"site_it_mw":null},"notes":["Preferred historical link redirects to Arizona regional operator page. It says datacenters operate in both cities, but does not verify individual expansion parcels, size, opening or investment. Global community commitments are not project-specific executed agreements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/communities/americas/greater-phoenix/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · El Mirage · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"microsoft-goodyear-az","state":"AZ","kind":"facility","name":"Microsoft Goodyear Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Goodyear","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Preferred historical link redirects to Arizona regional operator page. It says datacenters operate in both cities, but does not verify individual expansion parcels, size, opening or investment. Global community commitments are not project-specific executed agreements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/communities/americas/greater-phoenix/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4353,"lng":-112.39,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"operator_named_operating_market":"Goodyear","county_context":"Maricopa","current_exact_building_status":null,"site_it_mw":null},"notes":["Preferred historical link redirects to Arizona regional operator page. It says datacenters operate in both cities, but does not verify individual expansion parcels, size, opening or investment. Global community commitments are not project-specific executed agreements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/communities/americas/greater-phoenix/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Goodyear · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"novva-mesa-az","state":"AZ","kind":"facility","name":"Novva Mesa Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Mesa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Novva Mesa phased development forecasts. Target not observed opening.160acsite and1.3Msqftfootprint are different scopes. Water savings versus hypothetical conventional system are projections, not measured withdrawals; renewable/biofuel designs not current results.300MWheadline not all phase1IT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.novva.com/media-center/novva-data-centers-announces-new-campus-in-mesa/","host":"novva.com","date":"2024-08-21","published":"2024-08-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.3717,"lng":-111.6747,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Novva Mesa phased development forecasts","fields":{"original_announcement_date":"2024-08-21","page_updated_date":"2026-01-13","proposed_campus_acres":160,"headline_planned_capacity_mw":300,"headline_power_basis":"not explicit critical IT","phase1_planned_critical_it_mw":96,"phase1_operation_target":"late2026","planned_investment_usd_min_exclusive":3000000000,"planned_buildout_period":"nextdecade","planned_data_halls":5,"planned_total_building_footprint_sqft":1300000,"expected_staff_approx":200,"published_location":"northwest alignment of Ellsworth and Warner roads, southeast Mesa, Arizona"},"notes":["Target not observed opening.160acsite and1.3Msqftfootprint are different scopes. Water savings versus hypothetical conventional system are projections, not measured withdrawals; renewable/biofuel designs not current results.300MWheadline not all phase1IT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.novva.com/media-center/novva-data-centers-announces-new-campus-in-mesa/","host":"novva.com","date":"2024-08-21","published":"2024-08-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Mesa · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"ntt-global-mesa-az","state":"AZ","kind":"facility","name":"NTT Global Data Centers Mesa  -  Pacific Proving Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Mesa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Recommendation is not final council approval. The separate 102-acre Elliot Road campus is not this 170-acre proposal. Reported 2.3 million square feet differs from other baseline area descriptions and remains unresolved. A 300-million-USD land purchase is not full construction investment. Closed-loop design and modeled noise measures are not measured water/noise; no later council outcome assumed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.themesatribune.com/news/big-data-center-in-se-mesa-passes-first-review/article_91081b9b-d2d1-47f6-91d2-b600115e4a55.html","host":"themesatribune.com","date":"2026-05-21","published":"2026-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.3025,"lng":-111.62,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Mesa Tribune reports a four-zero planning-board recommendation for NTT's Pecos/Crismon proposal, with council consideration still expected later and revised landscaping requested.","independently_verified_current_operating_status":null},"notes":["Recommendation is not final council approval. The separate 102-acre Elliot Road campus is not this 170-acre proposal. Reported 2.3 million square feet differs from other baseline area descriptions and remains unresolved. A 300-million-USD land purchase is not full construction investment. Closed-loop design and modeled noise measures are not measured water/noise; no later council outcome assumed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.themesatribune.com/news/big-data-center-in-se-mesa-passes-first-review/article_91081b9b-d2d1-47f6-91d2-b600115e4a55.html","host":"themesatribune.com","date":"2026-05-21","published":"2026-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Mesa · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"ntt-phoenix-ph1-data-center-az","state":"AZ","kind":"facility","name":"NTT Phoenix PH1 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Mesa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NTT Mesa PH1 site versus campus scope. 36MWnamedbuildingversus240MWcampus;donotassign240toPH1. Futuretensewillfeaturedoesnotdateenergization. Operator tax-incentive summary not independent current statutory interpretation or actual facility benefit.6MWvaultsubunitsnotextraIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/phoenix-ph1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.3536663,"lng":-111.6124114,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"NTT Mesa PH1 site versus campus scope","fields":{"operator_code":"PH1","address":"10256 Elliot Road, Mesa, Arizona85212","critical_it_mw":36,"data_floor_sqft":126000,"campus_acres":102,"campus_planned_data_centers":7,"campus_advertised_power_mw":240},"notes":["36MWnamedbuildingversus240MWcampus;donotassign240toPH1. Futuretensewillfeaturedoesnotdateenergization. Operator tax-incentive summary not independent current statutory interpretation or actual facility benefit.6MWvaultsubunitsnotextraIT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/phoenix-ph1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Mesa · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"phoenixnap-phx02-phoenix-az","state":"AZ","kind":"facility","name":"phoenixNAP PHX02","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Phoenix","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The first University Drive center is separate. Land price is not construction spending; zoning-extension approval is not commissioning. Power basis is unspecified. The stated rack count and rack density imply a very different total from the campus MW; do not reconcile or multiply them into canonical IT. No future completion observed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbex.com/planning-development/new-data-center-planned-in-south-phoenix/","host":"azbex.com","date":"2025-04-04","published":"2025-04-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4165398,"lng":-112.0116833,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"AZBEX reports proposed phoenixNAP PHX02, initial 30 MW inside a potential 50 MW plan, with first-floor completion hoped for in fourth-quarter 2026.","independently_verified_current_operating_status":null},"notes":["The first University Drive center is separate. Land price is not construction spending; zoning-extension approval is not commissioning. Power basis is unspecified. The stated rack count and rack density imply a very different total from the campus MW; do not reconcile or multiply them into canonical IT. No future completion observed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbex.com/planning-development/new-data-center-planned-in-south-phoenix/","host":"azbex.com","date":"2025-04-04","published":"2025-04-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Phoenix · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"takanock-project-baccara-maricopa-county-az","state":"AZ","kind":"facility","name":"Project Baccara","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Baccara named county agenda and prior recommendation only. Agenda records recommendation, not May6 Board approval or operating permit. Conditions from preceding unrelated storage project must not be assigned to Baccara. Turbine-stack heights, setbacks and parking ratios are not power MW or total DC area. No measured consumption, investment or opening established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10264?fileID=100345","host":"maricopa.gov","date":"2026-05-06","published":"2026-05-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.5685,"lng":-112.3703,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Baccara named county agenda and prior recommendation only","fields":{"project":"Project Baccara","case":"MCP250007","owner":"Baccara Eagle Land LLC","published_location":"north of Olive Road, approximately half a mile west of Litchfield Road, west Glendale area","planning_commission_recommendation_date":"2026-04-09","planning_commission_recommendation_vote":{"for":8,"against":0},"board_hearing_agenda_date":"2026-05-06","proposed_uses":["natural-gas generation","backup propane and diesel power","electrical substation","data-center buildings"]},"notes":["Agenda records recommendation, not May6 Board approval or operating permit. Conditions from preceding unrelated storage project must not be assigned to Baccara. Turbine-stack heights, setbacks and parking ratios are not power MW or total DC area. No measured consumption, investment or opening established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10264?fileID=100345","host":"maricopa.gov","date":"2026-05-06","published":"2026-05-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"beale-project-blue-pima-county-az","state":"AZ","kind":"facility","name":"Project Blue","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pima"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical Pima proposed-project scope; current outcome hold. Undated summary is forward-looking and links later development updates through April2026. It does not by itself resolve current post-Tucson vote development status. Tax revenue forecasts not incentives, neither payments nor local government debt. Ratepayer protection proposal not independently approved tariff. Current status held pending latest source document. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pima.gov/3552/Project-Blue-FAQ","host":"pima.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.1,"lng":-110.75,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical Pima proposed-project scope; current outcome hold","fields":{"historical_proposed_investment_usd":3600000000,"site_acres":290,"initial_potential_buildings":4,"full_property_potential_buildings_max":10,"first_building_earliest_operation_target_year":2027,"historical_projected_permanent_jobs_by2029":180,"historical_projected_construction_jobs_min_exclusive":3000,"published_location":"west of Houghton Road, north of Pima County Fairgrounds, unincorporated Pima County"},"notes":["Undated summary is forward-looking and links later development updates through April2026. It does not by itself resolve current post-Tucson vote development status. Tax revenue forecasts not incentives, neither payments nor local government debt. Ratepayer protection proposal not independently approved tariff. Current status held pending latest source document.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pima.gov/3552/Project-Blue-FAQ","host":"pima.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Pima · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"sahuarita-holdings-project-gravel-pima-county-az","state":"AZ","kind":"facility","name":"Project Gravel","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pima"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Eight roughly 203,000-square-foot buildings and full buildout by 2029 are proposal/study estimates, not built floor area or an observed opening. Power, water, operator, jobs and cost are explicitly unknown. Mixed rural and industrial zoning and environmental/cultural evaluation do not establish rezoning or construction authorization. Separate Rancho Sahuarita/Jeremy Sharp conversations and Project Blue must not be merged. Report describes a future 120-day moratorium discussion; related-story headlines alone do not establish adopted scope, start date or current applicability. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://tucson.com/news/local/government-politics/article_88b66e8c-6502-49de-832e-7cba5f958a77.html","host":"tucson.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.9357724,"lng":-110.9997989,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Arizona Daily Star reports newly obtained records for Project Gravel on roughly 160 acres near 2480 West Twin Buttes Road, unincorporated Pima County.","independently_verified_current_operating_status":null},"notes":["Eight roughly 203,000-square-foot buildings and full buildout by 2029 are proposal/study estimates, not built floor area or an observed opening. Power, water, operator, jobs and cost are explicitly unknown. Mixed rural and industrial zoning and environmental/cultural evaluation do not establish rezoning or construction authorization. Separate Rancho Sahuarita/Jeremy Sharp conversations and Project Blue must not be merged. Report describes a future 120-day moratorium discussion; related-story headlines alone do not establish adopted scope, start date or current applicability.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tucson.com/news/local/government-politics/article_88b66e8c-6502-49de-832e-7cba5f958a77.html","host":"tucson.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Pima · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"lpi-group-project-midway-casa-grande-az","state":"AZ","kind":"facility","name":"Project Midway Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Casa Grande","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Postponement is not approval. The 500 MW modeled primary and 400 MW backup generation are not additive IT; 298 MVA cannot be converted to MW without power factor. Proposed stipulations are not adopted conditions. Average 14,500 and maximum 35,200 gallons per day are alternatives, not additive use; an older 11,507 figure was superseded. Modeled noise is not operating measurement. Future water line, fire support and generation arrangements are not executed commitments. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/data-center-hearing-project-midway-rezoning-set-for-july-16/","host":"pinalpost.com","date":"2026-07-15","published":"2026-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.84,"lng":-111.79,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Pinal Post's July 20 update says both Project Midway planning cases scheduled for July 16 were postponed. The underlying concept covers five planned buildings and about 400 MW demand, with power technology still undecided.","independently_verified_current_operating_status":null},"notes":["Postponement is not approval. The 500 MW modeled primary and 400 MW backup generation are not additive IT; 298 MVA cannot be converted to MW without power factor. Proposed stipulations are not adopted conditions. Average 14,500 and maximum 35,200 gallons per day are alternatives, not additive use; an older 11,507 figure was superseded. Modeled noise is not operating measurement. Future water line, fire support and generation arrangements are not executed commitments.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/data-center-hearing-project-midway-rezoning-set-for-july-16/","host":"pinalpost.com","date":"2026-07-15","published":"2026-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Casa Grande · Pinal · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"tract-project-range-buckeye-goodyear-az","state":"AZ","kind":"facility","name":"Project Range","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Buckeye","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. County consideration and staff coordination are not approval; no hearing had been scheduled.15-plus-yearbuildout and 2025 site improvements were forecasts, not observed start. Revised 60 footheight/500 footsetbacks differ from initial 110/100 figures, not simultaneous options certified as final conditions. About 100 acrespublic use is within proposed project scope, not automatically another 100 acres. City opposition is not county denial. No MW, executed utility service, current status or tenant independently verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbex.com/planning-development/massive-data-center-master-plan-proposed-in-west-valley/","host":"azbex.com","date":"2024-03-22","published":"2024-03-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.435,"lng":-112.512,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"AZBEX reports Tract’s 2024 Project Range master-plan proposal on a Maricopa County island between Buckeye and Goodyear: two campuses,28 buildings and about 5.6 million squarefeet across 1000 acres.","independently_verified_current_operating_status":null},"notes":["County consideration and staff coordination are not approval; no hearing had been scheduled.15-plus-yearbuildout and 2025 site improvements were forecasts, not observed start. Revised 60 footheight/500 footsetbacks differ from initial 110/100 figures, not simultaneous options certified as final conditions. About 100 acrespublic use is within proposed project scope, not automatically another 100 acres. City opposition is not county denial. No MW, executed utility service, current status or tenant independently verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbex.com/planning-development/massive-data-center-master-plan-proposed-in-west-valley/","host":"azbex.com","date":"2024-03-22","published":"2024-03-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Buckeye · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"qts-phoenix-2-az","state":"AZ","kind":"facility","name":"QTS Phoenix 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Phoenix","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Multi-building campus total. Same postal address is listed for multiple buildings; no multiplication of 210 MW or automatic address-based collapsing. No commissioned-load inference. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/phoenix-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4644344,"lng":-111.994808,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":80,"advertised_critical_campus_mw_lower_bound":210,"published_multi_building_address":"1200 N 40th St, Phoenix, AZ 85008"},"notes":["Multi-building campus total. Same postal address is listed for multiple buildings; no multiplication of 210 MW or automatic address-based collapsing. No commissioned-load inference.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/phoenix-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Phoenix · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"qts-phoenix-4-tolleson-az","state":"AZ","kind":"facility","name":"QTS Phoenix 4","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Tolleson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Generic anticipated jobs and water-free design goals are not measured outcomes or an operating-status confirmation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/phoenix-4/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.420593,"lng":-112.311771,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"11753 W Lower Buckeye Rd, Tolleson, AZ 85353","operator_stage":"establishing new campus"},"notes":["Generic anticipated jobs and water-free design goals are not measured outcomes or an operating-status confirmation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/phoenix-4/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Tolleson · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"ryan-companies-southwest-crossing-data-park-eloy-az","state":"AZ","kind":"facility","name":"Southwest Crossing Data Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Eloy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Commission recommendation is not council adoption or construction. Three buildings exceeding 855,000 square feet differ from the economic study ceiling of 1.25 million square feet; do not merge both as final built area. 400 MW has no stated critical-IT basis. $687.5 million construction cost, more than $5.6 million annual direct tax and 4,800 direct construction jobs are consultant forecasts, not spending, collections or permanent jobs. Proposed 219,600 gallons/day average cap has a city-engineer exception and is not measured consumption or a claim of zero water use. End user is explicitly unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/","host":"azbex.com","date":"2025-01-21","published":"2025-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.7783292,"lng":-111.6023,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"AZBEX reports Ryan Companies pivoted the Eloy industrial proposal to Southwest Crossing Data Park, with planning commission recommending the rezoning on January 15.","independently_verified_current_operating_status":null,"reported_water_design_average_gallons_per_day":219600,"water_figure_scope":"Proposed application limit with city-engineer exception; not measured consumption","executed_utility_agreement_verified":false},"notes":["Commission recommendation is not council adoption or construction. Three buildings exceeding 855,000 square feet differ from the economic study ceiling of 1.25 million square feet; do not merge both as final built area. 400 MW has no stated critical-IT basis. $687.5 million construction cost, more than $5.6 million annual direct tax and 4,800 direct construction jobs are consultant forecasts, not spending, collections or permanent jobs. Proposed 219,600 gallons/day average cap has a city-engineer exception and is not measured consumption or a claim of zero water use. End user is explicitly unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/","host":"azbex.com","date":"2025-01-21","published":"2025-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Eloy · Pinal · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"stack-phx01-avondale-az","state":"AZ","kind":"facility","name":"STACK Infrastructure PHX01 Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Avondale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Regional headline 500 MW differs from campus descriptions 225 plus 250 MW. Do not silently reconcile or allocate extra 25 MW. No operating milestone established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/phoenix/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.418842,"lng":-112.357688,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"phx01_avondale_advertised_critical_capacity_mw":225,"regional_advertised_power_mw":500,"regional_campuses":2,"regional_acres":155},"notes":["Regional headline 500 MW differs from campus descriptions 225 plus 250 MW. Do not silently reconcile or allocate extra 25 MW. No operating milestone established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/phoenix/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Avondale · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"stack-phx02-phoenix-az","state":"AZ","kind":"facility","name":"STACK Infrastructure PHX02 Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Phoenix","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Designed capacity with dedicated substation, not proof of all buildings operating. Page also uses Skyway location label; exact street and county not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/phoenix/phx02/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.456212,"lng":-111.995301,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"planned_critical_capacity_mw":250,"planned_buildings":5,"campus_acres":51,"published_market_location":"Central Phoenix"},"notes":["Designed capacity with dedicated substation, not proof of all buildings operating. Page also uses Skyway location label; exact street and county not established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/phoenix/phx02/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Phoenix · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"vantage-phoenix-campus-goodyear-az-az","state":"AZ","kind":"facility","name":"Vantage Phoenix Campus (Goodyear, AZ)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Goodyear","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Vantage Goodyear full-campus IT and address scope. Fullfive-building future campus, not176MWcurrentlyenergized.69kVvoltage not ITMWor certified substation surplus. Near-zeroWUEdesign not measured zero domestic water. Operator green-building claims not independently audited. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/phoenix-arizona/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4463027,"lng":-112.3738867,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Vantage Goodyear full-campus IT and address scope","fields":{"campus_code":"AZ1","published_address":"45 S Bullard Avenue, Goodyear, AZ85338","planned_campus_acres":50,"planned_data_center_buildings":5,"fullbuild_critical_it_mw":176,"fullbuild_area_sqft_min_exclusive":1000000},"notes":["Fullfive-building future campus, not176MWcurrentlyenergized.69kVvoltage not ITMWor certified substation surplus. Near-zeroWUEdesign not measured zero domestic water. Operator green-building claims not independently audited.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/phoenix-arizona/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Goodyear · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"wintersburg-313-tonopah-az","state":"AZ","kind":"facility","name":"Wintersburg 313","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Maricopa"],"city":"Tonopah","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wintersburg named county agenda with prior planning recommendation. Agenda is not final Board disposition or an operating permit. Minimum20acres reserved for commercial development is not the data-center footprint. Height standards are not power MW. No reliable current project IT capacity, expenditure or opening from these agenda pages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10316?fileID=100604","host":"maricopa.gov","date":"2026-06-10","published":"2026-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.472,"lng":-112.911,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wintersburg named county agenda with prior planning recommendation","fields":{"project":"Wintersburg313","county_cases":["CPA250011","Z250034"],"owners":["313 Wintersburg LLC","Wintersburg Four LLC"],"published_location":"northwest corner of Encanto Boulevard and Wintersburg Road, Tonopah area, Maricopa County, Arizona","planning_commission_recommendation_date":"2026-05-07","planning_commission_recommendation_vote":{"for":7,"against":0},"board_hearing_agenda_date":"2026-06-10"},"notes":["Agenda is not final Board disposition or an operating permit. Minimum20acres reserved for commercial development is not the data-center footprint. Height standards are not power MW. No reliable current project IT capacity, expenditure or opening from these agenda pages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10316?fileID=100604","host":"maricopa.gov","date":"2026-06-10","published":"2026-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arizona · Tonopah · Maricopa · Source context reviewed","state_name":"Arizona","state_path":"/arizona/"},{"id":"artemis-technologies-cave-city-ar","state":"AR","kind":"facility","name":"Artemis Technologies Cave City Bitcoin Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Sharp"],"city":"Cave City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Keep capacity null. Proposed mitigation and developer water/noise claims are not measured results. Arkansas Artemis Technologies is not automatically Kentucky Artemis Power Tech. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.whiterivernow.com/2025/04/30/there-goes-the-neighborhood-data-center-draws-fire-from-cave-city-residents/","host":"whiterivernow.com","date":"2025-04-30","published":"2025-04-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.94806,"lng":-91.55083,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"White River Now reports earthwork for Artemis Technologies Cave City project and community objections; developer and utility declined to disclose MW.","independently_verified_current_operating_status":null},"notes":["Keep capacity null. Proposed mitigation and developer water/noise claims are not measured results. Arkansas Artemis Technologies is not automatically Kentucky Artemis Power Tech.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.whiterivernow.com/2025/04/30/there-goes-the-neighborhood-data-center-draws-fire-from-cave-city-residents/","host":"whiterivernow.com","date":"2025-04-30","published":"2025-04-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Cave City · Sharp · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"avaio-digital-leo-little-rock-ar","state":"AR","kind":"facility","name":"AVAIO Digital Leo Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pulaski"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AVAIO Leo development and planned energy components. 1070=570grid+500BTM, not all IT or power delivered. ExecutedESA/sourceplannedenergizationnotobservedservice. State/localofficialquotesnotspendingrecordsorindependentpermitinspection. Noactualincentiveawardordisbursementverified. Referencepointnotindependentlyparcelcentroid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.avaiodigital.com/developments/little-rock-arkansas","host":"avaiodigital.com","date":"2026-01-12","published":"2026-01-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.68,"lng":-92.296,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"AVAIO Leo development and planned energy components","fields":{"project":"Leo","location":"145th Street, Little Rock, Pulaski County, Arkansas","operator_reference_point":{"lat":34.623375,"lon":-92.246825},"campus_acres":296,"planned_total_baseload_power_mw":1070,"planned_grid_power_mw":570,"planned_behind_meter_baseload_mw":500,"initial_grid_service_target":"2027-Q4","developer_reported_status":"ground broken; site plan approved; ESA executed with Entergy Arkansas","investment_quoted_usd":6000000000,"jobs_quoted_min_exclusive":500},"notes":["1070=570grid+500BTM, not all IT or power delivered. ExecutedESA/sourceplannedenergizationnotobservedservice. State/localofficialquotesnotspendingrecordsorindependentpermitinspection. Noactualincentiveawardordisbursementverified. Referencepointnotindependentlyparcelcentroid.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.avaiodigital.com/developments/little-rock-arkansas","host":"avaiodigital.com","date":"2026-01-12","published":"2026-01-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Pulaski · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"bentaus-chadbourn-miller-county-ar","state":"AR","kind":"facility","name":"Bentaus Texarkana AI Data Center (Chadbourne Ranch site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miller"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Subscriber body not accessed. Caption land ownership/200 MW announcement is reported, not a parcel survey, current IT capacity or approval. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.texarkanagazette.com/news/2026/aug/15/public-records-reveal-site-of-planned-ai-data/","host":"texarkanagazette.com","date":"2026-08-15","published":"2026-08-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4817907,"lng":-93.9640754,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Readable Texarkana Gazette preview/caption identifies Bentaus/Chadbourn planned site north of Texarkana in Miller County.","independently_verified_current_operating_status":null},"notes":["Subscriber body not accessed. Caption land ownership/200 MW announcement is reported, not a parcel survey, current IT capacity or approval.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.texarkanagazette.com/news/2026/aug/15/public-records-reveal-site-of-planned-ai-data/","host":"texarkanagazette.com","date":"2026-08-15","published":"2026-08-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Miller · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"blockops-helena-west-helena-ar","state":"AR","kind":"facility","name":"BlockOps Helena-West Helena Bitcoin Mine (Dragon Woodland sawmill site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Phillips"],"city":"Helena-West Helena","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. BlockOps site-specific historical investment versus portfolio stages. Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/","host":"blockopsmining.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.5484515,"lng":-90.6556409,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"BlockOps site-specific historical investment versus portfolio stages","fields":{"operator":"BlockOps","page_updated_date":"2026-10-08","helena_site_acres":168,"helena_former_use":"Dragon Woodland Sawmill Corporation","historical_land_purchase_usd_approx":300000,"helena_renovation_commitment_usd":2000000,"helena_total_planned_investment_usd":13500000,"helena_projected_annual_sales_tax_usd":105000,"helena_planned_miner_count":2900,"other_operator_described_sites":{"Russellville":"operates","Moreland":"operates","Marion":"further development planned"}},"notes":["Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/","host":"blockopsmining.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Helena-West Helena · Phillips · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"blockops-marion-ar","state":"AR","kind":"facility","name":"BlockOps Marion Bitcoin Mine (planned)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Crittenden"],"city":"Marion","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. BlockOps site-specific historical investment versus portfolio stages. Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/","host":"blockopsmining.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.2129831,"lng":-90.19498,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"BlockOps site-specific historical investment versus portfolio stages","fields":{"operator":"BlockOps","page_updated_date":"2026-10-08","helena_site_acres":168,"helena_former_use":"Dragon Woodland Sawmill Corporation","historical_land_purchase_usd_approx":300000,"helena_renovation_commitment_usd":2000000,"helena_total_planned_investment_usd":13500000,"helena_projected_annual_sales_tax_usd":105000,"helena_planned_miner_count":2900,"other_operator_described_sites":{"Russellville":"operates","Moreland":"operates","Marion":"further development planned"}},"notes":["Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/","host":"blockopsmining.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Marion · Crittenden · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"blockops-moreland-ar","state":"AR","kind":"facility","name":"BlockOps Moreland Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Pope"],"city":"Moreland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. BlockOps site-specific historical investment versus portfolio stages. Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/","host":"blockopsmining.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.3639428,"lng":-93.0013492,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"BlockOps site-specific historical investment versus portfolio stages","fields":{"operator":"BlockOps","page_updated_date":"2026-10-08","helena_site_acres":168,"helena_former_use":"Dragon Woodland Sawmill Corporation","historical_land_purchase_usd_approx":300000,"helena_renovation_commitment_usd":2000000,"helena_total_planned_investment_usd":13500000,"helena_projected_annual_sales_tax_usd":105000,"helena_planned_miner_count":2900,"other_operator_described_sites":{"Russellville":"operates","Moreland":"operates","Marion":"further development planned"}},"notes":["Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/","host":"blockopsmining.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Moreland · Pope · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"blockops-russellville-ar","state":"AR","kind":"facility","name":"BlockOps Russellville Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Pope"],"city":"Russellville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. BlockOps site-specific historical investment versus portfolio stages. Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/","host":"blockopsmining.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.2784173,"lng":-93.1337856,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"BlockOps site-specific historical investment versus portfolio stages","fields":{"operator":"BlockOps","page_updated_date":"2026-10-08","helena_site_acres":168,"helena_former_use":"Dragon Woodland Sawmill Corporation","historical_land_purchase_usd_approx":300000,"helena_renovation_commitment_usd":2000000,"helena_total_planned_investment_usd":13500000,"helena_projected_annual_sales_tax_usd":105000,"helena_planned_miner_count":2900,"other_operator_described_sites":{"Russellville":"operates","Moreland":"operates","Marion":"further development planned"}},"notes":["Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/","host":"blockopsmining.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Russellville · Pope · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"forgelight-ventures-conway-ar","state":"AR","kind":"facility","name":"ForgeLight Ventures Conway Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Faulkner"],"city":"Conway","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Conway community information site, incorrectly queued as primary. Source explicitly says community group Conway First, not city, developer or chamber. Prior queue primary_candidate label incorrect. Linked records not themselves reviewed here. No1Bproject scope, approvals, parcel or end-user adopted from secondary summary. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://conwaydatacenter.com/","host":"conwaydatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0196304,"lng":-92.5572891,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Conway community information site, incorrectly queued as primary","fields":{},"notes":["Source explicitly says community group Conway First, not city, developer or chamber. Prior queue primary_candidate label incorrect. Linked records not themselves reviewed here. No1Bproject scope, approvals, parcel or end-user adopted from secondary summary.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://conwaydatacenter.com/","host":"conwaydatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Conway · Faulkner · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"gmi-computing-mountain-pine-ar","state":"AR","kind":"facility","name":"GMI Computing Mountain Pine Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Garland"],"city":"Mountain Pine","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Historical reporting only: not independent October2026 operation or original ordinance. Resident accounts disagree about severity; four-to-five-mile audibility is an attributed complaint, not calibrated noise measurement. No measured dBA, IT MW, energy, incentive, investment or verified deadline compliance. Do not treat crypto mining as ordinary colocation or apply the 2023 deadline as future. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kait8.com/2023/10/10/its-freaking-loud-neighbors-fed-up-with-crypto-mine-noise/","host":"kait8.com","date":"2023-10-10","published":"2023-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.5720347,"lng":-93.1732401,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"KAIT, relaying KATV local reporting, describes GMI Computing at Mountain Pine as operating for a few months and reports city hall issued a noise ordinance and required sound barriers by the end of 2023.","independently_verified_current_operating_status":null},"notes":["Historical reporting only: not independent October2026 operation or original ordinance. Resident accounts disagree about severity; four-to-five-mile audibility is an attributed complaint, not calibrated noise measurement. No measured dBA, IT MW, energy, incentive, investment or verified deadline compliance. Do not treat crypto mining as ordinary colocation or apply the 2023 deadline as future.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kait8.com/2023/10/10/its-freaking-loud-neighbors-fed-up-with-crypto-mine-noise/","host":"kait8.com","date":"2023-10-10","published":"2023-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Mountain Pine · Garland · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"google-west-memphis-ar","state":"AR","kind":"facility","name":"Google West Memphis Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Crittenden"],"city":"West Memphis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Subscriber article body was not read. The contract-review headline does not establish Entergy contract terms, executed contributions or all permit approvals. Public caption only. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.arkansasonline.com/news/2026/sep/03/googles-contribution-was-at-issue-in-arkansas/","host":"arkansasonline.com","date":"2026-09-03","published":"2026-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.156,"lng":-90.175,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Arkansas Democrat-Gazette's publicly visible caption documents June 1 construction of Google's planned four-billion-USD, 1,100-acre West Memphis campus.","independently_verified_current_operating_status":null},"notes":["Subscriber article body was not read. The contract-review headline does not establish Entergy contract terms, executed contributions or all permit approvals. Public caption only.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.arkansasonline.com/news/2026/sep/03/googles-contribution-was-at-issue-in-arkansas/","host":"arkansasonline.com","date":"2026-09-03","published":"2026-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · West Memphis · Crittenden · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"green-digital-harrison-ar","state":"AR","kind":"facility","name":"Green Digital Harrison Mine (proposed, withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Boone"],"city":"Harrison","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. KY3 LaurenSchwentker publishedNovember28,2023 reports Harrisoncouncilremoved cryptominingmoratorium atTuesdayspecialmeeting, withGreenDigitalproposalstilluncertain. URLNovember29 isnotnecessarilyeventdate. Doesnotestablish2026law/currentmoraoroperatingfacility. Reportattributeslegalconcernsand vaguefederallevelwording toofficials; no federalcourtorder orcurrentright-to-mineanalysis adopted. Reportedlandpurchase notindependenttitlecheck. Residentconcerns notmeasuredwater/noiseharm. NoMW/capex/currentconstructionestablished. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ky3.com/2023/11/29/harrison-ark-city-council-votes-remove-moratorium-crypto-mining-center-during-special-meeting/","host":"ky3.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.2298,"lng":-93.1077,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["KY3 LaurenSchwentker publishedNovember28,2023 reports Harrisoncouncilremoved cryptominingmoratorium atTuesdayspecialmeeting, withGreenDigitalproposalstilluncertain. URLNovember29 isnotnecessarilyeventdate. Doesnotestablish2026law/currentmoraoroperatingfacility.","Reportattributeslegalconcernsand vaguefederallevelwording toofficials; no federalcourtorder orcurrentright-to-mineanalysis adopted. Reportedlandpurchase notindependenttitlecheck. Residentconcerns notmeasuredwater/noiseharm. NoMW/capex/currentconstructionestablished.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://www.ky3.com/2023/11/29/harrison-ark-city-council-votes-remove-moratorium-crypto-mining-center-during-special-meeting/","host":"ky3.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Harrison · Boone · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"immersionbtc-walnut-ridge-ar","state":"AR","kind":"facility","name":"ImmersionBTC Walnut Ridge Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Lawrence"],"city":"Walnut Ridge","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The article does not name ImmersionBTC, so the operator and first-versus-second-site crosswalk remain open. The promised 55 dB ceiling is not measured operational noise. A hoped-for completion within months in 2023 does not establish present commissioning. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kait8.com/2023/11/06/town-welcome-second-crypto-mining-facility/","host":"kait8.com","date":"2023-11-06","published":"2023-11-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.0684,"lng":-90.9526,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KAIT reports an existing Walnut Ridge cryptocurrency facility on Custom Road and a second facility under construction on Midway Road.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The article does not name ImmersionBTC, so the operator and first-versus-second-site crosswalk remain open. The promised 55 dB ceiling is not measured operational noise. A hoped-for completion within months in 2023 does not establish present commissioning.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kait8.com/2023/11/06/town-welcome-second-crypto-mining-facility/","host":"kait8.com","date":"2023-11-06","published":"2023-11-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Walnut Ridge · Lawrence · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"interstate-holdings-blockchain-cabot-ar","state":"AR","kind":"facility","name":"Interstate Holdings Blockchain Cabot Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Lonoke"],"city":"Cabot","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Security concerns are officials opinions; article describes American ownership and does not establish espionage. Historical construction halt is not permanent cancellation or current status. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://katv.com/news/local/arkansas-officials-halt-cryptomine-near-lr-airbase-due-to-national-security-concerns-state-senator-ricky-hill-lonoke-county-judge-doug-erwin-cabot-mayor-ken-kincade-interstate-holdings-arkansas-blockchain-council-benjamin-smith-steven-landers-jr-lrafb","host":"katv.com","date":"2024-12-03","published":"2024-12-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.9748,"lng":-92.0179,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"construction-order-reported","reported_finding":"KATV reports Lonoke County cease-and-desist for Interstate Holdings after land clearing without required permits near Cabot.","report_display_date":"2024-12-03","independently_verified_current_status":null},"notes":["Security concerns are officials opinions; article describes American ownership and does not establish espionage. Historical construction halt is not permanent cancellation or current status.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://katv.com/news/local/arkansas-officials-halt-cryptomine-near-lr-airbase-due-to-national-security-concerns-state-senator-ricky-hill-lonoke-county-judge-doug-erwin-cabot-mayor-ken-kincade-interstate-holdings-arkansas-blockchain-council-benjamin-smith-steven-landers-jr-lrafb","host":"katv.com","date":"2024-12-03","published":"2024-12-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Cabot · Lonoke · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"interstate-holdings-blockchain-vilonia-ar","state":"AR","kind":"facility","name":"Interstate Holdings Blockchain Vilonia Mine (proposed, denied)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Faulkner"],"city":"Vilonia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Separate Cabot site and Faulkner County rules are contextual, not the same permit. No later appeal or renewed application outcome established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://arktimes.com/arkansas-blog/2025/05/21/vilonia-rejects-crypto-mine-proposed-by-steve-landers-jr","host":"arktimes.com","date":"2025-05-21","published":"2025-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.1073,"lng":-92.2071,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"permit-denial-reported","reported_finding":"Arkansas Times reports Vilonia council denied Interstate Holdings mining permit after planning recommendation against it.","report_display_date":"2025-05-21","independently_verified_current_status":null},"notes":["Separate Cabot site and Faulkner County rules are contextual, not the same permit. No later appeal or renewed application outcome established.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://arktimes.com/arkansas-blog/2025/05/21/vilonia-rejects-crypto-mine-proposed-by-steve-landers-jr","host":"arktimes.com","date":"2025-05-21","published":"2025-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Vilonia · Faulkner · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"jones-eagle-dewitt-ar","state":"AR","kind":"facility","name":"Jones Eagle Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Arkansas"],"city":"DeWitt","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. GriffinCoop ArkansasTimes December10,2024 originallegalreport: JudgeKristineBaker preliminaryinjunctionDecember9 protectsJonesEaglefromenforcementoftwostatutes. Case-specificinterimrelief, notfinalmeritsjudgment/statutesrepealed/statewidealloperatorsimmunity or2026orderstatus. November27TRO distinctfromlaterinjunction; ordersealedthen/publicredactedcopyplannedandunread. No casenumber/currentappeal/noise/airpermitoutcomeadopted. Ownershipallegationsnotprovenforeigncontrol; no unnecessarypersonalownerdataretained. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://arktimes.com/arkansas-blog/2024/12/10/state-cant-enforce-foreign-ownership-laws-against-arkansas-county-crypto-mine-judge-says","host":"arktimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.2875,"lng":-91.3383,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["GriffinCoop ArkansasTimes December10,2024 originallegalreport: JudgeKristineBaker preliminaryinjunctionDecember9 protectsJonesEaglefromenforcementoftwostatutes. Case-specificinterimrelief, notfinalmeritsjudgment/statutesrepealed/statewidealloperatorsimmunity or2026orderstatus.","November27TRO distinctfromlaterinjunction; ordersealedthen/publicredactedcopyplannedandunread. No casenumber/currentappeal/noise/airpermitoutcomeadopted. Ownershipallegationsnotprovenforeigncontrol; no unnecessarypersonalownerdataretained.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://arktimes.com/arkansas-blog/2024/12/10/state-cant-enforce-foreign-ownership-laws-against-arkansas-county-crypto-mine-judge-says","host":"arktimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · DeWitt · Arkansas · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"mainstream-technologies-little-rock-data-center-ar","state":"AR","kind":"facility","name":"Mainstream Technologies Little Rock Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pulaski"],"city":"Little Rock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City/street not independently confirmed by selected generic page. Operator confirms its colocation/managed services, but selected source does not name a physical Little Rock address. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mainstream-tech.com/data-center-services/","host":"mainstream-tech.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.7445,"lng":-92.274234,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"marketed_service":"colocation and managed colocation"},"notes":["City/street not independently confirmed by selected generic page.","Operator confirms its colocation/managed services, but selected source does not name a physical Little Rock address.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mainstream-tech.com/data-center-services/","host":"mainstream-tech.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Little Rock · Pulaski · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"moreland-holding-moreland-ar","state":"AR","kind":"facility","name":"Moreland Holding Cryptomine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Pope"],"city":"Moreland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge Moreland Holding with Block Ops' site across from the church or its existing Russellville operation. Local ownership allegations are not verified beneficial-ownership records. Calls to repeal Act 851 are not repeal; operator assurances are not measured noise or executed mitigation. No current MW, opening or later legal status established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://katv.com/news/local/two-cryptomines-unsettle-quiet-moreland-community-locals-appeal-for-act-851-repeal-first-baptist-church-rick-smith-green-digital-jones-digital-llc-new-rays-cryptomining-bitcoin-arkansas-pope-county-russellville-block-ops-connie-hollis-chinese-company","host":"katv.com","date":"2024-03-10","published":"2024-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.3675821,"lng":-92.9985046,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KATV reports two separate Moreland cryptocurrency proposals, Moreland Holding and Block Ops, and community calls to change state law.","independently_verified_current_operating_status":null},"notes":["Do not merge Moreland Holding with Block Ops' site across from the church or its existing Russellville operation. Local ownership allegations are not verified beneficial-ownership records. Calls to repeal Act 851 are not repeal; operator assurances are not measured noise or executed mitigation. No current MW, opening or later legal status established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://katv.com/news/local/two-cryptomines-unsettle-quiet-moreland-community-locals-appeal-for-act-851-repeal-first-baptist-church-rick-smith-green-digital-jones-digital-llc-new-rays-cryptomining-bitcoin-arkansas-pope-county-russellville-block-ops-connie-hollis-chinese-company","host":"katv.com","date":"2024-03-10","published":"2024-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Moreland · Pope · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"newrays-one-bono-ar","state":"AR","kind":"facility","name":"NewRays One Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Faulkner"],"city":"Bono","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. JosieLenora KUAR June29,2023 originalresident/officialreport identifies NewRays mine inBono COMMUNITYofGreenbrier/FaulknerCounty, notseparateBonoCITY/Jonesboro. Article describes mineoperating/noise atthatdate;2026operation/laterfederalcaseunverified. 60-70dBresidentreport measurementprotocolunread, not certifiedsiteboundaryreading/healthcausation. Vilonia60dBordinance/GreenDigitalproposedmine/fivejobforecast areSEPARATEproject, notNewRaysconditions. Act8512023reportnotcurrentArkansaslawcertification; globalenergycomparisonnotadoptedsiteusage. Audio notplayed. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ualrpublicradio.org/local-regional-news/2023-06-29/rural-arkansas-crypto-mines-prompt-noise-complaints-from-residents","host":"ualrpublicradio.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.256,"lng":-92.476,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["JosieLenora KUAR June29,2023 originalresident/officialreport identifies NewRays mine inBono COMMUNITYofGreenbrier/FaulknerCounty, notseparateBonoCITY/Jonesboro. Article describes mineoperating/noise atthatdate;2026operation/laterfederalcaseunverified.","60-70dBresidentreport measurementprotocolunread, not certifiedsiteboundaryreading/healthcausation. Vilonia60dBordinance/GreenDigitalproposedmine/fivejobforecast areSEPARATEproject, notNewRaysconditions. Act8512023reportnotcurrentArkansaslawcertification; globalenergycomparisonnotadoptedsiteusage. Audio notplayed.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.ualrpublicradio.org/local-regional-news/2023-06-29/rural-arkansas-crypto-mines-prompt-noise-complaints-from-residents","host":"ualrpublicradio.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Bono · Faulkner · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"ozarksgo-fayetteville-data-center-ar","state":"AR","kind":"facility","name":"OzarksGo Fayetteville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Fayetteville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. OzarksGo colocation service without exact site proof. NoFayettevillestreet/parcel,numericITMW,areaororiginalopeninginreviewedbody. Dallas/KansasCitynetworkhubconnectionsnotfacilitylocations. OnlyArkansasDNSrootserverclaimnotindependentDNSinfrastructurecensus. No forms ornetworktestsused. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ozarksgo.net/colocation","host":"ozarksgo.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.077952,"lng":-94.212464,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"OzarksGo colocation service without exact site proof","fields":{"operator":"OzarksGo","operator_parent":"Ozarks Electric Cooperative","advertised_service":"carrier-neutral colocation with redundant utility/UPS/generator supply"},"notes":["NoFayettevillestreet/parcel,numericITMW,areaororiginalopeninginreviewedbody. Dallas/KansasCitynetworkhubconnectionsnotfacilitylocations. OnlyArkansasDNSrootserverclaimnotindependentDNSinfrastructurecensus. No forms ornetworktestsused.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ozarksgo.net/colocation","host":"ozarksgo.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Fayetteville · Washington · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"google-port-of-little-rock-data-center-ar","state":"AR","kind":"facility","name":"Port of Little Rock Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pulaski"],"city":"Little Rock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Lucas Dufalla, ArkansasDemocratGazette March31,2026 original Corps-application report: Willowbend/ProjectBoar PortLittleRock five industrial buildings1.43Msf plus offices/substation. Google identity reported from prior newspaper work, not company acknowledgment in this article.380-acre sale MOU/rezoning not independently inspected closing/permits.16.8acre wetland fill/mitigation proposed, not authorized discharge or observed compliance. April24commentdeadline is past publication context, no outcome inferred.1B proposed investment/50jobs forecast;300k annual+200k per additional data center/2% five-year escalation/min65%30year abatement are reported agreement terms, not paid receipts. Five industrial buildings do not automatically mean five separately billed data centers. Utility2600MWnew/1600MWrepower are system generation, not campus IT; site power/water demands and construction timeline undisclosed. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.arkansasonline.com/news/2026/mar/31/googles-1b-port-of-little-rock-data-center/","host":"arkansasonline.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.746,"lng":-92.29,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Lucas Dufalla, ArkansasDemocratGazette March31,2026 original Corps-application report: Willowbend/ProjectBoar PortLittleRock five industrial buildings1.43Msf plus offices/substation. Google identity reported from prior newspaper work, not company acknowledgment in this article.380-acre sale MOU/rezoning not independently inspected closing/permits.16.8acre wetland fill/mitigation proposed, not authorized discharge or observed compliance. April24commentdeadline is past publication context, no outcome inferred.1B proposed investment/50jobs forecast;300k annual+200k per additional data center/2% five-year escalation/min65%30year abatement are reported agreement terms, not paid receipts. Five industrial buildings do not automatically mean five separately billed data centers. Utility2600MWnew/1600MWrepower are system generation, not campus IT; site power/water demands and construction timeline undisclosed.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.arkansasonline.com/news/2026/mar/31/googles-1b-port-of-little-rock-data-center/","host":"arkansasonline.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Little Rock · Pulaski · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"dc-devco-project-pulse-gum-springs-ar","state":"AR","kind":"facility","name":"Project Pulse Data Center Campus, Southwest Arkansas Mega Site (terminated)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Gum Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. Arkadelphian April16,2026 report with April22 transcript update records EDCCC authorization of a991acre SouthwestArkansasMegaSite purchase agreement in GumSprings with DCDevco.11.4Mland deal,1Bminimum/150jobs/2032target were prospective, not closed purchase or completed spend/jobs. Counterparty/enduser unnamed. Representatives claimed50000gpdclosed-loop use and600000gpdavailability plus no residential-rate impact; these are projections/assertions, not a signed water/power contract or measured rate outcome. Main article and opening transcript portion read, not all82kcharacters/audio. Later April30termination report controls the agreement outcome; no hypothetical multiGW figure adopted from unread transcript passages. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification. Arkadelphian April30,2026 report quotes EDCCC/Alliance CEO saying buyer did not deposit required200000USD earnest money in time, so agreement terminated under its terms. Public metadata publishes April30; October header is current-site chrome, not event date. This supports reported purchase-agreement termination, not a verified recorded deed or a ruling forbidding every future data center on the land. May1acknowledgment meeting was scheduled in this story; outcome not read. Existing inherited cancelled status is corroborated context, not a newly discovered reversal.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://arkadelphian.com/2026/04/16/data-center-eyes-clark-county-set-to-buy-mega-site-in-11m-deal/","host":"arkadelphian.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://arkadelphian.com/2026/04/30/project-pulse-topic-of-special-edccc-meeting-friday-morning/","host":"arkadelphian.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0642476,"lng":-93.0957833,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-operator-transaction-and-local-outcomes-round61-2026-10-15.json","scope":"Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.","fields":{},"notes":["Arkadelphian April16,2026 report with April22 transcript update records EDCCC authorization of a991acre SouthwestArkansasMegaSite purchase agreement in GumSprings with DCDevco.11.4Mland deal,1Bminimum/150jobs/2032target were prospective, not closed purchase or completed spend/jobs. Counterparty/enduser unnamed.","Representatives claimed50000gpdclosed-loop use and600000gpdavailability plus no residential-rate impact; these are projections/assertions, not a signed water/power contract or measured rate outcome. Main article and opening transcript portion read, not all82kcharacters/audio. Later April30termination report controls the agreement outcome; no hypothetical multiGW figure adopted from unread transcript passages.","Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."],"sources":[{"url":"https://arkadelphian.com/2026/04/16/data-center-eyes-clark-county-set-to-buy-mega-site-in-11m-deal/","host":"arkadelphian.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"original-operator-transaction-and-local-outcomes-round61-2026-10-15.json","scope":"Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.","fields":{},"notes":["Arkadelphian April30,2026 report quotes EDCCC/Alliance CEO saying buyer did not deposit required200000USD earnest money in time, so agreement terminated under its terms. Public metadata publishes April30; October header is current-site chrome, not event date. This supports reported purchase-agreement termination, not a verified recorded deed or a ruling forbidding every future data center on the land. May1acknowledgment meeting was scheduled in this story; outcome not read. Existing inherited cancelled status is corroborated context, not a newly discovered reversal.","Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."],"sources":[{"url":"https://arkadelphian.com/2026/04/30/project-pulse-topic-of-special-edccc-meeting-friday-morning/","host":"arkadelphian.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Gum Springs · Clark · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"ritter-communications-data-technology-center-jonesboro-ar","state":"AR","kind":"facility","name":"Ritter Communications Data Technology Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Craighead"],"city":"Jonesboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Ritter Jonesboro historical opening and site power. 82racksand4cagesx4mayoverlap;donotsum98withoutlayoutproof. Historical2020opening/currentthenstatusnotindependent2026inspection.8Mcompanyreportedprojectcostnotannualinvestment. NoexactstreetorindependentHIPAA/PCI/SOCreportinspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.rittercommunications.com/newsroom/data-technology-center-opens","host":"rittercommunications.com","date":"2020-11-30","published":"2020-11-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.81538,"lng":-90.6893576,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Ritter Jonesboro historical opening and site power","fields":{"operator":"Ritter Communications","project":"Data Technology Center","locality":"Jonesboro, Arkansas","opening_announced_on_or_before":"2020-11-30","historical_facility_investment_usd":8000000,"construction_start_period":"spring2019","published_power_capacity_mw":0.75,"power_basis":"power capacity, not explicit IT","rack_capacity":82,"cages":4,"racks_per_cage":4,"operator_historical_status":"open and fully operational"},"notes":["82racksand4cagesx4mayoverlap;donotsum98withoutlayoutproof. Historical2020opening/currentthenstatusnotindependent2026inspection.8Mcompanyreportedprojectcostnotannualinvestment. NoexactstreetorindependentHIPAA/PCI/SOCreportinspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.rittercommunications.com/newsroom/data-technology-center-opens","host":"rittercommunications.com","date":"2020-11-30","published":"2020-11-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Jonesboro · Craighead · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"serverfarm-clarksville-ar","state":"AR","kind":"facility","name":"Serverfarm ARK Clarksville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Clarksville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Serverfarm Clarksville proposed buildings and fiscal forecasts. Four108MWentriesarebuildingmarketingcapacity,notcurrentITloadorobservedenergization. RepeatedresponsiveHTMLtablesnot8buildings.558Mroundedtotalincludes548MPILOTandfees,notadditionalamount;548+3+2.1=553.1Mnot558M,remainder/scopeunresolved. Contracts/PILOTscheduleunread,notactualpublicreceipts.0Bcounteruninitializednotzero investment. CoolingcalledwaterlessbutFAQclosedloopreplacement;notzeroallsitewater.150to400jobsareINDIRECTregionalnotallsitepermanent. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.serverfarmllc.com/arkansas/","host":"serverfarmllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.4673307,"lng":-93.4405664,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Serverfarm Clarksville proposed buildings and fiscal forecasts","fields":{"operator":"Serverfarm","project_codes":["ARK1","ARK2","ARK3","ARK4"],"locality":"Clarksville, Arkansas","operator_stage":"coming soon, planned campus","advertised_each_building_capacity_mw":108,"power_basis":"building capacity, not explicitly critical IT","each_building_area_sqft":300000,"each_building_floors":2,"design_pue_target_max":1.3,"estimated_investment_usd":6600000000,"developer_projected_public_benefit_through_2060_usd_approx":558000000,"developer_projected_pilot_payments_usd":548000000,"developer_projected_upfront_agreement_fees_usd":3000000,"developer_projected_permit_fees_usd":2100000,"expected_first_two_buildings_complete_target":"2028-01"},"notes":["Four108MWentriesarebuildingmarketingcapacity,notcurrentITloadorobservedenergization. RepeatedresponsiveHTMLtablesnot8buildings.558Mroundedtotalincludes548MPILOTandfees,notadditionalamount;548+3+2.1=553.1Mnot558M,remainder/scopeunresolved. Contracts/PILOTscheduleunread,notactualpublicreceipts.0Bcounteruninitializednotzero investment. CoolingcalledwaterlessbutFAQclosedloopreplacement;notzeroallsitewater.150to400jobsareINDIRECTregionalnotallsitepermanent.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.serverfarmllc.com/arkansas/","host":"serverfarmllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Clarksville · Johnson · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"tierpoint-little-rock-ar","state":"AR","kind":"facility","name":"TierPoint Little Rock","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pulaski"],"city":"Little Rock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/arkansas/little-rock/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.7562396,"lng":-92.4447234,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":30000,"gross_area_is_lower_bound":true,"raised_floor_sqft":9000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2.25 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/arkansas/little-rock/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Little Rock · Pulaski · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"walmart-bentonville-data-center-ar","state":"AR","kind":"facility","name":"Walmart Bentonville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Benton"],"city":"Bentonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Arkansas listed Walmart facility address distinct from mailing office. Agency facility identity does not alone establish active IT operations, capacity or date. Environmental permit number/status needs underlying permit read. Lenexa licensing mailing address not server location. No critical IT MW or current emissions compliance inferred. Agency Active status is environmental facility inventory, not metered computing activity or certificate of IT capacity. Old interpolated point is not freshly surveyed entrance; do not silently treat NAD83 as independently surveyed WGS84. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://adeq.state.ar.us/home/pdssql/p_facil_details.aspx?AFINDash=04-01474&AFIN=0401474","host":"adeq.state.ar.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.364241,"lng":-94.182712,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Arkansas listed Walmart facility address distinct from mailing office","fields":{"agency":"Arkansas DEQ Permit Data System","afin":"04-01474","facility_as_listed":"WAL-MART DGTC/ISD9280","owner":"Walmart Inc.","site_address":"805 Moberly Lane, Bentonville, Arkansas72712","county":"Benton","alternate_agency_name":"East Data Center","agency_facility_status":"A Active","agency_reference_point":{"latitude":36.364241,"longitude":-94.182712,"datum":"NAD83","source":"ADEQ photo interpolation","measured_date":"2013-02-04"}},"notes":["Agency facility identity does not alone establish active IT operations, capacity or date. Environmental permit number/status needs underlying permit read. Lenexa licensing mailing address not server location. No critical IT MW or current emissions compliance inferred.","Agency Active status is environmental facility inventory, not metered computing activity or certificate of IT capacity. Old interpolated point is not freshly surveyed entrance; do not silently treat NAD83 as independently surveyed WGS84.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://adeq.state.ar.us/home/pdssql/p_facil_details.aspx?AFINDash=04-01474&AFIN=0401474","host":"adeq.state.ar.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Bentonville · Benton · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"wave-garden-macedonia-ar","state":"AR","kind":"facility","name":"Wave Garden Macedonia Cryptomine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Columbia"],"city":"Macedonia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Historical operation is not 2026 statuscertification. Reported county 65 dBlimit and resident 78 dBreading are different sources; unverified measurement does not establish adjudicated violation. Water request up-to 200,000 gallons in hot months has unclear stated period, with later monthly comparison; never publish as 200,000 gallonsPERDAY. Service contract was not completed/paid in report, not proof of current utility service.8.10 acre 243,000 dollartransfer and separate undivided two-acre interests must not be blindly summed into site area/capex. Nationality/ownership allegations and legal opinions are not independently examined corporate/court findings. No MWadopted. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.magnoliareporter.com/news_and_business/local_news/article_24255728-f722-11ee-a1c0-4773f2844f56.html","host":"magnoliareporter.com","date":"2024-04-10","published":"2024-04-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.1765201,"lng":-93.300169,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"MagnoliaReporter’s 2024 account describes operational cryptocurrency mining near CountyRoad 12 inMacedonia and neighborhood complaints, with WaveGarden/Bismarck land-interest reporting.","independently_verified_current_operating_status":null},"notes":["Historical operation is not 2026 statuscertification. Reported county 65 dBlimit and resident 78 dBreading are different sources; unverified measurement does not establish adjudicated violation. Water request up-to 200,000 gallons in hot months has unclear stated period, with later monthly comparison; never publish as 200,000 gallonsPERDAY. Service contract was not completed/paid in report, not proof of current utility service.8.10 acre 243,000 dollartransfer and separate undivided two-acre interests must not be blindly summed into site area/capex. Nationality/ownership allegations and legal opinions are not independently examined corporate/court findings. No MWadopted.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.magnoliareporter.com/news_and_business/local_news/article_24255728-f722-11ee-a1c0-4773f2844f56.html","host":"magnoliareporter.com","date":"2024-04-10","published":"2024-04-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Arkansas · Macedonia · Columbia · Source context reviewed","state_name":"Arkansas","state_path":"/arkansas/"},{"id":"amazon-sf011-corporate-avenue-hayward-ca","state":"CA","kind":"facility","name":"Amazon Data Center SF011 (26415 Corporate Avenue)","group":"operating","status":"Operating","raw_status":"operating","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Alameda"],"city":"Hayward","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not use35MW as measured consumption or IT capacity. City separately labels STACK76.6MW as backup generation, not IT load. City explicitly lists SF011 currently operating and35MW estimated capacity; basis is not identified as IT load. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. three identified Hayward sites with separate future STACK context. STACK SVY03A separately under construction with76.6MW BACKUP generation, not IT. City says no municipal tax incentives for STACK; this does not exclude state benefits or transfer to Amazon/Hines. April2026 category change does not retroactively redate older approvals. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","host":"hayward-ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.626012,"lng":-122.1133978,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Hayward","current_status":"operating","power_mw_estimate":35,"power_basis":"city estimate; IT/gross basis not specified","permit_date":"2015-02-20"},"notes":["Do not use35MW as measured consumption or IT capacity.","City separately labels STACK76.6MW as backup generation, not IT load.","City explicitly lists SF011 currently operating and35MW estimated capacity; basis is not identified as IT load.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","host":"hayward-ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"three identified Hayward sites with separate future STACK context","fields":{"named_sites":[{"name":"Amazon SF09","government_reported_status":"operating","advertised_capacity_mw":24,"capacity_basis":"not explicit IT","permit_approval_date":"2010-07-09"},{"name":"Amazon SF011","government_reported_status":"operating","estimated_capacity_mw":35,"capacity_basis":"not explicit IT","permit_approval_date":"2015-02-20"},{"name":"Hayward Exchange at92","government_reported_status":"operating","estimated_capacity_mw":49,"capacity_basis":"not explicit IT","permit_approval_date":"2021-02-11"}]},"notes":["STACK SVY03A separately under construction with76.6MW BACKUP generation, not IT. City says no municipal tax incentives for STACK; this does not exclude state benefits or transfer to Amazon/Hines. April2026 category change does not retroactively redate older approvals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","host":"hayward-ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Hayward · Alameda · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"nestory-park-1215-michigan-street-san-francisco-ca","state":"CA","kind":"facility","name":"1215 Michigan Street Data Center (Nestory Park Capital proposal)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Francisco"],"city":"San Francisco","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Do not equate speculative site linkage with acquired land, filed application or approved campus. ApproximatelyUSD350million was unassigned waterfront speculation, not confirmed project capex. Site area and marketed project area differ and exact parcel allocation is unresolved. Supervisor proposed45dayDistrict10pause with possible extension, not adopted citywide ban. Separate DogpatchPowerStation developer planned to retract accessory-use amendment, not this Nestory proposal; reported CouncilBluffs200MWis another campus, not SF criticalIT. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/us/articles/exclusive-major-f-waterfront-may-013424462.html","host":"yahoo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.7532109,"lng":-122.3853887,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"San Francisco Chronicle reporting syndicated onYahoo links NestoryPark lobbying discussions to1215MichiganStreet; property had not changed hands and no data-center plans appeared filed. Firm markets an unnamed160000squarefoot/1.6acre flagship, while1215MichiganStreet is a four-acre property.","independently_verified_current_operating_status":null},"notes":["Do not equate speculative site linkage with acquired land, filed application or approved campus. ApproximatelyUSD350million was unassigned waterfront speculation, not confirmed project capex. Site area and marketed project area differ and exact parcel allocation is unresolved. Supervisor proposed45dayDistrict10pause with possible extension, not adopted citywide ban. Separate DogpatchPowerStation developer planned to retract accessory-use amendment, not this Nestory proposal; reported CouncilBluffs200MWis another campus, not SF criticalIT.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/us/articles/exclusive-major-f-waterfront-may-013424462.html","host":"yahoo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Francisco · San Francisco · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"menlo-equities-300-holger-way-san-jose-ca","state":"CA","kind":"facility","name":"300 Holger Way Data Center (Menlo Equities conversion)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Holger Way existing-building conversion notice. Reuse/exemption is not a new97800sqftaddition, observed opening, all permits or MW. MenloParkapplicantcontactnotfacilitylocation. Do not merge with separate888RossDriveSunnyvaleMenloproject. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2026070652","host":"ceqanet.lci.ca.gov","date":"2026-07-16","published":"2026-07-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.4183407,"lng":-121.9466942,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Holger Way existing-building conversion notice","fields":{"government_cases":["SP25-029","ER25-243"],"project_name":"300 Holger Way Data Center Project","notice_posted_date":"2026-07-16","address":"300 Holger Way, San Jose, California95134","parcel":"09703132","existing_rd_building_sqft_approx":97800,"site_gross_acres_approx":4.86,"applicant":"Holger Technology Partners LLC","action":"CEQA exemption for special-use-permit data-center use in existing R&D building"},"notes":["Reuse/exemption is not a new97800sqftaddition, observed opening, all permits or MW. MenloParkapplicantcontactnotfacilitylocation. Do not merge with separate888RossDriveSunnyvaleMenloproject.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2026070652","host":"ceqanet.lci.ca.gov","date":"2026-07-16","published":"2026-07-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"menlo-equities-great-oaks-parkway-san-jose-ca","state":"CA","kind":"facility","name":"5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. AyahAliAhmad KQED August13updated14,2026 originalcouncilcommittee/reportwork: GreatOaksParkway444436sfproposedfacility andSilverCreekValley516000sf amongpendingprojects. This suppliesgeographic/sizecontextforGreatOaks; Menlooperator/notexactstreetaddressconfirmedinthisbody. 865EmbeddedWay/OppidanisNOTidentified, so thatIDreceivesnocredit. Originalcommunity-benefitstaffDIRECTIONnotadoptedstandards,99MWcapsnotallcriticalIT,10projectPG&EpactnotindividualESA. Caption49.5MWVernonprojectisNOTSanJose.20/25existingcitycountsfromdifferentperiods notnewcensus. Hydrationstate/duplicatesnotused. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kqed.org/news/12095008/san-jose-weighs-data-center-benefits-as-residents-raise-environmental-concerns","host":"kqed.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.2503404,"lng":-121.7944434,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["AyahAliAhmad KQED August13updated14,2026 originalcouncilcommittee/reportwork: GreatOaksParkway444436sfproposedfacility andSilverCreekValley516000sf amongpendingprojects. This suppliesgeographic/sizecontextforGreatOaks; Menlooperator/notexactstreetaddressconfirmedinthisbody.","865EmbeddedWay/OppidanisNOTidentified, so thatIDreceivesnocredit. Originalcommunity-benefitstaffDIRECTIONnotadoptedstandards,99MWcapsnotallcriticalIT,10projectPG&EpactnotindividualESA. Caption49.5MWVernonprojectisNOTSanJose.20/25existingcitycountsfromdifferentperiods notnewcensus. Hydrationstate/duplicatesnotused.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.kqed.org/news/12095008/san-jose-weighs-data-center-benefits-as-residents-raise-environmental-concerns","host":"kqed.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"eight-form-750-north-nash-el-segundo-ca","state":"CA","kind":"facility","name":"750 North Nash Street Data Center (Hyatt Place site, withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"El Segundo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Reported intent at hearing is not independently retained filed withdrawal. Existing nearby data centers and the hotel are not this proposed facility. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://la.urbanize.city/post/developer-pulls-plug-short-lived-plan-el-segundo-data-center","host":"la.urbanize.city","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.9262115,"lng":-118.3869379,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"withdrawal-intent-at-hearing","reported_finding":"Urbanize reports Eight Form representative stated intent to withdraw at July 9 El Segundo hearing for 750 N Nash Street project.","report_display_date":"2026-07-13","independently_verified_current_status":null},"notes":["Reported intent at hearing is not independently retained filed withdrawal. Existing nearby data centers and the hotel are not this proposed facility.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://la.urbanize.city/post/developer-pulls-plug-short-lived-plan-el-segundo-data-center","host":"la.urbanize.city","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · El Segundo · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"oppidan-rockpoint-865-embedded-way-san-jose-ca","state":"CA","kind":"facility","name":"865 Embedded Way Data Center (Oppidan / Rockpoint)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. The Registry August 13, 2026 publicly readable preview names Rockpoint/Oppidan, 865 Embedded Way, proposed 18 MW and a switch from a manufacturing plan. Limited original named-site preview context only; 152,676 square feet is in the headline, not an inspected plan. No IT basis, approval, tenant, RFS or full article adopted. Subscription remainder not read or bypassed. Nearby Great Oaks and Silver Creek proposals remain separate. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://news.theregistrysf.com/rockpoint-oppidan-swap-manufacturing-plans-for-152676-sqft-data-center-in-south-san-jose/","host":"news.theregistrysf.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.2673552,"lng":-121.7935875,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["The Registry August 13, 2026 publicly readable preview names Rockpoint/Oppidan, 865 Embedded Way, proposed 18 MW and a switch from a manufacturing plan. Limited original named-site preview context only; 152,676 square feet is in the headline, not an inspected plan. No IT basis, approval, tenant, RFS or full article adopted. Subscription remainder not read or bypassed. Nearby Great Oaks and Silver Creek proposals remain separate.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://news.theregistrysf.com/rockpoint-oppidan-swap-manufacturing-plans-for-152676-sqft-data-center-in-south-san-jose/","host":"news.theregistrysf.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"amazon-gilroy-ca","state":"CA","kind":"facility","name":"Amazon AWS Gilroy Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Gilroy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Gilroy municipal entitlement, permits and phase-specific water/power. 49MWutility and50MWpotentialstorage power are not critical IT or99MWcompute. Twenty-five2.5MW emergency generators plus600kWhouse generator are redundancy, not extra utility demand. Water forecasts not actual withdrawals. Building permits/agency construction account are not customer commissioning. Recycled-water agreement/connection still future; no exact service date. Two data buildings plus security is not three data centers. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS","host":"cityofgilroy.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.997,"lng":-121.541,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Gilroy municipal entitlement, permits and phase-specific water/power","fields":{"agency":"City of Gilroy","project":"AWS Gilroy Data Center AS20-23","address":"8050 Camino Arroyo, Gilroy, California","parcel":"841-69-044","site_acres":56,"agency_reported_stage":"under construction","site_architectural_entitlement_approval_date":"2025-07-03","appeal_received_date":"2025-07-21","appeal_withdrawn_date":"2025-08-18","grading_underground_utility_permits_date":"2025-12-11","building_permit_date":"2026-03-19","planned_data_center_buildings":2,"security_buildings":1,"total_building_sqft_approx":438500,"each_data_center_sqft_approx":218000,"security_building_sqft":2500,"phase1_utility_connection_mw":49,"potential_future_bess_power_mw_max":50,"phase1_expected_potable_water_acre_feet_per_year":23,"post_recycled_transition_expected_potable_water_acre_feet_per_year":2,"water_transition_deadline":"within2years after phase1completion or before first phase2occupancy, whichever first","water_answer_updated_date":"2026-08-12","anticipated_recycled_connection_year":2030},"notes":["49MWutility and50MWpotentialstorage power are not critical IT or99MWcompute. Twenty-five2.5MW emergency generators plus600kWhouse generator are redundancy, not extra utility demand. Water forecasts not actual withdrawals. Building permits/agency construction account are not customer commissioning. Recycled-water agreement/connection still future; no exact service date. Two data buildings plus security is not three data centers.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS","host":"cityofgilroy.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Gilroy · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"amazon-sf09-corporate-avenue-hayward-ca","state":"CA","kind":"facility","name":"Amazon Data Center SF09 (26464 Corporate Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Alameda"],"city":"Hayward","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three identified Hayward sites with separate future STACK context. STACK SVY03A separately under construction with76.6MW BACKUP generation, not IT. City says no municipal tax incentives for STACK; this does not exclude state benefits or transfer to Amazon/Hines. April2026 category change does not retroactively redate older approvals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","host":"hayward-ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.6263578,"lng":-122.1128762,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"three identified Hayward sites with separate future STACK context","fields":{"named_sites":[{"name":"Amazon SF09","government_reported_status":"operating","advertised_capacity_mw":24,"capacity_basis":"not explicit IT","permit_approval_date":"2010-07-09"},{"name":"Amazon SF011","government_reported_status":"operating","estimated_capacity_mw":35,"capacity_basis":"not explicit IT","permit_approval_date":"2015-02-20"},{"name":"Hayward Exchange at92","government_reported_status":"operating","estimated_capacity_mw":49,"capacity_basis":"not explicit IT","permit_approval_date":"2021-02-11"}]},"notes":["STACK SVY03A separately under construction with76.6MW BACKUP generation, not IT. City says no municipal tax incentives for STACK; this does not exclude state benefits or transfer to Amazon/Hines. April2026 category change does not retroactively redate older approvals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","host":"hayward-ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Hayward · Alameda · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"avaio-perseus-pittsburg-ca","state":"CA","kind":"facility","name":"AVAIO Digital Perseus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Contra Costa"],"city":"Pittsburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Pittsburg approved design modification and CEQA notice. Notice of determination records specified design/CEQA approval, not all construction permits or operations. No numeric MW in reviewed notice. AVAIO applicant email supports link, not tenant lease. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2025100607/4","host":"ceqanet.lci.ca.gov","date":"2026-02-17","published":"2026-02-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.011358,"lng":-121.91098,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Pittsburg approved design modification and CEQA notice","fields":{"project_title":"Pittsburg Data Hub","application":"AP-25-0113 CDR modification","agency_approval_date":"2026-02-12","notice_posted_date":"2026-02-17","earlier_design_approval_date":"2025-12-11","address":"2242 Golf Club Road, Pittsburg, California","parcel":"095-160-008","site_acres_approx":22,"data_center_stories":3,"modification":"PG&E interconnection relocation and wetland mitigation grading/site layout"},"notes":["Notice of determination records specified design/CEQA approval, not all construction permits or operations. No numeric MW in reviewed notice. AVAIO applicant email supports link, not tenant lease.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2025100607/4","host":"ceqanet.lci.ca.gov","date":"2026-02-17","published":"2026-02-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Pittsburg · Contra Costa · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"behring-415-20th-street-oakland-ca","state":"CA","kind":"facility","name":"Behring 415 20th Street Data Center (former LBNL supercomputing building)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Alameda"],"city":"Oakland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Historical proposal only in this article. Later official legislative record and signed ordinance supersede this pending-stage snapshot. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original adopted city law, not a project-specific cancellation.. No extension or subsequent project determination observed. Filing stamp October 13 is not adoption/effective date. Recital nationwide facility/water/moratorium statistics and descriptions of other bills are not independently validated by passage of this ordinance.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://oaklandside.org/2026/09/11/data-center-temporary-moratorium-oakland-carroll-fife/","host":"oaklandside.org","date":"2026-09-11","published":"2026-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://oakland.legistar.com/View.ashx?M=F&ID=16061258&GUID=FE63DAEB-29A2-4617-A8B8-63F0D607ABC5","host":"oakland.legistar.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://oakland.legistar.com/LegislationDetail.aspx?GUID=4775CA8D-0CB2-4BC8-BC13-DCCDA9352E08&ID=8203751&Options=&Search=","host":"oakland.legistar.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.8086782,"lng":-122.267477,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"proposed-moratorium","reported_finding":"Oakland councilmember proposed an initial 45-day pause, with committee consideration scheduled. Behring proposal at 415 20th Street named.","report_display_date":"2026-09-11","independently_verified_current_status":null},"notes":["Historical proposal only in this article. Later official legislative record and signed ordinance supersede this pending-stage snapshot.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://oaklandside.org/2026/09/11/data-center-temporary-moratorium-oakland-carroll-fife/","host":"oaklandside.org","date":"2026-09-11","published":"2026-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Original adopted city law, not a project-specific cancellation.","fields":{"ordinance":"13899 C.M.S.","adopted":"2026-10-06","effective":"2026-10-06","duration_days":45,"ayes":7,"noes":0,"excused":1,"clerk_filing_stamp":"2026-10-13","exemptions":"Incidental/subordinate server rooms and related IT uses relying solely on existing principal-use water, HVAC and electrical supplies.","approval_scope":"Specified land-use entitlements, permits, regulatory licenses and agreements for development or operation."},"notes":["No extension or subsequent project determination observed. Filing stamp October 13 is not adoption/effective date. Recital nationwide facility/water/moratorium statistics and descriptions of other bills are not independently validated by passage of this ordinance.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://oakland.legistar.com/View.ashx?M=F&ID=16061258&GUID=FE63DAEB-29A2-4617-A8B8-63F0D607ABC5","host":"oakland.legistar.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://oakland.legistar.com/LegislationDetail.aspx?GUID=4775CA8D-0CB2-4BC8-BC13-DCCDA9352E08&ID=8203751&Options=&Search=","host":"oakland.legistar.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Oakland · Alameda · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"bridgehead-industrial-oakley-data-center-ca","state":"CA","kind":"facility","name":"Bridgehead Industrial Project data center option (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Contra Costa"],"city":"Oakley","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bridgehead industrial approval does not substantiate data-center use. Government notice describes warehouse/light-industrial project, not data center. Do not count as approved DC or assign entire3.18Marea to data halls. Published total and warehouse-plus-office components do not exactly reconcile. Rezone/development-agreement first readings are not all final ordinances. Later conversion would require separate evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2024050471/4","host":"ceqanet.lci.ca.gov","date":"2026-03-12","published":"2026-03-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.006222,"lng":-121.739139,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Bridgehead industrial approval does not substantiate data-center use","fields":{"project_title":"Bridgehead Industrial Project","agency_approval_date":"2026-03-10","notice_posted_date":"2026-03-12","approved_use_description":"ten light industrial buildings with warehouse and office space","site_acres":164,"parcels":["037-020-007","037-040-007","037-040-015"],"published_total_building_area_sqft_approx":3180000,"published_warehouse_sqft":3045777,"published_office_sqft":72000,"canonical_data_center_it_mw":null},"notes":["Government notice describes warehouse/light-industrial project, not data center. Do not count as approved DC or assign entire3.18Marea to data halls. Published total and warehouse-plus-office components do not exactly reconcile. Rezone/development-agreement first readings are not all final ordinances. Later conversion would require separate evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2024050471/4","host":"ceqanet.lci.ca.gov","date":"2026-03-12","published":"2026-03-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Oakley · Contra Costa · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"nygc-buena-vista-ai-factory-ione-ca","state":"CA","kind":"facility","name":"Buena Vista AI Factory","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Amador"],"city":"Ione","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. An 18 MW existing plant and 41 MW proposed power platform are generation, not additive IT. A soft power-plant test target does not commission the AI facility. Carbon-negative claims and reported spending remain attributed. The claimed federal self-sufficiency requirement and derivative statewide capacity totals are excluded without original authority; staff direction to return with a moratorium is not adoption. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mymotherlode.com/news/local/11078052/biomass-fueled-data-center-project-planned-in-amador-county.html","host":"mymotherlode.com","date":"2026-08-19","published":"2026-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.2782244,"lng":-120.9115886,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"myMotherLode reports refurbishment of Buena Vista biomass generation and a proposed adjacent NYGC AI facility; the supervisor's July visit said no AI construction permit or EIR had been completed.","independently_verified_current_operating_status":null},"notes":["An 18 MW existing plant and 41 MW proposed power platform are generation, not additive IT. A soft power-plant test target does not commission the AI facility. Carbon-negative claims and reported spending remain attributed. The claimed federal self-sufficiency requirement and derivative statewide capacity totals are excluded without original authority; staff direction to return with a moratorium is not adoption.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://mymotherlode.com/news/local/11078052/biomass-fueled-data-center-project-planned-in-amador-county.html","host":"mymotherlode.com","date":"2026-08-19","published":"2026-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Ione · Amador · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"cdt-vacaville-data-center-ca","state":"CA","kind":"facility","name":"California Department of Technology Vacaville Data Center (1020 Vaquero Circle)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Solano"],"city":"Vacaville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CDT Vacaville existing data center lease renewal. Existing-use lease renewal is not a new build announcement, opening date or capacity expansion. Applicant postal contact RanchoCucamonga is not facility address. No MW or exact original opening in notice. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2026020164","host":"ceqanet.lci.ca.gov","date":"2026-02-05","published":"2026-02-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.3839859,"lng":-121.9499907,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"CDT Vacaville existing data center lease renewal","fields":{"address":"1020 Vaquero Circle, Vacaville, California","county":"Solano","notice_posted_date":"2026-02-05","agency":"California Department of Technology","action":"renewing lease for existing data center, no change of use"},"notes":["Existing-use lease renewal is not a new build announcement, opening date or capacity expansion. Applicant postal contact RanchoCucamonga is not facility address. No MW or exact original opening in notice.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2026020164","host":"ceqanet.lci.ca.gov","date":"2026-02-05","published":"2026-02-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Vacaville · Solano · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"centersquare-lax3-irvine-ca","state":"CA","kind":"facility","name":"Centersquare LAX3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Irvine","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two Irvine sections inside LosAngelesmarket page. HawthorneLAX4thirdsectionnotpartoftheseIrvineIDs. Market42.1MWnotperfacilityanddoesnotexactlyreconcileIrvinefeeds. UPS/utility/generatorratingsnotIToradditive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6870931,"lng":-117.8479769,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"two Irvine sections inside LosAngelesmarket page","fields":{"site_sections":[{"code":"LAX3","city":"Irvine","raised_floor_sqft":73952,"utility_power_mw":24.9,"ups_capacity_mw":9.2,"generator_capacity_mw":16},{"code":"LAX5","city":"Irvine","raised_floor_sqft":52470,"utility_power_mw":17.3,"ups_capacity_mw":5.6,"generator_capacity_mw":12}]},"notes":["HawthorneLAX4thirdsectionnotpartoftheseIrvineIDs. Market42.1MWnotperfacilityanddoesnotexactlyreconcileIrvinefeeds. UPS/utility/generatorratingsnotIToradditive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Irvine · Orange · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"centersquare-lax5-irvine-ca","state":"CA","kind":"facility","name":"Centersquare LAX5","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Irvine","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two Irvine sections inside LosAngelesmarket page. HawthorneLAX4thirdsectionnotpartoftheseIrvineIDs. Market42.1MWnotperfacilityanddoesnotexactlyreconcileIrvinefeeds. UPS/utility/generatorratingsnotIToradditive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6847703,"lng":-117.8366956,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"two Irvine sections inside LosAngelesmarket page","fields":{"site_sections":[{"code":"LAX3","city":"Irvine","raised_floor_sqft":73952,"utility_power_mw":24.9,"ups_capacity_mw":9.2,"generator_capacity_mw":16},{"code":"LAX5","city":"Irvine","raised_floor_sqft":52470,"utility_power_mw":17.3,"ups_capacity_mw":5.6,"generator_capacity_mw":12}]},"notes":["HawthorneLAX4thirdsectionnotpartoftheseIrvineIDs. Market42.1MWnotperfacilityanddoesnotexactlyreconcileIrvinefeeds. UPS/utility/generatorratingsnotIToradditive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Irvine · Orange · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"coachella-valley-technology-campus-ca","state":"CA","kind":"facility","name":"Coachella Valley Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Riverside"],"city":"Coachella","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Phase-one minimum270MW capacity and up-to300MW demand are not two additive quantities or verified IT. Separate42-million-USD IID infrastructure is not campus capex. Utility agreement is not commissioning or finalized tariff. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gpsbusinessinsider.com/coachella-power-strategy/","host":"gpsbusinessinsider.com","date":"2026-04-03","published":"2026-04-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.671181,"lng":-116.169492,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"GPS Business Insider distinguishes east-side Coachella municipal utility/data-campus concept from separate IID financing authority.","independently_verified_current_operating_status":null},"notes":["Phase-one minimum270MW capacity and up-to300MW demand are not two additive quantities or verified IT. Separate42-million-USD IID infrastructure is not campus capex. Utility agreement is not commissioning or finalized tariff.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gpsbusinessinsider.com/coachella-power-strategy/","host":"gpsbusinessinsider.com","date":"2026-04-03","published":"2026-04-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Coachella · Riverside · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"cologix-sv1-ca","state":"CA","kind":"facility","name":"Cologix SV1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 9MWscalableand15MWbackupseparate; not24MWIT. Existingofferingnotmeasurementofallcapacityoccupied. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/silicon-valley/sv1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3654018,"lng":-121.9616726,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"SV1","published_address":"2050 Martin Ave, Santa Clara, California","facility_area_sqft":84000,"campus_acres":5,"scalable_power_mw_max":9,"generator_backup_mw":15,"power_basis":"scalablepower, not explicitlycriticalIT"},"notes":["9MWscalableand15MWbackupseparate; not24MWIT. Existingofferingnotmeasurementofallcapacityoccupied.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/silicon-valley/sv1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"coresite-bowers-santa-clara-ca","state":"CA","kind":"facility","name":"CoreSite Bowers Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bowers backup generation and operator-identity hold. 72MW backup generation includes cooling and building/life-safety loads, not criticalIT. SPPE exemption from CEC powerplant jurisdiction permits local process, not construction/occupancy certification. Preferred record names CoreSite; exact ownership/operator relationship requires crosswalk, no automatic rename. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/bowers-backup-generating-facility","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.389,"lng":-121.974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Bowers backup generation and operator-identity hold","fields":{"published_project_address":"2805 Bowers Avenue, Santa Clara, California","government_listed_project_owner":"GI Partners","energy_docket":"22-SPPE-01","energy_project_status":"exempted","proposed_backup_generation_mw_max":72,"proposed_backup_generators":32},"notes":["72MW backup generation includes cooling and building/life-safety loads, not criticalIT. SPPE exemption from CEC powerplant jurisdiction permits local process, not construction/occupancy certification. Preferred record names CoreSite; exact ownership/operator relationship requires crosswalk, no automatic rename.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/bowers-backup-generating-facility","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"coresite-la1-los-angeles-ca","state":"CA","kind":"facility","name":"CoreSite LA1 (One Wilshire)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"Los Angeles","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/la1-los-angeles-ca","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0478871,"lng":-118.2555541,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"LA1","published_address":"624 S Grand Ave, Los Angeles, CA90017","operator_labeled_area_sqft_lower_bound":171000,"area_qualifier":"plus"},"notes":["Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/la1-los-angeles-ca","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Los Angeles · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"coresite-la2-los-angeles-ca-ca","state":"CA","kind":"facility","name":"CoreSite LA2 - Los Angeles, CA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"Los Angeles","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/la2-los-angeles-ca","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0584789,"lng":-118.2359144,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"LA2","published_address":"900 N Alameda St, Los Angeles, CA90012","operator_labeled_area_sqft_lower_bound":432000,"area_qualifier":"plus"},"notes":["Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/la2-los-angeles-ca","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Los Angeles · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"coresite-sv1-san-jose-ca-ca","state":"CA","kind":"facility","name":"CoreSite SV1 - San Jose, CA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/sv1-san-jose-ca","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3341181,"lng":-121.891646,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"SV1","published_address":"55 S Market St, San Jose, CA95113","operator_labeled_area_sqft_lower_bound":320000,"area_qualifier":"plus"},"notes":["Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/sv1-san-jose-ca","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"global-stack-cow-palace-daly-city-ca","state":"CA","kind":"facility","name":"Cow Palace Edge Data Center (Global Stack proposal)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Mateo"],"city":"Daly City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. MarinaNewman MissionLocal September10updated11,2026 originalreport names GlobalStack10MW PROPOSED CowPalaceDalyCityproject, no constructiondate/explicitITbasis. SanFrancisco45daymoratorium stillPROPOSEDSeptember15, notenactedthen andDalyCitydifferentjurisdiction. NOVVA400Paul nineMWfirstphase/36MWfuture andDigitalRealty200Paul areothercampuses.15regionalcampusesderiveddirectorynotcensus. Proposednational20MWbillnotpassedlaw. Generalhealth/blackoutclaimsnotobservedCowPalaceimpacts. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://missionlocal.org/2026/09/data-center-moratorium-sf-board-of-supervisors/","host":"missionlocal.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.7061821,"lng":-122.4202102,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["MarinaNewman MissionLocal September10updated11,2026 originalreport names GlobalStack10MW PROPOSED CowPalaceDalyCityproject, no constructiondate/explicitITbasis. SanFrancisco45daymoratorium stillPROPOSEDSeptember15, notenactedthen andDalyCitydifferentjurisdiction.","NOVVA400Paul nineMWfirstphase/36MWfuture andDigitalRealty200Paul areothercampuses.15regionalcampusesderiveddirectorynotcensus. Proposednational20MWbillnotpassedlaw. Generalhealth/blackoutclaimsnotobservedCowPalaceimpacts.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://missionlocal.org/2026/09/data-center-moratorium-sf-board-of-supervisors/","host":"missionlocal.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Daly City · San Mateo · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"csquare-sfo1-ca","state":"CA","kind":"facility","name":"Csquare SFO1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. FouranchorURLsreadthesameSiliconValleypage; onlyexactnamedsectionadopted.129.4MWregionaltotalnotperbuilding. RatingsnotcriticalIToradditive. SFO3Sunnyvale, othersSantaClara. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical complex/operator context or exact-address corroboration, with operator-transfer and multi-building limitations.. Csquare Silicon Valley five-page PDF: only pages 2 and 4 fully read, plus limited address search snippets on other pages; page 4 viewed. SFO1 is 2401/2403 Walsh Avenue, NOT inherited Lumen 3045 Raymond Street. SFO3 is 1400 Kifer Road, NOT inherited Lumen 1380 Kifer. Do not merge neighboring facilities or transfer 8.6 utility/3.2 UPS/5 generator MW to Lumen Sunnyvale. Existing csquare-sfo1-ca and csquare-sfo3-ca have matching addresses and receive corroborating references, not new ID counts. Not all fields, exact ownership chain, current measured IT or parcel pin verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley#santaclara-sfo1","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3714713,"lng":-121.9696826,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"SFO1","raised_floor_sqft":95981,"utility_power_mw":34.5,"ups_capacity_mw":11.2,"generator_capacity_mw":17.5},"notes":["FouranchorURLsreadthesameSiliconValleypage; onlyexactnamedsectionadopted.129.4MWregionaltotalnotperbuilding. RatingsnotcriticalIToradditive. SFO3Sunnyvale, othersSantaClara.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley#santaclara-sfo1","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-legacy-operator-address-and-power-basis-review-round83-2026-10-15.json","scope":"Historical complex/operator context or exact-address corroboration, with operator-transfer and multi-building limitations.","fields":{},"notes":["Csquare Silicon Valley five-page PDF: only pages 2 and 4 fully read, plus limited address search snippets on other pages; page 4 viewed. SFO1 is 2401/2403 Walsh Avenue, NOT inherited Lumen 3045 Raymond Street. SFO3 is 1400 Kifer Road, NOT inherited Lumen 1380 Kifer. Do not merge neighboring facilities or transfer 8.6 utility/3.2 UPS/5 generator MW to Lumen Sunnyvale. Existing csquare-sfo1-ca and csquare-sfo3-ca have matching addresses and receive corroborating references, not new ID counts.","Not all fields, exact ownership chain, current measured IT or parcel pin verified."],"sources":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"csquare-sfo2-ca","state":"CA","kind":"facility","name":"Csquare SFO2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. FouranchorURLsreadthesameSiliconValleypage; onlyexactnamedsectionadopted.129.4MWregionaltotalnotperbuilding. RatingsnotcriticalIToradditive. SFO3Sunnyvale, othersSantaClara. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley#santaclara-sfo2","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.397572,"lng":-121.980963,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"SFO2","raised_floor_sqft":100056,"utility_power_mw":43.2,"ups_capacity_mw":14.1,"generator_capacity_mw":22.5},"notes":["FouranchorURLsreadthesameSiliconValleypage; onlyexactnamedsectionadopted.129.4MWregionaltotalnotperbuilding. RatingsnotcriticalIToradditive. SFO3Sunnyvale, othersSantaClara.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley#santaclara-sfo2","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"csquare-sfo3-ca","state":"CA","kind":"facility","name":"Csquare SFO3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Sunnyvale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. FouranchorURLsreadthesameSiliconValleypage; onlyexactnamedsectionadopted.129.4MWregionaltotalnotperbuilding. RatingsnotcriticalIToradditive. SFO3Sunnyvale, othersSantaClara. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical complex/operator context or exact-address corroboration, with operator-transfer and multi-building limitations.. Csquare Silicon Valley five-page PDF: only pages 2 and 4 fully read, plus limited address search snippets on other pages; page 4 viewed. SFO1 is 2401/2403 Walsh Avenue, NOT inherited Lumen 3045 Raymond Street. SFO3 is 1400 Kifer Road, NOT inherited Lumen 1380 Kifer. Do not merge neighboring facilities or transfer 8.6 utility/3.2 UPS/5 generator MW to Lumen Sunnyvale. Existing csquare-sfo1-ca and csquare-sfo3-ca have matching addresses and receive corroborating references, not new ID counts. Not all fields, exact ownership chain, current measured IT or parcel pin verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley#sunnyvale-sfo3","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3720542,"lng":-121.9860407,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"SFO3","raised_floor_sqft":19661,"utility_power_mw":8.6,"ups_capacity_mw":3.2,"generator_capacity_mw":5},"notes":["FouranchorURLsreadthesameSiliconValleypage; onlyexactnamedsectionadopted.129.4MWregionaltotalnotperbuilding. RatingsnotcriticalIToradditive. SFO3Sunnyvale, othersSantaClara.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley#sunnyvale-sfo3","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-legacy-operator-address-and-power-basis-review-round83-2026-10-15.json","scope":"Historical complex/operator context or exact-address corroboration, with operator-transfer and multi-building limitations.","fields":{},"notes":["Csquare Silicon Valley five-page PDF: only pages 2 and 4 fully read, plus limited address search snippets on other pages; page 4 viewed. SFO1 is 2401/2403 Walsh Avenue, NOT inherited Lumen 3045 Raymond Street. SFO3 is 1400 Kifer Road, NOT inherited Lumen 1380 Kifer. Do not merge neighboring facilities or transfer 8.6 utility/3.2 UPS/5 generator MW to Lumen Sunnyvale. Existing csquare-sfo1-ca and csquare-sfo3-ca have matching addresses and receive corroborating references, not new ID counts.","Not all fields, exact ownership chain, current measured IT or parcel pin verified."],"sources":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Sunnyvale · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"csquare-sfo4-ca","state":"CA","kind":"facility","name":"Csquare SFO4","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. FouranchorURLsreadthesameSiliconValleypage; onlyexactnamedsectionadopted.129.4MWregionaltotalnotperbuilding. RatingsnotcriticalIToradditive. SFO3Sunnyvale, othersSantaClara. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley#santaclara-sfo4","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3757986,"lng":-121.9551844,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"SFO4","raised_floor_sqft":57450,"utility_power_mw":43.1,"ups_capacity_mw":12.3,"generator_capacity_mw":20.5},"notes":["FouranchorURLsreadthesameSiliconValleypage; onlyexactnamedsectionadopted.129.4MWregionaltotalnotperbuilding. RatingsnotcriticalIToradditive. SFO3Sunnyvale, othersSantaClara.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley#santaclara-sfo4","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"cyrusone-nas-lemoore-ca","state":"CA","kind":"facility","name":"CyrusOne AI Data Center at NAS Lemoore","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kings"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. AmerescoissuerSeptember9,2025 namesNavy/CyrusOne100MWAIreadyNASLemooreproposal. Agreementsstillbeingfinalized;firstportion2027forecast.100MWbasisunqualified,notcertifiedcriticalIT;microgrid/generationseparate. FedRAMP/FISMAHigh/DoDIL5/6arefutureengineeringrequirements,notcurrentauthorization/certification.55CyrusOneglobalcentersnotUSuniquephysicalcount;company2000foundingnotfacilityopening. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.ameresco.com/news-events/press-releases/detail/715/ameresco-and-u-s-navy-partner-to-build-ai-optimized-data","host":"ir.ameresco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.303,"lng":-119.953,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"AmerescoissuerSeptember9,2025 namesNavy/CyrusOne100MWAIreadyNASLemooreproposal. Agreementsstillbeingfinalized;firstportion2027forecast.100MWbasisunqualified,notcertifiedcriticalIT;microgrid/generationseparate. FedRAMP/FISMAHigh/DoDIL5/6arefutureengineeringrequirements,notcurrentauthorization/certification.55CyrusOneglobalcentersnotUSuniquephysicalcount;company2000foundingnotfacilityopening."},"notes":["AmerescoissuerSeptember9,2025 namesNavy/CyrusOne100MWAIreadyNASLemooreproposal. Agreementsstillbeingfinalized;firstportion2027forecast.100MWbasisunqualified,notcertifiedcriticalIT;microgrid/generationseparate. FedRAMP/FISMAHigh/DoDIL5/6arefutureengineeringrequirements,notcurrentauthorization/certification.55CyrusOneglobalcentersnotUSuniquephysicalcount;company2000foundingnotfacilityopening.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://ir.ameresco.com/news-events/press-releases/detail/715/ameresco-and-u-s-navy-partner-to-build-ai-optimized-data","host":"ir.ameresco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Kings · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"databank-san1-san-diego-ca","state":"CA","kind":"facility","name":"DataBank San Diego SAN1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Diego"],"city":"San Diego","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named source. 2022expansion announcement. Increment, later phase and future total are nested; no delivered status or current load inferred.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/san-diego/12270-world-trade-drive/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/press-releases/databank-expands-capacity-of-san1-data-center-in-san-diego/","host":"databank.com","date":"2022-03-21","published":"2022-03-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.9886013,"lng":-117.073246,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"SAN1","street":"12270 WorldTradeDrive Suite100","city":"San Diego","critical_it_capacity_mw":7.2,"it_area_sqft":55239,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/san-diego/12270-world-trade-drive/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"12270 World Trade Drive, San Diego","announced_raised_floor_increment_sqft":40000,"announced_resulting_total_area_sqft":60000,"phase1_critical_power_increment_mw":2,"phase2_future_increment_mw":4,"future_total_it_capacity_mw":7.5},"notes":["2022expansion announcement. Increment, later phase and future total are nested; no delivered status or current load inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/press-releases/databank-expands-capacity-of-san1-data-center-in-san-diego/","host":"databank.com","date":"2022-03-21","published":"2022-03-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Diego · San Diego · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"databank-sna1-irvine-ca","state":"CA","kind":"facility","name":"DataBank SNA1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Irvine","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/irvine/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.69137,"lng":-117.84036,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"SNA1","street":"17222 VonKarmanAvenue","city":"Irvine","critical_it_capacity_mw":2.64,"it_area_sqft":36720,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/irvine/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Irvine · Orange · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"databank-sna2-irvine-ca","state":"CA","kind":"facility","name":"DataBank SNA2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Irvine","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/irvine/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.68882,"lng":-117.84289,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"SNA2","street":"17400 VonKarmanAvenue","city":"Irvine","critical_it_capacity_mw":8,"it_area_sqft":53150,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/irvine/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Irvine · Orange · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digico-lax1-monterey-park-ca","state":"CA","kind":"facility","name":"DigiCo LAX1 (1977 Saturn Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"Monterey Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Monterey Park official withdrawal and regulation index. Official document-index descriptions, not independent reading of signed ordinances or June2election result. Withdrawn application date not stated.64.6acres and2164909sqft describe wider Saturn business park, not the data-center project. No current operating claim. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.montereypark.ca.gov/1710/Data-Center-Information","host":"montereypark.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.03951,"lng":-118.115058,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Monterey Park official withdrawal and regulation index","fields":{"city_described_project_status":"withdrawn","proposed_project_address":"1977 Saturn Street, Monterey Park, California","city_indexed_initial_moratorium_date":"2026-01-21","initial_moratorium_ordinance":"2272","city_indexed_extension_date":"2026-03-04","extension_ordinance":"2274","city_indexed_prohibition_ordinances":[{"identifier":"2276","date":"2026-04-20"},{"identifier":"2278","date":"2026-05-06"},{"identifier":"2279","date":"2026-05-06"}]},"notes":["Official document-index descriptions, not independent reading of signed ordinances or June2election result. Withdrawn application date not stated.64.6acres and2164909sqft describe wider Saturn business park, not the data-center project. No current operating claim.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.montereypark.ca.gov/1710/Data-Center-Information","host":"montereypark.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Monterey Park · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-727-s-grand-ave-la-ca","state":"CA","kind":"facility","name":"Digital Realty 727 S. Grand Avenue (DTLA)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"Los Angeles","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 39,000 squarefeetissitearea,notdatahallfloor;gross 486,000 includesparking/support/office. Quoted 13,300 officefeetconflictswithdirectoryOfficeSqFt 486000,whichappearstocopytotalbuilding;donotadoptall 486000 asofficeorcriticalspace. Proposedentitlementdescription isnotcurrentapproval/construction/RFS.1960 sparkinggaragehistoryisnotDCopeningdate. NoMW/ESA/tenants/capexverified;originalcityapplicationnotread. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://downtownla.com/building/727-s-grand-data-center","host":"downtownla.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.046823,"lng":-118.257149,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"DowntownLA’s undatedbuildingentry quotes Urbanize onDigitalRealty’s proposed 727 to 737 SouthGrand 13 storyredevelopment,withroughly 486,000 squarefeetgrossfloorarea.","independently_verified_current_operating_status":null},"notes":["39,000 squarefeetissitearea,notdatahallfloor;gross 486,000 includesparking/support/office. Quoted 13,300 officefeetconflictswithdirectoryOfficeSqFt 486000,whichappearstocopytotalbuilding;donotadoptall 486000 asofficeorcriticalspace. Proposedentitlementdescription isnotcurrentapproval/construction/RFS.1960 sparkinggaragehistoryisnotDCopeningdate. NoMW/ESA/tenants/capexverified;originalcityapplicationnotread.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://downtownla.com/building/727-s-grand-data-center","host":"downtownla.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Los Angeles · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-lax12-ca","state":"CA","kind":"facility","name":"Digital Realty LAX12","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"El Segundo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/los-angeles/lax12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9156593,"lng":-118.3846186,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"LAX12","published_address":"2260 East El Segundo Boulevard, El Segundo, CA 90245","advertised_building_sqft":129000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/los-angeles/lax12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · El Segundo · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-oak10-ca","state":"CA","kind":"facility","name":"Digital Realty OAK10","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Alameda"],"city":"Oakland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/oak10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.7992148,"lng":-122.2829762,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"OAK10","published_address":"720 2nd Street, Oakland, CA 94607","advertised_building_sqft":122000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/oak10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Oakland · Alameda · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-sc1-ca","state":"CA","kind":"facility","name":"Digital Realty SC1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sc1","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3616469,"lng":-121.9439784,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"SC1","published_address":"2220 De La Cruz Boulevard, Santa Clara, CA 95050","operator_label_total_building_size_sqft":471000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sc1","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-sfo10-ca","state":"CA","kind":"facility","name":"Digital Realty SFO10","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Francisco"],"city":"San Francisco","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sfo10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.7236272,"lng":-122.3979543,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"SFO10","published_address":"200 Paul Avenue, San Francisco, CA 94124","advertised_building_sqft":495000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sfo10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Francisco · San Francisco · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-sfo12-365-main-street-ca","state":"CA","kind":"facility","name":"Digital Realty SFO12 (365 Main Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Francisco"],"city":"San Francisco","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sfo12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.788731,"lng":-122.390469,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"SFO12","published_address":"365 Main Street, San Francisco, CA 94105","advertised_building_sqft":227000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sfo12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Francisco · San Francisco · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-silicon-valley-sjc10-ca","state":"CA","kind":"facility","name":"Digital Realty Silicon Valley SJC10","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.375822,"lng":-121.9533359,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"SJC10","published_address":"1100 Space Park Drive Santa Clara, CA 95054","advertised_building_sqft":163500},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-silicon-valley-sjc11-ca","state":"CA","kind":"facility","name":"Digital Realty Silicon Valley SJC11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3763668,"lng":-121.9485649,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"SJC11","published_address":"3011 Lafayette Street Santa Clara, CA 95054","advertised_building_sqft":91000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-silicon-valley-sjc16-ca","state":"CA","kind":"facility","name":"Digital Realty Silicon Valley SJC16","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc16","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3749324,"lng":-121.9559987,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"SJC16","published_address":"1525 Comstock Street, Santa Clara, CA 95054","advertised_building_sqft":42500},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc16","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-silicon-valley-sjc30-ca","state":"CA","kind":"facility","name":"Digital Realty Silicon Valley SJC30","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc30","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3782874,"lng":-121.9581107,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"SJC30","published_address":"3105 Alfred Street Santa Clara, CA 95054","advertised_building_sqft":13000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc30","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-silicon-valley-sjc31-ca","state":"CA","kind":"facility","name":"Digital Realty Silicon Valley SJC31","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc31","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3722213,"lng":-121.9482625,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"SJC31","published_address":"2805 Lafayette Street, Santa Clara, CA 95050","advertised_building_sqft":146000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc31","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-sjc34-ca","state":"CA","kind":"facility","name":"Digital Realty SJC34","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc34","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3724077,"lng":-121.973647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"SJC34","published_address":"2820 Northwestern Parkway Santa Clara, CA 95051","advertised_building_sqft":37500},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc34","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-sjc36-lafayette-santa-clara-ca","state":"CA","kind":"facility","name":"Digital Realty SJC36 (Lafayette Data Center, 2825 Lafayette Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lafayette EIR project-summary specifications. Environmentalimpactreport proposal not finalpermit,constructioncompletion or meterreading. Backupgeneratornumbers/power not additive towholefacilityload; summary wording about44gensets/one1MWunit ambiguous andheld. Grossbuildingarea notraisedfloor. Full486pagePDFrecovered after earlier4MBhold; adoptedfacts limited tosummarypage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=249557","host":"efiling.energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.37287,"lng":-121.946796,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Lafayette EIR project-summary specifications","fields":{"published_project_name":"LafayetteDataCenter","applicant":"DigitalRealty","published_address":"2825 LafayetteStreet,SantaClara,California","proposed_gross_building_area_sqft_approx":575400,"proposed_building_stories":3,"proposed_maximum_facility_electrical_load_mw":99.8,"power_basis":"maximumwholefacilityload,notexplicitcriticalIT"},"notes":["Environmentalimpactreport proposal not finalpermit,constructioncompletion or meterreading. Backupgeneratornumbers/power not additive towholefacilityload; summary wording about44gensets/one1MWunit ambiguous andheld. Grossbuildingarea notraisedfloor. Full486pagePDFrecovered after earlier4MBhold; adoptedfacts limited tosummarypage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=249557","host":"efiling.energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-sjc37-santa-clara-ca","state":"CA","kind":"facility","name":"Digital Realty SJC37 (641 Walsh Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc37","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3709854,"lng":-121.9472165,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"SJC37","published_address":"641 Walsh Ave, Santa Clara, CA 95050","advertised_building_sqft":399500},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc37","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"digital-realty-vernon-ca","state":"CA","kind":"facility","name":"Digital Realty Vernon Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"Vernon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. Buyer broker Klabin November4,2025 announces DigitalRealty purchase from PacificSantaFeIndustrialLLC of5.39acres/234760sfLAND for48.8MUSD inVernon. This is participant-reported completed land acquisition, not independently checked deed/closing funds. Parcel square feet are land area, not built data-center floor. A data center was planned; no MW, permits or operating date supplied. Across-street development is a different project, not a second DigitalRealty campus proved here. Regional350/400MWindustry statements lack inspected underlying measurement and are not adopted. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.klabin.com/news/the-klabin-company-represents-digital-realty-in-488-million-land-acquisition-in-vernon","host":"klabin.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.99951,"lng":-118.2252615,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-operator-transaction-and-local-outcomes-round61-2026-10-15.json","scope":"Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.","fields":{},"notes":["Buyer broker Klabin November4,2025 announces DigitalRealty purchase from PacificSantaFeIndustrialLLC of5.39acres/234760sfLAND for48.8MUSD inVernon. This is participant-reported completed land acquisition, not independently checked deed/closing funds. Parcel square feet are land area, not built data-center floor. A data center was planned; no MW, permits or operating date supplied. Across-street development is a different project, not a second DigitalRealty campus proved here. Regional350/400MWindustry statements lack inspected underlying measurement and are not adopted.","Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."],"sources":[{"url":"https://www.klabin.com/news/the-klabin-company-represents-digital-realty-in-488-million-land-acquisition-in-vernon","host":"klabin.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Vernon · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"eagle-mountain-data-oc1-anaheim-ca","state":"CA","kind":"facility","name":"Eagle Mountain Data OC1 (Anaheim Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Anaheim","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The energized headline and prelease body do not establish independently verified operation. The 45 MW plan spans facilities. Rack ratings and efficiency targets are not site IT demand or measured performance. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://eaglemountain.ai/post/eagle-mountain-data-now-offering-high-density-ai-gpu-capacity-at-fully-energized-anaheim-data-center","host":"eaglemountain.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.8366,"lng":-117.9143,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Eagle Mountain Data markets Anaheim OC1 for prelease and immediate GPU deployment, within a 45 MW multi-facility plan.","independently_verified_current_operating_status":null},"notes":["The energized headline and prelease body do not establish independently verified operation. The 45 MW plan spans facilities. Rack ratings and efficiency targets are not site IT demand or measured performance.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://eaglemountain.ai/post/eagle-mountain-data-now-offering-high-density-ai-gpu-capacity-at-fully-energized-anaheim-data-center","host":"eaglemountain.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Anaheim · Orange · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"ecl-csc1-santa-clara-ca","state":"CA","kind":"facility","name":"ECL CSC-1 FlexGrid AI Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The initial phase is included in the ultimate plan. Efficiency and Tier III-level design claims do not establish measured efficiency, certification or present energized IT capacity. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://convergedigest.com/ecl-unveils-35mw-flexgrid-data-center-in-santa-clara-to-tackle-ai-power-constraints/","host":"convergedigest.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.354,"lng":-121.955,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Converge Digest describes ECL CSC1 as a 35 MW modular plan starting with 2.5 MW and combining grid, gas and hydrogen inputs.","independently_verified_current_operating_status":null},"notes":["The initial phase is included in the ultimate plan. Efficiency and Tier III-level design claims do not establish measured efficiency, certification or present energized IT capacity.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://convergedigest.com/ecl-unveils-35mw-flexgrid-data-center-in-santa-clara-to-tackle-ai-power-constraints/","host":"convergedigest.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"edgeconnex-sac01-ca","state":"CA","kind":"facility","name":"EdgeConneX SAC01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sacramento"],"city":"Rancho Cordova","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. NoMWspecified; rackdensitynotwholefacility. Marketnameisnotparceladdress. SLI01operatoridentifiesSlidellratherthanmunicipalNewOrleans. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/americas/sacramento-ca/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.5922987,"lng":-121.27744,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"SAC01","facility_area_sqft":28500,"raised_floor_sqft":6500},"notes":["NoMWspecified; rackdensitynotwholefacility. Marketnameisnotparceladdress. SLI01operatoridentifiesSlidellratherthanmunicipalNewOrleans.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/americas/sacramento-ca/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Rancho Cordova · Sacramento · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"edgeconnex-sdg01-ca","state":"CA","kind":"facility","name":"EdgeConneX SDG01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Diego"],"city":"San Diego","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. NoMWspecified; rackdensitynotwholefacility. Marketnameisnotparceladdress. SLI01operatoridentifiesSlidellratherthanmunicipalNewOrleans. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/americas/san-diego-ca/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8423554,"lng":-117.1694226,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"SDG01","facility_area_sqft":9477,"raised_floor_sqft":2386},"notes":["NoMWspecified; rackdensitynotwholefacility. Marketnameisnotparceladdress. SLI01operatoridentifiesSlidellratherthanmunicipalNewOrleans.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/americas/san-diego-ca/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Diego · San Diego · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"edgecore-silicon-valley-santa-clara-ca","state":"CA","kind":"facility","name":"EdgeCore Silicon Valley Campus (Laurelwood Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Laurelwood historical CEQA project and power bases. 99MW is total load, not critical IT. Generator nameplates not extra usable IT or nonredundant demand.2019MND/SPPEapplication not observed current operations. Later EdgeCore identity/ownership requires separate crosswalk; applicant name alone not current owner. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2019089107/2","host":"ceqanet.lci.ca.gov","date":"2019-08-30","published":"2019-08-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3832941,"lng":-121.9624766,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Laurelwood historical CEQA project and power bases","fields":{"project_name":"Laurelwood Data Center","applicant":"MECP1 Santa Clara 1, LLC","address":"2201 Laurelwood Road, Santa Clara, California","parcel":"104-39-023","site_acres":13,"planned_data_center_buildings":2,"maximum_total_electrical_load_mw":99,"power_basis":"IT plus cooling and ancillary electrical/telecom load","backup_generator_count":56,"each_backup_generator_nameplate_mw":3,"notice_received_date":"2019-08-30"},"notes":["99MW is total load, not critical IT. Generator nameplates not extra usable IT or nonredundant demand.2019MND/SPPEapplication not observed current operations. Later EdgeCore identity/ownership requires separate crosswalk; applicant name alone not current owner.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2019089107/2","host":"ceqanet.lci.ca.gov","date":"2019-08-30","published":"2019-08-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"equinix-great-oaks-south-san-jose-ca","state":"CA","kind":"facility","name":"Equinix Great Oaks South Data Center (SV12, SV18, SV19)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Great Oaks South backup generating facility and three-building proposal. 99MW capacity is backup generation for all three buildings, not IT load. Do not sum36times3.25MWgenerator nameplates pluslife safety into usable critical capacity. Exemption is CEC jurisdictional step, not occupancy/operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/great-oaks-south-generating-facility","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.233028,"lng":-121.7807945,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Great Oaks South backup generating facility and three-building proposal","fields":{"energy_docket":"20-SPPE-01","project_owner_applicant":"SV1 LLC,wholly owned Equinix subsidiary","energy_project_status":"exempted","backup_generation_capacity_mw_max":99,"planned_data_center_buildings":3,"area_per_building_sqft":182350,"site_acres_approx":18,"published_building_addresses":["123 Great Oaks Boulevard,SanJose,CA","127 Great Oaks Boulevard,SanJose,CA","131 Great Oaks Boulevard,SanJose,CA"],"commission_final_decision_date":"2021-12-10"},"notes":["99MW capacity is backup generation for all three buildings, not IT load. Do not sum36times3.25MWgenerator nameplates pluslife safety into usable critical capacity. Exemption is CEC jurisdictional step, not occupancy/operating proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/great-oaks-south-generating-facility","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"equinix-la3-el-segundo-ca","state":"CA","kind":"facility","name":"Equinix LA3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"El Segundo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Explicitcolocationareanotwholebuilding. NoMWfromredundancyorfloorload. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/los-angeles-data-centers/la3","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9263426,"lng":-118.3940556,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"LA3","published_address":"1920 E Maple Ave, First Floor, El Segundo, CA90245","colocation_area_sqft":78318},"notes":["Explicitcolocationareanotwholebuilding. NoMWfromredundancyorfloorload.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/los-angeles-data-centers/la3","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · El Segundo · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"equinix-la4-el-segundo-ca","state":"CA","kind":"facility","name":"Equinix LA4","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"El Segundo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/los-angeles-data-centers/la4","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9219979,"lng":-118.383118,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"445 N Douglas St El Segundo, CA 90245","colocation_area_sqft":77263},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/los-angeles-data-centers/la4","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · El Segundo · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"equinix-sv1-ca","state":"CA","kind":"facility","name":"Equinix SV1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv1","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.2415975,"lng":-121.7833277,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"11 Great Oaks Boulevard San Jose, CA 95119","colocation_area_sqft":82850},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv1","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"equinix-sv15-ca","state":"CA","kind":"facility","name":"Equinix SV15","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv15","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3754952,"lng":-121.9884063,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"2970 Corvin Drive Pod C Santa Clara, CA 95051","colocation_area_sqft":28514},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv15","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"equinix-sv2-ca","state":"CA","kind":"facility","name":"Equinix SV2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv2","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3784704,"lng":-121.9549839,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"1350 Duane Ave Santa Clara, CA 95054","colocation_area_sqft":74971},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv2","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"equinix-sv4-ca","state":"CA","kind":"facility","name":"Equinix SV4","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Sunnyvale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv4","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.4145109,"lng":-122.0145563,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"255 Caspian Drive Sunnyvale, CA 94089","colocation_area_sqft":67619},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv4","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Sunnyvale · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"equinix-sv8-ca","state":"CA","kind":"facility","name":"Equinix SV8","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Palo Alto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv8","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.4458951,"lng":-122.160786,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"529 Bryant Street Palo Alto, CA 94301","colocation_area_sqft":26296},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv8","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Palo Alto · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"beacon-golden-valley-ca","state":"CA","kind":"facility","name":"Golden Valley Technology Hub","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kern"],"city":"Elk Hills","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. KERO RubyRivera originalinterviews onGoldenValleyTechnologyHub nearElkHills identifyCRC'sproposal on100acreswith400000sf INCLUDINGDC,substation,officesandparking. MetadataJune23,2026publication/June24update; bodydescribesproposalrequiringadditionalreviews/approvalsbeforeconstruction. No observedcommissioning/allpermits. Existingunderutilizedpowerplantasprimarysupply isdeveloperplan, notexecutedenergizedDCITload ornewgenerationapproval. Closed-loopnotzerowaterwithdrawal; resourceconcerns/supportiveviewsattributednotactualmeasuredharm/benefit. SourceprovidesnoITMW/actualspend; Beaconpartnership/legalcounterpartyunverifiedfromthisbodyalone. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.turnto23.com/news/in-your-neighborhood/taft-maricopa/massive-ai-data-center-proposed-for-kern-countys-elk-hills","host":"turnto23.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.36,"lng":-119.55,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["KERO RubyRivera originalinterviews onGoldenValleyTechnologyHub nearElkHills identifyCRC'sproposal on100acreswith400000sf INCLUDINGDC,substation,officesandparking. MetadataJune23,2026publication/June24update; bodydescribesproposalrequiringadditionalreviews/approvalsbeforeconstruction. No observedcommissioning/allpermits.","Existingunderutilizedpowerplantasprimarysupply isdeveloperplan, notexecutedenergizedDCITload ornewgenerationapproval. Closed-loopnotzerowaterwithdrawal; resourceconcerns/supportiveviewsattributednotactualmeasuredharm/benefit. SourceprovidesnoITMW/actualspend; Beaconpartnership/legalcounterpartyunverifiedfromthisbodyalone.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://www.turnto23.com/news/in-your-neighborhood/taft-maricopa/massive-ai-data-center-proposed-for-kern-countys-elk-hills","host":"turnto23.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Elk Hills · Kern · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"goodman-energy-park-vernon-ca","state":"CA","kind":"facility","name":"Goodman Energy Park Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"Vernon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Goodman Energy Park backup-power review. 99MW emergency generation is not criticalIT or grid export.38times3MWplus2times1MW nameplates include operational/redundant differences; do not sum into IT. No local permits, occupancy or opening established. Addresses differ from DataBank3094EVernon announcement; do not merge solely by Goodman association. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0055798,"lng":-118.2182202,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Goodman Energy Park backup-power review","fields":{"energy_docket":"25-SPPE-01","project_owner":"GIC Vernon LLC","energy_project_status":"under review","proposed_backup_generation_mw_max":99,"proposed_diesel_generators":40,"planned_data_center_buildings":2,"published_building_addresses":["3163 East Vernon Avenue,Vernon,California","3049 East Vernon Avenue,Vernon,California"]},"notes":["99MW emergency generation is not criticalIT or grid export.38times3MWplus2times1MW nameplates include operational/redundant differences; do not sum into IT. No local permits, occupancy or opening established. Addresses differ from DataBank3094EVernon announcement; do not merge solely by Goodman association.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Vernon · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"goodman-innovation-centre-san-jose-ca","state":"CA","kind":"facility","name":"Goodman Innovation Centre San Jose (NorthTown Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NorthTown backup generation, parcel identifiers and substation design. Backup MW, substation MVA and criticalIT are different bases. Two105MVAtransformers configured2to-make1, not210MVAusable. Eight3MWgenerators redundant. No parcel point researched or construction/occupancy proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/northtown-backup-generating-facility","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3806176,"lng":-121.9337744,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"NorthTown backup generation, parcel identifiers and substation design","fields":{"energy_docket":"25-SPPE-02","project_owner":"GIC San Jose LLC","energy_project_status":"under review","proposed_backup_generation_mw_max":97.3,"proposed_diesel_generators":42,"site_acres_approx":28.5,"published_project_parcels":["101-02-018","101-02-021"],"project_location_description":"southwest corner of West Trimble Road and Orchard Parkway,SanJose,California","substation_design_usable_mva":105},"notes":["Backup MW, substation MVA and criticalIT are different bases. Two105MVAtransformers configured2to-make1, not210MVAusable. Eight3MWgenerators redundant. No parcel point researched or construction/occupancy proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/northtown-backup-generating-facility","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"google-disk-drive-alviso-san-jose-ca","state":"CA","kind":"facility","name":"Google 5079-5087 Disk Drive Compute Campus (North San José)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Google named transmission-load draft resolution. DraftproposedoutcomeApprovesnotfinalCommissionapproval.230kVvoltage not250MWIT. Refundmethodologylimitsnotincentivepaid. Noobservedenergizationorfinalcostcap. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Google draft and actual October8 vote disposition. October8 voting-results table establishes hold, not approval; futureOctober29 result unobserved. Draft refundable capital advance is not a tax incentive paid or actual outlay. Updated100-percent draft refund methodology must not be replaced with75-percent term from distinct final Microsoft/Menlo resolutions.250MW remains full-build forecast, not current IT.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M607/K718/607718746.PDF","host":"docs.cpuc.ca.gov","date":"2026-07-16","published":"2026-07-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M620/K406/620406422.PDF","host":"docs.cpuc.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ia.cpuc.ca.gov/agendadocs/3588_results.pdf","host":"ia.cpuc.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.4256515,"lng":-121.9639616,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Google named transmission-load draft resolution","fields":{"draft_resolution":"E-5455","draft_resolution_date":"2026-07-16","utility_advice_letter":"7785-E","utility_advice_letter_filed":"2025-12-18","customer":"GoogleLLC","published_site_address":"5079 DiskDrive,SanJose,California","proposed_fullbuild_customer_load_mw":250,"power_basis":"transmissionretailcustomerload,notexplicitcriticalIT","proposed_construction_start_month":"2027-01","proposed_in_service_month":"2028-12","document_status":"DRAFT"},"notes":["DraftproposedoutcomeApprovesnotfinalCommissionapproval.230kVvoltage not250MWIT. Refundmethodologylimitsnotincentivepaid. Noobservedenergizationorfinalcostcap.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M607/K718/607718746.PDF","host":"docs.cpuc.ca.gov","date":"2026-07-16","published":"2026-07-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"utility-decisions-round8-2026-10-14.json","scope":"Google draft and actual October8 vote disposition","fields":{"resolution":"E-5455","current_reviewed_draft_date":"2026-10-08","advice_letter":"7785-E","published_site_address":"5079 Disk Drive, San Jose, California","fullbuild_customer_load_mw":250,"power_basis":"whole transmission-level customer load, not explicit critical IT","commission_meeting_date":"2026-10-08","commission_meeting_item":2,"meeting_outcome":"held for further review","next_scheduled_consideration":"2026-10-29","draft_additional_capital_advance_usd_per_mw":600000,"draft_annual_refund_limit_percent_net_revenue":100,"income_tax_component_adjustment_additional":true},"notes":["October8 voting-results table establishes hold, not approval; futureOctober29 result unobserved. Draft refundable capital advance is not a tax incentive paid or actual outlay. Updated100-percent draft refund methodology must not be replaced with75-percent term from distinct final Microsoft/Menlo resolutions.250MW remains full-build forecast, not current IT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M620/K406/620406422.PDF","host":"docs.cpuc.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ia.cpuc.ca.gov/agendadocs/3588_results.pdf","host":"ia.cpuc.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"raeden-grand-crossing-south-city-of-industry-ca","state":"CA","kind":"facility","name":"Grand Crossing South - Building 10","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"City of Industry","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RAEDEN portfolio fails California exact-site match. GenericRAEDENportfolioonlyPhoenix1710EastGrant,Detroit615LafayetteandMiami100Biscayne. NoGrandCrossingSouthCityofIndustryCaliforniasitematch. Othermarket2MWand6000sqftnotassignedtoCaliforniarecord. Absencefrompagealone notproofCaliforniaclosed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://raeden.com/data-centers/","host":"raeden.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0051077,"lng":-117.8333142,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"RAEDEN portfolio fails California exact-site match","fields":{},"notes":["GenericRAEDENportfolioonlyPhoenix1710EastGrant,Detroit615LafayetteandMiami100Biscayne. NoGrandCrossingSouthCityofIndustryCaliforniasitematch. Othermarket2MWand6000sqftnotassignedtoCaliforniarecord. Absencefrompagealone notproofCaliforniaclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://raeden.com/data-centers/","host":"raeden.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · City of Industry · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"hines-hayward-exchange-92-ca","state":"CA","kind":"facility","name":"Hayward Exchange @92 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Alameda"],"city":"Hayward","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three identified Hayward sites with separate future STACK context. STACK SVY03A separately under construction with76.6MW BACKUP generation, not IT. City says no municipal tax incentives for STACK; this does not exclude state benefits or transfer to Amazon/Hines. April2026 category change does not retroactively redate older approvals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","host":"hayward-ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.631411,"lng":-122.119608,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"three identified Hayward sites with separate future STACK context","fields":{"named_sites":[{"name":"Amazon SF09","government_reported_status":"operating","advertised_capacity_mw":24,"capacity_basis":"not explicit IT","permit_approval_date":"2010-07-09"},{"name":"Amazon SF011","government_reported_status":"operating","estimated_capacity_mw":35,"capacity_basis":"not explicit IT","permit_approval_date":"2015-02-20"},{"name":"Hayward Exchange at92","government_reported_status":"operating","estimated_capacity_mw":49,"capacity_basis":"not explicit IT","permit_approval_date":"2021-02-11"}]},"notes":["STACK SVY03A separately under construction with76.6MW BACKUP generation, not IT. City says no municipal tax incentives for STACK; this does not exclude state benefits or transfer to Amazon/Hines. April2026 category change does not retroactively redate older approvals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hayward-ca.gov/business/for-developers/data-center-development-applications","host":"hayward-ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Hayward · Alameda · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"ivcm-imperial-county-ca","state":"CA","kind":"facility","name":"Imperial Valley Computer Manufacturing AI Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Imperial"],"city":"Imperial","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Keep tenant unknown; speculation is not a Google commitment. The proposed 330 MW basis is undefined and reclaimed-water demand is prospective. Lot merger and litigation stages are not all permits or final court clearance. Competing job projections stay attributed; irrelevant personal allegations are excluded. A petition is not an enacted ban. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://inewsource.org/2026/04/05/data-center-developer-imperial-county/","host":"inewsource.org","date":"2026-04-05","published":"2026-04-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.847,"lng":-115.569,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"inewsource describes the IVCM Imperial County proposal as a land-and-permit package, with a Google spokesperson explicitly denying involvement and the developer identifying no agreement.","independently_verified_current_operating_status":null,"confirmed_google_involvement":false,"identified_tenant":null},"notes":["Keep tenant unknown; speculation is not a Google commitment. The proposed 330 MW basis is undefined and reclaimed-water demand is prospective. Lot merger and litigation stages are not all permits or final court clearance. Competing job projections stay attributed; irrelevant personal allegations are excluded. A petition is not an enacted ban.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://inewsource.org/2026/04/05/data-center-developer-imperial-county/","host":"inewsource.org","date":"2026-04-05","published":"2026-04-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Imperial · Imperial · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"global-stack-kings-county-fairgrounds-hanford-ca","state":"CA","kind":"facility","name":"Kings County Fairgrounds Edge Data Center (Global Stack proposal)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kings"],"city":"Hanford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. This is not an original lease or approval. Statewide site ambitions, proposed lease length and program investment are not local capex. Uncorroborated governor-moratorium and legislative claims are excluded pending original orders. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hoodline.com/2026/09/hanford-data-center-fight-turns-into-a-california-midterm-battleground/","host":"hoodline.com","date":"2026-09-06","published":"2026-09-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.3174744,"lng":-119.6346519,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"A Hoodline roundup describes Global Stack's Hanford fairgrounds evaluation without a formal proposal.","independently_verified_current_operating_status":null},"notes":["This is not an original lease or approval. Statewide site ambitions, proposed lease length and program investment are not local capex. Uncorroborated governor-moratorium and legislative claims are excluded pending original orders.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hoodline.com/2026/09/hanford-data-center-fight-turns-into-a-california-midterm-battleground/","host":"hoodline.com","date":"2026-09-06","published":"2026-09-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Hanford · Kings · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"lumen-sunnyvale-1-ca","state":"CA","kind":"facility","name":"Lumen Sunnyvale 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Sunnyvale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Distinct from H5 at1360 and Csquare at1400 in earlier operator review. Source ZIP98108 retained as an inconsistency, not adopted or used for a map pin. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3734695,"lng":-121.9878002,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Lumen","listed_address":"1380 Kifer Rd","listed_city":"Sunnyvale","listed_state":"CA"},"notes":["Distinct from H5 at1360 and Csquare at1400 in earlier operator review. Source ZIP98108 retained as an inconsistency, not adopted or used for a map pin.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Sunnyvale · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"martin-data-center-santa-clara-ca","state":"CA","kind":"facility","name":"Martin Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Martin backup-generation project. 96MW emergency backup, not IT. Forty-four2.75MWnameplates include support/redundancy, not121MWusableIT. SPPE exemption is not local construction or occupancy clearance. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/martin-backup-generating-facility-mbgf","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3663437,"lng":-121.945885,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Martin backup-generation project","fields":{"energy_docket":"22-SPPE-03","project_owner":"Martin Avenue Properties LLC","energy_project_status":"exempted","proposed_backup_generation_mw_max":96,"proposed_diesel_generators":44,"published_project_address":"651 Martin Avenue,SantaClara,California","application_materials_received_date":"2022-11-17"},"notes":["96MW emergency backup, not IT. Forty-four2.75MWnameplates include support/redundancy, not121MWusableIT. SPPE exemption is not local construction or occupancy clearance.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/martin-backup-generating-facility-mbgf","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"menlo-digital-md-sv1-ross-drive-sunnyvale-ca","state":"CA","kind":"facility","name":"Menlo Digital MD-SV1 (888-894 Ross Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Sunnyvale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Menlo Ross Drive named customer load in draft utility resolution. Draft proposed approval language is not a final CPUC decision or observed energization. Proposed 75-percent annual net-revenue refund limit plus ITCC adjustment over fifteen years is not an actual refund or upfront grant. 115 kV is interconnection voltage, not additional MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. California adopted customer-load resolution. Final adopted resolution supersedes earlier draft status only. Approval of customer-specific agreement does not certify construction completion, full energized load, actual refunds paid, a tax exemption or a statewide tariff. Follow-up modified agreement approval remains a separate procedural step. Source issuance date differs from adoption/effective date.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M602/K365/602365009.pdf","host":"docs.cpuc.ca.gov","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M602/K988/602988978.PDF","host":"docs.cpuc.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.4009443,"lng":-122.0324832,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Menlo Ross Drive named customer load in draft utility resolution","fields":{"draft_resolution":"E-5433","draft_date":"2026-03-19","utility_advice_letter":"7667-E","utility_advice_letter_filed":"2025-08-04","customer":"Sunnyvale Technology Partners LLC c/o Menlo Equities","published_site_address":"888 Ross Drive, Sunnyvale, California","proposed_customer_load_mw":49,"power_basis":"whole customer data-center and computing-lab transmission load, not explicit critical IT","operation_target_month":"2027-06","proposed_load_ramp_years":5,"document_status":"DRAFT"},"notes":["Draft proposed approval language is not a final CPUC decision or observed energization. Proposed 75-percent annual net-revenue refund limit plus ITCC adjustment over fifteen years is not an actual refund or upfront grant. 115 kV is interconnection voltage, not additional MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M602/K365/602365009.pdf","host":"docs.cpuc.ca.gov","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"utility-decisions-round8-2026-10-14.json","scope":"California adopted customer-load resolution","fields":{"final_resolution":"E-5433","adoption_effective_date":"2026-03-19","issuance_date":"2026-03-20","approved_subject":"customer-specific transmission energization agreement with modifications","customer_load_mw":49,"power_basis":"whole customer transmission load, not explicit critical IT","published_site_address":"888 Ross Drive, Sunnyvale, California","operator_operation_target_month":"2027-06","annual_infrastructure_refund_limit_percent_net_revenue":75,"income_tax_component_adjustment_additional":true,"refund_period_years":15},"notes":["Final adopted resolution supersedes earlier draft status only. Approval of customer-specific agreement does not certify construction completion, full energized load, actual refunds paid, a tax exemption or a statewide tariff. Follow-up modified agreement approval remains a separate procedural step. Source issuance date differs from adoption/effective date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M602/K988/602988978.PDF","host":"docs.cpuc.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Sunnyvale · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"microsoft-alviso-san-jose-ca","state":"CA","kind":"facility","name":"Microsoft Alviso Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose (Alviso)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft SJC02 named transmission-load draft resolution. Proposed outcome text does not prove final approval or operating status. Proposed 75-percent net-revenue refund cap plus ITCC over fifteen years is not an actual tax incentive paid. Redundant 115-kV line is not additional usable MW or a second data center. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. California adopted customer-load resolution. Final adopted resolution supersedes earlier draft status only. Approval of customer-specific agreement does not certify construction completion, full energized load, actual refunds paid, a tax exemption or a statewide tariff. Follow-up modified agreement approval remains a separate procedural step. Source issuance date differs from adoption/effective date.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M594/K913/594913838.PDF","host":"docs.cpuc.ca.gov","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M595/K970/595970063.PDF","host":"docs.cpuc.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.428,"lng":-121.977,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Microsoft SJC02 named transmission-load draft resolution","fields":{"draft_resolution":"E-5439","draft_date":"2026-01-15","utility_advice_letter":"7635-E","utility_advice_letter_filed":"2025-07-01","customer":"Microsoft Corporation","project":"SJC02","published_site_address":"1657 Alviso-Milpitas Road, San Jose, California","proposed_customer_load_mw":90,"power_basis":"whole customer transmission load, not explicit critical IT","operation_target_month":"2027-01","document_status":"DRAFT"},"notes":["Proposed outcome text does not prove final approval or operating status. Proposed 75-percent net-revenue refund cap plus ITCC over fifteen years is not an actual tax incentive paid. Redundant 115-kV line is not additional usable MW or a second data center.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M594/K913/594913838.PDF","host":"docs.cpuc.ca.gov","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"utility-decisions-round8-2026-10-14.json","scope":"California adopted customer-load resolution","fields":{"final_resolution":"E-5439","adoption_effective_date":"2026-01-15","issuance_date":"2026-01-20","approved_subject":"customer-specific transmission energization agreement with modifications","customer_load_mw":90,"power_basis":"whole customer transmission load, not explicit critical IT","published_site_address":"1657 Alviso-Milpitas Road, San Jose, California","operator_operation_target_month":"2027-01","annual_infrastructure_refund_limit_percent_net_revenue":75,"income_tax_component_adjustment_additional":true,"refund_period_years":15},"notes":["Final adopted resolution supersedes earlier draft status only. Approval of customer-specific agreement does not certify construction completion, full energized load, actual refunds paid, a tax exemption or a statewide tariff. Follow-up modified agreement approval remains a separate procedural step. Source issuance date differs from adoption/effective date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M595/K970/595970063.PDF","host":"docs.cpuc.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose (Alviso) · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"microsoft-orchard-parkway-san-jose-ca","state":"CA","kind":"facility","name":"Microsoft San Jose Data Center Campus (SJ04)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SJDC04 environmental review and backup-power scope. 97.8MWexplicitlybackup,notIT. Stated32x3+2x0.5+2x0.8equals98.6MWnameplate, not97.8; preserve published effective generation distinction/rounding hold rather than overwrite. Notice of preparation is review start, not project approval or operations. CEC says it determines exemption only, not construction approval. No tenant lease read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2023020229","host":"ceqanet.lci.ca.gov","date":"2023-02-09","published":"2023-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3796338,"lng":-121.9307551,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"SJDC04 environmental review and backup-power scope","fields":{"project_name":"San Jose Data Center04","cec_case":"22-SPPE-02","notice_received_date":"2023-02-09","site_acres_approx":22.29,"parcels":["101-02-020","101-02-019"],"cross_streets":"Orchard Parkway and Component Drive, San Jose","planned_data_center_buildings":2,"published_backup_generation_mw_max":97.8,"critical_it_mw":null},"notes":["97.8MWexplicitlybackup,notIT. Stated32x3+2x0.5+2x0.8equals98.6MWnameplate, not97.8; preserve published effective generation distinction/rounding hold rather than overwrite. Notice of preparation is review start, not project approval or operations. CEC says it determines exemption only, not construction approval. No tenant lease read.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2023020229","host":"ceqanet.lci.ca.gov","date":"2023-02-09","published":"2023-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"mission-college-data-center-santa-clara-ca","state":"CA","kind":"facility","name":"Mission College Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Mission College historical notice and generator scope. 78.1MWgenerationnotIToraddedgridload. Nameplate totals and usable generation differ with redundancy, not summable as available compute. CEQA/CECdeterminationnotallbuildingpermitsorobservedopening. Do not infer university owner just from MissionCollegeBoulevard name. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2020040254/3","host":"ceqanet.lci.ca.gov","date":"2020-08-18","published":"2020-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3887231,"lng":-121.9668334,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Mission College historical notice and generator scope","fields":{"project_name":"Mission College Data Center","address":"2305 Mission College Boulevard, Santa Clara, California","agency_approval_date":"2020-08-12","notice_received_date":"2020-08-13","notice_posted_date":"2020-08-18","planned_buildings":2,"planned_each_building_stories":3,"total_building_area_sqft":490000,"published_backup_generation_capacity_mw_max":78.1,"backup_main_generator_count":43,"each_main_generator_mw":2.5,"backup_house_generator_count":2,"each_house_generator_kw":600,"applicant":"Oppidan"},"notes":["78.1MWgenerationnotIToraddedgridload. Nameplate totals and usable generation differ with redundancy, not summable as available compute. CEQA/CECdeterminationnotallbuildingpermitsorobservedopening. Do not infer university owner just from MissionCollegeBoulevard name.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2020040254/3","host":"ceqanet.lci.ca.gov","date":"2020-08-18","published":"2020-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"nautilus-stockton-1-ca","state":"CA","kind":"facility","name":"Nautilus Stockton 1 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Joaquin"],"city":"Stockton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nautilus historical barge site notice. Listed1462acres is broad port/site context, not verified barge/data-center footprint.2018fiveyearleaseproposaldoesnotprovecurrentrenewaloroperation. Waterwithdrawalnotautomaticallyconsumption. No numeric ITMW or later commission date in reviewed notice. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2016062010/2","host":"ceqanet.lci.ca.gov","date":"2018-09-21","published":"2018-09-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.9633,"lng":-121.3681,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Nautilus historical barge site notice","fields":{"project_name":"Nautilus waterborne data storage facility","agency_approval_date":"2018-09-21","locality":"northwest area of Port of Stockton West Complex, California","parcel_reference":"16203007","historic_proposed_port_lease_years":5,"cooling_description":"San Joaquin River water used to cool barge-mounted equipment"},"notes":["Listed1462acres is broad port/site context, not verified barge/data-center footprint.2018fiveyearleaseproposaldoesnotprovecurrentrenewaloroperation. Waterwithdrawalnotautomaticallyconsumption. No numeric ITMW or later commission date in reviewed notice.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2016062010/2","host":"ceqanet.lci.ca.gov","date":"2018-09-21","published":"2018-09-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Stockton · San Joaquin · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"northpoint-fairfield-data-center-solano-ca","state":"CA","kind":"facility","name":"NorthPoint Fairfield Data Center (Vanden Road Industrial Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Solano"],"city":"Fairfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The proposed 150 MW is unspecified basis, not operating IT. Promotional by-right/near-complete entitlement claims differ from the city's stated next formal application/public hearing. Wastewater excess capacity is not consumption or secured water rights. A proposed county tax ballot applies to unincorporated land, not this city parcel, and has no observed election outcome. Other Solano/Pittsburg projects are separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. A promised motion and resident petition are not an adopted moratorium. The future meeting has no observed outcome. The article dates the wider master-development permit to August 23, 2023; that is not a DC construction permit. By-right email and participant legal views do not establish all approvals or a final grandfathering result.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.vallejosun.com/developers-planning-data-center-for-fairfield-industrial-park/","host":"vallejosun.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.vallejosun.com/fairfield-and-vacaville-residents-organize-opposition-to-data-center-project/","host":"vallejosun.com","date":"2026-10-14","published":"2026-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.2898329,"lng":-121.9607882,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Vallejo Sun describes NorthPoint/JLL marketing of Project North Bay Solutions at Canon Partners' Fairfield industrial property, with a broader 2023 master-development approval but no subsequent detailed development application according to the city.","independently_verified_current_operating_status":null},"notes":["The proposed 150 MW is unspecified basis, not operating IT. Promotional by-right/near-complete entitlement claims differ from the city's stated next formal application/public hearing. Wastewater excess capacity is not consumption or secured water rights. A proposed county tax ballot applies to unincorporated land, not this city parcel, and has no observed election outcome. Other Solano/Pittsburg projects are separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.vallejosun.com/developers-planning-data-center-for-fairfield-industrial-park/","host":"vallejosun.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Later reporting says Fairfield staff still had no formal project application, while a vice mayor intended to move for a moratorium at the October 20 council meeting.","reported_next_council_date":"2026-10-20","moratorium_adopted_verified":false,"current_dc_application_verified":false},"notes":["A promised motion and resident petition are not an adopted moratorium. The future meeting has no observed outcome.","The article dates the wider master-development permit to August 23, 2023; that is not a DC construction permit. By-right email and participant legal views do not establish all approvals or a final grandfathering result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.vallejosun.com/fairfield-and-vacaville-residents-organize-opposition-to-data-center-project/","host":"vallejosun.com","date":"2026-10-14","published":"2026-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Fairfield · Solano · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"novva-san-francisco-400-paul-avenue-ca","state":"CA","kind":"facility","name":"Novva San Francisco (400 Paul Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Francisco"],"city":"San Francisco","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Novva San Francisco marketed capacity and separate area categories. No exact400PaulAvenueaddress in reviewed text; base identity crosswalk and precise municipal locality remain separate. Current marketing presents capacity, but no metered energization or dated opening independently established. Datahall andoffice areas retain categories. Adherence-to-standards wording not independently certified audits. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.novva.com/data-center-facilities/san-francisco-ca/","host":"novva.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.72315,"lng":-122.398467,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Novva San Francisco marketed capacity and separate area categories","fields":{"published_campus_acres":7.5,"advertised_critical_load_mw":36,"data_hall_area_sqft":182000,"office_and_operations_support_area_sqft":56000},"notes":["No exact400PaulAvenueaddress in reviewed text; base identity crosswalk and precise municipal locality remain separate. Current marketing presents capacity, but no metered energization or dated opening independently established. Datahall andoffice areas retain categories. Adherence-to-standards wording not independently certified audits.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.novva.com/data-center-facilities/san-francisco-ca/","host":"novva.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Francisco · San Francisco · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"ntt-sacramento-ca1-data-center-ca","state":"CA","kind":"facility","name":"NTT Sacramento CA1 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sacramento"],"city":"Sacramento","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. Floor hold:HTML 85,000 sq ft versus linked PDF 105,805. No preferred exact floor adopted. 52.7 MW campus contains CA1, CA2, CA3 and must not be added to those components. Campus HTML 266,000 sq ft versus PDF 237,578 is another unresolved scope/vintage conflict. Green-energy claim does not establish hourly carbon-free operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/sacramento-ca-1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/794f769e12db48f7aff1e36cb518f5e7?v=b97004c3","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.6504319,"lng":-121.4891868,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":12.6,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":null,"operator_published_address":"1200 Striker Avenue, Sacramento, CA 95834","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","Floor hold:HTML 85,000 sq ft versus linked PDF 105,805. No preferred exact floor adopted.","52.7 MW campus contains CA1, CA2, CA3 and must not be added to those components. Campus HTML 266,000 sq ft versus PDF 237,578 is another unresolved scope/vintage conflict. Green-energy claim does not establish hourly carbon-free operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/sacramento-ca-1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/794f769e12db48f7aff1e36cb518f5e7?v=b97004c3","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Sacramento · Sacramento · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"ntt-sacramento-ca2-data-center-ca","state":"CA","kind":"facility","name":"NTT Sacramento CA2 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sacramento"],"city":"Sacramento","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. 52.7 MW campus contains CA1, CA2, CA3 and must not be added to those components. Campus HTML 266,000 sq ft versus PDF 237,578 is another unresolved scope/vintage conflict. Green-energy claim does not establish hourly carbon-free operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nttdata.com/en-us/services/global-data-centers/global-locations/americas/sacramento-data-centers/sacramento-ca-2-data-center","host":"nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.6504002,"lng":-121.4919461,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":26.1,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":87855,"operator_published_address":"1200 Striker Avenue, Sacramento, CA 95834","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","52.7 MW campus contains CA1, CA2, CA3 and must not be added to those components. Campus HTML 266,000 sq ft versus PDF 237,578 is another unresolved scope/vintage conflict. Green-energy claim does not establish hourly carbon-free operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nttdata.com/en-us/services/global-data-centers/global-locations/americas/sacramento-data-centers/sacramento-ca-2-data-center","host":"nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Sacramento · Sacramento · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"ntt-sacramento-ca3-data-center-ca","state":"CA","kind":"facility","name":"NTT Sacramento CA3 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sacramento"],"city":"Sacramento","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. Floor hold:HTML64,723 sq ft versus linked PDF 68,469. Source address corrects baseline malformed NationalDriveq string in review only; base not edited. 52.7 MW campus contains CA1, CA2, CA3 and must not be added to those components. Campus HTML 266,000 sq ft versus PDF 237,578 is another unresolved scope/vintage conflict. Green-energy claim does not establish hourly carbon-free operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nttdata.com/en-us/services/global-data-centers/global-locations/americas/sacramento-data-centers/sacramento-ca-3-data-center","host":"nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/74a2de9e1c3a47938e33436a3be41bf9?v=9d30cd8e","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.6442393,"lng":-121.4987627,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":14,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":null,"operator_published_address":"1625 W National Drive, Sacramento, CA 95834","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","Floor hold:HTML64,723 sq ft versus linked PDF 68,469. Source address corrects baseline malformed NationalDriveq string in review only; base not edited.","52.7 MW campus contains CA1, CA2, CA3 and must not be added to those components. Campus HTML 266,000 sq ft versus PDF 237,578 is another unresolved scope/vintage conflict. Green-energy claim does not establish hourly carbon-free operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nttdata.com/en-us/services/global-data-centers/global-locations/americas/sacramento-data-centers/sacramento-ca-3-data-center","host":"nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/74a2de9e1c3a47938e33436a3be41bf9?v=9d30cd8e","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Sacramento · Sacramento · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"ntt-silicon-valley-sv1-data-center-ca","state":"CA","kind":"facility","name":"NTT Silicon Valley SV1 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/silicon-valley-sv1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3690532,"lng":-121.9553378,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":16,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":64000,"operator_published_address":"1160 Walsh Avenue, Santa Clara, CA 95050","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/silicon-valley-sv1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"one-data-center-america-ontario-ca","state":"CA","kind":"facility","name":"One Data Center America (Ontario Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Bernardino"],"city":"Ontario","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ODCA operator Ontario second-site claim. Undatednowopenstatementnotexactopeningdate. No street/parcel or numericIT. Serveradvertisingprices/OSinstallationcountsnotfacilitycapacity. Claimed9.99ratingandtestimonialsnotindependentperformance. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://onedatacenteramerica.com","host":"onedatacenteramerica.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0633,"lng":-117.6509,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"ODCA operator Ontario second-site claim","fields":{"operator":"One Data Center America","operator_site_code":"ONT-2","operator_described_status":"now open","locality":"Ontario, California"},"notes":["Undatednowopenstatementnotexactopeningdate. No street/parcel or numericIT. Serveradvertisingprices/OSinstallationcountsnotfacilitycapacity. Claimed9.99ratingandtestimonialsnotindependentperformance.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://onedatacenteramerica.com","host":"onedatacenteramerica.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Ontario · San Bernardino · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"prime-1231-comstock-santa-clara-ca","state":"CA","kind":"facility","name":"Prime Data Centers 1231 Comstock Street","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The article's later display/update timestamps are not a different vote. Proposed 15-year taxes are not receipts. A recusal and one opposing member do not supply a vote denominator without the roster. Separate city budget, salary, property and equipment expenditures are not the DC project's cost or incentives. No current RFS or MW established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.svvoice.com/another-data-center-coming-to-santa-clara/","host":"svvoice.com","date":"2024-12-04","published":"2024-12-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.375002,"lng":-121.9548775,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Silicon Valley Voice reports a December 3 council decision upholding Prime's appeal for a Comstock data-center proposal after the planning commission's earlier rejection.","independently_verified_current_operating_status":null},"notes":["The article's later display/update timestamps are not a different vote. Proposed 15-year taxes are not receipts. A recusal and one opposing member do not supply a vote denominator without the roster. Separate city budget, salary, property and equipment expenditures are not the DC project's cost or incentives. No current RFS or MW established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.svvoice.com/another-data-center-coming-to-santa-clara/","host":"svvoice.com","date":"2024-12-04","published":"2024-12-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"prime-lax01-vernon-ca","state":"CA","kind":"facility","name":"Prime Data Centers LAX01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"Vernon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. Opening supported, but33MWexplicitlyfullbuildfuture, not all energized atceremony. Fullyleased is not measuredusage. Waterrestoration120percent is certificate commitment, not negative physical wateruse. Corporate5GWroadmap excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/prime-data-centers-announces-the-opening-of-its-hyperscale-data-center-in-vernon-california-302305195.html","host":"prnewswire.com","date":"2024-11-14","published":"2024-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.0014335,"lng":-118.2303092,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"opening_announcement":"2024-11-14","operator_site_code":"LAX01-01","published_address":"4701 S Santa Fe, Vernon, CA","floors":3,"area_sqft":242495,"full_build_critical_it_mw":33,"lease_status_at_release":"fully leased to two AI companies"},"notes":["Opening supported, but33MWexplicitlyfullbuildfuture, not all energized atceremony. Fullyleased is not measuredusage. Waterrestoration120percent is certificate commitment, not negative physical wateruse. Corporate5GWroadmap excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/prime-data-centers-announces-the-opening-of-its-hyperscale-data-center-in-vernon-california-302305195.html","host":"prnewswire.com","date":"2024-11-14","published":"2024-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Vernon · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"prologis-326-charcot-avenue-san-jose-ca","state":"CA","kind":"facility","name":"Prologis 326 Charcot Avenue Data Center (North San José)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 99 MW is total power, not confirmed critical IT. Office space is included in the described complex rather than automatically additive. Proposed developer-funded upgrades and carbon-free enrollment are intentions, not executed service or measured emissions. PG&E's regional queue and unnamed power-hookup projects are not available spare capacity or this site's approvals. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pressdemocrat.com/2026/09/25/tech-san-jose-data-pge-ai-property-economy-build-real-estate-prologis/","host":"pressdemocrat.com","date":"2026-09-25","published":"2026-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.381800835839,"lng":-121.915780681274,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Bay Area News Group reports Prologis' Charcot proposal with city and state utility decisions still pending, construction forecast for 2028 and operation possibly in 2030.","independently_verified_current_operating_status":null},"notes":["The 99 MW is total power, not confirmed critical IT. Office space is included in the described complex rather than automatically additive. Proposed developer-funded upgrades and carbon-free enrollment are intentions, not executed service or measured emissions. PG&E's regional queue and unnamed power-hookup projects are not available spare capacity or this site's approvals.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pressdemocrat.com/2026/09/25/tech-san-jose-data-pge-ai-property-economy-build-real-estate-prologis/","host":"pressdemocrat.com","date":"2026-09-25","published":"2026-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"prologis-rue-ferrari-san-jose-ca","state":"CA","kind":"facility","name":"Prologis 5853 Rue Ferrari","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Rue Ferrari R&D conversion does not establish DC classification. Notice describesR&D/laboratoryusewithbackups/cooling,notexplicitapproveddata-centeruse. HoldDCclassificationwithoutseparatepermitdefinition.140jobsfieldnotautomaticallycurrentDCpermanentjobs. Multi-citylocationlistnotmultiplesites.300000sqftisexistingbuildingnotnewaddition. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2022010266/2","host":"ceqanet.lci.ca.gov","date":"2025-12-18","published":"2025-12-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.247993,"lng":-121.778138,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Rue Ferrari R&D conversion does not establish DC classification","fields":{"project_name":"5853 Rue Ferrari Project","agency_approval_date":"2025-12-10","notice_posted_date":"2025-12-18","address":"5853 Rue Ferrari, San Jose, California","parcel":"678-05-057","site_gross_acres_approx":17.4,"existing_building_sqft_approx":300000,"approved_use_description":"research and development/laboratory use conversion of existing warehouse","applicant":"Prologis LP","critical_it_mw":null},"notes":["Notice describesR&D/laboratoryusewithbackups/cooling,notexplicitapproveddata-centeruse. HoldDCclassificationwithoutseparatepermitdefinition.140jobsfieldnotautomaticallycurrentDCpermanentjobs. Multi-citylocationlistnotmultiplesites.300000sqftisexistingbuildingnotnewaddition.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2022010266/2","host":"ceqanet.lci.ca.gov","date":"2025-12-18","published":"2025-12-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"prologis-silver-creek-valley-san-jose-ca","state":"CA","kind":"facility","name":"Prologis Silver Creek Valley Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower. GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them","host":"kqed.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.25,"lng":-121.79,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower.","GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them","host":"kqed.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"prologis-stem-park-zanker-road-san-jose-ca","state":"CA","kind":"facility","name":"Prologis STEM Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower. GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified. SanJoseInside November10,2025 reproducesCITYrelease: PrologisPREFERREDdeveloper159acreSTEMbufferland Hwy237/Zanker. November18councilnegotiationagreementstillfuture, laterenvironmentalreview/publichearings/finaldevelopmentGROUNDLEASEfuture, notfullyexecutedlease/deedpurchase/operatingcampus. 6000jobs/30Mannualtaxforecast mixedDCandadvancedmanufacturingnot6000DCops. First250MWavailability andfuture496MWscope not746MWsum. Regional2000MWrequests and2000MWtransmissionexpansion notPrologisIT. Leaseproceedsintendedratepayerbenefitnotverifiedpayment.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them","host":"kqed.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.sanjoseinside.com/news/prologis-inc-wins-bid-for-one-of-the-largest-economic-development-projects-in-south-bay/","host":"sanjoseinside.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.423,"lng":-121.943,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower.","GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them","host":"kqed.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["SanJoseInside November10,2025 reproducesCITYrelease: PrologisPREFERREDdeveloper159acreSTEMbufferland Hwy237/Zanker. November18councilnegotiationagreementstillfuture, laterenvironmentalreview/publichearings/finaldevelopmentGROUNDLEASEfuture, notfullyexecutedlease/deedpurchase/operatingcampus.","6000jobs/30Mannualtaxforecast mixedDCandadvancedmanufacturingnot6000DCops. First250MWavailability andfuture496MWscope not746MWsum. Regional2000MWrequests and2000MWtransmissionexpansion notPrologisIT. Leaseproceedsintendedratepayerbenefitnotverifiedpayment.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.sanjoseinside.com/news/prologis-inc-wins-bid-for-one-of-the-largest-economic-development-projects-in-south-bay/","host":"sanjoseinside.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"puente-hills-mall-data-center-city-of-industry-ca","state":"CA","kind":"facility","name":"Puente Hills Mall Redevelopment Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"City of Industry","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. A potential 10 MW use is not a tenant, approved permit or current IT load. Building 10/Raeden, the former school and the wider IBC campus are separate prospects. Thirty MVA is apparent power, not MW without power factor. A battery proposal is explicitly not formally linked. Citywide planning recommendation is not council enactment; no private residential details copied. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://investigatela.org/2026/03/02/city-of-industry-discussed-data-center-sites-months-before-zoning-vote/","host":"investigatela.org","date":"2026-03-02","published":"2026-03-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.9926096,"lng":-117.9278263,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Investigate LA describes a possible data-center component in Puente Hills Mall's industrial redevelopment and citywide zoning discussions, with council consideration not yet scheduled.","independently_verified_current_operating_status":null},"notes":["A potential 10 MW use is not a tenant, approved permit or current IT load. Building 10/Raeden, the former school and the wider IBC campus are separate prospects. Thirty MVA is apparent power, not MW without power factor. A battery proposal is explicitly not formally linked. Citywide planning recommendation is not council enactment; no private residential details copied.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://investigatela.org/2026/03/02/city-of-industry-discussed-data-center-sites-months-before-zoning-vote/","host":"investigatela.org","date":"2026-03-02","published":"2026-03-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · City of Industry · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"qts-sacramento-ca","state":"CA","kind":"facility","name":"QTS Sacramento","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sacramento"],"city":"Sacramento","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Redundancy, structural seismic standard and capacity do not establish measured power use or present utilization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/sacramento/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.6463763,"lng":-121.4862686,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"site_acres":7,"advertised_critical_power_mw_lower_bound":4},"notes":["Redundancy, structural seismic standard and capacity do not establish measured power use or present utilization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/sacramento/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Sacramento · Sacramento · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"qts-santa-clara-1-ca","state":"CA","kind":"facility","name":"QTS Santa Clara 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Multi-building campus specification, not individual building totals or measured utilization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/santa-clara/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3939862,"lng":-121.9783207,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":4,"advertised_critical_campus_mw":7.5},"notes":["Multi-building campus specification, not individual building totals or measured utilization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/santa-clara/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"quest-roseville-habc-ca","state":"CA","kind":"facility","name":"Quest Roseville HABC","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Placer"],"city":"Roseville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Named provider/address context; no HABC code, current occupancy or Tier award inspected. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.78829,"lng":-121.313874,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Quest Data Center","listed_address":"9000 Foothills Blvd","listed_city":"Roseville","listed_state":"CA"},"notes":["Named provider/address context; no HABC code, current occupancy or Tier award inspected.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Roseville · Placer · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"rb-inyokern-data-center-ca","state":"CA","kind":"facility","name":"RB Inyokern Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kern"],"city":"Inyokern","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. current public docket activity, no substantive determination. Docket contains public support and opposition, not regulator findings proving commenters claims. No final approval, parcel, current site MW, hearing outcome or investment adopted from comment titles. Individual commenters not added to outreach list. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=26-SPPE-01","host":"efiling.energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.631817,"lng":-117.807864,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"current public docket activity, no substantive determination","fields":{"regulatory_docket":"26-SPPE-01","project_name":"RB Inyokern Data Center","docket_log_generated_date":"2026-10-14","public_comments_present_through":"2026-10-12"},"notes":["Docket contains public support and opposition, not regulator findings proving commenters claims. No final approval, parcel, current site MW, hearing outcome or investment adopted from comment titles. Individual commenters not added to outreach list.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=26-SPPE-01","host":"efiling.energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Inyokern · Kern · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"global-stack-san-mateo-county-event-center-ca","state":"CA","kind":"facility","name":"San Mateo County Event Center Data Center (Global Stack proposal, dropped)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Mateo"],"city":"San Mateo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Publicresponseisprimaryforattributedofficialstatement,notanadoptedordinance,reviewedletter,formalpermitdenialorexecutedlease. Countylandandcityzoningareseparateroles.541signaturesareplatformtally,notverifiedlocalresidentpopulation. EightBayAreatargetsitesaredeveloperplan,notoperatingcampuses. Generichealth/utilityclaimsandNewYorklawassertionnotadopted. NoMW, water,capexorRFSverified;nosignature/message/formsubmitted. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.change.org/p/keep-data-centers-out-of-the-san-mateo-county-event-center","host":"change.org","date":"2026-07-24","published":"2026-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.5466677,"lng":-122.3020513,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Change.orgpetitionopposesGlobalStackatSanMateoEventCenter;publishedresponseattributedtoCouncilmemberLisaDiazNashsayssheaskedforanurgencyordinanceandcountyexecutivedirectedCEOtoceaseprojectdiscussions.","independently_verified_current_operating_status":null},"notes":["Publicresponseisprimaryforattributedofficialstatement,notanadoptedordinance,reviewedletter,formalpermitdenialorexecutedlease. Countylandandcityzoningareseparateroles.541signaturesareplatformtally,notverifiedlocalresidentpopulation. EightBayAreatargetsitesaredeveloperplan,notoperatingcampuses. Generichealth/utilityclaimsandNewYorklawassertionnotadopted. NoMW, water,capexorRFSverified;nosignature/message/formsubmitted.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.change.org/p/keep-data-centers-out-of-the-san-mateo-county-event-center","host":"change.org","date":"2026-07-24","published":"2026-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Mateo · San Mateo · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"scalematrix-san-diego-ca","state":"CA","kind":"facility","name":"ScaleMatrix San Diego","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["San Diego"],"city":"San Diego","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. AreaDevelopment November14,2018 republishesScaleMatrix/HPEofficialannouncementofplannedCenterOfExcellenceINSIDE EXISTINGSanDiegoHQdatacenter. Issuer-derivedstatement, notnewstandalonebuildingorindependentcompletedopeningconfirmation. 50kW+isRACKthermalDENSITY, notcampusMW. Thousandsofcoresnotload; nearlydecadecompanyhistorynotprecisefacilityopening. Noobserved2018launch/currentoccupancy/actualcapex. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.areadevelopment.com/newsItems/11-14-2018/scalematrix-data-center-san-diego-california.shtml","host":"areadevelopment.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8377287,"lng":-117.132639,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["AreaDevelopment November14,2018 republishesScaleMatrix/HPEofficialannouncementofplannedCenterOfExcellenceINSIDE EXISTINGSanDiegoHQdatacenter. Issuer-derivedstatement, notnewstandalonebuildingorindependentcompletedopeningconfirmation.","50kW+isRACKthermalDENSITY, notcampusMW. Thousandsofcoresnotload; nearlydecadecompanyhistorynotprecisefacilityopening. Noobserved2018launch/currentoccupancy/actualcapex.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.areadevelopment.com/newsItems/11-14-2018/scalematrix-data-center-san-diego-california.shtml","host":"areadevelopment.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Diego · San Diego · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"sequoia-data-center-2600-de-la-cruz-santa-clara-ca","state":"CA","kind":"facility","name":"Sequoia Data Center (2600 De La Cruz Boulevard)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Sequoia proposal and backup-power exemption. Gross minus administrative area not automatically raised-floor/ITspace. Backup96.5MWand100MVAtransformer are not ITload. SPPE exemption not construction/occupancy certificate. Proposed design figures not current metered consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/sequoia-data-center","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.379478,"lng":-121.939528,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Sequoia proposal and backup-power exemption","fields":{"energy_docket":"19-SPPE-03","energy_project_status":"exempted","backup_generation_capacity_mw":96.5,"proposed_diesel_generators":54,"site_acres":15,"published_address":"2600 DeLaCruzBoulevard,SantaClara,California","proposed_building_gross_area_sqft_approx":702114,"proposed_administrative_area_sqft_approx":70000,"proposed_building_stories":4,"substation_rating_mva":100},"notes":["Gross minus administrative area not automatically raised-floor/ITspace. Backup96.5MWand100MVAtransformer are not ITload. SPPE exemption not construction/occupancy certificate. Proposed design figures not current metered consumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/sequoia-data-center","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"serverfarm-lax1-el-segundo-ca","state":"CA","kind":"facility","name":"Serverfarm LAX1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"El Segundo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. El Segundo historical T5 expansion at existing DC. 63666sqftproposedadditionnottotalbuilding.2012MNDreviewnotobservedcompletionorcurrentoperatorownership. ServerfarmLAX1aliasrequiresownershipcrosswalkseparatefromhistoricalT5name.23employeesfieldnotcurrentstaffcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2012121003","host":"ceqanet.lci.ca.gov","date":"2012-12-03","published":"2012-12-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.9217807,"lng":-118.3864589,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"El Segundo historical T5 expansion at existing DC","fields":{"historical_project_name":"T5 Data Expansion Project EA971","address":"444 North Nash Street, El Segundo, California","parcel":"4138-003-007","site_acres":6.14,"planned_expansion_gross_sqft":63666,"notice_received_date":"2012-12-03","existing_use":"data center"},"notes":["63666sqftproposedadditionnottotalbuilding.2012MNDreviewnotobservedcompletionorcurrentoperatorownership. ServerfarmLAX1aliasrequiresownershipcrosswalkseparatefromhistoricalT5name.23employeesfieldnotcurrentstaffcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2012121003","host":"ceqanet.lci.ca.gov","date":"2012-12-03","published":"2012-12-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · El Segundo · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"skybox-santa-clara-1200-memorex-drive-ca","state":"CA","kind":"facility","name":"Skybox Santa Clara (1200 Memorex Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. 60 MW has explicit critical-processing basis but is design capacity, not independently verified commissioned/current operating IT. Project’s 550,000 square feet includes mixed development and is not wholly data hall area. Eleven acres, four-story data center and six-story office describe site/design scope. Thirty generators and sixty chillers are planned units, not operating counts or implied MW. Former Memorex 1961 history is not the data center opening date. No RFS or tenant independently verified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.corgan.com/projects/skybox-santa-clara-data-center","host":"corgan.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.36257104275,"lng":-121.949979903926,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Architect Corgan’s undated project description specifies a speculative Skybox Santa Clara data center shell alongside an office tower, with 60 MW of critical processing load described in the design.","independently_verified_current_operating_status":null,"architect_attributed_design_critical_processing_mw":60,"commissioned_critical_it_mw":null},"notes":["60 MW has explicit critical-processing basis but is design capacity, not independently verified commissioned/current operating IT. Project’s 550,000 square feet includes mixed development and is not wholly data hall area. Eleven acres, four-story data center and six-story office describe site/design scope. Thirty generators and sixty chillers are planned units, not operating counts or implied MW. Former Memorex 1961 history is not the data center opening date. No RFS or tenant independently verified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.corgan.com/projects/skybox-santa-clara-data-center","host":"corgan.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"global-stack-vallejo-fairgrounds-ca","state":"CA","kind":"facility","name":"Solano County Fairgrounds Data Center (Global Stack proposal)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Solano"],"city":"Vallejo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Discussionisnotexecutedleaseorapproval;Wednesdaymeetingdaynotinferredasexactdateoroutcome. August 7 updateandstockimageMay 2024 labelarenotprojectmilestones.8 to 10 MWbasisundefined,notcriticalIT/currentload. Morethan 70 fairgroundsby 2030 isdeveloperambition,not 70 signedcampuses. Emergencyhub/blackoutproofclaimsaremarketing,notindependentemergencycertification. Resident 2 to 4 degreeheat/neighborhoodutilityimpactclaimsarenotmeasuredsiteeffects. OtherPittsburg/Calistogaprojectsareseparate. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pressdemocrat.com/2026/07/13/solano-county-fair-association-will-discuss-proposed-data-center/","host":"pressdemocrat.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.135514,"lng":-122.2262112,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"PressDemocrat/TimesHeraldreportdescribesaforthcomingSolanoFairAssociationdiscussionofGlobalStack’sroughlyfive-acreVallejoproposal,with 8 to 10 MWplannedcapacity.","independently_verified_current_operating_status":null},"notes":["Discussionisnotexecutedleaseorapproval;Wednesdaymeetingdaynotinferredasexactdateoroutcome. August 7 updateandstockimageMay 2024 labelarenotprojectmilestones.8 to 10 MWbasisundefined,notcriticalIT/currentload. Morethan 70 fairgroundsby 2030 isdeveloperambition,not 70 signedcampuses. Emergencyhub/blackoutproofclaimsaremarketing,notindependentemergencycertification. Resident 2 to 4 degreeheat/neighborhoodutilityimpactclaimsarenotmeasuredsiteeffects. OtherPittsburg/Calistogaprojectsareseparate.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pressdemocrat.com/2026/07/13/solano-county-fair-association-will-discuss-proposed-data-center/","host":"pressdemocrat.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Vallejo · Solano · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"stack-svy01-ca","state":"CA","kind":"facility","name":"STACK SVY01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SVY01 campus with four building specifications. Building powers sum to 101 MW while campus rounded headline says 100 MW. No silent correction or extra capacity. Whole-campus row not four new records; area labels not explicit raised floor. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/silicon-valley/svy01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.4027449,"lng":-121.891051,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"SVY01 campus with four building specifications","fields":{"campus_advertised_power_mw":100,"campus_acres":19,"campus_buildings":4,"building_sections":[{"code":"SVY01A","area_sqft":140000,"power_mw":9},{"code":"SVY01B","area_sqft":240000,"power_mw":32},{"code":"SVY01C","area_sqft":357000,"power_mw":36},{"code":"SVY01D","area_sqft":300000,"power_mw":24}]},"notes":["Building powers sum to 101 MW while campus rounded headline says 100 MW. No silent correction or extra capacity. Whole-campus row not four new records; area labels not explicit raised floor.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/silicon-valley/svy01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"stack-svy02-ca","state":"CA","kind":"facility","name":"STACK SVY02","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Power not explicitly critical IT. Dedicated substation not additional capacity. New facility description lacks exact opening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/silicon-valley/svy02/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3619343,"lng":-121.9537306,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"advertised_power_mw":48,"campus_acres":9,"campus_buildings":1,"building_area_sqft":466000,"published_city":"Santa Clara, California"},"notes":["Power not explicitly critical IT. Dedicated substation not additional capacity. New facility description lacks exact opening date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/silicon-valley/svy02/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"stack-svy03a-hayward-ca","state":"CA","kind":"facility","name":"STACK SVY03A","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Alameda"],"city":"Hayward","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. STACK historical backup-power version versus later city account. EarlierMND67.2MWbackupdifferslaterHaywardcity76.6MWbackupreviewedRound7;dates/versionsmustremainseparate,donotsumoroverwriteIT.2025reviewnoticeisnotfinalCEC/localapprovaloropening. NoprovennumericcriticalITinthisnotice. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ceqanet.lci.ca.gov/2025030999","host":"ceqanet.lci.ca.gov","date":"2025-03-24","published":"2025-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.6281336,"lng":-122.1195048,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"STACK historical backup-power version versus later city account","fields":{"project_name":"SVY03A Data Center Campus","applicant":"STACK Infrastructure","notice_received_date":"2025-03-24","locality":"Hayward, Alameda County, California","site_acres":11.3,"parcels":["461-0085-016-00","461-0085-052-01"],"planned_data_center_stories":3,"historical_reviewed_backup_generation_mw_max":67.2,"power_basis":"emergency backup generation, not critical IT"},"notes":["EarlierMND67.2MWbackupdifferslaterHaywardcity76.6MWbackupreviewedRound7;dates/versionsmustremainseparate,donotsumoroverwriteIT.2025reviewnoticeisnotfinalCEC/localapprovaloropening. NoprovennumericcriticalITinthisnotice.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceqanet.lci.ca.gov/2025030999","host":"ceqanet.lci.ca.gov","date":"2025-03-24","published":"2025-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Hayward · Alameda · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"stack-trade-zone-park-san-jose-ca","state":"CA","kind":"facility","name":"STACK Trade Zone Park (SVYDC 05 / SVYDC 06)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Trade Zone mixed-development backup exemption. 91MWbackup serves twoDCbuildings plusadvanced-manufacturing support, not criticalIT.36times3MWand3times1MWnameplates not usable111MWIT. SPPE/EIR order not all local permits or operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.ca.gov/powerplant/tradezonepark","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.4028987,"lng":-121.8950398,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Trade Zone mixed-development backup exemption","fields":{"energy_docket":"21-SPPE-02","project_owner":"STACK Infrastructure","energy_project_status":"exempted","backup_generation_capacity_mw_max":91,"data_center_buildings":["SVYDC05","SVYDC06"],"location_description":"TradeZoneBoulevard and RingwoodAvenue,SanJose,California","sppe_and_final_eir_order_date":"2023-04-12"},"notes":["91MWbackup serves twoDCbuildings plusadvanced-manufacturing support, not criticalIT.36times3MWand3times1MWnameplates not usable111MWIT. SPPE/EIR order not all local permits or operating proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.ca.gov/powerplant/tradezonepark","host":"energy.ca.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"t5-silicon-valley-newark-ca","state":"CA","kind":"facility","name":"T5@Silicon Valley","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Alameda"],"city":"Newark","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Serverfarm portfolio page does not match T5 Newark. ServerfarmgenericportfolioindexlistsSantaClaracomings oonandLAX1butdoesnotidentifyT5Newarksite. Newarknotmatched,tenant/ownershipcrosswalknotproven. OthermarketcapacitiesnotadoptedforboundID. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.serverfarmllc.com/data-centers/","host":"serverfarmllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.5461,"lng":-122.0312,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Serverfarm portfolio page does not match T5 Newark","fields":{},"notes":["ServerfarmgenericportfolioindexlistsSantaClaracomings oonandLAX1butdoesnotidentifyT5Newarksite. Newarknotmatched,tenant/ownershipcrosswalknotproven. OthermarketcapacitiesnotadoptedforboundID.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.serverfarmllc.com/data-centers/","host":"serverfarmllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Newark · Alameda · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"terra-data-center-alviso-san-jose-ca","state":"CA","kind":"facility","name":"Terra Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. SF YIMBY April 7, 2025 desk review of revised Terra proposal: 4701 North First Street, 9 acres, 295,100-square-foot data center plus 167,400-square-foot energy hub = 462,500 combined, not 462,500 data-center floor space. Prior hotel/entertainment approval is not revised DC approval; Topgolf opened in 2021 is a different use, not DC opening. 172,500-square-foot 2023 scheme is earlier, not additive. No 417 MW, critical IT, largest-in-California status or current permit verified. Comment speculation not adopted. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sfyimby.com/2025/04/energy-plant-data-center-proposed-at-4701-north-first-street-san-jose.html","host":"sfyimby.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3807591,"lng":-121.9236758,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["SF YIMBY April 7, 2025 desk review of revised Terra proposal: 4701 North First Street, 9 acres, 295,100-square-foot data center plus 167,400-square-foot energy hub = 462,500 combined, not 462,500 data-center floor space. Prior hotel/entertainment approval is not revised DC approval; Topgolf opened in 2021 is a different use, not DC opening. 172,500-square-foot 2023 scheme is earlier, not additive. No 417 MW, critical IT, largest-in-California status or current permit verified. Comment speculation not adopted.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://sfyimby.com/2025/04/energy-plant-data-center-proposed-at-4701-north-first-street-san-jose.html","host":"sfyimby.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"global-stack-tulare-county-fairgrounds-ca","state":"CA","kind":"facility","name":"Tulare County Fairgrounds Edge Data Center (Global Stack proposal)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tulare"],"city":"Tulare","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Tabledagreementisnotapprovedlease,permanentdenial,datacenterbuildingpermitoroperation. Previewonly;fullsubscriberdetailsnotaccessed. Edgecomputinginfrastructurebrandingdoesnotestablishsize/ITMW, publicsafetyauthorization, ownershiporRFS. CountyfairgroundproposalnotautomaticallyallGlobalStacktargetproperties. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://thebusinessjournal.com/is-it-a-data-center-tulare-fairgrounds-tables-global-stack-proposal/","host":"thebusinessjournal.com","date":"2026-07-24","published":"2026-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.1991383,"lng":-119.3420041,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheBusinessJournal’spublicpreview/captionreportsTulareFairboardtabledGlobalStack’srentalagreementonJuly 21 afteropposition.","independently_verified_current_operating_status":null,"reported_rental_agreement_tabled_date":"2026-07-21","executed_lease_verified":false},"notes":["Tabledagreementisnotapprovedlease,permanentdenial,datacenterbuildingpermitoroperation. Previewonly;fullsubscriberdetailsnotaccessed. Edgecomputinginfrastructurebrandingdoesnotestablishsize/ITMW, publicsafetyauthorization, ownershiporRFS. CountyfairgroundproposalnotautomaticallyallGlobalStacktargetproperties.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://thebusinessjournal.com/is-it-a-data-center-tulare-fairgrounds-tables-global-stack-proposal/","host":"thebusinessjournal.com","date":"2026-07-24","published":"2026-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Tulare · Tulare · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"vantage-santa-clara-i-ca1-ca","state":"CA","kind":"facility","name":"Vantage Santa Clara I (CA1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Vantage Santa Clara campus electrical and area scope with PUE error hold. Substation ratings are not150MWcriticalIT.335Kdata-center-space headline and gallery building areas have differing scope; no canonical gross total inferred. Published PUEunder1claim is physically implausible under standard whole-facility definition and quarantined, not silently changed to1.1. LEED/largest ranking not independently verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/santa-clara-i-california/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3725693,"lng":-121.9736589,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Vantage Santa Clara campus electrical and area scope with PUE error hold","fields":{"campus_code":"CA1","published_address":"2820 Northwestern Parkway, Santa Clara, CA95051","campus_acres":21,"operator_named_buildings":6,"advertised_campus_critical_it_mw":77,"advertised_data_center_space_sqft":335000,"onsite_substation_ratings_mw_each":[50,50,50]},"notes":["Substation ratings are not150MWcriticalIT.335Kdata-center-space headline and gallery building areas have differing scope; no canonical gross total inferred. Published PUEunder1claim is physically implausible under standard whole-facility definition and quarantined, not silently changed to1.1. LEED/largest ranking not independently verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/santa-clara-i-california/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"vantage-santa-clara-ii-ca2-ca","state":"CA","kind":"facility","name":"Vantage Santa Clara II (CA2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Future tense persists in undated page.152MWcombinedCA1+CA2is not CA2alone; transformer ratings not added toIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/santa-clara-ii-california/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3640012,"lng":-121.94689,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"campus_acres":9,"campus_buildings":3,"critical_it_mw":75,"campus_area_sqft":541000,"published_address":"737 Mathew Street, Santa Clara, CA95051"},"notes":["Future tense persists in undated page.152MWcombinedCA1+CA2is not CA2alone; transformer ratings not added toIT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/santa-clara-ii-california/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"vantage-santa-clara-iii-ca3-ca","state":"CA","kind":"facility","name":"Vantage Santa Clara III (CA3)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"Santa Clara","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Future tense;216MWallthreeSantaClaralocations is not CA3alone. Design near-zeroWUEis not measured current usage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/data-center/santa-clara-iii-california/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.3712362,"lng":-121.9740103,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"campus_acres_approx":8,"data_centers":1,"planned_critical_it_mw":64,"planned_area_sqft":486000,"published_address":"2590 Walsh Avenue, Santa Clara, CA95051"},"notes":["Future tense;216MWallthreeSantaClaralocations is not CA3alone. Design near-zeroWUEis not measured current usage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/data-center/santa-clara-iii-california/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Santa Clara · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"databank-vernon-la-ca","state":"CA","kind":"facility","name":"Vernon LA Campus (with Goodman Group)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Los Angeles"],"city":"Vernon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Narrativeover140000purpose-builtspace andcard131000ITsqft need separate area fields; no area-total sum. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named source. Future delivery phases sum to planned32MW, not extra capacity. Goodman global work-in-progress and DataBank development portfolio totals excluded from project investment.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/","host":"databank.com","date":"2026-04-07","published":"2026-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.00543,"lng":-118.218653,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"LAX2","street":"3094 E.VernonAvenue","city":"Vernon","critical_it_capacity_mw":32,"it_area_sqft":131000,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Narrativeover140000purpose-builtspace andcard131000ITsqft need separate area fields; no area-total sum.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"3094 E Vernon Avenue, Vernon, CA","planned_capacity_mw":32,"power_basis":"release capacity, not explicitly critical IT versus gross","initial_delivery_target":{"mw":6,"date":"2026-12"},"remaining_delivery_target":{"mw":26,"through":"2027-09"},"joint_venture_partners":["DataBank","Goodman Group"],"joint_venture_equity_split_percent":[50,50]},"notes":["Future delivery phases sum to planned32MW, not extra capacity. Goodman global work-in-progress and DataBank development portfolio totals excluded from project investment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/","host":"databank.com","date":"2026-04-07","published":"2026-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · Vernon · Los Angeles · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"westbank-180-park-avenue-san-jose-ca","state":"CA","kind":"facility","name":"Westbank 180 Park Avenue Data Center (Park Habitat site, downtown San José)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Main article’s 35 SouthSecondFountainAlley 768 apartments/831,600 squarefeet/27 to 28 stories andDecember 17 hearing are NOT 180 ParkAvenue metrics.2022 demolition is not DCconstruction, and reported work never restarting is dated to this account, not a 2026 statuscertification. Apartment count is residential, not data halls. No DCfloor area, MW, investment, executed utility agreement, approval or RFSverified. BayAreaNews report is attributed but not separately read. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sfyimby.com/2025/12/new-renderings-for-big-designed-tower-in-downtown-san-jose.html","host":"sfyimby.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3308869,"lng":-121.8906767,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"SFYIMBY’s wider Westbank development account says 180 ParkAvenue plans shifted from offices to 391 apartments plus a data center, after earlier demolition/excavation halted over archaeological discovery.","independently_verified_current_operating_status":null},"notes":["Main article’s 35 SouthSecondFountainAlley 768 apartments/831,600 squarefeet/27 to 28 stories andDecember 17 hearing are NOT 180 ParkAvenue metrics.2022 demolition is not DCconstruction, and reported work never restarting is dated to this account, not a 2026 statuscertification. Apartment count is residential, not data halls. No DCfloor area, MW, investment, executed utility agreement, approval or RFSverified. BayAreaNews report is attributed but not separately read.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sfyimby.com/2025/12/new-renderings-for-big-designed-tower-in-downtown-san-jose.html","host":"sfyimby.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"westbank-300-south-first-street-san-jose-ca","state":"CA","kind":"facility","name":"Westbank 300 South First Street Data Center (downtown San José)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Acceptance provides early project feedback; article explicitly says final council approval still expected later.1,492 homes is combined residential total, not DCfloor area or current completed housing.99 MWtaxscenario and 3.5 to 6.4 millionannualforecast are not clearly allocated per campus; no duplicate 99 MWadoption. Potential construction-tax/affordable-fee relief and future revenue allocation are program/design discussions, not quantified executed site awards or received taxes. Heat-reuse/residential-first sequencing are intentions, not functioning systems or construction observations. No commissionedIT/RFS. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sanjosespotlight.com/data-center-hundreds-of-homes-coming-to-downtown-san-jose/","host":"sanjosespotlight.com","date":"2025-04-16","published":"2025-04-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3314706,"lng":-121.8865883,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"SanJoseSpotlight reports council’sApril 8 acceptance of two Westbank proposals into the InnovativeProjectPathway process:323 Terraine with 345 homes/11-storyDC and 300 SouthFirst with 1147 homes/10-storyDC.","independently_verified_current_operating_status":null,"reported_early_pathway_acceptance_date":"2025-04-08","final_project_approval_verified":false},"notes":["Acceptance provides early project feedback; article explicitly says final council approval still expected later.1,492 homes is combined residential total, not DCfloor area or current completed housing.99 MWtaxscenario and 3.5 to 6.4 millionannualforecast are not clearly allocated per campus; no duplicate 99 MWadoption. Potential construction-tax/affordable-fee relief and future revenue allocation are program/design discussions, not quantified executed site awards or received taxes. Heat-reuse/residential-first sequencing are intentions, not functioning systems or construction observations. No commissionedIT/RFS.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sanjosespotlight.com/data-center-hundreds-of-homes-coming-to-downtown-san-jose/","host":"sanjosespotlight.com","date":"2025-04-16","published":"2025-04-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"westbank-323-terraine-street-san-jose-ca","state":"CA","kind":"facility","name":"Westbank 323 Terraine Street Data Center (downtown San José)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Santa Clara"],"city":"San Jose","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Acceptance provides early project feedback; article explicitly says final council approval still expected later.1,492 homes is combined residential total, not DCfloor area or current completed housing.99 MWtaxscenario and 3.5 to 6.4 millionannualforecast are not clearly allocated per campus; no duplicate 99 MWadoption. Potential construction-tax/affordable-fee relief and future revenue allocation are program/design discussions, not quantified executed site awards or received taxes. Heat-reuse/residential-first sequencing are intentions, not functioning systems or construction observations. No commissionedIT/RFS. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sanjosespotlight.com/data-center-hundreds-of-homes-coming-to-downtown-san-jose/","host":"sanjosespotlight.com","date":"2025-04-16","published":"2025-04-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3392085,"lng":-121.897492,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"SanJoseSpotlight reports council’sApril 8 acceptance of two Westbank proposals into the InnovativeProjectPathway process:323 Terraine with 345 homes/11-storyDC and 300 SouthFirst with 1147 homes/10-storyDC.","independently_verified_current_operating_status":null,"reported_early_pathway_acceptance_date":"2025-04-08","final_project_approval_verified":false},"notes":["Acceptance provides early project feedback; article explicitly says final council approval still expected later.1,492 homes is combined residential total, not DCfloor area or current completed housing.99 MWtaxscenario and 3.5 to 6.4 millionannualforecast are not clearly allocated per campus; no duplicate 99 MWadoption. Potential construction-tax/affordable-fee relief and future revenue allocation are program/design discussions, not quantified executed site awards or received taxes. Heat-reuse/residential-first sequencing are intentions, not functioning systems or construction observations. No commissionedIT/RFS.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sanjosespotlight.com/data-center-hundreds-of-homes-coming-to-downtown-san-jose/","host":"sanjosespotlight.com","date":"2025-04-16","published":"2025-04-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"California · San Jose · Santa Clara · Source context reviewed","state_name":"California","state_path":"/california/"},{"id":"blusky-ai-walsenburg-co","state":"CO","kind":"facility","name":"BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Huerfano"],"city":"Walsenburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Developercommunitypartnership/powerreadyclaims are not executedmunicipalservice or approvedproject.15 MWisproposedbasisundefined, not currentcriticalIT. Mayorunwillingnesstosupplyutilities is not a formaldenial. SeparateWellsNevada 2 acrenonbindingleaseLOI andNephiUtah 4 MWpermit-readyprojectcannotbesummedintoWalsenburg. Nephi 29 to 85 MWcitysupplyupgrade is municipalcapacity, not DCload. Generic 15 MWwater/hospitalcomparison is not sitecoolingdemand. ColoradoSB 26-102/HB 26-1030 werependingbillsandnoresultassumed. No operatingstatus/RFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/","host":"gazette.com","date":"2026-03-28","published":"2026-03-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.6235234,"lng":-104.780995,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ColoradoSpringsGazette reports BluSky’s 36-acre Walsenburg purchaseagreement remained unclosed, with localmayor/administrator initially unaware of proposedup-to 15 MWmodularsite.","independently_verified_current_operating_status":null},"notes":["Developercommunitypartnership/powerreadyclaims are not executedmunicipalservice or approvedproject.15 MWisproposedbasisundefined, not currentcriticalIT. Mayorunwillingnesstosupplyutilities is not a formaldenial. SeparateWellsNevada 2 acrenonbindingleaseLOI andNephiUtah 4 MWpermit-readyprojectcannotbesummedintoWalsenburg. Nephi 29 to 85 MWcitysupplyupgrade is municipalcapacity, not DCload. Generic 15 MWwater/hospitalcomparison is not sitecoolingdemand. ColoradoSB 26-102/HB 26-1030 werependingbillsandnoresultassumed. No operatingstatus/RFSverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/","host":"gazette.com","date":"2026-03-28","published":"2026-03-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Walsenburg · Huerfano · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"undisclosed-brighton-cr4-50th-ave-co","state":"CO","kind":"facility","name":"Brighton Data Center Complex (County Road 4 & 50th Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Weld"],"city":"Brighton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Preview only, subscriber body not accessed. Suggested pause is not adopted law or a known current stop; no exact vote or ordinance scope verified. Building area is proposed, not completed; noMW/IT/capex/tenant disclosed in readable preview. County location isWeld, not automaticallyAdamsbecause Brighton spans counties. Road/parcel crosswalk and later outcomes remain unverified. Related Cheyenne 302 MW story is a separate campus. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bizwest.com/2026/09/24/plan-for-massive-data-center-spurs-call-for-brighton-pause/","host":"bizwest.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.015,"lng":-104.7523,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"BizWest’s public preview describes an eight-building 2.52 million-square-foot proposal in Brighton’s Weld County portion and a councilmember’s suggested 90-day application moratorium.","independently_verified_current_operating_status":null},"notes":["Preview only, subscriber body not accessed. Suggested pause is not adopted law or a known current stop; no exact vote or ordinance scope verified. Building area is proposed, not completed; noMW/IT/capex/tenant disclosed in readable preview. County location isWeld, not automaticallyAdamsbecause Brighton spans counties. Road/parcel crosswalk and later outcomes remain unverified. Related Cheyenne 302 MW story is a separate campus.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bizwest.com/2026/09/24/plan-for-massive-data-center-spurs-call-for-brighton-pause/","host":"bizwest.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Brighton · Weld · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"coresite-de1-denver-co","state":"CO","kind":"facility","name":"CoreSite DE1 (910 15th Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Denver"],"city":"Denver","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Denver regional context, not individual building specifications. DE1/DE2regional157knotappliedtoeach. DE3futureaddress4900RaceStreetnotDE1/DE2. NoopeningprooforITcapacityfrommarketpage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center-locations/denver","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.745646,"lng":-104.995336,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Denver regional context, not individual building specifications","fields":{"regional_listed_data_centers":2,"regional_area_sqft_min_exclusive":157000,"de3_opening_target":"end2026"},"notes":["DE1/DE2regional157knotappliedtoeach. DE3futureaddress4900RaceStreetnotDE1/DE2. NoopeningprooforITcapacityfrommarketpage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center-locations/denver","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Denver · Denver · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"coresite-de2-denver-co","state":"CO","kind":"facility","name":"CoreSite DE2 (639 E. 18th Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Denver"],"city":"Denver","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Denver regional context, not individual building specifications. DE1/DE2regional157knotappliedtoeach. DE3futureaddress4900RaceStreetnotDE1/DE2. NoopeningprooforITcapacityfrommarketpage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center-locations/denver","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.744914,"lng":-104.979413,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Denver regional context, not individual building specifications","fields":{"regional_listed_data_centers":2,"regional_area_sqft_min_exclusive":157000,"de3_opening_target":"end2026"},"notes":["DE1/DE2regional157knotappliedtoeach. DE3futureaddress4900RaceStreetnotDE1/DE2. NoopeningprooforITcapacityfrommarketpage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center-locations/denver","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Denver · Denver · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"coresite-de3-denver-co","state":"CO","kind":"facility","name":"CoreSite DE3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Denver"],"city":"Denver","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Current page still uses targeted availability in 2026. A target year does not prove the facility has opened. Retain source unit CMW without silently converting to a differently defined MW field. Campus and first building are nested, not additive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/de3-denver-co","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.7392,"lng":-104.9903,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_building_area_sqft_approx":170000,"advertised_building_power_cmw":18,"advertised_campus_area_sqft_lower_bound":590000,"advertised_campus_power_cmw":60,"availability_target_year":2026,"target_delivery_verified":false},"notes":["Current page still uses targeted availability in 2026. A target year does not prove the facility has opened. Retain source unit CMW without silently converting to a differently defined MW field. Campus and first building are nested, not additive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/de3-denver-co","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Denver · Denver · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"crusoe-walden-co","state":"CO","kind":"facility","name":"Crusoe Energy Digital Flare Mitigation  -  Oxbow Well Pad","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Jackson"],"city":"Walden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Crusoe NYDIG portfolio transaction context only. Portfolio spans seven states and Argentina, not Walden-only. Does not mention exact Walden facility/parcel or prove transaction later closed.425modularunits not425independently located physical buildings. Environmental estimates attributed company claims not independently certified. August18,2026secondary template date does not replace March25,2025release. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.crusoe.ai/resources/newsroom/nydig-to-acquire-crusoes-bitcoin-mining-operation-crusoe-to-scale-vertically","host":"crusoe.ai","date":"2025-03-25","published":"2025-03-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.7331,"lng":-106.2848,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Crusoe NYDIG portfolio transaction context only","fields":{"transaction_announcement_date":"2025-03-25","transaction_stage_at_announcement":"NYDIG plans to acquire Crusoe bitcoin operation, subject to regulatory approvals, consents and closing","portfolio_modular_data_centers_min_exclusive":425,"portfolio_power_mw_min_exclusive":250,"portfolio_employee_transfer_expected_approx":135,"walden_specific_acquisition_closed_date":null},"notes":["Portfolio spans seven states and Argentina, not Walden-only. Does not mention exact Walden facility/parcel or prove transaction later closed.425modularunits not425independently located physical buildings. Environmental estimates attributed company claims not independently certified. August18,2026secondary template date does not replace March25,2025release.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.crusoe.ai/resources/newsroom/nydig-to-acquire-crusoes-bitcoin-mining-operation-crusoe-to-scale-vertically","host":"crusoe.ai","date":"2025-03-25","published":"2025-03-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Walden · Jackson · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"centersquare-den1-highlands-ranch-co","state":"CO","kind":"facility","name":"Csquare (Centersquare) DEN1 Denver - Highlands Ranch","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Highlands Ranch","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Sheet does not label41593sqft as white-space; retain advertised area wording. Copyright2026 is not publication date. Visually inspected DEN1 specification page2. Wholemarket45.7MW combinesDEN1andDEN2utilitypower. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.549201,"lng":-105.032671,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"9110-9180 Commerce Center Circle","city_postal":"Littleton","neighborhood":"Highlands Ranch","utility_power_mw":18.3,"ups_capacity_mw":9.2,"generator_capacity_mw":15,"advertised_area_sqft":41593},"notes":["Sheet does not label41593sqft as white-space; retain advertised area wording.","Copyright2026 is not publication date.","Visually inspected DEN1 specification page2. Wholemarket45.7MW combinesDEN1andDEN2utilitypower.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Highlands Ranch · Douglas · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"centersquare-den2-englewood-co","state":"CO","kind":"facility","name":"Csquare (Centersquare) DEN2 Denver - Englewood","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Englewood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Utility27.4MW is not criticalITcapacity. Area not explicitly labelledwhite-space. Visually inspected DEN2 specification page3. Utility/UPS/generator dimensions are distinct. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.561593,"lng":-104.832547,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"8534 Concord Center Drive","city":"Englewood","utility_power_mw":27.4,"ups_capacity_mw":3.8,"generator_capacity_mw":6,"advertised_area_sqft":21938},"notes":["Utility27.4MW is not criticalITcapacity.","Area not explicitly labelledwhite-space.","Visually inspected DEN2 specification page3. Utility/UPS/generator dimensions are distinct.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Englewood · Douglas · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"databank-den1-englewood-co","state":"CO","kind":"facility","name":"DataBank DEN1 - Englewood","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Englewood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/denver/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.560952,"lng":-104.865649,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"DEN1","street":"393 Inverness Parkway","city":"Englewood","critical_it_capacity_mw":2,"it_area_sqft":24180,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/denver/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Englewood · Douglas · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"databank-den2-centennial-co","state":"CO","kind":"facility","name":"DataBank DEN2  -  Centennial","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Arapahoe"],"city":"Centennial","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/denver/centennial-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5917924,"lng":-104.8479857,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"DEN2","street":"6900 South Peoria Street","city":"Centennial","critical_it_capacity_mw":4,"it_area_sqft":31510,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/denver/centennial-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Centennial · Arapahoe · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"databank-den5-centennial-co","state":"CO","kind":"facility","name":"DataBank DEN5  -  Centennial II","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Arapahoe"],"city":"Centennial","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Page still says slated early2024 opening; past forecast not independently verified actual date. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named source. Named building offering, not campus total or measured consumption.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/denver/centennial-campus/den5/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5900652,"lng":-104.8469635,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"DEN5","street":"6961 S. Quentin Street","city":"Centennial","critical_it_capacity_mw":16,"it_area_sqft":56000,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Page still says slated early2024 opening; past forecast not independently verified actual date.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/denver/centennial-campus/den5/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"operator_site_code":"DEN5","it_area_sqft":56000,"critical_it_mw":16},"notes":["Named building offering, not campus total or measured consumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/denver/centennial-campus/den5/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Centennial · Arapahoe · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"edgeconnex-den01-denver-co","state":"CO","kind":"facility","name":"EdgeConneX DEN01 Denver","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Englewood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. DEN02separate115500sqft/up24MWnotDEN01.1.5MWadditionalinprogressnotdelivered. Noadditionofutility/UPS/generator. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/americas/denver-co/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5608526,"lng":-104.8275475,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"DEN01","facility_area_sqft":29800,"current_data_halls":2,"raised_floor_sqft":9300,"advertised_power_mw":3,"additional_power_in_progress_mw":1.5,"power_basis":"N+1power, not explicitcriticalIT"},"notes":["DEN02separate115500sqft/up24MWnotDEN01.1.5MWadditionalinprogressnotdelivered. Noadditionofutility/UPS/generator.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/americas/denver-co/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Englewood · Douglas · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"nlr-esif-hpc-data-center-golden-co","state":"CO","kind":"facility","name":"ESIF High-Performance Computing Data Center (Kestrel supercomputer)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Golden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. national-laboratory HPC facility context. Institutional page supports named HPCuse, not exact opening date, address, criticalMW or building area. World-most-efficient superlative not independently evaluated or adopted. This lab page does not certify an external national map dataset. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nlr.gov/computational-science/facilities","host":"nlr.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.74024,"lng":-105.16718,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"national-laboratory HPC facility context","fields":{"named_host_facility":"Energy Systems Integration Facility,ESIF","operator_reported_supercomputer_status":"Kestrel in production use","source_page_updated":"2025-12-04"},"notes":["Institutional page supports named HPCuse, not exact opening date, address, criticalMW or building area. World-most-efficient superlative not independently evaluated or adopted. This lab page does not certify an external national map dataset.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nlr.gov/computational-science/facilities","host":"nlr.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Golden · Jefferson · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"flexential-denver-aurora-den03-co","state":"CO","kind":"facility","name":"Flexential Denver - Aurora (DEN03)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Arapahoe"],"city":"Aurora","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.6610488,"lng":-104.8488321,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Denver - Aurora (DEN03)","publisher_reported_footprint_sqft":171289,"publisher_reported_critical_power_mw":6.75,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Aurora · Arapahoe · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"flexential-denver-centennial-den05-co","state":"CO","kind":"facility","name":"Flexential Denver - Centennial (DEN05)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Arapahoe"],"city":"Centennial","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5938733,"lng":-104.8431597,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Denver - Centennial (DEN05)","publisher_reported_footprint_sqft":43294,"publisher_reported_critical_power_mw":1.6,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Centennial · Arapahoe · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"flexential-denver-englewood-co","state":"CO","kind":"facility","name":"Flexential Denver - Englewood","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Arapahoe"],"city":"Englewood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.558994,"lng":-104.8375559,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Denver - Englewood","publisher_reported_footprint_sqft":240549,"publisher_reported_critical_power_mw":18,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Englewood · Arapahoe · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"flexential-parker-co","state":"CO","kind":"facility","name":"Flexential Parker (Compark)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Parker","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Future-tense planned facility. The guide does not establish opening, commissioning or a final tax rebate. Standby generation 55 MW and total cooling 25 MW are separate systems, not additional IT capacity. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5620551,"lng":-104.8119323,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Parker (Compark)","publisher_reported_footprint_sqft":249000,"publisher_reported_critical_power_mw":22.5,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false,"status_verified_by_this_document":null},"notes":["Future-tense planned facility. The guide does not establish opening, commissioning or a final tax rebate. Standby generation 55 MW and total cooling 25 MW are separate systems, not additional IT capacity.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Parker · Douglas · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"global-ai-windsor-co","state":"CO","kind":"facility","name":"Global AI Windsor Data Center (former Kodak/Carestream campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Weld"],"city":"Windsor","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. KUNC republishes SaraWilson/ColoradoNewsline September12,2026 report: Weldcommissioners5 to 0UsebySpecialReview approval for41acreGlobalAI proposal at formerCarestream2000HowardSmithAvenueW, unincorporatednearWindsor. Not a building permit, certificate of occupancy or current operation.438acreproperty and15.6Mreportedpurchase are different land scope from41acreproject. 27.5MWfirstphase and35MWwill-serveletter have unspecifiedpowerbasis, and letter adequacy was disputed by an opposing attorney. No executed/deliveredIT verified. Company1GWnetworkby2029 is not thiscampus.65000galinitialcoolingfill/6500annualtopoff are projected permit-related claims, not measured consumption. Closed-loop,ambient-noiseanddecommissionbond conditions reported; actual compliance unread.1500construction/200longtermjobs and firsthalllater2026 are forecasts. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kunc.org/news/2026-09-12/weld-county-commissioners-approve-permit-for-global-ai-data-center","host":"kunc.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.4653149,"lng":-104.909,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["KUNC republishes SaraWilson/ColoradoNewsline September12,2026 report: Weldcommissioners5 to 0UsebySpecialReview approval for41acreGlobalAI proposal at formerCarestream2000HowardSmithAvenueW, unincorporatednearWindsor. Not a building permit, certificate of occupancy or current operation.438acreproperty and15.6Mreportedpurchase are different land scope from41acreproject.","27.5MWfirstphase and35MWwill-serveletter have unspecifiedpowerbasis, and letter adequacy was disputed by an opposing attorney. No executed/deliveredIT verified. Company1GWnetworkby2029 is not thiscampus.65000galinitialcoolingfill/6500annualtopoff are projected permit-related claims, not measured consumption. Closed-loop,ambient-noiseanddecommissionbond conditions reported; actual compliance unread.1500construction/200longtermjobs and firsthalllater2026 are forecasts.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.kunc.org/news/2026-09-12/weld-county-commissioners-approve-permit-for-global-ai-data-center","host":"kunc.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Windsor · Weld · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"granite-renewables-logan-county-co","state":"CO","kind":"facility","name":"Granite Renewables Logan County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Logan"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Granite Renewables is not identified in the readable project discussion. Other counties' moratorium stages and other projects' generation/storage capacities do not establish Logan project approval, IT demand or a current operating site. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bigpivots.com/geaing-up-for-data-centers/","host":"bigpivots.com","date":"2026-02-03","published":"2026-02-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.6255415,"lng":-103.207709,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Big Pivots reports discussion of a roughly 4,000-acre solar and data-center concept in Logan County, without a definite proposal.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["Granite Renewables is not identified in the readable project discussion. Other counties' moratorium stages and other projects' generation/storage capacities do not establish Logan project approval, IT demand or a current operating site.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bigpivots.com/geaing-up-for-data-centers/","host":"bigpivots.com","date":"2026-02-03","published":"2026-02-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Sterling · Logan · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"h5-denver-greenwood-village-co","state":"CO","kind":"facility","name":"H5 Data Centers Denver (Denver Tech Center campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Arapahoe"],"city":"Greenwood Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus includes two facilities; do not assign300,000squarefeet to each. Solar generation is not IT load. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Undated cumulative investment since acquisition is not new development capex or annual spend. Utility supply is not critical IT utilization. Source address dropsSouth and usesDenver market; preserve primary campus address and require alias matching.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/denver-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://h5datacenters.com/denver-colocation.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.6167549,"lng":-104.8916814,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"5350 S Valentia Way, Greenwood Village, CO 80111","campus_sqft":300000,"campus_acres":12,"operator_described_data_centers_on_campus":2,"onsite_solar_generation_kw_up_to":460},"notes":["Campus includes two facilities; do not assign300,000squarefeet to each. Solar generation is not IT load.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/denver-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cumulative_upgrade_spend_usd_approx":20000000,"utility_provided_power_mw_lower_bound":17.5,"power_utility":"Xcel Energy"},"notes":["Undated cumulative investment since acquisition is not new development capex or annual spend. Utility supply is not critical IT utilization. Source address dropsSouth and usesDenver market; preserve primary campus address and require alias matching.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/denver-colocation.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Greenwood Village · Arapahoe · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"novva-colorado-springs-co","state":"CO","kind":"facility","name":"Novva Colorado Springs Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["El Paso"],"city":"Colorado Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. OriginalAugust31,2021body versusJanuary13,2026updatedheader. Acquisitionprice, expansioninvestment and resultingcapacitydifferentbases; no current30MWdeliveryproof. Area190kincludessupport/industrialfacilities. Utah180MWandSeptember21ribboncuttingnot Colorado. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.novva.com/media-center/novva-data-centers-acquires-colorado-springs-campus/","host":"novva.com","date":"2021-08-31","published":"2021-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.0130116,"lng":-104.8164434,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"acquisition_price_usd":38500000,"acquired_campus_acres":37,"acquired_data_center_and_support_area_sqft":190000,"existing_design_capacity_mw":6,"planned_resulting_capacity_mw":30,"planned_additional_area_sqft":250000,"planned_investment_usd_min_exclusive":200000000},"notes":["OriginalAugust31,2021body versusJanuary13,2026updatedheader. Acquisitionprice, expansioninvestment and resultingcapacitydifferentbases; no current30MWdeliveryproof. Area190kincludessupport/industrialfacilities. Utah180MWandSeptember21ribboncuttingnot Colorado.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.novva.com/media-center/novva-data-centers-acquires-colorado-springs-campus/","host":"novva.com","date":"2021-08-31","published":"2021-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Colorado Springs · El Paso · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"prometheus-hyperscale-fort-morgan-co","state":"CO","kind":"facility","name":"Prometheus Hyperscale Fort Morgan","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Morgan"],"city":"Fort Morgan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The source uses Prometheus Energy rather than establishing the exact Prometheus Hyperscale legal/project crosswalk. A regional intention does not identify parcel, approvals, IT capacity or current operation. Xcel forecasts, other data centers and general state-policy commentary cannot be assigned to either site; later outcomes remain unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bigpivots.com/looming-questions-about-data-centers/","host":"bigpivots.com","date":"2025-01-02","published":"2025-01-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2502582,"lng":-103.799951,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Big Pivots' retrospective mentions Prometheus Energy intentions for Fort Morgan and Pueblo in 2026.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The source uses Prometheus Energy rather than establishing the exact Prometheus Hyperscale legal/project crosswalk. A regional intention does not identify parcel, approvals, IT capacity or current operation. Xcel forecasts, other data centers and general state-policy commentary cannot be assigned to either site; later outcomes remain unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bigpivots.com/looming-questions-about-data-centers/","host":"bigpivots.com","date":"2025-01-02","published":"2025-01-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Fort Morgan · Morgan · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"prometheus-hyperscale-pueblo-co","state":"CO","kind":"facility","name":"Prometheus Hyperscale Pueblo","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pueblo"],"city":"Pueblo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The source uses Prometheus Energy rather than establishing the exact Prometheus Hyperscale legal/project crosswalk. A regional intention does not identify parcel, approvals, IT capacity or current operation. Xcel forecasts, other data centers and general state-policy commentary cannot be assigned to either site; later outcomes remain unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bigpivots.com/looming-questions-about-data-centers/","host":"bigpivots.com","date":"2025-01-02","published":"2025-01-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.263995,"lng":-104.6141867,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Big Pivots' retrospective mentions Prometheus Energy intentions for Fort Morgan and Pueblo in 2026.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The source uses Prometheus Energy rather than establishing the exact Prometheus Hyperscale legal/project crosswalk. A regional intention does not identify parcel, approvals, IT capacity or current operation. Xcel forecasts, other data centers and general state-policy commentary cannot be assigned to either site; later outcomes remain unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bigpivots.com/looming-questions-about-data-centers/","host":"bigpivots.com","date":"2025-01-02","published":"2025-01-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Pueblo · Pueblo · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"qts-colorado-springs-co","state":"CO","kind":"facility","name":"QTS Colorado Springs Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["El Paso"],"city":"Colorado Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Current operator specification, not measured utilization or total company capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/colorado-springs/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9220674,"lng":-104.8426568,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"site_acres":21,"advertised_building_sqft":249958,"advertised_critical_building_mw_lower_bound":14},"notes":["Current operator specification, not measured utilization or total company capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/colorado-springs/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Colorado Springs · El Paso · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"raeden-taurus-colorado-springs-co","state":"CO","kind":"facility","name":"Raeden Project Taurus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["El Paso"],"city":"Colorado Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Mary Shinn, Gazette June12,2026 original city/developer reporting: Raeden ProjectTaurus administratively approved; appeal routes still possible then, not all legal challenges finally exhausted/current2026 outcome.50MW maximum developer claim not explicit IT;200000gallons closed-loop fill is not daily consumption/independently proved never replenished.30backup generators/36chillers proposed, modelled noise compliance not measured performance or issued air approval. Original administrative record/noise study uninspected. Not all fields, current operation, permits, exact parcel or critical IT independently verified. Alexander Edwards, Gazette March28,2026 original developer/city-plan reporting: roughly450000sf reuse at1565HighTechWay, former Intel facility, with three smaller buildings to demolish. April7 neighborhood meeting was future then.50MW proposal and40-100jobs projections, not commissioned capacity/payroll. Highest-powered-in-Colorado comparison comes from a directory, not adopted. Same site historically mined bitcoin2018-20 per later article; do not describe that as current activity or create another operating building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gazette.com/2026/06/12/colorado-springs-administratively-approves-data-center-on-garden-of-the-gods-road/","host":"gazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://gazette.com/2026/03/28/large-data-center-may-be-heading-to-former-computer-chip-facility-in-colorado-springs/","host":"gazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.8339,"lng":-104.8214,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Mary Shinn, Gazette June12,2026 original city/developer reporting: Raeden ProjectTaurus administratively approved; appeal routes still possible then, not all legal challenges finally exhausted/current2026 outcome.50MW maximum developer claim not explicit IT;200000gallons closed-loop fill is not daily consumption/independently proved never replenished.30backup generators/36chillers proposed, modelled noise compliance not measured performance or issued air approval. Original administrative record/noise study uninspected.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://gazette.com/2026/06/12/colorado-springs-administratively-approves-data-center-on-garden-of-the-gods-road/","host":"gazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Alexander Edwards, Gazette March28,2026 original developer/city-plan reporting: roughly450000sf reuse at1565HighTechWay, former Intel facility, with three smaller buildings to demolish. April7 neighborhood meeting was future then.50MW proposal and40-100jobs projections, not commissioned capacity/payroll. Highest-powered-in-Colorado comparison comes from a directory, not adopted. Same site historically mined bitcoin2018-20 per later article; do not describe that as current activity or create another operating building.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://gazette.com/2026/03/28/large-data-center-may-be-heading-to-former-computer-chip-facility-in-colorado-springs/","host":"gazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Colorado Springs · El Paso · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"t5-colorado-springs-co","state":"CO","kind":"facility","name":"T5@Colorado Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["El Paso"],"city":"Colorado Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. 100 MW is advertised site electrical availability, not critical IT, current operating capacity or an executed 2026 service agreement. First phase Q 1 2014 was a forecast, not completion evidence. Quoted 4.4 cents/kWh and 97 percent possible free-cooling hours are historical marketing figures, not current tariffs, measured PUE or energy mix.400 to 600 jobs are forecasts with unclear phase/permanency; tax-incentive generalities are not site awards. Other Colorado Springs companies are separate facilities. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterknowledge.com/investing/t5-plans-800-million-campus-in-colorado-springs","host":"datacenterknowledge.com","date":"2013-04-23","published":"2013-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.795985,"lng":-104.794485,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Data Center Knowledge reports T 5’s historical 64-acre Colorado Springs proposal with 800 million-dollar campus plan and 100 MW available-power description.","independently_verified_current_operating_status":null},"notes":["100 MW is advertised site electrical availability, not critical IT, current operating capacity or an executed 2026 service agreement. First phase Q 1 2014 was a forecast, not completion evidence. Quoted 4.4 cents/kWh and 97 percent possible free-cooling hours are historical marketing figures, not current tariffs, measured PUE or energy mix.400 to 600 jobs are forecasts with unclear phase/permanency; tax-incentive generalities are not site awards. Other Colorado Springs companies are separate facilities.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterknowledge.com/investing/t5-plans-800-million-campus-in-colorado-springs","host":"datacenterknowledge.com","date":"2013-04-23","published":"2013-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Colorado · Colorado Springs · El Paso · Source context reviewed","state_name":"Colorado","state_path":"/colorado/"},{"id":"atlas-capital-bloomfield-ct","state":"CT","kind":"facility","name":"Atlas Capital Group Data Center (132 Griffin Road North)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hartford"],"city":"Bloomfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. town-hosted concept-proposal news summary. Town news summary links external reporting and describes concept presentation, not approved plan. Processing and substation areas are distinct scopes; no ITMW inferred. Archival date September30,2025 is not project cancellation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bloomfieldct.gov/CivicAlerts.aspx?AID=201","host":"bloomfieldct.gov","date":"2025-07-03","published":"2025-07-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.8843905,"lng":-72.7389957,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"town-hosted concept-proposal news summary","fields":{"concept_proposal_publication_date":"2025-07-03","published_address":"132 Griffin Road North, Bloomfield, Connecticut","concept_area_sqft_approx":1000000,"proposed_data_processing_space_sqft_min_exclusive":900000,"proposed_substation_area_sqft":127000,"expected_employees":40},"notes":["Town news summary links external reporting and describes concept presentation, not approved plan. Processing and substation areas are distinct scopes; no ITMW inferred. Archival date September30,2025 is not project cancellation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bloomfieldct.gov/CivicAlerts.aspx?AID=201","host":"bloomfieldct.gov","date":"2025-07-03","published":"2025-07-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Bloomfield · Hartford · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"og-industries-beacon-falls-ct","state":"CT","kind":"facility","name":"Beacon Falls Data Center Campus (1 Lopus Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Haven"],"city":"Beacon Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The listing conflicts internally on land area: 49, 44-plus, 29-plus and 17 acres. It also mixes a 100 MW ambition, a 112.5 MW key fact and power-in-place versus planned language. No canonical area or operating IT is adopted. Program eligibility and returns are marketing, not executed incentives or financial outcomes; largest-in-state is unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://agencycre.com/properties/one-of-the-northeasts-most-significant-planned-ai-digital-infrastructure-developments-beacon-falls-data-center/","host":"agencycre.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.442318,"lng":-73.064334,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"A commercial broker markets O&G's proposed Beacon Falls powered-land/build-to-suit opportunity, with no identified committed tenant.","independently_verified_current_operating_status":null},"notes":["The listing conflicts internally on land area: 49, 44-plus, 29-plus and 17 acres. It also mixes a 100 MW ambition, a 112.5 MW key fact and power-in-place versus planned language. No canonical area or operating IT is adopted. Program eligibility and returns are marketing, not executed incentives or financial outcomes; largest-in-state is unverified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://agencycre.com/properties/one-of-the-northeasts-most-significant-planned-ai-digital-infrastructure-developments-beacon-falls-data-center/","host":"agencycre.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Beacon Falls · New Haven · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"cigna-windsor-data-center-ct","state":"CT","kind":"facility","name":"Cigna Windsor Data Center (9 Griffin Road North)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hartford"],"city":"Windsor","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cigna historic reinvestment and municipal/state incentive separation. Historical2022 project not proof386Mspent or renovation complete by2026. Software included in budget; not wholly building construction. Generic state20/30year incentive framework does not establish exact awardedCignaterm. Revenue forecasts decline with depreciation; not permanent annual3Mguarantee. Existingbuilding1982not exactDCopening. No criticalITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hartfordbusiness.com/article/cigna-plans-386m-renovation-of-windsor-data-center/","host":"hartfordbusiness.com","date":"2022-06-22","published":"2022-06-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.879941,"lng":-72.73157,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Cigna historic reinvestment and municipal/state incentive separation","fields":{"company":"Cigna","facility_address":"9 Griffin Road North, Windsor, Connecticut","reported_building_area_sqft":153462,"assessment_construction_year":1982,"reported_renovation_investment_usd":386000000,"investment_components_usd":{"software":100000000,"taxable_personal_property":286000000},"planned_investment_period_years":5,"reported_host_municipality_agreement_approval_date":"2022-06-20","reported_local_abatement":"none on increasing local tax obligation"},"notes":["Historical2022 project not proof386Mspent or renovation complete by2026. Software included in budget; not wholly building construction. Generic state20/30year incentive framework does not establish exact awardedCignaterm. Revenue forecasts decline with depreciation; not permanent annual3Mguarantee. Existingbuilding1982not exactDCopening. No criticalITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hartfordbusiness.com/article/cigna-plans-386m-renovation-of-windsor-data-center/","host":"hartfordbusiness.com","date":"2022-06-22","published":"2022-06-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Windsor · Hartford · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"cognovum-trumbull-ct","state":"CT","kind":"facility","name":"CogNovum Data Center (80 Merritt Boulevard)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Trumbull","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Current operator identifies CNYC1 and UPS specification. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cognovum.com/test-1","host":"cognovum.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.2407281,"lng":-73.1474121,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"80 Merritt Boulevard","city":"Trumbull","power_mw":6.75,"power_basis":"UPS capacity","area_sqft":228000,"area_basis":"total facility size","marketed_service":"high-density compute"},"notes":["Current operator identifies CNYC1 and UPS specification.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cognovum.com/test-1","host":"cognovum.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Trumbull · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"cyrusone-nym5-norwalk-ct","state":"CT","kind":"facility","name":"CyrusOne NYM5 (Norwalk)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfield"],"city":"Norwalk","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Keep source label differences explicit. No area is adopted as a verified raised-floor total; recovery office space is not IT white space. Historic Fairfield County references require current Connecticut planning-region geography. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/norwalk-ct","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1130924,"lng":-73.3886495,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_total_it_capacity_mw":4,"key_feature_technical_it_space_sqft":168000,"specification_data_center_space_sqft":75000,"work_area_recovery_sqft":30000},"notes":["Keep source label differences explicit. No area is adopted as a verified raised-floor total; recovery office space is not IT white space. Historic Fairfield County references require current Connecticut planning-region geography.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/norwalk-ct","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Norwalk · Fairfield · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"eip-energy-innovation-park-new-britain-ct","state":"CT","kind":"facility","name":"Energy & Innovation Park Data Center (480 Myrtle Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hartford"],"city":"New Britain","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Opinion is not an original commissioning record. Fuel-cell generation is not critical IT capacity. The redevelopment includes broader uses and forecast jobs. The nearby ice-cream producer's jobs do not belong to this project. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ctmirror.org/2025/12/23/walking-myrtle-street-again-how-new-britain-is-rewriting-its-future-shuyue/","host":"ctmirror.org","date":"2025-12-23","published":"2025-12-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.669693,"lng":-72.797359,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"A CT Mirror commentary describes New Britain's Energy and Innovation Park and a fuel-cell installation.","independently_verified_current_operating_status":null},"notes":["Opinion is not an original commissioning record. Fuel-cell generation is not critical IT capacity. The redevelopment includes broader uses and forecast jobs. The nearby ice-cream producer's jobs do not belong to this project.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ctmirror.org/2025/12/23/walking-myrtle-street-again-how-new-britain-is-rewriting-its-future-shuyue/","host":"ctmirror.org","date":"2025-12-23","published":"2025-12-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · New Britain · Hartford · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"ne-edge-millstone-ct","state":"CT","kind":"facility","name":"NE Edge Millstone Nuclear Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New London"],"city":"Waterford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This is a participant opinion, not a reviewed municipal termination instrument or final judgment. End of one host agreement is not a permanent statewide ban or proof no later proposal can occur. Reactor outage, grid and developer-claim criticisms remain attributed; no independent power or emissions finding is adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ctmirror.org/2026/04/15/tale-of-a-defeated-ct-data-center/","host":"ctmirror.org","date":"2026-04-15","published":"2026-04-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.3218,"lng":-72.1582,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"A CT Mirror opinion by the local opposition group's founder says NE Edge-Waterford's host-fee agreement ended by default/expiration and describes the group's campaign.","independently_verified_current_operating_status":null},"notes":["This is a participant opinion, not a reviewed municipal termination instrument or final judgment. End of one host agreement is not a permanent statewide ban or proof no later proposal can occur. Reactor outage, grid and developer-claim criticisms remain attributed; no independent power or emissions finding is adopted.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ctmirror.org/2026/04/15/tale-of-a-defeated-ct-data-center/","host":"ctmirror.org","date":"2026-04-15","published":"2026-04-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Waterford · New London · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"omega-systems-stamford-ct","state":"CT","kind":"facility","name":"Omega Systems Stamford Data Center (26 Fahey Street, formerly Amnet/Cloudpath CT1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfield"],"city":"Stamford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Omega Amnet Stamford explicit office-plus-data-center address. ExplicitofficeANDDCsupportsco-locatedfacility,notentirebuildingdatacenterarea.1995companyservicehistorynotexactsiteopeningoracquisitiondate. No numericITMWorarea. NotallOmegaofficesareDCs. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://omegasystemscorp.com/company/amnet-systems-has-a-new-home/","host":"omegasystemscorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.091473,"lng":-73.517633,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Omega Amnet Stamford explicit office-plus-data-center address","fields":{"operator":"Omega Systems, formerly Amnet Systems","address":"26 Fahey Street, Stamford, Connecticut","operator_described_use":"office and data center","amnet_service_history_since":1995},"notes":["ExplicitofficeANDDCsupportsco-locatedfacility,notentirebuildingdatacenterarea.1995companyservicehistorynotexactsiteopeningoracquisitiondate. No numericITMWorarea. NotallOmegaofficesareDCs.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://omegasystemscorp.com/company/amnet-systems-has-a-new-home/","host":"omegasystemscorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Stamford · Fairfield · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"renew-riverside-bristol-ct","state":"CT","kind":"facility","name":"ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hartford"],"city":"Bristol","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ReNew proposed Bristol fuel-cell project, distinct from host data-center metrics. Draft staff report and historic schedule do not establish final ruling or delivered construction. 16 million USD is fuel-cell project cost, not the entire data-center investment. Vacant 9926-square-foot building would be removed; do not adopt as new DC area. 9423-square-foot fuel-cell compound is not IT floor area. Proposed 99-percent baseload coverage does not mean zero emissions or measured current consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://portal.ct.gov/-/media/csc/4_csc_calendarofevents/meetingmaterials/2022/20221208/pe1540-sr--draft_rev2_s.pdf?rev=75458ee8e14249e1a1a03b6e9a70cc96&hash=607BF2906B65A65CFFB6458607F564DD","host":"portal.ct.gov","date":"2022-12-02","published":"2022-12-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.670002,"lng":-72.934109,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"ReNew proposed Bristol fuel-cell project, distinct from host data-center metrics","fields":{"petition":"1540","staff_report_date":"2022-12-02","document_status":"DRAFT","applicant":"ReNew Developers LLC","proposed_host":"Connecticut Data Park","published_site_address":"234 Riverside Avenue, Bristol, Connecticut","parcel_acres":1.62,"proposed_fuel_cell_generation_mw":4,"proposed_fuel_cell_project_cost_usd_approx":16000000,"power_basis":"customer-side fuel-cell generation, not data-center IT capacity","historical_construction_start_target_month":"2023-09","historical_construction_duration_months":9},"notes":["Draft staff report and historic schedule do not establish final ruling or delivered construction. 16 million USD is fuel-cell project cost, not the entire data-center investment. Vacant 9926-square-foot building would be removed; do not adopt as new DC area. 9423-square-foot fuel-cell compound is not IT floor area. Proposed 99-percent baseload coverage does not mean zero emissions or measured current consumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://portal.ct.gov/-/media/csc/4_csc_calendarofevents/meetingmaterials/2022/20221208/pe1540-sr--draft_rev2_s.pdf?rev=75458ee8e14249e1a1a03b6e9a70cc96&hash=607BF2906B65A65CFFB6458607F564DD","host":"portal.ct.gov","date":"2022-12-02","published":"2022-12-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Bristol · Hartford · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"ct-das-groton-data-center-ct","state":"CT","kind":"facility","name":"State of Connecticut Groton Data Center (Pfizer campus Building 230)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New London"],"city":"Groton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. state government hosting service with two locations. Connecticut service uses one named facility outside Connecticut. Hartford office footer not hosting facility street. Tier description not independently reviewed certification, no site MW/area. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://portal.ct.gov/das/best/platform-services/statewide-data-center-facilities","host":"portal.ct.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.334586,"lng":-72.076516,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"state government hosting service with two locations","fields":{"state_hosting_locations":[{"name":"GDC","city":"Groton","state":"Connecticut"},{"name":"SDC","city":"Springfield","state":"Massachusetts"}],"operator_described_resiliency":"TierII redundant data centers"},"notes":["Connecticut service uses one named facility outside Connecticut. Hartford office footer not hosting facility street. Tier description not independently reviewed certification, no site MW/area.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://portal.ct.gov/das/best/platform-services/statewide-data-center-facilities","host":"portal.ct.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Groton · New London · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"tierpoint-waterbury-ct","state":"CT","kind":"facility","name":"TierPoint Waterbury","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Waterbury","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator space specifications, not a current-load measurement or physical parcel. Connecticut county-equivalent planning-region crosswalk remains applicable. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/connecticut/waterbury/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.554366,"lng":-73.0410751,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"gross_area_sqft_lower_bound":3000,"raised_floor_sqft_lower_bound":1600},"notes":["Operator space specifications, not a current-load measurement or physical parcel. Connecticut county-equivalent planning-region crosswalk remains applicable.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/connecticut/waterbury/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Connecticut · Waterbury · Source context reviewed","state_name":"Connecticut","state_path":"/connecticut/"},{"id":"data-canopy-newark-pencader-de","state":"DE","kind":"facility","name":"Data Canopy Newark (350 Pencader Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"Newark","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Data Canopy Newark building versus whitespace and power. 6MWbuildingpowernotexplicitIT.7000gallonsfuelnotwaterconsumption.16085whitespace notwholebuildinggrossarea. Hosting/managedservicerlistingdoesnotprovewholepropertyownershipornewphysicalbuildinguniqueagainstotheroperators. No exactopeningorindependentcertificatesread. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacanopy.com/data-centers/newark-de/","host":"datacanopy.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.612001,"lng":-75.760335,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Data Canopy Newark building versus whitespace and power","fields":{"operator":"Data Canopy","address":"350 Pencader Drive, Newark, Delaware19702","building_power_capacity_mw":6,"utility_feeds":3,"whitespace_sqft":16085,"generator_diesel_storage_gallons":7000},"notes":["6MWbuildingpowernotexplicitIT.7000gallonsfuelnotwaterconsumption.16085whitespace notwholebuildinggrossarea. Hosting/managedservicerlistingdoesnotprovewholepropertyownershipornewphysicalbuildinguniqueagainstotheroperators. No exactopeningorindependentcertificatesread.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacanopy.com/data-centers/newark-de/","host":"datacanopy.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · Newark · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"dastor-new-castle-boulden-circle-de","state":"DE","kind":"facility","name":"DāSTOR New Castle (3 Boulden Circle)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"New Castle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not combine marketed8MW with IT or measured-load totals. Operator names distinct New Castle and Wilmington facilities. Power is advertised without an IT/utility basis. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. DaSTOR two named Delaware locations. Reading110k/6MWandKingofPrussia22k/4MWdifferentPAsites. Philadelphia401NBroadand411SwedelandlistedPoPsnotautomaticallyoperatorownedwholeDCs. Taxadvantagewordingnotnamedexecutedincentive. No currentenergization/actualconsumptionorcensuscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dastorllc.com/locations/","host":"dastorllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.68965,"lng":-75.574117,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"3 Boulden Circle","city":"New Castle","area_sqft":61000,"power_mw":8,"power_basis":"advertised power, basis unspecified","marketed_service":"colocation"},"notes":["Do not combine marketed8MW with IT or measured-load totals.","Operator names distinct New Castle and Wilmington facilities. Power is advertised without an IT/utility basis.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dastorllc.com/locations/","host":"dastorllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"DaSTOR two named Delaware locations","fields":{"operator":"DaSTOR","delaware_sites":[{"address":"3 Boulden Circle, New Castle, Delaware","area_sqft":61000,"advertised_power_mw":8},{"address":"1201 North Market Street, Wilmington, Delaware","area_sqft":23000,"advertised_power_mw":4}],"power_basis":"operator power, not explicitly critical IT"},"notes":["Reading110k/6MWandKingofPrussia22k/4MWdifferentPAsites. Philadelphia401NBroadand411SwedelandlistedPoPsnotautomaticallyoperatorownedwholeDCs. Taxadvantagewordingnotnamedexecutedincentive. No currentenergization/actualconsumptionorcensuscertification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dastorllc.com/locations/","host":"dastorllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · New Castle · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"dastor-wilmington-1201-north-market-de","state":"DE","kind":"facility","name":"DāSTOR Wilmington (1201 North Market Street, formerly IPR Wilmington)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"Wilmington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DaSTOR two named Delaware locations. Reading110k/6MWandKingofPrussia22k/4MWdifferentPAsites. Philadelphia401NBroadand411SwedelandlistedPoPsnotautomaticallyoperatorownedwholeDCs. Taxadvantagewordingnotnamedexecutedincentive. No currentenergization/actualconsumptionorcensuscertification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dastorllc.com/locations/","host":"dastorllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.747859,"lng":-75.546753,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"DaSTOR two named Delaware locations","fields":{"operator":"DaSTOR","delaware_sites":[{"address":"3 Boulden Circle, New Castle, Delaware","area_sqft":61000,"advertised_power_mw":8},{"address":"1201 North Market Street, Wilmington, Delaware","area_sqft":23000,"advertised_power_mw":4}],"power_basis":"operator power, not explicitly critical IT"},"notes":["Reading110k/6MWandKingofPrussia22k/4MWdifferentPAsites. Philadelphia401NBroadand411SwedelandlistedPoPsnotautomaticallyoperatorownedwholeDCs. Taxadvantagewordingnotnamedexecutedincentive. No currentenergization/actualconsumptionorcensuscertification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dastorllc.com/locations/","host":"dastorllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · Wilmington · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"maguire-hayden-harrington-de","state":"DE","kind":"facility","name":"Harrington Data Center Proposal (Maguire Hayden)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Harrington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Not denial of a formally submitted project-specific conditional use application. Existing 220973-sq-ft building differs from proposed 125000-sq-ft data-center scheme; 24 MW not adopted as energized IT. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://delawarebusinesstimes.com/news/harrington-data-center/","host":"delawarebusinesstimes.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.9237244,"lng":-75.5777033,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"zoning-enabling-ordinance-rejected","reported_finding":"Delaware Business Times says Harrington rejected adding data centers as conditional uses in manufacturing zones; blanket ban was still under consideration.","report_display_date":"2026-08-18","independently_verified_current_status":null},"notes":["Not denial of a formally submitted project-specific conditional use application. Existing 220973-sq-ft building differs from proposed 125000-sq-ft data-center scheme; 24 MW not adopted as energized IT.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://delawarebusinesstimes.com/news/harrington-data-center/","host":"delawarebusinesstimes.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · Harrington · Kent · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"jpmorgan-chase-cdc1-bear-de","state":"DE","kind":"facility","name":"JPMorgan Chase Core Data Center 1 (CDC1), Bear","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"Bear","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Draft permit amendment, not final approval or current operating status. Newark postal address does not independently resolve Bear municipal/geographic record. Generator count in amendment not number of data centers or electrical ITMW. No hearing scheduled absent request. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dnrec.delaware.gov/public-notices/title-v-synthetic-minor-permit-applications-jp-morgan/","host":"dnrec.delaware.gov","date":"2021-12-12","published":"2021-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.64975,"lng":-75.656095,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"published_facility_address":"501 Bear Christiana Road,Newark,Delaware","historical_permit_amendment_notice_date":"2021-12-12","historical_comment_deadline":"2022-01-11","emergency_generators_covered_by_scr_removal_request":4,"requested_annual_hours_limit_per_emergency_generator":124},"notes":["Draft permit amendment, not final approval or current operating status. Newark postal address does not independently resolve Bear municipal/geographic record. Generator count in amendment not number of data centers or electrical ITMW. No hearing scheduled absent request.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dnrec.delaware.gov/public-notices/title-v-synthetic-minor-permit-applications-jp-morgan/","host":"dnrec.delaware.gov","date":"2021-12-12","published":"2021-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · Bear · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"cirrus-delaware-middletown-technology-center-de","state":"DE","kind":"facility","name":"Middletown Technology Center (Cirrus Delaware LLC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"Middletown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.. Historical Cirrus Delaware/MiddletownTechnologyCenter proposal, not2026operating evidence. Draftminutes record request up to7.5M infrastructure grant,350M estimatedproject/50M infrastructure and750construction/117operations jobs; all forecasts/claimedinvestments, not audited payments or present headcount. Early40MW description and later36MWwhite-space with about50MWtotal/PUE1.4 are spoken design descriptions; do not simply adopt40MWcriticalIT or add generator and load numbers.138/34/25kV are voltages, notMW. Draftpages8 to 9 record4 to 0conditionalapproval with an abstention/absence notation. Finalmotion conditions: DNRECairpermit; financing information toDEDOwithin12months FOLLOWINGFINALPERMIT and DEDOapproval; operator identity; reimbursement basis. Separate proposed12monthexpiration discussion is not automatically an adopted unconditionalexpiry. No finalminutes, executedgrant, actualdraw, airpermit or operation inspected. Operator remained unnamed/negotiatingFortune500client; Amazon comparisons are not proofAWSoccupancy. Separate haltedNewarkTDCproject must not be merged. Not whole record/current operating census, legal compliance or independent meter certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://publicmeetings.delaware.gov/Document/35863_Minutes-Draft.pdf","host":"publicmeetings.delaware.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4497639,"lng":-75.7166345,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-originals-model-and-approval-stages-round55-2026-10-15.json","scope":"Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.","fields":{},"notes":["Historical Cirrus Delaware/MiddletownTechnologyCenter proposal, not2026operating evidence. Draftminutes record request up to7.5M infrastructure grant,350M estimatedproject/50M infrastructure and750construction/117operations jobs; all forecasts/claimedinvestments, not audited payments or present headcount.","Early40MW description and later36MWwhite-space with about50MWtotal/PUE1.4 are spoken design descriptions; do not simply adopt40MWcriticalIT or add generator and load numbers.138/34/25kV are voltages, notMW.","Draftpages8 to 9 record4 to 0conditionalapproval with an abstention/absence notation. Finalmotion conditions: DNRECairpermit; financing information toDEDOwithin12months FOLLOWINGFINALPERMIT and DEDOapproval; operator identity; reimbursement basis. Separate proposed12monthexpiration discussion is not automatically an adopted unconditionalexpiry.","No finalminutes, executedgrant, actualdraw, airpermit or operation inspected. Operator remained unnamed/negotiatingFortune500client; Amazon comparisons are not proofAWSoccupancy. Separate haltedNewarkTDCproject must not be merged.","Not whole record/current operating census, legal compliance or independent meter certification."],"sources":[{"url":"https://publicmeetings.delaware.gov/Document/35863_Minutes-Draft.pdf","host":"publicmeetings.delaware.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · Middletown · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"starwood-digital-project-washington-de","state":"DE","kind":"facility","name":"Project Washington (Starwood Digital Ventures)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"Delaware City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Starwood Coastal Zone status notice; substantive result held. Notice confirms decision issued but does not state its outcome; linked decision not reviewed yet. Appeal deadline passing alone not proof no appeal or final disposition. Generator count not electricalMW. Tax parcels are identifiers, not researched point coordinates. No operating milestone or cost. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dnrec.delaware.gov/public-notices/cce20260043/","host":"dnrec.delaware.gov","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.578,"lng":-75.593,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Starwood Coastal Zone status notice; substantive result held","fields":{"coastal_zone_status_request_id":"CZA-448SD","status_request_submission_date":"2025-10-31","status_decision_notice_date":"2026-02-04","appeal_deadline":"2026-02-18","published_newcastle_tax_parcels":["10-049.00-073","12-002.00-025"],"proposed_data_center_buildings":11,"proposed_building_stories":2,"proposed_substations":5,"proposed_generators":516},"notes":["Notice confirms decision issued but does not state its outcome; linked decision not reviewed yet. Appeal deadline passing alone not proof no appeal or final disposition. Generator count not electricalMW. Tax parcels are identifiers, not researched point coordinates. No operating milestone or cost.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dnrec.delaware.gov/public-notices/cce20260043/","host":"dnrec.delaware.gov","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · Delaware City · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"parkway-gravel-st-georges-de","state":"DE","kind":"facility","name":"St. Georges Business Park & Lighthouse Farms","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"St. Georges","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Exploratory plans and permissive industrial zoning do not identify a committed DC tenant or operating project. Housing and warehouse areas are not confirmed DC floor area. Starwood Project Washington, White Clay and Blue Diamond are separate; an Aldi warehouse grant is not a data-center incentive. Proposed county rules are not enacted law. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://delawarebusinesstimes.com/news/three-sites-data-center-conversions/","host":"delawarebusinesstimes.com","date":"2025-12-18","published":"2025-12-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.5593065,"lng":-75.6542782,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Delaware Business Times reports exploratory St. Georges Business Park changes that could allow Parkway Gravel's industrial proposal to include data-center uses.","independently_verified_current_operating_status":null},"notes":["Exploratory plans and permissive industrial zoning do not identify a committed DC tenant or operating project. Housing and warehouse areas are not confirmed DC floor area. Starwood Project Washington, White Clay and Blue Diamond are separate; an Aldi warehouse grant is not a data-center incentive. Proposed county rules are not enacted law.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://delawarebusinesstimes.com/news/three-sites-data-center-conversions/","host":"delawarebusinesstimes.com","date":"2025-12-18","published":"2025-12-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · St. Georges · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"the-data-centers-star-campus-newark-de","state":"DE","kind":"facility","name":"STAR Campus Data Center & Cogeneration Plant (The Data Centers, LLC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"Newark","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Delaware university historical lease termination. University explicitly terminated lease and halted proposal. URL2015folder does not override July10,2014 article date. Historic proposal is not operating site.279MWgeneration not critical IT or current power. No inference all later STARCampus computing forbidden or halted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www1.udel.edu/udaily/2015/jul/decision071014.html","host":"www1.udel.edu","date":"2014-07-10","published":"2014-07-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.6655592,"lng":-75.7541725,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Delaware university historical lease termination","fields":{"institution":"University of Delaware","company":"The Data Centers LLC","project":"STAR Campus data center","university_lease_termination_date":"2014-07-10","proposed_cogeneration_mw":279,"power_basis":"proposed power plant generation, not IT"},"notes":["University explicitly terminated lease and halted proposal. URL2015folder does not override July10,2014 article date. Historic proposal is not operating site.279MWgeneration not critical IT or current power. No inference all later STARCampus computing forbidden or halted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www1.udel.edu/udaily/2015/jul/decision071014.html","host":"www1.udel.edu","date":"2014-07-10","published":"2014-07-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · Newark · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"delaware-dti-biggs-data-center-new-castle-de","state":"DE","kind":"facility","name":"State of Delaware Biggs Data Center (DTI)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"New Castle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Delaware two named state data-center service endpoints. RFPprovidespublicfacility addresses andservicepurpose, not currentoccupancycertificate.100Gbpsinterface/60Gbpscommit areconnectivity notelectricalMW. Contracttermnotopeningdate. SupplierblankNDAform notinstructions toresearcher. No publicprocurement submission made. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bidcondocs.delaware.gov/DTI/DTI230047-INTERNET-ad1.pdf","host":"bidcondocs.delaware.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.697868,"lng":-75.574992,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Delaware two named state data-center service endpoints","fields":{"state_primary_data_center_locations":[{"name":"BiggsBuilding","address":"1901 NorthDupontHighway,NewCastle,Delaware"},{"name":"WilliamPennBuilding","address":"801 SilverLakeBoulevard,Dover,Delaware"}],"historical_internet_procurement_submission_deadline":"2024-01-03"},"notes":["RFPprovidespublicfacility addresses andservicepurpose, not currentoccupancycertificate.100Gbpsinterface/60Gbpscommit areconnectivity notelectricalMW. Contracttermnotopeningdate. SupplierblankNDAform notinstructions toresearcher. No publicprocurement submission made.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bidcondocs.delaware.gov/DTI/DTI230047-INTERNET-ad1.pdf","host":"bidcondocs.delaware.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · New Castle · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"delaware-dti-william-penn-data-center-dover-de","state":"DE","kind":"facility","name":"State of Delaware William Penn Data Center (DTI)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Dover","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Delaware two named state data-center service endpoints. RFPprovidespublicfacility addresses andservicepurpose, not currentoccupancycertificate.100Gbpsinterface/60Gbpscommit areconnectivity notelectricalMW. Contracttermnotopeningdate. SupplierblankNDAform notinstructions toresearcher. No publicprocurement submission made. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bidcondocs.delaware.gov/DTI/DTI230047-INTERNET-ad1.pdf","host":"bidcondocs.delaware.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.171779,"lng":-75.536142,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Delaware two named state data-center service endpoints","fields":{"state_primary_data_center_locations":[{"name":"BiggsBuilding","address":"1901 NorthDupontHighway,NewCastle,Delaware"},{"name":"WilliamPennBuilding","address":"801 SilverLakeBoulevard,Dover,Delaware"}],"historical_internet_procurement_submission_deadline":"2024-01-03"},"notes":["RFPprovidespublicfacility addresses andservicepurpose, not currentoccupancycertificate.100Gbpsinterface/60Gbpscommit areconnectivity notelectricalMW. Contracttermnotopeningdate. SupplierblankNDAform notinstructions toresearcher. No publicprocurement submission made.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bidcondocs.delaware.gov/DTI/DTI230047-INTERNET-ad1.pdf","host":"bidcondocs.delaware.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · Dover · Kent · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"shelbourne-white-clay-newark-de","state":"DE","kind":"facility","name":"White Clay Corporate Center Data Center Redevelopment","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New Castle"],"city":"Newark","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Delmarva’s project has undetermined capacity and no named developer/site. White Clay is explicitly only a POSSIBLE match; do not adopt Sierra Club estimate above 100 MW or any other numbered project’s 100/300/1,200 MW as this site’s capacity. Utility review and cluster studies are not executed service or zoning approvals. The 30 MW withdrawn utility project has unknown identity and cannot mark White Clay withdrawn. Project Washington Coastal Zone denial/appeal and October 2025 large-load interconnection pause are separate scopes; no current ordinance interpretation or final appeal outcome inferred. Original FOIA records not separately examined. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://technical.ly/civics/delaware-data-center-foia-reveals-hidden-energy-demands/","host":"technical.ly","date":"2026-06-11","published":"2026-06-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.6828358,"lng":-75.7515682,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Technical.ly’s FOIA-based report discusses White Clay among possible matches for an unnamed early-stage New Castle County utility inquiry.","independently_verified_current_operating_status":null,"operator_or_exact_site_identity_needs_crosswalk":true},"notes":["Delmarva’s project has undetermined capacity and no named developer/site. White Clay is explicitly only a POSSIBLE match; do not adopt Sierra Club estimate above 100 MW or any other numbered project’s 100/300/1,200 MW as this site’s capacity. Utility review and cluster studies are not executed service or zoning approvals. The 30 MW withdrawn utility project has unknown identity and cannot mark White Clay withdrawn. Project Washington Coastal Zone denial/appeal and October 2025 large-load interconnection pause are separate scopes; no current ordinance interpretation or final appeal outcome inferred. Original FOIA records not separately examined.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://technical.ly/civics/delaware-data-center-foia-reveals-hidden-energy-demands/","host":"technical.ly","date":"2026-06-11","published":"2026-06-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Delaware · Newark · New Castle · Source context reviewed","state_name":"Delaware","state_path":"/delaware/"},{"id":"365-data-centers-washington-dc","state":"DC","kind":"facility","name":"365 Data Centers - Washington, D.C.","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Washington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. national network/POP listing. This is explicitly a facilities/network points-of-presence list. Address alone does not establish an owned operating data-center building. No capacity or new site count fromPOP. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. unrelated utility source hold. Utility ENERGY STAR award summary covers 2022 program accomplishments, not any bound DC building. 3 million MWh is multi-program utility energy savings over a decade, not site use or capacity.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://365datacenters.com/facilities-network/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.energystar.gov/about/potomac-electric-power-company-pepco","host":"energystar.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.902580481701,"lng":-77.029210511723,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"national network/POP listing","fields":{"named_public_network_addresses":[{"place":"Boca Raton","address":"3500 NW Boca Raton Boulevard, Suites800,810,900"},{"place":"Fort Lauderdale","address":"3250 W Commercial Boulevard, Suite140"},{"place":"Washington DC","address":"1275 K Street NW"}]},"notes":["This is explicitly a facilities/network points-of-presence list. Address alone does not establish an owned operating data-center building. No capacity or new site count fromPOP.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/facilities-network/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unrelated utility source hold","fields":{},"notes":["Utility ENERGY STAR award summary covers 2022 program accomplishments, not any bound DC building. 3 million MWh is multi-program utility energy savings over a decade, not site use or capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energystar.gov/about/potomac-electric-power-company-pepco","host":"energystar.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"District of Columbia · Washington · Source context reviewed","state_name":"District of Columbia","state_path":"/district-of-columbia/"},{"id":"cogent-washington-dc-2-1050-connecticut-ave-dc","state":"DC","kind":"facility","name":"Cogent Washington DC 2 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["District of Columbia"],"city":"Washington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unrelated utility source hold. Utility ENERGY STAR award summary covers 2022 program accomplishments, not any bound DC building. 3 million MWh is multi-program utility energy savings over a decade, not site use or capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energystar.gov/about/potomac-electric-power-company-pepco","host":"energystar.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.903131,"lng":-77.039741,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unrelated utility source hold","fields":{},"notes":["Utility ENERGY STAR award summary covers 2022 program accomplishments, not any bound DC building. 3 million MWh is multi-program utility energy savings over a decade, not site use or capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energystar.gov/about/potomac-electric-power-company-pepco","host":"energystar.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"District of Columbia · Washington · District of Columbia · Source context reviewed","state_name":"District of Columbia","state_path":"/district-of-columbia/"},{"id":"coresite-dc1-washington-d-c-dc","state":"DC","kind":"facility","name":"CoreSite DC1 - Washington, D.C.","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["District of Columbia"],"city":"Washington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator specification; actual utilization is not stated. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/dc1-washington-d-c","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9028879,"lng":-77.0291491,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft_lower_bound":22000},"notes":["Operator specification; actual utilization is not stated.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/dc1-washington-d-c","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"District of Columbia · Washington · District of Columbia · Source context reviewed","state_name":"District of Columbia","state_path":"/district-of-columbia/"},{"id":"coresite-dc2-washington-d-c-dc","state":"DC","kind":"facility","name":"CoreSite DC2 - Washington, D.C.","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["District of Columbia"],"city":"Washington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unrelated utility source hold. Utility ENERGY STAR award summary covers 2022 program accomplishments, not any bound DC building. 3 million MWh is multi-program utility energy savings over a decade, not site use or capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energystar.gov/about/potomac-electric-power-company-pepco","host":"energystar.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.903679,"lng":-77.031877,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unrelated utility source hold","fields":{},"notes":["Utility ENERGY STAR award summary covers 2022 program accomplishments, not any bound DC building. 3 million MWh is multi-program utility energy savings over a decade, not site use or capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energystar.gov/about/potomac-electric-power-company-pepco","host":"energystar.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"District of Columbia · Washington · District of Columbia · Source context reviewed","state_name":"District of Columbia","state_path":"/district-of-columbia/"},{"id":"365-data-centers-boca-raton-fl","state":"FL","kind":"facility","name":"365 Data Centers Boca Raton (BC1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Palm Beach"],"city":"Boca Raton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Areas are campus and data-center subsets, not additive. Generator ratings are not critical IT or utility service MW. Current advertised services are an operator assertion; opening date and measured load remain unknown. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. national network/POP listing. This is explicitly a facilities/network points-of-presence list. Address alone does not establish an owned operating data-center building. No capacity or new site count fromPOP.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://365datacenters.com/boca-raton-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://365datacenters.com/facilities-network/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.3814312,"lng":-80.0836087,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"3500 NW Boca Raton Blvd., Boca Raton, FL 33431","advertised_campus_sqft":49850,"advertised_data_center_sqft":30400,"backup_generators_kw":[800,1250]},"notes":["Areas are campus and data-center subsets, not additive. Generator ratings are not critical IT or utility service MW. Current advertised services are an operator assertion; opening date and measured load remain unknown.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/boca-raton-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"national network/POP listing","fields":{"named_public_network_addresses":[{"place":"Boca Raton","address":"3500 NW Boca Raton Boulevard, Suites800,810,900"},{"place":"Fort Lauderdale","address":"3250 W Commercial Boulevard, Suite140"},{"place":"Washington DC","address":"1275 K Street NW"}]},"notes":["This is explicitly a facilities/network points-of-presence list. Address alone does not establish an owned operating data-center building. No capacity or new site count fromPOP.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/facilities-network/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Boca Raton · Palm Beach · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"365-data-centers-fort-lauderdale-fl","state":"FL","kind":"facility","name":"365 Data Centers Fort Lauderdale (FLL)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Broward"],"city":"Fort Lauderdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The advertised generator is backup equipment, not grid-service MW or critical IT load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. national network/POP listing. This is explicitly a facilities/network points-of-presence list. Address alone does not establish an owned operating data-center building. No capacity or new site count fromPOP.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://365datacenters.com/fort-lauderdale-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://365datacenters.com/facilities-network/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.184971,"lng":-80.190819,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"3250 W Commercial Blvd., Fort Lauderdale, FL 33309","advertised_data_center_sqft":11400,"backup_generator_mw":1.5},"notes":["The advertised generator is backup equipment, not grid-service MW or critical IT load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/fort-lauderdale-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"national network/POP listing","fields":{"named_public_network_addresses":[{"place":"Boca Raton","address":"3500 NW Boca Raton Boulevard, Suites800,810,900"},{"place":"Fort Lauderdale","address":"3250 W Commercial Boulevard, Suite140"},{"place":"Washington DC","address":"1275 K Street NW"}]},"notes":["This is explicitly a facilities/network points-of-presence list. Address alone does not establish an owned operating data-center building. No capacity or new site count fromPOP.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/facilities-network/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Fort Lauderdale · Broward · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"3ex-hosting-boca-raton-fl","state":"FL","kind":"facility","name":"3EX Hosting Data Center  -  Boca Raton","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Palm Beach"],"city":"Boca Raton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 17kWrackoptionandcabinetofferingsnotfacilityMW. CarrierneutralanduptimeSLAnotindependentcurrentcapacitycertification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.3exhosting.com/data-center/","host":"3exhosting.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.4075552,"lng":-80.097877,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"6601 Park of Commerce Blvd, Boca Raton, FL33487","colocation_area_sqft":15000},"notes":["17kWrackoptionandcabinetofferingsnotfacilityMW. CarrierneutralanduptimeSLAnotindependentcurrentcapacitycertification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.3exhosting.com/data-center/","host":"3exhosting.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Boca Raton · Palm Beach · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"acehost-marion-tampa-fl","state":"FL","kind":"facility","name":"AceHost Marion Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hillsborough"],"city":"Tampa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator explicitly names its Marion mining facility in downtown Tampa and markets ASIC/GPU hosting. No full street address established in this page. Marion is a facility name here, not proof of Marion County. 100MW+ headline refers to multiple hosting locations and availability; the body says up to100MW without a defined IT, service, installed or delivered basis. Neither is measured consumption or a confirmed100MW load for one Tampa building. Air/immersion options and rig nameplate wattages are service/product descriptions, not certified campus thermal design, utility contract or actual electricity use. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.acehost.com/crypto-mining-colocation.php","host":"acehost.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.946873,"lng":-82.455567,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Operator explicitly names its Marion mining facility in downtown Tampa and markets ASIC/GPU hosting. No full street address established in this page. Marion is a facility name here, not proof of Marion County.","100MW+ headline refers to multiple hosting locations and availability; the body says up to100MW without a defined IT, service, installed or delivered basis. Neither is measured consumption or a confirmed100MW load for one Tampa building.","Air/immersion options and rig nameplate wattages are service/product descriptions, not certified campus thermal design, utility contract or actual electricity use.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.acehost.com/crypto-mining-colocation.php","host":"acehost.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Tampa · Hillsborough · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"american-tower-pinellas-park-fl","state":"FL","kind":"facility","name":"American Tower Pinellas Park Data Processing Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinellas"],"city":"Pinellas Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Pinellas proposed county reaffirmation does not establish PinellasPark site ban. Readableexcerpt only, subscriptionbody notbypassed. Headlineclosesdoor stronger thanreportedstaffdraftdirection. No originaladoptedresolution orcompletecodeinspected. UnincorporatedcountyrestrictionnotautomaticallyPinellasParkmunicipality orAmericanTowerparticularsite. Exactsiteidentity/vestedright/ITMW/currentoperationnotestablished. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.businessobserverfl.com/news/2026/aug/29/pinellas-county-closes-door-data-centers/","host":"businessobserverfl.com","date":"2026-08-29","published":"2026-08-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.869841,"lng":-82.743196,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Pinellas proposed county reaffirmation does not establish PinellasPark site ban","fields":{"publisher":"BusinessObserver","reported_county_action":"staff directed to draft resolution reaffirming existingcode interpretation","geographic_scope":"unincorporated PinellasCounty, Florida","target_use":"large standalone data centers; smaller institutional facilities distinguished"},"notes":["Readableexcerpt only, subscriptionbody notbypassed. Headlineclosesdoor stronger thanreportedstaffdraftdirection. No originaladoptedresolution orcompletecodeinspected. UnincorporatedcountyrestrictionnotautomaticallyPinellasParkmunicipality orAmericanTowerparticularsite. Exactsiteidentity/vestedright/ITMW/currentoperationnotestablished.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.businessobserverfl.com/news/2026/aug/29/pinellas-county-closes-door-data-centers/","host":"businessobserverfl.com","date":"2026-08-29","published":"2026-08-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Pinellas Park · Pinellas · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"atlas-compute-ai-data-center-campus-fort-pierce-fl","state":"FL","kind":"facility","name":"Atlas Compute AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Lucie"],"city":"Fort Pierce","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Zoning-verification letter and corporate landholding are not approvals or executedpoweragreements. UnspecifiedhundredsofMWinitialIT/up-to 1 GWexpansion are vague developer claims without examined technical basis; no exactcanonicalMWorRFS. Closed-loopdesign is not quantified actualwateruse or noimpact guarantee. Other 2025 St.Lucieproposal denial is different site. NamedLLCfilings/addresses are not independently reviewed originals and cannot alone identify an operatingtenant. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hoodline.com/2026/03/massive-ai-server-farm-sets-sights-on-fort-pierce-neighbors-want-answers/","host":"hoodline.com","date":"2026-03-13","published":"2026-03-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.44,"lng":-80.33,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"Hoodline relays WPTVcounty statements that no formal AtlasComputeapplication/permitpackage had been received, despite developer land/utility and 2026 to 27 opening claims for a FortPierceareaGPUcampus.","independently_verified_current_operating_status":null},"notes":["Zoning-verification letter and corporate landholding are not approvals or executedpoweragreements. UnspecifiedhundredsofMWinitialIT/up-to 1 GWexpansion are vague developer claims without examined technical basis; no exactcanonicalMWorRFS. Closed-loopdesign is not quantified actualwateruse or noimpact guarantee. Other 2025 St.Lucieproposal denial is different site. NamedLLCfilings/addresses are not independently reviewed originals and cannot alone identify an operatingtenant.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hoodline.com/2026/03/massive-ai-server-farm-sets-sights-on-fort-pierce-neighbors-want-answers/","host":"hoodline.com","date":"2026-03-13","published":"2026-03-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Fort Pierce · St. Lucie · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"centersquare-tpa1-tampa-fl","state":"FL","kind":"facility","name":"Centersquare Tampa TPA1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hillsborough"],"city":"Tampa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not display utility9MW as IT load. Operator separates utility, UPS and generator ratings; same9MW does not identify critical IT load. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/tampa","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.9455353,"lng":-82.351102,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Tampa","raised_floor_sqft":19245,"utility_power_mw":9,"ups_capacity_mw":2.5,"generator_capacity_mw":9,"marketed_service":"colocation"},"notes":["Do not display utility9MW as IT load.","Operator separates utility, UPS and generator ratings; same9MW does not identify critical IT load.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/tampa","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Tampa · Hillsborough · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"cielo-haines-city-fl","state":"FL","kind":"facility","name":"Cielo Haines City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Haines City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. City says150000 gallons/day added to pending modification; district explicitly says no data-center allocation or official additional request. Neither is approved use or observed consumption. No development application before commission. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://baynews9.com/fl/tampa/news/2026/07/10/haines-city-officials-explain-water-capacity-address-data-center-concerns","host":"baynews9.com","date":"2026-07-09","published":"2026-07-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":28.1114,"lng":-81.6198,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Spectrum reports preliminary Cielo Haines City utility inquiry on hold; city and SWFWMD accounts differ about requested water.","independently_verified_current_operating_status":null},"notes":["City says150000 gallons/day added to pending modification; district explicitly says no data-center allocation or official additional request. Neither is approved use or observed consumption. No development application before commission.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://baynews9.com/fl/tampa/news/2026/07/10/haines-city-officials-explain-water-capacity-address-data-center-concerns","host":"baynews9.com","date":"2026-07-09","published":"2026-07-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Haines City · Polk · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"cloud-south-west-palm-beach-fl","state":"FL","kind":"facility","name":"Cloud South West Palm Beach 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Palm Beach"],"city":"West Palm Beach","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cloud South two-site operator claim and company history. Twofacilitiescombinedarea,not8300eachorindependentlycountedparcels. Tier4HyperScaleclaimnotindependentcertification.2011companyfoundingnotindividualDCopening. Noexactaddresses/numericITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cloudsouth.com/","host":"cloudsouth.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.6838049,"lng":-80.0549592,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Cloud South two-site operator claim and company history","fields":{"operator":"Cloud South","company_founded_year":2011,"operator_reported_facilities":2,"locality":"West Palm Beach, Florida","combined_facility_area_sqft_min_exclusive":8300},"notes":["Twofacilitiescombinedarea,not8300eachorindependentlycountedparcels. Tier4HyperScaleclaimnotindependentcertification.2011companyfoundingnotindividualDCopening. Noexactaddresses/numericITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cloudsouth.com/","host":"cloudsouth.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · West Palm Beach · Palm Beach · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"cogent-boca-raton-fl","state":"FL","kind":"facility","name":"Cogent Boca Raton Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Palm Beach"],"city":"Boca Raton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Networkon-netbuildingselsewherearenotownedoperatingdatacenters. NoMWfromUPS/generatorterms. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cogentco.com/en/cogent-boca-raton","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.392805,"lng":-80.109732,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"5050 Conference Way North, Suite100, Boca Raton, FL33431","operator_labeled_space_sqft":10011},"notes":["Networkon-netbuildingselsewherearenotownedoperatingdatacenters. NoMWfromUPS/generatorterms.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cogentco.com/en/cogent-boca-raton","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Boca Raton · Palm Beach · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"cogent-hollywood-pembroke-park-fl","state":"FL","kind":"facility","name":"Cogent Hollywood, FL Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Broward"],"city":"Pembroke Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. PageusesHollywoodtitleandMiami/FortLauderdalemarketlabel; publishedmunicipalityspellingpreservedasverbatimnotcorrectedparcel. NoareaorMWprovided. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cogentco.com/en/cogent-miami/289-mia-office/2481-hollywood-fl-data-center","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.9954554,"lng":-80.1795761,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address_verbatim":"3924 Pembroke Rd, Pembrooke Park, FL33021"},"notes":["PageusesHollywoodtitleandMiami/FortLauderdalemarketlabel; publishedmunicipalityspellingpreservedasverbatimnotcorrectedparcel. NoareaorMWprovided.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cogentco.com/en/cogent-miami/289-mia-office/2481-hollywood-fl-data-center","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Pembroke Park · Broward · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"cogent-orlando-wewahootee-fl","state":"FL","kind":"facility","name":"Cogent Orlando Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Orlando","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. MaitlandofficeandDaytonaEdgeareseparatelocations; officestreetnotfacility. NoMWfromUPSdescription. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cogentco.com/en/cogent-orlando/475-orlando-dc","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.424645,"lng":-81.121894,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"17401 Wewahootee Rd, Orlando, FL32832","operator_labeled_space_sqft":38654},"notes":["MaitlandofficeandDaytonaEdgeareseparatelocations; officestreetnotfacility. NoMWfromUPSdescription.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cogentco.com/en/cogent-orlando/475-orlando-dc","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Orlando · Orange · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"colo-solutions-downtown-orlando-fl","state":"FL","kind":"facility","name":"Colo Solutions Downtown Orlando","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Orlando","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Colo Solutions Orlando suite and historical operation. Historicalsince1997notexactfirstserviceday. SLAcontractualnotmeasuredmonthlyuptime. Operator identifies2024-10-01to2025-09-30SOCperiods;restrictedreportsnotaccessed/requested. Ninecarriersnotninebuildings. No numericITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.colosolutions.com/","host":"colosolutions.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.534496,"lng":-81.379455,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Colo Solutions Orlando suite and historical operation","fields":{"operator":"Colo Solutions","address":"100 West Lucerne Circle, Suite201, Orlando, Florida32801","operator_reported_downtown_operation_since":1997,"monthly_availability_sla_percent":99.99,"sla_exception":"scheduled maintenance excluded","operator_reported_carriers_networks":9,"independent_utility_feeds":2,"diesel_generators":3},"notes":["Historicalsince1997notexactfirstserviceday. SLAcontractualnotmeasuredmonthlyuptime. Operator identifies2024-10-01to2025-09-30SOCperiods;restrictedreportsnotaccessed/requested. Ninecarriersnotninebuildings. No numericITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.colosolutions.com/","host":"colosolutions.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Orlando · Orange · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"cologix-jax1-fl","state":"FL","kind":"facility","name":"Cologix JAX1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Duval"],"city":"Jacksonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 5kW+cabinet not facilityIT. Sharedcarrierhotelarea may overlapothertenants; noindependentwholebuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/jacksonville/jax1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.3314298,"lng":-81.6624257,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"JAX1","published_address":"421 West Church Street, Jacksonville, Florida","facility_area_sqft":11000},"notes":["5kW+cabinet not facilityIT. Sharedcarrierhotelarea may overlapothertenants; noindependentwholebuildingcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/jacksonville/jax1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Jacksonville · Duval · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"cologix-jax2-jacksonville-fl","state":"FL","kind":"facility","name":"Cologix JAX2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Duval"],"city":"Jacksonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 125kincludesdisasterrecoverysuites/offices, notwhitefloor-only. JAX1MMRconnectionnotanotherJAX2address. NoMWinferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/jacksonville/jax2/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.273221,"lng":-81.613866,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"JAX2","published_address":"4800 Spring Park Road, Jacksonville, Florida","data_center_and_disaster_recovery_area_sqft":125000},"notes":["125kincludesdisasterrecoverysuites/offices, notwhitefloor-only. JAX1MMRconnectionnotanotherJAX2address. NoMWinferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/jacksonville/jax2/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Jacksonville · Duval · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"cologix-lak1-lakeland-fl","state":"FL","kind":"facility","name":"Cologix LAK1  -  Lakeland","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Lakeland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Area includesrecoveryamenitiesandsupport, notwhitefloor. Highestpoint/safetyclaimsnotindependentlyverified. Nogenerator/feedcountconvertedtoMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/lakeland/lak1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.079624,"lng":-81.975179,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"LAK1","published_address":"2850 Interstate Drive, Lakeland, Florida","disaster_recovery_and_colocation_area_sqft_min_exclusive":105000},"notes":["Area includesrecoveryamenitiesandsupport, notwhitefloor. Highestpoint/safetyclaimsnotindependentlyverified. Nogenerator/feedcountconvertedtoMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/lakeland/lak1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Lakeland · Polk · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"coresite-mi1-miami-fl","state":"FL","kind":"facility","name":"CoreSite MI1  -  Miami","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Miami","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator specification, not a new operating-status event. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/mi1-miami-fl","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.797548,"lng":-80.230038,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft_lower_bound":45000},"notes":["Operator specification, not a new operating-status event.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/mi1-miami-fl","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Miami · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"coresite-mi2-doral-fl","state":"FL","kind":"facility","name":"CoreSite MI2  -  Doral","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Doral","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not add linked Miami campus/MI1 area to this facility. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/mi2-miami-fl","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.793318,"lng":-80.333581,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft_lower_bound":103000},"notes":["Do not add linked Miami campus/MI1 area to this facility.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/mi2-miami-fl","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Doral · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"coresite-or1-orlando-fl","state":"FL","kind":"facility","name":"CoreSite OR1  -  Orlando","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Orlando","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Application not permit approval or construction. Existing129000squarefeet not all new. Campaign statement against new centers not enacted ban; Duke general large-load process not site executed tariff. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.growthspotter.com/2026/06/02/coresite-looks-to-add-second-orlando-data-center-building/","host":"growthspotter.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":28.429212,"lng":-81.420781,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"GrowthSpotter describes CoreSite Orlando application to modify environmental permit for second76280-square-foot building at9701SJohnYoung.","independently_verified_current_operating_status":null},"notes":["Application not permit approval or construction. Existing129000squarefeet not all new. Campaign statement against new centers not enacted ban; Duke general large-load process not site executed tariff.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.growthspotter.com/2026/06/02/coresite-looks-to-add-second-orlando-data-center-building/","host":"growthspotter.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Orlando · Orange · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"databank-mia1-miami-fl","state":"FL","kind":"facility","name":"DataBank MIA1  -  Downtown Miami","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Miami","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Carrier-hotel tenant suite; group with building, not whole-building metrics. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corrected operator/tenant source crosswalk. This alternative belongs to DataBankMIA1inside the same carrier hotel as DigitalRealtyMIA10. Exact existing base record crosswalk retained; never assign DataBank capacity/space to DigitalRealty or sum it with whole-building property area.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/miami/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/data-centers/miami/36-northeast-2nd-street/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.775811,"lng":-80.192959,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MIA1","street":"36 Northeast2ndStreet Suite700","city":"Miami","critical_it_capacity_mw":1.6,"it_area_sqft":11030,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Carrier-hotel tenant suite; group with building, not whole-building metrics.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/miami/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"corrected operator/tenant source crosswalk","fields":{"operator_site_code":"MIA1","published_address":"36 NE2nd Street, Suite700, Miami, FL","it_area_sqft":11030,"critical_it_mw":1.6},"notes":["This alternative belongs to DataBankMIA1inside the same carrier hotel as DigitalRealtyMIA10. Exact existing base record crosswalk retained; never assign DataBank capacity/space to DigitalRealty or sum it with whole-building property area.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/miami/36-northeast-2nd-street/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Miami · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"dc-blox-palm-coast-cable-landing-station-fl","state":"FL","kind":"facility","name":"DC BLOX Palm Coast Cable Landing Station","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Flagler"],"city":"Palm Coast","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Current page says comingQ12027. Critical capacity is combined committed/planned, not all delivered. Subsea cable pairs and cable systems are different units. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-centers/palm-coast-fl-cable-landing-station/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.4858163,"lng":-81.1959416,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"initial_operation_target":"2027-Q1","planned_area_sqft":100000,"critical_capacity_committed_and_planned_mw":10,"campus_acres_min_exclusive":20,"planned_subsea_cables":6},"notes":["Current page says comingQ12027. Critical capacity is combined committed/planned, not all delivered. Subsea cable pairs and cable systems are different units.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/palm-coast-fl-cable-landing-station/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Palm Coast · Flagler · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"dcip-arcadia-roan-street-fl","state":"FL","kind":"facility","name":"DCIP DeSoto County Data Center (Roan Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeSoto"],"city":"Arcadia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DeSoto original approval versus two larger pending applications. Three distinct cases and acreages. Approval reported only for the small original PUD and concept plan, not all hyperscale applications or every building permit. Pending hearings have no date on this index. No numeric IT MW or actual commissioning. Do not combine electrical generation with IT demand. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://desotobocc.com/431/Data-Center-Applications","host":"desotobocc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.2236505,"lng":-81.8041159,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"DeSoto original approval versus two larger pending applications","fields":{"agency":"DeSoto County, Florida","county_reported_approved_project":{"applicant":"DCIP","case":"RZNE-0077-2025","address":"3800 NE Roan Road","site_acres":34.22,"facility_and_office_sqft":35134,"generation_facility_included":true,"pud_and_concept_approval_date":"2026-03-24"},"separate_applications":[{"applicants":["DCIP","3-F Ranch"],"case":"RZNE-0086-2026","received":"2026-05-07","acres":274.26,"proposed_sqft":3686125},{"applicants":["Swisher Mildred E TR","Swisher Properties"],"case":"RZNE-0087-2026","received":"2026-05-13","acres":553.79,"proposed_sqft":4655000,"generation_facility_included":true}]},"notes":["Three distinct cases and acreages. Approval reported only for the small original PUD and concept plan, not all hyperscale applications or every building permit. Pending hearings have no date on this index. No numeric IT MW or actual commissioning. Do not combine electrical generation with IT demand.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://desotobocc.com/431/Data-Center-Applications","host":"desotobocc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Arcadia · DeSoto · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"north-port-holdings-300-deep-park-north-port-fl","state":"FL","kind":"facility","name":"Deep Park Data Center (North Port 300)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sarasota"],"city":"North Port","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. North Port pending application versus broader mixed-use concept. City map explicitly approximate, not exact coordinates. 282 acres and 112-acre pod include multiple uses, not exclusive DC footprint. Application receipt and voluntary master concept plan are not approval. Linked meetings do not establish enacted moratorium or exact expiry from this text. Legislative summaries are contextual agency explanations, not independent statute interpretation. No critical IT MW, final outcome or operations inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3","host":"engage.zencity.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.0677773,"lng":-82.0743791,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"North Port pending application versus broader mixed-use concept","fields":{"agency":"City of North Port, Florida","applicant":"North Port300","application_received_date":"2026-07-20","stage_as_reported":"awaiting applicant response to staff sufficiency issues","location":"Yorkshire area north of Interstate75 and south of Yorkshire Street","proposed_building_area_sqft":896000,"included_office_sqft_approx":123200,"broader_mixed_use_site_acres":282,"broader_plan_pods_acres_approx":{"commercial":62,"residential":107,"retail_office_storage_data_center":112}},"notes":["City map explicitly approximate, not exact coordinates. 282 acres and 112-acre pod include multiple uses, not exclusive DC footprint. Application receipt and voluntary master concept plan are not approval. Linked meetings do not establish enacted moratorium or exact expiry from this text. Legislative summaries are contextual agency explanations, not independent statute interpretation. No critical IT MW, final outcome or operations inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3","host":"engage.zencity.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · North Port · Sarasota · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"digital-realty-mia10-fl","state":"FL","kind":"facility","name":"Digital Realty MIA10","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Miami","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Group tenant DataBank MIA1 beneath its physical building for site counts. Separate operator offerings can remain visible. Do not transfer the tenant1.6MW specification to the whole building or treat the valid shared address as proof of an erroneous duplicate. Selected DataBank source corroborates its MIA1 tenant suite inside the carrier-hotel building that the baseline separately attributes to Digital Realty. Whole-building ownership and extent need a separate operator source; the baseline already describes tenant overlap. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/miami/36-northeast-2nd-street/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.digitalrealty.com/data-centers/americas/miami/mia10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.7758419,"lng":-80.1929625,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"source_identifies_operator":"DataBank","source_identifies_facility":"MIA1","source_identifies_street":"36 Northeast2ndStreet Suite700"},"notes":["Group tenant DataBank MIA1 beneath its physical building for site counts. Separate operator offerings can remain visible.","Do not transfer the tenant1.6MW specification to the whole building or treat the valid shared address as proof of an erroneous duplicate.","Selected DataBank source corroborates its MIA1 tenant suite inside the carrier-hotel building that the baseline separately attributes to Digital Realty. Whole-building ownership and extent need a separate operator source; the baseline already describes tenant overlap.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/miami/36-northeast-2nd-street/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"MIA10","published_address":"36 NE 2nd Street, Miami, FL 33132","operator_label_total_building_size_sqft":150000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/miami/mia10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Miami · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"edgeconnex-jax01-jacksonville-fl","state":"FL","kind":"facility","name":"EdgeConneX Jacksonville JAX01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Duval"],"city":"Jacksonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. NoMWspecified.20+kWpercabinetnotwholefacility. Addressnotpublishedincapturedwebspec. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/north-america/jacksonville/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.254238,"lng":-81.604183,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"JAX01","facility_area_sqft":17570,"raised_floor_sqft":6812},"notes":["NoMWspecified.20+kWpercabinetnotwholefacility. Addressnotpublishedincapturedwebspec.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/north-america/jacksonville/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Jacksonville · Duval · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"edgeconnex-mia01-miami-fl","state":"FL","kind":"facility","name":"EdgeConneX MIA01  -  Miami","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Miami","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Two locations share a datasheet; each section is specific and not copied to the other record. Shared7.5MW market total would be the same capacities, not extra power. Source has anomalous SOC2Type9 text; no certificate or corrected type inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2025/07/Miami-Data-Sheet_V2.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.793016,"lng":-80.38119,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"named_facility_sections":[{"facility":"MIA01","published_address":"2132 NW114th Avenue, Miami, FL33172","facility_area_sqft":27000,"raised_floor_sqft":11300,"advertised_power_mw":1.5},{"facility":"MIA02","published_address":"475 NE185th Street, Miami Gardens, FL33179","facility_area_sqft":65518,"raised_floor_sqft":34800,"advertised_power_mw":6}],"power_basis":"Source power field with N+1 redundancy; gross versus critical IT not separately defined."},"notes":["Two locations share a datasheet; each section is specific and not copied to the other record. Shared7.5MW market total would be the same capacities, not extra power. Source has anomalous SOC2Type9 text; no certificate or corrected type inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2025/07/Miami-Data-Sheet_V2.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Miami · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"edgeconnex-mia02-miami-gardens-fl","state":"FL","kind":"facility","name":"EdgeConneX MIA02  -  Miami Gardens","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Miami Gardens","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Two locations share a datasheet; each section is specific and not copied to the other record. Shared7.5MW market total would be the same capacities, not extra power. Source has anomalous SOC2Type9 text; no certificate or corrected type inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2025/07/Miami-Data-Sheet_V2.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.945524,"lng":-80.191391,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"named_facility_sections":[{"facility":"MIA01","published_address":"2132 NW114th Avenue, Miami, FL33172","facility_area_sqft":27000,"raised_floor_sqft":11300,"advertised_power_mw":1.5},{"facility":"MIA02","published_address":"475 NE185th Street, Miami Gardens, FL33179","facility_area_sqft":65518,"raised_floor_sqft":34800,"advertised_power_mw":6}],"power_basis":"Source power field with N+1 redundancy; gross versus critical IT not separately defined."},"notes":["Two locations share a datasheet; each section is specific and not copied to the other record. Shared7.5MW market total would be the same capacities, not extra power. Source has anomalous SOC2Type9 text; no certificate or corrected type inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2025/07/Miami-Data-Sheet_V2.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Miami Gardens · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"edgeconnex-mia03-beacon-station-medley-fl","state":"FL","kind":"facility","name":"EdgeConneX MIA03 (Beacon Station, withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Medley","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. A preapplication does not prove permit approval, acquisition or operation. Other Miami facilities are separate. The hosting broker is not the original reporter or operator. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://miamiairportwarehouses.com/data-center-proposed-at-beacon-station/","host":"miamiairportwarehouses.com","date":"2022-12-22","published":"2022-12-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":25.86892,"lng":-80.379227,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"A broker repost of SFBJ describes EdgeConneX's Beacon Station preapplication for a 145,700-square-foot building on 6.25 acres.","independently_verified_current_operating_status":null},"notes":["A preapplication does not prove permit approval, acquisition or operation. Other Miami facilities are separate. The hosting broker is not the original reporter or operator.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://miamiairportwarehouses.com/data-center-proposed-at-beacon-station/","host":"miamiairportwarehouses.com","date":"2022-12-22","published":"2022-12-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Medley · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"edgeconnex-tal01-tallahassee-fl","state":"FL","kind":"facility","name":"EdgeConneX TAL01  -  Tallahassee","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Leon"],"city":"Tallahassee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 250current offering and500planned expansion are nested. No completion date for expansion; URL month not publication date. Anomalous SOC2Type21 source text not adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2024/09/Tallahassee-Data-Sheet.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.471969,"lng":-84.353232,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"facility":"TAL01","published_address":"1531 Commonwealth Business Drive, Units404-408, Tallahassee, FL32303","facility_area_sqft":11810,"raised_floor_sqft":3778,"advertised_power_kw":250,"planned_scalable_power_kw":500,"power_basis":"Source N+1 power; not independently defined as utility versus critical IT."},"notes":["250current offering and500planned expansion are nested. No completion date for expansion; URL month not publication date. Anomalous SOC2Type21 source text not adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2024/09/Tallahassee-Data-Sheet.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Tallahassee · Leon · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"equinix-mi1-nap-of-the-americas-fl","state":"FL","kind":"facility","name":"Equinix MI1 (NAP of the Americas)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Miami","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. regional hub with named listing only. Miami market page lists multiple locations and offers no adopted MI1specific specification. No regional total or another site area is copied to NAPofAmericas. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/miami-data-centers","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.782359,"lng":-80.1930886,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"regional hub with named listing only","fields":{"operator_market_listing":"MI1named among Miami locations"},"notes":["Miami market page lists multiple locations and offers no adopted MI1specific specification. No regional total or another site area is copied to NAPofAmericas.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/miami-data-centers","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Miami · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"equinix-mi3-boca-raton-fl","state":"FL","kind":"facility","name":"Equinix MI3  -  Boca Raton","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Palm Beach"],"city":"Boca Raton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Equinix historical MI3 opening. Opening announced by release date, not necessarily exact first customer service day. Historical initial floor area excludes unspecified expansion options. Miami market name not Miami city parcel. Current2026capacity/ownership or independent storm-resilience certification not established by2012release. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://investor.equinix.com/news-events/press-releases/detail/641/equinix-opens-new-data-center-in-greater-miami-area","host":"investor.equinix.com","date":"2012-12-03","published":"2012-12-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":26.387989,"lng":-80.108267,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Equinix historical MI3 opening","fields":{"operator_code":"MI3","site_locality":"Boca Raton, Florida","opening_announcement_date":"2012-12-03","historical_initial_floor_space_sqft":31300},"notes":["Opening announced by release date, not necessarily exact first customer service day. Historical initial floor area excludes unspecified expansion options. Miami market name not Miami city parcel. Current2026capacity/ownership or independent storm-resilience certification not established by2012release.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://investor.equinix.com/news-events/press-releases/detail/641/equinix-opens-new-data-center-in-greater-miami-area","host":"investor.equinix.com","date":"2012-12-03","published":"2012-12-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Boca Raton · Palm Beach · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"flexential-fort-lauderdale-fll01-02-fl","state":"FL","kind":"facility","name":"Flexential Fort Lauderdale (FLL01/02)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Broward"],"city":"Fort Lauderdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Power conflict in the same guide: page 21 quick facts 3.15 MW; page 22 specification 6.75 MW. No single power value adopted. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.1900857,"lng":-80.1932967,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Fort Lauderdale (FLL01/02)","publisher_reported_footprint_sqft":64164,"publisher_reported_critical_power_mw":null,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Power conflict in the same guide: page 21 quick facts 3.15 MW; page 22 specification 6.75 MW. No single power value adopted.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Fort Lauderdale · Broward · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"flexential-jacksonville-fl","state":"FL","kind":"facility","name":"Flexential Jacksonville","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Duval"],"city":"Jacksonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.2457482,"lng":-81.5817226,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Jacksonville","publisher_reported_footprint_sqft":35184,"publisher_reported_critical_power_mw":1.39,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Jacksonville · Duval · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"flexential-tampa-north-tpa03-fl","state":"FL","kind":"facility","name":"Flexential Tampa - North (TPA03)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hillsborough"],"city":"Tampa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.0738698,"lng":-82.3683619,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Tampa - North (TPA03)","publisher_reported_footprint_sqft":60166,"publisher_reported_critical_power_mw":3,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Tampa · Hillsborough · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"flexential-tampa-west-fl","state":"FL","kind":"facility","name":"Flexential Tampa - West","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hillsborough"],"city":"Tampa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Unit conflict: page 27 quick facts 1.81 KW; page 28 specification 1.81 MW. No silent 1000-fold correction. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.0372991,"lng":-82.5399781,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Tampa - West","publisher_reported_footprint_sqft":31600,"publisher_reported_critical_power_mw":null,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Unit conflict: page 27 quick facts 1.81 KW; page 28 specification 1.81 MW. No silent 1000-fold correction.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Tampa · Hillsborough · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"stonebridge-fort-meade-fl","state":"FL","kind":"facility","name":"Florida Ecopark AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Fort Meade","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JessicaMeszaros WUSF April8,2026 originalmeetingreport: planningcommissionRECOMMENDED20yearStonebridgeagreement; citycommissionFINALdecisionstillfutureTuesday.200acreDCuseon1300acreproperty;1.2GWrequiredpowerbasisnotcriticalIT. Unnamedtenant notconfirmed hyperscaler.100%backupcapacitynotcontinuousgenerationduty. 40hourtypical/100hourclaimedpermittedannualgeneratorruntime and50-52dBAhalf-mileforecast aredeveloperassertions, underlyingpermit/acousticmeasurementunread.140kgpdoldwater versus50kgpdeverydayoperationsrevisedprojection, unknowncoolantreplacementvolume notzero-water. Advocate5-8MGD isscenario warning, notactualfacilityuse.10Mcontribution/upgradesnotverifiedpaid/allfundswater. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wusf.org/environment/2026-04-08/fort-meade-is-one-step-closer-to-building-floridas-first-hysperscale-ai-data-center","host":"wusf.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.7525,"lng":-81.8024,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["JessicaMeszaros WUSF April8,2026 originalmeetingreport: planningcommissionRECOMMENDED20yearStonebridgeagreement; citycommissionFINALdecisionstillfutureTuesday.200acreDCuseon1300acreproperty;1.2GWrequiredpowerbasisnotcriticalIT. Unnamedtenant notconfirmed hyperscaler.100%backupcapacitynotcontinuousgenerationduty.","40hourtypical/100hourclaimedpermittedannualgeneratorruntime and50-52dBAhalf-mileforecast aredeveloperassertions, underlyingpermit/acousticmeasurementunread.140kgpdoldwater versus50kgpdeverydayoperationsrevisedprojection, unknowncoolantreplacementvolume notzero-water. Advocate5-8MGD isscenario warning, notactualfacilityuse.10Mcontribution/upgradesnotverifiedpaid/allfundswater.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wusf.org/environment/2026-04-08/fort-meade-is-one-step-closer-to-building-floridas-first-hysperscale-ai-data-center","host":"wusf.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Fort Meade · Polk · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"h5-data-centers-tampa-franklin-exchange-fl","state":"FL","kind":"facility","name":"H5 Data Centers Tampa (Franklin Exchange, formerly 365 Data Centers TA1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hillsborough"],"city":"Tampa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Release identifies markets, not exact addresses or a purchase price. Existing base already reflects H5 at these locations; no extra facility additions or automatic duplicate deletion. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. historical 365Tampa expansion before H5 acquisition. 2023former-operator announcement not currentH5ownership. NoMWorarea in original release; H5Feb2,2026acquisition review takes precedence for operator.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/H5-Data-Centers-Announces-Acquisition-of-Three-Locations-from-365-Data-Centers.html","host":"h5datacenters.com","date":"2026-02-02","published":"2026-02-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://365datacenters.com/365-data-centers-to-expand-tampa-campus/","host":"365datacenters.com","date":"2023-06-20","published":"2023-06-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.949508,"lng":-82.458396,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_acquisition_announcement_date":"2026-02-02","buyer_group":"H5 Data Centers and Novacap joint venture","seller":"365 Data Centers","acquired_markets":["Buffalo","Nashville","Tampa"],"acquired_locations":3},"notes":["Release identifies markets, not exact addresses or a purchase price. Existing base already reflects H5 at these locations; no extra facility additions or automatic duplicate deletion.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/H5-Data-Centers-Announces-Acquisition-of-Three-Locations-from-365-Data-Centers.html","host":"h5datacenters.com","date":"2026-02-02","published":"2026-02-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"historical 365Tampa expansion before H5 acquisition","fields":{"historical_expansion_address":"655 North Franklin St, Tampa","historical_expansion_stage":"additional floor and more available power announced"},"notes":["2023former-operator announcement not currentH5ownership. NoMWorarea in original release; H5Feb2,2026acquisition review takes precedence for operator.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/365-data-centers-to-expand-tampa-campus/","host":"365datacenters.com","date":"2023-06-20","published":"2023-06-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Tampa · Hillsborough · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"hivelocity-tpa1-tampa-fl","state":"FL","kind":"facility","name":"Hivelocity Tampa 1 (TPA1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hillsborough"],"city":"Tampa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hivelocity TPA1 suite and raised-floor space. Fuelnotwaterconsumption. CoolingthermaltonsnotITMW.135mphroofdesignnotindependentcurrentengineeringinspection.17milesinland/floodzoneclaimsnotparcelriskreview. No exactopeningdateorITMW. Operatorcomplianceclaimsnotrestrictedreportverification;testnetworknotrun. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hivelocity.net/products/colocation/tampa-1/","host":"hivelocity.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.01989,"lng":-82.52466,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Hivelocity TPA1 suite and raised-floor space","fields":{"operator":"Hivelocity","code":"TPA1","address":"8010 Woodland Center Boulevard, Suite700, Tampa, Florida33614","raised_floor_sqft":15000,"backup_diesel_gallons":3750,"operator_reported_generator_runtime_days":5,"cooling_tons":260},"notes":["Fuelnotwaterconsumption. CoolingthermaltonsnotITMW.135mphroofdesignnotindependentcurrentengineeringinspection.17milesinland/floodzoneclaimsnotparcelriskreview. No exactopeningdateorITMW. Operatorcomplianceclaimsnotrestrictedreportverification;testnetworknotrun.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hivelocity.net/products/colocation/tampa-1/","host":"hivelocity.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Tampa · Hillsborough · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"hivelocity-tpa2-tampa-fl","state":"FL","kind":"facility","name":"Hivelocity Tampa 2 (TPA2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hillsborough"],"city":"Tampa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. Hivelocity current TPA2 operator page identifies5908HamptonOaksParkway SuiteD Tampa and30200sf RAISED FLOOR space, not whole-campus gross floor area. Commercial colocation offer is operator evidence, not independently measured occupancy. 120/208V are voltage,420tons is cooling and1000gallons diesel/eight-day runtime is a vendor claim without tested load. None yields IT MW. SOC/HIPAA/PCI claims are marketing assertions; audit reports not read. Network peers/40+global sites are not new US building counts;24/7 support is not public visitor access. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hivelocity.net/products/colocation/tampa-2/","host":"hivelocity.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.001197,"lng":-82.359058,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Hivelocity current TPA2 operator page identifies5908HamptonOaksParkway SuiteD Tampa and30200sf RAISED FLOOR space, not whole-campus gross floor area. Commercial colocation offer is operator evidence, not independently measured occupancy.","120/208V are voltage,420tons is cooling and1000gallons diesel/eight-day runtime is a vendor claim without tested load. None yields IT MW. SOC/HIPAA/PCI claims are marketing assertions; audit reports not read. Network peers/40+global sites are not new US building counts;24/7 support is not public visitor access.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://www.hivelocity.net/products/colocation/tampa-2/","host":"hivelocity.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Tampa · Hillsborough · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"deltona-holder-industrial-park-citrus-county-fl","state":"FL","kind":"facility","name":"Holder Industrial Park Data Center Expansion (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Citrus"],"city":"Lecanto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. 352Today JamieBerube June24,2026 reports Deltona withdrew HolderIndustrialPark land-useandrezoningapplications June23; July14countyhearingscanceled. Planningrecommendationagainstproject was ADVISORY; denialofcontinuancerequest notfinalprojectdenial. Underlyingwithdrawal/backupmaterials/signedmoratoriumunread,so sourceMayone-yearmora notcertifiedcurrentlaw. Morethan1300acreindustrialproperty differs from675-777acreproposeddata-centerusearea.1800-2700MW is an INTERVENOR's estimatedlandpotential, notdevelopercommittedcapacity or criticalIT. No named hyperscaletenantconfirmed. ReportedJune19publicmeetingsequence notindependentlycertified; no currentbuildingapprovaloractualresourceharm inferred. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://352today.com/news/257752-company-withdraws-controversial-industrial-park-data-center-proposal-in-citrus-county/","host":"352today.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.86722,"lng":-82.49444,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["352Today JamieBerube June24,2026 reports Deltona withdrew HolderIndustrialPark land-useandrezoningapplications June23; July14countyhearingscanceled. Planningrecommendationagainstproject was ADVISORY; denialofcontinuancerequest notfinalprojectdenial. Underlyingwithdrawal/backupmaterials/signedmoratoriumunread,so sourceMayone-yearmora notcertifiedcurrentlaw.","Morethan1300acreindustrialproperty differs from675-777acreproposeddata-centerusearea.1800-2700MW is an INTERVENOR's estimatedlandpotential, notdevelopercommittedcapacity or criticalIT. No named hyperscaletenantconfirmed. ReportedJune19publicmeetingsequence notindependentlycertified; no currentbuildingapprovaloractualresourceharm inferred.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://352today.com/news/257752-company-withdraws-controversial-industrial-park-data-center-proposal-in-citrus-county/","host":"352today.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Lecanto · Citrus · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"hostdime-eatonville-fl","state":"FL","kind":"facility","name":"HostDime Orlando Tier IV Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Eatonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. HostDime SuperNova construction and mixed-use area scope. 100kgrossincludesoffices/amenities,notalldataraisedfloor. CompanyCentralFloridasince2003notSuperNovaopening. TierIVdesign/Category5claimnotindependentcertifier/engineeringinspection. UndatedcurrentpagecannotestablishexactRFSday;do notdisplayoperatingfromgenericreserve-spaceCTA. No numericITMWinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hostdime.com/new-orlando-data-center","host":"hostdime.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.6106,"lng":-81.3806,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"HostDime SuperNova construction and mixed-use area scope","fields":{"operator":"HostDime","facility":"SuperNova","address":"1 Innovative Place, Orlando metro, Florida","building_gross_sqft":100000,"building_stories":7,"dedicated_data_center_floors":3,"designed_rack_capacity_min_exclusive":1000,"operator_described_stage":"final construction, commissioning and facility preparation ahead of opening"},"notes":["100kgrossincludesoffices/amenities,notalldataraisedfloor. CompanyCentralFloridasince2003notSuperNovaopening. TierIVdesign/Category5claimnotindependentcertifier/engineeringinspection. UndatedcurrentpagecannotestablishexactRFSday;do notdisplayoperatingfromgenericreserve-spaceCTA. No numericITMWinreviewedbody.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hostdime.com/new-orlando-data-center","host":"hostdime.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Eatonville · Orange · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"im-critical-miami-fl","state":"FL","kind":"facility","name":"iM Critical Miami Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Miami","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. iM Critical historical Miami available facility announcement. Historical2022availableclaimnotnew2026commissioningoractualoccupancy.60kcolospacesubsetof100kbuilding,not160k. Noexactstreetorindependentcurrentpower/certificationread. Onsite renewablementionedwithoutmeasuredgeneration. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://imcritical.com/about/newsroom/introducing-im-criticals-miami-data-center-miamis-next-gen-hub-for-mission-critical-colocation/","host":"imcritical.com","date":"2022-06-09","published":"2022-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":25.848356,"lng":-80.194926,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"iM Critical historical Miami available facility announcement","fields":{"operator":"iM Critical","announcement_date":"2022-06-09","locality":"Miami Little River, Florida","building_gross_sqft":100000,"colocation_space_sqft_min_exclusive":60000,"advertised_available_power_mw":5,"power_basis":"power, not explicit critical IT","operator_described_service_status":"available today as of2022release","utility_substation_sources":3},"notes":["Historical2022availableclaimnotnew2026commissioningoractualoccupancy.60kcolospacesubsetof100kbuilding,not160k. Noexactstreetorindependentcurrentpower/certificationread. Onsite renewablementionedwithoutmeasuredgeneration.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://imcritical.com/about/newsroom/introducing-im-criticals-miami-data-center-miamis-next-gen-hub-for-mission-critical-colocation/","host":"imcritical.com","date":"2022-06-09","published":"2022-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Miami · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"metrobloks-mia-a1-miami-fl","state":"FL","kind":"facility","name":"Metrobloks MIA-A1 (MB01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Miami","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Metrobloks Miami planned IT, utility and area conflicts. Two15200suitessum30400not40500;scopeunresolved,donotsilentfix.22utilitynot15.8ITor37.8total. Will-serveletternotinspectedorenergizationproof.6percentFLsalestaxabatementoperatorclaimnotindependentlaw/awardreview. UptimeTierIIIdesignand99.999availabilitymarketingnotindependentcertification/observeduptime.0.21mslatencynotmethodverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.metrobloks.com/sites/mia-mb01","host":"metrobloks.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.79,"lng":-80.41,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Metrobloks Miami planned IT, utility and area conflicts","fields":{"developer":"Metrobloks","site_code":"MIA A1","address":"500 Northwest137thAvenue, Miami, Florida","operator_status":"coming soon","planned_critical_it_mw":15.8,"claimed_utility_power_secured_mw":22,"claimed_utility_document":"FloridaPowerandLightwill-serveletteranddeposits","site_acres":4.1,"buildings":1,"floors":2,"published_whitespace_sqft":40500,"data_suites":2,"published_each_suite_sqft":15200,"canonical_current_whitespace_sqft":null},"notes":["Two15200suitessum30400not40500;scopeunresolved,donotsilentfix.22utilitynot15.8ITor37.8total. Will-serveletternotinspectedorenergizationproof.6percentFLsalestaxabatementoperatorclaimnotindependentlaw/awardreview. UptimeTierIIIdesignand99.999availabilitymarketingnotindependentcertification/observeduptime.0.21mslatencynotmethodverified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.metrobloks.com/sites/mia-mb01","host":"metrobloks.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Miami · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"nextnrg-nassau-county-data-center-energy-campus-fl","state":"FL","kind":"facility","name":"NextNRG Nassau County Data Center & Energy Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nassau"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The exact property is unknown; no engineer, architect or landowner is identified. A 200 MW microgrid on roughly 1,200 acres is generation infrastructure, not IT demand for the remaining 400 acres. Lease option is not acquisition or approved development. An article's future-law language does not establish final enacted legal scope; original statutes remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.jaxdailyrecord.com/news/2026/apr/06/announced-nassau-county-data-center-details-remain-unknown-to-county/","host":"jaxdailyrecord.com","date":"2026-04-06","published":"2026-04-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.55,"lng":-81.68,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Jax Daily Record reports Nassau County and its development agency had no project details or contact from NextNRG beyond a September announcement of a 1,600-acre lease-option concept.","independently_verified_current_operating_status":null,"exact_site_location_verified":false,"reported_microgrid_generation_mw":200,"critical_it_mw":null},"notes":["The exact property is unknown; no engineer, architect or landowner is identified. A 200 MW microgrid on roughly 1,200 acres is generation infrastructure, not IT demand for the remaining 400 acres. Lease option is not acquisition or approved development. An article's future-law language does not establish final enacted legal scope; original statutes remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.jaxdailyrecord.com/news/2026/apr/06/announced-nassau-county-data-center-details-remain-unknown-to-county/","host":"jaxdailyrecord.com","date":"2026-04-06","published":"2026-04-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Nassau · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"okee-one-irsc-okeechobee-fl","state":"FL","kind":"facility","name":"Okee-One Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Okeechobee"],"city":"Okeechobee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Subscriber body was not read. The public deck is not a formal cancellation, agency disposition or proof of completed training facilities. No capacity, permit or exact current status adopted beyond uncertainty. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tampabay.com/news/environment/2026/04/24/florida-data-center-desantis-okeechobee-college-campus/","host":"tampabay.com","date":"2026-04-24","published":"2026-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.24667,"lng":-80.83028,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Tampa Bay Times' public headline, deck and caption describe uncertain prospects for the Okeechobee former-school data-center training proposal, with one official calling it dead and the state not answering.","independently_verified_current_operating_status":null},"notes":["Subscriber body was not read. The public deck is not a formal cancellation, agency disposition or proof of completed training facilities. No capacity, permit or exact current status adopted beyond uncertainty.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tampabay.com/news/environment/2026/04/24/florida-data-center-desantis-okeechobee-college-campus/","host":"tampabay.com","date":"2026-04-24","published":"2026-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Okeechobee · Okeechobee · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"ryan-companies-project-swan-lakeland-fl","state":"FL","kind":"facility","name":"Project Swan","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Lakeland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. City explicitly has not approved or endorsed this concept. June 3 staff review was future in the report and is not a public hearing or observed final outcome. Operator, intended workload, water and electrical demand are undisclosed. A 3.8-acre substation footprint cannot determine MW; neighboring wastewater plant 3.75 million gallons/day is not campus demand. County portions require annexation. Historical land transfers and prior fertilizer-facility approval are neither current data center capital spending nor its permit. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lkldnow.com/hyperscale-data-center-proposed-for-lakeland/","host":"lkldnow.com","date":"2026-05-28","published":"2026-05-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":28.0305,"lng":-82.0054,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"LkldNow reports Ryan Companies’ Project Swan concept at 923 Wilkinson Road proposes three buildings up to 600,000 square feet on 60.5 acres, with application filed May 5.","independently_verified_current_operating_status":null},"notes":["City explicitly has not approved or endorsed this concept. June 3 staff review was future in the report and is not a public hearing or observed final outcome. Operator, intended workload, water and electrical demand are undisclosed. A 3.8-acre substation footprint cannot determine MW; neighboring wastewater plant 3.75 million gallons/day is not campus demand. County portions require annexation. Historical land transfers and prior fertilizer-facility approval are neither current data center capital spending nor its permit.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lkldnow.com/hyperscale-data-center-proposed-for-lakeland/","host":"lkldnow.com","date":"2026-05-28","published":"2026-05-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Lakeland · Polk · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"project-tango-loxahatchee-fl","state":"FL","kind":"facility","name":"Project Tango AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Palm Beach"],"city":"Loxahatchee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Postponement is not denial or permanent cancellation; the later hearing outcome is unobserved. The 2016 earlier data-center approval and added land are different proposal stages. AI-versus-regular labels do not independently establish hardware/workloads. Noise and cooling plans were still being developed. Legislative proposals and national advocacy letters are not enacted bans. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wlrn.org/government-politics/2025-12-10/project-tango-ai-data-center-palm-beach-county","host":"wlrn.org","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":26.6284,"lng":-80.39,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WLRN reports a seven-zero postponement of Project Tango's application to an April 23, 2026 meeting, allowing further impact studies.","independently_verified_current_operating_status":null},"notes":["Postponement is not denial or permanent cancellation; the later hearing outcome is unobserved. The 2016 earlier data-center approval and added land are different proposal stages. AI-versus-regular labels do not independently establish hardware/workloads. Noise and cooling plans were still being developed. Legislative proposals and national advocacy letters are not enacted bans.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wlrn.org/government-politics/2025-12-10/project-tango-ai-data-center-palm-beach-county","host":"wlrn.org","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Loxahatchee · Palm Beach · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"qts-mia1-sweetwater-fl","state":"FL","kind":"facility","name":"QTS Miami (MIA1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Sweetwater","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator postal address is Miami; imported Sweetwater municipality still requires a jurisdiction check. Structural wind rating is not Tier or operational certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/miami/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.7915329,"lng":-80.3795596,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"site_acres":1,"advertised_critical_power_mw":2,"published_address":"11234 NW 20th Street, Miami, FL 33172"},"notes":["Operator postal address is Miami; imported Sweetwater municipality still requires a jurisdiction check. Structural wind rating is not Tier or operational certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/miami/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Sweetwater · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"radiusdc-miami-i-sweetwater-fl","state":"FL","kind":"facility","name":"RadiusDC Miami I","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami-Dade"],"city":"Sweetwater","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Hayden Beeson, Lightwave August13,2024, reproduces issuer acquisition statement: RadiusDC acquired Sweetwater MiamiI from Actis/NextStream; price undisclosed.170000sf/criticalIT3.2MW then, targeted9.2MW total, ultimate >15MW capability are different stages, not27.4MW additive or verified2026 expansion. No exact opening or independently surveyed parcel from the report. Issuer-statement context, not a second independent operational audit. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lightwaveonline.com/data-center/article/55132665/radiusdc-acquires-south-florida-data-center","host":"lightwaveonline.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":25.7871,"lng":-80.3839,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Hayden Beeson, Lightwave August13,2024, reproduces issuer acquisition statement: RadiusDC acquired Sweetwater MiamiI from Actis/NextStream; price undisclosed.170000sf/criticalIT3.2MW then, targeted9.2MW total, ultimate >15MW capability are different stages, not27.4MW additive or verified2026 expansion. No exact opening or independently surveyed parcel from the report. Issuer-statement context, not a second independent operational audit.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.lightwaveonline.com/data-center/article/55132665/radiusdc-acquires-south-florida-data-center","host":"lightwaveonline.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Sweetwater · Miami-Dade · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"sd-data-center-melbourne-fl","state":"FL","kind":"facility","name":"SD Data Center  -  Melbourne","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Brevard"],"city":"Melbourne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SD Melbourne operator site history and area. 25000sqftnotexplicitraisedfloor. TierIIIand100percentuptimeclaimsnotindependentcertifierrecordorobservedperformance;SLAseparate. Satellite-ground-stationLevel4WTAcertificationnotDCITtier. Corporate/partnerPoPsnotadditionaloperatorownedbuildings. No exact openingdayorITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sddatacenter.com/","host":"sddatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":28.259162,"lng":-80.694858,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"SD Melbourne operator site history and area","fields":{"operator":"SD Data Center, Satcom Direct","locality":"Melbourne, Florida","operator_reported_operating_since_year":2010,"climate_controlled_environment_sqft":25000,"operator_described_site_class":"Tier3"},"notes":["25000sqftnotexplicitraisedfloor. TierIIIand100percentuptimeclaimsnotindependentcertifierrecordorobservedperformance;SLAseparate. Satellite-ground-stationLevel4WTAcertificationnotDCITtier. Corporate/partnerPoPsnotadditionaloperatorownedbuildings. No exact openingdayorITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sddatacenter.com/","host":"sddatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Melbourne · Brevard · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"sentinel-grove-technology-park-fort-pierce-fl","state":"FL","kind":"facility","name":"Sentinel Grove Technology Park (Project Jarvis)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Lucie"],"city":"Fort Pierce","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. Kate Hussey, WPTV original commissioner interview: public metadata dates February23,2026; modified timestamp precedes publication same day, so no exact event time inferred. Sentinel Grove MAY withdraw; commissioner says waiting on legislation before OFFICIAL cutting ties. This is not a confirmed withdrawal/canceled project.15M sf proposal onOrangeAvenue separate from1.8M sfProjectTango inPalmBeach. ProposedSB482/484 not current enactedlaw.1.7Mgal/month belongsTango, notSentinel. No developer response or ITMW established. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wptv.com/wptv-investigates/scrapped-developer-of-st-lucie-county-data-center-project-may-withdraw-plan-amid-new-ai-legislation","host":"wptv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.4552,"lng":-80.559,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["Kate Hussey, WPTV original commissioner interview: public metadata dates February23,2026; modified timestamp precedes publication same day, so no exact event time inferred. Sentinel Grove MAY withdraw; commissioner says waiting on legislation before OFFICIAL cutting ties. This is not a confirmed withdrawal/canceled project.15M sf proposal onOrangeAvenue separate from1.8M sfProjectTango inPalmBeach. ProposedSB482/484 not current enactedlaw.1.7Mgal/month belongsTango, notSentinel. No developer response or ITMW established.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wptv.com/wptv-investigates/scrapped-developer-of-st-lucie-county-data-center-project-may-withdraw-plan-amid-new-ai-legislation","host":"wptv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Fort Pierce · St. Lucie · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"silver-fox-606-indiantown-fl","state":"FL","kind":"facility","name":"Silver Fox 606 AI Data Center Campus (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Martin"],"city":"Indiantown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Record both withdrawal and later revival; do not leave permanently withdrawn or mark approved. Council decision remains future in the report; earliest phased construction in 2027 is conditional. Developer waterless, no-vibration, code-compliant noise and no-pressure-impact statements are proposed/attributed commitments, not independently measured impacts or final permit conditions. Billion-dollar investment is a projection, not spent capital or guaranteed tax revenue. Prior power-plant use and industrial zoning are not all necessary DC approvals. No confirmed tenant/MW/RFS. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wflx.com/2026/09/22/indiantown-project-silver-fox-data-center-plan-returns-with-changes-resident-concerns-remain/","host":"wflx.com","date":"2026-09-22","published":"2026-09-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.0400025,"lng":-80.517281,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"WFLX reports Project Silver Fox returned with a revised 606-acre Indiantown proposal following an April withdrawal, presented at a public open house.","independently_verified_current_operating_status":null},"notes":["Record both withdrawal and later revival; do not leave permanently withdrawn or mark approved. Council decision remains future in the report; earliest phased construction in 2027 is conditional. Developer waterless, no-vibration, code-compliant noise and no-pressure-impact statements are proposed/attributed commitments, not independently measured impacts or final permit conditions. Billion-dollar investment is a projection, not spent capital or guaranteed tax revenue. Prior power-plant use and industrial zoning are not all necessary DC approvals. No confirmed tenant/MW/RFS.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wflx.com/2026/09/22/indiantown-project-silver-fox-data-center-plan-returns-with-changes-resident-concerns-remain/","host":"wflx.com","date":"2026-09-22","published":"2026-09-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Indiantown · Martin · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"skylink-data-centers-naples-fl","state":"FL","kind":"facility","name":"SkyLink Data Centers  -  Naples","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collier"],"city":"Naples","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SkyLink Naples address and service scope. Category5/PCI/HIPAAandonlytruefacilityregionalclaimsnotindependentcertifier/engineering/comprehensivecensusreview.2018pagetimestampnotoriginalDCopening. No numericITMWorarea. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://skylinkdc.com/colocation/","host":"skylinkdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.167743,"lng":-81.799835,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"SkyLink Naples address and service scope","fields":{"operator":"SkyLink Data Centers","published_address":"801 Orchid Drive, Naples, Florida34102","advertised_service":"Nplus1colocation and managed hosting in Southwest Florida"},"notes":["Category5/PCI/HIPAAandonlytruefacilityregionalclaimsnotindependentcertifier/engineering/comprehensivecensusreview.2018pagetimestampnotoriginalDCopening. No numericITMWorarea.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://skylinkdc.com/colocation/","host":"skylinkdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Naples · Collier · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"tierpoint-jacksonville-fl","state":"FL","kind":"facility","name":"TierPoint Jacksonville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Duval"],"city":"Jacksonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Backup generators are not IT load. Extra space availability is an expansion offering, not delivered occupancy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/florida/jacksonville/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.220681,"lng":-81.585108,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"gross_area_sqft_lower_bound":120000,"raised_floor_sqft_lower_bound":17000,"backup_generators":{"units":2,"mw_each":2}},"notes":["Backup generators are not IT load. Extra space availability is an expansion offering, not delivered occupancy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/florida/jacksonville/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Jacksonville · Duval · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"university-of-florida-data-center-gainesville-fl","state":"FL","kind":"facility","name":"University of Florida Data Center (East Campus, HiPerGator)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Alachua"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. UF existing supercomputer versus forecast system upgrade. System-upgrade forecast not a new separate physical campus. Delivery/testing and announced future production do not prove achieved2025 or2026 commissioning. Compute node count, ranks and university-wide annual research impact are not IT MW or facility capex. No exact server address adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://news.ufl.edu/2025/05/the-fourth-generation-model-of-ufs-hipergator/","host":"news.ufl.edu","date":"2025-05-28","published":"2025-05-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":29.672262,"lng":-82.3013842,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"UF existing supercomputer versus forecast system upgrade","fields":{"institution":"University of Florida","system":"HiPerGator fourth generation","publication_date":"2025-05-28","location":"Gainesville campus","announced_compute_nodes":63,"early_access_target_month":"2025-06","full_production_target":"fall2025","first_hipergator_generation_year":2013},"notes":["System-upgrade forecast not a new separate physical campus. Delivery/testing and announced future production do not prove achieved2025 or2026 commissioning. Compute node count, ranks and university-wide annual research impact are not IT MW or facility capex. No exact server address adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://news.ufl.edu/2025/05/the-fourth-generation-model-of-ufs-hipergator/","host":"news.ufl.edu","date":"2025-05-28","published":"2025-05-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Gainesville · Alachua · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"yeehaw-junction-us-development-osceola-fl","state":"FL","kind":"facility","name":"US Development Yeehaw Junction Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Osceola"],"city":"Yeehaw Junction","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. This is 2024 forecast, notOctober 15,2026 event or observed approval. Nine 675,000 square-footbuildings imply 6.075 million, while article saysover 7 million; total-area inconsistency remains unresolved and no canonical total selected. Existingwarehouseindustrialfuturelanduse on part of property is not newDCrezoningapproval.15 acresubstation is footprint, not MW. FP&L/Toho/fiberprovidersnamedinplan are not examined executed contracts or dedicated solar supply. FP&L 212 million/40000 acreslandpurchase andSwitch 5 billionfinancing concern others. Amazon/Google/Microsoftare generic hypotheticalclients, not tenants. No actualcapital, IT or RFS. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.growthspotter.com/2024/09/15/osceola-is-being-scouted-for-one-of-the-worlds-largest-data-centers/","host":"growthspotter.com","date":"2024-09-15","published":"2024-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.69944,"lng":-80.88694,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"GrowthSpotter describes scouting/preapplication for a proposed 434-acre YeehawJunction campus under USDevelopment, with anOctober 15 preapplication meeting expected in 2024.","independently_verified_current_operating_status":null,"canonical_total_floor_sqft":null,"building_count_area_total_conflict":true},"notes":["This is 2024 forecast, notOctober 15,2026 event or observed approval. Nine 675,000 square-footbuildings imply 6.075 million, while article saysover 7 million; total-area inconsistency remains unresolved and no canonical total selected. Existingwarehouseindustrialfuturelanduse on part of property is not newDCrezoningapproval.15 acresubstation is footprint, not MW. FP&L/Toho/fiberprovidersnamedinplan are not examined executed contracts or dedicated solar supply. FP&L 212 million/40000 acreslandpurchase andSwitch 5 billionfinancing concern others. Amazon/Google/Microsoftare generic hypotheticalclients, not tenants. No actualcapital, IT or RFS.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.growthspotter.com/2024/09/15/osceola-is-being-scouted-for-one-of-the-worlds-largest-data-centers/","host":"growthspotter.com","date":"2024-09-15","published":"2024-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Yeehaw Junction · Osceola · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"volico-fll1-pompano-beach-fl","state":"FL","kind":"facility","name":"Volico FLL1 (500 Green Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Broward"],"city":"Pompano Beach","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Volico Pompano FLL1 current versus expansion utility and area. 2MWutilitynotcriticalIT;48MWfuturemaybetotaloradditionalunspecified,not50guaranteed.2MWbackupnotextraIT.140kfuturearea notcurrentplus140knewwithoutscopeproof. FortLauderdalemarketanddeerfieldURLnotcityidentity;explicitPompanoaddresscontrols. TierIV/Category5marketingnotindependentcertifier/engineeringcertificate. Noactualexpansioncompletionororiginalopeningday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.volico.com/data-centers/deerfield-data-center/","host":"volico.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.289687,"lng":-80.130014,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Volico Pompano FLL1 current versus expansion utility and area","fields":{"operator":"Volico","code":"FLL1","address":"500 Green Road, Pompano Beach, Florida33064","current_published_floor_sqft":20000,"future_published_floor_sqft":140000,"current_utility_power_mw":2,"published_utility_expansion_capacity_mw":48,"current_generator_power_mw":2,"published_generator_expansion_capacity_mw":48},"notes":["2MWutilitynotcriticalIT;48MWfuturemaybetotaloradditionalunspecified,not50guaranteed.2MWbackupnotextraIT.140kfuturearea notcurrentplus140knewwithoutscopeproof. FortLauderdalemarketanddeerfieldURLnotcityidentity;explicitPompanoaddresscontrols. TierIV/Category5marketingnotindependentcertifier/engineeringcertificate. Noactualexpansioncompletionororiginalopeningday.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.volico.com/data-centers/deerfield-data-center/","host":"volico.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Pompano Beach · Broward · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"willow-lakes-west-midway-fort-pierce-fl","state":"FL","kind":"facility","name":"Willow Lakes Data Center (West Midway Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Lucie"],"city":"Fort Pierce","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Owner’s 203 acres,174 industrial and 26 commercial are parent/subarea descriptions, not additive or exactly reconciled total. Rezoning request is not approval; partner developer and separate site plan would come later. Failed surf-park financing is history, not DCtenant failure. FPLlines and man-made-lake closed-loop concept are not executed power contract, water rights or zero-water/impact certification. Commissioner conditions are prospective preferences, not issued permit terms. NoMW/IT/RFS/current construction. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wflx.com/2026/08/31/203-acre-data-center-proposed-western-st-lucie-county-near-interstate-95/","host":"wflx.com","date":"2026-08-31","published":"2026-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.3742,"lng":-80.4104,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"WFLX reports WillowLakes submitted June rezoning for 174 acres of a 203-acre property near WestMidwayRoad/I 95 inFortPierce to enable a data center, withSeptember 17 planning review expected.","independently_verified_current_operating_status":null},"notes":["Owner’s 203 acres,174 industrial and 26 commercial are parent/subarea descriptions, not additive or exactly reconciled total. Rezoning request is not approval; partner developer and separate site plan would come later. Failed surf-park financing is history, not DCtenant failure. FPLlines and man-made-lake closed-loop concept are not executed power contract, water rights or zero-water/impact certification. Commissioner conditions are prospective preferences, not issued permit terms. NoMW/IT/RFS/current construction.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wflx.com/2026/08/31/203-acre-data-center-proposed-western-st-lucie-county-near-interstate-95/","host":"wflx.com","date":"2026-08-31","published":"2026-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Florida · Fort Pierce · St. Lucie · Source context reviewed","state_name":"Florida","state_path":"/florida/"},{"id":"prime-storage-powers-ferry-place-marietta-ga","state":"GA","kind":"facility","name":"1155 Powers Ferry Place Data Center (Prime Storage conversion)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cobb"],"city":"Marietta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 90,000-square-foot storage property is not all confirmed DC floor area. Prime Storage/Prime Group Holdings is not Prime Data Centers. The existing 1130 Powers Ferry site and other Marietta proposals are separate. Opponents' corruption/health allegations are attributed, not findings; no later vote or moratorium adoption is assumed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/","host":"atlpresscollective.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.926145,"lng":-84.4857377,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Atlanta Community Press Collective reports a four-three planning recommendation for Prime Storage's requested conversion of part of its Powers Ferry facility, with council action still pending.","independently_verified_current_operating_status":null},"notes":["The 90,000-square-foot storage property is not all confirmed DC floor area. Prime Storage/Prime Group Holdings is not Prime Data Centers. The existing 1130 Powers Ferry site and other Marietta proposals are separate. Opponents' corruption/health allegations are attributed, not findings; no later vote or moratorium adoption is assumed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/","host":"atlpresscollective.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Marietta · Cobb · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"aligned-atl-01-lithia-springs-ga","state":"GA","kind":"facility","name":"Aligned Data Centers ATL-01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Lithia Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Generator3MW and UPS2MW lineup ratings are not whole-facility capacity. Operator lists facility address and services. Design standards are not certification. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/atlanta-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7943,"lng":-84.6602,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"1551 N River Rd.","city":"Lithia Springs"},"notes":["Generator3MW and UPS2MW lineup ratings are not whole-facility capacity.","Operator lists facility address and services. Design standards are not certification.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/atlanta-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Lithia Springs · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"atlas-stiles-road-cartersville-ga","state":"GA","kind":"facility","name":"Atlas Development Stiles Road Data Center (Euharlee Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd","host":"change.org","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.1354,"lng":-84.89,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"Change.org opposition petition names AtlasDevelopment’s proposed 260,000 square-foot use at 208/329 StilesRoad, with aDecember 15,2025 Bartowconditional-permit hearing described.","independently_verified_current_operating_status":null},"notes":["Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd","host":"change.org","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Cartersville · Bartow · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"aws-butts-county-ga","state":"GA","kind":"facility","name":"AWS Butts County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butts"],"city":"Jackson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AWS combined Georgia investment statement. Do not assign full two-county investment or all550jobs to Butts County alone. Amazon statewide workforce, solar household-equivalents and GDP are other scopes. Announcement is planned investment, not actual expenditure or per-campus IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2946,"lng":-83.9663,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"AWS combined Georgia investment statement","fields":{"investment_scope":"Butts and Douglas counties, Georgia, combined","planned_investment_usd":11000000000,"expected_direct_jobs_min_inclusive":550},"notes":["Do not assign full two-county investment or all550jobs to Butts County alone. Amazon statewide workforce, solar household-equivalents and GDP are other scopes. Announcement is planned investment, not actual expenditure or per-campus IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Jackson · Butts · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"mmm-acquisitions-bells-ferry-marietta-ga","state":"GA","kind":"facility","name":"Bells Ferry Road Data Center (MMM Acquisitions)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cobb"],"city":"Marietta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The four-acre substation is within the campus, not extra site area. Staff raised unresolved variance concerns; plan approval is not a construction permit or commissioning. The readable article does not establish MMM Acquisitions as operator, confirmed power demand or actual tax receipts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wsbtv.com/news/local/cobb-county/marietta-city-council-approves-plan-31-acre-data-center/UIDXM4QEJ5EMDGAQMPLRENRRF4/","host":"wsbtv.com","date":"2025-06-17","published":"2025-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.9916854,"lng":-84.5507217,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WSB-TV reports council plan approval for a 31-acre Bells Ferry Road data-center proposal with two buildings, a substation and a stormwater pond.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The four-acre substation is within the campus, not extra site area. Staff raised unresolved variance concerns; plan approval is not a construction permit or commissioning. The readable article does not establish MMM Acquisitions as operator, confirmed power demand or actual tax receipts.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wsbtv.com/news/local/cobb-county/marietta-city-council-approves-plan-31-acre-data-center/UIDXM4QEJ5EMDGAQMPLRENRRF4/","host":"wsbtv.com","date":"2025-06-17","published":"2025-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Marietta · Cobb · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"bridgeport-data-center-campus-coweta-ga","state":"GA","kind":"facility","name":"Bridgeport Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coweta"],"city":"Moreland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No power estimate in DRI; 500000 gallons daily supply and 100000 wastewater are separate, not 600000 consumption. Three to five billion USD is estimated buildout value. Project Peach approval year conflicts with another report; no preferred year adopted. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html","host":"times-herald.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2868748,"lng":-84.7679526,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Coweta roundup describes Bridgeport DRI and previously approved rezoning, with buildout value and water/sewage forecasts.","independently_verified_current_operating_status":null},"notes":["No power estimate in DRI; 500000 gallons daily supply and 100000 wastewater are separate, not 600000 consumption. Three to five billion USD is estimated buildout value. Project Peach approval year conflicts with another report; no preferred year adopted.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html","host":"times-herald.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Moreland · Coweta · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"4am-development-burkhalter-road-statesboro-ga","state":"GA","kind":"facility","name":"Burkhalter Road Data Center (4AM Development)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bulloch"],"city":"Statesboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Statesboro rezoning vote, remaining special-use hurdle and forecast scopes. Rezoning not final special-use/buildingpermit; no selectedoperatorasofreport.1.2B10yearmodelnotactualspending orlandpurchase.300gpdrestrooms and30to100gpdmakeup differ from10000galloninitialfill and1000gpdpeak. Noise50dBroughsummarynotadoptedprecisepermitlimit. No numeric criticalITMW or currentoperation. Public opposition attendance not countyopinionpoll. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.statesboroherald.com/local/statesboro-mayor-and-council-approve-rezoning-for-burkhalter-data-center-by-3-2-vote/","host":"statesboroherald.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.4049295,"lng":-81.7440222,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Statesboro rezoning vote, remaining special-use hurdle and forecast scopes","fields":{"applicant":"4AM Development LLC","location":"BurkhalterRoad, Statesboro, Georgia","reported_rezoning_approval_date":"2026-08-18","reported_vote":"3-2includingmayortiebreaker","proposed_site_acres_approx":27,"proposed_stories":2,"proposed_area_sqft_approx":230000,"reported_status":"rezoning approved; separate special-use permit still required","developer_funded_model10year_investment_usd":1200000000,"developer_model_fulltime_jobs_approx":12},"notes":["Rezoning not final special-use/buildingpermit; no selectedoperatorasofreport.1.2B10yearmodelnotactualspending orlandpurchase.300gpdrestrooms and30to100gpdmakeup differ from10000galloninitialfill and1000gpdpeak. Noise50dBroughsummarynotadoptedprecisepermitlimit. No numeric criticalITMW or currentoperation. Public opposition attendance not countyopinionpoll.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.statesboroherald.com/local/statesboro-mayor-and-council-approve-rezoning-for-burkhalter-data-center-by-3-2-vote/","host":"statesboroherald.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Statesboro · Bulloch · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"cleanspark-college-park-ga","state":"GA","kind":"facility","name":"CleanSpark College Park Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Fulton"],"city":"College Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Historical transaction agreement, supply expansion and mining draw are different scopes; April2021 completion forecast is not actual completion. No current site capacity adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-agrees-to-acquire-bitcoin-miner-atl-data-center-301190492.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6407,"lng":-84.4277,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"annual_report_property_use":"Company-owned immersion bitcoin mining property in CollegePark.","annual_report_period":"2025-09-30","historical_announcement_date":"2020-12-10","historical_atl_purchase_agreement_up_to_usd_stock":19400000,"historical_power":"20MW facility supply with planned50MW expansion; then9.6MW mining capacity use described separately."},"notes":["Historical transaction agreement, supply expansion and mining draw are different scopes; April2021 completion forecast is not actual completion. No current site capacity adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-agrees-to-acquire-bitcoin-miner-atl-data-center-301190492.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · College Park · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"cleanspark-dalton-ga","state":"GA","kind":"facility","name":"CleanSpark Dalton Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Whitfield"],"city":"Dalton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Dalton4 energization mentioned as last week in Sept11,2024 release; exact day unknown and distinct from Dalton3. Do not sum subproject figures into current city operating load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. MonthlyMWh are energy, not MW or criticalIT. No source records available forAbutmentRoad. Caption1850Abutment conflicts with listing850; do not resolve streetnumber silently. USD9.3millionpurchase plusUSD7millionlaterproject not automaticallycurrentcampuscapex; threeoperationsnotthreeidenticalAIbuildings.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.7698,"lng":-84.9702,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"dalton3_agreement_date":"2024-02-02","dalton3_acquisition_period":"2024-02","dalton3_reported_purchase_price_including_costs_usd":3569000,"parcel_scope":"Approximately2acres Dalton3 subproject, WhitfieldCounty, not all Dalton campuses."},"notes":["Dalton4 energization mentioned as last week in Sept11,2024 release; exact day unknown and distinct from Dalton3. Do not sum subproject figures into current city operating load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.","fields":{"reported_context":"Local reporting separates CleanSpark AbutmentRoad and EnterpriseDrive operations. Two purchasedJune2023forUSD9.3million; third announced2024USD7million. DaltonUtilities records reportedly averaged16770MWh/month at1022Enterprise and10290at952Enterprise over prior12months.","independently_verified_current_operating_status":null},"notes":["MonthlyMWh are energy, not MW or criticalIT. No source records available forAbutmentRoad. Caption1850Abutment conflicts with listing850; do not resolve streetnumber silently. USD9.3millionpurchase plusUSD7millionlaterproject not automaticallycurrentcampuscapex; threeoperationsnotthreeidenticalAIbuildings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Dalton · Whitfield · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"cleanspark-lafayette-ga","state":"GA","kind":"facility","name":"CleanSpark LaFayette Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Walker"],"city":"LaFayette","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Agreement day not independently specified closing day. Acquisition accounting is not new-campus construction spending, IT load or public incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.7048,"lng":-85.2819,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"asset_purchase_agreement_date":"2025-05-13","seller":"MGT Capital Investments","reported_completed_asset_acquisition_usd":1413000,"cash_consideration_usd":1350000,"transaction_cost_usd":63000},"notes":["Agreement day not independently specified closing day. Acquisition accounting is not new-campus construction spending, IT load or public incentive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · LaFayette · Walker · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"cleanspark-norcross-ga","state":"GA","kind":"facility","name":"CleanSpark Norcross Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Gwinnett"],"city":"Norcross","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Miner collateral location and subsidiary listing do not independently establish current operating status, street address, commissioning or whole-site load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9412,"lng":-84.2135,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"historical_named_site_evidence":"Annual report financing note locates pledged miners at CollegePark and Norcross.","site_it_mw":null},"notes":["Miner collateral location and subsidiary listing do not independently establish current operating status, street address, commissioning or whole-site load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Norcross · Gwinnett · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"cleanspark-sandersville-ga","state":"GA","kind":"facility","name":"CleanSpark Sandersville Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Washington"],"city":"Sandersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Lease revenues are not capex, subsidies or an awarded tax incentive. Actual executed lease and ready-for-service day not inspected. Existing bitcoin campus and proposed tenant infrastructure are different phases; no new current AI load inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-reports-third-fiscal-quarter-2026-results-302845377.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.9807,"lng":-82.8071,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"lease_announcement":"2026-07-14","initial_lease_years":20,"optional_extensions_years":[5,5],"expected_initial_term_revenue_usd":6600000000,"expected_revenue_if_both_extensions_usd":11600000000,"initial_operations_launch_year":2022,"tenant":"Confidential global technology company, name unverified","september_finance_update":"October9 issuer release reports Sandersville fully funded following notes financing.","landlord_cost_scope":"Estimated10M to12M per criticalIT MW, not a disclosed total site cost."},"notes":["Lease revenues are not capex, subsidies or an awarded tax incentive. Actual executed lease and ready-for-service day not inspected. Existing bitcoin campus and proposed tenant infrastructure are different phases; no new current AI load inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-reports-third-fiscal-quarter-2026-results-302845377.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Sandersville · Washington · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"cleanspark-twin-city-ga","state":"GA","kind":"facility","name":"CleanSpark Twin City Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Emanuel"],"city":"Twin City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Table net5.49M differs from gross5.9M by assumed0.41M lease liability; do not add these accounting views. Agreement day not independently established closing day. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.5829,"lng":-82.1551,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"asset_purchase_agreement_date":"2025-01-21","seller":"Apex Data Centers","reported_combined_purchase_price_usd":5900000,"cash_consideration_usd":5400000,"transaction_cost_usd":90000,"assumed_lease_liability_usd":410000},"notes":["Table net5.49M differs from gross5.9M by assumed0.41M lease liability; do not add these accounting views. Agreement day not independently established closing day.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Twin City · Emanuel · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"atlas-coosa-project-gracie-floyd-ga","state":"GA","kind":"facility","name":"Coosa Data Center (Project Gracie)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Floyd"],"city":"Rome","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.257,"lng":-85.1647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Atlas Gracie versus Sassy proposal identity","fields":{"developer":"Atlas Development","separate_proposals":[{"name":"Project Gracie","locality":"Coosa, FloydCounty, Georgia","proposed_acres":200,"proposed_area_sqft":2400000,"proposed_buildings":7,"target_completion_month":"2032-12","reported_planning_recommendation":"4-3 in favor; CountyBoard decision still required"},{"name":"Project Sassy","locality":"Rome, Georgia","proposed_initial_acres":178,"sought_additional_acres":15}]},"notes":["Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Rome · Floyd · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"coresite-at1-atlanta-ga-ga","state":"GA","kind":"facility","name":"CoreSite AT1 - Atlanta, GA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Atlanta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/at1-atlanta-ga","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7559857,"lng":-84.3911712,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"AT1","published_address":"55 Marietta St NW, Atlanta, GA30303","operator_labeled_area_sqft_lower_bound":62000,"area_qualifier":"plus"},"notes":["Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/at1-atlanta-ga","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Atlanta · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"coresite-at2-marietta-data-center-ga","state":"GA","kind":"facility","name":"CoreSite AT2 - Marietta Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cobb"],"city":"Marietta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/at2-atlanta-ga","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9255145,"lng":-84.4816338,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"AT2","published_address":"1130 Powers Ferry Place, Marietta, GA30067","operator_labeled_area_sqft_lower_bound":67000,"area_qualifier":"plus"},"notes":["Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/at2-atlanta-ga","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Marietta · Cobb · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"coreweave-dalton-ii-old-tilton-road-whitfield-ga","state":"GA","kind":"facility","name":"CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Whitfield"],"city":"Dalton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Old Tilton Road cadastral identity, separate ownership and tenant roles. Reference point is not independently verified building entrance. Zero-price JDA transfer is not free construction or full incentive value. Prior purchase includes other parcel 13-060-04-000; 3.6M is not this parcel-only capex. No displayed commercial structure does not prove vacancy or closure. CoreWeave tenant identity, operating stage and IT MW remain unverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. Neither expired forecast establishesOctoberoperation. ExistingDalton1+2at2205IndustrialSouth andDalton3atBoringDrive are distinct;50MW/142MWand1706/74712monthlyMWh not automatically thisfourthsite or its criticalIT. Main entranceEnterpriseDrive differs fromearlierOldTiltonreference.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.whitfieldcountyga.com/GIS/WCGIS/parceldetail.asp?txtrealkey=31339","host":"gis.whitfieldcountyga.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.69265485,"lng":-84.94183002,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Old Tilton Road cadastral identity, separate ownership and tenant roles","fields":{"agency":"Whitfield County Georgia parcel service","parcel":"13-060-01-000","realkey":31339,"owner_as_listed":"Dalton Whitfield County Joint Development Authority","situs":"0 Old Tilton Road","acres":167.56,"tax_bill_recipient":"Core Scientific Inc.","county_reference_point_latitude":34.69265485,"county_reference_point_longitude":-84.94183002,"listed_jda_transfer_date":"2025-12-16","listed_prior_multiple_parcel_purchase_date":"2024-12-20","listed_multiple_parcel_purchase_usd":3600000},"notes":["Reference point is not independently verified building entrance. Zero-price JDA transfer is not free construction or full incentive value. Prior purchase includes other parcel 13-060-04-000; 3.6M is not this parcel-only capex. No displayed commercial structure does not prove vacancy or closure. CoreWeave tenant identity, operating stage and IT MW remain unverified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.whitfieldcountyga.com/GIS/WCGIS/parceldetail.asp?txtrealkey=31339","host":"gis.whitfieldcountyga.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.","fields":{"reported_context":"Local reporting describes fourth CoreScientific/CoreWeave development, approximately250000squarefeet and145MWundefined capacity, under construction, countyrezoningMarch2025. OriginalJuly2026completionestimate followed official belief operationbySeptember.","independently_verified_current_operating_status":null},"notes":["Neither expired forecast establishesOctoberoperation. ExistingDalton1+2at2205IndustrialSouth andDalton3atBoringDrive are distinct;50MW/142MWand1706/74712monthlyMWh not automatically thisfourthsite or its criticalIT. Main entranceEnterpriseDrive differs fromearlierOldTiltonreference.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Dalton · Whitfield · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"databank-indo-cartersville-ga","state":"GA","kind":"facility","name":"DataBank Project Indo","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html","host":"daily-tribune.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.1651,"lng":-84.7996,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Daily Tribune reports DataBank DRI/rezoning application for69-acre218IndustrialParkRoad in Cartersville.","independently_verified_current_operating_status":null},"notes":["Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html","host":"daily-tribune.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Cartersville · Bartow · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"dcblox-atlanta-east-conyers-ga","state":"GA","kind":"facility","name":"DC BLOX Atlanta East Hyperscale Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rockdale"],"city":"Conyers","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. OriginalDecember12,2023body versus September8,2026updated header. Utility total216MWis not criticalIT. Historical delivery target is not a completed opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Page title still coming soon. Completed-and-planned total154is not all energized. Prior216MWutility commitment uses a different basis. Do not add154to216or copy total to each building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/","host":"dcblox.com","date":"2023-12-12","published":"2023-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.66,"lng":-84.02,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"acquired_acres":72,"full_build_design_area_sqft":750000,"utility_committed_total_power_mw":216,"additional_tenant_area_sqft":160000,"historical_expected_delivery":"2025-Q4"},"notes":["OriginalDecember12,2023body versus September8,2026updated header. Utility total216MWis not criticalIT. Historical delivery target is not a completed opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/","host":"dcblox.com","date":"2023-12-12","published":"2023-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"published_address":"1726 Farmer Road, Conyers, GA30012","campus_buildings":4,"campus_area_sqft":747787,"critical_capacity_completed_and_planned_mw":154,"building_power_blocks_mw":[10,48,48,48],"site_preparations_started_by":"2024-09"},"notes":["Page title still coming soon. Completed-and-planned total154is not all energized. Prior216MWutility commitment uses a different basis. Do not add154to216or copy total to each building.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Conyers · Rockdale · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"dc-blox-atlanta-west-ga","state":"GA","kind":"facility","name":"DC BLOX Atlanta West (ATL1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Lithia Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. August11,2025original release body takes precedence over September16,2026updated header. Financing is not spent campus capex. Company-wide470criticalMWfooter and previous265Mloan excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/","host":"dcblox.com","date":"2025-08-11","published":"2025-08-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.7882,"lng":-84.6608,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"construction_green_loan_usd":1150000000,"initial_planned_capacity_mw":120,"additional_planned_capacity_mw":80,"additional_capacity_earliest_target":"2027","power_basis":"release capacity; critical IT versus gross not specified"},"notes":["August11,2025original release body takes precedence over September16,2026updated header. Financing is not spent campus capex. Company-wide470criticalMWfooter and previous265Mloan excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/","host":"dcblox.com","date":"2025-08-11","published":"2025-08-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Lithia Springs · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"digital-realty-atl11-ga","state":"GA","kind":"facility","name":"Digital Realty ATL11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cobb"],"city":"Austell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Requested ATL11 URL returned the Atlanta regional page, which lists ATL13 and ATL14. No current ATL11 facility/address/status is supported; redirect is not closure proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7465605,"lng":-84.5797407,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Requested ATL11 URL returned the Atlanta regional page, which lists ATL13 and ATL14. No current ATL11 facility/address/status is supported; redirect is not closure proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Austell · Cobb · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"digital-realty-atlanta-atl13-ga","state":"GA","kind":"facility","name":"Digital Realty Atlanta ATL13","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Atlanta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl13","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7555186,"lng":-84.3914814,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"ATL13","published_address":"56 Marietta Street Atlanta, GA 30303","advertised_building_sqft":84000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl13","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Atlanta · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"edged-atlanta-tilford-yard-ga","state":"GA","kind":"facility","name":"Edged Atlanta (ATL01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Atlanta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. ReleaseAugust22says ceremonyyesterday.27MWfirstbuilding is within168MWcampus, not all168opened.1.69Beconomicinvestmentregional wording not audited construction spend.70Mfuture taxes not incentive amount. Cooling-water savings design comparison not measured actual consumption; portfolioPUEnotcampusmeasurement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html","host":"prnewswire.com","date":"2024-08-22","published":"2024-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.749,"lng":-84.388,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"first_building_opening_event_date":"2024-08-21","published_address":"1800 Thomas Street NW, Atlanta, GA","first_building_capacity_mw":27,"planned_campus_critical_capacity_mw":168,"campus_buildings":3,"operator_described_economic_investment_region_usd":1690000000,"tax_revenue_forecast_usd_approx":70000000,"tax_revenue_forecast_period_years":10},"notes":["ReleaseAugust22says ceremonyyesterday.27MWfirstbuilding is within168MWcampus, not all168opened.1.69Beconomicinvestmentregional wording not audited construction spend.70Mfuture taxes not incentive amount. Cooling-water savings design comparison not measured actual consumption; portfolioPUEnotcampusmeasurement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html","host":"prnewswire.com","date":"2024-08-22","published":"2024-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Atlanta · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"flexential-atlanta-alpharetta-data-center-ga","state":"GA","kind":"facility","name":"Flexential Atlanta - Alpharetta Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Alpharetta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0869864,"lng":-84.2518184,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Atlanta - Alpharetta Data Center","publisher_reported_footprint_sqft":142475,"publisher_reported_critical_power_mw":6,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Alpharetta · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"flexential-atlanta-douglasville-1-ga","state":"GA","kind":"facility","name":"Flexential Atlanta - Douglasville 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Page 32 gives 204,700 square feet building and 150,000 data halls; these are different floor-area scopes. This PDF does not establish a commissioning date. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7310574,"lng":-84.6160809,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Atlanta - Douglasville 1","publisher_reported_footprint_sqft":204700,"publisher_reported_critical_power_mw":22.5,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Page 32 gives 204,700 square feet building and 150,000 data halls; these are different floor-area scopes. This PDF does not establish a commissioning date.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Douglasville · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"flexential-atlanta-douglasville-2-ga","state":"GA","kind":"facility","name":"Flexential Atlanta - Douglasville 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7307027,"lng":-84.6112398,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Atlanta - Douglasville 2","publisher_reported_footprint_sqft":358000,"publisher_reported_critical_power_mw":36,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Douglasville · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"flexential-atlanta-norcross-atl01-02-ga","state":"GA","kind":"facility","name":"Flexential Atlanta - Norcross (ATL01/02)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Gwinnett"],"city":"Norcross","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Source heading groups Norcross without numbered-building split. Apply only to the existing grouped ATL01/02 record, never duplicate per building. Narrative nearly 40,000 square feet plus proposed additional 40,000 differs from 32,740 quick facts. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9547396,"lng":-84.1985246,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Atlanta - Norcross (ATL01/02)","publisher_reported_footprint_sqft":32740,"publisher_reported_critical_power_mw":2.21,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Source heading groups Norcross without numbered-building split. Apply only to the existing grouped ATL01/02 record, never duplicate per building. Narrative nearly 40,000 square feet plus proposed additional 40,000 differs from 32,740 quick facts.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Norcross · Gwinnett · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"google-douglas-county-ga","state":"GA","kind":"facility","name":"Google Douglasville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7514966,"lng":-84.7477136,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Georgia statewide page, separate location milestones","fields":{"douglas_county_opening_year":2007,"announced_new_locations_year":2026,"new_locations":["LaGrange","Columbia County"],"regional_committed_investment_usd_min_exclusive":3000000000,"investment_scope":"Georgia statewide"},"notes":["2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Douglasville · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"google-columbia-county-ga","state":"GA","kind":"facility","name":"Google Evans Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Columbia"],"city":"Evans","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5313102,"lng":-82.2563979,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Georgia statewide page, separate location milestones","fields":{"douglas_county_opening_year":2007,"announced_new_locations_year":2026,"new_locations":["LaGrange","Columbia County"],"regional_committed_investment_usd_min_exclusive":3000000000,"investment_scope":"Georgia statewide"},"notes":["2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Evans · Columbia · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"google-lagrange-ga","state":"GA","kind":"facility","name":"Google LaGrange Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Troup"],"city":"LaGrange","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.039291,"lng":-85.0313269,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Georgia statewide page, separate location milestones","fields":{"douglas_county_opening_year":2007,"announced_new_locations_year":2026,"new_locations":["LaGrange","Columbia County"],"regional_committed_investment_usd_min_exclusive":3000000000,"investment_scope":"Georgia statewide"},"notes":["2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · LaGrange · Troup · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"montana-property-group-high-falls-road-spalding-ga","state":"GA","kind":"facility","name":"High Falls Road Data Center Campus (Montana Property Group)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spalding"],"city":"Griffin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","host":"griffindailynews.com","date":"2026-04-25","published":"2026-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.2468,"lng":-84.2641,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Griffin Daily News distinguishes Montana Property Group's High Falls/Alicia proposal from Spalding Investments' High Falls/South McDonough proposal, with different acreage, buildings and reported approval stages.","independently_verified_current_operating_status":null},"notes":["Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","host":"griffindailynews.com","date":"2026-04-25","published":"2026-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Griffin · Spalding · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"thor-equities-kingston-technology-hub-bartow-ga","state":"GA","kind":"facility","name":"Kingston Technology Hub (Thor Equities)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Kingston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/","host":"newslinelocal.com","date":"2026-09-08","published":"2026-09-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.2367172,"lng":-84.9450325,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Center Square reporting republished by Newsline Local describes Thor Equities’ proposed Kingston DRI, quoting 350,000 squarefeet,559 acres and 150 MW peak power.","independently_verified_current_operating_status":null},"notes":["DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/","host":"newslinelocal.com","date":"2026-09-08","published":"2026-09-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Kingston · Bartow · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"edgeconnex-liberty-road-douglas-county-ga","state":"GA","kind":"facility","name":"Liberty Road Data Center Campus (EdgeConneX)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Villa Rica","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Planning recommendations and board votes distinguished. No current appeal result or permanent prohibition inferred. Regional stock counts and advocated tax revenue not adopted as site facts. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.douglascountysentinel.com/douglasville_sentinel/county-rejects-plans-for-700-acre-data-center-campus/article_a5761e68-bcdb-5537-a954-b2a948460ea3.html","host":"douglascountysentinel.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.7314864,"lng":-84.900079,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"land-use-and-special-use-denials","reported_finding":"Douglas County Sentinel reports 4-1 denials of land-use amendment, rezoning and special-use requests for EdgeConneX / East Dothan Village near Liberty Road.","report_display_date":"2026-07-08","independently_verified_current_status":null},"notes":["Planning recommendations and board votes distinguished. No current appeal result or permanent prohibition inferred. Regional stock counts and advocated tax revenue not adopted as site facts.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.douglascountysentinel.com/douglasville_sentinel/county-rejects-plans-for-700-acre-data-center-campus/article_a5761e68-bcdb-5537-a954-b2a948460ea3.html","host":"douglascountysentinel.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Villa Rica · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"ln-compute-cuthbert-ga","state":"GA","kind":"facility","name":"LN Compute Cuthbert Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Randolph"],"city":"Cuthbert","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. LN Compute is not named; current operator identity needs a crosswalk. Megawatts per hour and kilowatts per hour in the report are unit errors, so no silent conversion to IT MW or energy. Household equivalence and water tests are not independently verified measurements; another county's future groundbreaking is separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.walb.com/2025/09/25/new-crypto-mine-could-pump-millions-into-south-georgia-community/","host":"walb.com","date":"2025-09-25","published":"2025-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.77083,"lng":-84.79361,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WALB reports an opened cryptocurrency facility in Cuthbert industrial park, interviewing manager Hao Chen.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["LN Compute is not named; current operator identity needs a crosswalk. Megawatts per hour and kilowatts per hour in the report are unit errors, so no silent conversion to IT MW or energy. Household equivalence and water tests are not independently verified measurements; another county's future groundbreaking is separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.walb.com/2025/09/25/new-crypto-mine-could-pump-millions-into-south-georgia-community/","host":"walb.com","date":"2025-09-25","published":"2025-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Cuthbert · Randolph · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"ln-energy-blackshear-pierce-ga","state":"GA","kind":"facility","name":"LN Energy Blackshear Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Pierce"],"city":"Blackshear","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The original county decision and any later appeal remain unreviewed. Prior facilities sold to CleanSpark, their combined capacity and sale price are separate from this proposed site. Utility bills are not investment; noise/health allegations and curtailment promises are not measured effects or an executed contract. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theenergymag.com/news/2025-02-19/georgia-bitcoin-mining-permit-den","host":"theenergymag.com","date":"2025-02-19","published":"2025-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.30518,"lng":-82.24207,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Energy Magazine reports unanimous Pierce County denial of LN Energy's requested conditional use at 1199 Cason Road, citing the Blackshear Times.","independently_verified_current_operating_status":null},"notes":["The original county decision and any later appeal remain unreviewed. Prior facilities sold to CleanSpark, their combined capacity and sale price are separate from this proposed site. Utility bills are not investment; noise/health allegations and curtailment promises are not measured effects or an executed contract.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theenergymag.com/news/2025-02-19/georgia-bitcoin-mining-permit-den","host":"theenergymag.com","date":"2025-02-19","published":"2025-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Blackshear · Pierce · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"stillwater-lovejoy-panhandle-road-clayton-ga","state":"GA","kind":"facility","name":"Lovejoy Data Center Campus (Stillwater Development)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clayton"],"city":"Lovejoy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Lovejoy is separate from unincorporated Clayton County moratorium. Original DRI contains historical applicant forecasts, not current approval, operation, spending or delivered jobs. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical governmental form containing applicant forecasts, separate from reported later withdrawal.. Undated captured form. None of these values proves spending, delivered jobs, tax receipts, measured demand, utility commitment or project approval. Water supply and sewage are separate flows, not additive consumption. No radio-button answer inferred from extracted not-selected labels.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.atlantanewsfirst.com/2026/08/07/proposal-clayton-county-data-center-withdrawn/","host":"atlantanewsfirst.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4794","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4516522,"lng":-84.343564,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"formal-withdrawal-reported","reported_finding":"Atlanta News First says Stillwater Lovejoy proposal formally withdrawn at special council session; mayor said residential use pursued instead.","report_display_date":"2026-08-06","independently_verified_current_status":null},"notes":["Lovejoy is separate from unincorporated Clayton County moratorium. Original DRI contains historical applicant forecasts, not current approval, operation, spending or delivered jobs.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.atlantanewsfirst.com/2026/08/07/proposal-clayton-county-data-center-withdrawn/","host":"atlantanewsfirst.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Historical governmental form containing applicant forecasts, separate from reported later withdrawal.","fields":{"dri_id":"4794","applicant":"Stillwater Development LLC","local_government":"City of Lovejoy","estimated_buildout_value_usd":13000000000,"estimated_annual_local_tax_revenue_usd":25000000,"estimated_full_time_employees":650,"estimated_peak_connected_load_mw":1250,"power_basis":"Peak connected electrical load, not explicit critical IT capacity","estimated_water_supply_mgd":0.36,"estimated_sewage_mgd":0.36},"notes":["Undated captured form. None of these values proves spending, delivered jobs, tax receipts, measured demand, utility commitment or project approval. Water supply and sewage are separate flows, not additive consumption. No radio-button answer inferred from extracted not-selected labels.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4794","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Lovejoy · Clayton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"meta-stanton-springs-newton-ga","state":"GA","kind":"facility","name":"Meta Newton Data Center (Stanton Springs)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Newton"],"city":"Social Circle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2021/03/hello-georgia/","host":"datacenters.atmeta.com","date":"2021-03-14","published":"2021-03-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.6551,"lng":-83.7182,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"historical_planned_structure_area_sqft":970000,"historical_completion_target_year":2020},"notes":["Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2021/03/hello-georgia/","host":"datacenters.atmeta.com","date":"2021-03-14","published":"2021-03-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Social Circle · Newton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"microsoft-firecracker-rome-ga","state":"GA","kind":"facility","name":"Microsoft Data Center Campus - Rome, GA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Floyd"],"city":"Rome","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending. Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/","host":"allongeorgia.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.27,"lng":-85.16,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending.","Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/","host":"allongeorgia.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Rome · Floyd · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"microsoft-douglasville-ga","state":"GA","kind":"facility","name":"Microsoft Douglasville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. statewide qualification thresholds, no named-site award. Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county","host":"dor.georgia.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7547,"lng":-84.7427,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"statewide qualification thresholds, no named-site award","fields":{},"notes":["Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county","host":"dor.georgia.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Douglasville · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"microsoft-east-point-ben-hill-road-ga","state":"GA","kind":"facility","name":"Microsoft East Point Data Center (Ben Hill Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"East Point","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft regional Georgia context without exact Ben Hill match. Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6465885,"lng":-84.5173738,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Microsoft regional Georgia context without exact Ben Hill match","fields":{"operator_region_label":"South Fulton County, Georgia","regional_workforce_forecast":"hundreds of fulltime employees and contractors across operational facilities by end2026","regional_cooling_description":"direct evaporative, no cooling water below29.4degreesCelsius"},"notes":["Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · East Point · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"microsoft-fairwater-fayetteville-ga","state":"GA","kind":"facility","name":"Microsoft Fairwater Atlanta (Azure AI Superfactory)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fayette"],"city":"Fayetteville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fayette generic incentives not Fairwater awarded benefits. Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fayettega.org/doing-business/incentives-tax-rates/","host":"fayettega.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4487,"lng":-84.4549,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Fayette generic incentives not Fairwater awarded benefits","fields":{"publisher":"Fayette County Development Authority","scope":"generic incentive eligibility page","tax_table_year":2021},"notes":["Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fayettega.org/doing-business/incentives-tax-rates/","host":"fayettega.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Fayetteville · Fayette · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"microsoft-palmetto-fulton-ga","state":"GA","kind":"facility","name":"Microsoft Palmetto Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Palmetto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft Palmetto construction chronology. October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/blog/palmetto-datacenter-construction-update/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5178907,"lng":-84.6696549,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Microsoft Palmetto construction chronology","fields":{"operator_site_name":"Palmetto datacenter","locality":"Palmetto, Georgia","construction_start":"2024-04","construction_start_precision":"month","historical_construction_completion_estimate":"beginning of2025-10","operator_community_information_session_date":"2024-07-23","general_contractor":"Turner Construction Company"},"notes":["October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/blog/palmetto-datacenter-construction-update/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Palmetto · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"microsoft-tyrone-ga","state":"GA","kind":"facility","name":"Microsoft Tyrone Campus (Project Rita)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fayette"],"city":"Tyrone","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Tyrone dated land-use and operator water forecast summary. Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tyronega.gov/datacenter","host":"tyronega.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.494,"lng":-84.588,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Tyrone dated land-use and operator water forecast summary","fields":{"town_council_zoning_approval_date":"2024-03-28","town_reported_permit_status_as_of":"2026-06-02","town_reported_permit_status":"no site plan,land-disturbance or building-permit applications submitted","town_reported_local_incentive_status":"no abatement offered or requested","operator_estimated_operational_water_gallons_per_day_approx":4000},"notes":["Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tyronega.gov/datacenter","host":"tyronega.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Tyrone · Fayette · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"northern-data-maysville-jackson-ga","state":"GA","kind":"facility","name":"Northern Data Maysville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jackson"],"city":"Maysville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Canceled informational meeting is not a canceled project or a new denial. The city clerk's interpretation of code is attributed, not independently reviewed law. Maysville here is in Jackson County, Georgia, not Kentucky. No construction, critical IT, exact approval date or operating status established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/","host":"wgtjradio.com","date":"2026-05-31","published":"2026-05-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.2527233,"lng":-83.5613446,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WGTJ reports cancellation of a Northern Data Maysville informational meeting because previous zoning/conditional-use action had already occurred and scheduling changed.","independently_verified_current_operating_status":null},"notes":["Canceled informational meeting is not a canceled project or a new denial. The city clerk's interpretation of code is attributed, not independently reviewed law. Maysville here is in Jackson County, Georgia, not Kentucky. No construction, critical IT, exact approval date or operating status established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/","host":"wgtjradio.com","date":"2026-05-31","published":"2026-05-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Maysville · Jackson · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"oakley-brown-farm-road-cartersville-ga","state":"GA","kind":"facility","name":"Oakley Real Estate Partners Brown Farm Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bartow generic agenda without exact-site evidence. Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf","host":"cms2.revize.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.1181,"lng":-84.8698,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Bartow generic agenda without exact-site evidence","fields":{},"notes":["Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf","host":"cms2.revize.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Cartersville · Bartow · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"eagle-rock-pine-ridge-tech-park-twiggs-ga","state":"GA","kind":"facility","name":"Pine Ridge Tech Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Twiggs"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Claims about notice and regional review are plaintiffs allegations; article expressly says county had not responded. No court ruling, injunction or current case outcome established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans","host":"govtech.com","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.6467914,"lng":-83.4351636,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-litigation-reported","reported_finding":"Macon Telegraph reporting syndicated by GovTech describes residents suit challenging Twiggs County rezoning for Eagle Rock.","report_display_date":"2025-09-29","independently_verified_current_status":null},"notes":["Claims about notice and regional review are plaintiffs allegations; article expressly says county had not responded. No court ruling, injunction or current case outcome established.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans","host":"govtech.com","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Twiggs · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"taurus-digital-realty-project-bunkhouse-stilesboro-ga","state":"GA","kind":"facility","name":"Project Bunkhouse (Digital Realty Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Stilesboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bunkhouse filed initial proposal with operator/area holds. Description prints8,675,0000while sizefieldprints8,675,000; scope/typo conflict held, no approved canonical area. Form lists engineering contact as developer, not independentTaurus/DigitalRealty operator confirmation. InitialDRI not rezoning approval, actual build or energized capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.096532,"lng":-84.911951,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Bunkhouse filed initial proposal with operator/area holds","fields":{"dri_id":"4433","project_name":"ProjectBunkhouse","published_location_description":"TaffRoad southofHighway113,BartowCounty,Georgia","published_project_point":{"latitude":34.096532,"longitude":-84.911951,"geo_precision":"applicant-provided project location,not parcel centroid"},"proposed_area_sqft_size_field":8675000,"estimated_completion_year":2035,"printed_property_owner":"GainesFamilyLandLLC"},"notes":["Description prints8,675,0000while sizefieldprints8,675,000; scope/typo conflict held, no approved canonical area. Form lists engineering contact as developer, not independentTaurus/DigitalRealty operator confirmation. InitialDRI not rezoning approval, actual build or energized capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Stilesboro · Bartow · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"atlas-project-bus-temple-ga","state":"GA","kind":"facility","name":"Project Bus (Atlas Development Temple Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carroll"],"city":"Temple","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Page has two date labels and a corporate-location correction that conflicts with its body. Operator identity and exact publication/action dates remain qualified; 2036 is a forecast. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gradickcommunications.com/data-center-planned-for-development-in-carroll-county/","host":"gradickcommunications.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7376,"lng":-85.0327,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Gradick reports Project Bus / Atlas Development proposal in Carroll County requiring rezoning, annexation and sewer.","independently_verified_current_operating_status":null},"notes":["Page has two date labels and a corporate-location correction that conflicts with its body. Operator identity and exact publication/action dates remain qualified; 2036 is a forecast.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gradickcommunications.com/data-center-planned-for-development-in-carroll-county/","host":"gradickcommunications.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Temple · Carroll · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"openai-project-camellia-effingham-ga","state":"GA","kind":"facility","name":"Project Camellia (OpenAI Effingham County Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Effingham"],"city":"Rincon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Camellia county forecasts, benefit scopes and incomplete review. County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center","host":"effinghamcounty.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.296,"lng":-81.2354,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Camellia county forecasts, benefit scopes and incomplete review","fields":{"agency":"Effingham County, Georgia","project":"Project Camellia","named_company":"OpenAI","review_stage":"initial requirements met; county/state reviews, permits and inspections remain","planned_phases":5,"minimum_required_investment_basis_usd":20000000000,"openai_community_commitment_lifetime_usd":80000000,"included_school_meal_grant_2026_27_usd":4300000,"ecida_tax_relief_commitment_annual_usd":30000000,"ecida_tax_relief_years":3,"forecast_pilot_2032_annual_usd":{"county":27000000,"schools":39000000},"forecast_buildout_year":2032,"planned_nonindustrial_neighbor_buffer_feet_min":300,"cooling_plan":"closed loop; treated surface water, not Floridan aquifer groundwater"},"notes":["County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center","host":"effinghamcounty.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Rincon · Effingham · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"project-oak-walt-sanders-road-coweta-ga","state":"GA","kind":"facility","name":"Project Oak Data Center (Walt Sanders Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coweta"],"city":"Newnan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Existing industrial zoning is not data-center approval. Reduced 255-acre scheme distinct from earlier footprint; applicant future plan undecided. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html","host":"times-herald.com","date":"2026-08-25","published":"2026-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4330945,"lng":-84.7301816,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-condition-change-denied","reported_finding":"Newnan Times-Herald reports unanimous Coweta denial of Project Oak request to remove office/warehouse-only condition on previously industrial-zoned land.","report_display_date":"2026-08-25","independently_verified_current_status":null},"notes":["Existing industrial zoning is not data-center approval. Reduced 255-acre scheme distinct from earlier footprint; applicant future plan undecided.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html","host":"times-herald.com","date":"2026-08-25","published":"2026-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Newnan · Coweta · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"cyrusone-project-peach-palmetto-ga","state":"GA","kind":"facility","name":"Project Peach (CyrusOne Palmetto Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coweta"],"city":"Palmetto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Peach described as April2025 while May2026 roundup prints April2026: approval year held for original resolution. Allegations/communications not court findings. Sail economics not Peach figures. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.desmog.com/2026/04/07/how-data-center-developers-staked-their-claim-in-rural-georgia/","host":"desmog.com","date":"2026-04-07","published":"2026-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.5182,"lng":-84.6693,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"DeSmog distinguishes Project Peach CyrusOne rezoning from Project Sail Atlas/Prologis approval campaign.","independently_verified_current_operating_status":null},"notes":["Peach described as April2025 while May2026 roundup prints April2026: approval year held for original resolution. Allegations/communications not court findings. Sail economics not Peach figures.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.desmog.com/2026/04/07/how-data-center-developers-staked-their-claim-in-rural-georgia/","host":"desmog.com","date":"2026-04-07","published":"2026-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Palmetto · Coweta · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"project-ruby-upatoi-muscogee-ga","state":"GA","kind":"facility","name":"Project Ruby (Upatoi Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Muscogee"],"city":"Columbus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Framework adoption is not approval/operating proof for Ruby. USD5.18billion,865acres,600MWand195jobs are proposal/promoter metrics, powerbasisnotcriticalITverified. USD68.7millionannual2030tax forecast is predepreciation, not cash collected or net fiscal impact. Reported500footbuffer/noise/TierIVconditions need original adopted text; ordinance applies beyond one campus. Open-meetings complaint undecided, not established violation; petition5000not verified local residents. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aol.com/articles/columbus-council-votes-rules-allow-144112000.html","host":"aol.com","date":"2026-06-16","published":"2026-06-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.5487503,"lng":-84.7399283,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Ledger-Enquirer local report syndicated onAOL says ColumbusCouncil voted6-2 June16 for a technology-overlay ordinance; ProjectRuby still needed a developer rezoning request, which had not been submitted.","independently_verified_current_operating_status":null,"reported_framework_vote":"2026-06-16","reported_vote_for":6,"reported_vote_against":2,"developer_rezoning_application_submitted_at_publication":false,"project_approval_verified":false},"notes":["Framework adoption is not approval/operating proof for Ruby. USD5.18billion,865acres,600MWand195jobs are proposal/promoter metrics, powerbasisnotcriticalITverified. USD68.7millionannual2030tax forecast is predepreciation, not cash collected or net fiscal impact. Reported500footbuffer/noise/TierIVconditions need original adopted text; ordinance applies beyond one campus. Open-meetings complaint undecided, not established violation; petition5000not verified local residents.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aol.com/articles/columbus-council-votes-rules-allow-144112000.html","host":"aol.com","date":"2026-06-16","published":"2026-06-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Columbus · Muscogee · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"prologis-project-sail-coweta-ga","state":"GA","kind":"facility","name":"Project Sail - Prologis Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coweta"],"city":"Newnan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Coweta Project Sail nine-building concept and fiscal estimate. 100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cowetaprojectsail.com/coweta-lp/","host":"cowetaprojectsail.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.3807,"lng":-84.7974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Coweta Project Sail nine-building concept and fiscal estimate","fields":{"project":"Project Sail","county":"Coweta County, Georgia","planned_buildings":9,"planned_data_center_area_sqft":4340000,"estimated_annual_tax_at_fullbuildout_usd_approx":100000000,"tax_forecast_condition":"fully assessed, completed buildout in roughly10years","site_view_reference":"Wagers Mill Road"},"notes":["100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cowetaprojectsail.com/coweta-lp/","host":"cowetaprojectsail.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Newnan · Coweta · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"atlas-project-sassy-rome-ga","state":"GA","kind":"facility","name":"Project Sassy (Atlas Development Rome Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Floyd"],"city":"Rome","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.257,"lng":-85.1647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Atlas Gracie versus Sassy proposal identity","fields":{"developer":"Atlas Development","separate_proposals":[{"name":"Project Gracie","locality":"Coosa, FloydCounty, Georgia","proposed_acres":200,"proposed_area_sqft":2400000,"proposed_buildings":7,"target_completion_month":"2032-12","reported_planning_recommendation":"4-3 in favor; CountyBoard decision still required"},{"name":"Project Sassy","locality":"Rome, Georgia","proposed_initial_acres":178,"sought_additional_acres":15}]},"notes":["Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Rome · Floyd · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"atlas-project-springbank-adairsville-ga","state":"GA","kind":"facility","name":"Project Springbank (Atlas Development Bartow County Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Adairsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. filed initial regional-impact proposal. Initial regional-impact information form not rezoning approval, final permit or construction proof. Checkbox selection states not inferred from plain text. Closed-loop description not measured water use or zero wastewater. Mailing address in Carrollton is developer address, not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.30926,"lng":-84.96325,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"filed initial regional-impact proposal","fields":{"dri_id":"4403","project_name":"Project Springbank","submitting_jurisdiction":"Bartow County, Georgia","developer":"Atlas Development LLC","planned_buildings":6,"planned_total_area_sqft":2274000,"published_project_location":{"latitude":34.30926,"longitude":-84.96325,"geo_precision":"applicant-provided project location; not parcel centroid"},"estimated_completion_month":"2031-12"},"notes":["Initial regional-impact information form not rezoning approval, final permit or construction proof. Checkbox selection states not inferred from plain text. Closed-loop description not measured water use or zero wastewater. Mailing address in Carrollton is developer address, not site.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Adairsville · Bartow · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"project-turbo-okelly-road-gainesville-ga","state":"GA","kind":"facility","name":"Project Turbo (Gainesville Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hall"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html","host":"yahoo.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.2246468,"lng":-83.783998,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"WSBTV story syndicated onYahoo describes ProjectTurbo proposed atOkellyRoad GainesvilleHallCounty,900000squarefeet/threebuildings/substation, USD1.2billionproposedvalue and developer-requested delay to aSeptember15planning meeting. Headline says plans abandoned while body still says proposed.","independently_verified_current_operating_status":null,"canonical_current_status":null,"headline_body_stage_conflict":true},"notes":["Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html","host":"yahoo.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Gainesville · Hall · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"cloverleaf-pumpkin-technology-campus-harlem-ga","state":"GA","kind":"facility","name":"Pumpkin Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Columbia"],"city":"Harlem","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Publisher correction: First Bank made EDACC loan; county supplied security deposit. White Oak transaction/loan is separate from Pumpkin project. Four data buildings, two warehouses and offices are different uses; background acoustics not operational noise. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theaugustapress.com/data-center-project-proposed-along-appling-harlem-road/","host":"theaugustapress.com","date":"2025-12-15","published":"2025-12-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4145834,"lng":-82.3126237,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Augusta Press describes Pumpkin Technology Campus rezoning request and scheduled January planning review.","independently_verified_current_operating_status":null},"notes":["Publisher correction: First Bank made EDACC loan; county supplied security deposit. White Oak transaction/loan is separate from Pumpkin project. Four data buildings, two warehouses and offices are different uses; background acoustics not operational noise.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theaugustapress.com/data-center-project-proposed-along-appling-harlem-road/","host":"theaugustapress.com","date":"2025-12-15","published":"2025-12-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Harlem · Columbia · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"qts-atlanta-1-atlanta-metro-dc1-ga","state":"GA","kind":"facility","name":"QTS Atlanta 1 (Atlanta-Metro DC1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Atlanta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus total, not DC1 alone. Substations are planned; no energized utilization or all-building completion inferred. Company conservation acres and annual report totals excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/atlanta/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7776897,"lng":-84.4211544,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":99,"advertised_critical_campus_capacity_mw_lower_bound":278,"planned_dedicated_substations":3},"notes":["Campus total, not DC1 alone. Substations are planned; no energized utilization or all-building completion inferred. Company conservation acres and annual report totals excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/atlanta/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Atlanta · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"qts-blue-hole-blakely-ga","state":"GA","kind":"facility","name":"QTS Project Blue Hole","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Early"],"city":"Blakely","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. JacklynnLambert WTVY August11,2026 originalBlakelymeetingreport sayscityapprovedMOUwithEarlyCounty,schools,developmentauthority/QTS. SOURCECORRECTED earlier TAXBREAK label.7.5Mfirstphasefollowed7Mannualpaymentsreportedcommitments, notabatementvalue/paidreceipts. Sharedfunddistributionandwater/sewer/transportdetailsSTILLTOBEAGREEDpercityattorney. Nofullyexecutedallpartycounterpartread, no unconditionalpaymentguarantee/allpermits/ITMWoroperatingdate. Do notmultiplyundefinedannualdurationoraddunrelatedcommunityprojectcosts. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wtvy.com/2026/08/11/blakely-approves-agreement-with-qts-data-centers-related-proposed-facility/","host":"wtvy.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.3763,"lng":-84.9346,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["JacklynnLambert WTVY August11,2026 originalBlakelymeetingreport sayscityapprovedMOUwithEarlyCounty,schools,developmentauthority/QTS. SOURCECORRECTED earlier TAXBREAK label.7.5Mfirstphasefollowed7Mannualpaymentsreportedcommitments, notabatementvalue/paidreceipts.","Sharedfunddistributionandwater/sewer/transportdetailsSTILLTOBEAGREEDpercityattorney. Nofullyexecutedallpartycounterpartread, no unconditionalpaymentguarantee/allpermits/ITMWoroperatingdate. Do notmultiplyundefinedannualdurationoraddunrelatedcommunityprojectcosts.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.wtvy.com/2026/08/11/blakely-approves-agreement-with-qts-data-centers-related-proposed-facility/","host":"wtvy.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Blakely · Early · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"qts-eisenhower-augusta-ga","state":"GA","kind":"facility","name":"QTS Project Eisenhower","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Richmond"],"city":"Augusta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Historical pause is not proof of a moratorium still effective October 14; no later extension or current rule is assumed. Exclusion from the pause is not all permits or commissioning. The proposed one-year extension requested by residents was not the adopted 49-day measure. Neighbor concerns are not health/property-value findings, and nearby Columbia/McDuffie campuses are separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wrdw.com/2026/06/02/augustans-urge-city-leaders-put-data-centers-hold/","host":"wrdw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4735,"lng":-82.0105,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WRDW reports Augusta's 49-day pause on new projects and explicit exclusion of the existing QTS Eisenhower proposal, where groundwork had been observed.","independently_verified_current_operating_status":null,"reported_moratorium_days":49,"reported_action_date":"2026-06-02","source_says_this_project_excluded":true,"moratorium_currently_effective":null},"notes":["Historical pause is not proof of a moratorium still effective October 14; no later extension or current rule is assumed. Exclusion from the pause is not all permits or commissioning. The proposed one-year extension requested by residents was not the adopted 49-day measure. Neighbor concerns are not health/property-value findings, and nearby Columbia/McDuffie campuses are separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wrdw.com/2026/06/02/augustans-urge-city-leaders-put-data-centers-hold/","host":"wrdw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Augusta · Richmond · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"serverfarm-covington-hazelbrand-ga","state":"GA","kind":"facility","name":"Serverfarm Covington Data Center (Hazelbrand Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Newton"],"city":"Covington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. GrantBlankenship GPB July7 updatedJuly8,2026 original reporting of GeorgiaEPD letter: likely air-rule violation and construction pause for VoltaGrid gas generation at ServerfarmCovington. Eight of33planned engines reportedly installed before permit;33GENunits not ITMW. Agencyresponse deadline midJuly is historical, later compliance/currentpermit outcome unknown. UnderlyingEPDletter not directlyread. SELCallegations and regulatorlikely wording not final penalty/settledruling. Blackstone/Halliburton1BVoltaGridinvestment notServerfarmcampuscapex. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law","host":"gpb.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5968,"lng":-83.8602,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["GrantBlankenship GPB July7 updatedJuly8,2026 original reporting of GeorgiaEPD letter: likely air-rule violation and construction pause for VoltaGrid gas generation at ServerfarmCovington. Eight of33planned engines reportedly installed before permit;33GENunits not ITMW. Agencyresponse deadline midJuly is historical, later compliance/currentpermit outcome unknown. UnderlyingEPDletter not directlyread. SELCallegations and regulatorlikely wording not final penalty/settledruling. Blackstone/Halliburton1BVoltaGridinvestment notServerfarmcampuscapex.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law","host":"gpb.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Covington · Newton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"tpa-social-circle-technology-park-ga","state":"GA","kind":"facility","name":"Social Circle Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Newton"],"city":"Social Circle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6562,"lng":-83.7182,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Social Circle · Newton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"spalding-investments-high-falls-road-campus-ga","state":"GA","kind":"facility","name":"Spalding Investments Data Center Campus (High Falls Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spalding"],"city":"Griffin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","host":"griffindailynews.com","date":"2026-04-25","published":"2026-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.2468,"lng":-84.2641,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Griffin Daily News distinguishes Montana Property Group's High Falls/Alicia proposal from Spalding Investments' High Falls/South McDonough proposal, with different acreage, buildings and reported approval stages.","independently_verified_current_operating_status":null},"notes":["Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","host":"griffindailynews.com","date":"2026-04-25","published":"2026-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Griffin · Spalding · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"t5-atlanta-i-ga","state":"GA","kind":"facility","name":"STACK ATL01 (formerly T5@Atlanta)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Alpharetta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. operator/name crosswalk hold. Preferred source is STACK ATL01 while upstream record is named T5 Atlanta I. This source alone does not prove historical ownership/address equivalence. All specifications held as source context until exact crosswalk established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/atlanta/atl01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0757915,"lng":-84.264267,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"operator/name crosswalk hold","fields":{"source_identifies_operator":"STACK","source_identifies_site_code":"ATL01","source_identifies_city":"Alpharetta, Georgia","source_campus_critical_capacity_mw":20,"source_campus_buildings":2,"source_campus_acres":18,"source_building_sections":[{"code":"ATL01A","area_sqft":105000,"power_mw":8},{"code":"ATL01B","area_sqft":133000,"power_mw":12}]},"notes":["Preferred source is STACK ATL01 while upstream record is named T5 Atlanta I. This source alone does not prove historical ownership/address equivalence. All specifications held as source context until exact crosswalk established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/atlanta/atl01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Alpharetta · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"switch-atlanta-the-keep-ga","state":"GA","kind":"facility","name":"Switch Atlanta: The KEEP","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Lithia Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7550251,"lng":-84.5872685,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"corporate energy context only","fields":{},"notes":["Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Lithia Springs · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"switch-keep-2-atlanta-north-cartersville-ga","state":"GA","kind":"facility","name":"Switch KEEP 2.0 Atlanta North Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Switch phased regional-impact application. 126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.1149,"lng":-84.7938,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Switch phased regional-impact application","fields":{"dri_id":"4061","project_name":"SwitchKEEP2.0AtlantaNorthCampus","initial_phase_site_acres":126,"initial_phase_buildings":1,"initial_phase_completion_target":"2026-Q2","overall_project_completion_target_year":2046,"published_location_description":"south ofOldAlabamaRoad/BatesRoad intersection towardPauldingCountyline,CityofCartersville"},"notes":["126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Cartersville · Bartow · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"t5-atlanta-iv-palmetto-ga","state":"GA","kind":"facility","name":"T5 @ Atlanta IV","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Palmetto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Jarred Schenke, Bisnow June 12, 2024 original Fairburn planning-director interview: early T5 proposal near I-85/Gullatt, 495,000 square feet/two buildings, land not yet owned and use permit still needed. Limited corridor crosswalk to inherited Atlanta IV/Palmetto row; exact parcel/city-boundary discrepancy and later 200/300 MW claims not resolved here. Existing Lithia Springs and Coweta proposal are separate campuses. DRI filing/review is not construction approval or current operation. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/t5-plotting-data-center-campus-in-fairburn-124663","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.548,"lng":-84.724,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Jarred Schenke, Bisnow June 12, 2024 original Fairburn planning-director interview: early T5 proposal near I-85/Gullatt, 495,000 square feet/two buildings, land not yet owned and use permit still needed. Limited corridor crosswalk to inherited Atlanta IV/Palmetto row; exact parcel/city-boundary discrepancy and later 200/300 MW claims not resolved here. Existing Lithia Springs and Coweta proposal are separate campuses. DRI filing/review is not construction approval or current operation.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/t5-plotting-data-center-campus-in-fairburn-124663","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Palmetto · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"ta-realty-east-tanners-church-ellenwood-ga","state":"GA","kind":"facility","name":"TA Realty East Tanners Church Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clayton"],"city":"Ellenwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Ten-year property-tax arrangement starts with 50 percent reduction in year 1 then declines; not 50 percent every year. More than 36 million savings is AJC estimate, not disclosed executed award value or paid subsidy. Forecast 93 million tax revenue is cumulative over ten years, not annual/collected. More than 700 jobs includes temporary construction; roughly 30 employees and 30 contractors are separate operating projections. End 2026 RFS remains future and 180 MW basis is undefined, not critical IT. Site-plan approval in previousOctober is reported history, not all permits/ESA. Later 2026 web modification does not redate the 2025 event. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/policy/clayton-county-ga-agency-approves-tax-break-for-data-center","host":"govtech.com","date":"2025-06-17","published":"2025-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.6101096,"lng":-84.287978,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Atlanta Journal-Constitution reporting republished by Government Technology describes Clayton development-authority approval of a TA Realty incentive package for a proposed 959 million-dollar/180 MW East Tanners Church Road data center.","independently_verified_current_operating_status":null},"notes":["Ten-year property-tax arrangement starts with 50 percent reduction in year 1 then declines; not 50 percent every year. More than 36 million savings is AJC estimate, not disclosed executed award value or paid subsidy. Forecast 93 million tax revenue is cumulative over ten years, not annual/collected. More than 700 jobs includes temporary construction; roughly 30 employees and 30 contractors are separate operating projections. End 2026 RFS remains future and 180 MW basis is undefined, not critical IT. Site-plan approval in previousOctober is reported history, not all permits/ESA. Later 2026 web modification does not redate the 2025 event.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/policy/clayton-county-ga-agency-approves-tax-break-for-data-center","host":"govtech.com","date":"2025-06-17","published":"2025-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Ellenwood · Clayton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"edgeconnex-union-city-campus-fulton-ga","state":"GA","kind":"facility","name":"Union City Data Center Campus (EdgeConneX / TA Realty)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Union City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The 324 MW total has an undefined basis. First-phase 2026 delivery, overall 2029 target and 2032 requirement are distinct. Land cost, tax abatement, investment and economic impact must not be summed. Original agreements were not reviewed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterfrontier.com/hyperscale/article/55126626/details-emerge-on-microsofts-18-billion-investment-in-atlanta-data-centers-amid-tax-development-wrangles","host":"datacenterfrontier.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.5870558,"lng":-84.5424299,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Data Center Frontier names Union City's Project Steamboat, TA Realty, EdgeConneX and Microsoft end use, citing planning records.","independently_verified_current_operating_status":null},"notes":["The 324 MW total has an undefined basis. First-phase 2026 delivery, overall 2029 target and 2032 requirement are distinct. Land cost, tax abatement, investment and economic impact must not be summed. Original agreements were not reviewed.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterfrontier.com/hyperscale/article/55126626/details-emerge-on-microsofts-18-billion-investment-in-atlanta-data-centers-amid-tax-development-wrangles","host":"datacenterfrontier.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Union City · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"vantage-douglasville-campus-ga","state":"GA","kind":"facility","name":"Vantage Data Centers Douglasville Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","host":"insidetowers.com","date":"2024-08-16","published":"2024-08-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.7515,"lng":-84.7477,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Inside Towers relays Vantage DRI filings for Westlake inSouthFulton 754,000 squarefeet/January 2028 target and separate StacksRoad 697,000 squarefeet/January 2027 target, plus earlier Douglasville 1.7 million-square-foot three-building plan/December 2025 target.","independently_verified_current_operating_status":null,"site_specific_scope":"Douglasville1700000sqft/December2025forecast; Stacks Road is a different campus"},"notes":["Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","host":"insidetowers.com","date":"2024-08-16","published":"2024-08-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Douglasville · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"vantage-westlake-south-fulton-ga","state":"GA","kind":"facility","name":"Vantage Data Centers Westlake","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"South Fulton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","host":"insidetowers.com","date":"2024-08-16","published":"2024-08-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.6273,"lng":-84.5646,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Inside Towers relays Vantage DRI filings for Westlake inSouthFulton 754,000 squarefeet/January 2028 target and separate StacksRoad 697,000 squarefeet/January 2027 target, plus earlier Douglasville 1.7 million-square-foot three-building plan/December 2025 target.","independently_verified_current_operating_status":null,"site_specific_scope":"Westlake754000sqft/January2028forecast"},"notes":["Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","host":"insidetowers.com","date":"2024-08-16","published":"2024-08-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · South Fulton · Fulton · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"white-oak-technology-park-columbia-county-ga","state":"GA","kind":"facility","name":"White Oak Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Columbia"],"city":"Appling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. LizOwens/EthanHunter WRDW originalFebruary25updated26,2026 plaintiffinterview reports TWOjudicialreviewpetitions filedFebruary25 reWhiteOakandPumpkinCenterrezonings. Allegations oftraffic/water/notice/comprehensiveplanfailures notcourtfindings. WhiteOak1635ApplingHarlemRdaccesschangeattributedtopetition, notsurveyedparcel. Originalpleadings/casenumbers/laterorderunread. JournalistinterpretationthatOCGA5-4-3wasoutdatednotcurrentlegalopinion; do notdeclarecaseinvalid/dismissedfromthisreport. Twofilingsnotonecombinedproject; PumpkinCenteralreadycontextreviewedelsewhere. No ITMW/newcurrentoperations. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/","host":"wrdw.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6,"lng":-82.28,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["LizOwens/EthanHunter WRDW originalFebruary25updated26,2026 plaintiffinterview reports TWOjudicialreviewpetitions filedFebruary25 reWhiteOakandPumpkinCenterrezonings. Allegations oftraffic/water/notice/comprehensiveplanfailures notcourtfindings. WhiteOak1635ApplingHarlemRdaccesschangeattributedtopetition, notsurveyedparcel.","Originalpleadings/casenumbers/laterorderunread. JournalistinterpretationthatOCGA5-4-3wasoutdatednotcurrentlegalopinion; do notdeclarecaseinvalid/dismissedfromthisreport. Twofilingsnotonecombinedproject; PumpkinCenteralreadycontextreviewedelsewhere. No ITMW/newcurrentoperations.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/","host":"wrdw.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Appling · Columbia · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"tc-atlanta-development-winston-douglas-ga","state":"GA","kind":"facility","name":"Winston Data Center (Waldrop Farms)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Winston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Reported rezoning action is not all building/environmental approvals, executed utility service or operation. Conditions concern appearance, paths/transit, utility connection, emergency access and heavy vehicles, but exact legal instrument not reviewed; internally awkward project/property reversion wording is not independently interpreted. Forecast 2.4 million/year in 2025 and 96 million over next ten years have unclear annual-versus-cumulative endpoint scope; do not infer 96 million yearly or received taxes. No MW/RFS/capital verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/douglas-county-commissioners-approve-data-210537294.html","host":"yahoo.com","date":"2025-02-05","published":"2025-02-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.725108,"lng":-84.8249382,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"WSB-TV reporting on Yahoo describes Douglas commissioners approving TC Atlanta’s two-building/substation Winston rezoning with added conditions after staff recommended denial.","independently_verified_current_operating_status":null},"notes":["Reported rezoning action is not all building/environmental approvals, executed utility service or operation. Conditions concern appearance, paths/transit, utility connection, emergency access and heavy vehicles, but exact legal instrument not reviewed; internally awkward project/property reversion wording is not independently interpreted. Forecast 2.4 million/year in 2025 and 96 million over next ten years have unclear annual-versus-cumulative endpoint scope; do not infer 96 million yearly or received taxes. No MW/RFS/capital verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/douglas-county-commissioners-approve-data-210537294.html","host":"yahoo.com","date":"2025-02-05","published":"2025-02-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Georgia · Winston · Douglas · Source context reviewed","state_name":"Georgia","state_path":"/georgia/"},{"id":"1547-alohanap-kapolei-hi","state":"HI","kind":"facility","name":"AlohaNAP (1547 HAII1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Honolulu"],"city":"Kapolei","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 3.3kW/cabinet heat design is not campus MW. PhaseIII construction/extra50000squarefeet has no verified completion date on source. Operator identifies AlohaNAP and phase program. Proposed additional50000squarefeet is separate from advertised existing10200. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Hawaiki telecom project; AlohaNAP crosswalk hold. Finalenvironmentalassessment describes proposed shorecrossing/conduit expansion, not a new completed data center.2.5acreproject excludes subsurfacebores, not entire telecomcampus. PreferredAlohaNAPrecord is not established by executive summary; keep sourcefacts specifictoHawaiki. Delawareapplicantoffice notsite. No ITMW/capex/openingadopted. Earlier4MBcapture truncated; full15.9MBpublicPDFretained.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.1547realty.com/data-center/kapolei-hi-haii1/","host":"1547realty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://files.hawaii.gov/dbedt/erp/Doc_Library/2025-07-08-OA-FEA-Hawaiki-Submarine-Cable-Landing-Expansion-Project.pdf","host":"files.hawaii.gov","date":"2025-05-13","published":"2025-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":21.335728,"lng":-158.086738,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Kapolei","advertised_space_sqft":10200,"marketed_service":"carrier-neutral colocation"},"notes":["3.3kW/cabinet heat design is not campus MW.","PhaseIII construction/extra50000squarefeet has no verified completion date on source.","Operator identifies AlohaNAP and phase program. Proposed additional50000squarefeet is separate from advertised existing10200.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.1547realty.com/data-center/kapolei-hi-haii1/","host":"1547realty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Hawaiki telecom project; AlohaNAP crosswalk hold","fields":{"source_project":"HawaikiCableLandingExpansion","source_location":"Kapolei,Oahu,CityandCountyofHonolulu","hawaiki_landing_facility_tmk":"(1)9-2-051:011","expansion_land_area_acres_approx":2.5,"source_described_existing_use":"existingHawaikiCableLandingStation"},"notes":["Finalenvironmentalassessment describes proposed shorecrossing/conduit expansion, not a new completed data center.2.5acreproject excludes subsurfacebores, not entire telecomcampus. PreferredAlohaNAPrecord is not established by executive summary; keep sourcefacts specifictoHawaiki. Delawareapplicantoffice notsite. No ITMW/capex/openingadopted. Earlier4MBcapture truncated; full15.9MBpublicPDFretained.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://files.hawaii.gov/dbedt/erp/Doc_Library/2025-07-08-OA-FEA-Hawaiki-Submarine-Cable-Landing-Expansion-Project.pdf","host":"files.hawaii.gov","date":"2025-05-13","published":"2025-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Kapolei · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"cogent-pearl-city-waihona-hi","state":"HI","kind":"facility","name":"Cogent Data Center - Hawaii (96-1402 Waihona Place)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Honolulu"],"city":"Pearl City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. PearlCity listing and askingprice versus operational closure. Askingprice not completed sale, capex or marketvaluationassessment. Listing not proof closedsite; operator can sell/leaseback.2022wireline announcement not exactcompleted acquisition; current ownership/tenancy needs deed/operator proof. Corporate177MW/1.9Msqftportfolio not thissitecapacity. No actual800kWmeteredIT, currentenergization or salecompletion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sdxcentral.com/news/cogent-data-center-up-for-sale-in-hawaii/","host":"sdxcentral.com","date":"2025-03-31","published":"2025-03-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":21.41146,"lng":-157.97475,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"PearlCity listing and askingprice versus operational closure","fields":{"company_as_reported":"Cogent Communications","site":"96-1402 WaihonaPlace, PearlCity, Oahu, Hawaii","reported_site_acres":2.5,"reported_building_sqft":10320,"reported_capacity_kw":800,"power_basis":"sale listing reported capacity, critical IT boundary unspecified","reported_asking_price_usd":8000000,"reported_stage":"offered for sale"},"notes":["Askingprice not completed sale, capex or marketvaluationassessment. Listing not proof closedsite; operator can sell/leaseback.2022wireline announcement not exactcompleted acquisition; current ownership/tenancy needs deed/operator proof. Corporate177MW/1.9Msqftportfolio not thissitecapacity. No actual800kWmeteredIT, currentenergization or salecompletion.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sdxcentral.com/news/cogent-data-center-up-for-sale-in-hawaii/","host":"sdxcentral.com","date":"2025-03-31","published":"2025-03-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Pearl City · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"drfortress-koapaka-honolulu-hi","state":"HI","kind":"facility","name":"DRFortress Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Honolulu","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. 1547markets DRFortress Honolulu with65000sffacility,800racksavailableforlease and24carriers.4.2MW is BACKUPpower, not criticalIT/load/utility capacity. Rack availability is not occupancy or separate buildings. N+1/design claims and flood/tsunami/CAT5/earthquake assertions are operator representations, not independently checked hazard maps, building certificates or engineering audits. NewJerseyHQfooter is not Hawaii premises. Honolulu identity supported; exact Koapaka street/parcel and firstoperation date not newly certified. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.1547realty.com/data-center/honolulu-hi-drfortress/","host":"1547realty.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":21.3344171,"lng":-157.9171752,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-operator-transaction-and-local-outcomes-round61-2026-10-15.json","scope":"Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.","fields":{},"notes":["1547markets DRFortress Honolulu with65000sffacility,800racksavailableforlease and24carriers.4.2MW is BACKUPpower, not criticalIT/load/utility capacity. Rack availability is not occupancy or separate buildings. N+1/design claims and flood/tsunami/CAT5/earthquake assertions are operator representations, not independently checked hazard maps, building certificates or engineering audits. NewJerseyHQfooter is not Hawaii premises. Honolulu identity supported; exact Koapaka street/parcel and firstoperation date not newly certified.","Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."],"sources":[{"url":"https://www.1547realty.com/data-center/honolulu-hi-drfortress/","host":"1547realty.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"hawaiiantel-endeavor-honolulu-hi","state":"HI","kind":"facility","name":"Endeavor Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Honolulu","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. HawaiianTelcomoperatornamesEndeavorOahu andseparateKawaihaeHawaiiIslandlocations as currentcolocationofferings. Endeavorelevatedsecondfloor,N+2HVAC,N+1UPS/generator areoperatorclaims,nofloodsurveyorcertifications. Separateislandbackupfuel5daysnotEndeavorclaim. NoEndeavoraddress,ITMW,commissioningyearorindependentauditverified. Only-provider/twoislands superlativeunverified. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hawaiiantel.com/business/Business/Products-Services/Network-Security/Data-Center-Colocation-Services","host":"hawaiiantel.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":21.304547,"lng":-157.855676,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"HawaiianTelcomoperatornamesEndeavorOahu andseparateKawaihaeHawaiiIslandlocations as currentcolocationofferings. Endeavorelevatedsecondfloor,N+2HVAC,N+1UPS/generator areoperatorclaims,nofloodsurveyorcertifications. Separateislandbackupfuel5daysnotEndeavorclaim. NoEndeavoraddress,ITMW,commissioningyearorindependentauditverified. Only-provider/twoislands superlativeunverified."},"notes":["HawaiianTelcomoperatornamesEndeavorOahu andseparateKawaihaeHawaiiIslandlocations as currentcolocationofferings. Endeavorelevatedsecondfloor,N+2HVAC,N+1UPS/generator areoperatorclaims,nofloodsurveyorcertifications. Separateislandbackupfuel5daysnotEndeavorclaim. NoEndeavoraddress,ITMW,commissioningyearorindependentauditverified. Only-provider/twoislands superlativeunverified.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://www.hawaiiantel.com/business/Business/Products-Services/Network-Security/Data-Center-Colocation-Services","host":"hawaiiantel.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"google-uh-west-oahu-cable-landing-station-kapolei-hi","state":"HI","kind":"facility","name":"Google Cable Landing Station at UH West Oʻahu","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Honolulu"],"city":"Kapolei","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Oahu offshore cable land-interest proposal. Staffeasement/entryrecommendationnotfinalBoardgrantorcompleteinlanddatacenter.70004sqftsubmergedeasementsnotdatacenterbuildingarea. Sixeasementcomponentsnot6datacenters. UHWestOahutelecomfacilityproposalnotordinaryHPCmegawattcampus. Commencementandfairmarketpaymenttobedetermined. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dlnr.hawaii.gov/wp-content/uploads/2026/04/D-7.pdf","host":"dlnr.hawaii.gov","date":"2026-04-24","published":"2026-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":21.35761,"lng":-158.05734,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Oahu offshore cable land-interest proposal","fields":{"board_staff_submission_date":"2026-04-24","applicant_entities":["HumuhumuServicesLLC","StarfishInfrastructureInc"],"proposed_use":"submarinecommunicationcableeasement","proposed_submerged_easement_area_sqft_approx":70004,"referenced_fea_fonsi_issued_date":"2025-09-25"},"notes":["Staffeasement/entryrecommendationnotfinalBoardgrantorcompleteinlanddatacenter.70004sqftsubmergedeasementsnotdatacenterbuildingarea. Sixeasementcomponentsnot6datacenters. UHWestOahutelecomfacilityproposalnotordinaryHPCmegawattcampus. Commencementandfairmarketpaymenttobedetermined.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dlnr.hawaii.gov/wp-content/uploads/2026/04/D-7.pdf","host":"dlnr.hawaii.gov","date":"2026-04-24","published":"2026-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Kapolei · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"hawaiki-cable-kapolei-hi","state":"HI","kind":"facility","name":"Kapolei Cable Landing Station","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Kapolei","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hawaiki telecom project; AlohaNAP crosswalk hold. Finalenvironmentalassessment describes proposed shorecrossing/conduit expansion, not a new completed data center.2.5acreproject excludes subsurfacebores, not entire telecomcampus. PreferredAlohaNAPrecord is not established by executive summary; keep sourcefacts specifictoHawaiki. Delawareapplicantoffice notsite. No ITMW/capex/openingadopted. Earlier4MBcapture truncated; full15.9MBpublicPDFretained. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://files.hawaii.gov/dbedt/erp/Doc_Library/2025-07-08-OA-FEA-Hawaiki-Submarine-Cable-Landing-Expansion-Project.pdf","host":"files.hawaii.gov","date":"2025-05-13","published":"2025-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":21.349388772017,"lng":-158.128697947756,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Hawaiki telecom project; AlohaNAP crosswalk hold","fields":{"source_project":"HawaikiCableLandingExpansion","source_location":"Kapolei,Oahu,CityandCountyofHonolulu","hawaiki_landing_facility_tmk":"(1)9-2-051:011","expansion_land_area_acres_approx":2.5,"source_described_existing_use":"existingHawaikiCableLandingStation"},"notes":["Finalenvironmentalassessment describes proposed shorecrossing/conduit expansion, not a new completed data center.2.5acreproject excludes subsurfacebores, not entire telecomcampus. PreferredAlohaNAPrecord is not established by executive summary; keep sourcefacts specifictoHawaiki. Delawareapplicantoffice notsite. No ITMW/capex/openingadopted. Earlier4MBcapture truncated; full15.9MBpublicPDFretained.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://files.hawaii.gov/dbedt/erp/Doc_Library/2025-07-08-OA-FEA-Hawaiki-Submarine-Cable-Landing-Expansion-Project.pdf","host":"files.hawaii.gov","date":"2025-05-13","published":"2025-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Kapolei · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"hawaiiantel-kawaihae-hi","state":"HI","kind":"facility","name":"Kawaihae Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hawaii"],"city":"Kawaihae","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hawaiian Telcom distinct island colocation sites. Separateislandsnotsamecampus. NoexactKawaihaestreet,ITMW,areaoropening. Disaster-proof/beyondhazardzonesmarketingnotindependentparcelriskassessmentorzeroriskguarantee. End eavorsecondfloorandHVACnottransferredtoKawaihae. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hawaiiantel.com/business/Business/Products-Services/Network-Security/Data-Center-Colocation-Services","host":"hawaiiantel.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":20.0397244,"lng":-155.829133,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Hawaiian Telcom distinct island colocation sites","fields":{"operator":"Hawaiian Telcom","named_sites":[{"name":"Kawaihae","island":"Hawaii Island","operator_reported_backup_fuel_reserve_days":5},{"name":"Endeavor","island":"Oahu"}],"service":"colocation with inter-island redundant fiber"},"notes":["Separateislandsnotsamecampus. NoexactKawaihaestreet,ITMW,areaoropening. Disaster-proof/beyondhazardzonesmarketingnotindependentparcelriskassessmentorzeroriskguarantee. End eavorsecondfloorandHVACnottransferredtoKawaihae.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hawaiiantel.com/business/Business/Products-Services/Network-Security/Data-Center-Colocation-Services","host":"hawaiiantel.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Kawaihae · Hawaii · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"uh-mhpcc-kihei-hi","state":"HI","kind":"facility","name":"Maui High Performance Computing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Kihei","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Maui historical system retirement distinct from facility closure. Specific old supercomputer retired, not whole Maui facility closed. Hilo recipient lab is separate location. Historical operating research center identity only; no current2026 load, IT MW, capacity, modern ownership or exact Kihei address established. Expected deployment/new testing dates not actual observed outcomes. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://manoa.hawaii.edu/news/article.php?aId=1522","host":"manoa.hawaii.edu","date":"2006-08-15","published":"2006-08-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":20.74929227073,"lng":-156.439610266824,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Maui historical system retirement distinct from facility closure","fields":{"institution":"University of Hawaii","historical_facility":"Maui High Performance Computing Center","publication_date":"2006-08-15","event":"decommissioned Huinalu system donated to UH Hilo","management_asof2006":"University of Hawaii for Air Force Research Laboratory"},"notes":["Specific old supercomputer retired, not whole Maui facility closed. Hilo recipient lab is separate location. Historical operating research center identity only; no current2026 load, IT MW, capacity, modern ownership or exact Kihei address established. Expected deployment/new testing dates not actual observed outcomes.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://manoa.hawaii.edu/news/article.php?aId=1522","host":"manoa.hawaii.edu","date":"2006-08-15","published":"2006-08-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Kihei · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"servpac-mtp2-mililani-hi","state":"HI","kind":"facility","name":"Servpac MTP Building 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Honolulu"],"city":"Mililani","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Servpac MTP second building groundbreaking and planned expansion. 15500addedareanotwholeMTPorcurrentopenarea.50percentsizeexpansionanddoublingcapacitydifferentmetrics,notautomaticMW.2026Q2targetunobserved.15permanentversus150temporarynot165permanent. TierIVoperatorclaimnotindependentcertifierrecord,Building1certnotautomaticallyBuilding2. No exactfirstequipmentRFSorITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://servpac.com/mtp-groundbreaking/","host":"servpac.com","date":"2026-01-22","published":"2026-01-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":21.448,"lng":-158.017,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Servpac MTP second building groundbreaking and planned expansion","fields":{"operator":"Servpac","campus":"MTP, Mililani Technology Park, Hawaii","building2_groundbreaking_announcement_date":"2026-01-22","building2_added_sqft_min_exclusive":15500,"building2_project_cost_usd":13000000,"building2_added_company_owned_land_acres":5,"building2_completion_target_quarter":"2026-Q2","expected_new_permanent_jobs_min_inclusive":15,"expected_temporary_construction_jobs_approx":150,"separate_historical_events":{"Puuhale_design_year":2014,"MTP_design_year":2020,"MTP_colocation_expansion_year":2023}},"notes":["15500addedareanotwholeMTPorcurrentopenarea.50percentsizeexpansionanddoublingcapacitydifferentmetrics,notautomaticMW.2026Q2targetunobserved.15permanentversus150temporarynot165permanent. TierIVoperatorclaimnotindependentcertifierrecord,Building1certnotautomaticallyBuilding2. No exactfirstequipmentRFSorITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://servpac.com/mtp-groundbreaking/","host":"servpac.com","date":"2026-01-22","published":"2026-01-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Mililani · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"servpac-mtp-building-1-mililani-hi","state":"HI","kind":"facility","name":"Servpac MTP Data Center (Building 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Honolulu"],"city":"Mililani","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Servpac MTP second building groundbreaking and planned expansion. 15500addedareanotwholeMTPorcurrentopenarea.50percentsizeexpansionanddoublingcapacitydifferentmetrics,notautomaticMW.2026Q2targetunobserved.15permanentversus150temporarynot165permanent. TierIVoperatorclaimnotindependentcertifierrecord,Building1certnotautomaticallyBuilding2. No exactfirstequipmentRFSorITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://servpac.com/mtp-groundbreaking/","host":"servpac.com","date":"2026-01-22","published":"2026-01-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":21.47999,"lng":-158.0202,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Servpac MTP second building groundbreaking and planned expansion","fields":{"operator":"Servpac","campus":"MTP, Mililani Technology Park, Hawaii","building2_groundbreaking_announcement_date":"2026-01-22","building2_added_sqft_min_exclusive":15500,"building2_project_cost_usd":13000000,"building2_added_company_owned_land_acres":5,"building2_completion_target_quarter":"2026-Q2","expected_new_permanent_jobs_min_inclusive":15,"expected_temporary_construction_jobs_approx":150,"separate_historical_events":{"Puuhale_design_year":2014,"MTP_design_year":2020,"MTP_colocation_expansion_year":2023}},"notes":["15500addedareanotwholeMTPorcurrentopenarea.50percentsizeexpansionanddoublingcapacitydifferentmetrics,notautomaticMW.2026Q2targetunobserved.15permanentversus150temporarynot165permanent. TierIVoperatorclaimnotindependentcertifierrecord,Building1certnotautomaticallyBuilding2. No exactfirstequipmentRFSorITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://servpac.com/mtp-groundbreaking/","host":"servpac.com","date":"2026-01-22","published":"2026-01-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Mililani · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"servpac-puahale-honolulu-hi","state":"HI","kind":"facility","name":"Servpac Puahale Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Honolulu"],"city":"Honolulu","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Servpac general MTP page fails Puuhale exact-site match. BoundrecordPuuhaleHonolulu,butcurrentgeneralcolocationbodyexplicitlyMTP30000sqft850ftelevation20milesfromdowntown,notPuuhale. MTPcertification/size/uptimecannottransfer. EarlierseparatearchitecthistorymentionsPuuhale2014butdoesnotprovecurrentPuuhalestatusorcapacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://servpac.com/data-center-colocation/","host":"servpac.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":21.33204,"lng":-157.87777,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Servpac general MTP page fails Puuhale exact-site match","fields":{},"notes":["BoundrecordPuuhaleHonolulu,butcurrentgeneralcolocationbodyexplicitlyMTP30000sqft850ftelevation20milesfromdowntown,notPuuhale. MTPcertification/size/uptimecannottransfer. EarlierseparatearchitecthistorymentionsPuuhale2014butdoesnotprovecurrentPuuhalestatusorcapacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://servpac.com/data-center-colocation/","host":"servpac.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Honolulu · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"uh-cancer-center-medai-core-honolulu-hi","state":"HI","kind":"facility","name":"UH Cancer Center Data Center - Medical AI Core (PAC-AID)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Honolulu"],"city":"Honolulu","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cancer institution profile not specific MedicalAI data-center proof. General cancer-center page does not identify a separate physical MedicalAI Core data center, its server-room location, IT MW or operating status. Research-building completion and300researchfaculty/staff/students are not data-center opening or employees. Institutional contact cannot substitute for facility evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.uhcancercenter.org/about-us","host":"uhcancercenter.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":21.29525,"lng":-157.86368,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Cancer institution profile not specific MedicalAI data-center proof","fields":{"institution":"University of Hawaii Cancer Center","general_address":"701 Ilalo Street, Honolulu, HI96813","research_building_completed_year":2013},"notes":["General cancer-center page does not identify a separate physical MedicalAI Core data center, its server-room location, IT MW or operating status. Research-building completion and300researchfaculty/staff/students are not data-center opening or employees. Institutional contact cannot substitute for facility evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.uhcancercenter.org/about-us","host":"uhcancercenter.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Honolulu · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"uh-information-technology-center-honolulu-hi","state":"HI","kind":"facility","name":"University of Hawaiʻi Information Technology Center Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Honolulu"],"city":"Honolulu","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. UH IT Center area and dedication versus staff move. Dedication and staff relocation are distinct events; neither exact IT commissioning independently established.8000data-centerarea subset of74000building. Claimed tier availability not measured actual uptime or independent certificate. Main text groundbreakingFeb2,2012 conflicts with linked article labelsFeb3,2013; exact groundbreaking held.260staff includes offices/student assistants, not all data-center employment. No numeric IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hawaii.edu/its/leed-about-the-building/","host":"hawaii.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":21.29868,"lng":-157.81681,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"UH IT Center area and dedication versus staff move","fields":{"institution":"University of Hawaii","facility":"Information Technology Center","address":"2520 Correa Road, Honolulu, HI96822","gross_building_sqft":74000,"stories":6,"included_data_center_sqft":8000,"dedication_date":"2013-12-16","full_staff_move_began_date":"2014-01-27","operator_reported_redundancy":"TierII"},"notes":["Dedication and staff relocation are distinct events; neither exact IT commissioning independently established.8000data-centerarea subset of74000building. Claimed tier availability not measured actual uptime or independent certificate. Main text groundbreakingFeb2,2012 conflicts with linked article labelsFeb3,2013; exact groundbreaking held.260staff includes offices/student assistants, not all data-center employment. No numeric IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hawaii.edu/its/leed-about-the-building/","host":"hawaii.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hawaii · Honolulu · Honolulu · Source context reviewed","state_name":"Hawaii","state_path":"/hawaii/"},{"id":"centeris-boise-bethel-court-id","state":"ID","kind":"facility","name":"Centeris Boise (former HP / DataSite data center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ada"],"city":"Boise","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Boise historical sale and occupancy readiness. 2011acquisition not2026opening/currenttenantproof. Building vacant since mid2008 does not establish current vacancy. Centeris operator crosswalk still needs currentcompany evidence. Undisclosed price not inferred from area. No numeric critical ITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://idahobusinessreview.com/?p=45117","host":"idahobusinessreview.com","date":"2011-06-03","published":"2011-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.606214,"lng":-116.303601,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Boise historical sale and occupancy readiness","fields":{"historical_facility":"former HewlettPackard BoiseDataCenter","address":"9700 WestBethelCourt, Boise, Idaho","reported_building_sqft":60252,"purchaser":"BCC RPI Boise LLC, Benaroya and RealPropertyInvestors","reported_historical_stage":"building ready for occupancy; no tenants announced June2,2011","purchase_price":null},"notes":["2011acquisition not2026opening/currenttenantproof. Building vacant since mid2008 does not establish current vacancy. Centeris operator crosswalk still needs currentcompany evidence. Undisclosed price not inferred from area. No numeric critical ITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://idahobusinessreview.com/?p=45117","host":"idahobusinessreview.com","date":"2011-06-03","published":"2011-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Boise · Ada · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"fbi-greywolf-pocatello-id","state":"ID","kind":"facility","name":"FBI Grey Wolf Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bannock"],"city":"Pocatello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. John OConnell, Idaho State Journal, November19,2019 original ribbon-cutting report identifies Pocatello Gray Wolf expansion; Monday ceremony implies November18 from report, not directly dated official minutes. Groundbreaking October2017 and roughly100M historical expansion distinguish construction start, ceremony and current operation. About300 existing staff and space for250 additional over2-5years are2019 conditions/forecasts, not550 current jobs.110 nationwide2014 facilities,100 phased out and ultimate three retained are FBI historical consolidation counts, not US data-center census. No IT MW or current occupancy established. Public main body read; no account access. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.idahostatejournal.com/news/local/fbi-cuts-ribbon-on-pocatello-addition/article_0ba8e3c8-5d0e-50a6-b2da-8b75cbf79530.html","host":"idahostatejournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.90482,"lng":-112.46388,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["John OConnell, Idaho State Journal, November19,2019 original ribbon-cutting report identifies Pocatello Gray Wolf expansion; Monday ceremony implies November18 from report, not directly dated official minutes. Groundbreaking October2017 and roughly100M historical expansion distinguish construction start, ceremony and current operation.","About300 existing staff and space for250 additional over2-5years are2019 conditions/forecasts, not550 current jobs.110 nationwide2014 facilities,100 phased out and ultimate three retained are FBI historical consolidation counts, not US data-center census. No IT MW or current occupancy established. Public main body read; no account access.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://www.idahostatejournal.com/news/local/fbi-cuts-ribbon-on-pocatello-addition/article_0ba8e3c8-5d0e-50a6-b2da-8b75cbf79530.html","host":"idahostatejournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Pocatello · Bannock · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"diode-ventures-gemstone-kuna-id","state":"ID","kind":"facility","name":"Gemstone Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ada"],"city":"Kuna","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. No operating status, MW or investment established by this page. Developer explicitly calls Gemstone a proposed620-acre site in early development. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.diodeventures.com/projects/kuna-idaho-usa","host":"diodeventures.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.44545,"lng":-116.37335,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"project_status":"proposed, early development","site_acres":620,"city":"Kuna"},"notes":["No operating status, MW or investment established by this page.","Developer explicitly calls Gemstone a proposed620-acre site in early development.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.diodeventures.com/projects/kuna-idaho-usa","host":"diodeventures.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Kuna · Ada · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"geobitmine-aberdeen-id","state":"ID","kind":"facility","name":"GeoBitmine Bingham County Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Bingham"],"city":"Aberdeen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The six-MW Aberdeen load is a proposal. Allowed curtailment is not an actual outage. Discrimination is the company's allegation, not a judgment. The separate Washington appellate case does not decide GeoBitmine's request. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utilitydive.com/news/geobitmine-idaho-power-cryptocurrency-mining-rate/626724/","host":"utilitydive.com","date":"2022-07-07","published":"2022-07-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.9442,"lng":-112.8383,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Utility Dive reports GeoBitmine's reconsideration request against Idaho PUC's June 2022 cryptocurrency tariff decision.","independently_verified_current_operating_status":null},"notes":["The six-MW Aberdeen load is a proposal. Allowed curtailment is not an actual outage. Discrimination is the company's allegation, not a judgment. The separate Washington appellate case does not decide GeoBitmine's request.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utilitydive.com/news/geobitmine-idaho-power-cryptocurrency-mining-rate/626724/","host":"utilitydive.com","date":"2022-07-07","published":"2022-07-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Aberdeen · Bingham · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"inl-c3-idahofalls-id","state":"ID","kind":"facility","name":"Idaho National Laboratory Collaborative Computing Center (C3)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bonneville"],"city":"Idaho Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The combined 148,000 square feet and secure-space scope are not C3 alone. Do not add design and day-one capacities, or count redundant MW as IT demand. Web publication/update dates are not physical completion dates, and contractor completion is not current metered load. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://jedunn.com/projects/idaho-national-laboratory-c3-data-centers/","host":"jedunn.com","date":"2022-12-03","published":"2022-12-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.4666,"lng":-112.0341,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"JE Dunn describes completed INL Cybercore and C3 buildings: Cybercore 80,979 square feet and C3 66,520 square feet. C3 design is 8 MW with 2 MW redundancy, while day-one capacity is 4 MW with 2 MW redundancy.","independently_verified_current_operating_status":null,"contractor_reported_design_mw":8,"contractor_reported_day_one_mw":4,"contractor_reported_redundancy_mw":2,"critical_it_basis_verified":false},"notes":["The combined 148,000 square feet and secure-space scope are not C3 alone. Do not add design and day-one capacities, or count redundant MW as IT demand. Web publication/update dates are not physical completion dates, and contractor completion is not current metered load.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://jedunn.com/projects/idaho-national-laboratory-c3-data-centers/","host":"jedunn.com","date":"2022-12-03","published":"2022-12-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Idaho Falls · Bonneville · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"lex-developments-pocatello-id","state":"ID","kind":"facility","name":"Lex Developments AI Data Center (former Hoku polysilicon site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bannock"],"city":"Pocatello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Utility study and final scale unresolved in report. Property purchase is not facility construction expenditure. Current appeal outcome unverified. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.idahostatejournal.com/news/local/pocatello-hearing-examiner-denies-hoku-site-data-center-permit-but-lex-developments-vows-return/article_c80a0e12-3fe8-4ed0-b755-89321377a95d.html","host":"idahostatejournal.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.8713,"lng":-112.4455,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"conditional-use-denial-with-possible-return","reported_finding":"Idaho State Journal reports hearing examiner denied Lex Hoku-site permit; applicant considered appeal or revised application.","report_display_date":"2026-05-18","independently_verified_current_status":null},"notes":["Utility study and final scale unresolved in report. Property purchase is not facility construction expenditure. Current appeal outcome unverified.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.idahostatejournal.com/news/local/pocatello-hearing-examiner-denies-hoku-site-data-center-permit-but-lex-developments-vows-return/article_c80a0e12-3fe8-4ed0-b755-89321377a95d.html","host":"idahostatejournal.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Pocatello · Bannock · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"meta-kuna-id","state":"ID","kind":"facility","name":"Meta Kuna Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ada"],"city":"Kuna","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. Dakota Castets-Didier CBS2/IdahoNews original interviews publishedSeptember3,2026, updatedSeptember23 report Kuna facility OPEN/FULLYOPERATIONAL and serving Meta traffic. This is a newer reported operating milestone than earlier2025completion target, but not independent physical inspection or allfuturephasecompletion. Construction began2022; reported1.2Bcapital and750000+sf are company facility claims, not independently audited spend/gross survey. Closed-loop/virtually no water most of year and water-positive2030 are attributed technology claims/goals, not zero annual withdrawal or verified watershed restoration. Campus grid impact unclear in article: no exact IT MW. National poll percentages not independently checked/adopted. Broad1Bcommunityfund not Kuna-only capex. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://idahonews.com/news/local/meta-opens-new-ai-data-center-in-kuna-hopes-to-become-water-positive","host":"idahonews.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.491,"lng":-116.418,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["Dakota Castets-Didier CBS2/IdahoNews original interviews publishedSeptember3,2026, updatedSeptember23 report Kuna facility OPEN/FULLYOPERATIONAL and serving Meta traffic. This is a newer reported operating milestone than earlier2025completion target, but not independent physical inspection or allfuturephasecompletion. Construction began2022; reported1.2Bcapital and750000+sf are company facility claims, not independently audited spend/gross survey.","Closed-loop/virtually no water most of year and water-positive2030 are attributed technology claims/goals, not zero annual withdrawal or verified watershed restoration. Campus grid impact unclear in article: no exact IT MW. National poll percentages not independently checked/adopted. Broad1Bcommunityfund not Kuna-only capex.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://idahonews.com/news/local/meta-opens-new-ai-data-center-in-kuna-hopes-to-become-water-positive","host":"idahonews.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Kuna · Ada · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"trex-peakdigital-orofino-id","state":"ID","kind":"facility","name":"Peak Digital Solutions - Orofino Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Clearwater"],"city":"Orofino","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Clearwater utility association contact not Orofino site evidence. Trade association member page lists Clearwater Power offices, employees,2022sales and utility founding/energization history. None establish TREXPeakDigital Orofino location, data-center opening or power agreement. Do not transfer Lewiston office address or1938utility energization to DC record. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.icua.coop/member/clearwater-power-co/","host":"icua.coop","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":46.4794,"lng":-116.254,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Clearwater utility association contact not Orofino site evidence","fields":{},"notes":["Trade association member page lists Clearwater Power offices, employees,2022sales and utility founding/energization history. None establish TREXPeakDigital Orofino location, data-center opening or power agreement. Do not transfer Lewiston office address or1938utility energization to DC record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.icua.coop/member/clearwater-power-co/","host":"icua.coop","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Orofino · Clearwater · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"rhea-data-blacks-creek-campus-ada-county-id","state":"ID","kind":"facility","name":"Rhea Data Blacks Creek Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ada"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Public-land proposal and future scoping are not a conveyance, environmental approval or operating campus. Potential solar supply, gas generation and existing Micron/Meta demand are separate from verified IT. No current permit, exact final footprint or tenant established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.boisestatepublicradio.org/politics-government/2026-09-21/idaho-data-center-blacks-creek-blm","host":"boisestatepublicradio.org","date":"2026-09-21","published":"2026-09-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.4593323,"lng":-116.1412266,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Boise State Public Radio reports Rhea/Arevia interest in public parcels near Blacks Creek and possible gas generation, with BLM scoping hoped for by year-end.","independently_verified_current_operating_status":null},"notes":["Public-land proposal and future scoping are not a conveyance, environmental approval or operating campus. Potential solar supply, gas generation and existing Micron/Meta demand are separate from verified IT. No current permit, exact final footprint or tenant established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.boisestatepublicradio.org/politics-government/2026-09-21/idaho-data-center-blacks-creek-blm","host":"boisestatepublicradio.org","date":"2026-09-21","published":"2026-09-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Ada · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"valorc3-boise-2-id","state":"ID","kind":"facility","name":"ValorC3 Boise 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ada"],"city":"Boise","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS. FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/","host":"idahobusinessreview.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.60955,"lng":-116.30185,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS.","FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/","host":"idahobusinessreview.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Boise · Ada · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"valorc3-boise-emerald-id","state":"ID","kind":"facility","name":"ValorC3 Boise Data Center (former Fiberpipe)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ada"],"city":"Boise","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS. FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/","host":"idahobusinessreview.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.60801,"lng":-116.310153,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS.","FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/","host":"idahobusinessreview.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Idaho · Boise · Ada · Source context reviewed","state_name":"Idaho","state_path":"/idaho/"},{"id":"aligned-coal-city-il","state":"IL","kind":"facility","name":"Aligned Coal City Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grundy"],"city":"Coal City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CoalCity nonbinding inducement versus final TIF award. Original resolutions andredevelopmentagreementnotread; blog expressly saysinducementsnonbinding. Does notguaranteeTIFdistrict,extension,finalagreement orzoning.2Kconstructionand300permanentforecastsnotcurrentemployees.55to65dBnotexplicitAweighted,andatnearestresidencenotpropertyline; do notadoptcomplianceconclusion. No numericITMW or actualoperation.100Ktradefoundationdonationcorporateclaimnotadditionalcampsubsidy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hs.getobedio.com/blog/a-multi-billion-dollar-data-center-takes-a-step-forward-in-coal-city","host":"hs.getobedio.com","date":"2026-06-30","published":"2026-06-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.2575,"lng":-88.303,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"CoalCity nonbinding inducement versus final TIF award","fields":{"publisher_role":"Obedio land-use research/vendor blog","project":"Aligned CoalCity, GrundyCounty, Illinois","reported_site_acres_approx":305,"reported_inducement_resolutions":["26-09","26-10"],"reported_action_date":"2026-06-24","reported_expected_construction_jobs_approx":2000,"reported_expected_permanent_jobs_approx":300,"reported_expected_water_gallons_per_day_approx":41500},"notes":["Original resolutions andredevelopmentagreementnotread; blog expressly saysinducementsnonbinding. Does notguaranteeTIFdistrict,extension,finalagreement orzoning.2Kconstructionand300permanentforecastsnotcurrentemployees.55to65dBnotexplicitAweighted,andatnearestresidencenotpropertyline; do notadoptcomplianceconclusion. No numericITMW or actualoperation.100Ktradefoundationdonationcorporateclaimnotadditionalcampsubsidy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hs.getobedio.com/blog/a-multi-billion-dollar-data-center-takes-a-step-forward-in-coal-city","host":"hs.getobedio.com","date":"2026-06-30","published":"2026-06-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Coal City · Grundy · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"aligned-ord-01-il","state":"IL","kind":"facility","name":"Aligned ORD-01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Northlake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 48 MW upstream total not supplied on this source; 3 MW generator and 2 MW UPS lineup ratings are equipment units, not facility totals. Tier III design is not Uptime certification. Current operator lists ORD-01 and ORD-02 as distinct buildings on an 18.5-acre campus. Site design/marketing does not establish independently measured utilization. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Chicago multi-site sections, preserve shared campus. ORD01/02share18.5acrecampus, not37acrescombined.3MWbackupgeneratorand2MWUPSlineupnotbuildingITtotals. Currentofferingnotindependentfullcapacityenergization.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/chicago/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://aligneddc.com/chicago-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9140034,"lng":-87.9175163,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"505 Northwest Ave","city":"Northlake","campus_acres":18.5},"notes":["48 MW upstream total not supplied on this source; 3 MW generator and 2 MW UPS lineup ratings are equipment units, not facility totals.","Tier III design is not Uptime certification.","Current operator lists ORD-01 and ORD-02 as distinct buildings on an 18.5-acre campus. Site design/marketing does not establish independently measured utilization.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/chicago/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Chicago multi-site sections, preserve shared campus","fields":{"site_sections":[{"code":"ORD01","address":"505 Northwest Ave, Northlake, IL60164","campus_acres":18.5},{"code":"ORD02","address":"501 Northwest Ave, Northlake, IL60164","campus_acres":18.5},{"code":"ORD03","address":"50 NW Point Blvd, Elk Grove Village, IL60007","campus_acres":36}]},"notes":["ORD01/02share18.5acrecampus, not37acrescombined.3MWbackupgeneratorand2MWUPSlineupnotbuildingITtotals. Currentofferingnotindependentfullcapacityenergization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/chicago-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Northlake · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"aligned-ord-02-northlake-il","state":"IL","kind":"facility","name":"Aligned ORD-02","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Northlake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Whole campus versus building deduplication required. Same campus as ORD-01, separate address. Do not count each 18.5-acre description as distinct land. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Chicago multi-site sections, preserve shared campus. ORD01/02share18.5acrecampus, not37acrescombined.3MWbackupgeneratorand2MWUPSlineupnotbuildingITtotals. Currentofferingnotindependentfullcapacityenergization. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/chicago/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://aligneddc.com/chicago-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9169,"lng":-87.8956,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"501 Northwest Ave","city":"Northlake","campus_acres":18.5},"notes":["Whole campus versus building deduplication required.","Same campus as ORD-01, separate address. Do not count each 18.5-acre description as distinct land.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/chicago/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Chicago multi-site sections, preserve shared campus","fields":{"site_sections":[{"code":"ORD01","address":"505 Northwest Ave, Northlake, IL60164","campus_acres":18.5},{"code":"ORD02","address":"501 Northwest Ave, Northlake, IL60164","campus_acres":18.5},{"code":"ORD03","address":"50 NW Point Blvd, Elk Grove Village, IL60007","campus_acres":36}]},"notes":["ORD01/02share18.5acrecampus, not37acrescombined.3MWbackupgeneratorand2MWUPSlineupnotbuildingITtotals. Currentofferingnotindependentfullcapacityenergization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/chicago-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Northlake · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"aligned-ord-03-elk-grove-village-il","state":"IL","kind":"facility","name":"Aligned ORD-03","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chicago multi-site sections, preserve shared campus. ORD01/02share18.5acrecampus, not37acrescombined.3MWbackupgeneratorand2MWUPSlineupnotbuildingITtotals. Currentofferingnotindependentfullcapacityenergization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/chicago-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0039,"lng":-87.9703,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Chicago multi-site sections, preserve shared campus","fields":{"site_sections":[{"code":"ORD01","address":"505 Northwest Ave, Northlake, IL60164","campus_acres":18.5},{"code":"ORD02","address":"501 Northwest Ave, Northlake, IL60164","campus_acres":18.5},{"code":"ORD03","address":"50 NW Point Blvd, Elk Grove Village, IL60007","campus_acres":36}]},"notes":["ORD01/02share18.5acrecampus, not37acrescombined.3MWbackupgeneratorand2MWUPSlineupnotbuildingITtotals. Currentofferingnotindependentfullcapacityenergization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/chicago-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"brennan-barrington-hills-il","state":"IL","kind":"facility","name":"Brennan Barrington Hills Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Barrington Hills","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Syndicated article links original Daily Herald January 27 item while supplied URL is January 29. Exact withdrawal date not established; not an industry-wide or permanent legal ban. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.shawlocal.com/northwest-herald/news/2026/01/29/2-billion-data-center-proposal-in-barrington-hills-withdrawn/","host":"shawlocal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.1049652,"lng":-88.2408645,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"reported-withdrawal","reported_finding":"Brennan withdrew Barrington Hills proposal and planned presentation; village considered the matter closed at reporting.","report_display_date":null,"independently_verified_current_status":null},"notes":["Syndicated article links original Daily Herald January 27 item while supplied URL is January 29. Exact withdrawal date not established; not an industry-wide or permanent legal ban.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.shawlocal.com/northwest-herald/news/2026/01/29/2-billion-data-center-proposal-in-barrington-hills-withdrawn/","host":"shawlocal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Barrington Hills · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"centersquare-ord1-chicago-il","state":"IL","kind":"facility","name":"Centersquare ORD1 (Chicago Cermak)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Values are from the first Cermak section. ORD2 and ORD4 have separate specifications; regional 147.6 MW is not ORD1. Utility, redundant UPS and generator ratings are not additive or measured IT load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/chicago","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8537537,"lng":-87.6183798,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"site_label":"Chicago Cermak ORD1","raised_floor_sqft":58893,"utility_capacity_mw":32.8,"ups_capacity_mw":8.8,"generator_capacity_mw":16},"notes":["Values are from the first Cermak section. ORD2 and ORD4 have separate specifications; regional 147.6 MW is not ORD1. Utility, redundant UPS and generator ratings are not additive or measured IT load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"centersquare-ord2-elk-grove-village-il","state":"IL","kind":"facility","name":"Centersquare ORD2 (Elk Grove Village)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9923175,"lng":-87.9582323,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"centersquare-ord4-lisle-il","state":"IL","kind":"facility","name":"Centersquare ORD4 (Lisle)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Lisle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8023406,"lng":-88.0948856,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Lisle · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"cloudhq-mount-prospect-ord-il","state":"IL","kind":"facility","name":"CloudHQ Mount Prospect (ORD) Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Mount Prospect","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. Daily Energy Insider August 26, 2022 utility/developer reporting identifies CloudHQ ORD at the former United Airlines headquarters in Mount Prospect. Groundbreaking that week and planned $2.5 billion, 1.5 million square feet and three buildings are historical announcement context, not current completion/spend. First phase 2024 and remaining three-to-five-year demand-driven phases are old targets. Planned ComEd substation and line extensions are not executed power terms or energized IT MW. Local-government approval does not prove every permit or occupancy certificate. 100-plus jobs were forecast; ComEd's 70 other data centers is a service-area marketing count, not an independently verified census. Previously gated Daily Herald bodies were not decoded. No complete record/current operating status, signed instruments, measured impacts or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dailyenergyinsider.com/innovation/36434-comed-joins-with-cloudhq-to-build-2-5b-data-center-in-northern-illinois/","host":"dailyenergyinsider.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.055,"lng":-87.935,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["Daily Energy Insider August 26, 2022 utility/developer reporting identifies CloudHQ ORD at the former United Airlines headquarters in Mount Prospect. Groundbreaking that week and planned $2.5 billion, 1.5 million square feet and three buildings are historical announcement context, not current completion/spend.","First phase 2024 and remaining three-to-five-year demand-driven phases are old targets. Planned ComEd substation and line extensions are not executed power terms or energized IT MW. Local-government approval does not prove every permit or occupancy certificate. 100-plus jobs were forecast; ComEd's 70 other data centers is a service-area marketing count, not an independently verified census. Previously gated Daily Herald bodies were not decoded.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://dailyenergyinsider.com/innovation/36434-comed-joins-with-cloudhq-to-build-2-5b-data-center-in-northern-illinois/","host":"dailyenergyinsider.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Mount Prospect · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"cloverleaf-troy-il","state":"IL","kind":"facility","name":"Cloverleaf Troy Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Troy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Troy developer presentation cover-date and example-site limits. Actual coverJanuary8,2025contradictsdate-likefilename;do notcalendarJanuary7,2026fromfilename. GenericcomponentsandphotosofMetaMesa/GoogleMayes/QTSAshburn/AWSNewAlbanyareexamples,notTroybuildings. Developer reliability/waterpromisesnotactualmeasuredsiteuse or executedAmerencontract. Concept-planimagesneedindependentlayoutreviewbeforebuildingcount/areaadoption. No numericTroyITMWorfinalapprovalinreviewedtext. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.troyil.us/DocumentCenter/View/2026/20260107-Troy-Informative-Slides---No-Site","host":"troyil.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.719,"lng":-89.913,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Troy developer presentation cover-date and example-site limits","fields":{"publisher_role":"Cloverleaf developer slides hosted by City of Troy, Illinois","slide_cover_date":"2025-01-08","url_filename_date_candidate":"2026-01-07","document_purpose":"proposed data center informational meeting"},"notes":["Actual coverJanuary8,2025contradictsdate-likefilename;do notcalendarJanuary7,2026fromfilename. GenericcomponentsandphotosofMetaMesa/GoogleMayes/QTSAshburn/AWSNewAlbanyareexamples,notTroybuildings. Developer reliability/waterpromisesnotactualmeasuredsiteuse or executedAmerencontract. Concept-planimagesneedindependentlayoutreviewbeforebuildingcount/areaadoption. No numericTroyITMWorfinalapprovalinreviewedtext.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.troyil.us/DocumentCenter/View/2026/20260107-Troy-Informative-Slides---No-Site","host":"troyil.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Troy · Madison · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"compass-hoffman-estates-il","state":"IL","kind":"facility","name":"Compass Datacenters Hoffman Estates Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Hoffman Estates","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Site work/demolition precedes construction; mid2026 power and late2025 construction were forecasts.194-million land cost and ten-billion project investment not additive capex; market-wide MW not campus capacity. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterfrontier.com/hyperscale/article/55089460/suburban-chicago-welcomes-compass-datacenters-major-hyperscale-development-on-legacy-sears-hq-site","host":"datacenterfrontier.com","date":"2024-06-18","published":"2024-06-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.0770709,"lng":-88.2175155,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Data Center Frontier reports Compass June13 launch of redevelopment at former Sears Hoffman Estates campus.","independently_verified_current_operating_status":null},"notes":["Site work/demolition precedes construction; mid2026 power and late2025 construction were forecasts.194-million land cost and ten-billion project investment not additive capex; market-wide MW not campus capacity.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterfrontier.com/hyperscale/article/55089460/suburban-chicago-welcomes-compass-datacenters-major-hyperscale-development-on-legacy-sears-hq-site","host":"datacenterfrontier.com","date":"2024-06-18","published":"2024-06-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Hoffman Estates · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"coresite-ch1-chicago-il","state":"IL","kind":"facility","name":"CoreSite CH1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8763329,"lng":-87.6314808,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"coresite-ch2-chicago-il","state":"IL","kind":"facility","name":"CoreSite CH2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not aggregate the 18 MW with verified IT or utility capacity totals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/ch2-chicago-il","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8628,"lng":-87.6413029,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft_lower_bound":168000,"advertised_power_mw":18,"power_basis":"Operator webpage states MW without a separately defined critical-IT or gross-service basis.","current_operator_listing":"Facility space is advertised for custom buildouts."},"notes":["Do not aggregate the 18 MW with verified IT or utility capacity totals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/ch2-chicago-il","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"cyrusone-chi1-chi3-aurora-il","state":"IL","kind":"facility","name":"CyrusOne CHI1-CHI3 (Aurora)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kane"],"city":"Aurora","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Combined three-building campus specification. Never repeat campus MW or area as each building total; no measured utilization established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. general design article, not site proof. General AI design FAQ has market forecasts and company design context. It does not establish Aurora or Somerset site capex, capacity, operation or construction date. Publication metadata is2023, not its2025modification date. named operator source. A maintenance schedule is not a new capacity or construction event; emergency equipment is not IT load.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/aurora-il","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.cyrusone.com/resources/blogs/cyrusone-intelliscale-design-and-ai-data-center-faq","host":"cyrusone.com","date":"2023-08-24","published":"2023-08-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.cyrusone.com/data-centers/north-america/aurora-il-back-up-generator-schedule","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.7966077,"lng":-88.2438232,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":16,"campus_buildings":["CHI1","CHI2","CHI3"],"campus_technical_it_space_sqft":450000,"campus_total_it_capacity_mw":114},"notes":["Combined three-building campus specification. Never repeat campus MW or area as each building total; no measured utilization established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/aurora-il","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"general design article, not site proof","fields":{},"notes":["General AI design FAQ has market forecasts and company design context. It does not establish Aurora or Somerset site capex, capacity, operation or construction date. Publication metadata is2023, not its2025modification date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/blogs/cyrusone-intelliscale-design-and-ai-data-center-faq","host":"cyrusone.com","date":"2023-08-24","published":"2023-08-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_resource":"Aurora CHI1-CHI3 generator schedule and sound mitigation page"},"notes":["A maintenance schedule is not a new capacity or construction event; emergency equipment is not IT load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/aurora-il-back-up-generator-schedule","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Aurora · Kane · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"cyrusone-sangamon-talkington-township-il","state":"IL","kind":"facility","name":"CyrusOne Sangamon County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sangamon"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. CyrusOne spokesperson claims incentive grandfathering; original agreement not reviewed.630MWundefined operating requirement not current IT. Summer2026start/four-yearbuild forecasts unobserved;65-million Hut8 promise not CyrusOne incentive. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.illinoistimes.com/news/area-data-center-updates/","host":"illinoistimes.com","date":"2026-06-10","published":"2026-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.64,"lng":-89.84,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Illinois Times distinguishes Sangamon CyrusOne approved proposal from early Christian County EagleRock and paused Logan Hut8.","independently_verified_current_operating_status":null},"notes":["CyrusOne spokesperson claims incentive grandfathering; original agreement not reviewed.630MWundefined operating requirement not current IT. Summer2026start/four-yearbuild forecasts unobserved;65-million Hut8 promise not CyrusOne incentive.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.illinoistimes.com/news/area-data-center-updates/","host":"illinoistimes.com","date":"2026-06-10","published":"2026-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Sangamon · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"cyrusone-chi6-wood-dale-il","state":"IL","kind":"facility","name":"CyrusOne Wood Dale Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Wood Dale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Source datePublished metadata isMay13,2025, while modification isSeptember10,2026. Do not relabel this as a2026construction event, opening or delivered capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony","host":"cyrusone.com","date":"2025-05-13","published":"2025-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9790594,"lng":-87.964189,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"historical_construction_event":"topping out, structural framework milestone","planned_buildings":2,"future_building_area_sqft_lower_bound":500000,"initial_it_capacity_mw":18},"notes":["Source datePublished metadata isMay13,2025, while modification isSeptember10,2026. Do not relabel this as a2026construction event, opening or delivered capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony","host":"cyrusone.com","date":"2025-05-13","published":"2025-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Wood Dale · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"cyrusone-yorkville-chi11-il","state":"IL","kind":"facility","name":"CyrusOne Yorkville Technology Campus (CHI-11)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kendall"],"city":"Yorkville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Yorkville plan and proposed revisions. Developer page says revised one-story design still seeks approval. Area reduction is not final building area. Tax revenue is a forecast; property-tax statement is not proof of absence of a separate sales-tax program or all incentives. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.679,"lng":-88.48,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"Yorkville plan and proposed revisions","fields":{"operator_reported_city_approval_year":2024,"operator_reported_utility_improvement_start_year":2025,"operator_reported_site_work_start":"early2026","planned_full_buildout_investment_usd_lower_bound":1000000000,"proposed_area_reduction_sqft_approx":300000,"first_building_completion_target":"late2027","full_operations_target_year":2028,"forecast_annual_local_tax_revenue_usd_approx":15000000,"operator_property_tax_abatement_statement":"not requesting property tax abatement"},"notes":["Developer page says revised one-story design still seeks approval. Area reduction is not final building area. Tax revenue is a forecast; property-tax statement is not proof of absence of a separate sales-tax program or all incentives.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Yorkville · Kendall · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"databank-ord3-mount-prospect-il","state":"IL","kind":"facility","name":"DataBank ORD3 (Mount Prospect)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Mount Prospect","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/chicago/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0771274,"lng":-87.9238121,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"ORD3","street":"800 E.BusinessCenterDrive","city":"Mount Prospect","critical_it_capacity_mw":2.7,"it_area_sqft":28950,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/chicago/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Mount Prospect · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"databank-ord4-oak-brook-il","state":"IL","kind":"facility","name":"DataBank ORD4 (Chicago Tri-State)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Oak Brook","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/chicago/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.85392,"lng":-87.9221234,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"ORD4","street":"1808 SwiftDrive SuiteB&C","city":"Oak Brook","critical_it_capacity_mw":8.75,"it_area_sqft":77510,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/chicago/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Oak Brook · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"digital-realty-ch2-il","state":"IL","kind":"facility","name":"Digital Realty CH2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch2","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9945332,"lng":-87.9577513,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"2299 Busse Road, Elk Grove Village, IL 60007","advertised_building_sqft":328000,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch2","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"digital-realty-ch3-elk-grove-village-il","state":"IL","kind":"facility","name":"Digital Realty CH3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Matched the named facility card on a regional page. Regional space summary has inconsistent imperial/metric scales and is excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch3","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9927374,"lng":-87.9968732,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"1400 East Devon Avenue, Elk Grove Village, IL","advertised_building_sqft":305500,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Matched the named facility card on a regional page. Regional space summary has inconsistent imperial/metric scales and is excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"CH3","published_address":"1400 East Devon Avenue Elk Grove Village, IL","operator_label_total_building_size_sqft":305500},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch3","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"digital-realty-chicago-ch1-il","state":"IL","kind":"facility","name":"Digital Realty Chicago CH1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch1","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9942413,"lng":-87.961935,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"2200 Busse Road, Elk Grove Village, IL 60007","advertised_building_sqft":485000,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch1","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"digital-realty-ord10-il","state":"IL","kind":"facility","name":"Digital Realty ORD10","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8533507,"lng":-87.6183067,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"350 East Cermak, Chicago, IL 60616","advertised_building_sqft":1005500,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"digital-realty-ord11-il","state":"IL","kind":"facility","name":"Digital Realty ORD11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8743036,"lng":-87.6299404,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"600 South Federal Street, Chicago, IL 60605","advertised_building_sqft":146000,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"digital-realty-ord12-franklin-park-il","state":"IL","kind":"facility","name":"Digital Realty ORD12","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Franklin Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Campus acreage is not the ORD12 building parcel or additional floor space. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9283705,"lng":-87.8592552,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"9333 Grand Avenue, Franklin Park, IL 60131","advertised_building_sqft":110000,"current_operator_facility_listing":true,"surrounding_master_planned_campus_acres":40},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Campus acreage is not the ORD12 building parcel or additional floor space.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Franklin Park · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"digital-realty-ord13-franklin-park-il","state":"IL","kind":"facility","name":"Digital Realty ORD13","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Franklin Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord13","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9290818,"lng":-87.8587696,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"ORD13","published_address":"9355 Grand Avenue, Franklin Park, IL 60131","operator_label_total_building_size_sqft":224500},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord13","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Franklin Park · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"digital-realty-ord14-franklin-park-il","state":"IL","kind":"facility","name":"Digital Realty ORD14","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Franklin Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord14","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9291102,"lng":-87.8594098,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"ORD14","published_address":"9377 Grand Avenue, Franklin Park, IL 60131","operator_label_total_building_size_sqft":130500},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord14","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Franklin Park · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"digital-realty-ord23-northlake-il","state":"IL","kind":"facility","name":"Digital Realty ORD23","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Northlake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Matched the named facility card on a regional page. Regional space summary has inconsistent imperial/metric scales and is excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord23","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9196689,"lng":-87.9129266,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"505 North Railroad Avenue, Northlake, IL 60164","advertised_building_sqft":186500,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Matched the named facility card on a regional page. Regional space summary has inconsistent imperial/metric scales and is excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"ORD23","published_address":"505 North Railroad Avenue, Northlake, IL 60164","operator_label_total_building_size_sqft":186500},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord23","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Northlake · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"edgeconnex-chi02-il","state":"IL","kind":"facility","name":"EdgeConneX CHI02","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. mixed Chicago site sections. PageheaderCHI01/02butincludesCHI03.282ktenantfloorlabel may mixphase/building scopes; holdcanonicalarea. Match exact building/address before replacing CHI02withothersection. No summed campuscapacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Chicago single-tenant development; identity crosswalk held. 30+MWisChicagoandAtlantacombined, notChicagoalone.23MWnewChicago may differfromCHI02section7MW; exactaddress/buildingidentityunresolved. EdgeConneXandLambda IDs mayreferoneleasedfacility; nosecondphysicalsitecount.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/americas/chicago-il/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.edgeconnex.com/news/press-releases/edgeconnex-and-lambda-to-build-ai-factory-in-chicago-with-industry-leading-high-density-data-center-infrastructure/","host":"edgeconnex.com","date":"2025-08-21","published":"2025-08-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.0014952,"lng":-87.9525624,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"mixed Chicago site sections","fields":{"named_power_sections_mw":{"CHI01":24,"CHI02":7,"CHI03":22.4},"power_basis":"N+1capacity labels; not explicitly criticalIT"},"notes":["PageheaderCHI01/02butincludesCHI03.282ktenantfloorlabel may mixphase/building scopes; holdcanonicalarea. Match exact building/address before replacing CHI02withothersection. No summed campuscapacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/americas/chicago-il/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Chicago single-tenant development; identity crosswalk held","fields":{"new_single_tenant_chicago_planned_capacity_mw":23,"ready_for_service_target_year":2026,"power_basis":"releasecapacity, notexplicitITversusgross"},"notes":["30+MWisChicagoandAtlantacombined, notChicagoalone.23MWnewChicago may differfromCHI02section7MW; exactaddress/buildingidentityunresolved. EdgeConneXandLambda IDs mayreferoneleasedfacility; nosecondphysicalsitecount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/news/press-releases/edgeconnex-and-lambda-to-build-ai-factory-in-chicago-with-industry-leading-high-density-data-center-infrastructure/","host":"edgeconnex.com","date":"2025-08-21","published":"2025-08-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"edged-aurora-il","state":"IL","kind":"facility","name":"Edged Chicago Campus  -  Aurora (ORD01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Aurora","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. ReleaseNovember14saysceremonyyesterday. Campusfirstbuildingopennotsecondphaseonline. Water-savingcomparisonandportfolioPUEdesignnotmeasuredsiteconsumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edged.us/news/edged-us-expands-chicagoland-campus","host":"edged.us","date":"2025-11-14","published":"2025-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.79,"lng":-88.284,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"second_building_groundbreaking_event":"2025-11-13","second_building_planned_critical_power_mw":72,"second_building_published_address":"2835 Bilter Road, Aurora, IL","first_building_opening_month":"2025-02","second_building_operation_target":"2027-Q2"},"notes":["ReleaseNovember14saysceremonyyesterday. Campusfirstbuildingopennotsecondphaseonline. Water-savingcomparisonandportfolioPUEdesignnotmeasuredsiteconsumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edged.us/news/edged-us-expands-chicagoland-campus","host":"edged.us","date":"2025-11-14","published":"2025-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Aurora · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"edged-dekalb-project-vector-il","state":"IL","kind":"facility","name":"Edged DeKalb Campus (Project Vector)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeKalb"],"city":"DeKalb","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DeKalb Project Vector table approval and distinct nearby projects. Actual table columns visually checked; recommendation and councilapproval distinct. Constructionintervalnotproofallphasesunderwayoroperating. SeparateGoldin/Karis1.75MsqftsevenbuildingrownotVectorandnotadded. No criticalITMWorcurrentenergization. Annexation/rezoning/concept approval not all final building permits. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The single page was visually inspected. Vector has four planned buildings and two substations with a 2026 to 2032 construction schedule. Karis has seven planned buildings and a blank status. Approval and schedules do not prove construction or operation. The solar row is unrelated. Current original approvals, disclosures and later outcomes take precedence.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-","host":"cityofdekalb.com","date":"2026-03-18","published":"2026-03-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.878256,"lng":-88.753784,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"DeKalb Project Vector table approval and distinct nearby projects","fields":{"agency":"City of DeKalb, Illinois","status_list_asof_date":"2026-03-18","project":"JJK343LLC Edged ProjectVector","location":"Route23 and KeslingerRoad","site_acres":560,"planned_data_center_buildings":4,"planned_electrical_substations":2,"planning_recommendation_date":"2025-12-01","city_council_approval_date":"2025-12-08","listed_construction_schedule":"2026to2032"},"notes":["Actual table columns visually checked; recommendation and councilapproval distinct. Constructionintervalnotproofallphasesunderwayoroperating. SeparateGoldin/Karis1.75MsqftsevenbuildingrownotVectorandnotadded. No criticalITMWorcurrentenergization. Annexation/rezoning/concept approval not all final building permits.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-","host":"cityofdekalb.com","date":"2026-03-18","published":"2026-03-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"DeKalb's city table separates Edged Vector's December 8, 2025 council approval from Karis's July 22, 2024 amendment approval.","independently_verified_current_operating_status":null,"city_council_approval_date":"2025-12-08","city_status_as_of":"2026-03-18","city_reported_status":"Construction 2026 to 2032","data_center_buildings_planned":4},"notes":["The single page was visually inspected. Vector has four planned buildings and two substations with a 2026 to 2032 construction schedule. Karis has seven planned buildings and a blank status. Approval and schedules do not prove construction or operation. The solar row is unrelated.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-","host":"cityofdekalb.com","date":"2026-03-18","published":"2026-03-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · DeKalb · DeKalb · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"element-critical-chicago-one-il","state":"IL","kind":"facility","name":"Element Critical Chicago One","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Wood Dale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator identifies ChicagoOne at711N.EdgewoodAve,WoodDaleIL60191;151,000sf property and85,500sf raised floor are different scopes. Power explicitly7MW TOTAL UTILITY with configurable redundancy, not7MWIT. Rack density and1MWhall offerings are not additions to utility capacity. Companion ChicagoTwo page mixes N+1/2N and generic campus descriptions; no single independently verified redundancy or uptime certification inferred. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://elementcritical.com/data-centers/chicago-one/","host":"elementcritical.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9757324,"lng":-87.9646913,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Operator identifies ChicagoOne at711N.EdgewoodAve,WoodDaleIL60191;151,000sf property and85,500sf raised floor are different scopes.","Power explicitly7MW TOTAL UTILITY with configurable redundancy, not7MWIT. Rack density and1MWhall offerings are not additions to utility capacity.","Companion ChicagoTwo page mixes N+1/2N and generic campus descriptions; no single independently verified redundancy or uptime certification inferred.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://elementcritical.com/data-centers/chicago-one/","host":"elementcritical.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Wood Dale · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"element-critical-chicago-two-il","state":"IL","kind":"facility","name":"Element Critical Chicago Two","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Wood Dale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. URL chicago-two currently presents BOTH ChicagoOne and ChicagoTwo, not just one facility. Named ChicagoTwo block gives341HaynesDrive,WoodDale60191;45,000sf property/26,000sf raised floor. ChicagoTwo power specification explicitly5MW TOTAL UTILITY; ChicagoOne separately7MW. Do not assign12MW to each building or use it as12MWcriticalIT. Combined page contains generic N+1 and2N wording and ChicagoOne-only floodplain sections; do not copy every section to ChicagoTwo. No independent certificates/current meter audit. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://elementcritical.com/data-centers/chicago-two/","host":"elementcritical.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9742269,"lng":-87.9671756,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["URL chicago-two currently presents BOTH ChicagoOne and ChicagoTwo, not just one facility. Named ChicagoTwo block gives341HaynesDrive,WoodDale60191;45,000sf property/26,000sf raised floor.","ChicagoTwo power specification explicitly5MW TOTAL UTILITY; ChicagoOne separately7MW. Do not assign12MW to each building or use it as12MWcriticalIT.","Combined page contains generic N+1 and2N wording and ChicagoOne-only floodplain sections; do not copy every section to ChicagoTwo. No independent certificates/current meter audit.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://elementcritical.com/data-centers/chicago-two/","host":"elementcritical.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Wood Dale · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"equinix-ch1-il","state":"IL","kind":"facility","name":"Equinix CH1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Square-footage field on CH1 operator page does not separately define gross versus raised-floor basis. N+1 is redundancy, not power capacity or certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/chicago-data-centers/ch1","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8535578,"lng":-87.6180475,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_area_sqft":107295,"operator_power_redundancy":"N+1"},"notes":["Square-footage field on CH1 operator page does not separately define gross versus raised-floor basis. N+1 is redundancy, not power capacity or certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/chicago-data-centers/ch1","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"equinix-ch7-il","state":"IL","kind":"facility","name":"Equinix CH7","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Westmont","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/chicago-data-centers/ch7","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8125627,"lng":-87.9728504,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"111 Plaza Drive Westmont, IL 60559","colocation_area_sqft":29289},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/chicago-data-centers/ch7","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Westmont · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"equinix-ch8-minooka-il","state":"IL","kind":"facility","name":"Equinix CH8 Minooka","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grundy"],"city":"Minooka","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. Patch January23,2025, updatedMarch7, is a COMMUNITY CONTRIBUTION by village-trustee candidate Josh Stell, describing personal attendance at an Equinix proposal meeting. It is not Patch staff reporting, official minutes or a village endorsement. Limited original witness context supports an early Minooka proposal near Ridge Road between Holt and Wildy; it does not corroborate CH8 facility code. Approximately300acres, multi-billion-dollar investment, $20million annualtax and160-plus permanentjobs are contributor-reported proposal/forecast claims, not verified parcels, spending, receipts or jobs. No MW disclosed. No variance intention or promised communityfiber equals enacted conditions, executedservice or deliveredbenefit. Exact centroid pin remains unverified. Not full-field, exact parcel, currentoperations or independently audited numerical certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://patch.com/illinois/channahon-minooka/equinix-proposes-billion-dollar-data-center-investment-minooka-nodx","host":"patch.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.4506,"lng":-88.262,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json","scope":"Named municipal/limited original-witness or operator context; dates and source origins explicit.","fields":{},"notes":["Patch January23,2025, updatedMarch7, is a COMMUNITY CONTRIBUTION by village-trustee candidate Josh Stell, describing personal attendance at an Equinix proposal meeting. It is not Patch staff reporting, official minutes or a village endorsement. Limited original witness context supports an early Minooka proposal near Ridge Road between Holt and Wildy; it does not corroborate CH8 facility code.","Approximately300acres, multi-billion-dollar investment, $20million annualtax and160-plus permanentjobs are contributor-reported proposal/forecast claims, not verified parcels, spending, receipts or jobs. No MW disclosed. No variance intention or promised communityfiber equals enacted conditions, executedservice or deliveredbenefit. Exact centroid pin remains unverified.","Not full-field, exact parcel, currentoperations or independently audited numerical certification."],"sources":[{"url":"https://patch.com/illinois/channahon-minooka/equinix-proposes-billion-dollar-data-center-investment-minooka-nodx","host":"patch.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Minooka · Grundy · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"hut8-batavia-il","state":"IL","kind":"facility","name":"Hut 8 Batavia Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kane"],"city":"Batavia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. City of Batavia August31,2026 update explicitly names Hut8proposal at1780HubbardAvenue. It says updatedprojectmaterial addresses closed-loopcooling, municipalwaterlimits, noise, projectedutility/fundrevenue and infrastructurecost/reimbursement. No exact limits, MW, money or signedagreement printed in thisannouncement; those remain unverified here. City describes proposal andfutureperformance rules, not an observedenergization/occupancycertificate. Currentmainpage returnedonlynavigation. No questionformsubmitted, videoswatched or imaginedcontents of absentagreement adopted. Publicworks/city-officeaddress100NIslandAvenue is NOTthedata-centeraddress. Not full-field, exact parcel, currentoperations or independently audited numerical certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bataviail.gov/o/ed/article/3102661","host":"bataviail.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.859,"lng":-88.275,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json","scope":"Named municipal/limited original-witness or operator context; dates and source origins explicit.","fields":{},"notes":["City of Batavia August31,2026 update explicitly names Hut8proposal at1780HubbardAvenue. It says updatedprojectmaterial addresses closed-loopcooling, municipalwaterlimits, noise, projectedutility/fundrevenue and infrastructurecost/reimbursement. No exact limits, MW, money or signedagreement printed in thisannouncement; those remain unverified here.","City describes proposal andfutureperformance rules, not an observedenergization/occupancycertificate. Currentmainpage returnedonlynavigation. No questionformsubmitted, videoswatched or imaginedcontents of absentagreement adopted. Publicworks/city-officeaddress100NIslandAvenue is NOTthedata-centeraddress.","Not full-field, exact parcel, currentoperations or independently audited numerical certification."],"sources":[{"url":"https://www.bataviail.gov/o/ed/article/3102661","host":"bataviail.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Batavia · Kane · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"hydravault-chicago-il","state":"IL","kind":"facility","name":"HydraVault Chicago","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.846546,"lng":-87.6254598,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"iron-mountain-chi1-des-plaines-il","state":"IL","kind":"facility","name":"Iron Mountain CHI-1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Des Plaines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0116575,"lng":-87.8811913,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Des Plaines · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"joliet-technology-center-il","state":"IL","kind":"facility","name":"Joliet Technology Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Will"],"city":"Joliet","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The reported annexation agreement was not separately read. Projected tax revenue is not construction spending; community pledges and construction/permanent-job estimates are not paid contributions or observed jobs. Claims about cooling and rates are not measured outcomes. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cbsnews.com/chicago/news/joliet-city-council-approves-data-center-plan/","host":"cbsnews.com","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.432,"lng":-88.128,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"CBS Chicago reports council approval of the roughly 795-acre, 24-building Joliet Technology Center, with operation forecast for 2030.","independently_verified_current_operating_status":null},"notes":["The reported annexation agreement was not separately read. Projected tax revenue is not construction spending; community pledges and construction/permanent-job estimates are not paid contributions or observed jobs. Claims about cooling and rates are not measured outcomes.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cbsnews.com/chicago/news/joliet-city-council-approves-data-center-plan/","host":"cbsnews.com","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Joliet · Will · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"karis-critical-hoffman-estates-plum-farms-il","state":"IL","kind":"facility","name":"Karis Critical Hoffman Estates Data Center (Plum Farms)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Hoffman Estates","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Staff support letter did not guarantee board approval. July 1 notification is reported in caption. Land purchase and proposed legislative reforms not approval or enacted regional veto rights. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nprillinois.org/economy-business/2026-07-02/developer-withdraws-rezoning-request-for-controversial-data-center-in-hoffman-estates","host":"nprillinois.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.074441,"lng":-88.189834,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-request-withdrawn","reported_finding":"Capitol News Illinois reporting via NPR Illinois says Karis withdrew Hoffman Estates rezoning request; developer said a more specific future proposal remained possible.","report_display_date":"2026-07-02","independently_verified_current_status":null},"notes":["Staff support letter did not guarantee board approval. July 1 notification is reported in caption. Land purchase and proposed legislative reforms not approval or enacted regional veto rights.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nprillinois.org/economy-business/2026-07-02/developer-withdraws-rezoning-request-for-controversial-data-center-in-hoffman-estates","host":"nprillinois.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Hoffman Estates · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"karis-critical-naperville-il","state":"IL","kind":"facility","name":"Karis Critical Naperville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Naperville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Article references Tuesday meeting, not an explicit calendar decision date. Proposed 36 MW lacks critical IT basis. No later appeal or replacement outcome established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cbsnews.com/chicago/news/naperville-city-council-to-vote-on-controversial-data-center/","host":"cbsnews.com","date":"2026-01-21","published":"2026-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.809029,"lng":-88.117382,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"council-project-denial","reported_finding":"CBS Chicago reports Naperville vote 6-1 with two abstentions against Karis plan; smaller alternative also rejected.","report_display_date":"2026-01-21","independently_verified_current_status":null},"notes":["Article references Tuesday meeting, not an explicit calendar decision date. Proposed 36 MW lacks critical IT basis. No later appeal or replacement outcome established.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cbsnews.com/chicago/news/naperville-city-council-to-vote-on-controversial-data-center/","host":"cbsnews.com","date":"2026-01-21","published":"2026-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Naperville · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"karis-dekalb-campus-il","state":"IL","kind":"facility","name":"KARIS DeKalb Campus (Peace and Gurler Roads)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeKalb"],"city":"DeKalb","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The single page was visually inspected. Vector has four planned buildings and two substations with a 2026 to 2032 construction schedule. Karis has seven planned buildings and a blank status. Approval and schedules do not prove construction or operation. The solar row is unrelated. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-","host":"cityofdekalb.com","date":"2026-03-18","published":"2026-03-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.892979,"lng":-88.724193,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"DeKalb's city table separates Edged Vector's December 8, 2025 council approval from Karis's July 22, 2024 amendment approval.","independently_verified_current_operating_status":null,"city_council_approval_date":"2024-07-22","city_status_as_of":"2026-03-18","city_reported_status":null,"data_center_buildings_planned":7},"notes":["The single page was visually inspected. Vector has four planned buildings and two substations with a 2026 to 2032 construction schedule. Karis has seven planned buildings and a blank status. Approval and schedules do not prove construction or operation. The solar row is unrelated.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-","host":"cityofdekalb.com","date":"2026-03-18","published":"2026-03-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · DeKalb · DeKalb · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"lambda-chicago-edgeconnex-il","state":"IL","kind":"facility","name":"Lambda Chicago EdgeConneX AI Factory","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chicago single-tenant development; identity crosswalk held. 30+MWisChicagoandAtlantacombined, notChicagoalone.23MWnewChicago may differfromCHI02section7MW; exactaddress/buildingidentityunresolved. EdgeConneXandLambda IDs mayreferoneleasedfacility; nosecondphysicalsitecount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/news/press-releases/edgeconnex-and-lambda-to-build-ai-factory-in-chicago-with-industry-leading-high-density-data-center-infrastructure/","host":"edgeconnex.com","date":"2025-08-21","published":"2025-08-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.8781,"lng":-87.6298,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Chicago single-tenant development; identity crosswalk held","fields":{"new_single_tenant_chicago_planned_capacity_mw":23,"ready_for_service_target_year":2026,"power_basis":"releasecapacity, notexplicitITversusgross"},"notes":["30+MWisChicagoandAtlantacombined, notChicagoalone.23MWnewChicago may differfromCHI02section7MW; exactaddress/buildingidentityunresolved. EdgeConneXandLambda IDs mayreferoneleasedfacility; nosecondphysicalsitecount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/news/press-releases/edgeconnex-and-lambda-to-build-ai-factory-in-chicago-with-industry-leading-high-density-data-center-infrastructure/","host":"edgeconnex.com","date":"2025-08-21","published":"2025-08-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"hut8-logan-prairie-latham-il","state":"IL","kind":"facility","name":"Logan Prairie Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Logan"],"city":"Latham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hut8 Logan Prairie proposed phases and fiscal forecast. 500MWnot provenIT or energized load.65Mannualupperestimate uses2023valuation inputs and official assessment still future; no guaranteed1.95Btaxpayment.50acfootprintnotverifiedlargerlandholdings.18monthsafterapprovalnotfixedstart/opening. Water for domestic/landscape not cooling; finalpermitcapnotread. No later CUP decision or interconnection clearance established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hut8.com/data-centers/logan-prairie","host":"hut8.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.9672,"lng":-89.1614,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Hut8 Logan Prairie proposed phases and fiscal forecast","fields":{"project_name":"Logan Prairie","county":"Logan County, Illinois","developer_described_stage":"early development, local approvals required","published_capacity_mw":500,"power_basis":"capacity, not explicitly critical IT","site_footprint_acres":50,"planned_data_halls":3,"planned_investment_usd_min_exclusive":5000000000,"expected_construction_jobs_min_exclusive":1500,"expected_fullbuildout_permanent_jobs_max":200,"conditional_construction_duration_months_approx":18,"developer_estimated_average_annual_property_tax_usd_max":65000000,"tax_forecast_period_years":30,"projected_domestic_landscape_water_gallons_per_day_max_approx":9000,"community_open_house_date":"2026-02-04"},"notes":["500MWnot provenIT or energized load.65Mannualupperestimate uses2023valuation inputs and official assessment still future; no guaranteed1.95Btaxpayment.50acfootprintnotverifiedlargerlandholdings.18monthsafterapprovalnotfixedstart/opening. Water for domestic/landscape not cooling; finalpermitcapnotread. No later CUP decision or interconnection clearance established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hut8.com/data-centers/logan-prairie","host":"hut8.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Latham · Logan · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"western-hospitality-partners-pekin-il","state":"IL","kind":"facility","name":"Lutticken Farm Data Center (Pekin)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tazewell"],"city":"Pekin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Legal end to proposed agreement expected at March 23 council meeting, not observed in March 9 article. Announcement distinct from executed termination or permanent ban. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nprillinois.org/illinois/2026-03-09/data-center-wont-be-built-in-pekin","host":"nprillinois.org","date":"2026-03-09","published":"2026-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.5847113,"lng":-89.58595,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"mayoral-termination-announcement","reported_finding":"WCBU reporting via NPR Illinois says Pekin mayor announced city would no longer consider Western Hospitality Partners proposal.","report_display_date":"2026-03-09","independently_verified_current_status":null},"notes":["Legal end to proposed agreement expected at March 23 council meeting, not observed in March 9 article. Announcement distinct from executed termination or permanent ban.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nprillinois.org/illinois/2026-03-09/data-center-wont-be-built-in-pekin","host":"nprillinois.org","date":"2026-03-09","published":"2026-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Pekin · Tazewell · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"menlo-digital-chicago-exchange-il","state":"IL","kind":"facility","name":"Menlo Digital Chicago Exchange (601 West Polk)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Menlo Chicago acquired existing warehouse-conversion DC. AcquisitionmonthnotoriginalDCopening.8MWnotindependentlymeasuredload. Tenantinfrastructureinvestmentsunspecifiednotownerwholecampuscapex. MenloParkHQnotprojectlocation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.menloequities.com/properties/601-polk-west-polk-street/","host":"menloequities.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8716062,"lng":-87.6430697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Menlo Chicago acquired existing warehouse-conversion DC","fields":{"owner_publication":"Menlo Equities","address":"601 West Polk Street, Chicago, Illinois","property_area_sqft":104000,"building_stories":2,"acquisition_month":"2021-04","installed_capacity_mw":8,"power_basis":"installed capacity, not explicit critical IT","original_building_use":"brick warehouse"},"notes":["AcquisitionmonthnotoriginalDCopening.8MWnotindependentlymeasuredload. Tenantinfrastructureinvestmentsunspecifiednotownerwholecampuscapex. MenloParkHQnotprojectlocation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.menloequities.com/properties/601-polk-west-polk-street/","host":"menloequities.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"eagle-rock-meridian-technology-park-taylorville-il","state":"IL","kind":"facility","name":"Meridian Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Christian"],"city":"Clarksdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No formal county zoning request had been filed or voted on. Proposed power plant is a separate project; do not infer public opposition was the company stated reason or all plants were cancelled. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.illinoistimes.com/news/data-center-developer-abandons-plans-for-christian-county/","host":"illinoistimes.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.489771,"lng":-89.36787,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"developer-abandonment-reported","reported_finding":"Illinois Times reports Eagle Rock announced August 12 abandonment of Christian County proposal, citing uncertain delivery of required power infrastructure.","report_display_date":"2026-08-12","independently_verified_current_status":null},"notes":["No formal county zoning request had been filed or voted on. Proposed power plant is a separate project; do not infer public opposition was the company stated reason or all plants were cancelled.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.illinoistimes.com/news/data-center-developer-abandons-plans-for-christian-county/","host":"illinoistimes.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Clarksdale · Christian · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"meta-dekalb-data-center-il","state":"IL","kind":"facility","name":"Meta DeKalb Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeKalb"],"city":"DeKalb","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/dekalb-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.909,"lng":-88.792,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"operator_labeled_data_center_investment_usd":1000000000,"investment_is_lower_bound":true,"investment_geographic_label":"Illinois","historic_groundbreaking_year":2020,"peak_construction_workers":1200,"operator_reported_operational_jobs_lower_bound":200,"local_school_nonprofit_direct_funding_usd_lower_bound":2600000,"direct_funding_county_scope":"DeKalb"},"notes":["Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/dekalb-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · DeKalb · DeKalb · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"metro-edge-imd1-chicago-il","state":"IL","kind":"facility","name":"Metro Edge IMD1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8639696,"lng":-87.6749686,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"microsoft-elk-grove-village-il","state":"IL","kind":"facility","name":"Microsoft Elk Grove Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.005,"lng":-87.96,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"microsoft-hoffman-estates-il","state":"IL","kind":"facility","name":"Microsoft Hoffman Estates Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Hoffman Estates","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0769632,"lng":-88.1338875,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Hoffman Estates · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"microsoft-northlake-il","state":"IL","kind":"facility","name":"Microsoft Northlake Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Northlake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9231062,"lng":-87.9182633,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Northlake · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"ntt-chicago-ch1-data-center-il","state":"IL","kind":"facility","name":"NTT Chicago CH1 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Itasca","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. 19 acres and 200+ MW are campus context/plans, not CH1-only land or an additional commissioned load. General tax exemptions are not a project-specific award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9879619,"lng":-88.0072217,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":36,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":126000,"operator_published_address":"255 Pierce Road, Itasca, IL 60143","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","19 acres and 200+ MW are campus context/plans, not CH1-only land or an additional commissioned load. General tax exemptions are not a project-specific award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Itasca · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"ntt-chicago-ch2-data-center-il","state":"IL","kind":"facility","name":"NTT Chicago CH2 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DuPage"],"city":"Itasca","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. Page specifications explicitly call 36 MW planned client IT capacity; headline offers do not prove current energization or opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch2-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9890149,"lng":-88.0072131,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":36,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":126000,"operator_published_address":"275 Pierce Road, Itasca, IL 60143","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","Page specifications explicitly call 36 MW planned client IT capacity; headline offers do not prove current energization or opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch2-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Itasca · DuPage · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"oracle-elk-grove-village-il","state":"IL","kind":"facility","name":"Oracle Elk Grove Village Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0035588,"lng":-88.0037711,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"prime-ord-elk-grove-village-il","state":"IL","kind":"facility","name":"Prime ORD Chicago Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Release published two days after ceremony. Campus and first building are nested. Regional 15-center/4.6-billion investment statement and company portfolio capacity excluded. No present commissioning inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/prime-data-centers-breaks-ground-on-1b-chicago-data-center-campus-in-elk-grove-village-301681170.html","host":"prnewswire.com","date":"2022-11-17","published":"2022-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.0224688,"lng":-87.9621839,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"groundbreaking_event_date":"2022-11-15","published_address":"1600 East Higgins Road, Elk Grove Village, Illinois","announced_campus_investment_usd":1000000000,"full_buildout_sqft_lower_bound":750000,"full_buildout_power_mw":175,"planned_buildings":3,"ord01_building_sqft":384000,"ord01_power_mw_up_to":72,"power_basis":"release capacity; no independently specified gross versus critical IT basis"},"notes":["Release published two days after ceremony. Campus and first building are nested. Regional 15-center/4.6-billion investment statement and company portfolio capacity excluded. No present commissioning inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/prime-data-centers-breaks-ground-on-1b-chicago-data-center-campus-in-elk-grove-village-301681170.html","host":"prnewswire.com","date":"2022-11-17","published":"2022-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"project-cardinal-yorkville-il","state":"IL","kind":"facility","name":"Project Cardinal Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kendall"],"city":"Yorkville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Yorkville Cardinal proposal identity and stale hearing language. City project index describes submitted applications, not final adopted annexation/PUD or all permits. 2025 hearing dates are historical, not upcoming2026. June11hearing continued toJuly9 after lack of quorum; linked later studies throughMarch2026 do not prove approval. Buildings and area are proposal and subject to revisions. No numeric critical IT MW, actual operations or final current outcome adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne","host":"yorkville.il.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.7,"lng":-88.461,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Yorkville Cardinal proposal identity and stale hearing language","fields":{"agency":"City of Yorkville, Illinois","project":"Project Cardinal","case":"PZC2025-08","petitioner_contract_purchaser":"Pioneer Development LLC","proposed_site_acres_approx":1037,"proposed_parcels":20,"proposed_data_center_buildings":14,"proposed_area_sqft_min_exclusive":17000000,"proposed_substations":2,"location":"northwest of Route47 and GalenaRoad, south of BaselineRoad, east of AsheRoad"},"notes":["City project index describes submitted applications, not final adopted annexation/PUD or all permits. 2025 hearing dates are historical, not upcoming2026. June11hearing continued toJuly9 after lack of quorum; linked later studies throughMarch2026 do not prove approval. Buildings and area are proposal and subject to revisions. No numeric critical IT MW, actual operations or final current outcome adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne","host":"yorkville.il.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Yorkville · Kendall · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"white-rose-project-kilo-south-elgin-il","state":"IL","kind":"facility","name":"Project Kilo Data Center (South Elgin)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kane"],"city":"South Elgin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. July 15 meeting was cancelled and previously suggestedAugust 19 review was no longer scheduled; do not publish either as an observed approval. Developer seeks to buy land, not verified closed purchase. Several-million annual taxes and infrastructure funding are projections/promises, not signed payments or tariff protection. Half-Olympic-pool initial fill/two-household ongoing water and whisper-level modeled noise are nonquantified developer analogies, not metered impact or adopted permit limits.8347 petition signatures are dated online tally, not unique local residents or survey result. NoITMW, tenant or RFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.shawlocal.com/kane-county-chronicle/2026/07/28/data-center-developer-launches-website-to-allay-south-elgins-fears/","host":"shawlocal.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.0007,"lng":-88.2795,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ShawLocal reports WhiteRose launched a public ProjectKilo website for a proposed 20 acreSouthElgin annexation/data center, with concept-review meeting date now undetermined.","independently_verified_current_operating_status":null},"notes":["July 15 meeting was cancelled and previously suggestedAugust 19 review was no longer scheduled; do not publish either as an observed approval. Developer seeks to buy land, not verified closed purchase. Several-million annual taxes and infrastructure funding are projections/promises, not signed payments or tariff protection. Half-Olympic-pool initial fill/two-household ongoing water and whisper-level modeled noise are nonquantified developer analogies, not metered impact or adopted permit limits.8347 petition signatures are dated online tally, not unique local residents or survey result. NoITMW, tenant or RFSverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.shawlocal.com/kane-county-chronicle/2026/07/28/data-center-developer-launches-website-to-allay-south-elgins-fears/","host":"shawlocal.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · South Elgin · Kane · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"prologis-project-steel-yorkville-il","state":"IL","kind":"facility","name":"Project Steel Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kendall"],"city":"Yorkville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Yorkville Steel revision supersedes stale18building narrative. Explicit March2026 revision supersedes18building headline with16. Older over9Marea not independently confirmed for revised plan. Proposal/application index is not final approval or current construction. August13,2025 hearing schedule not future2026 hearing. No critical IT MW or actual service proven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yorkville.il.us/905/Project-Steel-Data-Center-Campus-Annex-A","host":"yorkville.il.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.699,"lng":-88.484,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Yorkville Steel revision supersedes stale18building narrative","fields":{"agency":"City of Yorkville, Illinois","project":"Project Steel","case":"2025-07","petitioner_contract_purchaser":"Prologis LP","proposed_site_acres_approx":540,"proposed_parcels":16,"latest_index_revision_date":"2026-03-18","latest_index_proposed_data_center_buildings":16,"older_proposed_buildings":18,"older_proposed_area_sqft_min_exclusive":9000000,"proposed_substations":3,"location":"east of EldamainRoad, between CorneilsRoad and GalenaRoad"},"notes":["Explicit March2026 revision supersedes18building headline with16. Older over9Marea not independently confirmed for revised plan. Proposal/application index is not final approval or current construction. August13,2025 hearing schedule not future2026 hearing. No critical IT MW or actual service proven.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yorkville.il.us/905/Project-Steel-Data-Center-Campus-Annex-A","host":"yorkville.il.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Yorkville · Kendall · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"qts-chicago-1-il","state":"IL","kind":"facility","name":"QTS Chicago 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Dedicated page reviewed does not provide site MW. Do not import a generic archive value or corporate annual-report spending as a verified current site value. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/chicago/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8422152,"lng":-87.6689701,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"campus_acres":30,"campus_buildings":2,"published_address":"2800 S Ashland Ave, Chicago, IL60608"},"notes":["Dedicated page reviewed does not provide site MW. Do not import a generic archive value or corporate annual-report spending as a verified current site value.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/chicago/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"related-digital-8080-lake-shore-chicago-il","state":"IL","kind":"facility","name":"Related Digital South Works Campus (8080 S DuSable Lake Shore Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. March27,2025 issuer launch explicitly identifies8080LakeShoreDrive Chicago formerSouthWorks site and proposes1GWundefined-basis data center on its north side. Over400acmasterproperty and128acIQMP quantum project are distinct scopes; PsiQuantum is not confirmed tenant of the1GWgeneralDC. 45Bnear-termpipeline, at least500Msponsorcommitments and up to8Bcapitalraise are different financing/project scopes, not45Bspent or8Bclosed. More than5GWpipeline includes US AND CANADA.64MWOntario expansion is notUS capacity. Additional Illinois1000+MW/Missouri1200MW/Wyoming250MW pipeline bullets have no exact parcels; possible overlap with Chicago not resolved. No additionalpins/ITMW/currentRFS certified. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.related.com/press-releases/2025-03-27/related-companies-accelerates-push-data-centers-capitalization-related","host":"related.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.7466434,"lng":-87.5379905,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["March27,2025 issuer launch explicitly identifies8080LakeShoreDrive Chicago formerSouthWorks site and proposes1GWundefined-basis data center on its north side. Over400acmasterproperty and128acIQMP quantum project are distinct scopes; PsiQuantum is not confirmed tenant of the1GWgeneralDC.","45Bnear-termpipeline, at least500Msponsorcommitments and up to8Bcapitalraise are different financing/project scopes, not45Bspent or8Bclosed. More than5GWpipeline includes US AND CANADA.64MWOntario expansion is notUS capacity.","Additional Illinois1000+MW/Missouri1200MW/Wyoming250MW pipeline bullets have no exact parcels; possible overlap with Chicago not resolved. No additionalpins/ITMW/currentRFS certified.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.related.com/press-releases/2025-03-27/related-companies-accelerates-push-data-centers-capitalization-related","host":"related.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"monarch-rock-air-rockford-il","state":"IL","kind":"facility","name":"Rock Air Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Rockford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. WIFR/Nathaniel Langley July 1, 2026 original records-based report on Monarch Rock Air near 8685 Friday Road, Rockford, describes a 28-page redacted state incentive agreement reportedly signed by Monarch June 5 and state June 11. Underlying agreement/redactions were not inspected in this pass. Article says later processing pause began July 1; this is not independent current-law verification or project cancellation. 1,300 acres and a phased 1,400 MW campus are reported descriptions; power basis is unspecified, not certified IT or generation. Redacted capital amount stays unknown. $250 million is the PROGRAM MINIMUM, not disclosed Rock Air capex. At least 100 employees (74 operations, 20 maintenance, six executive) with listed 2028-2031 starts are obligations/forecasts, not current workers. March 11, 2031 in-service deadline, minimum 20-year operation and carbon-neutral requirement within two years are reported conditions, not fulfilled outcomes. City FAQ says city was not party to state agreement; state incentive approval is not local permitting. No named end user confirmed. No complete record/current operating status, signed instruments, measured impacts or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.rockfordnewsfirst.com/2026/07/01/incentive-deal-proposed-rockford-data-center-shows-possible-development-timeline/","host":"rockfordnewsfirst.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.1514357,"lng":-89.101077,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["WIFR/Nathaniel Langley July 1, 2026 original records-based report on Monarch Rock Air near 8685 Friday Road, Rockford, describes a 28-page redacted state incentive agreement reportedly signed by Monarch June 5 and state June 11. Underlying agreement/redactions were not inspected in this pass. Article says later processing pause began July 1; this is not independent current-law verification or project cancellation.","1,300 acres and a phased 1,400 MW campus are reported descriptions; power basis is unspecified, not certified IT or generation. Redacted capital amount stays unknown. $250 million is the PROGRAM MINIMUM, not disclosed Rock Air capex. At least 100 employees (74 operations, 20 maintenance, six executive) with listed 2028-2031 starts are obligations/forecasts, not current workers. March 11, 2031 in-service deadline, minimum 20-year operation and carbon-neutral requirement within two years are reported conditions, not fulfilled outcomes. City FAQ says city was not party to state agreement; state incentive approval is not local permitting. No named end user confirmed.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://www.rockfordnewsfirst.com/2026/07/01/incentive-deal-proposed-rockford-data-center-shows-possible-development-timeline/","host":"rockfordnewsfirst.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Rockford · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"sangha-systems-hennepin-il","state":"IL","kind":"facility","name":"Sangha Systems Hennepin (82 River North)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Putnam"],"city":"Hennepin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Public preview and caption only; full body not available and not bypassed. Caption says roughly one-third filled with servers at the historical observation, not one-third of power capacity, critical IT or current occupancy. Sangha is not named in readable caption, so operator crosswalk and 2026 status remain unverified. No operating certification, MW or financial claims adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pantagraph.com/business/from-bitcoins-to-atms-illinois-is-positioning-itself-as-a-center-for-the-cryptocurrency-industry/article_3415fc2f-2e64-578e-b660-d07b9fa45269.html","host":"pantagraph.com","date":"2021-06-19","published":"2021-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.2489,"lng":-89.339,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Public Pantagraph/Chicago Tribune photo caption describes a 25,000-square-foot former steel-mill boiler house used for cryptocurrency mining in Hennepin, photographed June 14, 2021.","independently_verified_current_operating_status":null,"operator_or_exact_site_identity_needs_crosswalk":true},"notes":["Public preview and caption only; full body not available and not bypassed. Caption says roughly one-third filled with servers at the historical observation, not one-third of power capacity, critical IT or current occupancy. Sangha is not named in readable caption, so operator crosswalk and 2026 status remain unverified. No operating certification, MW or financial claims adopted.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pantagraph.com/business/from-bitcoins-to-atms-illinois-is-positioning-itself-as-a-center-for-the-cryptocurrency-industry/article_3415fc2f-2e64-578e-b660-d07b9fa45269.html","host":"pantagraph.com","date":"2021-06-19","published":"2021-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Hennepin · Putnam · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"serverfarm-ch1-chicago-il","state":"IL","kind":"facility","name":"Serverfarm CH1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Chicago","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.8717114,"lng":-87.6392312,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Chicago · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"skybox-chicago-i-il","state":"IL","kind":"facility","name":"Skybox Chicago I","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. Skybox operator identifies ChicagoI in ElkGroveVillage as190,000squarefeet on tenacres, available now. This supports named facility/service-offer context, not independently observed tenancy, occupancy or actual operatingload. No exact streetaddress established from this body. 30MW is explicitly TOTAL dedicatedload fromComEd services, not statedcriticalIT.18/20/22MW are ALTERNATIVE blockdesign configurations, not additive capacity. Source prints34.5kVa service wording; unit is ambiguous/likely publisher error and is not silently converted to authoritative kV. LEEDSilver and resilience are operator claims, not independently inspected certificates. Renewable-program ACCESS is not100%hourly carbon-free electricity. Not full-field, exact parcel, currentoperations or independently audited numerical certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.skyboxdatacenters.com/locations/skybox-chicago","host":"skyboxdatacenters.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9936612,"lng":-87.973521,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json","scope":"Named municipal/limited original-witness or operator context; dates and source origins explicit.","fields":{},"notes":["Skybox operator identifies ChicagoI in ElkGroveVillage as190,000squarefeet on tenacres, available now. This supports named facility/service-offer context, not independently observed tenancy, occupancy or actual operatingload. No exact streetaddress established from this body.","30MW is explicitly TOTAL dedicatedload fromComEd services, not statedcriticalIT.18/20/22MW are ALTERNATIVE blockdesign configurations, not additive capacity. Source prints34.5kVa service wording; unit is ambiguous/likely publisher error and is not silently converted to authoritative kV. LEEDSilver and resilience are operator claims, not independently inspected certificates. Renewable-program ACCESS is not100%hourly carbon-free electricity.","Not full-field, exact parcel, currentoperations or independently audited numerical certification."],"sources":[{"url":"https://www.skyboxdatacenters.com/locations/skybox-chicago","host":"skyboxdatacenters.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"stack-chi01-il","state":"IL","kind":"facility","name":"STACK CHI01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chicago market with explicit CHI01section. Market80MW/32acresacrosstwo campuses, not CHI01alone. No inferred40MWforCHI02by subtraction. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/chicago/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.006856,"lng":-87.9651767,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Chicago market with explicit CHI01section","fields":{"chi01_campus_capacity_mw":40,"power_basis":"capacity, not explicitly criticalIT","chi01_campus_acres":14,"named_city":"Elk Grove Village"},"notes":["Market80MW/32acresacrosstwo campuses, not CHI01alone. No inferred40MWforCHI02by subtraction.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/chicago/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"vme-lockport-star-innovation-district-il","state":"IL","kind":"facility","name":"Star Innovation District Data Center (Lockport)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Will"],"city":"Lockport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lockport suspended inquiry and unvalidated power request. City explicitly says no actual operator discussions, site plan, type or validated power availability.300MWis speculative request, not contracted/critical IT or energized. Generic utility safeguards not executed project agreement or guarantee. Discussion suspension not final citywide prohibition. Linked five-year district review not five-year DC moratorium. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityoflockport.net/956/Data-Center-Information","host":"cityoflockport.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5970347,"lng":-88.0552886,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Lockport suspended inquiry and unvalidated power request","fields":{"agency":"City of Lockport, Illinois","project":"STAR Innovation District data-center inquiry","city_notice":"all June workshops cancelled; data-center discussions suspended pending broader regulatory frameworks","developer_inquiry_name":"VME","projected_evaluation_request_mw":300,"power_basis":"unvalidated prospective request, no cluster study","actual_operator_identified":false,"site_plan_presented":false},"notes":["City explicitly says no actual operator discussions, site plan, type or validated power availability.300MWis speculative request, not contracted/critical IT or energized. Generic utility safeguards not executed project agreement or guarantee. Discussion suspension not final citywide prohibition. Linked five-year district review not five-year DC moratorium.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cityoflockport.net/956/Data-Center-Information","host":"cityoflockport.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Lockport · Will · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"midwest-power-investors-rochelle-il","state":"IL","kind":"facility","name":"Steward Drive Data Center (Rochelle)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ogle"],"city":"Rochelle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Earlier zoning permission existed. Contract denial is not reversal of every zoning entitlement. 48 MW and possible 150 MW expansion are planned scales, not additive/current IT load. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.rockfordnewsfirst.com/2026/04/28/rochelle-city-council-unanimously-rejects-data-center-proposal/","host":"rockfordnewsfirst.com","date":"2026-04-27","published":"2026-04-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.8979132,"lng":-89.0482469,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"development-contract-rejected","reported_finding":"WIFR reports Rochelle council rejected Midwest Power Investors / LFF proposal 0-7 on April 27; Mayor asked council to vote contract down.","report_display_date":"2026-04-27","independently_verified_current_status":null},"notes":["Earlier zoning permission existed. Contract denial is not reversal of every zoning entitlement. 48 MW and possible 150 MW expansion are planned scales, not additive/current IT load.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.rockfordnewsfirst.com/2026/04/28/rochelle-city-council-unanimously-rejects-data-center-proposal/","host":"rockfordnewsfirst.com","date":"2026-04-27","published":"2026-04-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Rochelle · Ogle · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"stream-chicago-i-orda-elk-grove-village-il","state":"IL","kind":"facility","name":"Stream Chicago I (ORDA)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0039,"lng":-87.9703,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"stream-chicago-ii-ordb-elk-grove-village-il","state":"IL","kind":"facility","name":"Stream Chicago II (ORDB)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0039,"lng":-87.9703,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"stream-chicago-iii-ordc-elk-grove-village-il","state":"IL","kind":"facility","name":"Stream Chicago III (ORDC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0039,"lng":-87.9703,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"t5-chicago-iii-northlake-il","state":"IL","kind":"facility","name":"T5 @ Chicago III (Northlake)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Northlake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9310571,"lng":-87.9145933,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Northlake · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"t5-chicago-v-elk-grove-village-il","state":"IL","kind":"facility","name":"T5 @ Chicago V (CHI V)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical acquisition announcement and future delivery target. Separate Grayslake 1.2 GW campus excluded. Utility secured does not prove construction started or commissioned. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html","host":"prnewswire.com","date":"2025-03-26","published":"2025-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.0035588,"lng":-88.0037711,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"acquired_site_acres":7,"planned_building_sqft":220000,"planned_critical_it_mw":36,"occupancy_target_year":2028},"notes":["Historical acquisition announcement and future delivery target. Separate Grayslake 1.2 GW campus excluded. Utility secured does not prove construction started or commissioned.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html","host":"prnewswire.com","date":"2025-03-26","published":"2025-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"t5-chicago-ii-il","state":"IL","kind":"facility","name":"T5 Chicago II","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0230424,"lng":-87.9755567,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"t5-chicago-iv-grayslake-il","state":"IL","kind":"facility","name":"T5 Chicago IV (CHI IV)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Grayslake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.3442,"lng":-88.0417,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Grayslake · Lake · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"ta-realty-elk-grove-village-il","state":"IL","kind":"facility","name":"TA Realty Elk Grove Village Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cook"],"city":"Elk Grove Village","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Demolition observation/official statements do not establish completed data center buildings or operation.250 MW is portfolio-plan capacity with undefined IT/gross basis. Expanded 138 kV ComEd substation is voltage and service-area infrastructure, not additional 250 MW or an examined ESA. TA ORD 02 Northlake 11 acres and other village campuses are separate. Claimed national second-largest hub is not independently validated ranking. No current 2026 RFS/tenant/contract verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.journal-topics.com/articles/demolition-to-clear-way-for-47-acre-data-center-near-higgins-elmhurst/","host":"journal-topics.com","date":"2025-10-06","published":"2025-10-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.0039,"lng":-87.9703,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Journal & Topics reports demolition underway at TA Realty ORD 01’s 47-acre former office-park site, with site plan for four buildings totaling 1.183 million squarefeet.","independently_verified_current_operating_status":null},"notes":["Demolition observation/official statements do not establish completed data center buildings or operation.250 MW is portfolio-plan capacity with undefined IT/gross basis. Expanded 138 kV ComEd substation is voltage and service-area infrastructure, not additional 250 MW or an examined ESA. TA ORD 02 Northlake 11 acres and other village campuses are separate. Claimed national second-largest hub is not independently validated ranking. No current 2026 RFS/tenant/contract verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.journal-topics.com/articles/demolition-to-clear-way-for-47-acre-data-center-near-higgins-elmhurst/","host":"journal-topics.com","date":"2025-10-06","published":"2025-10-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Elk Grove Village · Cook · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"chirisa-volo-data-center-il","state":"IL","kind":"facility","name":"Volo Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Volo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.3486,"lng":-88.1382,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations","fields":{"program_report_year":2025,"program_register_as_of":"2025-12-31","applications_received":35,"approved_owner_operator_applications":34,"operator_certificates_issued":34,"tenant_certificates_issued":91,"construction_credit_certificates_issued":0,"total_investment_commitments_usd":10665815092,"estimated_tax_benefits_usd":666613443,"estimated_tax_benefit_calculation_percent":6.25,"listed_new_job_commitments":731,"investment_commitment_period_months":60},"notes":["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf","host":"dceo.illinois.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Illinois · Volo · Lake · Source context reviewed","state_name":"Illinois","state_path":"/illinois/"},{"id":"google-fort-wayne-in","state":"IN","kind":"facility","name":"Google Fort Wayne Data Center (Project Zodiac)","group":"operating","status":"Operating","raw_status":"operational","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Allen"],"city":"Fort Wayne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Exact coordinates not established by road-intersection description. State press release establishes groundbreaking April 26, 2024, not current opening. Up to 200 jobs includes support categories; incentive term is performance based. Current operator Indiana page now explicitly confirms FortWayne operational; MichiganCity/MorganCounty in development. Current status is sourced separately from2024groundbreaking. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://events.in.gov/event/gov-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana","host":"events.in.gov","date":"2024-04-26","published":"2024-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://datacenters.google/locations/indiana/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.99,"lng":-85.056,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"event_status":"groundbreaking","event_date":"2024-04-26","investment_usd":2000000000,"investment_basis":"announced campus investment","jobs_max":200,"incentive":"35-year sales tax exemption for minimum800million eligible capital; additional800million increments qualify for5years each, capped50years.","current_status":"operational"},"notes":["Exact coordinates not established by road-intersection description.","State press release establishes groundbreaking April 26, 2024, not current opening. Up to 200 jobs includes support categories; incentive term is performance based. Current operator Indiana page now explicitly confirms FortWayne operational; MichiganCity/MorganCounty in development. Current status is sourced separately from2024groundbreaking.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://events.in.gov/event/gov-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana","host":"events.in.gov","date":"2024-04-26","published":"2024-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://datacenters.google/locations/indiana/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Fort Wayne · Allen · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"aboutbit-merom-sullivan-county-in","state":"IN","kind":"facility","name":"AboutBit Merom Cryptocurrency Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Sullivan"],"city":"Merom","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Merom historical cryptocurrency supply agreement announcement. Historicalforecastnotactualopening/current2026service. Original executedWINagreementnotinspected. Liquidcooling/noimpactpromises not measurednoise/environmental findings. MiningseparatefromAI/cloud. Existingpowerstationage notDCfounding;115MWnotstationgenerationandnotper-building. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rejournals.com/aboutbit-to-turn-portion-of-indiana-power-station-into-cryptocurrency-mining-facility/","host":"rejournals.com","date":"2022-05-18","published":"2022-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.067889,"lng":-87.513056,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Merom historical cryptocurrency supply agreement announcement","fields":{"company":"AboutBit LLC","location":"adjacent MeromGeneratingStation, SullivanCounty, Indiana","use":"cryptocurrency mining","reported_electricity_purchase_agreement_mw":115,"reported_agreement_years":5,"power_basis":"reported electricity supply agreement, not explicit IT or metered consumption","expected_new_jobs_max":15,"announced_opening_target":"within30days ofMay18,2022"},"notes":["Historicalforecastnotactualopening/current2026service. Original executedWINagreementnotinspected. Liquidcooling/noimpactpromises not measurednoise/environmental findings. MiningseparatefromAI/cloud. Existingpowerstationage notDCfounding;115MWnotstationgenerationandnotper-building.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rejournals.com/aboutbit-to-turn-portion-of-indiana-power-station-into-cryptocurrency-mining-facility/","host":"rejournals.com","date":"2022-05-18","published":"2022-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Merom · Sullivan · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"agincourt-valparaiso-porter-county-in","state":"IN","kind":"facility","name":"Agincourt Valparaiso Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Porter"],"city":"Valparaiso","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Valparaiso historical city-authored option statement. City-authored statement republished by local outlet, not independent signed option inspection.50Kdeposit includes10Knonrefundable, not60K. Option not purchase or construction approval.2025terms do not establish current2026continuation. No requested incentives asof2025does not mean perpetual no-incentive covenant. New moratorium reviewed separately. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Valparaiso signed moratorium and trigger-based expiry. Signed ordinance establishes adoption and conditional duration, not a fixed6or12month sunset. No assumption Agincourt has or lacks vested rights. Subsequent repeal/amendment and project outcome need separate record. Citywide restriction not allPorterCounty.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://greatnews.life/article/city-of-valparaiso-statement-on-data-center/","host":"greatnews.life","date":"2025-03-07","published":"2025-03-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.ci.valparaiso.in.us/Archive.aspx?ADID=6192","host":"ci.valparaiso.in.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5031027,"lng":-87.0201162,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Valparaiso historical city-authored option statement","fields":{"city_statement_date":"2025-03-07","project_company":"Agincourt Investments LLC","rdc_option_approval_date":"2025-01-09","broader_city_owned_land_acres":238,"optioned_acres_approx":180,"initial_due_diligence_days":180,"possible_additional_extension_days":120,"initial_deposit_usd":50000,"included_nonrefundable_usd":10000,"deposit_increase_per30dayextension_usd":25000,"offered_land_price_usd_min_exclusive":9000000,"statement_stage":"no pending data-center design/application asof statement"},"notes":["City-authored statement republished by local outlet, not independent signed option inspection.50Kdeposit includes10Knonrefundable, not60K. Option not purchase or construction approval.2025terms do not establish current2026continuation. No requested incentives asof2025does not mean perpetual no-incentive covenant. New moratorium reviewed separately.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://greatnews.life/article/city-of-valparaiso-statement-on-data-center/","host":"greatnews.life","date":"2025-03-07","published":"2025-03-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Valparaiso signed moratorium and trigger-based expiry","fields":{"agency":"CityofValparaiso, Indiana","ordinance":"16-2026","adopted_date":"2026-08-10","vote":"6-0","mayor_signed_date":"2026-08-10","mayor_signed_time_local":"19:55","scope":"no approval of new data-center establishment or new land-use approvals/permits","exceptions":["existing lawful uses","routine maintenance, repair or renovation","development with established vested rights"],"expiry_trigger":"effective date of UDO amendments governing data-center development, unless repealed or extended","fixed_expiry_date":null},"notes":["Signed ordinance establishes adoption and conditional duration, not a fixed6or12month sunset. No assumption Agincourt has or lacks vested rights. Subsequent repeal/amendment and project outcome need separate record. Citywide restriction not allPorterCounty.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ci.valparaiso.in.us/Archive.aspx?ADID=6192","host":"ci.valparaiso.in.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Valparaiso · Porter · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"amazon-project-rainier-new-carlisle-in","state":"IN","kind":"facility","name":"Amazon Project Rainier","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Joseph"],"city":"New Carlisle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","host":"iedc.in.gov","date":"2024-04-25","published":"2024-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6978,"lng":-86.5117,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county":"St. Joseph","announced_planned_investment_usd":11000000000,"forecast_jobs_minimum":1000,"announced_sales_tax_exemption_term_years":50,"performance_based_incentive_caps_usd":{"headcount_tax_credits":18300000,"training_grants":5000000,"hoosier_business_investment_credits":55000000,"redevelopment_credits":20000000},"road_infrastructure_contribution_usd_up_to":7000000},"notes":["Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","host":"iedc.in.gov","date":"2024-04-25","published":"2024-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · New Carlisle · St. Joseph · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"american-tower-pike-township-indianapolis-in","state":"IN","kind":"facility","name":"American Tower Pike Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Indianapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Withdrawal is not zoning denial, existing-facility closure or necessarily permanent abandonment; company did not explain motive or refiling intent. Exact withdrawal day not supplied. Existingbroadcasttower is not an operating data center. HB 1333 was prospective legislation in this account, not independently reviewed enacted law. NoMW, capex, construction orRFSadopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/articles/american-tower-corporation-withdraws-data-051459463.html","host":"yahoo.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.9241559,"lng":-86.2030783,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"WTHR viaYahoo reports AmericanTower withdrew its PikeTownship Indianapolis zoning proposal near 79 thStreet/TownshipLineRoad amid neighborhood opposition.","independently_verified_current_operating_status":null},"notes":["Withdrawal is not zoning denial, existing-facility closure or necessarily permanent abandonment; company did not explain motive or refiling intent. Exact withdrawal day not supplied. Existingbroadcasttower is not an operating data center. HB 1333 was prospective legislation in this account, not independently reviewed enacted law. NoMW, capex, construction orRFSadopted.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/articles/american-tower-corporation-withdraws-data-051459463.html","host":"yahoo.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Indianapolis · Marion · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"aws-hobart-in","state":"IN","kind":"facility","name":"AWS Hobart Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Hobart","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Northwest Indiana investment geography and Hobart announcement. 15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","host":"nwiforum.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.517,"lng":-87.263,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Northwest Indiana investment geography and Hobart announcement","fields":{"publisher_role":"Northwest Indiana regional economic-development organization","regional_planned_aws_investment_usd":15000000000,"regional_expected_new_jobs":1100,"statewide_aws_planned_total_usd":26000000000,"prior_st_joseph_county_commitment_usd":11000000000,"hobart_agreement_announcement_date":"2025-11-25"},"notes":["15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","host":"nwiforum.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Hobart · Lake · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"aws-portage-in","state":"IN","kind":"facility","name":"AWS Portage Data Center (AmeriPlex at the Port)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Porter"],"city":"Portage","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Reported 87 million USD combines 35 million building and 52 million equipment; do not add all three. No opening timeline provided; delivery warehouse is separate. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.insideindianabusiness.com/articles/amazon-building-87m-data-center-in-portage","host":"insideindianabusiness.com","date":"2023-12-20","published":"2023-12-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6090532,"lng":-87.170469,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Inside INdiana Business, citing Times of Northwest Indiana, reports Portage AWS project and proposed tax treatment.","independently_verified_current_operating_status":null},"notes":["Reported 87 million USD combines 35 million building and 52 million equipment; do not add all three. No opening timeline provided; delivery warehouse is separate.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.insideindianabusiness.com/articles/amazon-building-87m-data-center-in-portage","host":"insideindianabusiness.com","date":"2023-12-20","published":"2023-12-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Portage · Porter · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"aws-wheatfield-in","state":"IN","kind":"facility","name":"AWS Wheatfield Campus (Project Rise)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jasper"],"city":"Wheatfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. Northwest Indiana Business June 18, 2026 reports officials approved Project Rise June 17, drawing on Northwest Indiana Forum and other attributed reporting. Exact approval instrument, all permits and current construction were not inspected. AWS Wheatfield/Jasper County identity gains context. $7 billion community investment and 250 future jobs are plans, not spending or actual headcount. $98 million described as paid in advance appears in future-deal narrative; independent payment receipt unread. $25 million public-water expansion and separately funded campus water/wastewater infrastructure are different scopes, not measured withdrawal. Annual-revenue/ten-year wording is ambiguous; no multiplied tax total adopted. 304 acres near Schahfer is attributed reporting, not surveyed parcel. 400 MW NIPSCO peaker and $643.7 million plant construction/financing describe generation, not campus IT or data-center capex. Air cooling except about 2% of the year is not 2% of water volume or zero annual use. 425-acre habitat and 110-million-gallon annual water-availability increase are commitments/projections, not completed restoration or campus use. Other regional Amazon investments are separate/possibly overlapping scopes. No complete record/current operating status, signed instruments, measured impacts or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/","host":"nwindianabusiness.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1955,"lng":-87.0586,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["Northwest Indiana Business June 18, 2026 reports officials approved Project Rise June 17, drawing on Northwest Indiana Forum and other attributed reporting. Exact approval instrument, all permits and current construction were not inspected. AWS Wheatfield/Jasper County identity gains context.","$7 billion community investment and 250 future jobs are plans, not spending or actual headcount. $98 million described as paid in advance appears in future-deal narrative; independent payment receipt unread. $25 million public-water expansion and separately funded campus water/wastewater infrastructure are different scopes, not measured withdrawal. Annual-revenue/ten-year wording is ambiguous; no multiplied tax total adopted.","304 acres near Schahfer is attributed reporting, not surveyed parcel. 400 MW NIPSCO peaker and $643.7 million plant construction/financing describe generation, not campus IT or data-center capex. Air cooling except about 2% of the year is not 2% of water volume or zero annual use. 425-acre habitat and 110-million-gallon annual water-availability increase are commitments/projections, not completed restoration or campus use. Other regional Amazon investments are separate/possibly overlapping scopes.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/","host":"nwindianabusiness.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Wheatfield · Jasper · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"province-group-bristol-innovation-park-elkhart-county-in","state":"IN","kind":"facility","name":"Bristol Innovation Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Elkhart"],"city":"Bristol","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The one-billion-USD plan, million square feet, jobs and five-to-seven-year buildout were forecasts. The future council meeting is not approval, and nearby Amazon/Microsoft projects do not identify the Bristol client. No current operation, utility allocation or critical IT established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvpe.org/wvpe-news/2024-09-10/undisclosed-tech-firm-plans-1-billion-data-center-for-bristol","host":"wvpe.org","date":"2024-09-10","published":"2024-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.7203,"lng":-85.8175,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WVPE reports Province Group's Bristol proposal for an undisclosed tech company, with a favorable planning recommendation but a delayed town-council vote.","independently_verified_current_operating_status":null},"notes":["The one-billion-USD plan, million square feet, jobs and five-to-seven-year buildout were forecasts. The future council meeting is not approval, and nearby Amazon/Microsoft projects do not identify the Bristol client. No current operation, utility allocation or critical IT established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvpe.org/wvpe-news/2024-09-10/undisclosed-tech-firm-plans-1-billion-data-center-for-bristol","host":"wvpe.org","date":"2024-09-10","published":"2024-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Bristol · Elkhart · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"coreweave-digital-crossroads-hammond-in","state":"IN","kind":"facility","name":"CoreWeave Digital Crossroads","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Hammond","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hammond official expiration of proposed development agreement. Expired proposed-project agreement does not establish closure of all existing Digital Crossroads operations. No permanent site-wide prohibition or inability to negotiate a different future project inferred. No new operating CoreWeave campus under the expired agreement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/","host":"gohammond.com","date":"2026-07-01","published":"2026-07-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5836,"lng":-87.5,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Hammond official expiration of proposed development agreement","fields":{"agency":"City of Hammond, Indiana","announcement_date":"2026-07-01","project_address":"301 Digital Crossroads","agreement_parties":["City of Hammond","Hammond Redevelopment Commission","Decennial Group","CoreWeave"],"development_agreement_expired_date":"2026-06-30","previous_extensions":2,"reason":"required milestones and obligations not satisfied","city_position":"no additional extensions of the current agreement"},"notes":["Expired proposed-project agreement does not establish closure of all existing Digital Crossroads operations. No permanent site-wide prohibition or inability to negotiate a different future project inferred. No new operating CoreWeave campus under the expired agreement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/","host":"gohammond.com","date":"2026-07-01","published":"2026-07-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Hammond · Lake · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"dc-blox-warren-township-marion-county-in","state":"IN","kind":"facility","name":"DC BLOX Warren Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Warren Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer page describes a reduced design; 28 MW is a reduction, not resulting capacity. Construction cost and labor subset are not extra investment. Schedule conditional on variance/replat approval; no opening date or approval outcome inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/indianapolisdatacenter/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.78,"lng":-86.05,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"developer_current_stage":"evaluation, permitting and public engagement","planned_capital_investment_usd_range":[1800000000,2000000000],"peak_construction_jobs_up_to":600,"planned_phases":2,"building1_sqft":70000,"building2_sqft":250000,"building1_target_months_after_approval":24,"construction_cost_estimate_usd":800000000,"labor_cost_subset_usd_approx":320000000,"revised_it_load_reduction_mw":28},"notes":["Developer page describes a reduced design; 28 MW is a reduction, not resulting capacity. Construction cost and labor subset are not extra investment. Schedule conditional on variance/replat approval; no opening date or approval outcome inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/indianapolisdatacenter/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Warren Township · Marion · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"decennial-akron-fulton-county-in","state":"IN","kind":"facility","name":"Decennial Group Akron Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Akron","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval. $100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation. No complete record/current operating status, signed instruments, measured impacts or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns","host":"abc57.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.0387819,"lng":-86.0282647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval.","$100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns","host":"abc57.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Akron · Fulton · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"google-michigan-city-in","state":"IN","kind":"facility","name":"Google Michigan City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["LaPorte"],"city":"Michigan City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Indiana regional page with named stages. FortWayne2Blink is not MichiganCityinvestment. Regional page supplies no exact MichiganCityopening/MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/indiana/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.7075394,"lng":-86.8950297,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Indiana regional page with named stages","fields":{"michigan_city_announcement_year":2026,"michigan_city_stage_at_page":"in development","other_named_location_stages":{"Fort Wayne":"operational","Morgan County":"in development"}},"notes":["FortWayne2Blink is not MichiganCityinvestment. Regional page supplies no exact MichiganCityopening/MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/indiana/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Michigan City · LaPorte · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"google-project-louie-monrovia-in","state":"IN","kind":"facility","name":"Google Project Louie (Morgan County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Morgan"],"city":"Monrovia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. utility procurement testimony without exact site match. AESIndianaCause46394testimonyherecoversresourceprocurementRFPdesign,evaluation andgenerationbids,notidentifiedGoogleMonroviaProjectLouiesiteapproval. Aggregate14.2GWresourcesoffered and26.7GWproposaloptionsnotdatacenterloadornewbuiltgeneration. Publicredactedcopyonly; noattempttoobtainorreconstructconfidentialattachments. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf","host":"iurc.portal.in.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.57,"lng":-86.35,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"utility procurement testimony without exact site match","fields":{},"notes":["AESIndianaCause46394testimonyherecoversresourceprocurementRFPdesign,evaluation andgenerationbids,notidentifiedGoogleMonroviaProjectLouiesiteapproval. Aggregate14.2GWresourcesoffered and26.7GWproposaloptionsnotdatacenterloadornewbuiltgeneration. Publicredactedcopyonly; noattempttoobtainorreconstructconfidentialattachments.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf","host":"iurc.portal.in.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Monrovia · Morgan · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"surge-hancock-county-megasite-buck-creek-township-in","state":"IN","kind":"facility","name":"Hancock County MegaSite","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hancock"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Company response sought more specificity; withdrawal does not prove no future proposal. Different Hancock counties in Iowa, Indiana and Kentucky must remain separate. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wibc.com/623821/developer-pulls-application-to-build-data-center-in-hancock-county/","host":"wibc.com","date":"2025-05-14","published":"2025-05-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.82722,"lng":-85.89833,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-application-withdrawn","reported_finding":"WIBC reports Surge withdrew 775-acre Buck Creek / Hancock MegaSite rezoning application and planning meeting was cancelled.","report_display_date":"2025-05-14","independently_verified_current_status":null},"notes":["Company response sought more specificity; withdrawal does not prove no future proposal. Different Hancock counties in Iowa, Indiana and Kentucky must remain separate.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wibc.com/623821/developer-pulls-application-to-build-data-center-in-hancock-county/","host":"wibc.com","date":"2025-05-14","published":"2025-05-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Hancock · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"heartland-industrial-park-sullivan-county-in","state":"IN","kind":"facility","name":"Heartland Industrial Park (Fluidstack Sullivan County Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sullivan"],"city":"Merom","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fluidstack Sullivan large planned valuation and scoped commitments. 65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sullivanfluidstack.io/","host":"sullivanfluidstack.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0694,"lng":-87.5108,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Fluidstack Sullivan large planned valuation and scoped commitments","fields":{"developer":"Fluidstack","project":"Sullivan County Data Center","state":"Indiana","planned_development_value_usd":65000000000,"forecast_operations_start_year":2027,"community_enhancement_commitment_usd":50000000,"named_community_program_subset_usd":4500000,"land_donation_commitment_acres":15,"operator_named_power_provider":"WIN Energy REMC","voluntary_nearest_dwelling_sound_limit_db":55,"developer_claims_no_local_property_tax_incentives_sought":true},"notes":["65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sullivanfluidstack.io/","host":"sullivanfluidstack.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Merom · Sullivan · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"jefferson-proving-ground-data-center-jefferson-county-in","state":"IN","kind":"facility","name":"Jefferson Proving Ground Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Madison","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Bob Demaree/Paxton, Madison Courier April1,2026 original Ford-family interviews/planning report:549-acre JPG airport proposal/nine buildings7,175,657sf, February site-plan approval reported CONDITIONED on federal/state permits. Not all construction approvals or an operating campus.1880-acre family property is broader, not additive. Three-to-four-year phased timeline has no exact RFS.300 future onsite jobs/$60M annual county tax are forecasts, not payroll/paid receipts. No-abatement/developer-pays-upgrades/closed-loop-water promises not executed ESA, no-rate-increase finding or measured zero site water.25M charitable commitment includes1.5M fairground allocation and500k initial expected, not all additive or verified disbursed. No actual MW stated. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.madisoncourier.com/carroll_news_democrat/news/proposed-jpg-data-center-could-generate-60m-taxes-annually/article_2804a794-5c76-548f-be98-8975b84b2284.html","host":"madisoncourier.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.82,"lng":-85.4,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Bob Demaree/Paxton, Madison Courier April1,2026 original Ford-family interviews/planning report:549-acre JPG airport proposal/nine buildings7,175,657sf, February site-plan approval reported CONDITIONED on federal/state permits. Not all construction approvals or an operating campus.1880-acre family property is broader, not additive. Three-to-four-year phased timeline has no exact RFS.300 future onsite jobs/$60M annual county tax are forecasts, not payroll/paid receipts. No-abatement/developer-pays-upgrades/closed-loop-water promises not executed ESA, no-rate-increase finding or measured zero site water.25M charitable commitment includes1.5M fairground allocation and500k initial expected, not all additive or verified disbursed. No actual MW stated.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.madisoncourier.com/carroll_news_democrat/news/proposed-jpg-data-center-could-generate-60m-taxes-annually/article_2804a794-5c76-548f-be98-8975b84b2284.html","host":"madisoncourier.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Madison · Jefferson · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"jumping-bison-greensburg-decatur-county-in","state":"IN","kind":"facility","name":"Jumping Bison Greensburg Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Decatur"],"city":"Greensburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Publication date is not established. Two 400-million-USD phases form the stated 800-million-USD plan and must not be counted again. A 125-percent wage commitment is not a job count. Hotel investment and jobs in the same story belong to another project; additional approval stages remain. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/","host":"wrbiradio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.3372,"lng":-85.4836,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WRBI reports unanimous seven-zero approval of an economic revitalization area and a ten-year, 60-percent real-property abatement for Jumping Bison's proposed two-phase Greensburg project.","independently_verified_current_operating_status":null},"notes":["Publication date is not established. Two 400-million-USD phases form the stated 800-million-USD plan and must not be counted again. A 125-percent wage commitment is not a job count. Hotel investment and jobs in the same story belong to another project; additional approval stages remain.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/","host":"wrbiradio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Greensburg · Decatur · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"karis-critical-deep-river-merrillville-in","state":"IN","kind":"facility","name":"Karis Critical Deep River Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Merrillville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.47,"lng":-87.27,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.","independently_verified_current_operating_status":null},"notes":["The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Merrillville · Lake · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"logix-reality-frankfort-clinton-county-in","state":"IN","kind":"facility","name":"Logix Reality Frankfort Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clinton"],"city":"Frankfort","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The full retained article was read; the automatic largest-article excerpt incorrectly selected a related January 7 story. A reported twelve-month reconsideration restriction is not a countywide ban. The separate city zoning variance dated April 23, 2025 does not approve the county project. City-land plans and later outcomes remain unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.clintoncountytoday.com/commissioners-say-no-to-the-rezoning-of-land-for-data-center/","host":"clintoncountytoday.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2792,"lng":-86.5108,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Clinton County Today reports the commissioners' unanimous January 20 denial of Logix's 714.55-acre rezoning after a favorable January 6 planning recommendation.","independently_verified_current_operating_status":null,"reported_rezoning_status":"denied","reported_denial_date":"2026-01-20","countywide_moratorium_verified":false},"notes":["The full retained article was read; the automatic largest-article excerpt incorrectly selected a related January 7 story. A reported twelve-month reconsideration restriction is not a countywide ban. The separate city zoning variance dated April 23, 2025 does not approve the county project. City-land plans and later outcomes remain unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.clintoncountytoday.com/commissioners-say-no-to-the-rezoning-of-land-for-data-center/","host":"clintoncountytoday.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Frankfort · Clinton · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"province-group-merrillville-technology-park-in","state":"IN","kind":"facility","name":"Merrillville Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Merrillville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.46,"lng":-87.29,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.","independently_verified_current_operating_status":null},"notes":["The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Merrillville · Lake · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"meta-jeffersonville-in","state":"IN","kind":"facility","name":"Meta Jeffersonville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Jeffersonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical operator announcement. No completion date or delivered renewable supply established by an intent to build and match electricity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2024/01/hello-jeffersonville/","host":"datacenters.atmeta.com","date":"2024-01-25","published":"2024-01-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.33,"lng":-85.715,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"announcement_date":"2024-01-25","planned_campus_sqft_approx":700000,"forecast_investment_usd_lower_bound":800000000,"forecast_operational_jobs_approx":100,"forecast_peak_construction_workers_lower_bound":1250},"notes":["Historical operator announcement. No completion date or delivered renewable supply established by an intent to build and match electricity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2024/01/hello-jeffersonville/","host":"datacenters.atmeta.com","date":"2024-01-25","published":"2024-01-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Jeffersonville · Clark · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"meta-lebanon-in","state":"IN","kind":"facility","name":"Meta Lebanon (Project Domino)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Boone"],"city":"Lebanon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Meta original dated February11,2026 says it is breaking ground on LebanonIndiana/BooneCounty campus designed for1GW when operational. Basis undefined; not commissionedITMW or observed2026 operation. Over10B planned infrastructure/community investment is not proven spending to date. More than4,000 peak construction jobs and about300operational jobs are forecasts, not current payroll. 1Mannually20years toBooneREMCfund, more than120Mwater/public-infrastructure investments and200Mgal/year watershed-restoration project for10years are stated commitments. They are not verified paid totals, campus water consumption or additional DC capacity. Annual clean-energy matching is not hourly physical supply. Zero water for MAJORITY of year is not zero annual use; LEEDGold is future once-operational claim. No executedESA or measured rate impact verified. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","host":"about.fb.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.07,"lng":-86.45,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Meta original dated February11,2026 says it is breaking ground on LebanonIndiana/BooneCounty campus designed for1GW when operational. Basis undefined; not commissionedITMW or observed2026 operation.","Over10B planned infrastructure/community investment is not proven spending to date. More than4,000 peak construction jobs and about300operational jobs are forecasts, not current payroll.","1Mannually20years toBooneREMCfund, more than120Mwater/public-infrastructure investments and200Mgal/year watershed-restoration project for10years are stated commitments. They are not verified paid totals, campus water consumption or additional DC capacity.","Annual clean-energy matching is not hourly physical supply. Zero water for MAJORITY of year is not zero annual use; LEEDGold is future once-operational claim. No executedESA or measured rate impact verified.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","host":"about.fb.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Lebanon · Boone · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"metrobloks-martindale-brightwood-indianapolis-in","state":"IN","kind":"facility","name":"Metrobloks Martindale-Brightwood Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Indianapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. The Indiana Lawyer May 13, 2026 republishes Taylor Wooten/Indianapolis Business Journal reporting. It reports five residents/property owners and Hoosier Environmental Council filed May 1 challenging MDC's earlier Metrobloks rezoning. Alleged environmental-justice and review failures are plaintiffs' allegations, not a ruling or adjudicated harm. Underlying complaint/docket/current disposition unread; other cited Sabey and Virginia cases are different projects. $500 million, 14 acres and 75 MW are reported project descriptions, with MW basis unspecified. Generator testing 20-to-30 hours, approximately 60,000 gallons initial cooling fill and 5,000 gallons annual top-off are reported developer/filing commitments, not measured use. WFYI's two-building fill figures differ; do not silently choose or add them. Utility-upgrade cost commitment is not proof of actual payment or executed service agreement. No complete record/current operating status, signed instruments, measured impacts or all-field certification. WFYI Farrah Anderson May 4, 2026 original reporting describes City-County Council approval of Metrobloks rezoning for nearly 14 acres at 2505 N. Sherman Ave., a former drive-in. This is a later procedural stage than MDC approval, not construction approval, occupancy or operation. Same meeting's temporary-stay resolution was explicitly NON-BINDING, not an enacted moratorium. Reported letter describes AES contracts, not an inspected executed agreement; no implication that physical residential infrastructure is unaffected. Closed-loop claim is not zero consumption. About 19,000 gallons for building one plus 47,500 for building two are initial fills, not annual consumption. Their 66,500-gallon derived sum differs from IBJ's approximate 60,000 figure; scopes/version unresolved. Community concerns retain attribution. A reported shooting is not evidence identifying who committed it, and is not generalized to opponents.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.theindianalawyer.com/articles/martindale-brightwood-residents-cite-environmental-concerns-in-suit-against-data-center-plan","host":"theindianalawyer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood","host":"wfyi.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.7975,"lng":-86.1197,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["The Indiana Lawyer May 13, 2026 republishes Taylor Wooten/Indianapolis Business Journal reporting. It reports five residents/property owners and Hoosier Environmental Council filed May 1 challenging MDC's earlier Metrobloks rezoning. Alleged environmental-justice and review failures are plaintiffs' allegations, not a ruling or adjudicated harm. Underlying complaint/docket/current disposition unread; other cited Sabey and Virginia cases are different projects.","$500 million, 14 acres and 75 MW are reported project descriptions, with MW basis unspecified. Generator testing 20-to-30 hours, approximately 60,000 gallons initial cooling fill and 5,000 gallons annual top-off are reported developer/filing commitments, not measured use. WFYI's two-building fill figures differ; do not silently choose or add them. Utility-upgrade cost commitment is not proof of actual payment or executed service agreement.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://www.theindianalawyer.com/articles/martindale-brightwood-residents-cite-environmental-concerns-in-suit-against-data-center-plan","host":"theindianalawyer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["WFYI Farrah Anderson May 4, 2026 original reporting describes City-County Council approval of Metrobloks rezoning for nearly 14 acres at 2505 N. Sherman Ave., a former drive-in. This is a later procedural stage than MDC approval, not construction approval, occupancy or operation. Same meeting's temporary-stay resolution was explicitly NON-BINDING, not an enacted moratorium.","Reported letter describes AES contracts, not an inspected executed agreement; no implication that physical residential infrastructure is unaffected. Closed-loop claim is not zero consumption. About 19,000 gallons for building one plus 47,500 for building two are initial fills, not annual consumption. Their 66,500-gallon derived sum differs from IBJ's approximate 60,000 figure; scopes/version unresolved. Community concerns retain attribution. A reported shooting is not evidence identifying who committed it, and is not generalized to opponents.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood","host":"wfyi.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Indianapolis · Marion · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"microsoft-granger-in","state":"IN","kind":"facility","name":"Microsoft Granger Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Joseph"],"city":"Granger","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting","host":"wvpe.org","date":"2026-02-19","published":"2026-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.73,"lng":-86.13,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WVPE reports a Granger community panel on Microsoft's proposed campus and a county official still negotiating a development agreement under an NDA.","independently_verified_current_operating_status":null},"notes":["Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting","host":"wvpe.org","date":"2026-02-19","published":"2026-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Granger · St. Joseph · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"new-carlisle-chicago-trail-data-center-st-joseph-county-in","state":"IN","kind":"facility","name":"New Carlisle Chicago Trail Data Center (rezoning denied)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Joseph"],"city":"New Carlisle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle","host":"wvpe.org","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.7003,"lng":-86.5089,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-denied","reported_finding":"WVPE reports St Joseph County Council rejected rezoning needed for Chicago Trail proposal near New Carlisle after overnight meeting.","report_display_date":"2025-12-10","independently_verified_current_status":null},"notes":["A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle","host":"wvpe.org","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · New Carlisle · St. Joseph · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"outrigger-washington-daviess-county-in","state":"IN","kind":"facility","name":"Outrigger Industrial Washington Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Daviess"],"city":"Washington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Google, Meta, Amazon, hospitals and banks are examples, not tenants. Projected 250 to 500 MW has no critical-IT basis. Building and equipment cost ranges have different scopes; forecasts of jobs and ten-year tax receipts are not observed benefits. A requested will-serve letter is not an executed service agreement. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ipm.org/news/2026-03-24/new-data-center-proposed-near-washington-ind","host":"ipm.org","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.65,"lng":-87.05,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WFIU reports Outrigger's preliminary 120-acre Washington-area concept, with water/sewer assurances, ordinance work and utility agreements still needed before an end user would commit.","independently_verified_current_operating_status":null},"notes":["Google, Meta, Amazon, hospitals and banks are examples, not tenants. Projected 250 to 500 MW has no critical-IT basis. Building and equipment cost ranges have different scopes; forecasts of jobs and ten-year tax receipts are not observed benefits. A requested will-serve letter is not an executed service agreement.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ipm.org/news/2026-03-24/new-data-center-proposed-near-washington-ind","host":"ipm.org","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Washington · Daviess · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"posey-county-boberg-road-data-center-in","state":"IN","kind":"facility","name":"Posey County Boberg Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Posey"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Do not convert headline or URL into completed denial vote. Two-year moratorium was residents request, not adoption. Signed NDA is not a development approval. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.14news.com/2026/08/04/posey-co-commissioners-vote-no-proposed-data-center-near-boberg-hoenert-rd/","host":"14news.com","date":"2026-08-04","published":"2026-08-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.033661,"lng":-87.7368008,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"commissioner-intention-not-recorded-vote","reported_finding":"WFIE body says commissioners would vote no on Boberg/Hoenert proposal, yet also says no official proposal received and meeting adjourned after comment.","report_display_date":"2026-08-04","independently_verified_current_status":null},"notes":["Do not convert headline or URL into completed denial vote. Two-year moratorium was residents request, not adoption. Signed NDA is not a development approval.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.14news.com/2026/08/04/posey-co-commissioners-vote-no-proposed-data-center-near-boberg-hoenert-rd/","host":"14news.com","date":"2026-08-04","published":"2026-08-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Posey · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"powerhouse-hobart-lake-county-in","state":"IN","kind":"facility","name":"PowerHouse Hobart","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Hobart","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW. DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5322592,"lng":-87.2550353,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW.","DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Hobart · Lake · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"project-shirley-eagle-creek-township-lake-county-in","state":"IN","kind":"facility","name":"Project Shirley","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Eagle Creek Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/","host":"latitudemedia.com","date":"2026-05-01","published":"2026-05-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.31,"lng":-87.3,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Latitude Media discusses Sentinel's proposed Eagle Creek Project Shirley and a postponed rezoning vote, saying no executed IURC service agreement had been filed at publication.","independently_verified_current_operating_status":null},"notes":["A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/","host":"latitudemedia.com","date":"2026-05-01","published":"2026-05-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Eagle Creek Township · Lake · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"prologis-shelbyville-in","state":"IN","kind":"facility","name":"Prologis Shelbyville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Shelbyville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City explicitly requires separate applications, permits and regulatory approvals before construction. Annexation, rezoning and economic agreement are not construction/operation approval. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364","host":"shelbyville.in.gov","date":"2026-04-06","published":"2026-04-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.5214,"lng":-85.7769,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"municipal_action_date":"2026-04-06","annexation_and_rezoning_approved":true,"economic_development_resolution":"2026-06","resolution_vote":"4-2-1","site_acres_approx":429,"buildings_up_to":11,"estimated_investment_usd_approx":2000000000},"notes":["City explicitly requires separate applications, permits and regulatory approvals before construction. Annexation, rezoning and economic agreement are not construction/operation approval.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364","host":"shelbyville.in.gov","date":"2026-04-06","published":"2026-04-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Shelbyville · Shelby · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"provident-chesterton-porter-county-in","state":"IN","kind":"facility","name":"Provident Chesterton Data Center Campus (former Brassie Golf Club)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Porter"],"city":"Chesterton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. Original Chesterton TownCouncil minutes datedJune10,2024, pages1 to 2, record DanaLafata referencing attorneyGregBabcock's letter on behalfofPPMChestertonLLC, BrassieDevelopmentLLC andProvidentRealtyAdvisors. Minutes state clientformallywithdrew PUDandannexationpetitions forformerBrassieGolfCourse. Page2 continues the account and records official/residentresponses. This corroborates the inherited cancelled/withdrawn stage with original municipal context, not a newly discovered2026cancellation. Underlying letter/petitionwithdrawal and citedJune7pressrelease notseparatelyinspected. No permanentcityban, laterrevival, exactparceladdress, publishedMW or new investmentfigure inferred. Unrelatedlight/HOA/publiccomment subjects are differentpropertyissues. Textpages1 to 3read;only1 to 2visuallyinspected;otherthreepagesnotread. Not full-field, exact parcel, currentoperations or independently audited numerical certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024","host":"chestertonin.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.6006171,"lng":-87.0910251,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json","scope":"Named municipal/limited original-witness or operator context; dates and source origins explicit.","fields":{},"notes":["Original Chesterton TownCouncil minutes datedJune10,2024, pages1 to 2, record DanaLafata referencing attorneyGregBabcock's letter on behalfofPPMChestertonLLC, BrassieDevelopmentLLC andProvidentRealtyAdvisors. Minutes state clientformallywithdrew PUDandannexationpetitions forformerBrassieGolfCourse. Page2 continues the account and records official/residentresponses.","This corroborates the inherited cancelled/withdrawn stage with original municipal context, not a newly discovered2026cancellation. Underlying letter/petitionwithdrawal and citedJune7pressrelease notseparatelyinspected. No permanentcityban, laterrevival, exactparceladdress, publishedMW or new investmentfigure inferred. Unrelatedlight/HOA/publiccomment subjects are differentpropertyissues. Textpages1 to 3read;only1 to 2visuallyinspected;otherthreepagesnotread.","Not full-field, exact parcel, currentoperations or independently audited numerical certification."],"sources":[{"url":"https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024","host":"chestertonin.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Chesterton · Porter · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"qlevr-charlestown-clark-county-in","state":"IN","kind":"facility","name":"QLEVR Charlestown Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Charlestown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public introduction was read. Encoded premium body was not decoded. The economic summary's 105-million-USD and fourteen-to-sixteen-month schedule are proposal claims, not spending or observed completion. A future plan-commission hearing is not approval; original filing and power basis remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newsandtribune.com/news/data-center-proposed-for-charlestowns-shadow-lake-park/article_b0967582-6664-4499-a2b4-44dfcfa4702a.html","host":"newsandtribune.com","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.4517,"lng":-85.67,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The News and Tribune's public introduction identifies QLEVR LLC's Shadow Lake request, with 12 acres, about 55,000 square feet and a proposed 3 MW facility.","independently_verified_current_operating_status":null},"notes":["Only the public introduction was read. Encoded premium body was not decoded. The economic summary's 105-million-USD and fourteen-to-sixteen-month schedule are proposal claims, not spending or observed completion. A future plan-commission hearing is not approval; original filing and power basis remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newsandtribune.com/news/data-center-proposed-for-charlestowns-shadow-lake-park/article_b0967582-6664-4499-a2b4-44dfcfa4702a.html","host":"newsandtribune.com","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Charlestown · Clark · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"radiusdc-plainfield-hendricks-county-in","state":"IN","kind":"facility","name":"RadiusDC Plainfield Campus (Indy I / Indy II)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hendricks"],"city":"Plainfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT. Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.radius-dc.com/location/indianapolis","host":"radius-dc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.7416036,"lng":-86.35343,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT.","Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.radius-dc.com/location/indianapolis","host":"radius-dc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Plainfield · Hendricks · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"vantage-pittsboro-in","state":"IN","kind":"facility","name":"Vantage Pittsboro Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hendricks"],"city":"Pittsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county","host":"insideindianabusiness.com","date":"2025-02-07","published":"2025-02-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.8656,"lng":-86.4675,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Inside INdiana Business publicly readable article describes Vantage’s 618-acre Pittsboro rezoning request, with about 285 acres intended for the data center and three buildings described as 256/96/48 MW.","independently_verified_current_operating_status":null},"notes":["Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county","host":"insideindianabusiness.com","date":"2025-02-07","published":"2025-02-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Pittsboro · Hendricks · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"blue-ladder-wolcott-white-county-in","state":"IN","kind":"facility","name":"Wolcott Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["White"],"city":"Wolcott","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wolcott developer concept and conflicting buildout timing. Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wolcottdatacenter.com/","host":"wolcottdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7581,"lng":-87.0281,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Wolcott developer concept and conflicting buildout timing","fields":{"project_name":"Wolcott Data Center","county":"White County, Indiana","proposed_campus_acres":322,"planned_data_center_buildings":4,"planned_each_data_building_footprint_sqft":327612,"planned_office_sqft":50000,"planned_warehouse_sqft":100000,"expected_construction_jobs_approx":1000,"developer_community_enhancement_commitment_usd":35000000,"developer_claims_no_incentives_sought":true,"full_buildout_year_conflict":[2029,2030]},"notes":["Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wolcottdatacenter.com/","host":"wolcottdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Wolcott · White · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"wylie-capital-broadway-merrillville-in","state":"IN","kind":"facility","name":"Wylie Capital Broadway Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Merrillville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.4828,"lng":-87.3328,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.","independently_verified_current_operating_status":null},"notes":["The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indiana · Merrillville · Lake · Source context reviewed","state_name":"Indiana","state_path":"/indiana/"},{"id":"imon-713-nebraska-sioux-city-ia","state":"IA","kind":"facility","name":"713 Nebraska Carrier Hotel (FiberComm)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Woodbury"],"city":"Sioux City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The historical report does not establish the current iMON ownership/operator crosswalk. Building construction year is not data-center founding; the second-floor project is not the whole building. No current IT MW or tenant identity is disclosed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/data/Sioux-City-Iowa-Turns-Vacant-Building-Into-Data-Center.html","host":"govtech.com","date":"2019-10-10","published":"2019-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.498104,"lng":-96.403951,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"GovTech reproduces Sioux City Journal reporting on FiberComm's completed six-million-USD carrier hotel on the second floor at 713 Nebraska Street, with tenants moving in during 2019.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The historical report does not establish the current iMON ownership/operator crosswalk. Building construction year is not data-center founding; the second-floor project is not the whole building. No current IT MW or tenant identity is disclosed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/data/Sioux-City-Iowa-Turns-Vacant-Building-Into-Data-Center.html","host":"govtech.com","date":"2019-10-10","published":"2019-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Sioux City · Woodbury · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"apple-waukee-ia","state":"IA","kind":"facility","name":"Apple Waukee Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Waukee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6193799,"lng":-93.9258365,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.","independently_verified_current_operating_status":null},"notes":["Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Waukee · Dallas · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"applied-digital-adair-ia","state":"IA","kind":"facility","name":"Applied Digital Adair County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Adair"],"city":"Adair","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. Mandy Billings, Western Iowa Today, April10,2024 original board report identifies Applied Digital proposal near Adair. Board scheduled April24 hearing on a DRAFT SETBACK ORDINANCE, not a project approval or adopted moratorium. Original ordinance/minutes and later outcome unread. 40-70 jobs and summer/fall2024 construction were forecasts. A resident feared a70ft wall; this is not an adopted building height or measured construction. No MW, exact parcel, current construction or operating outcome established. Embedded audio was not played. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://westerniowatoday.com/2024/04/10/adair-county-supervisors-discuss-proposed-data-center-and-set-public-hearing-on-an-ordinance-creating-setbacks/","host":"westerniowatoday.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5005601,"lng":-94.6434954,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Mandy Billings, Western Iowa Today, April10,2024 original board report identifies Applied Digital proposal near Adair. Board scheduled April24 hearing on a DRAFT SETBACK ORDINANCE, not a project approval or adopted moratorium. Original ordinance/minutes and later outcome unread.","40-70 jobs and summer/fall2024 construction were forecasts. A resident feared a70ft wall; this is not an adopted building height or measured construction. No MW, exact parcel, current construction or operating outcome established. Embedded audio was not played.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://westerniowatoday.com/2024/04/10/adair-county-supervisors-discuss-proposed-data-center-and-set-public-hearing-on-an-ordinance-creating-setbacks/","host":"westerniowatoday.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Adair · Adair · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"aureon-616-des-moines-ia","state":"IA","kind":"facility","name":"Aureon 616 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Voltage/ampere service rating cannot be converted to measured IT load without design factors. UptimeSLA is not certification. Operator names61610thStreet and separates total area from white space; it separately lists Minneapolis511 location. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Presence of a network point does not prove provider owns or operates an entire data center, exclusive tenancy, parcel coordinates or capacity. Original executed approvals, current operator disclosures and subsequent decisions take precedence.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aureon.com/solutions/data-center-solutions/","host":"aureon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://southfront.io/pop","host":"southfront.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5880038,"lng":-93.6310193,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"616 10th St.","city":"Des Moines","total_area_sqft":30000,"white_space_sqft":10000,"marketed_service":"colocation"},"notes":["Voltage/ampere service rating cannot be converted to measured IT load without design factors.","UptimeSLA is not certification.","Operator names61610thStreet and separates total area from white space; it separately lists Minneapolis511 location.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aureon.com/solutions/data-center-solutions/","host":"aureon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"published_network_presence_address":"616 10th Street, Des Moines, IA50309","provider_ownership_of_whole_building_verified":false,"reported_context":"South Front Networks published PoP list names Aureon at 616 10th Street Des Moines and IA-Emery at 16455 Lark Avenue Mason City.","independently_verified_current_operating_status":null},"notes":["Presence of a network point does not prove provider owns or operates an entire data center, exclusive tenancy, parcel coordinates or capacity.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://southfront.io/pop","host":"southfront.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Des Moines · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"bluebird-quad-cities-bettendorf-ia","state":"IA","kind":"facility","name":"Bluebird Quad Cities Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Scott"],"city":"Bettendorf","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bluebird regional services with mixed-site feature scope. PageinterleavesQuadCitiesandBluebirdUndergroundSpringfieldfeatures;85ftunderground/threefeeds/8to10kwhitespace/numericalenergysharecannotbeassignedtoBettendorffromthisbody. No exact QuadCitiesaddress/MW/opening. Up-timeguaranteeandSOCclaimnotindependentmeasuredcertification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bluebirdfiber.com/quad-cities-data-center/","host":"bluebirdfiber.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5245,"lng":-90.5157,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Bluebird regional services with mixed-site feature scope","fields":{"operator":"Bluebird Fiber","advertised_markets":["Quad Cities, Iowa/Illinois","Springfield, Missouri"],"services":["colocation","smart hands","custom space"]},"notes":["PageinterleavesQuadCitiesandBluebirdUndergroundSpringfieldfeatures;85ftunderground/threefeeds/8to10kwhitespace/numericalenergysharecannotbeassignedtoBettendorffromthisbody. No exact QuadCitiesaddress/MW/opening. Up-timeguaranteeandSOCclaimnotindependentmeasuredcertification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bluebirdfiber.com/quad-cities-data-center/","host":"bluebirdfiber.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Bettendorf · Scott · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"cologix-des-moines-ia","state":"IA","kind":"facility","name":"Cologix DSM1 (Financial Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two Iowa sites, dated acquisition context. HistoricalDSM1address666conflictswithcurrentDSM2crosslink606Walnut; do not overwritecanonicalstreetwithoutresolution. HistoricalDSM2area12500notcurrent24kfacility/6kcolo. Acquisitionnotnewconstruction; expansionpotentialnotdelivered. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/news/cologix-expands-footprint-acquisition-two-data-centers-iowa-including-des-moines-carrier-hotel/","host":"cologix.com","date":"2024-06-05","published":"2024-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5868,"lng":-93.625,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"two Iowa sites, dated acquisition context","fields":{"acquisition_announcement":"2024-06-05","acquired_sites":["DSM1","DSM2"],"historical_dsm1":{"published_address":"666 Walnut Street, Des Moines, Iowa","area_sqft":4000,"power_mw":0.6,"potential_expansion_area_sqft":10000,"potential_expansion_power_mw":1},"historical_dsm2":{"published_city":"Cedar Falls","area_sqft":12500,"power_mw":1,"potential_expansion_area_sqft":10000}},"notes":["HistoricalDSM1address666conflictswithcurrentDSM2crosslink606Walnut; do not overwritecanonicalstreetwithoutresolution. HistoricalDSM2area12500notcurrent24kfacility/6kcolo. Acquisitionnotnewconstruction; expansionpotentialnotdelivered.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/news/cologix-expands-footprint-acquisition-two-data-centers-iowa-including-des-moines-carrier-hotel/","host":"cologix.com","date":"2024-06-05","published":"2024-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Des Moines · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"cologix-cedar-falls-ia","state":"IA","kind":"facility","name":"Cologix DSM2 (Cedar Falls)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Black Hawk"],"city":"Cedar Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Recovered readable operator capture replaces corrupted compressed text. DesMoinesmarketnotcityCedarFalls. Current24kfacility/6kcolo differs from2024release12.5karea basis; retain source-specificareas. Expansionpotentialnotdelivered. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/des-moines/dsm2/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.5347,"lng":-92.4453,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"DSM2","published_address":"1205 Technology Parkway, Cedar Falls, Iowa","facility_area_sqft":24000,"colocation_area_sqft":6000,"site_capacity_mw":1,"potential_additional_colocation_area_sqft":10000,"potential_additional_power_mw_max":1,"power_basis":"sitecapacity, not explicitly criticalIT"},"notes":["Recovered readable operator capture replaces corrupted compressed text. DesMoinesmarketnotcityCedarFalls. Current24kfacility/6kcolo differs from2024release12.5karea basis; retain source-specificareas. Expansionpotentialnotdelivered.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/des-moines/dsm2/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Cedar Falls · Black Hawk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"cologix-dsm3-altoona-ia","state":"IA","kind":"facility","name":"Cologix DSM3 Altoona","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Altoona","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6633344,"lng":-93.5030853,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.","independently_verified_current_operating_status":null},"notes":["Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Altoona · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"copt-defense-properties-van-meter-ia","state":"IA","kind":"facility","name":"COPT Defense Van Meter Data Center Shell Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Van Meter","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. COPT Iowa land acquisition versus potential development. 32Mlandpurchaseactualreported,notcampusconstructioncapex.1GWestimatednotcontracted/energized/criticalIT.80k-sqft17MSanAntonioofficeacquisitionseparateunrelatedproperty. NoexactVanMeterparcelmunicipalitymatchorallpermitsread. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://investors.copt.com/news-events/press-releases/detail/516/copt-defense-acquires-land-for-data-center-shell","host":"investors.copt.com","date":"2024-10-28","published":"2024-10-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5031,"lng":-93.9469,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"COPT Iowa land acquisition versus potential development","fields":{"issuer":"COPT Defense Properties","historical_land_acquisition_month":"2024-09","land_acres":365,"land_purchase_usd":32000000,"locality":"near Des Moines, Iowa","planned_development_sqft_approx":3300000,"estimated_power_capacity_gw":1,"power_basis":"estimated development power, not explicit IT","issuer_described_zoning":"allows data center development"},"notes":["32Mlandpurchaseactualreported,notcampusconstructioncapex.1GWestimatednotcontracted/energized/criticalIT.80k-sqft17MSanAntonioofficeacquisitionseparateunrelatedproperty. NoexactVanMeterparcelmunicipalitymatchorallpermitsread.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://investors.copt.com/news-events/press-releases/detail/516/copt-defense-acquires-land-for-data-center-shell","host":"investors.copt.com","date":"2024-10-28","published":"2024-10-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Van Meter · Dallas · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"cyrusone-ocb1-council-bluffs-ia","state":"IA","kind":"facility","name":"CyrusOne OCB1 Council Bluffs Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pottawattamie"],"city":"Council Bluffs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Page describes 216,000 total building/120,000 raised floor, but key feature states 420,000 technical IT space. Do not choose or sum conflicting areas; site scope/expansion needs clarification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/council-bluffs-ia","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.2121526,"lng":-95.8779924,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_total_it_capacity_mw":9,"narrative_building_sqft":216000,"narrative_raised_floor_sqft":120000,"key_feature_technical_it_space_sqft":420000,"area_conflict":true},"notes":["Page describes 216,000 total building/120,000 raised floor, but key feature states 420,000 technical IT space. Do not choose or sum conflicting areas; site scope/expansion needs clarification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/council-bluffs-ia","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Council Bluffs · Pottawattamie · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"edged-energy-ankeny-ia","state":"IA","kind":"facility","name":"Edged Ankeny (Des Moines) Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Ankeny","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 24monthscompletionestimatefromrelease, notexactopeningdateoroperatingproof.52Mgallonsannualsavingsdesigncomparisonnotmeasuredwateruse. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edged.us/news/des-moines-iowa","host":"edged.us","date":"2025-05-06","published":"2025-05-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.7297,"lng":-93.6058,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"groundbreaking_announcement":"2025-05-06","planned_critical_capacity_mw":13.2,"published_city":"Ankeny, Iowa","expected_construction_duration_months":24},"notes":["24monthscompletionestimatefromrelease, notexactopeningdateoroperatingproof.52Mgallonsannualsavingsdesigncomparisonnotmeasuredwateruse.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edged.us/news/des-moines-iowa","host":"edged.us","date":"2025-05-06","published":"2025-05-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Ankeny · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"edged-council-bluffs-ia","state":"IA","kind":"facility","name":"Edged Council Bluffs Data Center Campus (Project Lola)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pottawattamie"],"city":"Council Bluffs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Plan approval does not establish a delivered building, working substation or current opening. Keep the revised size distinct from the superseded concept. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.3newsnow.com/council-bluffs/council-bluffs-project-lola-data-center-reduced-in-size-still-planned-near-iowa-western","host":"3newsnow.com","date":"2025-06-10","published":"2025-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.278141,"lng":-95.7940246,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"KMTV reports Council Bluffs amended Project Lola from 450,000 to 285,000 square feet and reduced building height.","independently_verified_current_operating_status":null},"notes":["Plan approval does not establish a delivered building, working substation or current opening. Keep the revised size distinct from the superseded concept.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.3newsnow.com/council-bluffs/council-bluffs-project-lola-data-center-reduced-in-size-still-planned-near-iowa-western","host":"3newsnow.com","date":"2025-06-10","published":"2025-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Council Bluffs · Pottawattamie · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"ecg-coon-rapids-ia","state":"IA","kind":"facility","name":"Energy Conversion Group Coon Rapids Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Carroll"],"city":"Coon Rapids","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The planned 19.2 MW is not measured full operation. Expansion was noncommittal. The daily city-electricity comparison mixes power and energy; it is excluded. Cedar Falls is separate. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://carrollspaper.com/news/crypto-mining-operation-prepares-to-go-online/article_33737516-3fad-11ee-8bb6-5b151e356586.html","host":"carrollspaper.com","date":"2023-08-20","published":"2023-08-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.8708561,"lng":-94.6781764,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"The Carroll report describes an ECG Coon Rapids test of 768 miners before anticipated full operation later that month.","independently_verified_current_operating_status":null},"notes":["The planned 19.2 MW is not measured full operation. Expansion was noncommittal. The daily city-electricity comparison mixes power and energy; it is excluded. Cedar Falls is separate.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://carrollspaper.com/news/crypto-mining-operation-prepares-to-go-online/article_33737516-3fad-11ee-8bb6-5b151e356586.html","host":"carrollspaper.com","date":"2023-08-20","published":"2023-08-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Coon Rapids · Carroll · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"fidium-des-moines-ia","state":"IA","kind":"facility","name":"Fidium Des Moines Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fidium Des Moines named colocation suite. Published500sqftnotcorrectedto5000.65kVAgeneratornotcriticalITMWoractivepower. Repeatedresponsivefeaturetablesnotduplicatefacilities. Hostingserviceprovidersuite notwholecarrierhotelownership. Noopeningdateorcurrentmeasuredload. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fidiumbusiness.com/network/data-center-locations/iowa","host":"fidiumbusiness.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5868299,"lng":-93.6227589,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Fidium Des Moines named colocation suite","fields":{"operator":"Fidium Business","address":"400 Locust Street, Suite190, Des Moines, Iowa50309","published_suite_facility_area_sqft":500,"backup_generator_apparent_power_kva":65,"utility_transformers":3},"notes":["Published500sqftnotcorrectedto5000.65kVAgeneratornotcriticalITMWoractivepower. Repeatedresponsivefeaturetablesnotduplicatefacilities. Hostingserviceprovidersuite notwholecarrierhotelownership. Noopeningdateorcurrentmeasuredload.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fidiumbusiness.com/network/data-center-locations/iowa","host":"fidiumbusiness.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Des Moines · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"global-reach-ames-ia","state":"IA","kind":"facility","name":"Global Reach Ames Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Story"],"city":"Ames","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Global Reach office directions do not prove data center. 2321NorthLoopDriveSuite210explicitlyGlobalReachAmesheadquartersanddrivingdirections. No evidencehereofficeisdatacenter;CyprusofficeisnotadditionalUSDC. No facilitycapacity/area/openingadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.globalreach.com/contact/locations/headquarters","host":"globalreach.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0020484,"lng":-93.6351121,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Global Reach office directions do not prove data center","fields":{},"notes":["2321NorthLoopDriveSuite210explicitlyGlobalReachAmesheadquartersanddrivingdirections. No evidencehereofficeisdatacenter;CyprusofficeisnotadditionalUSDC. No facilitycapacity/area/openingadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.globalreach.com/contact/locations/headquarters","host":"globalreach.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Ames · Story · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"google-cedar-rapids-ia","state":"IA","kind":"facility","name":"Google Cedar Rapids Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Linn"],"city":"Cedar Rapids","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. statewide incentive guidance, campus qualification unverified. Iowa statewide tax guidance not a Google Cedar Rapids registration, paid incentive amount, actual site investment or operating date. November3,2025publication is policy-document date. Program electricity/fuel duration varies by property start and location; do not apply generic lifetime exemption to this campus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://revenue.iowa.gov/taxes/tax-guidance/sales-use-excise-tax/data-centers","host":"revenue.iowa.gov","date":"2025-11-03","published":"2025-11-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.936,"lng":-91.723,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"statewide incentive guidance, campus qualification unverified","fields":{},"notes":["Iowa statewide tax guidance not a Google Cedar Rapids registration, paid incentive amount, actual site investment or operating date. November3,2025publication is policy-document date. Program electricity/fuel duration varies by property start and location; do not apply generic lifetime exemption to this campus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://revenue.iowa.gov/taxes/tax-guidance/sales-use-excise-tax/data-centers","host":"revenue.iowa.gov","date":"2025-11-03","published":"2025-11-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Cedar Rapids · Linn · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"google-council-bluffs-ia","state":"IA","kind":"facility","name":"Google Council Bluffs Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pottawattamie"],"city":"Council Bluffs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 20Bstatewideand7BjointinvestmentnotbothCouncilBluffsaloneoradditive.2007build/presenceyearnotindependentlyexactopeningdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/iowa/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.167368,"lng":-95.792975,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"council_bluffs_initial_investment_announcement_year":2007,"initial_planned_investment_usd":600000000,"regional_investment_usd_min_exclusive":20000000000,"recent_joint_expansion_investment_usd":7000000000,"investment_scope":"Iowastatewide; CouncilBluffsandCedarRapids"},"notes":["20Bstatewideand7BjointinvestmentnotbothCouncilBluffsaloneoradditive.2007build/presenceyearnotindependentlyexactopeningdate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/iowa/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Council Bluffs · Pottawattamie · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"google-palo-ia","state":"IA","kind":"facility","name":"Google Palo Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Linn"],"city":"Palo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. IPR July21,2026 reports Palo passed local data-center rules while prospective Google land remained unincorporatedLinnCounty. Potential annexation is not completed annexation; mayor says city will not initiate it. County18monthEU3application pause is distinct from Palo city law. Staff considering nuclear-plant accessory use inEU2 is not enacted exception or Google approval. August17earliestdraftdate is historical forecast, not observed vote. Nuclearplant recommissioning support is not operating nuclear generation or a licensed completed data center. No exact signed ordinances/current moratorium status/ITMW adopted. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.iowapublicradio.org/ipr-news/2026-07-21/palo-linn-county-google-data-center-duane-arnold-nuclear-plant","host":"iowapublicradio.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0611,"lng":-91.7935,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["IPR July21,2026 reports Palo passed local data-center rules while prospective Google land remained unincorporatedLinnCounty. Potential annexation is not completed annexation; mayor says city will not initiate it. County18monthEU3application pause is distinct from Palo city law. Staff considering nuclear-plant accessory use inEU2 is not enacted exception or Google approval. August17earliestdraftdate is historical forecast, not observed vote. Nuclearplant recommissioning support is not operating nuclear generation or a licensed completed data center. No exact signed ordinances/current moratorium status/ITMW adopted.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.iowapublicradio.org/ipr-news/2026-07-21/palo-linn-county-google-data-center-duane-arnold-nuclear-plant","host":"iowapublicradio.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Palo · Linn · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"great-lakes-colocation-lake-park-ia","state":"IA","kind":"facility","name":"Great Lakes Colocation Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dickinson"],"city":"Lake Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Great Lakes facility description with location gap. ReviewedbodydoesnotstateLakeParkstreet/municipality. Weeksbackupclaimnotindependentfuelruntimecertification. No numericcriticalITMWorarea. Samecompanymarketingnotexactphysicalsitecertification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://greatlakescolocation.com/facility/","host":"greatlakescolocation.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.455556,"lng":-95.3207429,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Great Lakes facility description with location gap","fields":{"operator":"Great Lakes Colocation","published_location_scope":"Iowa","generator_count":2},"notes":["ReviewedbodydoesnotstateLakeParkstreet/municipality. Weeksbackupclaimnotindependentfuelruntimecertification. No numericcriticalITMWorarea. Samecompanymarketingnotexactphysicalsitecertification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://greatlakescolocation.com/facility/","host":"greatlakescolocation.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Lake Park · Dickinson · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"heartland-technology-jesup-ia","state":"IA","kind":"facility","name":"Heartland Technology Data Center (HTDC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Buchanan"],"city":"Jesup","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Heartland Technology generic facility/service body. Revieweddata-centerURLbodyisgenericoperatorhomepage,notexactJesupstreet. September16,2026networkmaintenancebannerisnotDCopeningorcurrentoutage. TierIIIclaimnotindependentcertificate. No numericITMWorarea. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://heartlandtechnology.com/data-center/","host":"heartlandtechnology.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.471271,"lng":-92.054083,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Heartland Technology generic facility/service body","fields":{"operator":"Heartland Technology","advertised_service":"colocation, edge computing and disaster recovery at operator data center"},"notes":["Revieweddata-centerURLbodyisgenericoperatorhomepage,notexactJesupstreet. September16,2026networkmaintenancebannerisnotDCopeningorcurrentoutage. TierIIIclaimnotindependentcertificate. No numericITMWorarea.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://heartlandtechnology.com/data-center/","host":"heartlandtechnology.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Jesup · Buchanan · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"infobunker-boone-ia","state":"IA","kind":"facility","name":"InfoBunker Underground Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Boone"],"city":"Boone","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Iowa environmental-site identity and entrance location. Environmental registry confirms named site and reported location, not current IT operations or capacity. Active underground storage tank status not proof servers operating. Ownership labelIFB not fully researched corporate title. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://facilityexplorer.iowadnr.gov/FacilityExplorer/SiteDetail.aspx?facID=310505952","host":"facilityexplorer.iowadnr.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.16522,"lng":-93.79436,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Iowa environmental-site identity and entrance location","fields":{"published_name":"Infobunker","published_address":"308 T Avenue,Boone,IA50036","state_facility_id":"310505952","government_location_point":{"latitude":42.16522,"longitude":-93.79436,"accuracy_meters":20,"reference_point":"plant entrance,general","collection_method":"photo interpolation","geo_precision":"agency-reported entrance point,not parcel centroid"},"agency_record_last_updated_date":"2026-10-14"},"notes":["Environmental registry confirms named site and reported location, not current IT operations or capacity. Active underground storage tank status not proof servers operating. Ownership labelIFB not fully researched corporate title.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://facilityexplorer.iowadnr.gov/FacilityExplorer/SiteDetail.aspx?facID=310505952","host":"facilityexplorer.iowadnr.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Boone · Boone · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"ip-pathways-urbandale-ia","state":"IA","kind":"facility","name":"IP Pathways Urbandale Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Urbandale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. IP Pathways whitespace and power-scope inconsistency. Holdcanonicalpoweruntilsite-levelscope/unitsconfirmed,donotsilentlycorrect5000to500orassume5MWcurrentIT. Omaha4000sqftandKansasCity11000sqftdifferentfacilities. No exactUrbandalestreetorobservedopening. Certificationoperatorclaimsnotindependentreport. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ippathways.com/solutions/data-center-and-colocation/","host":"ippathways.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.6275758,"lng":-93.7672535,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"IP Pathways whitespace and power-scope inconsistency","fields":{"operator":"IP Pathways","urbandale_whitespace_sqft":5817,"urbandale_published_critical_power_kw":5000,"urbandale_rack_power_kw_max":17.2,"canonical_urbandale_critical_it_mw":null,"scope_conflict":"repeated5000kWcriticalspecacrosssites;KansasCityoverviewseparately0.5MWand500kWper4500sqft"},"notes":["Holdcanonicalpoweruntilsite-levelscope/unitsconfirmed,donotsilentlycorrect5000to500orassume5MWcurrentIT. Omaha4000sqftandKansasCity11000sqftdifferentfacilities. No exactUrbandalestreetorobservedopening. Certificationoperatorclaimsnotindependentreport.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ippathways.com/solutions/data-center-and-colocation/","host":"ippathways.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Urbandale · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"its-monticello-ia","state":"IA","kind":"facility","name":"ITS Iowa Data Center (Monticello)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jones"],"city":"Monticello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ITS Monticello own-operated facility claim. ServingIowasince2007notexactfacilitycommissioning. SOC2TypeIoperatorclaimnotindependentrestrictedreportread. No exactstreet,numericITMWorarea. Manchesterlistedoffice/marketnotautomaticsecondDC. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://its.tech/about/data-center/","host":"its.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.2382752,"lng":-91.1869428,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"ITS Monticello own-operated facility claim","fields":{"operator":"ITS, Trusted IT Solutions","locality":"Monticello, Iowa","operator_described_control":"built and operates own data center","company_service_history_since":2007},"notes":["ServingIowasince2007notexactfacilitycommissioning. SOC2TypeIoperatorclaimnotindependentrestrictedreportread. No exactstreet,numericITMWorarea. Manchesterlistedoffice/marketnotautomaticsecondDC.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://its.tech/about/data-center/","host":"its.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Monticello · Jones · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"karis-dubuque-county-ia","state":"IA","kind":"facility","name":"Karis Dubuque County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dubuque"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public introduction and caption were read. Encoded premium body was not decoded; no moratorium, denial or application-completeness outcome from it is adopted. Interest and a mapped prospect are not a completed acquisition, approved development or operating facility. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.telegraphherald.com/news/tri-state/article_76c9d4f6-6aa1-410a-9073-4be5b479363e.html","host":"telegraphherald.com","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.388,"lng":-90.67,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Telegraph Herald's public introduction and caption identify Karis interest in Dubuque County farmland east of the airport, referencing May 15 emails and the Old Davenport Road area.","independently_verified_current_operating_status":null},"notes":["Only the public introduction and caption were read. Encoded premium body was not decoded; no moratorium, denial or application-completeness outcome from it is adopted. Interest and a mapped prospect are not a completed acquisition, approved development or operating facility.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.telegraphherald.com/news/tri-state/article_76c9d4f6-6aa1-410a-9073-4be5b479363e.html","host":"telegraphherald.com","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Dubuque · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"lightedge-solutions-altoona-ia","state":"IA","kind":"facility","name":"LightEdge Altoona Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Altoona","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lightedge two named Altoona sites. Two named addresses, not automatic creation of two new whole-building count records under generic boundID. Missing dynamic capacity/area numbers remain null. DesMoinesmarketnotcity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://lightedge.com/data-centers/des-moines-data-center/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.6433,"lng":-93.4627,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Lightedge two named Altoona sites","fields":{"operator":"Lightedge","market":"Des Moines","named_sites":[{"code":"Des Moines Data Center1","address":"1435 Northridge Circle, Altoona, Iowa50009"},{"code":"Des Moines Data Center2","address":"1401 Northridge Circle, Altoona, Iowa50009"}]},"notes":["Two named addresses, not automatic creation of two new whole-building count records under generic boundID. Missing dynamic capacity/area numbers remain null. DesMoinesmarketnotcity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://lightedge.com/data-centers/des-moines-data-center/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Altoona · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"lightedge-ames-ia","state":"IA","kind":"facility","name":"LightEdge Ames Edge Colocation Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Story"],"city":"Ames","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lightedge Ames proposal and stale public calendar. Page still calls pastJuly28upcoming; current approval/outcome unknown. Do not infer2026construction from stale relative schedule. Altoona1267gallons/day and2000to3000gallonloop are other facility, not measured Ames data. Near-zero cooling water not zero domestic use. Proposed45to55dBAproperty-line range not measured compliance; generic7m-generator-enclosure ratings not whole-campus boundary noise. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://lightedge.com/ames/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.0308,"lng":-93.6319,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Lightedge Ames proposal and stale public calendar","fields":{"operator":"Lightedge","locality":"airport land on Aviation Way, Ames, Iowa","proposed_site_acres_approx":10.86,"planned_building_stories":1,"planned_power_phases_mw":[3,6,25],"power_basis":"phased power draw, not explicit critical IT","approx_fullbuildout_years":10,"historical_next_council_date_in_stale_page":"2026-07-28"},"notes":["Page still calls pastJuly28upcoming; current approval/outcome unknown. Do not infer2026construction from stale relative schedule. Altoona1267gallons/day and2000to3000gallonloop are other facility, not measured Ames data. Near-zero cooling water not zero domestic use. Proposed45to55dBAproperty-line range not measured compliance; generic7m-generator-enclosure ratings not whole-campus boundary noise.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://lightedge.com/ames/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Ames · Story · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"long-lines-sioux-city-ia","state":"IA","kind":"facility","name":"Long Lines Secure Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Woodbury"],"city":"Sioux City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Long Lines Sioux City campus location and current unit. 2000ampscannotconverttoMWwithoutvoltage/phases/powerfactor;notIT.3972specand4000narrativeplausibleroundingnotadditionalareas.2008buildyearnotexactopening. Networkfiber1165milesnotfacilityfootprint. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.longlines.com/business/data-center","host":"longlines.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.483287,"lng":-96.348107,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Long Lines Sioux City campus location and current unit","fields":{"operator":"Long Lines Broadband","site":"Secure Data Center at Western Iowa Tech Community College","address":"4647 Stone Avenue, Sioux City, Iowa51102","operator_reported_build_year":2008,"specification_area_sqft":3972,"narrative_area_sqft_approx":4000,"commercial_power_current_amps":2000},"notes":["2000ampscannotconverttoMWwithoutvoltage/phases/powerfactor;notIT.3972specand4000narrativeplausibleroundingnotadditionalareas.2008buildyearnotexactopening. Networkfiber1165milesnotfacilityfootprint.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.longlines.com/business/data-center","host":"longlines.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Sioux City · Woodbury · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"mcni-concord-township-hancock-county-ia","state":"IA","kind":"facility","name":"MCNI Concord Township Data Center (rezoning denied)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hancock"],"city":"Garner","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Board of Adjustment appeal result not established. Advisory/appealable stage must remain distinct from permanent cancellation. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://kiow.com/2026/09/10/rezoning-change-in-hancock-county-denied/","host":"kiow.com","date":"2026-09-10","published":"2026-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.09806,"lng":-93.60417,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"planning-zoning-denial-appealable","reported_finding":"KIOW reports unanimous planning and zoning rejection of MCNI request for 724 acres in Concord Township. Company said appeal likely.","report_display_date":"2026-09-10","independently_verified_current_status":null},"notes":["Board of Adjustment appeal result not established. Advisory/appealable stage must remain distinct from permanent cancellation.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://kiow.com/2026/09/10/rezoning-change-in-hancock-county-denied/","host":"kiow.com","date":"2026-09-10","published":"2026-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Garner · Hancock · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"meta-altoona-ia","state":"IA","kind":"facility","name":"Meta Altoona Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Altoona","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. December2021expansion; planned2025completion is not verified as delivered2026. Investment and area cover the whole expanded campus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2021/12/meta-announces-new-expansion-to-altoona-campus-new-hardhat-in-hand-graduates/","host":"datacenters.atmeta.com","date":"2021-12-14","published":"2021-12-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6459,"lng":-93.4696,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"historical_expansion_new_buildings":2,"planned_resulting_campus_area_sqft_min_exclusive":5000000,"historical_planned_buildout_completion_year":2025,"capital_investment_usd_min_exclusive":2500000000,"groundbreaking_year":2013,"operator_reported_operations_jobs_min_exclusive":400},"notes":["December2021expansion; planned2025completion is not verified as delivered2026. Investment and area cover the whole expanded campus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2021/12/meta-announces-new-expansion-to-altoona-campus-new-hardhat-in-hand-graduates/","host":"datacenters.atmeta.com","date":"2021-12-14","published":"2021-12-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Altoona · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"meta-davenport-ia","state":"IA","kind":"facility","name":"Meta Davenport Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Scott"],"city":"Davenport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. South Front's two container facilities, 20,000 kWh per month and no-water claim are separate from Meta and are attributed operator statements. Monthly energy is not MW capacity. Neither this report nor construction comparisons establish Meta's operating load, resource allocation or current commissioning. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kwqc.com/2026/03/06/more-than-house-less-than-grocery-store-how-much-electricity-qca-data-centers-uses/","host":"kwqc.com","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5236,"lng":-90.5776,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KWQC reports Meta bought 328 acres in Davenport for a future campus and says construction had not started as of the report.","independently_verified_current_operating_status":null},"notes":["South Front's two container facilities, 20,000 kWh per month and no-water claim are separate from Meta and are attributed operator statements. Monthly energy is not MW capacity. Neither this report nor construction comparisons establish Meta's operating load, resource allocation or current commissioning.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kwqc.com/2026/03/06/more-than-house-less-than-grocery-store-how-much-electricity-qca-data-centers-uses/","host":"kwqc.com","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Davenport · Scott · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"microsoft-alluvion-west-des-moines-ia","state":"IA","kind":"facility","name":"Microsoft Project Alluvion Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"West Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established. 6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wdmchamber.org/economic-development/microsoft-data-centers/","host":"wdmchamber.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5143718,"lng":-93.7083034,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"named_campus":"Alluvion","reported_total_floor_area_sqft":1166000,"annual_property_tax_to_be_paid_usd":8100000,"reported_public_infrastructure_built_usd":45000000,"source_date":null},"notes":["Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established.","6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wdmchamber.org/economic-development/microsoft-data-centers/","host":"wdmchamber.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.","independently_verified_current_operating_status":null},"notes":["Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · West Des Moines · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"microsoft-ginger-east-ia","state":"IA","kind":"facility","name":"Microsoft Project Ginger East Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"West Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status. GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/","host":"gowestdesmoines.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5193146,"lng":-93.7362003,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"source_republished_report_date":"2024-07-17","campus_address":"1475 SE Maffitt Lake Road","historical_building_permits":2,"area_each_sqft":244676,"permit_valuation_each_usd":384000000,"reported_contractor":"Weitz"},"notes":["City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status.","GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/","host":"gowestdesmoines.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.","independently_verified_current_operating_status":null},"notes":["Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · West Des Moines · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"microsoft-ginger-west-ia","state":"IA","kind":"facility","name":"Microsoft Project Ginger West Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"West Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.551,"lng":-93.782,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"construction_completion_target":"Summer2028; season precision only","general_contractor":"Turner Construction","actual_operational_date":null},"notes":["Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.","independently_verified_current_operating_status":null},"notes":["Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · West Des Moines · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"microsoft-mountain-west-des-moines-ia","state":"IA","kind":"facility","name":"Microsoft Project Mountain Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"West Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established. 6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wdmchamber.org/economic-development/microsoft-data-centers/","host":"wdmchamber.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5385054,"lng":-93.8253005,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"named_campus":"Mountain","reported_total_floor_area_sqft":415000,"annual_property_tax_to_be_paid_usd":1600000,"reported_public_infrastructure_built_usd":10000000,"source_date":null},"notes":["Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established.","6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wdmchamber.org/economic-development/microsoft-data-centers/","host":"wdmchamber.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.","independently_verified_current_operating_status":null},"notes":["Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · West Des Moines · Dallas · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"microsoft-osmium-west-des-moines-ia","state":"IA","kind":"facility","name":"Microsoft Project Osmium Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"West Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Municipal economic-development project label Completed is not an exact commissioning day or metered IT load. Do not publish generic job/benefit copy as guaranteed positions or an executed tax award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/","host":"gowestdesmoines.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.500537,"lng":-93.7755662,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"municipal_development_stage":"Completed in2025, year precision only","address":"5855 SW Kerry Street","total_size_sqft":1700000,"actual_operational_date":null},"notes":["Municipal economic-development project label Completed is not an exact commissioning day or metered IT load. Do not publish generic job/benefit copy as guaranteed positions or an executed tax award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/","host":"gowestdesmoines.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.","independently_verified_current_operating_status":null},"notes":["Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/","host":"businessrecord.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · West Des Moines · Warren · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"microsoft-ruthenium-west-des-moines-ia","state":"IA","kind":"facility","name":"Microsoft Project Ruthenium Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"West Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Ruthenium proposed project and county identity. Sixth campus in West Des Moines is not six buildings on this site. City crosses four counties; this site is specifically Madison County. Size listed TBD. No critical IT MW, final permit, current construction or actual opening established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/","host":"gowestdesmoines.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.4999095,"lng":-93.8098423,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Ruthenium proposed project and county identity","fields":{"publisher":"West Des Moines economic development","project":"Microsoft Ruthenium","stage_as_published":"Proposed","location":"Veterans Parkway at Woodland Avenue","county":"Madison, Iowa","reported_city_microsoft_campus_ordinal":6},"notes":["Sixth campus in West Des Moines is not six buildings on this site. City crosses four counties; this site is specifically Madison County. Size listed TBD. No critical IT MW, final permit, current construction or actual opening established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/","host":"gowestdesmoines.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · West Des Moines · Madison · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"microsoft-van-meter-ia","state":"IA","kind":"facility","name":"Microsoft Van Meter Data Center (Vision Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Van Meter","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Land acquisition and contemplated seventh centralIowa campus are historical, not a filed/approved/operating site inOctober2026. Purchase price is land, not buildout capex. FirstVanMeter site is not firstDallasCounty site; nearby WestDesMoines properties and USD15millionMadison land deal are separate. No IT, water or RFS independently verified. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aol.com/microsofts-van-meter-data-center-120442101.html","host":"aol.com","date":"2024-02-02","published":"2024-02-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5332166,"lng":-93.9548406,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Des Moines Register article syndicated on AOL reports Microsoft bought more than221acres plus193acres in January2024 for nearlyUSD40million near360th/Richland and365thStreet, VanMeter. City administrator said plans had not yet arrived for review.","independently_verified_current_operating_status":null},"notes":["Land acquisition and contemplated seventh centralIowa campus are historical, not a filed/approved/operating site inOctober2026. Purchase price is land, not buildout capex. FirstVanMeter site is not firstDallasCounty site; nearby WestDesMoines properties and USD15millionMadison land deal are separate. No IT, water or RFS independently verified.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aol.com/microsofts-van-meter-data-center-120442101.html","host":"aol.com","date":"2024-02-02","published":"2024-02-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Van Meter · Dallas · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"miningstore-eldora-township-ia","state":"IA","kind":"facility","name":"MiningStore Eldora Township Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hardin"],"city":"Eldora","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. MiningStore portfolio count and power arithmetic conflicts. Headline11deployedconflictswithtenliveandsite11underdevelopment. Table62.7doesnotreconcile62.5headline. No allocationfromnumberedfacilitylisttoEldora/UnionTownshipIDs;do notassignarbitrarysiteMWtoeach. Tax/returnmarketingnotindependentfinancial/legalguidance. No observedQ22026completion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://miningstore.com/miningstore-62-5-mw-bitcoin-mining-in-iowa/","host":"miningstore.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.3622,"lng":-93.0996,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"MiningStore portfolio count and power arithmetic conflicts","fields":{"operator":"MiningStore","published_iowa_portfolio_capacity_mw":62.5,"headline_fully_deployed_facilities":11,"narrative_live_sites":10,"site11_published_capacity_mw":3.5,"site11_status":"under development, historicalQ22026target","published_eleven_site_capacity_sum_mw_derived":62.7,"canonical_current_operating_portfolio_mw":null},"notes":["Headline11deployedconflictswithtenliveandsite11underdevelopment. Table62.7doesnotreconcile62.5headline. No allocationfromnumberedfacilitylisttoEldora/UnionTownshipIDs;do notassignarbitrarysiteMWtoeach. Tax/returnmarketingnotindependentfinancial/legalguidance. No observedQ22026completion.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://miningstore.com/miningstore-62-5-mw-bitcoin-mining-in-iowa/","host":"miningstore.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Eldora · Hardin · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"miningstore-grundy-center-ia","state":"IA","kind":"facility","name":"MiningStore Grundy Center Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grundy"],"city":"Grundy Center","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. MiningStore historical Grundy County launch. 19percentcostreductionand9Mrevenueswith50.37percentmarginsoperatorcase-studyattributionnotindependentutilityauditedcausalstudy. Iowa2023windsharestatewidecontextnotfacilityrenewablepercentage. CaryNorthCarolinafooteriscorporatecontactnotIowafacility. No exactGrundyCenterparcel/streetorcurrentpowerverification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://miningstore.com/case-study/grundy-county-rural-electric-cooperative/","host":"miningstore.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.37,"lng":-92.925,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"MiningStore historical Grundy County launch","fields":{"operator":"MiningStore","project_region":"Grundy County, Iowa","historical_launch_period":"end2019","operator_reported_mining_facility_power_mw":7,"power_basis":"Bitcoin mining facility power, not explicit critical IT","power_cooperative":"Grundy County Rural Electric Cooperative"},"notes":["19percentcostreductionand9Mrevenueswith50.37percentmarginsoperatorcase-studyattributionnotindependentutilityauditedcausalstudy. Iowa2023windsharestatewidecontextnotfacilityrenewablepercentage. CaryNorthCarolinafooteriscorporatecontactnotIowafacility. No exactGrundyCenterparcel/streetorcurrentpowerverification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://miningstore.com/case-study/grundy-county-rural-electric-cooperative/","host":"miningstore.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Grundy Center · Grundy · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"miningstore-st-anthony-ia","state":"IA","kind":"facility","name":"MiningStore St. Anthony Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Marshall"],"city":"St. Anthony","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The Hardin January 24 permits, each site's 5 MW, bonds and noise conditions must not be assigned to St. Anthony. A photograph also depicts Grundy County, not St. Anthony. The brief historical mention does not identify St. Anthony's exact parcel, current power or 2026 operating status. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.thegazette.com/energy/hardin-county-approves-two-crypto-mining-sites/","host":"thegazette.com","date":"2023-02-20","published":"2023-02-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.1355,"lng":-93.1988,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Gazette mentions MiningStore's existing Marshall County site near St. Anthony while covering two separately approved Hardin County mining proposals.","independently_verified_current_operating_status":null},"notes":["The Hardin January 24 permits, each site's 5 MW, bonds and noise conditions must not be assigned to St. Anthony. A photograph also depicts Grundy County, not St. Anthony. The brief historical mention does not identify St. Anthony's exact parcel, current power or 2026 operating status.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.thegazette.com/energy/hardin-county-approves-two-crypto-mining-sites/","host":"thegazette.com","date":"2023-02-20","published":"2023-02-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · St. Anthony · Marshall · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"miningstore-union-township-hardin-ia","state":"IA","kind":"facility","name":"MiningStore Union Township Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hardin"],"city":"Union","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. MiningStore portfolio count and power arithmetic conflicts. Headline11deployedconflictswithtenliveandsite11underdevelopment. Table62.7doesnotreconcile62.5headline. No allocationfromnumberedfacilitylisttoEldora/UnionTownshipIDs;do notassignarbitrarysiteMWtoeach. Tax/returnmarketingnotindependentfinancial/legalguidance. No observedQ22026completion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://miningstore.com/miningstore-62-5-mw-bitcoin-mining-in-iowa/","host":"miningstore.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.2453,"lng":-93.0788,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"MiningStore portfolio count and power arithmetic conflicts","fields":{"operator":"MiningStore","published_iowa_portfolio_capacity_mw":62.5,"headline_fully_deployed_facilities":11,"narrative_live_sites":10,"site11_published_capacity_mw":3.5,"site11_status":"under development, historicalQ22026target","published_eleven_site_capacity_sum_mw_derived":62.7,"canonical_current_operating_portfolio_mw":null},"notes":["Headline11deployedconflictswithtenliveandsite11underdevelopment. Table62.7doesnotreconcile62.5headline. No allocationfromnumberedfacilitylisttoEldora/UnionTownshipIDs;do notassignarbitrarysiteMWtoeach. Tax/returnmarketingnotindependentfinancial/legalguidance. No observedQ22026completion.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://miningstore.com/miningstore-62-5-mw-bitcoin-mining-in-iowa/","host":"miningstore.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Union · Hardin · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"oppidan-cedar-rapids-ia","state":"IA","kind":"facility","name":"Oppidan Cedar Rapids Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Linn"],"city":"Cedar Rapids","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. RichardPratt CorridorBusinessJournal July9,2026 originalmunicipal-recordreport identifies CLOPLLC/Oppidan1515-33rdAveSWCedarRapids, buildingpermitapprovedJune22,98695sf/justover101MlistedVALUATION/up10MWfacilityDRAW. Originalpermitnotdirectlyread; constructiontimelinenotshown. Valuationnotauditedpaidcapex;10MWnotexplicitcriticalIT. Nearby4.5MWAlliantsolargardennotfacilityITorcontractedsolar. DesMoines60000sf5MW2024openingbelongsOTHERfacility. QTS10Beconomicimpactnotcampuscapex. DataCenterMap112Iowasites/14markets andotherfacilityhistory arederivative, notcreditednewcensus. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/","host":"corridorbusiness.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9439273,"lng":-91.6736877,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["RichardPratt CorridorBusinessJournal July9,2026 originalmunicipal-recordreport identifies CLOPLLC/Oppidan1515-33rdAveSWCedarRapids, buildingpermitapprovedJune22,98695sf/justover101MlistedVALUATION/up10MWfacilityDRAW. Originalpermitnotdirectlyread; constructiontimelinenotshown.","Valuationnotauditedpaidcapex;10MWnotexplicitcriticalIT. Nearby4.5MWAlliantsolargardennotfacilityITorcontractedsolar. DesMoines60000sf5MW2024openingbelongsOTHERfacility. QTS10Beconomicimpactnotcampuscapex. DataCenterMap112Iowasites/14markets andotherfacilityhistory arederivative, notcreditednewcensus.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/","host":"corridorbusiness.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Cedar Rapids · Linn · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"oppidan-des-moines-ia","state":"IA","kind":"facility","name":"Oppidan Des Moines Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Des Moines","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The body also says summer 2024; no exact completion day is inferred. Contractor completion is not current occupancy, metered IT or independent certification verification. Future regional portfolio plans are not additional built facilities at this site. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.weitz.com/projects/oppidan-data-center/","host":"weitz.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5868,"lng":-93.625,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Weitz describes completion of Oppidan's Des Moines project in May 2024, with 60,000 square feet, 5 MW and a contractor-reported LEED certification.","independently_verified_current_operating_status":null},"notes":["The body also says summer 2024; no exact completion day is inferred. Contractor completion is not current occupancy, metered IT or independent certification verification. Future regional portfolio plans are not additional built facilities at this site.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.weitz.com/projects/oppidan-data-center/","host":"weitz.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Des Moines · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"pathone-ida-county-galva-ia","state":"IA","kind":"facility","name":"PathOne Ida County Data Center (Galva site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ida"],"city":"Galva","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Arthur meeting venue is not a verified Galva project parcel. Proposed 10 to 25 MW has no critical-IT basis. Annual water estimates do not clearly identify the phase basis and must not inherit Hull's separate detailed numbers. Proposed community benefits and tax prominence are not executed agreements or paid contributions; a public meeting is not approval. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ktiv.com/2026/08/25/arthur-residents-ask-questions-pathones-data-center-meeting/","host":"ktiv.com","date":"2026-08-25","published":"2026-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.5069289,"lng":-95.4172221,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KTIV reports an August 24 Arthur informational meeting on PathOne's Ida County proposal, which could not proceed under the county's then-current moratorium.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["Arthur meeting venue is not a verified Galva project parcel. Proposed 10 to 25 MW has no critical-IT basis. Annual water estimates do not clearly identify the phase basis and must not inherit Hull's separate detailed numbers. Proposed community benefits and tax prominence are not executed agreements or paid contributions; a public meeting is not approval.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ktiv.com/2026/08/25/arthur-residents-ask-questions-pathones-data-center-meeting/","host":"ktiv.com","date":"2026-08-25","published":"2026-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Galva · Ida · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"pathone-hull-ia","state":"IA","kind":"facility","name":"PathOne Sioux County Data Center (Hull)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sioux"],"city":"Hull","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The source says the June 16 unincorporated-county moratorium remained in place. Company advisory councils cannot enact regulations. Water estimates are annual and phase-specific, not daily or additive. Promises on noise, infrastructure payment and no local abatement are not executed conditions or actual results. No completed PathOne-branded facility was claimed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ktiv.com/2026/08/12/residents-seek-more-details-potential-sioux-county-data-center/","host":"ktiv.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.1888,"lng":-96.1333,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KTIV/Sioux County Radio reports PathOne's Hull concept, starting at 10 MW with a requested 25 MW cap, an unidentified tenant and an informational meeting that was not county approval.","independently_verified_current_operating_status":null},"notes":["The source says the June 16 unincorporated-county moratorium remained in place. Company advisory councils cannot enact regulations. Water estimates are annual and phase-specific, not daily or additive. Promises on noise, infrastructure payment and no local abatement are not executed conditions or actual results. No completed PathOne-branded facility was claimed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ktiv.com/2026/08/12/residents-seek-more-details-potential-sioux-county-data-center/","host":"ktiv.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Hull · Sioux · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"qts-cedar-rapids-ia","state":"IA","kind":"facility","name":"QTS Cedar Rapids Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Linn"],"city":"Cedar Rapids","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cedar Rapids official development agreement announcement. City announcement supports agreement approval account but signed terms not read here.18Mover20years conditional commitment not already paid.30permanentjobs distinct from hundreds of construction/trade jobs. Water-free cooling does not mean zero total site water consumption. No exact critical IT MW, commissioning or actual spend adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cedar-rapids.org/news_detail_T6_R2180.php","host":"cedar-rapids.org","date":"2025-02-12","published":"2025-02-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.932,"lng":-91.718,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Cedar Rapids official development agreement announcement","fields":{"agency":"City of Cedar Rapids, Iowa","announcement_date":"2025-02-12","operator":"QTS Cedar Rapids LLC","city_reported_agreement_approval_date":"2025-01-28","site":"Big Cedar Industrial Center","site_acres":612,"minimum_planned_investment_usd":750000000,"community_betterment_commitment_usd_max":18000000,"commitment_years":20,"payment_trigger":"following first construction phase","minimum_first_two_phase_fulltime_jobs":30,"jobs_per_first_phase":15},"notes":["City announcement supports agreement approval account but signed terms not read here.18Mover20years conditional commitment not already paid.30permanentjobs distinct from hundreds of construction/trade jobs. Water-free cooling does not mean zero total site water consumption. No exact critical IT MW, commissioning or actual spend adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cedar-rapids.org/news_detail_T6_R2180.php","host":"cedar-rapids.org","date":"2025-02-12","published":"2025-02-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Cedar Rapids · Linn · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"qts-clinton-clinton-county-ia","state":"IA","kind":"facility","name":"QTS Clinton Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clinton"],"city":"Clinton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Page describes exploration, not project approval, construction or operation. General company environmental claims do not establish a site permit or measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/clinton/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.88,"lng":-90.24,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_stage":"exploring development, very early plans"},"notes":["Page describes exploration, not project approval, construction or operation. General company environmental claims do not establish a site permit or measured water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/clinton/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Clinton · Clinton · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"salix-data-center-site-ia","state":"IA","kind":"facility","name":"Salix Data Center Site (Midwest Capital Group)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Woodbury"],"city":"Salix","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Agreement enables exploration and is not an executed power-service contract. Google says it will not seek local real-estate abatements or rebates; this does not exclude all state/federal incentives or establish paid tax revenue. More than $20 billion is statewide historical Iowa investment, not Salix spending. July 8 vote directs drafting of a possible moratorium; August 12 adoption outcome is not observed in this source. Annexation is not DC construction approval. Other Norwalk investment and statewide counts must not be attributed to Salix. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ktiv.com/2026/08/03/google-considering-data-center-salix-iowa-according-midamerican-energy/","host":"ktiv.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.3208,"lng":-96.2872,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"KTIV reports Google and MidAmerican publicly identified exploratory interest in a potential 900-acre Salix site, explicitly describing no formal project announcement, development agreement or filed rezoning/application as of August 3.","independently_verified_current_operating_status":null,"reported_stage":"exploratory interest; no formal application as of source date","executed_utility_agreement_verified":false},"notes":["Agreement enables exploration and is not an executed power-service contract. Google says it will not seek local real-estate abatements or rebates; this does not exclude all state/federal incentives or establish paid tax revenue. More than $20 billion is statewide historical Iowa investment, not Salix spending. July 8 vote directs drafting of a possible moratorium; August 12 adoption outcome is not observed in this source. Annexation is not DC construction approval. Other Norwalk investment and statewide counts must not be attributed to Salix.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ktiv.com/2026/08/03/google-considering-data-center-salix-iowa-according-midamerican-energy/","host":"ktiv.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Salix · Woodbury · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"simple-mining-cascade-ia","state":"IA","kind":"facility","name":"Simple Mining Cascade (Dubuque County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Dubuque"],"city":"Cascade","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. The 10 to 40 MW range is the columnist’s generic container calculation, NOT disclosed site demand, a permit or utility commitment; leave canonical MW unknown. More than 75 MW and up-to-65% wind are company Iowa portfolio statements, not this site’s load or measured energy mix. Forty 160-square-foot containers are proposed units, not operating buildings. Company planned to disclose maximum power before buying land, so ownership/construction were not established. Normal-conversation noise description is not a sourced numerical ordinance limit. Generic tax/bill effects and home-equivalence estimates are not measured local impacts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://eagle1023fm.com/cascade-bitcoin-mining-project/","host":"eagle1023fm.com","date":"2026-03-25","published":"2026-03-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.2997,"lng":-91.0143,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Eagle 102.3 reports Simple Mining’s proposed Cascade modular bitcoin-mining project with about forty containers and roughly eight forecast local jobs.","independently_verified_current_operating_status":null,"canonical_it_mw":null,"commentator_generic_mw_estimate_excluded":true},"notes":["The 10 to 40 MW range is the columnist’s generic container calculation, NOT disclosed site demand, a permit or utility commitment; leave canonical MW unknown. More than 75 MW and up-to-65% wind are company Iowa portfolio statements, not this site’s load or measured energy mix. Forty 160-square-foot containers are proposed units, not operating buildings. Company planned to disclose maximum power before buying land, so ownership/construction were not established. Normal-conversation noise description is not a sourced numerical ordinance limit. Generic tax/bill effects and home-equivalence estimates are not measured local impacts.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://eagle1023fm.com/cascade-bitcoin-mining-project/","host":"eagle1023fm.com","date":"2026-03-25","published":"2026-03-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Cascade · Dubuque · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"simple-mining-cedar-falls-ia","state":"IA","kind":"facility","name":"Simple Mining Cedar Falls (rezoning defeated)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Black Hawk"],"city":"Cedar Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Public hearing was postponed from April 8 to April 22; no later vote outcome is in this source. Article correction explicitly says the crypto proposal was NOT brought by Cedar Falls Utilities. Utility’s 38-acre acquisition, closed-loop cooling/no-discharge statements concern Viking power-plant planning, not automatically the mining operation. At least 50 mining jobs is developer forecast. Existing three city mining locations are separately reported historical operations, not three new approved sites or independently verified active mines. No site MW or measured impact certified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.iowapublicradio.org/ipr-news/2026-03-26/cedar-falls-rezoning-proposal-cryptocurrency-mining-site","host":"iowapublicradio.org","date":"2026-03-26","published":"2026-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.5347,"lng":-92.4453,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Iowa Public Radio reports commission discussion of rezoning and crypto-mining regulations around Simple Mining’s proposed Cedar Falls location near the planned Viking Energy Center.","independently_verified_current_operating_status":null,"crypto_proposal_not_brought_by_cedar_falls_utilities":true},"notes":["Public hearing was postponed from April 8 to April 22; no later vote outcome is in this source. Article correction explicitly says the crypto proposal was NOT brought by Cedar Falls Utilities. Utility’s 38-acre acquisition, closed-loop cooling/no-discharge statements concern Viking power-plant planning, not automatically the mining operation. At least 50 mining jobs is developer forecast. Existing three city mining locations are separately reported historical operations, not three new approved sites or independently verified active mines. No site MW or measured impact certified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.iowapublicradio.org/ipr-news/2026-03-26/cedar-falls-rezoning-proposal-cryptocurrency-mining-site","host":"iowapublicradio.org","date":"2026-03-26","published":"2026-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Cedar Falls · Black Hawk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"simple-mining-manchester-ia","state":"IA","kind":"facility","name":"Simple Mining Manchester","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Delaware"],"city":"Manchester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Only public introductory preview was read; premium body is not accessed or decoded. Exact meeting day, conditions, capex, site MW and current construction/operation are not supplied in the preview. Site-plan approval is not service availability. The article’s later modification timestamp does not establish a new approval or current project status. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.telegraphherald.com/news/tri-state/article_efb5a5f4-c946-11ef-bf6a-8f5650901c78.html","host":"telegraphherald.com","date":"2025-01-03","published":"2025-01-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.4842,"lng":-91.4515,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Public Telegraph Herald preview says Manchester council approved Simple Mining’s proposed industrial-park site plan at its most recent meeting.","independently_verified_current_operating_status":null},"notes":["Only public introductory preview was read; premium body is not accessed or decoded. Exact meeting day, conditions, capex, site MW and current construction/operation are not supplied in the preview. Site-plan approval is not service availability. The article’s later modification timestamp does not establish a new approval or current project status.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.telegraphherald.com/news/tri-state/article_efb5a5f4-c946-11ef-bf6a-8f5650901c78.html","host":"telegraphherald.com","date":"2025-01-03","published":"2025-01-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Manchester · Delaware · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"south-front-networks-davenport-ia","state":"IA","kind":"facility","name":"South Front Networks IA-Davenport Interconnection Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Scott"],"city":"Davenport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. SouthFrontoperatorbuildinglistnamesIA-Davenport2814NClarkSt,withmetrofibertoBluebirdQuadCities. DistinctIA-Bettendorf2701DevilsGlenRdlistedseparately. POP/networkreachlocationnotproofSouthFrontownsentireDC;noITMW,commissioningdate,permitorpoweragreement. Othercities/ZIPpossibletyposnotreconciled. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol. SouthFrontoperatorhomeexplainsmiddle-milecarrier-motel/interconnectionservices,neutraltransportand10G-400Gwavelengths. Gbps/networkcapacitynotMWelectricalcapacity;companyHQMankatoisnotDavenportsiteaddress. PairednamedbuildinglistsupportsDavenportidentitycontextonly.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://southfront.io/pop","host":"southfront.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://southfront.io/","host":"southfront.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5477099,"lng":-90.620859,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"SouthFrontoperatorbuildinglistnamesIA-Davenport2814NClarkSt,withmetrofibertoBluebirdQuadCities. DistinctIA-Bettendorf2701DevilsGlenRdlistedseparately. POP/networkreachlocationnotproofSouthFrontownsentireDC;noITMW,commissioningdate,permitorpoweragreement. Othercities/ZIPpossibletyposnotreconciled."},"notes":["SouthFrontoperatorbuildinglistnamesIA-Davenport2814NClarkSt,withmetrofibertoBluebirdQuadCities. DistinctIA-Bettendorf2701DevilsGlenRdlistedseparately. POP/networkreachlocationnotproofSouthFrontownsentireDC;noITMW,commissioningdate,permitorpoweragreement. Othercities/ZIPpossibletyposnotreconciled.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://southfront.io/pop","host":"southfront.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"SouthFrontoperatorhomeexplainsmiddle-milecarrier-motel/interconnectionservices,neutraltransportand10G-400Gwavelengths. Gbps/networkcapacitynotMWelectricalcapacity;companyHQMankatoisnotDavenportsiteaddress. PairednamedbuildinglistsupportsDavenportidentitycontextonly."},"notes":["SouthFrontoperatorhomeexplainsmiddle-milecarrier-motel/interconnectionservices,neutraltransportand10G-400Gwavelengths. Gbps/networkcapacitynotMWelectricalcapacity;companyHQMankatoisnotDavenportsiteaddress. PairednamedbuildinglistsupportsDavenportidentitycontextonly.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://southfront.io/","host":"southfront.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Davenport · Scott · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"south-front-networks-emery-mason-city-ia","state":"IA","kind":"facility","name":"South Front Networks IA-Emery","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cerro Gordo"],"city":"Mason City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Presence of a network point does not prove provider owns or operates an entire data center, exclusive tenancy, parcel coordinates or capacity. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://southfront.io/pop","host":"southfront.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.132695,"lng":-93.27891,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"published_network_presence_address":"16455 Lark Avenue, Mason City, IA50401","provider_ownership_of_whole_building_verified":false,"reported_context":"South Front Networks published PoP list names Aureon at 616 10th Street Des Moines and IA-Emery at 16455 Lark Avenue Mason City.","independently_verified_current_operating_status":null},"notes":["Presence of a network point does not prove provider owns or operates an entire data center, exclusive tenancy, parcel coordinates or capacity.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://southfront.io/pop","host":"southfront.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Mason City · Cerro Gordo · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"swarm-systems-marshalltown-ia","state":"IA","kind":"facility","name":"Swarm Systems Marshalltown Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marshall"],"city":"Marshalltown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. City’s reported 120-day pause/November 23 expiry is not an original ordinance review; report says adopted inAugust, so exact start/end calculation is not reconstructed. Optional 60-day extension is not adopted extension. September 17 draft presentation was future and no result assumed. County’s separate possible six-month pause is not the city action. No tenant/MW/RFS verified. Other Iowa project powers, revenues and jobs are not Swarm figures. Directory-derived 116 statewide count is not an independently established census. Only project-relevant and surrounding policy context personally reviewed; no certification of every other county row. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.businessrecord.com/iowa-communities-grapple-with-regulating-data-centers-as-development-spreads/","host":"businessrecord.com","date":"2026-09-11","published":"2026-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.056,"lng":-92.897,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Business Record’s Marshalltown sections describe Swarm Systems discussing purchase of 21 city-owned acres at Edgewood Industrial Park for a 150,000-square-foot concept, with proposal and land negotiations not finalized.","independently_verified_current_operating_status":null},"notes":["City’s reported 120-day pause/November 23 expiry is not an original ordinance review; report says adopted inAugust, so exact start/end calculation is not reconstructed. Optional 60-day extension is not adopted extension. September 17 draft presentation was future and no result assumed. County’s separate possible six-month pause is not the city action. No tenant/MW/RFS verified. Other Iowa project powers, revenues and jobs are not Swarm figures. Directory-derived 116 statewide count is not an independently established census. Only project-relevant and surrounding policy context personally reviewed; no certification of every other county row.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.businessrecord.com/iowa-communities-grapple-with-regulating-data-centers-as-development-spreads/","host":"businessrecord.com","date":"2026-09-11","published":"2026-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Marshalltown · Marshall · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"tract-altoona-ia","state":"IA","kind":"facility","name":"Tract Altoona Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Polk"],"city":"Altoona","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Altoona announced entitled land campus and future capacity. Headline450acre approximation versus body453ac retained as different precision. Fully entitled marketing does not establish all individual building permits or energization. More than1GW expected, not existing load or committed tenant. Actual signed development agreement/incentives and spending not inspected. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/","host":"altoonanow.org","date":"2025-10-01","published":"2025-10-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6439,"lng":-93.4649,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Altoona announced entitled land campus and future capacity","fields":{"publisher":"City of Altoona economic development","company":"Tract","announcement_date":"2025-10-01","reported_entitled_acres":453,"expected_capacity_gw_min_exclusive":1,"power_basis":"campus capacity, not explicit critical IT","city_reported_processes":["annexation","rezoning","development agreement"]},"notes":["Headline450acre approximation versus body453ac retained as different precision. Fully entitled marketing does not establish all individual building permits or energization. More than1GW expected, not existing load or committed tenant. Actual signed development agreement/incentives and spending not inspected.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/","host":"altoonanow.org","date":"2025-10-01","published":"2025-10-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Altoona · Polk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"tract-norwalk-ia","state":"IA","kind":"facility","name":"Tract Norwalk Data Center Park (Project West)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"Norwalk","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Norwalk infrastructure due-diligence proposal and qualified forecasts. Developer infrastructure agreement vote explicitly not approval to build a data center. Water capacity reserved not actual use. No tax incentives offered statement qualified by non-tax fee waiver and possible future benefits. City rate-protection advocacy not independently approved utility tariff or measured bill outcome. No exact vote outcome or operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.norwalk.iowa.gov/news_detail_T5_R273.php","host":"norwalk.iowa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.460963,"lng":-93.6978644,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Norwalk infrastructure due-diligence proposal and qualified forecasts","fields":{"historical_hearing_scheduled_date":"2026-03-05","historical_hearing_scheduled_local_time":"18:00","proposed_developer_water_capacity_dedication_gallons_per_day":400000,"city_industrial_reserved_capacity_gallons_per_day":650000,"city_projected_full_build_annual_new_property_tax_usd_approx":5000000,"all_taxing_entities_projected_annual_new_property_tax_usd_approx":15000000,"proposed_non_tax_incentive":"sanitary sewer district fee waiver"},"notes":["Developer infrastructure agreement vote explicitly not approval to build a data center. Water capacity reserved not actual use. No tax incentives offered statement qualified by non-tax fee waiver and possible future benefits. City rate-protection advocacy not independently approved utility tariff or measured bill outcome. No exact vote outcome or operating proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.norwalk.iowa.gov/news_detail_T5_R273.php","host":"norwalk.iowa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Norwalk · Warren · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"usshc-monticello-ia","state":"IA","kind":"facility","name":"US Secure Hosting Center (USSHC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jones"],"city":"Monticello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Historical tenant launch does not certify 2026 tenant occupancy, facility ownership or operation. Intro says tomorrow while later update says January 7 service live; no exact building-opening date is inferred. Company security/redundancy claims are attributed, not independent certification. Nearby/comparison underground facilities’ floor areas and another provider’s 23 locations are not USSHC capacity. No MW, current space or financial amount verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterknowledge.com/business/wikia-search-launches-from-iowa-data-bunker","host":"datacenterknowledge.com","date":"2008-01-07","published":"2008-01-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.284076,"lng":-91.092129,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Data Center Knowledge’s 2008 account identifies USSHC’s Monticello underground facility as providing colocation/disaster recovery for Wikia’s launch.","independently_verified_current_operating_status":null},"notes":["Historical tenant launch does not certify 2026 tenant occupancy, facility ownership or operation. Intro says tomorrow while later update says January 7 service live; no exact building-opening date is inferred. Company security/redundancy claims are attributed, not independent certification. Nearby/comparison underground facilities’ floor areas and another provider’s 23 locations are not USSHC capacity. No MW, current space or financial amount verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterknowledge.com/business/wikia-search-launches-from-iowa-data-bunker","host":"datacenterknowledge.com","date":"2008-01-07","published":"2008-01-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Monticello · Jones · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"us-signal-ia01-waukee-ia","state":"IA","kind":"facility","name":"US Signal IA01 Des Moines Data Center (Waukee)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Waukee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Dynamic headline counters appear as zero in saved text; critical load and areas remain unknown, not zero. Generator, UPS and kVA are different electrical bases, not IT MW. Built year not precise opening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers/ia01-des-moines/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.6118485,"lng":-93.8845129,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"IA01","published_address":"390 N Alices Road, Waukee, IA50263","operator_reported_year_built":2009,"generator_kw":3000,"ups_kw":2000,"utility_kva":5000},"notes":["Dynamic headline counters appear as zero in saved text; critical load and areas remain unknown, not zero. Generator, UPS and kVA are different electrical bases, not IT MW. Built year not precise opening date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers/ia01-des-moines/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Waukee · Dallas · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"wahawk-power-waterloo-ia","state":"IA","kind":"facility","name":"Wahawk Power Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Black Hawk"],"city":"Waterloo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Six-million-dollarMINIMUMASSESSMENT is taxable-value commitment, not necessarily capex or cash investment. Reported 1 dollar 12 acrelandconveyance and separate 10 to 12 acreoption are not proof option exercised;183 acreswholebusinesspark is not campus footprint.50 percentten-year TIF rebate concerns increment above 73,957 base and reportedly requires taxes paid/annual appropriation, not an up-front cash grant or rebate on all property. RegionalRISE 3.797798 millionroadgrants/6.329663 millioneligiblecosts are public infrastructure, not all a Wahawk award. Site-certification 5 MW minimum/500,000 gallonsdaily or park 1.5 to 2 milliondailyexcess do not establish facility load or consumption. Completion deadlines run from conveyance, whose exact date is not independently examined. Original agreements/tax law/current renewable or rate claims need primary review; no current operating certification. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hottlerealestate.com/blog/wahawk-power-data-center-blog_2","host":"hottlerealestate.com","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.4429861,"lng":-92.4006906,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Hottle Real Estate’s broker explainer describes a proposed WahawkPower 80,000-square-foot development and city-land/development terms reportedly reviewed December 15,2025.","independently_verified_current_operating_status":null},"notes":["Six-million-dollarMINIMUMASSESSMENT is taxable-value commitment, not necessarily capex or cash investment. Reported 1 dollar 12 acrelandconveyance and separate 10 to 12 acreoption are not proof option exercised;183 acreswholebusinesspark is not campus footprint.50 percentten-year TIF rebate concerns increment above 73,957 base and reportedly requires taxes paid/annual appropriation, not an up-front cash grant or rebate on all property. RegionalRISE 3.797798 millionroadgrants/6.329663 millioneligiblecosts are public infrastructure, not all a Wahawk award. Site-certification 5 MW minimum/500,000 gallonsdaily or park 1.5 to 2 milliondailyexcess do not establish facility load or consumption. Completion deadlines run from conveyance, whose exact date is not independently examined. Original agreements/tax law/current renewable or rate claims need primary review; no current operating certification.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hottlerealestate.com/blog/wahawk-power-data-center-blog_2","host":"hottlerealestate.com","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Iowa · Waterloo · Black Hawk · Source context reviewed","state_name":"Iowa","state_path":"/iowa/"},{"id":"beale-gardner-johnson-county-ks","state":"KS","kind":"facility","name":"Beale Infrastructure Gardner Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Gardner","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. KCUR publishes credited JohnsonCountyPost original byMargaretMellott May7,2026. Reports Beale withdrew Gardner application May6 following city position that no incentives would be provided. May4council tookNOACTIONonproposal; withdrawal is not councildenial or permanentcountyban. 300ac near191stStreet/SouthClareRoad, initial50jobs and15 to 20kgpdwater were proposed, not built/headcount/metereduse. Comparative5MGD genericbenchmark not actualGardnerwithdrawal. Separate DeSoto3.1B project and other southernJohnsonCounty withdrawals are not the same parcel; do not copy funding, buildings or groundbreaking into Gardner. Exactsignedwithdrawal/cityrelease not read here. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kcur.org/housing-development-section/2026-05-07/gardner-data-center-plan-withdrawn-by-company-after-resident-opposition","host":"kcur.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.81,"lng":-94.93,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["KCUR publishes credited JohnsonCountyPost original byMargaretMellott May7,2026. Reports Beale withdrew Gardner application May6 following city position that no incentives would be provided. May4council tookNOACTIONonproposal; withdrawal is not councildenial or permanentcountyban.","300ac near191stStreet/SouthClareRoad, initial50jobs and15 to 20kgpdwater were proposed, not built/headcount/metereduse. Comparative5MGD genericbenchmark not actualGardnerwithdrawal.","Separate DeSoto3.1B project and other southernJohnsonCounty withdrawals are not the same parcel; do not copy funding, buildings or groundbreaking into Gardner. Exactsignedwithdrawal/cityrelease not read here.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.kcur.org/housing-development-section/2026-05-07/gardner-data-center-plan-withdrawn-by-company-after-resident-opposition","host":"kcur.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Gardner · Johnson · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"beale-project-pilot-de-soto-ks","state":"KS","kind":"facility","name":"Beale Project Pilot (De Soto)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"De Soto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DeSoto incentives ceiling versus project cost and water scope. 50B is reported incentive-eligible private investment ceiling, not city general debt, actual spend or50Bpublicsubsidy. Original final agreement/bonds not inspected. Specific tenant unknown despite namechecking Google/Meta/Amazon/Microsoft. Water rights increased capacity belongs city system; generic millions-gallons/day examples not measured Pilot use. NearbyPanasonicandFlintCommerce warehouse distinct from computing buildings. No critical ITMW or current operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/","host":"johnsoncountypost.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.966,"lng":-94.967,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"DeSoto incentives ceiling versus project cost and water scope","fields":{"project":"Project Pilot","developer_entity":"Mount Sunflower Properties LLC, managed by Beale Infrastructure","city":"DeSoto, Kansas","reported_site_acres":290,"reported_project_investment_usd":3100000000,"reported_incentive_eligible_irb_ceiling_usd":50000000000,"planned_buildings":4,"planned_each_building_sqft":285000,"planned_combined_sqft":1140000,"first_building_target_year":2027,"fullbuildout_duration_years_range":[5,9],"reported_per_building_abatement_years":10},"notes":["50B is reported incentive-eligible private investment ceiling, not city general debt, actual spend or50Bpublicsubsidy. Original final agreement/bonds not inspected. Specific tenant unknown despite namechecking Google/Meta/Amazon/Microsoft. Water rights increased capacity belongs city system; generic millions-gallons/day examples not measured Pilot use. NearbyPanasonicandFlintCommerce warehouse distinct from computing buildings. No critical ITMW or current operations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/","host":"johnsoncountypost.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · De Soto · Johnson · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"crypto-colo-center-mclouth-ks","state":"KS","kind":"facility","name":"Crypto Colo Center McLouth Data Center (proposed)  -  cancelled","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Jefferson"],"city":"McLouth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. McLouth city only recommended denial; county had jurisdiction outside city.32.4MWproposed generation not IT demand. Historical pause cannot be presumed active October2026; no current restart result verified. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://startlandnews.com/2023/03/no-crypto/","host":"startlandnews.com","date":"2023-03-06","published":"2023-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.19611,"lng":-95.20833,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Flatland report via Startland says Crypto Colo application withdrawn February27,2023 and Jefferson County enacted twelve-month pause.","independently_verified_current_operating_status":null},"notes":["McLouth city only recommended denial; county had jurisdiction outside city.32.4MWproposed generation not IT demand. Historical pause cannot be presumed active October2026; no current restart result verified.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://startlandnews.com/2023/03/no-crypto/","host":"startlandnews.com","date":"2023-03-06","published":"2023-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · McLouth · Jefferson · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"colossus-bullock-spring-hill-ks","state":"KS","kind":"facility","name":"Data Center Proposal at 191st & Renner, Spring Hill  -  cancelled","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Spring Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Industrial rezoning withdrawn; final intended land use was not specifically confirmed by officials. No completed operating data center or citywide ban inferred. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kshb.com/news/local-news/kansas/johnson-county/developers-drop-application-to-develop-possible-data-center-in-spring-hill","host":"kshb.com","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.7430646,"lng":-94.8255166,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"KSHB reproduces Bullock/Colossus withdrawal statement, with Spring Hill mayor confirmation and cancelled March25 special meeting.","independently_verified_current_operating_status":null},"notes":["Industrial rezoning withdrawn; final intended land use was not specifically confirmed by officials. No completed operating data center or citywide ban inferred.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kshb.com/news/local-news/kansas/johnson-county/developers-drop-application-to-develop-possible-data-center-in-spring-hill","host":"kshb.com","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Spring Hill · Johnson · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"databank-overland-park-ks","state":"KS","kind":"facility","name":"DataBank MCI2 Pine Ridge Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Overland Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.975738717441,"lng":-94.708635080112,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MCI2","street":"10605 W.84thTerrace","city":"Overland Park","critical_it_capacity_mw":2,"it_area_sqft":11510,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Overland Park · Johnson · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"databank-lenexa-ks","state":"KS","kind":"facility","name":"DataBank MCI3 South Lake Campus Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Lenexa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Market14.8MW describes multiple centers, not MCI3. Campus summary66,920 ITsqft versus MCI3card69,762 ITsqft differs; retain scope-specific figures and flag conflict. Operator explicitly lists MCI3 at11200LakeviewAve and MCI2 in Overland Park. Market header says2facilities while narrative says3; do not turn market total into one-site capacity. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.925685125075,"lng":-94.769520334995,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Lenexa","street":"11200 Lakeview Ave","facility_code":"MCI3","power_mw":12.75,"power_basis":"critical IT load specification","it_area_sqft":69762},"notes":["Market14.8MW describes multiple centers, not MCI3.","Campus summary66,920 ITsqft versus MCI3card69,762 ITsqft differs; retain scope-specific figures and flag conflict.","Operator explicitly lists MCI3 at11200LakeviewAve and MCI2 in Overland Park. Market header says2facilities while narrative says3; do not turn market total into one-site capacity.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Lenexa · Johnson · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"evolution-technology-bourbon-county-ks","state":"KS","kind":"facility","name":"Evolution Technology Bitcoin Mine (Bourbon County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Bourbon"],"city":"Uniontown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. No adopted moratorium or crime finding is established. A resident's ChatGPT-derived wind-noise reference is not verified cryptocurrency law. Complaints are attributed observations, without certified acoustic measurements or health causation. Unrelated county purchases are not incentives. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fortscott.biz/news/bourbon-county-commission-discusses-bitcoin-mining-noise-issue-cemetery-records","host":"fortscott.biz","date":"2025-10-07","published":"2025-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.8473,"lng":-94.9753,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Fort Scott Biz reports Bourbon County, Kansas discussion of Evolution Technology generator noise, an investigation and a rough moratorium draft.","independently_verified_current_operating_status":null},"notes":["No adopted moratorium or crime finding is established. A resident's ChatGPT-derived wind-noise reference is not verified cryptocurrency law. Complaints are attributed observations, without certified acoustic measurements or health causation. Unrelated county purchases are not incentives.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fortscott.biz/news/bourbon-county-commission-discusses-bitcoin-mining-noise-issue-cemetery-records","host":"fortscott.biz","date":"2025-10-07","published":"2025-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Uniontown · Bourbon · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"kanza-park-flint-hills-emporia-ks","state":"KS","kind":"facility","name":"Flint Hills Digital Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lyon"],"city":"Emporia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Gigawatt-scale language supplies no exact critical IT MW. Economic-development endorsement is not a permit, identified tenant, groundbreaking or observed hearing outcome. Forecast spending and jobs are not measured benefits. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wibw.com/2026/06/02/flint-hills-digital-campus-proposed-emporia/","host":"wibw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.4040054,"lng":-96.181623,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WIBW reports Kanza Park Place predevelopment near Emporia and a scheduled June 23 hearing.","independently_verified_current_operating_status":null},"notes":["Gigawatt-scale language supplies no exact critical IT MW. Economic-development endorsement is not a permit, identified tenant, groundbreaking or observed hearing outcome. Forecast spending and jobs are not measured benefits.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wibw.com/2026/06/02/flint-hills-digital-campus-proposed-emporia/","host":"wibw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Emporia · Lyon · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"google-project-helium-sharon-ks","state":"KS","kind":"facility","name":"Google Data Center (Project Helium)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Barber"],"city":"Sharon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Barber County authoritative document-discovery index. County document index lists Helium agreements, presentations and forecasts but not signed contractual terms in HTML. No project MW, incentive dollars, executed effective date or actual tax receipts adopted before reading linked instruments. Public partner website link not proof of operating data center. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://barber.ks.gov/data-center.html","host":"barber.ks.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.2486335,"lng":-98.4206316,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Barber County authoritative document-discovery index","fields":{},"notes":["County document index lists Helium agreements, presentations and forecasts but not signed contractual terms in HTML. No project MW, incentive dollars, executed effective date or actual tax receipts adopted before reading linked instruments. Public partner website link not proof of operating data center.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://barber.ks.gov/data-center.html","host":"barber.ks.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Sharon · Barber · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"cloverleaf-bluestem-tonganoxie-ks","state":"KS","kind":"facility","name":"Project Bluestem","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Leavenworth"],"city":"Tonganoxie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bluestem conceptual developer statement. Undated no-application statement is not independently current local docket check. Generic building-size FAQ not actual campus plan. Closed-loop cooling still has initial fill and domestic water. Ratepayer promises not signed tariff or independent finding. Frenchtown Michigan image attribution does not relocate Kansas project. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bluestemdatacenter.com/","host":"bluestemdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.1097,"lng":-95.0877,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Bluestem conceptual developer statement","fields":{"project_name":"Project Bluestem","locality":"near Tonganoxie Business Park, Leavenworth County, Kansas","developer":"Cloverleaf Infrastructure","source_described_stage":"conceptual, no formal local approval or permit requests submitted at time of undated text","expected_phase1_construction_years_min_exclusive":2,"expected_construction_jobs_min_exclusive":1000,"expected_initial_fulltime_jobs_min_exclusive":50,"expected_full_buildout_fulltime_jobs_min_exclusive":200},"notes":["Undated no-application statement is not independently current local docket check. Generic building-size FAQ not actual campus plan. Closed-loop cooling still has initial fill and domestic water. Ratepayer promises not signed tariff or independent finding. Frenchtown Michigan image attribution does not relocate Kansas project.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bluestemdatacenter.com/","host":"bluestemdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Tonganoxie · Leavenworth · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"red-wolf-dcd-properties-project-red-wolf-ks","state":"KS","kind":"facility","name":"Project Red Wolf","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wyandotte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Staff recommendation and scheduled meetings are not commission or board approval. The operating company is explicitly undisclosed. No power, current construction, commissioning or later outcome established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyandottenewsdaily.com/large-data-center-project-prompts-special-planning-commission-meeting/","host":"wyandottenewsdaily.com","date":"2025-05-27","published":"2025-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.132358,"lng":-94.88035,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Wyandotte News Daily describes Red Wolf Park North rezoning and master-plan requests for over240acres and six proposed buildings, with a favorable staff recommendation and meetings scheduled.","independently_verified_current_operating_status":null},"notes":["Staff recommendation and scheduled meetings are not commission or board approval. The operating company is explicitly undisclosed. No power, current construction, commissioning or later outcome established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyandottenewsdaily.com/large-data-center-project-prompts-special-planning-commission-meeting/","host":"wyandottenewsdaily.com","date":"2025-05-27","published":"2025-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Kansas City · Wyandotte · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"powertransitions-project-yardbird-ks","state":"KS","kind":"facility","name":"Project Yardbird","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wyandotte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Issuer marketing and conceptual plan, not executed land/tenant/utility agreement, current operating campus or delivered criticalIT.161kVtransmission voltage is not MW; new150MWon-siteGENis not additive IT or proof built. StateSB98policy eligibility is not site-specific tax award. PartnersGroup170billionAUM and team50billionexperience are not campus capex. Planned demolition/permits and power-ready dates remain forecasts. Publicly served flipbook has confidentiality/distribution notice; retained for internal source evaluation, do not redistribute presentation/media as press asset or imply NDA execution. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City","host":"wsp.cld.bz","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.147,"lng":-94.635,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Public PowerTransitions Quindaro presentation markets40acres at3601North12thStreet KansasCityKansas and option to purchase/lease, with150MWgridpower targetedQ1-2027 and150plusadditionalMWtargetedQ1-2028, totaling300plusMWGROSS. Presentation states nonbinding until definitive written agreement.","independently_verified_current_operating_status":null,"issuer_planned_gross_grid_mw_phase1":150,"issuer_planned_gross_grid_mw_phase2_lower_bound":150,"issuer_planned_gross_grid_mw_total_lower_bound":300,"phase1_power_target":"Q1 2027","phase2_power_target":"Q1 2028","critical_it_mw":null,"executed_utility_agreement_verified":false},"notes":["Issuer marketing and conceptual plan, not executed land/tenant/utility agreement, current operating campus or delivered criticalIT.161kVtransmission voltage is not MW; new150MWon-siteGENis not additive IT or proof built. StateSB98policy eligibility is not site-specific tax award. PartnersGroup170billionAUM and team50billionexperience are not campus capex. Planned demolition/permits and power-ready dates remain forecasts. Publicly served flipbook has confidentiality/distribution notice; retained for internal source evaluation, do not redistribute presentation/media as press asset or imply NDA execution.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City","host":"wsp.cld.bz","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Kansas City · Wyandotte · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"tierpoint-kansas-city-lenexa-ks","state":"KS","kind":"facility","name":"TierPoint Kansas City - Lenexa","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Lenexa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/kansas/kansas-city-lenexa/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9406295,"lng":-94.7552326,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":58000,"gross_area_is_lower_bound":true,"raised_floor_sqft":11000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2.5 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/kansas/kansas-city-lenexa/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas · Lenexa · Johnson · Source context reviewed","state_name":"Kansas","state_path":"/kansas/"},{"id":"aws-benton-bossier-parish-la","state":"LA","kind":"facility","name":"Amazon Web Services Bossier Parish Campus (Benton)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bossier"],"city":"Benton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.77,"lng":-93.74,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical two-campus regional project with potential duplicate operator/customer records","fields":{"historical_announcement_date":"2026-02-23","historical_regional_planned_investment_usd":12000000000,"expected_regional_direct_jobs":540,"expected_regional_indirect_jobs":1700,"expected_regional_construction_jobs_max":1500,"developer_owner":"STACK Infrastructure","customer":"Amazon","regional_scope":"Caddo and Bossier Parishes"},"notes":["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Benton · Bossier · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"aws-blanchard-caddo-parish-la","state":"LA","kind":"facility","name":"Amazon Web Services Caddo Parish Campus (Blanchard)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caddo"],"city":"Blanchard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.6,"lng":-94.04,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical two-campus regional project with potential duplicate operator/customer records","fields":{"historical_announcement_date":"2026-02-23","historical_regional_planned_investment_usd":12000000000,"expected_regional_direct_jobs":540,"expected_regional_indirect_jobs":1700,"expected_regional_construction_jobs_max":1500,"developer_owner":"STACK Infrastructure","customer":"Amazon","regional_scope":"Caddo and Bossier Parishes"},"notes":["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Blanchard · Caddo · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"applied-digital-delta-forge-1-la","state":"LA","kind":"facility","name":"Applied Digital Delta Forge 1 AI Factory Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rapides"],"city":"Boyce","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 418 is direct plus218indirect, not418onsite permanent jobs. Forecast not completed build or current consumption. 300MW is explicitly criticalIT combined initial two buildings, not300each. Sales/use exemption qualification has no dollar award quantified here. Closed loop does not prove zero total water. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","host":"opportunitylouisiana.gov","date":"2026-05-26","published":"2026-05-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.4,"lng":-92.65,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"development_announcement_date":"2026-05-26","planned_investment_usd":3600000000,"planned_initial_critical_it_mw":300,"planned_initial_buildings":2,"campus_acres_approx":300,"site_development_start_month":"2026-01","initial_operations_target":"mid2027","expected_direct_full_time_onsite_jobs":200,"expected_indirect_jobs":218,"peak_construction_jobs_min_exclusive":1000,"government_reported_equipment_sales_use_exemption_qualification":true},"notes":["418 is direct plus218indirect, not418onsite permanent jobs. Forecast not completed build or current consumption. 300MW is explicitly criticalIT combined initial two buildings, not300each. Sales/use exemption qualification has no dollar award quantified here. Closed loop does not prove zero total water.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","host":"opportunitylouisiana.gov","date":"2026-05-26","published":"2026-05-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Boyce · Rapides · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"stack-bossier-parish-la","state":"LA","kind":"facility","name":"Bossier Parish Campus (with Amazon)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bossier"],"city":"Benton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.69,"lng":-93.74,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical two-campus regional project with potential duplicate operator/customer records","fields":{"historical_announcement_date":"2026-02-23","historical_regional_planned_investment_usd":12000000000,"expected_regional_direct_jobs":540,"expected_regional_indirect_jobs":1700,"expected_regional_construction_jobs_max":1500,"developer_owner":"STACK Infrastructure","customer":"Amazon","regional_scope":"Caddo and Bossier Parishes"},"notes":["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Benton · Bossier · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"walker-buddy-ellis-road-data-center-livingston-la","state":"LA","kind":"facility","name":"Buddy Ellis Road Data Center Site (Walker)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Livingston"],"city":"Walker","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Microsoft identity is explicitly UNOFFICIALrumor, not confirmed tenant/operator. General heavy-industrial rezoning and apparent land ownership do not establish approved DCsite plan or completed purchase of neighboring hospital land; eviction recipient’s inference is not deed evidence. Utility 1 GWapplication is described as generation but original instrument needed to distinguish load/interconnection/generation; no critical IT adopted. Old grid/home-year comparisons have unit/time problems and are excluded. November 3 commission/November 20,2025 councilactions are reported history, not independently read originals. No quantified incentives, permanent jobs or RFS. Published localAugust 31 corresponds toUTCSeptember 1 metadata. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://louisianavoice.com/2026/08/31/louisianavoice-learns-new-data-center-on-tap-for-livingston-parish-everything-was-done-in-secrecy-via-use-of-ndas/","host":"louisianavoice.com","date":"2026-08-31","published":"2026-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.4541822,"lng":-90.8767224,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"LouisianaVoice’s reported-records/opinion piece links a 691-acre BuddyEllisRoad industrial rezoning to a possible Walker data center and utility large-project activity.","independently_verified_current_operating_status":null},"notes":["Microsoft identity is explicitly UNOFFICIALrumor, not confirmed tenant/operator. General heavy-industrial rezoning and apparent land ownership do not establish approved DCsite plan or completed purchase of neighboring hospital land; eviction recipient’s inference is not deed evidence. Utility 1 GWapplication is described as generation but original instrument needed to distinguish load/interconnection/generation; no critical IT adopted. Old grid/home-year comparisons have unit/time problems and are excluded. November 3 commission/November 20,2025 councilactions are reported history, not independently read originals. No quantified incentives, permanent jobs or RFS. Published localAugust 31 corresponds toUTCSeptember 1 metadata.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://louisianavoice.com/2026/08/31/louisianavoice-learns-new-data-center-on-tap-for-livingston-parish-everything-was-done-in-secrecy-via-use-of-ndas/","host":"louisianavoice.com","date":"2026-08-31","published":"2026-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Walker · Livingston · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"stack-caddo-parish-la","state":"LA","kind":"facility","name":"Caddo Parish Campus (with Amazon)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caddo"],"city":"Blanchard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.58,"lng":-93.9,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical two-campus regional project with potential duplicate operator/customer records","fields":{"historical_announcement_date":"2026-02-23","historical_regional_planned_investment_usd":12000000000,"expected_regional_direct_jobs":540,"expected_regional_indirect_jobs":1700,"expected_regional_construction_jobs_max":1500,"developer_owner":"STACK Infrastructure","customer":"Amazon","regional_scope":"Caddo and Bossier Parishes"},"notes":["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Blanchard · Caddo · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"dartpoints-btr1-baton-rouge-la","state":"LA","kind":"facility","name":"DartPoints BTR1 Baton Rouge","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["East Baton Rouge"],"city":"Baton Rouge","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Utility2.5MW is not IT0.5MW. Advertised zero outages over15years is operator claim, not independently measured availability. Operator clearly separates critical IT capacity and utility power, and data hall area from whole facility. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dartpoints.com/locations/btr01-baton-rouge-la/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.4539942,"lng":-91.115481,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Baton Rouge","critical_it_capacity_mw":0.5,"utility_power_mw":2.5,"data_hall_sqft":25800,"whole_facility_sqft":86400,"marketed_service":"colocation"},"notes":["Utility2.5MW is not IT0.5MW.","Advertised zero outages over15years is operator claim, not independently measured availability.","Operator clearly separates critical IT capacity and utility power, and data hall area from whole facility.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dartpoints.com/locations/btr01-baton-rouge-la/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Baton Rouge · East Baton Rouge · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"dartpoints-btr2-baton-rouge-la","state":"LA","kind":"facility","name":"DartPoints BTR2 Baton Rouge","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["East Baton Rouge"],"city":"Baton Rouge","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DartPoints Venyu completed acquisition and portfolio scope. Corporate11sites/20MW/325000sqft are not BTR2 alone or Louisiana-only. Three acquired sites do not establish exact BTR2address, opening or power. Historical2023portfolio is not current2026census. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dartpoints.com/press/dartpoints-acquires-venyu-adding-three-louisiana-data-centers-to-portfolio/","host":"dartpoints.com","date":"2023-05-02","published":"2023-05-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.4514445,"lng":-91.1156117,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"DartPoints Venyu completed acquisition and portfolio scope","fields":{"acquisition_announced_completed_date":"2023-05-02","acquired_operator":"Venyu","acquired_louisiana_data_centers":3,"acquired_markets":["Baton Rouge","Shreveport"],"post_acquisition_corporate_portfolio_data_centers":11,"post_acquisition_portfolio_area_sqft_min_exclusive":325000,"post_acquisition_portfolio_power_mw":20},"notes":["Corporate11sites/20MW/325000sqft are not BTR2 alone or Louisiana-only. Three acquired sites do not establish exact BTR2address, opening or power. Historical2023portfolio is not current2026census.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dartpoints.com/press/dartpoints-acquires-venyu-adding-three-louisiana-data-centers-to-portfolio/","host":"dartpoints.com","date":"2023-05-02","published":"2023-05-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Baton Rouge · East Baton Rouge · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"dartpoints-shv01-shreveport-la","state":"LA","kind":"facility","name":"DartPoints SHV01 Shreveport","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caddo"],"city":"Shreveport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. DartPoints identifies SHV01Shreveport colocation: table215kWcriticalIT,5600sfdatahall,760tonscooling; narrative2.25MWUTILITY and4000kWGENERATORS. Those capacities are distinct, not additive or interchangeable.20kW-per-rack and200-plusactive racks are marketing descriptions, not proof all racks draw20kW or an inferred4MWIT replacement for printed215kW. Potential specification inconsistency remains unreconciled. TierIII/onlyinLouisiana/46thUS/SOC claims not independently audited. DallasHQ address is not Shreveport premises; no exact facility street or commissioning day newly verified. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dartpoints.com/locations/shv01-shreveport-la/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.5135356,"lng":-93.7477839,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-operator-transaction-and-local-outcomes-round61-2026-10-15.json","scope":"Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.","fields":{},"notes":["DartPoints identifies SHV01Shreveport colocation: table215kWcriticalIT,5600sfdatahall,760tonscooling; narrative2.25MWUTILITY and4000kWGENERATORS. Those capacities are distinct, not additive or interchangeable.20kW-per-rack and200-plusactive racks are marketing descriptions, not proof all racks draw20kW or an inferred4MWIT replacement for printed215kW. Potential specification inconsistency remains unreconciled. TierIII/onlyinLouisiana/46thUS/SOC claims not independently audited. DallasHQ address is not Shreveport premises; no exact facility street or commissioning day newly verified.","Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."],"sources":[{"url":"https://dartpoints.com/locations/shv01-shreveport-la/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Shreveport · Caddo · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"edgeconnex-sli01-slidell-la","state":"LA","kind":"facility","name":"EdgeConneX SLI01 (Slidell)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Tammany"],"city":"Slidell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. NoMWspecified; rackdensitynotwholefacility. Marketnameisnotparceladdress. SLI01operatoridentifiesSlidellratherthanmunicipalNewOrleans. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/americas/new-orleans-la/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.287098,"lng":-89.737403,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"SLI01","facility_area_sqft":26950,"raised_floor_sqft":4610},"notes":["NoMWspecified; rackdensitynotwholefacility. Marketnameisnotparceladdress. SLI01operatoridentifiesSlidellratherthanmunicipalNewOrleans.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/americas/new-orleans-la/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Slidell · St. Tammany · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"fogo-data-centers-new-orleans-la","state":"LA","kind":"facility","name":"Fogo Data Centers New Orleans","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orleans"],"city":"New Orleans","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. FOGO New Orleans commercial facility/service listing. No street, numericITMW,areaoropeningdayinreviewedmarketbody. FooterNewOrleansandKennerseparatemarketsnotproofthislistingisnewbuildingversustenantspace. Genericcompliance-readydoesnotmeanindependentlycertifiedHIPAA/CJISfacility. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fogosolutions.com/data-center-new-orleans-la/","host":"fogosolutions.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.9529522,"lng":-90.0730531,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"FOGO New Orleans commercial facility/service listing","fields":{"operator":"FOGO Solutions","advertised_market":"New Orleans, Louisiana","operator_described_services":["colocation","cloud","disaster recovery"]},"notes":["No street, numericITMW,areaoropeningdayinreviewedmarketbody. FooterNewOrleansandKennerseparatemarketsnotproofthislistingisnewbuildingversustenantspace. Genericcompliance-readydoesnotmeanindependentlycertifiedHIPAA/CJISfacility.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fogosolutions.com/data-center-new-orleans-la/","host":"fogosolutions.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · New Orleans · Orleans · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"hut8-river-bend-west-feliciana-la","state":"LA","kind":"facility","name":"Hut 8 River Bend AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["West Feliciana"],"city":"St. Francisville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 330MWutility and245MWcriticalIT are separate scopes, not additive.1000MWfull-site utility potential not operating IT.10Bmaximum phase1investment not audited spend;268jobs includes193indirect. State program participation expected, no paid rebate or executed award value. Reported construction underway not operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center","host":"opportunitylouisiana.gov","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.79,"lng":-91.38,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"development_announcement_date":"2025-12-17","phase1_investment_usd_max":10000000000,"phase1_initial_utility_capacity_mw":330,"phase1_critical_it_capacity_mw":245,"potential_full_site_utility_capacity_mw_max":1000,"expected_phase1_direct_jobs_min":75,"expected_phase1_indirect_jobs":193,"peak_phase1_construction_workers_approx":1000,"operations_target":"2027-Q2","tenant":"Fluidstack","tenant_lease_backstop":"Google"},"notes":["330MWutility and245MWcriticalIT are separate scopes, not additive.1000MWfull-site utility potential not operating IT.10Bmaximum phase1investment not audited spend;268jobs includes193indirect. State program participation expected, no paid rebate or executed award value. Reported construction underway not operations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center","host":"opportunitylouisiana.gov","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · St. Francisville · West Feliciana · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"meta-hyperion-richland-parish-la","state":"LA","kind":"facility","name":"Meta Hyperion","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Richland"],"city":"Delhi vicinity","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Undated current page says5GWtopline but later says over2GW; retain scope/version discrepancy rather than summing. Compute label is not independently established utility gross or energized load.50B+label is Louisiana investment, not proven site spend. Contracts are committed value, not additional capex. Consumer savings and teacher-bonus claims require independent fiscal evidence before headline use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/richland-parish-data-center/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.4442,"lng":-91.4906,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"initial_announcement_month":"2024-12","planned_compute_capacity_gw":5,"data_center_investment_louisiana_usd_min_exclusive":50000000000,"forecast_peak_construction_jobs_min_exclusive":7500,"forecast_operational_jobs":1000,"operator_reported_louisiana_contracts_usd_min_exclusive":1600000000},"notes":["Undated current page says5GWtopline but later says over2GW; retain scope/version discrepancy rather than summing. Compute label is not independently established utility gross or energized load.50B+label is Louisiana investment, not proven site spend. Contracts are committed value, not additional capex. Consumer savings and teacher-bonus claims require independent fiscal evidence before headline use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/richland-parish-data-center/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · Delhi vicinity · Richland · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"ms-solar-grid-data-new-orleans-east-la","state":"LA","kind":"facility","name":"MS Solar Grid Data (New Orleans East)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orleans"],"city":"New Orleans","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Permanent prohibition was intended, not already enacted in this article. Interim zoning legal text, later rules and current expiry not independently established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wwno.org/economy/2026-01-29/new-orleans-city-council-bans-data-center-development-for-a-year-heres-why","host":"wwno.org","date":"2026-01-29","published":"2026-01-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.0406363,"lng":-89.9786145,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"interim-zoning-pause-and-permit-withdrawal","reported_finding":"WWNO reports January 28 six-zero one-year interim zoning pause; proposed New Orleans East developer then pulled zoning permit.","report_display_date":"2026-01-29","independently_verified_current_status":null},"notes":["Permanent prohibition was intended, not already enacted in this article. Interim zoning legal text, later rules and current expiry not independently established.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wwno.org/economy/2026-01-29/new-orleans-city-council-bans-data-center-development-for-a-year-heres-why","host":"wwno.org","date":"2026-01-29","published":"2026-01-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisiana · New Orleans · Orleans · Source context reviewed","state_name":"Louisiana","state_path":"/louisiana/"},{"id":"centra-portland-me","state":"ME","kind":"facility","name":"CENTRA Digital Interconnect -- 340 Cumberland (PMW01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"Portland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Headline2.5K MVA conflicts with prose up to2.5MVA; suppress malformed headline. Headline1.1K SF building footprint should be checked against tech sheet before publication. MVA is not MW without power-factor basis. Operator identifies PWM1 carrier hotel and1MW critical capacity. Page headline power/area typography conflicts with prose. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.centradigital.com/data-centers/pwm1","host":"centradigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.6578388,"lng":-70.2613785,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Portland","street":"340 Cumberland Ave","facility_code":"PWM1","critical_capacity_mw":1,"utility_potential_mva":2.5,"utility_basis":"up to2.5MVA potential, apparent power"},"notes":["Headline2.5K MVA conflicts with prose up to2.5MVA; suppress malformed headline.","Headline1.1K SF building footprint should be checked against tech sheet before publication.","MVA is not MW without power-factor basis.","Operator identifies PWM1 carrier hotel and1MW critical capacity. Page headline power/area typography conflicts with prose.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.centradigital.com/data-centers/pwm1","host":"centradigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maine · Portland · Cumberland · Source context reviewed","state_name":"Maine","state_path":"/maine/"},{"id":"liquidcool-loring-afb-me","state":"ME","kind":"facility","name":"Loring LiquidCool Data Center (Green 4 Maine Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Aroostook"],"city":"Limestone","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification. DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","host":"mainemorningstar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":46.9502,"lng":-67.8849,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification.","DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","host":"mainemorningstar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maine · Limestone · Aroostook · Source context reviewed","state_name":"Maine","state_path":"/maine/"},{"id":"millcompute-bates-mill-lewiston-me","state":"ME","kind":"facility","name":"MillCompute Bates Mill No. 3 AI Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Androscoggin"],"city":"Lewiston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The requested 20-year TIF/credit-enhancement terms were not awarded. Developer claims about utility prices and water were not independently verified. Rejection of this proposal is not a citywide moratorium or permanent prohibition on all later proposals. No operating facility is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal","host":"mainepublic.org","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.0970175,"lng":-70.2183307,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Maine Public reports unanimous Lewiston council rejection on December 16 of MillCompute's Bates Mill No. 3 proposal.","independently_verified_current_operating_status":null,"reported_proposal_status":"rejected","reported_rejection_date":"2025-12-16"},"notes":["The requested 20-year TIF/credit-enhancement terms were not awarded. Developer claims about utility prices and water were not independently verified. Rejection of this proposal is not a citywide moratorium or permanent prohibition on all later proposals. No operating facility is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal","host":"mainepublic.org","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maine · Lewiston · Androscoggin · Source context reviewed","state_name":"Maine","state_path":"/maine/"},{"id":"nautilus-millinocket-me","state":"ME","kind":"facility","name":"Nautilus Data Technologies Data Center (Former Great Northern Paper Mill / One North)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Penobscot"],"city":"Millinocket","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. industrial remediation funding context, site match limited. Cleanup grant to OurKatahdin, not Nautilus data-center capex or a data-center approval.1400acres describes former mill complex, not specific campus footprint. No ITMW or current operation established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.epa.gov/newsreleases/investing-millinocket-epa-maine-officials-highlight-former-paper-mill-site","host":"epa.gov","date":"2025-06-09","published":"2025-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.6501257,"lng":-68.7073294,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"industrial remediation funding context, site match limited","fields":{"cleanup_property_address":"1 Katahdin Avenue,Millinocket,Maine","reported_brownfields_cleanup_grant_selection_usd":4000000,"cleanup_scope":"former paper-mill roll-storage and machine-shop buildings"},"notes":["Cleanup grant to OurKatahdin, not Nautilus data-center capex or a data-center approval.1400acres describes former mill complex, not specific campus footprint. No ITMW or current operation established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.epa.gov/newsreleases/investing-millinocket-epa-maine-officials-highlight-former-paper-mill-site","host":"epa.gov","date":"2025-06-09","published":"2025-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maine · Millinocket · Penobscot · Source context reviewed","state_name":"Maine","state_path":"/maine/"},{"id":"new-england-energy-sanford-woods-dc-me","state":"ME","kind":"facility","name":"Sanford Woods Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["York"],"city":"Sanford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Feasibility and a legislator's confidence are not a development commitment or operating plant. The 900-million to 1.5-billion-USD range is a generic cost-guide comparison for 100 MW, not a Sanford project budget. Utility water capacity and a crossing main are not allocated rights; future committee and legislative outcomes are unknown. The blank automatic article selection was corrected using the retained main body. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sanfordspringvalenews.com/company-eyes-sanford-site-for-data-center/","host":"sanfordspringvalenews.com","date":"2026-02-20","published":"2026-02-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.4387179,"lng":-70.7746224,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Sanford Springvale News reports New England Energy exploring a 100 to 300 MW concept on 1,060 acres, with on-site hydrogen fuel cells/solar discussed by a legislator.","independently_verified_current_operating_status":null},"notes":["Feasibility and a legislator's confidence are not a development commitment or operating plant. The 900-million to 1.5-billion-USD range is a generic cost-guide comparison for 100 MW, not a Sanford project budget. Utility water capacity and a crossing main are not allocated rights; future committee and legislative outcomes are unknown. The blank automatic article selection was corrected using the retained main body.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sanfordspringvalenews.com/company-eyes-sanford-site-for-data-center/","host":"sanfordspringvalenews.com","date":"2026-02-20","published":"2026-02-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maine · Sanford · York · Source context reviewed","state_name":"Maine","state_path":"/maine/"},{"id":"sentinel-jay-me","state":"ME","kind":"facility","name":"Sentinel Data Centers Androscoggin Mill Campus, Jay","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Jay","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Support letter is not final construction authorization, operating status or legislative exemption. January 1, 2027 stripping/handover contract deadline is future, not service availability. Developer’s 150 MW solar generation, at-most 25 MW grid draw and 82 MW local supply are different scopes, not additive critical IT. Reported 300,000 gallons/day makeup and historical mill 35 to 40 million gallons/day remain attributed, not actual metered use or zero-water cooling. $550 million investment, 800 to 1,000 construction workers and 125 to 150 operating jobs are forecasts. Proposed LD307 and minority amendment were not law in this report; later enacted/vetoed outcomes govern. Auto extractor chose unrelated related story, corrected from retained main body. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://themainemonitor.org/jay-backs-data-center-plan/","host":"themainemonitor.org","date":"2026-03-25","published":"2026-03-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.5024,"lng":-70.2175,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Maine Monitor reports Jay’s board voted 4 to 0 with one abstention to prepare a letter supporting JGT2’s proposed former-mill redevelopment for identified client Sentinel.","independently_verified_current_operating_status":null},"notes":["Support letter is not final construction authorization, operating status or legislative exemption. January 1, 2027 stripping/handover contract deadline is future, not service availability. Developer’s 150 MW solar generation, at-most 25 MW grid draw and 82 MW local supply are different scopes, not additive critical IT. Reported 300,000 gallons/day makeup and historical mill 35 to 40 million gallons/day remain attributed, not actual metered use or zero-water cooling. $550 million investment, 800 to 1,000 construction workers and 125 to 150 operating jobs are forecasts. Proposed LD307 and minority amendment were not law in this report; later enacted/vetoed outcomes govern. Auto extractor chose unrelated related story, corrected from retained main body.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://themainemonitor.org/jay-backs-data-center-plan/","host":"themainemonitor.org","date":"2026-03-25","published":"2026-03-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maine · Jay · Franklin · Source context reviewed","state_name":"Maine","state_path":"/maine/"},{"id":"wiscasset-proposed-me","state":"ME","kind":"facility","name":"Wiscasset Data Center (Old Ferry Road Site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lincoln"],"city":"Wiscasset","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification. DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","host":"mainemorningstar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.0015,"lng":-69.6553,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification.","DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","host":"mainemorningstar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maine · Wiscasset · Lincoln · Source context reviewed","state_name":"Maine","state_path":"/maine/"},{"id":"priseda-prosperity-drive-silver-spring-md","state":"MD","kind":"facility","name":"12401 Prosperity Drive Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Silver Spring","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Silver Spring broker project phases and separate studied capacity. 35.2=4+20+11.2futureGROSSpower,notcurrentIT.49designand100studyuncommittednotenergizedcapacitysum.214kgrossincludesavailabledatahall/officefloors,notallwhitespace.179800thermalstorageand315000makeupgallonsnotannualwithdrawals. BrokerprojectiondisclaimerandnoNDAdetailsaccessed. Noactualapprovedairpermitorenergizationverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pdcproperty-silverspring.com/","host":"pdcproperty-silverspring.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.058994201626,"lng":-76.965681665201,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Silver Spring broker project phases and separate studied capacity","fields":{"publication_role":"JLL property broker/manager offering","property":"PDC Property","address":"12401 Prosperity Drive, Silver Spring, Maryland","facility_sqft":214000,"data_hall_available_sqft_approx":50000,"office_flex_available_sqft_approx":25000,"phased_planned_gross_power_mw":35.2,"phases":[{"power_mw":4,"source":"onsite natural gas island","target":"2027-Q1"},{"power_mw":20,"source":"onsite natural gas island","target":"2027-Q2"},{"power_mw":11.2,"source":"grid","target":"2027-Q4"}],"additional_grid_mw_design_engineering":49,"additional_onsite_gas_mw_under_study":100},"notes":["35.2=4+20+11.2futureGROSSpower,notcurrentIT.49designand100studyuncommittednotenergizedcapacitysum.214kgrossincludesavailabledatahall/officefloors,notallwhitespace.179800thermalstorageand315000makeupgallonsnotannualwithdrawals. BrokerprojectiondisclaimerandnoNDAdetailsaccessed. Noactualapprovedairpermitorenergizationverified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pdcproperty-silverspring.com/","host":"pdcproperty-silverspring.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Silver Spring · Montgomery · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"security-land-woodlawn-baltimore-county-md","state":"MD","kind":"facility","name":"1500 Woodlawn Drive Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Baltimore"],"city":"Woodlawn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. 150 MW has undefined capacity basis; five acres donated for a substation is a proposal, not an executed utility agreement. June/July construction was a forecast interrupted by a reported pause, not an observed start. Forecast 1,000 construction workers and alternative permanent staffing estimates are not current jobs. Historical SSA power and office staffing do not establish the new proposal’s load or displacement. EJ percentages may be SCREENING/PERCENTILE indicators: statements implying 78.7% asthma, 94% low birth rates or 97.2% lack broadband are not adopted as population prevalence; primary definitions and denominator require review. Baltimore City hearing is separate from County ordinance. Demolition/plumbing permits do not equal DC building approval. Company-registration expiry alone does not prove ownership loss or dissolution. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://natureforward.org/woodlawn-data-center-baltimore-md-maryland-data-center-series-pt-2/","host":"natureforward.org","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3196,"lng":-76.7448,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Nature Forward’s advocacy article describes Security Land’s proposed 1500 Woodlawn Drive redevelopment and community opposition, reporting a 42-acre plan and Baltimore County permit pause under Bill 3-26.","independently_verified_current_operating_status":null},"notes":["150 MW has undefined capacity basis; five acres donated for a substation is a proposal, not an executed utility agreement. June/July construction was a forecast interrupted by a reported pause, not an observed start. Forecast 1,000 construction workers and alternative permanent staffing estimates are not current jobs. Historical SSA power and office staffing do not establish the new proposal’s load or displacement. EJ percentages may be SCREENING/PERCENTILE indicators: statements implying 78.7% asthma, 94% low birth rates or 97.2% lack broadband are not adopted as population prevalence; primary definitions and denominator require review. Baltimore City hearing is separate from County ordinance. Demolition/plumbing permits do not equal DC building approval. Company-registration expiry alone does not prove ownership loss or dissolution.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://natureforward.org/woodlawn-data-center-baltimore-md-maryland-data-center-series-pt-2/","host":"natureforward.org","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Woodlawn · Baltimore · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"ainet-cybernap-glen-burnie-md","state":"MD","kind":"facility","name":"AiNET CyberNAP","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Anne Arundel"],"city":"Glen Burnie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not add two redundant80MW feeds into160MW IT capacity. Will-feature/will-join language is insufficient to verify current completed deployment. Operator identifies CyberNAP and describes two redundant80MW power feeds; future-tense service descriptions limit commissioned-capacity proof. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ai.net/cybernap/","host":"ai.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.169,"lng":-76.612,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Glen Burnie","campus_acres":15,"total_area_sqft":300000,"feed_power_mw":80,"feed_count":2,"power_basis":"advertised redundant2N utility feeds, not measured IT draw"},"notes":["Do not add two redundant80MW feeds into160MW IT capacity.","Will-feature/will-join language is insufficient to verify current completed deployment.","Operator identifies CyberNAP and describes two redundant80MW power feeds; future-tense service descriptions limit commissioned-capacity proof.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ai.net/cybernap/","host":"ai.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Glen Burnie · Anne Arundel · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"ainet-one-market-center-baltimore-md","state":"MD","kind":"facility","name":"AiNET One Market Center (Baltimore Carrier Hotel)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Baltimore","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AiNET One Market Center building scope. Mixed-use rentable area is not all data hall.80MWnot independently energized or IT. Carrier hotel tenants not separate physical buildings; no exact original opening established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ai.net/carrierhotel/","host":"ai.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.291652966378,"lng":-76.619738877727,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"AiNET One Market Center building scope","fields":{"operator":"AiNET","facility":"One Market Center","address":"300 West Lexington Street, Baltimore, Maryland","advertised_power_mw":80,"power_basis":"total building power, not explicit critical IT","rentable_area_sqft_min_exclusive":150000,"area_scope":"telecom, data center and technical office combined"},"notes":["Mixed-use rentable area is not all data hall.80MWnot independently energized or IT. Carrier hotel tenants not separate physical buildings; no exact original opening established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ai.net/carrierhotel/","host":"ai.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Baltimore · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"aligned-quantum-frederick-md","state":"MD","kind":"facility","name":"Aligned Data Centers IAD-04 Frederick","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Adamstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. statewide program context only. State guidance is not proof Aligned Frederick received a certificate, an individual award amount or current project completion. No project-specific exemption adopted. Statute controls over web summary. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://commerce.maryland.gov/fund/data-center-maryland-sales-and-use-tax-exemption-incentive-program","host":"commerce.maryland.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.263,"lng":-77.387,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"statewide program context only","fields":{"program_scope":"Maryland statewide data-center personal-property sales/use tax exemption","program_excludes_electricity":true},"notes":["State guidance is not proof Aligned Frederick received a certificate, an individual award amount or current project completion. No project-specific exemption adopted. Statute controls over web summary.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://commerce.maryland.gov/fund/data-center-maryland-sales-and-use-tax-exemption-incentive-program","host":"commerce.maryland.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Adamstown · Frederick · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"aligned-iad-06-frederick-md","state":"MD","kind":"facility","name":"Aligned Data Centers IAD-06 Frederick","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Frederick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. same-market building-code mismatch. Marylandregionalpage currentnamedsectionisIAD04, not IAD06baseID.5601ManorWoodsRoad/75acrescannotassign toIAD06withoutresolvedbuildingidentity.3MWgeneratorsand2MWUPSnotITtotal. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/maryland-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.3417,"lng":-77.5089,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"same-market building-code mismatch","fields":{},"notes":["Marylandregionalpage currentnamedsectionisIAD04, not IAD06baseID.5601ManorWoodsRoad/75acrescannotassign toIAD06withoutresolvedbuildingidentity.3MWgeneratorsand2MWUPSnotITtotal.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/maryland-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Frederick · Frederick · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"natelli-appeal-digital-park-lusby-md","state":"MD","kind":"facility","name":"Appeal Digital Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Calvert"],"city":"Lusby","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Calvert county policy and withdrawn AWS application, not operating campus. County summary not separately read signed ordinance or termination instruments. Exact legal moratorium expiry remains unknown; do not calculate it. August4 is withdrawal announcement, not independently exact filing date. ENRA expiry does not prove all possible private proposals permanently cancelled. Generic jobs examples not local forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.calvertcountymd.gov/3880/Data-Centers","host":"calvertcountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.39,"lng":-76.435,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Calvert county policy and withdrawn AWS application, not operating campus","fields":{"county_reported_moratorium_adoption_date":"2026-08-18","moratorium_duration_months":6,"ordinance_identifier":"42-26","county_reported_aws_withdrawal_public_update_date":"2026-08-04","county_reported_latest_enra_expiration":"2026-05-17","current_county_statement":"no data-center site applications pending"},"notes":["County summary not separately read signed ordinance or termination instruments. Exact legal moratorium expiry remains unknown; do not calculate it. August4 is withdrawal announcement, not independently exact filing date. ENRA expiry does not prove all possible private proposals permanently cancelled. Generic jobs examples not local forecasts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.calvertcountymd.gov/3880/Data-Centers","host":"calvertcountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Lusby · Calvert · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"aws-calvert-cliffs-md","state":"MD","kind":"facility","name":"AWS Calvert County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Calvert"],"city":"Lusby","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Calvert county policy and withdrawn AWS application, not operating campus. County summary not separately read signed ordinance or termination instruments. Exact legal moratorium expiry remains unknown; do not calculate it. August4 is withdrawal announcement, not independently exact filing date. ENRA expiry does not prove all possible private proposals permanently cancelled. Generic jobs examples not local forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.calvertcountymd.gov/3880/Data-Centers","host":"calvertcountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.437,"lng":-76.443,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Calvert county policy and withdrawn AWS application, not operating campus","fields":{"county_reported_moratorium_adoption_date":"2026-08-18","moratorium_duration_months":6,"ordinance_identifier":"42-26","county_reported_aws_withdrawal_public_update_date":"2026-08-04","county_reported_latest_enra_expiration":"2026-05-17","current_county_statement":"no data-center site applications pending"},"notes":["County summary not separately read signed ordinance or termination instruments. Exact legal moratorium expiry remains unknown; do not calculate it. August4 is withdrawal announcement, not independently exact filing date. ENRA expiry does not prove all possible private proposals permanently cancelled. Generic jobs examples not local forecasts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.calvertcountymd.gov/3880/Data-Centers","host":"calvertcountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Lusby · Calvert · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"lerner-brightseat-tech-park-md","state":"MD","kind":"facility","name":"Brightseat Tech Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince George's"],"city":"Landover","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Prince George County general news index, no exact-site evidence. County-wide news archive captured unrelated council statements. It does not identify the Brightseat/Lerner project or establish parcel, approval, operating status or incentives. Original discovery URL should be replaced by a project-specific official record. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pgccouncil.us/m/newsflash","host":"pgccouncil.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.931,"lng":-76.868,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Prince George County general news index, no exact-site evidence","fields":{},"notes":["County-wide news archive captured unrelated council statements. It does not identify the Brightseat/Lerner project or establish parcel, approval, operating status or incentives. Original discovery URL should be replaced by a project-specific official record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pgccouncil.us/m/newsflash","host":"pgccouncil.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Landover · Prince George's · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"cogent-elkridge-howard-md","state":"MD","kind":"facility","name":"Cogent Data Center - Elkridge","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Howard"],"city":"Elkridge","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. UndatedPDFpage1visuallyreviewed. Listedraised/nonraisedcomponentsdonotaccountforentiretotal; do notinventremainingarea.250kVAUPSratingsand750/1500kWgeneratorsnotcriticalITcapacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cogentco.com/files/docs/network/colocation/Elkridge_Data_Center_Brochure.pdf","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.204016181007,"lng":-76.711386050454,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"6050 Race Road, Elkridge, MD","operator_labeled_total_space_sqft":61734,"raised_space_sqft":29182,"non_raised_space_sqft":10131},"notes":["UndatedPDFpage1visuallyreviewed. Listedraised/nonraisedcomponentsdonotaccountforentiretotal; do notinventremainingarea.250kVAUPSratingsand750/1500kWgeneratorsnotcriticalITcapacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cogentco.com/files/docs/network/colocation/Elkridge_Data_Center_Brochure.pdf","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Elkridge · Howard · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"databank-bwi1-baltimore-md","state":"MD","kind":"facility","name":"DataBank BWI1 (Downtown Baltimore Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Baltimore","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical2020operator datasheet. PDFpathlabelsQ32020; noexactpublicationday. Page1visuallyreviewedexplicitlyseparatessite1.5MWversuscritical600kW. Historicaldatasheetnotcurrent2026capacityorindependentFedRAMPcertificate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/wp-content/uploads/2020/10/DB_DCTR_BWI1_Q32020_v2.pdf","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.291652966378,"lng":-76.619738877727,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"historical2020operator datasheet","fields":{"operator_site_code":"BWI1","published_address":"300 W Lexington Street, Baltimore, MD","historical_raised_floor_sqft":10000,"historical_site_power_mw":1.5,"historical_critical_power_mw":0.6},"notes":["PDFpathlabelsQ32020; noexactpublicationday. Page1visuallyreviewedexplicitlyseparatessite1.5MWversuscritical600kW. Historicaldatasheetnotcurrent2026capacityorindependentFedRAMPcertificate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/wp-content/uploads/2020/10/DB_DCTR_BWI1_Q32020_v2.pdf","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Baltimore · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"atmosphere-dickerson-montgomery-md","state":"MD","kind":"facility","name":"Dickerson Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Dickerson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 360 MWisplannedbasisundefined; formercoal 588 MWisgenerationnotIT. Requestedup-to 2 milliongallons/dayisPEAKwithdrawalapplicationnotapprovedallocationoractualuse.2016 coal-plantsettlementcoveredtwoplantsandisnotanAtmosphereDCfine. June 12 EO 109-26 sixmonths,July 28 Bill 19-26 E 18 months andZTA 26-01/Ordinance 20-35 prohibition are distinct reported instruments; originaltexts/scope/exceptionsneedreview. ArticlepublishedAugust 14 yet describesAugust 17 futureprohibition ascurrent,so noexactcurrentlegalityadoptedfromthisalone. FutureNovember 12/13 hearingandcourtchallengehavenoassumedoutcome. Existingindustry/EJconcernsarecontextnotmeasurednewcampusimpact. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original enacted/signed documents personally read; not court-outcome verification or whole-site operating certification.. No final adjudication, later rescission/amendment, project-specific grandfathering determination, power ESA or current operating status verified. Monthly demand wording preserved as printed, not converted toMWh, average use or criticalIT. Building-law18-monthsunset and zoning prohibition without printed sunset are distinct; no invented common expiration. Do not generalize County DPS or District Council zoning provisions to independently administered municipal permits/zoning without separate jurisdiction review. Higher-education exclusion does not by itself establish eligibility for any proposed commercial campus.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://natureforward.org/dickerson-data-center-montgomery-county-md-data-center-series-pt-5/","host":"natureforward.org","date":"2026-08-14","published":"2026-08-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://assets.montgomerycountymd.gov/files/2026-06/Executive%20Order%20109-26_0.pdf","host":"assets.montgomerycountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://assets.montgomerycountymd.gov/files/2026-07/Ordinance%2020-35%20(ZTA%2026-01).pdf","host":"assets.montgomerycountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://apps.montgomerycountymd.gov/ccllims/DownloadFilePage?FileName=2907_1_26953_Bill_19-26E_Signed_20260810.pdf","host":"apps.montgomerycountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://apps.montgomerycountymd.gov/ccllims/BillDetailsPage?RecordId=2907","host":"apps.montgomerycountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.2117,"lng":-77.4736,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"NatureForward advocacy article describes Atmosphere’s revisedfive-building 360 MWDickersonproposal, priorTerraEnergytwo-buildingapproval and county executive/legislative actions restricting new data centers.","independently_verified_current_operating_status":null},"notes":["360 MWisplannedbasisundefined; formercoal 588 MWisgenerationnotIT. Requestedup-to 2 milliongallons/dayisPEAKwithdrawalapplicationnotapprovedallocationoractualuse.2016 coal-plantsettlementcoveredtwoplantsandisnotanAtmosphereDCfine. June 12 EO 109-26 sixmonths,July 28 Bill 19-26 E 18 months andZTA 26-01/Ordinance 20-35 prohibition are distinct reported instruments; originaltexts/scope/exceptionsneedreview. ArticlepublishedAugust 14 yet describesAugust 17 futureprohibition ascurrent,so noexactcurrentlegalityadoptedfromthisalone. FutureNovember 12/13 hearingandcourtchallengehavenoassumedoutcome. Existingindustry/EJconcernsarecontextnotmeasurednewcampusimpact.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://natureforward.org/dickerson-data-center-montgomery-county-md-data-center-series-pt-5/","host":"natureforward.org","date":"2026-08-14","published":"2026-08-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Original enacted/signed documents personally read; not court-outcome verification or whole-site operating certification.","fields":{"county":"Montgomery","state":"MD","executive_order":{"number":"109-26","signed_and_effective":"2026-06-12","pause_months":6,"scope":"DPS acceptance, consideration and processing of permit applications related to broadly defined Data Center; includes proposed Cable Communications System used primarily for computing","threshold_mw_stated":null,"sunset":"Earlier of six months from effective date or rescission; another six months requires further executive order","extension_or_rescission_independently_reviewed":false},"enacted_building_law":{"bill":"19-26E","chapter":24,"year":2026,"council_enactment":"2026-07-28","executive_approval_and_effective":"2026-08-10","signed_page_visually_checked":true,"sunset_months_after_effective":18,"printed_exact_expiry_date":null,"definition_threshold_mw":25,"threshold_basis_exact":"aggregate monthly electricity demand","prohibited_actions":"Director must not accept, review or issue a building or grading permit for a Data Center application during effective period","transition":"Applies to conditional-use applications filed before or after effect, pending OZAH review or approved by OZAH but without DPS permit","definition_exclusions":["Primarily manufacturing","Quantum computing research","Biomedical research","Medical care","Higher education institution approved by Maryland Higher Education Commission"]},"zoning_ordinance":{"number":"20-35","zta":"26-01","adopted":"2026-07-28","effective":"2026-08-17","definition_threshold_mw":25,"threshold_basis_exact":"aggregate monthly electricity demand","mechanism":"Data Center use-table cells blank across all zones; proposed conditional-use permissions removed","exclusions_same_as_building_law":true,"transition":"Applies to applications without DPS building permit before ordinance effective date","printed_sunset":null,"court_disposition_or_later_amendment_verified":false,"printed_jurisdiction":"County Council sitting as District Council for that portion of the Maryland-Washington Regional District within Montgomery County"},"required_correction":"Do not flatten three instruments into a July28effective blanket ban on all server rooms. Later building/zoning definitions have25MWthreshold and exclusions, unlike broad EO. Deleted double-bracket draft conditions are not adopted standards."},"notes":["No final adjudication, later rescission/amendment, project-specific grandfathering determination, power ESA or current operating status verified.","Monthly demand wording preserved as printed, not converted toMWh, average use or criticalIT.","Building-law18-monthsunset and zoning prohibition without printed sunset are distinct; no invented common expiration.","Do not generalize County DPS or District Council zoning provisions to independently administered municipal permits/zoning without separate jurisdiction review. Higher-education exclusion does not by itself establish eligibility for any proposed commercial campus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://assets.montgomerycountymd.gov/files/2026-06/Executive%20Order%20109-26_0.pdf","host":"assets.montgomerycountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://assets.montgomerycountymd.gov/files/2026-07/Ordinance%2020-35%20(ZTA%2026-01).pdf","host":"assets.montgomerycountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://apps.montgomerycountymd.gov/ccllims/DownloadFilePage?FileName=2907_1_26953_Bill_19-26E_Signed_20260810.pdf","host":"apps.montgomerycountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://apps.montgomerycountymd.gov/ccllims/BillDetailsPage?RecordId=2907","host":"apps.montgomerycountymd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Dickerson · Montgomery · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"expedient-bwi1-owings-mills-md","state":"MD","kind":"facility","name":"Expedient BWI1 (Owings Mills)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Baltimore"],"city":"Owings Mills","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Baltimore unresolved header and site-table scope. Header and namedBWI1table differ; stage/expansion/market scope unresolved. Preserve both, do not silently choose current2.3MWor add0.8to2.3.3.5MWgenerator capacity not IT. Operator compliance lists not independent certificate review. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.expedient.com/data-centers/baltimore/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4273178,"lng":-76.8115503,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Expedient Baltimore unresolved header and site-table scope","fields":{"operator_code":"BWI1","published_address":"11155 Red Run Boulevard, Suite200, Owings Mills, MD21117","site_table_critical_it_mw":0.8,"site_table_data_center_area_sqft":22000,"site_table_raised_floor_sqft":8800,"market_header_critical_it_mw":2.3,"market_header_total_area_sqft":55000,"market_header_raised_floor_sqft":17700,"canonical_current_critical_it_mw":null},"notes":["Header and namedBWI1table differ; stage/expansion/market scope unresolved. Preserve both, do not silently choose current2.3MWor add0.8to2.3.3.5MWgenerator capacity not IT. Operator compliance lists not independent certificate review.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.expedient.com/data-centers/baltimore/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Owings Mills · Baltimore · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"globalinx-fastnet-cls-ocean-city-md","state":"MD","kind":"facility","name":"Globalinx Fastnet Cable Landing Station","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Worcester"],"city":"Berlin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Duration ends earlier if rescinded. Signed resolution/effective day not separately reviewed; exact expiry unknown. July30publication differs from July21adoption. No new hearing invented. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://worcestermd.gov/news/worcester-county-enacts-moratorium-data-centers-and-cable-landing-stations-while-new","host":"worcestermd.gov","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.3117282,"lng":-75.1228506,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"county_reported_moratorium_adoption_date":"2026-07-21","resolution_id":"26-18","moratorium_duration_months":12,"scope":"data-center and cable-landing-station permit submittal/issuance and BZA proceedings","county_reported_bza_status":"no current appeals or special-exception requests scheduled for these facilities"},"notes":["Duration ends earlier if rescinded. Signed resolution/effective day not separately reviewed; exact expiry unknown. July30publication differs from July21adoption. No new hearing invented.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://worcestermd.gov/news/worcester-county-enacts-moratorium-data-centers-and-cable-landing-stations-while-new","host":"worcestermd.gov","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Berlin · Worcester · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"quantum-frederick-campus-md","state":"MD","kind":"facility","name":"Quantum Frederick","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Frederick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historic masterplanned land announcement. Land acquisition/masterplan announcement not all campuses operating.2100acres historical overallland, not each tenant. Generic2021state10yearincentive description not current campus award or paid tax saving. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/","host":"business.maryland.gov","date":"2021-06-28","published":"2021-06-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.347656,"lng":-77.493847,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historic masterplanned land announcement","fields":{"historical_development_announcement_date":"2021-06-28","historic_masterplan_site_acres":2100,"published_historic_site":"former Alcoa EastalcoWorks,nearBuckeystown,FrederickCounty,Maryland","reported_acquisition_joint_venture":["QuantumLoophole","TPGRealEstatePartners"]},"notes":["Land acquisition/masterplan announcement not all campuses operating.2100acres historical overallland, not each tenant. Generic2021state10yearincentive description not current campus award or paid tax saving.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/","host":"business.maryland.gov","date":"2021-06-28","published":"2021-06-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Frederick · Frederick · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"rowan-bauxite-ii-frederick-md","state":"MD","kind":"facility","name":"Rowan Digital Infrastructure Bauxite II","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Frederick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Rowan Bauxite campus power conflict and phased dates. 600headlineversus630plusnarrativepowerconflict/phaseunresolved;notperBauxiteIIorIII.375accombinednot375each. Substantialcompletionnotclientenergization. Neither exactFrederickparcelnorcriticalITbasisindependentlyconfirmed. Plannednetzerogoalsnotachievedmeasuredenergy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.34,"lng":-77.515,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Rowan Bauxite campus power conflict and phased dates","fields":{"developer":"Rowan Digital Infrastructure","campus":"Bauxite I, II and III, Maryland","combined_site_acres":375,"headline_combined_capacity_mw":600,"narrative_combined_capacity_mw_min_exclusive":630,"canonical_campus_current_it_mw":null,"developer_reported_bauxite1_substantial_completion_year":2025,"bauxite2_delivery_target_year":2026,"bauxite3_delivery_target_year":2027},"notes":["600headlineversus630plusnarrativepowerconflict/phaseunresolved;notperBauxiteIIorIII.375accombinednot375each. Substantialcompletionnotclientenergization. Neither exactFrederickparcelnorcriticalITbasisindependentlyconfirmed. Plannednetzerogoalsnotachievedmeasuredenergy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Frederick · Frederick · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"rowan-bauxite-iii-frederick-md","state":"MD","kind":"facility","name":"Rowan Digital Infrastructure Bauxite III","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Frederick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Rowan Bauxite campus power conflict and phased dates. 600headlineversus630plusnarrativepowerconflict/phaseunresolved;notperBauxiteIIorIII.375accombinednot375each. Substantialcompletionnotclientenergization. Neither exactFrederickparcelnorcriticalITbasisindependentlyconfirmed. Plannednetzerogoalsnotachievedmeasuredenergy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.338,"lng":-77.506,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Rowan Bauxite campus power conflict and phased dates","fields":{"developer":"Rowan Digital Infrastructure","campus":"Bauxite I, II and III, Maryland","combined_site_acres":375,"headline_combined_capacity_mw":600,"narrative_combined_capacity_mw_min_exclusive":630,"canonical_campus_current_it_mw":null,"developer_reported_bauxite1_substantial_completion_year":2025,"bauxite2_delivery_target_year":2026,"bauxite3_delivery_target_year":2027},"notes":["600headlineversus630plusnarrativepowerconflict/phaseunresolved;notperBauxiteIIorIII.375accombinednot375each. Substantialcompletionnotclientenergization. Neither exactFrederickparcelnorcriticalITbasisindependentlyconfirmed. Plannednetzerogoalsnotachievedmeasuredenergy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Frederick · Frederick · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"rowan-digital-frederick-md","state":"MD","kind":"facility","name":"Rowan Digital Infrastructure Frederick Campus (Bauxite I)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Adamstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Frederick sharedpark versus separate Rowan projects. Conservation advocacy not final legal/permit record. Broader2400MWpark notRowanIT.100MWguesses forII/IIInotadopted. Prior directRowan600/630MWcombinedI/II/IIIscope remains separate. ReportJune2026noops does not override later operator substantialcompletion or establishOctoberstatus. Court/referendum, executivepause and pollution claims need originalorders/agencyinspectionrecords; no legal outcome/compliance violation adopted here. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://natureforward.org/quantum-frederick-frederick-county-md-maryland-data-center-series-pt-3/","host":"natureforward.org","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.265,"lng":-77.394,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Frederick sharedpark versus separate Rowan projects","fields":{"publisher":"NatureForward","project_context":"QuantumFrederick broader industrial park","broader_site_acres_approx":2100,"advocacy_reported_rowan_bauxiteI_aws_acres":151,"advocacy_reported_rowan_bauxiteI_buildings":4,"advocacy_reported_rowan_bauxiteI_power_mw":300,"power_basis":"secondary reported demand, not independently explicit critical IT","advocacy_reported_bauxiteII_buildings":4,"advocacy_reported_bauxiteIII_buildings":3},"notes":["Conservation advocacy not final legal/permit record. Broader2400MWpark notRowanIT.100MWguesses forII/IIInotadopted. Prior directRowan600/630MWcombinedI/II/IIIscope remains separate. ReportJune2026noops does not override later operator substantialcompletion or establishOctoberstatus. Court/referendum, executivepause and pollution claims need originalorders/agencyinspectionrecords; no legal outcome/compliance violation adopted here.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://natureforward.org/quantum-frederick-frederick-county-md-maryland-data-center-series-pt-3/","host":"natureforward.org","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Adamstown · Frederick · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"terawulf-morgantown-charles-county-md","state":"MD","kind":"facility","name":"TeraWulf Morgantown Generating Station AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Charles"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.terawulf.com/our-sites","host":"terawulf.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.362,"lng":-77.129,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Charles","operator_status":"Permitting","critical_it_total_mw":800,"critical_it_contracted_mw":0,"critical_it_open_mw":800},"notes":["Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.terawulf.com/our-sites","host":"terawulf.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Charles · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"tierpoint-russell-street-baltimore-md","state":"MD","kind":"facility","name":"TierPoint Baltimore (Russell Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Baltimore","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. regional hub, site-specific source still needed. Maryland market page does not independently identify RussellStreet site specifications. Customer portfolio/hardware investment quotation is not site capex. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/maryland/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.275776951529,"lng":-76.625636130534,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"regional hub, site-specific source still needed","fields":{},"notes":["Maryland market page does not independently identify RussellStreet site specifications. Customer portfolio/hardware investment quotation is not site capex.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/maryland/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Baltimore · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"tierpoint-baltimore-bwi-md","state":"MD","kind":"facility","name":"TierPoint Baltimore - BWI","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Anne Arundel"],"city":"Linthicum Heights","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/maryland/baltimore-bwi/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.213455,"lng":-76.682834,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":34000,"gross_area_is_lower_bound":true,"raised_floor_sqft":13000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 1.25 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/maryland/baltimore-bwi/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland · Linthicum Heights · Anne Arundel · Source context reviewed","state_name":"Maryland","state_path":"/maryland/"},{"id":"365datacenters-marlborough-ma","state":"MA","kind":"facility","name":"365 Data Centers Marlborough (MA1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Marlborough","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Admin and data-center areas not automatically combined.780toncooling rating notITpower. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Marlborough regional summary. Rounded64kmarket description versus64800specificsite page retained separately; not a second building. Stray SouthFloridaintro not site fact.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://365datacenters.com/marlborough-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://365datacenters.com/greater-boston/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.3527,"lng":-71.58411,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"published_address":"250 Locke Drive, Marlborough, MA01752","data_center_area_sqft":64800,"admin_area_sqft":5000,"advertised_data_center_power_mw":2.8,"power_basis":"power for Data Center; not explicitly criticalIT"},"notes":["Admin and data-center areas not automatically combined.780toncooling rating notITpower.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/marlborough-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Marlborough regional summary","fields":{"published_address":"250 Locke Drive, Marlborough, MA01752","market_summary_data_center_area_sqft":64000},"notes":["Rounded64kmarket description versus64800specificsite page retained separately; not a second building. Stray SouthFloridaintro not site fact.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/greater-boston/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Marlborough · Middlesex · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"aws-grafton-ma","state":"MA","kind":"facility","name":"Amazon Data Services Grafton","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Worcester"],"city":"Grafton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. TimothyDoyle WBJ November22,2022 original registry/assessor report: AmazonDataServices bought Grafton8Centennial155000sf/1.8acres for15.1M and Westborough600/800Friberg for11.6M,26.7M COMBINED. Westborough600 building was StateStreetDC,99160sf; twoWestboroughlots19acres total. Thursdayclosing impliesNovember17, not originaldeedread. Grafton flexbuilding DCuse UNCONFIRMED; Amazon didnot respond onfutureuses. Propertyprice is notnewDCconstruction spending or operatingproof. Other AmazonRobotics/OtisStreetprojects aredifferent uses/properties, notadditionalDCs. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wbjournal.com/article/amazon-buys-properties-in-grafton-and-westborough-for-267m/","host":"wbjournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.25013,"lng":-71.68772,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["TimothyDoyle WBJ November22,2022 original registry/assessor report: AmazonDataServices bought Grafton8Centennial155000sf/1.8acres for15.1M and Westborough600/800Friberg for11.6M,26.7M COMBINED. Westborough600 building was StateStreetDC,99160sf; twoWestboroughlots19acres total. Thursdayclosing impliesNovember17, not originaldeedread.","Grafton flexbuilding DCuse UNCONFIRMED; Amazon didnot respond onfutureuses. Propertyprice is notnewDCconstruction spending or operatingproof. Other AmazonRobotics/OtisStreetprojects aredifferent uses/properties, notadditionalDCs.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://wbjournal.com/article/amazon-buys-properties-in-grafton-and-westborough-for-267m/","host":"wbjournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Grafton · Worcester · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"aws-westborough-ma","state":"MA","kind":"facility","name":"Amazon Data Services Westborough","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Worcester"],"city":"Westborough","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. TimothyDoyle WBJ November22,2022 original registry/assessor report: AmazonDataServices bought Grafton8Centennial155000sf/1.8acres for15.1M and Westborough600/800Friberg for11.6M,26.7M COMBINED. Westborough600 building was StateStreetDC,99160sf; twoWestboroughlots19acres total. Thursdayclosing impliesNovember17, not originaldeedread. Grafton flexbuilding DCuse UNCONFIRMED; Amazon didnot respond onfutureuses. Propertyprice is notnewDCconstruction spending or operatingproof. Other AmazonRobotics/OtisStreetprojects aredifferent uses/properties, notadditionalDCs. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wbjournal.com/article/amazon-buys-properties-in-grafton-and-westborough-for-267m/","host":"wbjournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.28296,"lng":-71.58339,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["TimothyDoyle WBJ November22,2022 original registry/assessor report: AmazonDataServices bought Grafton8Centennial155000sf/1.8acres for15.1M and Westborough600/800Friberg for11.6M,26.7M COMBINED. Westborough600 building was StateStreetDC,99160sf; twoWestboroughlots19acres total. Thursdayclosing impliesNovember17, not originaldeedread.","Grafton flexbuilding DCuse UNCONFIRMED; Amazon didnot respond onfutureuses. Propertyprice is notnewDCconstruction spending or operatingproof. Other AmazonRobotics/OtisStreetprojects aredifferent uses/properties, notadditionalDCs.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://wbjournal.com/article/amazon-buys-properties-in-grafton-and-westborough-for-267m/","host":"wbjournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Westborough · Worcester · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"chestnut-river-holyoke-ma","state":"MA","kind":"facility","name":"Chestnut River Holyoke Data Center (former Hampden Papers complex)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hampden"],"city":"Holyoke","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Mayor veto remained possible; original effective ordinance not retained. Developer had not bought property/filed permits. Proposed20MW and mayor21MW differ;250000 gallons/day is preliminary estimate. Ban is not every server room. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gazettenet.com/2026/06/17/holyoke-first-in-state-to-ban-development-of-ai-data-centers/","host":"gazettenet.com","date":"2026-06-17","published":"2026-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.1975752,"lng":-72.600908,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Gazette reports Holyoke council9to4 vote prohibiting AI data-center development over12MW, with MGHPCC exclusion.","independently_verified_current_operating_status":null},"notes":["Mayor veto remained possible; original effective ordinance not retained. Developer had not bought property/filed permits. Proposed20MW and mayor21MW differ;250000 gallons/day is preliminary estimate. Ban is not every server room.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gazettenet.com/2026/06/17/holyoke-first-in-state-to-ban-development-of-ai-data-centers/","host":"gazettenet.com","date":"2026-06-17","published":"2026-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Holyoke · Hampden · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"coresite-bo1-boston-ma-ma","state":"MA","kind":"facility","name":"CoreSite BO1 - Boston, MA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Somerville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Portfolio30centers/4.8million+sqft are not BO1 metrics. Operator location list explicitly identifies BO1 in Boston and says it owns/operates its centers. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-centers/locations","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.3767059,"lng":-71.0797577,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Boston","facility_code":"BO1","marketed_service":"colocation"},"notes":["Portfolio30centers/4.8million+sqft are not BO1 metrics.","Operator location list explicitly identifies BO1 in Boston and says it owns/operates its centers.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-centers/locations","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Somerville · Middlesex · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"databank-bos1-boston-ma","state":"MA","kind":"facility","name":"DataBank BOS1 - Downtown Boston","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Suffolk"],"city":"Boston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Carrier-hotel tenant suite; group with building, not whole-building metrics. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/boston/1-summer-street/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.354699,"lng":-71.060271,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"BOS1","street":"1 Summer Street Suite704","city":"Boston","critical_it_capacity_mw":0.5,"it_area_sqft":7760,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Carrier-hotel tenant suite; group with building, not whole-building metrics.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/boston/1-summer-street/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/data-centers/boston/1-summer-street/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Boston · Suffolk · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"digitalrealty-bos14-needham-ma","state":"MA","kind":"facility","name":"Digital Realty BOS14","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Norfolk"],"city":"Needham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Matched the sole named BOS14 card on the Boston market page. No power value or independent operating-status inspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/boston","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.digitalrealty.com/data-centers/americas/boston/bos14","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.30177,"lng":-71.22184,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"128 First Avenue, Needham, MA 02494","advertised_building_sqft":281000,"operator_facility_code":"BOS14"},"notes":["Matched the sole named BOS14 card on the Boston market page. No power value or independent operating-status inspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/boston","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"BOS14","published_address":"128 First Avenue Needham, MA 02494","operator_label_total_building_size_sqft":281000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/boston/bos14","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Needham · Norfolk · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"equinix-bo2-billerica-ma","state":"MA","kind":"facility","name":"Equinix BO2 - Boston, Billerica","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Billerica","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Bostonmarketpage namesBO2butdoesnotsupplysiteaddress/area/MW. Corporateecosystemcountsnotfacilityspecifications. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/boston-data-centers","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.55167,"lng":-71.215669,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"named_facility":"BO2","published_city":"Billerica, Massachusetts"},"notes":["Bostonmarketpage namesBO2butdoesnotsupplysiteaddress/area/MW. Corporateecosystemcountsnotfacilityspecifications.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/boston-data-centers","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Billerica · Middlesex · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"evocative-bos1-somerville-ma","state":"MA","kind":"facility","name":"Evocative BOS1 (Somerville)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Somerville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Evocative Boston area categories and utility basis. 6MWutilitynotcriticalIT;redundantgenerator6MWnotadded.900gallons/minpumpclosedloopflownotconsumptivewater. ExactSomervillejurisdiction/streetnotestablishedbyBostonmarketlabelalone. No exactopeningorindependentcertifierreport. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.evocative.com/data-centers/boston/","host":"evocative.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.377932,"lng":-71.080419,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Evocative Boston area categories and utility basis","fields":{"operator":"Evocative","code":"BOS1","market":"Boston, Massachusetts","facility_area_sqft":46000,"raised_floor_sqft":21600,"total_utility_power_mw":6,"cabinet_load_kw":20,"generator_count":3,"each_generator_mw":2},"notes":["6MWutilitynotcriticalIT;redundantgenerator6MWnotadded.900gallons/minpumpclosedloopflownotconsumptivewater. ExactSomervillejurisdiction/streetnotestablishedbyBostonmarketlabelalone. No exactopeningorindependentcertifierreport.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.evocative.com/data-centers/boston/","host":"evocative.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Somerville · Middlesex · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"expedient-boston-medford-ma","state":"MA","kind":"facility","name":"Expedient Boston","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Medford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Medford historical expansion. Four million is historical renovation/expansion, not campus replacement value.8000sqftis added raised floor, not total. More than ten operating years does not yield exact original opening date.2017opening does not independently prove current2026status or certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://expedient.com/about/media/2017-03-20-expedient-celebrates-4-million-expansion-in-boston/","host":"expedient.com","date":"2017-03-20","published":"2017-03-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.405414,"lng":-71.074978,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Expedient Medford historical expansion","fields":{"expansion_opening_announcement_date":"2017-03-20","historical_expansion_investment_usd":4000000,"historical_added_raised_floor_sqft":8000,"published_address":"1 Cabot Road, Medford, Massachusetts"},"notes":["Four million is historical renovation/expansion, not campus replacement value.8000sqftis added raised floor, not total. More than ten operating years does not yield exact original opening date.2017opening does not independently prove current2026status or certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://expedient.com/about/media/2017-03-20-expedient-celebrates-4-million-expansion-in-boston/","host":"expedient.com","date":"2017-03-20","published":"2017-03-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Medford · Middlesex · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"lumen-boston-cambridge-ma","state":"MA","kind":"facility","name":"Lumen Boston (300 Bent Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Cambridge","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. April 30, 2026 industry publication with direct constructor and owner-representative statements.. Reports completed third/final renovation phase at 300 Bent Street, Cambridge, described as occupied multi-carrier telecom/data infrastructure serving Verizon, Lumen, Lightpath and others. Direct statements from contractor and owner representative support construction context; publication does not establish sole operator or a new greenfield opening. 100000-square-foot, three-story description applies to the building, not a verified Lumen-only data hall or critical IT floor area. Earlier search snippets describing 90000 square feet/two stories were not independently read or reconciled; do not infer exactly 10000 square feet of new white space. Reported owner Paul Lohnes / Lohnes Company management / DeNunzio owner representative / Nauset constructor / Khalsa architect have distinct roles; no deed or exclusive lease chain inspected. April 30 is publication day and completion was described as recent, so exact construction completion and original data-center commissioning dates remain unknown. Lobby accessibility, elevator, facade, roof and MEP upgrades do not independently prove new IT capacity, energy savings or 2026 commissioning of every carrier. Limited context; company office, renovation, acquisition, offering and physical operation are different facts.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.high-profile.com/nauset-completes-kendall-square-data-center-renovation/","host":"high-profile.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.367691,"lng":-71.086779,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-renovation-acquisition-and-office-role-review-round91-2026-10-15.json","scope":"April 30, 2026 industry publication with direct constructor and owner-representative statements.","fields":{},"notes":["Reports completed third/final renovation phase at 300 Bent Street, Cambridge, described as occupied multi-carrier telecom/data infrastructure serving Verizon, Lumen, Lightpath and others. Direct statements from contractor and owner representative support construction context; publication does not establish sole operator or a new greenfield opening.","100000-square-foot, three-story description applies to the building, not a verified Lumen-only data hall or critical IT floor area. Earlier search snippets describing 90000 square feet/two stories were not independently read or reconciled; do not infer exactly 10000 square feet of new white space.","Reported owner Paul Lohnes / Lohnes Company management / DeNunzio owner representative / Nauset constructor / Khalsa architect have distinct roles; no deed or exclusive lease chain inspected.","April 30 is publication day and completion was described as recent, so exact construction completion and original data-center commissioning dates remain unknown. Lobby accessibility, elevator, facade, roof and MEP upgrades do not independently prove new IT capacity, energy savings or 2026 commissioning of every carrier.","Limited context; company office, renovation, acquisition, offering and physical operation are different facts."],"sources":[{"url":"https://www.high-profile.com/nauset-completes-kendall-square-data-center-renovation/","host":"high-profile.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Cambridge · Middlesex · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"markley-boston-summer-street-ma","state":"MA","kind":"facility","name":"Markley Group Boston (One Summer Street / BOSIX)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Suffolk"],"city":"Boston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Markley Boston versus Lowell area scope. Boston920kgross/building-scopepublicationnotallraisedfloor;Lowell352knotBostonaddition.90/100carrierstatsscopesdiffer,notadoptedascensus. No numericcriticalITMW. LowellpersonalpropertyexemptionclaimnotindependentcurrentawardorBostontaxbenefit. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.markleygroup.com/data-center","host":"markleygroup.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.3545151,"lng":-71.0595422,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Markley Boston versus Lowell area scope","fields":{"operator":"Markley","boston_site":"One Summer Street, Boston, Massachusetts","published_boston_area_sqft":920000,"separate_lowell_reported_whitespace_sqft":352000},"notes":["Boston920kgross/building-scopepublicationnotallraisedfloor;Lowell352knotBostonaddition.90/100carrierstatsscopesdiffer,notadoptedascensus. No numericcriticalITMW. LowellpersonalpropertyexemptionclaimnotindependentcurrentawardorBostontaxbenefit.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.markleygroup.com/data-center","host":"markleygroup.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Boston · Suffolk · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"markley-lowell-ma","state":"MA","kind":"facility","name":"Markley Group One Lowell Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Lowell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The range is attributed and partially corroborated by the reporter, not our complete meter audit. Markley did not disclose Lowell MW; Boston's 30 MW is a different site. Trade crews are not the whole permanent workforce. Partial-load generator testing is not a full-load acoustic assessment; health causation is not established. The reported Lowell moratorium needs its original scope reviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cbsnews.com/boston/news/inside-lowell-markley-data-center/","host":"cbsnews.com","date":"2026-06-17","published":"2026-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.6334,"lng":-71.3162,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"CBS Boston reports a tour of Markley's existing roughly 350,000-square-foot Lowell facility and an operator estimate of 60,000 to 120,000 gallons per day over the preceding year, with reporters seeing some bills.","independently_verified_current_operating_status":null},"notes":["The range is attributed and partially corroborated by the reporter, not our complete meter audit. Markley did not disclose Lowell MW; Boston's 30 MW is a different site. Trade crews are not the whole permanent workforce. Partial-load generator testing is not a full-load acoustic assessment; health causation is not established. The reported Lowell moratorium needs its original scope reviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cbsnews.com/boston/news/inside-lowell-markley-data-center/","host":"cbsnews.com","date":"2026-06-17","published":"2026-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Lowell · Middlesex · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"mghpcc-holyoke-ma","state":"MA","kind":"facility","name":"Massachusetts Green High Performance Computing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hampden"],"city":"Holyoke","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. MGHPCC assessment identity and historical parcel transaction. Parcel area is not necessarily whole current campus footprint. Assessment construction year is not exact first computing operation. Sale amount is historical land/property transaction, not building capex or incentive. No critical IT MW, power contract or actual current load established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://arcgisserver.digital.mass.gov/arcgisserver/rest/services/AGOL/L3_Parcels_FeatureService_4326/FeatureServer/1/query?where=MAP_PAR_ID%3D%27020-02-003%27&outFields=*&f=json","host":"arcgisserver.digital.mass.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.20285,"lng":-72.60693,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"MGHPCC assessment identity and historical parcel transaction","fields":{"agency":"Massachusetts public parcel service","parcel":"020-02-003","municipality":"Holyoke","facility_address":"100 Bigelow Street, Holyoke, MA01040","owner_as_listed":"Massachusetts Green High Performance Computing","fiscal_year":2026,"listed_lot_acres":1.66,"assessment_building_area_sqft":91700,"assessment_stories":2,"assessment_year_built":2012,"listed_prior_sale_date":"2011-10-07","listed_prior_sale_usd":856529},"notes":["Parcel area is not necessarily whole current campus footprint. Assessment construction year is not exact first computing operation. Sale amount is historical land/property transaction, not building capex or incentive. No critical IT MW, power contract or actual current load established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://arcgisserver.digital.mass.gov/arcgisserver/rest/services/AGOL/L3_Parcels_FeatureService_4326/FeatureServer/1/query?where=MAP_PAR_ID%3D%27020-02-003%27&outFields=*&f=json","host":"arcgisserver.digital.mass.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Holyoke · Hampden · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"servistar-westfield-ma","state":"MA","kind":"facility","name":"Servistar Realties Westfield Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hampden"],"city":"Westfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. NBC Boston August22,2025 republishes State House News Service reporting on Servistar Realties in Westfield. Officials describe a roughly120acre,10 to 14building proposal,2.5 to 4B investment estimate,400operations jobs and1800 to 2000construction jobs over8 to 10years, not completed spending/current employment. Reported2021 local approval does not establish all subsequent permits. Tenant still being sought; Microsoft/Google are examples, not signed occupants. Predevelopment in about six months and construction in12months are historical contingent forecasts, not October2026 construction observations. Article discusses proposed incentive regulations at a hearing; no final enacted rule or project certification independently checked. No committed IT MW, current power agreement or measured impacts verified. Statewide facility count attributed to another newspaper is not an independent census adopted here. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nbcboston.com/news/local/massive-multi-billion-dollar-data-center-campus-planned-in-western-massachusetts/3795016/","host":"nbcboston.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.157077,"lng":-72.741619,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["NBC Boston August22,2025 republishes State House News Service reporting on Servistar Realties in Westfield. Officials describe a roughly120acre,10 to 14building proposal,2.5 to 4B investment estimate,400operations jobs and1800 to 2000construction jobs over8 to 10years, not completed spending/current employment. Reported2021 local approval does not establish all subsequent permits.","Tenant still being sought; Microsoft/Google are examples, not signed occupants. Predevelopment in about six months and construction in12months are historical contingent forecasts, not October2026 construction observations. Article discusses proposed incentive regulations at a hearing; no final enacted rule or project certification independently checked. No committed IT MW, current power agreement or measured impacts verified. Statewide facility count attributed to another newspaper is not an independent census adopted here.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://www.nbcboston.com/news/local/massive-multi-billion-dollar-data-center-campus-planned-in-western-massachusetts/3795016/","host":"nbcboston.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Westfield · Hampden · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"tierpoint-boston-andover-ma","state":"MA","kind":"facility","name":"TierPoint Boston - Andover","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Essex"],"city":"Andover","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/massachusetts/boston-andover/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.6857078,"lng":-71.2086024,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":92700,"gross_area_is_lower_bound":true,"raised_floor_sqft":21000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2.5 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/massachusetts/boston-andover/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Andover · Essex · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"tierpoint-marlborough-ma","state":"MA","kind":"facility","name":"TierPoint Boston Data Center (Marlborough)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Marlborough","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred document is a Massachusetts regional page describing two facilities. Its combined area is not a Marlborough facility total. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/massachusetts/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.31391,"lng":-71.58139,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred document is a Massachusetts regional page describing two facilities. Its combined area is not a Marlborough facility total.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/massachusetts/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massachusetts · Marlborough · Middlesex · Source context reviewed","state_name":"Massachusetts","state_path":"/massachusetts/"},{"id":"123net-dc4-byron-center-mi","state":"MI","kind":"facility","name":"123NET DC4 Grand Rapids Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Byron Center","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. four named Michigan sections. Detroit/GrandRapidsaremarketlabels; publishedmunicipalitiesSouthfield/ByronCenterretained. Colocationareasnotwholebuilding. A/BsupplynotITMW; noindependentenergization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.123.net/data-center-colocation/","host":"123.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.826202163837,"lng":-85.67268596115,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"four named Michigan sections","fields":{"site_sections":[{"code":"DC1","address":"24700 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":80000},{"code":"DC2","address":"24275 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":8000},{"code":"DC3","address":"24245 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":8000},{"code":"DC4","address":"400 76th St SW, Byron Center, MI49315","colocation_area_sqft":3500}]},"notes":["Detroit/GrandRapidsaremarketlabels; publishedmunicipalitiesSouthfield/ByronCenterretained. Colocationareasnotwholebuilding. A/BsupplynotITMW; noindependentenergization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.123.net/data-center-colocation/","host":"123.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Byron Center · Kent · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"123net-dc1-southfield-mi","state":"MI","kind":"facility","name":"123NET Southfield DC1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Southfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. four named Michigan sections. Detroit/GrandRapidsaremarketlabels; publishedmunicipalitiesSouthfield/ByronCenterretained. Colocationareasnotwholebuilding. A/BsupplynotITMW; noindependentenergization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.123.net/data-center-colocation/","host":"123.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.4716416,"lng":-83.2380417,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"four named Michigan sections","fields":{"site_sections":[{"code":"DC1","address":"24700 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":80000},{"code":"DC2","address":"24275 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":8000},{"code":"DC3","address":"24245 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":8000},{"code":"DC4","address":"400 76th St SW, Byron Center, MI49315","colocation_area_sqft":3500}]},"notes":["Detroit/GrandRapidsaremarketlabels; publishedmunicipalitiesSouthfield/ByronCenterretained. Colocationareasnotwholebuilding. A/BsupplynotITMW; noindependentenergization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.123.net/data-center-colocation/","host":"123.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Southfield · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"123net-dc2-southfield-mi","state":"MI","kind":"facility","name":"123NET Southfield DC2 (Southfield Data Center NW)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Southfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. four named Michigan sections. Detroit/GrandRapidsaremarketlabels; publishedmunicipalitiesSouthfield/ByronCenterretained. Colocationareasnotwholebuilding. A/BsupplynotITMW; noindependentenergization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.123.net/data-center-colocation/","host":"123.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.467179479879,"lng":-83.234668656697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"four named Michigan sections","fields":{"site_sections":[{"code":"DC1","address":"24700 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":80000},{"code":"DC2","address":"24275 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":8000},{"code":"DC3","address":"24245 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":8000},{"code":"DC4","address":"400 76th St SW, Byron Center, MI49315","colocation_area_sqft":3500}]},"notes":["Detroit/GrandRapidsaremarketlabels; publishedmunicipalitiesSouthfield/ByronCenterretained. Colocationareasnotwholebuilding. A/BsupplynotITMW; noindependentenergization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.123.net/data-center-colocation/","host":"123.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Southfield · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"123net-dc3-southfield-mi","state":"MI","kind":"facility","name":"123NET Southfield DC3 (Southfield Data Center W)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Southfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. four named Michigan sections. Detroit/GrandRapidsaremarketlabels; publishedmunicipalitiesSouthfield/ByronCenterretained. Colocationareasnotwholebuilding. A/BsupplynotITMW; noindependentenergization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.123.net/data-center-colocation/","host":"123.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.466994454342,"lng":-83.234393055905,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"four named Michigan sections","fields":{"site_sections":[{"code":"DC1","address":"24700 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":80000},{"code":"DC2","address":"24275 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":8000},{"code":"DC3","address":"24245 Northwestern Hwy, Southfield, MI48075","colocation_area_sqft":8000},{"code":"DC4","address":"400 76th St SW, Byron Center, MI49315","colocation_area_sqft":3500}]},"notes":["Detroit/GrandRapidsaremarketlabels; publishedmunicipalitiesSouthfield/ByronCenterretained. Colocationareasnotwholebuilding. A/BsupplynotITMW; noindependentenergization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.123.net/data-center-colocation/","host":"123.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Southfield · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"365-data-centers-dt1-southfield-mi","state":"MI","kind":"facility","name":"365 Data Centers Detroit (DT1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Southfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not sum redundant UPS units as critical IT capacity or treat the generator as utility supply. No independent uptime verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://365datacenters.com/detroit-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.4691728,"lng":-83.2604844,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"24660 Lahser Road, Southfield, MI 48033","advertised_data_center_sqft":12000,"ups_configuration":{"units":3,"kw_per_unit":203,"redundancy":"N+1"},"backup_generator_kw":750},"notes":["Do not sum redundant UPS units as critical IT capacity or treat the generator as utility supply. No independent uptime verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/detroit-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Southfield · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"acd-net-metroix-lansing-mi","state":"MI","kind":"facility","name":"ACD.net MetroIX Lansing Data Center (1800 N. Grand River Ave)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ingham"],"city":"Lansing","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Current ACD operator colocation page offers a controlled Lansing facility, UPS/generator/cooling, network-provider choices, racks, cages and on-site Remote Hands. Footer identifies 1800 N Grand River Avenue. This supplies limited operator/location context for the inherited MetroIX row; the MetroIX name is not used. No MW, square footage, certification or exact commissioning date is stated. Company office and service context are not an independently surveyed parcel. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://acd.net/colocation","host":"acd.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.7541772,"lng":-84.5568307,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Current ACD operator colocation page offers a controlled Lansing facility, UPS/generator/cooling, network-provider choices, racks, cages and on-site Remote Hands. Footer identifies 1800 N Grand River Avenue. This supplies limited operator/location context for the inherited MetroIX row; the MetroIX name is not used. No MW, square footage, certification or exact commissioning date is stated. Company office and service context are not an independently surveyed parcel.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://acd.net/colocation","host":"acd.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Lansing · Ingham · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"solstice-data-allen-park-mi","state":"MI","kind":"facility","name":"Allen Park Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wayne"],"city":"Allen Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.2830061,"lng":-83.1947008,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo."},"notes":["GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Allen Park · Wayne · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"alterra-development-marshall-mi","state":"MI","kind":"facility","name":"Alterra Marshall Technology & Energy Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Calhoun"],"city":"Marshall","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Marshall conditional property agreement and separate powerplant scope. Duediligenceagreement notcompletedpurchase,finalsiteapproval oroperatingcampus.1GWpowerplantnotITandnotuniversallyguaranteedratepayerbenefit. Forecastjobsapplycombinedtechnology/energydevelopmentnotallDCroles.18to24monthconstructionstartforecastconditionalafterapprovals, not2026actualstart. Existingindustrialzoningdoesnotproveallpermits. Broadernaturearea notautomaticallyprojectland. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://marshalladvisor.com/articles/news/data-center-being-proposed-in-marshall-begins-due-dilligence-period-with-city/","host":"marshalladvisor.com","date":"2025-12-27","published":"2025-12-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.276,"lng":-84.955,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Marshall conditional property agreement and separate powerplant scope","fields":{"developer":"Alterra Development","project":"Marshall Technology and EnergyCenter","location":"BrooksIndustrialPark, Marshall, Michigan","reported_initial_purchase_agreement_date":"2025-10-30","proposed_land_acres_min_exclusive":200,"reported_due_diligence_months_range":[6,12],"proposed_generation_gw":1,"power_basis":"onsite generation, not critical IT","developer_expected_direct_skilled_jobs_range":[300,500]},"notes":["Duediligenceagreement notcompletedpurchase,finalsiteapproval oroperatingcampus.1GWpowerplantnotITandnotuniversallyguaranteedratepayerbenefit. Forecastjobsapplycombinedtechnology/energydevelopmentnotallDCroles.18to24monthconstructionstartforecastconditionalafterapprovals, not2026actualstart. Existingindustrialzoningdoesnotproveallpermits. Broadernaturearea notautomaticallyprojectland.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://marshalladvisor.com/articles/news/data-center-being-proposed-in-marshall-begins-due-dilligence-period-with-city/","host":"marshalladvisor.com","date":"2025-12-27","published":"2025-12-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Marshall · Calhoun · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"aunalytics-kalamazoo-mi","state":"MI","kind":"facility","name":"Aunalytics Kalamazoo Datacenter","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kalamazoo"],"city":"Kalamazoo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Exact company office address context; data-center use still unverified at that address.. Current company contact page lists Kalamazoo office at 6395 Technology Avenue, matching the inherited street. Page does not identify Suite A or explicitly describe the office as a data center. Corporate office listing corroborates company presence only. No critical IT MW, commissioned floor space, sole ownership, Tier award or environmental permit inferred. Other listed offices do not automatically become new data-center pins. No contact or hotline used. Limited context; company office, renovation, acquisition, offering and physical operation are different facts. Company-wide cloud infrastructure representations, not site-specific proof.. Company says it owns and operates infrastructure and data centers across the Midwest and offers colocation. Combined with Kalamazoo office address this is limited company context, not independent proof of data-hall use at 6395 Technology Avenue. 99.999% uptime claim covers company Cloud and ISP services over a stated seven-year period; not an independently measured Kalamazoo building uptime record. Demonstration monitoring percentages, approximate team size and AI claims are not facility capacity or operating evidence.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aunalytics.com/contact/","host":"aunalytics.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.aunalytics.com/enterprise-cloud/","host":"aunalytics.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.246545,"lng":-85.675111,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-renovation-acquisition-and-office-role-review-round91-2026-10-15.json","scope":"Exact company office address context; data-center use still unverified at that address.","fields":{},"notes":["Current company contact page lists Kalamazoo office at 6395 Technology Avenue, matching the inherited street. Page does not identify Suite A or explicitly describe the office as a data center.","Corporate office listing corroborates company presence only. No critical IT MW, commissioned floor space, sole ownership, Tier award or environmental permit inferred. Other listed offices do not automatically become new data-center pins. No contact or hotline used.","Limited context; company office, renovation, acquisition, offering and physical operation are different facts."],"sources":[{"url":"https://www.aunalytics.com/contact/","host":"aunalytics.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-renovation-acquisition-and-office-role-review-round91-2026-10-15.json","scope":"Company-wide cloud infrastructure representations, not site-specific proof.","fields":{},"notes":["Company says it owns and operates infrastructure and data centers across the Midwest and offers colocation. Combined with Kalamazoo office address this is limited company context, not independent proof of data-hall use at 6395 Technology Avenue.","99.999% uptime claim covers company Cloud and ISP services over a stated seven-year period; not an independently measured Kalamazoo building uptime record. Demonstration monitoring percentages, approximate team size and AI claims are not facility capacity or operating evidence.","Limited context; company office, renovation, acquisition, offering and physical operation are different facts."],"sources":[{"url":"https://www.aunalytics.com/enterprise-cloud/","host":"aunalytics.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Kalamazoo · Kalamazoo · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"benton-township-yore-avenue-ai-data-center-mi","state":"MI","kind":"facility","name":"Benton Township AI Data Center (Yore Avenue, near Lake Michigan College)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berrien"],"city":"Benton Charter Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Headline says three billion USD while body prints three million. Investment remains null; no current construction, tenant or final legislative outcome inferred. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://abc57.com/news/jackie","host":"abc57.com","date":"2024-04-04","published":"2024-04-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.0952439,"lng":-86.388123,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"canonical_investment_usd":null,"source_internal_investment_conflict":true,"reported_context":"ABC57 reports unnamed company considering Yore Avenue site, contingent on proposed state incentives at that time.","independently_verified_current_operating_status":null},"notes":["Headline says three billion USD while body prints three million. Investment remains null; no current construction, tenant or final legislative outcome inferred.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://abc57.com/news/jackie","host":"abc57.com","date":"2024-04-04","published":"2024-04-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Benton Charter Township · Berrien · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"hillwood-sterling-buick-city-flint-mi","state":"MI","kind":"facility","name":"Buick City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Genesee"],"city":"Flint","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.043131,"lng":-83.6880801,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo."},"notes":["GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Flint · Genesee · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"cogent-detroit-1320-3rd-st-mi","state":"MI","kind":"facility","name":"Cogent Detroit Data Center (1320 3rd St)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wayne"],"city":"Detroit","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Generic multiple-options power gives no MW. Two area blocks need brochure mapping before assigning to Detroit versus Troy. Operator explicitly separates Detroit, Troy and Michigan edge sites. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Detroit/Troy named sections. Distinctsiteaddressesandspaces; GrandRapids/Lansing/Pontiac/FlintedgeaddressesnotadditionalDetroitfloorarea. NoMWadopted.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cogentco.com/en/cogent-detroit","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.330743,"lng":-83.055773,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"1320 3rd St","city":"Detroit","marketed_service":"colocation"},"notes":["Generic multiple-options power gives no MW.","Two area blocks need brochure mapping before assigning to Detroit versus Troy.","Operator explicitly separates Detroit, Troy and Michigan edge sites.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cogentco.com/en/cogent-detroit","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Detroit/Troy named sections","fields":{"site_sections":[{"city":"Troy","address":"3331 W Big Beaver Road, Troy, MI48084","operator_labeled_space_sqft":5624},{"city":"Detroit","address":"1320 3rd St, Detroit, MI48226","operator_labeled_space_sqft":31149}]},"notes":["Distinctsiteaddressesandspaces; GrandRapids/Lansing/Pontiac/FlintedgeaddressesnotadditionalDetroitfloorarea. NoMWadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cogentco.com/en/cogent-detroit","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Detroit · Wayne · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"cogent-troy-big-beaver-mi","state":"MI","kind":"facility","name":"Cogent Troy Data Center (3331 W. Big Beaver Rd)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Troy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Detroit/Troy named sections. Distinctsiteaddressesandspaces; GrandRapids/Lansing/Pontiac/FlintedgeaddressesnotadditionalDetroitfloorarea. NoMWadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cogentco.com/en/cogent-detroit","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.5594738,"lng":-83.193147,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Detroit/Troy named sections","fields":{"site_sections":[{"city":"Troy","address":"3331 W Big Beaver Road, Troy, MI48084","operator_labeled_space_sqft":5624},{"city":"Detroit","address":"1320 3rd St, Detroit, MI48226","operator_labeled_space_sqft":31149}]},"notes":["Distinctsiteaddressesandspaces; GrandRapids/Lansing/Pontiac/FlintedgeaddressesnotadditionalDetroitfloorarea. NoMWadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cogentco.com/en/cogent-detroit","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Troy · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"deep-green-lansing-mi","state":"MI","kind":"facility","name":"Deep Green Lansing Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ingham"],"city":"Lansing","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.747831829239,"lng":-84.544559589342,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.","independently_verified_current_operating_status":null,"site_stage_scope":"Reported April application withdrawal; not a denied vote"},"notes":["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Lansing · Ingham · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"edgeconnex-det01-mi","state":"MI","kind":"facility","name":"EdgeConneX DET01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Detroit (Oakland County)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 20+kWcabinetand600+WpersquarefootdensitynotfacilityMW; noextrapolationfromgrossfloor. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/americas/detroit-mi/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.4476693,"lng":-83.2626336,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"DET01","facility_area_sqft":39900,"raised_floor_sqft":9930},"notes":["20+kWcabinetand600+WpersquarefootdensitynotfacilityMW; noextrapolationfromgrossfloor.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/americas/detroit-mi/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Detroit (Oakland County) · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"gm-enterprise-data-center-warren-mi","state":"MI","kind":"facility","name":"General Motors Enterprise Data Center (Warren Technical Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Macomb"],"city":"Warren","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. HistoricalissuerclaimisnotindependentlyreviewedUSGBCcertificate,currentoperationor2026meteredperformance.70percentreductionlacksfullyreviewedbaseline/scope;notPUEor70percentbetterthanallpeers.12,000carbatteriesreplacedisbackuphistory,notcomputeorMWhcapacity. GM20facilitiesdownfrom23areglobalhistoricalportfolio,notUSbuildingcount. Milfordmirrorunderconstructionisaseparate2013projectstage,notcurrentconstruction. NocriticalITorcapitalverified. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.3blmedia.com/news/gm-data-center-goes-green-leed","host":"3blmedia.com","date":"2013-09-13","published":"2013-09-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.5155048,"lng":-83.0377165,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"GMissuercontenton3BLannouncesWarrenEnterpriseDataCenterLEEDGoldandclaimed70percentenergyreductionfromredesign,withflywheelbackupandin-row/freecooling.","independently_verified_current_operating_status":null},"notes":["HistoricalissuerclaimisnotindependentlyreviewedUSGBCcertificate,currentoperationor2026meteredperformance.70percentreductionlacksfullyreviewedbaseline/scope;notPUEor70percentbetterthanallpeers.12,000carbatteriesreplacedisbackuphistory,notcomputeorMWhcapacity. GM20facilitiesdownfrom23areglobalhistoricalportfolio,notUSbuildingcount. Milfordmirrorunderconstructionisaseparate2013projectstage,notcurrentconstruction. NocriticalITorcapitalverified.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.3blmedia.com/news/gm-data-center-goes-green-leed","host":"3blmedia.com","date":"2013-09-13","published":"2013-09-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Warren · Macomb · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"genh-lake-billings-dam-manton-mi","state":"MI","kind":"facility","name":"GenH Lake Billings Dam Data Services Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wexford"],"city":"Manton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Negative first impressions are not a formal rejection. Proposed hydropower is not an operating data center. Cooling and MW are undisclosed. Free installation and rent-style payments are a pitch, not an executed lease. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cadillacnews.com/news/manton-wary-of-lake-billings-data-center-proposal/article_81fc6587-837e-4e89-a949-b889d28ecd35.html","host":"cadillacnews.com","date":"2026-07-23","published":"2026-07-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.4137447,"lng":-85.3944105,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Cadillac News describes GenH's initial Lake Billings dam proposal, a small modular facility and a possible work group.","independently_verified_current_operating_status":null},"notes":["Negative first impressions are not a formal rejection. Proposed hydropower is not an operating data center. Cooling and MW are undisclosed. Free installation and rent-style payments are a pitch, not an executed lease.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cadillacnews.com/news/manton-wary-of-lake-billings-data-center-proposal/article_81fc6587-837e-4e89-a949-b889d28ecd35.html","host":"cadillacnews.com","date":"2026-07-23","published":"2026-07-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Manton · Wexford · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"genh-morley-dam-mecosta-mi","state":"MI","kind":"facility","name":"GenH Morley Dam Data Services Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mecosta"],"city":"Morley","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.490861,"lng":-85.443928,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.","independently_verified_current_operating_status":null,"site_stage_scope":"Unfiled hydropower/data-services concept"},"notes":["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Morley · Mecosta · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"raeden-gibraltar-mclouth-mi","state":"MI","kind":"facility","name":"Gibraltar Data Center (former McLouth Steel site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wayne"],"city":"Gibraltar","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.106282080203,"lng":-83.196799127817,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo."},"notes":["GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Gibraltar · Wayne · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"grand-river-power-hamlin-township-mi","state":"MI","kind":"facility","name":"Grand River Power Company Smithville Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Eaton"],"city":"Eaton Rapids","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. December 3 rezoning hearing and conditional use remained prospective. Historical order is not proof of current shutdown or later permit result; residents and operator noise claims conflict. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wkar.org/wkar-news/2025-11-19/cease-and-desist-issued-to-bitcoin-mining-site-in-eaton-county-over-noise-complaints","host":"wkar.org","date":"2025-11-19","published":"2025-11-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.4996675,"lng":-84.6291791,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"cease-and-desist-reported","reported_finding":"WKAR says Hamlin Township issued October 1 cease-and-desist regarding Grand River Power mining trailer; noise stopped shortly after.","report_display_date":"2025-11-19","independently_verified_current_status":null},"notes":["December 3 rezoning hearing and conditional use remained prospective. Historical order is not proof of current shutdown or later permit result; residents and operator noise claims conflict.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wkar.org/wkar-news/2025-11-19/cease-and-desist-issued-to-bitcoin-mining-site-in-eaton-county-over-noise-complaints","host":"wkar.org","date":"2025-11-19","published":"2025-11-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Eaton Rapids · Eaton · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"harbor-farmz-full-circle-drive-kalamazoo-mi","state":"MI","kind":"facility","name":"Harbor Farmz Inference Data Center Conversion (2839 Full Circle Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kalamazoo"],"city":"Kalamazoo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.291707,"lng":-85.5872286,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.","independently_verified_current_operating_status":null,"site_stage_scope":"Property marketed for possible DC; no filed proposal or named developer"},"notes":["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Kalamazoo · Kalamazoo · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"stantec-randee-howell-township-mi","state":"MI","kind":"facility","name":"Howell Township Hyperscale Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Livingston"],"city":"Howell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Planet Detroit December8,2025 names Stantec Consulting Michigan Inc/Randee LLC and1077acres north ofI96 in Howell Township. Applicants withdrew a conditional rezoning request following community concerns; the December8 agenda hearing/vote was removed. This is not permanent cancellation or proof of a later resubmission. Article reports November20 six-month moratorium, with a township-attorney interpretation of possible rezoning/site-plan waivers. Original enacted instrument and current2026 status not checked. Planning recommendations are advisory. Billion-dollar cost, tax benefits and petition totals remain dated proposals/claims, not audited spending or certified votes. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://planetdetroit.org/2025/12/billion-dollar-data-center-paused/","host":"planetdetroit.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.6317633,"lng":-83.9932682,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["Planet Detroit December8,2025 names Stantec Consulting Michigan Inc/Randee LLC and1077acres north ofI96 in Howell Township. Applicants withdrew a conditional rezoning request following community concerns; the December8 agenda hearing/vote was removed. This is not permanent cancellation or proof of a later resubmission.","Article reports November20 six-month moratorium, with a township-attorney interpretation of possible rezoning/site-plan waivers. Original enacted instrument and current2026 status not checked. Planning recommendations are advisory. Billion-dollar cost, tax benefits and petition totals remain dated proposals/claims, not audited spending or certified votes.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://planetdetroit.org/2025/12/billion-dollar-data-center-paused/","host":"planetdetroit.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Howell · Livingston · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"hyperscale-data-dowagiac-mi","state":"MI","kind":"facility","name":"Hyperscale Data Dowagiac Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cass"],"city":"Dowagiac","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. ColinRoose WWMT March31updatedApril1,2026 originalDowagiac citymanager/residentinterviews:48+acrelandpurchaseagreement expectedclose60days, no citydevelopmentproposalreceived.30MWexisting/340MWproposedtotal not370MWIT orcompletedexpansion. Cityelectricutilitynotoperator supplier; noiseordinanceamendedpreviousweekreportedwithoutexactlimits/currentcodificationread. Residentnoise/propertyworriesnotmeasuredhealthharm. Noresponseoperator/currentclosing unverified. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wwmt.com/news/local/ai-data-center-expansion-dowagiac-loud-noise-complaints-residents-southwest-michigan-hyperscale-megawatt-bitcoin-wwmt","host":"wwmt.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.984,"lng":-86.109,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["ColinRoose WWMT March31updatedApril1,2026 originalDowagiac citymanager/residentinterviews:48+acrelandpurchaseagreement expectedclose60days, no citydevelopmentproposalreceived.30MWexisting/340MWproposedtotal not370MWIT orcompletedexpansion.","Cityelectricutilitynotoperator supplier; noiseordinanceamendedpreviousweekreportedwithoutexactlimits/currentcodificationread. Residentnoise/propertyworriesnotmeasuredhealthharm. Noresponseoperator/currentclosing unverified.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://wwmt.com/news/local/ai-data-center-expansion-dowagiac-loud-noise-complaints-residents-southwest-michigan-hyperscale-megawatt-bitcoin-wwmt","host":"wwmt.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Dowagiac · Cass · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"telkite-aeris-ki-sawyer-marquette-mi","state":"MI","kind":"facility","name":"K.I. Sawyer Data Center (SAGE building / Greenfield Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marquette"],"city":"K. I. Sawyer","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. My UP Now June19,2026 original interviews identify Telkite/Aeris exploration at former KI Sawyer airport in Marquette County. Mango Investments LLC ownership is reported; Telkite manages land. No permits, applications or end users were identified, and a rumored vote was not scheduled. Website claims of1000acres,130000sf SAGE building,25/50/500 to 1000MW timelines are marketing scenarios, not additive commissioned IT capacity. Interview discusses roughly25MW gas generation contingent on finding an end user, not25MW delivered IT. Former SAGE building needs modernization; water/noise assertions are unmeasured. No current construction, signed tenant or ready-for-service date established. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.myupnow.com/news/local/he-wants-to-bring-a-data-center-to-the-upper-peninsula-he-also-says-dont/article_ef82a784-75a0-4bbd-80e3-cec8ad62726d.html","host":"myupnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":46.3529764,"lng":-87.3915429,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["My UP Now June19,2026 original interviews identify Telkite/Aeris exploration at former KI Sawyer airport in Marquette County. Mango Investments LLC ownership is reported; Telkite manages land. No permits, applications or end users were identified, and a rumored vote was not scheduled.","Website claims of1000acres,130000sf SAGE building,25/50/500 to 1000MW timelines are marketing scenarios, not additive commissioned IT capacity. Interview discusses roughly25MW gas generation contingent on finding an end user, not25MW delivered IT. Former SAGE building needs modernization; water/noise assertions are unmeasured. No current construction, signed tenant or ready-for-service date established.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://www.myupnow.com/news/local/he-wants-to-bring-a-data-center-to-the-upper-peninsula-he-also-says-dont/article_ef82a784-75a0-4bbd-80e3-cec8ad62726d.html","host":"myupnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · K. I. Sawyer · Marquette · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"rocklocker-kalkaska-go-mi","state":"MI","kind":"facility","name":"Kalkaska Go","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kalkaska"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Company second statement specifically disclaims data centers on public lands while continuing carbon-storage business; not evidence the whole company closed. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.traverseticker.com/news/developer-pulls-plug-on-kalkaska-data-center/","host":"traverseticker.com","date":"2025-11-20","published":"2025-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.7254528,"lng":-85.2916494,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"public-land-proposal-abandoned","reported_finding":"Traverse Ticker reports Rocklocker / Kalkaska Go ended proposed public-land data center pursuit and cancelled community forum.","report_display_date":"2025-11-20","independently_verified_current_status":null},"notes":["Company second statement specifically disclaims data centers on public lands while continuing carbon-storage business; not evidence the whole company closed.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.traverseticker.com/news/developer-pulls-plug-on-kalkaska-data-center/","host":"traverseticker.com","date":"2025-11-20","published":"2025-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Kalkaska · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"liberty-center-one-royal-oak-mi","state":"MI","kind":"facility","name":"Liberty Center One Royal Oak Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Royal Oak","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Liberty Center One offices versus data-center site identity. Genericserviceshomepageprovides4815DelemereRoyalOakand1080NimitzviewCincinnatiexplicitOFFICEaddresses;notexactdatacenterproof. ColocationadvertisementdoesnotconfirmbothwholeofficebuildingsareDCs. No numericcapacity,areaoropeningadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://libertycenterone.com/","host":"libertycenterone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.533508,"lng":-83.177393,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Liberty Center One offices versus data-center site identity","fields":{},"notes":["Genericserviceshomepageprovides4815DelemereRoyalOakand1080NimitzviewCincinnatiexplicitOFFICEaddresses;notexactdatacenterproof. ColocationadvertisementdoesnotconfirmbothwholeofficebuildingsareDCs. No numericcapacity,areaoropeningadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://libertycenterone.com/","host":"libertycenterone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Royal Oak · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"liquid-web-dc3-lansing-mi","state":"MI","kind":"facility","name":"Liquid Web Lansing DC3 (2703 Ena Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Eaton"],"city":"Lansing","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Liquid Web Lansing two-site scope and apparent power. 13.5MVAutilitynotcriticalITor13.5MWactivepower;scopeacrossfacilitiesunspecified. A/BtoDC3aliasnotproven.1997founding/regionyearnotexactopeningofeachDC. Servercapacitynotcurrentoccupancy. No exactstreetorindependentcertificate;oldSafeHarborclaimnotcurrentlegalcomplianceproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.liquidweb.com/data-centers/lansing-web-hosting/","host":"liquidweb.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.7053904,"lng":-84.6660891,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Liquid Web Lansing two-site scope and apparent power","fields":{"operator":"Liquid Web","regional_facilities":2,"locality":"Lansing, Michigan","operator_described_ownership":"wholly owned","named_facilities":[{"label":"A","area_sqft":32000,"server_capacity":8000},{"label":"B","area_sqft":90000,"server_capacity":25000}],"published_expandable_utility_feeds_kva":13500,"company_region_established_year":1997},"notes":["13.5MVAutilitynotcriticalITor13.5MWactivepower;scopeacrossfacilitiesunspecified. A/BtoDC3aliasnotproven.1997founding/regionyearnotexactopeningofeachDC. Servercapacitynotcurrentoccupancy. No exactstreetorindependentcertificate;oldSafeHarborclaimnotcurrentlegalcomplianceproof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.liquidweb.com/data-centers/lansing-web-hosting/","host":"liquidweb.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Lansing · Eaton · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"managedway-tym1-troy-mi","state":"MI","kind":"facility","name":"ManagedWay TYM1 (319 Executive Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Troy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ManagedWay Troy two-building identity and rack density. AddresslistdoesnotmapTYM1/TYM2codesbyorder.30pluskWrackcapabilitynotcampusMW/currentaverage.2001customerhistorynotbothbuildingscommissionedthen. SOC/TierIIIplusreportsrestrictednotaccessed;designclaimnotindependentcertification. No streetparcelownershipinspection or exactopeningday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://managedway.com/colocation-facilities","host":"managedway.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.537158,"lng":-83.099861,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"ManagedWay Troy two-building identity and rack density","fields":{"operator":"ManagedWay","named_building_addresses":["600 Executive Drive, Troy, Michigan","319 Executive Drive, Troy, Michigan"],"facilities":2,"available_rack_power_kw_min_exclusive":30,"company_customer_history_since":2001},"notes":["AddresslistdoesnotmapTYM1/TYM2codesbyorder.30pluskWrackcapabilitynotcampusMW/currentaverage.2001customerhistorynotbothbuildingscommissionedthen. SOC/TierIIIplusreportsrestrictednotaccessed;designclaimnotindependentcertification. No streetparcelownershipinspection or exactopeningday.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://managedway.com/colocation-facilities","host":"managedway.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Troy · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"managedway-tym2-troy-mi","state":"MI","kind":"facility","name":"ManagedWay TYM2 (600 Executive Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Troy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ManagedWay Troy two-building identity and rack density. AddresslistdoesnotmapTYM1/TYM2codesbyorder.30pluskWrackcapabilitynotcampusMW/currentaverage.2001customerhistorynotbothbuildingscommissionedthen. SOC/TierIIIplusreportsrestrictednotaccessed;designclaimnotindependentcertification. No streetparcelownershipinspection or exactopeningday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://managedway.com/colocation-facilities","host":"managedway.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.540615,"lng":-83.098459,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"ManagedWay Troy two-building identity and rack density","fields":{"operator":"ManagedWay","named_building_addresses":["600 Executive Drive, Troy, Michigan","319 Executive Drive, Troy, Michigan"],"facilities":2,"available_rack_power_kw_min_exclusive":30,"company_customer_history_since":2001},"notes":["AddresslistdoesnotmapTYM1/TYM2codesbyorder.30pluskWrackcapabilitynotcampusMW/currentaverage.2001customerhistorynotbothbuildingscommissionedthen. SOC/TierIIIplusreportsrestrictednotaccessed;designclaimnotindependentcertification. No streetparcelownershipinspection or exactopeningday.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://managedway.com/colocation-facilities","host":"managedway.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Troy · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"mason-columbia-road-data-center-mi","state":"MI","kind":"facility","name":"Mason / Vevay Township Data Center (unnamed developer)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ingham"],"city":"Mason","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Secondary dated snapshot, not final annexation, project permit, confirmed tenant or construction. Other seven-entry regulatory sections are distinct jurisdictions: Eagle reported expiry February17,2027; Solon Resolution26-10 July13 extension to February9,2027; Williamstown draft minutes remain draft; Lenox recommendation is not adopted rule; Oakland Charter Township is not Oakland University. Linked originals and subsequent dispositions unexamined in this source review. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Primary for what Mason city staff reported; not independently inspected annexation application or StateBoundaryCommission acceptance.. Laterannexationoutcomeandtenantidentityunknown. LinkedSeptember4reportlabelactuallytargetsfilenameSeptember11;requesttimedout,nodate/outcomeadopted. Otherjurisdictionlawsuit/noisethresholdsummariesinMasonreportaresecondaryandnotthissiteoradoptedMasonstandards. Generalcapitalbudget/street/parkprojectsinreportnotDCincentives.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://baldorilaw.com/resources/michigan-data-center-tracker","host":"baldorilaw.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.mason.mi.us/document_center/Departments/City%20Manager/City%20Manager%20Reports/2026%20City%20Manager%20Reports/8.14.26%20City%20Manager%27s,%20FINAL.pdf?t=202608141542460","host":"mason.mi.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.582234294066,"lng":-84.479676261494,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Baldori Law dated tracker reports Mason city staff learned of a landowner annexation request August14,2026, but the city had not received the application and was awaiting State Boundary Commission completeness notice. September4 outreach report did not establish approval.","independently_verified_current_operating_status":null},"notes":["Secondary dated snapshot, not final annexation, project permit, confirmed tenant or construction. Other seven-entry regulatory sections are distinct jurisdictions: Eagle reported expiry February17,2027; Solon Resolution26-10 July13 extension to February9,2027; Williamstown draft minutes remain draft; Lenox recommendation is not adopted rule; Oakland Charter Township is not Oakland University. Linked originals and subsequent dispositions unexamined in this source review.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://baldorilaw.com/resources/michigan-data-center-tracker","host":"baldorilaw.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round37-2026-10-14.json","scope":"Primary for what Mason city staff reported; not independently inspected annexation application or StateBoundaryCommission acceptance.","fields":{"official_report_date":"2026-08-14","city_reported_notified_landowner_applied_for_annexation":true,"city_had_received_application_at_report_date":false,"boundary_commission_completeness_verified":false,"project_approval_verified":false},"notes":["Laterannexationoutcomeandtenantidentityunknown. LinkedSeptember4reportlabelactuallytargetsfilenameSeptember11;requesttimedout,nodate/outcomeadopted. Otherjurisdictionlawsuit/noisethresholdsummariesinMasonreportaresecondaryandnotthissiteoradoptedMasonstandards. Generalcapitalbudget/street/parkprojectsinreportnotDCincentives.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mason.mi.us/document_center/Departments/City%20Manager/City%20Manager%20Reports/2026%20City%20Manager%20Reports/8.14.26%20City%20Manager%27s,%20FINAL.pdf?t=202608141542460","host":"mason.mi.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Mason · Ingham · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"metrobloks-southfield-mi","state":"MI","kind":"facility","name":"Metrobloks Southfield Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Southfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.474,"lng":-83.293,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo."},"notes":["GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Southfield · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"microsoft-dorr-township-mi","state":"MI","kind":"facility","name":"Microsoft Dorr Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegan"],"city":"Dorr Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No signed ordinance or exact start/expiry retained. Residents allegations about health, water and taxes are not independently adopted effects. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wilcoxnewspapers.com/dorr-twp-approves-12-month-moratorium-on-data-centers/","host":"wilcoxnewspapers.com","date":"2026-03-04","published":"2026-03-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.64,"lng":-85.652,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"twelve-month-moratorium-reported","reported_finding":"TownBroadcast reporting republished by Wilcox says Dorr Township approved twelve-month pause after debate over shorter period.","report_display_date":"2026-03-04","independently_verified_current_status":null},"notes":["No signed ordinance or exact start/expiry retained. Residents allegations about health, water and taxes are not independently adopted effects.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wilcoxnewspapers.com/dorr-twp-approves-12-month-moratorium-on-data-centers/","host":"wilcoxnewspapers.com","date":"2026-03-04","published":"2026-03-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Dorr Township · Allegan · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"microsoft-gaines-township-mi","state":"MI","kind":"facility","name":"Microsoft Gaines Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Gaines Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. No specific development plans had been provided. The existing Switch Pyramid's water use and history are not Microsoft site facts. Requested rezoning is not an observed approval; historic purchase price is land consideration, not project capex or current power demand. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wgvunews.org/news/2025-12-16/gaines-township-to-consider-rezoning-for-future-microsoft-data-center","host":"wgvunews.org","date":"2025-12-16","published":"2025-12-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.802,"lng":-85.571,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WGVU reports Microsoft's rezoning request for an additional Gaines Township parcel adjoining its former Steelcase land, with a December 18 public hearing scheduled.","independently_verified_current_operating_status":null},"notes":["No specific development plans had been provided. The existing Switch Pyramid's water use and history are not Microsoft site facts. Requested rezoning is not an observed approval; historic purchase price is land consideration, not project capex or current power demand.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wgvunews.org/news/2025-12-16/gaines-township-to-consider-rezoning-for-future-microsoft-data-center","host":"wgvunews.org","date":"2025-12-16","published":"2025-12-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Gaines Township · Kent · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"microsoft-lowell-township-mi","state":"MI","kind":"facility","name":"Microsoft Lowell Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Lowell Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.93,"lng":-85.352,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.","independently_verified_current_operating_status":null,"site_stage_scope":"Municipal service/development talks suspended, not project withdrawal"},"notes":["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Lowell Township · Kent · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"newberry-bitcoin-mine-luce-county-mi","state":"MI","kind":"facility","name":"Newberry Bitcoin Mine (Cloverland Electric service territory)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Luce"],"city":"Newberry","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Newberry's operator, exact parcel, MW and current service terms are not disclosed. Noise measurements, a school dispute and a temporary restraining order concern Dafter and must not be copied to Newberry. Bills in committee are not law; statewide mine counts are explicitly incomplete, not an exhaustive census. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bridgemi.com/business-watch/crypto-mines-noisy-nuisance-some-should-michigan-regulate-them/","host":"bridgemi.com","date":"2025-07-15","published":"2025-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":46.3559523,"lng":-85.5098868,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Bridge Michigan's utility-attributed regional account identifies one operating Newberry cryptocurrency mine in Cloverland territory alongside two Dafter mines.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["Newberry's operator, exact parcel, MW and current service terms are not disclosed. Noise measurements, a school dispute and a temporary restraining order concern Dafter and must not be copied to Newberry. Bills in committee are not law; statewide mine counts are explicitly incomplete, not an exhaustive census.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bridgemi.com/business-watch/crypto-mines-noisy-nuisance-some-should-michigan-regulate-them/","host":"bridgemi.com","date":"2025-07-15","published":"2025-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Newberry · Luce · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"oakland-university-computing-auburn-hills-mi","state":"MI","kind":"facility","name":"Oakland University Campus Computing Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Auburn Hills","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.675,"lng":-83.215,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.","independently_verified_current_operating_status":null,"site_stage_scope":"Trustees authorized due diligence, not final construction"},"notes":["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Auburn Hills · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"otava-ann-arbor-mi","state":"MI","kind":"facility","name":"Otava Ann Arbor Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washtenaw"],"city":"Ann Arbor","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. OTAVA two named Michigan area/power scopes, location crosswalk held. 1.2MWMetroDetroitTOTALbuildingloadnotIT;2500kVAtransformernot2.5MWIT. MidMichigan1600kVAUPSnotcriticalITMW. GeographiclabelsWestland/MidMichigansourceheadingsmisordered;exactmunicipality/streetcrosswalkunresolved. AnnArborfieldsnotadoptedfromunreadleadsection. CompanythreesitesversusotherthreeMIwordingnotsitecensus. No currentmeteredloadorc ertifierreport. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.otava.com/data-center-michigan/","host":"otava.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.2813722,"lng":-83.7484616,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"OTAVA two named Michigan area/power scopes, location crosswalk held","fields":{"operator":"OTAVA","named_sites":[{"market":"Mid-Michigan, Genesee County","total_hosting_area_sqft":32500,"raised_floor_sqft":22500,"workplace_recovery_sqft":10000,"historical_upgrade_investment_usd_min_exclusive":1000000,"conditioned_ups_apparent_power_kva_min_exclusive":1600},{"market":"Metro Detroit","standalone_building_sqft":34500,"raised_floor_sqft":18000,"total_building_load_capacity_mw":1.2,"utility_transformer_kva":2500,"generators":3,"each_generator_kw":500}]},"notes":["1.2MWMetroDetroitTOTALbuildingloadnotIT;2500kVAtransformernot2.5MWIT. MidMichigan1600kVAUPSnotcriticalITMW. GeographiclabelsWestland/MidMichigansourceheadingsmisordered;exactmunicipality/streetcrosswalkunresolved. AnnArborfieldsnotadoptedfromunreadleadsection. CompanythreesitesversusotherthreeMIwordingnotsitecensus. No currentmeteredloadorc ertifierreport.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.otava.com/data-center-michigan/","host":"otava.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Ann Arbor · Washtenaw · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"otava-metro-detroit-westland-mi","state":"MI","kind":"facility","name":"Otava Metro Detroit Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wayne"],"city":"Westland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. OTAVA two named Michigan area/power scopes, location crosswalk held. 1.2MWMetroDetroitTOTALbuildingloadnotIT;2500kVAtransformernot2.5MWIT. MidMichigan1600kVAUPSnotcriticalITMW. GeographiclabelsWestland/MidMichigansourceheadingsmisordered;exactmunicipality/streetcrosswalkunresolved. AnnArborfieldsnotadoptedfromunreadleadsection. CompanythreesitesversusotherthreeMIwordingnotsitecensus. No currentmeteredloadorc ertifierreport. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.otava.com/data-center-michigan/","host":"otava.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.331172,"lng":-83.419408,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"OTAVA two named Michigan area/power scopes, location crosswalk held","fields":{"operator":"OTAVA","named_sites":[{"market":"Mid-Michigan, Genesee County","total_hosting_area_sqft":32500,"raised_floor_sqft":22500,"workplace_recovery_sqft":10000,"historical_upgrade_investment_usd_min_exclusive":1000000,"conditioned_ups_apparent_power_kva_min_exclusive":1600},{"market":"Metro Detroit","standalone_building_sqft":34500,"raised_floor_sqft":18000,"total_building_load_capacity_mw":1.2,"utility_transformer_kva":2500,"generators":3,"each_generator_kw":500}]},"notes":["1.2MWMetroDetroitTOTALbuildingloadnotIT;2500kVAtransformernot2.5MWIT. MidMichigan1600kVAUPSnotcriticalITMW. GeographiclabelsWestland/MidMichigansourceheadingsmisordered;exactmunicipality/streetcrosswalkunresolved. AnnArborfieldsnotadoptedfromunreadleadsection. CompanythreesitesversusotherthreeMIwordingnotsitecensus. No currentmeteredloadorc ertifierreport.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.otava.com/data-center-michigan/","host":"otava.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Westland · Wayne · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"otava-mid-michigan-flint-township-mi","state":"MI","kind":"facility","name":"Otava Mid-Michigan Data Center (5225 Exchange Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Genesee"],"city":"Flint Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. OTAVA two named Michigan area/power scopes, location crosswalk held. 1.2MWMetroDetroitTOTALbuildingloadnotIT;2500kVAtransformernot2.5MWIT. MidMichigan1600kVAUPSnotcriticalITMW. GeographiclabelsWestland/MidMichigansourceheadingsmisordered;exactmunicipality/streetcrosswalkunresolved. AnnArborfieldsnotadoptedfromunreadleadsection. CompanythreesitesversusotherthreeMIwordingnotsitecensus. No currentmeteredloadorc ertifierreport. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.otava.com/data-center-michigan/","host":"otava.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.9687373,"lng":-83.7796697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"OTAVA two named Michigan area/power scopes, location crosswalk held","fields":{"operator":"OTAVA","named_sites":[{"market":"Mid-Michigan, Genesee County","total_hosting_area_sqft":32500,"raised_floor_sqft":22500,"workplace_recovery_sqft":10000,"historical_upgrade_investment_usd_min_exclusive":1000000,"conditioned_ups_apparent_power_kva_min_exclusive":1600},{"market":"Metro Detroit","standalone_building_sqft":34500,"raised_floor_sqft":18000,"total_building_load_capacity_mw":1.2,"utility_transformer_kva":2500,"generators":3,"each_generator_kw":500}]},"notes":["1.2MWMetroDetroitTOTALbuildingloadnotIT;2500kVAtransformernot2.5MWIT. MidMichigan1600kVAUPSnotcriticalITMW. GeographiclabelsWestland/MidMichigansourceheadingsmisordered;exactmunicipality/streetcrosswalkunresolved. AnnArborfieldsnotadoptedfromunreadleadsection. CompanythreesitesversusotherthreeMIwordingnotsitecensus. No currentmeteredloadorc ertifierreport.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.otava.com/data-center-michigan/","host":"otava.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Flint Township · Genesee · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"franklin-partners-pavilion-township-mi","state":"MI","kind":"facility","name":"Pavilion Township Data Center (S 26th St & E N Ave)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kalamazoo"],"city":"Pavilion Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.206527,"lng":-85.4718656,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.","independently_verified_current_operating_status":null,"site_stage_scope":"Reported rezoning request withdrawal"},"notes":["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Pavilion Township · Kalamazoo · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"project-cannoli-van-buren-township-wayne-county-mi","state":"MI","kind":"facility","name":"Project Cannoli","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wayne"],"city":"Van Buren Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cannoli official FAQ with quoted utility load schedule. Town FAQ quotes utility testimony, underlying contract/order not read in this row. Load ramp adjustable.2.7GWnew generation/resource portfolio is not site capacity and not additive to1GW. Development-agreement link does not prove executed effective terms. Ratepayer protection statements are not measured bill outcomes. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vbtmi.gov/departments/municipal_services/data_center_faq.php","host":"vbtmi.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.23,"lng":-83.44,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Cannoli official FAQ with quoted utility load schedule","fields":{"project_name":"Cannoli","published_location_description":"nearI94andHaggertyRoad,VanBurenTownship,Michigan","site_maximum_contract_load_mw":1000,"contract_load_basis":"maximum customer load,not explicitly criticalIT","utility_testimony_quoted_load_ramp_start_month":"2027-12","utility_testimony_quoted_max_load_month":"2028-12","separate_new_grid_resource_capacity_gw":2.7},"notes":["Town FAQ quotes utility testimony, underlying contract/order not read in this row. Load ramp adjustable.2.7GWnew generation/resource portfolio is not site capacity and not additive to1GW. Development-agreement link does not prove executed effective terms. Ratepayer protection statements are not measured bill outcomes.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vbtmi.gov/departments/municipal_services/data_center_faq.php","host":"vbtmi.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Van Buren Township · Wayne · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"cloverleaf-cherry-blossom-frenchtown-mi","state":"MI","kind":"facility","name":"Project Cherry Blossom","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monroe"],"city":"Frenchtown Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cherry Blossom developer concept and fiscal forecasts. Forecast tax categories may overlap capture/district structures; not summed or recorded as actual payments. No executed CBA, independent permit approval, numeric IT MW or observed groundbreaking. Developer describes eventual end-user selection after approvals and power, so do not invent hyperscaler. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cherryblossomdatacenter.com/","host":"cherryblossomdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.988,"lng":-83.386,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Cherry Blossom developer concept and fiscal forecasts","fields":{"project_name":"Project Cherry Blossom","locality":"former ProMedica Hospital site off I-75 and North Dixie Highway, Frenchtown Township, Michigan","proposed_site_acres_approx":200,"expected_construction_jobs_min_exclusive":1000,"expected_longterm_fulltime_jobs_min_exclusive":100,"developer_estimated_annual_local_government_tax_usd":14800000,"developer_estimated_annual_college_tax_usd":2100000,"developer_estimated_annual_monroe_isd_technology_tax_usd":4700000,"developer_estimated_annual_jefferson_school_tax_usd":1500000,"community_benefits_agreement_stage":"negotiating"},"notes":["Forecast tax categories may overlap capture/district structures; not summed or recorded as actual payments. No executed CBA, independent permit approval, numeric IT MW or observed groundbreaking. Developer describes eventual end-user selection after approvals and power, so do not invent hyperscaler.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cherryblossomdatacenter.com/","host":"cherryblossomdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Frenchtown Township · Monroe · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"verrus-project-flex-lyon-township-oakland-county-mi","state":"MI","kind":"facility","name":"Project Flex","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Lyon Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. BrianAllnutt PlanetDetroit January13,2026 originalLyonmeetingreport. ProjectFlexconditionalSeptember8siteplanapprovalpendingindependentnoise/energyaudits, notfinalauthorization.6buildings/172acres/1.8Msfproposalonecampus. Alphabetinvestmentinparent notGoogleoperatororAnthropictenantproof. January7study44dBAforecastEXCLUDESdiesel; primaryBESSunder4hour/secondarydiesellongeroutages conflictwithsimplifiednodieselexecutivequote. No110dBAgenericmachinevalueassiteboundarynoise; noactualwellcontamination/healthharmfromresidentconcern.12monthmoratoriumwasresidentREQUESTnotenacted. Jan15/22meetings/Feb8questionshistorical, no outreachactions. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://planetdetroit.org/2026/01/lyon-township-data-center-plan/","host":"planetdetroit.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.47,"lng":-83.53,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["BrianAllnutt PlanetDetroit January13,2026 originalLyonmeetingreport. ProjectFlexconditionalSeptember8siteplanapprovalpendingindependentnoise/energyaudits, notfinalauthorization.6buildings/172acres/1.8Msfproposalonecampus. Alphabetinvestmentinparent notGoogleoperatororAnthropictenantproof.","January7study44dBAforecastEXCLUDESdiesel; primaryBESSunder4hour/secondarydiesellongeroutages conflictwithsimplifiednodieselexecutivequote. No110dBAgenericmachinevalueassiteboundarynoise; noactualwellcontamination/healthharmfromresidentconcern.12monthmoratoriumwasresidentREQUESTnotenacted. Jan15/22meetings/Feb8questionshistorical, no outreachactions.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://planetdetroit.org/2026/01/lyon-township-data-center-plan/","host":"planetdetroit.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Lyon Township · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"cloverleaf-ironwood-dundee-township-mi","state":"MI","kind":"facility","name":"Project Ironwood","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monroe"],"city":"Dundee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Ironwood FAQ generic versus project-specific sections. Generic400000to1000000sqftperbuilding and50to300jobs are not approved project-specific quantities. Developer describes future425Agreement as conditional; no executed annexation/revenue-sharing agreement read. Claims on legally binding promises not independent legal finding. No exact MW, permit approval date or named end-user adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ironwooddatacenter.com/faqs/","host":"ironwooddatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.9319902,"lng":-83.6371591,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Ironwood FAQ generic versus project-specific sections","fields":{"project_name":"Project Ironwood","developer":"Cloverleaf Infrastructure","locality":"Dundee Township, Michigan","developer_described_stage":"proposed development","northern_boundary_description":"Day Road"},"notes":["Generic400000to1000000sqftperbuilding and50to300jobs are not approved project-specific quantities. Developer describes future425Agreement as conditional; no executed annexation/revenue-sharing agreement read. Claims on legally binding promises not independent legal finding. No exact MW, permit approval date or named end-user adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ironwooddatacenter.com/faqs/","host":"ironwooddatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Dundee · Monroe · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"raeden-detroit-carrier-hotel-mi","state":"MI","kind":"facility","name":"Raeden Detroit Carrier Hotel (615 W Lafayette)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wayne"],"city":"Detroit","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RAEDEN two Detroit properties and power-scope separation. 500kVAUPSnotcriticalIT;linked3MWplusnotautomatically615Lafayettecapacity.1050Woodward3MWSCALABLEpotentialnotactualenergizedIT. Distinctaddressesnotonephysicalbuilding. No originalopeningorindependentwholecarrierhotelownership. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://raeden.com/data-centers/detroit/","host":"raeden.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.32854,"lng":-83.053799,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"RAEDEN two Detroit properties and power-scope separation","fields":{"operator":"RAEDEN","named_detroit_sites":[{"address":"615 WestLafayetteBoulevard, Detroit, Michigan","ups_apparent_power_kva":500,"network_link":"directly connected to3MWplusenterprisecolocation"},{"address":"1050 WoodwardAvenue, Detroit, Michigan","alias":"One Campus Martius","colocation_space_sqft":10000,"scalable_power_mw_max":3}]},"notes":["500kVAUPSnotcriticalIT;linked3MWplusnotautomatically615Lafayettecapacity.1050Woodward3MWSCALABLEpotentialnotactualenergizedIT. Distinctaddressesnotonephysicalbuilding. No originalopeningorindependentwholecarrierhotelownership.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://raeden.com/data-centers/detroit/","host":"raeden.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Detroit · Wayne · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"raeden-one-campus-martius-detroit-mi","state":"MI","kind":"facility","name":"Raeden One Campus Martius (1050 Woodward)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wayne"],"city":"Detroit","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. RAEDENoperatorpageidentifies1050Woodward/OneCampusMartiusDetroit10000sfcolocation,up-to3MWSCALABLEpower. NoIT/grossbasis,currentcommittedorcommissioned3MWverified. Separate615WLafayette500kVAUPS andconnected3MW+colocation cannotbeadded/copiedtoOCM. TwoRAEDENmanagedhubsitesnotproofownswholebuildings. 1-6monthmarketingcallnotactualRFS. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://raeden.com/data-centers/detroit/","host":"raeden.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.332695679242,"lng":-83.047534477833,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"RAEDENoperatorpageidentifies1050Woodward/OneCampusMartiusDetroit10000sfcolocation,up-to3MWSCALABLEpower. NoIT/grossbasis,currentcommittedorcommissioned3MWverified. Separate615WLafayette500kVAUPS andconnected3MW+colocation cannotbeadded/copiedtoOCM. TwoRAEDENmanagedhubsitesnotproofownswholebuildings. 1-6monthmarketingcallnotactualRFS."},"notes":["RAEDENoperatorpageidentifies1050Woodward/OneCampusMartiusDetroit10000sfcolocation,up-to3MWSCALABLEpower. NoIT/grossbasis,currentcommittedorcommissioned3MWverified. Separate615WLafayette500kVAUPS andconnected3MW+colocation cannotbeadded/copiedtoOCM. TwoRAEDENmanagedhubsitesnotproofownswholebuildings. 1-6monthmarketingcallnotactualRFS.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://raeden.com/data-centers/detroit/","host":"raeden.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Detroit · Wayne · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"detroit-shoemaker-street-data-center-mi","state":"MI","kind":"facility","name":"Shoemaker Street Data Center Proposal (11031 & 11081 Shoemaker St, Detroit east side)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wayne"],"city":"Detroit","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.3895216,"lng":-82.9892122,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo."},"notes":["GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Detroit · Wayne · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"solon-township-data-center-kent-mi","state":"MI","kind":"facility","name":"Solon Township Data Center (16-17 Mile Road, US-131)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Solon Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Jurisdictional policy context, not site-specific permit rejection or cancellation.. ExtensionincorporatesalloriginalFebruary9orders/conditions;thatseparateoriginalnotreadhere,sodonotcertifyeveryexceptionortransition. GoalofnewordinanceeffectivebeforeFebruary9,2027isnotadoption. StateSenateBill1046-1051discussionisconditionalpendinglegislation,notproofenactedlaw. Latertermination,litigationorordinanceadoptionunreviewed.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.solontwp.org/wp-content/uploads/2026/07/26-10-Extend-Moratorium-on-Data-Centers.pdf","host":"solontwp.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.2612958,"lng":-85.6119334,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.","independently_verified_current_operating_status":null,"site_stage_scope":"Reported pause extension, original dates/scope unexamined"},"notes":["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round37-2026-10-14.json","scope":"Jurisdictional policy context, not site-specific permit rejection or cancellation.","fields":{"jurisdictional_pause_extension_adopted":"2026-07-13","extension_until_printed":"2027-02-09","campus_specific_denial_verified":false},"notes":["ExtensionincorporatesalloriginalFebruary9orders/conditions;thatseparateoriginalnotreadhere,sodonotcertifyeveryexceptionortransition. GoalofnewordinanceeffectivebeforeFebruary9,2027isnotadoption. StateSenateBill1046-1051discussionisconditionalpendinglegislation,notproofenactedlaw. Latertermination,litigationorordinanceadoptionunreviewed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.solontwp.org/wp-content/uploads/2026/07/26-10-Extend-Moratorium-on-Data-Centers.pdf","host":"solontwp.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Solon Township · Kent · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"springfield-township-andersonville-road-data-center-mi","state":"MI","kind":"facility","name":"Springfield Township Data Center Proposal (Andersonville Road & White Lake Road, 84 acres)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Springfield Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Springfield official change from DC inquiry to storage and offices. This is a changed property-owner direction after earlier DC inquiry, not an operating data center. Future storage/office proposal not automatically completed. Posted resident groundwater analysis explicitly not groundwater-flow model or prediction of harm. Linked moratorium title does not establish exact enacted expiry without underlying decision. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.springfield-twp.us/departments/supervisor/data_centers/latest_updates.php","host":"springfield-twp.us","date":"2026-08-27","published":"2026-08-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.7033707,"lng":-83.4491906,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Springfield official change from DC inquiry to storage and offices","fields":{"agency":"Springfield Township, Michigan","update_date":"2026-08-27","owner_meeting_date":"2026-08-26","parcel":"07-36-401-012","site_acres_approx":84.49,"location":"Andersonville Road and White Lake Road","agency_reported_current_direction":"owner pursuing high-end storage and office development; property not presently available for other development"},"notes":["This is a changed property-owner direction after earlier DC inquiry, not an operating data center. Future storage/office proposal not automatically completed. Posted resident groundwater analysis explicitly not groundwater-flow model or prediction of harm. Linked moratorium title does not establish exact enacted expiry without underlying decision.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.springfield-twp.us/departments/supervisor/data_centers/latest_updates.php","host":"springfield-twp.us","date":"2026-08-27","published":"2026-08-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Springfield Township · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"stargate-saline-township-mi","state":"MI","kind":"facility","name":"Stargate The Barn Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washtenaw"],"city":"Saline Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Michigan final storage-project approval, separate from DC IT. 1.383GWand332MWareENERGYSTORAGEpowernotSalineAIcriticalIToradditionalDCload.332isfirstsubsetoftotal1.383not1.715GW. Orderapprovesstorageandcontracts,notallDCconstructionorenergization. CustomerfundingundertheESAandno-rate-increasefindingforthisapprovalnotunlimitedfuturebillguarantee;costallocation/recoveryreservedforfutureappropriate ratecase. Storagecrediteligibilitycompanyclaimnotactualtaxcreditpaid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27397","host":"adms.apps.lara.state.mi.us","date":"2026-03-27","published":"2026-03-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.174,"lng":-83.8063,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Michigan final storage-project approval, separate from DC IT","fields":{"regulator":"Michigan Public Service Commission","case":"U-21990","order_date":"2026-03-27","action":"approvedColdCreek,FishCreek,PineRiverstorageprojectsandrelatedcontracts","customer":"Green Chile Ventures LLC, Oracle subsidiary","earlier_special_contract_approval_date":"2025-12-18","dte_conditions_acceptance_date":"2026-01-15","authorized_storage_resource_total_gw":1.383,"storage_projects_this_order_mw":332,"projects":[{"name":"Cold Creek","county":"Branch, Michigan","storage_dispatchable_mw":100},{"name":"Fish Creek","county":"Montcalm, Michigan","storage_dispatchable_mw":132},{"name":"Pine River","county":"Gratiot, Michigan","storage_dispatchable_mw":100}],"expected_storage_commercial_operation_no_later_than":"2027-Q2","cost_allocation_recovery_method_approved_by_this_order":false},"notes":["1.383GWand332MWareENERGYSTORAGEpowernotSalineAIcriticalIToradditionalDCload.332isfirstsubsetoftotal1.383not1.715GW. Orderapprovesstorageandcontracts,notallDCconstructionorenergization. CustomerfundingundertheESAandno-rate-increasefindingforthisapprovalnotunlimitedfuturebillguarantee;costallocation/recoveryreservedforfutureappropriate ratecase. Storagecrediteligibilitycompanyclaimnotactualtaxcreditpaid.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27397","host":"adms.apps.lara.state.mi.us","date":"2026-03-27","published":"2026-03-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Saline Township · Washtenaw · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"tondu-stronach-township-manistee-mi","state":"MI","kind":"facility","name":"Stronach Township Data Center (Stronach Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Manistee"],"city":"Stronach","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.2119349,"lng":-86.171785,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.","independently_verified_current_operating_status":null,"site_stage_scope":"Exploratory unfiled concept and reported temporary pause"},"notes":["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Stronach · Manistee · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"switch-pyramid-campus-grand-rapids-mi","state":"MI","kind":"facility","name":"Switch Pyramid Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Gaines Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Publicationdate from article:published_time, not2024modifieddate. Firstphaseopen does not energize full320MWdesign. Power basis not explicitlyIT. Later2017grandopeningceremony is not first operatingdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. 2017proposal does not establish current tariff approval, measured renewable supply or campusMW.1.8Marea describes planned campus, not completed firstphase.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/","host":"switch.com","date":"2017-03-09","published":"2017-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.switch.com/switch-leads-consumers-energys-program-bring-100-renewable-energy-michigan-businesses/","host":"switch.com","date":"2017-05-15","published":"2017-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.823,"lng":-85.64,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"first_phase_opening_announcement_date":"2017-03-09","full_campus_design_area_sqft_max":1800000,"full_campus_design_power_mw_max":320,"first_phase_design_area_sqft_min_exclusive":225000,"subsequent_grand_rapids1_planned_area_sqft":471248},"notes":["Publicationdate from article:published_time, not2024modifieddate. Firstphaseopen does not energize full320MWdesign. Power basis not explicitlyIT. Later2017grandopeningceremony is not first operatingdate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/","host":"switch.com","date":"2017-03-09","published":"2017-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_reported_opening_month":"2017-03","historical_renewable_program_stage":"proposed to Michigan PSC"},"notes":["2017proposal does not establish current tariff approval, measured renewable supply or campusMW.1.8Marea describes planned campus, not completed firstphase.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-leads-consumers-energys-program-bring-100-renewable-energy-michigan-businesses/","host":"switch.com","date":"2017-05-15","published":"2017-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Gaines Township · Kent · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"thor-equities-augusta-township-mi","state":"MI","kind":"facility","name":"Thor Equities Augusta Township Data Center (Form8tion)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washtenaw"],"city":"Augusta Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Planet Detroit August29,2025 explicitly connects Thor Equities to a522acre Augusta Township proposal near Milan, with a reported July22 board rezoning. Organizers submitted957signatures;561valid were needed. Submission is not signature validation, a referendum result or a ban. Possible May/August2026 ballot dates in this2025 article are not observed election outcomes. Billion-dollar investment and future tax benefits remain projections. Adjacent solar, FBI range and Ypsilanti projects are separate; no generic hyperscaler reference is a tenant commitment. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://planetdetroit.org/2025/08/augusta-data-center-petition/","host":"planetdetroit.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.163,"lng":-83.72,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["Planet Detroit August29,2025 explicitly connects Thor Equities to a522acre Augusta Township proposal near Milan, with a reported July22 board rezoning. Organizers submitted957signatures;561valid were needed. Submission is not signature validation, a referendum result or a ban. Possible May/August2026 ballot dates in this2025 article are not observed election outcomes. Billion-dollar investment and future tax benefits remain projections. Adjacent solar, FBI range and Ypsilanti projects are separate; no generic hyperscaler reference is a tenant commitment.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://planetdetroit.org/2025/08/augusta-data-center-petition/","host":"planetdetroit.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Augusta Township · Washtenaw · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"umich-lanl-research-computing-ypsilanti-township-mi","state":"MI","kind":"facility","name":"U-M / Los Alamos Research Computing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washtenaw"],"city":"Ypsilanti","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. One proposed facility with two computing centers not automatically two physical buildings.15Mfiveyearresearchcontract is existing collaboration funding, not facility construction budget. Lab NewMexico footer not Michigan site address; specificYpsilantiTownship location not established in this release. No completion, MW or exact site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lanl.gov/media/news/1206-university-of-michigan-collaboration","host":"lanl.gov","date":"2024-12-06","published":"2024-12-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.202962873437,"lng":-83.557610942093,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"partnership_facility_announcement_date":"2024-12-06","proposed_facility_county":"Washtenaw,Michigan","proposed_computing_centers":2,"facility_funding_status_as_of_release":"not finalized"},"notes":["One proposed facility with two computing centers not automatically two physical buildings.15Mfiveyearresearchcontract is existing collaboration funding, not facility construction budget. Lab NewMexico footer not Michigan site address; specificYpsilantiTownship location not established in this release. No completion, MW or exact site.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lanl.gov/media/news/1206-university-of-michigan-collaboration","host":"lanl.gov","date":"2024-12-06","published":"2024-12-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Ypsilanti · Washtenaw · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"us-signal-mi01-kentwood-mi","state":"MI","kind":"facility","name":"US Signal MI01 Grand Rapids Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Kentwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. operator location index only. Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.87690347654,"lng":-85.563698606365,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"operator location index only","fields":{"named_locations":["MI01 Grand Rapids","MN01 Minneapolis","WI02 Madison"],"operator_network_data_center_count":17},"notes":["Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Kentwood · Kent · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"us-signal-mi02-byron-center-mi","state":"MI","kind":"facility","name":"US Signal MI02 Grand Rapids Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Byron Center","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening. Same published street address as 123NET DC4; co-location, ownership change or duplicate requires reconciliation before physical-building count. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers/mi02-grand-rapids/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.826202163837,"lng":-85.67268596115,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MI02","published_address":"400 76th Street SW, Byron Center, MI49315","generator_kw":450,"ups_kw":250,"utility_kva":1500,"operator_reported_year_built":null},"notes":["Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening.","Same published street address as 123NET DC4; co-location, ownership change or duplicate requires reconciliation before physical-building count.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers/mi02-grand-rapids/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Byron Center · Kent · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"us-signal-mi03-van-buren-township-mi","state":"MI","kind":"facility","name":"US Signal MI03 Detroit Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wayne"],"city":"Belleville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening. Belleville postal city does not independently resolve Van Buren Township municipal/parcel boundary. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers/mi03-detroit/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.2356076,"lng":-83.4450278,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MI03","published_address":"9275 Haggerty Road, Belleville, MI48111","generator_kw":2000,"ups_kw":1500,"utility_kva":2500,"operator_reported_year_built":2020},"notes":["Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening.","Belleville postal city does not independently resolve Van Buren Township municipal/parcel boundary.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers/mi03-detroit/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Belleville · Wayne · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"us-signal-mi04-southfield-mi","state":"MI","kind":"facility","name":"US Signal MI04 Detroit Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Southfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers/mi04-detroit/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.4477475,"lng":-83.2562243,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MI04","published_address":"21648 Melrose Avenue, Southfield, MI48075","generator_kw":800,"ups_kw":250,"utility_kva":1500,"operator_reported_year_built":1972},"notes":["Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers/mi04-detroit/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Southfield · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"us-signal-mi05-auburn-hills-mi","state":"MI","kind":"facility","name":"US Signal MI05 Detroit Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Auburn Hills","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers/mi05-detroit/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.6529314,"lng":-83.2148612,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MI05","published_address":"1035 W Entrance Drive, Auburn Hills, MI48326","generator_kw":6000,"ups_kw":4000,"utility_kva":4000,"operator_reported_year_built":null},"notes":["Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers/mi05-detroit/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Auburn Hills · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"prologis-washington-township-mi","state":"MI","kind":"facility","name":"Washington Township Technical Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Macomb"],"city":"Washington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.80333473861,"lng":-82.980045064045,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo."},"notes":["GanderdirectorybodyupdatedOct8,2026,relevantselectedprojectpassagesonlyread. Shoemakerproposalreporteddropped;FlintHillwood-Sterling200acUNDERCONTRACTnotclosed,MetaTexaspastprojectnotFlinttenant. SouthfieldMetrobloks1.5B100MW218ksf13acsiteplanapprovedbutfinancing/additionalpermitsincomplete. AllenParkSolstice26MW45ksfPCrejectedJune,appealpossible. PrologisWashingtonTownship312acwithdrewMay,sixmonthmoranotpermanentban. GibraltarRaeden100MWformerMcLouthpaused,waiverpossible,lawsuitallegationsnotcourtfindings. Poll/electionheadlinesnotreadasadoptedlaw. HowellMeta-linked1077acproposaldoesnotidentifyStantec/Randee;Telkite/Aeris/KISawyernotfound,noexactIDcreditforthosetwo.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Washington · Macomb · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"sansone-wixom-road-mi","state":"MI","kind":"facility","name":"Wixom Road Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oakland"],"city":"Wixom","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Developer Sansone is not named in readable roundup and exact parcel crosswalk remains unconfirmed. Denial concerns a moratorium exemption, not necessarily final land-use denial. Reported pause through end of August does not establish October status. Lansing 182-day pause, Saline 12-year 50% property-tax action and $43 billion valuation concern separate jurisdictions/projects; statewide historical $13 million tax breaks are not an award to this Wixom proposal. Governor plan and voluntary commitments are not enacted legislation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://civicmedia.us/news/2026/07/20/michigan-data-centers-the-weekly-download-2","host":"civicmedia.us","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.518432572023,"lng":-83.537488801805,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Michigan Advance’s weekly roundup republished by Civic Media reports Wixom unanimously denied a requested waiver for a proposed 54-acre Wixom Road data center site.","independently_verified_current_operating_status":null,"operator_or_exact_site_identity_needs_crosswalk":true},"notes":["Developer Sansone is not named in readable roundup and exact parcel crosswalk remains unconfirmed. Denial concerns a moratorium exemption, not necessarily final land-use denial. Reported pause through end of August does not establish October status. Lansing 182-day pause, Saline 12-year 50% property-tax action and $43 billion valuation concern separate jurisdictions/projects; statewide historical $13 million tax breaks are not an award to this Wixom proposal. Governor plan and voluntary commitments are not enacted legislation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://civicmedia.us/news/2026/07/20/michigan-data-centers-the-weekly-download-2","host":"civicmedia.us","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · Wixom · Oakland · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"sansone-york-township-washtenaw-mi","state":"MI","kind":"facility","name":"York Township Data Center (Platt Road / former Toyota land)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washtenaw"],"city":"York Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.1276226,"lng":-83.7163675,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.","independently_verified_current_operating_status":null,"site_stage_scope":"Reported land-acquisition effort withdrawn after deed-restriction issue"},"notes":["Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","host":"gandernewsroom.com","date":"2026-10-08","published":"2026-10-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan · York Township · Washtenaw · Source context reviewed","state_name":"Michigan","state_path":"/michigan/"},{"id":"aaim-data-centers-blue-earth-mn","state":"MN","kind":"facility","name":"AAIM Data Centers  -  Blue Earth (Minnesota 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Faribault"],"city":"Blue Earth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operatorstatusclaim, notindependentmeter.80MWdesigniswithin95MWfuturetotal; no175MWsum.15MWdoesnotproveallAIuse. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aaimdc.com/data-centers/minnesota/","host":"aaimdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.635,"lng":-94.098,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_reported_online_power_mw":15,"power_basis":"online power, not explicitlycriticalIT","in_service_month":"2025-06","planned_expansion_power_mw":80,"full_build_target_mw":95,"expansion_target":"2027-Q3","facility_area_sqft_approx":10000,"published_city":"Blue Earth, Minnesota"},"notes":["Operatorstatusclaim, notindependentmeter.80MWdesigniswithin95MWfuturetotal; no175MWsum.15MWdoesnotproveallAIuse.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aaimdc.com/data-centers/minnesota/","host":"aaimdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Blue Earth · Faribault · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"aaim-data-centers-hutchinson-mn","state":"MN","kind":"facility","name":"AAIM Data Centers  -  Hutchinson (Minnesota 2 Energy Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["McLeod"],"city":"Hutchinson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hutchinson city/utility FAQ,all five pages text reviewed. FAQ not underlying signed permit or PPA. Future expansion requires newCUP.20MWexpectedpeak not actual metered demand; no opening date. Document also usesMWperhour wording incorrectly, no energy calculation adopted. Utility-tariff and collateral descriptions not actual customer invoices or ratepayer-outcome measurement. UndatedJune2026file path not exact publication date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf","host":"hutchinsonmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.8870325,"lng":-94.351735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Hutchinson city/utility FAQ,all five pages text reviewed","fields":{"published_address":"1025 FifthAvenueSE,Hutchinson,Minnesota","city_reported_final_permit_approval_date":"2025-08-26","city_reported_power_agreement_date":"2025-09-24","developer_entity":"B-MNDataCentersInc,dbaAAIMDataCenters","initial_building_area_sqft":7500,"potential_expanded_area_sqft":15000,"expected_peak_power_mw":20,"power_basis":"expected customer load,not explicitly criticalIT","expected_jobs_less_than":5,"city_reported_local_financial_assistance":"none"},"notes":["FAQ not underlying signed permit or PPA. Future expansion requires newCUP.20MWexpectedpeak not actual metered demand; no opening date. Document also usesMWperhour wording incorrectly, no energy calculation adopted. Utility-tariff and collateral descriptions not actual customer invoices or ratepayer-outcome measurement. UndatedJune2026file path not exact publication date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf","host":"hutchinsonmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Hutchinson · McLeod · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"aaim-data-centers-mountain-lake-mn","state":"MN","kind":"facility","name":"AAIM Data Centers  -  Mountain Lake (Minnesota 3 Energy Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cottonwood"],"city":"Mountain Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Mountain Lake historical council discussion. Minutes describe review request, not project approval, construction or operation. No operator named in minutes, AAIMalias requires separate match.250kannualrevenueestimate not taxaward paid.50dBexpectation without measurement/distance not achieved noise result. No exact street or researched parcelpoint. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cityofmountainlakemn.gov/wp-content/uploads/10-7-24-City-Council-Minutes.pdf","host":"cityofmountainlakemn.gov","date":"2024-10-07","published":"2024-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.941966,"lng":-94.9150665,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Mountain Lake historical council discussion","fields":{"historical_city_meeting_date":"2024-10-07","proposed_initial_power_mw":10,"power_basis":"anticipated start load,not explicitIT","proposed_location_description":"industrial district nexttoMilkSpecialtiesandBalzer","proposed_use_description":"AIonly,noBitcoinorcryptocurrency mining"},"notes":["Minutes describe review request, not project approval, construction or operation. No operator named in minutes, AAIMalias requires separate match.250kannualrevenueestimate not taxaward paid.50dBexpectation without measurement/distance not achieved noise result. No exact street or researched parcelpoint.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cityofmountainlakemn.gov/wp-content/uploads/10-7-24-City-Council-Minutes.pdf","host":"cityofmountainlakemn.gov","date":"2024-10-07","published":"2024-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Mountain Lake · Cottonwood · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"amazon-becker-mn","state":"MN","kind":"facility","name":"Amazon Becker Data Center (Suspended)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sherburne"],"city":"Becker","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. KNSINov14,2024reportsAmazonbought348acBeckerfor73.56MfromElkRiverTechnologies/Diode,whichhadboughtfromXcel7.97MinApril. Specificcertificate/deednotindependentlyread. Laterstageunknown;publishedlandtransactionnotconstruction/energization.1Bcapital100perm1200constructionwerecompanyforecasts,notlandpricepluscapex/actualjobs. Exactclosingdayunprinted. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://knsiradio.com/2024/11/14/amazon-purchases-348-acres-in-becker-for-data-center-development-near-retiring-sherco-plant/","host":"knsiradio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.397,"lng":-93.876,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"KNSINov14,2024reportsAmazonbought348acBeckerfor73.56MfromElkRiverTechnologies/Diode,whichhadboughtfromXcel7.97MinApril. Specificcertificate/deednotindependentlyread. Laterstageunknown;publishedlandtransactionnotconstruction/energization.1Bcapital100perm1200constructionwerecompanyforecasts,notlandpricepluscapex/actualjobs. Exactclosingdayunprinted."},"notes":["KNSINov14,2024reportsAmazonbought348acBeckerfor73.56MfromElkRiverTechnologies/Diode,whichhadboughtfromXcel7.97MinApril. Specificcertificate/deednotindependentlyread. Laterstageunknown;publishedlandtransactionnotconstruction/energization.1Bcapital100perm1200constructionwerecompanyforecasts,notlandpricepluscapex/actualjobs. Exactclosingdayunprinted.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://knsiradio.com/2024/11/14/amazon-purchases-348-acres-in-becker-for-data-center-development-near-retiring-sherco-plant/","host":"knsiradio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Becker · Sherburne · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"oppidan-apple-valley-technology-park-mn","state":"MN","kind":"facility","name":"Apple Valley Technology Park (Oppidan/Rockport)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Apple Valley","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The expected March 26 council action is not an observed result. Distinguish withdrawn rezoning, earlier plan denial and later recommendation; do not mark the whole project finally denied from this report alone. Oppidan's Eagan facility is separate. Seven overall buildings are not seven data halls; five were described as data centers. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.limitless-news.com/local/apple-valley-technology-park-update","host":"limitless-news.com","date":"2026-03-20","published":"2026-03-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.7546223,"lng":-93.1731744,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Limitless News reports a March 18 Apple Valley planning recommendation to deny several Oppidan/Rockport requests after a January comprehensive-plan denial and March rezoning withdrawals.","independently_verified_current_operating_status":null},"notes":["The expected March 26 council action is not an observed result. Distinguish withdrawn rezoning, earlier plan denial and later recommendation; do not mark the whole project finally denied from this report alone. Oppidan's Eagan facility is separate. Seven overall buildings are not seven data halls; five were described as data centers.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.limitless-news.com/local/apple-valley-technology-park-update","host":"limitless-news.com","date":"2026-03-20","published":"2026-03-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Apple Valley · Dakota · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"archer-datacenter-faribault-mn","state":"MN","kind":"facility","name":"Archer Datacenter Faribault","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rice"],"city":"Faribault","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Faribault official project and review chronology. City reports no formal development applications or city financial-assistance requests yet, not no possible state exemption. Court ruling summarized by city, underlying order not independently read here. July7work session not signed resolution date. 2025negative EIS decision does not establish final 2026 environmental clearance. No MW adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.faribaultmn.gov/815/Archer-Datacenters","host":"faribaultmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.3654972,"lng":-93.2871543,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Faribault official project and review chronology","fields":{"proposed_building_area_sqft_max":500000,"site_acres_approx":87,"proposed_buildings_max":6,"land_purchase_month":"2024-11","city_reported_court_environmental_review_order_date":"2026-06-08","city_reported_supplemental_review_extension_resolution_date":"2026-07-14","supplemental_review_deadline":"2027-03-31","status":"proposed; supplemental environmental review"},"notes":["City reports no formal development applications or city financial-assistance requests yet, not no possible state exemption. Court ruling summarized by city, underlying order not independently read here. July7work session not signed resolution date. 2025negative EIS decision does not establish final 2026 environmental clearance. No MW adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.faribaultmn.gov/815/Archer-Datacenters","host":"faribaultmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Faribault · Rice · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"atomic-data-minneapolis-central-mn","state":"MN","kind":"facility","name":"Atomic Data Minneapolis Central (MSP250)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Global service specifications cannot establish a specific building MW or street. Operator explicitly lists Minneapolis Central, Minneapolis East and Dallas service locations. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.atomicdata.com/infrastructure/","host":"atomicdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.9808119,"lng":-93.2673888,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Minneapolis","location_label":"Minneapolis Central","marketed_service":"colocation"},"notes":["Global service specifications cannot establish a specific building MW or street.","Operator explicitly lists Minneapolis Central, Minneapolis East and Dallas service locations.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.atomicdata.com/infrastructure/","host":"atomicdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Minneapolis · Hennepin · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"tract-cannon-falls-technology-park-mn","state":"MN","kind":"facility","name":"Cannon Falls Technology Park (Tract)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Goodhue"],"city":"Cannon Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Annexation is jurisdiction change, not land purchase or final DC approval. Hundreds-of-millions-to-one-billion investment is a broad developer-narrative forecast, not actual capital. Conditional construction within next year and September hearings are future at publication. Roughly 250 footbuffer is described planned separation, not independently checked final standard.2,400 dollars annually for ten years is CITY payment to township under annexation, not a developer tax subsidy or annual site tax revenue. Utility/infrastructure cost intentions are not an executed ESA. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kttc.com/2025/08/27/cannon-falls-explores-major-data-center-project-following-land-annexation","host":"kttc.com","date":"2025-08-27","published":"2025-08-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.5068445,"lng":-92.9062175,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"KTTC reports Cannon Falls annexed nearly 240 acres from Randolph Township for a possible Tract data center, still needing city-council project approval.","independently_verified_current_operating_status":null},"notes":["Annexation is jurisdiction change, not land purchase or final DC approval. Hundreds-of-millions-to-one-billion investment is a broad developer-narrative forecast, not actual capital. Conditional construction within next year and September hearings are future at publication. Roughly 250 footbuffer is described planned separation, not independently checked final standard.2,400 dollars annually for ten years is CITY payment to township under annexation, not a developer tax subsidy or annual site tax revenue. Utility/infrastructure cost intentions are not an executed ESA.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kttc.com/2025/08/27/cannon-falls-explores-major-data-center-project-following-land-annexation","host":"kttc.com","date":"2025-08-27","published":"2025-08-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Cannon Falls · Goodhue · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"centersquare-shakopee-mn","state":"MN","kind":"facility","name":"Centersquare Shakopee (MSP1 Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Scott"],"city":"Shakopee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. NamedsiteexplicitlabelutilityversusUPSversusgenerator, notcriticalIToradditive. Minneapolisismarketlabel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/minneapolis","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.7965,"lng":-93.482,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MSP1","published_city":"Shakopee, Minnesota","raised_floor_sqft":29800,"utility_power_mw":19.1,"ups_capacity_mw":2.4,"generator_capacity_mw":3.6},"notes":["NamedsiteexplicitlabelutilityversusUPSversusgenerator, notcriticalIToradditive. Minneapolisismarketlabel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/minneapolis","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Shakopee · Scott · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"centra-msp1-eagan-mn","state":"MN","kind":"facility","name":"CENTRA MSP1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Eagan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CENTRA Eagan utility and critical capacity. 12MVAapparentpowernotIT.92000footprintnotnecessarilycombinedtwo-storygrossarea. TierIIIplusisoperator-designclaim,notindependentUptimecertificate. PublishedISO270001spellingnotcorrectedtoverifiedISO27001cert. DesignPUEnotmeasured. No exactopeningdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.centradigital.com/data-centers/msp1","host":"centradigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.8288628,"lng":-93.1184514,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"CENTRA Eagan utility and critical capacity","fields":{"operator":"CENTRA Digital","site_code":"MSP1","address":"3640 Nasseff Way, Eagan, Minnesota55123","utility_capacity_mva":12,"critical_capacity_mw":8.1,"building_footprint_sqft":92000,"building_stories":2,"rack_capability_kw_max":150,"design_pue_target_max":1.35},"notes":["12MVAapparentpowernotIT.92000footprintnotnecessarilycombinedtwo-storygrossarea. TierIIIplusisoperator-designclaim,notindependentUptimecertificate. PublishedISO270001spellingnotcorrectedtoverifiedISO27001cert. DesignPUEnotmeasured. No exactopeningdate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.centradigital.com/data-centers/msp1","host":"centradigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Eagan · Dakota · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"cloudhq-msp-campus-chaska-mn","state":"MN","kind":"facility","name":"CloudHQ MSP Campus (Chaska)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carver"],"city":"Chaska","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chaska project review and design forecasts. No final site/plat approval or energization established. City local tax relief statement not all state/federal incentives. Water forecast not measured consumption. Undated six-month study estimate cannot produce exact completion date; proposed substation not site IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.chaskamn.gov/841/Cloud-HQ","host":"chaskamn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.81068,"lng":-93.63557,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Chaska project review and design forecasts","fields":{"published_address":"2007 Schoolmaster Drive, Chaska, Minnesota","planned_area_sqft_approx":1500000,"city_council_preliminary_approval_date":"2024-10-21","city_council_conditional_use_approval_date":"2023-10-16","current_city_reported_status":"final application not submitted; no final review timeline","forecast_water_gallons_per_year":14000000,"city_reported_local_tax_relief_status":"none applied for or offered"},"notes":["No final site/plat approval or energization established. City local tax relief statement not all state/federal incentives. Water forecast not measured consumption. Undated six-month study estimate cannot produce exact completion date; proposed substation not site IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.chaskamn.gov/841/Cloud-HQ","host":"chaskamn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Chaska · Carver · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"cologix-minneapolis-511-building-mn","state":"MN","kind":"facility","name":"Cologix Minneapolis (511 Building, MIN1-MIN5)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. MIN5expansion inside511carrierhotel, not entirebuilding. MIN1 to 5sameaddressare suites/offerings; do not count five separate physical buildings fromcodes. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/minneapolis/min5/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.971127,"lng":-93.2546167,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MIN5","published_address":"511 11th Avenue South, Minneapolis, MN","additional_colocation_area_sqft":10000,"additional_power_capacity_mw":1.5,"power_basis":"power capacity, not explicitly criticalIT"},"notes":["MIN5expansion inside511carrierhotel, not entirebuilding. MIN1 to 5sameaddressare suites/offerings; do not count five separate physical buildings fromcodes.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/minneapolis/min5/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Minneapolis · Hennepin · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"connect-data-centers-eagan-mn","state":"MN","kind":"facility","name":"Connect Data Centers - Eagan (powered by Oppidan)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Eagan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Oppidan Eagan build-to-suit groundbreaking. Year-onlycompletionforecastnotobservedopening. Onlytwoground-upactiveMinnesotaprojectsclaimishistoricaldeveloperstatementnotcurrentstatewidecensus. No numericITMW, tenantname, signedleaseorparcel. Excelsiorheadquartersnotfacility. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan","host":"oppidan.com","date":"2025-06-05","published":"2025-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.8278868,"lng":-93.1108726,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Oppidan Eagan build-to-suit groundbreaking","fields":{"developer":"Oppidan","project":"Connect Data Centers Eagan","groundbreaking_announcement_date":"2025-06-05","planned_area_sqft":61000,"site_description":"Argenta Trail, south of YMCA, Eagan, Minnesota","developer_role":"landlord financing and developing build-to-suit with unnamed tenant","expected_completion_year":2026},"notes":["Year-onlycompletionforecastnotobservedopening. Onlytwoground-upactiveMinnesotaprojectsclaimishistoricaldeveloperstatementnotcurrentstatewidecensus. No numericITMW, tenantname, signedleaseorparcel. Excelsiorheadquartersnotfacility.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan","host":"oppidan.com","date":"2025-06-05","published":"2025-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Eagan · Dakota · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"databank-brooklyn-park-mn","state":"MN","kind":"facility","name":"DataBank Brooklyn Park Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Brooklyn Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named source. Operator separately labels critical IT and utility feeds. No redundancy arithmetic, energized-load measurement or independent uptime claim. Dated operator assertion, not reviewed DEED certificate or legal verification of current2026tax treatment. Claimed client savings and electricity exemptions need current government law; no incentive value or award disbursement inferred.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","host":"databank.com","date":"2024-10-15","published":"2024-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.116,"lng":-93.386,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MSP3","street":"8111 Oxbow Creek N","city":"Brooklyn Park","critical_it_capacity_mw":9,"it_area_sqft":82231,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"operator_site_code":"MSP3","published_address":"8111 Oxbow Creek N, Brooklyn Park, MN55445","campus_acres":14,"it_area_sqft":82231,"critical_it_mw":9,"utility_feeds":{"count":2,"mw_each":4.5,"utility":"Xcel Energy"}},"notes":["Operator separately labels critical IT and utility feeds. No redundancy arithmetic, energized-load measurement or independent uptime claim.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"historical_operator_statement":"MSP3 certified by Minnesota DEED; joins MSP2","historical_msp3_opening_year":2021},"notes":["Dated operator assertion, not reviewed DEED certificate or legal verification of current2026tax treatment. Claimed client savings and electricity exemptions need current government law; no incentive value or award disbursement inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","host":"databank.com","date":"2024-10-15","published":"2024-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Brooklyn Park · Hennepin · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"databank-downtown-minneapolis-msp4-mn","state":"MN","kind":"facility","name":"DataBank Downtown Minneapolis Data Center (MSP4)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Carrier-hotel tenant suite; group with building, not whole-building metrics. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/minneapolis/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.971127,"lng":-93.2546167,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MSP4","street":"511 11th Avenue S","city":"Minneapolis","critical_it_capacity_mw":0.779,"it_area_sqft":8170,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Carrier-hotel tenant suite; group with building, not whole-building metrics.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Minneapolis · Hennepin · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"databank-east-twin-cities-eagan-mn","state":"MN","kind":"facility","name":"DataBank East Twin Cities Data Center (MSP2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Eagan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named source. Dated operator assertion, not reviewed DEED certificate or legal verification of current2026tax treatment. Claimed client savings and electricity exemptions need current government law; no incentive value or award disbursement inferred. Current operator specification; not a measurement or independently reviewed FedRAMP/uptime certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/minneapolis/eagan/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","host":"databank.com","date":"2024-10-15","published":"2024-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.8375194,"lng":-93.1454144,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MSP2","street":"3255 Neil Armstrong Blvd","city":"Eagan","critical_it_capacity_mw":5,"it_area_sqft":48860,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/eagan/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"historical_operator_statement":"MSP3 certified by Minnesota DEED; joins MSP2","historical_msp3_opening_year":2021},"notes":["Dated operator assertion, not reviewed DEED certificate or legal verification of current2026tax treatment. Claimed client savings and electricity exemptions need current government law; no incentive value or award disbursement inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","host":"databank.com","date":"2024-10-15","published":"2024-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"operator_site_code":"MSP2","it_area_sqft":48860,"critical_it_mw":5},"notes":["Current operator specification; not a measurement or independently reviewed FedRAMP/uptime certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/eagan/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Eagan · Dakota · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"databank-west-twin-cities-edina-mn","state":"MN","kind":"facility","name":"DataBank West Twin Cities Data Center (MSP1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Edina","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/minneapolis/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.8628296,"lng":-93.3305557,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MSP1","street":"7700 FranceAveS","city":"Edina","critical_it_capacity_mw":1.35,"it_area_sqft":26240,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Edina · Hennepin · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"edgeconnex-msp01-eden-prairie-mn","state":"MN","kind":"facility","name":"EdgeConneX Minneapolis (EDCMSP01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Eden Prairie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. PDFpage2visuallyreviewed.2.85MWscalableincludes1.35notextra. PDFvisiblysaysSOC2Type10; certificationclaimquarantinedratherthansilentlycorrectedtoType2. Noindependentcurrentcertificate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2024/09/Minneapolis-Data-Sheet.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.878844,"lng":-93.404156,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MSP01","published_address":"6875 Shady Oak Road, Eden Prairie, MN55344","facility_area_sqft":32738,"raised_floor_sqft":14935,"advertised_power_mw":1.35,"scalable_power_mw":2.85,"power_basis":"N+1power, not explicitlycriticalIT"},"notes":["PDFpage2visuallyreviewed.2.85MWscalableincludes1.35notextra. PDFvisiblysaysSOC2Type10; certificationclaimquarantinedratherthansilentlycorrectedtoType2. Noindependentcurrentcertificate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2024/09/Minneapolis-Data-Sheet.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Eden Prairie · Hennepin · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"elk-river-capital-swervo-mn","state":"MN","kind":"facility","name":"Elk River Data Center (Elk River Capital / Swervo Development)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sherburne"],"city":"Elk River","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Requested draft one-year moratorium is not an adopted moratorium. August 3 anticipated permit denial not observed in this July article. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mprnews.org/story/2026/07/07/elk-river-rejects-changing-rules-to-allow-data-centers","host":"mprnews.org","date":"2026-07-07","published":"2026-07-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.3187147,"lng":-93.5864375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"ordinance-amendment-rejected","reported_finding":"MPR reports Elk River rejected ordinance changes needed for Elk River Capital / Swervo project; conditional-use permit decision still expected later.","report_display_date":"2026-07-07","independently_verified_current_status":null},"notes":["Requested draft one-year moratorium is not an adopted moratorium. August 3 anticipated permit denial not observed in this July article.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mprnews.org/story/2026/07/07/elk-river-rejects-changing-rules-to-allow-data-centers","host":"mprnews.org","date":"2026-07-07","published":"2026-07-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Elk River · Sherburne · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"tract-farmington-technology-park-mn","state":"MN","kind":"facility","name":"Farmington Technology Park (Tract)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Farmington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Farmington city planning chronology and qualified litigation update. City is a litigant; filed dismissals not independently read final court dismissal order. AUAR andpreliminarydevelopment approvals not specific operatingtenant or building occupancy. November13,2025no-specific-application statement not automatically refreshed toOctober14,2026. No currentMWorcapexadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park","host":"farmingtonmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.606,"lng":-93.152,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Farmington city planning chronology and qualified litigation update","fields":{"city_reported_litigation_update_date":"2026-09-16","city_reported_litigation_status":"plaintiffs filed dismissals; final directions from court awaited","published_case_number":"19HA-CV-25-992","city_council_final_auar_adoption_date":"2024-11-04","city_council_preliminary_pud_plat_approval_date":"2024-11-04"},"notes":["City is a litigant; filed dismissals not independently read final court dismissal order. AUAR andpreliminarydevelopment approvals not specific operatingtenant or building occupancy. November13,2025no-specific-application statement not automatically refreshed toOctober14,2026. No currentMWorcapexadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park","host":"farmingtonmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Farmington · Dakota · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"flexential-minneapolis-chaska-msp01-mn","state":"MN","kind":"facility","name":"Flexential Minneapolis - Chaska (MSP01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carver"],"city":"Chaska","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.8516116,"lng":-93.5988964,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Minneapolis - Chaska (MSP01)","publisher_reported_footprint_sqft":160838,"publisher_reported_critical_power_mw":9,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Chaska · Carver · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"google-hermantown-mn","state":"MN","kind":"facility","name":"Google Hermantown Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis"],"city":"Hermantown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Minnesota PUC named ESA index, no final order reviewed. Captured PUCpage says agreement under review, but passed comment deadline not a final decision. Generic statutory annual2to5Mfee is demand-dependent policy, not an awarded/paid site amount. Separate PineIsland EchoZone docket26-170 not Hermantown. No site MW from backup-generation permit thresholds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mn.gov/puc/activities/v-l-e-c/data-centers/","host":"mn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":46.8068852,"lng":-92.2382464,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Minnesota PUC named ESA index, no final order reviewed","fields":{"hermantown_service_applicant":"Harmony Group LLC,Alphabet/Google subsidiary","hermantown_esa_filing_date":"2026-03-26","hermantown_utility_docket":"26-159","hermantown_comment_deadline":"2026-08-28"},"notes":["Captured PUCpage says agreement under review, but passed comment deadline not a final decision. Generic statutory annual2to5Mfee is demand-dependent policy, not an awarded/paid site amount. Separate PineIsland EchoZone docket26-170 not Hermantown. No site MW from backup-generation permit thresholds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://mn.gov/puc/activities/v-l-e-c/data-centers/","host":"mn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Hermantown · St. Louis · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"google-skyway-pine-island-mn","state":"MN","kind":"facility","name":"Google Project Skyway (Pine Island)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Goodhue"],"city":"Pine Island","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Pine Island land-use approval and conditional municipal subsidy summary. AUAR maximum buildout not current phase.36.5Mconditional reimbursement over28years not cash paid;290jobs assumes9stages. Page conflicts December2025versusDecember2026preliminary dates and April14PUCversusApril15city ESA date; those dates held. City says potential site energy usage unknown. Offsite wind/solar/storage excluded from ITMW; air-cooling design not zero domestic water. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pineislandmn.gov/skyway","host":"pineislandmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.2019,"lng":-92.6496,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Pine Island land-use approval and conditional municipal subsidy summary","fields":{"auar_study_area_acres_approx":482,"city_council_final_land_use_approval_date":"2026-01-20","city_reported_tax_abatement_approval_date":"2026-02-04","city_reported_abatement_total_usd_approx":36500000,"abatement_term_years":28,"first_stage_employment_condition_jobs":38,"city_reported_operator":"Google","utility_docket":"26-170","current_permit_stage_description":"developer pursuing state permits"},"notes":["AUAR maximum buildout not current phase.36.5Mconditional reimbursement over28years not cash paid;290jobs assumes9stages. Page conflicts December2025versusDecember2026preliminary dates and April14PUCversusApril15city ESA date; those dates held. City says potential site energy usage unknown. Offsite wind/solar/storage excluded from ITMW; air-cooling design not zero domestic water.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pineislandmn.gov/skyway","host":"pineislandmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Pine Island · Goodhue · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"h5-data-centers-st-paul-mn","state":"MN","kind":"facility","name":"H5 Data Centers St. Paul","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ramsey"],"city":"St. Paul","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Minneapolis is the market label; actual published municipality is St.Paul. A power uptime SLA is not measured uptime. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/minneapolis-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.974,"lng":-93.167,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"1125 Energy Park Dr., Suite100, St. Paul, MN 55108","advertised_facility_sqft":17000},"notes":["Minneapolis is the market label; actual published municipality is St.Paul. A power uptime SLA is not measured uptime.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/minneapolis-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · St. Paul · Ramsey · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"legacy-investing-north-loop-minneapolis-mn","state":"MN","kind":"facility","name":"Legacy Investing North Loop (former Star Tribune printing plant)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. An agreement is not a confirmed closing. Thirteen acres converted to roughly 566,000 square feet is land area, not building floor area. The separate Sleep Number site is 30 MW and must not be added. The article reverses the moratorium threshold in one sentence; the city bulletin describes an exception up to 350,000 square feet downtown, but an original ordinance and this site's eligibility still require review. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. This is a council member account on the city bulletin service, not the adopted ordinance. It describes an interim step with later hearing and council/mayor action. Do not assume a final six-month start or expiry. The July CBS article reverses the threshold in one sentence. Land area is not building floor area and does not decide the Legacy project exemption.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cbsnews.com/minnesota/news/data-center-minnesota-star-tribune-downtown-minneapolis/","host":"cbsnews.com","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://content.govdelivery.com/accounts/MPLS/bulletins/41889b9","host":"content.govdelivery.com","date":"2026-05-22","published":"2026-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.9906553,"lng":-93.2766429,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"CBS Minnesota reports Legacy Investing's agreement to buy the former Star Tribune printing property for a proposed 20 MW data center and possible mixed use.","independently_verified_current_operating_status":null},"notes":["An agreement is not a confirmed closing. Thirteen acres converted to roughly 566,000 square feet is land area, not building floor area. The separate Sleep Number site is 30 MW and must not be added. The article reverses the moratorium threshold in one sentence; the city bulletin describes an exception up to 350,000 square feet downtown, but an original ordinance and this site's eligibility still require review.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cbsnews.com/minnesota/news/data-center-minnesota-star-tribune-downtown-minneapolis/","host":"cbsnews.com","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"City council member bulletin reports May 21 temporary action and a downtown exception for projects up to 350,000 square feet, with further legislative action pending.","source_reported_threshold_direction":"exception up to 350,000 square feet downtown","specific_site_exemption_verified":false},"notes":["This is a council member account on the city bulletin service, not the adopted ordinance. It describes an interim step with later hearing and council/mayor action. Do not assume a final six-month start or expiry.","The July CBS article reverses the threshold in one sentence. Land area is not building floor area and does not decide the Legacy project exemption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://content.govdelivery.com/accounts/MPLS/bulletins/41889b9","host":"content.govdelivery.com","date":"2026-05-22","published":"2026-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Minneapolis · Hennepin · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"lightedge-chaska-mn","state":"MN","kind":"facility","name":"LightEdge Chaska (fka Stream Data Centers Minneapolis I)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carver"],"city":"Chaska","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lightedge Chaska named address. Capacity/areaheadingswithoutvaluesinthecapture;notzero. MarketnameMinneapolisnotmunicipality. No numericITMW,currentmeteredloadoropeningday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lightedge.com/data-center-locations/minneapolis/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.828,"lng":-93.635,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Lightedge Chaska named address","fields":{"operator":"Lightedge","market":"Minneapolis","address":"1708 WestCreekLane, Chaska, Minnesota55318"},"notes":["Capacity/areaheadingswithoutvaluesinthecapture;notzero. MarketnameMinneapolisnotmunicipality. No numericITMW,currentmeteredloadoropeningday.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lightedge.com/data-center-locations/minneapolis/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Chaska · Carver · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"meta-rosemount-mn","state":"MN","kind":"facility","name":"Meta Rosemount Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Rosemount","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Announcement forecasts once completed; no exact opening or measured load.19thUSand23rdglobal are historical company fleet rankings, not current national counts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2024/03/hello-rosemount/","host":"datacenters.atmeta.com","date":"2024-03-14","published":"2024-03-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.74,"lng":-93.115,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_campus_area_sqft":715000,"planned_investment_usd_min_exclusive":800000000,"forecast_operational_jobs_approx":100,"forecast_peak_construction_jobs_min_exclusive":1000},"notes":["Announcement forecasts once completed; no exact opening or measured load.19thUSand23rdglobal are historical company fleet rankings, not current national counts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2024/03/hello-rosemount/","host":"datacenters.atmeta.com","date":"2024-03-14","published":"2024-03-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Rosemount · Dakota · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"microsoft-becker-mn","state":"MN","kind":"facility","name":"Microsoft Becker Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sherburne"],"city":"Becker","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Land purchase is not data-center construction spending, secured utility service or commissioning. Microsoft declined to disclose project details. Google's canceled proposal and Elk River Technologies' separate land sale are not this site. No MW, specific design or final opening date is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mprnews.org/story/2024/02/21/xcel-energy-sells-land-in-becker-to-microsoft-for-data-center","host":"mprnews.org","date":"2024-02-21","published":"2024-02-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.3931821,"lng":-93.8768904,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"MPR reports Microsoft's purchase of about 295 Becker acres from Xcel for about 17.7 million USD, confirmed by Xcel and state property data cited by the reporter.","independently_verified_current_operating_status":null},"notes":["Land purchase is not data-center construction spending, secured utility service or commissioning. Microsoft declined to disclose project details. Google's canceled proposal and Elk River Technologies' separate land sale are not this site. No MW, specific design or final opening date is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mprnews.org/story/2024/02/21/xcel-energy-sells-land-in-becker-to-microsoft-for-data-center","host":"mprnews.org","date":"2024-02-21","published":"2024-02-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Becker · Sherburne · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"monticello-tech-park-frattalone-mn","state":"MN","kind":"facility","name":"Monticello Tech Park (Monticello Tech LLC / Frattalone)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wright"],"city":"Monticello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.298583,"lng":-93.7994056,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Monticello Times separates Frattalone/Monticello Tech's 550-acre concept from Scannell's roughly 106-acre concept near Bertram park, explicitly saying neither project was approved or had building permits.","independently_verified_current_operating_status":null},"notes":["Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Monticello · Wright · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"geronimo-nobles-county-powered-data-park-mn","state":"MN","kind":"facility","name":"Nobles County Powered Data Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nobles"],"city":"Worthington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Geronimo Nobles development context versus staff power portfolio. Generalpowered-data-parkandstaffbiographycontentnotapprovedNoblesDCplan.1600MW/550MWinbiographyisstaffpastprojectexperience,notNoblesITorcampuspower. Bloomingtonheadquartersnotprojectsite. Noexactparcel,opening,currentapprovalorITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://geronimopower.com/in-development/nobles-county-powered-data-park/","host":"geronimopower.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.62,"lng":-95.6,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Geronimo Nobles development context versus staff power portfolio","fields":{"developer":"Geronimo Power","project_label":"Nobles County Data Center","associated_wind_projects":["Plum Creek1","Plum Creek2","Lime Creek"]},"notes":["Generalpowered-data-parkandstaffbiographycontentnotapprovedNoblesDCplan.1600MW/550MWinbiographyisstaffpastprojectexperience,notNoblesITorcampuspower. Bloomingtonheadquartersnotprojectsite. Noexactparcel,opening,currentapprovalorITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://geronimopower.com/in-development/nobles-county-powered-data-park/","host":"geronimopower.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Worthington · Nobles · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"revolve-labs-glencoe-mn","state":"MN","kind":"facility","name":"Revolve Labs Glencoe","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["McLeod"],"city":"Glencoe","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Maximum headline value is not fixed spent capex. Existing mining operations, proposed AI facilities and another Windom withdrawal are different. Utility net revenue is an attributed historical claim, not project investment or guaranteed bill savings. Noise/health descriptions from elsewhere are not measured Glencoe findings. No IT capacity or later approval established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://crypto.news/bitcoin-miner-revolve-labs-proposes-60m-data-center-in-minnesota/","host":"crypto.news","date":"2024-10-21","published":"2024-10-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.7691,"lng":-94.1497,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Crypto.news summarizes a preliminary Revolve Labs Glencoe expansion concept, reporting a40-to60-million-USDrange and around ten planned jobs.","independently_verified_current_operating_status":null},"notes":["Maximum headline value is not fixed spent capex. Existing mining operations, proposed AI facilities and another Windom withdrawal are different. Utility net revenue is an attributed historical claim, not project investment or guaranteed bill savings. Noise/health descriptions from elsewhere are not measured Glencoe findings. No IT capacity or later approval established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://crypto.news/bitcoin-miner-revolve-labs-proposes-60m-data-center-in-minnesota/","host":"crypto.news","date":"2024-10-21","published":"2024-10-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Glencoe · McLeod · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"revolve-labs-moose-lake-mn","state":"MN","kind":"facility","name":"Revolve Labs Moose Lake (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Carlton"],"city":"Moose Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Public opposition also described, but cannot replace stated company reason. Land lease agreement did not establish operating mine. Future discussions remained possible. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pinejournal.com/news/local/crypto-mining-company-withdraws-moose-lake-proposal","host":"pinejournal.com","date":"2026-03-12","published":"2026-03-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":46.4543725,"lng":-92.761976,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"conditional-use-application-withdrawn","reported_finding":"Pine Journal reports March 11 council notification that Revolve withdrew Moose Lake permit application. Company cited power-availability timing.","report_display_date":"2026-03-12","independently_verified_current_status":null},"notes":["Public opposition also described, but cannot replace stated company reason. Land lease agreement did not establish operating mine. Future discussions remained possible.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pinejournal.com/news/local/crypto-mining-company-withdraws-moose-lake-proposal","host":"pinejournal.com","date":"2026-03-12","published":"2026-03-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Moose Lake · Carlton · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"revolve-labs-windom-mn","state":"MN","kind":"facility","name":"Revolve Labs Windom (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cottonwood"],"city":"Windom","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Visible publication date September 26 differs from URL/metadata September 25. No exact withdrawal day adopted. Glencoe capacity is another site, not Windom. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theenergymag.com/news/2024-09-25/revolve-bitcoin-mining-windom","host":"theenergymag.com","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.8663464,"lng":-95.1169366,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"withdrawal-reported-secondhand","reported_finding":"The EnergyMag reports Revolve withdrew Windom mining application, citing Minnesota Star Tribune reporting.","report_display_date":"2024-09-26","independently_verified_current_status":null},"notes":["Visible publication date September 26 differs from URL/metadata September 25. No exact withdrawal day adopted. Glencoe capacity is another site, not Windom.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theenergymag.com/news/2024-09-25/revolve-bitcoin-mining-windom","host":"theenergymag.com","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Windom · Cottonwood · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"scannell-monticello-tech-park-mn","state":"MN","kind":"facility","name":"Scannell Properties Monticello Tech Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wright"],"city":"Monticello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.2914854,"lng":-93.8499172,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Monticello Times separates Frattalone/Monticello Tech's 550-acre concept from Scannell's roughly 106-acre concept near Bertram park, explicitly saying neither project was approved or had building permits.","independently_verified_current_operating_status":null},"notes":["Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Monticello · Wright · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"t5-minneapolis-1001-third-avenue-mn","state":"MN","kind":"facility","name":"T5@Minneapolis (1001 Third Avenue South)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cloud Capital Minneapolis acquisition context with exact-site gap. 21currentplus10potential=31not52. ExactT5/1001ThirdAvenuepropertycrosswalknotstatedbyrelease;capacitynotcanonicaluntilmatched. Corporate26globalassets/5.5BAUMnotthiscampuscapex/count. No saleprice,originalopeningdayorcompletedexpansion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cloudcapital.com/cloud-capital-and-arcapita-acquire-a-21-megawatt-data-center-in-the-us-with-planned-expansion/","host":"cloudcapital.com","date":"2026-01-13","published":"2026-01-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.9714683,"lng":-93.2702827,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Cloud Capital Minneapolis acquisition context with exact-site gap","fields":{"buyers":["Cloud Capital","Arcapita"],"acquisition_announcement_date":"2026-01-13","reported_market":"Minneapolis, Minnesota","reported_stabilized_capacity_mw":21,"planned_expansion_mw":10,"planned_total_capacity_mw":31,"power_basis":"data-center capacity, not explicitly critical IT","tenant_description":"unnamed sovereign AI/cloud inference provider, primarily longterm leased"},"notes":["21currentplus10potential=31not52. ExactT5/1001ThirdAvenuepropertycrosswalknotstatedbyrelease;capacitynotcanonicaluntilmatched. Corporate26globalassets/5.5BAUMnotthiscampuscapex/count. No saleprice,originalopeningdayorcompletedexpansion.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cloudcapital.com/cloud-capital-and-arcapita-acquire-a-21-megawatt-data-center-in-the-us-with-planned-expansion/","host":"cloudcapital.com","date":"2026-01-13","published":"2026-01-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Minneapolis · Hennepin · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"tract-rosemount-technology-park-mn","state":"MN","kind":"facility","name":"Tract Rosemount Technology Park (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Rosemount","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Tract Rosemount secondary institutional withdrawal report. Regional article compiles media/public sources; not direct signed Tract withdrawal or current2026 status. Second Rosemount tract not automatically all Tract holdings and not Meta Rosemount. No precise parcel/name match from reviewed narrative; exact preferred record unresolved. Regional facility counts have explicit hyperscale definition and date, not all current data centers. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.minneapolisfed.org/article/2025/massive-data-centers-lay-roots-in-the-ninth-district","host":"minneapolisfed.org","date":"2025-10-07","published":"2025-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.735,"lng":-92.985,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Tract Rosemount secondary institutional withdrawal report","fields":{"publisher_role":"Federal Reserve Bank of Minneapolis regional analysis","publication_date":"2025-10-07","inventory_asof":"2025-10-01","reported_tract_stage":"pulled out of a second Rosemount site, attributed to city planning officials"},"notes":["Regional article compiles media/public sources; not direct signed Tract withdrawal or current2026 status. Second Rosemount tract not automatically all Tract holdings and not Meta Rosemount. No precise parcel/name match from reviewed narrative; exact preferred record unresolved. Regional facility counts have explicit hyperscale definition and date, not all current data centers.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.minneapolisfed.org/article/2025/massive-data-centers-lay-roots-in-the-ninth-district","host":"minneapolisfed.org","date":"2025-10-07","published":"2025-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Rosemount · Dakota · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"us-signal-mn01-eden-prairie-mn","state":"MN","kind":"facility","name":"US Signal MN01 Minneapolis (Eden Prairie)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Eden Prairie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. operator location index only. Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.877094,"lng":-93.407686,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"operator location index only","fields":{"named_locations":["MI01 Grand Rapids","MN01 Minneapolis","WI02 Madison"],"operator_network_data_center_count":17},"notes":["Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Eden Prairie · Hennepin · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"vaultas-alexandria-mn","state":"MN","kind":"facility","name":"Vaultas Alexandria (ALX1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Alexandria","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Vaultas Alexandria exact site versus global partner network. 1600plusglobaldata-centerlocationsarepartner/consultingaccessnotVaultasownedbuildings.500vendors/40yearsindustryexperienceothercontexts. No numericITMW,areaororiginalopening. Operatorphysicalsecuritycomplianceclaimsnotindependentrestrictedreport. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vaultas.com/data-centers/minnesota/","host":"vaultas.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.8844516,"lng":-95.3762121,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Vaultas Alexandria exact site versus global partner network","fields":{"operator":"Vaultas","code":"ALX1","address":"720 Hawthorne Street, Alexandria, Minnesota56308"},"notes":["1600plusglobaldata-centerlocationsarepartner/consultingaccessnotVaultasownedbuildings.500vendors/40yearsindustryexperienceothercontexts. No numericITMW,areaororiginalopening. Operatorphysicalsecuritycomplianceclaimsnotindependentrestrictedreport.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vaultas.com/data-centers/minnesota/","host":"vaultas.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · Alexandria · Douglas · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"vaultas-st-cloud-mn","state":"MN","kind":"facility","name":"Vaultas St. Cloud","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stearns"],"city":"St. Cloud","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Preserve internal construction-status conflict and dated statements; no current operation certified.0.5 to 0.6 MW is PERMODULARNODE starting capacity, not necessarily full-site IT or current load; node count unknown. Planned opening during 2026 is unobserved. Related 100,000 dollarpartnership headline is not an examined award instrument. St.Joseph policy research, hypothetical other cities and statewide tax rules are separate contexts. Economist/utility bill-saving statements are opinions, not site-specific guaranteed tariffs or measured household savings. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stcloudlive.com/news/local/to-plug-in-or-not-to-plug-in-that-is-the-question-for-area-cities-about-data-centers-1","host":"stcloudlive.com","date":"2026-02-13","published":"2026-02-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.5405392,"lng":-94.2023528,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"St.CloudLive identifies Vaultas’s planned 3701 18 thStreetSouth modular-edge site and says in the developer-attributed body that construction had not yet begun, despite an introductory under-construction statement.","independently_verified_current_operating_status":null},"notes":["Preserve internal construction-status conflict and dated statements; no current operation certified.0.5 to 0.6 MW is PERMODULARNODE starting capacity, not necessarily full-site IT or current load; node count unknown. Planned opening during 2026 is unobserved. Related 100,000 dollarpartnership headline is not an examined award instrument. St.Joseph policy research, hypothetical other cities and statewide tax rules are separate contexts. Economist/utility bill-saving statements are opinions, not site-specific guaranteed tariffs or measured household savings.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stcloudlive.com/news/local/to-plug-in-or-not-to-plug-in-that-is-the-question-for-area-cities-about-data-centers-1","host":"stcloudlive.com","date":"2026-02-13","published":"2026-02-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minnesota · St. Cloud · Stearns · Source context reviewed","state_name":"Minnesota","state_path":"/minnesota/"},{"id":"avaio-taurus-brandon-ms","state":"MS","kind":"facility","name":"AVAIO Digital Taurus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rankin"],"city":"Brandon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Hundreds of indirect jobs include construction; not a quantified permanent onsite total. No site MW or dollar exemption value supplied. Construction target not delivery proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/","host":"governorreeves.ms.gov","date":"2025-08-19","published":"2025-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.27,"lng":-89.99,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"announcement_date":"2025-08-19","planned_investment_usd":6000000000,"expected_direct_jobs_min":60,"construction_completion_target":"2027-H1","government_reported_tax_program_approval":"Mississippi Data Center Enterprises exemption","published_location":"East Metropolitan Center Business and Industrial Park, Brandon, Rankin County"},"notes":["Hundreds of indirect jobs include construction; not a quantified permanent onsite total. No site MW or dollar exemption value supplied. Construction target not delivery proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/","host":"governorreeves.ms.gov","date":"2025-08-19","published":"2025-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Brandon · Rankin · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"aws-clinton-hinds-ms","state":"MS","kind":"facility","name":"AWS Clinton Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hinds"],"city":"Clinton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Clinton municipal AWS reuse announcement. 1Bplanned investment, not actual spent or separate amount to add again to Amazon statewide25B. Reused industrial plant not newly built whole facility from scratch. Thousands of additional construction/supplychain jobs not all permanent direct onsite. Ceremony/announcement not actual customer opening; no ITMW or exact parcel in reviewed section. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://clintonms.org/awsdatacenter/","host":"clintonms.org","date":"2026-06-09","published":"2026-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.3415,"lng":-90.3218,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Clinton municipal AWS reuse announcement","fields":{"agency":"City of Clinton, Mississippi","announcement_date":"2026-06-09","project_operator":"AWS","project_use":"repurpose former Delphi manufacturing plant as data center","planned_investment_usd":1000000000,"expected_full_operation_positions_min_inclusive":100},"notes":["1Bplanned investment, not actual spent or separate amount to add again to Amazon statewide25B. Reused industrial plant not newly built whole facility from scratch. Thousands of additional construction/supplychain jobs not all permanent direct onsite. Ceremony/announcement not actual customer opening; no ITMW or exact parcel in reviewed section.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://clintonms.org/awsdatacenter/","host":"clintonms.org","date":"2026-06-09","published":"2026-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Clinton · Hinds · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"aws-costas-ridgeland-ms","state":"MS","kind":"facility","name":"AWS Costas Property Campus (Ridgeland)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Ridgeland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Combined investment and job commitments must not be assigned fully to each site. Warehouse and data center uses differ; historical forecast is not current delivery. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://magnoliatribune.com/?p=118379","host":"magnoliatribune.com","date":"2024-07-24","published":"2024-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.400198,"lng":-90.1818699,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Magnolia Tribune identifies Costas/Ridgeland and Canton sites within a combined Madison County AWS plan, with 2027 completion forecast.","independently_verified_current_operating_status":null},"notes":["Combined investment and job commitments must not be assigned fully to each site. Warehouse and data center uses differ; historical forecast is not current delivery.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://magnoliatribune.com/?p=118379","host":"magnoliatribune.com","date":"2024-07-24","published":"2024-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Ridgeland · Madison · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"aws-project-atlas-madison-county-ms","state":"MS","kind":"facility","name":"AWS Project Atlas - Madison County Mega Site (Canton)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Canton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Combined one GW and ten-billion-USD investment are regional plans, not each site. Groundbreaking is not operation; quoted spring-2027 target remains a forecast. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://siteselection.com/amazon-delivers-record-package-to-mississippi/","host":"siteselection.com","date":"2024-06-19","published":"2024-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.6121,"lng":-90.039,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Site Selection reports May 20 AWS Madison County groundbreaking and two-campus development goals.","independently_verified_current_operating_status":null},"notes":["Combined one GW and ten-billion-USD investment are regional plans, not each site. Groundbreaking is not operation; quoted spring-2027 target remains a forecast.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://siteselection.com/amazon-delivers-record-package-to-mississippi/","host":"siteselection.com","date":"2024-06-19","published":"2024-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Canton · Madison · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"aws-project-steamboat-warren-county-ms","state":"MS","kind":"facility","name":"AWS Project Steamboat - Warren County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"Vicksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AWS Mississippi statewide and county-specific investment scopes. 25B and2000jobs are Mississippi totals, not Warren-only. State totals include previously announced amounts; do not add25Bto its components. Canton2027recycled-water transition and83millionannualgallons are future other-campus plans. Renewable616MW is generation, not IT. Ratepayer/grid/water claims remain attributed forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3526,"lng":-90.8779,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"AWS Mississippi statewide and county-specific investment scopes","fields":{"statewide_total_planned_investment_usd":25000000000,"statewide_expected_jobs":2000,"warren_previously_announced_planned_investment_usd":3000000000,"additional_madison_planned_investment_usd":11000000000,"hinds_planned_investment_usd":1000000000,"hinds_reuse":"former Delphi manufacturing plant"},"notes":["25B and2000jobs are Mississippi totals, not Warren-only. State totals include previously announced amounts; do not add25Bto its components. Canton2027recycled-water transition and83millionannualgallons are future other-campus plans. Renewable616MW is generation, not IT. Ratepayer/grid/water claims remain attributed forecasts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Vicksburg · Warren · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"cspire-starkville-ms","state":"MS","kind":"facility","name":"C Spire Starkville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oktibbeha"],"city":"Starkville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. C Spire historical Starkville construction announcement. 23Mbuilding/electrical/cooling/securityexcludesplannedIThardware/softwarepurchases;notfullcampusactualspend.1.5MWgenerator/feedstatementnotIT. Historical2014plansnotobservedopening. Publisheddouble14footthickwallclaimimplausibleandheld,notcorrectedtoinches.52nationalTier3/4countandcertificationclaimsnotcurrentcensus/certifierproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cspire.com/cms/news/wireless/20600007/new-c-spire-world-class-business-enterprise-data-center-built-like-fort-knox","host":"cspire.com","date":"2014-05-20","published":"2014-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4709294,"lng":-88.7927699,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"C Spire historical Starkville construction announcement","fields":{"operator":"C Spire","announcement_date":"2014-05-20","locality":"Thad Cochran Research Technology and Economic Development Park, Starkville, Mississippi","site_acres":6.5,"initial_phase_area_sqft":23800,"initial_phase_building_systems_cost_usd":23000000,"historic_groundwork_start":"2013-11","historical_initial_phase_completion_target":"fall2014","published_generator_feed_power_mw":1.5},"notes":["23Mbuilding/electrical/cooling/securityexcludesplannedIThardware/softwarepurchases;notfullcampusactualspend.1.5MWgenerator/feedstatementnotIT. Historical2014plansnotobservedopening. Publisheddouble14footthickwallclaimimplausibleandheld,notcorrectedtoinches.52nationalTier3/4countandcertificationclaimsnotcurrentcensus/certifierproof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cspire.com/cms/news/wireless/20600007/new-c-spire-world-class-business-enterprise-data-center-built-like-fort-knox","host":"cspire.com","date":"2014-05-20","published":"2014-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Starkville · Oktibbeha · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"clarksdale-hyperscale-data-center-ms","state":"MS","kind":"facility","name":"Clarksdale Hyperscale Data Center Project","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coahoma"],"city":"Clarksdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No data-center development application filed as ofMarch23. Zoning action does not approve construction, tenant or current facility. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.actionnews5.com/2026/03/24/clarksdale-passes-motion-that-allows-rezoning-potential-data-center","host":"actionnews5.com","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.2006,"lng":-90.5702,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WMC reports Clarksdale March23 motion allowing rezoning toward light industrial for648-acre potential campus.","independently_verified_current_operating_status":null},"notes":["No data-center development application filed as ofMarch23. Zoning action does not approve construction, tenant or current facility.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.actionnews5.com/2026/03/24/clarksdale-passes-motion-that-allows-rezoning-potential-data-center","host":"actionnews5.com","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Clarksdale · Coahoma · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"cleanspark-clinton-ms","state":"MS","kind":"facility","name":"CleanSpark Clinton Bitcoin Mining Facilities","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hinds"],"city":"Clinton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Construction-in-progress acquired, not proven completed by old target. Grouped Clinton pin may represent multiple sites. Acquisition and construction contract values are separate and not current total capex. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3560924,"lng":-90.3635037,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"asset_agreement_date":"2024-09-16","acquisition_consumated_period":"2024-09","reported_purchase_price_including_costs_usd":3020000,"separate_construction_management_agreement_usd":2888000,"old_substantial_completion_forecast":"2024-12"},"notes":["Construction-in-progress acquired, not proven completed by old target. Grouped Clinton pin may represent multiple sites. Acquisition and construction contract values are separate and not current total capex.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Clinton · Hinds · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"cleanspark-meridian-ms","state":"MS","kind":"facility","name":"CleanSpark Meridian Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Lauderdale"],"city":"Meridian","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3643,"lng":-88.7037,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_city":"Meridian","combined_three_site_purchase_closed":"2024-02-26","combined_three_site_purchase_price_including_costs_usd":19771000,"scope":"One named member of Meridian,Vicksburg,Wiggins three-site transaction."},"notes":["19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Meridian · Lauderdale · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"cleanspark-vicksburg-ms","state":"MS","kind":"facility","name":"CleanSpark Vicksburg Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Warren"],"city":"Vicksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3526,"lng":-90.8779,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_city":"Vicksburg","combined_three_site_purchase_closed":"2024-02-26","combined_three_site_purchase_price_including_costs_usd":19771000,"scope":"One named member of Meridian,Vicksburg,Wiggins three-site transaction."},"notes":["19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Vicksburg · Warren · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"cleanspark-wiggins-ms","state":"MS","kind":"facility","name":"CleanSpark Wiggins Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Stone"],"city":"Wiggins","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.8508,"lng":-89.1284,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_city":"Wiggins","combined_three_site_purchase_closed":"2024-02-26","combined_three_site_purchase_price_including_costs_usd":19771000,"scope":"One named member of Meridian,Vicksburg,Wiggins three-site transaction."},"notes":["19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Wiggins · Stone · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"greenidge-columbus-ms","state":"MS","kind":"facility","name":"Columbus Bitcoin Mining Facility (formerly Greenidge Columbus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Lowndes"],"city":"Columbus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. LMFunding originalissuer September18,2025 announcement says acquisitionCLOSED forColumbusMS11MWsite/approximately2300miners fromGreenidge for4Mtotalconsideration. NowhostedunderPowerComputebrand; do notsilentlyrenamehistoricalissuer/currentownerwithoutscopeddate. Original8K,deedandcurrent2026ownershipunread. 11MWfacilityminingcapacity versus7.5MWoperationalminers/157PHs are distinct; neither labeledcriticalIT.26MWfleet expectedtotalINCLUDES11, not37.1.3Msecuredloan PARTfunds4Mdeal, not5.3Mcapex. Approx3.6c/kWhpower-priceclaim notexecutedall-inrate/guaranteed2026price. Acquiredminersnotnewemployees/buildings; TampaHQnotMSpremises. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.power-compute.com/investors/news-events/press-releases/detail/168/lm-funding-america-closes-acquisition-of-11-mw-site-and","host":"power-compute.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4957,"lng":-88.4273,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["LMFunding originalissuer September18,2025 announcement says acquisitionCLOSED forColumbusMS11MWsite/approximately2300miners fromGreenidge for4Mtotalconsideration. NowhostedunderPowerComputebrand; do notsilentlyrenamehistoricalissuer/currentownerwithoutscopeddate. Original8K,deedandcurrent2026ownershipunread.","11MWfacilityminingcapacity versus7.5MWoperationalminers/157PHs are distinct; neither labeledcriticalIT.26MWfleet expectedtotalINCLUDES11, not37.1.3Msecuredloan PARTfunds4Mdeal, not5.3Mcapex. Approx3.6c/kWhpower-priceclaim notexecutedall-inrate/guaranteed2026price. Acquiredminersnotnewemployees/buildings; TampaHQnotMSpremises.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://www.power-compute.com/investors/news-events/press-releases/detail/168/lm-funding-america-closes-acquisition-of-11-mw-site-and","host":"power-compute.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Columbus · Lowndes · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"compass-lauderdale-meridian-ms","state":"MS","kind":"facility","name":"Compass Datacenters Lauderdale County Hyperscale Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lauderdale"],"city":"Meridian","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 500MW utility supply, not explicit IT. Eight-year buildout not all operating. Thousands of jobs are unspecified direct/indirect total, not exact permanent onsite employment. Certification and tax exemption described prospectively, not actual dollar tax expenditure. Quoted4Msite grant not independently executed award reviewed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","host":"governorreeves.ms.gov","date":"2025-01-09","published":"2025-01-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.3644,"lng":-88.7037,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"announcement_date":"2025-01-09","planned_buildings":8,"expected_construction_program_years":8,"estimated_investment_at_occupancy_usd":10000000000,"investment_basis":"campus plus future tenant information-technology equipment","planned_utility_supply_mw_approx":500,"announced_income_franchise_exemption_years":10},"notes":["500MW utility supply, not explicit IT. Eight-year buildout not all operating. Thousands of jobs are unspecified direct/indirect total, not exact permanent onsite employment. Certification and tax exemption described prospectively, not actual dollar tax expenditure. Quoted4Msite grant not independently executed award reviewed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","host":"governorreeves.ms.gov","date":"2025-01-09","published":"2025-01-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Meridian · Lauderdale · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"erdc-dsrc-vicksburg-ms","state":"MS","kind":"facility","name":"ERDC DoD Supercomputing Resource Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"Vicksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ERDC historical institutional compute-system procurement. Procurement/performance units are not MW of critical IT or building investment. Historical system installation forecast is not observed2023 commissioning or current2026 configuration. Footer program-office contact is not independently verified server-room entrance. Existing center identity supported; whole record not verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hpc.mil/?view=article&id=88%3Anew-hpc-systems-at-the-us-army-engineer-research-and-development-center-erdc-dod-supercomputing-resource-center-will-provide-an-additional-9-petaflops-of-computational-capability&catid=2","host":"hpc.mil","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3019615,"lng":-90.8630294,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"ERDC historical institutional compute-system procurement","fields":{"agency":"HPC Modernization Program","facility":"US Army ERDC DoD Supercomputing Resource Center","city":"Vicksburg, Mississippi","procurement_fiscal_year":2022,"announced_new_system_petaflops":9,"announced_new_compute_cores":277248,"new_system_production_target_year":2023},"notes":["Procurement/performance units are not MW of critical IT or building investment. Historical system installation forecast is not observed2023 commissioning or current2026 configuration. Footer program-office contact is not independently verified server-room entrance. Existing center identity supported; whole record not verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hpc.mil/?view=article&id=88%3Anew-hpc-systems-at-the-us-army-engineer-research-and-development-center-erdc-dod-supercomputing-resource-center-will-provide-an-additional-9-petaflops-of-computational-capability&catid=2","host":"hpc.mil","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Vicksburg · Warren · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"gawk-enerpower-amory-ms","state":"MS","kind":"facility","name":"Gawk Enerpower Amory Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Monroe"],"city":"Amory","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The body does not name Gawk or Enerpower, so operator identity stays unverified. This is not described as a large hyperscale campus. August completion is an unobserved forecast, and hoped-for utility savings are not measured. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wtva.com/2026/05/30/bitcoin-mining-facility-be-built-amory/","host":"wtva.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.9944791,"lng":-88.5028344,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"WTVA reports an Amory cryptocurrency container facility under construction on Waterway Drive, targeting August completion.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The body does not name Gawk or Enerpower, so operator identity stays unverified. This is not described as a large hyperscale campus. August completion is an unobserved forecast, and hoped-for utility savings are not measured.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wtva.com/2026/05/30/bitcoin-mining-facility-be-built-amory/","host":"wtva.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Amory · Monroe · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"xai-macrohardrr-southaven-ms","state":"MS","kind":"facility","name":"MACROHARDRR (xAI Southaven Data Center III)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeSoto"],"city":"Southaven","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not assign nearly2GW company computing power to the Mississippi building alone. Past forecast is not verified actual opening. Hundreds of jobs is not an exact number. Governor January8announcement says acquired-building retrofit and forecasts February opening; nearly2GW describes total company computing power after expansion. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named xAI project with duplicate-record and system-power holds. Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.991886,"lng":-90.034358,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Southaven","county":"DeSoto","investment_usd_min":20000000000,"investment_basis":"announced corporate investment in Southaven project","event_status":"retrofitting as of2026-01-08","opening_forecast":"2026-02","incentive":"MDA data center sales/use exemption approved; city/county fee-in-lieu support; values not stated"},"notes":["Do not assign nearly2GW company computing power to the Mississippi building alone.","Past forecast is not verified actual opening.","Hundreds of jobs is not an exact number.","Governor January8announcement says acquired-building retrofit and forecasts February opening; nearly2GW describes total company computing power after expansion.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named xAI project with duplicate-record and system-power holds","fields":{"project_name":"MACROHARDRR","historical_announcement_date":"2026-01-08","announced_project_corporate_investment_usd_min_exclusive":20000000000,"reported_existing_building_retrofit":true,"historical_operation_target_month":"2026-02","government_reported_incentive_approval":"Mississippi DataCenterIncentive sales/use exemption","local_incentive_type":"Southaven andDeSotoCounty fee-in-lieu agreements"},"notes":["Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Southaven · DeSoto · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"msu-hpc2-portera-starkville-ms","state":"MS","kind":"facility","name":"Mississippi State University HPC2  -  Malcolm A. Portera High Performance Computing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oktibbeha"],"city":"Starkville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. MSU historical operating research system, funding scope. 2019 announcement is historical confirmation of housed operating research system, not fresh 2026 performance/ranking or every replacement system. 22M includes system purchase, installation and operation, not exclusively building construction. No critical IT MW, exact parcel or 2026 headcount adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer","host":"newsarchive.msstate.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4733639,"lng":-88.7907511,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"MSU historical operating research system, funding scope","fields":{"institution":"Mississippi State University","facility":"Malcolm A. Portera High Performance Computing Center","system":"Orion","ceremony_date":"2019-12-18","system_funding_agency":"NOAA","grants_to_purchase_install_run_system_usd":22000000,"system_cabinets":28,"processing_cores":72000,"system_ram_terabytes":350,"reported_peak_performance_petaflops":5},"notes":["2019 announcement is historical confirmation of housed operating research system, not fresh 2026 performance/ranking or every replacement system. 22M includes system purchase, installation and operation, not exclusively building construction. No critical IT MW, exact parcel or 2026 headcount adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer","host":"newsarchive.msstate.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Starkville · Oktibbeha · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"navy-dsrc-stennis-space-center-ms","state":"MS","kind":"facility","name":"Navy DoD Supercomputing Resource Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hancock"],"city":"Stennis Space Center","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Machine acceptance is not opening of a new physical campus. The 68-million-USD amount spans two contracts, not this facility alone. Petaflops measure computation, not MW; fleet performance, maximum authorized users and named systems are not counts of data-center buildings or current utilization. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://defensescoop.com/2023/04/27/navys-powerful-new-supercomputer-nautilus-is-officially-open-for-dod-use/","host":"defensescoop.com","date":"2023-04-27","published":"2023-04-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.3776388,"lng":-89.5978312,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"DefenseScoop reports Navy DSRC acceptance and availability of the Nautilus supercomputer at Stennis after 2022 delivery, distinguishing it from Narwhal and the broader DSRC fleet.","independently_verified_current_operating_status":null},"notes":["Machine acceptance is not opening of a new physical campus. The 68-million-USD amount spans two contracts, not this facility alone. Petaflops measure computation, not MW; fleet performance, maximum authorized users and named systems are not counts of data-center buildings or current utilization.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://defensescoop.com/2023/04/27/navys-powerful-new-supercomputer-nautilus-is-officially-open-for-dod-use/","host":"defensescoop.com","date":"2023-04-27","published":"2023-04-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Stennis Space Center · Hancock · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"prado-ai-jackson-metro-ms","state":"MS","kind":"facility","name":"Prado AI / PraCon Global AI Industrial Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Ridgeland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Regulatory nondecision is neither permission, denial nor finding of lawful utility exemption. Entergy/MississippiPower CPCN arguments and developer landlord-exemption argument remain competing positions, not holdings. USD25billionlong-term goal is unfinanced aspiration, not committed campus capex; AmazonUSD1billioncomparison not this project. No exact coordinates/county/municipal ordinance assignment, criticalIT, generation size or operating date independently verified. Jackson proposed six-month pause and Ridgeland April500foot ordinance are separate jurisdictions and need originals. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/","host":"web.archive.org","date":"2026-06-01","published":"2026-06-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.4282,"lng":-90.132,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"MississippiToday reports PSC declined to issue requested declaratory opinion on PradoAI private generation/tenant-supply proposal because facts were insufficient and premature. Developer planned to proceed but still sought financing; exact location changed from Ridgeland to unspecified Jacksonmetro.","independently_verified_current_operating_status":null,"reported_regulatory_action":"Declined requested declaratory opinion due insufficient facts","regulatory_permission_verified":false,"exact_campus_location_verified":false},"notes":["Regulatory nondecision is neither permission, denial nor finding of lawful utility exemption. Entergy/MississippiPower CPCN arguments and developer landlord-exemption argument remain competing positions, not holdings. USD25billionlong-term goal is unfinanced aspiration, not committed campus capex; AmazonUSD1billioncomparison not this project. No exact coordinates/county/municipal ordinance assignment, criticalIT, generation size or operating date independently verified. Jackson proposed six-month pause and Ridgeland April500foot ordinance are separate jurisdictions and need originals.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/","host":"web.archive.org","date":"2026-06-01","published":"2026-06-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Ridgeland · Madison · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"saxum-forest-avenue-jackson-ms","state":"MS","kind":"facility","name":"Saxum Forest Avenue Data Center Site (Northwest Jackson)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hinds"],"city":"Jackson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Application itself seeks industrial zoning without naming data centers; proposed use is established by counsel/reporting, not a named operating tenant. Planning hearing and later council sequence are future at publication, not approvals. Council TABLED the proposed 183-day moratorium for a hearing, so it was not an adopted ban in this report. Counsel forecast tens of millions of taxes OVER A DECADE is neither annual revenue nor paid incentive. No MW, construction date or verified employment. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wlbt.com/2026/05/20/company-seeking-rezone-forest-avenue-property-jackson-data-center/","host":"wlbt.com","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.3705052,"lng":-90.1998927,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"WLBT reports Saxum sought rezoning of roughly 190 Forest Avenue acres for a proposed Jackson data center, with a planning hearing expected May 27.","independently_verified_current_operating_status":null},"notes":["Application itself seeks industrial zoning without naming data centers; proposed use is established by counsel/reporting, not a named operating tenant. Planning hearing and later council sequence are future at publication, not approvals. Council TABLED the proposed 183-day moratorium for a hearing, so it was not an adopted ban in this report. Counsel forecast tens of millions of taxes OVER A DECADE is neither annual revenue nor paid incentive. No MW, construction date or verified employment.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wlbt.com/2026/05/20/company-seeking-rezone-forest-avenue-property-jackson-data-center/","host":"wlbt.com","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Jackson · Hinds · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"starkville-industrial-park-road-crypto-mine-ms","state":"MS","kind":"facility","name":"Starkville Industrial Park Road Cryptocurrency Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Oktibbeha"],"city":"Starkville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. No approval, executed utility agreement, current draw or critical IT verified. Resident bill reductions are explicitly unsubstantiated for this proposal. Operator identity is not established; separate CleanSpark Mississippi acquisitions cannot identify this site. Article’s local displayed date is July 13 while UTC metadata is July 14; these are time-zone representations, not two project events. General 2023 legislation claims were not independently reviewed as law. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cryptobriefing.com/bitcoin-mine-mississippi-starkville-energy-bills/","host":"cryptobriefing.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4385866,"lng":-88.8363381,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Crypto Briefing describes an early-review Starkville bitcoin proposal near Industrial Park Road, with up to 30 MW power and 20,000 gallons/day attributed proposed demand.","independently_verified_current_operating_status":null},"notes":["No approval, executed utility agreement, current draw or critical IT verified. Resident bill reductions are explicitly unsubstantiated for this proposal. Operator identity is not established; separate CleanSpark Mississippi acquisitions cannot identify this site. Article’s local displayed date is July 13 while UTC metadata is July 14; these are time-zone representations, not two project events. General 2023 legislation claims were not independently reviewed as law.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cryptobriefing.com/bitcoin-mine-mississippi-starkville-energy-bills/","host":"cryptobriefing.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Starkville · Oktibbeha · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"xai-southaven-ms","state":"MS","kind":"facility","name":"xAI Southaven","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeSoto"],"city":"Southaven","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named xAI project with duplicate-record and system-power holds. Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.993,"lng":-89.974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named xAI project with duplicate-record and system-power holds","fields":{"project_name":"MACROHARDRR","historical_announcement_date":"2026-01-08","announced_project_corporate_investment_usd_min_exclusive":20000000000,"reported_existing_building_retrofit":true,"historical_operation_target_month":"2026-02","government_reported_incentive_approval":"Mississippi DataCenterIncentive sales/use exemption","local_incentive_type":"Southaven andDeSotoCounty fee-in-lieu agreements"},"notes":["Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Southaven · DeSoto · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"xai-tulane-road-southaven-ms","state":"MS","kind":"facility","name":"xAI Tulane Road Data Center (Southaven)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeSoto"],"city":"Southaven","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Approval is not completed construction/RFS. Fifth regional site includes projects, not five operating campuses. SpaceXAI is source nomenclature, not independent corporate/legal-entity verification. Reported 40 million-dollarcontribution supports replacement city training facility, not a public subsidy awarded to data center or campuscapex. Adjacent StantonRoadpowerplant is separate generation; no MW assigned or added. Noise complaints/turbine extension belong to existing area facilities, not measured emissions from unbuilt Tulane campus. Related 600 million-dollarcontractor allegation is not a court award. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.actionnews5.com/2026/09/02/southaven-approves-new-spacexai-data-center-fifth-location-area/","host":"actionnews5.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.9897,"lng":-90.043,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ActionNews 5 reports Southaven aldermen approved a 660,000-square-foot data center at former 51-acre TulaneRoad training site, obtained through reported city land swap.","independently_verified_current_operating_status":null},"notes":["Approval is not completed construction/RFS. Fifth regional site includes projects, not five operating campuses. SpaceXAI is source nomenclature, not independent corporate/legal-entity verification. Reported 40 million-dollarcontribution supports replacement city training facility, not a public subsidy awarded to data center or campuscapex. Adjacent StantonRoadpowerplant is separate generation; no MW assigned or added. Noise complaints/turbine extension belong to existing area facilities, not measured emissions from unbuilt Tulane campus. Related 600 million-dollarcontractor allegation is not a court award.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.actionnews5.com/2026/09/02/southaven-approves-new-spacexai-data-center-fifth-location-area/","host":"actionnews5.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mississippi · Southaven · DeSoto · Source context reviewed","state_name":"Mississippi","state_path":"/mississippi/"},{"id":"armory-innovation-district-st-louis-mo","state":"MO","kind":"facility","name":"Armory Innovation District Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"St. Louis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. StLouis reported conditional-use approval and employment/forecast boundaries. Conditional-use approval attributed to reporting, actual permit/recordedCBA and later appeals not inspected.3Bcombineddata+Armoryoffices not all actual DCspend.100jobscondition afteryear2 conflicts with separate50permanentDCforecast; retain scopes rather than replacing.1050construction and150office employees not same as directDCjobs. Renewable/water/noincentive provisions are reported commitments, not actual measured performance or final later compliance. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/","host":"stlmag.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.636,"lng":-90.237,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"StLouis reported conditional-use approval and employment/forecast boundaries","fields":{"project":"Armory Innovation District","city":"StLouis, Missouri","reported_conditional_use_approval_date":"2026-04-21","reported_vote":"5-0","reported_data_center_power_mw":120,"power_basis":"reported project MW, not explicit critical IT","reported_combined_development_investment_usd_min_exclusive":3000000000,"proposed_full_operation_deadline":"2028-12-31","reported_20year_job_obligation_schedule":[{"year":1,"jobs":25},{"year":2,"jobs":50},{"year":3,"jobs":100,"continues_through_year":20}],"reported_city10year_tax_fee_forecast_usd":432000000},"notes":["Conditional-use approval attributed to reporting, actual permit/recordedCBA and later appeals not inspected.3Bcombineddata+Armoryoffices not all actual DCspend.100jobscondition afteryear2 conflicts with separate50permanentDCforecast; retain scopes rather than replacing.1050construction and150office employees not same as directDCjobs. Renewable/water/noincentive provisions are reported commitments, not actual measured performance or final later compliance.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/","host":"stlmag.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · St. Louis · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"aws-green-new-florence-mo","state":"MO","kind":"facility","name":"AWS Project Green Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"New Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Tax projections are scenarios, not receipts; announced county/community payments are not verified disbursement. Do not add 25-year minimum and maximum cases. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://themissouritimes.com/aws-new-facilities-near-new-florence-will-double-tax-revenue-for-montgomery-county/","host":"themissouritimes.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.852,"lng":-91.52,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Missouri Times describes Project Green minimum and maximum tax projections and different treatment of real and personal property.","independently_verified_current_operating_status":null},"notes":["Tax projections are scenarios, not receipts; announced county/community payments are not verified disbursement. Do not add 25-year minimum and maximum cases.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://themissouritimes.com/aws-new-facilities-near-new-florence-will-double-tax-revenue-for-montgomery-county/","host":"themissouritimes.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · New Florence · Montgomery · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"crusoe-callaway-county-kingdom-city-mo","state":"MO","kind":"facility","name":"Crusoe Callaway County Data Center (proposed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Callaway"],"city":"Kingdom City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Exact site undisclosed. Private land transaction and absence of county zoning do not eliminate other permits. Warrenton/Montgomery Google/AWS and their incentives are separate. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html","host":"komu.com","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.9427219,"lng":-91.9417153,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"KOMU describes Callaway County Crusoe open house, with no construction or county contract at report date.","independently_verified_current_operating_status":null},"notes":["Exact site undisclosed. Private land transaction and absence of county zoning do not eliminate other permits. Warrenton/Montgomery Google/AWS and their incentives are separate.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html","host":"komu.com","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Kingdom City · Callaway · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"crusoe-warrenton-mo","state":"MO","kind":"facility","name":"Crusoe Warrenton Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"Warrenton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. WarrenCountyRecord January15,2026 reports Crusoe Warrenton Planning&Zoning January8 CUP/site-plan vote8 to 2, with tree/lighting conditions and BoardofAldermen review scheduledJanuary20. Not all permits, final board action or current operating certification. Two805000sfhalls plus40000sfadmin,337cityacres and243countybuffer are proposed distinct components, not three campuses. Developer120000galannualcooling and6200gpdALLUSES are different projected water scopes, not measured consumption/zero-water. Building1Q32027operations andBuilding2Q22029 are targets, not observed completion.2000 to 2400construction/100permanent jobs and70 to 80Mannualtax are estimates. Suggested no-abatement guarantees were debated, not adopted in the reported P&Zconditions. Utility representatives described upfront/minimum-use/termination obligations; executed agreements and actual payments not read. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.warrencountyrecord.com/stories/warrenton-planning-and-zoning-approves-data-center-site-plan-conditional-use,180583","host":"warrencountyrecord.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.8125,"lng":-91.1432,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-operator-transaction-and-local-outcomes-round61-2026-10-15.json","scope":"Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.","fields":{},"notes":["WarrenCountyRecord January15,2026 reports Crusoe Warrenton Planning&Zoning January8 CUP/site-plan vote8 to 2, with tree/lighting conditions and BoardofAldermen review scheduledJanuary20. Not all permits, final board action or current operating certification. Two805000sfhalls plus40000sfadmin,337cityacres and243countybuffer are proposed distinct components, not three campuses.","Developer120000galannualcooling and6200gpdALLUSES are different projected water scopes, not measured consumption/zero-water. Building1Q32027operations andBuilding2Q22029 are targets, not observed completion.2000 to 2400construction/100permanent jobs and70 to 80Mannualtax are estimates. Suggested no-abatement guarantees were debated, not adopted in the reported P&Zconditions. Utility representatives described upfront/minimum-use/termination obligations; executed agreements and actual payments not read.","Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."],"sources":[{"url":"https://www.warrencountyrecord.com/stories/warrenton-planning-and-zoning-approves-data-center-site-plan-conditional-use,180583","host":"warrencountyrecord.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Warrenton · Warren · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"diamond-farms-gateway-digital-villa-ridge-mo","state":"MO","kind":"facility","name":"Diamond Farms (Gateway Digital Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Villa Ridge","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Planningapprovalisrecommendation,notfinalrezoningorconstructionpermission. Developer 3000 totaljobs/2000 construction/250 permanent mixscopesanddonotreconcile; no 3,000 permanentjobsoradditive 5,250 total. Waterless-than 54 homes isanonquantifiedforecast,notactualgallons. Infrastructure 100 percentpaymentpromise is not examinedbindingESA/tariff orguaranteedresidentbills. Genericbillions/tensofmillionsfromsimilarMissouriprojectsarenotsitecapex/taxagreement. NoMW/RFSorcurrentoperatingcertification. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://themissouritimes.com/franklin-county-planning-and-zoning-approves-diamond-farms-data-center-project/","host":"themissouritimes.com","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.484,"lng":-90.85,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"MissouriTimes reports FranklinPlanning/Zoning voted forward DiamondFarms/GatewayDigital nearGraySummit onover 600 acres,whileexplicitlystating finalcountycommissionapprovalstillrequired.","independently_verified_current_operating_status":null},"notes":["Planningapprovalisrecommendation,notfinalrezoningorconstructionpermission. Developer 3000 totaljobs/2000 construction/250 permanent mixscopesanddonotreconcile; no 3,000 permanentjobsoradditive 5,250 total. Waterless-than 54 homes isanonquantifiedforecast,notactualgallons. Infrastructure 100 percentpaymentpromise is not examinedbindingESA/tariff orguaranteedresidentbills. Genericbillions/tensofmillionsfromsimilarMissouriprojectsarenotsitecapex/taxagreement. NoMW/RFSorcurrentoperatingcertification.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://themissouritimes.com/franklin-county-planning-and-zoning-approves-diamond-farms-data-center-project/","host":"themissouritimes.com","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Villa Ridge · Franklin · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"edged-kansas-city-mo","state":"MO","kind":"facility","name":"Edged Kansas City","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historic opening verified; later additions and current measured load remain unchecked. State announcement says facility opened; ribbon cutting was December 11. Capacity describes critical capacity, not measured draw. Water savings are developer comparison estimates. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million","host":"ded.mo.gov","date":"2024-12-12","published":"2024-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.1675448,"lng":-94.4651703,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"event_status":"opened","event_date":"2024-12-11","power_mw":26,"power_basis":"critical capacity","investment_usd_min":143000000,"investment_basis":"initial facility economic investment","incentive":"Data Center Sales Tax Exemption Program; no award value supplied"},"notes":["Historic opening verified; later additions and current measured load remain unchecked.","State announcement says facility opened; ribbon cutting was December 11. Capacity describes critical capacity, not measured draw. Water savings are developer comparison estimates.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million","host":"ded.mo.gov","date":"2024-12-12","published":"2024-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Kansas City · Clay · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"crg-festus-data-center-mo","state":"MO","kind":"facility","name":"Festus Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Festus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.festusmo.gov/","host":"festusmo.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.2192,"lng":-90.399,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.festusmo.gov/","host":"festusmo.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Festus · Jefferson · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"foristell-i70-annexation-data-center-site-mo","state":"MO","kind":"facility","name":"Foristell I-70 Data Center Site (216-acre annexation)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"Foristell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. No formal data-center application or tenant is identified. Annexation is not project approval. The two areas are not one campus. Other Missouri developments are separate; later annexation action remains unobserved. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/products/two-data-centers-eye-land-near-st-charles-county-mo","host":"govtech.com","date":"2026-01-05","published":"2026-01-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.8150501,"lng":-90.955972,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Post-Dispatch reporting via GovTech describes two possible Foristell sites: one seeking annexation and another already within city limits.","independently_verified_current_operating_status":null},"notes":["No formal data-center application or tenant is identified. Annexation is not project approval. The two areas are not one campus. Other Missouri developments are separate; later annexation action remains unobserved.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/products/two-data-centers-eye-land-near-st-charles-county-mo","host":"govtech.com","date":"2026-01-05","published":"2026-01-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Foristell · Warren · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"next-revolution-emerson-campus-ferguson-mo","state":"MO","kind":"facility","name":"Former Emerson Campus Data Center (Next Revolution Technologies)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis"],"city":"Ferguson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Proposed 1.5-billion-USD tax benefits, up-to-22-billion-USD bond authority and neighborhood/environmental contributions are not approved benefits, capex or paid funds. Rejection of the earlier incentive bill is not necessarily denial of the underlying development. Closed-loop intent is not a numeric water cap; no later vote is assumed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stlpr.org/economy-business/2026-09-10/ferguson-tax-break-plan-data-center-emerson-redevelopment","host":"stlpr.org","date":"2026-09-10","published":"2026-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.744707,"lng":-90.3038975,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"St. Louis Public Radio reports a renewed Ferguson incentive proposal after a May three-three failure, with a future final vote still pending at publication.","independently_verified_current_operating_status":null},"notes":["Proposed 1.5-billion-USD tax benefits, up-to-22-billion-USD bond authority and neighborhood/environmental contributions are not approved benefits, capex or paid funds. Rejection of the earlier incentive bill is not necessarily denial of the underlying development. Closed-loop intent is not a numeric water cap; no later vote is assumed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stlpr.org/economy-business/2026-09-10/ferguson-tax-break-plan-data-center-emerson-redevelopment","host":"stlpr.org","date":"2026-09-10","published":"2026-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Ferguson · St. Louis · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"google-hunt-midwest-kc-northland-mo","state":"MO","kind":"facility","name":"Google Kansas City Data Center (Hunt Midwest Business Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The 400 MW statement concerns new-to-grid carbon-free electricity capacity associated with regional opportunity, not facility IT or utility service load. Excluded from site power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/kansas-city-missouri/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.17256,"lng":-94.46443,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"current_operator_location_listing":"Kansas City, Missouri"},"notes":["The 400 MW statement concerns new-to-grid carbon-free electricity capacity associated with regional opportunity, not facility IT or utility service load. Excluded from site power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/kansas-city-missouri/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Kansas City · Clay · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"google-project-mica-kc-northland-mo","state":"MO","kind":"facility","name":"Google Project Mica","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Bond authorization is not public debt, taxpayer cash or construction spending. The first-phase 18-month schedule and school/career contributions are forecasts. Exact jurisdiction and current commissioning remain unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kctv5.com/2025/07/29/10b-500-acre-tech-campus-gets-stamp-approval-near-smithville/","host":"kctv5.com","date":"2025-07-29","published":"2025-07-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3097,"lng":-94.5845,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KCTV5 reports Port KC authorization of up to 10 billion USD in taxable revenue bonds for Google's planned five-building Northland campus near Smithville, on roughly 500 acres acquired in 2024.","independently_verified_current_operating_status":null},"notes":["Bond authorization is not public debt, taxpayer cash or construction spending. The first-phase 18-month schedule and school/career contributions are forecasts. Exact jurisdiction and current commissioning remain unverified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kctv5.com/2025/07/29/10b-500-acre-tech-campus-gets-stamp-approval-near-smithville/","host":"kctv5.com","date":"2025-07-29","published":"2025-07-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Kansas City · Clay · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"google-spade-new-florence-mo","state":"MO","kind":"facility","name":"Google Project Spade Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"New Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","host":"governor.mo.gov","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.791,"lng":-91.508,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Montgomery","city":"New Florence","announced_planned_infrastructure_investment_usd":15000000000,"energy_impact_fund_usd":20000000,"additional_power_generation_support_mw_lower_bound":500},"notes":["State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","host":"governor.mo.gov","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · New Florence · Montgomery · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"hematite-bitcoin-mining-jefferson-county-mo","state":"MO","kind":"facility","name":"Hematite Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Jefferson"],"city":"Hematite","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Possible immediate startup is not observed commissioning. NYDIG and Global Connect Communications both appear but their relationship is explicitly unknown. Substation proximity is not a confirmed electrical allocation; current occupancy remains unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.myleaderpaper.com/business/bitcoin-mining-facility-to-possibly-open-in-hematite/article_b383ae61-29e9-42cd-b1e0-95f291992a93.html","host":"myleaderpaper.com","date":"2025-08-28","published":"2025-08-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.126,"lng":-90.508,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Leader reports building and stormwater permits for the Hematite cryptocurrency proposal, with occupancy still waiting on permanent access through neighboring National Guard property.","independently_verified_current_operating_status":null},"notes":["Possible immediate startup is not observed commissioning. NYDIG and Global Connect Communications both appear but their relationship is explicitly unknown. Substation proximity is not a confirmed electrical allocation; current occupancy remains unverified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.myleaderpaper.com/business/bitcoin-mining-facility-to-possibly-open-in-hematite/article_b383ae61-29e9-42cd-b1e0-95f291992a93.html","host":"myleaderpaper.com","date":"2025-08-28","published":"2025-08-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Hematite · Jefferson · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"geronimo-jasper-county-powered-data-park-mo","state":"MO","kind":"facility","name":"Jasper County Powered Data Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jasper"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. KOAM March20,2026, updatedApril23, reports Geronimo Power discussions with Sarcoxie-area residents about a possible Jasper County data park. CountyRoad20 is a potential location indicated by resident-obtained images. Company says no final decisions have been made. Community opposition is documented reporting, not a final permitting decision or signed moratorium. No exact parcel, developer land ownership, tenant, MW or operation date verified. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.koamnewsnow.com/news/top-stories/jasper-county-residents-voice-concerns-over-proposed-data-center-development/article_6faf3e40-f7dd-40d1-ad5e-215025dbd4b5.html","host":"koamnewsnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.1414461,"lng":-94.0616037,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["KOAM March20,2026, updatedApril23, reports Geronimo Power discussions with Sarcoxie-area residents about a possible Jasper County data park. CountyRoad20 is a potential location indicated by resident-obtained images. Company says no final decisions have been made. Community opposition is documented reporting, not a final permitting decision or signed moratorium. No exact parcel, developer land ownership, tenant, MW or operation date verified.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://www.koamnewsnow.com/news/top-stories/jasper-county-residents-voice-concerns-over-proposed-data-center-development/article_6faf3e40-f7dd-40d1-ad5e-215025dbd4b5.html","host":"koamnewsnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Jasper · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"lambda-kansas-city-mo","state":"MO","kind":"facility","name":"Lambda Kansas City AI Supercomputer","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Platte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city","host":"ded.mo.gov","date":"2025-10-28","published":"2025-10-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.33,"lng":-94.72,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_status":"planned conversion of unoccupied building","existing_building_year":2009,"initial_power_mw":24,"initial_power_basis":"capacity, not independently defined as gross or critical IT","future_power_mw_lower_bound":100,"launch_target":"early 2026","initial_phase_investment_usd_lower_bound":500000000,"state_program_as_reported":"Data Center Sales Tax Exemption Program"},"notes":["Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city","host":"ded.mo.gov","date":"2025-10-28","published":"2025-10-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Kansas City · Platte · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"lumon-solutions-marshfield-mo","state":"MO","kind":"facility","name":"Marshfield Data Center (Lumon Solutions)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Webster"],"city":"Marshfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County report identifies a project, but does not name Lumon in the reviewed text. Facility/developer crosswalk remains pending. No analogy from a different McDonald County facility is adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://webstercountymo.gov/commission-data-center-update-may-21/","host":"webstercountymo.gov","date":"2026-05-21","published":"2026-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.36,"lng":-92.905,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county_reported_status":"under construction","county":"Webster","site_description":"Rifle Range Road, northeast of Marshfield"},"notes":["County report identifies a project, but does not name Lumon in the reviewed text. Facility/developer crosswalk remains pending. No analogy from a different McDonald County facility is adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://webstercountymo.gov/commission-data-center-update-may-21/","host":"webstercountymo.gov","date":"2026-05-21","published":"2026-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Marshfield · Webster · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"beltline-meramec-valley-technology-park-pacific-mo","state":"MO","kind":"facility","name":"Meramec Valley Technology Park (Beltline Energy)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Caption notes application later moved to Franklin County. No final approval, measured sound, tax receipts or permanent jobs established. Diamond Farms is another proposal. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stlmag.com/business/pacific-data-center-beltline-energy-proposal/","host":"stlmag.com","date":"2026-01-28","published":"2026-01-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.4385316,"lng":-90.7501765,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"St Louis Magazine reports Beltline presentation for Pacific-area proposal, seeking annexation and wastewater partnership.","independently_verified_current_operating_status":null},"notes":["Caption notes application later moved to Franklin County. No final approval, measured sound, tax receipts or permanent jobs established. Diamond Farms is another proposal.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stlmag.com/business/pacific-data-center-beltline-energy-proposal/","host":"stlmag.com","date":"2026-01-28","published":"2026-01-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Franklin · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"meta-kansas-city-northland-mo","state":"MO","kind":"facility","name":"Meta Kansas City Northland","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Document concerns the Golden Plains Zone 3 preliminary plat, not a named Meta operating facility or its full campus. Do not infer end user, capacity or completion from a plat. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://clerk.kcmo.gov/LegislationDetail.aspx?ID=5140162&GUID=B4B56878-A985-43D7-A86E-1C499DF6EC99","host":"clerk.kcmo.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.247,"lng":-94.705,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"municipal_file":"210841","plat_scope_acres_approx":374.89,"plat_proposed_lots":2,"county_in_legal_description":"Platte"},"notes":["Document concerns the Golden Plains Zone 3 preliminary plat, not a named Meta operating facility or its full campus. Do not infer end user, capacity or completion from a plat.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://clerk.kcmo.gov/LegislationDetail.aspx?ID=5140162&GUID=B4B56878-A985-43D7-A86E-1C499DF6EC99","host":"clerk.kcmo.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Kansas City · Clay · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"metrobloks-liberty-mo","state":"MO","kind":"facility","name":"Metrobloks Liberty Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Liberty","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Metrobloks Liberty proposed three-building campus. Up-to1.4Bfutureinvestmentnotactual.150MWcampusnotperbuilding. Hundredsotherjobsincludeconstruction/security/maintenance,notsameas30directfulltime. No exactparcel,RFSdateorapprovedpermitsread. Linkedstateannouncementnotadditionalindependentsourceunlessread. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri","host":"metrobloks.com","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.2459,"lng":-94.4191,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Metrobloks Liberty proposed three-building campus","fields":{"developer":"Metrobloks","announcement_date":"2026-03-24","locality":"Liberty, Missouri","planned_investment_usd_max":1400000000,"planned_campus_power_mw":150,"power_basis":"power, not explicit critical IT","planned_campus_sqft_approx":568800,"planned_buildings":3,"expected_fulltime_jobs_min_inclusive":30},"notes":["Up-to1.4Bfutureinvestmentnotactual.150MWcampusnotperbuilding. Hundredsotherjobsincludeconstruction/security/maintenance,notsameas30directfulltime. No exactparcel,RFSdateorapprovedpermitsread. Linkedstateannouncementnotadditionalindependentsourceunlessread.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri","host":"metrobloks.com","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Liberty · Clay · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"nebius-independence-mo","state":"MO","kind":"facility","name":"Nebius AI Factory (Independence)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jackson"],"city":"Independence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.arconational.com/nebius-independence-mo/","host":"arconational.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.089,"lng":-94.342,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"ARCO's project page labels Nebius Independence under construction and describes a first 200 MW computing-capacity building of about 490,000 square feet within a planned 1.2 GW campus.","independently_verified_current_operating_status":null},"notes":["First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.arconational.com/nebius-independence-mo/","host":"arconational.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Independence · Jackson · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"patmos-kansas-city-mo","state":"MO","kind":"facility","name":"Patmos KC Star Building Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jackson"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/","host":"kctv5.com","date":"2026-01-12","published":"2026-01-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.0997,"lng":-94.5786,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KCTV5 reports Patmos bought the former KC Star building after occupying part of it and announced a 100-million-USD clean-energy loan for further improvements.","independently_verified_current_operating_status":null},"notes":["The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/","host":"kctv5.com","date":"2026-01-12","published":"2026-01-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Kansas City · Jackson · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"crg-project-cumulus-st-charles-mo","state":"MO","kind":"facility","name":"Project Cumulus (St. Charles)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Charles"],"city":"St. Charles","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Withdrawal is not an irrevocable permanent cancellation or proof a replacement was filed. Linked original company letter separately reviewed. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original publicly published company email, hosted by reporter.. Email asks for receipt; acknowledgement not included. No filed replacement or later outcome established. Do not label irrevocably cancelled.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stlpr.org/news-briefs/2025-08-18/developer-controversial-data-center-st-charles","host":"stlpr.org","date":"2025-08-18","published":"2025-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://npr.brightspotcdn.com/81/a0/8ba01da44bfd963fe7ef6281241f/crg-letter.pdf","host":"npr.brightspotcdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.783855,"lng":-90.481677,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"permit-application-withdrawn","reported_finding":"CRG withdrew Cumulus conditional-use-permit application before council vote and said it intended to revise outreach and proposal.","report_display_date":"2025-08-18","independently_verified_current_status":null},"notes":["Withdrawal is not an irrevocable permanent cancellation or proof a replacement was filed. Linked original company letter separately reviewed.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stlpr.org/news-briefs/2025-08-18/developer-controversial-data-center-st-charles","host":"stlpr.org","date":"2025-08-18","published":"2025-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Original publicly published company email, hosted by reporter.","fields":{"operator_email_sent":"2025-08-18T14:42:00","timezone_in_email":null,"application_withdrawal":"Conditional use permit consideration at August 19 council meeting","future_intent":"Revised proposal and outreach planned."},"notes":["Email asks for receipt; acknowledgement not included. No filed replacement or later outcome established. Do not label irrevocably cancelled.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://npr.brightspotcdn.com/81/a0/8ba01da44bfd963fe7ef6281241f/crg-letter.pdf","host":"npr.brightspotcdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · St. Charles · St. Charles · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"shenandoah-project-kestrel-kc-northland-mo","state":"MO","kind":"facility","name":"Project Kestrel","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Platte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Port KC Kestrel source arithmetic and project-identity limits. Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/","host":"portkc.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3470623,"lng":-94.7038818,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Port KC Kestrel source arithmetic and project-identity limits","fields":{"agency":"Port KC","project":"Project Kestrel","announcement_date":"2025-08-26","site":"KCI-29 industrial mega site, Kansas City, Missouri","planned_site_acres":379,"planned_hyperscale_buildings":6,"planned_full_buildout_sqft_max":1800000,"headline_projected_investment_usd":100000000000,"expected_jobs_per_phase_approx":50,"first_phase_construction_target_year":2026,"forecast_new_tax_revenue_over_bond_term_usd_min_exclusive":110000000,"stated_workforce_fee_usd_per_sqft":0.25,"stated_workforce_forecast_usd":15750000},"notes":["Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/","host":"portkc.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Kansas City · Platte · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"tierpoint-st-louis-locust-mo","state":"MO","kind":"facility","name":"TierPoint St. Louis - Locust","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis city"],"city":"Saint Louis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-locust/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.633535,"lng":-90.2126613,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":135840,"gross_area_is_lower_bound":true,"raised_floor_sqft":22640,"raised_floor_is_lower_bound":false,"raised_floor_basis":"phase 1","expansion_area_sqft":45000,"backup_generator_configuration_source_statement":"Four 2.0 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-locust/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Saint Louis · St. Louis city · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"tierpoint-st-louis-millpark-mo","state":"MO","kind":"facility","name":"TierPoint St. Louis - Millpark","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis"],"city":"Maryland Heights","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.6993591,"lng":-90.4114091,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":23000,"gross_area_is_lower_bound":true,"raised_floor_sqft":14400,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Maryland Heights · St. Louis · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"tierpoint-st-louis-olive-mo","state":"MO","kind":"facility","name":"TierPoint St. Louis - Olive","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis city"],"city":"Saint Louis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-olive/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.6297601,"lng":-90.1964208,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":124000,"gross_area_is_lower_bound":true,"raised_floor_sqft":11000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-olive/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Saint Louis · St. Louis city · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"white-cloud-acres-barnard-mo","state":"MO","kind":"facility","name":"White Cloud Acres","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nodaway"],"city":"Barnard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. White Cloud source-role correction and separate nearby power plant. Upstream countygovernment label incorrect: site describes movies, podcasts, photos, stories and maps. Secondary4B/600MW/200000gallons-day/noise analogies not primary technical record and not adopted as verified. Nearby440MWMullinCreek power plant separate project, not addable IT. Exact site, permit, hearing outcome and actual service remain unknown. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nodaway.org/6270/proposed-4-billion-white-cloud-acres-ai-data-center-in-rural-barnard/","host":"nodaway.org","date":"2026-04-29","published":"2026-04-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2528,"lng":-94.9436,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"White Cloud source-role correction and separate nearby power plant","fields":{"publisher_role":"personal/local blog nodaway.org, author roger","article_date":"2026-04-29","project_name":"White Cloud Acres","developer_as_reported":"Scale Microgrids","reported_location":"rural Barnard, Nodaway County, Missouri"},"notes":["Upstream countygovernment label incorrect: site describes movies, podcasts, photos, stories and maps. Secondary4B/600MW/200000gallons-day/noise analogies not primary technical record and not adopted as verified. Nearby440MWMullinCreek power plant separate project, not addable IT. Exact site, permit, hearing outcome and actual service remain unknown.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://nodaway.org/6270/proposed-4-billion-white-cloud-acres-ai-data-center-in-rural-barnard/","host":"nodaway.org","date":"2026-04-29","published":"2026-04-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Barnard · Nodaway · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"wildwood-ranch-joplin-mo","state":"MO","kind":"facility","name":"Wildwood Ranch Industrial Complex (potential data center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jasper"],"city":"Joplin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. City explicitly says construction still needs normal permits. Latest update says no construction applications and power feasibility study first; printed MondayMarch 6,2026 weekday/date is inconsistent, so preserve printed date as uncorrected source label and do not treat as freshOctoberstatus. Annexation/industrial zoning is not a DCbuilding permit, electricity-service contract or operation. DeveloperFAQlink is not itself verified impact evidence. No MW/capex/RFSadopted. Original page is primary municipal stage evidence, not a site inspection. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mo-joplin2.civicplus.com/1286/Wildwood-Ranch-Industrial-Complex","host":"mo-joplin2.civicplus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.0819886,"lng":-94.583417,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"CityofJoplin’s official page records Wildwood’sDecember 4,2025 application,January 12,2026 planning hearing andFebruary 17,2026 council approval of annexation/rezoning bills 2026-256 and 2026-257 for roughly 600.4 acres.","independently_verified_current_operating_status":null,"city_recorded_annexation_rezoning_approval":"2026-02-17","construction_permit_verified":false,"source_update_weekday_date_inconsistent":true},"notes":["City explicitly says construction still needs normal permits. Latest update says no construction applications and power feasibility study first; printed MondayMarch 6,2026 weekday/date is inconsistent, so preserve printed date as uncorrected source label and do not treat as freshOctoberstatus. Annexation/industrial zoning is not a DCbuilding permit, electricity-service contract or operation. DeveloperFAQlink is not itself verified impact evidence. No MW/capex/RFSadopted. Original page is primary municipal stage evidence, not a site inspection.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://mo-joplin2.civicplus.com/1286/Wildwood-Ranch-Industrial-Complex","host":"mo-joplin2.civicplus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Missouri · Joplin · Jasper · Source context reviewed","state_name":"Missouri","state_path":"/missouri/"},{"id":"atlas-power-butte-mt","state":"MT","kind":"facility","name":"Atlas Power Butte Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Silver Bow"],"city":"Butte","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Encoded premium body not decoded. Requested damages are not awarded damages, site capex, operating failure or current court result. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mtstandard.com/news/local/atlas-power-suing-equipment-supplier-for-over-11m/article_f9ab550f-1329-5f14-988a-067f974b46a8.html","host":"mtstandard.com","date":"2023-01-17","published":"2023-01-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.930855,"lng":-112.518238,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Readable Montana Standard preview reports Atlas Butte equipment-supplier suit filed December 27, 2022.","independently_verified_current_operating_status":null},"notes":["Encoded premium body not decoded. Requested damages are not awarded damages, site capex, operating failure or current court result.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://mtstandard.com/news/local/atlas-power-suing-equipment-supplier-for-over-11m/article_f9ab550f-1329-5f14-988a-067f974b46a8.html","host":"mtstandard.com","date":"2023-01-17","published":"2023-01-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Butte · Silver Bow · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"big-horn-data-hub-hardin-mt","state":"MT","kind":"facility","name":"Big Horn Data Hub (Hardin Generating Station)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Big Horn"],"city":"Hardin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Attachment title alone is insufficient to verify exactsite, operator, land, status, MWorwater. No manual exact-site credit or operating certification. Parent article is a separate public follow-up lead; listedfutureMEICevents are not data center project milestones. No inference from sitecopyright, social links or image label. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical named-site context only; photo date and current operating status unknown.. NorthWestern400MWportfolio offer,750average-MW/year wording andHB424proposed85percentHardinGENERATIONtaxcut are not BigHorncriticalIT or an awarded data-center subsidy. Legislative and ratepayer allegations are not court or tariff findings.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://meic.org/is-northwestern-hoodwinking-customers-as-it-lures-data-centers-into-the-state/big-horn-data-hardin/","host":"meic.org","date":"2025-04-14","published":"2025-04-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://meic.org/is-northwestern-hoodwinking-customers-as-it-lures-data-centers-into-the-state/","host":"meic.org","date":"2025-03-30","published":"2025-03-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.765054,"lng":-107.598778,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{},"notes":["Attachment title alone is insufficient to verify exactsite, operator, land, status, MWorwater. No manual exact-site credit or operating certification. Parent article is a separate public follow-up lead; listedfutureMEICevents are not data center project milestones. No inference from sitecopyright, social links or image label.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://meic.org/is-northwestern-hoodwinking-customers-as-it-lures-data-centers-into-the-state/big-horn-data-hardin/","host":"meic.org","date":"2025-04-14","published":"2025-04-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Historical named-site context only; photo date and current operating status unknown.","fields":{"historical_caption_context":"MEIC parent article dated March30,2025 describes Big Horn Data Hub as crypto mining relying on adjacent Hardin coal generation","independently_verified_current_operating_status":null},"notes":["NorthWestern400MWportfolio offer,750average-MW/year wording andHB424proposed85percentHardinGENERATIONtaxcut are not BigHorncriticalIT or an awarded data-center subsidy. Legislative and ratepayer allegations are not court or tariff findings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://meic.org/is-northwestern-hoodwinking-customers-as-it-lures-data-centers-into-the-state/","host":"meic.org","date":"2025-03-30","published":"2025-03-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Hardin · Big Horn · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"quantica-bsdi-billings-mt","state":"MT","kind":"facility","name":"Big Sky Digital Infrastructure Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Yellowstone"],"city":"Billings","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Quantica undisclosed laborMOU and divergent power horizons. MOU text not supplied to reporter, no guaranteedjobcount/unionfraction adopted. Laborframework not signed constructionpermit, interconnection or financingclose.1.1GWnearand7GWpossiblelongterm not8.1GWcurrent. ExactBillingsmunicipal/parcelmatchnotproven; report locates outsideBroadview30milesnorth. Publicenvironmentalconcerns not actualharmfindings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://montanafreepress.org/2026/06/17/agreement-between-data-center-developer-and-union-federation-thin-on-details/","host":"montanafreepress.org","date":"2026-06-17","published":"2026-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.823,"lng":-108.7,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Quantica undisclosed laborMOU and divergent power horizons","fields":{"developer":"Quantica Infrastructure","project":"BigSkyCampus nearBroadview, Montana","reported_planned_site_acres_approx":5000,"reported_buildings_range":[12,16],"reported_each_building_sqft_range":[200000,300000],"near_term_expected_power_mw":1100,"longterm_possible_power_mw":7000,"power_basis":"developer expected/potential power, not explicit critical IT or energized","reported_agreement_type":"MOUwithSoutheasternMontanaBuildingandConstructionTradesCouncil","source_update_date":"2026-06-18"},"notes":["MOU text not supplied to reporter, no guaranteedjobcount/unionfraction adopted. Laborframework not signed constructionpermit, interconnection or financingclose.1.1GWnearand7GWpossiblelongterm not8.1GWcurrent. ExactBillingsmunicipal/parcelmatchnotproven; report locates outsideBroadview30milesnorth. Publicenvironmentalconcerns not actualharmfindings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://montanafreepress.org/2026/06/17/agreement-between-data-center-developer-and-union-federation-thin-on-details/","host":"montanafreepress.org","date":"2026-06-17","published":"2026-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Billings · Yellowstone · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"bitzero-polson-lake-county-mt","state":"MT","kind":"facility","name":"Bitzero Polson Data Center (SKQ/Salish-Kootenai Dam)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Lake"],"city":"Polson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Planned fifty MW mine is distinct from dam generation and North Dakota investment. No commissioning, secured allocation, current renewable delivery or later cancellation established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tradeandindustrydev.com/region/montana/news/mt-bitcoin-mining-company-announces-plans-50-30698","host":"tradeandindustrydev.com","date":"2022-08-08","published":"2022-08-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.69,"lng":-114.12639,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Trade and Industry Development reports Bitzero Polson proposal announced with tribal/state officials.","independently_verified_current_operating_status":null},"notes":["Planned fifty MW mine is distinct from dam generation and North Dakota investment. No commissioning, secured allocation, current renewable delivery or later cancellation established.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tradeandindustrydev.com/region/montana/news/mt-bitcoin-mining-company-announces-plans-50-30698","host":"tradeandindustrydev.com","date":"2022-08-08","published":"2022-08-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Polson · Lake · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"cogent-billings-data-center-billings-mt","state":"MT","kind":"facility","name":"Cogent Billings Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Yellowstone"],"city":"Billings","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Three unlabelled area blocks need brochure mapping; no numerical IT load published. Operator regional page explicitly names Billings and separately Missoulaedge. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cogentco.com/en/cogent-great-plains","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.740895,"lng":-108.591913,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"3025 Hesper Road","city":"Billings","marketed_service":"data center"},"notes":["Three unlabelled area blocks need brochure mapping; no numerical IT load published.","Operator regional page explicitly names Billings and separately Missoulaedge.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cogentco.com/en/cogent-great-plains","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Billings · Yellowstone · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"krambu-bonner-mill-data-center-bonner-mt","state":"MT","kind":"facility","name":"Krambu Bonner Data Center (former UFP Edge building, Bonner Mill Industrial Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Missoula"],"city":"Bonner","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bonner divergent scale claims and conditional opening forecast. Juneopening conditional forecast, not observed outcome.1/3/10/100MWdifferent statements not additive or canonicalcurrentload.240Kwholeoldbuilding not occupiedwhitefloor.500gallonsperMWhas no explicit recurringtimebasis; do not labelgallonsperday. Closedloopnotzerowater/noisefinding. EarlierHyperblockoperation separateoperator and historicalbankruptcy notKrambuclosure. No actual issuedpermit or clientlease. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://missoulacurrent.com/krambu-data-center/","host":"missoulacurrent.com","date":"2026-03-23","published":"2026-03-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":46.8709014,"lng":-113.872499,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Bonner divergent scale claims and conditional opening forecast","fields":{"company":"Krambu","site":"former BonnerMill planerbuilding, Bonner, MissoulaCounty, Montana","reported_existing_industrial_building_sqft_approx":240000,"stage_asofreport":"due diligence, no final countyapplication or client confirmed","developer_initial_phase_possible_mw":1,"engineer_described_initial_request_mw":3,"planner_described_preliminary_application_mw":10,"developer_longterm_vision_mw":100,"power_basis":"conflicting proposal/request horizons, none established criticalIT or operating","suggested_initial_operation_target_month":"2026-06","reported_review_meeting_date":"2026-05-06"},"notes":["Juneopening conditional forecast, not observed outcome.1/3/10/100MWdifferent statements not additive or canonicalcurrentload.240Kwholeoldbuilding not occupiedwhitefloor.500gallonsperMWhas no explicit recurringtimebasis; do not labelgallonsperday. Closedloopnotzerowater/noisefinding. EarlierHyperblockoperation separateoperator and historicalbankruptcy notKrambuclosure. No actual issuedpermit or clientlease.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://missoulacurrent.com/krambu-data-center/","host":"missoulacurrent.com","date":"2026-03-23","published":"2026-03-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Bonner · Missoula · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"nydig-dfm-kraken-richland-mt","state":"MT","kind":"facility","name":"NYDIG DFM Kraken Central Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Richland"],"city":"Sidney vicinity (unincorporated)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. final Montana air permit identity, point and equipment scope. Final effective air permit is established, but engine horsepower is not critical IT MW and does not prove current workload or site opening. VOC limit change is a permitted standard, not a measured emissions exceedance. New York mailing office is not the Montana facility. Source prints both minus sign and W for longitude; retained ordinary western signed coordinate without a second inversion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf","host":"deq.mt.gov","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.873,"lng":-103.924,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"final Montana air permit identity, point and equipment scope","fields":{"permittee":"NYDIG DFM LLC","site_name":"Kraken Central Site","air_permit":"MAQP 5262-05","permit_final_effective_date":"2025-11-15","agency_posting_date":"2025-11-17","published_location":"Section 8, Township 25 North, Range 59 East, approximately 15.2 miles northeast of Sidney, Richland County, Montana","agency_published_point":{"latitude":47.934,"longitude":-104.137,"geo_precision":"agency site reference point, not independently parcel geocoded"},"permitted_rich_burn_natural_gas_engines_max":7,"permitted_engine_brake_horsepower_each_max":2500},"notes":["Final effective air permit is established, but engine horsepower is not critical IT MW and does not prove current workload or site opening. VOC limit change is a permitted standard, not a measured emissions exceedance. New York mailing office is not the Montana facility. Source prints both minus sign and W for longitude; retained ordinary western signed coordinate without a second inversion.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf","host":"deq.mt.gov","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Sidney vicinity (unincorporated) · Richland · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"parsec-data-management-billings-mt","state":"MT","kind":"facility","name":"Parsec Data Management Billings","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Yellowstone"],"city":"Billings","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Parsec Billings published operator address. Footeraddressoperatorpublishednotindependentwholebuildingparcelownership. Tier3marketingclaimnotindependentcertificate. BusinessofficeMonFri8to5notdata-centeroperatinghoursoruptime. No numericITMWoropeningday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.parsecdata.com/","host":"parsecdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.742945,"lng":-108.602984,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Parsec Billings published operator address","fields":{"operator":"Parsec Data Management","published_address":"3470 Gabel Road, Billings, Montana59102","advertised_services":["colocation","hosting","cloud","disaster recovery"]},"notes":["Footeraddressoperatorpublishednotindependentwholebuildingparcelownership. Tier3marketingclaimnotindependentcertificate. BusinessofficeMonFri8to5notdata-centeroperatinghoursoruptime. No numericITMWoropeningday.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.parsecdata.com/","host":"parsecdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Billings · Yellowstone · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"tac-project-cardinal-great-falls-mt","state":"MT","kind":"facility","name":"Project Cardinal (TAC Data Centers Great Falls Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cascade"],"city":"Great Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JennRowell TheElectric November18,2025 originalGFDAinterview reports ArdentTACProjectCardinalGreatFallsOFF andlandoptionreleased becausepowertimingdidnotwork. NotProjectFalconmanufacturing orAdmiralBeverageconstruction.1-1.5B/2M sf/569acres/150-200opsjobspastfailedproposalnotactualspend/operations. 500-600MW CRITICAL LOAD requested is explicitlycriticalbasis but POWERNOTSECURED; no energization. TransmissionSTUDYqueue notapprovedinterconnection. Late2027/early2028firstphase/2030fulltargets obsoleteforwithdrawnsite, notlatestfuturecalendar. No originaloptionterminationdocumentorlaterrevivalinspected. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theelectricgf.com/2025/11/18/proposed-data-center-project-off/","host":"theelectricgf.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.5048851,"lng":-111.29189,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["JennRowell TheElectric November18,2025 originalGFDAinterview reports ArdentTACProjectCardinalGreatFallsOFF andlandoptionreleased becausepowertimingdidnotwork. NotProjectFalconmanufacturing orAdmiralBeverageconstruction.1-1.5B/2M sf/569acres/150-200opsjobspastfailedproposalnotactualspend/operations.","500-600MW CRITICAL LOAD requested is explicitlycriticalbasis but POWERNOTSECURED; no energization. TransmissionSTUDYqueue notapprovedinterconnection. Late2027/early2028firstphase/2030fulltargets obsoleteforwithdrawnsite, notlatestfuturecalendar. No originaloptionterminationdocumentorlaterrevivalinspected.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://theelectricgf.com/2025/11/18/proposed-data-center-project-off/","host":"theelectricgf.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Great Falls · Cascade · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"sabey-butte-mt","state":"MT","kind":"facility","name":"Sabey Data Centers Butte Campus (Montana Connections)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Silver Bow"],"city":"Butte","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Automatic excerpt selected unrelated infrastructure article; actual mainstory read in retained body. Headline acquires conflicts with body sale-not-closed: do not mark completed purchase. LOI/optional futurepower not ESA/deliveredIT or300MWsum. Possible second Montana facility is unnamed/unconfirmed, not duplicateoperatingcampus or confirmed governmentcontract. Deadline elapsed does not establish closing, cancellation or extension.35percentutilityhydroportfolio not campus hourlyrenewable share; landprice not buildoutcapex. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bebeez.eu/2025/10/20/sabey-dc-acquires-land-for-data-center-in-butte-montana/","host":"bebeez.eu","date":"2025-10-20","published":"2025-10-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.9965283,"lng":-112.6981966,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"BeBeez syndicatedDCD main story reports Sabey proposed600acre Butte MontanaConnections acquisition for estimatedUSD1.2million, with council extending unclosed sale deadline fromOctober15toFebruary11,2026. Northwestern nonbindingLOI reportedly50MWstarting2027, optional250plusMWby2029.","independently_verified_current_operating_status":null,"land_closing_verified":false,"reported_nonbinding_loi_mw":50,"optional_future_total_mw_lower_bound":250,"critical_it_mw":null},"notes":["Automatic excerpt selected unrelated infrastructure article; actual mainstory read in retained body. Headline acquires conflicts with body sale-not-closed: do not mark completed purchase. LOI/optional futurepower not ESA/deliveredIT or300MWsum. Possible second Montana facility is unnamed/unconfirmed, not duplicateoperatingcampus or confirmed governmentcontract. Deadline elapsed does not establish closing, cancellation or extension.35percentutilityhydroportfolio not campus hourlyrenewable share; landprice not buildoutcapex.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bebeez.eu/2025/10/20/sabey-dc-acquires-land-for-data-center-in-butte-montana/","host":"bebeez.eu","date":"2025-10-20","published":"2025-10-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Butte · Silver Bow · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"vision-net-billings-central-ave-billings-mt","state":"MT","kind":"facility","name":"Vision Net Billings 2 (1030 Central Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Yellowstone"],"city":"Billings","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant retrospective ribbon-cutting section in company events archive.. Company says it held a September 9 ribbon cutting after acquiring a data center, with manager Shawn Helmbrecht providing tours. Read in conjunction with the separately dated September 7, 2022 invitation identifying 1030 Central Avenue. Same publisher, not two independent confirmations. Only targeted event section and neighboring headings reviewed, not all event articles, conference speeches, images or videos. Other statewide AI-ready fiber-network launches are not new data-center opening events. Limited context; company office, renovation, acquisition, offering and physical operation are different facts. September 7, 2022 operator invitation and facility description.. Specifies September 9 open house 11:00 to 13:00 at 1030 Central Avenue, Billings, and says facility was acquired with iConnect Montana. Invitation is future-tense at publication; company retrospective separately reports an event held. 24000 square feet is operator-reported facility figure in 2022, not verified current occupied white space. 200-plus pounds/square-foot floor loading is a structural load rating, not watts per square foot or MW. SOC1 Type2 and PCI DSS SAQ language is company compliance wording; no current auditor report or Uptime Tier award inspected. Acquisition celebration is not proof this was first construction, first energization or a newly operating Montana building in 2022. No purchase price or closing deed inspected.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vision.net/category/events/","host":"vision.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://vision.net/vision-net-opens-the-doors-on-its-newest-data-center/","host":"vision.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.76973999352,"lng":-108.542169482237,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-renovation-acquisition-and-office-role-review-round91-2026-10-15.json","scope":"Relevant retrospective ribbon-cutting section in company events archive.","fields":{},"notes":["Company says it held a September 9 ribbon cutting after acquiring a data center, with manager Shawn Helmbrecht providing tours. Read in conjunction with the separately dated September 7, 2022 invitation identifying 1030 Central Avenue. Same publisher, not two independent confirmations.","Only targeted event section and neighboring headings reviewed, not all event articles, conference speeches, images or videos. Other statewide AI-ready fiber-network launches are not new data-center opening events.","Limited context; company office, renovation, acquisition, offering and physical operation are different facts."],"sources":[{"url":"https://vision.net/category/events/","host":"vision.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-renovation-acquisition-and-office-role-review-round91-2026-10-15.json","scope":"September 7, 2022 operator invitation and facility description.","fields":{},"notes":["Specifies September 9 open house 11:00 to 13:00 at 1030 Central Avenue, Billings, and says facility was acquired with iConnect Montana. Invitation is future-tense at publication; company retrospective separately reports an event held.","24000 square feet is operator-reported facility figure in 2022, not verified current occupied white space. 200-plus pounds/square-foot floor loading is a structural load rating, not watts per square foot or MW.","SOC1 Type2 and PCI DSS SAQ language is company compliance wording; no current auditor report or Uptime Tier award inspected. Acquisition celebration is not proof this was first construction, first energization or a newly operating Montana building in 2022. No purchase price or closing deed inspected.","Limited context; company office, renovation, acquisition, offering and physical operation are different facts."],"sources":[{"url":"https://vision.net/vision-net-opens-the-doors-on-its-newest-data-center/","host":"vision.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montana · Billings · Yellowstone · Source context reviewed","state_name":"Montana","state_path":"/montana/"},{"id":"1623-farnam-omaha-ne","state":"NE","kind":"facility","name":"1623 Farnam","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Omaha","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. OMA2futureexpansion not separately operating. This page supplies noadoptedcampusMWorarea. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.1623farnam.com/omaha-edge-data-center/","host":"1623farnam.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.2578,"lng":-95.9375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"1623 Farnam Street, Suite860, Omaha, NE68102","planned_expansion_name":"OMA2","existing_use_operator_statement":"flagship interconnection carrier hotel"},"notes":["OMA2futureexpansion not separately operating. This page supplies noadoptedcampusMWorarea.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.1623farnam.com/omaha-edge-data-center/","host":"1623farnam.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Omaha · Douglas · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"archgreen-doniphan-hall-ne","state":"NE","kind":"facility","name":"ArchGreen Doniphan Data Center (proposed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hall"],"city":"Doniphan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Doniphan denial must not be replaced by operating status of a different ArchGreen location. Later applications and rulings remain unobserved. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.centralnebraskatoday.com/2026/06/26/data-center-nearing-completion-in-east-grand-island/","host":"centralnebraskatoday.com","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.772,"lng":-98.3709,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported October 2023 denial of ArchGreen Doniphan permit at 2502 E Giltner Road, separate from northwest Grand Island site.","independently_verified_current_operating_status":null},"notes":["Doniphan denial must not be replaced by operating status of a different ArchGreen location. Later applications and rulings remain unobserved.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.centralnebraskatoday.com/2026/06/26/data-center-nearing-completion-in-east-grand-island/","host":"centralnebraskatoday.com","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Doniphan · Hall · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"archgreen-grand-island-hall-ne","state":"NE","kind":"facility","name":"ArchGreen Grand Island Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hall"],"city":"Grand Island","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Same page says development completed and currently under construction. Actual commissioning and exact build completion remain null. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.arch-green.com/project-1-3","host":"arch-green.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.9423,"lng":-98.4551,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"ArchGreen operator page names modular crypto development west of Grand Island in Hall County.","independently_verified_current_operating_status":null},"notes":["Same page says development completed and currently under construction. Actual commissioning and exact build completion remain null.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.arch-green.com/project-1-3","host":"arch-green.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Grand Island · Hall · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"basic-mining-superior-nuckolls-ne","state":"NE","kind":"facility","name":"Basic Mining Superior Hosting Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Nuckolls"],"city":"Superior","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Hosting customer fleet/hashrate is not entire building capacity or host ownership. Historical customer power tariff is not current public colocation offer; no investment recommendation adopted. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.share-talk.com/vinanz-limited-bitcoin-mining-fleet-increases-by-50-in-nebraska/","host":"share-talk.com","date":"2024-08-14","published":"2024-08-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.020847,"lng":-98.070044,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Vinanz issued announcement reproduced by Share Talk describes hosted mining equipment at Basic Mining in Superior, Nebraska.","independently_verified_current_operating_status":null},"notes":["Hosting customer fleet/hashrate is not entire building capacity or host ownership. Historical customer power tariff is not current public colocation offer; no investment recommendation adopted.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.share-talk.com/vinanz-limited-bitcoin-mining-fleet-increases-by-50-in-nebraska/","host":"share-talk.com","date":"2024-08-14","published":"2024-08-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Superior · Nuckolls · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"bginusa-york-ne","state":"NE","kind":"facility","name":"BginUSA York Data Mining Complex","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["York"],"city":"York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Historical transactions do not establish present operator or operation. Kearney numerical metrics are another site. Jigowatt/Stanton is not named in the reviewed article. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://flatwaterfreepress.org/crypto-needs-cheap-energy-it-found-a-whole-bunch-in-nebraska/","host":"flatwaterfreepress.org","date":"2023-01-25","published":"2023-01-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.885,"lng":-97.593,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Flatwater Free Press names BginUSA York land sale and pending transfer of Minden project to Foundry.","independently_verified_current_operating_status":null},"notes":["Historical transactions do not establish present operator or operation. Kearney numerical metrics are another site. Jigowatt/Stanton is not named in the reviewed article.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://flatwaterfreepress.org/crypto-needs-cheap-energy-it-found-a-whole-bunch-in-nebraska/","host":"flatwaterfreepress.org","date":"2023-01-25","published":"2023-01-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · York · York · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"binary-net-vault-lincoln-ne","state":"NE","kind":"facility","name":"Binary Net The Vault Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lancaster"],"city":"Lincoln","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Vault-specific address/status and exact acquisition date not established by this page. Operator confirms Lincoln data-center services under LincolnDataCenters acquisition; selected document is not a site-specific Vault specification. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.binary.net/lincolndatacenters/","host":"binary.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.81209,"lng":-96.70226,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Lincoln","marketed_service":"colocation"},"notes":["Vault-specific address/status and exact acquisition date not established by this page.","Operator confirms Lincoln data-center services under LincolnDataCenters acquisition; selected document is not a site-specific Vault specification.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.binary.net/lincolndatacenters/","host":"binary.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Lincoln · Lancaster · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"clop-omaha-papillion-ne","state":"NE","kind":"facility","name":"CLOP Omaha NE Data Center (5 MW)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sarpy"],"city":"Papillion","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical state air-construction permit notice. Proposed construction permit notice, not issued permit or operating proof in2026. Seven engines not seven new data centers. No current consumed MW or investment adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dwee.nebraska.gov/node/5401","host":"dwee.nebraska.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1783633,"lng":-96.1621103,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical state air-construction permit notice","fields":{"proposed_power_mw":5,"power_basis":"data center power, not explicitly IT","published_address":"11684 S158th Street, Papillion, Sarpy County, Nebraska68138","air_facility_id":"122487","proposed_emergency_diesel_generators":7,"historical_comment_start":"2025-10-06","historical_comment_end":"2025-11-07"},"notes":["Proposed construction permit notice, not issued permit or operating proof in2026. Seven engines not seven new data centers. No current consumed MW or investment adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dwee.nebraska.gov/node/5401","host":"dwee.nebraska.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Papillion · Sarpy · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"crusoe-monolith-hallam-lancaster-ne","state":"NE","kind":"facility","name":"Crusoe Hallam Data Center (Monolith Olive Creek campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lancaster"],"city":"Hallam","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No construction date released. Original approval conditions and power basis not reviewed; public reaction is not unanimous support. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wowt.com/2026/10/06/hallam-village-board-approves-zoning-rights-data-center/","host":"wowt.com","date":"2026-10-05","published":"2026-10-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.5485515,"lng":-96.782795,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"KOLN report carried by WOWT says Hallam board approved zoning rights Monday following July special-permit step with Monolith.","independently_verified_current_operating_status":null},"notes":["No construction date released. Original approval conditions and power basis not reviewed; public reaction is not unanimous support.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wowt.com/2026/10/06/hallam-village-board-approves-zoning-rights-data-center/","host":"wowt.com","date":"2026-10-05","published":"2026-10-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Hallam · Lancaster · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"fortitude-aurora-ne","state":"NE","kind":"facility","name":"Fortitude Aurora Nebraska Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hamilton"],"city":"Aurora","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The article does not name Fortitude, so operator identity needs a crosswalk. Initial capacity lies inside a 15 MW target. The 2024 opening and future franchise-fee scenario do not establish current operation or paid tax benefits. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.auroranewsregister.com/news/data-center-be-built-mission-critical","host":"auroranewsregister.com","date":"2023-12-13","published":"2023-12-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.86472,"lng":-98.0075,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Aurora News-Register reports AAIM's land purchase and initial five-MW plan at the Mission Critical subdivision.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The article does not name Fortitude, so operator identity needs a crosswalk. Initial capacity lies inside a 15 MW target. The 2024 opening and future franchise-fee scenario do not establish current operation or paid tax benefits.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.auroranewsregister.com/news/data-center-be-built-mission-critical","host":"auroranewsregister.com","date":"2023-12-13","published":"2023-12-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Aurora · Hamilton · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"fortitude-grand-island-ne","state":"NE","kind":"facility","name":"Fortitude Grand Island Nebraska Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hall"],"city":"Grand Island","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. No observed opening or final current status inferred; original lease, rates and acoustic reports not retained. Company/utility water and noise claims are attributed. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.centralnebraskatoday.com/2026/06/26/data-center-nearing-completion-in-east-grand-island/","host":"centralnebraskatoday.com","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.92167,"lng":-98.35861,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported Fortitude nearing completion at 380 Museum Drive; July/August opening forecast.","independently_verified_current_operating_status":null},"notes":["No observed opening or final current status inferred; original lease, rates and acoustic reports not retained. Company/utility water and noise claims are attributed.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.centralnebraskatoday.com/2026/06/26/data-center-nearing-completion-in-east-grand-island/","host":"centralnebraskatoday.com","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Grand Island · Hall · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"fortitude-prosser-ne","state":"NE","kind":"facility","name":"Fortitude Prosser Nebraska Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Adams"],"city":"Prosser","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. WillVraspir HastingsTribune January4,2024 (updatedFeb27,2025) originalmeetingreport names A-NE/AAIM2.64acreProsser proposal near82nd/Overland/Hayland.6-1planningRECOMMENDATION withsiteplan/setbackconditions; countyboardJanuary16stillfuture. Notfinalpermit/2026Fortitudeownershipproofalone. 12.5MW SUBSTATION planned, notcertifiedIT. Noise measurements fromMexicoMISSOURI OTHERfacilitynotProsserreadings; reported55dB/hour/propertyrules not currentcompliancetest. Upfrontconnectioncostscreditedlater notblanketutilitygift. FortitudeissueracquisitionbelowprovideslaternamedProssercontext, no unverifieddeedlinkclaim. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified. FortitudeoriginalissuerBWmainbodyreadwithweb; ordinarylocalcapturetimeout, nohash/HTTPstatusinvented. AnnouncementURLAugust4,2026 versusissuerindexAugust8 listingdiscrepancyheld; preciseclosingdayunknown. IssuersaysProsser12.5MWrealpropertyassetacquisitionCOMPLETEDandgeneratingrevenueatclose, notnewgreenfieldconstruction. 6.25Mpurchaseprice versusapproximately4.7MNEWCASH aftercredits/deposits, not10.95Mtotalcapex.985khostingcredit/465500minerscreditcomponentsnotextraacquisitions.67kVsubstationnot67MW.12.5MWcontractedpowernotexplicitIT;60MWseven-siteportfolioINCLUDESsite.4.5c/kWhESTIMATEnot2026executedall-intariff. Mergerstillproposed, notcompletedHeartSciencesownership.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hastingstribune.com/news/adams-county-planning-and-zoning-commission-recommends-conditional-use-permit-for-countys-first-data-center/article_b39985d2-ab6e-11ee-9c27-832166c0311a.html","host":"hastingstribune.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.businesswire.com/news/home/20260804871523/en/Fortitude-Completes-Acquisition-of-12.5-MW-Prosser-Nebraska-Facility","host":"businesswire.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.6875,"lng":-98.57806,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["WillVraspir HastingsTribune January4,2024 (updatedFeb27,2025) originalmeetingreport names A-NE/AAIM2.64acreProsser proposal near82nd/Overland/Hayland.6-1planningRECOMMENDATION withsiteplan/setbackconditions; countyboardJanuary16stillfuture. Notfinalpermit/2026Fortitudeownershipproofalone.","12.5MW SUBSTATION planned, notcertifiedIT. Noise measurements fromMexicoMISSOURI OTHERfacilitynotProsserreadings; reported55dB/hour/propertyrules not currentcompliancetest. Upfrontconnectioncostscreditedlater notblanketutilitygift. FortitudeissueracquisitionbelowprovideslaternamedProssercontext, no unverifieddeedlinkclaim.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.hastingstribune.com/news/adams-county-planning-and-zoning-commission-recommends-conditional-use-permit-for-countys-first-data-center/article_b39985d2-ab6e-11ee-9c27-832166c0311a.html","host":"hastingstribune.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["FortitudeoriginalissuerBWmainbodyreadwithweb; ordinarylocalcapturetimeout, nohash/HTTPstatusinvented. AnnouncementURLAugust4,2026 versusissuerindexAugust8 listingdiscrepancyheld; preciseclosingdayunknown. IssuersaysProsser12.5MWrealpropertyassetacquisitionCOMPLETEDandgeneratingrevenueatclose, notnewgreenfieldconstruction.","6.25Mpurchaseprice versusapproximately4.7MNEWCASH aftercredits/deposits, not10.95Mtotalcapex.985khostingcredit/465500minerscreditcomponentsnotextraacquisitions.67kVsubstationnot67MW.12.5MWcontractedpowernotexplicitIT;60MWseven-siteportfolioINCLUDESsite.4.5c/kWhESTIMATEnot2026executedall-intariff. Mergerstillproposed, notcompletedHeartSciencesownership.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.businesswire.com/news/home/20260804871523/en/Fortitude-Completes-Acquisition-of-12.5-MW-Prosser-Nebraska-Facility","host":"businesswire.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Prosser · Adams · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"foundry-minden-ne","state":"NE","kind":"facility","name":"Foundry Digital Minden Site (former Compute North expansion)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Kearney"],"city":"Minden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Historical transactions do not establish present operator or operation. Kearney numerical metrics are another site. Jigowatt/Stanton is not named in the reviewed article. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://flatwaterfreepress.org/crypto-needs-cheap-energy-it-found-a-whole-bunch-in-nebraska/","host":"flatwaterfreepress.org","date":"2023-01-25","published":"2023-01-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.5033,"lng":-98.9484,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Flatwater Free Press names BginUSA York land sale and pending transfer of Minden project to Foundry.","independently_verified_current_operating_status":null},"notes":["Historical transactions do not establish present operator or operation. Kearney numerical metrics are another site. Jigowatt/Stanton is not named in the reviewed article.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://flatwaterfreepress.org/crypto-needs-cheap-energy-it-found-a-whole-bunch-in-nebraska/","host":"flatwaterfreepress.org","date":"2023-01-25","published":"2023-01-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Minden · Kearney · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"google-lincoln-ne","state":"NE","kind":"facility","name":"Google Lincoln Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lancaster"],"city":"Lincoln","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nebraska namedsite milestones and regionaltotal. CurrentprimarymilestoneexplicitlyLincolncomesonline2026, month/dayunknown.15Bregionalnotpercampus.1.2B2023jointgrowthnotadditive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original annual report visibly read; self-reported period, redactions and number definitions control.. The 2026 annual report contains 2025 resource/tax labels; do not relabel usage as 2026. Area is the reported total campus footprint in a gross-floor-area column, not verified white space or individual-building area. Efficiency, demand response and clean-energy discussion includes Google-wide/global figures; do not assign them to this campus. Design-life language is not an opening date or a scheduled closure. Nebraska Advantage sales/use exemptions utilized or expected are described; no ImagiNE payments received or expected is the report statement, not all tax benefits zero. Resource and tax values visibly redacted in the current public report. No underlying hidden text extracted. Not all-field or current operating-building certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/nebraska/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/AfCJDhMKiqvTaxJZjfRNNDI6NZNHB9INCqfl2wzh85kTJ5AE62%C3%81MxmFV9%C3%89EHOJJySbhd12bX5kAuxOTW2i6MdPg%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.8968,"lng":-96.6437,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Nebraska namedsite milestones and regionaltotal","fields":{"operator_reported_papillion_built_year":2019,"operator_reported_omaha_built_year":2022,"lincoln_development_announcement_year":2023,"operator_reported_lincoln_online_year":2026,"regional_investment_usd_min_exclusive":15000000000,"investment_scope":"Nebraska statewide"},"notes":["CurrentprimarymilestoneexplicitlyLincolncomesonline2026, month/dayunknown.15Bregionalnotpercampus.1.2B2023jointgrowthnotadditive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/nebraska/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"nebraska-annual-reports-visible-review-round51-2026-10-15.json","scope":"Original annual report visibly read; self-reported period, redactions and number definitions control.","fields":{},"notes":["The 2026 annual report contains 2025 resource/tax labels; do not relabel usage as 2026.","Area is the reported total campus footprint in a gross-floor-area column, not verified white space or individual-building area.","Efficiency, demand response and clean-energy discussion includes Google-wide/global figures; do not assign them to this campus.","Design-life language is not an opening date or a scheduled closure.","Nebraska Advantage sales/use exemptions utilized or expected are described; no ImagiNE payments received or expected is the report statement, not all tax benefits zero.","Resource and tax values visibly redacted in the current public report. No underlying hidden text extracted.","Not all-field or current operating-building certification."],"sources":[{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/AfCJDhMKiqvTaxJZjfRNNDI6NZNHB9INCqfl2wzh85kTJ5AE62%C3%81MxmFV9%C3%89EHOJJySbhd12bX5kAuxOTW2i6MdPg%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Lincoln · Lancaster · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"google-nebraska-ai-campus-proposed","state":"NE","kind":"facility","name":"Google Nebraska AI Campus (proposed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Otoe"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Land options are not completed purchases or operator commitments. Proposed gas generation is not critical IT. Carbon capture is prospective, and the historical bill stage does not establish current law. No exact site or current opening is confirmed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://grist.org/accountability/google-data-center-carbon-capture-nebraska/","host":"grist.org","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.474,"lng":-96.371,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Grist and Flatwater report Tenaska land options and documents suggesting a Nebraska Google gas-and-computing project, while Tallgrass denies partnership.","independently_verified_current_operating_status":null},"notes":["Land options are not completed purchases or operator commitments. Proposed gas generation is not critical IT. Carbon capture is prospective, and the historical bill stage does not establish current law. No exact site or current opening is confirmed.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://grist.org/accountability/google-data-center-carbon-capture-nebraska/","host":"grist.org","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Otoe · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"google-omaha-ne","state":"NE","kind":"facility","name":"Google Omaha Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Omaha","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Omaha named environmental permit revision. Draft air-permit revision notice, not final approval/installation or consumed fuel. Other hub/booster/CLCengines listed separately; do not sumengine countsinto buildingsor ITMW. Source does not independently establish Google subsidiary alias; retain applicant as published. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original annual report visibly read; self-reported period, redactions and number definitions control.. The 2026 annual report contains 2025 resource/tax labels; do not relabel usage as 2026. Area is the reported total campus footprint in a gross-floor-area column, not verified white space or individual-building area. Efficiency, demand response and clean-energy discussion includes Google-wide/global figures; do not assign them to this campus. Design-life language is not an opening date or a scheduled closure. Nebraska Advantage sales/use exemptions utilized or expected are described; no ImagiNE payments received or expected is the report statement, not all tax benefits zero. Resource and tax values visibly redacted in the current public report. No underlying hidden text extracted. Not all-field or current operating-building certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dwee.nebraska.gov/news-events/public-notices/westwood-solutions-llc-0","host":"dwee.nebraska.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/ARuMkgE1TvD7Umlj6wRARHuYJ40%C3%81%C3%890lDqLE4lryd4tuqzMUw7BJFzTpAydzwcQK6MmQc9GLu9GQlAFjgVozyT4g%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.334,"lng":-96.145,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Omaha named environmental permit revision","fields":{"air_permit_applicant":"Westwood Solutions LLC","air_facility_id":"117197","published_address":"8425 North114thStreet,Omaha,DouglasCounty,Nebraska68142","permit_revision_comment_start":"2026-07-23","permit_revision_comment_end":"2026-08-24","proposed_additional_type1_emergency_engines":72,"proposed_additional_type2_emergency_engines":4,"proposed_additional_cooling_towers":24,"proposed_annual_emergency_diesel_fuel_limit_gallons":1190000},"notes":["Draft air-permit revision notice, not final approval/installation or consumed fuel. Other hub/booster/CLCengines listed separately; do not sumengine countsinto buildingsor ITMW. Source does not independently establish Google subsidiary alias; retain applicant as published.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dwee.nebraska.gov/news-events/public-notices/westwood-solutions-llc-0","host":"dwee.nebraska.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"nebraska-annual-reports-visible-review-round51-2026-10-15.json","scope":"Original annual report visibly read; self-reported period, redactions and number definitions control.","fields":{},"notes":["The 2026 annual report contains 2025 resource/tax labels; do not relabel usage as 2026.","Area is the reported total campus footprint in a gross-floor-area column, not verified white space or individual-building area.","Efficiency, demand response and clean-energy discussion includes Google-wide/global figures; do not assign them to this campus.","Design-life language is not an opening date or a scheduled closure.","Nebraska Advantage sales/use exemptions utilized or expected are described; no ImagiNE payments received or expected is the report statement, not all tax benefits zero.","Resource and tax values visibly redacted in the current public report. No underlying hidden text extracted.","Not all-field or current operating-building certification."],"sources":[{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/ARuMkgE1TvD7Umlj6wRARHuYJ40%C3%81%C3%890lDqLE4lryd4tuqzMUw7BJFzTpAydzwcQK6MmQc9GLu9GQlAFjgVozyT4g%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Omaha · Douglas · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"google-papillion-ne","state":"NE","kind":"facility","name":"Google Papillion Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sarpy"],"city":"Papillion","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nebraska namedsite milestones and regionaltotal. CurrentprimarymilestoneexplicitlyLincolncomesonline2026, month/dayunknown.15Bregionalnotpercampus.1.2B2023jointgrowthnotadditive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original annual report visibly read; self-reported period, redactions and number definitions control.. The 2026 annual report contains 2025 resource/tax labels; do not relabel usage as 2026. Area is the reported total campus footprint in a gross-floor-area column, not verified white space or individual-building area. Efficiency, demand response and clean-energy discussion includes Google-wide/global figures; do not assign them to this campus. Design-life language is not an opening date or a scheduled closure. Nebraska Advantage sales/use exemptions utilized or expected are described; no ImagiNE payments received or expected is the report statement, not all tax benefits zero. Fireball additionally states no Nebraska Advantage rebates received to date; do not infer that statement for all reports. Resource and tax values visibly redacted in the current public report. No underlying hidden text extracted. Not all-field or current operating-building certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/nebraska/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/Aerrd1gj6liDUR%C3%81TTL9Uc3n82mcP0rlZ7xFegDul%C3%89UBjKadUONlF4aV%C3%895cr8WpV57TAEW0lDJpmfgfbZl2NKjV0%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.13257,"lng":-96.143728,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Nebraska namedsite milestones and regionaltotal","fields":{"operator_reported_papillion_built_year":2019,"operator_reported_omaha_built_year":2022,"lincoln_development_announcement_year":2023,"operator_reported_lincoln_online_year":2026,"regional_investment_usd_min_exclusive":15000000000,"investment_scope":"Nebraska statewide"},"notes":["CurrentprimarymilestoneexplicitlyLincolncomesonline2026, month/dayunknown.15Bregionalnotpercampus.1.2B2023jointgrowthnotadditive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/nebraska/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"nebraska-annual-reports-visible-review-round51-2026-10-15.json","scope":"Original annual report visibly read; self-reported period, redactions and number definitions control.","fields":{},"notes":["The 2026 annual report contains 2025 resource/tax labels; do not relabel usage as 2026.","Area is the reported total campus footprint in a gross-floor-area column, not verified white space or individual-building area.","Efficiency, demand response and clean-energy discussion includes Google-wide/global figures; do not assign them to this campus.","Design-life language is not an opening date or a scheduled closure.","Nebraska Advantage sales/use exemptions utilized or expected are described; no ImagiNE payments received or expected is the report statement, not all tax benefits zero.","Fireball additionally states no Nebraska Advantage rebates received to date; do not infer that statement for all reports.","Resource and tax values visibly redacted in the current public report. No underlying hidden text extracted.","Not all-field or current operating-building certification."],"sources":[{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/Aerrd1gj6liDUR%C3%81TTL9Uc3n82mcP0rlZ7xFegDul%C3%89UBjKadUONlF4aV%C3%895cr8WpV57TAEW0lDJpmfgfbZl2NKjV0%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Papillion · Sarpy · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"h5-la-vista-ne","state":"NE","kind":"facility","name":"H5 Data Centers Omaha (La Vista)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sarpy"],"city":"La Vista","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Omaha is market label; physical location is LaVista. Do not add redundant equipment capacities. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/omaha-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.166,"lng":-96.075,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"10917 Harry Watanabe Pkwy, La Vista, NE","campus_sqft":234500,"campus_acres":32,"advertised_critical_capacity_mw":17.3,"power_redundancy":"N+1"},"notes":["Omaha is market label; physical location is LaVista. Do not add redundant equipment capacities.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/omaha-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · La Vista · Sarpy · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"jigowatt-stanton-ne","state":"NE","kind":"facility","name":"Jigowatt Stanton Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Stanton"],"city":"Stanton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. FlatwaterJune27,2025originalJigowattStantonreport:20MWthenexistingCOUNTYload/70MWrequestedfuture not90MWorIT. PriorNorthernData40ac2021cloudplanpaused/soldwithoutgroundbreaking;Jigowattpods2023differentoperation. Separate4acNorfolksiteunmerged.20Mapproxinfraprogramincludes11Mline/9.5Msubstations,notsummedagainorDCcapex.5Mlettersofcreditcollateralnotpaidcost/rebate;100kparkpledge,paymentunverified.2024taxBILLS98kpersonal+18krealnotcashcollections/current2026taxes. Eminentdomainappealsongoingnotfinallegalityfinding;healthsymptomsresidentreportsnotcausation;partialimmersionconversionnotalltenantfanseliminated. Sourcecommentsnotadopted. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://flatwaterfreepress.org/a-nebraska-crypto-company-wants-to-get-bigger-landowners-decry-nppds-use-of-eminent-domain-that-will-help-it-grow/","host":"flatwaterfreepress.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.94722,"lng":-97.21722,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"FlatwaterJune27,2025originalJigowattStantonreport:20MWthenexistingCOUNTYload/70MWrequestedfuture not90MWorIT. PriorNorthernData40ac2021cloudplanpaused/soldwithoutgroundbreaking;Jigowattpods2023differentoperation. Separate4acNorfolksiteunmerged.20Mapproxinfraprogramincludes11Mline/9.5Msubstations,notsummedagainorDCcapex.5Mlettersofcreditcollateralnotpaidcost/rebate;100kparkpledge,paymentunverified.2024taxBILLS98kpersonal+18krealnotcashcollections/current2026taxes. Eminentdomainappealsongoingnotfinallegalityfinding;healthsymptomsresidentreportsnotcausation;partialimmersionconversionnotalltenantfanseliminated. Sourcecommentsnotadopted."},"notes":["FlatwaterJune27,2025originalJigowattStantonreport:20MWthenexistingCOUNTYload/70MWrequestedfuture not90MWorIT. PriorNorthernData40ac2021cloudplanpaused/soldwithoutgroundbreaking;Jigowattpods2023differentoperation. Separate4acNorfolksiteunmerged.20Mapproxinfraprogramincludes11Mline/9.5Msubstations,notsummedagainorDCcapex.5Mlettersofcreditcollateralnotpaidcost/rebate;100kparkpledge,paymentunverified.2024taxBILLS98kpersonal+18krealnotcashcollections/current2026taxes. Eminentdomainappealsongoingnotfinallegalityfinding;healthsymptomsresidentreportsnotcausation;partialimmersionconversionnotalltenantfanseliminated. Sourcecommentsnotadopted.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://flatwaterfreepress.org/a-nebraska-crypto-company-wants-to-get-bigger-landowners-decry-nppds-use-of-eminent-domain-that-will-help-it-grow/","host":"flatwaterfreepress.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Stanton · Stanton · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"lightedge-papillion-ne","state":"NE","kind":"facility","name":"LightEdge Omaha Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sarpy"],"city":"Papillion","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lightedge Papillion street identity. CriticalITandareaheadingshave no numeric values in captured body. No zero or guessedMW adopted. Market name not municipality. Operator commercial listing, no exact original opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://lightedge.com/data-centers/omaha-data-center/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1544,"lng":-96.0428,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Lightedge Papillion street identity","fields":{"operator":"Lightedge","market":"Omaha","address":"1148 American Parkway, Papillion, Nebraska 68046"},"notes":["CriticalITandareaheadingshave no numeric values in captured body. No zero or guessedMW adopted. Market name not municipality. Operator commercial listing, no exact original opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://lightedge.com/data-centers/omaha-data-center/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Papillion · Sarpy · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"mara-kearney-buffalo-ne","state":"NE","kind":"facility","name":"MARA Kearney Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Buffalo"],"city":"Kearney","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original annual report visibly read; self-reported period, redactions and number definitions control.. Peak electrical demand is not IT load, nominal site capacity or delivered energy. Annual electricity MWh is separate. January 2025 water includes an estimate of 3 HCF. Report states domestic water only and no water used for cooling; neither claim establishes zero total water or zero indirect water footprint. Report states no participation in the listed sales/use exemptions and N/A for the two incentive-payment fields; do not expand this to all taxes or subsidies. Report describes NPPD curtailment participation, not a quantified delivered response or independently verified rate agreement. The annual MWh is numerically close to one anonymous NPPD row after conversion/rounding, but NPPD names no operator. Do not assert a proven row-to-facility identity or add the two as independent consumption. Not all-field or current operating-building certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/AbobcZrAZNpJb7gsgke%C3%89aW5fNZniWK2c1ZflxM9O3rmi8KZ%C3%8171InSLiWRdK2%C3%892SnP%C3%89YoFaZyS%C3%89YR%C3%89hqHqSKSxRU%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.728341,"lng":-99.045806,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"nebraska-annual-reports-visible-review-round51-2026-10-15.json","scope":"Original annual report visibly read; self-reported period, redactions and number definitions control.","fields":{},"notes":["Peak electrical demand is not IT load, nominal site capacity or delivered energy. Annual electricity MWh is separate.","January 2025 water includes an estimate of 3 HCF. Report states domestic water only and no water used for cooling; neither claim establishes zero total water or zero indirect water footprint.","Report states no participation in the listed sales/use exemptions and N/A for the two incentive-payment fields; do not expand this to all taxes or subsidies.","Report describes NPPD curtailment participation, not a quantified delivered response or independently verified rate agreement.","The annual MWh is numerically close to one anonymous NPPD row after conversion/rounding, but NPPD names no operator. Do not assert a proven row-to-facility identity or add the two as independent consumption.","Not all-field or current operating-building certification."],"sources":[{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/AbobcZrAZNpJb7gsgke%C3%89aW5fNZniWK2c1ZflxM9O3rmi8KZ%C3%8171InSLiWRdK2%C3%892SnP%C3%89YoFaZyS%C3%89YR%C3%89hqHqSKSxRU%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Kearney · Buffalo · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"meta-sarpy-springfield-ne","state":"NE","kind":"facility","name":"Meta Sarpy Campus (Springfield expansion)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sarpy"],"city":"Springfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original annual report visibly read; self-reported period, redactions and number definitions control.. Annual electricity is supplied in MWh and is an energy quantity, not peak MW or IT capacity. Withdrawal and consumption are distinct reported measures; never sum them as water usage. The property exemption figure is the value of property exempted, not tax dollars forgiven, cash incentives, capital investment or an extra amount to add to investment credit. Actual treasury payments not verified. A 100% annual renewable/clean-energy matching statement does not establish hourly carbon-free physical supply. Reported campus area and operational-building LEED claim do not establish that every expansion phase is operating. This is an operator submission published by the agency, not an independent meter, title or certification audit. Not all-field or current operating-building certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/sarpy-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/Aa%C3%81ITmiK1H%C3%81rd9NGax01kgn7O0Melbh18nAi3oOQU4oAq200thXCFxuBc8J2d13sj5zsw5MOTzNRqmP2jV6Recs%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.052,"lng":-96.148,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"groundbreaking_year":2017,"investment_usd_min":2500000000,"investment_scope":"Nebraska statewide","operator_reported_operational_jobs_min":300,"peak_construction_workers":1300,"local_school_nonprofit_funding_usd_min":5700000,"jobs_qualification":"operational jobs supported"},"notes":["Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/sarpy-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"nebraska-annual-reports-visible-review-round51-2026-10-15.json","scope":"Original annual report visibly read; self-reported period, redactions and number definitions control.","fields":{},"notes":["Annual electricity is supplied in MWh and is an energy quantity, not peak MW or IT capacity.","Withdrawal and consumption are distinct reported measures; never sum them as water usage.","The property exemption figure is the value of property exempted, not tax dollars forgiven, cash incentives, capital investment or an extra amount to add to investment credit. Actual treasury payments not verified.","A 100% annual renewable/clean-energy matching statement does not establish hourly carbon-free physical supply.","Reported campus area and operational-building LEED claim do not establish that every expansion phase is operating.","This is an operator submission published by the agency, not an independent meter, title or certification audit.","Not all-field or current operating-building certification."],"sources":[{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/Aa%C3%81ITmiK1H%C3%81rd9NGax01kgn7O0Melbh18nAi3oOQU4oAq200thXCFxuBc8J2d13sj5zsw5MOTzNRqmP2jV6Recs%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Springfield · Sarpy · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"nebraska-colocation-centers-lincoln-ne","state":"NE","kind":"facility","name":"Nebraska Colocation Centers  -  Lincoln (Sharp Building)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lancaster"],"city":"Lincoln","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. A later page-author timestamp is not the original publication date or an opening event. Omaha's carrier count is not Lincoln's. Unrelated pharmaceutical spam in the body lowers source quality; no current guarantees, operator status, power, contact accuracy or tenant counts are adopted from this old promotional account. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://strictly-business.com/cover-story/nebraska-colocation-centers-defining-moment-technology-lincoln-nebraska/","host":"strictly-business.com","date":"2014-08-01","published":"2014-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8120852,"lng":-96.7022622,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Strictly Business's historical cover story describes Nebraska Colocation Centers' first Lincoln raised-floor phase at 206 South 13th Street, opened the preceding October.","independently_verified_current_operating_status":null},"notes":["A later page-author timestamp is not the original publication date or an opening event. Omaha's carrier count is not Lincoln's. Unrelated pharmaceutical spam in the body lowers source quality; no current guarantees, operator status, power, contact accuracy or tenant counts are adopted from this old promotional account.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://strictly-business.com/cover-story/nebraska-colocation-centers-defining-moment-technology-lincoln-nebraska/","host":"strictly-business.com","date":"2014-08-01","published":"2014-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Lincoln · Lancaster · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"starwood-project-horizon-kearney-ne","state":"NE","kind":"facility","name":"Project Horizon (Tech oNE Crossing)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Buffalo"],"city":"Kearney","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Starwood/Project Horizon identity is not named in this source and needs crosswalk before adopting developer identity. Proposed 368 MW is ultimate campus electrical demand, not additional to reused 100 MW, critical IT or current load. Council vote was future later September 8 in this account; no outcome assumed. First phase late 2027/full 2030 are forecasts. August zoning ordinance/report’s 55 dB average needs original measurement/time/scope definitions; code adoption is not site CUP. Small separate 5 MW proposal is not this campus. No end-user identity known. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wowt.com/2026/09/08/kearney-poised-go-all-data-centers-even-many-nebraska-towns-throttle-back/","host":"wowt.com","date":"2026-09-08","published":"2026-09-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.728341,"lng":-99.045806,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Flatwater Free Press reporting republished by WOWT describes Worldwide Mission Critical’s Tech One Crossing proposal to replace a 100 MW Marathon bitcoin mine with eventual 368 MW development under Kearney’s new code.","independently_verified_current_operating_status":null,"developer_identity_from_this_source":"Worldwide Mission Critical; Starwood not named here","reported_ultimate_electrical_mw":368,"critical_it_mw":null,"reported_retired_mining_power_reuse_mw":100},"notes":["Starwood/Project Horizon identity is not named in this source and needs crosswalk before adopting developer identity. Proposed 368 MW is ultimate campus electrical demand, not additional to reused 100 MW, critical IT or current load. Council vote was future later September 8 in this account; no outcome assumed. First phase late 2027/full 2030 are forecasts. August zoning ordinance/report’s 55 dB average needs original measurement/time/scope definitions; code adoption is not site CUP. Small separate 5 MW proposal is not this campus. No end-user identity known.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wowt.com/2026/09/08/kearney-poised-go-all-data-centers-even-many-nebraska-towns-throttle-back/","host":"wowt.com","date":"2026-09-08","published":"2026-09-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Kearney · Buffalo · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"sagebrush-hallam-hyperscale-campus-lancaster-ne","state":"NE","kind":"facility","name":"Sagebrush Hallam Hyperscale Campus (proposed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lancaster"],"city":"Hallam","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. More than $8 million refers to reported optioned land value, not necessarily option fees paid or completed land acquisitions. Local identification with Sagebrush 1 and 1.7 GW remains attributed and basis undefined, not critical IT or a signed utility agreement. Nearby Sheldon/Princeton generation and pipelines do not establish secured service, permits or operating status. Co-located generation is separate from computing load; no current demand, start or RFS verified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/","host":"1011now.com","date":"2026-08-27","published":"2026-08-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.545,"lng":-96.7992,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"KOLN reports Sagebrush land options covering more than 1,500 acres near Hallam, with residents linking the location to a Stark investor project.","independently_verified_current_operating_status":null},"notes":["More than $8 million refers to reported optioned land value, not necessarily option fees paid or completed land acquisitions. Local identification with Sagebrush 1 and 1.7 GW remains attributed and basis undefined, not critical IT or a signed utility agreement. Nearby Sheldon/Princeton generation and pipelines do not establish secured service, permits or operating status. Co-located generation is separate from computing load; no current demand, start or RFS verified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/","host":"1011now.com","date":"2026-08-27","published":"2026-08-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Hallam · Lancaster · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"scott-data-center-omaha-ne","state":"NE","kind":"facility","name":"Scott Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Omaha","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Scott Data named contact and rack capability scope. Contactaddressmaybetenant/suiteaddress;notverifiedwholebuildingparcel.60pluskWcabinetdesignnotcampusMW. CMMCclientcompliancedependsclientcontrols;operatorpageisnotCMMCcertificationofeverytenant. No numeric totalIT or exact openingdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.scottdatacenter.com/data-center/","host":"scottdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.2406,"lng":-96.0093,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Scott Data named contact and rack capability scope","fields":{"operator":"Scott Data","operator_described_model":"nonprofit data center founded by Walter Scott Jr.","published_contact_address":"6825 Pine Street, Suite141, Omaha, Nebraska68106","advertised_reference_architecture_kw_per_cabinet_min_exclusive":60},"notes":["Contactaddressmaybetenant/suiteaddress;notverifiedwholebuildingparcel.60pluskWcabinetdesignnotcampusMW. CMMCclientcompliancedependsclientcontrols;operatorpageisnotCMMCcertificationofeverytenant. No numeric totalIT or exact openingdate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.scottdatacenter.com/data-center/","host":"scottdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Omaha · Douglas · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"sequitor-edge-kearney-ne","state":"NE","kind":"facility","name":"Sequitor Edge Kearney Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Buffalo"],"city":"Kearney","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Sequitor Kearney proposed site, land sale and LOIs. Approvedlandsaleoperatoraccountnotreadcitysignedcontract/deed. NotallDCpermitsorenergization. NonbindingLOIsnotexecutedleases.40kplannednotcurrentoperatingfloor. No numericITMWoractualcurrentheadcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/","host":"sequitoredge.com","date":"2025-09-19","published":"2025-09-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.6994,"lng":-99.0817,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Sequitor Kearney proposed site, land sale and LOIs","fields":{"developer":"Sequitor Edge","land_buyer":"Shamrock Data LLC","location":"Tech One Crossing, Kearney, Nebraska","land_sale_approved_acres_approx":16,"planned_facility_sqft":40000,"operator_reported_council_land_sale_approval":"announcedSeptember19,2025","service_target":"early2027","tenant_commitment_stage":"nonbinding letters of intent from local organizations"},"notes":["Approvedlandsaleoperatoraccountnotreadcitysignedcontract/deed. NotallDCpermitsorenergization. NonbindingLOIsnotexecutedleases.40kplannednotcurrentoperatingfloor. No numericITMWoractualcurrentheadcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/","host":"sequitoredge.com","date":"2025-09-19","published":"2025-09-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Kearney · Buffalo · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"tierpoint-omaha-bellevue-ne","state":"NE","kind":"facility","name":"TierPoint Omaha - Bellevue Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sarpy"],"city":"Bellevue","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/nebraska/omaha-bellevue/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.153,"lng":-95.925,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":100000,"gross_area_is_lower_bound":true,"raised_floor_sqft":21000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Five redundant generators totaling 5.5 MW","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/nebraska/omaha-bellevue/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Bellevue · Sarpy · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"tierpoint-omaha-midlands-papillion-ne","state":"NE","kind":"facility","name":"TierPoint Omaha - Midlands Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sarpy"],"city":"Papillion","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/nebraska/omaha-midlands/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.11,"lng":-96.046,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":63000,"gross_area_is_lower_bound":true,"raised_floor_sqft":15000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2.25 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/nebraska/omaha-midlands/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Papillion · Sarpy · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"travelers-data-center-sarpy-ne","state":"NE","kind":"facility","name":"Travelers Data Center (Project Oasis)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sarpy"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Historical opening announcement is not 2026 operating certification.4 MW basis is unspecified, not independently verified critical IT; TierIII claim is not independently checked Uptime certification.140 acreacquisition,41 acrefacilityparcel,92 acresfutureland and 5 acreOPPDsubstation are overlapping parent/subparcel scopes, not additive holdings. State site/building/job-training funds approved but no amount or disbursement verified. Infrastructure contributions and substation cost are not site-capital/tax-benefit totals. No exact physical completion day inferred beyond dated announcement. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original annual report visibly read; self-reported period, redactions and number definitions control.. Report claims Tier III and Energy Star 98; no independent certificate checked. Report states none for listed sales/use exemptions, listed incentive payments and renewable commitments, without proving all tax benefits or physical power mix. Service-life text includes a question mark after 100 years; no certain design life or closure date adopted. This reporting period differs from the calendar2025 Meta/MARA data; no cross-site total or ranking derived. Not all-field or current operating-building certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tradeandindustrydev.com/industry/back-office-call-centers-data-centers/news/ne-travelers-cuts-ribbon-new-data-center-sarpy-c","host":"tradeandindustrydev.com","date":"2015-05-13","published":"2015-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/AY09VhpYXkD6EN57RKIaU25viqt7O0s9sx9vOIsV%C3%89nA%C3%89yzXAzBbOqvuMT1piq9LHPbWAmVRc%C3%81y3mfDrhFs6Xi9A%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/AcFfh0ETS7vgXZ9Qf0jnqiM7UM%C3%899vkIEandSZ8JEc%C3%89rkP5vyukBQjTMobL08opvN64wF3ufApa8r0DGBinWQzXQ%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1278561,"lng":-96.145074,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Trade & Industry Development carries a state/economic-development announcement of Travelers’ Sarpy County ribbon cutting for a 183,000-square-foot facility described as TierIII 4 MW.","independently_verified_current_operating_status":null},"notes":["Historical opening announcement is not 2026 operating certification.4 MW basis is unspecified, not independently verified critical IT; TierIII claim is not independently checked Uptime certification.140 acreacquisition,41 acrefacilityparcel,92 acresfutureland and 5 acreOPPDsubstation are overlapping parent/subparcel scopes, not additive holdings. State site/building/job-training funds approved but no amount or disbursement verified. Infrastructure contributions and substation cost are not site-capital/tax-benefit totals. No exact physical completion day inferred beyond dated announcement.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tradeandindustrydev.com/industry/back-office-call-centers-data-centers/news/ne-travelers-cuts-ribbon-new-data-center-sarpy-c","host":"tradeandindustrydev.com","date":"2015-05-13","published":"2015-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"nebraska-annual-reports-visible-review-round51-2026-10-15.json","scope":"Original annual report visibly read; self-reported period, redactions and number definitions control.","fields":{},"notes":["Report claims Tier III and Energy Star 98; no independent certificate checked.","Report states none for listed sales/use exemptions, listed incentive payments and renewable commitments, without proving all tax benefits or physical power mix.","Service-life text includes a question mark after 100 years; no certain design life or closure date adopted.","This reporting period differs from the calendar2025 Meta/MARA data; no cross-site total or ranking derived.","Not all-field or current operating-building certification."],"sources":[{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/AY09VhpYXkD6EN57RKIaU25viqt7O0s9sx9vOIsV%C3%89nA%C3%89yzXAzBbOqvuMT1piq9LHPbWAmVRc%C3%81y3mfDrhFs6Xi9A%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ecmp.nebraska.gov/PublicAccess/api/Document/AcFfh0ETS7vgXZ9Qf0jnqiM7UM%C3%899vkIEandSZ8JEc%C3%89rkP5vyukBQjTMobL08opvN64wF3ufApa8r0DGBinWQzXQ%3D/","host":"ecmp.nebraska.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nebraska · Sarpy · Source context reviewed","state_name":"Nebraska","state_path":"/nebraska/"},{"id":"amazon-data-services-reno-storey-county-nv","state":"NV","kind":"facility","name":"Amazon Data Services Reno Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"Sparks","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nevada Amazon proposed air-construction permit. Proposed action notice, not issued permit or observed operating proof. Sparks postal address not proof project is withinReno orSparks municipality.358engines not358facilities or MWload. Draft permits can condition use of diesel/renewable diesel; not carbon-free operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ndep.nv.gov/uploads/documents/ap7374-4768-proposed-action.pdf","host":"ndep.nv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.517683,"lng":-119.479421,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Nevada Amazon proposed air-construction permit","fields":{"air_permit_applicant":"AmazonDataServicesInc","air_permit_id":"AP7374-4768","air_facility_id":"A2648","published_applicant_address":"3800 PeruDrive,Sparks,NV89437","published_site_region":"TahoeRenoIndustrialCenter,approximately15miles eastofReno","proposed_standby_diesel_generators":358,"historical_comment_deadline":"2026-03-02"},"notes":["Proposed action notice, not issued permit or observed operating proof. Sparks postal address not proof project is withinReno orSparks municipality.358engines not358facilities or MWload. Draft permits can condition use of diesel/renewable diesel; not carbon-free operations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ndep.nv.gov/uploads/documents/ap7374-4768-proposed-action.pdf","host":"ndep.nv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Sparks · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"apple-reno-nv","state":"NV","kind":"facility","name":"Apple Reno Data Center (Reno Technology Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washoe"],"city":"Sparks","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Apple Washoe expansion incentive application facts,notpaidaward. Application/boardpacket not observed actual spend, taxsaving or final executed approval. Fiveyearcapex is within tenyearprojection, not additive.1281economicimpactjobs include1257construction andindirecteffects, not permanent onsitepositions. Solarprojects offsite generation notITload. Claimed130600millionmetrictonsCO2avoided implausible; fieldquarantined without silent correction. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf","host":"goed.nv.gov","date":"2024-07-25","published":"2024-07-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.563085,"lng":-119.554805,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Apple Washoe expansion incentive application facts,notpaidaward","fields":{"board_packet_date":"2024-07-25","published_company_site_address":"21505 RenoTechnologyParkwayWest,Sparks,NV89434","published_county":"Washoe,Nevada","historical_opening_month":"2012-12","five_year_proposed_equipment_capex_usd":742071428,"ten_year_proposed_equipment_capex_usd":992071428,"estimated_ten_year_sales_tax_abatement_usd":62153275,"proposed_new_fulltime_jobs_first5years":10},"notes":["Application/boardpacket not observed actual spend, taxsaving or final executed approval. Fiveyearcapex is within tenyearprojection, not additive.1281economicimpactjobs include1257construction andindirecteffects, not permanent onsitepositions. Solarprojects offsite generation notITload. Claimed130600millionmetrictonsCO2avoided implausible; fieldquarantined without silent correction.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf","host":"goed.nv.gov","date":"2024-07-25","published":"2024-07-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Sparks · Washoe · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"blusky-ai-wells-elko-county-nv","state":"NV","kind":"facility","name":"BluSky AI Wells Modular Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Elko"],"city":"Wells","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nevada legislative briefing is compiled context, not facility census. LCBexplicitlycannotverifymapcompleteness. Footnotecompares71Baxtellocationsand68DataCenterMaplocations, not70certifiedoperatingphysicalbuildings. Tablelistscompaniesbycountynotnumberofbuildings. BluSkyLOIcompiledfrompressrelease,notexecutedpurchase/permitorWellsparcelconfirmation. Othercountyoperatorstagesnotindependentnewcertification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. No exact-site credit or independent operating census from regional company table.68 versus 71 directory counts and omitted WhitePine/Carson applications illustrate gaps. Page 5 total 716 gallons/year is an apparent missing-unit/magnitude error, not corrected by assumption or used as state total. Withdrawal versus consumption and forecasts remain distinct; no site actuals adopted from secondary tables. General energy/cooling/household/AI-query comparisons and legal summaries are not independently examined primary measurements/laws. Revised CTT/TRIGID footnotes correct older memo errors. All 7 pages extracted/read;countytablepage 2 visuallyviewed. Later originals and observed outcomes take precedence; future dates have no assumed result. Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.. LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","host":"leg.state.nv.us","date":"2026-05-12","published":"2026-05-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/","host":"gazette.com","date":"2026-03-28","published":"2026-03-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.108813,"lng":-114.956386,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Nevada legislative briefing is compiled context, not facility census","fields":{"publisher":"Nevada Legislative Counsel Bureau Research Division","document_date":"2026-05-12","document_stage":"revised background briefing","blusky_elko_county_status_as_compiled":"signed letter of intent","reported_statewide_location_count_approx":70,"statewide_count_scope":"planned, under construction and operational combined; compiled commercial maps"},"notes":["LCBexplicitlycannotverifymapcompleteness. Footnotecompares71Baxtellocationsand68DataCenterMaplocations, not70certifiedoperatingphysicalbuildings. Tablelistscompaniesbycountynotnumberofbuildings. BluSkyLOIcompiledfrompressrelease,notexecutedpurchase/permitorWellsparcelconfirmation. Othercountyoperatorstagesnotindependentnewcertification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","host":"leg.state.nv.us","date":"2026-05-12","published":"2026-05-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{},"notes":["No exact-site credit or independent operating census from regional company table.68 versus 71 directory counts and omitted WhitePine/Carson applications illustrate gaps. Page 5 total 716 gallons/year is an apparent missing-unit/magnitude error, not corrected by assumption or used as state total. Withdrawal versus consumption and forecasts remain distinct; no site actuals adopted from secondary tables. General energy/cooling/household/AI-query comparisons and legal summaries are not independently examined primary measurements/laws. Revised CTT/TRIGID footnotes correct older memo errors. All 7 pages extracted/read;countytablepage 2 visuallyviewed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075","host":"leg.state.nv.us","date":"2026-05-12","published":"2026-05-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.","fields":{"reported_context":"Gazette March28report describes August2025nonbinding two-acre cannabis-site lease LOI and Wells city-manager opposition, not final denial","independently_verified_current_operating_status":null},"notes":["LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/","host":"gazette.com","date":"2026-03-28","published":"2026-03-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Wells · Elko · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"centra-rno2-keystone-reno-nv","state":"NV","kind":"facility","name":"CENTRA RNO2 (Keystone Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washoe"],"city":"Reno","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.. City names Centra Keystone project and reports CUP approval January15,2025 with no appeal filed at that point, allowing building-permit stage. Not a certificate of occupancy, all permits or current RFS. Question22 alleges3MWinitial/6.67MW and12MWadvertisement. City answer refers electrical capacity/service to NVEnergy; it does NOT supply executed power agreement or independently verify12MWIT/current demand. Question assertions are not city findings. Question29 refers to26000gallons initial cooling fill; answer describes changed cooling/documentation, not measured daily consumption. City answer onpage11 anticipates about2acre-feet without printing a time period; no gallons/day/year conversion or zero-water claim adopted. City describes15ftchillerbarrier,53dBAambient and43dBAequipment target, not measured operating compliance. Its residential-zoning applicability and regulator statements are city interpretations, not an independently reviewed court decision. OnlyselectedFAQpages read. Not whole record/current operating census, legal compliance or independent meter certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300","host":"reno.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.525542,"lng":-119.82612,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-originals-model-and-approval-stages-round55-2026-10-15.json","scope":"Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.","fields":{},"notes":["City names Centra Keystone project and reports CUP approval January15,2025 with no appeal filed at that point, allowing building-permit stage. Not a certificate of occupancy, all permits or current RFS.","Question22 alleges3MWinitial/6.67MW and12MWadvertisement. City answer refers electrical capacity/service to NVEnergy; it does NOT supply executed power agreement or independently verify12MWIT/current demand. Question assertions are not city findings.","Question29 refers to26000gallons initial cooling fill; answer describes changed cooling/documentation, not measured daily consumption. City answer onpage11 anticipates about2acre-feet without printing a time period; no gallons/day/year conversion or zero-water claim adopted.","City describes15ftchillerbarrier,53dBAambient and43dBAequipment target, not measured operating compliance. Its residential-zoning applicability and regulator statements are city interpretations, not an independently reviewed court decision. OnlyselectedFAQpages read.","Not whole record/current operating census, legal compliance or independent meter certification."],"sources":[{"url":"https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300","host":"reno.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Reno · Washoe · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"colovore-reno-1-storey-county-nv","state":"NV","kind":"facility","name":"Colovore Reno 1 (RN01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. draft Colovore air-permit equipment/site identity. Firstpage visually markedDRAFT despite templateIssuedTo/ClassIIOperatingPermit title. Not an issued final operatingpermit. Generatorratings notcriticalIT. Equipmentmanufacture2024notopeningdate. No actualsiteoperation or currentconsumption established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ndep.nv.gov/uploads/documents/ap7374-5002-class-ii-aqop.pdf","host":"ndep.nv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5341121,"lng":-119.4771513,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"draft Colovore air-permit equipment/site identity","fields":{"air_permit_id":"AP7374-5002","air_facility_id":"A2675","published_permittee":"ColovoreReno1LLC","published_physical_address":"100 ItalyDrive,McCarran,NV89434","published_county":"Storey,Nevada","listed_emergency_generators":5,"generator_rating_kw_each":3490,"document_status":"DRAFT watermark"},"notes":["Firstpage visually markedDRAFT despite templateIssuedTo/ClassIIOperatingPermit title. Not an issued final operatingpermit. Generatorratings notcriticalIT. Equipmentmanufacture2024notopeningdate. No actualsiteoperation or currentconsumption established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ndep.nv.gov/uploads/documents/ap7374-5002-class-ii-aqop.pdf","host":"ndep.nv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"databank-las1-las-vegas-nv","state":"NV","kind":"facility","name":"DataBank LAS1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Rounded3.4MW market summary is not a second independent capacity. Operator facility card gives precise3.35MW; rounded market header is3.4MW. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/las-vegas/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0597501,"lng":-115.1470938,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Las Vegas","street":"7185 Pollock Drive","critical_it_capacity_mw":3.35,"it_area_sqft":57364},"notes":["Rounded3.4MW market summary is not a second independent capacity.","Operator facility card gives precise3.35MW; rounded market header is3.4MW.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/las-vegas/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"edgecore-reno-campus-storey-county-nv","state":"NV","kind":"facility","name":"EdgeCore Reno Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nevada draft air-permit identity andstatus. WatermarkvisuallyDRAFTdespiteIssuedTotemplate. Notfinaloperatingpermit. Enginehorsepower andemergencygeneration notcriticalIT. Manufacturingafter2024notcampusopening. ExactEdgeCoreoperatorlegalentitycrosswalknotindependentlyprovenhere. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ndep.nv.gov/uploads/documents/ap7374-4772_AC12456-class-ii-aqop.pdf","host":"ndep.nv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5429755,"lng":-119.4851422,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Nevada draft air-permit identity andstatus","fields":{"air_permit_id":"AP7374-4772","air_facility_id":"A2652","published_permittee":"MECP1Reno1LLC","published_physical_address":"3000 USAParkway,McCarran,NV89437","published_county":"Storey,Nevada","document_status":"DRAFTwatermark"},"notes":["WatermarkvisuallyDRAFTdespiteIssuedTotemplate. Notfinaloperatingpermit. Enginehorsepower andemergencygeneration notcriticalIT. Manufacturingafter2024notcampusopening. ExactEdgeCoreoperatorlegalentitycrosswalknotindependentlyprovenhere.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ndep.nv.gov/uploads/documents/ap7374-4772_AC12456-class-ii-aqop.pdf","host":"ndep.nv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"fleet-data-centers-storey-county-nv","state":"NV","kind":"facility","name":"Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Two 200 MW campuses are not 400 MW each. Initial power delivery, ultimate IT and temporary generation differ. Construction and all-in investment scenarios are not additive. Tenant identity cannot be inferred from market capitalization. Forecast 2027 openings are not current operation. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nnbw.com/news/2026/jun/02/fleet-data-centers-breaks-ground-on-2-facilities/","host":"nnbw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.53,"lng":-119.43,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"NNBW reports Fleet South Valley and Peru Ridge groundbreakings and a combined 400 MW of critical computing capacity.","independently_verified_current_operating_status":null},"notes":["Two 200 MW campuses are not 400 MW each. Initial power delivery, ultimate IT and temporary generation differ. Construction and all-in investment scenarios are not additive. Tenant identity cannot be inferred from market capitalization. Forecast 2027 openings are not current operation.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nnbw.com/news/2026/jun/02/fleet-data-centers-breaks-ground-on-2-facilities/","host":"nnbw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"flexential-las-vegas-downtown-nv","state":"NV","kind":"facility","name":"Flexential Las Vegas - Downtown","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Page 48 prints vMW; page 47 quick facts explicitly MW. Retain 1.37 MW only as the page 47 operator rating, never measured draw. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.1686438,"lng":-115.1431445,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Las Vegas - Downtown","publisher_reported_footprint_sqft":33135,"publisher_reported_critical_power_mw":1.37,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Page 48 prints vMW; page 47 quick facts explicitly MW. Retain 1.37 MW only as the page 47 operator rating, never measured draw.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"flexential-las-vegas-north-las04-nv","state":"NV","kind":"facility","name":"Flexential Las Vegas - North (LAS04)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"North Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.2481633,"lng":-115.1012553,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Las Vegas - North (LAS04)","publisher_reported_footprint_sqft":111240,"publisher_reported_critical_power_mw":9,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · North Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"google-storey-county-nv","state":"NV","kind":"facility","name":"Google  Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 6B+state total not Storey-onlycapex. Built2021is year only, not exact opening date. Geothermal sourcing is not siteITcapacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. duplicate URL, no additional facility. Trailing-slash duplicate of StoreyCountyoperator page reviewed in same overlay. No second site, investment or milestone.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/storey-county-nevada","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://datacenters.google/locations/storey-county-nevada/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4572167,"lng":-119.5157991,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"storey_built_year_operator_statement":2021,"regional_investment_usd_min_exclusive":6000000000,"investment_scope":"Nevada statewide including Henderson and Storey","geothermal_use_start_year":2023},"notes":["6B+state total not Storey-onlycapex. Built2021is year only, not exact opening date. Geothermal sourcing is not siteITcapacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/storey-county-nevada","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"duplicate URL, no additional facility","fields":{},"notes":["Trailing-slash duplicate of StoreyCountyoperator page reviewed in same overlay. No second site, investment or milestone.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/storey-county-nevada/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"google-henderson-nv","state":"NV","kind":"facility","name":"Google Henderson Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Henderson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Built/groundbreakingyearsame2019notexactopeningday.6BstateinvestmentnotHenderson-only. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/henderson-nevada/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.056187,"lng":-115.042545,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_reported_henderson_built_year":2019,"henderson_groundbreaking_year":2019,"published_county":"Clark, Nevada","regional_investment_usd_min_exclusive":6000000000,"investment_scope":"Nevadastatewide includingStoreyCounty"},"notes":["Built/groundbreakingyearsame2019notexactopeningday.6BstateinvestmentnotHenderson-only.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/henderson-nevada/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Henderson · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"isp-net-las-vegas-fremont-nv","state":"NV","kind":"facility","name":"isp.net Las Vegas Data Center (DC1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. isp.net markets colocation in two owned downtownLasVegas rooms and gives2595FremontStreetfooter. Footer alone does not establish which data hall is at that address or both share it; precise premise crosswalk remains held. No ITMW/date derived.100Gbpsupstreams and up-to10Gbpsports are network bandwidth, not power; provider expressly does not promise everycabinet10Gbps. Bank-vault room, redundant systems,24/7staff andSOCTypeII are operator claims, not independent onsite/certificate review. No second exact facility pin or two-building census credit added. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.isp.net/colocation-las-vegas","host":"isp.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.160035,"lng":-115.119051,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-operator-transaction-and-local-outcomes-round61-2026-10-15.json","scope":"Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.","fields":{},"notes":["isp.net markets colocation in two owned downtownLasVegas rooms and gives2595FremontStreetfooter. Footer alone does not establish which data hall is at that address or both share it; precise premise crosswalk remains held. No ITMW/date derived.100Gbpsupstreams and up-to10Gbpsports are network bandwidth, not power; provider expressly does not promise everycabinet10Gbps. Bank-vault room, redundant systems,24/7staff andSOCTypeII are operator claims, not independent onsite/certificate review. No second exact facility pin or two-building census credit added.","Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."],"sources":[{"url":"https://www.isp.net/colocation-las-vegas","host":"isp.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"manse-technology-campus-pahrump-nv","state":"NV","kind":"facility","name":"Manse Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nye"],"city":"Pahrump","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manse developer fullbuildout and postabatement tax forecast. Developerfinancial/engineeringprojectionsnotactualexpenditure,taxes,jobsorwaterwithdrawals.91.8+22.4=114.2Mroundstoheadline114M,not228M. Claimedpostabatementnettaxnotindependentapprovedabatementreview. Landscapingwaiverconditional. No numericITMW,exactparcelorservice date. Petition/feedbacknotused. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mansetechcampus.com/","host":"mansetechcampus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.1925194,"lng":-115.9758446,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Manse developer fullbuildout and postabatement tax forecast","fields":{"project":"Manse Technology Campus","locality":"Manse Road corridor, Pahrump, Nye County, Nevada","developer_described_stage":"proposed, county approval future","planned_fullbuildout_capital_usd":18400000000,"estimated_annual_property_tax_usd_approx":114000000,"estimated_real_property_tax_component_usd":91800000,"estimated_personal_property_tax_component_usd":22400000,"estimated_onetime_impact_fees_usd":12700000,"expected_peak_construction_jobs":1600,"expected_permanent_jobs":380,"projected_annual_water_acre_feet_max_exclusive":300},"notes":["Developerfinancial/engineeringprojectionsnotactualexpenditure,taxes,jobsorwaterwithdrawals.91.8+22.4=114.2Mroundstoheadline114M,not228M. Claimedpostabatementnettaxnotindependentapprovedabatementreview. Landscapingwaiverconditional. No numericITMW,exactparcelorservice date. Petition/feedbacknotused.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://mansetechcampus.com/","host":"mansetechcampus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Pahrump · Nye · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"microsoft-silver-springs-lyon-county-nv","state":"NV","kind":"facility","name":"Microsoft Silver Springs Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lyon"],"city":"Silver Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. energy-infrastructure decision without exact campus match. Decision concerns NV Energy transmission right-of-way and345kVline, not a named Microsoft data-center approval or345MWload. No site capacity, current operation, campus parcel or investment adopted. June17toJuly17,2026appeal window does not establish appeal outcome. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold","host":"blm.gov","date":"2026-06-18","published":"2026-06-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.373597,"lng":-119.2267443,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"energy-infrastructure decision without exact campus match","fields":{},"notes":["Decision concerns NV Energy transmission right-of-way and345kVline, not a named Microsoft data-center approval or345MWload. No site capacity, current operation, campus parcel or investment adopted. June17toJuly17,2026appeal window does not establish appeal outcome.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold","host":"blm.gov","date":"2026-06-18","published":"2026-06-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Silver Springs · Lyon · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"microsoft-fernley-nv","state":"NV","kind":"facility","name":"Microsoft Victory Logistics District Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lyon"],"city":"Fernley","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. RobSabo/NNBW report publishedNevadaAppeal April17,2025 describes purchase300.7acres rawland atVictoryLogisticsDistrict for70.5M, citingLyonpublicrecords. Deed not directlyread. Microsoft declined to state development plans; article says DC only IF that is eventualdirection. Landpurchase mustnotbecome approved/underconstructionDC or70.5Mconstructioncapex. 1997Nevadapresence not Fernleyfacilityopening. MarkIV120Mgrading/600acres/1600acresdevelopmentready and4300acrepark are broaderparkplans, notMicrosoft-ownedacreage/spend. ProposedEaglesubstation/privategenerationnotdeliveredITorapprovedESA. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nevadaappeal.com/news/2025/apr/17/microsoft-buy-300-acres-in-fernley-lyon-county-victory-logistics-district/","host":"nevadaappeal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.6082,"lng":-119.2169,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["RobSabo/NNBW report publishedNevadaAppeal April17,2025 describes purchase300.7acres rawland atVictoryLogisticsDistrict for70.5M, citingLyonpublicrecords. Deed not directlyread. Microsoft declined to state development plans; article says DC only IF that is eventualdirection. Landpurchase mustnotbecome approved/underconstructionDC or70.5Mconstructioncapex.","1997Nevadapresence not Fernleyfacilityopening. MarkIV120Mgrading/600acres/1600acresdevelopmentready and4300acrepark are broaderparkplans, notMicrosoft-ownedacreage/spend. ProposedEaglesubstation/privategenerationnotdeliveredITorapprovedESA.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.nevadaappeal.com/news/2025/apr/17/microsoft-buy-300-acres-in-fernley-lyon-county-victory-logistics-district/","host":"nevadaappeal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Fernley · Lyon · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"monarch-data-center-yerington-nv","state":"NV","kind":"facility","name":"Monarch Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lyon"],"city":"Yerington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The automatic excerpt selected an unrelated hospital item; the retained main article was read separately. The 1,000 MW proposal has no verified IT basis. NV Energy's wider resource-plan amount is not Monarch's allocation. A proposed county ordinance and assumed grandfathering are not adopted law. Gas and storage plans are not operating power. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nevbex.com/2026/08/12/monarch-data-center-lyon-county-rezoning/","host":"nevbex.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.9855429,"lng":-119.162989,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"NVBEX reports Lyon County's August 6 three-one Monarch rezoning vote near Yerington, with final designs still required before construction.","independently_verified_current_operating_status":null},"notes":["The automatic excerpt selected an unrelated hospital item; the retained main article was read separately. The 1,000 MW proposal has no verified IT basis. NV Energy's wider resource-plan amount is not Monarch's allocation. A proposed county ordinance and assumed grandfathering are not adopted law. Gas and storage plans are not operating power.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://nevbex.com/2026/08/12/monarch-data-center-lyon-county-rezoning/","host":"nevbex.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Yerington · Lyon · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"novva-las-vegas-nicco-way-nv","state":"NV","kind":"facility","name":"Novva Las Vegas Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"North Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Samepage conflicts16vs20acresand275kvs246328sqft; holdcanonicalarea/acreage. Waterlesscoolingdoesnotmeanzerowater; householdcomparison/usageclaimrequireactualbillreview. Advertisedtaxabatementnotawardvalue; unsourcedmarket953percent/3812MWforecastsnotadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.novva.com/data-center-facilities/las-vegas/","host":"novva.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.266299,"lng":-115.0478715,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"owner_substation_mw":100,"power_basis":"utility/owner substation, not IT"},"notes":["Samepage conflicts16vs20acresand275kvs246328sqft; holdcanonicalarea/acreage. Waterlesscoolingdoesnotmeanzerowater; householdcomparison/usageclaimrequireactualbillreview. Advertisedtaxabatementnotawardvalue; unsourcedmarket953percent/3812MWforecastsnotadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.novva.com/data-center-facilities/las-vegas/","host":"novva.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · North Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"novva-tahoe-reno-storey-county-nv","state":"NV","kind":"facility","name":"Novva Tahoe Reno Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Launchcompletedfacility supported.60MWsumofdatahalls distinct100MWsubstation; no160MWtotal. Newcapacity2026targetnotproofallhallsfullyoccupiedorenergized. January13,2026modifiedheadernotlaunch. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.novva.com/media-center/launch-of-tahoe-reno-data-center/","host":"novva.com","date":"2025-07-08","published":"2025-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.53,"lng":-119.44,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"launch_announcement_date":"2025-07-08","campus_acres":20,"area_sqft":300000,"data_halls":6,"data_hall_capacity_mw_each":10,"data_hall_area_sqft_approx_each":30000,"onsite_substation_mw":100,"new_capacity_availability_target_year":2026},"notes":["Launchcompletedfacility supported.60MWsumofdatahalls distinct100MWsubstation; no160MWtotal. Newcapacity2026targetnotproofallhallsfullyoccupiedorenergized. January13,2026modifiedheadernotlaunch.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.novva.com/media-center/launch-of-tahoe-reno-data-center/","host":"novva.com","date":"2025-07-08","published":"2025-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"oppidan-paradise-post-road-clark-county-nv","state":"NV","kind":"facility","name":"Oppidan Post Road Data Center (Paradise)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Paradise","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The automatic excerpt selected an unrelated senior-living article; the retained main body was read. Five MW is unspecified basis, not current critical IT. The 9.5-acre development is within the 12.3-acre property. Approval conditions are not evidence of completion or occupancy, and the Reno project is separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nevbex.com/2025/03/10/oppidan-paradise-data-center-approval/","host":"nevbex.com","date":"2025-03-10","published":"2025-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.07533,"lng":-115.20061,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"NVBEX reports March 4 Clark County planning approval of Oppidan/Connect design review and waivers at 4460 West Post Road, with compliance, drainage, FAA notice and other conditions still required.","independently_verified_current_operating_status":null},"notes":["The automatic excerpt selected an unrelated senior-living article; the retained main body was read. Five MW is unspecified basis, not current critical IT. The 9.5-acre development is within the 12.3-acre property. Approval conditions are not evidence of completion or occupancy, and the Reno project is separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://nevbex.com/2025/03/10/oppidan-paradise-data-center-approval/","host":"nevbex.com","date":"2025-03-10","published":"2025-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Paradise · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"powerhouse-reno-storey-county-nv","state":"NV","kind":"facility","name":"PowerHouse Reno Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. PowerHouse Reno republished historical development report. UndatedoperatorrepublicationattributesgroundbreakingtoRenoGazetteJournalandthisMonday;noexactceremonydayinferred. Q32025targetunobserved,notcurrentopenstatus.30DC/2.3GWcompanypipelineotherprojectsnotReno. No executedleaseoractualcapexinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-reno-data-center","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5602824,"lng":-119.4990959,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"PowerHouse Reno republished historical development report","fields":{"developer_publication":"PowerHouse","project":"Reno campus","location":"Tahoe Reno Industrial Center, Storey County, Nevada","planned_campus_capacity_mw":65,"power_basis":"campus capacity, not explicit IT","site_acres":49,"planned_buildings":3,"each_building_stories":2,"total_planned_building_sqft":900000,"first_building_historical_target":"2025-Q3","campus_completion_target_year":2028},"notes":["UndatedoperatorrepublicationattributesgroundbreakingtoRenoGazetteJournalandthisMonday;noexactceremonydayinferred. Q32025targetunobserved,notcurrentopenstatus.30DC/2.3GWcompanypipelineotherprojectsnotReno. No executedleaseoractualcapexinreviewedbody.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-reno-data-center","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"sarcobatus-solar-scottys-junction-nye-county-nv","state":"NV","kind":"facility","name":"Sarcobatus Solar Project (off-grid bitcoin mining)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Nye"],"city":"Scotty's Junction","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This Tesla Solar LLC is explicitly described as unaffiliated with Elon Musk; do not assign Tesla Inc. as owner. Reported plan covers 800 acres of private land with distributed bitcoin servers, solar and batteries, not a public-land award or verified operating AI campus. Preliminary-plan approval is not final permit or energization. No MW or guaranteed overnight energy is verified. Developer says not grid tied and construction dust-control water trucked in; these are attributed design statements, not independently certified continuous zero-water/renewable operation. No direct original minutes reviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://basinandrangewatch.substack.com/p/new-threat-to-the-desert-unlocked","host":"basinandrangewatch.substack.com","date":"2026-01-22","published":"2026-01-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.298826,"lng":-117.052767,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Basin & Range Watch’s first-person advocacy report says Nye County approved a preliminary Sarcobatus Solar development plan at its January 21 meeting after discussion with Tesla Solar LLC.","independently_verified_current_operating_status":null},"notes":["This Tesla Solar LLC is explicitly described as unaffiliated with Elon Musk; do not assign Tesla Inc. as owner. Reported plan covers 800 acres of private land with distributed bitcoin servers, solar and batteries, not a public-land award or verified operating AI campus. Preliminary-plan approval is not final permit or energization. No MW or guaranteed overnight energy is verified. Developer says not grid tied and construction dust-control water trucked in; these are attributed design statements, not independently certified continuous zero-water/renewable operation. No direct original minutes reviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://basinandrangewatch.substack.com/p/new-threat-to-the-desert-unlocked","host":"basinandrangewatch.substack.com","date":"2026-01-22","published":"2026-01-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Scotty's Junction · Nye · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-apex-industrial-park-north-las-vegas-nv","state":"NV","kind":"facility","name":"Switch Apex Industrial Park Land Position","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"North Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. OonaMilliken NevadaIndependent publicmetadataJune17,2026: Switchbought300+acresApexNorthLasVegasforfutureDCdevelopment. Exactparcel/titleclosedate/currentconstructionunread; separate54acresouthernLasVegaspurchase/57000sfexpansionnotApexscope. HendersonJuly21consideration/180dayPROPOSEDpause inDIFFERENTcitynotApexban. Company17centerswordingambiguousgeography, notcertifiedUS/Clarksites. GoogleHenderson352Mgal2024sourceviaLVRJnotSwitchwater. Closedloop99%recyclednotzero use; waterlawcurrentapplicationnotcertified. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://thenevadaindependent.com/article/henderson-considers-data-center-pause-amid-construction-boom-across-clark-county","host":"thenevadaindependent.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.329138,"lng":-114.9277774,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["OonaMilliken NevadaIndependent publicmetadataJune17,2026: Switchbought300+acresApexNorthLasVegasforfutureDCdevelopment. Exactparcel/titleclosedate/currentconstructionunread; separate54acresouthernLasVegaspurchase/57000sfexpansionnotApexscope.","HendersonJuly21consideration/180dayPROPOSEDpause inDIFFERENTcitynotApexban. Company17centerswordingambiguousgeography, notcertifiedUS/Clarksites. GoogleHenderson352Mgal2024sourceviaLVRJnotSwitchwater. Closedloop99%recyclednotzero use; waterlawcurrentapplicationnotcertified.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://thenevadaindependent.com/article/henderson-considers-data-center-pause-amid-construction-boom-across-clark-county","host":"thenevadaindependent.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · North Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-citadel-storey-county-nv","state":"NV","kind":"facility","name":"Switch CITADEL Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only capture. HTTP200contains title only, no substantive captured campus specifications. This is not verification of claimed full-buildcapacity or currentoperation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/citadel/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.6183,"lng":-119.3732,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"title-only capture","fields":{},"notes":["HTTP200contains title only, no substantive captured campus specifications. This is not verification of claimed full-buildcapacity or currentoperation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/citadel/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-edge-1-nv","state":"NV","kind":"facility","name":"Switch Edge 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0591345,"lng":-115.213688,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"unmatched Switch deployment context only","fields":{},"notes":["Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-las-19-enterprise-nv","state":"NV","kind":"facility","name":"Switch LAS 19","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Enterprise","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Zoning approval is not operating availability or critical IT; no MW disclosed. Existing campus area above 2 million squarefeet is separate from the expansion. Under 1,000 gallons/day is developer estimate of public water for bathrooms/kitchenettes with proposed closed-loop cooling, not independently metered lifetime or all-source consumption. Audet substation supply description is not examined executed service. Other Nevada counts, regional 5900 MW forecasts, DRI water-equivalence comparisons and Google Henderson 205 million-gallon 2024 use cannot be assigned to this Switch expansion. Henderson future vote/other cities’ policies are separate jurisdictions and not original ordinance reviews. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://lasvegassun.com/news/2026/jun/23/switch-wins-las-vegas-expansion-approval-even-as-d/","host":"lasvegassun.com","date":"2026-06-23","published":"2026-06-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.0571,"lng":-115.2125,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Las Vegas Sun reports Clark County unanimously approved Switch’s 56,800-square-foot/nine-acre expansion onJune 17, with landscaping/tree waiver withdrawn and pedestrian-barrier commitment.","independently_verified_current_operating_status":null,"reported_zoning_approval_date":"2026-06-17","reported_additional_building_sqft":56800,"operating_expansion_verified":false},"notes":["Zoning approval is not operating availability or critical IT; no MW disclosed. Existing campus area above 2 million squarefeet is separate from the expansion. Under 1,000 gallons/day is developer estimate of public water for bathrooms/kitchenettes with proposed closed-loop cooling, not independently metered lifetime or all-source consumption. Audet substation supply description is not examined executed service. Other Nevada counts, regional 5900 MW forecasts, DRI water-equivalence comparisons and Google Henderson 205 million-gallon 2024 use cannot be assigned to this Switch expansion. Henderson future vote/other cities’ policies are separate jurisdictions and not original ordinance reviews.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://lasvegassun.com/news/2026/jun/23/switch-wins-las-vegas-expansion-approval-even-as-d/","host":"lasvegassun.com","date":"2026-06-23","published":"2026-06-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Enterprise · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-las-vegas-10-nv","state":"NV","kind":"facility","name":"Switch Las Vegas 10","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0555857,"lng":-115.2230608,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"unmatched Switch deployment context only","fields":{},"notes":["Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-las-vegas-11-nv","state":"NV","kind":"facility","name":"Switch Las Vegas 11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0558853,"lng":-115.2141369,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"unmatched Switch deployment context only","fields":{},"notes":["Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-las-vegas-12-nv","state":"NV","kind":"facility","name":"Switch Las Vegas 12","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0617389,"lng":-115.2132922,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"corporate energy context only","fields":{},"notes":["Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-las-vegas-5-nv","state":"NV","kind":"facility","name":"Switch Las Vegas 5","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.1427635,"lng":-115.0766965,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"unmatched Switch deployment context only","fields":{},"notes":["Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-las-vegas-7-nv","state":"NV","kind":"facility","name":"Switch Las Vegas 7","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Enterprise","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0599191,"lng":-115.210197,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"unmatched Switch deployment context only","fields":{},"notes":["Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Enterprise · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-las-vegas-9-nv","state":"NV","kind":"facility","name":"Switch Las Vegas 9","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Las Vegas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0557074,"lng":-115.2196277,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"unmatched Switch deployment context only","fields":{},"notes":["Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Las Vegas · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-tahoe-reno-1-the-citadel-campus-nv","state":"NV","kind":"facility","name":"Switch Tahoe Reno 1 (The Citadel Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. offsite/behind-meter generation portfolio, not IT capacity. Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/","host":"switch.com","date":"2020-07-21","published":"2020-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.5140681,"lng":-119.4755145,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"offsite/behind-meter generation portfolio, not IT capacity","fields":{"project_type":"solar and battery development portfolio","solar_power_mw_portfolio":555,"battery_energy_mwh_portfolio":800,"storey_solar_power_mw":127,"storey_battery_energy_mwh":240},"notes":["Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/","host":"switch.com","date":"2020-07-21","published":"2020-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-tahoe-reno-2-the-citadel-campus-nv","state":"NV","kind":"facility","name":"Switch Tahoe Reno 2 (The Citadel Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. offsite/behind-meter generation portfolio, not IT capacity. Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/","host":"switch.com","date":"2020-07-21","published":"2020-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5138706,"lng":-119.4848531,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"offsite/behind-meter generation portfolio, not IT capacity","fields":{"project_type":"solar and battery development portfolio","solar_power_mw_portfolio":555,"battery_energy_mwh_portfolio":800,"storey_solar_power_mw":127,"storey_battery_energy_mwh":240},"notes":["Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/","host":"switch.com","date":"2020-07-21","published":"2020-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"corporate energy context only","fields":{},"notes":["Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"switch-tahoe-reno-3-the-citadel-campus-nv","state":"NV","kind":"facility","name":"Switch Tahoe Reno 3 (The Citadel Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. offsite/behind-meter generation portfolio, not IT capacity. Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/","host":"switch.com","date":"2020-07-21","published":"2020-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.5115198,"lng":-119.4833058,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"offsite/behind-meter generation portfolio, not IT capacity","fields":{"project_type":"solar and battery development portfolio","solar_power_mw_portfolio":555,"battery_energy_mwh_portfolio":800,"storey_solar_power_mw":127,"storey_battery_energy_mwh":240},"notes":["Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/","host":"switch.com","date":"2020-07-21","published":"2020-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"corporate energy context only","fields":{},"notes":["Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"townsite-solar-2-boulder-city-nv","state":"NV","kind":"facility","name":"Townsite Solar 2 Boulder City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Boulder City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Boulder City withdrawn city parcel versus disputed federal parcel. Withdrawal concerns nearby CITY-owned site, not automatically federal80acreproject. City says BLM approved, but original federal decision and appeal docket not inspected here. Authorization/planned filing is not confirmed filed appeal or court disposition. Alleged consultation deficiencies are City position, not adjudicated violation. No IT MW, current construction or commissioning. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bcnv.org/1170/Data-Centers","host":"bcnv.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.9787649,"lng":-114.8337574,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Boulder City withdrawn city parcel versus disputed federal parcel","fields":{"agency":"Boulder City, Nevada","project_company":"Townsite Solar2 LLC","city_land_application_withdrawal_news_date":"2026-07-07","separate_federal_parcel_acres":80,"city_council_meeting_date":"2026-07-14","city_reported_action":"unanimously authorized appeal of BLM approval for federal parcel","planned_appeal_filing_deadline":"2026-07-27"},"notes":["Withdrawal concerns nearby CITY-owned site, not automatically federal80acreproject. City says BLM approved, but original federal decision and appeal docket not inspected here. Authorization/planned filing is not confirmed filed appeal or court disposition. Alleged consultation deficiencies are City position, not adjudicated violation. No IT MW, current construction or commissioning.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bcnv.org/1170/Data-Centers","host":"bcnv.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · Boulder City · Clark · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"vantage-nv1-storey-county-nv","state":"NV","kind":"facility","name":"Vantage Data Centers NV1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Storey"],"city":"McCarran","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Past target is not proof opening. Lease status does not mean delivered. Investment nearly3Bnot actualspend. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/","host":"vantage-dc.com","date":"2025-07-15","published":"2025-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.5311,"lng":-119.5904,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_capacity_mw":224,"power_basis":"campus capacity, IT versus gross unspecified in release","planned_investment_usd_approx":3000000000,"campus_acres_approx":137,"planned_buildings":4,"planned_area_sqft_min_exclusive":1000000,"first_building_opening_target":"2026-Q2","first_two_buildings_lease_status":"fully leased at announcement","forecast_combined_construction_operations_jobs_min_exclusive":1200},"notes":["Past target is not proof opening. Lease status does not mean delivered. Investment nearly3Bnot actualspend.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/","host":"vantage-dc.com","date":"2025-07-15","published":"2025-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nevada · McCarran · Storey · Source context reviewed","state_name":"Nevada","state_path":"/nevada/"},{"id":"dartmouth-college-data-center-lebanon-nh","state":"NH","kind":"facility","name":"Dartmouth College Data Center (Etna Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grafton"],"city":"Lebanon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Institution identity verified; Lebanon street/county/site count and MW unverified on this page. Institution confirms enterprise data-center facilities supporting academic/research systems. Selected service page does not state physical Lebanon location. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.dartmouth.edu/TDClient/1806/Portal/Requests/ServiceDet?ID=31708","host":"services.dartmouth.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.6600753,"lng":-72.2430802,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"service":"college server hosting"},"notes":["Institution identity verified; Lebanon street/county/site count and MW unverified on this page.","Institution confirms enterprise data-center facilities supporting academic/research systems. Selected service page does not state physical Lebanon location.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.dartmouth.edu/TDClient/1806/Portal/Requests/ServiceDet?ID=31708","host":"services.dartmouth.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Hampshire · Lebanon · Grafton · Source context reviewed","state_name":"New Hampshire","state_path":"/new-hampshire/"},{"id":"firstlight-keene-nh","state":"NH","kind":"facility","name":"FirstLight Keene Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cheshire"],"city":"Keene","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only site evidence hold. Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.firstlight.net/keene-nh-data-center/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.9258906,"lng":-72.2672342,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-access-review-round7-2026-10-14.json","scope":"title-only site evidence hold","fields":{},"notes":["Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.firstlight.net/keene-nh-data-center/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Hampshire · Keene · Cheshire · Source context reviewed","state_name":"New Hampshire","state_path":"/new-hampshire/"},{"id":"firstlight-lebanon-nh","state":"NH","kind":"facility","name":"FirstLight Lebanon Data Center (Dartmouth Regional Technology Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grafton"],"city":"Lebanon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. FirstLight Lebanon thin source with corporate footer only. BodyonlyregionalleadformandAlbany12MetroParkcorporateheadquarters. Do notassignAlbanyaddress/fiberroute-milecounttoLebanonDC. Page date notcommissioning. No usableexactsiteaddress/MW/area. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://firstlight.net/lebanon-nh-data-center","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.6788826,"lng":-72.2561477,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"FirstLight Lebanon thin source with corporate footer only","fields":{"operator_page_title":"Lebanon, New Hampshire Data Center","page_date":"2025-10-07"},"notes":["BodyonlyregionalleadformandAlbany12MetroParkcorporateheadquarters. Do notassignAlbanyaddress/fiberroute-milecounttoLebanonDC. Page date notcommissioning. No usableexactsiteaddress/MW/area.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://firstlight.net/lebanon-nh-data-center","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Hampshire · Lebanon · Grafton · Source context reviewed","state_name":"New Hampshire","state_path":"/new-hampshire/"},{"id":"firstlight-manchester-nh","state":"NH","kind":"facility","name":"FirstLight Manchester Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hillsborough"],"city":"Manchester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only site evidence hold. Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.firstlight.net/resources/data-center-manchester-nh-specifications/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.9720295,"lng":-71.4705697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-access-review-round7-2026-10-14.json","scope":"title-only site evidence hold","fields":{},"notes":["Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.firstlight.net/resources/data-center-manchester-nh-specifications/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Hampshire · Manchester · Hillsborough · Source context reviewed","state_name":"New Hampshire","state_path":"/new-hampshire/"},{"id":"firstlight-portsmouth-nh-data-center-nh","state":"NH","kind":"facility","name":"FirstLight Portsmouth, NH Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rockingham"],"city":"Portsmouth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only site evidence hold. Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.firstlight.net/resources/data-center-portsmouth-nh-specifications/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.0761287,"lng":-70.8080395,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-access-review-round7-2026-10-14.json","scope":"title-only site evidence hold","fields":{},"notes":["Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.firstlight.net/resources/data-center-portsmouth-nh-specifications/","host":"firstlight.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Hampshire · Portsmouth · Rockingham · Source context reviewed","state_name":"New Hampshire","state_path":"/new-hampshire/"},{"id":"locke-road-micro-data-center-concord-nh","state":"NH","kind":"facility","name":"Locke Road Micro Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Merrimack"],"city":"Concord","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Concord microfacility application versus completeness and prior land uses. HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/","host":"concordmonitor.com","date":"2026-09-14","published":"2026-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.2441282,"lng":-71.5460077,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Concord microfacility application versus completeness and prior land uses","fields":{"project":"LockeRoad micro data center","address":"52 LockeRoad, Concord, NewHampshire","owner_applicant":"Granite Municipal Manufacturing and Sales LLC","engineer":"Northpoint Engineering LLC","proposed_building_gross_sqft":8160,"proposed_data_center_space_sqft":7220,"parent_site_acres_approx":21,"reported_buildable_acres_approx":9.3,"stage_asofreport":"application completeness/site design consideration, not final approval","scheduled_completeness_meeting":"2026-09-16T19:00:00-04:00"},"notes":["HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/","host":"concordmonitor.com","date":"2026-09-14","published":"2026-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Hampshire · Concord · Merrimack · Source context reviewed","state_name":"New Hampshire","state_path":"/new-hampshire/"},{"id":"granite-shore-merrimack-station-bow-nh","state":"NH","kind":"facility","name":"Merrimack Station Data Center (proposed, Bow)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Merrimack"],"city":"Bow","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. NHPR September1,2026 republishes ConcordMonitor original reporting on GraniteShorePower/MerrimackStation Bow discussions. April350MWviability request is not approvedinterconnection, executedpower, ITload or DCapplication;200MWfromconsumeradvocate account is differentdiscussedscope, not550MWsum.343acres is ownerlandholding, not approvedcampus. Site described likely rather than confirmed inthisearlyreport. Statewideten-count is directory-derived/notnewcensus. Governor opposition/proposedmora and tabledbill are not a currentstateban. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification. VermontPublic September23,2026 republishes KateDario/NHPR original report of Bow public-commentmeeting. Selectboardchair says no projectapplication orGraniteShorecommunication received asofmeeting; planningboard would decide a futureapplication. Publicrecords350MWviabilityassessment and200MWdiscussion do notprove commissionedIT. StorycontainsGraniteState/GraniteShore naming inconsistency; legalcounterpartyrequiresoriginalfiling, notsilentrename. Taxeffects explicitlyunknown; oldcoalplant70%historictaxshare notDCforecast. Governor2027budgetmoraproposal notadoptedlaw. Different original reporting fromSeptember1ConcordMonitor, not independentVermont onsite reporting.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center","host":"nhpr.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.vermontpublic.org/2026-09-23/were-not-willing-to-trade-lower-taxes-for-this-bow-residents-speak-out-against-proposed-data-centers","host":"vermontpublic.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.1411,"lng":-71.4692,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["NHPR September1,2026 republishes ConcordMonitor original reporting on GraniteShorePower/MerrimackStation Bow discussions. April350MWviability request is not approvedinterconnection, executedpower, ITload or DCapplication;200MWfromconsumeradvocate account is differentdiscussedscope, not550MWsum.343acres is ownerlandholding, not approvedcampus. Site described likely rather than confirmed inthisearlyreport. Statewideten-count is directory-derived/notnewcensus. Governor opposition/proposedmora and tabledbill are not a currentstateban.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center","host":"nhpr.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["VermontPublic September23,2026 republishes KateDario/NHPR original report of Bow public-commentmeeting. Selectboardchair says no projectapplication orGraniteShorecommunication received asofmeeting; planningboard would decide a futureapplication. Publicrecords350MWviabilityassessment and200MWdiscussion do notprove commissionedIT. StorycontainsGraniteState/GraniteShore naming inconsistency; legalcounterpartyrequiresoriginalfiling, notsilentrename. Taxeffects explicitlyunknown; oldcoalplant70%historictaxshare notDCforecast. Governor2027budgetmoraproposal notadoptedlaw. Different original reporting fromSeptember1ConcordMonitor, not independentVermont onsite reporting.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.vermontpublic.org/2026-09-23/were-not-willing-to-trade-lower-taxes-for-this-bow-residents-speak-out-against-proposed-data-centers","host":"vermontpublic.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Hampshire · Bow · Merrimack · Source context reviewed","state_name":"New Hampshire","state_path":"/new-hampshire/"},{"id":"jersey-avenue-new-brunswick-data-center-nj","state":"NJ","kind":"facility","name":"100 Jersey Avenue Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"New Brunswick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. An amended redevelopment plan is not a citywide data-center ban. The former 27,000-square-foot component, 2022 mixed-use tax exemption and later deed-in-lieu financing are not current DC construction, incentive or investment totals. Future site plans remain separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://jerseydigs.com/90-jersey-ave-new-brunswick-development/","host":"jerseydigs.com","date":"2026-03-10","published":"2026-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.4884182,"lng":-74.4576813,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Jersey Digs reports a five-zero February 18 council amendment removing the Jersey Avenue data-center component and restoring a four-acre public park in the New Brunswick redevelopment plan.","independently_verified_current_operating_status":null,"reported_redevelopment_amendment_date":"2026-02-18","reported_dc_component_removed":true},"notes":["An amended redevelopment plan is not a citywide data-center ban. The former 27,000-square-foot component, 2022 mixed-use tax exemption and later deed-in-lieu financing are not current DC construction, incentive or investment totals. Future site plans remain separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://jerseydigs.com/90-jersey-ave-new-brunswick-development/","host":"jerseydigs.com","date":"2026-03-10","published":"2026-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · New Brunswick · Middlesex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"165-halsey-street-newark-nj","state":"NJ","kind":"facility","name":"165 Halsey Street","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Essex"],"city":"Newark","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Facility ID names whole building; source metrics describe one tenant suite. Group carrier-hotel building separately to prevent double counting. 4.7MW market total includes EWR2, not only165Halsey. Source describes DataBank EWR1 suite inside165Halsey carrier-hotel building, not whole building capacity. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/new-jersey/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7369,"lng":-74.1739,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"operator":"DataBank","street":"165 Halsey Street Suite500","city":"Newark","critical_it_capacity_mw":1.7,"it_area_sqft":34360},"notes":["Facility ID names whole building; source metrics describe one tenant suite. Group carrier-hotel building separately to prevent double counting.","4.7MW market total includes EWR2, not only165Halsey.","Source describes DataBank EWR1 suite inside165Halsey carrier-hotel building, not whole building capacity.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/new-jersey/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Newark · Essex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"365-data-centers-bridgewater-nj","state":"NJ","kind":"facility","name":"365 Data Centers Bridgewater","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Somerset"],"city":"Bridgewater","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 20MWfuture total is not delivered or additive to2.3MW. UPS redundancy and generator supply are different measures. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://365datacenters.com/new-jersey-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5814424,"lng":-74.5738875,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"published_address":"999 Frontier Rd, Bridgewater, NJ08807","data_center_area_sqft":25600,"advertised_power_mw":2.3,"future_total_available_power_mw":20,"power_basis":"power; IT versus gross unspecified"},"notes":["20MWfuture total is not delivered or additive to2.3MW. UPS redundancy and generator supply are different measures.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/new-jersey-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Bridgewater · Somerset · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"365-data-centers-carlstadt-nj","state":"NJ","kind":"facility","name":"365 Data Centers Carlstadt (NJ3)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bergen"],"city":"Carlstadt","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Page conflicts between introduction over200karea and specification187600plus4000admin; raised floor120k+separate. Hold canonical area until dated cutsheet resolves. Backup generator total notIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://365datacenters.com/carlstadt-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.827949,"lng":-74.049418,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"published_address":"410 Commerce Blvd, Carlstadt, NJ07072","advertised_data_center_power_mw":18,"power_basis":"power for Data Center; not explicitly criticalIT"},"notes":["Page conflicts between introduction over200karea and specification187600plus4000admin; raised floor120k+separate. Hold canonical area until dated cutsheet resolves. Backup generator total notIT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/carlstadt-data-center/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Carlstadt · Bergen · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"new-hook-road-data-center-bayonne-nj","state":"NJ","kind":"facility","name":"69-71 New Hook Road Data Center (Constable Hook)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Bayonne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Zach Blackburn, NewJerseyGlobe April21,2026 original candidate-release reporting explicitly names NewHookRoad. City opposition RESOLUTION is not zoning ban; candidate claims December planning vote may protect the project, not a court/vesting determination. Later August citywide-ban reporting in round77 is separate and does not settle this site exception. No exact December vote date, permit text or final project outcome inspected. Personal campaign accusations not findings. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://newjerseyglobe.com/campaigns/bayonne-mayoral-candidates-spar-over-data-center-vote/","host":"newjerseyglobe.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.6565644,"lng":-74.0944372,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Zach Blackburn, NewJerseyGlobe April21,2026 original candidate-release reporting explicitly names NewHookRoad. City opposition RESOLUTION is not zoning ban; candidate claims December planning vote may protect the project, not a court/vesting determination. Later August citywide-ban reporting in round77 is separate and does not settle this site exception. No exact December vote date, permit text or final project outcome inspected. Personal campaign accusations not findings.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://newjerseyglobe.com/campaigns/bayonne-mayoral-candidates-spar-over-data-center-vote/","host":"newjerseyglobe.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Bayonne · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"a1-data-center-millville-nj","state":"NJ","kind":"facility","name":"A1 Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"Millville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Undateddevelopmentplatformpage simultaneouslyclaims100MWsubstationtarget6 to 12monthsand100MWliveincluding100MWfeeds+10MWgas. Unreconciledcurrentpowerheld; do notreport110MWITor1.4GWbuilt.2.9Mbuildablearea notcompletedfloor. Taxabatementapprovalmarketingrequiresgovernmentawardtext; noneadopted. Twoapproxcoordinatesnotparcelproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.a1datacenter.net/","host":"a1datacenter.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.402,"lng":-75.043,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"marketed_campus_acres":66,"buildable_area_sqft":2900000,"long_term_generation_scale_horizon_gw":1.4},"notes":["Undateddevelopmentplatformpage simultaneouslyclaims100MWsubstationtarget6 to 12monthsand100MWliveincluding100MWfeeds+10MWgas. Unreconciledcurrentpowerheld; do notreport110MWITor1.4GWbuilt.2.9Mbuildablearea notcompletedfloor. Taxabatementapprovalmarketingrequiresgovernmentawardtext; noneadopted. Twoapproxcoordinatesnotparcelproof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.a1datacenter.net/","host":"a1datacenter.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Millville · Cumberland · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"bell-works-holmdel-data-center-nj","state":"NJ","kind":"facility","name":"Bell Works Data Center (101 Crawfords Corner Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monmouth"],"city":"Holmdel","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Attorney’s grandfathering interpretation is attributed, not examined ordinance/court ruling or projectapproval. July 21 introduction is not adoption/effectivedate; exactfinalbantext still needed. Proposedtwo-story 40 MWbasisundefined, not criticalIT/currentload. Marketingcomparison to 300 to 500 MWis not a reliable one-tenth equivalence. Closed-loop/no-added-traffic/isolatedlocation claims are developer plans, not measuredimpacts.2012 redevelopmentpermitteduse is not a newbuildingpermit. No RFS/tenant/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://patch.com/new-jersey/holmdel-hazlet/data-center-proposed-bell-works-see-details","host":"patch.com","date":"2026-08-20","published":"2026-08-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.3650934,"lng":-74.1674935,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"Patch reports InspiredbySomerset’sJuly 24 BellWorks data-center application preceded Holmdel’slaterban, with township attorney saying priorzoning applies but site-plan review remains required.","independently_verified_current_operating_status":null,"reported_application_filed":"2026-07-24","grandfathering_claim_attributed_to_township_attorney":true,"final_site_plan_approval_verified":false},"notes":["Attorney’s grandfathering interpretation is attributed, not examined ordinance/court ruling or projectapproval. July 21 introduction is not adoption/effectivedate; exactfinalbantext still needed. Proposedtwo-story 40 MWbasisundefined, not criticalIT/currentload. Marketingcomparison to 300 to 500 MWis not a reliable one-tenth equivalence. Closed-loop/no-added-traffic/isolatedlocation claims are developer plans, not measuredimpacts.2012 redevelopmentpermitteduse is not a newbuildingpermit. No RFS/tenant/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://patch.com/new-jersey/holmdel-hazlet/data-center-proposed-bell-works-see-details","host":"patch.com","date":"2026-08-20","published":"2026-08-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Holmdel · Monmouth · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"hexa-builders-black-horse-pike-monroe-nj","state":"NJ","kind":"facility","name":"Black Horse Pike Data Center (3043 Black Horse Pike)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Gloucester"],"city":"Monroe Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. First Amendment and damages claims are litigant arguments, not accepted law. 300 million USD is requested damages, not capex or award. No court outcome established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://jerseyvindicator.org/2026/08/01/developer-challenges-gloucester-county-data-center-ban-on-free-speech-grounds","host":"jerseyvindicator.org","date":"2026-08-01","published":"2026-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.7005307,"lng":-75.0041347,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"ban-challenged-in-litigation","reported_finding":"Jersey Vindicator reports Hexa challenge to Monroe Township ban; suit filed June 5 in state court then removed to federal court.","report_display_date":"2026-08-01","independently_verified_current_status":null},"notes":["First Amendment and damages claims are litigant arguments, not accepted law. 300 million USD is requested damages, not capex or award. No court outcome established.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://jerseyvindicator.org/2026/08/01/developer-challenges-gloucester-county-data-center-ban-on-free-speech-grounds","host":"jerseyvindicator.org","date":"2026-08-01","published":"2026-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Monroe Township · Gloucester · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"centersquare-ewr2-weehawken-nj","state":"NJ","kind":"facility","name":"Centersquare EWR2 (Weehawken)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Weehawken","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three NewJersey sections; not regional total per site. Allpowerbasesexplicitandnotadditive. Market127.2MWdoesnotreconcileexactlywithlistedbuildingfeeds; no canonicalmarketsumorITconversion.199110raisedfloornotentirebuilding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7615218,"lng":-74.0260271,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"three NewJersey sections; not regional total per site","fields":{"site_sections":[{"code":"EWR2","raised_floor_sqft":199110,"utility_power_mw":45.7,"ups_capacity_mw":20.7,"generator_capacity_mw":31},{"code":"EWR3","raised_floor_sqft":47490,"utility_power_mw":54.8,"ups_capacity_mw":8.1,"generator_capacity_mw":14},{"code":"EWR5","raised_floor_sqft":59572,"utility_power_mw":26.3,"ups_capacity_mw":11.6,"generator_capacity_mw":16}]},"notes":["Allpowerbasesexplicitandnotadditive. Market127.2MWdoesnotreconcileexactlywithlistedbuildingfeeds; no canonicalmarketsumorITconversion.199110raisedfloornotentirebuilding.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Weehawken · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"centersquare-ewr3-piscataway-nj","state":"NJ","kind":"facility","name":"Centersquare EWR3 (Piscataway)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Piscataway","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three NewJersey sections; not regional total per site. Allpowerbasesexplicitandnotadditive. Market127.2MWdoesnotreconcileexactlywithlistedbuildingfeeds; no canonicalmarketsumorITconversion.199110raisedfloornotentirebuilding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.554537,"lng":-74.4569,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"three NewJersey sections; not regional total per site","fields":{"site_sections":[{"code":"EWR2","raised_floor_sqft":199110,"utility_power_mw":45.7,"ups_capacity_mw":20.7,"generator_capacity_mw":31},{"code":"EWR3","raised_floor_sqft":47490,"utility_power_mw":54.8,"ups_capacity_mw":8.1,"generator_capacity_mw":14},{"code":"EWR5","raised_floor_sqft":59572,"utility_power_mw":26.3,"ups_capacity_mw":11.6,"generator_capacity_mw":16}]},"notes":["Allpowerbasesexplicitandnotadditive. Market127.2MWdoesnotreconcileexactlywithlistedbuildingfeeds; no canonicalmarketsumorITconversion.199110raisedfloornotentirebuilding.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Piscataway · Middlesex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"centersquare-ewr5-secaucus-nj","state":"NJ","kind":"facility","name":"Centersquare EWR5 (Secaucus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three NewJersey sections; not regional total per site. Allpowerbasesexplicitandnotadditive. Market127.2MWdoesnotreconcileexactlywithlistedbuildingfeeds; no canonicalmarketsumorITconversion.199110raisedfloornotentirebuilding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.78617,"lng":-74.0692821,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"three NewJersey sections; not regional total per site","fields":{"site_sections":[{"code":"EWR2","raised_floor_sqft":199110,"utility_power_mw":45.7,"ups_capacity_mw":20.7,"generator_capacity_mw":31},{"code":"EWR3","raised_floor_sqft":47490,"utility_power_mw":54.8,"ups_capacity_mw":8.1,"generator_capacity_mw":14},{"code":"EWR5","raised_floor_sqft":59572,"utility_power_mw":26.3,"ups_capacity_mw":11.6,"generator_capacity_mw":16}]},"notes":["Allpowerbasesexplicitandnotadditive. Market127.2MWdoesnotreconcileexactlywithlistedbuildingfeeds; no canonicalmarketsumorITconversion.199110raisedfloornotentirebuilding.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"cologix-cedar-knolls-campus-nj","state":"NJ","kind":"facility","name":"Cologix Cedar Knolls Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Morris"],"city":"Cedar Knolls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NewJersey market named locations. 200k+usablefloorspaceisregionalacrossmultiplefacilities/businesscontinuitysites, not each. ExactcurrentNNJ1notlisted; CedarKnollscampusnotonebuildingfromthispage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/new-jersey/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.81995,"lng":-74.427986,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"NewJersey market named locations","fields":{"named_locations":[{"code":"NNJ2","address":"9 Wing Drive, Cedar Knolls, New Jersey"},{"code":"NNJ3","address":"200 Webro Road, Parsippany, New Jersey"},{"code":"NNJ4","address":"16 Wing Drive, Cedar Knolls, New Jersey"}]},"notes":["200k+usablefloorspaceisregionalacrossmultiplefacilities/businesscontinuitysites, not each. ExactcurrentNNJ1notlisted; CedarKnollscampusnotonebuildingfromthispage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/new-jersey/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Cedar Knolls · Morris · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"cologix-nnj3-parsippany-nj","state":"NJ","kind":"facility","name":"Cologix NNJ3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Morris"],"city":"Parsippany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NewJersey market named locations. 200k+usablefloorspaceisregionalacrossmultiplefacilities/businesscontinuitysites, not each. ExactcurrentNNJ1notlisted; CedarKnollscampusnotonebuildingfromthispage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/new-jersey/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.859636,"lng":-74.423348,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"NewJersey market named locations","fields":{"named_locations":[{"code":"NNJ2","address":"9 Wing Drive, Cedar Knolls, New Jersey"},{"code":"NNJ3","address":"200 Webro Road, Parsippany, New Jersey"},{"code":"NNJ4","address":"16 Wing Drive, Cedar Knolls, New Jersey"}]},"notes":["200k+usablefloorspaceisregionalacrossmultiplefacilities/businesscontinuitysites, not each. ExactcurrentNNJ1notlisted; CedarKnollscampusnotonebuildingfromthispage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/new-jersey/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Parsippany · Morris · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"continent-8-atlantic-city-convention-center-nj","state":"NJ","kind":"facility","name":"Continent 8 Atlantic City (Convention Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Atlantic"],"city":"Atlantic City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Continent8 Atlantic City historical opening. No inventeddayofopening. Firsteverpurpose-builtclaimnotindependentcitywidehistoricalaudit.40globalnetworklocationsnotadditionalAtlanticCitybuildings. No numericITMWorcurrent2026capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.continent8.com/everything-to-know-about-the-new-data-center-in-atlantic-city/","host":"continent8.com","date":"2019-07-11","published":"2019-07-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3630994,"lng":-74.4385634,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Continent8 Atlantic City historical opening","fields":{"operator":"Continent8","facility_location":"Atlantic City Convention Center, New Jersey","opening_month":"2019-06","opening_date_precision":"month inferred from last month in July11release","partner":"Casino Reinvestment Development Authority"},"notes":["No inventeddayofopening. Firsteverpurpose-builtclaimnotindependentcitywidehistoricalaudit.40globalnetworklocationsnotadditionalAtlanticCitybuildings. No numericITMWorcurrent2026capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.continent8.com/everything-to-know-about-the-new-data-center-in-atlantic-city/","host":"continent8.com","date":"2019-07-11","published":"2019-07-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Atlantic City · Atlantic · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"continent-8-atlantic-city-ocean-casino-resort-nj","state":"NJ","kind":"facility","name":"Continent 8 Atlantic City (Ocean Casino Resort)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Atlantic"],"city":"Atlantic City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Casino June28 opening is not necessarily data-center opening date. Future third location and30globalcenters not site inventory/current operation. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.roi-nj.com/2018/06/26/tech/continent-8-opens-new-data-center-at-ocean-resort-casino/","host":"roi-nj.com","date":"2018-06-26","published":"2018-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3624135,"lng":-74.4147501,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"ROI-NJ reports Continent8 opened its second Atlantic City location at Ocean Resort Casino.","independently_verified_current_operating_status":null},"notes":["Casino June28 opening is not necessarily data-center opening date. Future third location and30globalcenters not site inventory/current operation.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.roi-nj.com/2018/06/26/tech/continent-8-opens-new-data-center-at-ocean-resort-casino/","host":"roi-nj.com","date":"2018-06-26","published":"2018-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Atlantic City · Atlantic · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"coresite-ny2-secaucus-nj-nj","state":"NJ","kind":"facility","name":"CoreSite NY2 - Secaucus, NJ","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator facility area; not an additional building-count assertion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://coresite.com/data-center/ny2-secaucus-nj","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7842844,"lng":-74.0652426,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft_lower_bound":256000},"notes":["Operator facility area; not an additional building-count assertion.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://coresite.com/data-center/ny2-secaucus-nj","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"coresite-ny3-secaucus-nj","state":"NJ","kind":"facility","name":"CoreSite NY3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://coresite.com/data-center/ny3-secaucus-nj","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7849039,"lng":-74.0653573,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"NY3","published_address":"2 Emerson Lane, Secaucus, NJ07094","operator_labeled_area_sqft_lower_bound":138000,"area_qualifier":"plus"},"notes":["Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://coresite.com/data-center/ny3-secaucus-nj","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"coreweave-kenilworth-nj","state":"NJ","kind":"facility","name":"CoreWeave NEST Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Union"],"city":"Kenilworth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. New Jersey statewide program context; project award unverified. General program guidance, not a Kenilworth/CoreWeave award certificate or paid amount. Program cap versus per-business maximum and total allocated must not become site investment or incentives received. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.njeda.gov/nextnjai/","host":"njeda.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.6762,"lng":-74.2913,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"New Jersey statewide program context; project award unverified","fields":{"statewide_program_status":"fully allocated; no new applications","program_budget_reduction_law_date":"2026-08-27","current_total_program_authorization_usd":250000000},"notes":["General program guidance, not a Kenilworth/CoreWeave award certificate or paid amount. Program cap versus per-business maximum and total allocated must not become site investment or incentives received.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.njeda.gov/nextnjai/","host":"njeda.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Kenilworth · Union · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"cyrusone-nym1-somerset-nj","state":"NJ","kind":"facility","name":"CyrusOne NYM1 (Somerset)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Somerset"],"city":"Somerset","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Gross/full-build and technical-space figures are distinct, not additive; no delivered expansion or measured load inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. general design article, not site proof. General AI design FAQ has market forecasts and company design context. It does not establish Aurora or Somerset site capex, capacity, operation or construction date. Publication metadata is2023, not its2025modification date.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/somerset-nj","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.cyrusone.com/resources/blogs/cyrusone-intelliscale-design-and-ai-data-center-faq","host":"cyrusone.com","date":"2023-08-24","published":"2023-08-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.5379623,"lng":-74.5457225,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_total_it_capacity_mw":23,"key_feature_technical_it_space_sqft":185000,"full_build_data_center_sqft_lower_bound":430000},"notes":["Gross/full-build and technical-space figures are distinct, not additive; no delivered expansion or measured load inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/somerset-nj","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"general design article, not site proof","fields":{},"notes":["General AI design FAQ has market forecasts and company design context. It does not establish Aurora or Somerset site capex, capacity, operation or construction date. Publication metadata is2023, not its2025modification date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/blogs/cyrusone-intelliscale-design-and-ai-data-center-faq","host":"cyrusone.com","date":"2023-08-24","published":"2023-08-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Somerset · Somerset · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"cyrusone-nym2-totowa-nj","state":"NJ","kind":"facility","name":"CyrusOne NYM2 (Totowa)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Passaic"],"city":"Totowa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Key feature labels 200,000 as technical IT space, while specifications use it as two-building total. Preserve this label conflict; colocation and recovery areas are different subsets. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/totowa-nj-nym2","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.9072095,"lng":-74.2422211,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_total_it_capacity_mw":6,"buildings":2,"building_total_sqft":200000,"colocation_space_sqft":50000,"work_area_recovery_sqft":60000},"notes":["Key feature labels 200,000 as technical IT space, while specifications use it as two-building total. Preserve this label conflict; colocation and recovery areas are different subsets.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/totowa-nj-nym2","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Totowa · Passaic · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"databank-ewr2-piscataway-nj","state":"NJ","kind":"facility","name":"DataBank EWR2 (Piscataway)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Piscataway","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/new-jersey/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.549247,"lng":-74.458241,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"EWR2","street":"25 Corporate Place South","city":"Piscataway","critical_it_capacity_mw":3,"it_area_sqft":22590,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/new-jersey/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Piscataway · Middlesex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"digital-realty-clifton-campus-nj","state":"NJ","kind":"facility","name":"Digital Realty Clifton Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Passaic"],"city":"Clifton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Only the two named Clifton cards are retained; New York/New Jersey regional summary and other cities are excluded. Resolve campus/building identity before counting places. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. This source describes one of the two Clifton buildings in an aggregated base campus record; never repeat their sum as each building total.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr20","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr21","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.862137,"lng":-74.160393,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"regional_cards":[{"facility":"EWR20","published_address":"100 Delawanna Avenue, Clifton, NJ 07014","advertised_building_sqft":183000},{"facility":"EWR21","published_address":"2 Peekay Drive, Clifton, NJ 07014","advertised_building_sqft":215000}]},"notes":["Only the two named Clifton cards are retained; New York/New Jersey regional summary and other cities are excluded. Resolve campus/building identity before counting places.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"EWR20","published_address":"100 Delawanna Avenue, Clifton, NJ 07014","operator_label_total_building_size_sqft":183000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","This source describes one of the two Clifton buildings in an aggregated base campus record; never repeat their sum as each building total.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr20","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"EWR21","published_address":"2 Peekay Drive, Clifton, NJ 07014","operator_label_total_building_size_sqft":215000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","This source describes one of the two Clifton buildings in an aggregated base campus record; never repeat their sum as each building total.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr21","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Clifton · Passaic · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"digital-realty-new-york-ewr11-nj","state":"NJ","kind":"facility","name":"Digital Realty New York EWR11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Piscataway Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5537931,"lng":-74.4571024,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"EWR11","published_address":"3 Corporate Place, Piscataway Township, NJ 08854","advertised_building_sqft":207500},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Piscataway Township · Middlesex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"digital-realty-new-york-ewr12-nj","state":"NJ","kind":"facility","name":"Digital Realty New York EWR12","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Piscataway Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5529283,"lng":-74.4592038,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"EWR12","published_address":"365 S. Randolphville Road, Piscataway Township, NJ 08854","advertised_building_sqft":323000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Piscataway Township · Middlesex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"equinix-ny11-carteret-nj","state":"NJ","kind":"facility","name":"Equinix NY11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Carteret","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. NY5's power and generators do not belong to these two sites. NY3's planned cabinets and rack density are not a certified site total. Historical construction is not current operation. Global fleet counts are not US counts. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterfrontier.com/network/article/33008176/equinix-ny5-ny11-data-centers-generate-digital-economic-magnetism-in-ny-nj","host":"datacenterfrontier.com","date":"2023-07-13","published":"2023-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.58433,"lng":-74.243607,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Data Center Frontier distinguishes NY11 Carteret's AWS Local Zone expansion from NY3 Secaucus construction.","independently_verified_current_operating_status":null},"notes":["NY5's power and generators do not belong to these two sites. NY3's planned cabinets and rack density are not a certified site total. Historical construction is not current operation. Global fleet counts are not US counts.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterfrontier.com/network/article/33008176/equinix-ny5-ny11-data-centers-generate-digital-economic-magnetism-in-ny-nj","host":"datacenterfrontier.com","date":"2023-07-13","published":"2023-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Carteret · Middlesex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"equinix-ny2-secaucus-nj","state":"NJ","kind":"facility","name":"Equinix NY2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. ResolvedcaptureNovember 12,2025 isnotopeningdateorOctober 2026 currentoperation. Businessaddressisnotparcel/roofcoordinatesverification. Redundancy/complianceclaimsnotindependentcertificationorcriticalIT. SpecificationformnotcompletedandnoPDFfactsadopted. NYmarketlabeldoesnotmakeNewJerseyaNewYorkphysicalsite. NoMW/capex/tenant/RFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://web.archive.org/web/2025/https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny2","host":"web.archive.org","date":"2025-11-12","published":"2025-11-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.7775822,"lng":-74.0759403,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ArchivedEquinixNY 2 operatorpage identifies 275 HartzWay,SecaucuswithN+1 electricalandN+1 coolingdesign.","independently_verified_current_operating_status":null,"archived_operator_business_address":"275 Hartz Way, Secaucus, New Jersey","resolved_archive_date":"2025-11-12"},"notes":["ResolvedcaptureNovember 12,2025 isnotopeningdateorOctober 2026 currentoperation. Businessaddressisnotparcel/roofcoordinatesverification. Redundancy/complianceclaimsnotindependentcertificationorcriticalIT. SpecificationformnotcompletedandnoPDFfactsadopted. NYmarketlabeldoesnotmakeNewJerseyaNewYorkphysicalsite. NoMW/capex/tenant/RFSverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/2025/https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny2","host":"web.archive.org","date":"2025-11-12","published":"2025-11-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"equinix-ny3-secaucus-nj","state":"NJ","kind":"facility","name":"Equinix NY3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. NY5's power and generators do not belong to these two sites. NY3's planned cabinets and rack density are not a certified site total. Historical construction is not current operation. Global fleet counts are not US counts. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterfrontier.com/network/article/33008176/equinix-ny5-ny11-data-centers-generate-digital-economic-magnetism-in-ny-nj","host":"datacenterfrontier.com","date":"2023-07-13","published":"2023-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.774179,"lng":-74.065868,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Data Center Frontier distinguishes NY11 Carteret's AWS Local Zone expansion from NY3 Secaucus construction.","independently_verified_current_operating_status":null},"notes":["NY5's power and generators do not belong to these two sites. NY3's planned cabinets and rack density are not a certified site total. Historical construction is not current operation. Global fleet counts are not US counts.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterfrontier.com/network/article/33008176/equinix-ny5-ny11-data-centers-generate-digital-economic-magnetism-in-ny-nj","host":"datacenterfrontier.com","date":"2023-07-13","published":"2023-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"equinix-ny4-secaucus-nj","state":"NJ","kind":"facility","name":"Equinix NY4","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Exact named provider/street context; NY4 code not independently given. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.778534,"lng":-74.072237,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Equinix","listed_address":"755 Secaucus Rd","listed_city":"Secaucus","listed_state":"NJ"},"notes":["Exact named provider/street context; NY4 code not independently given.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"equinix-ny5-nj","state":"NJ","kind":"facility","name":"Equinix NY5","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny5","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7785845,"lng":-74.0723242,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"800 Secaucus Rd Secaucus, NJ 07094","colocation_area_sqft":129436},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny5","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"equinix-ny6-secaucus-nj","state":"NJ","kind":"facility","name":"Equinix NY6","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. ResolvedWaybacksnapshotisDecember 6,2025,notgeneric 2025 URLorOctober 2026 currentstatus. Electrical/coolingredundancydescriptionsarenotcriticalITMWorindependentuptimecertification. LEED/complianceiconsareunverifiedoperatorclaimswithoutreviewedawardlevel/date. Specificationformwasnotcompleted,so nohiddenPDFcapacityclaimadopted. NYmarketlabeldoesnotplacefacilityinNewYorkState;SecaucusisNewJersey. NoRFS/tenant/capex. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://web.archive.org/web/2025/https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny6","host":"web.archive.org","date":"2025-12-06","published":"2025-12-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.7763898,"lng":-74.0718595,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ArchivedEquinixNY 6 operatorpage identifies 105 EnterpriseAvenueSouth,Secaucus,with 2 N/N+1 electricalandN+2 coolingdesign.","independently_verified_current_operating_status":null,"archived_operator_business_address":"105 Enterprise Avenue South, Secaucus, New Jersey","resolved_archive_date":"2025-12-06"},"notes":["ResolvedWaybacksnapshotisDecember 6,2025,notgeneric 2025 URLorOctober 2026 currentstatus. Electrical/coolingredundancydescriptionsarenotcriticalITMWorindependentuptimecertification. LEED/complianceiconsareunverifiedoperatorclaimswithoutreviewedawardlevel/date. Specificationformwasnotcompleted,so nohiddenPDFcapacityclaimadopted. NYmarketlabeldoesnotplacefacilityinNewYorkState;SecaucusisNewJersey. NoRFS/tenant/capex.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/2025/https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny6","host":"web.archive.org","date":"2025-12-06","published":"2025-12-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"equinix-ny7-nj","state":"NJ","kind":"facility","name":"Equinix NY7","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"North Bergen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny7","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7968626,"lng":-74.0311403,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"5851 West Side Ave North Bergen, NJ 07047","colocation_area_sqft":71946},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny7","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · North Bergen · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"evocative-ewr1-secaucus-nj","state":"NJ","kind":"facility","name":"Evocative EWR1 (Secaucus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Evocative EWR1 utility power and future expansion. 20MWfutureexpansionnotcurrentadditionalIT.600gallons/minclosedloopflownotnetwaterconsumption. Four2MWgeneratorsredundancyseparate. Global20DC/32PoPnotNJcount. Exactstreetandcurrentenergizedcapacityunverified. Operatorcomplianceclaimsnotindependentcertificates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://evocative.com/data-centers/secaucus-nj-data-center-ewr1/","host":"evocative.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.787662,"lng":-74.068015,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Evocative EWR1 utility power and future expansion","fields":{"operator":"Evocative","code":"EWR1","market":"New Jersey","published_area_sqft":105000,"published_total_power_mw":10,"power_basis":"total capacity/utility feeds, not explicit critical IT","utility_feed_configuration":"two5MWundergroundfeeds","potential_expanded_power_mw":20},"notes":["20MWfutureexpansionnotcurrentadditionalIT.600gallons/minclosedloopflownotnetwaterconsumption. Four2MWgeneratorsredundancyseparate. Global20DC/32PoPnotNJcount. Exactstreetandcurrentenergizedcapacityunverified. Operatorcomplianceclaimsnotindependentcertificates.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://evocative.com/data-centers/secaucus-nj-data-center-ewr1/","host":"evocative.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"h5-data-centers-secaucus-nj","state":"NJ","kind":"facility","name":"H5 Data Centers Secaucus (NJ01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Secaucus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. TierIII described by operator is not an independently checked Uptime registry certificate. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/new-jersey-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.784817,"lng":-74.076264,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"200B Meadowlands Parkway, Secaucus, NJ 07094","advertised_facility_sqft_lower_bound":38000},"notes":["TierIII described by operator is not an independently checked Uptime registry certificate.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/new-jersey-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Secaucus · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"lumen-weehawken-1-nj","state":"NJ","kind":"facility","name":"Lumen Weehawken 1 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Weehawken","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Historical complex/operator context or exact-address corroboration, with operator-transfer and multi-building limitations.. Four-page current Csquare New York/New Jersey operator sheet obtained through the observed Centersquare URL; cover and page 2 fully read, page 2 also viewed. Cover 127.2 MW is market COMBINED UTILITY power, not EWR2 alone. EWR2 lists 300 JFK Boulevard East AND 1919 Park Avenue together, 199,110 square feet, 45.7 MW utility /20.7 MW UPS /31 MW generator. Different systems/scopes; not additive IT or necessarily measured coincident demand. Current operator/address context for the inherited Weehawken complex, but exact legal transfer, individual-building allocation, land ownership and inherited centroid pin remain unverified. Copyright 2026 is not publication/rebranding/commissioning date; cached search had older 2025/28-provider text while inspected current page has 2026/30 providers. Current captured bytes govern this review. Not all fields, exact ownership chain, current measured IT or parcel pin verified. Original CenturyLink March 25, 2014 issuer statement says Weehawken expansion completed in March 2014. Other market completions were future targets. More than 20 MW and 180,000 square feet are COMBINED new builds/expansions across eight markets, not Weehawken alone. Historical >55 worldwide data centers/2.5 million raised-floor square feet are not current Lumen US operating counts. No exact building address or later transaction chain established by this release. Rich Miller, Data Center Knowledge June 25, 2010, public issuer-announcement report: Savvis NJ2X expansion opened by publication week, adjacent to existing NJ2 complex in Weehawken. 22,000 SELLABLE square feet new and 40,000 POTENTIAL future expansion are not 62,000 currently installed floor space; reported $23 million is historical expansion cost, not current Lumen capex or acquisition price. 64 microseconds is issuer proximity-hosting claim, not independently measured performance. Limited historical complex context for inherited Weehawken row, not exact modern operator/parcel ownership. Fresh capture repeats earlier availability receipt; not a second independent source. Limited named street-label/service context or issuer acquisition statement.. Current captured certificate1361865-19/version19, issued September24,2026, expires June17,2028. Original registrationSeptember14,2007 is management-system registration, not each building founding. ISO27001:2022/27701:2019 cover ISMS/PIMS supporting services, not UptimeTier certification, MW, building ownership or guaranteed breach-free/uptime performance. No issuer revocation-directory check or surveillance audit inspected. Page2 separately names AlbanyAirlineDrive gateway for colocation versus PearlStreet edgecompute; page8 names NashvilleSidcoDrive. Limited street-label context, not independently verified street numbers, parcels or sole operator. Most other rows only give cities and do not resolve remaining Lumen pins. Page7 still names Weehawken in Lumen service scope; current Csquare EWR2 material from round83 does not prove Lumen vanished or a sole ownership transfer. Shared complex/tenancy/operating-role ambiguity remains. No automatic rename/merge. Fetched8-page version19 differs from search cache10-page version18; retained current source bytes/date govern this review. Portfolio certification rows are not a physical-building census. Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-EWR-SpecSheet.pdf","host":"centersquaredc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ir.lumen.com/news/news-details/2014/CenturyLink-expands-global-data-center-presence-in-eight-markets/default.aspx","host":"ir.lumen.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.datacenterknowledge.com/investing/savvis-opens-new-nj2x-financial-trading-hub","host":"datacenterknowledge.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://assets.lumen.com/is/content/Lumen/iso27001-certificate-lumen?Creativeid=b54bb9d7-6311-4aac-acac-84580992d059","host":"assets.lumen.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7714,"lng":-74.0194,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-legacy-operator-address-and-power-basis-review-round83-2026-10-15.json","scope":"Historical complex/operator context or exact-address corroboration, with operator-transfer and multi-building limitations.","fields":{},"notes":["Four-page current Csquare New York/New Jersey operator sheet obtained through the observed Centersquare URL; cover and page 2 fully read, page 2 also viewed. Cover 127.2 MW is market COMBINED UTILITY power, not EWR2 alone. EWR2 lists 300 JFK Boulevard East AND 1919 Park Avenue together, 199,110 square feet, 45.7 MW utility /20.7 MW UPS /31 MW generator. Different systems/scopes; not additive IT or necessarily measured coincident demand. Current operator/address context for the inherited Weehawken complex, but exact legal transfer, individual-building allocation, land ownership and inherited centroid pin remain unverified. Copyright 2026 is not publication/rebranding/commissioning date; cached search had older 2025/28-provider text while inspected current page has 2026/30 providers. Current captured bytes govern this review.","Not all fields, exact ownership chain, current measured IT or parcel pin verified."],"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-EWR-SpecSheet.pdf","host":"centersquaredc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-legacy-operator-address-and-power-basis-review-round83-2026-10-15.json","scope":"Historical complex/operator context or exact-address corroboration, with operator-transfer and multi-building limitations.","fields":{},"notes":["Original CenturyLink March 25, 2014 issuer statement says Weehawken expansion completed in March 2014. Other market completions were future targets. More than 20 MW and 180,000 square feet are COMBINED new builds/expansions across eight markets, not Weehawken alone. Historical >55 worldwide data centers/2.5 million raised-floor square feet are not current Lumen US operating counts. No exact building address or later transaction chain established by this release.","Not all fields, exact ownership chain, current measured IT or parcel pin verified."],"sources":[{"url":"https://ir.lumen.com/news/news-details/2014/CenturyLink-expands-global-data-center-presence-in-eight-markets/default.aspx","host":"ir.lumen.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-legacy-operator-address-and-power-basis-review-round83-2026-10-15.json","scope":"Historical complex/operator context or exact-address corroboration, with operator-transfer and multi-building limitations.","fields":{},"notes":["Rich Miller, Data Center Knowledge June 25, 2010, public issuer-announcement report: Savvis NJ2X expansion opened by publication week, adjacent to existing NJ2 complex in Weehawken. 22,000 SELLABLE square feet new and 40,000 POTENTIAL future expansion are not 62,000 currently installed floor space; reported $23 million is historical expansion cost, not current Lumen capex or acquisition price. 64 microseconds is issuer proximity-hosting claim, not independently measured performance. Limited historical complex context for inherited Weehawken row, not exact modern operator/parcel ownership. Fresh capture repeats earlier availability receipt; not a second independent source.","Not all fields, exact ownership chain, current measured IT or parcel pin verified."],"sources":[{"url":"https://www.datacenterknowledge.com/investing/savvis-opens-new-nj2x-financial-trading-hub","host":"datacenterknowledge.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-management-system-scope-and-acquisition-stages-round88-2026-10-15.json","scope":"Limited named street-label/service context or issuer acquisition statement.","fields":{},"notes":["Current captured certificate1361865-19/version19, issued September24,2026, expires June17,2028. Original registrationSeptember14,2007 is management-system registration, not each building founding. ISO27001:2022/27701:2019 cover ISMS/PIMS supporting services, not UptimeTier certification, MW, building ownership or guaranteed breach-free/uptime performance. No issuer revocation-directory check or surveillance audit inspected.","Page2 separately names AlbanyAirlineDrive gateway for colocation versus PearlStreet edgecompute; page8 names NashvilleSidcoDrive. Limited street-label context, not independently verified street numbers, parcels or sole operator. Most other rows only give cities and do not resolve remaining Lumen pins.","Page7 still names Weehawken in Lumen service scope; current Csquare EWR2 material from round83 does not prove Lumen vanished or a sole ownership transfer. Shared complex/tenancy/operating-role ambiguity remains. No automatic rename/merge.","Fetched8-page version19 differs from search cache10-page version18; retained current source bytes/date govern this review. Portfolio certification rows are not a physical-building census.","Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied."],"sources":[{"url":"https://assets.lumen.com/is/content/Lumen/iso27001-certificate-lumen?Creativeid=b54bb9d7-6311-4aac-acac-84580992d059","host":"assets.lumen.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Weehawken · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"hekemian-montvale-kpmg-site-data-center-nj","state":"NJ","kind":"facility","name":"Montvale KPMG Site Data Center (3 Chestnut Ridge Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bergen"],"city":"Montvale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. No final court judgment, executed PILOT, data-center permit or tenant is established. A photograph's 48 MW Yondr facility is in Loudoun, not Montvale. Competing alternatives are not two approved projects; constitutional arguments remain attributed positions. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://thepressgroup.net/data-center-option-at-former-kpmg-site-montvales-mayor-affordable-housing-group-clash/","host":"thepressgroup.net","date":"2026-03-04","published":"2026-03-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.0474026,"lng":-74.0694211,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Pascack Press describes competing housing and data-center alternatives for the 34-acre former KPMG site in Montvale and a complaint filed March 2, 2026.","independently_verified_current_operating_status":null},"notes":["No final court judgment, executed PILOT, data-center permit or tenant is established. A photograph's 48 MW Yondr facility is in Loudoun, not Montvale. Competing alternatives are not two approved projects; constitutional arguments remain attributed positions.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://thepressgroup.net/data-center-option-at-former-kpmg-site-montvales-mayor-affordable-housing-group-clash/","host":"thepressgroup.net","date":"2026-03-04","published":"2026-03-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Montvale · Bergen · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"american-tower-mount-royal-east-greenwich-nj","state":"NJ","kind":"facility","name":"Mt. Royal Data Storage Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Gloucester"],"city":"East Greenwich Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. EastGreenwich township withdrawal notice and reported future-use prohibition. PDF body has no explicit publication date; late-yesterday wording not assignedJune8fromfilename alone. Government announcement confirms withdrawal account, not full adopted ordinance text, case-specific vested-right finding or later legal challenge. No application withdrawal grounds, numeric ITMW or actual environmental violation inferred. No currentoperating site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://drive.google.com/uc?export=download&id=1QIDBqtYZFfpIb8-4Fwjltgp0Xcki6UUO","host":"drive.google.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.8101134,"lng":-75.2112925,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"EastGreenwich township withdrawal notice and reported future-use prohibition","fields":{"agency":"EastGreenwichTownship, NewJersey","company":"American Tower Company","official_statement_action":"application formally withdrawn; no pending DCapplications asofletter","cancelled_special_meeting_date":"2026-06-30","cancelled_venue":"SamuelMickleSchool","statement_reports_ordinance":"prohibits future data-center development","internal_statement_date":null,"linked_filename_label":"June9,2026DataCenter"},"notes":["PDF body has no explicit publication date; late-yesterday wording not assignedJune8fromfilename alone. Government announcement confirms withdrawal account, not full adopted ordinance text, case-specific vested-right finding or later legal challenge. No application withdrawal grounds, numeric ITMW or actual environmental violation inferred. No currentoperating site.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://drive.google.com/uc?export=download&id=1QIDBqtYZFfpIb8-4Fwjltgp0Xcki6UUO","host":"drive.google.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · East Greenwich Township · Gloucester · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"nebius-vineland-nj","state":"NJ","kind":"facility","name":"Nebius Vineland Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"Vineland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nebius Vineland tenant/owner distinction and PILOT claim. Nebiusist enantnotDataOnepropertyowner;do notduplicateasnewbuildingforboth. OperatorPILOTaccountnotactualordinance/signedcontractread;notamountsavedorpaid. One-timefillnotannualuse;poolcomparisonnotconvertedwithoutdefinedpoolvolume. FuelcelltechnologydoesnotmeanzeroGHG. No numericITMWinreviewedpage.2027forecastnotobservedservice. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nebius.com/vinelandnj","host":"nebius.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4862,"lng":-74.992,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Nebius Vineland tenant/owner distinction and PILOT claim","fields":{"tenant":"Nebius","facility_owner_operator_as_reported":"DataOne","construction_contractor":"Northeast Precast","locality":"Vineland, New Jersey","operator_described_status":"construction ongoing","expected_operation_year":2027,"operator_reported_tax_arrangement":"five-year PILOT ordinance approved January2026","expected_construction_jobs_approx":1000,"expected_permanent_onsite_jobs_approx":200,"power_partner":"Bloom Energy","cooling_initial_fill_gallons":1000000,"annual_water_use_description":"approximatelysevenOlympicswimmingpools,mainlytypicalofficeuse"},"notes":["Nebiusist enantnotDataOnepropertyowner;do notduplicateasnewbuildingforboth. OperatorPILOTaccountnotactualordinance/signedcontractread;notamountsavedorpaid. One-timefillnotannualuse;poolcomparisonnotconvertedwithoutdefinedpoolvolume. FuelcelltechnologydoesnotmeanzeroGHG. No numericITMWinreviewedpage.2027forecastnotobservedservice.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://nebius.com/vinelandnj","host":"nebius.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Vineland · Cumberland · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"njfx-wall-township-nj","state":"NJ","kind":"facility","name":"NJFX Cable Landing Station Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monmouth"],"city":"Wall Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NJFX Wall Township campus power and connectivity scope. 12MWnotindependentlyenergizedIT. Tier3certified/designclaimnotindependentUptimeregisterread. Fourcables/35plusnetworkoperatorsnotphysicalDCcount. First/onlyUSconvergenceclaimnotindependentlycomprehensivehistoricalcomparison. No exactstreet/originalopeninginreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://njfx.net/ecosystem-of-carriers/campus-detail/","host":"njfx.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1615781,"lng":-74.0531626,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"NJFX Wall Township campus power and connectivity scope","fields":{"operator":"NJFX","locality":"Wall Township, New Jersey","facility_area_sqft":64000,"published_power_capacity_mw":12,"power_basis":"campus power, not explicit critical IT","facility_type":"colocation and cable landing station campus"},"notes":["12MWnotindependentlyenergizedIT. Tier3certified/designclaimnotindependentUptimeregisterread. Fourcables/35plusnetworkoperatorsnotphysicalDCcount. First/onlyUSconvergenceclaimnotindependentlycomprehensivehistoricalcomparison. No exactstreet/originalopeninginreviewedbody.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://njfx.net/ecosystem-of-carriers/campus-detail/","host":"njfx.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Wall Township · Monmouth · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"nyse-mahwah-data-center-nj","state":"NJ","kind":"facility","name":"NYSE Data Center (Mahwah)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bergen"],"city":"Mahwah","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The historical account does not establish current operator, MW, client counts or service latency. Completion a year earlier is not an exact opening day. Do not republish detailed physical-security descriptions as map content; no site vulnerability assessment was performed. North American trading shares are not United States site counts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.computerworld.com/article/1433811/in-fortified-data-center-nyse-runs-gated-trading-cloud.html","host":"computerworld.com","date":"2011-08-31","published":"2011-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.078373,"lng":-74.15293,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Computerworld describes NYSE's existing Mahwah complex, distinguishing roughly 400,000 square feet of building area from 100,000 of raised floor and a newly marketed financial-services cloud.","independently_verified_current_operating_status":null},"notes":["The historical account does not establish current operator, MW, client counts or service latency. Completion a year earlier is not an exact opening day. Do not republish detailed physical-security descriptions as map content; no site vulnerability assessment was performed. North American trading shares are not United States site counts.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.computerworld.com/article/1433811/in-fortified-data-center-nyse-runs-gated-trading-cloud.html","host":"computerworld.com","date":"2011-08-31","published":"2011-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Mahwah · Bergen · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"prism-on3-nutley-data-center-nj","state":"NJ","kind":"facility","name":"ON3 Data Center (275 Kingsland Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Essex"],"city":"Nutley","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. An allowed use is not a committed tenant or construction approval. The campus's 10 MW cogeneration and broader mixed-use spending, housing, retail, R&D and PILOT arrangements are not the DC component's capacity, budget or incentives. Withdrawal of the warehouse is not withdrawal of all redevelopment; current DC operation is not established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://patch.com/new-jersey/belleville/major-data-center-may-be-coming-on3-site-nutley-other-updates-announced","host":"patch.com","date":"2025-07-21","published":"2025-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8300104,"lng":-74.1535977,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Patch quotes Prism on redevelopment-plan approvals allowing a possible data center at 275 Kingsland Street within ON3 after a warehouse application withdrawal.","independently_verified_current_operating_status":null},"notes":["An allowed use is not a committed tenant or construction approval. The campus's 10 MW cogeneration and broader mixed-use spending, housing, retail, R&D and PILOT arrangements are not the DC component's capacity, budget or incentives. Withdrawal of the warehouse is not withdrawal of all redevelopment; current DC operation is not established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://patch.com/new-jersey/belleville/major-data-center-may-be-coming-on3-site-nutley-other-updates-announced","host":"patch.com","date":"2025-07-21","published":"2025-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Nutley · Essex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"princeton-university-hpcrc-plainsboro-nj","state":"NJ","kind":"facility","name":"Princeton University High-Performance Computing Research Center (Forrestal Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Plainsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Hardware addition is not a new campus opening, site MW, annual electricity use or current utilization. The issue month differs from the publication day and does not change installation timing. No broader building dimensions or new construction inferred from the photo. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://paw.princeton.edu/article/research-photo-advancing-ai","host":"paw.princeton.edu","date":"2024-04-25","published":"2024-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.3461201,"lng":-74.6160723,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Princeton Alumni Weekly reports a new 300-GPU cluster housed in the existing High-Performance Computing Research Center on the Forrestal campus.","independently_verified_current_operating_status":null},"notes":["Hardware addition is not a new campus opening, site MW, annual electricity use or current utilization. The issue month differs from the publication day and does not change installation timing. No broader building dimensions or new construction inferred from the photo.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://paw.princeton.edu/article/research-photo-advancing-ai","host":"paw.princeton.edu","date":"2024-04-25","published":"2024-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Plainsboro · Middlesex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"qts-east-windsor-nj","state":"NJ","kind":"facility","name":"QTS East Windsor","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mercer"],"city":"East Windsor","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Requested Jersey City URL returned the all-locations archive. The named East Windsor entry supports only a narrow directory claim. Dedicated source and correct-site crosswalk required. Archive Richmond values also differ from its dedicated page; never apply archive totals indiscriminately. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Expansion investment is additional planned scope, not confirmed spending. Onsite solar generation is not IT power and must not be added to critical capacity.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/jersey-city/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://q.com/data-centers/east-windsor/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.279249,"lng":-74.547551,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_archive_entry":{"site":"East Windsor","acres":52,"mw_lower_bound":70,"power_basis":"archive label not separately defined"}},"notes":["Requested Jersey City URL returned the all-locations archive. The named East Windsor entry supports only a narrow directory claim. Dedicated source and correct-site crosswalk required. Archive Richmond values also differ from its dedicated page; never apply archive totals indiscriminately.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/jersey-city/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"critical_power_capacity_mw_lower_bound":70,"planned_additional_investment_usd":600000000,"solar_generation_mw":14,"solar_field_acres":50},"notes":["Expansion investment is additional planned scope, not confirmed spending. Onsite solar generation is not IT power and must not be added to critical capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/east-windsor/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · East Windsor · Mercer · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"qts-jersey-city-nj","state":"NJ","kind":"facility","name":"QTS Jersey City (JCY1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hudson"],"city":"Jersey City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. The introduction says more than5MW/50,000squarefeet added while the body says these are totals. Both capacity and floor-area increment-versus-total remain unresolved, with no additive sum or current IT adoption. Old global/company fleet counts and expected delivery do not establish2026operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterknowledge.com/operations-and-management/qts-expands-jersey-city-data-center","host":"datacenterknowledge.com","date":"2011-03-17","published":"2011-03-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.716892,"lng":-74.03382,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Data Center Knowledge reports planned QTS Jersey City power/raised-floor upgrades with second-quarter2011delivery targeted.","independently_verified_current_operating_status":null,"canonical_it_mw":null,"canonical_raised_floor_sqft":null,"source_increment_vs_total_conflict":true},"notes":["The introduction says more than5MW/50,000squarefeet added while the body says these are totals. Both capacity and floor-area increment-versus-total remain unresolved, with no additive sum or current IT adoption. Old global/company fleet counts and expected delivery do not establish2026operation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterknowledge.com/operations-and-management/qts-expands-jersey-city-data-center","host":"datacenterknowledge.com","date":"2011-03-17","published":"2011-03-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Jersey City · Hudson · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"qts-piscataway-1-nj","state":"NJ","kind":"facility","name":"QTS Piscataway 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"Piscataway","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Expansion is a source-described addition with no independently checked commissioning date. Do not add 15 to 65 without an explicit baseline; 2 MW solar is generation, not additional IT load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/piscataway/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5569431,"lng":-74.4839173,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":38,"advertised_critical_power_mw_lower_bound":65,"additional_expansion_sqft":50000,"additional_expansion_mw":15,"onsite_rooftop_solar_mw":2,"published_address":"101 Possumtown Road, Piscataway, NJ 08854"},"notes":["Expansion is a source-described addition with no independently checked commissioning date. Do not add 15 to 65 without an explicit baseline; 2 MW solar is generation, not additional IT load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/piscataway/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Piscataway · Middlesex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"russo-600-commerce-boulevard-carlstadt-nj","state":"NJ","kind":"facility","name":"Russo Data Center (600 Commerce Boulevard)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bergen"],"city":"Carlstadt","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. 249,640 square feet is leased building area, not critical IT or newly constructed area. Original building reportedly purpose-built in 2008 for a global bank; no identity inferred for the new confidential tenant. Lease execution does not by itself certify tenant move-in or present operation. More than 2 million square feet is Russo portfolio context. New Jersey program $500 million ceiling and CoreWeave Kenilworth $250 million award/$1.8 billion project concern other entities, not this Carlstadt lease. No capacity inferred from rental-rate MW bands. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://njbiz.com/exclusive-cresa-carlstadt-data-center-lease-russo","host":"njbiz.com","date":"2026-03-16","published":"2026-03-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8275493,"lng":-74.0492103,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"NJBIZ reports Cresa completed a full-building lease at Russo Development’s 600 Commerce Boulevard, Carlstadt, for a confidential tenant.","independently_verified_current_operating_status":null},"notes":["249,640 square feet is leased building area, not critical IT or newly constructed area. Original building reportedly purpose-built in 2008 for a global bank; no identity inferred for the new confidential tenant. Lease execution does not by itself certify tenant move-in or present operation. More than 2 million square feet is Russo portfolio context. New Jersey program $500 million ceiling and CoreWeave Kenilworth $250 million award/$1.8 billion project concern other entities, not this Carlstadt lease. No capacity inferred from rental-rate MW bands.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://njbiz.com/exclusive-cresa-carlstadt-data-center-lease-russo","host":"njbiz.com","date":"2026-03-16","published":"2026-03-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · Carlstadt · Bergen · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"sentinel-princeton-nurseries-south-brunswick-nj","state":"NJ","kind":"facility","name":"Sentinel Princeton Nurseries DC-1 (4405 Route 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Middlesex"],"city":"South Brunswick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Participant original independently supports named Sentinel project association at a specific address.. InterstateDrywall names Sentinel and says it was awarded drywall/carpentry for recently approved development. A package award is not observed active construction or commissioning. 340000squarefeet is contractor approximation versus directory341031;160acre contractor site versus143acre municipal segment need parcel-scope review. End2026 is future target, not observed opening. No criticalIT, final permit or capital independently established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://interstatedrywallcorp.com/portfolio-view/sentinel-princeton-nurseries-data-center/","host":"interstatedrywallcorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.363,"lng":-74.602,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round39-2026-10-14.json","scope":"Participant original independently supports named Sentinel project association at a specific address.","fields":{"contractor_named_project":"Sentinel Princeton Nurseries DC-1 core and shell","contractor_project_address":"4405 US Route1, South Brunswick, New Jersey","contractor_reported_building_sqft_approximate":340000,"contractor_reported_site_acres":160,"contractor_completion_target":"end of2026","independently_verified_current_operating_status":null},"notes":["InterstateDrywall names Sentinel and says it was awarded drywall/carpentry for recently approved development. A package award is not observed active construction or commissioning.","340000squarefeet is contractor approximation versus directory341031;160acre contractor site versus143acre municipal segment need parcel-scope review. End2026 is future target, not observed opening. No criticalIT, final permit or capital independently established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://interstatedrywallcorp.com/portfolio-view/sentinel-princeton-nurseries-data-center/","host":"interstatedrywallcorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Jersey · South Brunswick · Middlesex · Source context reviewed","state_name":"New Jersey","state_path":"/new-jersey/"},{"id":"atterix-raton-digital-hub-nm","state":"NM","kind":"facility","name":"Atterix Raton Advanced Digital Hub","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Colfax"],"city":"Raton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. MOU/study is not development approval or operation. Initial five MW is included in possible total fifty MW, not fifty-five. Deferred moratorium vote is not adopted pause. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kob.com/news/top-news/raton-residents-push-back-on-proposed-data-center-plans/","host":"kob.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.9033,"lng":-104.4392,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"KOB describes Atterix Raton MOU for a six-month feasibility study and possible phased digital hub.","independently_verified_current_operating_status":null},"notes":["MOU/study is not development approval or operation. Initial five MW is included in possible total fifty MW, not fifty-five. Deferred moratorium vote is not adopted pause.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kob.com/news/top-news/raton-residents-push-back-on-proposed-data-center-plans/","host":"kob.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Raton · Colfax · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"centersquare-abq1-albuquerque-nm","state":"NM","kind":"facility","name":"Centersquare ABQ1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Utility8.6MW is not ITload; advertisedarea not explicitlyraisedfloor. Operator PDF identifies ABQ1 and distinct utility/UPS/generator ratings. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://csquare.com/hubfs/CenterSquare/docs/Centersquare-ABQ-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0844,"lng":-106.6504,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"400 Tijeras Avenue Northwest","city":"Albuquerque","utility_power_mw":8.6,"ups_capacity_mw":1.8,"generator_capacity_mw":5,"advertised_area_sqft":12921},"notes":["Utility8.6MW is not ITload; advertisedarea not explicitlyraisedfloor.","Operator PDF identifies ABQ1 and distinct utility/UPS/generator ratings.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://csquare.com/hubfs/CenterSquare/docs/Centersquare-ABQ-SpecSheet.pdf","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Albuquerque · Bernalillo · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"connect-data-centers-albuquerque-nm","state":"NM","kind":"facility","name":"Connect Albuquerque (Westpointe 40)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Signed municipal site-plan decision and separate contractor project section; not full operating-site certification.. Site-plan approval has water/sewer, infrastructure-list, recorded improvement-agreement and plat conditions. Notice expressly separates later building permits from site approval; satisfaction, actual permit issuance and appeal outcome not verified. The operative notice states July31; the signature-audit document title says July24 while signature audit is August1. Preserve different date roles and document-label discrepancy. Printed appeal deadline August16 is not independently recalculated or certified as statutory deadline. 90301squarefeet includes the6800office component; do not add them. Legal tract7.9830acres, requested11.5acreplat and directory10acres are different scopes, not interchangeable exact footprints. City calls it10MW without specifying criticalIT. Utility adequacy finding is not executed10MWservice agreement. Water-meter design conditions and exterior tanks are not measured consumption. PowerDesign participant page labels completion January2026; this is a contractor project milestone claim, not occupancy or tenant-service certificate. Only this project section was read, not the large unrelated portfolio list. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf","host":"documents.cabq.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.powerdesigninc.us/projects/10mw-albq-data-center","host":"powerdesigninc.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0881581,"lng":-106.7353893,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round39-2026-10-14.json","scope":"Signed municipal site-plan decision and separate contractor project section; not full operating-site certification.","fields":{"city_project":"PR-2020-004747","site_plan_application":"SI-2024-00451","decision_date_in_operative_notice":"2024-07-31","signature_audit_date":"2024-08-01","approved_building_sqft":90301,"office_component_sqft":6800,"printed_legal_tract_acres":7.983,"requested_adjusted_plat_acres":11.5,"planned_mw_with_unspecified_basis":10,"critical_it_mw":null,"contractor_published_completion_month":"2026-01","independently_verified_current_operating_status":null},"notes":["Site-plan approval has water/sewer, infrastructure-list, recorded improvement-agreement and plat conditions. Notice expressly separates later building permits from site approval; satisfaction, actual permit issuance and appeal outcome not verified.","The operative notice states July31; the signature-audit document title says July24 while signature audit is August1. Preserve different date roles and document-label discrepancy. Printed appeal deadline August16 is not independently recalculated or certified as statutory deadline.","90301squarefeet includes the6800office component; do not add them. Legal tract7.9830acres, requested11.5acreplat and directory10acres are different scopes, not interchangeable exact footprints.","City calls it10MW without specifying criticalIT. Utility adequacy finding is not executed10MWservice agreement. Water-meter design conditions and exterior tanks are not measured consumption.","PowerDesign participant page labels completion January2026; this is a contractor project milestone claim, not occupancy or tenant-service certificate. Only this project section was read, not the large unrelated portfolio list.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf","host":"documents.cabq.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.powerdesigninc.us/projects/10mw-albq-data-center","host":"powerdesigninc.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Albuquerque · Bernalillo · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"green-data-socorro-county-nm","state":"NM","kind":"facility","name":"Green Data Socorro Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Socorro"],"city":"Socorro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Jessica Carranza Pino, El Defensor Chieftain original interviews syndicated by Albuquerque Journal April 15, 2026: Green Data CEO describes a Socorro proposal with 2 GW baseload GENERATION and a monthly delivery goal. No critical IT basis, secured interconnection, binding NMT partnership, construction start or largest-in-world certification. Atmospheric-water/renewable/minimal-grid-use statements are developer design aspirations, not measured consumption or zero-impact findings. Spaceport America 50 MW solar/5 MW continuous concept is another project; neither is additive Socorro IT. The Illinois mayor and developer disagree about an earlier failed venture; reported past conduct is not a verified financing outcome for Socorro. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420","host":"abqjournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0584,"lng":-106.8914,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Jessica Carranza Pino, El Defensor Chieftain original interviews syndicated by Albuquerque Journal April 15, 2026: Green Data CEO describes a Socorro proposal with 2 GW baseload GENERATION and a monthly delivery goal. No critical IT basis, secured interconnection, binding NMT partnership, construction start or largest-in-world certification. Atmospheric-water/renewable/minimal-grid-use statements are developer design aspirations, not measured consumption or zero-impact findings. Spaceport America 50 MW solar/5 MW continuous concept is another project; neither is additive Socorro IT. The Illinois mayor and developer disagree about an earlier failed venture; reported past conduct is not a verified financing outcome for Socorro.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420","host":"abqjournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Socorro · Socorro · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"green-data-spaceport-america-sierra-county-nm","state":"NM","kind":"facility","name":"Green Data Spaceport America Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sierra"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Green Data proposal requires state land commissioner sublease consent, undecided in report. Do not tag this state-land project cancelled by county resolution. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.abqjournal.com/news/sierra-county-enacts-18-month-data-center-moratorium/3086595","host":"abqjournal.com","date":"2026-07-21","published":"2026-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.9903,"lng":-106.9698,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"moratorium-with-jurisdiction-limit","reported_finding":"Albuquerque Journal reports unanimous 18-month Sierra County moratorium, but explicitly says resolution does not apply on state land at Spaceport America.","report_display_date":"2026-07-21","independently_verified_current_status":null},"notes":["Green Data proposal requires state land commissioner sublease consent, undecided in report. Do not tag this state-land project cancelled by county resolution.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.abqjournal.com/news/sierra-county-enacts-18-month-data-center-moratorium/3086595","host":"abqjournal.com","date":"2026-07-21","published":"2026-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Sierra · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"h5-data-centers-albuquerque-nm","state":"NM","kind":"facility","name":"H5 Data Centers Albuquerque","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical announcement. Whole mixed-use building area is not H5 white space; present tenancy/operation requires current evidence. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/h5-Albuquerque.html","host":"h5datacenters.com","date":"2018-03-26","published":"2018-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.0862,"lng":-106.6512,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_expansion_announcement_date":"2018-03-26","published_address":"505 Marquette Avenue NW, Albuquerque, New Mexico","mixed_use_carrier_hotel_office_building_sqft":225000},"notes":["Historical announcement. Whole mixed-use building area is not H5 white space; present tenancy/operation requires current evidence.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/h5-Albuquerque.html","host":"h5datacenters.com","date":"2018-03-26","published":"2018-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Albuquerque · Bernalillo · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"nova-innova-data-center-albuquerque-nm","state":"NM","kind":"facility","name":"Innova Data Center (Mesa del Sol)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 130,000-square-foot building, 6,000 delivered first-phase data space and potential 80,000 data space are different scopes. The inherited 8 MW power and 100-to-150-million-USD full-campus expectation are not current critical IT or completed spending. A ten-year lease with purchase option is not verified ownership today. Largest-in-state was an operator claim, not independently established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterknowledge.com/archives/2015/06/29/navajo-owned-data-center-offers-way-to-diversify-tribes-revenue-base-beyond-casinos","host":"datacenterknowledge.com","date":"2015-06-29","published":"2015-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35,"lng":-106.63,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Data Center Knowledge reports Innava/Nova's launched first phase at a former solar-panel plant in Albuquerque, separate from an earlier proposed site about a mile away.","independently_verified_current_operating_status":null},"notes":["The 130,000-square-foot building, 6,000 delivered first-phase data space and potential 80,000 data space are different scopes. The inherited 8 MW power and 100-to-150-million-USD full-campus expectation are not current critical IT or completed spending. A ten-year lease with purchase option is not verified ownership today. Largest-in-state was an operator claim, not independently established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterknowledge.com/archives/2015/06/29/navajo-owned-data-center-offers-way-to-diversify-tribes-revenue-base-beyond-casinos","host":"datacenterknowledge.com","date":"2015-06-29","published":"2015-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Albuquerque · Bernalillo · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"new-era-energy-digital-lea-county-data-center-nm","state":"NM","kind":"facility","name":"Lea County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lea"],"city":"Lovington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. New Era Lea County planned pipeline versus Texas project. 7GWLeaCountyand1.4GWTexasseparateprojects,notsite-leveloperatingIT. Company8plusGWpipelineincludesprojectsnotadditionalcapacity. Generic12to15monthmodulardeploymenttargetnotdatedLeaCountyRFS. No exactparcel,energization/permitsorconfirmedtenant.493/492Texasacredifferenceheldforlatercrosswalk. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newerainfra.ai/","host":"newerainfra.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.7,"lng":-103.3,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"New Era Lea County planned pipeline versus Texas project","fields":{"developer":"New Era Energy and Digital","project":"Lea County, New Mexico","planned_capacity_gw_min_exclusive":7,"power_basis":"planned energy-integrated pipeline, not explicit critical IT","planned_land_acres":3500,"separate_texas_tcdc_planned_capacity_gw_min_exclusive":1.4,"texas_acreage_conflict":[493,492]},"notes":["7GWLeaCountyand1.4GWTexasseparateprojects,notsite-leveloperatingIT. Company8plusGWpipelineincludesprojectsnotadditionalcapacity. Generic12to15monthmodulardeploymenttargetnotdatedLeaCountyRFS. No exactparcel,energization/permitsorconfirmedtenant.493/492Texasacredifferenceheldforlatercrosswalk.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newerainfra.ai/","host":"newerainfra.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Lovington · Lea · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"meta-los-lunas-ai-nm","state":"NM","kind":"facility","name":"Meta Los Lunas AI Expansion","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Valencia"],"city":"Los Lunas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Secondary consultant compilation only, not original permits, audited spending, signed IRBs, water records or utility contract. Internal timeline describes spring2025 groundbreaking as future in March2026 and alternates six/eight completed structures and phase milestones; current building count held. Generic40MWperbuilding/80MWexpansion not adopted as criticalIT. USD30billion and series IRB ceilings are not grants, public debt or capex spent; 145million cumulative GRT cannot be annualized or netted against incomparable PILOT schedules. 283ML2023consumption, allocations up to4.5MGD, 885MWrenewable procurement and100MWbattery are distinct measures, not current campus IT, actual water withdrawal or continuous renewable supply. Photo-based commissioning/tier/power inferences and asserted population causation remain unverified; original sources needed. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","host":"mmcginvest.com","date":"2026-03-07","published":"2026-03-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.8083,"lng":-106.7296,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"MMCG commercial analysis describes Meta Los Lunas phased expansion and reports an approximately USD3.3billion completed-buildout investment, eight completed buildings and later AI-building plans.","independently_verified_current_operating_status":null},"notes":["Secondary consultant compilation only, not original permits, audited spending, signed IRBs, water records or utility contract. Internal timeline describes spring2025 groundbreaking as future in March2026 and alternates six/eight completed structures and phase milestones; current building count held. Generic40MWperbuilding/80MWexpansion not adopted as criticalIT. USD30billion and series IRB ceilings are not grants, public debt or capex spent; 145million cumulative GRT cannot be annualized or netted against incomparable PILOT schedules. 283ML2023consumption, allocations up to4.5MGD, 885MWrenewable procurement and100MWbattery are distinct measures, not current campus IT, actual water withdrawal or continuous renewable supply. Photo-based commissioning/tier/power inferences and asserted population causation remain unverified; original sources needed.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","host":"mmcginvest.com","date":"2026-03-07","published":"2026-03-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Los Lunas · Valencia · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"roswell-information-park-chaves-county-nm","state":"NM","kind":"facility","name":"Roswell Information Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chaves"],"city":"Roswell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Lease rights are not DC commissioning or construction approval. Management fees on gas and excess electricity are not taxes or incentives. An off-grid description alongside grid-export provisions does not establish permanent disconnection. Limited water rights are unquantified; produced-water treatment and the fourteen-acre battery plant are prospective. Support letters are not permits or awarded funds, and the changed site requires a geographic crosswalk. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.thenewswire.com/press-releases/1A0vFwYPV-desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer.html","host":"thenewswire.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.3943,"lng":-104.523,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Issuer-distributed release says Desert Mountain Energy signed a25-year Roswell Information Park lease with a five-year option, while a separate long-term gas contract and new pipeline route remained to be developed.","independently_verified_current_operating_status":null},"notes":["Lease rights are not DC commissioning or construction approval. Management fees on gas and excess electricity are not taxes or incentives. An off-grid description alongside grid-export provisions does not establish permanent disconnection. Limited water rights are unquantified; produced-water treatment and the fourteen-acre battery plant are prospective. Support letters are not permits or awarded funds, and the changed site requires a geographic crosswalk.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.thenewswire.com/press-releases/1A0vFwYPV-desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer.html","host":"thenewswire.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Roswell · Chaves · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"sandia-725e-hpc-data-center-albuquerque-nm","state":"NM","kind":"facility","name":"Sandia National Laboratories 725E High-Performance Computing Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bernalillo"],"city":"Albuquerque","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Completion month not precise public-opening day. Certification source is lab announcement, not independentUSGBCregistry review.250kWsolar not criticalITcapacity. Cooling savings over initial sixmonths not current annual measured water withdrawal. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/","host":"sandia.gov","date":"2020-06-19","published":"2020-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.05,"lng":-106.54,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"operator_reported_building_completion_month":"2018-10","building_identifier":"725E","reported_use":"HPC addition,Albuquerque campus","operator_reported_certification":"LEEDv4GoldBD+C,DataCenter","certification_announcement_date":"2020-06-19"},"notes":["Completion month not precise public-opening day. Certification source is lab announcement, not independentUSGBCregistry review.250kWsolar not criticalITcapacity. Cooling savings over initial sixmonths not current annual measured water withdrawal.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/","host":"sandia.gov","date":"2020-06-19","published":"2020-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Albuquerque · Bernalillo · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"stargate-project-jupiter-dona-ana-nm","state":"NM","kind":"facility","name":"Stargate Project Jupiter","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dona Ana"],"city":"Santa Teresa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition. 360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification. Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement. No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/","host":"elpasomatters.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/","host":"oracle.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.8636,"lng":-106.6895,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition.","360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/","host":"elpasomatters.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement.","No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/","host":"oracle.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Santa Teresa · Dona Ana · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"teraplex-gallup-tradeport-mckinley-county-nm","state":"NM","kind":"facility","name":"Teraplex Gallup Tradeport Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["McKinley"],"city":"Gallup","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originalcityagenda,draftthirdamendment,signedhistoricaloption/assignmentandtariff; conditional/historycontextnotcurrentexecution/operationcertification.. NoApril28vote/minutesor laterexecutedthirdamendment read; agendadoesnotprove deferral/adoption. Secondarydeferralclaims remainseparate. Nooptionexercise/paymentreceipt,landclosing,constructionpermit,effluentdeliverymetering or currentoperationproof. No MW/generation/tenant/capex/jobs certified. The2023signedoption doesnot establish that2026draftterms arebinding;first/secondamendments notindependentlyreadinthispass. Noexactparcelcoordinates or boundary merged.330approximateacresversus324.787LOIarea requiresscope/revisioncrosswalk. Originaldeliverysystem allocated planning/permitting/design/construction/operationexpensestodeveloper; notreceipt,publicsubsidyaward orproofall permitsgranted. Consultrecord-leveldate-role,signature,water-optionandareaholds.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15084","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15085","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15088","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15089","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.5203,"lng":-108.8367,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"gallup-effluent-originals-round45-2026-10-14.json","scope":"Originalcityagenda,draftthirdamendment,signedhistoricaloption/assignmentandtariff; conditional/historycontextnotcurrentexecution/operationcertification.","fields":{"proposal_identity_context":{"source":"gallup-original","pages":[1,2,9,10],"value":"April28,2026 city agenda names Teraplex and Gutami potential GallupTradeport project; presentation only. ItemF5 proposes effluent option amendment forTeraplexDataCentersLLC,notsiteapproval."},"water_option_context":{"sources":["gallup-original","gallup-third","gallup-original-agreement","gallup-rate"],"value":{"proposed_annual_effluent_gallons":109500000,"printed_approximate_acre_feet":336,"basis":"Annual fiscal-year option/right quantity, not actual withdrawals/consumption, not potable-source measurement","annual_quantity_carry_forward":false,"additional_surplus_possible":"Subject to city commitments; not unlimited guaranteed water","proposed_rate_usd_per_1000_gallons":5.66,"rate_basis":"FY26reclaimedwastewater tariff attachment, not fresh potable tariff or executedTeraplexbill","third_amendment_execution_status":"Supplied draft date/day,payment deadline and signatures blank","effectiveness_fee_usd":5000,"effectiveness_basis":"Proposed collectedfundsbydeadline plusCouncilapproval; no paidreceipt/approvalverified","proposed_purchase_deadline_years":4,"proposed_construction_start_deadline_years":5,"proposed_take_or_pay_start_year":7,"printed_minimum_take_or_pay_percent":33.33,"termination_basis":"Mayterminate,with15-day exercise windows; not automatic cancellation merely from target elapsed","proposed_rate_lock_years":15,"next_rate_reference_year":2041,"fixed_calendar_deadlines":null,"critical_it_mw":null}},"original_option_history":{"sources":["gallup-original-agreement","gallup-third"],"value":{"original_printed_effective_date":"2023-07-25","city_signature_date_visually_read":"2023-07-27","developer_signature_date_visually_read":"2023-08-01","initial_use":"Recycling/manufacturing complex, not original2023data-centeroperation","original_land_intention_acres_approx":330,"original_plant_effluent_million_gallons_per_day":2.33,"plant_effluent_measure":"Historical2023plant-output description, notTeraplexusage or currentmeasured2026plantoutput","term_scope":"Original20-yearterm references definedOptionExerciseDate;10-yearextension requiresnotice andUSD5000payment. Not automatically30yearsfromApril28."}},"assignment_history":{"source":"gallup-assignment","value":{"body_date":"2026-03-03","third_amendment_recital_date":"2026-03-06","exact_assignment_execution_date":null,"date_hold":"BodydatedasofMarch3 versuslaterrecitalMarch6; signaturesbothpresentbutpageundated. No automatic reconciliation.","loi_printed_date":"2025-07-28","loi_recited_execution_date":"2025-07-29","loi_acres_approx":324.787,"land_closed":null,"basis":"Assignment of effluent-option andexclusiveLOIrights, notdeed/landclosing. OriginalLOIexhibit is onlycoverinthisfile. Financialterms partlyredacted;no recoveryor inference."}}},"notes":["NoApril28vote/minutesor laterexecutedthirdamendment read; agendadoesnotprove deferral/adoption. Secondarydeferralclaims remainseparate.","Nooptionexercise/paymentreceipt,landclosing,constructionpermit,effluentdeliverymetering or currentoperationproof. No MW/generation/tenant/capex/jobs certified.","The2023signedoption doesnot establish that2026draftterms arebinding;first/secondamendments notindependentlyreadinthispass.","Noexactparcelcoordinates or boundary merged.330approximateacresversus324.787LOIarea requiresscope/revisioncrosswalk.","Originaldeliverysystem allocated planning/permitting/design/construction/operationexpensestodeveloper; notreceipt,publicsubsidyaward orproofall permitsgranted.","Consultrecord-leveldate-role,signature,water-optionandareaholds."],"sources":[{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15084","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15085","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15088","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15089","host":"gallupnm.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Gallup · McKinley · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"westblock-shiprock-nm","state":"NM","kind":"facility","name":"WestBlock Capital Bitcoin Mine (Shiprock)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["San Juan"],"city":"Shiprock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Historical claimed 23 to 25 bitcoin/month and 1.4 to 1.6 million-dollarvalue are 2021 commodity/revenue context, not current revenue, profit or site capex. Reported 48,000 dollartaxoverthree years is cumulative;60,000 landlease payment period is not clear, so never label annual. CEO’s 6 percenttaxonpower/services and 6 to 10 staff are attributed, not current audited totals or a reviewed tribal tax instrument. Criticism of resource access is not an adjudicated legal violation or measured site water impact. No MW,currentownership or operating status independently verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://futurism.com/navajo-bitcoin-mine-startup","host":"futurism.com","date":"2021-11-10","published":"2021-11-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.7867,"lng":-108.6866,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Futurism relays Vice/Grist reporting about WestBlock’s bitcoin mine near Shiprock on Navajo Nation land and community concerns over distribution of benefits.","independently_verified_current_operating_status":null},"notes":["Historical claimed 23 to 25 bitcoin/month and 1.4 to 1.6 million-dollarvalue are 2021 commodity/revenue context, not current revenue, profit or site capex. Reported 48,000 dollartaxoverthree years is cumulative;60,000 landlease payment period is not clear, so never label annual. CEO’s 6 percenttaxonpower/services and 6 to 10 staff are attributed, not current audited totals or a reviewed tribal tax instrument. Criticism of resource access is not an adjudicated legal violation or measured site water impact. No MW,currentownership or operating status independently verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://futurism.com/navajo-bitcoin-mine-startup","host":"futurism.com","date":"2021-11-10","published":"2021-11-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Shiprock · San Juan · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"zenith-volts-roswell-chaves-county-data-center-nm","state":"NM","kind":"facility","name":"Zenith Volts Roswell / Chaves County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chaves"],"city":"Roswell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chaves combined solar/storage/DC summary power-basis correction. Economic-development summary not original signed permit or independent inspection.1265MWisSOLARgeneration, not data-center IT or battery energy.300/250acare different uses, not550acDC.6Bcombined project estimate not actual DC-onlycapex. Roswell publisher office not project city/location. No current construction or actual opening verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility","host":"chavescounty.net","date":"2025-08-22","published":"2025-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.14,"lng":-104.52,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Chaves combined solar/storage/DC summary power-basis correction","fields":{"publisher_role":"Roswell Chaves County Economic Development Corporation summary linking original article","publication_date":"2025-08-22","developer":"Zenith Volts Corp.","reported_action":"county approved special use permit","proposed_solar_generation_mw":1265,"proposed_data_center_acres":300,"proposed_battery_storage_acres":250,"combined_estimated_project_cost_usd":6000000000,"location":"north side of700/800block WestPearsonRoad near LakeArthur, Chaves/Eddy boundary"},"notes":["Economic-development summary not original signed permit or independent inspection.1265MWisSOLARgeneration, not data-center IT or battery energy.300/250acare different uses, not550acDC.6Bcombined project estimate not actual DC-onlycapex. Roswell publisher office not project city/location. No current construction or actual opening verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility","host":"chavescounty.net","date":"2025-08-22","published":"2025-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Mexico · Roswell · Chaves · Source context reviewed","state_name":"New Mexico","state_path":"/new-mexico/"},{"id":"32-avenue-of-the-americas-ny","state":"NY","kind":"facility","name":"32 Avenue of the Americas","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New York"],"city":"New York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/jfk13","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.720012,"lng":-74.004641,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"JFK13","published_address":"32 Avenue of the Americas, New York, NY 10013","operator_label_total_building_size_sqft":132500},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/jfk13","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · New York · New York · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"netrality-325-hudson-street-ny","state":"NY","kind":"facility","name":"325 Hudson Street","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New York"],"city":"New York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical H5 service relationship is not exclusive building ownership or a new second physical facility. No precise power value from multiple-megawatts language. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/H5-Expands-NYC.html","host":"h5datacenters.com","date":"2021-05-27","published":"2021-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.7268,"lng":-74.008,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_h5_service_expansion_date":"2021-05-27","published_address":"325 Hudson Street, New York City","mixed_use_building_sqft":225000,"historical_partner":"DivcoWest"},"notes":["Historical H5 service relationship is not exclusive building ownership or a new second physical facility. No precise power value from multiple-megawatts language.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/H5-Expands-NYC.html","host":"h5datacenters.com","date":"2021-05-27","published":"2021-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · New York · New York · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"365-data-centers-commack-ny","state":"NY","kind":"facility","name":"365 Data Centers Long Island (Commack)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Suffolk"],"city":"Commack","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Page contains stray SouthFloridaintro despite LongIsland-specific address. No power/area inferred from template. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://365datacenters.com/commack/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.8242092,"lng":-73.2929267,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"published_address":"500 Commack Rd, Commack, NY11725"},"notes":["Page contains stray SouthFloridaintro despite LongIsland-specific address. No power/area inferred from template.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/commack/","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Commack · Suffolk · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"365-data-centers-ny10-65-broadway-ny","state":"NY","kind":"facility","name":"365 Data Centers NY10 (65 Broadway)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New York"],"city":"New York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator space inside a shared building is not the whole physical tower. Backup UPS/generator equipment is not critical IT or utility capacity. URL upload-month is not publication date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://365datacenters.com/wp-content/uploads/2023/05/365_CUTSHEET_FINAL_NYC_V3.pdf","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.707335,"lng":-74.012583,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"65 Broadway, New York, NY10006","operator_data_center_area_sqft":16000,"ups_configuration":{"units":3,"kw_each":203,"redundancy":"N+1"},"onsite_generator_kw":750},"notes":["Operator space inside a shared building is not the whole physical tower. Backup UPS/generator equipment is not critical IT or utility capacity. URL upload-month is not publication date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://365datacenters.com/wp-content/uploads/2023/05/365_CUTSHEET_FINAL_NYC_V3.pdf","host":"365datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · New York · New York · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"60-hudson-street-ny","state":"NY","kind":"facility","name":"60 Hudson Street","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New York"],"city":"New York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Building/participant context only; not exclusive Digital Realty ownership or one separate building for every listed carrier. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.71767,"lng":-74.008348,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Digital Realty","listed_address":"60 Hudson St","listed_city":"New York","listed_state":"NY"},"notes":["Building/participant context only; not exclusive Digital Realty ownership or one separate building for every listed carrier.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · New York · New York · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"75-broad-street-manhattan-ny","state":"NY","kind":"facility","name":"75 Broad Street (Broad Street Connect carrier hotel)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New York"],"city":"New York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 10000sqftroofspace is antennaarea, notwhitefloor.6500Awithoutverifiedvoltage/powerfactor notconvertedtoMW.1928buildingorigin notdata-centeropening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nyi.net/solutions/colocation-data-centers/new-york/broad-street-connect/","host":"nyi.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7045967,"lng":-74.011221,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"75 Broad Street, New York, NY10004","potential_electrical_output_mw_approx":12.5,"power_basis":"potential electrical infrastructure output, not criticalIT"},"notes":["10000sqftroofspace is antennaarea, notwhitefloor.6500Awithoutverifiedvoltage/powerfactor notconvertedtoMW.1928buildingorigin notdata-centeropening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nyi.net/solutions/colocation-data-centers/new-york/broad-street-connect/","host":"nyi.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · New York · New York · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"9ldg-niagara-falls-ny","state":"NY","kind":"facility","name":"9LDG Niagara AI Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Niagara"],"city":"Niagara Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NiagaraFalls limited readable proposal excerpt. Only publicly readable lede reviewed; encoded protectedbody not decoded or bypassed. Proposalnotoperatingfacility orfinalpermit. No projectMW, investment, actualpurchaseprice oropeningverified. Personalcriminalhistoryheadline not needed for facility facts and not adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.niagara-gazette.com/news/local_news/falls-firm-fronted-by-convicted-money-launderer-eyeing-north-end-data-center/article_80fca10c-4f5d-11ef-89b1-777f94833d22.html","host":"niagara-gazette.com","date":"2024-08-01","published":"2024-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.0628,"lng":-79.0175,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"NiagaraFalls limited readable proposal excerpt","fields":{"company":"9 Lives Digital Group","reported_property":"former GlobeMetallurgical,3807HighlandAvenue, NiagaraFalls, NewYork","reported_plan":"AI data center with logistics/warehousing redevelopment"},"notes":["Only publicly readable lede reviewed; encoded protectedbody not decoded or bypassed. Proposalnotoperatingfacility orfinalpermit. No projectMW, investment, actualpurchaseprice oropeningverified. Personalcriminalhistoryheadline not needed for facility facts and not adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.niagara-gazette.com/news/local_news/falls-firm-fronted-by-convicted-money-launderer-eyeing-north-end-data-center/article_80fca10c-4f5d-11ef-89b1-777f94833d22.html","host":"niagara-gazette.com","date":"2024-08-01","published":"2024-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Niagara Falls · Niagara · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"american-bitcoin-niagara-falls-ny","state":"NY","kind":"facility","name":"American Bitcoin  -  Niagara Falls (\"Alpha Site\")","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Niagara"],"city":"Niagara Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hut8 named Alpha Niagara Falls platform listing. Corporate Miami address is not site. Does not establish AmericanBitcoin ownership/tenant relationship, exact parcel, observed metered load or original opening. Ignore illustrative SaltCreek26MV/25percent animation and do not transfer unrelated platform capacity to this site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hut8.com/our-platform","host":"hut8.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.082124888357896,"lng":-79.03094758819105,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Hut8 named Alpha Niagara Falls platform listing","fields":{"site_name":"Alpha","site_locality":"Niagara Falls, New York","published_power_mw":50,"power_basis":"operator platform ASIC-compute output, not explicit critical IT","use_case":"ASIC Compute"},"notes":["Corporate Miami address is not site. Does not establish AmericanBitcoin ownership/tenant relationship, exact parcel, observed metered load or original opening. Ignore illustrative SaltCreek26MV/25percent animation and do not transfer unrelated platform capacity to this site.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hut8.com/our-platform","host":"hut8.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Niagara Falls · Niagara · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"arconic-arsenal-data-site-massena-ny","state":"NY","kind":"facility","name":"Arsenal Data Site (Arconic Massena Operations)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Lawrence"],"city":"Massena","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. industrial cleanup-site context only. EPA cleanup profile not data-center development approval or parcel-specific campus footprint.2700acres describes industrial cleanup property, not necessarily data-center land. Ready-for-anticipated-use2015is a remediation milestone, not data-center opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ordspub.epa.gov/ords/cimc/f?p=CIMC:RCRA:::::P14_RCRA_HANDLER_ID:NYD002232304","host":"ordspub.epa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.9528,"lng":-74.883,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"industrial cleanup-site context only","fields":{"cleanup_site_rcra_identifier":"NYD002232304","cleanup_site_published_address":"45 County Route42, Massena, NY13662"},"notes":["EPA cleanup profile not data-center development approval or parcel-specific campus footprint.2700acres describes industrial cleanup property, not necessarily data-center land. Ready-for-anticipated-use2015is a remediation milestone, not data-center opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ordspub.epa.gov/ords/cimc/f?p=CIMC:RCRA:::::P14_RCRA_HANDLER_ID:NYD002232304","host":"ordspub.epa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Massena · St. Lawrence · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"blockfusion-niagara-falls-ny","state":"NY","kind":"facility","name":"Blockfusion Niagara Falls Facility (North East Data)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Niagara"],"city":"Niagara Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Rick Pfeiffer, Niagara Gazette, April 17, 2025: readable original preview names North East Data LLC doing business as BlockFusion at 5380 Frontier Avenue. A public hearing concerned a high-energy-use overlay/operating permit to RESUME mining. This is historical permit-process context, not proof the permit was subsequently issued or mining was operating in October 2026. Remaining scrambled/gated body was neither decoded nor used. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.niagara-gazette.com/news/falls-planning-board-considers-recommending-operating-permit-for-frontier-avenue-bitcoin-mine/article_3614d579-696d-4175-95ac-875c7714886b.html","host":"niagara-gazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.0962,"lng":-79.0377,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Rick Pfeiffer, Niagara Gazette, April 17, 2025: readable original preview names North East Data LLC doing business as BlockFusion at 5380 Frontier Avenue. A public hearing concerned a high-energy-use overlay/operating permit to RESUME mining. This is historical permit-process context, not proof the permit was subsequently issued or mining was operating in October 2026. Remaining scrambled/gated body was neither decoded nor used.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.niagara-gazette.com/news/falls-planning-board-considers-recommending-operating-permit-for-frontier-avenue-bitcoin-mine/article_3614d579-696d-4175-95ac-875c7714886b.html","host":"niagara-gazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Niagara Falls · Niagara · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"bloomberg-orangeburg-ny","state":"NY","kind":"facility","name":"Bloomberg LP Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rockland"],"city":"Orangeburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Rockland Times June27,2013 reports a June20 topping-off ceremony for Bloomberg at Corporate Park Drive,Orangeburg, with130000sf then under construction. First-quarter2014 occupancy,80permanent jobs and840M investment were forecasts, not current operation/spending. Reported250construction jobs are a dated source claim. Article describes a12year PILOT and separate developer/equipment sales/mortgage-tax exemptions, but signed agreements and actual tax receipts not checked. A30M Orange & Rockland substation was reportedly online2011; that is grid infrastructure cost, not campus capex or MW. Separate Martin Group232000sf property is not another Bloomberg building. No current operating-status or exact power finding. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rocklandtimes.com/2013/06/27/bloomberg-tops-off-new-datacenter/","host":"rocklandtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.036652,"lng":-73.986828,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["Rockland Times June27,2013 reports a June20 topping-off ceremony for Bloomberg at Corporate Park Drive,Orangeburg, with130000sf then under construction. First-quarter2014 occupancy,80permanent jobs and840M investment were forecasts, not current operation/spending. Reported250construction jobs are a dated source claim.","Article describes a12year PILOT and separate developer/equipment sales/mortgage-tax exemptions, but signed agreements and actual tax receipts not checked. A30M Orange & Rockland substation was reportedly online2011; that is grid infrastructure cost, not campus capex or MW. Separate Martin Group232000sf property is not another Bloomberg building. No current operating-status or exact power finding.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://rocklandtimes.com/2013/06/27/bloomberg-tops-off-new-datacenter/","host":"rocklandtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Orangeburg · Rockland · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"wf-industrial-yaphank-ny","state":"NY","kind":"facility","name":"Brookhaven Digital Infrastructure Facility (WF Industrial / Wildflower, Yaphank)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Suffolk"],"city":"Yaphank","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Brookhaven draft minutes and unrelated fiscal-action separation. Actualpages10and11haveDRAFTwatermarkabsentfromtext extraction. Do not report draftdiscussionasfinalapprovedminutes/J uly15decision, taxbenefittermination, issuedrecaptureorapprovedDCconversion.20yearPILOT/129Macquisition/14MrenovationonthesamepagebelongdifferentLakeRonkonkomahousingproject,notWFIndustrial. WFIndustrialXIIIpickleballcasealsoseparate.50FTEproposalnotcurrentemployment. Original4MBpartialpreserved;complete14.8MB270pagepacketrecoveredordinaryHTTP. No numericITMWorfinallateroutcomeadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://brookhavenida.org/files/7-15-26%20IDA%20Packet.pdf","host":"brookhavenida.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.832188,"lng":-72.929969,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Brookhaven draft minutes and unrelated fiscal-action separation","fields":{"agency":"Town of Brookhaven Industrial Development Agency","packet_date":"2026-07-15","reviewed_component":"June17,2026DRAFTmeetingminutes","project":"WF Industrial XII LLC","draft_minutes_described_proposal":"convert all three buildings to data centers","proposed_fulltime_equivalent_jobs":50,"draft_minutes_described_disposition":"reviewpendingstudiesbeforedecision","final_termination_or_approval_from_this_component":null},"notes":["Actualpages10and11haveDRAFTwatermarkabsentfromtext extraction. Do not report draftdiscussionasfinalapprovedminutes/J uly15decision, taxbenefittermination, issuedrecaptureorapprovedDCconversion.20yearPILOT/129Macquisition/14MrenovationonthesamepagebelongdifferentLakeRonkonkomahousingproject,notWFIndustrial. WFIndustrialXIIIpickleballcasealsoseparate.50FTEproposalnotcurrentemployment. Original4MBpartialpreserved;complete14.8MB270pagepacketrecoveredordinaryHTTP. No numericITMWorfinallateroutcomeadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://brookhavenida.org/files/7-15-26%20IDA%20Packet.pdf","host":"brookhavenida.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Yaphank · Suffolk · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"bnl-sdcc-b725-upton-ny","state":"NY","kind":"facility","name":"Brookhaven National Laboratory Scientific Data and Computing Center (Building 725)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Suffolk"],"city":"Upton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. BNL researcher paper explicit staged IT capacity and calendar opening. Paper initial3.6MWIT versus3.5MWbackup inclusive overhead has unresolved backup/design scope; not guarantee3.6ITfullygenerator-backed.9.6fullbuildoutcapabilitynotobserved2026energizedload. Fiscal2022openingcorrespondsOctober2021onward,notinventedcalendar2022day. FormerBuilding515separateoldDC;old1940m2notnewB725floor. TierIIIclassdesignnotindependentUptimecertificate,designPUEnotactualmeasuredannualefficiency. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://indico.jlab.org/event/459/papers/11607/files/718-CHEP-2023-BNL-Data-Center-paper.pdf","host":"indico.jlab.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.8679786,"lng":-72.876393,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"BNL researcher paper explicit staged IT capacity and calendar opening","fields":{"institution":"Brookhaven National Laboratory","facility":"SDCC new data center in Building725, former NSLS1 shell","construction_finished_quarter":"2021-Q3","operational_quarter":"2021-Q4","initial_buildout_ups_supported_it_mw":3.6,"initial_published_diesel_backup_mw":3.5,"fullbuildout_capability_it_mw":9.6,"fullbuildout_backup_capability_mw":14,"total_it_floor_sqft_approx":17000,"total_it_floor_m2_approx":1600,"design_pue_target":1.2,"design_monthly_pue_expected_range":[1.17,1.28]},"notes":["Paper initial3.6MWIT versus3.5MWbackup inclusive overhead has unresolved backup/design scope; not guarantee3.6ITfullygenerator-backed.9.6fullbuildoutcapabilitynotobserved2026energizedload. Fiscal2022openingcorrespondsOctober2021onward,notinventedcalendar2022day. FormerBuilding515separateoldDC;old1940m2notnewB725floor. TierIIIclassdesignnotindependentUptimecertificate,designPUEnotactualmeasuredannualefficiency.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://indico.jlab.org/event/459/papers/11607/files/718-CHEP-2023-BNL-Data-Center-paper.pdf","host":"indico.jlab.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Upton · Suffolk · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"centrilogic-rochester-ny","state":"NY","kind":"facility","name":"Centrilogic Rochester Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monroe"],"city":"Rochester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Centrilogic Rochester own-operated facility. 22000sqftnotexplicitraised-floorarea.18inchheightnotcapacity. Twofeedsnot2separatebuildings. Operatorcertification/complianceclaimsnotindependentcertifierinspection. NoexactaddressorITMWinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.centrilogic.com/rochester-new-york-data-center/","host":"centrilogic.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.1671944,"lng":-77.6730439,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Centrilogic Rochester own-operated facility","fields":{"operator":"Centrilogic","locality":"Rochester, New York","operator_described_ownership":"owns and operates self-contained data center","data_center_sqft":22000,"raised_floor_height_inches":18,"utility_feed_substations":2},"notes":["22000sqftnotexplicitraised-floorarea.18inchheightnotcapacity. Twofeedsnot2separatebuildings. Operatorcertification/complianceclaimsnotindependentcertifierinspection. NoexactaddressorITMWinreviewedbody.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.centrilogic.com/rochester-new-york-data-center/","host":"centrilogic.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Rochester · Monroe · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"coinmint-massena-ny","state":"NY","kind":"facility","name":"Coinmint (Massena East / former Alcoa Smelter)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["St. Lawrence"],"city":"Massena","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Customer exits do not prove host closure.166MW utilized of435MW approved was historical company claim, not current critical IT. Plattsburgh10MW customer retention is separate site. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theminermag.com/news/2024-11-21/miner-weekly-coinmint-nydig-bitcoin","host":"theminermag.com","date":"2024-11-21","published":"2024-11-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.977701,"lng":-74.732659,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"EnergyMag reports three hosted customers planned to vacate47plus27plus36MW at Coinmint Massena, while NYDIG partnership supported expansion.","independently_verified_current_operating_status":null},"notes":["Customer exits do not prove host closure.166MW utilized of435MW approved was historical company claim, not current critical IT. Plattsburgh10MW customer retention is separate site.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theminermag.com/news/2024-11-21/miner-weekly-coinmint-nydig-bitcoin","host":"theminermag.com","date":"2024-11-21","published":"2024-11-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Massena · St. Lawrence · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"colocrossing-buf1-buffalo-ny","state":"NY","kind":"facility","name":"ColoCrossing BUF1, Buffalo","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Erie"],"city":"Buffalo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ColoCrossing Buffalo power and opening-date conflict. NarrativeJuly2012openingand2014commissionedtableconflict;do notsilentlychooseopening.1.44utilityand1.4backupnotcriticalIT.130coolingtonsnotMW. Renewablehydroclaimnotindependentmeteredenergycertificate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.colocrossing.com/datacenter/buffalo-ny","host":"colocrossing.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.8930043,"lng":-78.8752659,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"ColoCrossing Buffalo power and opening-date conflict","fields":{"operator":"ColoCrossing","code":"BUF1","address":"325 Delaware Avenue, Buffalo, New York14202","area_sqft":13000,"utility_power_mw":1.44,"generator_capacity_mw":1.4,"narrative_opening":"2012-07","specification_commissioned_year":2014,"canonical_opening_date":null},"notes":["NarrativeJuly2012openingand2014commissionedtableconflict;do notsilentlychooseopening.1.44utilityand1.4backupnotcriticalIT.130coolingtonsnotMW. Renewablehydroclaimnotindependentmeteredenergycertificate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.colocrossing.com/datacenter/buffalo-ny","host":"colocrossing.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Buffalo · Erie · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"cyrusone-nym7-wappingers-falls-ny","state":"NY","kind":"facility","name":"CyrusOne NYM7 (Wappingers Falls)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dutchess"],"city":"Wappingers Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Raised floor and recovery space are subsets of the facility, not additive total building area. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/wappingers-falls-ny","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.599043,"lng":-73.882221,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_total_it_capacity_mw":3,"building_sqft":100000,"raised_white_floor_sqft":37000,"work_area_recovery_sqft":25000},"notes":["Raised floor and recovery space are subsets of the facility, not additive total building area.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/wappingers-falls-ny","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Wappingers Falls · Dutchess · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"databank-lga3-orangeburg-ny","state":"NY","kind":"facility","name":"DataBank LGA3 (Orangeburg Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rockland"],"city":"Orangeburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Embedded historicvideo predicts200000sqft/40MW; current facilitycard110000ITsqft/20MW is different scope/phase. Do not sum or silently replace. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named source. Legacy construction video on same page describes200,000squarefeet/40MWfuture scope. Do not replace current labeled specifications or infer that expansion was delivered.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/new-york/lga3","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.037331,"lng":-73.987853,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"LGA3","street":"2000 Corporate Dr.","city":"Orangeburg","critical_it_capacity_mw":20,"it_area_sqft":110000,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Embedded historicvideo predicts200000sqft/40MW; current facilitycard110000ITsqft/20MW is different scope/phase. Do not sum or silently replace.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/new-york/lga3","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"operator_site_code":"LGA3","it_area_sqft":110000,"critical_it_mw":20},"notes":["Legacy construction video on same page describes200,000squarefeet/40MWfuture scope. Do not replace current labeled specifications or infer that expansion was delivered.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/new-york/lga3","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Orangeburg · Rockland · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"dataverge-brooklyn-ny","state":"NY","kind":"facility","name":"DataVerge Brooklyn (Industry City)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kings"],"city":"Brooklyn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DataVerge Brooklyn current space versus potential expansion. 35kexpansionnotcurrentoperatingareaandnotaddedto50kactual.111TownSquarePlaceJerseyCitybackupsiteisnotBrooklynaddress.40carriersnot40buildings. No numericITMWororiginalopening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dataverge.com/interconnected-data-center-brooklyn/","host":"dataverge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.6579597,"lng":-74.0055488,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"DataVerge Brooklyn current space versus potential expansion","fields":{"operator":"DataVerge","locality":"Industry City, Brooklyn, New York","published_data_center_area_sqft":50000,"raised_floor_sqft":40000,"additional_expansion_area_sqft_available":35000,"floor_labels":[8,9]},"notes":["35kexpansionnotcurrentoperatingareaandnotaddedto50kactual.111TownSquarePlaceJerseyCitybackupsiteisnotBrooklynaddress.40carriersnot40buildings. No numericITMWororiginalopening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dataverge.com/interconnected-data-center-brooklyn/","host":"dataverge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Brooklyn · Kings · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"digihost-erie-county-ny","state":"NY","kind":"facility","name":"Digihost  -  Erie County (Buffalo)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Erie"],"city":"Buffalo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Buffalo Erie parcel context without inferred data-center operations. Assessment of the larger industrial property is not Digihost occupied IT area. Year 1922 is historical improvement, not data-center commissioning. Owner and operator are different roles; operator tenancy not independently proven here. Assessment value is not project capex. Polygon geometry is parcel boundary, not verified entrance. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gisservices.its.ny.gov/arcgis/rest/services/NYS_Tax_Parcels_Public/MapServer/1/query?where=PRINT_KEY%3D%27101.24-1-1.1%27+AND+COUNTY_NAME%3D%27Erie%27&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gisservices.its.ny.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.919825,"lng":-78.81999,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Buffalo Erie parcel context without inferred data-center operations","fields":{"agency":"New York State public tax parcel service","parcel":"101.24-1-1.1","county":"Erie","municipality":"Buffalo","situs":"1001 Delavan East","owner_as_listed":"East Delavan Property LLC","assessment_roll_year":2025,"listed_acres":35.4,"listed_gross_floor_area_sqft":745577,"assessment_year_built":1922,"recorded_use_description":"Light manufacturing"},"notes":["Assessment of the larger industrial property is not Digihost occupied IT area. Year 1922 is historical improvement, not data-center commissioning. Owner and operator are different roles; operator tenancy not independently proven here. Assessment value is not project capex. Polygon geometry is parcel boundary, not verified entrance.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gisservices.its.ny.gov/arcgis/rest/services/NYS_Tax_Parcels_Public/MapServer/1/query?where=PRINT_KEY%3D%27101.24-1-1.1%27+AND+COUNTY_NAME%3D%27Erie%27&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gisservices.its.ny.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Buffalo · Erie · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"digihost-north-tonawanda-ny","state":"NY","kind":"facility","name":"Digihost / Digi Power X  -  Fortistar North Tonawanda","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Niagara"],"city":"North Tonawanda","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. Earthjustice May28,2026 is litigationcounsel's original PARTYannouncement about NorthTonawanda/DigihostnowDigiPowerX. Its languageaboutvictory, health/emissions and statutoryrollbacks is advocateinterpretation, notindependentmeasurements or currentlegalreview. Originalcourtdecision below supplies actualdisposition. 55MW relates FortistarGASGENERATION, not statedminingIT. Hundreds-of-thousandstonsemissions and noise/water harms are advocacy claims notadoptedasmeasuredcampusdata. RequiringPSCclimatereview isnot an inspectedshutdownorder, permanentcryptoban or automaticrevocationofeverypermit. No callsforpubliccomments/outreach actedon. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification. AllsevenpagesoforiginalNewYorkAppellateDivisionThirdDepartmentmemorandumandorder CV24-2101,decided/enteredMay28,2026,visuallyread;firstfivepagesalsoreadthroughpublicwebparser. GovernmentauthoredcopyhostedbyEarthjustice,litigationcounselnotcourthost. P1calendarApr21isnotdecisiondate;P2lowerAlbanyjudgmententeredNov14,2024. P5-6affirmPSCdeclaratoryrulinghadapprovaleffectandrequiredCLCPA7(2)greenhousegasanalysis. Proformaassertiononrehearingdidnotsatisfyreview; DECfacilitypermittingdoesnotreplacePSCapproval-specificduty. P7judgmentAFFIRMEDWITHCOSTS. Opiniondoesnotorderfacilityshutdowninthistext;laterPSCcompliance/appeals/currentoperationnotinspected. P3footnote1disadvantaged-communityportionwasNOTanissueonthisappeal; do notclaimcourtadjudicatedalladvocacyhealth/environmental-justiceharms. Courtbackground2021acquisitioncontract/petitionisnotverifiedsaleclosingdateorITcapacity. OpinionstateslegalrulingasofMay28,notacomprehensivereviewofeverylaterNewYorklawchange. NoPDFtext/OCRextractionperformedlocally;signatureimagevisiblebutnotindependentdigitalauthentication.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://earthjustice.org/press/2026/appeals-court-delivers-blow-to-north-tonawanda-crypto-operation-reinforces-new-yorks-climate-law","host":"earthjustice.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://earthjustice.org/document/ny-supreme-court-appellate-division-fortistar-decision-may-2026","host":"earthjustice.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.0483121591696,"lng":-78.85360658271534,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["Earthjustice May28,2026 is litigationcounsel's original PARTYannouncement about NorthTonawanda/DigihostnowDigiPowerX. Its languageaboutvictory, health/emissions and statutoryrollbacks is advocateinterpretation, notindependentmeasurements or currentlegalreview. Originalcourtdecision below supplies actualdisposition.","55MW relates FortistarGASGENERATION, not statedminingIT. Hundreds-of-thousandstonsemissions and noise/water harms are advocacy claims notadoptedasmeasuredcampusdata. RequiringPSCclimatereview isnot an inspectedshutdownorder, permanentcryptoban or automaticrevocationofeverypermit. No callsforpubliccomments/outreach actedon.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://earthjustice.org/press/2026/appeals-court-delivers-blow-to-north-tonawanda-crypto-operation-reinforces-new-yorks-climate-law","host":"earthjustice.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["AllsevenpagesoforiginalNewYorkAppellateDivisionThirdDepartmentmemorandumandorder CV24-2101,decided/enteredMay28,2026,visuallyread;firstfivepagesalsoreadthroughpublicwebparser. GovernmentauthoredcopyhostedbyEarthjustice,litigationcounselnotcourthost. P1calendarApr21isnotdecisiondate;P2lowerAlbanyjudgmententeredNov14,2024.","P5-6affirmPSCdeclaratoryrulinghadapprovaleffectandrequiredCLCPA7(2)greenhousegasanalysis. Proformaassertiononrehearingdidnotsatisfyreview; DECfacilitypermittingdoesnotreplacePSCapproval-specificduty. P7judgmentAFFIRMEDWITHCOSTS. Opiniondoesnotorderfacilityshutdowninthistext;laterPSCcompliance/appeals/currentoperationnotinspected.","P3footnote1disadvantaged-communityportionwasNOTanissueonthisappeal; do notclaimcourtadjudicatedalladvocacyhealth/environmental-justiceharms. Courtbackground2021acquisitioncontract/petitionisnotverifiedsaleclosingdateorITcapacity. OpinionstateslegalrulingasofMay28,notacomprehensivereviewofeverylaterNewYorklawchange. NoPDFtext/OCRextractionperformedlocally;signatureimagevisiblebutnotindependentdigitalauthentication.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://earthjustice.org/document/ny-supreme-court-appellate-division-fortistar-decision-may-2026","host":"earthjustice.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · North Tonawanda · Niagara · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"digital-realty-jfk10-manhattan-ny","state":"NY","kind":"facility","name":"Digital Realty JFK10 (111 Eighth Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New York"],"city":"New York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/jfk10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.741369,"lng":-74.003206,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"JFK10","published_address":"111 8th Avenue New York, NY 10011","operator_label_total_building_size_sqft":111000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/new-york/jfk10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · New York · New York · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"eco-yotta-oneonta-ny","state":"NY","kind":"facility","name":"Eco-Yotta Data Center (proposed, County Route 9)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Otsego"],"city":"Oneonta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Only readable public preview reviewed. Encoded premium body was not decoded or bypassed. Exact effective date, exemptions, law text and effect on EcoYotta require original records. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.thedailystar.com/news/local_news/oneonta-town-board-passes-one-year-data-center-moratorium/article_a68f1baa-9dec-4ac5-8bae-3dd86ba53b1c.html","host":"thedailystar.com","date":"2026-05-14","published":"2026-05-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.451656,"lng":-75.115285,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"moratorium-adoption-reported-preview","reported_finding":"Readable Daily Star preview reports unanimous Oneonta town vote on May 13 for a one-year data-center moratorium.","report_display_date":"2026-05-14","independently_verified_current_status":null},"notes":["Only readable public preview reviewed. Encoded premium body was not decoded or bypassed. Exact effective date, exemptions, law text and effect on EcoYotta require original records.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.thedailystar.com/news/local_news/oneonta-town-board-passes-one-year-data-center-moratorium/article_a68f1baa-9dec-4ac5-8bae-3dd86ba53b1c.html","host":"thedailystar.com","date":"2026-05-14","published":"2026-05-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Oneonta · Otsego · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"empire-ai-beta-buffalo-ny","state":"NY","kind":"facility","name":"Empire AI Beta","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Erie"],"city":"Buffalo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Empire AI Beta funding. Equipment tranche, not entire campus development cost. More than500Mpublic/private funding is wider Empire AI program, not Beta alone. Compute performance multipliers are not electrical MW. This2025funding release alone not operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.governor.ny.gov/news/governor-hochul-announces-40-million-launch-empire-ai-beta-supercomputer","host":"governor.ny.gov","date":"2025-06-26","published":"2025-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.8949,"lng":-78.8677,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Empire AI Beta funding","fields":{"beta_equipment_funding_approval_announcement":"2025-06-26","beta_equipment_funding_usd":40000000,"beta_host_location":"University at Buffalo"},"notes":["Equipment tranche, not entire campus development cost. More than500Mpublic/private funding is wider Empire AI program, not Beta alone. Compute performance multipliers are not electrical MW. This2025funding release alone not operating proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.governor.ny.gov/news/governor-hochul-announces-40-million-launch-empire-ai-beta-supercomputer","host":"governor.ny.gov","date":"2025-06-26","published":"2025-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Buffalo · Erie · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"empire-ai-gamma-buffalo-ny","state":"NY","kind":"facility","name":"Empire AI Gamma","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Erie"],"city":"Buffalo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Beta operating milestone and separate Gamma construction target. Headline Beta fully online must not become Gamma operating. Alpha/Beta/Gamma phases and supercomputer systems are not automatically separate physical facilities.40Mrefers Beta system, not Gamma buildout. Waste-heat reuse future design not measured energy savings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new","host":"governor.ny.gov","date":"2026-08-05","published":"2026-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.8864,"lng":-78.8784,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Beta operating milestone and separate Gamma construction target","fields":{"beta_online_announcement_date":"2026-08-05","gamma_government_reported_status":"construction continues","gamma_expected_completion":"2027-year-end"},"notes":["Headline Beta fully online must not become Gamma operating. Alpha/Beta/Gamma phases and supercomputer systems are not automatically separate physical facilities.40Mrefers Beta system, not Gamma buildout. Waste-heat reuse future design not measured energy savings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new","host":"governor.ny.gov","date":"2026-08-05","published":"2026-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Buffalo · Erie · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"equinix-ny9-manhattan-ny","state":"NY","kind":"facility","name":"Equinix NY9","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New York"],"city":"New York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Same address also lists Crown Castle and Digital Realty; no exclusive owner or separate-building inference. NY9 code not given. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.740907,"lng":-74.001768,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Equinix","listed_address":"111 8th Ave","listed_city":"New York","listed_state":"NY"},"notes":["Same address also lists Crown Castle and Digital Realty; no exclusive owner or separate-building inference. NY9 code not given.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · New York · New York · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"evocative-jfk2-chappaqua-ny","state":"NY","kind":"facility","name":"Evocative JFK2 (NY2) Chappaqua","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Westchester"],"city":"Chappaqua","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. VPLS Chappaqua historical operating partnership. HistoricalNY2toJFK2codecrosswalknotexplicitinbody. Operation/managementpartnershipnotsolewhole-campusVPLSownership. Acquisitionannouncementnotoriginalfacilityopening. No numericITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://evocative.com/news/new-york-data-center-acquisition/","host":"evocative.com","date":"2021-03-09","published":"2021-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.1779776,"lng":-73.7548848,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"VPLS Chappaqua historical operating partnership","fields":{"historical_operator":"VPLS","historical_code":"NY2","address":"480 NorthBedfordPlaza, Chappaqua, New York","colocation_area_sqft":38000,"operation_partnership_announcement_date":"2021-03-09","campus_ownership_partners":["Crestline Partners","Summit Development"],"named_property_company":"CL Summit Chappaqua HoldCo LLC"},"notes":["HistoricalNY2toJFK2codecrosswalknotexplicitinbody. Operation/managementpartnershipnotsolewhole-campusVPLSownership. Acquisitionannouncementnotoriginalfacilityopening. No numericITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://evocative.com/news/new-york-data-center-acquisition/","host":"evocative.com","date":"2021-03-09","published":"2021-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Chappaqua · Westchester · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"1547-orny1-orangeburg-ny","state":"NY","kind":"facility","name":"fifteenfortyseven ORNY1 (1 Ramland Road, Orangeburg)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rockland"],"city":"Orangeburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historic forecast does not prove actual event or2026status. Regional investmentover40million is not exact campus capex. Operator2015release announcedMay5ribboncutting.24MW usable power plus approved50MW substation do not demonstrate current commissioned74MW. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. NYISO Orangeburg load request, geography and timing limits. Exact original workbook recovered; earlier binary-as-HTML wrapper not used. Proposed backfeed is not operational service or approved IT demand. Existing ORNY1 identity/expansion crosswalk still needs site evidence; do not add30MW to a current building total. Published NJ code conflicts with Rockland/Orangeburg association; no state correction inferred. Status-code meaning not guessed. Other Orangeburg projects in workbook are distinct.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://1547realty.com/resource/fifteenfortyseven-announces-ribbon-cutting-ceremony-for-flagship-facility-in-orangeburg-ny","host":"1547realty.com","date":"2015-04-29","published":"2015-04-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","host":"nyiso.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.034512,"lng":-73.97584,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"1 Ramland Road","city":"Orangeburg","county":"Rockland","campus_acres":32,"facility_area_sqft":232000,"opening_ceremony_forecast":"2015-05-05","power_mw":24,"power_basis":"usable power stated2015","additional_substation_approved_mw":50},"notes":["Historic forecast does not prove actual event or2026status.","Regional investmentover40million is not exact campus capex.","Operator2015release announcedMay5ribboncutting.24MW usable power plus approved50MW substation do not demonstrate current commissioned74MW.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://1547realty.com/resource/fifteenfortyseven-announces-ribbon-cutting-ceremony-for-flagship-facility-in-orangeburg-ny","host":"1547realty.com","date":"2015-04-29","published":"2015-04-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"NYISO Orangeburg load request, geography and timing limits","fields":{"nyiso_queue_number":1715,"project_name":"1547 CSR - Orangeburg LLC","developer_name_as_published":"Jerry Martin","ir_submission_date":"2024-07-02","published_peak_load_mw":30,"power_basis":"load interconnection request peak, not measured or critical IT","county_as_published":"Rockland","state_code_as_published":"NJ","utility":"Orange and Rockland","interconnection":"138kV Line703 between Corporate Drive and Harings Corner","raw_project_status_code":10,"available_studies":"SIS","record_last_updated":"2025-12-31","proposed_initial_backfeed_month":"2027-01"},"notes":["Exact original workbook recovered; earlier binary-as-HTML wrapper not used. Proposed backfeed is not operational service or approved IT demand. Existing ORNY1 identity/expansion crosswalk still needs site evidence; do not add30MW to a current building total. Published NJ code conflicts with Rockland/Orangeburg association; no state correction inferred. Status-code meaning not guessed. Other Orangeburg projects in workbook are distinct.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","host":"nyiso.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Orangeburg · Rockland · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"greenidge-generation-dresden-ny","state":"NY","kind":"facility","name":"Greenidge Generation","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Yates"],"city":"Dresden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Greenidge regulator settlement summary, not current final permit. Required reductions over renewed permit term, not measured reductions achieved.44percent permitted potential versus25percent actual baseline are different.2022denial alone not current permanently closed status. Underlying agreement and later permit decisions not reviewed in this row. No crypto-to-AI change inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dec.ny.gov/news/press-releases/2025/11/dec-statement-regarding-the-greenidge-agreement","host":"dec.ny.gov","date":"2025-11-08","published":"2025-11-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.679134,"lng":-76.948604,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Greenidge regulator settlement summary, not current final permit","fields":{"regulator_reported_agreement_finalized_date":"2025-11-08","required_actual_ghg_reduction_percent_min":25,"required_potential_ghg_reduction_percent":44,"required_next_step":"permit modification application and public review before final permit decision"},"notes":["Required reductions over renewed permit term, not measured reductions achieved.44percent permitted potential versus25percent actual baseline are different.2022denial alone not current permanently closed status. Underlying agreement and later permit decisions not reviewed in this row. No crypto-to-AI change inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dec.ny.gov/news/press-releases/2025/11/dec-statement-regarding-the-greenidge-agreement","host":"dec.ny.gov","date":"2025-11-08","published":"2025-11-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Dresden · Yates · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"h5-buffalo-i-lockport-ny","state":"NY","kind":"facility","name":"H5 Data Centers Buffalo I (formerly Yahoo Lockport)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Niagara"],"city":"Lockport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. BTPM/WBFO JimFink January22,2025 originalinterview reports49M H5purchaseofYahooLockportrealestatewithYahoooperatingunderlease. OWNERSHIPtransfer isnotYahoooperationssaleornewcampusconstruction. ClosingdescribedafterChristmasbeforeJanreport; noexactclosingday inferred. 43acres/409000sf/eight-data-centercomplex are sourcecampusscopes, not eightnewmapIDs.140Yahoostaffretained/15shifttoH5are existingjobs, not155netnew. Five-yearleasewithrenewaloptionsisreported, underlyingcontract/unconditionalguaranteeunread. H5foregoingformerYahooincentives isofficialinterviewclaim, notverifiedpaidtaxorindependentabatementledger.49Massetprice not newconstructioncapex. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification. Operator campus brochure; specifications shared by Buffalo I and II.. Both pages read and viewed. Operator explicitly names Buffalo I & II, with campus 409200 square feet / 43 acres and two substations totaling up to 44 MVA. These are campus totals, not each building. MVA is apparent power, not established critical IT MW; do not convert without power factor and scope. Footer gives 5319 Enterprise Drive; page-two site image outlines separate campus structures by Enterprise and Crown. This does not resolve inherited Buffalo II street discrepancy: location field 5369 Crown versus narrative 5365 Crown. Parcel-query certificate failure held, no bypass. Tier III design wording is not a verified Uptime Institute award. 100% uptime SLA is a contractual offering, not measured uninterrupted history. Renewable-energy, safety and annual audit claims are operator representations; no current independent certificates, energy-matching records or tenant occupancy inspected. Undated brochure does not independently establish acquisition closing date, individual-building commissioning or current occupied capacity. Limited context, not full technical or current operating verification. January 9, 2025 Town of Lockport IDA minutes, both pages read/viewed.. Page two reports that a formal H5 contact was identified and regular communications established. It does not record approval of a new H5 incentive agreement, purchase price or facility specifications. The nearby draft PILOT closing concerns SIVA Wind, not H5. Agency financial balances and the 1000 Junction Road land sale are also not H5 project investment or incentives.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.btpm.org/local/2025-01-22/yahoo-lockport-data-center-sold-for-49-million","host":"btpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://h5datacenters.com/slick_BuffaloI%26II.pdf","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.lockporteconomicdevelopment.com/wp-content/uploads/2025/01/January-2025-IDA-Board-Minutes.pdf","host":"lockporteconomicdevelopment.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.16879237433895,"lng":-78.7516290070774,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["BTPM/WBFO JimFink January22,2025 originalinterview reports49M H5purchaseofYahooLockportrealestatewithYahoooperatingunderlease. OWNERSHIPtransfer isnotYahoooperationssaleornewcampusconstruction. ClosingdescribedafterChristmasbeforeJanreport; noexactclosingday inferred.","43acres/409000sf/eight-data-centercomplex are sourcecampusscopes, not eightnewmapIDs.140Yahoostaffretained/15shifttoH5are existingjobs, not155netnew. Five-yearleasewithrenewaloptionsisreported, underlyingcontract/unconditionalguaranteeunread. H5foregoingformerYahooincentives isofficialinterviewclaim, notverifiedpaidtaxorindependentabatementledger.49Massetprice not newconstructioncapex.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://www.btpm.org/local/2025-01-22/yahoo-lockport-data-center-sold-for-49-million","host":"btpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json","scope":"Operator campus brochure; specifications shared by Buffalo I and II.","fields":{},"notes":["Both pages read and viewed. Operator explicitly names Buffalo I & II, with campus 409200 square feet / 43 acres and two substations totaling up to 44 MVA. These are campus totals, not each building. MVA is apparent power, not established critical IT MW; do not convert without power factor and scope.","Footer gives 5319 Enterprise Drive; page-two site image outlines separate campus structures by Enterprise and Crown. This does not resolve inherited Buffalo II street discrepancy: location field 5369 Crown versus narrative 5365 Crown. Parcel-query certificate failure held, no bypass.","Tier III design wording is not a verified Uptime Institute award. 100% uptime SLA is a contractual offering, not measured uninterrupted history. Renewable-energy, safety and annual audit claims are operator representations; no current independent certificates, energy-matching records or tenant occupancy inspected.","Undated brochure does not independently establish acquisition closing date, individual-building commissioning or current occupied capacity.","Limited context, not full technical or current operating verification."],"sources":[{"url":"https://h5datacenters.com/slick_BuffaloI%26II.pdf","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json","scope":"January 9, 2025 Town of Lockport IDA minutes, both pages read/viewed.","fields":{},"notes":["Page two reports that a formal H5 contact was identified and regular communications established. It does not record approval of a new H5 incentive agreement, purchase price or facility specifications.","The nearby draft PILOT closing concerns SIVA Wind, not H5. Agency financial balances and the 1000 Junction Road land sale are also not H5 project investment or incentives.","Limited context, not full technical or current operating verification."],"sources":[{"url":"https://www.lockporteconomicdevelopment.com/wp-content/uploads/2025/01/January-2025-IDA-Board-Minutes.pdf","host":"lockporteconomicdevelopment.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Lockport · Niagara · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"h5-buffalo-ii-lockport-ny","state":"NY","kind":"facility","name":"H5 Data Centers Buffalo II","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Niagara"],"city":"Lockport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator campus brochure; specifications shared by Buffalo I and II.. Both pages read and viewed. Operator explicitly names Buffalo I & II, with campus 409200 square feet / 43 acres and two substations totaling up to 44 MVA. These are campus totals, not each building. MVA is apparent power, not established critical IT MW; do not convert without power factor and scope. Footer gives 5319 Enterprise Drive; page-two site image outlines separate campus structures by Enterprise and Crown. This does not resolve inherited Buffalo II street discrepancy: location field 5369 Crown versus narrative 5365 Crown. Parcel-query certificate failure held, no bypass. Tier III design wording is not a verified Uptime Institute award. 100% uptime SLA is a contractual offering, not measured uninterrupted history. Renewable-energy, safety and annual audit claims are operator representations; no current independent certificates, energy-matching records or tenant occupancy inspected. Undated brochure does not independently establish acquisition closing date, individual-building commissioning or current occupied capacity. Limited context, not full technical or current operating verification. January 9, 2025 Town of Lockport IDA minutes, both pages read/viewed.. Page two reports that a formal H5 contact was identified and regular communications established. It does not record approval of a new H5 incentive agreement, purchase price or facility specifications. The nearby draft PILOT closing concerns SIVA Wind, not H5. Agency financial balances and the 1000 Junction Road land sale are also not H5 project investment or incentives.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/slick_BuffaloI%26II.pdf","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.lockporteconomicdevelopment.com/wp-content/uploads/2025/01/January-2025-IDA-Board-Minutes.pdf","host":"lockporteconomicdevelopment.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.16967580851366,"lng":-78.74808845761379,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json","scope":"Operator campus brochure; specifications shared by Buffalo I and II.","fields":{},"notes":["Both pages read and viewed. Operator explicitly names Buffalo I & II, with campus 409200 square feet / 43 acres and two substations totaling up to 44 MVA. These are campus totals, not each building. MVA is apparent power, not established critical IT MW; do not convert without power factor and scope.","Footer gives 5319 Enterprise Drive; page-two site image outlines separate campus structures by Enterprise and Crown. This does not resolve inherited Buffalo II street discrepancy: location field 5369 Crown versus narrative 5365 Crown. Parcel-query certificate failure held, no bypass.","Tier III design wording is not a verified Uptime Institute award. 100% uptime SLA is a contractual offering, not measured uninterrupted history. Renewable-energy, safety and annual audit claims are operator representations; no current independent certificates, energy-matching records or tenant occupancy inspected.","Undated brochure does not independently establish acquisition closing date, individual-building commissioning or current occupied capacity.","Limited context, not full technical or current operating verification."],"sources":[{"url":"https://h5datacenters.com/slick_BuffaloI%26II.pdf","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json","scope":"January 9, 2025 Town of Lockport IDA minutes, both pages read/viewed.","fields":{},"notes":["Page two reports that a formal H5 contact was identified and regular communications established. It does not record approval of a new H5 incentive agreement, purchase price or facility specifications.","The nearby draft PILOT closing concerns SIVA Wind, not H5. Agency financial balances and the 1000 Junction Road land sale are also not H5 project investment or incentives.","Limited context, not full technical or current operating verification."],"sources":[{"url":"https://www.lockporteconomicdevelopment.com/wp-content/uploads/2025/01/January-2025-IDA-Board-Minutes.pdf","host":"lockporteconomicdevelopment.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Lockport · Niagara · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"h5-buffalo-iii-350-main-street-buffalo-ny","state":"NY","kind":"facility","name":"H5 Data Centers Buffalo III (350 Main Street / Main Place Tower)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Erie"],"city":"Buffalo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Facility area does not represent the entire multi-tenant tower or a new standalone campus. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/buffalo-III-colocation.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.88427,"lng":-78.875707,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"350 Main Street, Buffalo, NY","advertised_facility_area_sqft":19000,"building":"Main Place Tower"},"notes":["Facility area does not represent the entire multi-tenant tower or a new standalone campus.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/buffalo-III-colocation.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Buffalo · Erie · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"holtec-hi-cloud-indian-point-buchanan-ny","state":"NY","kind":"facility","name":"Holtec HI-CLOUD Indian Point data center campus (proposed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Westchester"],"city":"Buchanan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Holtec July31,2025 HI-CLOUD announcement identifies Indian Point as an anchor with an initial200MW target of unspecified basis. The broader up-to2000MW delivery-infrastructure concept is not certified Indian Point IT capacity. Retained nuclear licenses do not authorize a data center or new SMR operation. Water access, dark fiber and future heat/storage technologies are opportunities and issuer claims, not measured impacts or issued permits. Other cities under evaluation have no mapped project locations here. No current construction or tenant verified. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://holtecinternational.com/hh-40-16/","host":"holtecinternational.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.2697,"lng":-73.9519,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["Holtec July31,2025 HI-CLOUD announcement identifies Indian Point as an anchor with an initial200MW target of unspecified basis. The broader up-to2000MW delivery-infrastructure concept is not certified Indian Point IT capacity. Retained nuclear licenses do not authorize a data center or new SMR operation. Water access, dark fiber and future heat/storage technologies are opportunities and issuer claims, not measured impacts or issued permits. Other cities under evaluation have no mapped project locations here. No current construction or tenant verified.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://holtecinternational.com/hh-40-16/","host":"holtecinternational.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Buchanan · Westchester · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"ibm-quantum-data-center-poughkeepsie-ny","state":"NY","kind":"facility","name":"IBM Quantum Data Center, Poughkeepsie","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dutchess"],"city":"Poughkeepsie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. Quantum utility-scale is computational capability terminology, not electric utility load. Global dozen-plus systems and fleet performance comparisons not facility MW/area. Cloud access since2016is not exact Poughkeepsieopening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/ibm-expands-quantum-data-center-in-poughkeepsie-new-york-to-advance-algorithm-discovery-globally-302259851.html","host":"prnewswire.com","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6603798,"lng":-73.9400178,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"expansion_completion_announcement":"2024-09-26","computing_type":"quantum data center","ibm_heron_systems_available":2},"notes":["Quantum utility-scale is computational capability terminology, not electric utility load. Global dozen-plus systems and fleet performance comparisons not facility MW/area. Cloud access since2016is not exact Poughkeepsieopening date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/ibm-expands-quantum-data-center-in-poughkeepsie-new-york-to-advance-algorithm-discovery-globally-302259851.html","host":"prnewswire.com","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Poughkeepsie · Dutchess · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"jpmorgan-chase-orangeburg-ny","state":"NY","kind":"facility","name":"JPMorgan Chase Data Center, Orangeburg","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rockland"],"city":"Orangeburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Tax relief is not a cash grant, and one NEW job is not the whole facility workforce. Temporary construction jobs are separate. The directly reviewed original inducement document remains conditional and has blank signature fields; neither source proves benefits actually received or final PILOT execution. The largest-subsidy superlative is unverified advocacy. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Page 3 requires a later authorizing resolution for final financial assistance. Page 4 says this is not a contract. Pages 5 and 6 leave vote, county approval and company acceptance signatures blank. Adopted date is printed April 23, 2024, but this unsigned public copy does not independently prove effective approval, executed PILOT amendments or receipt of the ceiling amount. No claim that one new job is the existing total workforce.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.theregister.com/2026/04/20/chase_77m_tax_subsidy_datacenter_job/","host":"theregister.com","date":"2026-04-20","published":"2026-04-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://rocklandida.com/wp-content/uploads/2024/04/FINAL-FINALInducement-Resolution-4-23-24-002.pdf","host":"rocklandida.com","date":"2024-04-23","published":"2024-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.044286,"lng":-73.973952,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Register describes the JPMorgan Orangeburg expansion's requested sales-tax exemption and one additional permanent job, with further PILOT terms still needing assessment and finalization.","independently_verified_current_operating_status":null},"notes":["Tax relief is not a cash grant, and one NEW job is not the whole facility workforce. Temporary construction jobs are separate. The directly reviewed original inducement document remains conditional and has blank signature fields; neither source proves benefits actually received or final PILOT execution. The largest-subsidy superlative is unverified advocacy.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.theregister.com/2026/04/20/chase_77m_tax_subsidy_datacenter_job/","host":"theregister.com","date":"2026-04-20","published":"2026-04-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Original amended inducement resolution identifies an existing data-center expansion at 140 Old Orangeburg Road, with a represented one-billion-USD project cost and one additional full-time job within three years of construction completion.","requested_sales_tax_exemption_ceiling_usd":76715000,"qualified_project_expenditure_ceiling_usd":916000000,"represented_project_cost_usd":1000000000,"represented_new_full_time_jobs":1,"pilots_finalized_verified":false,"benefits_actually_received_usd":null,"document_signature_fields":"blank"},"notes":["Page 3 requires a later authorizing resolution for final financial assistance. Page 4 says this is not a contract. Pages 5 and 6 leave vote, county approval and company acceptance signatures blank.","Adopted date is printed April 23, 2024, but this unsigned public copy does not independently prove effective approval, executed PILOT amendments or receipt of the ceiling amount. No claim that one new job is the existing total workforce.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rocklandida.com/wp-content/uploads/2024/04/FINAL-FINALInducement-Resolution-4-23-24-002.pdf","host":"rocklandida.com","date":"2024-04-23","published":"2024-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Orangeburg · Rockland · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"guild-ventures-kenwood-commons-albany-ny","state":"NY","kind":"facility","name":"Kenwood Commons Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Albany"],"city":"Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NYISO Kenwood name match with developer-identity hold. Kenwood name/location association does not independently establish GuildVentures tenant or identicalparcel. Developer roles crosswalk held. Rawinterconnectionquestionmark retained, no guessed line name. Statuscode4uninterpreted. Proposedload and backfeed not permit, currentoperation or signedESA. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","host":"nyiso.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.6225,"lng":-73.7601,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"NYISO Kenwood name match with developer-identity hold","fields":{"queue_number":1754,"developer_as_published":"EKG Group LLC","project_name":"Kenwood Tech Center","request_date":"2025-11-11","peak_requested_load_mw":180,"power_basis":"load interconnection request, not explicit critical IT or energized load","county":"Albany","state":"NY","utility":"NationalGrid","interconnection_as_published":"Albany?Bethlehem115kVLine18","raw_status_code":4,"record_updated":"2026-01-31","proposed_initial_backfeed_month":"2028-12"},"notes":["Kenwood name/location association does not independently establish GuildVentures tenant or identicalparcel. Developer roles crosswalk held. Rawinterconnectionquestionmark retained, no guessed line name. Statuscode4uninterpreted. Proposedload and backfeed not permit, currentoperation or signedESA.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","host":"nyiso.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Albany · Albany · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"long-island-interconnect-westbury-ny","state":"NY","kind":"facility","name":"Long Island Interconnect (formerly 1025Connect)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nassau"],"city":"Westbury","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Operator identifies colocation/interconnection at1025OldCountryRoad,WestburyNY11590. September15,2026 news describes Megaport collaboration and formerly1025Connect, an alias rather than an additional building or new physical opening. Current service marketing supports operator context, not independent occupancy certification. No MW, floor area, founding/opening date or independently checked SOC certificate adopted. Metro New York is not a borough-level premise address. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"http://longislandinterconnect.com/","host":"longislandinterconnect.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.755433,"lng":-73.5578939,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["Operator identifies colocation/interconnection at1025OldCountryRoad,WestburyNY11590. September15,2026 news describes Megaport collaboration and formerly1025Connect, an alias rather than an additional building or new physical opening. Current service marketing supports operator context, not independent occupancy certification. No MW, floor area, founding/opening date or independently checked SOC certificate adopted. Metro New York is not a borough-level premise address.","Not whole-record or current operating-census certification."],"sources":[{"url":"http://longislandinterconnect.com/","host":"longislandinterconnect.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Westbury · Nassau · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"lumen-albany-4-ny","state":"NY","kind":"facility","name":"Lumen Albany 4","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Albany"],"city":"Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Limited named street-label/service context or issuer acquisition statement.. Current captured certificate1361865-19/version19, issued September24,2026, expires June17,2028. Original registrationSeptember14,2007 is management-system registration, not each building founding. ISO27001:2022/27701:2019 cover ISMS/PIMS supporting services, not UptimeTier certification, MW, building ownership or guaranteed breach-free/uptime performance. No issuer revocation-directory check or surveillance audit inspected. Page2 separately names AlbanyAirlineDrive gateway for colocation versus PearlStreet edgecompute; page8 names NashvilleSidcoDrive. Limited street-label context, not independently verified street numbers, parcels or sole operator. Most other rows only give cities and do not resolve remaining Lumen pins. Page7 still names Weehawken in Lumen service scope; current Csquare EWR2 material from round83 does not prove Lumen vanished or a sole ownership transfer. Shared complex/tenancy/operating-role ambiguity remains. No automatic rename/merge. Fetched8-page version19 differs from search cache10-page version18; retained current source bytes/date govern this review. Portfolio certification rows are not a physical-building census. Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://assets.lumen.com/is/content/Lumen/iso27001-certificate-lumen?Creativeid=b54bb9d7-6311-4aac-acac-84580992d059","host":"assets.lumen.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.7356308,"lng":-73.818665,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-management-system-scope-and-acquisition-stages-round88-2026-10-15.json","scope":"Limited named street-label/service context or issuer acquisition statement.","fields":{},"notes":["Current captured certificate1361865-19/version19, issued September24,2026, expires June17,2028. Original registrationSeptember14,2007 is management-system registration, not each building founding. ISO27001:2022/27701:2019 cover ISMS/PIMS supporting services, not UptimeTier certification, MW, building ownership or guaranteed breach-free/uptime performance. No issuer revocation-directory check or surveillance audit inspected.","Page2 separately names AlbanyAirlineDrive gateway for colocation versus PearlStreet edgecompute; page8 names NashvilleSidcoDrive. Limited street-label context, not independently verified street numbers, parcels or sole operator. Most other rows only give cities and do not resolve remaining Lumen pins.","Page7 still names Weehawken in Lumen service scope; current Csquare EWR2 material from round83 does not prove Lumen vanished or a sole ownership transfer. Shared complex/tenancy/operating-role ambiguity remains. No automatic rename/merge.","Fetched8-page version19 differs from search cache10-page version18; retained current source bytes/date govern this review. Portfolio certification rows are not a physical-building census.","Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied."],"sources":[{"url":"https://assets.lumen.com/is/content/Lumen/iso27001-certificate-lumen?Creativeid=b54bb9d7-6311-4aac-acac-84580992d059","host":"assets.lumen.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Albany · Albany · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"metlife-north-greenbush-ny","state":"NY","kind":"facility","name":"MetLife Information Systems Computer Center, North Greenbush","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rensselaer"],"city":"North Greenbush","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. MetLife existing computer center and recurring improvements. Existing information-systems computer center identified in historical project list. Renovation/equipment upgrades are not automatically a new campus or proof current critical IT load. Linked benefit agreement not independently read, so no signed incentive amount or term adopted. No 2026 headcount or exact opening inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.discoverrensselaer.com/projects-2/","host":"discoverrensselaer.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.6841786,"lng":-73.696422,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"MetLife existing computer center and recurring improvements","fields":{"publisher":"Rensselaer County economic development","companies":["Metropolitan Life Insurance Company","MetLife Services and Solutions LLC"],"facility_address":"500 Jordan Road, North Greenbush, New York","existing_facility_area_sqft_approx":200000,"listed_project_scope":"maintenance, repair, replacement and equipment upgrades","historical_project_year":2019},"notes":["Existing information-systems computer center identified in historical project list. Renovation/equipment upgrades are not automatically a new campus or proof current critical IT load. Linked benefit agreement not independently read, so no signed incentive amount or term adopted. No 2026 headcount or exact opening inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.discoverrensselaer.com/projects-2/","host":"discoverrensselaer.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · North Greenbush · Rensselaer · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"niagara-digital-campus-niagara-falls-ny","state":"NY","kind":"facility","name":"Niagara Digital Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Niagara"],"city":"Niagara Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. Spectrum originalJune4,2026 mayorinterview explicitly sayspreviousnightdecisionwas LAND/LITIGATIONAGREEMENT, NOT approvalofDC. June3 isweekdayinference, notoriginalminutes. NiagaraFallsRedevelopment1.5Bdigitalcampus remainspotential, financing/starttimelineunknown. 10acres transferredforCentennialPark/eventcenter arecitypublicprojectscope, notdigitalcampusfootprint. Eminentdomainsettlementnotalllanddevelopmentpermits. Residentcancer/miscarriage/watercontaminationclaims are unverifiedmeetingtestimony, not causalfindings. Proposedstate1yearmoratoriumbillnotadoptedlaw. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://spectrumlocalnews.com/nys/buffalo/news/2026/06/04/contentious-niagara-falls-city-council-meeting-leads-to-approval-of-new-data-center","host":"spectrumlocalnews.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.0885,"lng":-79.0603,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["Spectrum originalJune4,2026 mayorinterview explicitly sayspreviousnightdecisionwas LAND/LITIGATIONAGREEMENT, NOT approvalofDC. June3 isweekdayinference, notoriginalminutes. NiagaraFallsRedevelopment1.5Bdigitalcampus remainspotential, financing/starttimelineunknown.","10acres transferredforCentennialPark/eventcenter arecitypublicprojectscope, notdigitalcampusfootprint. Eminentdomainsettlementnotalllanddevelopmentpermits. Residentcancer/miscarriage/watercontaminationclaims are unverifiedmeetingtestimony, not causalfindings. Proposedstate1yearmoratoriumbillnotadoptedlaw.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://spectrumlocalnews.com/nys/buffalo/news/2026/06/04/contentious-niagara-falls-city-council-meeting-leads-to-approval-of-new-data-center","host":"spectrumlocalnews.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Niagara Falls · Niagara · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"nccs-massena-reynolds-ny","state":"NY","kind":"facility","name":"North Country Collocation Services Massena Data Center (former Reynolds site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Lawrence"],"city":"Massena","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Reported 635 MW and 200 MW are proposals without verified critical-IT basis. Ilion employment spans the whole mixed use. Brownfield application is not cleanup completion or construction approval. The state's bill is described as awaiting the governor as of June; it must not be labeled enacted from this account. Other local moratorium and statewide bill summaries require original texts and later outcomes. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","host":"rockinst.org","date":"2026-06-10","published":"2026-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.979,"lng":-74.73,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Rockefeller Institute discusses Massena's proposed three-building campus near Alcoa East and Turin Hoefler's revised brownfield application for an Ilion mixed-use redevelopment.","independently_verified_current_operating_status":null},"notes":["Reported 635 MW and 200 MW are proposals without verified critical-IT basis. Ilion employment spans the whole mixed use. Brownfield application is not cleanup completion or construction approval. The state's bill is described as awaiting the governor as of June; it must not be labeled enacted from this account. Other local moratorium and statewide bill summaries require original texts and later outcomes.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","host":"rockinst.org","date":"2026-06-10","published":"2026-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Massena · St. Lawrence · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"opti9-ny1-garden-city-ny","state":"NY","kind":"facility","name":"Opti9 NY1 (formerly Webair NY-1), Garden City","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nassau"],"city":"Garden City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Provider/address context; no NY1 code, historical Webair acquisition date or current technical capacity independently supplied. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.722759,"lng":-73.631821,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Opti9","listed_address":"501 Franklin Ave","listed_city":"Garden City","listed_state":"NY"},"notes":["Provider/address context; no NY1 code, historical Webair acquisition date or current technical capacity independently supplied.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Garden City · Nassau · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"pontoon-bridge-road-massena-ny","state":"NY","kind":"facility","name":"Pontoon Bridge Road Data Center (proposed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Lawrence"],"city":"Massena","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NYISO PontoonBridge load request. Requested load/backfeed forecast not contractedenergization, buildpermit or occupiedsite. Status code4not decoded without workbook legend. Exactparcel/entrance not proven. OtherMassena200/1935MWrequests and generation/transmission projects distinct, never added to this project. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","host":"nyiso.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.9593245,"lng":-74.912909,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"NYISO PontoonBridge load request","fields":{"queue_number":1745,"developer_as_published":"American Data Center Partners LLC","project_name":"Pontoon Bridge Road Data Center","request_date":"2025-10-09","peak_requested_load_mw":250,"power_basis":"load interconnection request peak, not critical IT or metered demand","county_as_published":"StLawrence","state_as_published":"NY","utility_as_published":"NYPA","interconnection":"Haverstock-Adirondack345kVtransmissionlines","raw_status_code":4,"record_updated":"2026-03-31","proposed_initial_backfeed_month":"2027-12"},"notes":["Requested load/backfeed forecast not contractedenergization, buildpermit or occupiedsite. Status code4not decoded without workbook legend. Exactparcel/entrance not proven. OtherMassena200/1935MWrequests and generation/transmission projects distinct, never added to this project.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","host":"nyiso.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Massena · St. Lawrence · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"ranalli-lysander-ny","state":"NY","kind":"facility","name":"Ranalli Lysander Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Onondaga"],"city":"Lysander","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Eagle News April20,2026 publicly readable introduction identifies Ranalli Super DC LLC and a124acre industrial-zoned property near Hencle Boulevard/Oswego Road in Lysander. It reports a May2025 NYISO application for a300MW proposal, basis unspecified. Application is not grid approval, delivery or IT capacity. Most subsequent body is scrambled/access restricted and was not decoded. Headline indicates attorney drafting a moratorium; no adopted, effective or current moratorium verified. No further gated values adopted. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.eaglenewsonline.com/baldwinsville_messenger/possible-massive-data-center-in-lysander-faces-community-opposition-town-attorney-to-draft-moratorium/article_635b1885-9f97-4747-bdf4-604d468fc641.html","host":"eaglenewsonline.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.17,"lng":-76.39,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["Eagle News April20,2026 publicly readable introduction identifies Ranalli Super DC LLC and a124acre industrial-zoned property near Hencle Boulevard/Oswego Road in Lysander. It reports a May2025 NYISO application for a300MW proposal, basis unspecified. Application is not grid approval, delivery or IT capacity. Most subsequent body is scrambled/access restricted and was not decoded. Headline indicates attorney drafting a moratorium; no adopted, effective or current moratorium verified. No further gated values adopted.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://www.eaglenewsonline.com/baldwinsville_messenger/possible-massive-data-center-in-lysander-faces-community-opposition-town-attorney-to-draft-moratorium/article_635b1885-9f97-4747-bdf4-604d468fc641.html","host":"eaglenewsonline.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Lysander · Onondaga · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"rpi-center-for-computational-innovations-troy-ny","state":"NY","kind":"facility","name":"Rensselaer Center for Computational Innovations (CCI), Rensselaer Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rensselaer"],"city":"Troy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RPI institution facility identity and machine-room area. Machine room4500is subset of22000gross. Campus footer110EighthStreet Troy is university administration, not verified technology-park server address. Compute PF, chip milliwatts and rankings do not establish facility IT MW or current energy use.2007center founding not independently exact building commissioning. Undated hardware list may lag replacements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://foci.rpi.edu/computing-resources/center-computational-innovations","host":"foci.rpi.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.68056,"lng":-73.69722,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"RPI institution facility identity and machine-room area","fields":{"institution":"Rensselaer Polytechnic Institute","facility":"Center for Computational Innovations","location":"Rensselaer Technology Park, New York","institution_established_year":2007,"facility_area_sqft":22000,"included_machine_room_sqft":4500,"system":"AiMOS"},"notes":["Machine room4500is subset of22000gross. Campus footer110EighthStreet Troy is university administration, not verified technology-park server address. Compute PF, chip milliwatts and rankings do not establish facility IT MW or current energy use.2007center founding not independently exact building commissioning. Undated hardware list may lag replacements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://foci.rpi.edu/computing-resources/center-computational-innovations","host":"foci.rpi.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Troy · Rensselaer · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"riverview-innovation-tech-campus-tonawanda-ny","state":"NY","kind":"facility","name":"Riverview Innovation & Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Erie"],"city":"Tonawanda","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This is a compilation, not an independently reviewed original application. The reported two-billion-USD and300MW are proposal claims without critical-IT basis. Other cities moratoriums, loans and capacity figures do not apply to Tonawanda; no current approval or construction outcome adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hudsonvalleypost.com/ai-data-centers-new-york/","host":"hudsonvalleypost.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.037,"lng":-78.887,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Hudson Valley Post includes a Tonawanda former-coke-site proposal in a statewide discussion roundup.","independently_verified_current_operating_status":null},"notes":["This is a compilation, not an independently reviewed original application. The reported two-billion-USD and300MW are proposal claims without critical-IT basis. Other cities moratoriums, loans and capacity figures do not apply to Tonawanda; no current approval or construction outcome adopted.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hudsonvalleypost.com/ai-data-centers-new-york/","host":"hudsonvalleypost.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Tonawanda · Erie · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"rochester-colo-pittsford-ny","state":"NY","kind":"facility","name":"Rochester Colo","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monroe"],"city":"Pittsford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Rochester Colo regional operator listing. Since2008notexactcommissioningday. NoexactPittsfordaddress/municipalboundary,ITMWorarea. Redundancy/zerofailureclaimnotindependentuptimeaudit. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rochestercolo.com/","host":"rochestercolo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.090959,"lng":-77.515298,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Rochester Colo regional operator listing","fields":{"operator":"Rochester Colo","operator_described_region":"Rochester, New York","operator_service_history_since":2008,"advertised_service":"carrier-neutral colocation"},"notes":["Since2008notexactcommissioningday. NoexactPittsfordaddress/municipalboundary,ITMWorarea. Redundancy/zerofailureclaimnotindependentuptimeaudit.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rochestercolo.com/","host":"rochestercolo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Pittsford · Monroe · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"sabey-intergate-manhattan-ny","state":"NY","kind":"facility","name":"SDC Manhattan (Intergate.Manhattan), 375 Pearl Street","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New York"],"city":"New York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Over1Msquarefeetwholemixed-usebuilding is not dedicated222kdata-center footprint. Aggregate18MWnot explicitly criticalIT. Generator capacity not added. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sabeydatacenters.com/locations/new-york-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7106,"lng":-74.0013,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"dedicated_data_center_area_sqft":222000,"aggregate_power_delivered_mw":18,"building_floors":32,"building_use":"mixed data center and office","published_address":"375 Pearl St, New York, NY10038"},"notes":["Over1Msquarefeetwholemixed-usebuilding is not dedicated222kdata-center footprint. Aggregate18MWnot explicitly criticalIT. Generator capacity not added.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sabeydatacenters.com/locations/new-york-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · New York · New York · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"watchtower-sterling-forest-warwick-ny","state":"NY","kind":"facility","name":"Sterling Forest Business Resiliency Services Center (former IBM/Kyndryl Sterling Forest data center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Orange"],"city":"Sterling Forest (Town of Warwick)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Kyndryl historical water application; preferred Watchtower record mismatch. Backup water only during supply-service interruptions, not routine measured daily consumption. Source identifiesKyndryl, not Watchtower; exact historical property/operator crosswalk held.2023application andnegative declaration not current2026ownership, final waterpermit or datacenter occupancy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dec.ny.gov/news/environmental-notice-bulletin/2023-11-22/completed-application/town-of-warwick-kyndryl-inc-sterling-forest","host":"dec.ny.gov","date":"2023-11-22","published":"2023-11-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.19592,"lng":-74.255576,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Kyndryl historical water application; preferred Watchtower record mismatch","fields":{"published_permit_applicant":"KyndrylInc","published_facility_address":"300 LongMeadowRoad,SterlingForest,NY10979","published_municipality_county":"Warwick,OrangeCounty,NewYork","water_application_id":"3-3354-00261/00016","proposed_backup_water_withdrawal_gallons_per_day_max":130000,"historical_comment_deadline":"2023-12-07"},"notes":["Backup water only during supply-service interruptions, not routine measured daily consumption. Source identifiesKyndryl, not Watchtower; exact historical property/operator crosswalk held.2023application andnegative declaration not current2026ownership, final waterpermit or datacenter occupancy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dec.ny.gov/news/environmental-notice-bulletin/2023-11-22/completed-application/town-of-warwick-kyndryl-inc-sterling-forest","host":"dec.ny.gov","date":"2023-11-22","published":"2023-11-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Sterling Forest (Town of Warwick) · Orange · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"stream-stamp-alabama-ny","state":"NY","kind":"facility","name":"STREAM U.S. Data Centers at STAMP","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Genesee"],"city":"Alabama","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. June 4 legislative passage still awaited governor signature in this account; do not treat bill passage or related-story headlines as an effective signed moratorium. Planned 19.5 billion cost and requested 1.46 billion sales/mortgage-tax relief are not spent capital or granted incentives. Forecast 550 million taxes is OVER 30 YEARS, not annual.125 permanent jobs and construction positions are forecasts disputed by an opposition-commissioned analysis. Critic-attributed 500 MW is not verified critical IT;25-to-1 benefit ratio is contested advocacy analysis, not an adjudicated result. No operating/RFS/utility contract verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rbj.net/2026/06/15/new-york-moratorium-genesee-county-data-center/","host":"rbj.net","date":"2026-06-15","published":"2026-06-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.0837,"lng":-78.3936,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Rochester Business Journal reports Stream’s proposed three-building,2.2-million-square-foot STAMP campus on roughly 90 acres and the legislative debate over a statewide pause.","independently_verified_current_operating_status":null},"notes":["June 4 legislative passage still awaited governor signature in this account; do not treat bill passage or related-story headlines as an effective signed moratorium. Planned 19.5 billion cost and requested 1.46 billion sales/mortgage-tax relief are not spent capital or granted incentives. Forecast 550 million taxes is OVER 30 YEARS, not annual.125 permanent jobs and construction positions are forecasts disputed by an opposition-commissioned analysis. Critic-attributed 500 MW is not verified critical IT;25-to-1 benefit ratio is contested advocacy analysis, not an adjudicated result. No operating/RFS/utility contract verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rbj.net/2026/06/15/new-york-moratorium-genesee-county-data-center/","host":"rbj.net","date":"2026-06-15","published":"2026-06-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Alabama · Genesee · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"four-winds-sugar-hill-portland-ny","state":"NY","kind":"facility","name":"Sugar Hill Data Center (proposed, former Sugar Hill Golf Course)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chautauqua"],"city":"Portland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Support does not establish development approval or operation. Four Winds is not named. Generic water, utility-bill and Virginia tax statistics are not local impacts. A statewide moratorium proposal is not an enacted restriction. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.observertoday.com/news/top-stories/2026/07/area-fully-plugged-in-to-data-center-debate/","host":"observertoday.com","date":"2026-07-10","published":"2026-07-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.3758232,"lng":-79.5200432,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"An Observer editorial reports a Portland board resolution supporting a possible Sugar Hill golf-course development.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["Support does not establish development approval or operation. Four Winds is not named. Generic water, utility-bill and Virginia tax statistics are not local impacts. A statewide moratorium proposal is not an enacted restriction.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.observertoday.com/news/top-stories/2026/07/area-fully-plugged-in-to-data-center-debate/","host":"observertoday.com","date":"2026-07-10","published":"2026-07-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Portland · Chautauqua · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"telehouse-staten-island-ny","state":"NY","kind":"facility","name":"Telehouse New York (Staten Island Teleport)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Richmond"],"city":"Staten Island","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Telehouse Staten Island historical campus context. 700k/100ac/440acscopesteleport/officecomplex/broaderlandnotTelehouseindividualDC.1989complexconstructionnotTelehousefirstopening.29yearbusinesshistoryandneverlostpowerclaimsnotindependent2026uptimeaudi t. No numericITMW/exactstreetinreviewed2016article. Regionaldualgridarchitectureclaimnotcurrentcustomtariffproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.telehouse.com/2016/06/07/benefits-colocation-staten-island/","host":"telehouse.com","date":"2016-06-07","published":"2016-06-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.606205,"lng":-74.171125,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Telehouse Staten Island historical campus context","fields":{"operator":"Telehouse","historic_facility_region":"Staten Island Teleport, New York","historic_teleport_office_complex_acres":100,"historic_broader_land_acres":440,"historic_teleport_campus_area_sqft":700000,"historic_teleport_construction_start_year":1989},"notes":["700k/100ac/440acscopesteleport/officecomplex/broaderlandnotTelehouseindividualDC.1989complexconstructionnotTelehousefirstopening.29yearbusinesshistoryandneverlostpowerclaimsnotindependent2026uptimeaudi t. No numericITMW/exactstreetinreviewed2016article. Regionaldualgridarchitectureclaimnotcurrentcustomtariffproof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.telehouse.com/2016/06/07/benefits-colocation-staten-island/","host":"telehouse.com","date":"2016-06-07","published":"2016-06-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Staten Island · Richmond · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"telehouse-chelsea-manhattan-ny","state":"NY","kind":"facility","name":"Telehouse New York Chelsea (85 10th Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["New York"],"city":"New York","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Telehouse Chelsea explicit colocation and apparent-power scope. 4.15MVAapparentnot4.15MWcriticalIT.3plus1UPS3000kVAnameplateincludesredundancy,notallavailablecompute. BackupMVAseparatefromutility/IT. PUEundatedoperatorclaimnotindependentmeasuredannualresult. Tier3designnotindependentcertification. Nooriginalopeningorcurrentoccupancy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.telehouse.com/global-data-centers/america/new-york-datacenters/telehouse-new-york-chelsea/","host":"telehouse.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.743446,"lng":-74.00734,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Telehouse Chelsea explicit colocation and apparent-power scope","fields":{"operator":"Telehouse","site":"New York Chelsea","address":"85 Tenth Avenue, Manhattan, New York","colocation_space_sqft":60000,"utility_feed_apparent_power_mva":4.15,"ups_modules":4,"each_ups_module_kva":750,"ups_redundancy":"3plus1","generators":3,"each_generator_mva":2.5,"operator_published_pue":1.69},"notes":["4.15MVAapparentnot4.15MWcriticalIT.3plus1UPS3000kVAnameplateincludesredundancy,notallavailablecompute. BackupMVAseparatefromutility/IT. PUEundatedoperatorclaimnotindependentmeasuredannualresult. Tier3designnotindependentcertification. Nooriginalopeningorcurrentoccupancy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.telehouse.com/global-data-centers/america/new-york-datacenters/telehouse-new-york-chelsea/","host":"telehouse.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · New York · New York · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"terawulf-lansing-ny","state":"NY","kind":"facility","name":"TeraWulf AI Data Center Campus, Lansing","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tompkins"],"city":"Lansing","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.terawulf.com/our-sites","host":"terawulf.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.5453,"lng":-76.4968,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"operator_status":"Permitting","critical_it_total_mw":320,"critical_it_contracted_mw":0,"critical_it_open_mw":320,"former_industrial_site_acres":183},"notes":["Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.terawulf.com/our-sites","host":"terawulf.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Lansing · Tompkins · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"terawulf-lake-mariner-ny","state":"NY","kind":"facility","name":"TeraWulf Lake Mariner","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Niagara"],"city":"Barker","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.terawulf.com/our-sites","host":"terawulf.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.35055916999524,"lng":-78.61459634619537,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"operator_status":"Operating","critical_it_total_mw":600,"critical_it_contracted_mw":438,"critical_it_open_mw":162},"notes":["Undated operator portfolio page, checked October 14. Total/contracted/open are explicitly critical IT capacity, not measured consumption. Planned total capacity at an operating campus does not mean every advertised MW is energized. Former generating-station MW are excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.terawulf.com/our-sites","host":"terawulf.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Barker · Niagara · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"tierpoint-hawthorne-westchester-ny","state":"NY","kind":"facility","name":"TierPoint Hawthorne (11 & 17 Skyline Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Westchester"],"city":"Hawthorne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Two specification sections/addresses under one base Hawthorne record. Keep identities separate for review, not two automatic additions; no summed generator ratings or duplicated floor area. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/new-york/new-york-hawthorne/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.088456,"lng":-73.815184,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"published_site_sections":[{"address":"11 Skyline Drive, Hawthorne, NY10532","gross_sqft_lower_bound":46000,"raised_floor_sqft_lower_bound":28000},{"address":"17 Skyline Drive, Hawthorne, NY10532","gross_sqft_lower_bound":172000,"raised_floor_sqft_lower_bound":28000}]},"notes":["Two specification sections/addresses under one base Hawthorne record. Keep identities separate for review, not two automatic additions; no summed generator ratings or duplicated floor area.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/new-york/new-york-hawthorne/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Hawthorne · Westchester · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"treetop-east-fishkill-ny","state":"NY","kind":"facility","name":"Treetop East Fishkill Data Center (proposed, no application filed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dutchess"],"city":"East Fishkill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. Headlinepullsplugdoesnotmeanpermitdenial,formalwithdrawalorcancellationofanapprovedcampus.765000squarefootwarehouse isaseparateusewithwarehousemoratoriumthroughJune30,2026,notdata-centerfloorareaorcurrentDCban.1GWunfiledconceptnotcriticalIT/securedpower. NYandfederallegislationintroducednotadopted;countrymoratoriumcountsandAmericaspowercohortnotthisinventory/actualmeters. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cicbca.org/202605-east-fishkill-supervisor-pulls-plug-on-plan-to-build-big-data-center/","host":"cicbca.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.534,"lng":-73.801,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.","fields":{"reported_context":"CICBCA JohnJordanreport quotes EastFishkillSupervisorMay11statement: noformalTreetopdata-centerapplication,siteplan,specialpermit,rezoningordevelopmentapplication hadbeenfiled; currentelectricalinfrastructurecouldnotsupportreported1GWconcept.","independently_verified_current_operating_status":null},"notes":["Headlinepullsplugdoesnotmeanpermitdenial,formalwithdrawalorcancellationofanapprovedcampus.765000squarefootwarehouse isaseparateusewithwarehousemoratoriumthroughJune30,2026,notdata-centerfloorareaorcurrentDCban.1GWunfiledconceptnotcriticalIT/securedpower. NYandfederallegislationintroducednotadopted;countrymoratoriumcountsandAmericaspowercohortnotthisinventory/actualmeters.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cicbca.org/202605-east-fishkill-supervisor-pulls-plug-on-plan-to-build-big-data-center/","host":"cicbca.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · East Fishkill · Dutchess · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"turin-hoefler-ilion-ny","state":"NY","kind":"facility","name":"Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Herkimer"],"city":"Ilion","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Reported 635 MW and 200 MW are proposals without verified critical-IT basis. Ilion employment spans the whole mixed use. Brownfield application is not cleanup completion or construction approval. The state's bill is described as awaiting the governor as of June; it must not be labeled enacted from this account. Other local moratorium and statewide bill summaries require original texts and later outcomes. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","host":"rockinst.org","date":"2026-06-10","published":"2026-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.0119,"lng":-75.0357,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Rockefeller Institute discusses Massena's proposed three-building campus near Alcoa East and Turin Hoefler's revised brownfield application for an Ilion mixed-use redevelopment.","independently_verified_current_operating_status":null},"notes":["Reported 635 MW and 200 MW are proposals without verified critical-IT basis. Ilion employment spans the whole mixed use. Brownfield application is not cleanup completion or construction approval. The state's bill is described as awaiting the governor as of June; it must not be labeled enacted from this account. Other local moratorium and statewide bill summaries require original texts and later outcomes.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/","host":"rockinst.org","date":"2026-06-10","published":"2026-06-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Ilion · Herkimer · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"zafra-plattsburgh-ny","state":"NY","kind":"facility","name":"Zafra Plattsburgh crypto-mining hosting facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Clinton"],"city":"Plattsburgh","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Zafra Plattsburgh versus Hennepin mining power. Plattsburgh8MWnot82plusIllinois. Mailing/contactaddressnotindependentfacilityparcel.100percenthydroclaimnotindependenthourlyenergycertification. LargestIllinoisbitcoinminecomparativenotindependentcensus. Undatedavailable-nowtextnotexactopeningoractualcurrentutilization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.zafrahosting.com/","host":"zafrahosting.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.658589,"lng":-73.4540824,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Zafra Plattsburgh versus Hennepin mining power","fields":{"operator":"Zafra","named_sites":[{"name":"Plattsburgh","state":"New York","published_power_mw":8,"operator_status":"hosting available now"},{"name":"Hennepin","state":"Illinois","published_power_mw_min_exclusive":82,"operator_status":"available now"}],"published_contact_address":"126 Idaho Avenue, Plattsburgh, New York12903","power_basis":"site mining power, not explicit critical IT"},"notes":["Plattsburgh8MWnot82plusIllinois. Mailing/contactaddressnotindependentfacilityparcel.100percenthydroclaimnotindependenthourlyenergycertification. LargestIllinoisbitcoinminecomparativenotindependentcensus. Undatedavailable-nowtextnotexactopeningoractualcurrentutilization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.zafrahosting.com/","host":"zafrahosting.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Plattsburgh · Clinton · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"petawatt-zeroc-massena-ny","state":"NY","kind":"facility","name":"ZeroC / Petawatt Holdings Data Center Site (417 County Route 42)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Lawrence"],"city":"Massena","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Massena substation approval versus applicant future data-center claims. Minute approval is specifically 30M substation, not final approval of all future data-center use or executed NYISO agreement. Representative certainty of obtaining interconnection is not actual agreement. Offer to prohibit cryptocurrency is not a signed covenant. Start within60days after approval is a forecast, not observed start. Jobs ratio40to60per100MW not actual hiring and not independently converted to site jobs. No current opening established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.massena.us/AgendaCenter/ViewFile/Minutes/_02202025-1061","host":"massena.us","date":"2025-02-20","published":"2025-02-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.953,"lng":-74.86,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Massena substation approval versus applicant future data-center claims","fields":{"agency":"Massena Town Planning Board, New York","meeting_date":"2025-02-20","project":"ZeroC Data Centers LLC and Petawatt Holdings Inc. substation","address":"417 County Route42, Massena, NY13662","parcel":"10.001-1-7.21","approved_action":"substation site plan","vote":"4yes,0no","applicant_estimated_substation_cost_usd_approx":30000000,"applicant_described_site_mw":200,"power_basis":"applicant site description, not explicit critical IT or energized service","applicant_estimated_future_building_sqft_approx":900000,"applicant_reported_owner":"ZeroC Data Center","applicant_reported_majority_shareholder":"Petawatt"},"notes":["Minute approval is specifically 30M substation, not final approval of all future data-center use or executed NYISO agreement. Representative certainty of obtaining interconnection is not actual agreement. Offer to prohibit cryptocurrency is not a signed covenant. Start within60days after approval is a forecast, not observed start. Jobs ratio40to60per100MW not actual hiring and not independently converted to site jobs. No current opening established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.massena.us/AgendaCenter/ViewFile/Minutes/_02202025-1061","host":"massena.us","date":"2025-02-20","published":"2025-02-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New York · Massena · St. Lawrence · Source context reviewed","state_name":"New York","state_path":"/new-york/"},{"id":"advanced-internet-technologies-fayetteville-nc","state":"NC","kind":"facility","name":"Advanced Internet Technologies (AIT) Fayetteville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"Fayetteville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. Paul Woolverton, CityView, January27,2026 original report (updated May21) identifies AIT existing headquarters data center at Hay Street/Maiden Lane. Company founding in the1990s does not date that physical opening; present operating condition is not independently inspected. Separate Terra Nexus200MW/180acre Custer Avenue proposal and Energy Storage Solutions300MW/50acre/6.4B Dunn Road brochure are NOT AIT capacity/capex. Economic-development executive says Dunn Road was never under contract and surprised the landowner. No closed land deal, committed IT basis or completed new campus inferred. Plan C Crypto2022 Dedication Drive opening is another operator, not AIT. January29 informational seminar is historical, not an upcoming2026October hearing. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityviewnc.com/stories/how-to-learn-more-about-data-centers-in-fayetteville/","host":"cityviewnc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.085,"lng":-78.97722,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Paul Woolverton, CityView, January27,2026 original report (updated May21) identifies AIT existing headquarters data center at Hay Street/Maiden Lane. Company founding in the1990s does not date that physical opening; present operating condition is not independently inspected.","Separate Terra Nexus200MW/180acre Custer Avenue proposal and Energy Storage Solutions300MW/50acre/6.4B Dunn Road brochure are NOT AIT capacity/capex. Economic-development executive says Dunn Road was never under contract and surprised the landowner. No closed land deal, committed IT basis or completed new campus inferred. Plan C Crypto2022 Dedication Drive opening is another operator, not AIT. January29 informational seminar is historical, not an upcoming2026October hearing.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://www.cityviewnc.com/stories/how-to-learn-more-about-data-centers-in-fayetteville/","host":"cityviewnc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Fayetteville · Cumberland · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"aws-richmond-county-nc","state":"NC","kind":"facility","name":"Amazon Web Services Richmond County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Richmond"],"city":"Rockingham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. June26draft-permit hearing notice not final permit or operating proof as ofOctober14. Engine counts and backup versus bridge power are not campus IT MW and not normally concurrent. Hearing announcement not observed hearing outcome. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.deq.nc.gov/news/press-releases/2026/06/26/deq-announces-joint-public-hearing-amazon-data-center-and-duke-energy-air-quality-permits-richmond","host":"deq.nc.gov","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.9445,"lng":-79.775,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"project_name":"Energy Way Tech Campus","published_location":"Airport Road, Hamlet, Richmond County, North Carolina","hearing_scheduled_date":"2026-07-30","hearing_scheduled_local_time":"18:00","comment_deadline":"2026-07-31","proposed_duke_bridge_diesel_engines":57,"proposed_amazon_emergency_diesel_engines":588,"bridge_retirement_requirement_after_operation_years":1},"notes":["June26draft-permit hearing notice not final permit or operating proof as ofOctober14. Engine counts and backup versus bridge power are not campus IT MW and not normally concurrent. Hearing announcement not observed hearing outcome.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.deq.nc.gov/news/press-releases/2026/06/26/deq-announces-joint-public-hearing-amazon-data-center-and-duke-energy-air-quality-permits-richmond","host":"deq.nc.gov","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Rockingham · Richmond · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"american-tower-reedy-creek-charlotte-nc","state":"NC","kind":"facility","name":"American Tower Reedy Creek Data Center (East Charlotte)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mecklenburg"],"city":"Charlotte","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Charlotte ReedyCreek deferred hearing and community concerns. April23report of postponement not current2026finaldecision.2percentofhyperscalepower lacks numeric reference/boundary, not usable IT MW.15protesters reported not total opposition count. Residents concerns not measured violations.10DCacres subset58parentland. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wfae.org/energy-environment/2026-04-23/east-charlotte-residents-protest-data-center-development-during-rezoning-hearing","host":"wfae.org","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.2703,"lng":-80.7229,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Charlotte ReedyCreek deferred hearing and community concerns","fields":{"project_company":"American Tower","location":"near ReedyCreek Nature Preserve, east Charlotte, North Carolina","reported_data_center_acres":10,"broader_owned_property_acres":58,"reported_stage_asof":"rezoning hearing deferred to following month"},"notes":["April23report of postponement not current2026finaldecision.2percentofhyperscalepower lacks numeric reference/boundary, not usable IT MW.15protesters reported not total opposition count. Residents concerns not measured violations.10DCacres subset58parentland.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wfae.org/energy-environment/2026-04-23/east-charlotte-residents-protest-data-center-development-during-rezoning-hearing","host":"wfae.org","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Charlotte · Mecklenburg · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"apple-maiden-nc","state":"NC","kind":"facility","name":"Apple Maiden Data Center (iCloud)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Catawba"],"city":"Maiden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 20 MWsolar and 5 MWfuel-cell descriptions are GENERATION, not campuscriticalIT or added computing capacity.84 millionkWh is forecastANNUALENERGYfor two arrays, not MW. May 14 staffconference/May 17 certificate issuance are 2012 events; November/December 2012 construction/operation dates are forecasts, not 2026 availability. PrimaryNCUCcertificate linked but not separately examined in this pass. No current grid mix, fullrenewablesmatching or operating capacity certified. Automated unrelated-story selection corrected from retained main body. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://9to5mac.com/2012/05/17/apples-20-megawatt-solar-farm-near-nc-data-center-gets-ncuc-approval/","host":"9to5mac.com","date":"2012-05-17","published":"2012-05-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.588607,"lng":-81.256686,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"9 to 5 Mac’s historical account quotes NCUC approval/certificate for Apple’s proposed 20 MWsolar generating facility near Maiden.","independently_verified_current_operating_status":null},"notes":["20 MWsolar and 5 MWfuel-cell descriptions are GENERATION, not campuscriticalIT or added computing capacity.84 millionkWh is forecastANNUALENERGYfor two arrays, not MW. May 14 staffconference/May 17 certificate issuance are 2012 events; November/December 2012 construction/operation dates are forecasts, not 2026 availability. PrimaryNCUCcertificate linked but not separately examined in this pass. No current grid mix, fullrenewablesmatching or operating capacity certified. Automated unrelated-story selection corrected from retained main body.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://9to5mac.com/2012/05/17/apples-20-megawatt-solar-farm-near-nc-data-center-gets-ncuc-approval/","host":"9to5mac.com","date":"2012-05-17","published":"2012-05-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Maiden · Catawba · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"compass-statesville-nc","state":"NC","kind":"facility","name":"Compass Statesville Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Iredell"],"city":"Statesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. WBTV MaryCalkins September16,2025 reports StatesvilleCouncil unanimously ADVANCED Compass rezoning, with secondreading/finalvote still scheduledOctober1. Headlineapproved mustnotbecome finaladoption/allpermits. Laterfinalvote/closing/currentconstruction outcome unverified. 365acres/fivebuildings nearStameyFarmRd/I40/HickoryHighway are proposal figures; no siteMW or executedlandpurchase shown. Neighbor fears and developer mitigation assertions retain attribution, notobservedpollution or compliance. OnecampusnotfiveindependentfacilityIDs. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wbtv.com/2025/09/16/statesville-city-council-approves-rezoning-request-new-data-center/","host":"wbtv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.7826,"lng":-80.8873,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["WBTV MaryCalkins September16,2025 reports StatesvilleCouncil unanimously ADVANCED Compass rezoning, with secondreading/finalvote still scheduledOctober1. Headlineapproved mustnotbecome finaladoption/allpermits. Laterfinalvote/closing/currentconstruction outcome unverified.","365acres/fivebuildings nearStameyFarmRd/I40/HickoryHighway are proposal figures; no siteMW or executedlandpurchase shown. Neighbor fears and developer mitigation assertions retain attribution, notobservedpollution or compliance. OnecampusnotfiveindependentfacilityIDs.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://www.wbtv.com/2025/09/16/statesville-city-council-approves-rezoning-request-new-data-center/","host":"wbtv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Statesville · Iredell · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"core-scientific-marble-cherokee-county-nc","state":"NC","kind":"facility","name":"Core Scientific Marble Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cherokee"],"city":"Marble","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. WUNCApr10,2026originalreport/photosApr7namesCoreScientificMarbleAIconversiondistinctfromMurphyHarshawcrypto. FailedCoreSci/CoreWeavecorporatemergernotproofHPCleasecanceled.170+dieselgeneratorcountnotMW;250000feetversussevenacnotreconciledarea.268000USD2024taxreceiptreportednotannual2026forecast;oldfactory2015closingnotDCclosure. Andrewssewerhookupdenialmayorquote notwholecampuspermitdenial;proposedsepticnotapproved. Threewells/12hlimitstatementnotactualgallonsorindependentlyverifiedregulation. Januaryrenewaldiscussionresultednoaction,notAIban. PrimeBlocknameabsentcurrentarticle;HarshawregionalcontextonlyforselectedPrimeBlock. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wunc.org/2026-04-10/cherokee-county-residents-were-upset-about-crypto-mines-then-came-ai","host":"wunc.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.135,"lng":-83.924,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"WUNCApr10,2026originalreport/photosApr7namesCoreScientificMarbleAIconversiondistinctfromMurphyHarshawcrypto. FailedCoreSci/CoreWeavecorporatemergernotproofHPCleasecanceled.170+dieselgeneratorcountnotMW;250000feetversussevenacnotreconciledarea.268000USD2024taxreceiptreportednotannual2026forecast;oldfactory2015closingnotDCclosure. Andrewssewerhookupdenialmayorquote notwholecampuspermitdenial;proposedsepticnotapproved. Threewells/12hlimitstatementnotactualgallonsorindependentlyverifiedregulation. Januaryrenewaldiscussionresultednoaction,notAIban. PrimeBlocknameabsentcurrentarticle;HarshawregionalcontextonlyforselectedPrimeBlock."},"notes":["WUNCApr10,2026originalreport/photosApr7namesCoreScientificMarbleAIconversiondistinctfromMurphyHarshawcrypto. FailedCoreSci/CoreWeavecorporatemergernotproofHPCleasecanceled.170+dieselgeneratorcountnotMW;250000feetversussevenacnotreconciledarea.268000USD2024taxreceiptreportednotannual2026forecast;oldfactory2015closingnotDCclosure. Andrewssewerhookupdenialmayorquote notwholecampuspermitdenial;proposedsepticnotapproved. Threewells/12hlimitstatementnotactualgallonsorindependentlyverifiedregulation. Januaryrenewaldiscussionresultednoaction,notAIban. PrimeBlocknameabsentcurrentarticle;HarshawregionalcontextonlyforselectedPrimeBlock.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.wunc.org/2026-04-10/cherokee-county-residents-were-upset-about-crypto-mines-then-came-ai","host":"wunc.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Marble · Cherokee · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"dc-blox-high-point-nc","state":"NC","kind":"facility","name":"DC BLOX High Point Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Guilford"],"city":"High Point","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. redirected regional map, facility mismatch. HighPointpreferred URL redirects to regional location map. Its12campuses/470criticalMWinclude operating and development across multiple states, not a HighPointfacility. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-centers/high-point/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0537978,"lng":-79.9518696,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"redirected regional map, facility mismatch","fields":{},"notes":["HighPointpreferred URL redirects to regional location map. Its12campuses/470criticalMWinclude operating and development across multiple states, not a HighPointfacility.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/high-point/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · High Point · Guilford · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"deep-river-data-cumnock-lee-county-nc","state":"NC","kind":"facility","name":"Deep River Data AI Data Center (Cumnock, Lee County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lee"],"city":"Cumnock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Preparingapplication/stategeologistcommunication is not filed/approveddrilling/fracking/generationpermit or operatingDC. LeeCountyproposal, Sanfordcityruleshearing andGrahamHMTech 11 MW/60,000 squarefeet/10 jobs are distinctscopes. Marchvote todraftmoratorium is not adoption; April 20/21 campaignschedule hasnoobservedoutcome or independentlyestablishedexactyear here. Geologicaldepth/fracture/health/noise claims are advocacyarguments, not project-specific measuredcontamination or medicalfindings. NoMWorwaterdemandforCumnockadopted. No petition/RSVP/email submitted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cwfnc.org/nofracklee/","host":"cwfnc.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.555,"lng":-79.23778,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"CleanWaterforNC’s undatedadvocacypage describes DeepRiverData pursuing anOil&GasCommissionapplication to reopenButlerWell 3 nearCumnock for proposedgas-poweredAI.","independently_verified_current_operating_status":null},"notes":["Preparingapplication/stategeologistcommunication is not filed/approveddrilling/fracking/generationpermit or operatingDC. LeeCountyproposal, Sanfordcityruleshearing andGrahamHMTech 11 MW/60,000 squarefeet/10 jobs are distinctscopes. Marchvote todraftmoratorium is not adoption; April 20/21 campaignschedule hasnoobservedoutcome or independentlyestablishedexactyear here. Geologicaldepth/fracture/health/noise claims are advocacyarguments, not project-specific measuredcontamination or medicalfindings. NoMWorwaterdemandforCumnockadopted. No petition/RSVP/email submitted.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cwfnc.org/nofracklee/","host":"cwfnc.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Cumnock · Lee · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"energy-storage-solutions-fayetteville-cumberland-county-nc","state":"NC","kind":"facility","name":"Energy Storage Solutions Fayetteville AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"Fayetteville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The combined headline investment is not per site. A zoning text change is not a site permit. Early 2026 groundbreaking was a forecast. The previously rejected Tarboro site is separate; its questionable printed investment figure is not silently corrected. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds","host":"datacenterknowledge.com","date":"2025-11-05","published":"2025-11-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.053,"lng":-78.878,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Data Center Knowledge quotes ESS plans for Kingsboro and a Fayetteville twin, with phased construction and undisclosed investors.","independently_verified_current_operating_status":null},"notes":["The combined headline investment is not per site. A zoning text change is not a site permit. Early 2026 groundbreaking was a forecast. The previously rejected Tarboro site is separate; its questionable printed investment figure is not silently corrected.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds","host":"datacenterknowledge.com","date":"2025-11-05","published":"2025-11-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Fayetteville · Cumberland · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"flexential-charlotte-north-clt04-05-nc","state":"NC","kind":"facility","name":"Flexential Charlotte - North (CLT04/05)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mecklenburg"],"city":"Charlotte","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Power conflict: page 52 quick facts 3.3 MW; page 53 specification 6.75 MW. No single value adopted. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.329773,"lng":-80.7657588,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Charlotte - North (CLT04/05)","publisher_reported_footprint_sqft":62589,"publisher_reported_critical_power_mw":null,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Power conflict: page 52 quick facts 3.3 MW; page 53 specification 6.75 MW. No single value adopted.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Charlotte · Mecklenburg · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"flexential-charlotte-south-clt01-02-03-nc","state":"NC","kind":"facility","name":"Flexential Charlotte - South (CLT01/02/03)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mecklenburg"],"city":"Charlotte","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.1354147,"lng":-80.9368313,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Charlotte - South (CLT01/02/03)","publisher_reported_footprint_sqft":66666,"publisher_reported_critical_power_mw":2.36,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Charlotte · Mecklenburg · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"flexential-raleigh-ral02-ral03-nc","state":"NC","kind":"facility","name":"Flexential Raleigh (RAL02/RAL03)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wake"],"city":"Morrisville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.8505281,"lng":-78.8291431,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Raleigh (RAL02/RAL03)","publisher_reported_footprint_sqft":99976,"publisher_reported_critical_power_mw":4.31,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Morrisville · Wake · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"flexential-salisbury-henderson-grove-nc","state":"NC","kind":"facility","name":"Flexential Salisbury (Henderson Grove Church Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rowan"],"city":"Salisbury","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. A recommendation is not council approval. The reported meeting weekday and date conflict. Average and peak water figures are not additive, nor are water and sewage. A will-serve letter is not an executed service agreement or critical IT certification. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salisburypost.com/2026/08/12/salisbury-planning-recommends-henderson-grove-church-data-center-approval/","host":"salisburypost.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.6288,"lng":-80.5054,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Salisbury Post reports a planning recommendation for Flexential and Trammell Crow, a peak demand estimate and a reported Duke will-serve letter.","independently_verified_current_operating_status":null},"notes":["A recommendation is not council approval. The reported meeting weekday and date conflict. Average and peak water figures are not additive, nor are water and sewage. A will-serve letter is not an executed service agreement or critical IT certification.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salisburypost.com/2026/08/12/salisbury-planning-recommends-henderson-grove-church-data-center-approval/","host":"salisburypost.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Salisbury · Rowan · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"google-lenoir-nc","state":"NC","kind":"facility","name":"Google Lenoir Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caldwell"],"city":"Lenoir","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Intro says building since2007; milestone explicitly says opens2008.4B+region/state is not site-onlyspend. Historic1.2Bplan is not additive to updated4B. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/lenoir-north-carolina/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.900163,"lng":-81.546892,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"first_data_center_opening_year":2008,"initial_announcement_year":2007,"initial_planned_investment_usd":1200000000,"regional_investment_usd_min_exclusive":4000000000,"regional_investment_scope":"region and North Carolina state"},"notes":["Intro says building since2007; milestone explicitly says opens2008.4B+region/state is not site-onlyspend. Historic1.2Bplan is not additive to updated4B.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/lenoir-north-carolina/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Lenoir · Caldwell · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"energy-storage-solutions-kingsboro-edgecombe-county-nc","state":"NC","kind":"facility","name":"Kingsboro AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Edgecombe"],"city":"Rocky Mount","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Calling a hearing does not enact a pause. The bills discussed were explicitly unfinished. Proposed demand is not present usage, and statewide tax-exemption scenarios are not site awards. Opposition to a land sale does not establish a closing. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.northcarolinahealthnews.org/2026/07/14/rural-nc-data-centers/","host":"northcarolinahealthnews.org","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.941,"lng":-77.734,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"NC Health News describes the Kingsboro ESS proposal and a proposed 24-month moratorium hearing.","independently_verified_current_operating_status":null},"notes":["Calling a hearing does not enact a pause. The bills discussed were explicitly unfinished. Proposed demand is not present usage, and statewide tax-exemption scenarios are not site awards. Opposition to a land sale does not establish a closing.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.northcarolinahealthnews.org/2026/07/14/rural-nc-data-centers/","host":"northcarolinahealthnews.org","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Rocky Mount · Edgecombe · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"long-ferry-road-rowan-county-nc","state":"NC","kind":"facility","name":"Long Ferry Road Data Center Campus (Rowan County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rowan"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Chair community protection requests were proposed, not enacted conditions. Later county-published May 4 ordinance is separately reviewed and supersedes this initial procedural stage. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Signed ordinance supersedes initial April vote; county law includes explicit exemptions.. Two printed parcel strings omit hyphens. Preserve printed forms; assessor crosswalk not independently performed. Do not equate all county geography with county zoning jurisdiction. Subsequent early termination not observed. County position as stated on March 26, not universal permit/utility clearance or a court ruling.. Statement no offers/paid incentives is dated, not proof no later award or no historical incentive discussions. Does not establish project energization or exemption eligibility for every parcel.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salisburypost.com/2026/04/21/roco-passes-data-center-moratorium-over-100-residents-express-data-center-opposition/","host":"salisburypost.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.rowancountync.gov/DocumentCenter/View/57271","host":"rowancountync.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.rowancountync.gov/2073/Long-Ferry-Development","host":"rowancountync.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.rowancountync.gov/DocumentCenter/View/56772","host":"rowancountync.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.6944,"lng":-80.3974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"initial-moratorium-vote-needs-readoption","reported_finding":"Salisbury Post says April 20 moratorium vote needed another approval after one commissioner left, and Long Ferry was excluded.","report_display_date":"2026-04-21","independently_verified_current_status":null},"notes":["Chair community protection requests were proposed, not enacted conditions. Later county-published May 4 ordinance is separately reviewed and supersedes this initial procedural stage.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salisburypost.com/2026/04/21/roco-passes-data-center-moratorium-over-100-residents-express-data-center-opposition/","host":"salisburypost.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Signed ordinance supersedes initial April vote; county law includes explicit exemptions.","fields":{"adopted":"2026-05-04","effective":"2026-05-04","expiry_no_later_than":"2027-05-04","early_termination_allowed":true,"jurisdiction":"County zoning jurisdiction","exempt_parcel_ids_as_printed":["603-112","603-113","603114","603-116","603118","603-045","603-061"],"exemptions":"State statutory and common-law exemptions plus explicitly listed ongoing-project parcels."},"notes":["Two printed parcel strings omit hyphens. Preserve printed forms; assessor crosswalk not independently performed. Do not equate all county geography with county zoning jurisdiction. Subsequent early termination not observed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.rowancountync.gov/DocumentCenter/View/57271","host":"rowancountync.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.rowancountync.gov/2073/Long-Ferry-Development","host":"rowancountync.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"County position as stated on March 26, not universal permit/utility clearance or a court ruling.","fields":{"statement_date":"2026-03-26","end_user_identified_in_statement":false,"county_statement_no_offers_or_paid_incentives":true,"county_statement_no_further_board_use_approvals":true},"notes":["Statement no offers/paid incentives is dated, not proof no later award or no historical incentive discussions. Does not establish project energization or exemption eligibility for every parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.rowancountync.gov/DocumentCenter/View/56772","host":"rowancountync.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Rowan · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"meta-forest-city-nc","state":"NC","kind":"facility","name":"Meta Forest City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rutherford"],"city":"Forest City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use. No exact construction count inferred. Source layout clips some labels; extracted text and visual columns were both reviewed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/forest-city-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.317,"lng":-81.826,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"operator_labeled_data_center_investment_usd":750000000,"investment_is_lower_bound":true,"investment_geographic_label":"North Carolina","historic_groundbreaking_year":2010,"peak_construction_workers":null,"operator_reported_operational_jobs_lower_bound":275,"local_school_nonprofit_direct_funding_usd_lower_bound":6400000,"direct_funding_county_scope":"Rutherford","peak_construction_workers_source_wording":"hundreds"},"notes":["Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.","No exact construction count inferred. Source layout clips some labels; extracted text and visual columns were both reviewed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/forest-city-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Forest City · Rutherford · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"microsoft-conover-catawba-county-nc","state":"NC","kind":"facility","name":"Microsoft Conover Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Catawba"],"city":"Conover","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Catawba multi-site joint statement. Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/","host":"catawbacountync.gov","date":"2026-06-23","published":"2026-06-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.7065,"lng":-81.2184,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Catawba multi-site joint statement","fields":{"joint_statement_publication_date":"2026-06-23","historical_project_announcement_month":"2022-11","regional_planned_investment_usd_min":1000000000,"regional_planned_data_centers":4,"regional_development_period_years":10,"announced_local_property_tax_commitment":"pay based on full value; local agreements being amended"},"notes":["Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/","host":"catawbacountync.gov","date":"2026-06-23","published":"2026-06-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Conover · Catawba · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"microsoft-hickory-catawba-county-nc","state":"NC","kind":"facility","name":"Microsoft Hickory Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Catawba"],"city":"Hickory","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Catawba multi-site joint statement. Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.conovernc.gov/m/newsflash/Home/Detail/41","host":"conovernc.gov","date":"2026-06-23","published":"2026-06-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.7333,"lng":-81.3443,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Catawba multi-site joint statement","fields":{"joint_statement_publication_date":"2026-06-23","historical_project_announcement_month":"2022-11","regional_planned_investment_usd_min":1000000000,"regional_planned_data_centers":4,"regional_development_period_years":10,"announced_local_property_tax_commitment":"pay based on full value; local agreements being amended"},"notes":["Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.conovernc.gov/m/newsflash/Home/Detail/41","host":"conovernc.gov","date":"2026-06-23","published":"2026-06-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Hickory · Catawba · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"microsoft-maiden-catawba-county-nc","state":"NC","kind":"facility","name":"Microsoft Maiden Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Catawba"],"city":"Maiden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Catawba multi-site joint statement. Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/","host":"catawbacountync.gov","date":"2026-06-23","published":"2026-06-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.5845,"lng":-81.2255,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Catawba multi-site joint statement","fields":{"joint_statement_publication_date":"2026-06-23","historical_project_announcement_month":"2022-11","regional_planned_investment_usd_min":1000000000,"regional_planned_data_centers":4,"regional_development_period_years":10,"announced_local_property_tax_commitment":"pay based on full value; local agreements being amended"},"notes":["Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/","host":"catawbacountync.gov","date":"2026-06-23","published":"2026-06-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Maiden · Catawba · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"microsoft-person-county-roxboro-nc","state":"NC","kind":"facility","name":"Microsoft Person County Mega Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Person"],"city":"Roxboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. EricMiller WRAL June30,2026 originalcommunitymeetingreport (updatedJuly1) identifies MicrosoftPersonCountyWoodsdale/Virginiaborder mega-site;1385acres and28.85M2024landpurchase reported, notcurrentconstructionspending. Pay-own-way/lowwater promises remainvoluntary assertions inarticle, notexecutedtariff/PPA/abatement/currentmeasuredwater. No ITMW or building approval/operatingdeadline. LaterSeptemberparagraph lacks independenteventdate and doesnotmoveJune30meetingtoSeptember. Localconcerns/poll notmeasuredcampusharm. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/","host":"wral.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.396,"lng":-78.9828,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["EricMiller WRAL June30,2026 originalcommunitymeetingreport (updatedJuly1) identifies MicrosoftPersonCountyWoodsdale/Virginiaborder mega-site;1385acres and28.85M2024landpurchase reported, notcurrentconstructionspending.","Pay-own-way/lowwater promises remainvoluntary assertions inarticle, notexecutedtariff/PPA/abatement/currentmeasuredwater. No ITMW or building approval/operatingdeadline. LaterSeptemberparagraph lacks independenteventdate and doesnotmoveJune30meetingtoSeptember. Localconcerns/poll notmeasuredcampusharm.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/","host":"wral.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Roxboro · Person · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"tract-mooresville-nc","state":"NC","kind":"facility","name":"Mooresville Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Iredell"],"city":"Mooresville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. April 16,2025 binding power agreement was ISSUED; source says Tract would EXECUTE it tentatively inSeptember AFTER zoning, so this does not verify a signed ESA.230 kV is line voltage, not MW. Town capacity up-to 500,000 gallons/day is developer-attributed possible supply, not measured demand or issued water allocation.1000 construction/195 or 200 permanent jobs are forecasts with rounding discrepancy. Developer claim of 400 data centers is not adopted as Tract’s owned/operating fleet. Public-hearing scheduling language still conditions August 4 action despite August 5 publication; no hearing result inferred. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/products/n-c-data-center-awaits-approval-to-build-on-earnhardt-land","host":"govtech.com","date":"2025-08-05","published":"2025-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.58,"lng":-80.81,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Statesville Record & Landmark reporting republished by Government Technology describes Tract’s conditional 399.25-acre Mooresville annexation/rezoning proposal and developer utility-study timeline.","independently_verified_current_operating_status":null,"developer_reports_power_agreement_issued":"2025-04-16","executed_utility_agreement_verified":false},"notes":["April 16,2025 binding power agreement was ISSUED; source says Tract would EXECUTE it tentatively inSeptember AFTER zoning, so this does not verify a signed ESA.230 kV is line voltage, not MW. Town capacity up-to 500,000 gallons/day is developer-attributed possible supply, not measured demand or issued water allocation.1000 construction/195 or 200 permanent jobs are forecasts with rounding discrepancy. Developer claim of 400 data centers is not adopted as Tract’s owned/operating fleet. Public-hearing scheduling language still conditions August 4 action despite August 5 publication; no hearing result inferred.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/products/n-c-data-center-awaits-approval-to-build-on-earnhardt-land","host":"govtech.com","date":"2025-08-05","published":"2025-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Mooresville · Iredell · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"natelli-new-hill-nc","state":"NC","kind":"facility","name":"Natelli New Hill Digital Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wake"],"city":"New Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Withdrawal is not final denial or permanent cancellation of every future proposal. The mentioned one-year moratorium was a proposed future motion in this report, not an adopted result. Generator MW is backup capacity, not critical IT. Nuclear-plant proximity does not establish direct reactor supply; planned wastewater cooling is not executed service. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/","host":"wral.com","date":"2026-03-05","published":"2026-03-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.6526,"lng":-79.0033,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WRAL reports Natelli's withdrawal of its New Hill Digital Campus annexation and rezoning applications in Apex, with any future action contingent on later zoning changes.","independently_verified_current_operating_status":null,"reported_application_status":"withdrawn","reported_withdrawal_date":"2026-03-05"},"notes":["Withdrawal is not final denial or permanent cancellation of every future proposal. The mentioned one-year moratorium was a proposed future motion in this report, not an adopted result. Generator MW is backup capacity, not critical IT. Nuclear-plant proximity does not establish direct reactor supply; planned wastewater cooling is not executed service.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/","host":"wral.com","date":"2026-03-05","published":"2026-03-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · New Hill · Wake · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"natelli-vance-county-henderson-nc","state":"NC","kind":"facility","name":"Natelli Vance County Campus (proposed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Vance"],"city":"Henderson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The report explicitly says Natelli has not confirmed that the rezoning is for a data center. This supports a rezoning event, not a confirmed DC project approval, tenant, power allocation or construction start. The withdrawn Apex proposal and other counties' moratoriums are separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wral.com/news/local/vance-county-board-approves-rezoning-potential-data-center-development-april-2026/","host":"wral.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.3085,"lng":-78.4709,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WRAL reports a six-one April 20 Vance County rezoning near Henderson associated with Natelli Investments.","independently_verified_current_operating_status":null,"reported_rezoning_date":"2026-04-20","specific_data_center_use_confirmed":false},"notes":["The report explicitly says Natelli has not confirmed that the rezoning is for a data center. This supports a rezoning event, not a confirmed DC project approval, tenant, power allocation or construction start. The withdrawn Apex proposal and other counties' moratoriums are separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wral.com/news/local/vance-county-board-approves-rezoning-potential-data-center-development-april-2026/","host":"wral.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Henderson · Vance · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"plan-c-crypto-fayetteville-cumberland-county-nc","state":"NC","kind":"facility","name":"Plan C Crypto Fayetteville (Dedication Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cumberland"],"city":"Fayetteville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Plan C historical mining announcement without presumed completion. Historical forecast does not prove eventual opening or current 2026 activity. Fourth North Carolina facility is company-level ordinal, not four buildings here. Cryptocurrency mining stays distinct from general AI/cloud data-center totals. No exact site, IT MW or current contract independently established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fcedc.com/fayetteville-welcomes-new-data-mining-operation-first-of-its-kind-for-cumberland-county/","host":"fcedc.com","date":"2022-02-08","published":"2022-02-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.085,"lng":-78.97722,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Plan C historical mining announcement without presumed completion","fields":{"publisher":"Fayetteville Cumberland Economic Development Corporation","announcement_date":"2022-02-08","company":"Plan C Crypto","location":"Fayetteville, Cumberland County, North Carolina","proposal":"regional headquarters and mining in existing industrial facility","operations_target_quarter":"2022-Q3","expected_new_jobs_2022":19},"notes":["Historical forecast does not prove eventual opening or current 2026 activity. Fourth North Carolina facility is company-level ordinal, not four buildings here. Cryptocurrency mining stays distinct from general AI/cloud data-center totals. No exact site, IT MW or current contract independently established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fcedc.com/fayetteville-welcomes-new-data-mining-operation-first-of-its-kind-for-cumberland-county/","host":"fcedc.com","date":"2022-02-08","published":"2022-02-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Fayetteville · Cumberland · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"pointone-lower-moncure-road-lee-county-nc","state":"NC","kind":"facility","name":"PointOne Lower Moncure Road Data Center (Lee County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lee"],"city":"Sanford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. SAGA's infrastructure-payment, low water/sewer, no-local-incentive and compliant-design claims are attributed, not executed contracts or independent permit review. Building investment and installed technology multiples are different scopes. Later-2026 construction and early-2028 customer acceptance are forecasts. Household equivalents are not actual gallons; public utility service does not establish capacity secured. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sandhills.news/2026/06/08/lee-county-pointone-data-center/","host":"sandhills.news","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.48778,"lng":-79.17833,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Sandhills News quotes SAGA on PointOne/Helix's proposed Lower Moncure technology park, with a stated 90 MW IT load and an application under initial technical review.","independently_verified_current_operating_status":null,"attributed_planned_it_mw":90,"executed_utility_agreement_verified":false},"notes":["SAGA's infrastructure-payment, low water/sewer, no-local-incentive and compliant-design claims are attributed, not executed contracts or independent permit review. Building investment and installed technology multiples are different scopes. Later-2026 construction and early-2028 customer acceptance are forecasts. Household equivalents are not actual gallons; public utility service does not establish capacity secured.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sandhills.news/2026/06/08/lee-county-pointone-data-center/","host":"sandhills.news","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Sanford · Lee · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"primeblock-murphy-cherokee-county-nc","state":"NC","kind":"facility","name":"PrimeBlock Murphy Bitcoin Mine (Harshaw Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cherokee"],"city":"Murphy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. WUNCJan19,2024reportwithJan11photosdirectlyidentifiesPrimeBlockHarshawRoadcryptomineoutsideMurphy. Thenobservedoperatingnotcurrent2026certificate. Commissionerinterviewallegestwoyearsunpaidtax/possiblefutureforeclosure;notverifiedtaxledgeroractualforeclosure. EstimatedMarble10-15jobsbelongtoOTHERsiteandolderyear. Countyland-usecontrolsnotblanketno-permitjurisdiction;current2026noaction/expiredmoranotcontradictionwithoutdates. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wunc.org/politics/2024-01-19/murphy-noise-cryptomining-north-carolina-western-regulations","host":"wunc.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0756,"lng":-84.0235,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"WUNCJan19,2024reportwithJan11photosdirectlyidentifiesPrimeBlockHarshawRoadcryptomineoutsideMurphy. Thenobservedoperatingnotcurrent2026certificate. Commissionerinterviewallegestwoyearsunpaidtax/possiblefutureforeclosure;notverifiedtaxledgeroractualforeclosure. EstimatedMarble10-15jobsbelongtoOTHERsiteandolderyear. Countyland-usecontrolsnotblanketno-permitjurisdiction;current2026noaction/expiredmoranotcontradictionwithoutdates."},"notes":["WUNCJan19,2024reportwithJan11photosdirectlyidentifiesPrimeBlockHarshawRoadcryptomineoutsideMurphy. Thenobservedoperatingnotcurrent2026certificate. Commissionerinterviewallegestwoyearsunpaidtax/possiblefutureforeclosure;notverifiedtaxledgeroractualforeclosure. EstimatedMarble10-15jobsbelongtoOTHERsiteandolderyear. Countyland-usecontrolsnotblanketno-permitjurisdiction;current2026noaction/expiredmoranotcontradictionwithoutdates.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.wunc.org/politics/2024-01-19/murphy-noise-cryptomining-north-carolina-western-regulations","host":"wunc.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Murphy · Cherokee · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"crosland-southeast-matthews-project-accelerate-nc","state":"NC","kind":"facility","name":"Project Accelerate  -  Matthews (East John Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mecklenburg"],"city":"Matthews","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Developer says additional time to explore options, not irrevocable permanent cancellation.600MW proposal not current load; date not independently adopted from supplied excerpt. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/articles/matthews-data-center-project-withdrawn-132947026.html","host":"yahoo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.1015,"lng":-80.7082,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Charlotte Observer report via Yahoo reproduces Project Accelerate withdrawal and Matthews mayor confirmation; future hearings cancelled.","independently_verified_current_operating_status":null},"notes":["Developer says additional time to explore options, not irrevocable permanent cancellation.600MW proposal not current load; date not independently adopted from supplied excerpt.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/articles/matthews-data-center-project-withdrawn-132947026.html","host":"yahoo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Matthews · Mecklenburg · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"project-delta-walnut-cove-nc","state":"NC","kind":"facility","name":"Project Delta Data Center - Stokes County","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stokes"],"city":"Walnut Cove","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Requested court relief and allegations of procedural/ownership errors are not judicial findings. The prior solar case and other county parcels are separate. Developer jobs, tax, cooling, gas-generator and noise claims are not measured operation or enforceable commitments. No exact hearing date, current tenant or later judgment inferred; sensitive burial details and private family history are excluded from map content. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.theassemblync.com/news/environment/data-center-rezoning-stokes-county/","host":"theassemblync.com","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.282,"lng":-80.1494,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Assembly republishes Inside Climate News reporting on Stokes County's January three-two rezoning and a subsequent lawsuit seeking to invalidate it.","independently_verified_current_operating_status":null},"notes":["Requested court relief and allegations of procedural/ownership errors are not judicial findings. The prior solar case and other county parcels are separate. Developer jobs, tax, cooling, gas-generator and noise claims are not measured operation or enforceable commitments. No exact hearing date, current tenant or later judgment inferred; sensitive burial details and private family history are excluded from map content.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.theassemblync.com/news/environment/data-center-rezoning-stokes-county/","host":"theassemblync.com","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Walnut Cove · Stokes · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"quiet-data-centers-enfield-halifax-county-nc","state":"NC","kind":"facility","name":"Project Q  -  Quiet Data Centers Enfield (Halifax County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Halifax"],"city":"Enfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Finalizing is not a closed sale, exact Enfield parcel or approved site plan. No tenant, power or current operation established. Other counties moratoriums are separate jurisdictions and include threshold/date ambiguities requiring original texts. Later Raleigh October6and Fayetteville October meetings are not observed outcomes from this September update. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wral.com/news/local/central-north-carolina-data-center-plans-april-2026/","host":"wral.com","date":"2026-04-24","published":"2026-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.18,"lng":-77.66889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"WRAL regional roundup, updated September16, says Halifax officials were finalizing sale of a251-acre industrial site to Quiet Data Centers.","independently_verified_current_operating_status":null},"notes":["Finalizing is not a closed sale, exact Enfield parcel or approved site plan. No tenant, power or current operation established. Other counties moratoriums are separate jurisdictions and include threshold/date ambiguities requiring original texts. Later Raleigh October6and Fayetteville October meetings are not observed outcomes from this September update.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wral.com/news/local/central-north-carolina-data-center-plans-april-2026/","host":"wral.com","date":"2026-04-24","published":"2026-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Enfield · Halifax · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"prsm-group-cumberland-county-nc","state":"NC","kind":"facility","name":"PRSM Group Cumberland County AI Data Center (undisclosed industrial park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The exact site was withheld and cannot be mapped as a verified parcel. A county moratorium would not govern Fayetteville city limits. Proposed 225 MW is unspecified basis, not utility reserve or operating IT; the utility's average existing load is not available capacity. Cooling descriptions, jobs and claimed protections require engineering/contracts. Other canceled/proposed county projects are separate; no later moratorium vote inferred. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityviewnc.com/stories/data-center-proposal-emerges-as-county-holds-hearing-on-moratorium/","host":"cityviewnc.com","date":"2026-05-21","published":"2026-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.0462,"lng":-78.8394,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"CityView reports PRSM's undisclosed Cumberland client concept and a May 18 moratorium hearing at which commissioners took no formal action.","independently_verified_current_operating_status":null},"notes":["The exact site was withheld and cannot be mapped as a verified parcel. A county moratorium would not govern Fayetteville city limits. Proposed 225 MW is unspecified basis, not utility reserve or operating IT; the utility's average existing load is not available capacity. Cooling descriptions, jobs and claimed protections require engineering/contracts. Other canceled/proposed county projects are separate; no later moratorium vote inferred.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cityviewnc.com/stories/data-center-proposal-emerges-as-county-holds-hearing-on-moratorium/","host":"cityviewnc.com","date":"2026-05-21","published":"2026-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Cumberland · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"radius-dc-raleigh-1-wake-county-nc","state":"NC","kind":"facility","name":"Radius DC Raleigh I","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wake"],"city":"Raleigh","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Raleigh signed annexation request, not municipal approval. Signed applicant petition is not adopted annexation or certificate of occupancy.180M projected market value is not actual construction spending/incentive. Project title identifies RadiusDC but use field saysOffice; clarify development use before treating whole99345sqft as data hall. Requested water/sewer boxes are not issued service capacity. No critical IT MW or current operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/AX-009-26.pdf","host":"cityofraleigh0drupal.blob.core.usgovcloudapi.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.7289,"lng":-78.5776,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Raleigh signed annexation request, not municipal approval","fields":{"publisher_role":"applicant petition hosted by City of Raleigh","project":"Radius DC RaleighI","address":"3101 Jones Sausage Road, Raleigh, NC27529","wake_county_pin":"1722731048","requested_annexation_acres":13.646,"applicant_nonresidential_space_sqft":99345,"applicant_use_description":"Office","projected_buildout_market_value_usd":180000000,"owner":"B3-SFRE JSR LLC","owner_petition_signature_date":"2026-03-11","city_clerk_receipt_fields":"blank"},"notes":["Signed applicant petition is not adopted annexation or certificate of occupancy.180M projected market value is not actual construction spending/incentive. Project title identifies RadiusDC but use field saysOffice; clarify development use before treating whole99345sqft as data hall. Requested water/sewer boxes are not issued service capacity. No critical IT MW or current operations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/AX-009-26.pdf","host":"cityofraleigh0drupal.blob.core.usgovcloudapi.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Raleigh · Wake · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"drox-group-rural-hall-forsyth-county-nc","state":"NC","kind":"facility","name":"Rural Hall Data Center (The Drox Group)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Forsyth"],"city":"Rural Hall","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Rural Hall source-role correction and reported denial requiring official record. Upstream government label was wrong. Campaign contains archived pre-vote language alongside later denial report. Independent county final minutes/decision needed before authoritative legal status. Approximate 144-acre site is not identical to 128.54-acre rezoning scope. Campaign environmental claims are concerns, not measured violations. Tenant unknown. No exact IT MW or operations inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ruralhallinfo.com/project-iron-spur/","host":"ruralhallinfo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.267,"lng":-80.267,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Rural Hall source-role correction and reported denial requiring official record","fields":{"publisher_role":"resident opposition campaign, not municipal government","case":"F-1669","project":"Project Iron Spur","developer_as_reported":"Drox Group LLC","reported_rezoning_acres":128.54,"campaign_reported_denial_date":"2026-07-30","campaign_reported_denial_vote":"5-2","reported_planned_buildings":3,"reported_planned_gross_sqft":1122300},"notes":["Upstream government label was wrong. Campaign contains archived pre-vote language alongside later denial report. Independent county final minutes/decision needed before authoritative legal status. Approximate 144-acre site is not identical to 128.54-acre rezoning scope. Campaign environmental claims are concerns, not measured violations. Tenant unknown. No exact IT MW or operations inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ruralhallinfo.com/project-iron-spur/","host":"ruralhallinfo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Rural Hall · Forsyth · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"t5-charlotte-nc","state":"NC","kind":"facility","name":"T5@Charlotte","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cleveland"],"city":"Kings Mountain","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 2022reportdoesnot independentlyestablish2026status or exactaddress. Perfect assessmentscore isnot measured uptime guarantee. OperatorSeptember14,2022reportsM&OStampofApprovalrenewalforT5Charlotte;differentfromTierdesign/facilitycertificate. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://t5datacenters.com/resources/t5-charlotte-stamp-of-approval/","host":"t5datacenters.com","date":"2022-09-14","published":"2022-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.2504249,"lng":-81.395039,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"historic_operation_evidence_date":"2022-09-14","assessment":"Uptime M&O Stamp of Approval renewal"},"notes":["2022reportdoesnot independentlyestablish2026status or exactaddress.","Perfect assessmentscore isnot measured uptime guarantee.","OperatorSeptember14,2022reportsM&OStampofApprovalrenewalforT5Charlotte;differentfromTierdesign/facilitycertificate.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://t5datacenters.com/resources/t5-charlotte-stamp-of-approval/","host":"t5datacenters.com","date":"2022-09-14","published":"2022-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Kings Mountain · Cleveland · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"terra-nexus-custer-avenue-fayetteville-cumberland-county-nc","state":"NC","kind":"facility","name":"Terra Nexus Custer Avenue Data Center (Fayetteville)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"Fayetteville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. TerraNexus Custer proposal separated from speculative DunnRoad project. Separate EnergyStorageSolutions DunnRoad50acre300MW6.4Bidea reportedlynotundercontract; notsameproject or actualfinancing. SeminarrelativeThursdaynotconvertedtofuturehearingdate. PlanCCrypto andAITexistingfacilities distinct. No exactparcel, finalapproval, currenttenant or energization established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityviewnc.com/stories/how-to-learn-more-about-data-centers-in-fayetteville/","host":"cityviewnc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.085,"lng":-78.97722,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"TerraNexus Custer proposal separated from speculative DunnRoad project","fields":{"company":"Terra Nexus Ventures","reported_proposal_location":"CusterAvenue nearFayettevillePWCpowerplant andEastover, NorthCarolina","reported_site_acres":180,"reported_proposed_power_mw":200,"power_basis":"reported proposal MW, not explicit critical IT","reported_stage":"plans submitted to city"},"notes":["Separate EnergyStorageSolutions DunnRoad50acre300MW6.4Bidea reportedlynotundercontract; notsameproject or actualfinancing. SeminarrelativeThursdaynotconvertedtofuturehearingdate. PlanCCrypto andAITexistingfacilities distinct. No exactparcel, finalapproval, currenttenant or energization established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cityviewnc.com/stories/how-to-learn-more-about-data-centers-in-fayetteville/","host":"cityviewnc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Fayetteville · Cumberland · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"terra-nexus-rockingham-richmond-county-nc","state":"NC","kind":"facility","name":"Terra Nexus Rockingham Data Center (Old Cheraw Highway)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Richmond"],"city":"Rockingham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Council-hearing chronology is inconsistent: article publishedAugust 13 uses futureTuesday while caption citesAugust 11 packet; do not invent exact hearing/result. Initial 75,000 gallons/day is explicitly superseded by a proposed lower-water cooling design, but revised exact demand is unknown;1000 gallons/daysewer is distinct not additive consumption.48.4 dB is model output, not measurement. Staff claim no air permit needed despite backup generators is not adopted legal conclusion.30 jobs and 9 to 12 monthfirst-phase timing lack an observed start.824.3 million is whole-city existing taxable value, not project investment. No city incentives statement does not exclude all state/federal assistance. Project Blue Marlin/Amazon is separate. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yourdailyjournal.com/news/265529/rockingham-council-to-hold-public-hearing-on-data-center-rezoning","host":"yourdailyjournal.com","date":"2026-08-13","published":"2026-08-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.9151,"lng":-79.7948,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Richmond County Daily Journal reports Terra Nexus’s 165-acre conditional-rezoning proposal at 316 OldCherawHighway, with planning recommendation onAugust 4 and a proposed phased 1.2 billion-dollar data center.","independently_verified_current_operating_status":null,"original_water_design_gallons_per_day":75000,"original_water_design_superseded_by_revised_proposal":true,"revised_water_design_gallons_per_day":null},"notes":["Council-hearing chronology is inconsistent: article publishedAugust 13 uses futureTuesday while caption citesAugust 11 packet; do not invent exact hearing/result. Initial 75,000 gallons/day is explicitly superseded by a proposed lower-water cooling design, but revised exact demand is unknown;1000 gallons/daysewer is distinct not additive consumption.48.4 dB is model output, not measurement. Staff claim no air permit needed despite backup generators is not adopted legal conclusion.30 jobs and 9 to 12 monthfirst-phase timing lack an observed start.824.3 million is whole-city existing taxable value, not project investment. No city incentives statement does not exclude all state/federal assistance. Project Blue Marlin/Amazon is separate.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yourdailyjournal.com/news/265529/rockingham-council-to-hold-public-hearing-on-data-center-rezoning","host":"yourdailyjournal.com","date":"2026-08-13","published":"2026-08-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Rockingham · Richmond · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"tierpoint-charlotte-center-park-nc","state":"NC","kind":"facility","name":"TierPoint Charlotte - Center Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mecklenburg"],"city":"Charlotte","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Redundant generator ratings are not critical IT or utility capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/charlotte-center-park/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.1731955,"lng":-80.928121,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"gross_area_sqft_lower_bound":60000,"raised_floor_sqft_lower_bound":20000,"backup_generator_configuration":{"units":4,"mw_each":2.25}},"notes":["Redundant generator ratings are not critical IT or utility capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/charlotte-center-park/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Charlotte · Mecklenburg · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"tierpoint-charlotte-north-myers-nc","state":"NC","kind":"facility","name":"TierPoint Charlotte - North Myers","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mecklenburg"],"city":"Charlotte","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. North Carolina regional source with three bound named addresses. 230000 square feet covers four North Carolina locations including Center Park, not per site. RTP is Durham, not Raleigh municipality. Tax-exemption marketing not a reviewed incentive award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.221531,"lng":-80.8358072,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"North Carolina regional source with three bound named addresses","fields":{"named_site_addresses":[{"site":"Charlotte North Myers","address":"125 North Myers Street, Charlotte, NC28202"},{"site":"Raleigh Departure","address":"5301 Departure Drive, Raleigh, NC27616"},{"site":"Raleigh RTP","address":"99 TW Alexander Drive, Durham, NC27709"}],"regional_combined_area_sqft":230000},"notes":["230000 square feet covers four North Carolina locations including Center Park, not per site. RTP is Durham, not Raleigh municipality. Tax-exemption marketing not a reviewed incentive award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Charlotte · Mecklenburg · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"tierpoint-raleigh-departure-drive-nc","state":"NC","kind":"facility","name":"TierPoint Raleigh (Departure Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wake"],"city":"Raleigh","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. North Carolina regional source with three bound named addresses. 230000 square feet covers four North Carolina locations including Center Park, not per site. RTP is Durham, not Raleigh municipality. Tax-exemption marketing not a reviewed incentive award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.8543896,"lng":-78.595815,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"North Carolina regional source with three bound named addresses","fields":{"named_site_addresses":[{"site":"Charlotte North Myers","address":"125 North Myers Street, Charlotte, NC28202"},{"site":"Raleigh Departure","address":"5301 Departure Drive, Raleigh, NC27616"},{"site":"Raleigh RTP","address":"99 TW Alexander Drive, Durham, NC27709"}],"regional_combined_area_sqft":230000},"notes":["230000 square feet covers four North Carolina locations including Center Park, not per site. RTP is Durham, not Raleigh municipality. Tax-exemption marketing not a reviewed incentive award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Raleigh · Wake · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"tierpoint-raleigh-rtp-durham-nc","state":"NC","kind":"facility","name":"TierPoint Raleigh - RTP","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Durham"],"city":"Durham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. North Carolina regional source with three bound named addresses. 230000 square feet covers four North Carolina locations including Center Park, not per site. RTP is Durham, not Raleigh municipality. Tax-exemption marketing not a reviewed incentive award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.9248595,"lng":-78.852029,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"North Carolina regional source with three bound named addresses","fields":{"named_site_addresses":[{"site":"Charlotte North Myers","address":"125 North Myers Street, Charlotte, NC28202"},{"site":"Raleigh Departure","address":"5301 Departure Drive, Raleigh, NC27616"},{"site":"Raleigh RTP","address":"99 TW Alexander Drive, Durham, NC27709"}],"regional_combined_area_sqft":230000},"notes":["230000 square feet covers four North Carolina locations including Center Park, not per site. RTP is Durham, not Raleigh municipality. Tax-exemption marketing not a reviewed incentive award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/north-carolina/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Durham · Durham · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"eco-tip-west-moncure-chatham-county-nc","state":"NC","kind":"facility","name":"Triangle Innovation Point West Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chatham"],"city":"Moncure","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. Secondary screeningcontextonly; nocourtjudgment,originalcomplaintoradoptedChathammoratoriumreviewedhere.750MWbasisnotcriticalITverified;11millionispartyclaimnotauditedcapex.20plusNCjurisdictioncountmixespauses/bans/drafts; cannotadoptascomplete/currentcensus. TrackerAprilRowanclaimconflictswithseparatelyreviewedMay4original,whichcontrols. UnenactedHB1063notlaw; genericinterconnectiontimelines/homewater/forecastelectricitysharesnotcampuscommitments. Unverifiedfuturecourtoutcomedoesnotautomaticallysetstatewideprecedent. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gpuleaseindex.com/readiness/nc-data-center-moratoriums","host":"gpuleaseindex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.6224994,"lng":-79.0783143,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.","fields":{"reported_context":"Commercial GPULeaseIndex tracker describes EcoTIPWest lawsuit against ChathamCounty moratorium over a750MW/400plusacreMoncureproposal, with developer claiming11millionUSDpre-pauseexpenditure andvested/permitted-usearguments.","independently_verified_current_operating_status":null},"notes":["Secondary screeningcontextonly; nocourtjudgment,originalcomplaintoradoptedChathammoratoriumreviewedhere.750MWbasisnotcriticalITverified;11millionispartyclaimnotauditedcapex.20plusNCjurisdictioncountmixespauses/bans/drafts; cannotadoptascomplete/currentcensus. TrackerAprilRowanclaimconflictswithseparatelyreviewedMay4original,whichcontrols. UnenactedHB1063notlaw; genericinterconnectiontimelines/homewater/forecastelectricitysharesnotcampuscommitments. Unverifiedfuturecourtoutcomedoesnotautomaticallysetstatewideprecedent.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gpuleaseindex.com/readiness/nc-data-center-moratoriums","host":"gpuleaseindex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Moncure · Chatham · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"whitefiber-nc1-madison-nc","state":"NC","kind":"facility","name":"WhiteFiber NC-1 AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rockingham"],"city":"Madison","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. WhiteFiber NC1 mixed-date status and conditional investment. May2026updatedpagestillusesDec2025futuretargetand24expectedbodywhileheadline24operational;statusconflictheld.200conditionalESAnotcurrentIToradditionalto99.45Mcashpropertyacquisitionnotfullbuildcapex;1Bplanincludesconditionalphasesnotallpaid.970kgrossindustrialreuse notallbuiltDCwhitespace. Noobservedcommissioning/executedtenantlease. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.whitefiber.com/blog/nc-1-data-center","host":"whitefiber.com","date":"2026-05-06","published":"2026-05-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.3801,"lng":-79.9692,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"WhiteFiber NC1 mixed-date status and conditional investment","fields":{"operator":"WhiteFiber","site":"NC1","locality":"Madison, Rockingham County, North Carolina","page_updated_date":"2026-05-06","existing_industrial_sqft_approx":970000,"site_acres":96,"reported_cash_property_purchase_usd":45000000,"headline_operational_power_mw":24,"body_expected_power_mw":24,"body_expected_power_target":"2025-Q4","historical_go_live_target":"2025-12","reported_power_secured_mw":99,"conditional_potential_power_mw_max":200,"planned_investment_usd_min_exclusive":1000000000,"investment_condition":"up-to200MWfromDukeEnergyoverextendedperiod,financingandexecutionmilestones","first_customer_commitment":"nonbindingLOI","canonical_current_operating_power_mw":null},"notes":["May2026updatedpagestillusesDec2025futuretargetand24expectedbodywhileheadline24operational;statusconflictheld.200conditionalESAnotcurrentIToradditionalto99.45Mcashpropertyacquisitionnotfullbuildcapex;1Bplanincludesconditionalphasesnotallpaid.970kgrossindustrialreuse notallbuiltDCwhitespace. Noobservedcommissioning/executedtenantlease.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.whitefiber.com/blog/nc-1-data-center","host":"whitefiber.com","date":"2026-05-06","published":"2026-05-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Carolina · Madison · Rockingham · Source context reviewed","state_name":"North Carolina","state_path":"/north-carolina/"},{"id":"applied-digital-jamestown-nd","state":"ND","kind":"facility","name":"Applied Digital Jamestown Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Stutsman"],"city":"Jamestown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.029587,"lng":-98.679092,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Dakota · Jamestown · Stutsman · Source context reviewed","state_name":"North Dakota","state_path":"/north-dakota/"},{"id":"applied-digital-polaris-forge-1-ellendale-nd","state":"ND","kind":"facility","name":"Applied Digital Polaris Forge 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dickey"],"city":"Ellendale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not sum phases into campus total again. 250MW is operator-reported commissioned criticalIT capacity, not independently measured demand. July1release establishes75MWphase and175MW then-live campus. October2release supersedes campus live total with250MW;400MW remains contracted full buildout. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1","host":"ir.applieddigital.com","date":"2026-07-01","published":"2026-07-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source for campus operational it mw"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":46.003,"lng":-98.509,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Ellendale","event_status":"Building2Phase1ready for service","event_date":"2026-07-01","phase_operational_it_mw":75,"campus_operational_it_mw":250,"contracted_full_buildout_it_mw":400,"campus_operational_it_as_of":"2026-10-02"},"notes":["Do not sum phases into campus total again.","250MW is operator-reported commissioned criticalIT capacity, not independently measured demand.","July1release establishes75MWphase and175MW then-live campus. October2release supersedes campus live total with250MW;400MW remains contracted full buildout.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1","host":"ir.applieddigital.com","date":"2026-07-01","published":"2026-07-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source for campus operational it mw"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Dakota · Ellendale · Dickey · Source context reviewed","state_name":"North Dakota","state_path":"/north-dakota/"},{"id":"applied-digital-polaris-forge-2-harwood-nd","state":"ND","kind":"facility","name":"Applied Digital Polaris Forge 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cass"],"city":"Harwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Minnkota Harwood project load and workforce forecast. 3Bdeveloper investment excludes unspecified additional tenant investment; not money already spent.280MWnot per building or measured. Utility ratepayer assurances not independently audited actual future bills. Company2021founding does not date Harwood opening. No exact parcel, current energization or customer lease read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.minnkota.com/minnkota-website/our-press/data-center-faqs","host":"minnkota.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.02,"lng":-97.025,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Minnkota Harwood project load and workforce forecast","fields":{"utility":"Minnkota Power Cooperative","retail_utility":"Cass County Electric Cooperative","developer_operator":"Applied Digital","location":"near Harwood, North Dakota","planned_buildings":2,"combined_planned_area_sqft_min_exclusive":1800000,"projected_applied_digital_investment_usd_min_exclusive":3000000000,"expected_fulltime_personnel_min_exclusive":200,"expected_peak_construction_workers_approx":700,"expected_peak_electrical_usage_mw":280,"power_basis":"expected facility peak usage, not explicit critical IT"},"notes":["3Bdeveloper investment excludes unspecified additional tenant investment; not money already spent.280MWnot per building or measured. Utility ratepayer assurances not independently audited actual future bills. Company2021founding does not date Harwood opening. No exact parcel, current energization or customer lease read.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.minnkota.com/minnkota-website/our-press/data-center-faqs","host":"minnkota.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Dakota · Harwood · Cass · Source context reviewed","state_name":"North Dakota","state_path":"/north-dakota/"},{"id":"applied-digital-polaris-forge-3-oliver-nd","state":"ND","kind":"facility","name":"Applied Digital Polaris Forge 3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oliver"],"city":"Hanover","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Application filing and repealed pause are not zoning approval. Summer groundbreaking and 18 to 24 month completion were hopes, not observed milestones. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/","host":"kfyrtv.com","date":"2026-05-04","published":"2026-05-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.111,"lng":-101.426,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"KFYR reports Applied Digital filed Oliver County rezoning request after county repealed its moratorium.","independently_verified_current_operating_status":null},"notes":["Application filing and repealed pause are not zoning approval. Summer groundbreaking and 18 to 24 month completion were hopes, not observed milestones.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/","host":"kfyrtv.com","date":"2026-05-04","published":"2026-05-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Dakota · Hanover · Oliver · Source context reviewed","state_name":"North Dakota","state_path":"/north-dakota/"},{"id":"atlas-power-williston-nd","state":"ND","kind":"facility","name":"Atlas Power Data Center (Williston)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Williams"],"city":"Williston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Vendor analysis, not independent regulator determination. Do not turn historical proprietary load analysis into current metered capacity or 700 MW future expansion into existing IT power. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yesenergy.com/blog/crypto-mining-power-consumption-atlas-power","host":"yesenergy.com","date":"2024-05-09","published":"2024-05-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":48.147,"lng":-103.618,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Yes Energy publishes its own historical Atlas Williston load/congestion analysis and describes possible future phases.","independently_verified_current_operating_status":null},"notes":["Vendor analysis, not independent regulator determination. Do not turn historical proprietary load analysis into current metered capacity or 700 MW future expansion into existing IT power.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yesenergy.com/blog/crypto-mining-power-consumption-atlas-power","host":"yesenergy.com","date":"2024-05-09","published":"2024-05-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Dakota · Williston · Williams · Source context reviewed","state_name":"North Dakota","state_path":"/north-dakota/"},{"id":"bitzero-nekoma-nd","state":"ND","kind":"facility","name":"Bitzero Nekoma Data Center (Stanley R. Mickelsen Safeguard Complex)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cavalier"],"city":"Nekoma","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Acquisition agreements are not completed data-center construction. 200MW refers announced North American company buildout, not a Nekoma site allocation. Military site operational1975 is not data-center opening. Offset strategy and waste-heat greenhouse are plans, not measured environmental performance. No2026operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center","host":"governor.nd.gov","date":"2022-07-25","published":"2022-07-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":48.5894194,"lng":-98.3567389,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"historical_acquisition_redevelopment_announcement":"2022-07-25","reported_bid_acceptance_date":"2022-07-18","historical_expected_investment_usd_approx":500000000,"historical_expected_operational_jobs_min":35,"historical_expected_operational_jobs_max":50,"published_site":"Stanley R Mickelsen Safeguard Complex, Nekoma, Cavalier County, North Dakota"},"notes":["Acquisition agreements are not completed data-center construction. 200MW refers announced North American company buildout, not a Nekoma site allocation. Military site operational1975 is not data-center opening. Offset strategy and waste-heat greenhouse are plans, not measured environmental performance. No2026operating proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center","host":"governor.nd.gov","date":"2022-07-25","published":"2022-07-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Dakota · Nekoma · Cavalier · Source context reviewed","state_name":"North Dakota","state_path":"/north-dakota/"},{"id":"core-scientific-grand-forks-nd","state":"ND","kind":"facility","name":"Core Scientific Grand Forks Data Center (Grand Forks 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grand Forks"],"city":"Grand Forks","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operatorofferingnotindependentlyverifiedcurrentenergizedload/AIoccupancy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corescientific.com/high-density-data-centers/grand-forks-nd/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.8912,"lng":-97.0434,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"5601 11th Ave S, Grand Forks, ND58201","advertised_total_power_capacity_mw":100,"campus_acres":20,"total_area_sqft":90000,"power_basis":"totalpowercapacity, not explicitlycriticalIT"},"notes":["Operatorofferingnotindependentlyverifiedcurrentenergizedload/AIoccupancy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://corescientific.com/high-density-data-centers/grand-forks-nd/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Dakota · Grand Forks · Grand Forks · Source context reviewed","state_name":"North Dakota","state_path":"/north-dakota/"},{"id":"enerfore-pleasant-valley-tioga-nd","state":"ND","kind":"facility","name":"Enerfore Pleasant Valley Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Williams"],"city":"Tioga","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The headline does not establish an issued permit. Early 2025 opening was a forecast. Dry Fork and Pleasant Valley naming needs a parcel crosswalk. Company-wide 200 MW does not belong to this facility. Original minutes are reviewed separately. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Appeal acceptance does not grant either permit or variance. Original location failed the one-mile setback; staff had refused to accept a CUP application. Residents discuss Pleasant Valley and Dry Fork; exact parcel crosswalk still requires the later application. Claims in public comments are not findings of misconduct. Agenda is a request, not an adopted outcome. Do not move coordinates or replace township based on an incomplete parcel crosswalk. No later commissioning or current permit result established.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sdxcentral.com/news/enerfore-digital-gets-go-ahead-for-data-center-proposal-in-north-dakota/","host":"sdxcentral.com","date":"2024-10-04","published":"2024-10-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://williamsnd.civicweb.net/document/174556/","host":"williamsnd.civicweb.net","date":"2024-09-17","published":"2024-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://williamsnd.civicweb.net/document/175356/","host":"williamsnd.civicweb.net","date":"2024-12-19","published":"2024-12-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":48.28,"lng":-102.9424,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"SDxCentral describes Enerfore's successful appeal allowing a permit application, with a sound study and public comment still ahead.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The headline does not establish an issued permit. Early 2025 opening was a forecast. Dry Fork and Pleasant Valley naming needs a parcel crosswalk. Company-wide 200 MW does not belong to this facility. Original minutes are reviewed separately.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sdxcentral.com/news/enerfore-digital-gets-go-ahead-for-data-center-proposal-in-north-dakota/","host":"sdxcentral.com","date":"2024-10-04","published":"2024-10-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Original county minutes record a four-zero vote approving the appeal so Enerfore could concurrently submit a conditional-use and reduced-setback variance application.","appeal_approval_date":"2024-09-17","vote_ayes":4,"vote_nays":0,"conditional_use_permit_issuance_verified":false},"notes":["Appeal acceptance does not grant either permit or variance. Original location failed the one-mile setback; staff had refused to accept a CUP application.","Residents discuss Pleasant Valley and Dry Fork; exact parcel crosswalk still requires the later application. Claims in public comments are not findings of misconduct.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://williamsnd.civicweb.net/document/174556/","host":"williamsnd.civicweb.net","date":"2024-09-17","published":"2024-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Later official agenda lists Enerfore Digital Valley request LU-0086-24 for a cryptocurrency facility in Dry Fork Township.","application_number":"LU-0086-24","printed_location":"Sublot 2 and Sublot 3, Section 4, T155N, R95W; Dry Fork Township","permit_outcome_verified":false},"notes":["Agenda is a request, not an adopted outcome. Do not move coordinates or replace township based on an incomplete parcel crosswalk.","No later commissioning or current permit result established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://williamsnd.civicweb.net/document/175356/","host":"williamsnd.civicweb.net","date":"2024-12-19","published":"2024-12-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"North Dakota · Tioga · Williams · Source context reviewed","state_name":"North Dakota","state_path":"/north-dakota/"},{"id":"5c-group-vultr-prime-ohio-springfield-oh","state":"OH","kind":"facility","name":"5C Group / Vultr Data Center (Prime Ohio)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Springfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City publishes answers supplied by the developer. No measured consumption or operational start is established. Peak extreme-heat water figure is not typical daily or annual use; the source does not define 150 MW as critical IT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://springfieldohio.gov/5c-data-center-faqs/","host":"springfieldohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.8664,"lng":-83.7936,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"design_maximum_electrical_load_mw_up_to":150,"forecast_investment_usd_up_to":1300000000,"forecast_permanent_full_time_jobs":120,"extreme_heat_theoretical_max_water_gallons_per_day":300000},"notes":["City publishes answers supplied by the developer. No measured consumption or operational start is established. Peak extreme-heat water figure is not typical daily or annual use; the source does not define 150 MW as critical IT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://springfieldohio.gov/5c-data-center-faqs/","host":"springfieldohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Springfield · Clark · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aligned-pataskala-licking-oh","state":"OH","kind":"facility","name":"Aligned Data Centers  -  Pataskala","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"Pataskala","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Neither recommendation is council decision; August 25 hearing andJuly 6 petition submission were future.200 MWbasis is undefined, not criticalIT/currentload or an executed electricity agreement. Fuel-cell/closed-loop claims are proposed design, not hydrogen supply contract or zero-water guarantee.110 jobs andJEDDincome-tax estimates are forecasts;300,000 dollarpostconstructionperiod is not explicit annual revenue. Four-to-three redesign is not sevenbuildings. Proposedcharter 25 MWthreshold is not adopted law. Directory 139 regional/224 statecounts are not independently verified operating census. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aol.com/articles/pataskala-allow-data-center-industrial-180844000.html","host":"aol.com","date":"2026-06-30","published":"2026-06-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.9956,"lng":-82.6743,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"NewarkAdvocate viaAOL reports Aligned’s revised three-building 89-acre Pataskala 200 MWproposal with staff recommendation in favor but planning commission 5 to 2 recommendation to reject.","independently_verified_current_operating_status":null},"notes":["Neither recommendation is council decision; August 25 hearing andJuly 6 petition submission were future.200 MWbasis is undefined, not criticalIT/currentload or an executed electricity agreement. Fuel-cell/closed-loop claims are proposed design, not hydrogen supply contract or zero-water guarantee.110 jobs andJEDDincome-tax estimates are forecasts;300,000 dollarpostconstructionperiod is not explicit annual revenue. Four-to-three redesign is not sevenbuildings. Proposedcharter 25 MWthreshold is not adopted law. Directory 139 regional/224 statecounts are not independently verified operating census.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aol.com/articles/pataskala-allow-data-center-industrial-180844000.html","host":"aol.com","date":"2026-06-30","published":"2026-06-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Pataskala · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aligned-conesville-oh","state":"OH","kind":"facility","name":"Aligned Data Centers - Conesville Industrial Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coshocton"],"city":"Conesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Multi-billion wording supplies no exact investment amount; no MW in release. Past target does not establish delivered. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. TIF is not no taxes; future capacity/opening are not delivered. Original executed approvals, current operator disclosures and subsequent decisions take precedence.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/","host":"aligneddc.com","date":"2025-07-24","published":"2025-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","host":"athensindependent.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.27,"lng":-81.83,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_development_acres":197,"initial_capacity_delivery_target":"mid2026","initial_customer_status":"foundational customer secured at announcement"},"notes":["Multi-billion wording supplies no exact investment amount; no MW in release. Past target does not establish delivered.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/","host":"aligneddc.com","date":"2025-07-24","published":"2025-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Conesville Aligned Data Centers project described separately, including tax-increment arrangement and future opening.","independently_verified_current_operating_status":null},"notes":["TIF is not no taxes; future capacity/opening are not delivered.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","host":"athensindependent.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Conesville · Coshocton · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aligned-chillicothe-ross-oh","state":"OH","kind":"facility","name":"Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ross"],"city":"Chillicothe","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Canonical operator identity stays unresolved; no transfer of Aligned Data Centers portfolio facts. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Company announcement; partner name does not establish identity as Aligned Data Centers.. Glove and aircraft jobs/revenues belong to other proposed campus activities. No final tenant, construction, AMD supply contract or current operations independently established.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","host":"athensindependent.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://members.chillicotheohio.com/news/Details/u-s-paper-mill-plans-to-turn-former-pixelle-site-into-multi-industry-hub-341762","host":"members.chillicotheohio.com","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3331,"lng":-82.9824,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"operator_identity_hold":true,"verified_operator_name":null,"reported_context":"Publisher August12 correction says Chillicothe company named Aligned is not Aligned Data Centers.","independently_verified_current_operating_status":null},"notes":["Canonical operator identity stays unresolved; no transfer of Aligned Data Centers portfolio facts.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","host":"athensindependent.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Company announcement; partner name does not establish identity as Aligned Data Centers.","fields":{"announcement_date":"2026-07-02","publisher_author":"US Paper Mill Company LLC via chamber","anticipated_hpc_investment_usd":1500000000,"named_computing_partner":"Aligned","verified_legal_operator_identity":null},"notes":["Glove and aircraft jobs/revenues belong to other proposed campus activities. No final tenant, construction, AMD supply contract or current operations independently established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://members.chillicotheohio.com/news/Details/u-s-paper-mill-plans-to-turn-former-pixelle-site-into-multi-industry-hub-341762","host":"members.chillicotheohio.com","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Chillicothe · Ross · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aligned-neo-01-oh","state":"OH","kind":"facility","name":"Aligned NEO-01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Erie"],"city":"Sandusky (Perkins Township)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The same page separately describes 197-acre CMH-02 in Conesville. Generator 3 MW and UPS 2 MW are component ratings, not campus power. Design standard is not verified Uptime certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/northeast-ohio-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.4321977,"lng":-82.7189574,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"2509 Hayes Ave., Sandusky, OH 44870","campus_acres":129,"advertised_design":"Tier III standards"},"notes":["The same page separately describes 197-acre CMH-02 in Conesville. Generator 3 MW and UPS 2 MW are component ratings, not campus power. Design standard is not verified Uptime certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/northeast-ohio-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Sandusky (Perkins Township) · Erie · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"amazon-perry-township-stark-oh","state":"OH","kind":"facility","name":"Amazon Perry Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stark"],"city":"Canton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. IdeastreamApr15,2026originalreportnamesPanattoni240MWundefinedproposalFaircrestSW/KropfPerryTownshipStarkCounty100+ac. Openhouseeventnotapproval;noAmazontenantidentifiedinthissource.16qualifiedsmallbusinessesnot16permanentjobs. Health/noiseconcernsandquietestneighborpledgenotmeasuredcausality/compliance. Petitionseeking>25MWstateban notenactedlaw. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations. News5June25,2026report saysStarkRegionalPlanningCommissionapprovedPerryTownshipsite;scopeofapprovaloriginalnotreadanddoesnotprovebuildingpermit/RFS. SeparateCantonTownshipmoratoriumandCantonCityMillerton/Orchardviewproposals notsamejurisdiction/site. RelatedPerryVILLAGE/LakeCountyarticleisdistinct.18000signaturecomforttargetnotactualcollectedsignatures;ballotinitiativefuture,notcurrentstateban. Amazonidentitynotestablishedhere.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ideastream.org/environment-energy/2026-04-15/some-stark-county-residents-skeptical-of-developers-answers-on-data-center-project","host":"ideastream.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.news5cleveland.com/news/local-news/we-follow-through/as-data-center-proposals-spread-across-stark-county-neighbors-fear-whats-next","host":"news5cleveland.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7517,"lng":-81.4,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"IdeastreamApr15,2026originalreportnamesPanattoni240MWundefinedproposalFaircrestSW/KropfPerryTownshipStarkCounty100+ac. Openhouseeventnotapproval;noAmazontenantidentifiedinthissource.16qualifiedsmallbusinessesnot16permanentjobs. Health/noiseconcernsandquietestneighborpledgenotmeasuredcausality/compliance. Petitionseeking>25MWstateban notenactedlaw."},"notes":["IdeastreamApr15,2026originalreportnamesPanattoni240MWundefinedproposalFaircrestSW/KropfPerryTownshipStarkCounty100+ac. Openhouseeventnotapproval;noAmazontenantidentifiedinthissource.16qualifiedsmallbusinessesnot16permanentjobs. Health/noiseconcernsandquietestneighborpledgenotmeasuredcausality/compliance. Petitionseeking>25MWstateban notenactedlaw.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.ideastream.org/environment-energy/2026-04-15/some-stark-county-residents-skeptical-of-developers-answers-on-data-center-project","host":"ideastream.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"News5June25,2026report saysStarkRegionalPlanningCommissionapprovedPerryTownshipsite;scopeofapprovaloriginalnotreadanddoesnotprovebuildingpermit/RFS. SeparateCantonTownshipmoratoriumandCantonCityMillerton/Orchardviewproposals notsamejurisdiction/site. RelatedPerryVILLAGE/LakeCountyarticleisdistinct.18000signaturecomforttargetnotactualcollectedsignatures;ballotinitiativefuture,notcurrentstateban. Amazonidentitynotestablishedhere."},"notes":["News5June25,2026report saysStarkRegionalPlanningCommissionapprovedPerryTownshipsite;scopeofapprovaloriginalnotreadanddoesnotprovebuildingpermit/RFS. SeparateCantonTownshipmoratoriumandCantonCityMillerton/Orchardviewproposals notsamejurisdiction/site. RelatedPerryVILLAGE/LakeCountyarticleisdistinct.18000signaturecomforttargetnotactualcollectedsignatures;ballotinitiativefuture,notcurrentstateban. Amazonidentitynotestablishedhere.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.news5cleveland.com/news/local-news/we-follow-through/as-data-center-proposals-spread-across-stark-county-neighbors-fear-whats-next","host":"news5cleveland.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Canton · Stark · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"ardent-technologies-wilmington-clinton-oh","state":"OH","kind":"facility","name":"Ardent Technologies Wilmington Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clinton"],"city":"Wilmington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. No opening or construction result established. Planned referendum is not a filed or successful referendum; two developments are not one campus. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.whio.com/news/local/another-500-acres-land-zoned-second-data-center-wilmington/KXXP722G6ZD4LMQV2Z6U4UJUQE/","host":"whio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4453393,"lng":-83.8285375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"WHIO reports Wilmington council approved Ardent land rezoning five-two, separate from earlier Amazon rezoning.","independently_verified_current_operating_status":null},"notes":["No opening or construction result established. Planned referendum is not a filed or successful referendum; two developments are not one campus.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.whio.com/news/local/another-500-acres-land-zoned-second-data-center-wilmington/KXXP722G6ZD4LMQV2Z6U4UJUQE/","host":"whio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Wilmington · Clinton · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"ark-data-centers-akron-i-summit-county-oh","state":"OH","kind":"facility","name":"Ark Data Centers Akron I (fka Involta)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Summit"],"city":"Akron","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. SignalAkron original March5,2026 names BOTH Akron facilities at191E.Miller and Independence at7300E.PleasantValleyRoad; explicitly identifies Involta2024rebrand toark. Caption saysMillerRoad whereas bodyMillerAve; exactsuffix unresolved by this report. TwoAkronfacilities together exceed52,000sf, not52,000each;300racks each are notITMW. More than4.5Mestimated50%sales/usetaxbreak10years is reportedapproval, not cashpayment or totaltaxexemptionforever. 136M investment,10newjobs/1.1Mannualnewpayroll and27retainedjobs concern Akron+Independence expansion scope, not eachfacility. Min13yroperation and end2028investment/hiring obligations are conditions/forecasts, not observedcompletion. Viking150MWstatement is about a DIFFERENTcompany/site; notarkload. State127Mtaxcost/sevendatacenter/twohundredstatecounts are unverifiedsecondarycontext, not adoptedcensus. UnderlyingTaxCreditAuthorityawardnotread. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/","host":"signalakron.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.057162,"lng":-81.521388,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["SignalAkron original March5,2026 names BOTH Akron facilities at191E.Miller and Independence at7300E.PleasantValleyRoad; explicitly identifies Involta2024rebrand toark. Caption saysMillerRoad whereas bodyMillerAve; exactsuffix unresolved by this report.","TwoAkronfacilities together exceed52,000sf, not52,000each;300racks each are notITMW. More than4.5Mestimated50%sales/usetaxbreak10years is reportedapproval, not cashpayment or totaltaxexemptionforever.","136M investment,10newjobs/1.1Mannualnewpayroll and27retainedjobs concern Akron+Independence expansion scope, not eachfacility. Min13yroperation and end2028investment/hiring obligations are conditions/forecasts, not observedcompletion.","Viking150MWstatement is about a DIFFERENTcompany/site; notarkload. State127Mtaxcost/sevendatacenter/twohundredstatecounts are unverifiedsecondarycontext, not adoptedcensus. UnderlyingTaxCreditAuthorityawardnotread.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/","host":"signalakron.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Akron · Summit · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"ark-data-centers-akron-ii-summit-county-oh","state":"OH","kind":"facility","name":"Ark Data Centers Akron II (fka Involta)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Summit"],"city":"Akron","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. SignalAkron original March5,2026 names BOTH Akron facilities at191E.Miller and Independence at7300E.PleasantValleyRoad; explicitly identifies Involta2024rebrand toark. Caption saysMillerRoad whereas bodyMillerAve; exactsuffix unresolved by this report. TwoAkronfacilities together exceed52,000sf, not52,000each;300racks each are notITMW. More than4.5Mestimated50%sales/usetaxbreak10years is reportedapproval, not cashpayment or totaltaxexemptionforever. 136M investment,10newjobs/1.1Mannualnewpayroll and27retainedjobs concern Akron+Independence expansion scope, not eachfacility. Min13yroperation and end2028investment/hiring obligations are conditions/forecasts, not observedcompletion. Viking150MWstatement is about a DIFFERENTcompany/site; notarkload. State127Mtaxcost/sevendatacenter/twohundredstatecounts are unverifiedsecondarycontext, not adoptedcensus. UnderlyingTaxCreditAuthorityawardnotread. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/","host":"signalakron.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.057297,"lng":-81.521336,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["SignalAkron original March5,2026 names BOTH Akron facilities at191E.Miller and Independence at7300E.PleasantValleyRoad; explicitly identifies Involta2024rebrand toark. Caption saysMillerRoad whereas bodyMillerAve; exactsuffix unresolved by this report.","TwoAkronfacilities together exceed52,000sf, not52,000each;300racks each are notITMW. More than4.5Mestimated50%sales/usetaxbreak10years is reportedapproval, not cashpayment or totaltaxexemptionforever.","136M investment,10newjobs/1.1Mannualnewpayroll and27retainedjobs concern Akron+Independence expansion scope, not eachfacility. Min13yroperation and end2028investment/hiring obligations are conditions/forecasts, not observedcompletion.","Viking150MWstatement is about a DIFFERENTcompany/site; notarkload. State127Mtaxcost/sevendatacenter/twohundredstatecounts are unverifiedsecondarycontext, not adoptedcensus. UnderlyingTaxCreditAuthorityawardnotread.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/","host":"signalakron.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Akron · Summit · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"ark-data-centers-independence-cuyahoga-county-oh","state":"OH","kind":"facility","name":"Ark Data Centers Independence (fka Involta)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cuyahoga"],"city":"Independence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Undated City of Independence page describes a newly opened25,000sf Involta multi-tenant facility and a fiber connection to Akron. It is historical/local opening context, not an exact opening date or whole2026 operating audit. 6800BrecksvilleRoad is the CITY contact/footer address, not the data-center premises. Do not copy it into the map. City historical count of five facilities includes an operations-management agreement elsewhere; not five owned buildings or present national footprint. Current rebrand identity is separately supported by March2026 SignalAkron reporting. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification. SignalAkron original March5,2026 names BOTH Akron facilities at191E.Miller and Independence at7300E.PleasantValleyRoad; explicitly identifies Involta2024rebrand toark. Caption saysMillerRoad whereas bodyMillerAve; exactsuffix unresolved by this report. TwoAkronfacilities together exceed52,000sf, not52,000each;300racks each are notITMW. More than4.5Mestimated50%sales/usetaxbreak10years is reportedapproval, not cashpayment or totaltaxexemptionforever. 136M investment,10newjobs/1.1Mannualnewpayroll and27retainedjobs concern Akron+Independence expansion scope, not eachfacility. Min13yroperation and end2028investment/hiring obligations are conditions/forecasts, not observedcompletion. Viking150MWstatement is about a DIFFERENTcompany/site; notarkload. State127Mtaxcost/sevendatacenter/twohundredstatecounts are unverifiedsecondarycontext, not adoptedcensus. UnderlyingTaxCreditAuthorityawardnotread.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.independenceohio.org/business_resources/featured_project.php","host":"independenceohio.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/","host":"signalakron.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.360599,"lng":-81.632511,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Undated City of Independence page describes a newly opened25,000sf Involta multi-tenant facility and a fiber connection to Akron. It is historical/local opening context, not an exact opening date or whole2026 operating audit.","6800BrecksvilleRoad is the CITY contact/footer address, not the data-center premises. Do not copy it into the map.","City historical count of five facilities includes an operations-management agreement elsewhere; not five owned buildings or present national footprint. Current rebrand identity is separately supported by March2026 SignalAkron reporting.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.independenceohio.org/business_resources/featured_project.php","host":"independenceohio.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["SignalAkron original March5,2026 names BOTH Akron facilities at191E.Miller and Independence at7300E.PleasantValleyRoad; explicitly identifies Involta2024rebrand toark. Caption saysMillerRoad whereas bodyMillerAve; exactsuffix unresolved by this report.","TwoAkronfacilities together exceed52,000sf, not52,000each;300racks each are notITMW. More than4.5Mestimated50%sales/usetaxbreak10years is reportedapproval, not cashpayment or totaltaxexemptionforever.","136M investment,10newjobs/1.1Mannualnewpayroll and27retainedjobs concern Akron+Independence expansion scope, not eachfacility. Min13yroperation and end2028investment/hiring obligations are conditions/forecasts, not observedcompletion.","Viking150MWstatement is about a DIFFERENTcompany/site; notarkload. State127Mtaxcost/sevendatacenter/twohundredstatecounts are unverifiedsecondarycontext, not adoptedcensus. UnderlyingTaxCreditAuthorityawardnotread.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/","host":"signalakron.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Independence · Cuyahoga · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-cosgray-hilliard-oh","state":"OH","kind":"facility","name":"AWS Cosgray Road Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Hilliard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred city FAQ concerns the Scioto Darby Creek Road campus at 4186 Scioto Darby Creek Road. Do not assign its fuel-cell capacity, incentives or area to this different Hilliard record. Correct-site crosswalk required. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hilliardohio.gov/fuel-cells/","host":"hilliardohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.04946,"lng":-83.1761,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred city FAQ concerns the Scioto Darby Creek Road campus at 4186 Scioto Darby Creek Road. Do not assign its fuel-cell capacity, incentives or area to this different Hilliard record. Correct-site crosswalk required.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hilliardohio.gov/fuel-cells/","host":"hilliardohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Hilliard · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-crosby-court-franklin-county-oh","state":"OH","kind":"facility","name":"AWS Crosby Court Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Plain City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'275-000010'&outFields=PARCELID,SITEADDRESS,OWNERNME1,CLASSDSCRP,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.10187,"lng":-83.198633,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PARCELID":"275-000010","SITEADDRESS":"6685 - 6685 CROSBY CT","OWNERNME1":"VADATA INC","BLDGAREA":768498,"ACRES":66.82486614}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'275-000010'&outFields=PARCELID,SITEADDRESS,OWNERNME1,CLASSDSCRP,BLDGAREA,ACRES&returnCentroid=true&outSR=4326&f=json","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Plain City · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-jefferson-township-fayette-oh","state":"OH","kind":"facility","name":"AWS Fayette County (Jefferson Township)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fayette"],"city":"Jeffersonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Stakeholder account is not signed CRA agreement or observed start. County investment is within larger Ohio program, not additive to every statewide announcement; construction jobs are temporary. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://columbusconstruction.org/amazon-web-services-to-build-new-datacenter-campus-in-fayette-county/","host":"columbusconstruction.org","date":"2025-01-30","published":"2025-01-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.6534,"lng":-83.5677,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Building trades council describes planned Fayette County AWS campus, reported CRA exemption and anticipated early-2025 construction.","independently_verified_current_operating_status":null},"notes":["Stakeholder account is not signed CRA agreement or observed start. County investment is within larger Ohio program, not additive to every statewide announcement; construction jobs are temporary.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://columbusconstruction.org/amazon-web-services-to-build-new-datacenter-campus-in-fayette-county/","host":"columbusconstruction.org","date":"2025-01-30","published":"2025-01-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Jeffersonville · Fayette · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-hayden-run-hilliard-oh","state":"OH","kind":"facility","name":"AWS Hayden Run Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Hilliard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred city FAQ concerns the Scioto Darby Creek Road campus at 4186 Scioto Darby Creek Road. Do not assign its fuel-cell capacity, incentives or area to this different Hilliard record. Correct-site crosswalk required. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hilliardohio.gov/fuel-cells/","host":"hilliardohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.059949,"lng":-83.134305,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred city FAQ concerns the Scioto Darby Creek Road campus at 4186 Scioto Darby Creek Road. Do not assign its fuel-cell capacity, incentives or area to this different Hilliard record. Correct-site crosswalk required.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hilliardohio.gov/fuel-cells/","host":"hilliardohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Hilliard · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-industrial-parkway-jerome-township-oh","state":"OH","kind":"facility","name":"AWS Industrial Parkway Campus (Jerome Township)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Union"],"city":"Plain City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Union County Amazon Industrial Parkway cadastral context. Repeated joined feature rows are not three buildings. Distinct area/year attributes may represent improvements or joined assessment records; do not sum or label exact production opening. Appraised building value is tax-assessment context, not construction capex/transaction/incentive. Geometry is EPSG3857 meters, not lat/lon. No operating status or ITMW proven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www7.co.union.oh.us/unioncountyohio/rest/services/ParcelAllSaleinfoBuildingInfo/MapServer/1/query?where=ParcelNo%3D'1500220390010'&outFields=ParcelNo,DeedOwner,Address,city,township,Acreage,classDescription,yearBuilt,TotalBuildingArea,AppraisedBuildValue&f=json","host":"www7.co.union.oh.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.134553,"lng":-83.212394,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Union County Amazon Industrial Parkway cadastral context","fields":{"agency":"Union County Ohio parcel service","parcel":"1500220390010","deed_owner_as_listed":"AMAZON DATA SERVICES INC","situs_address":"8565 Industrial Parkway","postal_city":"Plain City","township":"Jerome","parcel_acres":86.18,"returned_feature_rows":3,"distinct_attribute_rows":2,"assessment_build_years":[2024,2025],"assessment_building_area_values_sqft":[151305,215144]},"notes":["Repeated joined feature rows are not three buildings. Distinct area/year attributes may represent improvements or joined assessment records; do not sum or label exact production opening. Appraised building value is tax-assessment context, not construction capex/transaction/incentive. Geometry is EPSG3857 meters, not lat/lon. No operating status or ITMW proven.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www7.co.union.oh.us/unioncountyohio/rest/services/ParcelAllSaleinfoBuildingInfo/MapServer/1/query?where=ParcelNo%3D'1500220390010'&outFields=ParcelNo,DeedOwner,Address,city,township,Acreage,classDescription,yearBuilt,TotalBuildingArea,AppraisedBuildValue&f=json","host":"www7.co.union.oh.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Plain City · Union · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-2550-beech-road-new-albany-oh","state":"OH","kind":"facility","name":"AWS New Albany (2550 Beech Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Assessed improvements/abatements are property records, not investment or incentive payments. Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111744-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.094442,"lng":-82.750086,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"parcel":"095-111744-00.000","parcel_owner":"VADATA INC","parcel_site_address":"2550 BEECH RD NW","tax_acres":67.27,"county":"Licking"},"notes":["Assessed improvements/abatements are property records, not investment or incentive payments.","Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111744-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-3180-beech-road-new-albany-oh","state":"OH","kind":"facility","name":"AWS New Albany (3180 Beech Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Assessed improvements/abatements are property records, not investment or incentive payments. 3180 street number is not present in this queried parcel. Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111618-04.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.104129,"lng":-82.750939,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"parcel":"095-111618-04.000","parcel_owner":"AMAZON DATA SERVICES INC","parcel_site_address":"BEECH RD NW","tax_acres":106.41,"county":"Licking"},"notes":["Assessed improvements/abatements are property records, not investment or incentive payments.","3180 street number is not present in this queried parcel.","Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111618-04.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-beech-road-new-albany-oh","state":"OH","kind":"facility","name":"AWS New Albany (Beech/Miller Road Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25AMAZON%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.11593,"lng":-82.75731,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":8,"cadastral_error":null,"parcel_assertions":[{"PID":93672,"Parcel":"093-106422-00.004","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"2575 NEWTON CT ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":1.64},{"PID":96925,"Parcel":"095-111408-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"BEECH RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":199.81},{"PID":93874,"Parcel":"095-111618-04.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"BEECH RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":106.41},{"PID":96928,"Parcel":"095-111648-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"MILLER RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":67.68},{"PID":96932,"Parcel":"095-111870-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"BEECH RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":0.27},{"PID":90304,"Parcel":"095-112074-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"2575 NEWTON CT ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":92.69},{"PID":96936,"Parcel":"095-112248-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"13757 MILLER RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":12.9},{"PID":96941,"Parcel":"095-112248-00.001","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"BEECH RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":71.3}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25AMAZON%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-newton-court-new-albany-oh","state":"OH","kind":"facility","name":"AWS New Albany (Newton Court)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-112074-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.093702,"lng":-82.72994,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PID":90304,"Parcel":"095-112074-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"2575 NEWTON CT ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":92.69}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-112074-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-project-cosmos-marysville-oh","state":"OH","kind":"facility","name":"AWS Project Cosmos","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Union"],"city":"Marysville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Marysville two distinct data-center projects and approval chronology. Two separate city projects; do not label Anadonna as AWS without tenant proof. First reading not final adoption day; city reports CRA approved but actual signed terms not read here. Approximate annual4Mpayroll per project not jobs count or investment. Atleast50fulltimejobs plural FAQ scope ambiguous; not assigned each. No numeric ITMW or observed commissioning. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://marysvilleohio.org/772/Data-Center-FAQs","host":"marysvilleohio.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.237,"lng":-83.35,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Marysville two distinct data-center projects and approval chronology","fields":{"agency":"City of Marysville, Ohio","named_projects":[{"operator":"AWS","project":"US33 Innovation Park","address":"14684 Industrial Parkway","site_acres_approx":55,"estimated_building_sqft_approx":500000,"estimated_investment_usd_approx":1000000000,"agency_reported_site_readiness_start":"early2026","construction_forecast_through_year":2027},{"applicant":"Anadonna LLC","project":"Marysville South","site_acres_approx":600,"estimated_building_sqft_range":[750000,1000000],"estimated_investment_usd_min_inclusive_approx":1000000000,"pud_rezoning_month":"2024-08","cra_donation_agreement_first_reading_date":"2025-11-10"}]},"notes":["Two separate city projects; do not label Anadonna as AWS without tenant proof. First reading not final adoption day; city reports CRA approved but actual signed terms not read here. Approximate annual4Mpayroll per project not jobs count or investment. Atleast50fulltimejobs plural FAQ scope ambiguous; not assigned each. No numeric ITMW or observed commissioning.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://marysvilleohio.org/772/Data-Center-FAQs","host":"marysvilleohio.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Marysville · Union · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-galaxy-sidney-oh","state":"OH","kind":"facility","name":"AWS Project Galaxy  -  Sidney, OH","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Sidney","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Advocacy/commerciallead-product tracker is not an independently examined cityagreement.180 to 350 millionforegonetax and 2.4 to 4.6 millionperjob are tracker estimates over 30 years, not cashaward/currentcost;50 millionPILOTis 15 yearcumulative, not annualreceivedrevenue. Generic 300 gpmexample is NOTGalaxywaterdemand. Source says utility/tariff undisclosed then guessesAEP 85 percentapplies; do not adopt supplier or tariff.80/100 risk is proprietary editorialscore, not measuredtechnicalrisk. January 2026 construction/2030 target are attributed and currentoperationunknown. NoMW, executedESAoractualincentiveverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://stopohiodatacenters.org/shelby-county","host":"stopohiodatacenters.org","date":"2026-04-26","published":"2026-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.29,"lng":-84.16,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"StopOhioDataCenters’ ShelbyCounty tracker describes ProjectGalaxy atSidney and reports 30 yearreal-propertyabatement/PILOT/constructionterms drawn from other reporting and cityFAQ.","independently_verified_current_operating_status":null},"notes":["Advocacy/commerciallead-product tracker is not an independently examined cityagreement.180 to 350 millionforegonetax and 2.4 to 4.6 millionperjob are tracker estimates over 30 years, not cashaward/currentcost;50 millionPILOTis 15 yearcumulative, not annualreceivedrevenue. Generic 300 gpmexample is NOTGalaxywaterdemand. Source says utility/tariff undisclosed then guessesAEP 85 percentapplies; do not adopt supplier or tariff.80/100 risk is proprietary editorialscore, not measuredtechnicalrisk. January 2026 construction/2030 target are attributed and currentoperationunknown. NoMW, executedESAoractualincentiveverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://stopohiodatacenters.org/shelby-county","host":"stopohiodatacenters.org","date":"2026-04-26","published":"2026-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Sidney · Shelby · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-scioto-darby-hilliard-oh","state":"OH","kind":"facility","name":"AWS Scioto Darby Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Hilliard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Fuel-cell generation is behind-the-meter supply, not data-center critical IT capacity. City FAQ reports a construction target, not a verified start. CRA campus scope and executed agreement need separate matching. Parcel service address 4120 differs from city fuel-cell address 4186; do not move the campus pin or overwrite the parcel address.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-002806'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://hilliardohio.gov/fuel-cells/","host":"hilliardohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.01895,"lng":-83.12439,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PARCELID":"050-002806","ACRES":143.33342767,"SITEADDRESS":"4120 SCIOTO DARBY CRK","OWNERNME1":"AMAZON DATA SERVICES INC","BLDGAREA":695120}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-002806'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"fuel_cell_generation_mw":72.9,"fuel_cell_site_address":"4186 Scioto Darby Creek Road","fuel_cell_site_acres_approx":6.4,"city_described_data_center_campus_acres":142,"fuel_cell_approval_date":"2025-09-22","fuel_cell_operation_target":"2027-09","city_described_cra_investment_requirement_usd":200000000,"cra_investment_requirement_deadline":"2026-12-31"},"notes":["Fuel-cell generation is behind-the-meter supply, not data-center critical IT capacity. City FAQ reports a construction target, not a verified start. CRA campus scope and executed agreement need separate matching. Parcel service address 4120 differs from city fuel-cell address 4186; do not move the campus pin or overwrite the parcel address.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hilliardohio.gov/fuel-cells/","host":"hilliardohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Hilliard · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-sprigg-township-adams-county-oh","state":"OH","kind":"facility","name":"AWS Sprigg Township Data Center Campus (Buck Canyon)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Adams"],"city":"Manchester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated county project FAQ. These are proposed-project forecasts, not actual water use or jobs. The page includes separate statewide jobs and unrelated restoration water benefits; excluded. Cooling circuit and consumption versus withdrawal basis need primary engineering permits. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://amazon.adamscountyoh.gov/","host":"amazon.adamscountyoh.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.63778,"lng":-83.69306,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"planned_investment_usd_minimum":10000000000,"forecast_long_term_jobs_minimum":500,"forecast_cooling_water_gallons_per_year_approx":19700000,"advertised_cooling_water_source":"Ohio River","developer_stage_as_described":"due diligence; general contractor not yet determined"},"notes":["Undated county project FAQ. These are proposed-project forecasts, not actual water use or jobs. The page includes separate statewide jobs and unrelated restoration water benefits; excluded. Cooling circuit and consumption versus withdrawal basis need primary engineering permits.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://amazon.adamscountyoh.gov/","host":"amazon.adamscountyoh.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Manchester · Adams · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-trenton-madison-st-clair-butler-oh","state":"OH","kind":"facility","name":"AWS Trenton / Madison-St. Clair Township Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butler"],"city":"Trenton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. TIF redirects tax increments; it is not automatically tax forgiveness. Competing proposed distributions are not actual receipts or final annexation; 141-acre and 600-acre schemes remain distinct. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wcpo.com/news/local-news/in-your-community/butler-county/townships-move-to-capture-future-data-center-tax-revenue-as-trenton-pursues-annexation","host":"wcpo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4808905,"lng":-84.4577222,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Journal-News reporting via WCPO describes competing township and Trenton TIF/annexation approaches for AWS land.","independently_verified_current_operating_status":null},"notes":["TIF redirects tax increments; it is not automatically tax forgiveness. Competing proposed distributions are not actual receipts or final annexation; 141-acre and 600-acre schemes remain distinct.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wcpo.com/news/local-news/in-your-community/butler-county/townships-move-to-capture-future-data-center-tax-revenue-as-trenton-pursues-annexation","host":"wcpo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Trenton · Butler · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-warner-road-jerome-township-oh","state":"OH","kind":"facility","name":"AWS Warner Road Campus (Jerome Township)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Union"],"city":"Plain City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Union County Warner Road cadastral duplicates and historical improvements. 24joinedfeaturesand7distinctattributesnot24or7independentbuildings. Repeated215k-likeareas acrossyears may be same improvement; no summed area/count. YearBuiltassessmentnotfirst data service. Appraised value not actual investment or incentives. Geometry EPSG3857notlat/lon. No current operating status or ITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www7.co.union.oh.us/unioncountyohio/rest/services/ParcelAllSaleinfoBuildingInfo/MapServer/1/query?where=ParcelNo%3D'1500300200000'&outFields=ParcelNo,DeedOwner,Address,city,township,Acreage,classDescription,yearBuilt,TotalBuildingArea,AppraisedBuildValue&f=json","host":"www7.co.union.oh.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.118607,"lng":-83.199984,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Union County Warner Road cadastral duplicates and historical improvements","fields":{"agency":"Union County Ohio parcel service","parcel":"1500300200000","deed_owner_as_listed":"AMAZON DATA SERVICES INC","situs_address":"8567 Warner Road","postal_city":"Plain City","township":"Jerome","parcel_acres":92.77,"returned_feature_rows":24,"distinct_attribute_rows":7,"assessment_build_years":[2023,2024],"assessment_area_values_sqft_unique":[900,13851,156826,214097,214507]},"notes":["24joinedfeaturesand7distinctattributesnot24or7independentbuildings. Repeated215k-likeareas acrossyears may be same improvement; no summed area/count. YearBuiltassessmentnotfirst data service. Appraised value not actual investment or incentives. Geometry EPSG3857notlat/lon. No current operating status or ITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www7.co.union.oh.us/unioncountyohio/rest/services/ParcelAllSaleinfoBuildingInfo/MapServer/1/query?where=ParcelNo%3D'1500300200000'&outFields=ParcelNo,DeedOwner,Address,city,township,Acreage,classDescription,yearBuilt,TotalBuildingArea,AppraisedBuildValue&f=json","host":"www7.co.union.oh.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Plain City · Union · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aws-wilmington-clinton-oh","state":"OH","kind":"facility","name":"AWS Wilmington Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clinton"],"city":"Wilmington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wilmington official project site and separate annexation petition. Separate545acJanuary15,2026annexation petition by four owners not automatically this471acAWSsite. Developer infrastructure25Mplus forecast not actual completed upgrades or money paid to county. Entitlement/annexation not energization. Nine planned data buildings not operational building census. Quoted current code requirements from FAQ not independent signed ordinance inspection. No ITMW or exact customer service date adopted. School compensation approval reported by agency, but executed signed agreement not independently read. Promised upfront/annual payments not actual receipts. Water6M is ANNUAL, not daily, and not guaranteed peak demand. One-million-gallon PUBLIC water tower is storage capacity, not annual DC consumption. State tax award reported but underlying award not inspected; no local CRA percentage/term guessed from first reading. Distribution/transmission assurances explicitly do not cover generation rates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.chooseclintoncountyoh.org/news/data-center-faqs","host":"chooseclintoncountyoh.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4453393,"lng":-83.8285375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Wilmington official project site and separate annexation petition","fields":{"publisher_role":"Clinton County Port Authority economic-development FAQ","project_operator":"AWS","address":"1488 SouthUS68, Wilmington, Ohio45177","project_site_acres":471,"planned_principal_data_center_buildings":9,"total_planned_building_sqft":1920299,"individual_building_sqft_range":[162787,219689],"agency_reported_annexation_approval_date":"2025-08-07","agency_reported_light_industrial_zoning_approval_date":"2025-08-07","agency_reported_dc_code_requirements_approval_date":"2025-07-17","faq_location_zoning_updated_date":"2026-03-25","developer_paid_public_infrastructure_capex_usd_min_exclusive":25000000,"minimum_expected_permanent_jobs":100,"expected_construction_jobs_min_exclusive":200,"construction_duration_years_min_inclusive":5,"expected_school_annual_revenue_usd":1000000,"agency_reported_school_compensation_approval_date":"2025-11-19","promised_upfront_city_payment_usd":1500000,"separate_port_authority_payment_usd":350000,"expected_annual_city_pilot_plus_income_tax_usd_min_exclusive":1000000,"estimated_annual_water_gallons":6000000,"water_basis":"developer projection quoted in FAQ, not metered actual","water_service_agreement_stage":"being pursued","city_public_water_tower_planned_gallons":1000000},"notes":["Separate545acJanuary15,2026annexation petition by four owners not automatically this471acAWSsite. Developer infrastructure25Mplus forecast not actual completed upgrades or money paid to county. Entitlement/annexation not energization. Nine planned data buildings not operational building census. Quoted current code requirements from FAQ not independent signed ordinance inspection. No ITMW or exact customer service date adopted.","School compensation approval reported by agency, but executed signed agreement not independently read. Promised upfront/annual payments not actual receipts. Water6M is ANNUAL, not daily, and not guaranteed peak demand. One-million-gallon PUBLIC water tower is storage capacity, not annual DC consumption. State tax award reported but underlying award not inspected; no local CRA percentage/term guessed from first reading. Distribution/transmission assurances explicitly do not cover generation rates.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.chooseclintoncountyoh.org/news/data-center-faqs","host":"chooseclintoncountyoh.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Wilmington · Clinton · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"bit-mining-viking-akron-summit-county-oh","state":"OH","kind":"facility","name":"BIT Mining / Viking Data Centers  -  Akron","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Summit"],"city":"Akron","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Viking Ohio platform and Seiberling redevelopment. Ohio-basedfacilities/portfolio scope not securely oneAkronbuilding. Power not explicit IT or observed metered load. No exactstreetmunicipality/parcelcrosswalkorcurrentBITMiningownershipproof. MarketingtransitiontoAIcapabilitynotexecutedAItenantlease. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.vikingdata.io/about-us","host":"vikingdata.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.050056,"lng":-81.473621,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Viking Ohio platform and Seiberling redevelopment","fields":{"operator":"Viking Data Centers","published_ohio_capacity_mw":150,"historical_capacity_mw_2021":20,"published_capacity_year":2024,"named_redevelopment":"428 Seiberling","operator_described_activity":"actively mining available capacity"},"notes":["Ohio-basedfacilities/portfolio scope not securely oneAkronbuilding. Power not explicit IT or observed metered load. No exactstreetmunicipality/parcelcrosswalkorcurrentBITMiningownershipproof. MarketingtransitiontoAIcapabilitynotexecutedAItenantlease.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.vikingdata.io/about-us","host":"vikingdata.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Akron · Summit · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"bitdeer-massillon-stark-county-oh","state":"OH","kind":"facility","name":"Bitdeer Massillon Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Stark"],"city":"Massillon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. White Tail Creek LLC affiliation/tenancy with Bitdeer is not established by this response. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://scgisa.starkcountyohio.gov/arcgis/rest/services/Auditor/StarkCountyParcels/MapServer/0/query?where=PIN%3D%2710018541%27&outFields=*&f=json","host":"scgisa.starkcountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.77069,"lng":-81.53947,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PIN":"10018541","SITE_ADDRESS":" 1115 INDUSTRIAL AVE SW MASSILLON OH 44647 ","ACRES":29.64,"OWNER":"WHITE TAIL CREEK LLC"}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","White Tail Creek LLC affiliation/tenancy with Bitdeer is not established by this response.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://scgisa.starkcountyohio.gov/arcgis/rest/services/Auditor/StarkCountyParcels/MapServer/0/query?where=PIN%3D%2710018541%27&outFields=*&f=json","host":"scgisa.starkcountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Massillon · Stark · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"bitdeer-shalersville-portage-county-oh","state":"OH","kind":"facility","name":"Bitdeer Shalersville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Portage"],"city":"Shalersville Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Original News5 interviews, metadata published May28,2026, identify Bitdeer contract to buy approximately257ac at Geis TurnpikeCommerceCenter Shalersville. Contract is not closedlandpurchase. Initial150MW/potential750MW have undefinedbasis and are nested, not900MWtotal. Fifteen-building concept includes two initial halls and office plus12later halls; not15built facilities or existing750MWIT. Reported350gpdwater is firstgroup projection, not full-campus actual usage. More than300Mconstruction excludes computer equipment.30 to 50initialjobs/150 to 200ultimate and2.17Mannualpropertytax with offeredshortfallmakeup are forecasts/promises, not paidtaxes/executedagreement. Reported mora until earlyNovember needs exact adoptedinstrument; no legal enddate certified. June16publicmeeting scheduled from Mayreport is historical, not a newly scheduledOctobermeeting/outcome. No currentapproval inferred. Massillon31ac/26buildings/Octobercompletiontarget refers to OTHERsite. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.news5cleveland.com/news/local-news/local-developer-global-tech-firm-plan-major-data-center-project-in-portage-county","host":"news5cleveland.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.199,"lng":-81.245,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Original News5 interviews, metadata published May28,2026, identify Bitdeer contract to buy approximately257ac at Geis TurnpikeCommerceCenter Shalersville. Contract is not closedlandpurchase.","Initial150MW/potential750MW have undefinedbasis and are nested, not900MWtotal. Fifteen-building concept includes two initial halls and office plus12later halls; not15built facilities or existing750MWIT.","Reported350gpdwater is firstgroup projection, not full-campus actual usage. More than300Mconstruction excludes computer equipment.30 to 50initialjobs/150 to 200ultimate and2.17Mannualpropertytax with offeredshortfallmakeup are forecasts/promises, not paidtaxes/executedagreement.","Reported mora until earlyNovember needs exact adoptedinstrument; no legal enddate certified. June16publicmeeting scheduled from Mayreport is historical, not a newly scheduledOctobermeeting/outcome. No currentapproval inferred. Massillon31ac/26buildings/Octobercompletiontarget refers to OTHERsite.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.news5cleveland.com/news/local-news/local-developer-global-tech-firm-plan-major-data-center-project-in-portage-county","host":"news5cleveland.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Shalersville Township · Portage · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"bristolville-25-lordstown-oh","state":"OH","kind":"facility","name":"Bristolville 25","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Trumbull"],"city":"Lordstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. DanOBrien/BusinessJournalDaily November14,2025 original report says Bristolville25DeveloperLLC/BHGHProperties petitioned OhioSupremeCourt to compel Lordstown site-plan review. Petitioners allegationsof proceduralfailure and village response about missing stormwater/utility/wetlandmaterials are opposingpositions, not a court ruling. Originaldocket/currentjudgment unread. ReportedNov3council6 to 0future-data-centerban withDec3effective date describes2025sequence; not verifiedcurrentordinance or all-later-moratorium outcome. Oct20submissionbeforeban doesnotbyitself establish vestedrights/approval. $3.6B/roughly130acres nearRoute45/ReutherDrive are proposal figures; partinJacksonTownshipMahoningCounty, not entirelyLordstown. SeparatefromSoftBank/FoxconnStargateproject. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://businessjournaldaily.com/developers-petition-ohio-supreme-court-in-lordstown-data-center-project/","host":"businessjournaldaily.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.18,"lng":-80.87,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["DanOBrien/BusinessJournalDaily November14,2025 original report says Bristolville25DeveloperLLC/BHGHProperties petitioned OhioSupremeCourt to compel Lordstown site-plan review. Petitioners allegationsof proceduralfailure and village response about missing stormwater/utility/wetlandmaterials are opposingpositions, not a court ruling. Originaldocket/currentjudgment unread.","ReportedNov3council6 to 0future-data-centerban withDec3effective date describes2025sequence; not verifiedcurrentordinance or all-later-moratorium outcome. Oct20submissionbeforeban doesnotbyitself establish vestedrights/approval. $3.6B/roughly130acres nearRoute45/ReutherDrive are proposal figures; partinJacksonTownshipMahoningCounty, not entirelyLordstown. SeparatefromSoftBank/FoxconnStargateproject.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://businessjournaldaily.com/developers-petition-ohio-supreme-court-in-lordstown-data-center-project/","host":"businessjournaldaily.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Lordstown · Trumbull · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cipher-digital-ulysses-center-township-morgan-oh","state":"OH","kind":"facility","name":"Cipher Digital Ulysses","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Morgan"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Two-hundred MW is secured power-site capacity, not verified critical IT or operating supply. Purchase price and intended initial workload undisclosed. Original utility agreements not reviewed. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theenergymag.com/news/2025-12-23/cipher-ohio-hpc-pjm","host":"theenergymag.com","date":"2025-12-23","published":"2025-12-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.63028,"lng":-81.64694,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"EnergyMag reports Cipher Ulysses Ohio land/power-site acquisition and Q42027 energization target.","independently_verified_current_operating_status":null},"notes":["Two-hundred MW is secured power-site capacity, not verified critical IT or operating supply. Purchase price and intended initial workload undisclosed. Original utility agreements not reviewed.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theenergymag.com/news/2025-12-23/cipher-ohio-hpc-pjm","host":"theenergymag.com","date":"2025-12-23","published":"2025-12-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Morgan · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cogent-akron-summit-county-oh","state":"OH","kind":"facility","name":"Cogent Data Center Akron","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Summit"],"city":"Akron","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. RegionalpagealsoincludesCleveland1621Euclid5000andCleveland22650Rockefeller5804; thosearenotAkronareaoraddresses. Spacebasisnotexplicitwhitefloor. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cogentco.com/en/cogent-cleveland/471-akron-dc","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.0876,"lng":-81.5183,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"120 N Broadway St, Akron, OH44304","operator_labeled_space_sqft":50747},"notes":["RegionalpagealsoincludesCleveland1621Euclid5000andCleveland22650Rockefeller5804; thosearenotAkronareaoraddresses. Spacebasisnotexplicitwhitefloor.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cogentco.com/en/cogent-cleveland/471-akron-dc","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Akron · Summit · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cologix-col1-columbus-oh","state":"OH","kind":"facility","name":"Cologix COL1 (Columbus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Columbus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cologix four named Columbus sites and regional context. Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/columbus/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1164761,"lng":-83.0021667,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Cologix four named Columbus sites and regional context","fields":{"named_sites":[{"code":"COL1","address":"535 Scherers Court, Columbus, Ohio"},{"code":"COL2","address":"555 Scherers Court, Columbus, Ohio"},{"code":"COL3","address":"585 Scherers Court, Columbus, Ohio","published_area_sqft":160000,"advertised_capacity_mw_min_exclusive":18,"power_basis":"not explicit critical IT"},{"code":"COL4","address":"7500 Alta View, Columbus, Ohio"}]},"notes":["Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/columbus/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Columbus · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cologix-col2-columbus-oh","state":"OH","kind":"facility","name":"Cologix COL2 (Columbus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Columbus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cologix four named Columbus sites and regional context. Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/columbus/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1164691,"lng":-83.0020077,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Cologix four named Columbus sites and regional context","fields":{"named_sites":[{"code":"COL1","address":"535 Scherers Court, Columbus, Ohio"},{"code":"COL2","address":"555 Scherers Court, Columbus, Ohio"},{"code":"COL3","address":"585 Scherers Court, Columbus, Ohio","published_area_sqft":160000,"advertised_capacity_mw_min_exclusive":18,"power_basis":"not explicit critical IT"},{"code":"COL4","address":"7500 Alta View, Columbus, Ohio"}]},"notes":["Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/columbus/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Columbus · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cologix-col3-columbus-oh","state":"OH","kind":"facility","name":"Cologix COL3 (Columbus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Columbus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cologix four named Columbus sites and regional context. Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/columbus/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1164586,"lng":-83.0017691,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Cologix four named Columbus sites and regional context","fields":{"named_sites":[{"code":"COL1","address":"535 Scherers Court, Columbus, Ohio"},{"code":"COL2","address":"555 Scherers Court, Columbus, Ohio"},{"code":"COL3","address":"585 Scherers Court, Columbus, Ohio","published_area_sqft":160000,"advertised_capacity_mw_min_exclusive":18,"power_basis":"not explicit critical IT"},{"code":"COL4","address":"7500 Alta View, Columbus, Ohio"}]},"notes":["Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/columbus/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Columbus · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cologix-col4-columbus-oh","state":"OH","kind":"facility","name":"Cologix COL4 (Columbus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Columbus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a Columbus market page. Current text does not establish COL4 site capacity or status; linked site-specific specification needs a separate review. Corporate financing headlines are unrelated. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Cologix four named Columbus sites and regional context. Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/columbus/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1178254,"lng":-83.0007799,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred source is a Columbus market page. Current text does not establish COL4 site capacity or status; linked site-specific specification needs a separate review. Corporate financing headlines are unrelated.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/columbus/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Cologix four named Columbus sites and regional context","fields":{"named_sites":[{"code":"COL1","address":"535 Scherers Court, Columbus, Ohio"},{"code":"COL2","address":"555 Scherers Court, Columbus, Ohio"},{"code":"COL3","address":"585 Scherers Court, Columbus, Ohio","published_area_sqft":160000,"advertised_capacity_mw_min_exclusive":18,"power_basis":"not explicit critical IT"},{"code":"COL4","address":"7500 Alta View, Columbus, Ohio"}]},"notes":["Regional uptime/network counts not independent measured performance of each site. COL3 operator certification claim not independently checked in certifier register. Preleasing COL7/COL8 in Johnstown does not establish operations or new base records; COL5 distinct not assigned to these four IDs.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/columbus/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Columbus · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cologix-col5-orange-township-delaware-county-oh","state":"OH","kind":"facility","name":"Cologix COL5","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Delaware"],"city":"Lewis Center","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cologix COL5 county-hosted secondary report. Countyhostingdoesnotmakethisprimarypermit/engineeringrecord. Newspaperreportquotescompanyforecasts;notactualspent,currentRFSorcurrenttenantlease.120MWcampusnotperbuilding. Separate154acJohnstownandfourpriorColumbuscentersotherprojects. DelawareCOUNTYOhio notDelawarestate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://regionalplanning.co.delaware.oh.us/wp-content/uploads/sites/17/2025/06/ORA-Cologix-starts-work-06.18.25.pdf","host":"regionalplanning.co.delaware.oh.us","date":"2025-06-18","published":"2025-06-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.190863,"lng":-83.011113,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Cologix COL5 county-hosted secondary report","fields":{"publisher_role":"Columbus Dispatch newspaper article hosted by county planning agency","article_author":"Jim Weiker","article_updated_date":"2025-06-18","project":"Cologix COL5","locality":"Green MeadowsDrive and HomeRoad, Orange Township, Delaware County, Ohio","reported_site_acres":28,"reported_planned_investment_usd":1000000000,"reported_eventual_capacity_mw":120,"power_basis":"reported capacity, not explicitly critical IT","reported_initial_phase_sqft":135000,"reported_initial_phase_completion_target":"fall2026"},"notes":["Countyhostingdoesnotmakethisprimarypermit/engineeringrecord. Newspaperreportquotescompanyforecasts;notactualspent,currentRFSorcurrenttenantlease.120MWcampusnotperbuilding. Separate154acJohnstownandfourpriorColumbuscentersotherprojects. DelawareCOUNTYOhio notDelawarestate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://regionalplanning.co.delaware.oh.us/wp-content/uploads/sites/17/2025/06/ORA-Cologix-starts-work-06.18.25.pdf","host":"regionalplanning.co.delaware.oh.us","date":"2025-06-18","published":"2025-06-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Lewis Center · Delaware · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cologix-johnstown-oh","state":"OH","kind":"facility","name":"Cologix Johnstown AI-Ready Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"Johnstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Potential800MWnot energized. ExistingColumbus500k/80MWportfolio not Johnstowncampus.525Msecuritizationnav not siteinvestment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/","host":"cologix.com","date":"2024-11-20","published":"2024-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.15,"lng":-82.68,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_investment_usd_min_exclusive":7000000000,"land_acres_approx":154,"full_build_planned_buildings":8,"potential_campus_capacity_mw":800,"power_basis":"potential capacity, not explicitlyIT","planned_campus_area_sqft":2000000,"first_phase_development_start_target_year":2025},"notes":["Potential800MWnot energized. ExistingColumbus500k/80MWportfolio not Johnstowncampus.525Msecuritizationnav not siteinvestment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/","host":"cologix.com","date":"2024-11-20","published":"2024-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Johnstown · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cyrusone-cin2-cincinnati-oh","state":"OH","kind":"facility","name":"CyrusOne CIN2 (Cincinnati)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hamilton"],"city":"Cincinnati","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator specification, not measured consumption or an independently audited claim of zero water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/cincinnati-ohio","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.1027886,"lng":-84.5179229,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"technical_it_space_sqft":143778,"total_it_capacity_mw":11,"cooling_design":"closed loop chilled water with redundant makeup feeds"},"notes":["Operator specification, not measured consumption or an independently audited claim of zero water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/cincinnati-ohio","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Cincinnati · Hamilton · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cyrusone-new-albany-col1-licking-county-oh","state":"OH","kind":"facility","name":"CyrusOne New Albany COL-1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"Johnstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Address-number query returns two different streets and owners. Only the Jug Street/C1 New Albany parcel is an identity candidate; do not merge the Johnstown-Utica property or add both acres. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=SiteAddress+LIKE+%27%2512181%25%27&outFields=*&returnGeometry=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.09294,"lng":-82.718059,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":2,"cadastral_error":null,"parcel_assertions":[{"PID":36887,"Parcel":"052-173028-00.000","OwnerName":"SPHERE PROPERTIES LLC","SiteAddress":"12181 JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":1.78},{"PID":95785,"Parcel":"095-112236-00.000","OwnerName":"C1 NEW ALBANY LLC","SiteAddress":"12181 JUG STREET RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":89.81}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Address-number query returns two different streets and owners. Only the Jug Street/C1 New Albany parcel is an identity candidate; do not merge the Johnstown-Utica property or add both acres.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=SiteAddress+LIKE+%27%2512181%25%27&outFields=*&returnGeometry=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Johnstown · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"databank-cleveland-cle1-oh","state":"OH","kind":"facility","name":"DataBank Cleveland (CLE1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cuyahoga"],"city":"Cleveland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Carrier-hotel tenant suite; group with building, not whole-building metrics. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/cleveland/1255-euclid-ave/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.4998,"lng":-81.6829,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"CLE1","street":"1255 Euclid Ave Suite200","city":"Cleveland","critical_it_capacity_mw":0.4,"it_area_sqft":7440,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Carrier-hotel tenant suite; group with building, not whole-building metrics.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/cleveland/1255-euclid-ave/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Cleveland · Cuyahoga · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"datayard-dayton-oh","state":"OH","kind":"facility","name":"DataYard Dayton Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Dayton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DataYard exact data-center versus office address. Explicitdatacenterversusofficeaddressesdistinct.0percent/0.000percentdynamiccountersuninitializednotrealzeroSLAorcustomersatisfaction. No numericITMWorarea. Do nottestnewsletter/webinarforms. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datayard.us/contact/","host":"datayard.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.7602255,"lng":-84.1953733,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"DataYard exact data-center versus office address","fields":{"operator":"DataYard","data_center_address":"130 WestSecondStreet, Suite250, Dayton, Ohio45402","administrative_office_address":"31 SouthMainStreet, Suite356, Dayton, Ohio45402"},"notes":["Explicitdatacenterversusofficeaddressesdistinct.0percent/0.000percentdynamiccountersuninitializednotrealzeroSLAorcustomersatisfaction. No numericITMWorarea. Do nottestnewsletter/webinarforms.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datayard.us/contact/","host":"datayard.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Dayton · Montgomery · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"lakeland-equity-east-55th-cleveland-oh","state":"OH","kind":"facility","name":"East 55th Street Data Center (Slavic Village)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cuyahoga"],"city":"Cleveland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Publication date conflicts between URL and malformed visible timestamp and stays unknown. The 1.6-billion-USD plan includes one billion in construction, not an additional billion. Google is an image credit, not a tenant. Permit application, possible river/tunnel water sources and legacy remediation clearance are not construction approval or water rights. A proposed ballot ban is not law. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://neo-trans.blog/2026/05/06/1-6b-data-center-planned-in-cleveland/","host":"neo-trans.blog","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.461694,"lng":-81.651208,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"NEOtrans describes Lakeland Equity's proposed three-building East 55th Cleveland project, with about 300,000 square feet and 150 MW of unspecified basis.","independently_verified_current_operating_status":null},"notes":["Publication date conflicts between URL and malformed visible timestamp and stays unknown. The 1.6-billion-USD plan includes one billion in construction, not an additional billion. Google is an image credit, not a tenant. Permit application, possible river/tunnel water sources and legacy remediation clearance are not construction approval or water rights. A proposed ballot ban is not law.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://neo-trans.blog/2026/05/06/1-6b-data-center-planned-in-cleveland/","host":"neo-trans.blog","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Cleveland · Cuyahoga · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"edgeconnex-mcn-new-albany-licking-county-oh","state":"OH","kind":"facility","name":"EdgeConneX MCN New Albany (South Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25EDGECONNEX%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.08878,"lng":-82.72274,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":17,"cadastral_error":null,"parcel_assertions":[{"PID":37146,"Parcel":"052-173658-00.000","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":35.2},{"PID":37147,"Parcel":"052-173658-00.002","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":4.0},{"PID":37148,"Parcel":"052-173658-00.003","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"13490 GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":2.53},{"PID":37149,"Parcel":"052-173658-00.004","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":2.53},{"PID":37150,"Parcel":"052-173658-00.005","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":2.53},{"PID":37151,"Parcel":"052-173658-00.006","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":1.33},{"PID":37152,"Parcel":"052-173664-00.000","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"13151 JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":79.86},{"PID":37357,"Parcel":"052-174306-00.000","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"13399 JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":0.75},{"PID":37649,"Parcel":"052-176184-00.000","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"13399 JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":1.0},{"PID":37650,"Parcel":"052-176184-00.001","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":1.33},{"PID":37651,"Parcel":"052-176184-00.002","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":1.33},{"PID":37652,"Parcel":"052-176184-00.004","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":3.99},{"PID":95774,"Parcel":"093-107490-00.002","OwnerName":"EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC","SiteAddress":"INNOVATION CAMPUS WAY ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":14.78},{"PID":96257,"Parcel":"095-111720-00.000","OwnerName":"EDGECONNEX MCN NEW ALBANY NORTH PROPCO 1 LLC","SiteAddress":"3356 CLOVER VALLEY RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":170.29},{"PID":96920,"Parcel":"095-112056-00.006","OwnerName":"EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC","SiteAddress":"12525 JUG STREET RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":9.28},{"PID":91103,"Parcel":"095-112080-02.001","OwnerName":"EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC","SiteAddress":"9850 INNOVATION CAMPUS WAY ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":33.86},{"PID":95687,"Parcel":"095-112188-00.000","OwnerName":"EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC","SiteAddress":"2465 CLOVER VALLEY RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":39.61}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25EDGECONNEX%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"edged-columbus-new-albany-oh","state":"OH","kind":"facility","name":"Edged Columbus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. ReleaseSeptember11saysopeningyesterday. Criticalcapacityspecificationnotmeasuredload.92Mgallonswatersavingscomparedtoconventionaldesignnotactualwaterwithdrawal;1.15PUEportfolioaverage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edged.us/news/columbus-grand-opening","host":"edged.us","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.10608,"lng":-82.81578,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"opening_event_date":"2025-09-10","critical_capacity_mw":24,"published_city":"New Albany, Ohio"},"notes":["ReleaseSeptember11saysopeningyesterday. Criticalcapacityspecificationnotmeasuredload.92Mgallonswatersavingscomparedtoconventionaldesignnotactualwaterwithdrawal;1.15PUEportfolioaverage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edged.us/news/columbus-grand-opening","host":"edged.us","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"expedient-cmh1-upper-arlington-oh","state":"OH","kind":"facility","name":"Expedient CMH1 (Upper Arlington)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Upper Arlington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Columbus three sites with explicit critical IT scope. 13.4MWis regional three-site total, not each building.10/6/3.5MWgenerators separate from IT. Published area categories not interchangeable; suite/building IDs need precise parcel crosswalk. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://expedient.com/data-centers/columbus/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.0578366,"lng":-83.078426,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Expedient Columbus three sites with explicit critical IT scope","fields":{"sites":[{"code":"CMH1","address":"5000 Arlington Centre Boulevard, Building One, Upper Arlington, OH43220","critical_it_mw":1.6,"gross_sqft":21591,"raised_floor_sqft":9300},{"code":"CMH2","address":"5700 Innovation Drive, Dublin, OH43016","critical_it_mw":4.8,"gross_sqft":29208,"raised_floor_sqft":10500},{"code":"CMH3","address":"281 E Powell Road, Lewis Center, OH43035","critical_it_mw":7,"gross_sqft":102000,"raised_floor_sqft":39600}],"regional_critical_it_mw":13.4},"notes":["13.4MWis regional three-site total, not each building.10/6/3.5MWgenerators separate from IT. Published area categories not interchangeable; suite/building IDs need precise parcel crosswalk.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://expedient.com/data-centers/columbus/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Upper Arlington · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"expedient-cmh2-dublin-oh","state":"OH","kind":"facility","name":"Expedient CMH2 (Dublin)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Dublin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Columbus three sites with explicit critical IT scope. 13.4MWis regional three-site total, not each building.10/6/3.5MWgenerators separate from IT. Published area categories not interchangeable; suite/building IDs need precise parcel crosswalk. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://expedient.com/data-centers/columbus/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.0907697,"lng":-83.1539198,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Expedient Columbus three sites with explicit critical IT scope","fields":{"sites":[{"code":"CMH1","address":"5000 Arlington Centre Boulevard, Building One, Upper Arlington, OH43220","critical_it_mw":1.6,"gross_sqft":21591,"raised_floor_sqft":9300},{"code":"CMH2","address":"5700 Innovation Drive, Dublin, OH43016","critical_it_mw":4.8,"gross_sqft":29208,"raised_floor_sqft":10500},{"code":"CMH3","address":"281 E Powell Road, Lewis Center, OH43035","critical_it_mw":7,"gross_sqft":102000,"raised_floor_sqft":39600}],"regional_critical_it_mw":13.4},"notes":["13.4MWis regional three-site total, not each building.10/6/3.5MWgenerators separate from IT. Published area categories not interchangeable; suite/building IDs need precise parcel crosswalk.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://expedient.com/data-centers/columbus/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Dublin · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"expedient-cmh3-lewis-center-oh","state":"OH","kind":"facility","name":"Expedient CMH3 (Lewis Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Delaware"],"city":"Lewis Center","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Columbus three sites with explicit critical IT scope. 13.4MWis regional three-site total, not each building.10/6/3.5MWgenerators separate from IT. Published area categories not interchangeable; suite/building IDs need precise parcel crosswalk. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://expedient.com/data-centers/columbus/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1533067,"lng":-82.9614584,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Expedient Columbus three sites with explicit critical IT scope","fields":{"sites":[{"code":"CMH1","address":"5000 Arlington Centre Boulevard, Building One, Upper Arlington, OH43220","critical_it_mw":1.6,"gross_sqft":21591,"raised_floor_sqft":9300},{"code":"CMH2","address":"5700 Innovation Drive, Dublin, OH43016","critical_it_mw":4.8,"gross_sqft":29208,"raised_floor_sqft":10500},{"code":"CMH3","address":"281 E Powell Road, Lewis Center, OH43035","critical_it_mw":7,"gross_sqft":102000,"raised_floor_sqft":39600}],"regional_critical_it_mw":13.4},"notes":["13.4MWis regional three-site total, not each building.10/6/3.5MWgenerators separate from IT. Published area categories not interchangeable; suite/building IDs need precise parcel crosswalk.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://expedient.com/data-centers/columbus/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Lewis Center · Delaware · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"flexential-cincinnati-cin01-02-oh","state":"OH","kind":"facility","name":"Flexential Cincinnati (CIN01/02)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butler"],"city":"West Chester Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.3159313,"lng":-84.4494638,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Cincinnati (CIN01/02)","publisher_reported_footprint_sqft":43551,"publisher_reported_critical_power_mw":3.8,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · West Chester Township · Butler · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"google-lancaster-oh","state":"OH","kind":"facility","name":"Google Lancaster Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfield"],"city":"Lancaster","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Ohio statewide page. 20B+state total cannot be copied to Lancaster and NewAlbany independently. Cloud region opening is a service region, not exact physical building commissioning. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/ohio/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.72057,"lng":-82.68839,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Ohio statewide page","fields":{"new_albany_construction_start_year":2019,"regional_investment_usd_min_exclusive":20000000000,"investment_scope":"Ohio statewide; New Albany, Lancaster and Columbus"},"notes":["20B+state total cannot be copied to Lancaster and NewAlbany independently. Cloud region opening is a service region, not exact physical building commissioning.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/ohio/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Lancaster · Fairfield · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"google-new-albany-oh","state":"OH","kind":"facility","name":"Google New Albany Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Montauk Innovations LLC affiliation with Google is not established by this cadastral response. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Ohio statewide page. 20B+state total cannot be copied to Lancaster and NewAlbany independently. Cloud region opening is a service region, not exact physical building commissioning.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'222-004984'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://datacenters.google/locations/ohio/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.05832,"lng":-82.77106,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PARCELID":"222-004984","ACRES":221.89582397,"SITEADDRESS":"5266 BABBITT RD","OWNERNME1":"MONTAUK INNOVATIONS LLC","BLDGAREA":811338}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Montauk Innovations LLC affiliation with Google is not established by this cadastral response.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'222-004984'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Ohio statewide page","fields":{"new_albany_construction_start_year":2019,"regional_investment_usd_min_exclusive":20000000000,"investment_scope":"Ohio statewide; New Albany, Lancaster and Columbus"},"notes":["20B+state total cannot be copied to Lancaster and NewAlbany independently. Cloud region opening is a service region, not exact physical building commissioning.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/ohio/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"google-bosc-lima-oh","state":"OH","kind":"facility","name":"Google Project BOSC (Lima)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allen"],"city":"Lima","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Google Allen County developer and economic-development project site. Developer/EDO project site, not signed CRA or tax-offset contract. Annual250000for15years is commitment description, not15years of actual receipts.500Mcampus and50Minfrastructure scope overlap not settled, do not add as550Mconfirmed. Current construction wording ambiguous between utilities/site prep and buildings. Generic global efficiency stats not site-measured water or ITMW. Lima market name not city boundary. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.allencountydatacenter.com/","host":"allencountydatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.744,"lng":-84.1052,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Google Allen County developer and economic-development project site","fields":{"operator_named_project":"Allen County Data Center, Project BOSC","operator_announced_identity_date":"2026-03-16","published_locality":"American Township, Allen County, Ohio","planned_capital_investment_usd":500000000,"planned_data_center_buildings":2,"anticipated_infrastructure_costs_usd":50000000,"developer_described_school_annual_offset_usd":250000,"school_offset_term_years":15,"school_partner":"Elida Local Schools","status_text_conflict":["construction anticipated late2026","construction underway, utilities being brought to site"]},"notes":["Developer/EDO project site, not signed CRA or tax-offset contract. Annual250000for15years is commitment description, not15years of actual receipts.500Mcampus and50Minfrastructure scope overlap not settled, do not add as550Mconfirmed. Current construction wording ambiguous between utilities/site prep and buildings. Generic global efficiency stats not site-measured water or ITMW. Lima market name not city boundary.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.allencountydatacenter.com/","host":"allencountydatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Lima · Allen · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"h5-data-centers-cincinnati-gest-oh","state":"OH","kind":"facility","name":"H5 Data Centers Cincinnati I","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hamilton"],"city":"Cincinnati","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Page has a stray CincinnatiII tour sentence. Identity/address and main heading are CincinnatiI; do not merge the two sites or adopt undated advertised electricity prices as a tariff. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/cincinnati-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0981558,"lng":-84.5261021,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"360 Gest Street, Cincinnati, OH 45203","operator_offering":"Cincinnati I powered shell/private suites","utility_as_stated":"Duke Energy"},"notes":["Page has a stray CincinnatiII tour sentence. Identity/address and main heading are CincinnatiI; do not merge the two sites or adopt undated advertised electricity prices as a tariff.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/cincinnati-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Cincinnati · Hamilton · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"h5-data-centers-cleveland-rockwell-oh","state":"OH","kind":"facility","name":"H5 Data Centers Cleveland","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cuyahoga"],"city":"Cleveland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Advertised sales-tax abatement/first-qualified claim lacks a reviewed government award here. No monetary incentive value inferred. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/cleveland-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5063269,"lng":-81.683262,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"1625 Rockwell Ave, Cleveland, OH 44114","advertised_colocation_facility_sqft":351000},"notes":["Advertised sales-tax abatement/first-qualified claim lacks a reviewed government award here. No monetary incentive value inferred.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/cleveland-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Cleveland · Cuyahoga · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"logistix-hamilton-innovation-center-butler-county-oh","state":"OH","kind":"facility","name":"Hamilton Innovation Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butler"],"city":"Hamilton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Providing design and will-feature language describe a plan. The over-100-MW basis is unspecified. Tier III/N+1 concept is not independent certification or readiness. Logistix is not established as operator in this source, and no actual opening is given. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://waremalcomb.com/projects/hamilton-innovation-center/","host":"waremalcomb.com","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3995,"lng":-84.5613,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Ware Malcomb describes its design work for Hamilton Innovation Center, planned at about 310,000 square feet on 15 acres with a two-acre substation inside the site.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["Providing design and will-feature language describe a plan. The over-100-MW basis is unspecified. Tier III/N+1 concept is not independent certification or readiness. Logistix is not established as operator in this source, and no actual opening is given.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://waremalcomb.com/projects/hamilton-innovation-center/","host":"waremalcomb.com","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Hamilton · Butler · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"strata-hanging-rock-haverhill-data-center-oh","state":"OH","kind":"facility","name":"Hanging Rock / Haverhill Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lawrence"],"city":"Hanging Rock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Precise Hanging Rock/Haverhill footprint and actual operating status unresolved. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","host":"athensindependent.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.567639,"lng":-82.781751,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Strata Hanging Rock project described as prospective AI campus with generation/cooling claims.","independently_verified_current_operating_status":null},"notes":["Precise Hanging Rock/Haverhill footprint and actual operating status unresolved.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","host":"athensindependent.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Hanging Rock · Lawrence · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"cipher-digital-hashworks-waterford-washington-oh","state":"OH","kind":"facility","name":"HashWorks Powered Land  -  Waterford Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Baseline combined Cipher/HashWorks identity needs splitting/crosswalk. Registered withdrawal capacity is not daily water consumption. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Public DocumentCloud metadata/index readable, two-page document body not manually reviewed.. Metadata does not verify statement contents. Web-tool request returned403; no alternate restricted-content retrieval attempted. Source report separately distinguishes Waterford from Morgan County Cipher proposal.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","host":"athensindependent.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.documentcloud.org/documents/28540731-cipher-digital-public-statement/","host":"documentcloud.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.55139,"lng":-81.64944,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"operator_identity_hold":true,"verified_operator_name":null,"reported_context":"Article distinguishes HashWorks Waterford from Cipher Center Township in Morgan County.","independently_verified_current_operating_status":null},"notes":["Baseline combined Cipher/HashWorks identity needs splitting/crosswalk. Registered withdrawal capacity is not daily water consumption.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://athensindependent.com/data-centers-across-appalachian-ohio/","host":"athensindependent.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Public DocumentCloud metadata/index readable, two-page document body not manually reviewed.","fields":{},"notes":["Metadata does not verify statement contents. Web-tool request returned403; no alternate restricted-content retrieval attempted. Source report separately distinguishes Waterford from Morgan County Cipher proposal.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.documentcloud.org/documents/28540731-cipher-digital-public-statement/","host":"documentcloud.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Washington · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"lumen-akron-2-oh","state":"OH","kind":"facility","name":"Lumen Akron 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Summit"],"city":"Akron","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The report says existing facilities and expansions are excluded, but the original ordinance scope is not independently reviewed. Viking's separate site and company capacity claims are not Lumen facts. North American fleet counts are not United States site totals. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://signalakron.org/future-data-centers-in-akron-may-face-new-review-process/","host":"signalakron.org","date":"2026-06-29","published":"2026-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.0695694,"lng":-81.4907582,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Signal Akron's July 28 editor note reports council approval of the review process on July 27, superseding the future tense in the June story. A caption identifies Lumen at 110 South Arlington.","independently_verified_current_operating_status":null},"notes":["The report says existing facilities and expansions are excluded, but the original ordinance scope is not independently reviewed. Viking's separate site and company capacity claims are not Lumen facts. North American fleet counts are not United States site totals.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://signalakron.org/future-data-centers-in-akron-may-face-new-review-process/","host":"signalakron.org","date":"2026-06-29","published":"2026-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Akron · Summit · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"mara-findlay-oh","state":"OH","kind":"facility","name":"MARA Findlay Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hancock"],"city":"Findlay","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. MARA historical Findlay versus Ohio portfolio power. 372MWwholeOhioportfolioincludes150Findlayand222otheracquiredsites,notFindlayalone.152operationalincludes30Findlayand122others;historical2024notcurrent2026.222includes100expansionnotalloperating.270USD/kWacquisitionmultiplebasisnotconstructioncapexorcustomelectricrate. No observed2025targetfulfillmentorcriticalITlabel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1375/mara-adds-372-megawatts-of-capacity-in-ohio-with-152-megawatts-operational-and-220-megawatts-in-development","host":"ir.mara.com","date":"2024-11-11","published":"2024-11-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.0442,"lng":-83.6499,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"MARA historical Findlay versus Ohio portfolio power","fields":{"issuer":"MARA","announcement_date":"2024-11-11","findlay_planned_capacity_mw":150,"findlay_reported_existing_capacity_mw_at_announcement":30,"historical_full_energization_target":"end2025","three_ohio_sites_total_interconnect_approved_capacity_mw":372,"three_sites_operational_at_announcement_mw":152,"three_sites_in_development_at_announcement_mw":220,"other_acquired_sites":["Hannibal","Hopedale"],"other_two_sites_combined_interconnect_approved_mw":222,"other_sites_acquisition_date":"2024-11-05"},"notes":["372MWwholeOhioportfolioincludes150Findlayand222otheracquiredsites,notFindlayalone.152operationalincludes30Findlayand122others;historical2024notcurrent2026.222includes100expansionnotalloperating.270USD/kWacquisitionmultiplebasisnotconstructioncapexorcustomelectricrate. No observed2025targetfulfillmentorcriticalITlabel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1375/mara-adds-372-megawatts-of-capacity-in-ohio-with-152-megawatts-operational-and-220-megawatts-in-development","host":"ir.mara.com","date":"2024-11-11","published":"2024-11-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Findlay · Hancock · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"mara-hannibal-monroe-oh","state":"OH","kind":"facility","name":"MARA Hannibal Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Monroe"],"city":"Hannibal","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. MARANov11,2024issuerreportsNov5closingHannibal/Hopedaletwosites.222MWINTERCONNECTAPPROVEDcombined,122MWthenoperatingcombined,100MWremainingexpansion;noindividualsplit. SeparateFindlay150MWplan,30MWthenoperatingcreates372approved/152operating/220developmentAGGREGATE. Not372MWineachsite,notallAIIT. End2025targetnotobserved2026energization.270USD/kWacquisitionmultiple=270000USD/MW,not270Mcapex. Hopedalepreviouslyhostednowacquired;potential50%costsavingnotactualmeteredresult. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1375/mara-adds-372-megawatts-of-capacity-in-ohio-with-152-megawatts-operational-and-220-megawatts-in-development","host":"ir.mara.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.6675,"lng":-80.8721,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"MARANov11,2024issuerreportsNov5closingHannibal/Hopedaletwosites.222MWINTERCONNECTAPPROVEDcombined,122MWthenoperatingcombined,100MWremainingexpansion;noindividualsplit. SeparateFindlay150MWplan,30MWthenoperatingcreates372approved/152operating/220developmentAGGREGATE. Not372MWineachsite,notallAIIT. End2025targetnotobserved2026energization.270USD/kWacquisitionmultiple=270000USD/MW,not270Mcapex. Hopedalepreviouslyhostednowacquired;potential50%costsavingnotactualmeteredresult."},"notes":["MARANov11,2024issuerreportsNov5closingHannibal/Hopedaletwosites.222MWINTERCONNECTAPPROVEDcombined,122MWthenoperatingcombined,100MWremainingexpansion;noindividualsplit. SeparateFindlay150MWplan,30MWthenoperatingcreates372approved/152operating/220developmentAGGREGATE. Not372MWineachsite,notallAIIT. End2025targetnotobserved2026energization.270USD/kWacquisitionmultiple=270000USD/MW,not270Mcapex. Hopedalepreviouslyhostednowacquired;potential50%costsavingnotactualmeteredresult.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1375/mara-adds-372-megawatts-of-capacity-in-ohio-with-152-megawatts-operational-and-220-megawatts-in-development","host":"ir.mara.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Hannibal · Monroe · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"mara-hopedale-harrison-oh","state":"OH","kind":"facility","name":"MARA Hopedale Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Harrison"],"city":"Hopedale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. MARANov11,2024issuerreportsNov5closingHannibal/Hopedaletwosites.222MWINTERCONNECTAPPROVEDcombined,122MWthenoperatingcombined,100MWremainingexpansion;noindividualsplit. SeparateFindlay150MWplan,30MWthenoperatingcreates372approved/152operating/220developmentAGGREGATE. Not372MWineachsite,notallAIIT. End2025targetnotobserved2026energization.270USD/kWacquisitionmultiple=270000USD/MW,not270Mcapex. Hopedalepreviouslyhostednowacquired;potential50%costsavingnotactualmeteredresult. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1375/mara-adds-372-megawatts-of-capacity-in-ohio-with-152-megawatts-operational-and-220-megawatts-in-development","host":"ir.mara.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.3253,"lng":-80.9012,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"MARANov11,2024issuerreportsNov5closingHannibal/Hopedaletwosites.222MWINTERCONNECTAPPROVEDcombined,122MWthenoperatingcombined,100MWremainingexpansion;noindividualsplit. SeparateFindlay150MWplan,30MWthenoperatingcreates372approved/152operating/220developmentAGGREGATE. Not372MWineachsite,notallAIIT. End2025targetnotobserved2026energization.270USD/kWacquisitionmultiple=270000USD/MW,not270Mcapex. Hopedalepreviouslyhostednowacquired;potential50%costsavingnotactualmeteredresult."},"notes":["MARANov11,2024issuerreportsNov5closingHannibal/Hopedaletwosites.222MWINTERCONNECTAPPROVEDcombined,122MWthenoperatingcombined,100MWremainingexpansion;noindividualsplit. SeparateFindlay150MWplan,30MWthenoperatingcreates372approved/152operating/220developmentAGGREGATE. Not372MWineachsite,notallAIIT. End2025targetnotobserved2026energization.270USD/kWacquisitionmultiple=270000USD/MW,not270Mcapex. Hopedalepreviouslyhostednowacquired;potential50%costsavingnotactualmeteredresult.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1375/mara-adds-372-megawatts-of-capacity-in-ohio-with-152-megawatts-operational-and-220-megawatts-in-development","host":"ir.mara.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Hopedale · Harrison · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"meta-middleton-township-oh","state":"OH","kind":"facility","name":"Meta Bowling Green (Project Accordion)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wood"],"city":"Bowling Green","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Meta Ohio announced campus scope. BowlingGreen market name is not evidence of Kentucky location or exact city boundary. Future forecasts not current spend/jobs. Ordinal24thUS/28thglobal belongs to announcement date, not current physical-building count. Renewable matching intent and planned operational LEED claims not achieved certification or IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2025/04/hello-bowling-green/","host":"datacenters.atmeta.com","date":"2025-04-09","published":"2025-04-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.432,"lng":-83.701,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Meta Ohio announced campus scope","fields":{"announcement_date":"2025-04-09","operator_site_name":"Bowling Green Data Center","published_locality":"Middleton Township, Wood County, Ohio","planned_campus_area_sqft":715000,"planned_investment_usd_min_exclusive":800000000,"expected_operational_jobs_approx":100,"expected_peak_construction_jobs_min_exclusive":1000},"notes":["BowlingGreen market name is not evidence of Kentucky location or exact city boundary. Future forecasts not current spend/jobs. Ordinal24thUS/28thglobal belongs to announcement date, not current physical-building count. Renewable matching intent and planned operational LEED claims not achieved certification or IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2025/04/hello-bowling-green/","host":"datacenters.atmeta.com","date":"2025-04-09","published":"2025-04-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Bowling Green · Wood · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"meta-prometheus-new-albany-oh","state":"OH","kind":"facility","name":"Meta Prometheus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The visible publication date is November 17, not the November 13 URL. Gigawatt-scale, world-first, no-grid-use and no-rate-impact statements are plans or attributed claims, not verified operating metrics or guarantees. Temporary construction jobs are not permanent jobs; no completed generation or power agreement is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-","host":"spectrumnews1.com","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.092,"lng":-82.836,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Spectrum News reports ongoing Prometheus construction and officials' plans for on-site gas generation at Meta's New Albany campus.","independently_verified_current_operating_status":null},"notes":["The visible publication date is November 17, not the November 13 URL. Gigawatt-scale, world-first, no-grid-use and no-rate-impact statements are plans or attributed claims, not verified operating metrics or guarantees. Temporary construction jobs are not permanent jobs; no completed generation or power agreement is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-","host":"spectrumnews1.com","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"microsoft-heath-oh","state":"OH","kind":"facility","name":"Microsoft Heath Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"Heath","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization. Future tree-removal or work-hour text does not establish a new hearing or current road closure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/blog/heath-datacenter-construction-updates/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.015,"lng":-82.46,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"latest_dated_update":"2026-07","reported_activity":"Summer site preparation, grading, stormwater controls and fencing; substation work expected to begin.","general_contractor":"Ames Construction","vertical_construction_schedule":"Not determined/awaiting detail in March2026 update.","older_mass_grading_forecast":"February through November2026","actual_operational_date":null,"reported_access":"Thornwood Drive construction entrance; second off Lees Road planned"},"notes":["Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization.","Future tree-removal or work-hour text does not establish a new hearing or current road closure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/blog/heath-datacenter-construction-updates/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Heath · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"microsoft-hebron-oh","state":"OH","kind":"facility","name":"Microsoft Hebron Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"Hebron","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization. Future tree-removal or work-hour text does not establish a new hearing or current road closure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/blog/hebron-datacenter-construction-update/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.01,"lng":-82.5,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"latest_dated_update":"2026-07","reported_activity":"Summer site preparation, grading, stormwater controls and fencing; substation work expected to begin.","general_contractor":"Ames Construction","vertical_construction_schedule":"Not determined/awaiting detail in March2026 update.","older_mass_grading_forecast":"February through November2026","actual_operational_date":null,"reported_access":"Temporary Canyon Road entrance; permanent east entrance by industrial park planned"},"notes":["Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization.","Future tree-removal or work-hour text does not establish a new hearing or current road closure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/blog/hebron-datacenter-construction-update/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Hebron · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"db-stu-mount-orab-brown-oh","state":"OH","kind":"facility","name":"Mount Orab Mega-Site Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Brown"],"city":"Mount Orab","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Proposedpause explicitly notadopted inthissource. General CRAauthorization is not a project-specific executedabatement or actualpaidbenefit. Tracker 81/100 risk is editorialscore, not independenttechnicalfinding. NDA/emergency-ordinance illegality andlitigation claims are allegations/interpretations without reviewedoriginalpleadings. HB 695 pendingbill andballotpetitioncertification/signaturecollection are not enacted 25 MWstateban or confirmedballotqualification. GenericOPSB 50 MWassertion cannot establish jurisdiction over every electricalLOAD; nolegalconclusionadopted. Operator undisclosed, no siteITMW/ESA/RFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://stopohiodatacenters.org/brown-county","host":"stopohiodatacenters.org","date":"2026-04-26","published":"2026-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.0275659,"lng":-83.919652,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"StopOhioDataCenters’ BrownCounty page describes DBStu’s roughly 1000 acreMt.Orab site-control/zoning/NDAcontroversy and a councilmember’s proposed six-monthpause, relying on other reporting.","independently_verified_current_operating_status":null},"notes":["Proposedpause explicitly notadopted inthissource. General CRAauthorization is not a project-specific executedabatement or actualpaidbenefit. Tracker 81/100 risk is editorialscore, not independenttechnicalfinding. NDA/emergency-ordinance illegality andlitigation claims are allegations/interpretations without reviewedoriginalpleadings. HB 695 pendingbill andballotpetitioncertification/signaturecollection are not enacted 25 MWstateban or confirmedballotqualification. GenericOPSB 50 MWassertion cannot establish jurisdiction over every electricalLOAD; nolegalconclusionadopted. Operator undisclosed, no siteITMW/ESA/RFSverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://stopohiodatacenters.org/brown-county","host":"stopohiodatacenters.org","date":"2026-04-26","published":"2026-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Mount Orab · Brown · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"oregon-industrial-park-data-center-lucas-oh","state":"OH","kind":"facility","name":"Oregon Industrial Park Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lucas"],"city":"Oregon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. 13abc BriannaWeaver July29,2026 originalinterview identifies Vantage asPROSPECTIVEdeveloper forOregonOhio Wynn/Corduroyroads proposal. Currentplanthreebuildings mayhavemultipleendusers; nofinaldecision, futurepropertytransfer/compensationnegotiations. Christmasanswer is atarget, notsigneddeal/permit. Petitiondrive1400signatures/fivedaysleft andNovemberballot aspiration are notvalidatedsignatures, acceptedreferendum or electionoutcome. Rumoredexpansionoutsideboundaryexplicitlynotonplan. Vantage2010company/2013Washingtonfirstsite doesnotdateOhiofacility. NoITMW orexactparcelgiven. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.13abc.com/2026/07/29/oregon-officials-eye-vantage-data-centers-proposed-development-near-wynn-corduroy-roads/","host":"13abc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.649,"lng":-83.4614,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["13abc BriannaWeaver July29,2026 originalinterview identifies Vantage asPROSPECTIVEdeveloper forOregonOhio Wynn/Corduroyroads proposal. Currentplanthreebuildings mayhavemultipleendusers; nofinaldecision, futurepropertytransfer/compensationnegotiations. Christmasanswer is atarget, notsigneddeal/permit.","Petitiondrive1400signatures/fivedaysleft andNovemberballot aspiration are notvalidatedsignatures, acceptedreferendum or electionoutcome. Rumoredexpansionoutsideboundaryexplicitlynotonplan. Vantage2010company/2013Washingtonfirstsite doesnotdateOhiofacility. NoITMW orexactparcelgiven.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.13abc.com/2026/07/29/oregon-officials-eye-vantage-data-centers-proposed-development-near-wynn-corduroy-roads/","host":"13abc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Oregon · Lucas · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"new-day-ports-technology-campus-piketon-oh","state":"OH","kind":"facility","name":"PORTS-Pike Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pike"],"city":"Piketon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. DOENov17,2025NEPAwebentrydescribesPROPOSEDlease189acBatch1PORTS. Pagealoneisnotexecutedlease,wholecampusenvironmentalapproval/constructionpermitorcurrentoperation. UnderlyinglinkedPDFnotreadinthispass. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol. DOEApr29,2026NEPAwebentrysaysPikeCountyPortsmouthDCLLC hasLEASEDapprox189acforAI/cloudandancillaryuses,phasedBatch1premises. Evidenceofreportedleasebydate,notexactclosingday/deed/newwholecampusarea. ESAinthistitlemeansEnvironmentalSiteAssessment,notElectricalServiceAgreement. UnderlyingPDFnotread. DOEMar20,2026factsheetdescribesplanned10GWdatacenterdevelopmentplus10GWNEWGENERATIONincludingatleast9.2GWgas;not20GWIT. Italso says10GWcomputepowerincluding9.2GWgen,soheadlineterminologyinconsistent;noITcertification.33.3BJapanese fundingforgeneration,4.2Bfuturetransmission,40Mcommunitycommitmentnotadditivewholecampuscapexorpaidfunds.765kVvoltage/foursubstationsnotMW. Dedicatedratestructurewillbeagreed,notexecutedtarifforprooflowerratepayerbills.10000constructionover4yr/2000+operationsregionalwholeprogramforecastsnot189acdirectsitepayroll. DOEMar24,2026EMphotocaptionreportsMar20groundbreaking;189acinitialphasewithdevelopmentexpected2026. Ceremonydoesnotproveconstruction/airpermit,RFSorallsitecleanupfinished.10GWgeneration/data-centerfiguresnot20GWIT;worldlargestclaimunverified. Leaseisgovernmentreported,notclosedlandpurchase. PermittingCouncilJune16,2026FAST41coverage forSBPORTSTechnologyCampus;USACEleadagency. Coverageprovidescoordinatedreview/timetable,notallpermitsapproved,NEPAcompletionorenergization.10GWcomplexincludesseparategasgen/gridupgrades;33Bquoteunclearscopenotnewpaidcampuscapex. NoexactnewRFS.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.gov/nepa/articles/cx-270875-4511a-086-lease-real-property-batch-1-property-portsmouth-gaseous-diffusion","host":"energy.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.energy.gov/nepa/articles/cx-270956-environmental-site-assessment-esa-batch-1-leased-property-portsmouth","host":"energy.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.energy.gov/articles/fact-sheet-department-energy-ensuring-affordable-energy-access-ohio-while-powering-future","host":"energy.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.energy.gov/em/articles/partnership-ensures-affordable-energy-powers-ai-future-portsmouth-site","host":"energy.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.permitting.gov/newsroom/press-releases/ports-technology-campus-latest-gain-fast-41-coverage","host":"permitting.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.06,"lng":-83.02,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"DOENov17,2025NEPAwebentrydescribesPROPOSEDlease189acBatch1PORTS. Pagealoneisnotexecutedlease,wholecampusenvironmentalapproval/constructionpermitorcurrentoperation. UnderlyinglinkedPDFnotreadinthispass."},"notes":["DOENov17,2025NEPAwebentrydescribesPROPOSEDlease189acBatch1PORTS. Pagealoneisnotexecutedlease,wholecampusenvironmentalapproval/constructionpermitorcurrentoperation. UnderlyinglinkedPDFnotreadinthispass.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://www.energy.gov/nepa/articles/cx-270875-4511a-086-lease-real-property-batch-1-property-portsmouth-gaseous-diffusion","host":"energy.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"DOEApr29,2026NEPAwebentrysaysPikeCountyPortsmouthDCLLC hasLEASEDapprox189acforAI/cloudandancillaryuses,phasedBatch1premises. Evidenceofreportedleasebydate,notexactclosingday/deed/newwholecampusarea. ESAinthistitlemeansEnvironmentalSiteAssessment,notElectricalServiceAgreement. UnderlyingPDFnotread."},"notes":["DOEApr29,2026NEPAwebentrysaysPikeCountyPortsmouthDCLLC hasLEASEDapprox189acforAI/cloudandancillaryuses,phasedBatch1premises. Evidenceofreportedleasebydate,notexactclosingday/deed/newwholecampusarea. ESAinthistitlemeansEnvironmentalSiteAssessment,notElectricalServiceAgreement. UnderlyingPDFnotread.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://www.energy.gov/nepa/articles/cx-270956-environmental-site-assessment-esa-batch-1-leased-property-portsmouth","host":"energy.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"DOEMar20,2026factsheetdescribesplanned10GWdatacenterdevelopmentplus10GWNEWGENERATIONincludingatleast9.2GWgas;not20GWIT. Italso says10GWcomputepowerincluding9.2GWgen,soheadlineterminologyinconsistent;noITcertification.33.3BJapanese fundingforgeneration,4.2Bfuturetransmission,40Mcommunitycommitmentnotadditivewholecampuscapexorpaidfunds.765kVvoltage/foursubstationsnotMW. Dedicatedratestructurewillbeagreed,notexecutedtarifforprooflowerratepayerbills.10000constructionover4yr/2000+operationsregionalwholeprogramforecastsnot189acdirectsitepayroll."},"notes":["DOEMar20,2026factsheetdescribesplanned10GWdatacenterdevelopmentplus10GWNEWGENERATIONincludingatleast9.2GWgas;not20GWIT. Italso says10GWcomputepowerincluding9.2GWgen,soheadlineterminologyinconsistent;noITcertification.33.3BJapanese fundingforgeneration,4.2Bfuturetransmission,40Mcommunitycommitmentnotadditivewholecampuscapexorpaidfunds.765kVvoltage/foursubstationsnotMW. Dedicatedratestructurewillbeagreed,notexecutedtarifforprooflowerratepayerbills.10000constructionover4yr/2000+operationsregionalwholeprogramforecastsnot189acdirectsitepayroll.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://www.energy.gov/articles/fact-sheet-department-energy-ensuring-affordable-energy-access-ohio-while-powering-future","host":"energy.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"DOEMar24,2026EMphotocaptionreportsMar20groundbreaking;189acinitialphasewithdevelopmentexpected2026. Ceremonydoesnotproveconstruction/airpermit,RFSorallsitecleanupfinished.10GWgeneration/data-centerfiguresnot20GWIT;worldlargestclaimunverified. Leaseisgovernmentreported,notclosedlandpurchase."},"notes":["DOEMar24,2026EMphotocaptionreportsMar20groundbreaking;189acinitialphasewithdevelopmentexpected2026. Ceremonydoesnotproveconstruction/airpermit,RFSorallsitecleanupfinished.10GWgeneration/data-centerfiguresnot20GWIT;worldlargestclaimunverified. Leaseisgovernmentreported,notclosedlandpurchase.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://www.energy.gov/em/articles/partnership-ensures-affordable-energy-powers-ai-future-portsmouth-site","host":"energy.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"PermittingCouncilJune16,2026FAST41coverage forSBPORTSTechnologyCampus;USACEleadagency. Coverageprovidescoordinatedreview/timetable,notallpermitsapproved,NEPAcompletionorenergization.10GWcomplexincludesseparategasgen/gridupgrades;33Bquoteunclearscopenotnewpaidcampuscapex. NoexactnewRFS."},"notes":["PermittingCouncilJune16,2026FAST41coverage forSBPORTSTechnologyCampus;USACEleadagency. Coverageprovidescoordinatedreview/timetable,notallpermitsapproved,NEPAcompletionorenergization.10GWcomplexincludesseparategasgen/gridupgrades;33Bquoteunclearscopenotnewpaidcampuscapex. NoexactnewRFS.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://www.permitting.gov/newsroom/press-releases/ports-technology-campus-latest-gain-fast-41-coverage","host":"permitting.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Piketon · Pike · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"google-project-dazzler-franklin-furnace-oh","state":"OH","kind":"facility","name":"Project Dazzler","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Scioto"],"city":"Franklin Furnace","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. SciotoValleyGuardian JasonSalley March6,2026updatedJuly1 report namesTiltedGateLLC ProjectDazzlerFranklinFurnace. Headerkeypermitclearsreview mustnotbecomepermitissued: bodyandoriginalletter say ADMINISTRATIVELYCOMPLETEapplication, technicalreviewstillrequired. No finalwetlandspermit/buildingapproval/commissioning established. $1B/1.7Msf/792acres/twobuildings/$500kannualPILOT/75%15yrabatement/50phase1jobsare reportedproposal/agreement claims, notinspectedexecutedcontract, payments, spentcapex oractualworkers. No multiplicationintopaidtax/subsidytotal. EastofOhioRivergeographicwordingnotusedtoverifyparcels. ApplicantTiltedGate notautomaticallysignedGoogletenant/operatorproof. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification. Both2pagesofOhioEPA-authoredProjectDazzlerletterhostedbynewspaper readVISUALLYonly. DatedMarch5,2026,applicationreceivedFeb13,OhioEPAID262431W,LevelThreeIsolatedWetlandsAPPLICATIONadministrativelycomplete. Intermediatecorrespondence, notfinalpermit.180dayactionwindowfromletterdoesnotproveapprovalorcompliancenowmerelydeadlinepassed. P2AndrewGravesapplicationcoordinatorsignaturevisible;notindependentdigitalsignaturevalidation. RecipientTiltedGateLLC/Google-domaincontactsupportscontactaffiliation,notparcel-title/operatorcontractproof. WilmingtonDelawareapplicantmailingaddressandColumbusagencyaddressareNOTOhioDCpremises. NoMW/investment/wetlandimpactquantityprovidedbyletter; secondaryprojectnumbersnotupgradedtooriginalpermitfacts.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sciotovalleyguardian.com/2026/03/06/scioto-county-data-center-moves-closer-to-construction-as-key-environmental-permit-clears-state-review/","host":"sciotovalleyguardian.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://sciotovalleyguardian.com/wp-content/uploads/2026/03/ViewDocument-3.pdf","host":"sciotovalleyguardian.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.68,"lng":-82.72,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["SciotoValleyGuardian JasonSalley March6,2026updatedJuly1 report namesTiltedGateLLC ProjectDazzlerFranklinFurnace. Headerkeypermitclearsreview mustnotbecomepermitissued: bodyandoriginalletter say ADMINISTRATIVELYCOMPLETEapplication, technicalreviewstillrequired. No finalwetlandspermit/buildingapproval/commissioning established.","$1B/1.7Msf/792acres/twobuildings/$500kannualPILOT/75%15yrabatement/50phase1jobsare reportedproposal/agreement claims, notinspectedexecutedcontract, payments, spentcapex oractualworkers. No multiplicationintopaidtax/subsidytotal. EastofOhioRivergeographicwordingnotusedtoverifyparcels. ApplicantTiltedGate notautomaticallysignedGoogletenant/operatorproof.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://sciotovalleyguardian.com/2026/03/06/scioto-county-data-center-moves-closer-to-construction-as-key-environmental-permit-clears-state-review/","host":"sciotovalleyguardian.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["Both2pagesofOhioEPA-authoredProjectDazzlerletterhostedbynewspaper readVISUALLYonly. DatedMarch5,2026,applicationreceivedFeb13,OhioEPAID262431W,LevelThreeIsolatedWetlandsAPPLICATIONadministrativelycomplete. Intermediatecorrespondence, notfinalpermit.180dayactionwindowfromletterdoesnotproveapprovalorcompliancenowmerelydeadlinepassed.","P2AndrewGravesapplicationcoordinatorsignaturevisible;notindependentdigitalsignaturevalidation. RecipientTiltedGateLLC/Google-domaincontactsupportscontactaffiliation,notparcel-title/operatorcontractproof. WilmingtonDelawareapplicantmailingaddressandColumbusagencyaddressareNOTOhioDCpremises. NoMW/investment/wetlandimpactquantityprovidedbyletter; secondaryprojectnumbersnotupgradedtooriginalpermitfacts.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://sciotovalleyguardian.com/wp-content/uploads/2026/03/ViewDocument-3.pdf","host":"sciotovalleyguardian.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Franklin Furnace · Scioto · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"meta-project-klondike-piqua-oh","state":"OH","kind":"facility","name":"Project Klondike","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Miami"],"city":"Piqua","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Reported corporate-document linkage, not independently retrieved Nevada/SEC originals or confirmed tenant lease. USD1billion headline is proposed value, not expenditure. November emergency resolution/tax abatement reported without original adopted agreement, exact terms or payment. 2500petition signatures are platform tally, not verified local population. DBStu corporate similarities are a separate MountOrab project; Hatchbo linkage explicitly unconfirmed, 500MWpower-equipment rental not Piqua IT. Source discloses investment-affiliate relationship. April2visible publication takes precedence over June20metadata as original report date; later ownership/approval outcomes unknown. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hntrbrk.com/meta-data-centers/","host":"hntrbrk.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.103974,"lng":-84.259053,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Hunterbrook open-source investigation links Piqua Project Klondike developer J5/Shaytura to Meta through a Nevada branch address at1601WillowRoad and named corporate officer David Kling, while describing residents opposing the proposed approximately600-acre project.","independently_verified_current_operating_status":null},"notes":["Reported corporate-document linkage, not independently retrieved Nevada/SEC originals or confirmed tenant lease. USD1billion headline is proposed value, not expenditure. November emergency resolution/tax abatement reported without original adopted agreement, exact terms or payment. 2500petition signatures are platform tally, not verified local population. DBStu corporate similarities are a separate MountOrab project; Hatchbo linkage explicitly unconfirmed, 500MWpower-equipment rental not Piqua IT. Source discloses investment-affiliate relationship. April2visible publication takes precedence over June20metadata as original report date; later ownership/approval outcomes unknown.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hntrbrk.com/meta-data-centers/","host":"hntrbrk.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Piqua · Miami · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"prologis-mila-trenton-oh","state":"OH","kind":"facility","name":"Prologis Project Mila","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butler"],"city":"Trenton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Secondary stage lead only, original deed/siteplan/adoption/conditions unreviewed. Site-plan approval is not final building permit or operation; fall2026construction/early2029firstservice are forecasts, not observed.250MWdemandbasisnotcriticalIT.140jobs/120000USDannualutilityfees are developer forecasts, utilitychargesnotpropertytax or netpublicbenefit. Threepercentyearwatercooling not gallons/actualwithdrawal. Tracker applies AEPOhiotariff without inspected site-specific utility territory/account; do not assume applicability.85percentminimum-bill terms not proof100percentinfrastructurefunded. Risk84/100is tracker score, not scientificrisk. City-versus-countyauthorityneedslawrecord; signaturecollectionnotadoptedballotban. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://stopohiodatacenters.org/butler-county","host":"stopohiodatacenters.org","date":"2026-04-26","published":"2026-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.48,"lng":-84.4638,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Commercial Ohio tracker reports TrentonPlanningCommission approved ProjectMila site plan March30,2026 on already-industrial141acres sold toPrologis forUSD7.75million inOctober2025. Four220353squarefootbuildings plus16150utility/1503security sum899065squarefeet.","independently_verified_current_operating_status":null},"notes":["Secondary stage lead only, original deed/siteplan/adoption/conditions unreviewed. Site-plan approval is not final building permit or operation; fall2026construction/early2029firstservice are forecasts, not observed.250MWdemandbasisnotcriticalIT.140jobs/120000USDannualutilityfees are developer forecasts, utilitychargesnotpropertytax or netpublicbenefit. Threepercentyearwatercooling not gallons/actualwithdrawal. Tracker applies AEPOhiotariff without inspected site-specific utility territory/account; do not assume applicability.85percentminimum-bill terms not proof100percentinfrastructurefunded. Risk84/100is tracker score, not scientificrisk. City-versus-countyauthorityneedslawrecord; signaturecollectionnotadoptedballotban.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://stopohiodatacenters.org/butler-county","host":"stopohiodatacenters.org","date":"2026-04-26","published":"2026-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Trenton · Butler · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"prsm-preble-county-oh","state":"OH","kind":"facility","name":"PRSM Preble County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Preble"],"city":"Monroe Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No final county commissioners decision established. Two advisory or intermediate denials do not prove permanent project cancellation. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dayton247now.com/news/local/commissions-in-preble-county-reject-farmland-rezoning-for-data-center-development-plan","host":"dayton247now.com","date":"2025-09-03","published":"2025-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.8283325,"lng":-84.6873978,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"two-commission-rejections-before-board-hearing","reported_finding":"Dayton 24/7 reports Preble planning and rural zoning commission rejections; county commissioners hearing was still scheduled for October 1.","report_display_date":"2025-09-03","independently_verified_current_status":null},"notes":["No final county commissioners decision established. Two advisory or intermediate denials do not prove permanent project cancellation.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dayton247now.com/news/local/commissions-in-preble-county-reject-farmland-rezoning-for-data-center-development-plan","host":"dayton247now.com","date":"2025-09-03","published":"2025-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Monroe Township · Preble · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"qts-new-albany-1-franklin-county-oh","state":"OH","kind":"facility","name":"QTS New Albany 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. No exact MW, opening event or site capital value adopted. Three-million-dollar electricity-assistance commitment is across Ohio over three years, not this individual campus. County conflict remains in the separate cadastral review.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-106404-00.011'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://q.com/data-centers/new-albany-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.06378,"lng":-82.75793,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PID":98685,"Parcel":"094-106404-00.011","OwnerName":"QTS NEW ALBANY I DC1 LLC","SiteAddress":"1235 BEECH RD SW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":18.1}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-106404-00.011'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_named_listing":"New Albany1"},"notes":["No exact MW, opening event or site capital value adopted. Three-million-dollar electricity-assistance commitment is across Ohio over three years, not this individual campus. County conflict remains in the separate cadastral review.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/new-albany-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"qts-new-albany-2-franklin-county-oh","state":"OH","kind":"facility","name":"QTS New Albany 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. No exact MW, opening event or site capital value adopted. Shared statewide assistance commitment cannot be counted again for this campus. County conflict remains unresolved.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-107502-00.003'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://q.com/data-centers/new-albany-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.05491,"lng":-82.75685,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PID":96153,"Parcel":"094-107502-00.003","OwnerName":"QTS NEW ALBANY II DC1 LLC","SiteAddress":"BEECH RD SW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":18.85}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-107502-00.003'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_named_listing":"New Albany2"},"notes":["No exact MW, opening event or site capital value adopted. Shared statewide assistance commitment cannot be counted again for this campus. County conflict remains unresolved.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/new-albany-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"qts-new-albany-3-franklin-county-oh","state":"OH","kind":"facility","name":"QTS New Albany III","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=UPPER(OWNERNME1)+LIKE+'%25QTS%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.06965,"lng":-82.77165,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PARCELID":"222-005361","ACRES":78.24176124,"SITEADDRESS":"5760 - 5780 BABBITT RD","OWNERNME1":"QTS NEW ALBANY III LLC","BLDGAREA":null}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=UPPER(OWNERNME1)+LIKE+'%25QTS%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"qts-new-albany-4-licking-county-oh","state":"OH","kind":"facility","name":"QTS New Albany IV","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25QTS+NEW+ALBANY+IV%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.11064,"lng":-82.74301,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PID":97052,"Parcel":"095-111570-01.000","OwnerName":"QTS NEW ALBANY IV LLC","SiteAddress":"13335 MILLER RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":161.26}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25QTS+NEW+ALBANY+IV%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"qts-van-wert-oh","state":"OH","kind":"facility","name":"QTS Van Wert Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Van Wert"],"city":"Van Wert","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer-issued release. Revenue/jobs are forecasts. Cooling no-consumption claim describes future cooling operations, not all facility water use or measured WUE. Its June 11 event is historical by check date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/news/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/","host":"q.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8696461,"lng":-84.5829261,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"planned_capital_investment_usd_approx":10000000000,"forecast_tax_revenue_usd":200000000,"forecast_tax_revenue_period_years":20,"forecast_construction_jobs_lower_bound":1500,"forecast_full_time_qts_jobs_approx":200,"initial_career_training_commitment_usd":100000,"planned_cooling_design":"closed loop"},"notes":["Developer-issued release. Revenue/jobs are forecasts. Cooling no-consumption claim describes future cooling operations, not all facility water use or measured WUE. Its June 11 event is historical by check date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/news/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/","host":"q.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Van Wert · Van Wert · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"saadia-holding-athens-dover-township-oh","state":"OH","kind":"facility","name":"Saadia Holding Athens-Dover Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Athens"],"city":"The Plains","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. 250,000 square feet and 100 jobs are an anonymous meeting source’s attributed expectation, not approvals or verified employment. Water superintendent relays 100,000 gallons INITIAL FILL plus 10,000 to 20,000 gallons PER MONTH makeup; do not publish either as daily use or sum monthly makeup into initial storage. No power quantity disclosed. A local study group is not a moratorium. The separate Pennsylvania $6.35 million rejected land offer is not Ohio investment. Indirect-water discussion is industry context, not a measured site footprint. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://athensindependent.com/possible-athens-data-center/","host":"athensindependent.com","date":"2026-07-23","published":"2026-07-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3700911,"lng":-82.1323674,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Athens County Independent reports Saadia’s July inquiry about nearly 300 acres across six Athens/Dover township parcels, with local planners explicitly saying no formal application had been submitted.","independently_verified_current_operating_status":null},"notes":["250,000 square feet and 100 jobs are an anonymous meeting source’s attributed expectation, not approvals or verified employment. Water superintendent relays 100,000 gallons INITIAL FILL plus 10,000 to 20,000 gallons PER MONTH makeup; do not publish either as daily use or sum monthly makeup into initial storage. No power quantity disclosed. A local study group is not a moratorium. The separate Pennsylvania $6.35 million rejected land offer is not Ohio investment. Indirect-water discussion is industry context, not a measured site footprint.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://athensindependent.com/possible-athens-data-center/","host":"athensindependent.com","date":"2026-07-23","published":"2026-07-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · The Plains · Athens · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"harner-sr-14-ravenna-portage-oh","state":"OH","kind":"facility","name":"SR-14 Data Center Proposal (Ravenna)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Portage"],"city":"Ravenna","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Secondary local-stage lead only; original signed ordinance, jurisdiction, scope, exceptions and expiry unreviewed. No countywide prohibition or project withdrawal inferred. Opening text says nine named counties but enumerates eight before FAQ adds Pike; no authoritative Ohio facility count adopted. April ballot-signature campaign is not evidence of qualification, passage or enacted ban. Risk scores, regional water/tariff claims and other-campus quantities do not establish this site. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://stopohiodatacenters.org/data-center-near-my-home-ohio","host":"stopohiodatacenters.org","date":"2026-04-27","published":"2026-04-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.157557,"lng":-81.242047,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Commercial advocacy tracker names Ray Harner SR14 across from UH Portage Medical Center and reports Ravenna adopted a 12-month pause April20,2026.","independently_verified_current_operating_status":null},"notes":["Secondary local-stage lead only; original signed ordinance, jurisdiction, scope, exceptions and expiry unreviewed. No countywide prohibition or project withdrawal inferred. Opening text says nine named counties but enumerates eight before FAQ adds Pike; no authoritative Ohio facility count adopted. April ballot-signature campaign is not evidence of qualification, passage or enacted ban. Risk scores, regional water/tariff claims and other-campus quantities do not establish this site.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://stopohiodatacenters.org/data-center-near-my-home-ohio","host":"stopohiodatacenters.org","date":"2026-04-27","published":"2026-04-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Ravenna · Portage · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"stack-nal01-new-albany-oh","state":"OH","kind":"facility","name":"STACK Infrastructure NAL01 (New Albany)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Regional page names NAL01. Do not claim contracted/energized capacity from scalability language. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/new-albany/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.07,"lng":-82.8,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_campus_power_mw":60,"power_basis":"scalable campus offering, not measured load","campus_acres":40,"campuses":1},"notes":["Regional page names NAL01. Do not claim contracted/energized capacity from scalability language.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/new-albany/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · New Albany · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"standard-power-coshocton-oh","state":"OH","kind":"facility","name":"Standard Power Coshocton","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Coshocton"],"city":"Coshocton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Host publication metadata is November 28, 2023, not a new opening. Monday ribbon-cutting day is relative and not assigned an inferred exact date. Historical 50 MW is not certified critical IT/current load. Proposed nearby Conesville 700 MW is a distinct project, not additive capacity at Coshocton. Plans for over 100 employees or more power by 2023 are unobserved forecasts in this retained account. October 2018 property purchase and 2015 paper-mill closure are separate history events. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://frontier-companies.com/coshoctons-standard-power-center-powers-blockchain-mining-for-ohio/","host":"frontier-companies.com","date":"2022-09-21","published":"2022-09-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2771782,"lng":-81.8649437,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Frontier Companies republishes a September 21, 2022 Coshocton Tribune account of Standard Power’s ribbon cutting at 500 North Fourth Street, with reported 50 MW mining operation and about twenty employees at that time.","independently_verified_current_operating_status":null},"notes":["Host publication metadata is November 28, 2023, not a new opening. Monday ribbon-cutting day is relative and not assigned an inferred exact date. Historical 50 MW is not certified critical IT/current load. Proposed nearby Conesville 700 MW is a distinct project, not additive capacity at Coshocton. Plans for over 100 employees or more power by 2023 are unobserved forecasts in this retained account. October 2018 property purchase and 2015 paper-mill closure are separate history events.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://frontier-companies.com/coshoctons-standard-power-center-powers-blockchain-mining-for-ohio/","host":"frontier-companies.com","date":"2022-09-21","published":"2022-09-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Coshocton · Coshocton · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"stargate-lordstown-oh","state":"OH","kind":"facility","name":"Stargate Lordstown Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Trumbull"],"city":"Lordstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. WFMJ AllyRoss September25,2025 originalreport quotesSoftBankspokesperson thatLordstownStargateDCusesasmallpartofexistingFoxconnformerGMmanufacturingfootprint.1.5GW announcedfigure is COMBINEDwithMilamCountyTexas, notLordstownalone. InitialsiteMWnotdisclosed. Originalissuerannouncementbelow confirmsgroup scope. Inheritedplanned1500MWcalledlongtermLordstownceiling isnotestablishedbythesetwosources; recommendnullsitecapacityuntilsite-specificevidence. Closed-loop/design-not-use-waterclaims notmeasuredzeroannualwater. Proof-of-conceptshowroom/AIservermanufacturing anddatacenterare distinctuses, notwholeindustrialcomplexoperatingIT. CurrentRFSnotobserved. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification. OpenAI originalSeptember23,2025announcement confirmsLordstownandMilamCountyTWOsitescan scaleTOGETHERto1.5GWover18months, not1.5GWeach/Lordstownceiling. Lordstowngroundbreakingand2026operatingtargethistoricalnotobservedRFS. Pairedcapacityisnotsite-specificIT. Nearly7GWplanned/$400Boverthreeyears/500B10GWcommitmentcoverbroaderStargateportfolio, notspentLordstowncapex oroperatingUScensus.4.5GWOracleagreement/5.5GWincludingpotential600MWexpansionareoverlappingscopes, notadditiveeveryfigure. October22,2025updateidentifiesMidwestsiteWisconsin, separateLordstown. AuthorclaimsAbileneearlyworkloadsnotLordstownoperation.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wfmj.com/archives/data-center-to-occupy-small-part-of-lordstown-ai-hub-feature-advanced-design/article_533f268a-ec1d-5378-9ccb-ceec7d6d343e.html","host":"wfmj.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://openai.com/index/five-new-stargate-sites/?trk=article-ssr-frontend-pulse_little-text-block","host":"openai.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1745,"lng":-80.8534,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["WFMJ AllyRoss September25,2025 originalreport quotesSoftBankspokesperson thatLordstownStargateDCusesasmallpartofexistingFoxconnformerGMmanufacturingfootprint.1.5GW announcedfigure is COMBINEDwithMilamCountyTexas, notLordstownalone. InitialsiteMWnotdisclosed. Originalissuerannouncementbelow confirmsgroup scope.","Inheritedplanned1500MWcalledlongtermLordstownceiling isnotestablishedbythesetwosources; recommendnullsitecapacityuntilsite-specificevidence. Closed-loop/design-not-use-waterclaims notmeasuredzeroannualwater. Proof-of-conceptshowroom/AIservermanufacturing anddatacenterare distinctuses, notwholeindustrialcomplexoperatingIT. CurrentRFSnotobserved.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.wfmj.com/archives/data-center-to-occupy-small-part-of-lordstown-ai-hub-feature-advanced-design/article_533f268a-ec1d-5378-9ccb-ceec7d6d343e.html","host":"wfmj.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["OpenAI originalSeptember23,2025announcement confirmsLordstownandMilamCountyTWOsitescan scaleTOGETHERto1.5GWover18months, not1.5GWeach/Lordstownceiling. Lordstowngroundbreakingand2026operatingtargethistoricalnotobservedRFS. Pairedcapacityisnotsite-specificIT.","Nearly7GWplanned/$400Boverthreeyears/500B10GWcommitmentcoverbroaderStargateportfolio, notspentLordstowncapex oroperatingUScensus.4.5GWOracleagreement/5.5GWincludingpotential600MWexpansionareoverlappingscopes, notadditiveeveryfigure. October22,2025updateidentifiesMidwestsiteWisconsin, separateLordstown. AuthorclaimsAbileneearlyworkloadsnotLordstownoperation.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://openai.com/index/five-new-stargate-sites/?trk=article-ssr-frontend-pulse_little-text-block","host":"openai.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Lordstown · Trumbull · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"state-of-ohio-computer-center-columbus-oh","state":"OH","kind":"facility","name":"State of Ohio Computer Center (SOCC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Columbus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SOCC host versus OSC tenant area/power and office-address separation. 1224KinnearRoad is explicitly OSC administrative building and must not automatically locate SOCC server rooms.10000tenantarea subset of225000raised/360000gross, not three facilities.1200kWtenantusable not measured whole-campus consumption. LargestMidwestclaim unverified ranking. No exact SOCC first opening or full IT MW established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.osc.edu/about/visitOSC","host":"osc.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.0057597,"lng":-83.0446845,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"SOCC host versus OSC tenant area/power and office-address separation","fields":{"institution":"Ohio Supercomputer Center","host_facility":"State of Ohio Computer Center","location":"west end of Ohio State University campus, Columbus, Ohio","host_gross_area_sqft":360000,"host_raised_floor_sqft":225000,"osc_occupied_area_sqft_approx":10000,"osc_usable_power_kw_approx":1200,"power_basis":"OSC tenant usable power, not whole SOCC facility demand"},"notes":["1224KinnearRoad is explicitly OSC administrative building and must not automatically locate SOCC server rooms.10000tenantarea subset of225000raised/360000gross, not three facilities.1200kWtenantusable not measured whole-campus consumption. LargestMidwestclaim unverified ranking. No exact SOCC first opening or full IT MW established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.osc.edu/about/visitOSC","host":"osc.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Columbus · Franklin · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"vantage-oh1-new-albany-licking-county-oh","state":"OH","kind":"facility","name":"Vantage Data Centers OH1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"Johnstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Target does not prove delivery by2026. Combined construction/long-term jobs not permanent-only.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=PID%3D96538&outFields=PID,Parcel,OwnerName,SiteAddress&returnGeometry=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/","host":"vantage-dc.com","date":"2024-10-25","published":"2024-10-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.100989,"lng":-82.746359,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PID":96538,"Parcel":"095-111756-00.009","OwnerName":"VANTAGE DATA CENTERS OH11 LLC","SiteAddress":"2914 HORIZON CT NW"}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=PID%3D96538&outFields=PID,Parcel,OwnerName,SiteAddress&returnGeometry=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"groundbreaking_date":"2024-10-25","planned_investment_usd_min_exclusive":2000000000,"campus_acres":70,"planned_it_capacity_mw":192,"planned_area_sqft_min_exclusive":1500000,"first_building_opening_target":"late2025","forecast_combined_construction_operations_jobs_min_exclusive":1500},"notes":["Target does not prove delivery by2026. Combined construction/long-term jobs not permanent-only.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/","host":"vantage-dc.com","date":"2024-10-25","published":"2024-10-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Johnstown · Licking · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"vantage-oh2-millersport-fairfield-oh","state":"OH","kind":"facility","name":"Vantage Data Centers OH2 (Millersport Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfield"],"city":"Millersport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Vantage Millersport explicit IT and building/job categories. 2550headlinejobscombinesconstructionandoperations,not2550permanent.7totalbuildingsnot7DCs;up-to4DCs.696ITnotgasplantnameplate/currentenergizedIT.2.1Bplannedinfrastructureinvestmentnotactualspent/tenantcomputeinvestment. NoRFSdayorsignedpermits/sourceplantapprovalread. Ratepayerclaimnotindependentutilityfinding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantagemillersportcampus.com/","host":"vantagemillersportcampus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.902,"lng":-82.5324,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Vantage Millersport explicit IT and building/job categories","fields":{"developer":"Vantage","project":"OH2 Millersport campus","location":"Lancaster Newark Road and Blacklick Road, Village of Millersport, Ohio","planned_critical_it_mw":696,"campus_acres":352,"total_planned_buildings":7,"data_center_buildings_max":4,"planned_data_center_area_sqft":2500000,"planned_investment_usd_min_exclusive":2100000000,"expected_construction_jobs_min_exclusive":2500,"expected_vantage_permanent_fulltime_positions_min_exclusive":50,"power_plan":"adjacent natural gas facility"},"notes":["2550headlinejobscombinesconstructionandoperations,not2550permanent.7totalbuildingsnot7DCs;up-to4DCs.696ITnotgasplantnameplate/currentenergizedIT.2.1Bplannedinfrastructureinvestmentnotactualspent/tenantcomputeinvestment. NoRFSdayorsignedpermits/sourceplantapprovalread. Ratepayerclaimnotindependentutilityfinding.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantagemillersportcampus.com/","host":"vantagemillersportcampus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Millersport · Fairfield · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"bitdeer-whitetail-creek-trumbull-county-oh","state":"OH","kind":"facility","name":"Whitetail Creek Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Trumbull"],"city":"Niles / Weathersfield Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. 300 MW is proposed secured/commissioning goal, not current IT usage. Plant demolition is not data center construction. Site use remains unclear; portfolio totals and other site fires not transferred. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://businessjournaldaily.com/bitdeer-eyes-energization-for-weathersfield-project-in-2029/","host":"businessjournaldaily.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.19,"lng":-80.77,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Business Journal reports Bitdeer Whitetail Creek land/site plans at former Niles plant, with energization targeted Q1 2029.","independently_verified_current_operating_status":null},"notes":["300 MW is proposed secured/commissioning goal, not current IT usage. Plant demolition is not data center construction. Site use remains unclear; portfolio totals and other site fires not transferred.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://businessjournaldaily.com/bitdeer-eyes-energization-for-weathersfield-project-in-2029/","host":"businessjournaldaily.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ohio · Niles / Weathersfield Township · Trumbull · Source context reviewed","state_name":"Ohio","state_path":"/ohio/"},{"id":"aligned-data-centers-amber-ok","state":"OK","kind":"facility","name":"Aligned Data Centers Amber Site (Grady County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grady"],"city":"Amber","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Amber land acquisition and early-stage special meeting report. September8meeting nowpast if2026, no outcome observed and exactyearnot inferred solely weekday. Acquisitionnotpermittedconstruction or17MtotalDCcapex. Closedloopcoolingclaimnotzerowater; no numericITMW, actualpermit,currentenergization orsignedutilitiesagreement. Countyregulatoryoptions unresolvedinreport. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.radiooklahomanews.com/post/grady-county-data-center-concerns-prompt-special-meeting","host":"radiooklahomanews.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.1603415,"lng":-97.8792104,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Amber land acquisition and early-stage special meeting report","fields":{"company_affiliate":"Aligned DataCenters","location":"nearAmber, GradyCounty, Oklahoma","reported_purchased_acres_approx":800,"reported_land_purchase_usd_min_exclusive":17000000,"reported_stage":"early planning; details not final","scheduled_special_meeting":"September8at18:30, yearnotprinted inbody"},"notes":["September8meeting nowpast if2026, no outcome observed and exactyearnot inferred solely weekday. Acquisitionnotpermittedconstruction or17MtotalDCcapex. Closedloopcoolingclaimnotzerowater; no numericITMW, actualpermit,currentenergization orsignedutilitiesagreement. Countyregulatoryoptions unresolvedinreport.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.radiooklahomanews.com/post/grady-county-data-center-concerns-prompt-special-meeting","host":"radiooklahomanews.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Amber · Grady · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"beltline-oklahoma-city-frisco-road-ok","state":"OK","kind":"facility","name":"Beltline Energy Oklahoma City Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oklahoma"],"city":"Oklahoma City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Combined development economics are not per-municipality amounts. No data-center-specific water permit does not imply no regulation or no water use. Operator and resident claims attributed; state legal text not independently reviewed. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://investigatemidwest.org/2026/07/14/oklahoma-data-centers-water-use-loophole/","host":"investigatemidwest.org","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.49,"lng":-97.795,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Investigate Midwest reports Beltline proposal spans both Oklahoma City and Yukon, with agreements/rezoning pending.","independently_verified_current_operating_status":null},"notes":["Combined development economics are not per-municipality amounts. No data-center-specific water permit does not imply no regulation or no water use. Operator and resident claims attributed; state legal text not independently reviewed.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://investigatemidwest.org/2026/07/14/oklahoma-data-centers-water-use-loophole/","host":"investigatemidwest.org","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Oklahoma City · Oklahoma · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"beltline-piedmont-kingfisher-county-ok","state":"OK","kind":"facility","name":"Beltline Energy Piedmont Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kingfisher"],"city":"Piedmont","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. 321-acre Beltline proposal is distinct from 630-acre Cloverleaf. Do not assign Cloverleaf power, jobs or water claims to Beltline; council disposition not established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://okcfox.com/news/local/commission-urges-council-to-deny-cloverleaf-plan-beltline-energy-vote-delayed-for-review","host":"okcfox.com","date":"2026-06-01","published":"2026-06-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.74394,"lng":-97.81183,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"planning-recommendation-and-deferral","reported_finding":"Piedmont planning commission recommended denying Cloverleaf, but deferred action on BLE Landholdings / Beltline Energy.","report_display_date":"2026-06-01","independently_verified_current_status":null},"notes":["321-acre Beltline proposal is distinct from 630-acre Cloverleaf. Do not assign Cloverleaf power, jobs or water claims to Beltline; council disposition not established.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://okcfox.com/news/local/commission-urges-council-to-deny-cloverleaf-plan-beltline-energy-vote-delayed-for-review","host":"okcfox.com","date":"2026-06-01","published":"2026-06-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Piedmont · Kingfisher · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"oklahoma-ai-ventures-black-bear-noble-county-ok","state":"OK","kind":"facility","name":"Black Bear AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Noble"],"city":"Perry","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Jericho describes Oklahoma AI Ventures launched April2025 and Black Bear as its flagship development between Oklahoma City and Tulsa. The roughly47000acres describe a subsurface oil/gas JV portfolio, not the data center parcel or fee-simple campus. Noble County identity is not established by this page. Existing infrastructure network and planned grid/gas/hydrogen resilience are not completed campus infrastructure, zero-emission operation or an executed utility agreement. No IT MW, tenant or ready-for-service date verified. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.jerichoenergyventures.com/aidatacenter","host":"jerichoenergyventures.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.2892,"lng":-97.2836,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["Jericho describes Oklahoma AI Ventures launched April2025 and Black Bear as its flagship development between Oklahoma City and Tulsa. The roughly47000acres describe a subsurface oil/gas JV portfolio, not the data center parcel or fee-simple campus. Noble County identity is not established by this page. Existing infrastructure network and planned grid/gas/hydrogen resilience are not completed campus infrastructure, zero-emission operation or an executed utility agreement. No IT MW, tenant or ready-for-service date verified.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://www.jerichoenergyventures.com/aidatacenter","host":"jerichoenergyventures.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Perry · Noble · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"boomtown-lawton-ok","state":"OK","kind":"facility","name":"Boomtown Lawton Data Center  -  cancelled","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Comanche"],"city":"Lawton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Secondarynewsletterclaim is not originalterminationinstrument or currentstatuscheck. BodyJan 10 date differs fromFebruary 9 publicationmetadata; preserveprovenance ratherthanredateleaseevent. Otherproject 18-count, speculationMetaAnthem, GoogleStillwater 9 billion andgenericpower/water/rateeffects are not adoptedsitefacts. HB 2992 describedasfiledbill is not lawatthishistoricalstage. NoMW, landdeed, exactterminationday or currentrefilingverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nathanhammer.substack.com/p/a-2026-guide-to-the-oklahoma-data","host":"nathanhammer.substack.com","date":"2026-01-10","published":"2026-01-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.6086,"lng":-98.3903,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"NathanHammer’s Oklahoma newsletter says Boomtown’s Lawtonlease was cancelled inDecember 2025 afterstatedelays, within a broader project guide.","independently_verified_current_operating_status":null},"notes":["Secondarynewsletterclaim is not originalterminationinstrument or currentstatuscheck. BodyJan 10 date differs fromFebruary 9 publicationmetadata; preserveprovenance ratherthanredateleaseevent. Otherproject 18-count, speculationMetaAnthem, GoogleStillwater 9 billion andgenericpower/water/rateeffects are not adoptedsitefacts. HB 2992 describedasfiledbill is not lawatthishistoricalstage. NoMW, landdeed, exactterminationday or currentrefilingverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://nathanhammer.substack.com/p/a-2026-guide-to-the-oklahoma-data","host":"nathanhammer.substack.com","date":"2026-01-10","published":"2026-01-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Lawton · Comanche · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"cerebras-oklahoma-city-ok","state":"OK","kind":"facility","name":"Cerebras Oklahoma City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oklahoma"],"city":"Oklahoma City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not certify actual opening from dated forecast. Publication date and June/Q3forecast conflict; need newer release. 20x/40milliontokens capacity is portfolio compute throughput, not site MW. Release contains conflicting publication labels and commissioning forecasts: headerFeb11, bodyMarch11; listQ3, narrativeJune2025. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cerebras.ai/press-release/cerebras-announces-six-new-ai-datacenters-across-north-america-and-europe-to-deliver-industry-s","host":"cerebras.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.4676,"lng":-97.5164,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Oklahoma City","operator":"Cerebras","planned_systems_min":300,"system_basis":"CS3 systems planned for ScaleDataCenter"},"notes":["Do not certify actual opening from dated forecast.","Publication date and June/Q3forecast conflict; need newer release.","20x/40milliontokens capacity is portfolio compute throughput, not site MW.","Release contains conflicting publication labels and commissioning forecasts: headerFeb11, bodyMarch11; listQ3, narrativeJune2025.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cerebras.ai/press-release/cerebras-announces-six-new-ai-datacenters-across-north-america-and-europe-to-deliver-industry-s","host":"cerebras.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Oklahoma City · Oklahoma · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"cloudburst-oklahoma-city-campus-ok","state":"OK","kind":"facility","name":"CloudBurst Oklahoma City Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oklahoma"],"city":"Oklahoma City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CloudBurst incomplete public template and held capacity. Page contains explicit editing placeholders: replace placeholders and publish verified facts; headline30MWinitial/200MWpotentialand2mslatencyasterisksnotreliablysubstantiated. Do not promote these to verified contracted capacity, exact point, approved project or measured latency. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cloudburstdc.com/oklahoma-city/","host":"cloudburstdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.4676,"lng":-97.5164,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"CloudBurst incomplete public template and held capacity","fields":{"project_label":"Oklahoma City Campus","published_stage_label":"development stage, verify","canonical_initial_it_mw":null,"canonical_full_campus_mw":null},"notes":["Page contains explicit editing placeholders: replace placeholders and publish verified facts; headline30MWinitial/200MWpotentialand2mslatencyasterisksnotreliablysubstantiated. Do not promote these to verified contracted capacity, exact point, approved project or measured latency.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cloudburstdc.com/oklahoma-city/","host":"cloudburstdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Oklahoma City · Oklahoma · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"cloverleaf-project-open-sky-piedmont-ok","state":"OK","kind":"facility","name":"Cloverleaf Project Open Sky","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Canadian"],"city":"Piedmont","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Not a vote result. July 27 year confirmed by page publication metadata. Developer forecasts in article are not current load, delivered jobs, annual receipts or verified water use. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.radiooklahomanews.com/post/piedmont-data-center-proposal-heads-to-city-council-vote-tonight","host":"radiooklahomanews.com","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.7,"lng":-97.8,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"scheduled-council-vote","reported_finding":"Radio Oklahoma says Project Open Sky / Cloverleaf rezoning would be considered that evening.","report_display_date":"2026-07-27","independently_verified_current_status":null},"notes":["Not a vote result. July 27 year confirmed by page publication metadata. Developer forecasts in article are not current load, delivered jobs, annual receipts or verified water use.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.radiooklahomanews.com/post/piedmont-data-center-proposal-heads-to-city-council-vote-tonight","host":"radiooklahomanews.com","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Piedmont · Canadian · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"cogent-oklahoma-city-ok","state":"OK","kind":"facility","name":"Cogent Oklahoma City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oklahoma"],"city":"Oklahoma City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Exact named operator street-level facility and original equipment brochure.. Operator explicitly identifies OklahomaCityDataCenter at630Southwest7thStreet,OK73109.5294sf is facility area and42Ucabinet height, not42cabinets or ITMW. Original brochure below adds backup/UPS specifications. No independent occupancy, current measuredload or openingyear verified. Same current page separately names TulsaEdgeDataCenter6800South65thWestAve,TulsaOK74131 and OklahomaCityEdgeDataCenter3500 192ndStNW,OkarcheOK73762. These are two ORIGINAL-OPERATOR CANDIDATES outside the namedCogentOKCbase record, not verified new buildings/precise pins. Address/postal/county/alias and existing shared-building identity need review; metro label must not override printed Okarche. Generic on-net buildings include offices/otherdata centers, not all owned Cogent halls. No independently measured demand, whole record or current operating-census certification. One-page original brochure visually/textually confirms630Southwest7th and5294sf, including3453sfnonraised. One50kVAUPS,450kWdieselgenerator,800amptransferswitch and3000gallondieselfuel tank are different equipment scopes. Generator rating is not criticalIT; do not convert kVA to kW without powerfactor or add UPS/generator to infer demand. Fuel gallons are not water use. Brochure lacks inspected commissioning date/available utilityMW.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www2.cogentco.com/en/cogent-oklahoma-city","host":"www2.cogentco.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www2.cogentco.com/files/docs/network/colocation/Oklahoma_City_Data_Center_Brochure.pdf","host":"www2.cogentco.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.4676,"lng":-97.5164,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-location-scope-and-cogent-originals-round64-2026-10-15.json","scope":"Exact named operator street-level facility and original equipment brochure.","fields":{},"notes":["Operator explicitly identifies OklahomaCityDataCenter at630Southwest7thStreet,OK73109.5294sf is facility area and42Ucabinet height, not42cabinets or ITMW. Original brochure below adds backup/UPS specifications. No independent occupancy, current measuredload or openingyear verified.","Same current page separately names TulsaEdgeDataCenter6800South65thWestAve,TulsaOK74131 and OklahomaCityEdgeDataCenter3500 192ndStNW,OkarcheOK73762. These are two ORIGINAL-OPERATOR CANDIDATES outside the namedCogentOKCbase record, not verified new buildings/precise pins. Address/postal/county/alias and existing shared-building identity need review; metro label must not override printed Okarche. Generic on-net buildings include offices/otherdata centers, not all owned Cogent halls.","No independently measured demand, whole record or current operating-census certification."],"sources":[{"url":"https://www2.cogentco.com/en/cogent-oklahoma-city","host":"www2.cogentco.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-location-scope-and-cogent-originals-round64-2026-10-15.json","scope":"Exact named operator street-level facility and original equipment brochure.","fields":{},"notes":["One-page original brochure visually/textually confirms630Southwest7th and5294sf, including3453sfnonraised. One50kVAUPS,450kWdieselgenerator,800amptransferswitch and3000gallondieselfuel tank are different equipment scopes. Generator rating is not criticalIT; do not convert kVA to kW without powerfactor or add UPS/generator to infer demand. Fuel gallons are not water use. Brochure lacks inspected commissioning date/available utilityMW.","No independently measured demand, whole record or current operating-census certification."],"sources":[{"url":"https://www2.cogentco.com/files/docs/network/colocation/Oklahoma_City_Data_Center_Brochure.pdf","host":"www2.cogentco.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Oklahoma City · Oklahoma · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"noec-core-data-center-vinita-ok","state":"OK","kind":"facility","name":"CORE Data Center (Vinita)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Craig"],"city":"Vinita","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NOEC office contact page not data-center evidence. Cooperative contact page lists Vinita headquarters and other offices/warehouses, not a specific operating data center. Office phone, hours and address must not be transferred as server-facility location or public visitor hours. No facility-specific MW, status or opening evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.noec.coop/about-noec/contact-us/","host":"noec.coop","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.6408372,"lng":-95.156363,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"NOEC office contact page not data-center evidence","fields":{},"notes":["Cooperative contact page lists Vinita headquarters and other offices/warehouses, not a specific operating data center. Office phone, hours and address must not be transferred as server-facility location or public visitor hours. No facility-specific MW, status or opening evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.noec.coop/about-noec/contact-us/","host":"noec.coop","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Vinita · Craig · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"core-scientific-muskogee-ok","state":"OK","kind":"facility","name":"Core Scientific Muskogee Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Muskogee"],"city":"Muskogee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 100MWongoingdevelopmentnotenergizedclaim.500+MWsubstationpotentialnotdatacenterITandnotadditiveto100. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corescientific.com/high-density-data-centers/muskogee-ok/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.72,"lng":-95.42,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"1525 W43rd Street South, Muskogee, OK74401","ongoing_development_capacity_mw":100,"substation_potential_mw_min_exclusive":500,"campus_acres":65,"total_area_sqft":138000,"power_basis":"developmentpower versus substationpotential"},"notes":["100MWongoingdevelopmentnotenergizedclaim.500+MWsubstationpotentialnotdatacenterITandnotadditiveto100.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://corescientific.com/high-density-data-centers/muskogee-ok/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Muskogee · Muskogee · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"fluidstack-okmulgee-county-ok","state":"OK","kind":"facility","name":"Fluidstack Okmulgee County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Okmulgee"],"city":"Okmulgee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fluidstack Okmulgee forecast, tenant claim and voluntary commitments. 7McommitmentnotactualpaymentorsignedCBAschedule. No executedtenantleaseorMWread. Statutorycompliance/ratepayerprotectionclaimsnotindependentlegalfinding;SB259textnotinspectedhere.60decibelsnotexplicitAweighting/timebasisoractualmeasurement. Olympic-poolcomparisonnotnumericverifiedwaterconsumption. Noon-siteinspection,approvalorenergizationconfirmed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.okmulgeefluidstack.io/","host":"okmulgeefluidstack.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.6231,"lng":-95.9605,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Fluidstack Okmulgee forecast, tenant claim and voluntary commitments","fields":{"developer":"Fluidstack","locality":"Okmulgee County, Oklahoma","first_phase_service_target":"2027-09","final_phase_service_target":"2028-09","developer_named_first_tenant":"Jane Street","joint_education_commitment_usd":7000000,"developer_claims_no_local_property_tax_incentives_sought":true,"operator_named_power_provider":"AEP-PSO","voluntary_boundary_noise_limit_db":60},"notes":["7McommitmentnotactualpaymentorsignedCBAschedule. No executedtenantleaseorMWread. Statutorycompliance/ratepayerprotectionclaimsnotindependentlegalfinding;SB259textnotinspectedhere.60decibelsnotexplicitAweighting/timebasisoractualmeasurement. Olympic-poolcomparisonnotnumericverifiedwaterconsumption. Noon-siteinspection,approvalorenergizationconfirmed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.okmulgeefluidstack.io/","host":"okmulgeefluidstack.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Okmulgee · Okmulgee · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"google-muskogee-county-ok","state":"OK","kind":"facility","name":"Google Muskogee County Data Center Campuses","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Muskogee"],"city":"Council Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The statewide program is not nine billion per campus. Renewable-generation agreements are not site IT demand. Construction dates were not released, and infrastructure-cost promises are not a retained executed agreement. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newson6.com/technology/google-data-centers-muskogee-county-oklahoma","host":"newson6.com","date":"2025-11-20","published":"2025-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.57,"lng":-95.65,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"NewsOn6 describes Google's announced Summit and Council Hill campuses within a nine-billion-USD Oklahoma investment program.","independently_verified_current_operating_status":null},"notes":["The statewide program is not nine billion per campus. Renewable-generation agreements are not site IT demand. Construction dates were not released, and infrastructure-cost promises are not a retained executed agreement.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newson6.com/technology/google-data-centers-muskogee-county-oklahoma","host":"newson6.com","date":"2025-11-20","published":"2025-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Council Hill · Muskogee · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"google-pryor-ok","state":"OK","kind":"facility","name":"Google Pryor Data Center Campus (Mayes County Expansion)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mayes"],"city":"Pryor","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. February22,2019historical figures, not current employee count, acreage or investment.13Bcompany commitment spans several states, not Pryor.2007arrival announcement not first opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.okcommerce.gov/google-planning-another-expansion-for-pryor-data-center/","host":"okcommerce.gov","date":"2019-02-22","published":"2019-02-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.32,"lng":-95.31,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"initial_pryor_opening_year":2011,"second_building_unveiled_year":2012,"historical_company_land_acres_approx":800,"historical_onsite_employees_min_exclusive":400,"historical_investment_oklahoma_usd_min_exclusive":2500000000},"notes":["February22,2019historical figures, not current employee count, acreage or investment.13Bcompany commitment spans several states, not Pryor.2007arrival announcement not first opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.okcommerce.gov/google-planning-another-expansion-for-pryor-data-center/","host":"okcommerce.gov","date":"2019-02-22","published":"2019-02-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Pryor · Mayes · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"google-stillwater-ok","state":"OK","kind":"facility","name":"Google Stillwater Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Payne"],"city":"Stillwater","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public introduction and caption were read; no email gate was submitted and the full article was not reviewed. The introduction's next-two-years window differs from the caption. Construction does not establish operating IT capacity. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.thestillwegian.news/2025-storylines-big-tech-comes-to-town/","host":"thestillwegian.news","date":"2025-12-29","published":"2025-12-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.14,"lng":-97.06,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Stillwegian's public introduction and December 24 construction caption describe Google's Stillwater campus, a first-phase 2026 target and a three-billion-USD plan.","independently_verified_current_operating_status":null},"notes":["Only the public introduction and caption were read; no email gate was submitted and the full article was not reviewed. The introduction's next-two-years window differs from the caption. Construction does not establish operating IT capacity.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.thestillwegian.news/2025-storylines-big-tech-comes-to-town/","host":"thestillwegian.news","date":"2025-12-29","published":"2025-12-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Stillwater · Payne · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"host-digital-northeast-oklahoma-ok","state":"OK","kind":"facility","name":"Host Digital Northeast Oklahoma Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Tulsa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 1.25-billion-USD base and conditional 3.2-billion-USD extended amounts are lease revenue, not construction spending or additive totals. Energized infrastructure does not prove 43 MW is operating. August merger conditions are historical; a later SEC search excerpt reports September 17 closing, but the original body returned 403 and is not adopted as a full-source verification. No cloud tenant is identified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://usdatacenterprojects.com/oklahoma/host-digital-locks-usd-1-25-billion-15-year-ai-data-center-lease-in-northeast-oklahoma","host":"usdatacenterprojects.com","date":"2026-08-31","published":"2026-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.154,"lng":-95.9928,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"US Data Center Projects reports a 43 critical-IT-MW lease at Host Digital's energized northeast Oklahoma facility, with delivery targeted for the first half of 2027.","independently_verified_current_operating_status":null,"planned_leased_critical_it_mw":43,"planned_delivery_window":"first half 2027","base_lease_revenue_usd":1250000000,"base_lease_years":15,"construction_investment_usd":null},"notes":["The 1.25-billion-USD base and conditional 3.2-billion-USD extended amounts are lease revenue, not construction spending or additive totals. Energized infrastructure does not prove 43 MW is operating. August merger conditions are historical; a later SEC search excerpt reports September 17 closing, but the original body returned 403 and is not adopted as a full-source verification. No cloud tenant is identified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://usdatacenterprojects.com/oklahoma/host-digital-locks-usd-1-25-billion-15-year-ai-data-center-lease-in-northeast-oklahoma","host":"usdatacenterprojects.com","date":"2026-08-31","published":"2026-08-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Tulsa · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"iren-woods-county-ok","state":"OK","kind":"facility","name":"IREN Woods County Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Woods"],"city":"Alva","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. IREN Oklahoma future grid ramp and geographic gap. 1600MWfuturesecuredpowernotIT/currentenergization. State-onlypagewithoutWoodsCountyexactpoint;countyrequiresotherprimarysource. Under6mslatencymarketingnotmethod/endpoints/independentnetworktest. No exactopeningday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://iren.com/data-centers/oklahoma","host":"iren.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.8031,"lng":-98.667,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"IREN Oklahoma future grid ramp and geographic gap","fields":{"operator":"IREN","campus_label":"Oklahoma","planned_power_secured_mw":1600,"land_acres":2000,"operator_described_stage":"in development","substation_energization_target_year":2028},"notes":["1600MWfuturesecuredpowernotIT/currentenergization. State-onlypagewithoutWoodsCountyexactpoint;countyrequiresotherprimarysource. Under6mslatencymarketingnotmethod/endpoints/independentnetworktest. No exactopeningday.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://iren.com/data-centers/oklahoma","host":"iren.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Alva · Woods · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"lambda-midamerica-industrial-park-chouteau-ok","state":"OK","kind":"facility","name":"Lambda MidAmerica Industrial Park Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mayes"],"city":"Chouteau","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lambda Mayes planned development and tax forecast. 500Mtaxforecastnotcapexoractualcollectionandnotautomatically50Mguaranteedeachyear. No numericITMW,exactparcelorRFSinreviewedannouncementsections. Statutoryratepayercomplianceandfederalpledgeclaimsnotindependentlyverifiedlegalorregulatoryfinding. Closedloopnotzero domesticwater. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://lambda.ai/blog/new-lambda-data-center-in-oklahoma","host":"lambda.ai","date":"2026-09-27","published":"2026-09-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.1859,"lng":-95.343,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Lambda Mayes planned development and tax forecast","fields":{"operator":"Lambda","announcement_date":"2026-09-27","project_location":"south section MidAmerica Industrial Park, Chouteau, Mayes County, Oklahoma","school_tax_boundary":"Chouteau-Mazie Public School District","estimated_tenyear_taxes_usd":500000000,"tax_estimate_basis":"current rates, future tenyear period","expected_construction_jobs_max":1000,"expected_permanent_positions_max":100,"cooling_plan":"closed loop"},"notes":["500Mtaxforecastnotcapexoractualcollectionandnotautomatically50Mguaranteedeachyear. No numericITMW,exactparcelorRFSinreviewedannouncementsections. Statutoryratepayercomplianceandfederalpledgeclaimsnotindependentlyverifiedlegalorregulatoryfinding. Closedloopnotzero domesticwater.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://lambda.ai/blog/new-lambda-data-center-in-oklahoma","host":"lambda.ai","date":"2026-09-27","published":"2026-09-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Chouteau · Mayes · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"beltline-luther-horizon-technology-park-ok","state":"OK","kind":"facility","name":"Luther Horizon Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oklahoma"],"city":"Luther","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Investment/jobs/payroll/noise limits and utility protections are proposals, not measured impacts or executed agreements. Will-serve letter is still required; no current supply agreement inferred. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://lutherhorizontechnologypark.com/","host":"lutherhorizontechnologypark.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.6612,"lng":-97.1961,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Luther Horizon operator project site explicitly says current details are design intentions under community/regulatory review, with final terms to be set.","independently_verified_current_operating_status":null},"notes":["Investment/jobs/payroll/noise limits and utility protections are proposals, not measured impacts or executed agreements. Will-serve letter is still required; no current supply agreement inferred.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://lutherhorizontechnologypark.com/","host":"lutherhorizontechnologypark.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Luther · Oklahoma · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"meta-anthem-tulsa-ok","state":"OK","kind":"facility","name":"Meta Project Anthem  -  Tulsa","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tulsa"],"city":"Tulsa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Investment is once completed; no exact opening date or campusMWprovided. Oklahoma1500MWrenewable projects are statewide contracted generation, not TulsaIT. Infrastructure commitment not automatically additive to total campus investment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2026/04/hello-tulsa/","host":"datacenters.atmeta.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.14,"lng":-95.88,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"announced_investment_usd_min_exclusive":1000000000,"local_infrastructure_investment_usd_min_exclusive":25000000,"forecast_peak_construction_jobs_min_exclusive":1000,"forecast_operational_jobs_approx":100},"notes":["Investment is once completed; no exact opening date or campusMWprovided. Oklahoma1500MWrenewable projects are statewide contracted generation, not TulsaIT. Infrastructure commitment not automatically additive to total campus investment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2026/04/hello-tulsa/","host":"datacenters.atmeta.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Tulsa · Tulsa · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"midcon-recovery-solutions-oklahoma-city-ok","state":"OK","kind":"facility","name":"MIDCON Recovery Solutions Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oklahoma"],"city":"Oklahoma City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Oklahoma compiled directory versus independent operating-site proof. Compilation relies on directory inventory, not independent site inspection.64projects/34operational mix projects and sites; not certifiedbuildingcount. MIDCONTierIVdesigndescription not independentUptimecertification. CloudBurst headingunderconstruction conflicts bodydelay/moratorium and prioroperatorplaceholderfinding; do not elevate. No exactcriticalITMW, actualcurrenttenant or directoperatorevidence for either preferredsite. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","host":"news9.com","date":"2026-10-12","published":"2026-10-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.618,"lng":-97.567,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Oklahoma compiled directory versus independent operating-site proof","fields":{"publisher":"News9 and NewsOn6 statewide compilation","article_updated":"2026-10-12","underlying_inventory_source":"USDataCenterMap dcmap.us","reported_midcon":"60000sqftQuailSpringsBusinessPark","reported_windstream_address":"825 NorthBroadwayAvenue, OklahomaCity"},"notes":["Compilation relies on directory inventory, not independent site inspection.64projects/34operational mix projects and sites; not certifiedbuildingcount. MIDCONTierIVdesigndescription not independentUptimecertification. CloudBurst headingunderconstruction conflicts bodydelay/moratorium and prioroperatorplaceholderfinding; do not elevate. No exactcriticalITMW, actualcurrenttenant or directoperatorevidence for either preferredsite.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","host":"news9.com","date":"2026-10-12","published":"2026-10-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Oklahoma City · Oklahoma · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"northern-data-pryor-ok","state":"OK","kind":"facility","name":"Northern Data North American Operational Center (Pryor)  -  cancelled","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Mayes"],"city":"Pryor","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical government-hosted newspaper project announcement. Government-hosted TulsaWorld article is a newspaper reprint, not independently executed state agreement. Source says250MWmonthly, invalid power/energy time basis; site capacity held.150initialversus300eventualjobs and phased build forecasts not current employment.24monthtarget not opening proof. No special incentives offered statement qualified by expected QualityJobs participation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.okcommerce.gov/northern-data-to-build-north-american-headquarters-at-midamerica-industrial-park/","host":"okcommerce.gov","date":"2022-03-10","published":"2022-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.29167,"lng":-95.31806,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical government-hosted newspaper project announcement","fields":{"historical_project_announcement_report_date":"2022-03-10","historical_planned_investment_usd_min":270000000,"historical_expected_initial_jobs":150,"historical_campus_acres":116,"historical_existing_building_area_sqft":100000,"historical_future_building_area_sqft_approx":150000,"historical_future_building_power_mw_max":50},"notes":["Government-hosted TulsaWorld article is a newspaper reprint, not independently executed state agreement. Source says250MWmonthly, invalid power/energy time basis; site capacity held.150initialversus300eventualjobs and phased build forecasts not current employment.24monthtarget not opening proof. No special incentives offered statement qualified by expected QualityJobs participation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.okcommerce.gov/northern-data-to-build-north-american-headquarters-at-midamerica-industrial-park/","host":"okcommerce.gov","date":"2022-03-10","published":"2022-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Pryor · Mayes · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"polaris-technologies-muskogee-ok","state":"OK","kind":"facility","name":"Polaris Technologies Muskogee Bitcoin Mining Facility (\"Project Bifrost\")","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Muskogee"],"city":"Muskogee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Announcement says investing to construct and becoming operational, not a current2026opening certificate. Phase2optimism not400MWonline orAIconverted load. Power basis not explicitly criticalIT. City office229WOkmulgee not data-center address. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.muskogeeok.gov/news_detail_T2_R666.php","host":"muskogeeok.gov","date":"2023-02-17","published":"2023-02-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.7479,"lng":-95.3697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"historical_announcement_date":"2023-02-17","historical_planned_investment_usd":100000000,"historical_initial_planned_power_mw":200,"potential_phase2_additional_power_mw":200,"expected_initial_tech_positions":20,"published_location":"Port Muskogee JohnTGriffin IndustrialPark","operator_described_use":"cryptocurrency mining"},"notes":["Announcement says investing to construct and becoming operational, not a current2026opening certificate. Phase2optimism not400MWonline orAIconverted load. Power basis not explicitly criticalIT. City office229WOkmulgee not data-center address.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.muskogeeok.gov/news_detail_T2_R666.php","host":"muskogeeok.gov","date":"2023-02-17","published":"2023-02-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Muskogee · Muskogee · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"potentia-oklahoma-campus-02-inola-ok","state":"OK","kind":"facility","name":"Potentia Oklahoma Campus 02 (Inola)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rogers"],"city":"Inola","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Current Rocky Point master-development website; limited project context.. Developer presents an 1800-plus-acre, multi-industry industrial park near Inola in Rogers County. Home page alone does not identify a named data-center tenant, 2000 MW contract, data-hall completion date or physical campus boundary. Connection of Rocky Point to Potentia is attributed to the original resident reporting below, not independently inspected company registrations or deeds. Limited context, not full technical or current operating verification. Developer role and infrastructure intentions.. Developer distinguishes land acquisition, entitlements and shared infrastructure from independently operated tenant buildings; tenant announcements remain prospective. Computing and digital infrastructure are among possible advanced-technology uses, alongside manufacturing and logistics. Grid redundancy, water availability and developer/tenant funding are planned representations, not inspected service agreements, certified capacities or independently measured protection of household rates. Disclaimer expressly treats figures as preliminary and nonbinding. Developer FAQ, not an enacted-law or final-zoning inspection.. Developer says land is zoned for moderate industrial, commercial and mixed use, and says the master developer seeks no abatements, PILOTs or ad valorem exemptions. Future tenant incentives are separately possible; this is not proof of no public subsidy anywhere in the park. FAQ asserts Oklahoma HB2992 requires tenants at or above 75 MW to fund grid upgrades. Underlying enacted text and PSO agreements not inspected in this pass; no legal conclusion or universal rate guarantee adopted. Noise/lighting controls and water-supply commitments are intended standards, not measurements or inspected permits. No exact public hearing date found in these pages.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rockypointpark.org/","host":"rockypointpark.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://rockypointpark.org/industrial-park.html","host":"rockypointpark.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://rockypointpark.org/transparency.html","host":"rockypointpark.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.1487,"lng":-95.5097,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json","scope":"Current Rocky Point master-development website; limited project context.","fields":{},"notes":["Developer presents an 1800-plus-acre, multi-industry industrial park near Inola in Rogers County. Home page alone does not identify a named data-center tenant, 2000 MW contract, data-hall completion date or physical campus boundary.","Connection of Rocky Point to Potentia is attributed to the original resident reporting below, not independently inspected company registrations or deeds.","Limited context, not full technical or current operating verification."],"sources":[{"url":"https://rockypointpark.org/","host":"rockypointpark.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json","scope":"Developer role and infrastructure intentions.","fields":{},"notes":["Developer distinguishes land acquisition, entitlements and shared infrastructure from independently operated tenant buildings; tenant announcements remain prospective. Computing and digital infrastructure are among possible advanced-technology uses, alongside manufacturing and logistics.","Grid redundancy, water availability and developer/tenant funding are planned representations, not inspected service agreements, certified capacities or independently measured protection of household rates. Disclaimer expressly treats figures as preliminary and nonbinding.","Limited context, not full technical or current operating verification."],"sources":[{"url":"https://rockypointpark.org/industrial-park.html","host":"rockypointpark.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json","scope":"Developer FAQ, not an enacted-law or final-zoning inspection.","fields":{},"notes":["Developer says land is zoned for moderate industrial, commercial and mixed use, and says the master developer seeks no abatements, PILOTs or ad valorem exemptions. Future tenant incentives are separately possible; this is not proof of no public subsidy anywhere in the park.","FAQ asserts Oklahoma HB2992 requires tenants at or above 75 MW to fund grid upgrades. Underlying enacted text and PSO agreements not inspected in this pass; no legal conclusion or universal rate guarantee adopted.","Noise/lighting controls and water-supply commitments are intended standards, not measurements or inspected permits. No exact public hearing date found in these pages.","Limited context, not full technical or current operating verification."],"sources":[{"url":"https://rockypointpark.org/transparency.html","host":"rockypointpark.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Inola · Rogers · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"beale-project-atlas-coweta-ok","state":"OK","kind":"facility","name":"Project Atlas (Coweta)  -  withdrawn","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wagoner"],"city":"Coweta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Report is secondary commentary, not originalwithdrawalletter or finalcourt/permitrecord.270 acres is Atlasproposal, notIRENcampus. IREN 2000 acres/50 billion/1.2 GWandChildress 750 MW/Sweetwater 1.4 GWare otherprojects withdifferentgeneration/load/energizationstages. HB 2992/SB 259 legalstatusandscope are not independently reviewed here. Author’s single-week framing spansweeks/months, and no actualweek,lawdate,watercontractoutcomeorassetvaluationinferenceadopted. NoAtlascriticalIT/ESA/currentbuildverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://infrathesis.substack.com/p/oklahoma-is-walling-off-data-centers","host":"infrathesis.substack.com","date":"2026-05-30","published":"2026-05-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.9526,"lng":-95.6483,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"InfraThesis investment commentary reports Beale withdrew CowetaProjectAtlas onMarch 30 after opposition, while primarily arguing implications forIREN’sseparateOklahoma/Texasportfolio.","independently_verified_current_operating_status":null},"notes":["Report is secondary commentary, not originalwithdrawalletter or finalcourt/permitrecord.270 acres is Atlasproposal, notIRENcampus. IREN 2000 acres/50 billion/1.2 GWandChildress 750 MW/Sweetwater 1.4 GWare otherprojects withdifferentgeneration/load/energizationstages. HB 2992/SB 259 legalstatusandscope are not independently reviewed here. Author’s single-week framing spansweeks/months, and no actualweek,lawdate,watercontractoutcomeorassetvaluationinferenceadopted. NoAtlascriticalIT/ESA/currentbuildverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://infrathesis.substack.com/p/oklahoma-is-walling-off-data-centers","host":"infrathesis.substack.com","date":"2026-05-30","published":"2026-05-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Coweta · Wagoner · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"iren-project-emerald-kiowa-ok","state":"OK","kind":"facility","name":"Project Emerald (Kiowa)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pittsburg"],"city":"Kiowa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Advancing a district is not all final incentive approvals. The roughly 2,000-acre, two-phase 2027 plan is prospective. Claims of adequate or trucked water do not establish allocation or executed service agreements; utility officials sought more details. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kjrh.com/news/local-news/project-emerald-ai-data-center-plan-in-pittsburg-county-moving-forward","host":"kjrh.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.7206516,"lng":-95.8991586,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KJRH reports that the tax-increment review committee advanced IREN Project Emerald for consideration by affected boards on April 21.","independently_verified_current_operating_status":null},"notes":["Advancing a district is not all final incentive approvals. The roughly 2,000-acre, two-phase 2027 plan is prospective. Claims of adequate or trucked water do not establish allocation or executed service agreements; utility officials sought more details.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kjrh.com/news/local-news/project-emerald-ai-data-center-plan-in-pittsburg-county-moving-forward","host":"kjrh.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Kiowa · Pittsburg · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"beale-project-mustang-claremore-ok","state":"OK","kind":"facility","name":"Project Mustang","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rogers"],"city":"Claremore","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Noformalcommitment, approval, landclosing or executedutilitycontract established. CityofClaremore/GRDA supplydescription is anticipatedarrangement, not verifiedreservedcapacity. Air-coolingclaim is design, not zeroactualwater certification. Clydesdale 1 billion/506 acres, CowetaAtlas andotherBealeprojects are distinct; nofigures transferredtoMustang. January 26 update is not a newpermit/actiondate. NoMWorcurrentRFSadopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://constructionreviewonline.com/beale-infrastructure-in-talks-to-build-project-mustang-data-center-campus-outside-tulsa-oklahoma/","host":"constructionreviewonline.com","date":"2026-01-06","published":"2026-01-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.31,"lng":-95.62,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ConstructionReview reports Beale’s preliminary ProjectMustang discussions and due diligence for ClaremoreIndustrialPark, with numberofbuildingsundisclosed andfirst-phase 2028 target.","independently_verified_current_operating_status":null},"notes":["Noformalcommitment, approval, landclosing or executedutilitycontract established. CityofClaremore/GRDA supplydescription is anticipatedarrangement, not verifiedreservedcapacity. Air-coolingclaim is design, not zeroactualwater certification. Clydesdale 1 billion/506 acres, CowetaAtlas andotherBealeprojects are distinct; nofigures transferredtoMustang. January 26 update is not a newpermit/actiondate. NoMWorcurrentRFSadopted.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://constructionreviewonline.com/beale-infrastructure-in-talks-to-build-project-mustang-data-center-campus-outside-tulsa-oklahoma/","host":"constructionreviewonline.com","date":"2026-01-06","published":"2026-01-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Claremore · Rogers · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"google-spring-sand-springs-ok","state":"OK","kind":"facility","name":"Project Spring (Sand Springs)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Osage"],"city":"Sand Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Project Spring developer-stage Google interest and site scale. Consideringpurchase/proposeddevelopmentnotexecutedGoogleownershiporoperatingDC. Baselinepropertytaxunder3000notprojecttaxpayment.65dBboundary/codeand100generatorhourslegalclaimsrequireactualordinance/permitnotindependentlyadopted. JanuaryupdatecannotguaranteecurrentOctoberstatus;noMWorseparateapprovalverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.projectspringok.com/","host":"projectspringok.com","date":"2026-01-14","published":"2026-01-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.256,"lng":-96.11,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Project Spring developer-stage Google interest and site scale","fields":{"project":"Project Spring","page_update_date":"2026-01-14","locality":"Sand Springs, Oklahoma","address":"5615 Oklahoma97, Sand Springs, Oklahoma74063","site_acres":827,"developer":"White Rose Partners","potential_buyer":"Google considering purchase","planned_building_footprint_site_share_max_exclusive_percent":10,"planned_vegetative_open_space_percent_range":[30,40]},"notes":["Consideringpurchase/proposeddevelopmentnotexecutedGoogleownershiporoperatingDC. Baselinepropertytaxunder3000notprojecttaxpayment.65dBboundary/codeand100generatorhourslegalclaimsrequireactualordinance/permitnotindependentlyadopted. JanuaryupdatecannotguaranteecurrentOctoberstatus;noMWorseparateapprovalverified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.projectspringok.com/","host":"projectspringok.com","date":"2026-01-14","published":"2026-01-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Sand Springs · Osage · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"plainsmen-project-thunderbird-enid-ok","state":"OK","kind":"facility","name":"Project Thunderbird (Enid)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Garfield"],"city":"Enid","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Kevin Hassler, Enid News and Eagle, September 8, 2026 readable original preview names Plainsmen Holdings and Project Thunderbird, a planned data-center/power corridor. Only announcement identity context; no MW, investment, signed lease, permits or construction proof. Remainder gated/scrambled and not decoded. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.enidnews.com/news/local_news/enid-natives-announce-local-data-center-power-generation-project/article_0465bc43-e183-4d3a-b602-9afd55ff300e.html","host":"enidnews.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.3967623,"lng":-97.8791341,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Kevin Hassler, Enid News and Eagle, September 8, 2026 readable original preview names Plainsmen Holdings and Project Thunderbird, a planned data-center/power corridor. Only announcement identity context; no MW, investment, signed lease, permits or construction proof. Remainder gated/scrambled and not decoded.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.enidnews.com/news/local_news/enid-natives-announce-local-data-center-power-generation-project/article_0465bc43-e183-4d3a-b602-9afd55ff300e.html","host":"enidnews.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Enid · Garfield · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"rack59-oklahoma-city-ok","state":"OK","kind":"facility","name":"RACK59 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oklahoma"],"city":"Oklahoma City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RACK59 published suite and large unverified power claim. 175MWnot independentlyenergized/availableIT;needsite-specificutility/phaseproofbeforecanonicalpower. Thirtyplus/35carriersdifferentmarketingcountsnotverifiedcensus. Five-ninesuptimeclaimnotobservedperformance.201RobertSKerrnetworkconnectionnotthisfacilityaddressornewoperator-ownedDC. Noexactopening/area. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rack59.com/","host":"rack59.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.4676,"lng":-97.5164,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"RACK59 published suite and large unverified power claim","fields":{"operator":"RACK59","address":"7725 WestRenoAvenue, Suite304, Oklahoma City, Oklahoma73127","advertised_facility_power_mw":175,"power_basis":"marketing power capacity, not explicit critical IT"},"notes":["175MWnot independentlyenergized/availableIT;needsite-specificutility/phaseproofbeforecanonicalpower. Thirtyplus/35carriersdifferentmarketingcountsnotverifiedcensus. Five-ninesuptimeclaimnotobservedperformance.201RobertSKerrnetworkconnectionnotthisfacilityaddressornewoperator-ownedDC. Noexactopening/area.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rack59.com/","host":"rack59.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Oklahoma City · Oklahoma · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"smarttec-site-01-mead-ok","state":"OK","kind":"facility","name":"SmartTec Site 01 (Mead)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bryan"],"city":"Mead","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. SmartTec identifies Site01 at8460USHwy70,MeadOK73449,39.39acres in Bryan County, with management-reported BC LLC ownership and related-party50year site-use agreement; no title or signed contract independently read. Existing buildings A/C total5035gross data-center square feet; utility/storage building B adds2083, not another operating data center. Two proposed30000sf manufacturing buildings are not existing data-center floor area. Operator expressly says capacity is not commissioned: fit-out and OG&E commissioning pending. Shared3000A208V three-phase distribution is not certified available IT MW. Proposed64B300GPUs/eight systems, direct-liquid layouts and later solar/BESS are plans. Air-cooled financial baseline needs repricing for the expanded concept; rendering is not a surveyed built facility. September10 management schedule targets September24 construction, October8 transformer and October8 to November5 fiber, not observed completion. Service follows procurement and commissioning. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://smarttec.dev/site","host":"smarttec.dev","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0005295,"lng":-96.5110921,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["SmartTec identifies Site01 at8460USHwy70,MeadOK73449,39.39acres in Bryan County, with management-reported BC LLC ownership and related-party50year site-use agreement; no title or signed contract independently read. Existing buildings A/C total5035gross data-center square feet; utility/storage building B adds2083, not another operating data center. Two proposed30000sf manufacturing buildings are not existing data-center floor area.","Operator expressly says capacity is not commissioned: fit-out and OG&E commissioning pending. Shared3000A208V three-phase distribution is not certified available IT MW. Proposed64B300GPUs/eight systems, direct-liquid layouts and later solar/BESS are plans. Air-cooled financial baseline needs repricing for the expanded concept; rendering is not a surveyed built facility. September10 management schedule targets September24 construction, October8 transformer and October8 to November5 fiber, not observed completion. Service follows procurement and commissioning.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://smarttec.dev/site","host":"smarttec.dev","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Mead · Bryan · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"tierpoint-oklahoma-city-ok","state":"OK","kind":"facility","name":"TierPoint Oklahoma City (OKC / OKC2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oklahoma"],"city":"Oklahoma City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Oklahoma regional source with named addresses. 130000 square feet spans Oklahoma portfolio including Tulsa Archer; not allocated to either bound record. Two OKC addresses not collapsed into one building or blindly added as new records. Client hardware investment quote excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/oklahoma/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.4676,"lng":-97.5164,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Oklahoma regional source with named addresses","fields":{"named_site_addresses":[{"site":"OKC","address":"4121 Perimeter Center Place, Oklahoma City, OK73112"},{"site":"OKC2","address":"4114 Perimeter Center Place, Oklahoma City, OK73112"},{"site":"Tulsa State Farm","address":"12151 E State Farm Boulevard, Tulsa, OK74146","shipping_gps_address":"12151 E 48th St, Tulsa, OK74146"}],"regional_combined_area_sqft":130000},"notes":["130000 square feet spans Oklahoma portfolio including Tulsa Archer; not allocated to either bound record. Two OKC addresses not collapsed into one building or blindly added as new records. Client hardware investment quote excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/oklahoma/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Oklahoma City · Oklahoma · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"tierpoint-tulsa-archer-ok","state":"OK","kind":"facility","name":"TierPoint Tulsa - Archer","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tulsa"],"city":"Tulsa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/oklahoma/tulsa-archer/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.1585898,"lng":-95.9886293,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":36000,"gross_area_is_lower_bound":true,"raised_floor_sqft":4000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 1 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/oklahoma/tulsa-archer/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Tulsa · Tulsa · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"tierpoint-tulsa-state-farm-ok","state":"OK","kind":"facility","name":"TierPoint Tulsa - State Farm","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tulsa"],"city":"Tulsa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Oklahoma regional source with named addresses. 130000 square feet spans Oklahoma portfolio including Tulsa Archer; not allocated to either bound record. Two OKC addresses not collapsed into one building or blindly added as new records. Client hardware investment quote excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/oklahoma/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.154,"lng":-95.9928,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Oklahoma regional source with named addresses","fields":{"named_site_addresses":[{"site":"OKC","address":"4121 Perimeter Center Place, Oklahoma City, OK73112"},{"site":"OKC2","address":"4114 Perimeter Center Place, Oklahoma City, OK73112"},{"site":"Tulsa State Farm","address":"12151 E State Farm Boulevard, Tulsa, OK74146","shipping_gps_address":"12151 E 48th St, Tulsa, OK74146"}],"regional_combined_area_sqft":130000},"notes":["130000 square feet spans Oklahoma portfolio including Tulsa Archer; not allocated to either bound record. Two OKC addresses not collapsed into one building or blindly added as new records. Client hardware investment quote excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/oklahoma/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Tulsa · Tulsa · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"tulsaconnect-downtown-dc5-tulsa-ok","state":"OK","kind":"facility","name":"TulsaConnect Downtown (DC-5)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tulsa"],"city":"Tulsa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. TulsaConnect two named Tulsa sites. TwoDC3podsnotnecessarilyseparatephysicalbuildings. Noexactstreet,numericITMW,areaororiginalopeninginreviewedoverview.100percentuptimeaspirationnotobservedguaranteedorhistoricalperformance. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tulsaconnect.com/data-centers-overview.php","host":"tulsaconnect.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.154,"lng":-95.9928,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"TulsaConnect two named Tulsa sites","fields":{"operator":"TulsaConnect","named_sites":[{"code":"DC5","market":"downtown Tulsa, Oklahoma"},{"code":"DC3","market":"East Tulsa, Oklahoma","data_center_pods":2,"diverse_utility_substations":2}]},"notes":["TwoDC3podsnotnecessarilyseparatephysicalbuildings. Noexactstreet,numericITMW,areaororiginalopeninginreviewedoverview.100percentuptimeaspirationnotobservedguaranteedorhistoricalperformance.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tulsaconnect.com/data-centers-overview.php","host":"tulsaconnect.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Tulsa · Tulsa · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"tulsaconnect-east-dc3-tulsa-ok","state":"OK","kind":"facility","name":"TulsaConnect East (DC-3)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tulsa"],"city":"Tulsa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. TulsaConnect two named Tulsa sites. TwoDC3podsnotnecessarilyseparatephysicalbuildings. Noexactstreet,numericITMW,areaororiginalopeninginreviewedoverview.100percentuptimeaspirationnotobservedguaranteedorhistoricalperformance. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tulsaconnect.com/data-centers-overview.php","host":"tulsaconnect.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.154,"lng":-95.9928,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"TulsaConnect two named Tulsa sites","fields":{"operator":"TulsaConnect","named_sites":[{"code":"DC5","market":"downtown Tulsa, Oklahoma"},{"code":"DC3","market":"East Tulsa, Oklahoma","data_center_pods":2,"diverse_utility_substations":2}]},"notes":["TwoDC3podsnotnecessarilyseparatephysicalbuildings. Noexactstreet,numericITMW,areaororiginalopeninginreviewedoverview.100percentuptimeaspirationnotobservedguaranteedorhistoricalperformance.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tulsaconnect.com/data-centers-overview.php","host":"tulsaconnect.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Tulsa · Tulsa · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"windstream-wholesale-oklahoma-city-ok","state":"OK","kind":"facility","name":"Windstream Wholesale Oklahoma City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oklahoma"],"city":"Oklahoma City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Oklahoma compiled directory versus independent operating-site proof. Compilation relies on directory inventory, not independent site inspection.64projects/34operational mix projects and sites; not certifiedbuildingcount. MIDCONTierIVdesigndescription not independentUptimecertification. CloudBurst headingunderconstruction conflicts bodydelay/moratorium and prioroperatorplaceholderfinding; do not elevate. No exactcriticalITMW, actualcurrenttenant or directoperatorevidence for either preferredsite. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","host":"news9.com","date":"2026-10-12","published":"2026-10-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.4791,"lng":-97.5142,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Oklahoma compiled directory versus independent operating-site proof","fields":{"publisher":"News9 and NewsOn6 statewide compilation","article_updated":"2026-10-12","underlying_inventory_source":"USDataCenterMap dcmap.us","reported_midcon":"60000sqftQuailSpringsBusinessPark","reported_windstream_address":"825 NorthBroadwayAvenue, OklahomaCity"},"notes":["Compilation relies on directory inventory, not independent site inspection.64projects/34operational mix projects and sites; not certifiedbuildingcount. MIDCONTierIVdesigndescription not independentUptimecertification. CloudBurst headingunderconstruction conflicts bodydelay/moratorium and prioroperatorplaceholderfinding; do not elevate. No exactcriticalITMW, actualcurrenttenant or directoperatorevidence for either preferredsite.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.news9.com/oklahoma-city-news/where-are-data-centers-are-being-built-oklahoma-list","host":"news9.com","date":"2026-10-12","published":"2026-10-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oklahoma · Oklahoma City · Oklahoma · Source context reviewed","state_name":"Oklahoma","state_path":"/oklahoma/"},{"id":"abundant-mines-cascadelocks-or","state":"OR","kind":"facility","name":"Abundant Mines - Cascade Locks Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hood River"],"city":"Cascade Locks","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. public landlord tenant listing. Port office 427 Portage Road is not automatically tenant site address. Lease listing not independent measured MW or AI conversion. Do not merge with cancelled Roundhouse project. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.portofcascadelocks.gov/port-tenants","host":"portofcascadelocks.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.6697,"lng":-121.8931,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"public landlord tenant listing","fields":{"government_listed_tenant":"Good Life Realty LLC dba Abundant Mines","listed_tenant_space":"Herman Creek Business Park, Flex1 Suite101","listed_activity":"Bitcoin mining and related high-performance computing"},"notes":["Port office 427 Portage Road is not automatically tenant site address. Lease listing not independent measured MW or AI conversion. Do not merge with cancelled Roundhouse project.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.portofcascadelocks.gov/port-tenants","host":"portofcascadelocks.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Cascade Locks · Hood River · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"aligned-pdx-01-or","state":"OR","kind":"facility","name":"Aligned PDX-01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Generic state enterprise-zone eligibility does not prove this site award. Generator/UPS per-unit ratings not totalMW;TierIII design not certification. Operator names27acrecampus atroadintersection, not parcel-confirmed address. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/hillsboro-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5540594,"lng":-122.9492507,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Hillsboro","street_description":"NE30thAve andNEEvergreenRd","campus_acres":27},"notes":["Generic state enterprise-zone eligibility does not prove this site award.","Generator/UPS per-unit ratings not totalMW;TierIII design not certification.","Operator names27acrecampus atroadintersection, not parcel-confirmed address.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/hillsboro-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"apple-prineville-or","state":"OR","kind":"facility","name":"Apple Prineville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Crook"],"city":"Prineville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical Oregon multi-program incentive context,primaryMorrowprojectnotboundsite. June2023agenda cover conflicts with2022running header; exact document date held. AppletwoLRZprojects not necessarilytwo physical campuses. MainMorrowCounty proposed2.37Bproject and113Mestimatednetbenefit do not belong to either boundApplePrineville orAmazonUmatillacampus. Historical15yearregime notcurrent2026eligibility; no tax savings allocated perbuilding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf","host":"oregon.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.30349,"lng":-120.84639,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical Oregon multi-program incentive context,primaryMorrowprojectnotboundsite","fields":{"historical_umatilla_amazon_sip_approval_year":2017,"historical_prineville_apple_lrz_exempt_projects":2,"historical_prineville_apple_lrz_term_years":15,"historical_reporting_period":"2022-2023"},"notes":["June2023agenda cover conflicts with2022running header; exact document date held. AppletwoLRZprojects not necessarilytwo physical campuses. MainMorrowCounty proposed2.37Bproject and113Mestimatednetbenefit do not belong to either boundApplePrineville orAmazonUmatillacampus. Historical15yearregime notcurrent2026eligibility; no tax savings allocated perbuilding.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf","host":"oregon.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Prineville · Crook · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"aws-arlington-gilliam-or","state":"OR","kind":"facility","name":"AWS Arlington Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Gilliam"],"city":"Arlington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Land price is not capex; wind energy purchase in MWh annually is not instantaneous site MW or proof of hourly renewable power. No exact construction/opening date given. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bendbulletin.com/?p=417891","host":"bendbulletin.com","date":"2025-02-16","published":"2025-02-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.7168,"lng":-120.20088,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Oregonian reporting via Bulletin describes Amazon Arlington land acquisition and additional port land negotiation, with operations potentially years away.","independently_verified_current_operating_status":null},"notes":["Land price is not capex; wind energy purchase in MWh annually is not instantaneous site MW or proof of hourly renewable power. No exact construction/opening date given.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bendbulletin.com/?p=417891","host":"bendbulletin.com","date":"2025-02-16","published":"2025-02-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Arlington · Gilliam · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"aws-hermiston-or","state":"OR","kind":"facility","name":"AWS Hermiston Data Center Campuses","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Umatilla"],"city":"Hermiston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hermiston signed urban growth boundary coadoption. Signed county ordinance is boundary/plan action, not all DC building permits, exactAWStenant, occupied campus or criticalIT.810acexpansionnotautomaticallydata-hallfootprint. October15,2025historicnotfutureOctober15,2026meeting. Attached city/exhibit records have separate scopes. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.co.umatilla.or.us/fileadmin/user_upload/Community_Development/Planning/Ordinances/2025/Ordinance_2025-11.pdf","host":"co.umatilla.or.us","date":"2025-10-15","published":"2025-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.84041,"lng":-119.28946,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Hermiston signed urban growth boundary coadoption","fields":{"agency":"Umatilla County, Oregon","ordinance":"2025-11","county_adoption_signature_date":"2025-10-15","coadopted_city_ordinance":"Hermiston2374","city_ordinance_adoption_date":"2025-09-08","urban_growth_boundary_added_acres_approx":810,"land_use_change":"Industrial comprehensive-plan designation, anticipating annexation/rezoning","area_description":"south of EastFeedvilleRoad, north of FeedCanal, between SouthOttRoad and Highway395"},"notes":["Signed county ordinance is boundary/plan action, not all DC building permits, exactAWStenant, occupied campus or criticalIT.810acexpansionnotautomaticallydata-hallfootprint. October15,2025historicnotfutureOctober15,2026meeting. Attached city/exhibit records have separate scopes.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.co.umatilla.or.us/fileadmin/user_upload/Community_Development/Planning/Ordinances/2025/Ordinance_2025-11.pdf","host":"co.umatilla.or.us","date":"2025-10-15","published":"2025-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hermiston · Umatilla · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"aws-pdx154-boardman-airport-or","state":"OR","kind":"facility","name":"AWS PDX 154 (Boardman Airport Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Morrow"],"city":"Boardman","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Conditional land-use approval is not permit completion or operational opening. Building and pond areas are separate; settlement about existing regional operations not proof this campus caused pollution. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","host":"tricitiesbusinessnews.com","date":"2026-04-14","published":"2026-04-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.81556,"lng":-119.81621,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Tri-Cities reporting says Morrow planning commission approved PDX154 land use March 31 with airport, stormwater and wastewater conditions.","independently_verified_current_operating_status":null},"notes":["Conditional land-use approval is not permit completion or operational opening. Building and pond areas are separate; settlement about existing regional operations not proof this campus caused pollution.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","host":"tricitiesbusinessnews.com","date":"2026-04-14","published":"2026-04-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Boardman · Morrow · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"aws-umatilla-city-or","state":"OR","kind":"facility","name":"AWS Umatilla Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Umatilla"],"city":"Umatilla","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical Oregon multi-program incentive context,primaryMorrowprojectnotboundsite. June2023agenda cover conflicts with2022running header; exact document date held. AppletwoLRZprojects not necessarilytwo physical campuses. MainMorrowCounty proposed2.37Bproject and113Mestimatednetbenefit do not belong to either boundApplePrineville orAmazonUmatillacampus. Historical15yearregime notcurrent2026eligibility; no tax savings allocated perbuilding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf","host":"oregon.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.91735,"lng":-119.34252,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical Oregon multi-program incentive context,primaryMorrowprojectnotboundsite","fields":{"historical_umatilla_amazon_sip_approval_year":2017,"historical_prineville_apple_lrz_exempt_projects":2,"historical_prineville_apple_lrz_term_years":15,"historical_reporting_period":"2022-2023"},"notes":["June2023agenda cover conflicts with2022running header; exact document date held. AppletwoLRZprojects not necessarilytwo physical campuses. MainMorrowCounty proposed2.37Bproject and113Mestimatednetbenefit do not belong to either boundApplePrineville orAmazonUmatillacampus. Historical15yearregime notcurrent2026eligibility; no tax savings allocated perbuilding.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf","host":"oregon.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Umatilla · Umatilla · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"boxminer-la-pine-or","state":"OR","kind":"facility","name":"Boxminer La Pine Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Deschutes"],"city":"La Pine","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Land-sale decision is not a permanent citywide ban. Developer revised job forecast and city challenged revenue estimates; no exact reliable investment or delivered jobs adopted. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opb.org/article/2026/05/28/la-pine-rejects-data-center-central-oregon/","host":"opb.org","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.6745541,"lng":-121.4913298,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"OPB reports La Pine council unanimously declined pursuing Boxminer land sale after May 27 meeting.","independently_verified_current_operating_status":null},"notes":["Land-sale decision is not a permanent citywide ban. Developer revised job forecast and city challenged revenue estimates; no exact reliable investment or delivered jobs adopted.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opb.org/article/2026/05/28/la-pine-rejects-data-center-central-oregon/","host":"opb.org","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · La Pine · Deschutes · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"copia-charlestown-data-center-hermiston-or","state":"OR","kind":"facility","name":"Charlestown Data Center and Battery Energy Storage System","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Umatilla"],"city":"Hermiston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Federal land application not approval or building. Related Snake River, Rhea and Nevada projects separate; no capacity given for Charlestown. Conflicting111vs140statecounts not reconciled as one census. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opb.org/article/2026/09/29/data-centers-proposed-federal-land-eastern-oregon/","host":"opb.org","date":"2026-09-29","published":"2026-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.8404101,"lng":-119.28946,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Oregon Capital Chronicle via OPB reports Copia Charlestown application on106BLMacres and May8draft development plan.","independently_verified_current_operating_status":null},"notes":["Federal land application not approval or building. Related Snake River, Rhea and Nevada projects separate; no capacity given for Charlestown. Conflicting111vs140statecounts not reconciled as one census.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opb.org/article/2026/09/29/data-centers-proposed-federal-land-eastern-oregon/","host":"opb.org","date":"2026-09-29","published":"2026-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hermiston · Umatilla · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"crane-pdx01-forest-grove-or","state":"OR","kind":"facility","name":"Crane PDX01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Forest Grove","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. First-building8MWinitial up-to47MWcap and approximate100MWwhole-site plan not additive. Air cooling applies first building only. Required road completion before occupancy and later phase uncertainty retained; no current opening inferred. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://forestgrovenewstimes.com/2025/08/18/construction-boots-up-on-first-data-center-in-forest-grove/","host":"forestgrovenewstimes.com","date":"2025-08-18","published":"2025-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.5207,"lng":-123.1087,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Forest Grove News-Times reports July2025 Crane groundbreaking with2026first-building completion forecast.","independently_verified_current_operating_status":null},"notes":["First-building8MWinitial up-to47MWcap and approximate100MWwhole-site plan not additive. Air cooling applies first building only. Required road completion before occupancy and later phase uncertainty retained; no current opening inferred.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://forestgrovenewstimes.com/2025/08/18/construction-boots-up-on-first-data-center-in-forest-grove/","host":"forestgrovenewstimes.com","date":"2025-08-18","published":"2025-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Forest Grove · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"crane-pdx02-forest-grove-or","state":"OR","kind":"facility","name":"Crane PDX02","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Forest Grove","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Crane Forest Grove site phases and campus mismatch. NamedPDX02notwholecampus100plus.24+24+48=96doesnotreconcileheadline100plus,phase/scoperoundingheld. PowerbasisnotexplicitcriticalITforcapacities. Q32026targetnotobservedservice. PUEdesignnotmeasuredannualaverage. Incentive/LEEDclaimsnotindependentapprovedaward/certifierinspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cranedc.com/data-centers/oregon-data-center","host":"cranedc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.51904,"lng":-123.11106,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Crane Forest Grove site phases and campus mismatch","fields":{"operator":"Crane Data Centers","market":"Forest Grove, Oregon","named_phases":[{"site":"PDX01 phase1","capacity_mw":24,"whitespace_sqft":36000,"adjacent_flex_sqft":6400},{"site":"PDX01 phase2","additional_capacity_mw":24,"additional_whitespace_sqft":36000,"additional_flex_sqft":6400},{"site":"PDX02","capacity_mw_approx":48,"area_sqft_approx":150000}],"campus_headline_capacity_mw_min_exclusive":100,"historical_service_target_quarter":"2026-Q3","design_pue_at_full_it_load":1.3},"notes":["NamedPDX02notwholecampus100plus.24+24+48=96doesnotreconcileheadline100plus,phase/scoperoundingheld. PowerbasisnotexplicitcriticalITforcapacities. Q32026targetnotobservedservice. PUEdesignnotmeasuredannualaverage. Incentive/LEEDclaimsnotindependentapprovedaward/certifierinspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cranedc.com/data-centers/oregon-data-center","host":"cranedc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Forest Grove · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"digital-realty-pdx10-or","state":"OR","kind":"facility","name":"Digital Realty PDX10","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/portland/pdx10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5476034,"lng":-122.891975,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"PDX10","published_address":"3825 NW Aloclek Street, Hillsboro, OR 97124","advertised_building_sqft":48000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/portland/pdx10","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"digital-realty-pdx12-or","state":"OR","kind":"facility","name":"Digital Realty PDX12","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/portland/pdx12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.56952,"lng":-122.91865,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"PDX12","published_address":"5870 NE Schaaf Street, Hillsboro, OR 97124","advertised_building_sqft":546000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/portland/pdx12","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"dmg-blockchain-boardman-or","state":"OR","kind":"facility","name":"DMG Blockchain Boardman Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Morrow"],"city":"Boardman","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Not evidence closing occurred.50MWcriticalIT refers to ChristinaLakeCANADA, not BoardmanOregon. AI-generated host summary excluded in favor of reproduced issuer body. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Canadian AI facilities and plans are separate. Later issuer MD&A supersedes initial timing expectations. Original issuer-authored filing retained via CEO.ca SEDAR-document mirror. No claim mirror is issuer domain or regulatory attestation. Pages3,6,23 visually inspected. Connected3.75 MW described on page3 is not critical IT or evidence DMG acquired/commissioned the building. Later August27 results link was403 and not retried; latest unreviewed results could contain later developments.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stocktitan.net/news/DMGGF/dmg-blockchain-solutions-announces-ai-strategy-update-and-november-291zgfegqhps.html","host":"stocktitan.net","date":"2025-12-04","published":"2025-12-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.dmgblockchain.com/p/dmg-expands-to-the-u-s-announces-asset-purchase-for-oregon-data-center","host":"dmgblockchain.com","date":"2025-11-04","published":"2025-11-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ceo.ca/api/sedar-document/DMGI-2026-05-26-interim-mda-english-bd9f.pdf","host":"ceo.ca","date":"2026-05-26","published":"2026-05-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.83986,"lng":-119.70058,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Issuer release reproduced by StockTitan says Boardman purchase still expected in coming weeks.","independently_verified_current_operating_status":null},"notes":["Not evidence closing occurred.50MWcriticalIT refers to ChristinaLakeCANADA, not BoardmanOregon. AI-generated host summary excluded in favor of reproduced issuer body.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stocktitan.net/news/DMGGF/dmg-blockchain-solutions-announces-ai-strategy-update-and-november-291zgfegqhps.html","host":"stocktitan.net","date":"2025-12-04","published":"2025-12-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Issuer announces intended letter-agreement purchase of 27600-square-foot building with 3.75 MW access, not a closed acquisition.","critical_it_mw":null},"notes":["Canadian AI facilities and plans are separate. Later issuer MD&A supersedes initial timing expectations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dmgblockchain.com/p/dmg-expands-to-the-u-s-announces-asset-purchase-for-oregon-data-center","host":"dmgblockchain.com","date":"2025-11-04","published":"2025-11-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Issuer MD&A for six months ended March31,2026 repeats February6 withdrawal of acquisition timing guidance and states completion uncertain.","acquisition_completion_verified":false,"acquisition_timing_guidance_withdrawn_date":"2026-02-06","critical_it_mw":null},"notes":["Original issuer-authored filing retained via CEO.ca SEDAR-document mirror. No claim mirror is issuer domain or regulatory attestation.","Pages3,6,23 visually inspected. Connected3.75 MW described on page3 is not critical IT or evidence DMG acquired/commissioned the building.","Later August27 results link was403 and not retried; latest unreviewed results could contain later developments.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ceo.ca/api/sedar-document/DMGI-2026-05-26-interim-mda-english-bd9f.pdf","host":"ceo.ca","date":"2026-05-26","published":"2026-05-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Boardman · Morrow · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"edgeconnex-por01-por02-hillsboro-campus-or","state":"OR","kind":"facility","name":"EdgeConneX POR01/POR02 (Hillsboro campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. POR01/02campus with plannedPOR03context. POR02total16850floorincludesplannedhall2. POR03plannedup21MWisseparateaddition, notonlinePOR01/02capacity. NoaggregateoperatingcampusMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/americas/portland-or/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5564226,"lng":-122.9122077,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"POR01/02campus with plannedPOR03context","fields":{"por01":{"facility_area_sqft":39400,"raised_floor_sqft":18700},"por02":{"phase1_raised_floor_sqft":8300,"planned_hall2_raised_floor_sqft":8550,"initial_power_mw":3,"planned_total_power_mw":6},"power_basis":"N+1power not explicitcriticalIT"},"notes":["POR02total16850floorincludesplannedhall2. POR03plannedup21MWisseparateaddition, notonlinePOR01/02capacity. NoaggregateoperatingcampusMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/americas/portland-or/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"flexential-portland-hillsboro-1-pdx01-or","state":"OR","kind":"facility","name":"Flexential Portland - Hillsboro 1 (PDX01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5498253,"lng":-122.8908454,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Portland - Hillsboro 1 (PDX01)","publisher_reported_footprint_sqft":85388,"publisher_reported_critical_power_mw":5.3,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"flexential-portland-hillsboro-2-or","state":"OR","kind":"facility","name":"Flexential Portland - Hillsboro 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.558302,"lng":-122.9171647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Portland - Hillsboro 2","publisher_reported_footprint_sqft":242683,"publisher_reported_critical_power_mw":18,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"flexential-portland-hillsboro-3-or","state":"OR","kind":"facility","name":"Flexential Portland - Hillsboro 3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5594805,"lng":-122.9382011,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Portland - Hillsboro 3","publisher_reported_footprint_sqft":358000,"publisher_reported_critical_power_mw":36,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"flexential-portland-hillsboro-4-pdx04-or","state":"OR","kind":"facility","name":"Flexential Portland - Hillsboro 4 (PDX04)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Footprint conflict: page 68 narrative 138,000 square feet; quick facts 158,000. No single footprint adopted. Planned campus total 54 MW is not an additional 54 MW at this building. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5553133,"lng":-122.9401317,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Portland - Hillsboro 4 (PDX04)","publisher_reported_footprint_sqft":null,"publisher_reported_critical_power_mw":18,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Footprint conflict: page 68 narrative 138,000 square feet; quick facts 158,000. No single footprint adopted. Planned campus total 54 MW is not an additional 54 MW at this building.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"flexential-portland-hillsboro-5-or","state":"OR","kind":"facility","name":"Flexential Portland - Hillsboro 5","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. separate Hillsboro5and6sections. 3935NEAloclekPlace is Hillsboro1acrossfrom newparcel, not verified Hillsboro6streetaddress.5and6are distinct developments; no copying63MWto each. Enterprise-zone marketing not individual incentive award. RegionalCBREmarketpercentages and corporate1Bfundraising excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Redundancy conflicts: page 70 quick facts 4:3 and N+1 cooling; same page sidebar and page 71 say 5:4 UPS, page 71 N+2 cooling. Do not publish a settled redundancy claim. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/flexential-acquires-prime-property-in-hillsboro-plans-new-data-center-as-next-phase-of-expansion-302546009.html","host":"prnewswire.com","date":"2025-09-04","published":"2025-09-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5564617,"lng":-122.9394058,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"separate Hillsboro5and6sections","fields":{"hillsboro6_planned_area_sqft":350000,"hillsboro6_planned_capacity_mw":27,"hillsboro6_floors":2,"hillsboro5_area_sqft":358000,"hillsboro5_planned_capacity_mw":36,"hillsboro5_stage_at_release":"under construction","hillsboro5_opening_target_year":2026,"power_basis":"capacity, not explicitly IT versus gross"},"notes":["3935NEAloclekPlace is Hillsboro1acrossfrom newparcel, not verified Hillsboro6streetaddress.5and6are distinct developments; no copying63MWto each. Enterprise-zone marketing not individual incentive award. RegionalCBREmarketpercentages and corporate1Bfundraising excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/flexential-acquires-prime-property-in-hillsboro-plans-new-data-center-as-next-phase-of-expansion-302546009.html","host":"prnewswire.com","date":"2025-09-04","published":"2025-09-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Portland - Hillsboro 5","publisher_reported_footprint_sqft":358000,"publisher_reported_critical_power_mw":36,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Redundancy conflicts: page 70 quick facts 4:3 and N+1 cooling; same page sidebar and page 71 say 5:4 UPS, page 71 N+2 cooling. Do not publish a settled redundancy claim.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"flexential-portland-hillsboro-6-or","state":"OR","kind":"facility","name":"Flexential Portland - Hillsboro 6","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. separate Hillsboro5and6sections. 3935NEAloclekPlace is Hillsboro1acrossfrom newparcel, not verified Hillsboro6streetaddress.5and6are distinct developments; no copying63MWto each. Enterprise-zone marketing not individual incentive award. RegionalCBREmarketpercentages and corporate1Bfundraising excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Marketing section alone does not establish a current operating date. WUE 0 and PUE 1.4 are design/target claims, not measured annual consumption. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/flexential-acquires-prime-property-in-hillsboro-plans-new-data-center-as-next-phase-of-expansion-302546009.html","host":"prnewswire.com","date":"2025-09-04","published":"2025-09-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5472442,"lng":-122.8910057,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"separate Hillsboro5and6sections","fields":{"hillsboro6_planned_area_sqft":350000,"hillsboro6_planned_capacity_mw":27,"hillsboro6_floors":2,"hillsboro5_area_sqft":358000,"hillsboro5_planned_capacity_mw":36,"hillsboro5_stage_at_release":"under construction","hillsboro5_opening_target_year":2026,"power_basis":"capacity, not explicitly IT versus gross"},"notes":["3935NEAloclekPlace is Hillsboro1acrossfrom newparcel, not verified Hillsboro6streetaddress.5and6are distinct developments; no copying63MWto each. Enterprise-zone marketing not individual incentive award. RegionalCBREmarketpercentages and corporate1Bfundraising excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/flexential-acquires-prime-property-in-hillsboro-plans-new-data-center-as-next-phase-of-expansion-302546009.html","host":"prnewswire.com","date":"2025-09-04","published":"2025-09-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Portland - Hillsboro 6","publisher_reported_footprint_sqft":350000,"publisher_reported_critical_power_mw":27,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false,"status_verified_by_this_document":null},"notes":["Marketing section alone does not establish a current operating date. WUE 0 and PUE 1.4 are design/target claims, not measured annual consumption.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"fort-rock-data-center-bend-or","state":"OR","kind":"facility","name":"Fort Rock Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Deschutes"],"city":"Bend","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fort Rock Bend explicit street identity. No numericITMW,areaororiginalopening. SOC2Type1operatorclaimnotindependentreportinspection. Low-risk/sustainabilitywordingnotzero-riskguaranteeormeasuredenergy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fortrockdc.com/about/","host":"fortrockdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.0474593,"lng":-121.3285495,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Fort Rock Bend explicit street identity","fields":{"operator":"Fort Rock Data Center","address":"207 SouthwestColumbiaStreet, Bend, Oregon97702","operator_described_use":"purpose-built carrier-neutral colocation facility"},"notes":["No numericITMW,areaororiginalopening. SOC2Type1operatorclaimnotindependentreportinspection. Low-risk/sustainabilitywordingnotzero-riskguaranteeormeasuredenergy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fortrockdc.com/about/","host":"fortrockdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Bend · Deschutes · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"google-the-dalles-port-river-road-or","state":"OR","kind":"facility","name":"Google The Dalles Data Center  -  3500 River Road (Port of The Dalles)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wasco"],"city":"The Dalles","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. TomPeterson ColumbiaCommunityConnection originalSeptember20,2022, perpublicmetadata; January3,2025modifiedtimestampnotevent. WhitingTurner filedGoogle/DesignLLC3500RiverRd290000sfAPPLICATION; 45dayprocess/months-to-groundbreakingnotactualapproval/construction.600Mpossiblecostnotpaid. Two-project125Mrevenue/147Mabatement20year estimates differ fromonefacility.3Mpersite initialpaymentconditionalonconstruction-in-processsubmission, notverifiedcash; twoifbuilt6Mnotone6M.50%/60%capturesdifferentscopesnotuniversalflatalltaxrebate.28.5MwaterinfrastructurecommitmentnotDCconsumption/currenttariff. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://columbiacommunityconnection.com/the-dalles/google-making-moves-to-break-ground-on-first-new-data-center-in-the-dalles","host":"columbiacommunityconnection.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.62539,"lng":-121.20239,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["TomPeterson ColumbiaCommunityConnection originalSeptember20,2022, perpublicmetadata; January3,2025modifiedtimestampnotevent. WhitingTurner filedGoogle/DesignLLC3500RiverRd290000sfAPPLICATION; 45dayprocess/months-to-groundbreakingnotactualapproval/construction.600Mpossiblecostnotpaid.","Two-project125Mrevenue/147Mabatement20year estimates differ fromonefacility.3Mpersite initialpaymentconditionalonconstruction-in-processsubmission, notverifiedcash; twoifbuilt6Mnotone6M.50%/60%capturesdifferentscopesnotuniversalflatalltaxrebate.28.5MwaterinfrastructurecommitmentnotDCconsumption/currenttariff.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://columbiacommunityconnection.com/the-dalles/google-making-moves-to-break-ground-on-first-new-data-center-in-the-dalles","host":"columbiacommunityconnection.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · The Dalles · Wasco · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"google-the-dalles-or","state":"OR","kind":"facility","name":"Google The Dalles Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wasco"],"city":"The Dalles","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 7Bstatetotalnotbuilding-onlycapex.2015fourthconstructionnotfourthopening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/oregon/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5975,"lng":-121.1776,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"first_data_center_opening_year":2006,"fourth_data_center_construction_start_year":2015,"regional_investment_usd_min_exclusive":7000000000,"investment_scope":"Oregon statewide"},"notes":["7Bstatetotalnotbuilding-onlycapex.2015fourthconstructionnotfourthopening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/oregon/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · The Dalles · Wasco · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"h5-data-centers-portland-or","state":"OR","kind":"facility","name":"H5 Data Centers Portland","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Multnomah"],"city":"Portland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Backup generator capacity is not IT or utility-service capacity. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/portland-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5318147,"lng":-122.6839805,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"1233 NW 12th Avenue, Suite201, Portland, OR 97209","advertised_facility_sqft":42000,"backup_generator_mw":2},"notes":["Backup generator capacity is not IT or utility-service capacity.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/portland-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Portland · Multnomah · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"meta-prineville-or","state":"OR","kind":"facility","name":"Meta Prineville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Crook"],"city":"Prineville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.3042,"lng":-120.8515,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"operator_labeled_data_center_investment_usd":2000000000,"investment_is_lower_bound":true,"investment_geographic_label":"Oregon","historic_groundbreaking_year":2010,"peak_construction_workers":1000,"operator_reported_operational_jobs_lower_bound":350,"local_school_nonprofit_direct_funding_usd_lower_bound":5700000,"direct_funding_county_scope":"Crook"},"notes":["Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Prineville · Crook · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"ntt-hillsboro-hi1-data-center-or","state":"OR","kind":"facility","name":"NTT Hillsboro HI1 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Address supports limited facility context; no HI1 code, exact current operator contract or critical IT specification in source. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5496803,"lng":-122.9373872,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"NTT Global","listed_address":"4050 NE Evergreen Rd","listed_city":"Hillsboro","listed_state":"OR"},"notes":["Address supports limited facility context; no HI1 code, exact current operator contract or critical IT specification in source.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"verrus-oakline-mill-creek-salem-or","state":"OR","kind":"facility","name":"Oakline at Mill Creek","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Salem","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Directive to terminate is not independently read executed cancellation or finding all adjacent private development impossible. No statewide data-center ban or current operational closure. Exact Verrus/Oakline company match not independently established in this release. No MW or cost. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.oregon.gov/oregon-newsroom/OR/GOV/Posts/Post/governor-kotek-directs-state-to-withdraw-land-for-proposed-salem-data-center-site","host":"apps.oregon.gov","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.88315,"lng":-122.96941,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"governor_directive_date":"2026-07-30","directed_action":"terminate state land-sale contract for proposed data-center site","state_land_area_acres_approx":32,"published_location":"MillCreekCorporateCenter,southeastSalem,Oregon"},"notes":["Directive to terminate is not independently read executed cancellation or finding all adjacent private development impossible. No statewide data-center ban or current operational closure. Exact Verrus/Oakline company match not independently established in this release. No MW or cost.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.oregon.gov/oregon-newsroom/OR/GOV/Posts/Post/governor-kotek-directs-state-to-withdraw-land-for-proposed-salem-data-center-site","host":"apps.oregon.gov","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Salem · Marion · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"percheron-data-center-or","state":"OR","kind":"facility","name":"Percheron Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Morrow"],"city":"Boardman area (Tower Road)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Rowan Percheron land and phased development chronology. Developerchronologynotindependentsignedrezoning/recordeddeedinspection.300MWplannednotoperatingIT. Boardmanofficialquotenotexactprojectparcelorendorsementbyallresidents. No exactfirstRFSday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rowan.digital/portfolio/percheron/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.7113177,"lng":-119.8262349,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Rowan Percheron land and phased development chronology","fields":{"developer":"Rowan Digital Infrastructure","project":"Percheron","region":"Oregon Columbia River Gorge","site_acres":275,"planned_campus_capacity_mw":300,"power_basis":"campus capacity, not explicit critical IT","developer_reported_due_diligence_start":"late2022","developer_reported_rezoning_approval_year":2023,"developer_reported_land_closing_year":2024,"phased_buildout_completion_target_year":2030},"notes":["Developerchronologynotindependentsignedrezoning/recordeddeedinspection.300MWplannednotoperatingIT. Boardmanofficialquotenotexactprojectparcelorendorsementbyallresidents. No exactfirstRFSday.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rowan.digital/portfolio/percheron/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Boardman area (Tower Road) · Morrow · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"pittock-block-portland-or","state":"OR","kind":"facility","name":"Pittock Block (PTOR1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Multnomah"],"city":"Portland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. 1547 Pittock carrier hotel area and power scope. Publishedspaceisbuilding/operatorofferingnotexplicitwhitespace.8MWpowernotIT;7MWbackupnotadded.94providersheadlineversus170plus/179servicesand16fiberoperatorsarescopecategoriesnotcurrentcarrier-censusproof. MatawanNJheadquartersnotPittockaddress. No exactopeningdateorcurrentload. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://1547realty.com/data-centers/portland/","host":"1547realty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5215436,"lng":-122.680704,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"1547 Pittock carrier hotel area and power scope","fields":{"operator_owner_publication":"1547 Critical Systems Realty","code":"PTOR1","facility":"Pittock Block","locality":"Portland, Oregon","published_space_sqft":302262,"published_power_capacity_mw":8,"backup_generation_mw":7,"onsite_generators":5},"notes":["Publishedspaceisbuilding/operatorofferingnotexplicitwhitespace.8MWpowernotIT;7MWbackupnotadded.94providersheadlineversus170plus/179servicesand16fiberoperatorsarescopecategoriesnotcurrentcarrier-censusproof. MatawanNJheadquartersnotPittockaddress. No exactopeningdateorcurrentload.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://1547realty.com/data-centers/portland/","host":"1547realty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Portland · Multnomah · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"qts-hillsboro-1-or","state":"OR","kind":"facility","name":"QTS Hillsboro 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Separate Tower Solar project is 166 MW-dc / 120 MWac generation, not data-center IT load; excluded. Campus critical specification is not measured utilization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/hillsboro-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5588149,"lng":-122.9277661,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":25,"advertised_critical_power_mw_lower_bound":20,"published_dc1_address":"4951 NE Huffman St, Hillsboro"},"notes":["Separate Tower Solar project is 166 MW-dc / 120 MWac generation, not data-center IT load; excluded. Campus critical specification is not measured utilization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/hillsboro-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"qts-hillsboro-2-or","state":"OR","kind":"facility","name":"QTS Hillsboro 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Campus total across multiple buildings. Separate regional TowerSolar166MW-dc/120MWac headline is generation, not site IT capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"http://q.com/data-centers/hillsboro-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.55888,"lng":-122.92961,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"campus_acres":51,"critical_campus_capacity_mw_lower_bound":180},"notes":["Campus total across multiple buildings. Separate regional TowerSolar166MW-dc/120MWac headline is generation, not site IT capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"http://q.com/data-centers/hillsboro-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"qts-hillsboro-3-or","state":"OR","kind":"facility","name":"QTS Hillsboro 3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Planned campus. Separate solar generation and company portfolio figures excluded; no site MW or commissioned status established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/hillsboro-3/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5719248,"lng":-122.918438,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"planned_campus_acres":44,"planned_buildings":2},"notes":["Planned campus. Separate solar generation and company portfolio figures excluded; no site MW or commissioned status established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/hillsboro-3/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"roundhouse-cascade-locks-or","state":"OR","kind":"facility","name":"Roundhouse Cascade Locks Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hood River"],"city":"Cascade Locks","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical cancellation. Does not describe separate Abundant Mines tenant, nor establish the prior announced power or investment. Port office address is not a facility parcel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.portofcascadelocks.gov/july-20-2023-cascade-locks-port-and-roundhouse-inc-jointly-announce-decision-to-discontinue-datacenter-project","host":"portofcascadelocks.gov","date":"2023-07-20","published":"2023-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.6678863,"lng":-121.8963113,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"status_event":"project_discontinued","event_date":"2023-07-20","actor":"Port of Cascade Locks and Roundhouse joint announcement"},"notes":["Historical cancellation. Does not describe separate Abundant Mines tenant, nor establish the prior announced power or investment. Port office address is not a facility parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.portofcascadelocks.gov/july-20-2023-cascade-locks-port-and-roundhouse-inc-jointly-announce-decision-to-discontinue-datacenter-project","host":"portofcascadelocks.gov","date":"2023-07-20","published":"2023-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Cascade Locks · Hood River · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"sabey-umatilla-or","state":"OR","kind":"facility","name":"SDC Umatilla Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Umatilla"],"city":"Umatilla","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Projected schedule, not delivered phases; shell delivery does not mean operating data hall. Power is aggregate, not explicitlyIT. Page1.3estimated versus1.25projectedPUElabels remain forecasts. Enterprise-zone and state tax marketing requires current government evidence; no award value adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sabeydatacenters.com/locations/sdc-umatilla","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.919,"lng":-119.339,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_aggregate_power_mw_min_exclusive":120,"projected_schedule":{"groundbreaking_year":2024,"core_shell_delivery_year":2026,"first_data_hall_online_year":2027,"first_data_hall_mw":9,"second_data_hall_online_year":2028,"second_data_hall_mw":9,"later_halls_and_building2_year_min":2029}},"notes":["Projected schedule, not delivered phases; shell delivery does not mean operating data hall. Power is aggregate, not explicitlyIT. Page1.3estimated versus1.25projectedPUElabels remain forecasts. Enterprise-zone and state tax marketing requires current government evidence; no award value adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sabeydatacenters.com/locations/sdc-umatilla","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Umatilla · Umatilla · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"stack-hillsboro-or","state":"OR","kind":"facility","name":"STACK Hillsboro Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Nick LaMora, HillsboroNewsTimes August8,2026 original city records/staff reporting: STACK filed July27at10:14 to REVISE existing2014three-phase approval, not a new permitted building or specified MW.120day July27moratorium reportedly allows this earlier filing to continue review, not approved changes. Aligned NE30th/glencoeswale preapplication about one hour later is NOT formal land-use filing and not exempt, separate unpinned concept. Wagon/Corny July21 applications nearly20/29ac respectively are not independently crosswalked to Hines/DigitalRealty rows.180day SIP-agreement pause separate from120day development pause/state enterprise-zone restrictions. August26/September15/October6rule milestones were future targets; no later adoption observed from this article. Signed enactments uninspected. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hillsboronewstimes.com/2026/08/08/data-center-proposals-filed-days-hours-before-hillsboro-moratorium-approved/","host":"hillsboronewstimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5229,"lng":-122.9898,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Nick LaMora, HillsboroNewsTimes August8,2026 original city records/staff reporting: STACK filed July27at10:14 to REVISE existing2014three-phase approval, not a new permitted building or specified MW.120day July27moratorium reportedly allows this earlier filing to continue review, not approved changes. Aligned NE30th/glencoeswale preapplication about one hour later is NOT formal land-use filing and not exempt, separate unpinned concept. Wagon/Corny July21 applications nearly20/29ac respectively are not independently crosswalked to Hines/DigitalRealty rows.180day SIP-agreement pause separate from120day development pause/state enterprise-zone restrictions. August26/September15/October6rule milestones were future targets; no later adoption observed from this article. Signed enactments uninspected.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://hillsboronewstimes.com/2026/08/08/data-center-proposals-filed-days-hours-before-hillsboro-moratorium-approved/","host":"hillsboronewstimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"stack-por01-or","state":"OR","kind":"facility","name":"STACK POR01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. POR01 campus and two building sections. Campus 80 MW including future expansion does not reconcile with displayed building powers 5 plus 72 MW. Retain scope conflict; no total current IT capacity inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/portland/por01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5493273,"lng":-122.9278183,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"POR01 campus and two building sections","fields":{"campus_advertised_power_mw":80,"future_expansion_power_mw":36,"campus_acres":18,"campus_buildings":2,"building_sections":[{"code":"POR01A","advertised_power_mw":5,"area_sqft":65000},{"code":"POR01B","advertised_power_mw":72,"area_sqft":215000}]},"notes":["Campus 80 MW including future expansion does not reconcile with displayed building powers 5 plus 72 MW. Retain scope conflict; no total current IT capacity inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/portland/por01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"stack-por02-or","state":"OR","kind":"facility","name":"STACK POR02","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Advertised power basis not explicitly IT. No precise energization date or measured load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/portland/por02/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5473758,"lng":-122.8973869,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"advertised_power_mw":24,"campus_acres":15,"campus_buildings":1,"published_city":"Hillsboro, Oregon"},"notes":["Advertised power basis not explicitly IT. No precise energization date or measured load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/portland/por02/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"stack-por03-or","state":"OR","kind":"facility","name":"STACK POR03","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Hillsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. POR03 campus operational versus future components. Explicit 72 MW operational critical capacity separated from near-term and expansion. Listed components total 193 MW versus approximately 200 MW headline. E/F combined area and power not repeated on each building. Water-use description is not measured withdrawal. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/portland/por03/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.5541322,"lng":-122.9379069,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"POR03 campus operational versus future components","fields":{"campus_approximate_total_critical_capacity_mw":200,"operational_critical_capacity_mw":72,"near_term_capacity_mw":25,"expansion_capacity_mw":96,"campus_acres":55,"campus_buildings":6,"building_sections":[{"code":"POR03A","area_sqft":182000,"power_mw":24},{"code":"POR03B","area_sqft":180000,"power_mw":24},{"code":"POR03C","area_sqft":180000,"power_mw":24},{"code":"POR03D","area_sqft":198000,"power_mw":25},{"code":"POR03E/F","combined_area_sqft":530000,"combined_power_mw":96}]},"notes":["Explicit 72 MW operational critical capacity separated from near-term and expansion. Listed components total 193 MW versus approximately 200 MW headline. E/F combined area and power not repeated on each building. Water-use description is not measured withdrawal.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/portland/por03/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Hillsboro · Washington · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"us-signal-or01-bend-or","state":"OR","kind":"facility","name":"US Signal OR01 Bend","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Deschutes"],"city":"Bend","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening. Source labels UPS as 256 tons, an invalid UPS capacity unit. Quarantine that field rather than convert cooling tons into electrical MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers/or01-bend/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.086105,"lng":-121.2830411,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"OR01","published_address":"20845 Sockeye Place, Bend, OR97701","generator_kw":2000,"ups_kw":null,"utility_kva":2500,"operator_reported_year_built":2010},"notes":["Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening.","Source labels UPS as 256 tons, an invalid UPS capacity unit. Quarantine that field rather than convert cooling tons into electrical MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers/or01-bend/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Oregon · Bend · Deschutes · Source context reviewed","state_name":"Oregon","state_path":"/oregon/"},{"id":"four-three-glenbrook-salem-township-luzerne-pa","state":"PA","kind":"facility","name":"4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Salem Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The potential 1.2-billion-USD purchase is neither a closed transaction nor construction spending. Proposed demand is not secured IT. The earlier QTS closing is separate. The buyer is undisclosed and the expected community agreement is not executed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.timesleader.com/news/1745226/1-2-billion-land-deal-for-second-data-center-project-in-salem-township-announced-by-4-3-group","host":"timesleader.com","date":"2026-06-13","published":"2026-06-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.1078249,"lng":-76.1791155,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Times Leader describes prospective Glen Brook land assembly, a 39-building concept and intended zoning applications.","independently_verified_current_operating_status":null},"notes":["The potential 1.2-billion-USD purchase is neither a closed transaction nor construction spending. Proposed demand is not secured IT. The earlier QTS closing is separate. The buyer is undisclosed and the expected community agreement is not executed.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.timesleader.com/news/1745226/1-2-billion-land-deal-for-second-data-center-project-in-salem-township-announced-by-4-3-group","host":"timesleader.com","date":"2026-06-13","published":"2026-06-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Salem Township · Luzerne · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"aws-falls-township-pa","state":"PA","kind":"facility","name":"Amazon Web Services Innovation Campus, Falls Township","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bucks"],"city":"Falls Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Falls municipal Amazon announcement and land-plan scopes. 20Band1250jobs statewide not Falls-only.1800ac entire redevelopment not DC footprint. Existingbuilding6distributionplan modified and247acphase2separate scopes;do not call all structures operating DCs. Preliminary/final land-development plans not observed customer service. No numeric ITMW, final current service date or actual spend. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fallstwp.com/resources/news/article/?id=10070","host":"fallstwp.com","date":"2025-06-09","published":"2025-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.1545,"lng":-74.7882,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Falls municipal Amazon announcement and land-plan scopes","fields":{"agency":"Falls Township, Pennsylvania","announcement_date":"2025-06-09","operator":"Amazon","regional_planned_investment_usd":20000000000,"regional_expected_jobs":1250,"regional_scope":"Pennsylvania multiple campuses","broader_keystone_trade_center_acres":1800,"phase2_digital_infrastructure_parcel_acres":247,"modified_existing_plan_addresses":["1 Ben Fairless Drive","700 SouthPortRoad"],"phase2_planned_structures":10,"phase2_total_planned_area_sqft_min_exclusive":2000000,"phase2_individual_structure_sqft_range":[112000,217000],"agency_described_plan_change_month":"2025-03"},"notes":["20Band1250jobs statewide not Falls-only.1800ac entire redevelopment not DC footprint. Existingbuilding6distributionplan modified and247acphase2separate scopes;do not call all structures operating DCs. Preliminary/final land-development plans not observed customer service. No numeric ITMW, final current service date or actual spend.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fallstwp.com/resources/news/article/?id=10070","host":"fallstwp.com","date":"2025-06-09","published":"2025-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Falls Township · Bucks · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"archbald-i-campus-1-eynon-jermyn-road-lackawanna-pa","state":"PA","kind":"facility","name":"Archbald I Campus 1 Data Center (Eynon Jermyn Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Archbald","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","host":"yahoo.com","date":"2025-11-01","published":"2025-11-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5095,"lng":-75.5661,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheTimes-Tribune viaYahoo describes ArchbaldILLCOctober 22 applications for two distinct campuses:18 buildings onroughly 408 acres andfourbuildings onroughly 66 acres, with corporate/end-user identity undisclosed.","independently_verified_current_operating_status":null},"notes":["22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","host":"yahoo.com","date":"2025-11-01","published":"2025-11-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Archbald · Lackawanna · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"archbald-i-campus-2-washington-avenue-lackawanna-pa","state":"PA","kind":"facility","name":"Archbald I Campus 2 Data Center (Eynon Jermyn Road at Washington Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Archbald","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","host":"yahoo.com","date":"2025-11-01","published":"2025-11-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5149,"lng":-75.5554,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TheTimes-Tribune viaYahoo describes ArchbaldILLCOctober 22 applications for two distinct campuses:18 buildings onroughly 408 acres andfourbuildings onroughly 66 acres, with corporate/end-user identity undisclosed.","independently_verified_current_operating_status":null},"notes":["22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html","host":"yahoo.com","date":"2025-11-01","published":"2025-11-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Archbald · Lackawanna · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"ardent-pittsburgh-mckees-rocks-pa","state":"PA","kind":"facility","name":"Ardent Data Centers Pittsburgh (McKees Rocks)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"McKees Rocks","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Limited named street-label/service context or issuer acquisition statement.. Original NorthernData issuer release January22,2024 states completed acquisition of McKeesRocks Pittsburgh7.5-acre/41000sf facility. Price undisclosed; no closing deed or exact parcel survey inspected. Existing5MW to full20MW targetH22025, with retrofit completionQ42024 separately targeted; not25MW additive or observed2026 energization. No explicitITbasis. PUE1.2orless is a target, not measured annual efficiency or independent most-efficient ranking. Under10ms regional latency/favorablepricing claims not audited currentperformance/all-in tariff. EuropeanBoden site is separate. Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.co.uk/news-releases/ardent-data-centers-a-northern-data-group-company-completes-acquisition-of-pennsylvania-data-center-302040653.html","host":"prnewswire.co.uk","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.4646,"lng":-80.081,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-management-system-scope-and-acquisition-stages-round88-2026-10-15.json","scope":"Limited named street-label/service context or issuer acquisition statement.","fields":{},"notes":["Original NorthernData issuer release January22,2024 states completed acquisition of McKeesRocks Pittsburgh7.5-acre/41000sf facility. Price undisclosed; no closing deed or exact parcel survey inspected. Existing5MW to full20MW targetH22025, with retrofit completionQ42024 separately targeted; not25MW additive or observed2026 energization. No explicitITbasis.","PUE1.2orless is a target, not measured annual efficiency or independent most-efficient ranking. Under10ms regional latency/favorablepricing claims not audited currentperformance/all-in tariff. EuropeanBoden site is separate.","Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied."],"sources":[{"url":"https://www.prnewswire.co.uk/news-releases/ardent-data-centers-a-northern-data-group-company-completes-acquisition-of-pennsylvania-data-center-302040653.html","host":"prnewswire.co.uk","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · McKees Rocks · Allegheny · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"aws-cumulus-salem-township-pa","state":"PA","kind":"facility","name":"AWS Cumulus Data Center Campus, Salem Township","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Salem Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Statewide exemption-cost estimates are not a known Amazon award amount. Two-campus commitment is not per-site spending; labor and energy claims remain attributed and dated. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://technical.ly/civics/amazon-data-centers-tax-break/","host":"technical.ly","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.0949,"lng":-76.1452,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Spotlight PA reporting via Technical.ly describes Salem Township and Falls Township AWS investments, state sales-tax exemption and workforce support.","independently_verified_current_operating_status":null},"notes":["Statewide exemption-cost estimates are not a known Amazon award amount. Two-campus commitment is not per-site spending; labor and energy claims remain attributed and dated.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://technical.ly/civics/amazon-data-centers-tax-break/","host":"technical.ly","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Salem Township · Luzerne · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"aws-kline-township-schuylkill-pa","state":"PA","kind":"facility","name":"AWS Kline Township Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Schuylkill"],"city":"Kline Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Extension is not preliminary/final land-development approval. Later deadline outcome remains unobserved; unrelated municipal spending in article is not project incentive. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://shensentinel.com/news/kline-supervisors-grant-extension-for-consideration-of-amazon-data-center-plans/","host":"shensentinel.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8699957,"lng":-76.0215859,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Shenandoah Sentinel reports AWS Kline plan consideration deadline extended to September 30, 2026.","independently_verified_current_operating_status":null},"notes":["Extension is not preliminary/final land-development approval. Later deadline outcome remains unobserved; unrelated municipal spending in article is not project incentive.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://shensentinel.com/news/kline-supervisors-grant-extension-for-consideration-of-amazon-data-center-plans/","host":"shensentinel.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Kline Township · Schuylkill · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"switch-big-beaver-pa","state":"PA","kind":"facility","name":"Big Beaver Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Beaver"],"city":"Big Beaver","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Planned development, no site MW, capital amount or opening date supplied. Zero server-cooling water explicitly allows office/warehouse water connection. Ratepayer protection statement not independent tariff review. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/","host":"switch.com","date":"2026-04-30","published":"2026-04-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.75,"lng":-80.33,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"development_announcement_date":"2026-04-30","planned_campus_acres":382,"published_municipality":"Big Beaver Borough","published_county":"Beaver, Pennsylvania"},"notes":["Planned development, no site MW, capital amount or opening date supplied. Zero server-cooling water explicitly allows office/warehouse water connection. Ratepayer protection statement not independent tariff review.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/","host":"switch.com","date":"2026-04-30","published":"2026-04-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Big Beaver · Beaver · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"bitfarms-sharon-pa","state":"PA","kind":"facility","name":"Bitfarms Sharon Facility (former Westinghouse plant)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Mercer"],"city":"Sharon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.2334,"lng":-80.497,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Campus-level issuer context, not proof every imported plant/building ID is independently energized.","fields":{"announcement_date":"2026-05-11","quarter_ended":"2026-03-31","company_claim":"Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.","redomiciliation_parent_transaction_date":"2026-04-01"},"notes":["Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Sharon · Mercer · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"blakely-borough-data-center-lackawanna-pa","state":"PA","kind":"facility","name":"Blakely Borough Data Center (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Blakely","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Proposed land clearing/storage remained disputed; withdrawal does not resolve legality of other uses or imply all activity ceased. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds","host":"fox56.com","date":"2025-09-15","published":"2025-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.4809,"lng":-75.5946,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"WOLF reports Blakely rezoning application withdrawal and cancelled hearing; developer said data center no longer moving ahead.","independently_verified_current_operating_status":null},"notes":["Proposed land clearing/storage remained disputed; withdrawal does not resolve legality of other uses or imply all activity ceased.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds","host":"fox56.com","date":"2025-09-15","published":"2025-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Blakely · Lackawanna · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"pennsylvania-glacial-till-caughbaugh-road-tobyhanna-monroe-pa","state":"PA","kind":"facility","name":"Caughbaugh Road Data Center (Pennsylvania Glacial Till site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monroe"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Overlay adoption is not all construction/environmental permits; the developer counsel acknowledged more reviews. Proposed closed-loop cooling and described noise limits are not measured operation. No 2026 opening, IT MW or new building count inferred, and the generic legal duty to allow DCs is not adopted as independent legal analysis. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fox56.com/news/local/tobyhanna-township-approves-second-data-center-zoning-overlay","host":"fox56.com","date":"2025-12-15","published":"2025-12-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.1345,"lng":-75.6185,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WOLF reports a December 15 Tobyhanna overlay vote for the Pennsylvania Glacial Till property along Caughbaugh Road, separate from the December 11 Pocono Manor ordinance.","independently_verified_current_operating_status":null},"notes":["Overlay adoption is not all construction/environmental permits; the developer counsel acknowledged more reviews. Proposed closed-loop cooling and described noise limits are not measured operation. No 2026 opening, IT MW or new building count inferred, and the generic legal duty to allow DCs is not adopted as independent legal analysis.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fox56.com/news/local/tobyhanna-township-approves-second-data-center-zoning-overlay","host":"fox56.com","date":"2025-12-15","published":"2025-12-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Monroe · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"air-products-cetronia-road-upper-macungie-pa","state":"PA","kind":"facility","name":"Cetronia Road Data Center (former Air Products site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lehigh"],"city":"Trexlertown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. LehighValleyNews originalNov12/13,2025report:AirProducts194acformerHQproposal2.6Msf,applicationstillprocessed/notpublicthen. Originalwarehouse2023approvalnotDCpermit.22.2Mtaxassessedvalue notsaleprice/capex. Generic500000homescomparisonnotmeasuredsiteMW. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations. WFMZMay27,2026hearingreportnames7300Cetronia/3buildings,denialofcontinuance andsimilar-use relief. OralhearingdenialdistinctfromwrittenJulydecision;45daywrittendecision/30dayappealreportedprocedure,notindependentlegaldeadlinecalculation. NoactualMWwaterorpermitcertification. Aug12,2026LehighValleyPublicMediaquotesAirProductsspokesman:companydidnotappeal,andhasnofuturepropertyuse/ownershipdecisiontoannounce. ReportedAug5appealdeadline,notcomputedlegaladvice;writtenJulydecisionafterMay27hearing.194ac2.6MsfDCproposalabandoned,notdemolitionofoperatingcampus. PrologisdealwasearlierWAREHOUSEplanandneverclosed,notDCoperator.95000gpd/930cars19truckstrafficwereSTUDYPROJECTIONSnotmeasureduse;23.2Massessmentnotcapex.22.2Moldassessmentdifferentdate.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lehighvalleynews.com/business/giant-data-center-proposal-in-upper-macungie-township-is-in-the-works","host":"lehighvalleynews.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.wfmz.com/news/area/lehighvalley/lehigh-county/western-lehigh-county/upper-macungie-zoners-reject-appeal-for-massive-data-center-campus-on-former-air-products-site/article_c531b72e-e928-4562-bcbf-3dbc7e9ce3e8.html","host":"wfmz.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.lehighvalleypublicmedia.org/news/all/air-products-abandons-plan-for-data-center-at-former-upper-macungie-headquarters/","host":"lehighvalleypublicmedia.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5510536,"lng":-75.5965424,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"LehighValleyNews originalNov12/13,2025report:AirProducts194acformerHQproposal2.6Msf,applicationstillprocessed/notpublicthen. Originalwarehouse2023approvalnotDCpermit.22.2Mtaxassessedvalue notsaleprice/capex. Generic500000homescomparisonnotmeasuredsiteMW."},"notes":["LehighValleyNews originalNov12/13,2025report:AirProducts194acformerHQproposal2.6Msf,applicationstillprocessed/notpublicthen. Originalwarehouse2023approvalnotDCpermit.22.2Mtaxassessedvalue notsaleprice/capex. Generic500000homescomparisonnotmeasuredsiteMW.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.lehighvalleynews.com/business/giant-data-center-proposal-in-upper-macungie-township-is-in-the-works","host":"lehighvalleynews.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"WFMZMay27,2026hearingreportnames7300Cetronia/3buildings,denialofcontinuance andsimilar-use relief. OralhearingdenialdistinctfromwrittenJulydecision;45daywrittendecision/30dayappealreportedprocedure,notindependentlegaldeadlinecalculation. NoactualMWwaterorpermitcertification."},"notes":["WFMZMay27,2026hearingreportnames7300Cetronia/3buildings,denialofcontinuance andsimilar-use relief. OralhearingdenialdistinctfromwrittenJulydecision;45daywrittendecision/30dayappealreportedprocedure,notindependentlegaldeadlinecalculation. NoactualMWwaterorpermitcertification.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.wfmz.com/news/area/lehighvalley/lehigh-county/western-lehigh-county/upper-macungie-zoners-reject-appeal-for-massive-data-center-campus-on-former-air-products-site/article_c531b72e-e928-4562-bcbf-3dbc7e9ce3e8.html","host":"wfmz.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"Aug12,2026LehighValleyPublicMediaquotesAirProductsspokesman:companydidnotappeal,andhasnofuturepropertyuse/ownershipdecisiontoannounce. ReportedAug5appealdeadline,notcomputedlegaladvice;writtenJulydecisionafterMay27hearing.194ac2.6MsfDCproposalabandoned,notdemolitionofoperatingcampus. PrologisdealwasearlierWAREHOUSEplanandneverclosed,notDCoperator.95000gpd/930cars19truckstrafficwereSTUDYPROJECTIONSnotmeasureduse;23.2Massessmentnotcapex.22.2Moldassessmentdifferentdate."},"notes":["Aug12,2026LehighValleyPublicMediaquotesAirProductsspokesman:companydidnotappeal,andhasnofuturepropertyuse/ownershipdecisiontoannounce. ReportedAug5appealdeadline,notcomputedlegaladvice;writtenJulydecisionafterMay27hearing.194ac2.6MsfDCproposalabandoned,notdemolitionofoperatingcampus. PrologisdealwasearlierWAREHOUSEplanandneverclosed,notDCoperator.95000gpd/930cars19truckstrafficwereSTUDYPROJECTIONSnotmeasureduse;23.2Massessmentnotcapex.22.2Moldassessmentdifferentdate.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://www.lehighvalleypublicmedia.org/news/all/air-products-abandons-plan-for-data-center-at-former-upper-macungie-headquarters/","host":"lehighvalleypublicmedia.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Trexlertown · Lehigh · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"coreweave-lancaster-pa","state":"PA","kind":"facility","name":"CoreWeave Lancaster Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lancaster"],"city":"Lancaster","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. LancasterAIHub CBA summary andconditionalcommunity commitments. Officialsummary not fullsignedCBAor actualpayments. Twofunds10Meach not10Mperbuilding. Clean-energyrequirement expresslyallows lowerpercentlongtermcontracts with significantfundcontributions, not unqualified100percentrenewable.20kgpd is percampus cap, not measuredtotalwithdrawal. LocalnoLERTA not allstate/federalincentives. No newsiteMWoropening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityoflancasterpa.gov/wp-content/uploads/2025/11/Community-Benefits-Agreement-Summary-1-1.pdf","host":"cityoflancasterpa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.0379,"lng":-76.3055,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"LancasterAIHub CBA summary andconditionalcommunity commitments","fields":{"described_water_cap_gallons_per_day_per_campus":20000,"described_community_funds":2,"described_contribution_usd_each_fund":10000000,"payment_milestones":"construction financing andwithin30days ofoperations,phasedperbuilding","city_tax_breaks_description":"ChirisaTechnologyParks affiliates not receivingCityofLancastertaxbreaks includingLERTA"},"notes":["Officialsummary not fullsignedCBAor actualpayments. Twofunds10Meach not10Mperbuilding. Clean-energyrequirement expresslyallows lowerpercentlongtermcontracts with significantfundcontributions, not unqualified100percentrenewable.20kgpd is percampus cap, not measuredtotalwithdrawal. LocalnoLERTA not allstate/federalincentives. No newsiteMWoropening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cityoflancasterpa.gov/wp-content/uploads/2025/11/Community-Benefits-Agreement-Summary-1-1.pdf","host":"cityoflancasterpa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Lancaster · Lancaster · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"databank-pit1-pittsburgh-pa","state":"PA","kind":"facility","name":"DataBank PIT1 (Downtown Pittsburgh)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Pittsburgh","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 6.9MW market total covers both sites; notPIT1. Operator separates downtownPIT1 fromPIT2SummitPark. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.4479,"lng":-80.0086,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"100 S Commons #126","city":"Pittsburgh","critical_it_capacity_mw":1.9,"it_area_sqft":30760},"notes":["6.9MW market total covers both sites; notPIT1.","Operator separates downtownPIT1 fromPIT2SummitPark.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Pittsburgh · Allegheny · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"databank-pit2-summit-park-pittsburgh-pa","state":"PA","kind":"facility","name":"DataBank PIT2 (Summit Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Pittsburgh","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.4433,"lng":-80.1697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"PIT2","street":"35 SummitParkDr","city":"Pittsburgh","critical_it_capacity_mw":5,"it_area_sqft":47100,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/data-centers/pittsburgh/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Pittsburgh · Allegheny · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"expedient-pit1-green-tree-pittsburgh-south-pa","state":"PA","kind":"facility","name":"Expedient PIT1 (Green Tree / Pittsburgh South)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Pittsburgh","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Pittsburgh regional header and distinct site tables. BoundpreferredIDnamesPIT1,soPIT2is separate contextual site, notPIT1expansion.6MWregional total not each site. Generator3/8MW separate from IT. Exact municipal GreenTree jurisdiction not independently established by Pittsburgh postal label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.expedient.com/data-centers/pittsburgh/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.427371,"lng":-80.0425212,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Expedient Pittsburgh regional header and distinct site tables","fields":{"sites":[{"code":"PIT1","address":"810 Parish Street, Pittsburgh, PA15220","critical_it_mw":1.8,"total_area_sqft":26000,"raised_floor_sqft":12000},{"code":"PIT2","address":"100 S Commons, Suite001, Pittsburgh, PA15212","critical_it_mw":4.2,"total_area_sqft":50700,"raised_floor_sqft":26000}],"regional_critical_it_mw":6},"notes":["BoundpreferredIDnamesPIT1,soPIT2is separate contextual site, notPIT1expansion.6MWregional total not each site. Generator3/8MW separate from IT. Exact municipal GreenTree jurisdiction not independently established by Pittsburgh postal label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.expedient.com/data-centers/pittsburgh/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Pittsburgh · Allegheny · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"flexential-allentown-data-center-abe01-pa","state":"PA","kind":"facility","name":"Flexential Allentown Data Center (ABE01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lehigh"],"city":"Allentown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Historical operator specification sheet; named Allentown facility, no address on these two pages.. Historical brochure remains publicly served; it does not independently verify October 2026 operations, current certification or actual annual PUE. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2020-02/allentown-data-center-sheet.pdf","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.6356953,"lng":-75.4575733,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Historical operator specification sheet; named Allentown facility, no address on these two pages.","fields":{"publisher_reported_footprint_sqft":46800,"publisher_reported_critical_power_mw":0.849,"original_power_value":{"value":849,"unit":"kW","conversion":"849 / 1000 = 0.849 MW"},"publisher_pue_rating":1.8,"current_measured_demand_mw":null,"commissioning_date":null},"notes":["Historical brochure remains publicly served; it does not independently verify October 2026 operations, current certification or actual annual PUE.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2020-02/allentown-data-center-sheet.pdf","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Allentown · Lehigh · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"flexential-philadelphia-collegeville-phl01-pa","state":"PA","kind":"facility","name":"Flexential Philadelphia - Collegeville (PHL01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Collegeville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1522366,"lng":-75.4776181,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Philadelphia - Collegeville (PHL01)","publisher_reported_footprint_sqft":203703,"publisher_reported_critical_power_mw":7.2,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Collegeville · Montgomery · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"gouldsboro-project-gold-clifton-covington-lackawanna-pa","state":"PA","kind":"facility","name":"Gouldsboro Data Center Campus (Project Gold)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Clifton Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. WVIA KatBolus January3,2026 original report of Cliftonsettlement approvedpreviousFriday describes1778RichPikeLLCProjectGold. SettlementgovernsZONINGonly; land-developmentstudies/approvals remain and solicitor saysitdoesNOTendunderlyingzoninglitigation. Residents' promisedlawsuit isnot filedcase/ruling. Jan2vote date isdated-articleweekdayinference,notoriginalminutesverification. Atleastsevenpropertiesbroaderproject vsTHREECliftonpropertiesinsettlement,390acres+144reportedpropertyscopes notallbuildableDCfootprint. Equitableownership isnotverifieddeedclosing. Fivebuildings/threeCliftonsubcampuses notnewindependentcompanypins.65ftbuilding+15ftequipment=80fttotal limits,85ftwatertanks separate;100ftparcel/400fthomes setbacks proposedconditionsnotasbuilt. 65/55dBAreportedday/night limits are two-decibel reductions from67/57, not2%lessnoise ormeasuredcompliance. No privatewellCOOLING whilewellDRINKINGallowed doesnotmeanzerogroundwater. Offsitewastewater/nuclear-gasabandonmentconditions on southeastcampus notstatewideenergyban. Covingtondifferentjurisdiction; proposedNDAenduserunnamed. Exactexecutedsettlement/currentcourtoutcome unread. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.195,"lng":-75.595,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["WVIA KatBolus January3,2026 original report of Cliftonsettlement approvedpreviousFriday describes1778RichPikeLLCProjectGold. SettlementgovernsZONINGonly; land-developmentstudies/approvals remain and solicitor saysitdoesNOTendunderlyingzoninglitigation. Residents' promisedlawsuit isnot filedcase/ruling. Jan2vote date isdated-articleweekdayinference,notoriginalminutesverification.","Atleastsevenpropertiesbroaderproject vsTHREECliftonpropertiesinsettlement,390acres+144reportedpropertyscopes notallbuildableDCfootprint. Equitableownership isnotverifieddeedclosing. Fivebuildings/threeCliftonsubcampuses notnewindependentcompanypins.65ftbuilding+15ftequipment=80fttotal limits,85ftwatertanks separate;100ftparcel/400fthomes setbacks proposedconditionsnotasbuilt.","65/55dBAreportedday/night limits are two-decibel reductions from67/57, not2%lessnoise ormeasuredcompliance. No privatewellCOOLING whilewellDRINKINGallowed doesnotmeanzerogroundwater. Offsitewastewater/nuclear-gasabandonmentconditions on southeastcampus notstatewideenergyban. Covingtondifferentjurisdiction; proposedNDAenduserunnamed. Exactexecutedsettlement/currentcourtoutcome unread.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Clifton Township · Lackawanna · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"pa-data-center-partners-granville-township-mifflin-pa","state":"PA","kind":"facility","name":"Granville Township Data Center Campus (Loop Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mifflin"],"city":"Lewistown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Filing and solicitor interpretation are not final site approval, construction or court ruling. Planned Sunday action, July15zoning meeting and July21townhall have no assumed outcomes. USD22.5millionproject tax forecast has no verified period and is neither annual collected taxes nor public subsidy. Proposed buffers/noise rules not adopted from this story; no actual water, IT or secured power. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/us/articles/plans-filed-mifflin-county-data-011151924.html","host":"yahoo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5656,"lng":-77.6176,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"ABC27/WHTM report quotes GranvilleTownship solicitor saying PADataCenterPartners filed LoopRoad plans Friday before planned curative-amendment action, so review would proceed under current zoning. Public rendering depicts six proposed buildings.","independently_verified_current_operating_status":null},"notes":["Filing and solicitor interpretation are not final site approval, construction or court ruling. Planned Sunday action, July15zoning meeting and July21townhall have no assumed outcomes. USD22.5millionproject tax forecast has no verified period and is neither annual collected taxes nor public subsidy. Proposed buffers/noise rules not adopted from this story; no actual water, IT or secured power.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/us/articles/plans-filed-mifflin-county-data-011151924.html","host":"yahoo.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Lewistown · Mifflin · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"homer-city-energy-campus-pa","state":"PA","kind":"facility","name":"Homer City Energy Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Indiana"],"city":"Homer City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Homer City redevelopment site and agency permit index. 2GW is decommissioned coal generation, not proposed IT capacity. Air-permit and demolition indexes do not establish completed new natural-gas plant or operational data-center buildings. No blanket environmental clearance from one listed permit. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment","host":"pa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5383,"lng":-79.1542,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Homer City redevelopment site and agency permit index","fields":{"agency_page_updated":"2026-10-05","published_site_address":"1750 Powerplant Road,HomerCity,PA15748","published_municipality_county":"Center Township,IndianaCounty,Pennsylvania","redevelopment_site_acres_min_exclusive":3200,"former_coal_generation_gw":2,"former_coal_plant_ceased_operations_year":2023,"listed_air_plan_approval_date":"2025-11-18","listed_titlev_renewal_date":"2026-02-26"},"notes":["2GW is decommissioned coal generation, not proposed IT capacity. Air-permit and demolition indexes do not establish completed new natural-gas plant or operational data-center buildings. No blanket environmental clearance from one listed permit.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment","host":"pa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Homer City · Indiana · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"iron-city-wells-karthaus-township-clearfield-pa","state":"PA","kind":"facility","name":"Iron City Wells A.I. Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clearfield"],"city":"Karthaus Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Original Pennsylvania Bulletin volume 56 number 5, January 31, 2026: only PDF page 89/printed page 671 read in text and pixels. DEP plan approval 17-00078A issued January 16, 2026, application received June 23, 2025, expiry July 15, 2027, for construction of FIFTEEN natural-gas engine-gensets powering Iron City No. 1 Power Generator and Compute Center, Karthaus Township/Clearfield County. Not an operating certificate, all-site permits, installed/energized engines or 15 MW. Frenchville PO Box is company mailing address, not verified facility parcel. Notice says conditions include emissions/monitoring/testing, but contains NO numeric emissions table; blog amounts are not silently promoted to this original. Full underlying approval not inspected. Other 207 PDF pages not reviewed. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-5/56-5.pdf","host":"pacodeandbulletin.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1420054,"lng":-78.1040324,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Original Pennsylvania Bulletin volume 56 number 5, January 31, 2026: only PDF page 89/printed page 671 read in text and pixels. DEP plan approval 17-00078A issued January 16, 2026, application received June 23, 2025, expiry July 15, 2027, for construction of FIFTEEN natural-gas engine-gensets powering Iron City No. 1 Power Generator and Compute Center, Karthaus Township/Clearfield County. Not an operating certificate, all-site permits, installed/energized engines or 15 MW. Frenchville PO Box is company mailing address, not verified facility parcel. Notice says conditions include emissions/monitoring/testing, but contains NO numeric emissions table; blog amounts are not silently promoted to this original. Full underlying approval not inspected. Other 207 PDF pages not reviewed.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-5/56-5.pdf","host":"pacodeandbulletin.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Karthaus Township · Clearfield · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"iron-mountain-wpa-1-boyers-butler-county-pa","state":"PA","kind":"facility","name":"Iron Mountain WPA-1 (Boyers underground data center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butler"],"city":"Boyers","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Marketing landing page includes company-wide 20 locations / 3 continents / 3.5 million sq ft, not WPA1-only metrics. Current date, exact street, metered capacity, actual efficiency and independently verified certifications not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenter.ironmountain.com/western-pennsylvania-data-center","host":"datacenter.ironmountain.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.0956,"lng":-79.9128,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_named_facility":"WPA1 near Boyers, Pennsylvania","publisher_area_sqft":333000,"total_potential_capacity_mw":40,"capacity_basis":"Potential, explicit critical IT basis not supplied","operator_campus_acres":200,"operator_underground_depth_feet":220,"source_copyright_year":2023,"current_operational_capacity_mw":null},"notes":["Marketing landing page includes company-wide 20 locations / 3 continents / 3.5 million sq ft, not WPA1-only metrics. Current date, exact street, metered capacity, actual efficiency and independently verified certifications not established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenter.ironmountain.com/western-pennsylvania-data-center","host":"datacenter.ironmountain.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Boyers · Butler · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"klondike-wyalusing-data-center-bradford-pa","state":"PA","kind":"facility","name":"Klondike Wyalusing Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bradford"],"city":"Wyalusing","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 248 MW turbine sum and 218 MW described electric delivery are not critical IT and must not be added. Original permit has not been read. Emissions allowances are not actual emissions. Reported July 9 county ordinance adoption and unsigned development/community-benefit templates do not prove this project's applicability or executed commitments. Prior LNG approval and other withdrawn projects are separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.northcentralpa.com/business/bradford-county-adopts-data-center-rules-wyalusing-hyperscale-projects-air-permit-issued/article_b09783c0-fc03-416b-b0a7-c6881f9616fd.html","host":"northcentralpa.com","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6966,"lng":-76.244,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"NorthcentralPA reports an October 9, 2025 DEP plan approval for Klondike's gas-generation project, nominally eight 31 MW turbines with up to 218 MW electric delivery to a future Wyalusing data center.","independently_verified_current_operating_status":null},"notes":["The 248 MW turbine sum and 218 MW described electric delivery are not critical IT and must not be added. Original permit has not been read. Emissions allowances are not actual emissions. Reported July 9 county ordinance adoption and unsigned development/community-benefit templates do not prove this project's applicability or executed commitments. Prior LNG approval and other withdrawn projects are separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.northcentralpa.com/business/bradford-county-adopts-data-center-rules-wyalusing-hyperscale-projects-air-permit-issued/article_b09783c0-fc03-416b-b0a7-c6881f9616fd.html","host":"northcentralpa.com","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Wyalusing · Bradford · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"mcd7-limerick-township-montgomery-county-pa","state":"PA","kind":"facility","name":"Limerick Township Data Center Campus (MCD 7)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Limerick Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The automated excerpt selected an unrelated October website notice; the retained main article was read separately. This association brief cites January 12 Pottstown Mercury reporting. Up to 750 MW has no critical-IT basis; 1.3 MGD is projected cooling demand, not measured use. Tax and jobs are developer forecasts; presentation is not approval. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.suburbanrealtorsalliance.com/news/2026/01/16/montgomery-county/limerick-gets-first-look-at-1.4m-square-foot-data-center-proposal/","host":"suburbanrealtorsalliance.com","date":"2026-01-16","published":"2026-01-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2447,"lng":-75.573,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Suburban Realtors Alliance summarizes a Limerick proposal by MCD 7 LLC: eight server buildings on 192 acres, replacing a warehouse concept.","independently_verified_current_operating_status":null},"notes":["The automated excerpt selected an unrelated October website notice; the retained main article was read separately. This association brief cites January 12 Pottstown Mercury reporting. Up to 750 MW has no critical-IT basis; 1.3 MGD is projected cooling demand, not measured use. Tax and jobs are developer forecasts; presentation is not approval.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.suburbanrealtorsalliance.com/news/2026/01/16/montgomery-county/limerick-gets-first-look-at-1.4m-square-foot-data-center-proposal/","host":"suburbanrealtorsalliance.com","date":"2026-01-16","published":"2026-01-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Limerick Township · Montgomery · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"diversified-longhorn-pad-a-horton-township-elk-pa","state":"PA","kind":"facility","name":"Longhorn Pad A Wellhead Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Elk"],"city":"Horton Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. LonghornPadC separate. Violations and permit conditions based on reporting, not independently retained original orders. Predicted67foldemissions not measuredactual/noisehealthcausation. No present operational certification. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://capitalandmain.com/in-rural-pennsylvania-crypto-mining-offers-a-lifeline-for-dying-gas-wells","host":"capitalandmain.com","date":"2024-06-03","published":"2024-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.2816445,"lng":-78.7281388,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Capital and Main reports LonghornPadA historic unpermitted operation followed byDecember permit, with full-time operation awaiting noise mitigation at report date.","independently_verified_current_operating_status":null},"notes":["LonghornPadC separate. Violations and permit conditions based on reporting, not independently retained original orders. Predicted67foldemissions not measuredactual/noisehealthcausation. No present operational certification.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://capitalandmain.com/in-rural-pennsylvania-crypto-mining-offers-a-lifeline-for-dying-gas-wells","host":"capitalandmain.com","date":"2024-06-03","published":"2024-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Horton Township · Elk · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"prospect-rd-misty-hollow-forward-township-butler-pa","state":"PA","kind":"facility","name":"Misty Hollow Energy and Data Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butler"],"city":"Prospect","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Visible publication is September 19, not the URL's September 18. Data-center footprint, separate treatment/office areas and possible future expansion are different scopes. Water/discharge design was still being developed, and no tenant was named. A prospective November SALDO vote and assumptions about prior submission are not adopted law or a final grandfathering decision. No creek withdrawals or exact capacity inferred. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.butlereagle.com/20260918/massive-data-center-proposed-in-forward-township/","host":"butlereagle.com","date":"2026-09-19","published":"2026-09-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8079,"lng":-80.0558,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Butler Eagle describes Misty Hollow's preliminary Forward Township plan and a developer target for approval in early 2027 and possible mid-2029 completion.","independently_verified_current_operating_status":null},"notes":["Visible publication is September 19, not the URL's September 18. Data-center footprint, separate treatment/office areas and possible future expansion are different scopes. Water/discharge design was still being developed, and no tenant was named. A prospective November SALDO vote and assumptions about prior submission are not adopted law or a final grandfathering decision. No creek withdrawals or exact capacity inferred.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.butlereagle.com/20260918/massive-data-center-proposed-in-forward-township/","host":"butlereagle.com","date":"2026-09-19","published":"2026-09-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Prospect · Butler · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"mlp-ventures-plymouth-township-conshohocken-pa","state":"PA","kind":"facility","name":"MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Conshohocken","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Participant status and a contingent property sale are not project approval or a closed acquisition. Other O'Neill proposals across the river are separate. Protest signs' diesel equivalence and neighbors' health concerns are not measured emissions or established causation. Future July hearing dates have no assumed outcome; tax-payment allegations are not adopted as findings. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://metrophiladelphia.com/stories/plymouth-township-data-center-proposal,145572","host":"metrophiladelphia.com","date":"2026-06-29","published":"2026-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.086,"lng":-75.312,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Metro Philadelphia reports a new MLP Ventures zoning application after an earlier withdrawal for the former Cleveland-Cliffs property at 900 Conshohocken Road, with June 25 proceedings granting participant status.","independently_verified_current_operating_status":null},"notes":["Participant status and a contingent property sale are not project approval or a closed acquisition. Other O'Neill proposals across the river are separate. Protest signs' diesel equivalence and neighbors' health concerns are not measured emissions or established causation. Future July hearing dates have no assumed outcome; tax-payment allegations are not adopted as findings.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://metrophiladelphia.com/stories/plymouth-township-data-center-proposal,145572","host":"metrophiladelphia.com","date":"2026-06-29","published":"2026-06-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Conshohocken · Montgomery · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"mudiita-ransom-township-lackawanna-pa","state":"PA","kind":"facility","name":"Mudiita Ransom Township Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Ransom Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This is not a formal countywide denial or verified permanent abandonment. Scranton Materials' separate quarry overlay denial/appeal and a pumped-storage study are other proceedings. Mudiita's 930-plus-acre marketing and a smaller acquired land area are not reconciled. Property price is not DC capex; no current tenant, service agreement or approval is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-07-27/future-of-ransom-twp-property-uncertain-as-carbon-county-developer-says-no-plans-for-data-center-campus","host":"wvia.org","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.4483,"lng":-75.7375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WVIA reports uncertainty at Mudiita's Ransom Township property: a former shareholder says there are no present data-center plans, websites are down and current shareholders are unidentified.","independently_verified_current_operating_status":null},"notes":["This is not a formal countywide denial or verified permanent abandonment. Scranton Materials' separate quarry overlay denial/appeal and a pumped-storage study are other proceedings. Mudiita's 930-plus-acre marketing and a smaller acquired land area are not reconciled. Property price is not DC capex; no current tenant, service agreement or approval is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvia.org/news/local/2026-07-27/future-of-ransom-twp-property-uncertain-as-carbon-county-developer-says-no-plans-for-data-center-campus","host":"wvia.org","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Ransom Township · Lackawanna · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"muncy-data-center-lycoming-county-pa","state":"PA","kind":"facility","name":"Muncy Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lycoming"],"city":"Muncy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. PatCrossley SunGazette July18,2026 originalreportquotes developerlegalnotice CLAIMING deemedapproval ofconditionaluse onYetterRoad. This is applicantposition afterallegedmissedhearingdeadline, not inspectedcourtjudgment or automaticall-permitcertification. Originalnotice/currentMPC/courtdocketunread; do notgivepresentlegaladvice. ArticleinitialApril28filingvs laterApril22applicationdates remainunresolved; do notinventoneprecisestartutorydeadline. Townshipmoratorium/curativeamendmentdisputes notverifiedcurrentlaw. Litigationanticipatednotprovedfiled/ruling. No ITMW/capex/currentoperations established. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sungazette.com/news/top-news/2026/07/legal-notice-claims-deemed-approval-for-muncy-township-data-center/","host":"sungazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.23,"lng":-76.804,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["PatCrossley SunGazette July18,2026 originalreportquotes developerlegalnotice CLAIMING deemedapproval ofconditionaluse onYetterRoad. This is applicantposition afterallegedmissedhearingdeadline, not inspectedcourtjudgment or automaticall-permitcertification. Originalnotice/currentMPC/courtdocketunread; do notgivepresentlegaladvice.","ArticleinitialApril28filingvs laterApril22applicationdates remainunresolved; do notinventoneprecisestartutorydeadline. Townshipmoratorium/curativeamendmentdisputes notverifiedcurrentlaw. Litigationanticipatednotprovedfiled/ruling. No ITMW/capex/currentoperations established.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.sungazette.com/news/top-news/2026/07/legal-notice-claims-deemed-approval-for-muncy-township-data-center/","host":"sungazette.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Muncy · Lycoming · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"netrality-401-north-broad-philadelphia-pa","state":"PA","kind":"facility","name":"Netrality 401 North Broad","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Philadelphia"],"city":"Philadelphia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Named provider/address context; no current title, capacity, exact suite or whole-building owner independently inspected. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.9601,"lng":-75.1619,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Netrality","listed_address":"401 N Broad St","listed_city":"Philadelphia","listed_state":"PA"},"notes":["Named provider/address context; no current title, capacity, exact suite or whole-building owner independently inspected.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Philadelphia · Philadelphia · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"nova-energy-cryptomine-frenchcreek-venango-county-pa","state":"PA","kind":"facility","name":"Nova Energy Natural Gas-Powered Cryptomine (Frenchcreek Township)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Venango"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Preview only: original permit number, exact location, conditions and Bulletin not inspected. Air permit is not operating proof, all environmental approvals or executed utility service. No MW, actual water, investment, construction or current operation adopted; subscriber material not accessed or decoded. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://marcellusdrilling.com/2025/03/gas-fired-cryptocurrency-data-center-coming-to-venango-county-pa/","host":"marcellusdrilling.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.44,"lng":-79.82,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Public Marcellus Drilling News preview reports Pennsylvania DEP air-quality permit for Nova Energy LLC cryptocurrency data center, FrenchcreekTownship, VenangoCounty, announced inMarch1PennsylvaniaBulletin.","independently_verified_current_operating_status":null},"notes":["Preview only: original permit number, exact location, conditions and Bulletin not inspected. Air permit is not operating proof, all environmental approvals or executed utility service. No MW, actual water, investment, construction or current operation adopted; subscriber material not accessed or decoded.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://marcellusdrilling.com/2025/03/gas-fired-cryptocurrency-data-center-coming-to-venango-county-pa/","host":"marcellusdrilling.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Venango · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"panther-creek-hpc-ai-campus-nesquehoning-pa","state":"PA","kind":"facility","name":"Panther Creek HPC/AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carbon"],"city":"Nesquehoning","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8564,"lng":-75.8283,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Campus-level issuer context, not proof every imported plant/building ID is independently energized.","fields":{"announcement_date":"2026-05-11","quarter_ended":"2026-03-31","company_claim":"Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.","redomiciliation_parent_transaction_date":"2026-04-01"},"notes":["Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Nesquehoning · Carbon · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"bitfarms-panther-creek-nesquehoning-pa","state":"PA","kind":"facility","name":"Panther Creek Plant","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Carbon"],"city":"Nesquehoning","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.8557,"lng":-75.828,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Campus-level issuer context, not proof every imported plant/building ID is independently energized.","fields":{"announcement_date":"2026-05-11","quarter_ended":"2026-03-31","company_claim":"Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.","redomiciliation_parent_transaction_date":"2026-04-01"},"notes":["Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Nesquehoning · Carbon · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"powerhouse-pax-carlisle-pa","state":"PA","kind":"facility","name":"PAX  -  Pennsylvania Digital I","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"Carlisle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Original adopted instruments not reviewed here. By-right use and laydown-yard action are not full campus building permit, utility agreement or operation. Site figures694/700/715acres represent differing source scopes; no single canonical parcel footprint selected. Three450MWsubstations/1.35GWinitial/1.8GWexpandable are planned infrastructure figures, not verified criticalIT. USD44millionland purchase not USD15billionbuildout spending; regional USD90billion summit not project capex. September future2025meetings have no assumed outcome; advocacy concerns are attributed. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://protectcumberlandcountypa.org/middlesex/","host":"protectcumberlandcountypa.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.2015,"lng":-77.1889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Protect Cumberland County advocacy page reports May30,2025 unanimous3-0 Ordinance3-2025 data-center overlay and September3 comprehensive zoning action for ProjectBolt/PennsylvaniaDigitalI. August11 sketch discussion had no formal submission/no action; August25 recommendation concerned PPLsubstation laydown yard only.","independently_verified_current_operating_status":null},"notes":["Original adopted instruments not reviewed here. By-right use and laydown-yard action are not full campus building permit, utility agreement or operation. Site figures694/700/715acres represent differing source scopes; no single canonical parcel footprint selected. Three450MWsubstations/1.35GWinitial/1.8GWexpandable are planned infrastructure figures, not verified criticalIT. USD44millionland purchase not USD15billionbuildout spending; regional USD90billion summit not project capex. September future2025meetings have no assumed outcome; advocacy concerns are attributed.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://protectcumberlandcountypa.org/middlesex/","host":"protectcumberlandcountypa.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Carlisle · Cumberland · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"stonebridge-powder-mills-lawrence-county-pa","state":"PA","kind":"facility","name":"Powder Mills Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lawrence"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. One assessor parcel, not the whole proposed campus.. County GIS returns control 26132000 / tax map 26-1409-102, Powder Mill Works LLC, situs 3478 Howard, assessed acreage 297.06 and calculated acreage 299.12982886. These are different measures on one parcel; neither independently verifies or disproves the inherited 569-acre combined campus. Assessor fields show nominal sale price 1, total assessed value 728000, year built 1967 and square feet 312. Do not promote these to campus acquisition price, investment, data-center opening year or total proposed floor space. No deed, assessment methodology, second parcel, Stonebridge corporate relationship, zoning ruling, remediation clearance or construction approval inspected. Original coordinate system is Pennsylvania State Plane 2272; no unverified conversion or replacement map pin made. Limited context, not full technical or current operating verification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.leoc.net:6443/arcgis/rest/services/LAWRENCEGIS/TaxParcelCAMA/MapServer/1/query?where=CONTROLNUM%3D%2726132000%27&outFields=*&f=json","host":"gis.leoc.net:6443","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.9915328,"lng":-80.4272333,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json","scope":"One assessor parcel, not the whole proposed campus.","fields":{},"notes":["County GIS returns control 26132000 / tax map 26-1409-102, Powder Mill Works LLC, situs 3478 Howard, assessed acreage 297.06 and calculated acreage 299.12982886. These are different measures on one parcel; neither independently verifies or disproves the inherited 569-acre combined campus.","Assessor fields show nominal sale price 1, total assessed value 728000, year built 1967 and square feet 312. Do not promote these to campus acquisition price, investment, data-center opening year or total proposed floor space. No deed, assessment methodology, second parcel, Stonebridge corporate relationship, zoning ruling, remediation clearance or construction approval inspected.","Original coordinate system is Pennsylvania State Plane 2272; no unverified conversion or replacement map pin made.","Limited context, not full technical or current operating verification."],"sources":[{"url":"https://gis.leoc.net:6443/arcgis/rest/services/LAWRENCEGIS/TaxParcelCAMA/MapServer/1/query?where=CONTROLNUM%3D%2726132000%27&outFields=*&f=json","host":"gis.leoc.net:6443","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Lawrence · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"cde-acquisitions-project-atlas-south-whitehall-lehigh-pa","state":"PA","kind":"facility","name":"Project Atlas Data Center Campus (South Whitehall Township)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lehigh"],"city":"South Whitehall Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Introductory presentation is not approval; nine-billion-USD investment and sixteen-million annual tax are projections. Claimed avoided cooling water is a modeled comparison, not measured water use; no-cost-to-ratepayer promise not executed utility terms. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lehighvalleypublicmedia.org/news/local/residents-push-for-public-hearing-as-south-whitehall-takes-new-look-at-hyperscale-data-center/","host":"lehighvalleypublicmedia.org","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.6400848,"lng":-75.5443246,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Lehigh Valley Public Media reports revised South Whitehall Atlas concept of three roughly500000-square-foot buildings instead of six.","independently_verified_current_operating_status":null},"notes":["Introductory presentation is not approval; nine-billion-USD investment and sixteen-million annual tax are projections. Claimed avoided cooling water is a modeled comparison, not measured water use; no-cost-to-ratepayer promise not executed utility terms.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lehighvalleypublicmedia.org/news/local/residents-push-for-public-hearing-as-south-whitehall-takes-new-look-at-hyperscale-data-center/","host":"lehighvalleypublicmedia.org","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · South Whitehall Township · Lehigh · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"project-gravity-archbald-lackawanna-county-pa","state":"PA","kind":"facility","name":"Project Gravity","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Archbald","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. KatBolus WVIA January8,2026 originalDEPmeetingreport identifiesArchbald25ProjectGravity; developerNOtenantyet andwouldnotconstructwithoutone. Seven135000sftwo-storybuildings/186acres areoneproposedcampus, notsevennewfacilityIDs. TuesdayJanuary6meetingdateinferredfromdatedreport. SeptemberpreliminaryCONDITIONALplanningapproval differsfromfinalconstructionauthorization. Chapter105administrativelycomplete/technicalreview,Chapter102completenessreview,404pending; AIRAPPLICATIONNOTYETRECEIVEDperDEPatmeeting. Laterapproval/currenttenantstatusunknown. Underlyingapplications/minutesnotdirectlyread. 360000gpd isdeveloperESTIMATE, utilityabilitytosupplynotapprovedwithdrawal/actualconsumption. LakeScrantonwater/pumpimprovementsconditional;coolingsystemtenant-specific/notchosen.55/45dBAdeveloperpromise notmeasurednoise.7wetlands/2streams/31waterbodies/2.25acrewetlandsare overlappinglandfeatures, notadditivecampusareas. Mine-spoiledlanddoesnotmeanhazardfree; noactualgroundwater/wildlifeharm inferred. CorporateoldWesternHospitalityPartners-Jermynname notsameascanceledKYproject. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5,"lng":-75.55,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["KatBolus WVIA January8,2026 originalDEPmeetingreport identifiesArchbald25ProjectGravity; developerNOtenantyet andwouldnotconstructwithoutone. Seven135000sftwo-storybuildings/186acres areoneproposedcampus, notsevennewfacilityIDs. TuesdayJanuary6meetingdateinferredfromdatedreport.","SeptemberpreliminaryCONDITIONALplanningapproval differsfromfinalconstructionauthorization. Chapter105administrativelycomplete/technicalreview,Chapter102completenessreview,404pending; AIRAPPLICATIONNOTYETRECEIVEDperDEPatmeeting. Laterapproval/currenttenantstatusunknown. Underlyingapplications/minutesnotdirectlyread.","360000gpd isdeveloperESTIMATE, utilityabilitytosupplynotapprovedwithdrawal/actualconsumption. LakeScrantonwater/pumpimprovementsconditional;coolingsystemtenant-specific/notchosen.55/45dBAdeveloperpromise notmeasurednoise.7wetlands/2streams/31waterbodies/2.25acrewetlandsare overlappinglandfeatures, notadditivecampusareas. Mine-spoiledlanddoesnotmeanhazardfree; noactualgroundwater/wildlifeharm inferred. CorporateoldWesternHospitalityPartners-Jermynname notsameascanceledKYproject.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Archbald · Lackawanna · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"project-hazelnut-hazle-township-pa","state":"PA","kind":"facility","name":"Project Hazelnut","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Hazle Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hazelnut contingent developer community funding and jobs conflict. 45+15+105=165Mpledgecomponentsnot330M. Fundsnotpaid/grantsnotuniversallyeligible. Jobheadlineversusdetailedtotalconflict,holdcanonical. Noobservedconservationdeed,currentoperations,ITMWorbuildingarea. Eventyearnotinbanner;do notcalendarOctober22,2026withoutdatedcorroborationorcallitgovernmenthearing. No RSVP/petition/formsubmitted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://projecthazelnut.com/","host":"projecthazelnut.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.985,"lng":-75.955,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Hazelnut contingent developer community funding and jobs conflict","fields":{"developer":"NorthPoint","project":"Project Hazelnut","location":"Hazle Township, Pennsylvania","community_benefit_commitment_total_usd":165000000,"resident_grant_fund_usd":45000000,"per_eligible_household_grant_usd":10000,"community_support_fund_usd":15000000,"longterm_community_commitment_usd":105000000,"annual_longterm_component_usd":7000000,"longterm_years":15,"benefit_availability_trigger":"first building operational","planned_conserved_forest_open_space_acres_approx":1100,"jobs_forecast_conflict":["2000constructionandoperationalcombined","1300plusconstructionand950pluspermanent"],"undated_event_banner":{"month_day":"10-22","time":"17:00to19:00","venue":"Maple Manor Elementary School","event_type":"community open house","year":null}},"notes":["45+15+105=165Mpledgecomponentsnot330M. Fundsnotpaid/grantsnotuniversallyeligible. Jobheadlineversusdetailedtotalconflict,holdcanonical. Noobservedconservationdeed,currentoperations,ITMWorbuildingarea. Eventyearnotinbanner;do notcalendarOctober22,2026withoutdatedcorroborationorcallitgovernmenthearing. No RSVP/petition/formsubmitted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://projecthazelnut.com/","host":"projecthazelnut.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Hazle Township · Luzerne · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"iep-hummingbird-data-center-campus-greene-county-pa","state":"PA","kind":"facility","name":"Project Hummingbird Data Center Campus (former Robena Mine)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Greene"],"city":"Greensboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Observed earthwork is described as ordinary owner reclamation, not data-center construction. The 910 MW figure is planned generation; 18 MGD is treatment capacity serving generation and computing, not measured DC consumption. The community-benefit agreement is unfinished and no end tenant is identified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.observer-reporter.com/news/local-news/2026/sep/25/monongahela-township-residents-seek-more-chances-for-input-on-data-center-project/","host":"observer-reporter.com","date":"2026-09-25","published":"2026-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.79,"lng":-79.92,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Observer-Reporter reports the Hummingbird proposal at the Robena Mine property, while the township says project work has not advanced since the December reclamation approval.","independently_verified_current_operating_status":null},"notes":["Observed earthwork is described as ordinary owner reclamation, not data-center construction. The 910 MW figure is planned generation; 18 MGD is treatment capacity serving generation and computing, not measured DC consumption. The community-benefit agreement is unfinished and no end tenant is identified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.observer-reporter.com/news/local-news/2026/sep/25/monongahela-township-residents-seek-more-chances-for-input-on-data-center-project/","host":"observer-reporter.com","date":"2026-09-25","published":"2026-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Greensboro · Greene · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"prologis-allen-township-northampton-pa","state":"PA","kind":"facility","name":"Prologis Allen Township Data Center (2500 Liberty Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Northampton"],"city":"Allen Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The regional letter recommendation is not the same vote or all permits. Existing warehouse floor area does not establish powered/occupied DC area. Water, cooling, noise and electrical demands were still questions. A likely-first regional description is not an independently verified superlative or operating status. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lehighvalleypublicmedia.org/northampton-county/allen-township-warehouse-could-become-lehigh-valleys-first-hyperscale-data-center","host":"lehighvalleypublicmedia.org","date":"2026-04-22","published":"2026-04-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.7017264,"lng":-75.4801064,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Lehigh Valley Public Media reports Allen Township's March approval for a Prologis warehouse conversion and a regional planning committee's request for more operational/resource details.","independently_verified_current_operating_status":null},"notes":["The regional letter recommendation is not the same vote or all permits. Existing warehouse floor area does not establish powered/occupied DC area. Water, cooling, noise and electrical demands were still questions. A likely-first regional description is not an independently verified superlative or operating status.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lehighvalleypublicmedia.org/northampton-county/allen-township-warehouse-could-become-lehigh-valleys-first-hyperscale-data-center","host":"lehighvalleypublicmedia.org","date":"2026-04-22","published":"2026-04-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Allen Township · Northampton · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"qts-salem-township-luzerne-pa","state":"PA","kind":"facility","name":"QTS Salem Township Data Center Campus (Salem 2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Salem Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. The reported more-than500-million-USD Salem2land proceeds are not full construction cost or Salem3spending. Salem3land-value descriptions differ at1.2/1.4billion; retain conflict. Developer survey results are self-reported from78respondents, not an independent regional economic-impact study. Generic pay ranges and statewide forecasts are not actual site jobs. Later hearing outcomes, critical IT and contractual nuclear supply are not independently verified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project","host":"timesleader.com","date":"2026-08-22","published":"2026-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.1078249,"lng":-76.1791155,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"The Times Leader separates Salem's AWS campus, QTS/4-3Salem2land transaction and proposed4-3GlennbrookSalem3campus, with the latter awaiting an overlay decision.","independently_verified_current_operating_status":null},"notes":["The reported more-than500-million-USD Salem2land proceeds are not full construction cost or Salem3spending. Salem3land-value descriptions differ at1.2/1.4billion; retain conflict. Developer survey results are self-reported from78respondents, not an independent regional economic-impact study. Generic pay ranges and statewide forecasts are not actual site jobs. Later hearing outcomes, critical IT and contractual nuclear supply are not independently verified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project","host":"timesleader.com","date":"2026-08-22","published":"2026-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Salem Township · Luzerne · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"renaissance-park-upper-merion-king-of-prussia-pa","state":"PA","kind":"facility","name":"Renaissance Park and Innovation Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"King of Prussia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. LelandPinder WPVI July23,2026 originalUpperMerionmeetingreport: Renaissancefive-site4.6Msfproposal,THREErevisedapplicationsreviewedWednesdayJuly22,remainingtwoAugust12future. Notfiveapprovedcampuses/permits/RFS. TownshipmanagerassertsapplicationsvestedbeforeMarchordinance; originalfilings/ordinance/courtvalidityunread, notcurrentlegalcertification. Publicoppositiondoesnotestablishhealthharm. No ITMW/capex/nameenduserconfirmed. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://6abc.com/post/proposed-king-prussia-data-center-campus-faces-renewed-scrutiny-review-continues/19560357/","host":"6abc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.092,"lng":-75.347,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["LelandPinder WPVI July23,2026 originalUpperMerionmeetingreport: Renaissancefive-site4.6Msfproposal,THREErevisedapplicationsreviewedWednesdayJuly22,remainingtwoAugust12future. Notfiveapprovedcampuses/permits/RFS.","TownshipmanagerassertsapplicationsvestedbeforeMarchordinance; originalfilings/ordinance/courtvalidityunread, notcurrentlegalcertification. Publicoppositiondoesnotestablishhealthharm. No ITMW/capex/nameenduserconfirmed.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://6abc.com/post/proposed-king-prussia-data-center-campus-faces-renewed-scrutiny-review-continues/19560357/","host":"6abc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · King of Prussia · Montgomery · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"bitfarms-scrubgrass-kennerdell-pa","state":"PA","kind":"facility","name":"Scrubgrass Generating Plant","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Venango"],"city":"Kennerdell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Potential expansion, studies and behind-the-meter generation are not energized AI capacity. September2026 ash-removal deadline is not proof completion; issuer original sources reviewed separately. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Potential operator development scale, not actual critical IT demand.. Scrubgrass page repeats project-update cards explicitly labelled Moses Lake or Sharon. Those concrete pours, piping and equipment deliveries are not Scrubgrass milestones. No project partners announced in this page.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/","host":"exploreclarion.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.keelinfra.com/campuses/scrubgrass","host":"keelinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.2306,"lng":-79.8517,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"ExploreClarion describes Keel/Bitfarms Scrubgrass AI development opportunity alongside existing crypto/power activity.","independently_verified_current_operating_status":null},"notes":["Potential expansion, studies and behind-the-meter generation are not energized AI capacity. September2026 ash-removal deadline is not proof completion; issuer original sources reviewed separately.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/","host":"exploreclarion.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Potential operator development scale, not actual critical IT demand.","fields":{"operator_advertised_expansion_capacity_gw_up_to":1.3,"advertised_site_acres":650,"stage":"Long-term pre-development and power planning","current_commissioned_hpc_capacity_mw":null},"notes":["Scrubgrass page repeats project-update cards explicitly labelled Moses Lake or Sharon. Those concrete pours, piping and equipment deliveries are not Scrubgrass milestones. No project partners announced in this page.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.keelinfra.com/campuses/scrubgrass","host":"keelinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Kennerdell · Venango · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"sentinel-east-whiteland-chester-county-pa","state":"PA","kind":"facility","name":"Sentinel East Whiteland Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chester"],"city":"East Whiteland Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Brooke Schultz, Inquirer June 11, 2026 original court/developer reporting: two appeals over East Whiteland 2018 zoning and 2024 plans quashed as untimely/nonappealable; not a merits finding of no environmental risk or every permit approved. Original orders/case numbers not inspected. 1.5 million square feet is a proposal; former attempt to add 600,000 square feet was abandoned, not additive current floor space. Stormwater work in adjacent West Whiteland and perimeter work do not establish all building construction complete. July 30 follow-up source 27 changes the work-stage narrative. Not all fields, current operation, precise parcel or critical IT independently certified. Brooke Schultz, Inquirer July 30, 2026 original township/developer interviews: work RESUMED Wednesday July 29 (calendar inference), following a temporary July stop. Township erosion/sedimentation permit allows EARTHMOVING with monitoring/dust/remedy conditions; footing/foundation construction permits still needed. No blanket all-construction approval. Possible redesign from 1.5 million to 536,000 square feet and lower-water air chillers was TABLED July 8; August 19 future meeting, not an adopted redesign/outcome. 3 million gallons/day belongs to the earlier water-cooled design, not measured current use or final new design. No implication Superfund cleanup or health impacts independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-judge-denial-challenges-20260611.html","host":"inquirer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-project-20260730.html","host":"inquirer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.041,"lng":-75.545,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Brooke Schultz, Inquirer June 11, 2026 original court/developer reporting: two appeals over East Whiteland 2018 zoning and 2024 plans quashed as untimely/nonappealable; not a merits finding of no environmental risk or every permit approved. Original orders/case numbers not inspected. 1.5 million square feet is a proposal; former attempt to add 600,000 square feet was abandoned, not additive current floor space. Stormwater work in adjacent West Whiteland and perimeter work do not establish all building construction complete. July 30 follow-up source 27 changes the work-stage narrative.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-judge-denial-challenges-20260611.html","host":"inquirer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Brooke Schultz, Inquirer July 30, 2026 original township/developer interviews: work RESUMED Wednesday July 29 (calendar inference), following a temporary July stop. Township erosion/sedimentation permit allows EARTHMOVING with monitoring/dust/remedy conditions; footing/foundation construction permits still needed. No blanket all-construction approval. Possible redesign from 1.5 million to 536,000 square feet and lower-water air chillers was TABLED July 8; August 19 future meeting, not an adopted redesign/outcome. 3 million gallons/day belongs to the earlier water-cooled design, not measured current use or final new design. No implication Superfund cleanup or health impacts independently certified.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-project-20260730.html","host":"inquirer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · East Whiteland Township · Chester · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"aligned-shippingport-pa","state":"PA","kind":"facility","name":"Shippingport Industrial Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Beaver"],"city":"Shippingport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Shippingport guest opinion source-role correction. Opinionarticleisnotagencyapproval/order. Claimedthreeapprovals requireoriginalpermitinspection; no adopteddate/powerbasisfromopinion. Generalhealthrisksnotproofsite-specificillness,airviolation oractualbills. No exactAlignedoperatorcrosswalk,currentcommissioning orcriticalITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://community.triblive.com/news/3990268","host":"community.triblive.com","date":"2026-02-26","published":"2026-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.63,"lng":-80.44,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Shippingport guest opinion source-role correction","fields":{"publisher_role":"guest opinion by EnvironmentalHealthProject communications manager","reported_project_location":"nearformerBruceMansfieldplant, Shippingport, BeaverCounty, Pennsylvania","reported_proposed_buildings_max":3,"reported_each_building_sqft_min_exclusive":600000,"reported_components":["data centers","warehouse","natural-gas generation pad"]},"notes":["Opinionarticleisnotagencyapproval/order. Claimedthreeapprovals requireoriginalpermitinspection; no adopteddate/powerbasisfromopinion. Generalhealthrisksnotproofsite-specificillness,airviolation oractualbills. No exactAlignedoperatorcrosswalk,currentcommissioning orcriticalITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://community.triblive.com/news/3990268","host":"community.triblive.com","date":"2026-02-26","published":"2026-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Shippingport · Beaver · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"slate-belt-holdings-upper-mount-bethel-northampton-pa","state":"PA","kind":"facility","name":"Slate Belt Holdings Data Center Campus (Upper Mount Bethel)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Northampton"],"city":"Upper Mount Bethel Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported 754-acre purchase and submitted plans are not approved data center construction. Planned 480 MW SUBSTATION is not critical IT; nearby Talen 607 MW natural-gas plant is separate generation. Historical 15-building/six-million-square-foot and 168 MW descriptions concern prior development scope, not additive current campus capacity. Amazon’s prior reported discussions and withdrawal of interest do not establish a committed tenant. Other Susquehanna/Amazon operating campus and Montour denial are separate projects. Court challenge is not a ruling; no approval/RFS adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bicmagazine.com/departments/AI-Infrastructure/talen-looks-to-develop-23-building-data-center-campus-in-pennsylvania/","host":"bicmagazine.com","date":"2026-08-10","published":"2026-08-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.9,"lng":-75.13,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"BIC republishes trade/local reporting on Slate Belt Holdings’ proposed up-to-23-building Upper Mount Bethel campus and zoning challenge.","independently_verified_current_operating_status":null},"notes":["Reported 754-acre purchase and submitted plans are not approved data center construction. Planned 480 MW SUBSTATION is not critical IT; nearby Talen 607 MW natural-gas plant is separate generation. Historical 15-building/six-million-square-foot and 168 MW descriptions concern prior development scope, not additive current campus capacity. Amazon’s prior reported discussions and withdrawal of interest do not establish a committed tenant. Other Susquehanna/Amazon operating campus and Montour denial are separate projects. Court challenge is not a ruling; no approval/RFS adopted.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bicmagazine.com/departments/AI-Infrastructure/talen-looks-to-develop-23-building-data-center-campus-in-pennsylvania/","host":"bicmagazine.com","date":"2026-08-10","published":"2026-08-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Upper Mount Bethel Township · Northampton · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"depg-smithfield-gateway-data-center-monroe-pa","state":"PA","kind":"facility","name":"Smithfield Gateway Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monroe"],"city":"East Stroudsburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Smithfield agency future hearing schedule and conditional-use limits. Both meetings are future as of October 14 and subject to postponement if review deadline extended. Recommendation is separate from Board hearing. Conditional-use application is not land-development approval; final engineering and land development still required before construction. Older sketch phases are not approved additional data-center buildings. No hearing outcome, numeric IT MW or current operations inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://smithfieldtownship.com/odp/gatewaydc/","host":"smithfieldtownship.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.0206,"lng":-75.1778,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Smithfield agency future hearing schedule and conditional-use limits","fields":{"agency":"Smithfield Township, Pennsylvania","page_updated":"2026-10-07","applicants":["DEPG Mosier Associates LP","DEPG of Shawnee II LP"],"project":"Smithfield Gateway conditional use","proposed_buildings":1,"proposed_stories":2,"proposed_area_sqft":250000,"application_date":"2026-04-03","resubmission_date":"2026-08-11","scheduled_planning_recommendation_meeting":"2026-10-21T19:00:00-04:00","scheduled_conditional_use_hearing":"2026-10-28T18:00:00-04:00","scheduled_venue":"J.T. Lambert Intermediate School, 2000 Milford Road, East Stroudsburg, PA18301","party_status_email_deadline_date":"2026-10-27"},"notes":["Both meetings are future as of October 14 and subject to postponement if review deadline extended. Recommendation is separate from Board hearing. Conditional-use application is not land-development approval; final engineering and land development still required before construction. Older sketch phases are not approved additional data-center buildings. No hearing outcome, numeric IT MW or current operations inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://smithfieldtownship.com/odp/gatewaydc/","host":"smithfieldtownship.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · East Stroudsburg · Monroe · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"inch-eastern-land-south-annville-lebanon-pa","state":"PA","kind":"facility","name":"South Annville Township Data Center Campus (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lebanon"],"city":"South Annville Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The May 5 planning recommendation to deny was not a final board denial. A withdrawn site application is not a township-wide ban. The former investment and floor-area proposal was not constructed; the original withdrawal letter is not separately retained. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://lebtown.com/2026/05/13/south-annville-twp-data-center-project-scrapped-after-grass-roots-opposition/","host":"lebtown.com","date":"2026-05-13","published":"2026-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.290713,"lng":-76.5192514,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"LebTown quotes the developer attorney's May 12 withdrawal of the South Annville rezoning application and intention to stop pursuing a data center at the Martina Drive property.","independently_verified_current_operating_status":null,"reported_application_status":"withdrawn","reported_withdrawal_date":"2026-05-12"},"notes":["The May 5 planning recommendation to deny was not a final board denial. A withdrawn site application is not a township-wide ban. The former investment and floor-area proposal was not constructed; the original withdrawal letter is not separately retained.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://lebtown.com/2026/05/13/south-annville-twp-data-center-project-scrapped-after-grass-roots-opposition/","host":"lebtown.com","date":"2026-05-13","published":"2026-05-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · South Annville Township · Lebanon · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"allegheny-dc-springdale-cheswick-pa","state":"PA","kind":"facility","name":"Springdale Data Center (former Cheswick Generating Station)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Springdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Springdale reported conditional-use approval and soundmodel limits. Conditionaluseapprovalreported, actualfinalpermitconditions andlaterappealsnotinspected. Existingcoalplantclosed/notoperationofnewDC.140000homepoweranalogy notnumericITMW.85decibelreportedboroughthresholdnotverifiedweighting/measurementpoint/timebasisoractualsitelevel. Soundmodelnotmeasuredoperatingcompliance. No constructioncompletion, customerenergization oractualtaxreceipt. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.alleghenyfront.org/springdale-allegheny-county-data-center-approval/","host":"alleghenyfront.org","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.5425,"lng":-79.7844,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Springdale reported conditional-use approval and soundmodel limits","fields":{"company":"Allegheny DC Property Company","site":"formerCheswickGeneratingStation, Springdale, AlleghenyCounty, Pennsylvania","reported_conditional_use_approval_date":"2025-12-16","reported_vote":"5-2","proposed_building_area_sqft":565000,"proposed_height_stories_approx":7},"notes":["Conditionaluseapprovalreported, actualfinalpermitconditions andlaterappealsnotinspected. Existingcoalplantclosed/notoperationofnewDC.140000homepoweranalogy notnumericITMW.85decibelreportedboroughthresholdnotverifiedweighting/measurementpoint/timebasisoractualsitelevel. Soundmodelnotmeasuredoperatingcompliance. No constructioncompletion, customerenergization oractualtaxreceipt.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.alleghenyfront.org/springdale-allegheny-county-data-center-approval/","host":"alleghenyfront.org","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Springdale · Allegheny · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"suncap-stowe-township-allegheny-county-pa","state":"PA","kind":"facility","name":"Stowe Township Data Center (former railcar plant)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Allegheny"],"city":"Stowe Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Advertising is not ordinance adoption, rezoning or site construction approval; next-month vote outcome is unobserved. Report expressly says amendment would enable a future developer, not immediately start a project. Unknown operator, utility arrangement, power, capital and RFS remain unknown. Commissioners’ statements about environmental regulators are assurances, not examined permit findings. This is 2025 reporting, not anOctober 2026 action. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wpxi.com/news/local/stowe-township-community-expresses-concerns-over-data-center-proposal/F3UN7MXY3RD2DMMTPZDZR6VVXM/","host":"wpxi.com","date":"2025-10-15","published":"2025-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.469,"lng":-80.064,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"WPXI reports Stowe commissioners authorized advertising a proposed ordinance amendment after SunCap’s presentation about allowing a potential Nichol Avenue railcar-site data center.","independently_verified_current_operating_status":null},"notes":["Advertising is not ordinance adoption, rezoning or site construction approval; next-month vote outcome is unobserved. Report expressly says amendment would enable a future developer, not immediately start a project. Unknown operator, utility arrangement, power, capital and RFS remain unknown. Commissioners’ statements about environmental regulators are assurances, not examined permit findings. This is 2025 reporting, not anOctober 2026 action.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wpxi.com/news/local/stowe-township-community-expresses-concerns-over-data-center-proposal/F3UN7MXY3RD2DMMTPZDZR6VVXM/","host":"wpxi.com","date":"2025-10-15","published":"2025-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Stowe Township · Allegheny · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"talen-montour-data-center-campus-montour-county-pa","state":"PA","kind":"facility","name":"Talen Energy Montour Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montour"],"city":"Washingtonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Discussion and future hearing are not rezoning approval. About twelve buildings of 2 to 3 acres each are preliminary concept, not built floor area or final parcel count. Data centers and generation are distinct; no electrical MW or water volume established. Developer environmental/lake-level assurances and intended public review are not measured impacts or permit findings. This 2025 stage must not override later reported denial or original decisions. No unrelated land offers are assigned to Talen. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.northcentralpa.com/business/talen-energy-officials-address-community-concerns-about-rezoning/article_18cf27f5-6015-4978-a910-593e02b43c79.html","host":"northcentralpa.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.05,"lng":-76.67,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"NorthcentralPA relays Talen’s virtual community session ahead of a planning hearing for a roughly 1,000-acre agricultural-to-industrial rezoning in northern Montour County.","independently_verified_current_operating_status":null},"notes":["Discussion and future hearing are not rezoning approval. About twelve buildings of 2 to 3 acres each are preliminary concept, not built floor area or final parcel count. Data centers and generation are distinct; no electrical MW or water volume established. Developer environmental/lake-level assurances and intended public review are not measured impacts or permit findings. This 2025 stage must not override later reported denial or original decisions. No unrelated land offers are assigned to Talen.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.northcentralpa.com/business/talen-energy-officials-address-community-concerns-about-rezoning/article_18cf27f5-6015-4978-a910-593e02b43c79.html","host":"northcentralpa.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Washingtonville · Montour · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"tecfusions-keystone-connect-upper-burrell-pa","state":"PA","kind":"facility","name":"TECfusions Keystone Connect","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Westmoreland"],"city":"Upper Burrell Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. MiaHollie PublicSource September3updated4,2026 originalUpperBurrellmeetingreport:180dayMaymoratorium reportedlyexpiresNovember2, but EXCLUDESpreviousBuildingJpermits. August5planapprovalcoversJinterior/mechanical/electricalalterations, notentire1400acre/3GWfuturecampus. PartialBuildingJliveclaimattributedtoTribLive/companyrelease, notindependentlyinspectedcurrentservice. LanduseappealProtectPT/residentsinWestmorelandCommonPleas ALLEGESspecialexceptionproceduremissing, notcourtwin/currentinjunction. Case number/unreadoriginalpleading/finaloutcomeunknown. Newdraftbaseloadgenerationrequirement notenactedlaw; September15reviewfutureinreportnotobservedoutcome. Moratoriumnotproofallcurrentworkillegal. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.publicsource.org/upper-burrell-data-center-transparency-backlash/","host":"publicsource.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5817,"lng":-79.705,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["MiaHollie PublicSource September3updated4,2026 originalUpperBurrellmeetingreport:180dayMaymoratorium reportedlyexpiresNovember2, but EXCLUDESpreviousBuildingJpermits. August5planapprovalcoversJinterior/mechanical/electricalalterations, notentire1400acre/3GWfuturecampus. PartialBuildingJliveclaimattributedtoTribLive/companyrelease, notindependentlyinspectedcurrentservice.","LanduseappealProtectPT/residentsinWestmorelandCommonPleas ALLEGESspecialexceptionproceduremissing, notcourtwin/currentinjunction. Case number/unreadoriginalpleading/finaloutcomeunknown. Newdraftbaseloadgenerationrequirement notenactedlaw; September15reviewfutureinreportnotobservedoutcome. Moratoriumnotproofallcurrentworkillegal.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.publicsource.org/upper-burrell-data-center-transparency-backlash/","host":"publicsource.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Upper Burrell Township · Westmoreland · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"tierpoint-allentown-tekpark-breinigsville-pa","state":"PA","kind":"facility","name":"TierPoint Allentown TekPark","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lehigh"],"city":"Breinigsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/tekpark-campus/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5384,"lng":-75.6288,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/tekpark-campus/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Breinigsville · Lehigh · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"tierpoint-valley-forge-pa","state":"PA","kind":"facility","name":"TierPoint Valley Forge","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Norristown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/valley-forge/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.1218812,"lng":-75.4208776,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":137000,"gross_area_is_lower_bound":true,"raised_floor_sqft":61000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Nine 2.5 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/pennsylvania/valley-forge/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Norristown · Montgomery · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"triboro-industrial-park-jessup-olyphant-lackawanna-county-pa","state":"PA","kind":"facility","name":"Triboro Industrial Park / Triboro Commerce Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Jessup / Olyphant","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash. PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.45,"lng":-75.58,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash.","PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Jessup / Olyphant · Lackawanna · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"tron-usa-ai-campus-titus-station-cumru-berks-pa","state":"PA","kind":"facility","name":"TRON USA AI Campus (former Titus Station)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berks"],"city":"Reading","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. 200 MWbasis is undefined and proposed, not critical IT/current operation. Potential future generation is separate; no MWaddition inferred. Existing industrial zoning, study activity and grant-related work are not final development/interconnection approval or awarded incentives. Investment, construction timeline and engineering details are explicitly pending.2014 coal-plant decommissioning is not newDCopening. Strategic developer agreement is not an executed tenant lease or utility ESA; TRONname does not independently identify a blockchain affiliate or crypto workload. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://berksweekly.com/news/titus-station-redevelopment-project-in-berks-county-planned-as-ai-infrastructure-campus/","host":"berksweekly.com","date":"2026-05-19","published":"2026-05-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2839,"lng":-75.9372,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Berks Weekly reports Titus Development announced a strategic agreement with Go Energy Group for a proposedTRONUSA AIcampus on about 196 acres at former TitusStation, initially described as 200 MW.","independently_verified_current_operating_status":null},"notes":["200 MWbasis is undefined and proposed, not critical IT/current operation. Potential future generation is separate; no MWaddition inferred. Existing industrial zoning, study activity and grant-related work are not final development/interconnection approval or awarded incentives. Investment, construction timeline and engineering details are explicitly pending.2014 coal-plant decommissioning is not newDCopening. Strategic developer agreement is not an executed tenant lease or utility ESA; TRONname does not independently identify a blockchain affiliate or crypto workload.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://berksweekly.com/news/titus-station-redevelopment-project-in-berks-county-planned-as-ai-infrastructure-campus/","host":"berksweekly.com","date":"2026-05-19","published":"2026-05-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Reading · Berks · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"wildcat-ridge-archbald-lackawanna-county-pa","state":"PA","kind":"facility","name":"Wildcat Ridge AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lackawanna"],"city":"Archbald","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash. PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.51,"lng":-75.54,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash.","PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county","host":"wvia.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Archbald · Lackawanna · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"ecp-york-2-energy-center-data-center-peach-bottom-york-pa","state":"PA","kind":"facility","name":"York 2 Energy Center Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["York"],"city":"Peach Bottom Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The proposed five-billion-USD project and 2,500 construction jobs are forecasts. The power station's 828 MW generation is not data-center IT. The article's much smaller statewide investment figure is inconsistent and excluded. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cpbj.com/5b-data-center-coming-to-york-county-energy-site/","host":"cpbj.com","date":"2025-07-21","published":"2025-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.75,"lng":-76.35,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Central Penn Business Journal reports an ECP plan for a data center at Calpine's York 2 Energy Center in Peach Bottom.","independently_verified_current_operating_status":null},"notes":["The proposed five-billion-USD project and 2,500 construction jobs are forecasts. The power station's 828 MW generation is not data-center IT. The article's much smaller statewide investment figure is inconsistent and excluded.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cpbj.com/5b-data-center-coming-to-york-county-energy-site/","host":"cpbj.com","date":"2025-07-21","published":"2025-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · Peach Bottom Township · York · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"cnx-zediker-station-south-strabane-washington-county-pa","state":"PA","kind":"facility","name":"Zediker Station Data Center Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"South Strabane Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Marketing release dateOct24 differs body datelineOct20. Generation is not critical IT; net-zero claim is broker/fuel-accounting assertion, not audited emissions. Available industrial site is not an operating data center. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.jll.com/en-us/newsroom/jll-announces-major-data-center-development-site-in-washington","host":"jll.com","date":"2025-10-24","published":"2025-10-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.156,"lng":-80.19,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"JLL markets CNX Zediker Station1500-acre property with400buildable acres and potential500to700MW gas generation.","independently_verified_current_operating_status":null},"notes":["Marketing release dateOct24 differs body datelineOct20. Generation is not critical IT; net-zero claim is broker/fuel-accounting assertion, not audited emissions. Available industrial site is not an operating data center.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.jll.com/en-us/newsroom/jll-announces-major-data-center-development-site-in-washington","host":"jll.com","date":"2025-10-24","published":"2025-10-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pennsylvania · South Strabane Township · Washington · Source context reviewed","state_name":"Pennsylvania","state_path":"/pennsylvania/"},{"id":"hanton-city-smithfield-ri","state":"RI","kind":"facility","name":"Hanton City Business Park (data center anchor)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Providence"],"city":"Smithfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. MemoheaderMarch16describesMarch19meeting; documentdateconflictretained. No finalCouncilvoteorHantonCitygrandfatheringdecisionestablishedbythispacket. Officialstaffmemorandumproposesdata-centerdefinitionandnot-permitteduseinallzoningdistricts. ThisApril7meetingpacketisnotadoptionproof. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://clerkshq.com/Content/Attachments/Smithfield-ri/260407_8e.pdf?clientSite=Smithfield-ri","host":"clerkshq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.867,"lng":-71.527,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"planning_board_recommendation_date":"2026-03-19","public_hearing_proposed_date":"2026-05-05","proposed_rule":"data centers not permitted in all zoning districts"},"notes":["MemoheaderMarch16describesMarch19meeting; documentdateconflictretained.","No finalCouncilvoteorHantonCitygrandfatheringdecisionestablishedbythispacket.","Officialstaffmemorandumproposesdata-centerdefinitionandnot-permitteduseinallzoningdistricts. ThisApril7meetingpacketisnotadoptionproof.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://clerkshq.com/Content/Attachments/Smithfield-ri/260407_8e.pdf?clientSite=Smithfield-ri","host":"clerkshq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Rhode Island · Smithfield · Providence · Source context reviewed","state_name":"Rhode Island","state_path":"/rhode-island/"},{"id":"cielo-gaffney-cherokee-county-sc","state":"SC","kind":"facility","name":"Cielo Digital Infrastructure Gaffney Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cherokee"],"city":"Gaffney","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 000 is a published placeholder, not independently parcel-geocoded street number. Investment and jobs forecasts, not spend/current employment. No site MW specified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development","host":"governor.sc.gov","date":"2025-06-24","published":"2025-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.0666365,"lng":-81.5576062,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"development_announcement_date":"2025-06-24","planned_investment_usd_approx":2100000000,"expected_new_jobs":30,"planned_buildings":4,"planned_area_per_building_sqft_approx":400000,"initial_operation_target":"2028-year-end","published_location":"000 Ford Road, Gaffney, Cherokee County, South Carolina"},"notes":["000 is a published placeholder, not independently parcel-geocoded street number. Investment and jobs forecasts, not spend/current employment. No site MW specified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development","host":"governor.sc.gov","date":"2025-06-24","published":"2025-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Gaffney · Cherokee · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"dartpoints-charleston-ladson-sc","state":"SC","kind":"facility","name":"DartPoints Charleston Data Center (CHS01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Charleston"],"city":"Ladson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Utility1MW is not criticalIT0.1MW. Ladson street not provided by reviewed source. Operator explicitly locatesCHS01inCharlestonCountyPalmettoCommercePark and separatesIT/utility. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dartpoints.com/locations/chs01-charleston-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.9648939,"lng":-80.1012147,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Charleston","campus":"Palmetto Commerce Park","critical_it_capacity_mw":0.1,"utility_power_mw":1,"data_hall_sqft":15000},"notes":["Utility1MW is not criticalIT0.1MW.","Ladson street not provided by reviewed source.","Operator explicitly locatesCHS01inCharlestonCountyPalmettoCommercePark and separatesIT/utility.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dartpoints.com/locations/chs01-charleston-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Ladson · Charleston · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"dartpoints-columbia-sc","state":"SC","kind":"facility","name":"DartPoints Columbia Data Center (CAE01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Richland"],"city":"Columbia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DartPoints CAE01 capacity bases and area conflict. Area categories/scopes differ and not reconciled; do not choose15000over8200as same measure.110kWITis0.11MW, not1MWutility.120tons cooling is thermal capacity, not electric load. Dallas headquarters is not site. No street address or observed opening date in reviewed body. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dartpoints.com/locations/cae01-columbia-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9873119,"lng":-81.0308106,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"DartPoints CAE01 capacity bases and area conflict","fields":{"operator_code":"CAE01","site_description":"SCRA Innovation Center, Columbia, South Carolina","headline_critical_it_kw":110,"utility_power_mw":1,"headline_data_hall_sqft":8200,"narrative_raised_floor_sqft":15000,"canonical_current_area_sqft":null},"notes":["Area categories/scopes differ and not reconciled; do not choose15000over8200as same measure.110kWITis0.11MW, not1MWutility.120tons cooling is thermal capacity, not electric load. Dallas headquarters is not site. No street address or observed opening date in reviewed body.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dartpoints.com/locations/cae01-columbia-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Columbia · Richland · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"dartpoints-greenville-sc","state":"SC","kind":"facility","name":"DartPoints Greenville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Greenville"],"city":"Greenville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Greenville state-confirmed expansion announcement. Expansion of existing facility is not a separate duplicate campus or 15MW total. July 2027 is projected, not actual operations. 125M and 10 jobs are commitments, not actual spend or employment. Four operator facilities in South Carolina are not four Greenville buildings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sccommerce.com/news/dartpoints-expands-greenville-county-operations","host":"sccommerce.com","date":"2025-11-12","published":"2025-11-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.8075277,"lng":-82.3434922,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Greenville state-confirmed expansion announcement","fields":{"agency":"South Carolina Department of Commerce","announcement_date":"2025-11-12","operator":"DartPoints","address":"78 Global Drive, Greenville, South Carolina","planned_expansion_investment_usd":125000000,"planned_new_jobs":10,"capacity_before_mw":2.5,"capacity_after_mw":12.5,"power_basis":"agency-reported capacity; critical IT mentioned in quote but technical boundary not specified","added_high_density_space_sqft":88000,"agency_reported_stage":"construction underway","operations_target_month":"2027-07"},"notes":["Expansion of existing facility is not a separate duplicate campus or 15MW total. July 2027 is projected, not actual operations. 125M and 10 jobs are commitments, not actual spend or employment. Four operator facilities in South Carolina are not four Greenville buildings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sccommerce.com/news/dartpoints-expands-greenville-county-operations","host":"sccommerce.com","date":"2025-11-12","published":"2025-11-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Greenville · Greenville · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"dartpoints-spartanburg-sc","state":"SC","kind":"facility","name":"DartPoints Spartanburg Data Center (SPA01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spartanburg"],"city":"Spartanburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DartPoints SPA01 explicit IT versus utility power. Cooling tons not electric IT.21kplusheadlineconsistentwith21400notadditionalarea. Dallas headquarters not site. SLA100percent is contractual promise, not observed historical uptime or independent certification. No exact street/parcel in body. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dartpoints.com/locations/spa01-spartanburg-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.9965845,"lng":-82.034841,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"DartPoints SPA01 explicit IT versus utility power","fields":{"operator_code":"SPA01","locality":"Spartanburg, South Carolina","critical_it_mw":0.8,"utility_power_mw":1.5,"raised_floor_sqft":21400,"headline_data_hall_sqft_min_exclusive":21000,"cooling_tons":200},"notes":["Cooling tons not electric IT.21kplusheadlineconsistentwith21400notadditionalarea. Dallas headquarters not site. SLA100percent is contractual promise, not observed historical uptime or independent certification. No exact street/parcel in body.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dartpoints.com/locations/spa01-spartanburg-sc/","host":"dartpoints.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Spartanburg · Spartanburg · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"dc-blox-camp-hall-berkeley-county-sc","state":"SC","kind":"facility","name":"DC BLOX Camp Hall Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berkeley"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Dated preliminary plan; current construction/opening not established. Corporate footer is not this site capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/","host":"dcblox.com","date":"2023-09-27","published":"2023-09-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.1595951,"lng":-79.9070461,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"purchased_land_acres":27.5,"preliminary_buildings":4,"preliminary_area_sqft":200000,"preliminary_capacity_mw":45,"power_basis":"planned power, unspecified IT versus gross"},"notes":["Dated preliminary plan; current construction/opening not established. Corporate footer is not this site capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/","host":"dcblox.com","date":"2023-09-27","published":"2023-09-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Berkeley · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"dc-blox-greenville-sc","state":"SC","kind":"facility","name":"DC BLOX Greenville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Greenville"],"city":"Greenville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Header8MWcommittedplanned/36493sqft/3centersdiffersfromlegacy54kdatahalland18MWfuture. Keep sourcecontexts, notall8MWenergized. Captiondateisceremony, notexactfirstoperation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-centers/greenville/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.80455191966,"lng":-82.342676840132,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"33 Global Drive, Greenville, SC29607","phase1_critical_load_mw_max":3,"expansion_potential_critical_load_mw_max":18,"ribbon_cutting_month_caption":"2022-04"},"notes":["Header8MWcommittedplanned/36493sqft/3centersdiffersfromlegacy54kdatahalland18MWfuture. Keep sourcecontexts, notall8MWenergized. Captiondateisceremony, notexactfirstoperation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/greenville/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Greenville · Greenville · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"dc-blox-myrtle-beach-cls-sc","state":"SC","kind":"facility","name":"DC BLOX Myrtle Beach Cable Landing Station","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Horry"],"city":"Myrtle Beach","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Opening is supported by dated operator release; full-build design is not measured energized capacity. UpdatedJuly30,2024header is not opening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Potential expansion adjacent to MYR1, not a second operating building or completed20MW. Power comes from existing substation; no double count against full-buildMYR1.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dc-blox-opens-myrtle-beach-cable-landing-station/","host":"dcblox.com","date":"2023-10-10","published":"2023-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.dcblox.com/dc-blox-to-expand-myrtle-beach-cable-landing-station/","host":"dcblox.com","date":"2025-10-14","published":"2025-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.6746096,"lng":-78.9440697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"opening_announcement":"2023-10-10","full_build_design_area_sqft":125000,"full_build_design_capacity_mw":19,"power_basis":"design power, not explicitly critical IT"},"notes":["Opening is supported by dated operator release; full-build design is not measured energized capacity. UpdatedJuly30,2024header is not opening date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-opens-myrtle-beach-cable-landing-station/","host":"dcblox.com","date":"2023-10-10","published":"2023-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"expansion_site_code":"MYR2","adjacent_land_acres_approx":20,"potential_additional_power_mw":20,"construction_condition":"pending additional demand"},"notes":["Potential expansion adjacent to MYR1, not a second operating building or completed20MW. Power comes from existing substation; no double count against full-buildMYR1.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-to-expand-myrtle-beach-cable-landing-station/","host":"dcblox.com","date":"2025-10-14","published":"2025-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Myrtle Beach · Horry · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"dc-blox-north-augusta-sc","state":"SC","kind":"facility","name":"DC BLOX North Augusta Hyper Edge Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Aiken"],"city":"North Augusta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NorthAugusta-specific section within4-site announcement. Four-site25MWinitialand160MWpotentialforadditionaltenantsnotNorthAugusta-only. Montgomery5initial/40expandandHuntsville5aredifferentlocations. Statusdeveloping2024notcurrentlyonlineproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/","host":"dcblox.com","date":"2024-11-14","published":"2024-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4838645,"lng":-81.9141182,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"NorthAugusta-specific section within4-site announcement","fields":{"north_augusta_planned_anchor_power_mw":5,"north_augusta_county_quote":"Aiken County, South Carolina","power_basis":"dedicatedhyperscaleclientpower, not explicitIT"},"notes":["Four-site25MWinitialand160MWpotentialforadditionaltenantsnotNorthAugusta-only. Montgomery5initial/40expandandHuntsville5aredifferentlocations. Statusdeveloping2024notcurrentlyonlineproof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/","host":"dcblox.com","date":"2024-11-14","published":"2024-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · North Augusta · Aiken · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"genesis-digital-assets-anderson-sc","state":"SC","kind":"facility","name":"Genesis Digital Assets Anderson Bitcoin Mining Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Anderson"],"city":"Anderson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/","host":"scbiz.com","date":"2023-08-01","published":"2023-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.5068601,"lng":-82.6506264,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"SCBiz reports Genesis's Anderson site opened in February 2023 and two Union or Lockhart sites ran from March 2023.","independently_verified_current_operating_status":null},"notes":["Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/","host":"scbiz.com","date":"2023-08-01","published":"2023-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Anderson · Anderson · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"genesis-digital-assets-union-lockhart-sc","state":"SC","kind":"facility","name":"Genesis Digital Assets Union-Lockhart Bitcoin Mining Data Centers","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Union"],"city":"Lockhart","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/","host":"scbiz.com","date":"2023-08-01","published":"2023-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.7865238,"lng":-81.4620402,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"SCBiz reports Genesis's Anderson site opened in February 2023 and two Union or Lockhart sites ran from March 2023.","independently_verified_current_operating_status":null},"notes":["Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/","host":"scbiz.com","date":"2023-08-01","published":"2023-08-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Lockhart · Union · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"google-moncks-corner-sc","state":"SC","kind":"facility","name":"Google Berkeley County Data Center (Moncks Corner)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berkeley"],"city":"Moncks Corner","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. South Carolina statewide redirect. PreferredBerkeleyURLredirectsstatewide.13B+not MoncksCorner-onlyinvestment; Dorchester2024opening not Berkeley date.225MWrenewabledeal is generation, not facilityIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. three-campus regional historical investment allocation. Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/berkeley-county-south-carolina/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","host":"governor.sc.gov","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.072101,"lng":-80.039105,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"South Carolina statewide redirect","fields":{"named_locations":["Moncks Corner","Summerville","St. George"],"regional_investment_usd_min_exclusive":13000000000,"investment_scope":"South Carolina statewide","dorchester_newest_opening_year":2024},"notes":["PreferredBerkeleyURLredirectsstatewide.13B+not MoncksCorner-onlyinvestment; Dorchester2024opening not Berkeley date.225MWrenewabledeal is generation, not facilityIT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/berkeley-county-south-carolina/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"three-campus regional historical investment allocation","fields":{"historical_expansion_announcement":"2024-09-26","combined_regional_planned_investment_usd":3300000000,"dorchester_two_new_campuses_combined_investment_usd":2000000000,"dorchester_two_new_campuses_expected_operational_jobs":200,"berkeley_existing_campus_expansion_planned_investment_usd":1300000000,"named_dorchester_locations":["Pine Hill Business Campus,Ridgeville","Winding Woods Commerce Park,StGeorge"],"named_berkeley_location":"Mount Holly Commerce Park,MoncksCorner"},"notes":["Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","host":"governor.sc.gov","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Moncks Corner · Berkeley · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"google-ridgeville-sc","state":"SC","kind":"facility","name":"Google Ridgeville Data Center (Project Dawson)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dorchester"],"city":"Ridgeville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-campus regional historical investment allocation. Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","host":"governor.sc.gov","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.096,"lng":-80.3239,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"three-campus regional historical investment allocation","fields":{"historical_expansion_announcement":"2024-09-26","combined_regional_planned_investment_usd":3300000000,"dorchester_two_new_campuses_combined_investment_usd":2000000000,"dorchester_two_new_campuses_expected_operational_jobs":200,"berkeley_existing_campus_expansion_planned_investment_usd":1300000000,"named_dorchester_locations":["Pine Hill Business Campus,Ridgeville","Winding Woods Commerce Park,StGeorge"],"named_berkeley_location":"Mount Holly Commerce Park,MoncksCorner"},"notes":["Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion","host":"governor.sc.gov","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Ridgeville · Dorchester · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"greenidge-spartanburg-sc","state":"SC","kind":"facility","name":"Greenidge Spartanburg (South Carolina)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Spartanburg"],"city":"Spartanburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. South Carolina Department of Commerce, January25,2022 original announcement: Greenidge proposed175acres/300JonesRoad Spartanburg crypto facility,264M announced investment/40future jobs/at least100MW fully developed DATACENTER CAPACITY, basis not explicit critical IT. Second-half2022 first phase and expansion through2025 are historical targets, not completed operating proof. Carbon-neutral commitment and local energy mix statements are issuer claims, not verified measured emissions. No grant/payment amount or current owner inferred; historical Greenidge identity does not automatically establish current Lighthouse conversion. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sccommerce.com/news/greenidge-generation-establishing-operations-spartanburg-county","host":"sccommerce.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.9494,"lng":-81.925,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["South Carolina Department of Commerce, January25,2022 original announcement: Greenidge proposed175acres/300JonesRoad Spartanburg crypto facility,264M announced investment/40future jobs/at least100MW fully developed DATACENTER CAPACITY, basis not explicit critical IT.","Second-half2022 first phase and expansion through2025 are historical targets, not completed operating proof. Carbon-neutral commitment and local energy mix statements are issuer claims, not verified measured emissions. No grant/payment amount or current owner inferred; historical Greenidge identity does not automatically establish current Lighthouse conversion.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://www.sccommerce.com/news/greenidge-generation-establishing-operations-spartanburg-county","host":"sccommerce.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Spartanburg · Spartanburg · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"lighthouse-data-centers-spartanburg-sc","state":"SC","kind":"facility","name":"LightHouse Data Centers Spartanburg (300 Jones Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spartanburg"],"city":"Spartanburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. RipLey Simone, WSPA original report; article metadata published August 26, 2026 at 23:36:24 UTC, modified 23:40:43 UTC. Photo/body identify the August 25 appeals meeting. Names Lighthouse at 300 Jones Road, 200,000 square feet/60 MW undefined power basis: this resolves the earlier held operator/address crosswalk. Appeals board upheld the June 26 application denial; not proof no judicial appeal is possible or all county development is permanently banned. Underlying ordinance, application, decision and current litigation not inspected. $28 million spent is the developer representative claim, not an audited receipt. Representative named Sam Outten; no OpenAI-CEO identity inference. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/amp/","host":"wspa.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0151258,"lng":-81.8838447,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["RipLey Simone, WSPA original report; article metadata published August 26, 2026 at 23:36:24 UTC, modified 23:40:43 UTC. Photo/body identify the August 25 appeals meeting. Names Lighthouse at 300 Jones Road, 200,000 square feet/60 MW undefined power basis: this resolves the earlier held operator/address crosswalk. Appeals board upheld the June 26 application denial; not proof no judicial appeal is possible or all county development is permanently banned. Underlying ordinance, application, decision and current litigation not inspected. $28 million spent is the developer representative claim, not an audited receipt. Representative named Sam Outten; no OpenAI-CEO identity inference.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/amp/","host":"wspa.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Spartanburg · Spartanburg · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"meta-aiken-county-sc","state":"SC","kind":"facility","name":"Meta Aiken Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Aiken"],"city":"Graniteville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Historical announced scope, not completed2026capacity. No site MW specified. Renewable matching and plannedLEEDGold do not prove continuous clean supply or current achieved certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center","host":"governor.sc.gov","date":"2024-08-29","published":"2024-08-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.5629,"lng":-81.8287,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"development_announcement_date":"2024-08-29","planned_investment_usd":800000000,"expected_operational_jobs":100,"planned_data_center_area_sqft":715000,"operation_target":"spring2027","published_location":"Sage Mill Industrial Park,AikenCounty,SouthCarolina"},"notes":["Historical announced scope, not completed2026capacity. No site MW specified. Renewable matching and plannedLEEDGold do not prove continuous clean supply or current achieved certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center","host":"governor.sc.gov","date":"2024-08-29","published":"2024-08-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Graniteville · Aiken · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"northmark-valara-spartanburg-sc","state":"SC","kind":"facility","name":"NorthMark Strategies Spartanburg High-Performance Computing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spartanburg"],"city":"Spartanburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Valara siteidentity andproposed onsitegeneration modification. Applicationcopy/digitalsignaturenotapprovalofnewturbines orcurrentoperations. Existing24times2MWenginesandrequestedgenerationnotcriticalIT,donotsumasenergizedcampuscapacity. Northmarkoperatoraliasnotindependentlyestablishedinthisform. Noexactcompletionorcapitalvalue. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf","host":"des.sc.gov","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.923066,"lng":-81.851905,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Valara siteidentity andproposed onsitegeneration modification","fields":{"application_copy_of_record_date":"2026-04-23","facility_name":"ValaraHoldingsHighPerformanceComputeCenter","published_physical_address":"4000 SouthPineStreet,Spartanburg,SC29302","applicant_reported_facility_point":{"latitude":34.923,"longitude":-81.8519,"geo_precision":"applicant-reported permitted-process center,notparcelcentroid"},"referenced_existing_air_permit":"CP-50000316v1.0","referenced_existing_permit_issue_date":"2025-09-17","requested_additional_generation":[{"units":5,"mw_each":17,"fuel":"naturalgas"},{"units":6,"mw_each":54,"fuel":"naturalgas"}]},"notes":["Applicationcopy/digitalsignaturenotapprovalofnewturbines orcurrentoperations. Existing24times2MWenginesandrequestedgenerationnotcriticalIT,donotsumasenergizedcampuscapacity. Northmarkoperatoraliasnotindependentlyestablishedinthisform. Noexactcompletionorcapitalvalue.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf","host":"des.sc.gov","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Spartanburg · Spartanburg · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"pollard-mccormick-county-data-center-sc","state":"SC","kind":"facility","name":"Pollard Data Center Site (McCormick County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["McCormick"],"city":"McCormick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Original publication metadata is July 28, with an August 12 update and an August 18 future council date; the exact information-session date is not established. Planning denial/recommendations are separate from council law. Pipeline cost is not DC capex, and a proposed gas-powered system is not critical IT or an executed fuel contract. Unrelated inserted political material is excluded. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wrdw.com/2026/08/12/hundreds-gather-debate-proposed-mccormick-county-data-center/","host":"wrdw.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.8992855,"lng":-82.2674735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WRDW reports Pollard's McCormick informational proposal with a gas pipeline, planned water use and a planning recommendation for a pause, while county action remained future.","independently_verified_current_operating_status":null},"notes":["Original publication metadata is July 28, with an August 12 update and an August 18 future council date; the exact information-session date is not established. Planning denial/recommendations are separate from council law. Pipeline cost is not DC capex, and a proposed gas-powered system is not critical IT or an executed fuel contract. Unrelated inserted political material is excluded.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wrdw.com/2026/08/12/hundreds-gather-debate-proposed-mccormick-county-data-center/","host":"wrdw.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · McCormick · McCormick · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"clarendon-county-ram-bay-data-center-manning-sc","state":"SC","kind":"facility","name":"Potential Data Center, Ram Bay Industrial Park (Clarendon County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clarendon"],"city":"Manning","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Clarendon early proposal, first reading and water-fill scope. Secondary account of countyfactsheet, not signedutilityagreement. Firstreading not effective moratorium; thirdreading/outcome unknown.40Kcoolingfill not gallonsperday or nofuturewateruse guarantee.4.5Mannualforecast not actualpaidtax. Officials noharm/nojurisdiction statements not independent legal or environmental finding. No named operator, exactparcel, ITMW or operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wistv.com/2026/08/19/clarendon-county-administration-responds-pushback-proposed-data-center/","host":"wistv.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6382891,"lng":-80.2708259,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Clarendon early proposal, first reading and water-fill scope","fields":{"county":"Clarendon, SouthCarolina","project_location":"RamBayIndustrialPark","report_date_as_url":"2026-08-19","reported_stage":"potential site secured through SanteeElectric contract; formal plans not official","reported_moratorium_first_reading_date":"2026-08-10","reported_projected_tax_revenue_annual_usd":4500000,"reported_initial_cooling_water_gallons_approx":40000},"notes":["Secondary account of countyfactsheet, not signedutilityagreement. Firstreading not effective moratorium; thirdreading/outcome unknown.40Kcoolingfill not gallonsperday or nofuturewateruse guarantee.4.5Mannualforecast not actualpaidtax. Officials noharm/nojurisdiction statements not independent legal or environmental finding. No named operator, exactparcel, ITMW or operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wistv.com/2026/08/19/clarendon-county-administration-responds-pushback-proposed-data-center/","host":"wistv.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Manning · Clarendon · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"volt-edge-project-alpaca-union-county-sc","state":"SC","kind":"facility","name":"Project Alpaca (Midway Green Industrial Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Union"],"city":"Union","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original participant/economic-development presentation for proposal and claims, not independent performance validation.. Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation. USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts. Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established. Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset. A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf","host":"gearupunionsc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.708932747649,"lng":-81.662386821414,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round39-2026-10-14.json","scope":"Original participant/economic-development presentation for proposal and claims, not independent performance validation.","fields":{"issuer_presentation_date":"2026-04","issuer_proposed_fixed_asset_investment_usd":410000000,"issuer_proposed_permanent_jobs_lower_bound":50,"issuer_proposed_construction_jobs_lower_bound":500,"issuer_mw_label":49,"issuer_mw_basis":"Presentation says existing transmission and generation capacity, not explicitly criticalIT","critical_it_mw":null,"issuer_construction_target":"2026","issuer_operating_target":"2027/2028","executed_utility_agreement_verified":false,"incentive_award_verified":false},"notes":["Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation.","USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts.","Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established.","Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset.","A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf","host":"gearupunionsc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Union · Union · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"project-altair-newberry-county-sc","state":"SC","kind":"facility","name":"Project Altair (Mid-Carolina Commerce Park II)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Newberry"],"city":"Prosperity","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Newberry County due-diligence proposal status. Option/due-diligence proposal not finalized sale, construction approval, cancellation or operating campus. Informational session has no confirmed date. No MW, budget, tax incentive amount or exact parcel adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers","host":"newberrycounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.2098669,"lng":-81.5338576,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Newberry County due-diligence proposal status","fields":{"project_name":"Altair","county_public_hearing_date":"2026-04-15","ordinance_id":"03-01-2026","reported_review_stage":"third reading delayed; community information session to be scheduled","published_location":"remaining acreage,MidCarolinaCommerceParkII","utility_feasibility_review":"SanteeCooper grid study"},"notes":["Option/due-diligence proposal not finalized sale, construction approval, cancellation or operating campus. Informational session has no confirmed date. No MW, budget, tax incentive amount or exact parcel adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers","host":"newberrycounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Prosperity · Newberry · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"project-boulder-colleton-county-sc","state":"SC","kind":"facility","name":"Project Boulder","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Colleton"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This is counsel/advocacy, not an adopted zoning finding or permit outcome. The approximately 850-acre project, wetlands and larger 2,600-acre tract have different scopes. Generic power/water/health impacts, the separate Canadys plant and its pipeline are not measured site consumption, actual emissions or committed project infrastructure. No original application was read in this pass. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.scelp.org/news/colleton-data-center","host":"scelp.org","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.7,"lng":-80.62,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"SCELP describes Thomas and Hutton/Eagle Rock's proposed Colleton campus and need for a special exception, with a hearing not yet scheduled in its account.","independently_verified_current_operating_status":null},"notes":["This is counsel/advocacy, not an adopted zoning finding or permit outcome. The approximately 850-acre project, wetlands and larger 2,600-acre tract have different scopes. Generic power/water/health impacts, the separate Canadys plant and its pipeline are not measured site consumption, actual emissions or committed project infrastructure. No original application was read in this pass.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.scelp.org/news/colleton-data-center","host":"scelp.org","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Colleton · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"stream-data-centers-project-liberty-marion-county-sc","state":"SC","kind":"facility","name":"Project Liberty (Stream Data Centers, Marion County Industrial Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Marion","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Community funding commitments reportedly continue but no recipients, amounts or disbursements established. County approval did not guarantee power or construction. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wmbfnews.com/2026/06/11/stream-data-centers-pulls-out-controversial-marion-county-project/","host":"wmbfnews.com","date":"2026-06-11","published":"2026-06-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.1782,"lng":-79.4006,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"developer-withdrawal-reported","reported_finding":"WMBF reports Stream no longer proceeding with Marion Project Liberty due to utility timing, despite earlier county approval.","report_display_date":"2026-06-11","independently_verified_current_status":null},"notes":["Community funding commitments reportedly continue but no recipients, amounts or disbursements established. County approval did not guarantee power or construction.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wmbfnews.com/2026/06/11/stream-data-centers-pulls-out-controversial-marion-county-project/","host":"wmbfnews.com","date":"2026-06-11","published":"2026-06-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Marion · Marion · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"tigerdc-project-spero-spartanburg-county-sc","state":"SC","kind":"facility","name":"Project Spero (TigerDC), Tyger River Industrial Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spartanburg"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. County explicitly did not close door to all data centers. Existing TigerDC presence since 2022 is not operation of withdrawn Spero; technology/water claims remain company assertions. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.foxcarolina.com/2026/02/27/company-withdraws-ai-data-center-spartanburg-county-consideration/","host":"foxcarolina.com","date":"2026-02-27","published":"2026-02-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.9109275,"lng":-82.092603,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"developer-withdrawal-after-incentive-rejection","reported_finding":"FOX Carolina reports TigerDC formally withdrew Project Spero and would seek other communities after county declined tax incentive.","report_display_date":"2026-02-27","independently_verified_current_status":null},"notes":["County explicitly did not close door to all data centers. Existing TigerDC presence since 2022 is not operation of withdrawn Spero; technology/water claims remain company assertions.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.foxcarolina.com/2026/02/27/company-withdraws-ai-data-center-spartanburg-county-consideration/","host":"foxcarolina.com","date":"2026-02-27","published":"2026-02-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Spartanburg · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"qts-york-county-sc","state":"SC","kind":"facility","name":"QTS York County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["York"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Four buildings is the first phase, nine is the three-phase plan, not a numerical conflict. Later land beyond approved campus would require additional investment; current estimate is not all spent. Per-billion tax examples are estimates, not guaranteed annual collections. Old May event has no verified current upcoming date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"http://q.com/data-centers/york/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0046528,"lng":-81.1001847,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_total_buildings":9,"planned_phases":3,"first_phase_buildings":4,"first_phase_acres_approx":109,"second_phase_construction_target":"early2027","planned_approved_campus_investment_usd_approx":8000000000,"forecast_construction_jobs":1000,"forecast_permanent_jobs":200},"notes":["Four buildings is the first phase, nine is the three-phase plan, not a numerical conflict. Later land beyond approved campus would require additional investment; current estimate is not all spent. Per-billion tax examples are estimates, not guaranteed annual collections. Old May event has no verified current upcoming date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"http://q.com/data-centers/york/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · York · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"eagle-rock-rhodes-technology-park-colleton-county-sc","state":"SC","kind":"facility","name":"Rhodes Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Colleton"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The proposed 1,000 MW, investment, jobs and tax benefits are forecasts. Construction was expected in 2028 or 2029. No tenant was identified; named technology companies were examples. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/","host":"live5news.com","date":"2026-09-22","published":"2026-09-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.0509477,"lng":-80.7911503,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"WCSC reports a Rhodes Technology Park information session after overlay passage, with the development agreement and energy studies pending.","independently_verified_current_operating_status":null},"notes":["The proposed 1,000 MW, investment, jobs and tax benefits are forecasts. Construction was expected in 2028 or 2029. No tenant was identified; named technology companies were examples.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/","host":"live5news.com","date":"2026-09-22","published":"2026-09-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Colleton · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"srs-ai-data-center-savannah-river-site-sc","state":"SC","kind":"facility","name":"Savannah River Site AI Data Center (Amentum)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Barnwell"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Savannah River federal negotiation selection, not awarded operating campus. Selection explicitly not final lease award. Subject to negotiations, permits,safety/security and federal approvals. Data-center1GWand onsitegeneration2GWnot3GWIT. No executed lease, operating date or investment value established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site","host":"energy.gov","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.2122041,"lng":-81.6223727,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Savannah River federal negotiation selection, not awarded operating campus","fields":{"developer_selection_for_negotiations_announcement":"2026-07-20","selected_negotiating_party":"Amentum","proposed_data_center_power_gw":1,"data_center_power_basis":"not explicitly criticalIT","proposed_dedicated_generation_gw_approx":2,"proposed_generation_transition":"natural gas bridging to nuclear"},"notes":["Selection explicitly not final lease award. Subject to negotiations, permits,safety/security and federal approvals. Data-center1GWand onsitegeneration2GWnot3GWIT. No executed lease, operating date or investment value established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site","host":"energy.gov","date":"2026-07-20","published":"2026-07-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Barnwell · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"terra-nexus-camden-kershaw-county-sc","state":"SC","kind":"facility","name":"Terra Nexus Ventures Camden Data Center (771 Park Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kershaw"],"city":"Camden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. LenahAllen WIS mainbodypublishedSeptember23,2025 despiteURL24. September8planningrecommendationrezoning161acres771ParkRdTerraNexusstillneededcountyfinalapproval.2warehouses/10-15jobsproposalnotnew2pins/hiredstaff. Garbledwordnotincompanysentence notadopted; sourceendexplicitTerraNexuscontact. CountyOctoberdiscussionfuturethen, currentvote/constructionunverified. No ITMW/capex/actualwater established. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wistv.com/2025/09/24/questions-concerns-raised-about-planned-kershaw-county-data-center/","host":"wistv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.3084326,"lng":-80.5392422,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["LenahAllen WIS mainbodypublishedSeptember23,2025 despiteURL24. September8planningrecommendationrezoning161acres771ParkRdTerraNexusstillneededcountyfinalapproval.2warehouses/10-15jobsproposalnotnew2pins/hiredstaff. Garbledwordnotincompanysentence notadopted; sourceendexplicitTerraNexuscontact. CountyOctoberdiscussionfuturethen, currentvote/constructionunverified. No ITMW/capex/actualwater established.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wistv.com/2025/09/24/questions-concerns-raised-about-planned-kershaw-county-data-center/","host":"wistv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Carolina · Camden · Kershaw · Source context reviewed","state_name":"South Carolina","state_path":"/south-carolina/"},{"id":"applied-digital-deuel-county-sd","state":"SD","kind":"facility","name":"Applied Digital Deuel County AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Deuel"],"city":"Toronto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Title 14 billion USD differs from 4.3 to 5.5 billion investment and 10 to 16 billion broader impact in body. No single capex figure adopted. Per-building 150 MW computing is not combined gross 400 to 430 MW. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mykxlg.com/news/local/potential-14-billion-data-center-could-transform-deuel-countys-economy/article_2a031739-b2ae-4932-95f5-57e4f280b7c7.html","host":"mykxlg.com","date":"2025-04-15","published":"2025-04-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.567,"lng":-96.62,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Applied Digital presentation described a potential Deuel County project east of Toronto, with zoning and state issues unresolved.","independently_verified_current_operating_status":null},"notes":["Title 14 billion USD differs from 4.3 to 5.5 billion investment and 10 to 16 billion broader impact in body. No single capex figure adopted. Per-building 150 MW computing is not combined gross 400 to 430 MW.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mykxlg.com/news/local/potential-14-billion-data-center-could-transform-deuel-countys-economy/article_2a031739-b2ae-4932-95f5-57e4f280b7c7.html","host":"mykxlg.com","date":"2025-04-15","published":"2025-04-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Toronto · Deuel · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"big-watt-digital-onida-sd","state":"SD","kind":"facility","name":"Big Watt Digital Sully Buttes Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Sully"],"city":"Onida","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Recommendation is not final county approval. Phrase 12.5 megawatts annually confuses power and energy; canonical energy/IT capacity remains null. March 2023 opening was a forecast. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.onidawatchman.com/news/article_ce136784-8c57-11ed-a366-7ba7e3d8d91d.html","host":"onidawatchman.com","date":"2023-01-04","published":"2023-01-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.705,"lng":-100.3115,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"canonical_annual_energy_mwh":null,"source_power_energy_unit_conflict":true,"reported_context":"Onida Watchman reports Sully planning/zoning recommendation on PUD2022-48, conditional on independent valuation.","independently_verified_current_operating_status":null},"notes":["Recommendation is not final county approval. Phrase 12.5 megawatts annually confuses power and energy; canonical energy/IT capacity remains null. March 2023 opening was a forecast.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.onidawatchman.com/news/article_ce136784-8c57-11ed-a366-7ba7e3d8d91d.html","host":"onidawatchman.com","date":"2023-01-04","published":"2023-01-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Onida · Sully · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"csre-properties-blockchain-rapid-city-sd","state":"SD","kind":"facility","name":"CSRE Properties South Dakota Blockchain Facility (Ben French Substation)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Pennington"],"city":"Rapid City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. South Dakota public utility docket index only. No approval order or hearing date listed in captured docket. Confidential agreement not accessed. Do not infer electricity price, site MW, current operation or AI conversion from service application. Applicant/customer identity and exact CSRE parcel not established by index alone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://puc.sd.gov/Dockets/Electric/2026/EL26-008.aspx","host":"puc.sd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.0872,"lng":-103.2611,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"South Dakota public utility docket index only","fields":{"docket":"EL26-008","filing_date":"2026-03-19","notice_date":"2026-03-26","amended_contract_submission_date":"2026-08-19","regulator_index_status":"pending","subject":"Black Hills Power blockchain interruptible electric service agreement"},"notes":["No approval order or hearing date listed in captured docket. Confidential agreement not accessed. Do not infer electricity price, site MW, current operation or AI conversion from service application. Applicant/customer identity and exact CSRE parcel not established by index alone.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://puc.sd.gov/Dockets/Electric/2026/EL26-008.aspx","host":"puc.sd.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Rapid City · Pennington · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"leola-data-center-mcpherson-county-sd","state":"SD","kind":"facility","name":"Leola Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["McPherson"],"city":"Leola","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Leola proposed project and unsigned county action form. Application and preliminary design do not prove a granted CUP, operation, AI conversion or a completion date. Four building areas are each 4080 square feet, not the entire 20-acre site. One-year expiry clause depends on an actual approval date, which is absent here. Transformer kVA and individual server wattage are separate equipment ratings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://puc.sd.gov/commission/dockets/electric/2024/EL24-027/CondUsePermit.pdf","host":"puc.sd.gov","date":"2024-11-07","published":"2024-11-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.704374067105,"lng":-99.035447087942,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Leola proposed project and unsigned county action form","fields":{"applicant":"Leola Data Center LLC","published_site_address":"11641 358th Avenue, Leola, South Dakota 57456","county":"McPherson, South Dakota","supplement_date":"2024-11-07","proposed_capacity_mw":50,"power_basis":"data-center project capacity; not explicitly critical IT","site_acres":20,"proposed_developed_acres_approx":2,"proposed_server_buildings":4,"proposed_area_per_server_building_sqft":4080,"approval_status_in_document":"approval and denial fields blank"},"notes":["Application and preliminary design do not prove a granted CUP, operation, AI conversion or a completion date. Four building areas are each 4080 square feet, not the entire 20-acre site. One-year expiry clause depends on an actual approval date, which is absent here. Transformer kVA and individual server wattage are separate equipment ratings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://puc.sd.gov/commission/dockets/electric/2024/EL24-027/CondUsePermit.pdf","host":"puc.sd.gov","date":"2024-11-07","published":"2024-11-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Leola · McPherson · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"midco-sioux-falls-sd","state":"SD","kind":"facility","name":"Midco Sioux Falls Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Sioux Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. TierIII is operator claim; independently consult certificate registry before displayingcertified. NoMW stated. Operator explicitly identifiesSiouxFalls and separates total area/raisedfloor. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://business.midco.com/services/data-centers/sioux-falls-data-center/","host":"business.midco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.4968,"lng":-96.7845,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Sioux Falls","whole_facility_sqft":11000,"raised_floor_sqft_min":9000,"marketed_service":"wholesale and retail colocation"},"notes":["TierIII is operator claim; independently consult certificate registry before displayingcertified.","NoMW stated.","Operator explicitly identifiesSiouxFalls and separates total area/raisedfloor.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://business.midco.com/services/data-centers/sioux-falls-data-center/","host":"business.midco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Sioux Falls · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"sequitor-edge-rapid-city-sd","state":"SD","kind":"facility","name":"Sequitor Edge Rapid City","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pennington"],"city":"Rapid City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Developer says initial up to 2 MW scales to at-most 10 MW with five halls; the 10 MW includes the initial phase and capacity basis is not independently established as critical IT. Water 19,000 to 20,000 gallons is initial fill for one hall, not daily demand; future halls require further fills and no independently audited lifetime water use is given. Tier III design and stated uptime are marketing/design claims, not certification or measured availability. Three to five jobs and $100,000 average wage are forecasts. No RFS or construction completion verified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rapidcitypost.com/?p=76434","host":"rapidcitypost.com","date":"2026-02-19","published":"2026-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.0222987,"lng":-103.1914102,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Rapid City Post reports Sequitor Edge planned a roughly 30,000-square-foot colocation facility on ten acres at Black Hills Industrial Center, initially one hall with about 240 cabinets.","independently_verified_current_operating_status":null},"notes":["Developer says initial up to 2 MW scales to at-most 10 MW with five halls; the 10 MW includes the initial phase and capacity basis is not independently established as critical IT. Water 19,000 to 20,000 gallons is initial fill for one hall, not daily demand; future halls require further fills and no independently audited lifetime water use is given. Tier III design and stated uptime are marketing/design claims, not certification or measured availability. Three to five jobs and $100,000 average wage are forecasts. No RFS or construction completion verified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rapidcitypost.com/?p=76434","host":"rapidcitypost.com","date":"2026-02-19","published":"2026-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Rapid City · Pennington · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"simple-mining-madison-sd","state":"SD","kind":"facility","name":"Simple Mining Madison Bitcoin Hosting Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Lake"],"city":"Madison","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Commission took NO ACTION; conditional-use permit remained a next step. Distinct developers and contract positions must not be merged. The 10 MW is proposed mining load, not certified critical IT/current draw. $425,000 yearly utility-fund estimate belongs to the failed Giga proposal; city hopes for similar results, not a binding Simple Mining payment or guaranteed resident rate cut. Developer-funded upgrades, two-month surety and no local water connection are representations, not examined executed terms. Air cooling initially and planned glycol conversion after 12 to 18 months are future design stages. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.madisondailyleader.com/news/local/simple-mining-data-center-hoping-to-come-to-madison","host":"madisondailyleader.com","date":"2026-07-07","published":"2026-07-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.0061,"lng":-97.114,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Madison Daily Leader reports an introductory July 6 discussion with Simple Mining for a proposed interruptible 10 MW mining facility after Giga Energy’s earlier plan fell through.","independently_verified_current_operating_status":null},"notes":["Commission took NO ACTION; conditional-use permit remained a next step. Distinct developers and contract positions must not be merged. The 10 MW is proposed mining load, not certified critical IT/current draw. $425,000 yearly utility-fund estimate belongs to the failed Giga proposal; city hopes for similar results, not a binding Simple Mining payment or guaranteed resident rate cut. Developer-funded upgrades, two-month surety and no local water connection are representations, not examined executed terms. Air cooling initially and planned glycol conversion after 12 to 18 months are future design stages.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.madisondailyleader.com/news/local/simple-mining-data-center-hoping-to-come-to-madison","host":"madisondailyleader.com","date":"2026-07-07","published":"2026-07-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Madison · Lake · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"gemini-data-center-sioux-falls-sd","state":"SD","kind":"facility","name":"Sioux Falls Technology Park (Gemini Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Minnehaha"],"city":"Sioux Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. SiouxFalls.Business January19,2026 original interview identifies GeminiDataCenterSDLLC and164acres reportedly acquired fromXcel late2023. EarlierJanuary rezoning/preliminarysubdivision approval is not campus construction approval or end-user lease. Petition gathering is not a validated referendum/result. Developer distinguishes itself from future operator and says no designs/enduser yet. 500MWpotential and possiblefive100MWbuildings have unspecifiedloadbasis, not deliveredIT. Interconnection/systemimpactstudy reportedly done, facilitystudy underway and futureESA still to be negotiated asofinterview. No-ratepayer-cost/noise/water50-home-equivalent claims are developer assertions, not signed current contracts or measurements. Domestic-use restriction/setbacks/conservation17acres reported, underlying signed instruments unread.50yeartax-exemption bill then pending, not current law. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://siouxfalls.business/sioux-falls-data-center-developers-detail-next-steps/","host":"siouxfalls.business","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.583,"lng":-96.685,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["SiouxFalls.Business January19,2026 original interview identifies GeminiDataCenterSDLLC and164acres reportedly acquired fromXcel late2023. EarlierJanuary rezoning/preliminarysubdivision approval is not campus construction approval or end-user lease. Petition gathering is not a validated referendum/result. Developer distinguishes itself from future operator and says no designs/enduser yet.","500MWpotential and possiblefive100MWbuildings have unspecifiedloadbasis, not deliveredIT. Interconnection/systemimpactstudy reportedly done, facilitystudy underway and futureESA still to be negotiated asofinterview. No-ratepayer-cost/noise/water50-home-equivalent claims are developer assertions, not signed current contracts or measurements. Domestic-use restriction/setbacks/conservation17acres reported, underlying signed instruments unread.50yeartax-exemption bill then pending, not current law.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://siouxfalls.business/sioux-falls-data-center-developers-detail-next-steps/","host":"siouxfalls.business","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Sioux Falls · Minnehaha · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"tierpoint-sioux-falls-east-sd","state":"SD","kind":"facility","name":"TierPoint Sioux Falls - East (SFE)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Minnehaha"],"city":"Sioux Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/south-dakota/sioux-falls-east/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.5947,"lng":-96.7193,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":16000,"gross_area_is_lower_bound":true,"raised_floor_sqft":4200,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 800 kW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/south-dakota/sioux-falls-east/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Sioux Falls · Minnehaha · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"tierpoint-sioux-falls-west-sd","state":"SD","kind":"facility","name":"TierPoint Sioux Falls - West","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Minnehaha"],"city":"Sioux Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/south-dakota/sioux-falls-west/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.6069708,"lng":-96.8091949,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":25000,"gross_area_is_lower_bound":true,"raised_floor_sqft":4300,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"1 MW generator","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/south-dakota/sioux-falls-west/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Dakota · Sioux Falls · Minnehaha · Source context reviewed","state_name":"South Dakota","state_path":"/south-dakota/"},{"id":"5c-mem01-memphis-tn","state":"TN","kind":"facility","name":"5C MEM01 Memphis (former Fred's headquarters)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Memphis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Table does not make clear incrementalversuscumulativefuturecolumns; do not sum20+64+35orclaim2026committedisfullyenergized. Otherregionalanonymoussitesnotnewmappedcampuses. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://5c.ai/datacenters","host":"5c.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0301213,"lng":-89.936928,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"mem01_advertised_capacity_schedule_mw":{"2026":20,"2027":64,"2029_and_later":35},"mem01_marketing_status":"fully committed; selective expansion capacity available","power_basis":"annual capacity table, not explicitlyIT"},"notes":["Table does not make clear incrementalversuscumulativefuturecolumns; do not sum20+64+35orclaim2026committedisfullyenergized. Otherregionalanonymoussitesnotnewmappedcampuses.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://5c.ai/datacenters","host":"5c.ai","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Memphis · Shelby · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"bny-mellon-tennessee-processing-center-nashville-tn","state":"TN","kind":"facility","name":"BNY Mellon Tennessee Processing Center (Nashville)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 2011 release also describes separate business offices and a combined 350,000-square-foot Metro Nashville footprint. Do not assign that regional total to this data center, treat office completion as data-center completion, or infer 2026 operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/bny-mellons-continued-global-growth-prompts-expansion-of-tennessee-facilities-123740554.html","host":"prnewswire.com","date":"2011-06-13","published":"2011-06-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.2156443,"lng":-86.7840012,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_proposed_processing_building_sqft":155000,"historical_county":"Davidson"},"notes":["2011 release also describes separate business offices and a combined 350,000-square-foot Metro Nashville footprint. Do not assign that regional total to this data center, treat office completion as data-center completion, or infer 2026 operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/bny-mellons-continued-global-growth-prompts-expansion-of-tennessee-facilities-123740554.html","host":"prnewswire.com","date":"2011-06-13","published":"2011-06-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"centersquare-gallatin-tn","state":"TN","kind":"facility","name":"Centersquare Gallatin (NAS) Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sumner"],"city":"Gallatin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Do not sum initial area and ultimate buildout or transfer operating headline to all planned phases. No current commissioning independently established. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newschannel5.com/news/how-big-are-middle-tennessees-data-centers-a-look-at-facilities-already-operating","host":"newschannel5.com","date":"2026-06-12","published":"2026-06-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.40406,"lng":-86.39812,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WTVF distinguishes Gallatin CSquare phase-one82000-square-foot space from planned500000-square-foot full campus.","independently_verified_current_operating_status":null},"notes":["Do not sum initial area and ultimate buildout or transfer operating headline to all planned phases. No current commissioning independently established.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newschannel5.com/news/how-big-are-middle-tennessees-data-centers-a-look-at-facilities-already-operating","host":"newschannel5.com","date":"2026-06-12","published":"2026-06-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Gallatin · Sumner · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-campbell-junction-tn","state":"TN","kind":"facility","name":"CleanSpark Campbell Junction Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cumberland"],"city":"Campbell Junction","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0436,"lng":-85.1692,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_acquisition_city":"Campbell Junction","tn_acquisition_mipa_group":2,"agreement_date":"2024-09-10","combined_seven_site_cash_and_land_consideration_usd":27500000,"source_period":"FY2025 annual acquisition note","exact_site_closing_date":null,"site_power_mw":null},"notes":["27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Campbell Junction · Cumberland · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-decatur-tn","state":"TN","kind":"facility","name":"CleanSpark Decatur Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Meigs"],"city":"Decatur","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.5148,"lng":-84.7902,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_acquisition_city":"Decatur","tn_acquisition_mipa_group":2,"agreement_date":"2024-09-10","combined_seven_site_cash_and_land_consideration_usd":27500000,"source_period":"FY2025 annual acquisition note","exact_site_closing_date":null,"site_power_mw":null},"notes":["27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Decatur · Meigs · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-jackson-tn","state":"TN","kind":"facility","name":"CleanSpark Jackson Bitcoin Mining Facility (former GRIID site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Madison"],"city":"Jackson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. NBC39 original Briana Hardiman report December 11, 2024, updated December 12, identifies Jackson Data as the local operation after CleanSpark bought Grid. Utility JEA was interviewed. Expected full operations that month is a historical target, not observed October 2026 commissioning. Seven Tennessee sites is a reported portfolio count, not a new verified census. Mayor's privately-owned comment does not establish the publicly traded parent's legal classification; possible local subsidiary distinction remains. Exact premises, MW, executed acquisition documents and current operating status were not verified. No complete record/current operating status, signed instruments, measured impacts or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nbc39.com/homepage/jackson-community-reacts-to-upcoming-bitcoin-mining-operation/article_dd7f7b22-b78e-11ef-b971-e38776884a3a.html","host":"nbc39.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.614445,"lng":-88.817742,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["NBC39 original Briana Hardiman report December 11, 2024, updated December 12, identifies Jackson Data as the local operation after CleanSpark bought Grid. Utility JEA was interviewed. Expected full operations that month is a historical target, not observed October 2026 commissioning.","Seven Tennessee sites is a reported portfolio count, not a new verified census. Mayor's privately-owned comment does not establish the publicly traded parent's legal classification; possible local subsidiary distinction remains. Exact premises, MW, executed acquisition documents and current operating status were not verified.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://www.nbc39.com/homepage/jackson-community-reacts-to-upcoming-bitcoin-mining-operation/article_dd7f7b22-b78e-11ef-b971-e38776884a3a.html","host":"nbc39.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Jackson · Madison · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-jellico-tn","state":"TN","kind":"facility","name":"CleanSpark Jellico Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Campbell"],"city":"Jellico","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.5825,"lng":-84.1306,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_acquisition_city":"Jellico","tn_acquisition_mipa_group":1,"agreement_date":"2024-09-10","combined_seven_site_cash_and_land_consideration_usd":27500000,"source_period":"FY2025 annual acquisition note","exact_site_closing_date":null,"site_power_mw":null},"notes":["27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Jellico · Campbell · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-lenoir-city-tn","state":"TN","kind":"facility","name":"CleanSpark Lenoir City Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Loudon"],"city":"Lenoir City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Historical site list and corporate merger do not prove later local operation, closure, relocation or court settlement.155M is transaction enterprise value, not per-site cost or construction investment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-announces-agreement-to-acquire-griid-infrastructure-based-on-an-enterprise-value-of-155-million-and-expansion-plans-of-over-400-mw-in-tennessee-302184116.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/2cbc77b7-304f-4fec-97ea-9a36e1d216ea.html","host":"d18rn0p25nwr6d.cloudfront.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.7973,"lng":-84.256,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"historical_griid_named_mining_location":"Lenoir City","named_source_date":"2024-06-27","griid_corporate_merger_actual_close":"2024-10-30","close_announcement":"2024-10-31","current_exact_site_status":null},"notes":["Historical site list and corporate merger do not prove later local operation, closure, relocation or court settlement.155M is transaction enterprise value, not per-site cost or construction investment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-announces-agreement-to-acquire-griid-infrastructure-based-on-an-enterprise-value-of-155-million-and-expansion-plans-of-over-400-mw-in-tennessee-302184116.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/2cbc77b7-304f-4fec-97ea-9a36e1d216ea.html","host":"d18rn0p25nwr6d.cloudfront.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Lenoir City · Loudon · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-limestone-tn","state":"TN","kind":"facility","name":"CleanSpark Limestone Bitcoin Mining Facility (closed 2026)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Washington"],"city":"Limestone","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Historical site list and corporate merger do not prove later local operation, closure, relocation or court settlement.155M is transaction enterprise value, not per-site cost or construction investment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-announces-agreement-to-acquire-griid-infrastructure-based-on-an-enterprise-value-of-155-million-and-expansion-plans-of-over-400-mw-in-tennessee-302184116.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/2cbc77b7-304f-4fec-97ea-9a36e1d216ea.html","host":"d18rn0p25nwr6d.cloudfront.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.2235,"lng":-82.625,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"historical_griid_named_mining_location":"Limestone","named_source_date":"2024-06-27","griid_corporate_merger_actual_close":"2024-10-30","close_announcement":"2024-10-31","current_exact_site_status":null},"notes":["Historical site list and corporate merger do not prove later local operation, closure, relocation or court settlement.155M is transaction enterprise value, not per-site cost or construction investment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-announces-agreement-to-acquire-griid-infrastructure-based-on-an-enterprise-value-of-155-million-and-expansion-plans-of-over-400-mw-in-tennessee-302184116.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/2cbc77b7-304f-4fec-97ea-9a36e1d216ea.html","host":"d18rn0p25nwr6d.cloudfront.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Limestone · Washington · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-maynardville-tn","state":"TN","kind":"facility","name":"CleanSpark Maynardville Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Union"],"city":"Maynardville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Historical site list and corporate merger do not prove later local operation, closure, relocation or court settlement.155M is transaction enterprise value, not per-site cost or construction investment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-announces-agreement-to-acquire-griid-infrastructure-based-on-an-enterprise-value-of-155-million-and-expansion-plans-of-over-400-mw-in-tennessee-302184116.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/2cbc77b7-304f-4fec-97ea-9a36e1d216ea.html","host":"d18rn0p25nwr6d.cloudfront.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.2506,"lng":-83.7974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"historical_griid_named_mining_location":"Maynardville","named_source_date":"2024-06-27","griid_corporate_merger_actual_close":"2024-10-30","close_announcement":"2024-10-31","current_exact_site_status":null},"notes":["Historical site list and corporate merger do not prove later local operation, closure, relocation or court settlement.155M is transaction enterprise value, not per-site cost or construction investment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-announces-agreement-to-acquire-griid-infrastructure-based-on-an-enterprise-value-of-155-million-and-expansion-plans-of-over-400-mw-in-tennessee-302184116.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/2cbc77b7-304f-4fec-97ea-9a36e1d216ea.html","host":"d18rn0p25nwr6d.cloudfront.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Maynardville · Union · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-mountain-city-tn","state":"TN","kind":"facility","name":"CleanSpark Mountain City Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Johnson"],"city":"Mountain City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Not an enacted countywide crypto ban or operating mine. Potential alternate Johnson County sites remain possible. Separate Cheyenne noise complaints and corporate fleet statistics do not establish Mountain City impacts. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lpm.org/news/2025-08-15/tennessee-town-pushes-back-over-proposed-bitcoin-mine-and-wins","host":"lpm.org","date":"2025-08-15","published":"2025-08-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.4745636,"lng":-81.804838,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WUOT reporting via LPM says Mountain City board declined to advance CleanSpark rezoning when all abstained; mayor described project as dead within city.","independently_verified_current_operating_status":null},"notes":["Not an enacted countywide crypto ban or operating mine. Potential alternate Johnson County sites remain possible. Separate Cheyenne noise complaints and corporate fleet statistics do not establish Mountain City impacts.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lpm.org/news/2025-08-15/tennessee-town-pushes-back-over-proposed-bitcoin-mine-and-wins","host":"lpm.org","date":"2025-08-15","published":"2025-08-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Mountain City · Johnson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-oneida-tn","state":"TN","kind":"facility","name":"CleanSpark Oneida Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Scott"],"city":"Oneida","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.4981,"lng":-84.5127,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_acquisition_city":"Oneida","tn_acquisition_mipa_group":3,"agreement_date":"2024-09-10","combined_seven_site_cash_and_land_consideration_usd":27500000,"source_period":"FY2025 annual acquisition note","exact_site_closing_date":null,"site_power_mw":null},"notes":["27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Oneida · Scott · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-west-crossville-tn","state":"TN","kind":"facility","name":"CleanSpark West Crossville Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cumberland"],"city":"Crossville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.9487,"lng":-85.0269,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_acquisition_city":"Crossville","tn_acquisition_mipa_group":1,"agreement_date":"2024-09-10","combined_seven_site_cash_and_land_consideration_usd":27500000,"source_period":"FY2025 annual acquisition note","exact_site_closing_date":null,"site_power_mw":null},"notes":["27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Crossville · Cumberland · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cleanspark-winfield-tn","state":"TN","kind":"facility","name":"CleanSpark Winfield Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Scott"],"city":"Winfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.5619,"lng":-84.4506,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_acquisition_city":"Winfield","tn_acquisition_mipa_group":3,"agreement_date":"2024-09-10","combined_seven_site_cash_and_land_consideration_usd":27500000,"source_period":"FY2025 annual acquisition note","exact_site_closing_date":null,"site_power_mw":null},"notes":["27.5M and85MW apply to seven-site portfolio, not each member. Annual note names MIPA1 and MIPA3 but supplies three closing dates; do not automatically assign those dates by position.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Winfield · Scott · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"cogent-nashville-woodycrest-tn","state":"TN","kind":"facility","name":"Cogent Data Center - Nashville (338 Woodycrest Ave)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Article says it confirmed listed places while also sourcing discovery/counts from Data Center Map. Dated named address reporting is not current operator ownership or independent floor/power certification; regional count not adopted. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","host":"wsmv.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.132143,"lng":-86.752262,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WSMV names Cogent338Woodycrest, Lumen2530Perimeter Place and2208Ninth Avenue North in its Nashville list.","independently_verified_current_operating_status":null},"notes":["Article says it confirmed listed places while also sourcing discovery/counts from Data Center Map. Dated named address reporting is not current operator ownership or independent floor/power certification; regional count not adopted.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","host":"wsmv.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"aphorio-carter-collierville-tn","state":"TN","kind":"facility","name":"Collierville Enterprise Data Center (FedEx World Technology Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Collierville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Purchase price is not a new-development capex figure. Site and surrounding campus acreage are nested. Construction year is not an independently verified opening date; no 2026 tenancy inference. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/aphorio-carter-acquires-data-center-in-collierville-tn-301983903.html","host":"prnewswire.com","date":"2023-11-09","published":"2023-11-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.04204,"lng":-89.66453,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"acquisition_price_usd_approx":13000000,"property_acres":4.62,"surrounding_campus_acres":118,"gross_floor_sqft_lower_bound":86000,"raised_floor_sqft":41000,"building_construction_year":2001,"status_at_announcement":"fully leased enterprise data-center property acquired"},"notes":["Purchase price is not a new-development capex figure. Site and surrounding campus acreage are nested. Construction year is not an independently verified opening date; no 2026 tenancy inference.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/aphorio-carter-acquires-data-center-in-collierville-tn-301983903.html","host":"prnewswire.com","date":"2023-11-09","published":"2023-11-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Collierville · Shelby · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"xai-colossus-memphis-tn","state":"TN","kind":"facility","name":"Colossus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Memphis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Preview only; full calculations/assessment period not examined. Expected tax bill is not collected revenue and cannot be labelled annual without the covered period. Report says no formal tax break was granted; lower assessment relative to claimed investment is not an adopted cash incentive.12 billion is attributed investment claim, not audited site spending or legal taxable value. No MW/currentcapacity adopted; subscriber body not accessed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dailymemphian.com/article/51159/heres-what-xai-will-pay-in-property-taxes","host":"dailymemphian.com","date":"2025-04-14","published":"2025-04-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.0565,"lng":-90.0148,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"DailyMemphian public excerpt reports xAI expected to pay more than 30 million dollars in combined Memphis/Shelby property taxes and company/chamber claims of 12 billion invested at formerElectrolux.","independently_verified_current_operating_status":null,"reported_expected_combined_property_tax_usd_lower_bound":30000000,"tax_period_verified":null,"formal_incentive_award_not_established":true},"notes":["Preview only; full calculations/assessment period not examined. Expected tax bill is not collected revenue and cannot be labelled annual without the covered period. Report says no formal tax break was granted; lower assessment relative to claimed investment is not an adopted cash incentive.12 billion is attributed investment claim, not audited site spending or legal taxable value. No MW/currentcapacity adopted; subscriber body not accessed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dailymemphian.com/article/51159/heres-what-xai-will-pay-in-property-taxes","host":"dailymemphian.com","date":"2025-04-14","published":"2025-04-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Memphis · Shelby · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"xai-colossus-2-memphis-tn","state":"TN","kind":"facility","name":"Colossus 2 (Whitehaven)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Memphis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Archive captureMay 17,2025 is not project event/publication date.1 million-square-footwarehouse/site wording and adjacent 100 acres are different area descriptions, not additive floor area. Requestedup-to 260 MWsystem-impact study is not a signed ESA or criticalIT; nearbyTVA 780 MWplant is separate generation. Up-to 350,000 GPUs and worldwide/memphisone-million ambition are forecasts, not deployed inventory at this site.80 million purchase is not complete retrofit-capex or tax incentive;5 billionDellorderdiscussions are separate corporate procurement. Do not merge Memphis 5400 Tulane with Southaven’s distinctTulaneRoad 2026 training-site project. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://web.archive.org/web/20250517234219/https://www.datacenterdynamics.com/en/news/elon-musks-xai-buys-one-million-sq-ft-site-for-second-memphis-data-center/","host":"web.archive.org","date":"2025-03-10","published":"2025-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.997983,"lng":-90.0348672,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ArchivedDataCenterDynamics report identifies xAIaffiliateCTCProperties’80 million-dollaracquisition of warehouse/three parcels at 5400 TulaneRoadinMemphis for a proposed second campus.","independently_verified_current_operating_status":null,"reported_purchase_usd":80000000,"reported_requested_system_study_mw":260,"executed_utility_agreement_verified":false,"critical_it_mw":null},"notes":["Archive captureMay 17,2025 is not project event/publication date.1 million-square-footwarehouse/site wording and adjacent 100 acres are different area descriptions, not additive floor area. Requestedup-to 260 MWsystem-impact study is not a signed ESA or criticalIT; nearbyTVA 780 MWplant is separate generation. Up-to 350,000 GPUs and worldwide/memphisone-million ambition are forecasts, not deployed inventory at this site.80 million purchase is not complete retrofit-capex or tax incentive;5 billionDellorderdiscussions are separate corporate procurement. Do not merge Memphis 5400 Tulane with Southaven’s distinctTulaneRoad 2026 training-site project.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20250517234219/https://www.datacenterdynamics.com/en/news/elon-musks-xai-buys-one-million-sq-ft-site-for-second-memphis-data-center/","host":"web.archive.org","date":"2025-03-10","published":"2025-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Memphis · Shelby · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"data-suites-murfreesboro-tn","state":"TN","kind":"facility","name":"Data Suites Murfreesboro","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rutherford"],"city":"Murfreesboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Tier3-ready is a design/marketing claim, not certification. Rack density cannot be multiplied without an independently verified installed rack count. Operator markets existing colocation in Murfreesboro; facility-wide MW and exact street are not established by the page. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mydatasuites.com/","host":"mydatasuites.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.85555,"lng":-86.4048269,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Murfreesboro","service":"AI/HPC colocation","rack_density_kw_min":50,"rack_density_basis":"advertised ability over50kW per rack"},"notes":["Tier3-ready is a design/marketing claim, not certification.","Rack density cannot be multiplied without an independently verified installed rack count.","Operator markets existing colocation in Murfreesboro; facility-wide MW and exact street are not established by the page.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://mydatasuites.com/","host":"mydatasuites.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Murfreesboro · Rutherford · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"databank-mem1-memphis-tn","state":"TN","kind":"facility","name":"DataBank MEM1 (Memphis)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Memphis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Current operator explicitly lists MEM1 and its critical IT specification. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/memphis/7620-appling-center-drive/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.20249,"lng":-89.8097,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"7620 Appling Center Drive","city":"Memphis","power_mw":0.45,"power_basis":"critical IT load specification, not measured demand","area_sqft":7090,"area_basis":"IT square feet","marketed_service":"colocation"},"notes":["Current operator explicitly lists MEM1 and its critical IT specification.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/memphis/7620-appling-center-drive/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Memphis · Shelby · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"dcblox-chattanooga-e16th-tn","state":"TN","kind":"facility","name":"DC BLOX Chattanooga (807 E 16th Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hamilton"],"city":"Chattanooga","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Page has different summary and building-spec area figures. Preserve both with scopes rather than choose one. Future expansion is not current energized load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. OneMWmaximum is not independently labeled criticalIT; typical utilization is interview estimate, not metered annualenergy. No expansionplanned as ofAugust2026, not permanentpromise. Other300timeslargercompanysites are separate.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-centers/chattanooga/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0314592,"lng":-85.2975821,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_described_status":"operational and in development","summary_area_sqft":9000,"initial_building_spec_area_sqft":8000,"expanded_building_spec_area_sqft_up_to":16000,"critical_load_mw_up_to":1,"future_expansion_critical_load_mw_up_to":3.5},"notes":["Page has different summary and building-spec area figures. Preserve both with scopes rather than choose one. Future expansion is not current energized load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/chattanooga/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.","fields":{"reported_context":"Local reporting describes operating DC BLOX at807East16thStreet,9000squarefeet, moved there2017. Named VP describes1MWmaximum, typically20percentused.","independently_verified_current_operating_status":null},"notes":["OneMWmaximum is not independently labeled criticalIT; typical utilization is interview estimate, not metered annualenergy. No expansionplanned as ofAugust2026, not permanentpromise. Other300timeslargercompanysites are separate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Chattanooga · Hamilton · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"dcblox-nashville-grassmere-tn","state":"TN","kind":"facility","name":"DC BLOX Nashville (Grassmere Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer plan. Data-center use being permitted in the zoning district does not prove project approval or construction start. Do not infer permanent jobs from a generic multiplier. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/nashville-data-center/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.0865,"lng":-86.74893,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"developer_current_stage":"evaluation","planned_building_sqft":69200,"advertised_building_power_mw":10,"power_basis":"not separately defined as utility or critical IT in this statement","planned_capital_investment_usd_lower_bound":380000000,"county":"Davidson"},"notes":["Developer plan. Data-center use being permitted in the zoning district does not prove project approval or construction start. Do not infer permanent jobs from a generic multiplier.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/nashville-data-center/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"edgeconnex-mem01-memphis-tn","state":"TN","kind":"facility","name":"EdgeConneX Memphis (EDCMEM01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Memphis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator facility specification; raised floor is a subset, not an additional building area. Backup/UPS equipment is not established IT capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/americas/memphis-tn/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.038995,"lng":-89.88623,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_gross_area_sqft":16700,"advertised_raised_floor_sqft":5633},"notes":["Operator facility specification; raised floor is a subset, not an additional building area. Backup/UPS equipment is not established IT capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/americas/memphis-tn/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Memphis · Shelby · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"edgeconnex-nas01-nashville-tn","state":"TN","kind":"facility","name":"EdgeConneX NAS01 Nashville","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Archiveobservationdate isnotpublication,openingorcurrentOctoberoperatingcertification. Raisedfloorisasubset,notadditionalarea.20-pluskW/cabinetand 600-pluswatts/squarefootarecapabilities,notcampusITandcannotbemultipliedwithoutlayout/loadingbasis. N+1 designandENERGYSTAR/complianceclaimsareoperatorstatements,notindependentcertificate-dateverification. March 2026 modification/2018 publicationmetadataarewebhistory,notbuildingevents. Noform,virtualtourorquote requestsubmitted;noMWadopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://web.archive.org/web/20260802162755/https://www.edgeconnex.com/locations/americas/nashville-tn/","host":"web.archive.org","date":"2026-08-02","published":"2026-08-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.1449104,"lng":-86.703549,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"EdgeConneXNAS 01 publicoperatorpage archivedAugust 2,2026 describes 42,500 squarefeetfacilityand 9,355 squarefeetraisedtenantfloor.","independently_verified_current_operating_status":null,"archived_operator_facility_sqft":42500,"archived_operator_raised_floor_sqft":9355,"critical_it_mw":null},"notes":["Archiveobservationdate isnotpublication,openingorcurrentOctoberoperatingcertification. Raisedfloorisasubset,notadditionalarea.20-pluskW/cabinetand 600-pluswatts/squarefootarecapabilities,notcampusITandcannotbemultipliedwithoutlayout/loadingbasis. N+1 designandENERGYSTAR/complianceclaimsareoperatorstatements,notindependentcertificate-dateverification. March 2026 modification/2018 publicationmetadataarewebhistory,notbuildingevents. Noform,virtualtourorquote requestsubmitted;noMWadopted.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260802162755/https://www.edgeconnex.com/locations/americas/nashville-tn/","host":"web.archive.org","date":"2026-08-02","published":"2026-08-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"exoticridge-bulls-gap-tn","state":"TN","kind":"facility","name":"ExoticRidge Bulls Gap Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hawkins"],"city":"Bulls Gap","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Plaintiff allegations are not court findings. The reported state permit was not retained as an original. Two unnamed Kentucky operations are discovery leads, without locations or new pins. Constitutional conclusions and no-harm claims remain attributed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.beacontn.org/exoticridge-v-hawkins-county-fighting-back-against-an-arbitrary-data-center-ban-in-east-tennessee/","host":"beacontn.org","date":"2026-04-01","published":"2026-04-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.2535742,"lng":-83.086061,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Beacon's counsel page describes ExoticRidge's intended ethane-powered Hawkins County facility and its federal challenge to a county ban.","independently_verified_current_operating_status":null},"notes":["Plaintiff allegations are not court findings. The reported state permit was not retained as an original. Two unnamed Kentucky operations are discovery leads, without locations or new pins. Constitutional conclusions and no-harm claims remain attributed.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.beacontn.org/exoticridge-v-hawkins-county-fighting-back-against-an-arbitrary-data-center-ban-in-east-tennessee/","host":"beacontn.org","date":"2026-04-01","published":"2026-04-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Bulls Gap · Hawkins · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"expedient-memphis-tn","state":"TN","kind":"facility","name":"Expedient Memphis (MEM1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Memphis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Memphis named site. 2MWtotal generator capacity not extra IT. Operator claims are not independent occupancy/certification inspection or measured energy consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://expedient.com/data-centers/memphis/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.062965,"lng":-89.786143,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Expedient Memphis named site","fields":{"operator_code":"MEM1","published_address":"3180 Players Lane, Memphis, TN38125","critical_it_mw":1.5,"total_area_sqft":35000,"raised_floor_sqft":7500},"notes":["2MWtotal generator capacity not extra IT. Operator claims are not independent occupancy/certification inspection or measured energy consumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://expedient.com/data-centers/memphis/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Memphis · Shelby · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"fisk-quantum-leap-nashville-tn","state":"TN","kind":"facility","name":"Fisk University Quantum Leap Innovation & Technology Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The billion-dollar initiative is broader than the data center. The proposed 30 MW is not measured IT demand. Future LEED certification is not an existing certification, generic water comparisons are not site consumption, and petitions are not legal denial. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wsmv.com/2026/06/08/what-know-about-data-center-planned-nashville-hbcu-fisk-universitys-campus/","host":"wsmv.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.1667902,"lng":-86.7973014,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"WSMV describes Fisk Quantum Leap's proposed 100,000-square-foot building, split between innovation and academic space, pending Metro review.","independently_verified_current_operating_status":null},"notes":["The billion-dollar initiative is broader than the data center. The proposed 30 MW is not measured IT demand. Future LEED certification is not an existing certification, generic water comparisons are not site consumption, and petitions are not legal denial.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wsmv.com/2026/06/08/what-know-about-data-center-planned-nashville-hbcu-fisk-universitys-campus/","host":"wsmv.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"lawrenceburg-flatwoods-road-data-center-tn","state":"TN","kind":"facility","name":"Flatwoods Road Data Center (Lawrenceburg)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lawrence"],"city":"Lawrenceburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. A date embedded in the URL is not sufficient publication-date evidence. Building permits and next-summer completion are forecasts with no observed outcome. Modest-power and reduced-water claims are unquantified; petitions are not denials and no original rezoning resolution was reviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://lawrenceburgnow.com/04212026data.html","host":"lawrenceburgnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.2423023,"lng":-87.3347389,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Lawrenceburg Now reproduces reporting on a roughly 50,000-square-foot Flatwoods Road proposal and a reported January rezoning.","independently_verified_current_operating_status":null},"notes":["A date embedded in the URL is not sufficient publication-date evidence. Building permits and next-summer completion are forecasts with no observed outcome. Modest-power and reduced-water claims are unquantified; petitions are not denials and no original rezoning resolution was reviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://lawrenceburgnow.com/04212026data.html","host":"lawrenceburgnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Lawrenceburg · Lawrence · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"flexential-nashville-brentwood-nas01-04-tn","state":"TN","kind":"facility","name":"Flexential Nashville - Brentwood (NAS01/04)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Williamson"],"city":"Brentwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.9727294,"lng":-86.8084949,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Nashville - Brentwood (NAS01/04)","publisher_reported_footprint_sqft":19150,"publisher_reported_critical_power_mw":1.49,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Brentwood · Williamson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"flexential-nashville-cool-springs-tn","state":"TN","kind":"facility","name":"Flexential Nashville - Cool Springs","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Williamson"],"city":"Franklin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.951045,"lng":-86.833406,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Nashville - Cool Springs","publisher_reported_footprint_sqft":74679,"publisher_reported_critical_power_mw":3.15,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Franklin · Williamson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"flexential-nashville-franklin-tn","state":"TN","kind":"facility","name":"Flexential Nashville - Franklin","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Williamson"],"city":"Franklin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.9204203,"lng":-86.8155401,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Nashville - Franklin","publisher_reported_footprint_sqft":80726,"publisher_reported_critical_power_mw":3.75,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Franklin · Williamson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"google-montgomery-county-tn","state":"TN","kind":"facility","name":"Google Montgomery County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Clarksville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The investment figure is statewide cumulative since construction; not site-only capex. Operator listing is not current measured utilization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/montgomery-county-tennessee/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.5288,"lng":-87.3636,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_described_build_year":2018,"operator_tennessee_investment_usd_lower_bound":6000000000},"notes":["The investment figure is statewide cumulative since construction; not site-only capex. Operator listing is not current measured utilization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/montgomery-county-tennessee/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Clarksville · Montgomery · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"h5-nashville-147-fourth-avenue-tn","state":"TN","kind":"facility","name":"H5 Data Centers Nashville (147 Fourth Avenue)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Facility floor area is not whole tower size. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/nashville-colocation.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.162626,"lng":-86.778674,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"147 Fourth Avenue N., 8th Floor, Nashville, TN 37219","advertised_facility_sqft":19700},"notes":["Facility floor area is not whole tower size.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/nashville-colocation.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"hca-it-services-data-center-nashville-tn","state":"TN","kind":"facility","name":"HCA Information Technology & Services Data Center (Antioch)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Municipal incentive dashboard last updated April 22, 2021. Do not present its historical to-date value, jobs or seven-year award as a current 2026 subsidy. Expected versus actual award values remain distinct. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nashville.gov/departments/mayor/economic-opportunity/growth-incentives/growth-projects/hca-data-center","host":"nashville.gov","date":"2021-04-22","published":"2021-04-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.0326354,"lng":-86.637789,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"5900 Crossings Blvd., Antioch, TN 37013","published_parcel_id":"17400003200","incentive_approval_date":"2012-03-06","ordinance":"BL2012-116","pilot_abatement_percent":60,"pilot_term_years":7,"estimated_incentive_value_usd":3044966,"reported_actual_value_to_date_usd":3379854,"reported_capital_investment_usd":200000000,"jobs_observation_date":"2016-12-31","reported_jobs_on_observation_date":834},"notes":["Municipal incentive dashboard last updated April 22, 2021. Do not present its historical to-date value, jobs or seven-year award as a current 2026 subsidy. Expected versus actual award values remain distinct.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nashville.gov/departments/mayor/economic-opportunity/growth-incentives/growth-projects/hca-data-center","host":"nashville.gov","date":"2021-04-22","published":"2021-04-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"hixson-data-center-mcminnville-tn","state":"TN","kind":"facility","name":"Hixson Data Center (McMinnville)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"McMinnville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. Hixson operator's undated public concept page explicitly places its proposal in McMinnville, Warren County, Tennessee and targets Q1 2028 tenant readiness. Operator lists site acquisition, FEED-LITE/Class 5 estimate, Phase I ESA and Bloom Energy power agreement as progress; financing/tenant, detailed design, permitting and construction remain in its future sequence. Underlying title, agreement and studies unread. No exact address/parcel pin established. 25 MW SELLABLE IT is explicit. 33.15 MW Bloom SOFC nameplate, 30 MW firm generation, 25 MW battery POWER and eight 4.4 MW diesel generators are separate systems, not additive IT or storage MWh. Grid-islanded/no utility intertie is a concept basis, not verified operating independence. 1.15 PUE is a design target, not measured efficiency. Approximately 96,064 square feet is a two-level concept. Rack 132 kVA is not automatically kW. Planned SOC 2/ISO/NIST/ITAR readiness is not current certification, and named counterparties do not establish independently confirmed commitments. No data-room login or request-access form used. No complete record/current operating status, signed instruments, measured impacts or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hixsondc.com/","host":"hixsondc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.6834,"lng":-85.76998,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["Hixson operator's undated public concept page explicitly places its proposal in McMinnville, Warren County, Tennessee and targets Q1 2028 tenant readiness. Operator lists site acquisition, FEED-LITE/Class 5 estimate, Phase I ESA and Bloom Energy power agreement as progress; financing/tenant, detailed design, permitting and construction remain in its future sequence. Underlying title, agreement and studies unread. No exact address/parcel pin established.","25 MW SELLABLE IT is explicit. 33.15 MW Bloom SOFC nameplate, 30 MW firm generation, 25 MW battery POWER and eight 4.4 MW diesel generators are separate systems, not additive IT or storage MWh. Grid-islanded/no utility intertie is a concept basis, not verified operating independence. 1.15 PUE is a design target, not measured efficiency. Approximately 96,064 square feet is a two-level concept. Rack 132 kVA is not automatically kW. Planned SOC 2/ISO/NIST/ITAR readiness is not current certification, and named counterparties do not establish independently confirmed commitments. No data-room login or request-access form used.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://hixsondc.com/","host":"hixsondc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · McMinnville · Warren · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"humboldt-gibson-county-bitcoin-mine-tn","state":"TN","kind":"facility","name":"Humboldt Bitcoin Mining Facility (near Gibson County Industrial Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Gibson"],"city":"Humboldt","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Agreement to enter a contract is not an executed agreement. Two million gallons is projected ANNUAL evaporative/misting water, not daily use or a closed-loop claim. The release's no-local-incentives assertion does not cover all state/federal programs. Utility gross revenue, net margin and city-tax forecasts are separate from capex and actual receipts. Utility reserve and water-capacity assertions are attributed local claims, not independently measured available resources. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://humboldtchamber.com/local-officials-release-details-on-humboldt-data-center/","host":"humboldtchamber.com","date":"2026-07-23","published":"2026-07-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.819792,"lng":-88.915895,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"A joint Humboldt city, utility and chamber release describes a roughly two-acre, 15 MW cryptocurrency project under construction, with interruptible-service arrangements planned.","independently_verified_current_operating_status":null},"notes":["Agreement to enter a contract is not an executed agreement. Two million gallons is projected ANNUAL evaporative/misting water, not daily use or a closed-loop claim. The release's no-local-incentives assertion does not cover all state/federal programs. Utility gross revenue, net margin and city-tax forecasts are separate from capex and actual receipts. Utility reserve and water-capacity assertions are attributed local claims, not independently measured available resources.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://humboldtchamber.com/local-officials-release-details-on-humboldt-data-center/","host":"humboldtchamber.com","date":"2026-07-23","published":"2026-07-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Humboldt · Gibson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"jailhouse-studios-chattanooga-tn","state":"TN","kind":"facility","name":"Jailhouse Studios (former Hamilton County Jail)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hamilton"],"city":"Chattanooga","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The one-billion-USD amount describes mixed use, not a data-center-only budget. Oracle expressed interest, not an executed tenancy. A petition is not a permit denial. Power, water, approvals and an actual opening remain unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. Mixedmedia redevelopmentvalue notdata-centercapex; racksnotMW. Claimed1-to5percenttraditionalDCelectricityhasundefinedbaseline and no-waterclaimisdeveloperstatement, notmeteredproof. Approvaloflease notapprovedbuiltoperatingDC.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://newschannel9.com/news/local/residents-rally-against-proposed-ai-data-center-inside-old-hamilton-county-jail","host":"newschannel9.com","date":"2026-01-14","published":"2026-01-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.04572,"lng":-85.30949,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WTVC reports Urban Story Ventures' proposed conversion of Chattanooga's former jail into a mixed film, music and data-center development.","independently_verified_current_operating_status":null},"notes":["The one-billion-USD amount describes mixed use, not a data-center-only budget. Oracle expressed interest, not an executed tenancy. A petition is not a permit denial. Power, water, approvals and an actual opening remain unverified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://newschannel9.com/news/local/residents-rally-against-proposed-ai-data-center-inside-old-hamilton-county-jail","host":"newschannel9.com","date":"2026-01-14","published":"2026-01-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.","fields":{"reported_context":"Local reporting describes proposedUSD100millionJailhouseStudios, Marchcommissionapprovalfor375000USDannualjaillease, with studiospecificdataprocessing approximately10racks perSTEM. Developer disputes labeltraditionaldatacenter.","independently_verified_current_operating_status":null},"notes":["Mixedmedia redevelopmentvalue notdata-centercapex; racksnotMW. Claimed1-to5percenttraditionalDCelectricityhasundefinedbaseline and no-waterclaimisdeveloperstatement, notmeteredproof. Approvaloflease notapprovedbuiltoperatingDC.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Chattanooga · Hamilton · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"lcub-data-center-lenoir-city-tn","state":"TN","kind":"facility","name":"LCUB Data Center (Lenoir City Utilities Board)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudon"],"city":"Lenoir City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. LCUB direct utility-operated colocation description. Utility operator directly markets the facility, but page has no adopted numeric IT MW, exact service address or opening date. Nearby travel times and utility administrative address are not parcel coordinates. Redundancy marketing is not an audited uptime guarantee or independent certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lcub.com/data-center/","host":"lcub.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.840815,"lng":-84.265703,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"LCUB direct utility-operated colocation description","fields":{"operator":"Lenoir City Utilities Board","facility":"LCUB Data Center","service":"enterprise colocation","utility_source":"Tennessee Valley Authority via diverse LCUB substations","operator_described_features":["A/B battery-backed power paths","dedicated generator building","carrier-neutral connectivity"]},"notes":["Utility operator directly markets the facility, but page has no adopted numeric IT MW, exact service address or opening date. Nearby travel times and utility administrative address are not parcel coordinates. Redundancy marketing is not an audited uptime guarantee or independent certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lcub.com/data-center/","host":"lcub.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Lenoir City · Loudon · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"litewire-mcminnville-tn","state":"TN","kind":"facility","name":"Litewire McMinnville (former A.O. Smith Building)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"McMinnville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 2015 announcement; current owner/operation/expansion require recheck. Maximum building potential is not a completed data hall. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tn.gov/ecd/news/2015/7/15/litewire-llc-to-open-new-facility-in-warren-county.html","host":"tn.gov","date":"2015-07-15","published":"2015-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.69221,"lng":-85.7619,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_status":"phase 1 complete and fully functional","historical_initial_footprint_sqft":35000,"potential_under_one_roof_sqft":285000,"county":"Warren"},"notes":["2015 announcement; current owner/operation/expansion require recheck. Maximum building potential is not a completed data hall.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tn.gov/ecd/news/2015/7/15/litewire-llc-to-open-new-facility-in-warren-county.html","host":"tn.gov","date":"2015-07-15","published":"2015-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · McMinnville · Warren · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"lumen-nashville-9th-ave-n-tn","state":"TN","kind":"facility","name":"Lumen Nashville (2208 9th Avenue North)  -  Level(3)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Article says it confirmed listed places while also sourcing discovery/counts from Data Center Map. Dated named address reporting is not current operator ownership or independent floor/power certification; regional count not adopted. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","host":"wsmv.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.189148,"lng":-86.804111,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WSMV names Cogent338Woodycrest, Lumen2530Perimeter Place and2208Ninth Avenue North in its Nashville list.","independently_verified_current_operating_status":null},"notes":["Article says it confirmed listed places while also sourcing discovery/counts from Data Center Map. Dated named address reporting is not current operator ownership or independent floor/power certification; regional count not adopted.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","host":"wsmv.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"lumen-nashville-sidco-drive-tn","state":"TN","kind":"facility","name":"Lumen Nashville (Sidco Drive)  -  Level(3)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Limited named street-label/service context or issuer acquisition statement.. Current captured certificate1361865-19/version19, issued September24,2026, expires June17,2028. Original registrationSeptember14,2007 is management-system registration, not each building founding. ISO27001:2022/27701:2019 cover ISMS/PIMS supporting services, not UptimeTier certification, MW, building ownership or guaranteed breach-free/uptime performance. No issuer revocation-directory check or surveillance audit inspected. Page2 separately names AlbanyAirlineDrive gateway for colocation versus PearlStreet edgecompute; page8 names NashvilleSidcoDrive. Limited street-label context, not independently verified street numbers, parcels or sole operator. Most other rows only give cities and do not resolve remaining Lumen pins. Page7 still names Weehawken in Lumen service scope; current Csquare EWR2 material from round83 does not prove Lumen vanished or a sole ownership transfer. Shared complex/tenancy/operating-role ambiguity remains. No automatic rename/merge. Fetched8-page version19 differs from search cache10-page version18; retained current source bytes/date govern this review. Portfolio certification rows are not a physical-building census. Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://assets.lumen.com/is/content/Lumen/iso27001-certificate-lumen?Creativeid=b54bb9d7-6311-4aac-acac-84580992d059","host":"assets.lumen.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.102726,"lng":-86.755786,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-management-system-scope-and-acquisition-stages-round88-2026-10-15.json","scope":"Limited named street-label/service context or issuer acquisition statement.","fields":{},"notes":["Current captured certificate1361865-19/version19, issued September24,2026, expires June17,2028. Original registrationSeptember14,2007 is management-system registration, not each building founding. ISO27001:2022/27701:2019 cover ISMS/PIMS supporting services, not UptimeTier certification, MW, building ownership or guaranteed breach-free/uptime performance. No issuer revocation-directory check or surveillance audit inspected.","Page2 separately names AlbanyAirlineDrive gateway for colocation versus PearlStreet edgecompute; page8 names NashvilleSidcoDrive. Limited street-label context, not independently verified street numbers, parcels or sole operator. Most other rows only give cities and do not resolve remaining Lumen pins.","Page7 still names Weehawken in Lumen service scope; current Csquare EWR2 material from round83 does not prove Lumen vanished or a sole ownership transfer. Shared complex/tenancy/operating-role ambiguity remains. No automatic rename/merge.","Fetched8-page version19 differs from search cache10-page version18; retained current source bytes/date govern this review. Portfolio certification rows are not a physical-building census.","Exact street number, ownership, critical IT, current commissioning and whole-record verification not implied."],"sources":[{"url":"https://assets.lumen.com/is/content/Lumen/iso27001-certificate-lumen?Creativeid=b54bb9d7-6311-4aac-acac-84580992d059","host":"assets.lumen.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"lumen-nashville-perimeter-place-tn","state":"TN","kind":"facility","name":"Lumen Nashville 2 (2530 Perimeter Place Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Article says it confirmed listed places while also sourcing discovery/counts from Data Center Map. Dated named address reporting is not current operator ownership or independent floor/power certification; regional count not adopted. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","host":"wsmv.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.147409,"lng":-86.681369,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WSMV names Cogent338Woodycrest, Lumen2530Perimeter Place and2208Ninth Avenue North in its Nashville list.","independently_verified_current_operating_status":null},"notes":["Article says it confirmed listed places while also sourcing discovery/counts from Data Center Map. Dated named address reporting is not current operator ownership or independent floor/power certification; regional count not adopted.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wsmv.com/2026/06/04/how-many-data-centers-are-there-nashville-heres-map-where-theyre-located/","host":"wsmv.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"mca-technology-solutions-chattanooga-tn","state":"TN","kind":"facility","name":"MCA Technology Solutions Data Center (6048 Century Oaks Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hamilton"],"city":"Chattanooga","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Observed/photo and interview context is as of publication, not independently observed October2026 operation. No MCA criticalIT, actual energy, water, investment or dedicated visitor access established. Twelve mixed operating/development regional entries are the newspaper cohort, not all conventional AI buildings; state directory counts and home-equivalence claims are not adopted as census or measured capacity. Hamilton County pause reportedly covers new construction in unincorporated county, not automatic Chattanooga-city or existing-building ban. Other campuses, projected dates, power and financial values are separate from MCA. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.0759,"lng":-85.184553,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Times Free Press original local reporting and July29 photo describe MCA Technology Solutions operating a 2,500-square-foot data center at 6048 Century Oaks Drive, Chattanooga, added in2012 to the IT business founded in1987. Named chief strategy officer describes client cloud/backup services.","independently_verified_current_operating_status":null,"reported_mca_facility_sqft":2500,"reported_mca_data_center_added_year":2012,"business_founded_year_distinct":1987},"notes":["Observed/photo and interview context is as of publication, not independently observed October2026 operation. No MCA criticalIT, actual energy, water, investment or dedicated visitor access established. Twelve mixed operating/development regional entries are the newspaper cohort, not all conventional AI buildings; state directory counts and home-equivalence claims are not adopted as census or measured capacity. Hamilton County pause reportedly covers new construction in unincorporated county, not automatic Chattanooga-city or existing-building ban. Other campuses, projected dates, power and financial values are separate from MCA.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Chattanooga · Hamilton · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"meta-gallatin-tn","state":"TN","kind":"facility","name":"Meta Gallatin Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sumner"],"city":"Gallatin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Dated operator opening statement. Full buildout capex is future/conditional in this release; 530 MW describes eight renewable projects, not this campus IT load. No 2026 operating measurement inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/","host":"datacenters.atmeta.com","date":"2024-11-14","published":"2024-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://datacenters.atmeta.com/asset/gallatin-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.3884,"lng":-86.4369,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_status_event":"serving traffic","event_date":"2024-11-14","forecast_fully_built_investment_usd_lower_bound":1500000000,"operational_jobs_as_of_release_lower_bound":100,"historic_groundbreaking_year":2020},"notes":["Dated operator opening statement. Full buildout capex is future/conditional in this release; 530 MW describes eight renewable projects, not this campus IT load. No 2026 operating measurement inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/","host":"datacenters.atmeta.com","date":"2024-11-14","published":"2024-11-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"operator_labeled_data_center_investment_usd":1500000000,"investment_is_lower_bound":true,"investment_geographic_label":"Tennessee","historic_groundbreaking_year":2020,"peak_construction_workers":1100,"operator_reported_operational_jobs_lower_bound":100,"local_school_nonprofit_direct_funding_usd_lower_bound":2200000,"direct_funding_county_scope":"Sumner"},"notes":["Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/gallatin-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Gallatin · Sumner · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"neural-nexus-memphis-tn","state":"TN","kind":"facility","name":"Neural Nexus Innovation District","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Memphis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Memphis mixed-use proposal announcement scope. Brief development summary links to external article; not independently inspected approved site plan, signed incentive or permit. 9.4B is combined mixed-use proposal, not exclusively data-center capex or actual spend. No numeric critical IT MW, final building count or opening proven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://downtownmemphis.com/post/downtown-memphis-to-get-94-billion-neural-nexus-mixed-use-development","host":"downtownmemphis.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.1428067,"lng":-90.0500147,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Memphis mixed-use proposal announcement scope","fields":{"publisher":"Downtown Memphis Commission","developer_as_reported":"Legacy Power Capital","proposal_name":"Neural Nexus","reported_combined_mixed_use_investment_usd":9400000000,"location":"two city blocks across from AutoZone Park, Memphis, Tennessee","mixed_uses":["cloud computing","housing","workplaces","public spaces"]},"notes":["Brief development summary links to external article; not independently inspected approved site plan, signed incentive or permit. 9.4B is combined mixed-use proposal, not exclusively data-center capex or actual spend. No numeric critical IT MW, final building count or opening proven.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://downtownmemphis.com/post/downtown-memphis-to-get-94-billion-neural-nexus-mixed-use-development","host":"downtownmemphis.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Memphis · Shelby · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"ornl-oak-ridge-leadership-computing-facility-tn","state":"TN","kind":"facility","name":"Oak Ridge Leadership Computing Facility (Frontier supercomputer)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Roane"],"city":"Oak Ridge","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named HPC system page supports computing function. Historic quotation containing opened is unrelated to facility opening. No conversion of FLOPS, processor counts or scientific performance into MW, building area or new campus counts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.olcf.ornl.gov/frontier/","host":"olcf.ornl.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.92951,"lng":-84.31057,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_system_listing":"Frontier, Oak Ridge Leadership Computing Facility"},"notes":["Named HPC system page supports computing function. Historic quotation containing opened is unrelated to facility opening. No conversion of FLOPS, processor counts or scientific performance into MW, building area or new campus counts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.olcf.ornl.gov/frontier/","host":"olcf.ornl.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Oak Ridge · Roane · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"doe-oak-ridge-reservation-ai-data-centers-tn","state":"TN","kind":"facility","name":"Oak Ridge Reservation AI Data Center Sites (DOE land lease)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Roane"],"city":"Oak Ridge","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Solicitation is not an awarded or built facility. Both dates are historical, not upcoming 2026 hearings. Project applicants must arrange interconnection; capacity/end user/award outcome remain unknown. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge","host":"energy.gov","date":"2025-09-30","published":"2025-09-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.9352633,"lng":-84.3923554,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_event":"request for proposals issued","available_site_candidates":["East Tennessee Technology Park","land adjacent to Oak Ridge National Laboratory"],"proposal_deadline":"2025-12-01","industry_day":"2025-10-15"},"notes":["Solicitation is not an awarded or built facility. Both dates are historical, not upcoming 2026 hearings. Project applicants must arrange interconnection; capacity/end user/award outcome remain unknown.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge","host":"energy.gov","date":"2025-09-30","published":"2025-09-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Oak Ridge · Roane · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"white-county-pleasant-hill-road-crypto-mine-tn","state":"TN","kind":"facility","name":"Pleasant Hill Road Crypto Mining Facility (White County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["White"],"city":"Sparta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Legal enforceability and five-acre subdivision exemption are third-party interpretations, not examined statute/ordinance or court decision. Do not adopt blanket legal exemption or enforceable countywide ban.4.9 MWis attributed proposed demand, not criticalIT/currentload; developer intent to evade 50 MWlaw cannot be inferred. HB 1847 threshold/effective status and 58 of 60 statewide count were not independently reviewed and do not prove smaller sites unregulated by every law. Sparta municipal pause is separate jurisdiction. August 17 meeting was future and no outcome assumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hoodline.com/2026/08/white-county-s-data-center-ban-meets-its-match-on-pleasant-hill-road/","host":"hoodline.com","date":"2026-08-11","published":"2026-08-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.8821,"lng":-85.4688,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"Hoodline summarizes dispute over proposed 4.9 MWcrypto use on just-over-five-acre PleasantHillRoad land after WhiteCounty’s reportedJuly 20 data-center ban resolution.","independently_verified_current_operating_status":null},"notes":["Legal enforceability and five-acre subdivision exemption are third-party interpretations, not examined statute/ordinance or court decision. Do not adopt blanket legal exemption or enforceable countywide ban.4.9 MWis attributed proposed demand, not criticalIT/currentload; developer intent to evade 50 MWlaw cannot be inferred. HB 1847 threshold/effective status and 58 of 60 statewide count were not independently reviewed and do not prove smaller sites unregulated by every law. Sparta municipal pause is separate jurisdiction. August 17 meeting was future and no outcome assumed.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hoodline.com/2026/08/white-county-s-data-center-ban-meets-its-match-on-pleasant-hill-road/","host":"hoodline.com","date":"2026-08-11","published":"2026-08-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Sparta · White · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"project-river-data-center-bradley-county-tn","state":"TN","kind":"facility","name":"Project River Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bradley"],"city":"Cleveland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Project River industrial energy campus and job components. 900=525+250+125onsiteacrossDC/plant/biomass,not900DCjobs.1700indirectseparateandforecastnotcurrentheadcount. Goingupwordingnotdatedconstructionpermitproof. Selfsuppliedwater/powerandquietclaimsunmeasured;noITMWorenergizationdate. Noactualtenantnamed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://projectriver.energy/","host":"projectriver.energy","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.3314339,"lng":-84.8686025,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Project River industrial energy campus and job components","fields":{"project":"Project River","location":"Cleveland and Bradley County, Tennessee","energy_plan":"onsite biomass and natural gas, grid peaking and backup","water_plan":"biomass moisture recovery and closed loop","forecast_permanent_onsite_jobs_total":900,"forecast_data_center_jobs":525,"forecast_generation_jobs":250,"forecast_biomass_handling_jobs":125,"forecast_indirect_forestry_jobs":1700},"notes":["900=525+250+125onsiteacrossDC/plant/biomass,not900DCjobs.1700indirectseparateandforecastnotcurrentheadcount. Goingupwordingnotdatedconstructionpermitproof. Selfsuppliedwater/powerandquietclaimsunmeasured;noITMWorenergizationdate. Noactualtenantnamed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://projectriver.energy/","host":"projectriver.energy","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Cleveland · Bradley · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"radiusdc-nashville-i-tn","state":"TN","kind":"facility","name":"RadiusDC Nashville I","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Davidson"],"city":"Nashville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nashville utility reported Radius groundbreaking. Utility attendance confirms reported groundbreaking ceremony, not final customer energization or opening. No exact parcel, critical IT MW, approved investment or current completion established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nespowernews.com/radiusdc-celebrates-its-new-data-center-with-groundbreaking/","host":"nespowernews.com","date":"2025-09-17","published":"2025-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.27987,"lng":-86.7837,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Nashville utility reported Radius groundbreaking","fields":{"utility":"Nashville Electric Service","developer":"RadiusDC","location":"Brick Church Pike, Nashville, Tennessee","reported_groundbreaking_date":"2025-09-04","publication_date":"2025-09-17"},"notes":["Utility attendance confirms reported groundbreaking ceremony, not final customer energization or opening. No exact parcel, critical IT MW, approved investment or current completion established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://nespowernews.com/radiusdc-celebrates-its-new-data-center-with-groundbreaking/","host":"nespowernews.com","date":"2025-09-17","published":"2025-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Nashville · Davidson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"tennessee-south-data-center-smyrna-tn","state":"TN","kind":"facility","name":"Tennessee South Data Center (State of Tennessee)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rutherford"],"city":"Smyrna","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Two 2000 kW backup generator services are standby electrical rating, not 4 MW certified critical IT. Two 3000 amp 277/480 V utility services cannot establish usableIT without power-factor, topology and redundancy/load basis.2 N andN+1 are design descriptions, not independent Tier certification or actual reliability. Copyright 2016 is not a project opening date. No current operator, operational date or measured load independently verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.abecelectric.com/tennessee-south-data-center","host":"abecelectric.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.9934295,"lng":-86.4958261,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"ABEC Electric’s undated project page describes Tennessee South in Smyrna as 50,000 squarefeet overall with 25,000 squarefeet of data center space and redundant electrical systems.","independently_verified_current_operating_status":null},"notes":["Two 2000 kW backup generator services are standby electrical rating, not 4 MW certified critical IT. Two 3000 amp 277/480 V utility services cannot establish usableIT without power-factor, topology and redundancy/load basis.2 N andN+1 are design descriptions, not independent Tier certification or actual reliability. Copyright 2016 is not a project opening date. No current operator, operational date or measured load independently verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.abecelectric.com/tennessee-south-data-center","host":"abecelectric.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Smyrna · Rutherford · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"tenhats-fort-summit-knoxville-tn","state":"TN","kind":"facility","name":"The Fort (TenHats Knoxville Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Knox"],"city":"Knoxville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. TenHats services page fails Fort Summit facility match. GenericTenHatsKnoxvillemanagedIT/cloudhomepagewithoutFortSummitfacilityname,address,DCspecsorownershipproof.300plusyearsstaffcombinedexperienceand6000usersnotfacilityage/count. NoExactFortSummitITMW/openingadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tenhats.com/","host":"tenhats.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.9704933,"lng":-83.9184704,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"TenHats services page fails Fort Summit facility match","fields":{},"notes":["GenericTenHatsKnoxvillemanagedIT/cloudhomepagewithoutFortSummitfacilityname,address,DCspecsorownershipproof.300plusyearsstaffcombinedexperienceand6000usersnotfacilityage/count. NoExactFortSummitITMW/openingadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tenhats.com/","host":"tenhats.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Knoxville · Knox · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"stem-practice-sycamore-view-memphis-tn","state":"TN","kind":"facility","name":"The STEM Practice Sycamore View AI Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Memphis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. The STEM Practice’s relationship with Oracle is not an executed Oracle lease or tenant commitment. Partly running byMay 1 is a forecast with no observed opening in this source. NoMW, investment or current operation verified. Neural Nexus downtown and xAI Southaven are separate projects; third announcement in two months is not total regional operating count. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.actionnews5.com/2026/01/14/another-ai-data-center-coming-memphis-sources-say/","host":"actionnews5.com","date":"2026-01-14","published":"2026-01-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.161633,"lng":-89.85969,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Action News 5 relays Daily Memphian reporting that Golden Acquisitions bought 1341 SycamoreView for a proposed modular data center with The STEM Practice.","independently_verified_current_operating_status":null},"notes":["The STEM Practice’s relationship with Oracle is not an executed Oracle lease or tenant commitment. Partly running byMay 1 is a forecast with no observed opening in this source. NoMW, investment or current operation verified. Neural Nexus downtown and xAI Southaven are separate projects; third announcement in two months is not total regional operating count.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.actionnews5.com/2026/01/14/another-ai-data-center-coming-memphis-sources-say/","host":"actionnews5.com","date":"2026-01-14","published":"2026-01-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Memphis · Shelby · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"tierpoint-nashville-tn","state":"TN","kind":"facility","name":"TierPoint Nashville","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Williamson"],"city":"Franklin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/tennessee/nashville/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.9245097,"lng":-86.8556872,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":52000,"gross_area_is_lower_bound":true,"raised_floor_sqft":26000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Four 2 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/tennessee/nashville/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tennessee · Franklin · Williamson · Source context reviewed","state_name":"Tennessee","state_path":"/tennessee/"},{"id":"canaan-alborz-happy-tx","state":"TX","kind":"facility","name":"Alborz Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Randall"],"city":"Happy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-project portfolio, no per-site allocation. 120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.012,"lng":-101.9165,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"three-project portfolio, no per-site allocation","fields":{"acquisition_announced_date":"2026-02-23","acquired_equity_percent":49,"continuing_windhq_equity_percent":51,"portfolio_projects":["Alborz","Bear","Chief Mountain"],"portfolio_operational_power_mw":120,"portfolio_transaction_consideration_usd_approx":39750000,"transaction_consideration_basis":"49percent joint-venture interests plus6840mining rigs, funded with shares"},"notes":["120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Happy · Randall · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"aligned-project-caprock-hale-county-tx","state":"TX","kind":"facility","name":"Aligned Data Centers Project Caprock","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hale"],"city":"Abernathy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 540MWnot explicitcriticalIT.5Bexpected regionaleconomic impact is not audited spend. Operator ratepayer/water protection statements not approved tariff or measured water findings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/","host":"aligneddc.com","date":"2026-04-09","published":"2026-04-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.84,"lng":-101.84,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"planned_campus_power_mw":540,"campus_acres":313,"planned_area_sqft":1650000,"planned_facilities":6,"first_facility_code":"LBB01","first_service_target":"2027-Q1","expected_regional_economic_investment_usd":5000000000},"notes":["540MWnot explicitcriticalIT.5Bexpected regionaleconomic impact is not audited spend. Operator ratepayer/water protection statements not approved tariff or measured water findings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/","host":"aligneddc.com","date":"2026-04-09","published":"2026-04-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Abernathy · Hale · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"aligned-dfw-01-tx","state":"TX","kind":"facility","name":"Aligned DFW-01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Plano","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus/buildinggroup needed to avoid duplicated19acres. Per-unit3MWgenerator/2MWUPS are notcampus totals. Operator listsDFW01and02samePlanoaddress;DFW03inMansfield and04atdifferentPlanoaddress. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/dallas-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.0093142,"lng":-96.6765617,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"2800 Summit Ave","city":"Plano","campus_acres":19},"notes":["Campus/buildinggroup needed to avoid duplicated19acres.","Per-unit3MWgenerator/2MWUPS are notcampus totals.","Operator listsDFW01and02samePlanoaddress;DFW03inMansfield and04atdifferentPlanoaddress.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/dallas-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Plano · Collin · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"aligned-dfw-03-tx","state":"TX","kind":"facility","name":"Aligned DFW-03","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tarrant"],"city":"Mansfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Company5000+MWfuturecapacity not DFW03. Rack350kWdensity not siteMW. No completed opening inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/","host":"aligneddc.com","date":"2025-02-19","published":"2025-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.5498227,"lng":-97.0748553,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"site_acres":27,"initial_capacity_availability_earliest_target":"2025-Q4","onsite_substation_statement":true},"notes":["Company5000+MWfuturecapacity not DFW03. Rack350kWdensity not siteMW. No completed opening inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/","host":"aligneddc.com","date":"2025-02-19","published":"2025-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Mansfield · Tarrant · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"amazon-pecos-county-data-center-tx","state":"TX","kind":"facility","name":"Amazon Pecos County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pecos"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Amazon Pecos County statement. No numeric IT MW, investment, opening date or permanent-versus-construction job split in reviewed statement. Solar/battery/produced-water options exploratory. Statement about ratepayer effects is developer claim, not adjudicated tariff finding. Publication day not present in saved body; metadata candidate not treated as event date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.8981,"lng":-102.8779,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Amazon Pecos County statement","fields":{"project_county":"Pecos County, Texas","developer_described_initial_power":"new on-site generation with intended later grid connection","water_plan":"non-potable water; exploring produced-water use","operator_expected_jobs_description":"thousands of new jobs"},"notes":["No numeric IT MW, investment, opening date or permanent-versus-construction job split in reviewed statement. Solar/battery/produced-water options exploratory. Statement about ratepayer effects is developer claim, not adjudicated tariff finding. Publication day not present in saved body; metadata candidate not treated as event date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Pecos · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"edgeconnex-cedar-creek-tx","state":"TX","kind":"facility","name":"AUS02 / Cedar Creek Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bastrop"],"city":"Cedar Creek","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Texas construction registration, not operational certificate. Architectural accessibility review complete is not construction/occupancy completion. Registered dates and estimated cost are plans, not actual spend or observed energization. Source concatenates two street references; parcel/geocode held pending exact address verification. No MW from area. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025023484","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.139438,"lng":-97.565051,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Texas construction registration, not operational certificate","fields":{"architectural_barriers_project_id":"TABS2025023484","facility_name":"AUS02","owner_entity":"DFW33220N LLC","registration_date":"2025-07-14","reported_location_county":"Bastrop, Texas","published_location_address_verbatim":"8001 WOLF LN BLDG2 6752 FM535, Cedar Creek, TX78612","registered_scheduled_start":"2025-08-01","registered_scheduled_completion":"2026-06-14","registered_estimated_cost_usd":440000000,"registered_area_sqft":578000,"work_description":"new two-story data-center facility"},"notes":["Architectural accessibility review complete is not construction/occupancy completion. Registered dates and estimated cost are plans, not actual spend or observed energization. Source concatenates two street references; parcel/geocode held pending exact address verification. No MW from area.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025023484","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Cedar Creek · Bastrop · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"aws-project-eagle-boling-wharton-county-tx","state":"TX","kind":"facility","name":"AWS Project Eagle (Wharton County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wharton"],"city":"Boling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. TDLR accessibility project registrations are not localbuildingpermits,groundbreakingprooforcompletion. Fourx300million=1.2billionestimatedconstructioncost,notspendingcommitmentorIT-inclusivecapex.2700acreslandbanknotallDCfootprint;756240squarefeetderivedsumoffourfloorareas,notland. 1587USDpersquarefootderivednotpaidcost. OtherBastrop,DeSoto/Spectrum andnuclearadjacencyprojectsareseparate;noenergysupply,ITorwaterverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original TDLR architectural-barriers project registrations; estimated costs and filed timelines, not measured operating census.. ReviewCompleteisaccessibilityplan-reviewstatus,notcommissioning,occupancycertification,localbuildingpermitorutilityagreement. Allstart/completiondatesarefiledplans,noteventsverifiedonthosedates. BuildingBisAugust2027,whileA/C/DareJanuary2027;donotassignlaterdatetoDbecauseitisthefourthletter. AandDshare244EaglewoodbuthaveuniqueregistrationIDs;donotdeduplicatebyaddressaloneorcreatetwoindependentlyoperatingcampuses. Fourestimated300millioncostsarenotauditedspendingorIT-inclusivecampuscapex. No2700acrefootprint,MW,water,incentivesorendcustomerfromtheseregistrations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://usdatacenterprojects.com/texas/aws-files-1-2-billion-permit-for-four-building-data-center-campus-in-wharton-county-texas","host":"usdatacenterprojects.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.3167,"lng":-96.0553,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.","fields":{"reported_context":"USDataCenterProjects reports four TexasTDLR filings forAWSProjectEagle nearBoling, each189060squarefeet/USD300millionestimatedcost, with August1,2026plannedstart and January/August2027completiontargets.","independently_verified_current_operating_status":null},"notes":["TDLR accessibility project registrations are not localbuildingpermits,groundbreakingprooforcompletion. Fourx300million=1.2billionestimatedconstructioncost,notspendingcommitmentorIT-inclusivecapex.2700acreslandbanknotallDCfootprint;756240squarefeetderivedsumoffourfloorareas,notland. 1587USDpersquarefootderivednotpaidcost. OtherBastrop,DeSoto/Spectrum andnuclearadjacencyprojectsareseparate;noenergysupply,ITorwaterverified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://usdatacenterprojects.com/texas/aws-files-1-2-billion-permit-for-four-building-data-center-campus-in-wharton-county-texas","host":"usdatacenterprojects.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Original TDLR architectural-barriers project registrations; estimated costs and filed timelines, not measured operating census.","fields":{"registered_buildings":[{"building":"A","registration_number":"TABS2026023825","registration_date":"2026-06-25","registered_owner":"AMAZON DATA SERVICES, INC","listed_tenant":"Not Assigned","address_as_filed":"244 Eaglewood Road, Boling, Texas77420","county":"Wharton","filed_start_date":"2026-08-01","filed_completion_date":"2027-01-01","estimated_cost_usd":300000000,"filed_building_sqft":189060,"architectural_barriers_review_status":"Review Complete","funding":"Privately funded, private land for private use","source":{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825","sha256":"007491f5007d3713e5e6533bdbf675c24947787295f603617946ae1ae634add7","publication_date":null,"publisher":"Texas Department of Licensing and Regulation"}},{"building":"B","registration_number":"TABS2026023826","registration_date":"2026-06-25","registered_owner":"AMAZON DATA SERVICES, INC","listed_tenant":"Not Assigned","address_as_filed":"258 Eaglewood Road, Boling, Texas77420","county":"Wharton","filed_start_date":"2026-08-01","filed_completion_date":"2027-08-01","estimated_cost_usd":300000000,"filed_building_sqft":189060,"architectural_barriers_review_status":"Review Complete","funding":"Privately funded, private land for private use","source":{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826","sha256":"44e02d9a4610e9a1d7923405be3f1f4fd587301bc84b858bb3fac88dd3d596ce","publication_date":null,"publisher":"Texas Department of Licensing and Regulation"}},{"building":"C","registration_number":"TABS2026023832","registration_date":"2026-06-25","registered_owner":"AMAZON DATA SERVICES, INC","listed_tenant":"Not Assigned","address_as_filed":"240 Eaglewood Road, Boling, Texas77420","county":"Wharton","filed_start_date":"2026-08-01","filed_completion_date":"2027-01-01","estimated_cost_usd":300000000,"filed_building_sqft":189060,"architectural_barriers_review_status":"Review Complete","funding":"Privately funded, private land for private use","source":{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832","sha256":"4502ce87801efc4ad7651df66d2b5d5c77cbdcd826670251e00f07cb30d6d62f","publication_date":null,"publisher":"Texas Department of Licensing and Regulation"}},{"building":"D","registration_number":"TABS2026023834","registration_date":"2026-06-25","registered_owner":"AMAZON DATA SERVICES, INC","listed_tenant":"Not Assigned","address_as_filed":"244 Eaglewood Road, Boling, Texas77420","county":"Wharton","filed_start_date":"2026-08-01","filed_completion_date":"2027-01-01","estimated_cost_usd":300000000,"filed_building_sqft":189060,"architectural_barriers_review_status":"Review Complete","funding":"Privately funded, private land for private use","source":{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834","sha256":"be57dbfec270f9f66815efc0df1378bda308c3b877871f4460073d1e7f182443","publication_date":null,"publisher":"Texas Department of Licensing and Regulation"}}],"derived_estimated_construction_cost_sum_usd":1200000000,"derived_filed_building_area_sum_sqft":756240,"campus_building_permit_verified":false,"actual_construction_start_verified":false,"actual_completion_verified":false,"critical_it_mw":null,"secured_utility_mw":null},"notes":["ReviewCompleteisaccessibilityplan-reviewstatus,notcommissioning,occupancycertification,localbuildingpermitorutilityagreement. Allstart/completiondatesarefiledplans,noteventsverifiedonthosedates. BuildingBisAugust2027,whileA/C/DareJanuary2027;donotassignlaterdatetoDbecauseitisthefourthletter. AandDshare244EaglewoodbuthaveuniqueregistrationIDs;donotdeduplicatebyaddressaloneorcreatetwoindependentlyoperatingcampuses. Fourestimated300millioncostsarenotauditedspendingorIT-inclusivecampuscapex. No2700acrefootprint,MW,water,incentivesorendcustomerfromtheseregistrations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Boling · Wharton · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"aws-project-spectrum-somervell-county-tx","state":"TX","kind":"facility","name":"AWS Project Spectrum (Somervell/Hood County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Somervell"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 435 acres/up-to 18 two-storybuildings/5 billioninvestment are proposals, not built/leasedcapacity or actualspending.2.4 GWComanchePeak is existingGENERATION, not campuscriticalITor dedicatedsupply/PPA; article’s 1974 plantlaunchdate not adopted without originalhistory.2.5 milliongroundbreakingpayment and 300,000 perbuildingannually are contingent terms, not receivedtaxes or paidincentives. HoodCounty 1265 acreaddress andSailfish 2000 acres/5 GWare distinct/uncrosswalked development scopes, not automaticadditions.2027 start is forecast. Readercommentcease-and-desistclaim is not independent recordevidence. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://constructionreviewonline.com/amazon-to-collocate-5-billion-project-spectrum-data-center-campus-in-texas-with-nuclear-power-plant/","host":"constructionreviewonline.com","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.2373,"lng":-97.7561,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ConstructionReview summarizes AmazonDataServices’ proposed ProjectSpectrum onVistra land byComanchePeak, withSomervell development-agreement motion and lease terms still unfinished.","independently_verified_current_operating_status":null},"notes":["435 acres/up-to 18 two-storybuildings/5 billioninvestment are proposals, not built/leasedcapacity or actualspending.2.4 GWComanchePeak is existingGENERATION, not campuscriticalITor dedicatedsupply/PPA; article’s 1974 plantlaunchdate not adopted without originalhistory.2.5 milliongroundbreakingpayment and 300,000 perbuildingannually are contingent terms, not receivedtaxes or paidincentives. HoodCounty 1265 acreaddress andSailfish 2000 acres/5 GWare distinct/uncrosswalked development scopes, not automaticadditions.2027 start is forecast. Readercommentcease-and-desistclaim is not independent recordevidence.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://constructionreviewonline.com/amazon-to-collocate-5-billion-project-spectrum-data-center-campus-in-texas-with-nuclear-power-plant/","host":"constructionreviewonline.com","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Somervell · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"barrio-energy-tyler-smith-county-tx","state":"TX","kind":"facility","name":"Barrio Energy Tyler Data Center (West Erwin Street)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Smith"],"city":"Tyler","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Not a final project cancellation. Source calls applicant Barrio Resources LLC, while baseline operator label uses Barrio Energy; corporate equivalence not established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kltv.com/2026/09/03/proposed-tyler-cryptocurrency-mining-center-denied-again/","host":"kltv.com","date":"2026-09-03","published":"2026-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.351,"lng":-95.3127,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"appeal-jurisdiction-denial","reported_finding":"Tyler board unanimously found it lacked jurisdiction over a late zoning-classification appeal. A separate timely special-use-permit appeal remained available.","report_display_date":"2026-09-03","independently_verified_current_status":null},"notes":["Not a final project cancellation. Source calls applicant Barrio Resources LLC, while baseline operator label uses Barrio Energy; corporate equivalence not established.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kltv.com/2026/09/03/proposed-tyler-cryptocurrency-mining-center-denied-again/","host":"kltv.com","date":"2026-09-03","published":"2026-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Tyler · Smith · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"canaan-bear-andrews-tx","state":"TX","kind":"facility","name":"Bear Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Andrews"],"city":"Andrews","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-project portfolio, no per-site allocation. 120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.2691,"lng":-102.6042,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"three-project portfolio, no per-site allocation","fields":{"acquisition_announced_date":"2026-02-23","acquired_equity_percent":49,"continuing_windhq_equity_percent":51,"portfolio_projects":["Alborz","Bear","Chief Mountain"],"portfolio_operational_power_mw":120,"portfolio_transaction_consideration_usd_approx":39750000,"transaction_consideration_basis":"49percent joint-venture interests plus6840mining rigs, funded with shares"},"notes":["120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Andrews · Andrews · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"canaan-chief-mountain-andrews-tx","state":"TX","kind":"facility","name":"Chief Mountain Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Andrews"],"city":"Andrews","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-project portfolio, no per-site allocation. 120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.285,"lng":-102.625,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"three-project portfolio, no per-site allocation","fields":{"acquisition_announced_date":"2026-02-23","acquired_equity_percent":49,"continuing_windhq_equity_percent":51,"portfolio_projects":["Alborz","Bear","Chief Mountain"],"portfolio_operational_power_mw":120,"portfolio_transaction_consideration_usd_approx":39750000,"transaction_consideration_basis":"49percent joint-venture interests plus6840mining rigs, funded with shares"},"notes":["120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html","host":"prnewswire.com","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Andrews · Andrews · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"cipher-colchis-tom-green-tx","state":"TX","kind":"facility","name":"Cipher Colchis Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tom Green"],"city":"San Angelo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization. Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate","host":"sanangelolive.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.5290977,"lng":-100.3212098,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization.","Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate","host":"sanangelolive.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · San Angelo · Tom Green · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"cipher-mclennan-county-tx","state":"TX","kind":"facility","name":"Cipher McLennan HPC Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["McLennan"],"city":"Waco","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. SamShaw WacoBridge May27updatedJune18,2026 original companyemail/landrecordreport: McLennanCipher300acres nearRattlesnakeRoad/Riesel, up500MWprojectrequestedgridaccess. No explicitITbasis or Juneexpectedapprovalobserved; existing900MWcoalplantnotcampusITtoadd. Water/coolingnotchosen; noRieselcitywater promise doesnotmeanzerowater. NearbyLakeCreek10000acrefeet/year/9MGDpotential not ownedrightsoractualdata-centeruse.13Maveragetax/yearoverdecade lacks jurisdictionbreakdown, notpaidreceipt.300acreland dealsOctober/Februaryreferencesnotoneinventedclosingday.13Mnotcapex. Originalreportedsectionsread; embeddedrepublishcopyignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","host":"wacobridge.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.474088,"lng":-96.96261,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["SamShaw WacoBridge May27updatedJune18,2026 original companyemail/landrecordreport: McLennanCipher300acres nearRattlesnakeRoad/Riesel, up500MWprojectrequestedgridaccess. No explicitITbasis or Juneexpectedapprovalobserved; existing900MWcoalplantnotcampusITtoadd.","Water/coolingnotchosen; noRieselcitywater promise doesnotmeanzerowater. NearbyLakeCreek10000acrefeet/year/9MGDpotential not ownedrightsoractualdata-centeruse.13Maveragetax/yearoverdecade lacks jurisdictionbreakdown, notpaidreceipt.300acreland dealsOctober/Februaryreferencesnotoneinventedclosingday.13Mnotcapex. Originalreportedsectionsread; embeddedrepublishcopyignored.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","host":"wacobridge.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Waco · McLennan · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"cleanspark-austin-county-tx","state":"TX","kind":"facility","name":"CleanSpark Austin County AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Austin"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Do not confuse Austin County/Sealy with City of Austin. Acquisition date is not October29 announcement date. Later Texas exclusivity is a LOI, not a definitive tenant lease or operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.9508,"lng":-96.2661,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"land_acquisition_reported_date":"2025-10-27","land_area_acres":271,"power_agreements_mw":285,"power_scope":"Long-term supply for future campus, not current IT draw","campus_name_in_later_release":"Sealy"},"notes":["Do not confuse Austin County/Sealy with City of Austin. Acquisition date is not October29 announcement date. Later Texas exclusivity is a LOI, not a definitive tenant lease or operating proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Austin · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"cleanspark-brazoria-county-tx","state":"TX","kind":"facility","name":"CleanSpark Brazoria County (Second Texas) Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Brazoria"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 600 includes initial300, not900. Demand/transmission capacity is not criticalIT or energized load. No final property-close day or original utility approval adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-reports-second-fiscal-quarter-2026-results-302768585.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.1694,"lng":-95.431,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"announcement_date":"2026-01-14","land_under_definitive_agreement_up_to_acres":447,"initial_demand_load_mw":300,"total_potential_mw":600,"initial_closing_target":"2026-Q1, conditional","ercot_approval_claim":"Company May11 release reports300MW approval; original ERCOT document not inspected."},"notes":["600 includes initial300, not900. Demand/transmission capacity is not criticalIT or energized load. No final property-close day or original utility approval adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-reports-second-fiscal-quarter-2026-results-302768585.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Brazoria · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"cloudburst-san-marcos-tx","state":"TX","kind":"facility","name":"CloudBurst San Marcos GigaCenter","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hays"],"city":"San Marcos","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. Evolve project-participant page posted November24,2025 reproduces November5 issuer announcement of CloudBurst SanMarcosDataCenterI groundbreaking. Located in Hays/Guadalupe corridor, not the Houston design-firm office. Independent parcel/title/permit and current construction outcome unread. Participant company names are not two independent confirmations. Up to1.2GW AI/HPC capacity has no explicit criticalITbasis; first50MWQ42026 is a target included in campus total, not1.25GW or observedenergization.450000MMBtu/day gas-supply claim and potential1.8GWgeneration are different units/systems, not extraIT to addto1.2GW. Underlying gas agreement unread, and gas access is not electrical interconnection/air-permit approval. Qualitative water-efficiency promises notmeasuredconsumption. Other Oklahoma plans/200worldwideprojects experience not newUSoperatingcensus. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas","host":"evolveincorporated.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.88,"lng":-97.94,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["Evolve project-participant page posted November24,2025 reproduces November5 issuer announcement of CloudBurst SanMarcosDataCenterI groundbreaking. Located in Hays/Guadalupe corridor, not the Houston design-firm office. Independent parcel/title/permit and current construction outcome unread. Participant company names are not two independent confirmations.","Up to1.2GW AI/HPC capacity has no explicit criticalITbasis; first50MWQ42026 is a target included in campus total, not1.25GW or observedenergization.450000MMBtu/day gas-supply claim and potential1.8GWgeneration are different units/systems, not extraIT to addto1.2GW. Underlying gas agreement unread, and gas access is not electrical interconnection/air-permit approval. Qualitative water-efficiency promises notmeasuredconsumption. Other Oklahoma plans/200worldwideprojects experience not newUSoperatingcensus.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas","host":"evolveincorporated.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · San Marcos · Hays · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"comanche-circle-sailfish-hood-county-tx","state":"TX","kind":"facility","name":"Comanche Circle","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hood"],"city":"Tolar","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Failed pause is not adoption or approval of any project. County authority arguments and residents water concerns are attributed; not a court holding or verified site consumption. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/","host":"texastribune.org","date":"2026-02-10","published":"2026-02-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.35,"lng":-97.83,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"moratorium-proposal-rejected","reported_finding":"Texas Tribune reports Hood County voted 3-2 against a proposed six-month industrial-development pause. Comanche Circle / Sailfish is one proposal discussed.","report_display_date":"2026-02-10","independently_verified_current_status":null},"notes":["Failed pause is not adoption or approval of any project. County authority arguments and residents water concerns are attributed; not a court holding or verified site consumption.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/","host":"texastribune.org","date":"2026-02-10","published":"2026-02-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Tolar · Hood · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"core-scientific-austin-tx","state":"TX","kind":"facility","name":"Core Scientific Austin Data Center (Austin 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Travis"],"city":"Austin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Publishedpostalcode/citycombinationrequiresgeographicverification; retainverbatimandholdcanonicalcounty/coordinate. AdvertisedcapacitynotmeasuredIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corescientific.com/high-density-data-centers/austin-tx/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.214,"lng":-97.622,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"advertised_total_power_capacity_mw":20,"campus_acres":38,"total_area_sqft":312000,"published_address_verbatim":"3301 Hibbetts Rd, Austin, TX78275","power_basis":"totalpowercapacity, not explicitlycriticalIT"},"notes":["Publishedpostalcode/citycombinationrequiresgeographicverification; retainverbatimandholdcanonicalcounty/coordinate. AdvertisedcapacitynotmeasuredIT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://corescientific.com/high-density-data-centers/austin-tx/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Austin · Travis · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"core-scientific-denton-tx","state":"TX","kind":"facility","name":"Core Scientific Denton Data Center (Denton 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Denton"],"city":"Denton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. FuturelargeAIcomputerexpectationnotproofall394MWconvertedfromminingoroperatingAI. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corescientific.com/high-density-data-centers/denton-texas/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.1932,"lng":-97.1276,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"8171 Jim Christal Rd, Denton, TX76207","advertised_total_power_capacity_mw":394,"campus_acres":78,"total_area_sqft":423831,"power_basis":"totalpowercapacity, not explicitlycriticalIT"},"notes":["FuturelargeAIcomputerexpectationnotproofall394MWconvertedfromminingoroperatingAI.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://corescientific.com/high-density-data-centers/denton-texas/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Denton · Denton · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"core-scientific-pecos-tx","state":"TX","kind":"facility","name":"Core Scientific Pecos AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Reeves"],"city":"Pecos","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Core Scientific two-site gross power increment, no Pecos split. NoPecos-onlysplitinreviewedpassage. HuntCounty430MWseparateproject.350energizedand590MWearly2027deliveryCoreWeaveportfoliofiguresnotPecos-only. Corporatefinancials/1.5GWpipelinecannotbecountedagainasindividualcampusload. NooriginalPecosopeningorexactparceladopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results","host":"investors.corescientific.com","date":"2026-03-02","published":"2026-03-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.44,"lng":-103.58,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Core Scientific two-site gross power increment, no Pecos split","fields":{"issuer":"Core Scientific","release_date":"2026-03-02","combined_dalton_pecos_gross_power_increase_mw_approx":300,"power_basis":"combined gross power increase across Georgia and Texas sites","pecos_specific_increment_mw":null},"notes":["NoPecos-onlysplitinreviewedpassage. HuntCounty430MWseparateproject.350energizedand590MWearly2027deliveryCoreWeaveportfoliofiguresnotPecos-only. Corporatefinancials/1.5GWpipelinecannotbecountedagainasindividualcampusload. NooriginalPecosopeningorexactparceladopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results","host":"investors.corescientific.com","date":"2026-03-02","published":"2026-03-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Pecos · Reeves · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"crow-holdings-cleanarc-stemmons-dallas-tx","state":"TX","kind":"facility","name":"Crow Holdings Stemmons Corridor Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Dallas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Crow CleanArc Dallas planned campus versus first building. 245includesinitial70not315.1950StemmonsInfomartand2323Bryanareproximityhubsnotcampusaddresses. National3GWpotentialunderreviewandVirginia1GWdifferentprojects. Design/procurementinprogressnotoperatingorallpermits. Noactualcapexinreviewedannouncement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.crowholdings.com/insights/crow-holdings-announces-245mw-flagship-data-center-campus-in-central-dallas/","host":"crowholdings.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.7762719,"lng":-96.7968559,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Crow CleanArc Dallas planned campus versus first building","fields":{"developers":["Crow Holdings","CleanArc"],"announcement_date":"2026-01-20","campus_locality":"Stemmons Corridor, Dallas, Texas","campus_acres_approx":40,"planned_campus_power_mw_max":245,"initial_building_power_mw":70,"initial_delivery_target":"late2027","power_basis":"turnkey campus/building capacity, not explicitly critical IT"},"notes":["245includesinitial70not315.1950StemmonsInfomartand2323Bryanareproximityhubsnotcampusaddresses. National3GWpotentialunderreviewandVirginia1GWdifferentprojects. Design/procurementinprogressnotoperatingorallpermits. Noactualcapexinreviewedannouncement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.crowholdings.com/insights/crow-holdings-announces-245mw-flagship-data-center-campus-in-central-dallas/","host":"crowholdings.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Dallas · Dallas · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"crusoe-nolan-county-tx","state":"TX","kind":"facility","name":"Crusoe Nolan County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nolan"],"city":"Sweetwater","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Seven-billion investment and200MW are proposed. Commissioner safeguards/own-generation statements not measured performance or executed contract review. Construction jobs temporary; PILOT and charity distinct from tax receipts. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ktxs.com/news/local/it-will-change-our-rural-town-tax-abatement-for-7-billion-texas-data-center-approved","host":"ktxs.com","date":"2026-04-13","published":"2026-04-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.4709519,"lng":-100.405938,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"KTXS reports Nolan County approved ten-year abatement for Crusoe proposal and quoted future PILOT/charitable payments.","independently_verified_current_operating_status":null},"notes":["Seven-billion investment and200MW are proposed. Commissioner safeguards/own-generation statements not measured performance or executed contract review. Construction jobs temporary; PILOT and charity distinct from tax receipts.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ktxs.com/news/local/it-will-change-our-rural-town-tax-abatement-for-7-billion-texas-data-center-approved","host":"ktxs.com","date":"2026-04-13","published":"2026-04-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Sweetwater · Nolan · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"crusoe-blue-energy-victoria-tx","state":"TX","kind":"facility","name":"Crusoe Victoria AI Factory","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Victoria"],"city":"Victoria","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blue Energy and Crusoe proposed gas-to-nuclear campus. 1.5GW is planned nuclear generation, not IT or current operating power. Port name is not proof campus lies in Victoria County; page explicitly names Calhoun. Gas bridge2028and nuclear2031are forecasts, not licensed/energized. Original date and secondary page/template date differ; do not reset announcement to template date. No site exact parcel or NRC construction license read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center","host":"crusoe.ai","date":"2025-10-30","published":"2025-10-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":28.8053,"lng":-97.0036,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Blue Energy and Crusoe proposed gas-to-nuclear campus","fields":{"project_region":"Port of Victoria, Texas","operator_named_campus_county":"Calhoun County, Texas","planned_crusoe_campus_acres":1600,"planned_nuclear_plant_generation_gw_max":1.5,"early_gas_powered_service_target_year":2028,"nuclear_generation_target_year":2031,"partners":["Blue Energy","Crusoe"],"original_heading_date":"2025-10-30","secondary_template_date":"2026-08-18"},"notes":["1.5GW is planned nuclear generation, not IT or current operating power. Port name is not proof campus lies in Victoria County; page explicitly names Calhoun. Gas bridge2028and nuclear2031are forecasts, not licensed/energized. Original date and secondary page/template date differ; do not reset announcement to template date. No site exact parcel or NRC construction license read.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center","host":"crusoe.ai","date":"2025-10-30","published":"2025-10-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Victoria · Victoria · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"cyrusone-bosque-county-thad-hill-tx","state":"TX","kind":"facility","name":"CyrusOne Bosque County Campus (Thad Hill Energy Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bosque"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two distinct Texas project power-agreement scopes. Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.9243,"lng":-97.6564,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"two distinct Texas project power-agreement scopes","fields":{"freestone_phase1_contracted_power_mw":380,"freestone_phase2_exclusive_power_agreement_mw":380,"thad_hill_bosque_previously_announced_power_agreements_mw":400,"power_basis":"electric-supply/development agreements, not explicit critical IT or energized load","announcement_date":"2026-02-09"},"notes":["Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Bosque · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"cyrusone-dfw3-dfw5-allen-tx","state":"TX","kind":"facility","name":"CyrusOne DFW3-DFW5 (Allen)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Allen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Record ID includes DFW5, but reviewed text expressly attributes 77 MW to DFW3 and DFW4. Campus buildout area is planned; do not assign these values to an additional DFW5 building. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/allen-texas","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.1385206,"lng":-96.6599516,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_dfw3_dfw4_it_capacity_mw":77,"full_buildout_technical_space_sqft":976000,"campus_acres":90},"notes":["Record ID includes DFW5, but reviewed text expressly attributes 77 MW to DFW3 and DFW4. Campus buildout area is planned; do not assign these values to an additional DFW5 building.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/allen-texas","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Allen · Collin · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"cyrusone-freestone-energy-center-fairfield-tx","state":"TX","kind":"facility","name":"CyrusOne Freestone Energy Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Freestone"],"city":"Fairfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Phase2exclusiveagreementnotallenergized; no760MWoperatingclaim.1100+MWTexasagreementsinclude400MWBosqueCounty, notFreestonealone. Generatorcapacity/global55GWportfolioexcluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. two distinct Texas project power-agreement scopes. Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.7285,"lng":-96.1611,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"agreement_date":"2026-02-09","initial_power_agreement_mw":380,"phase2_exclusive_power_grid_land_agreement_mw":380,"published_county":"Freestone, Texas","power_basis":"power/grid/site service agreement, not IT"},"notes":["Phase2exclusiveagreementnotallenergized; no760MWoperatingclaim.1100+MWTexasagreementsinclude400MWBosqueCounty, notFreestonealone. Generatorcapacity/global55GWportfolioexcluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"two distinct Texas project power-agreement scopes","fields":{"freestone_phase1_contracted_power_mw":380,"freestone_phase2_exclusive_power_agreement_mw":380,"thad_hill_bosque_previously_announced_power_agreements_mw":400,"power_basis":"electric-supply/development agreements, not explicit critical IT or energized load","announcement_date":"2026-02-09"},"notes":["Distinct Freestone and Bosque projects; do not put380MWon each or repeat fullTexas1100-plus total. Phase2 exclusive agreement not delivered facility. Current operations, exact parcel coordinates and power-plant generation not certified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas","host":"cyrusone.com","date":"2026-02-09","published":"2026-02-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Fairfield · Freestone · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"cyrusone-sat2-sat4-san-antonio-tx","state":"TX","kind":"facility","name":"CyrusOne SAT2-SAT4 (San Antonio)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bexar"],"city":"San Antonio","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus combines multiple facilities. The separate 18 MW distributed redundant configuration has a different/unclear scope and is not added to the 36 MW key feature. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. unmatched fifth San Antonio campus, not approved SAT2-SAT4 field merge. Reviewed source concerns a new fifth campus in TexasResearchPark, not an independently matched SAT2-SAT4 expansion. Keep new-campus context separate until exact identity is established. One-billion-dollar SanAntonio investment statement is cumulative across the market, not this campus.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","host":"cyrusone.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":29.4708878,"lng":-98.6730474,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_campus_total_it_capacity_mw":36,"campus_technical_space_sqft":295785,"separate_source_power_configuration_mw":18},"notes":["Campus combines multiple facilities. The separate 18 MW distributed redundant configuration has a different/unclear scope and is not added to the 36 MW key feature.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"unmatched fifth San Antonio campus, not approved SAT2-SAT4 field merge","fields":{"historical_event":"groundbreaking of a fifth San Antonio campus","planned_buildings":2,"planned_building_area_sqft":276000,"planned_it_capacity_mw":36},"notes":["Reviewed source concerns a new fifth campus in TexasResearchPark, not an independently matched SAT2-SAT4 expansion. Keep new-campus context separate until exact identity is established. One-billion-dollar SanAntonio investment statement is cumulative across the market, not this campus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","host":"cyrusone.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · San Antonio · Bexar · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"data-city-energy-abundance-laredo-tx","state":"TX","kind":"facility","name":"Data City, Texas","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Webb"],"city":"Laredo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. Body5GWversusimage6GWconflict held, no headline canonical total. CorrectedMarch21release refers priorMarch20image correction, not new project. Initial300MWincluded in full build, not extra.100percentgreenmarketing does not erase initial naturalgas or prove actual emissions. No exact current delivery or investment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html","host":"prnewswire.com","date":"2025-03-21","published":"2025-03-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.5306,"lng":-99.4803,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"planned_hub_acres":50000,"body_full_build_planned_power_gw":5,"image_caption_power_gw":6,"initial_phase_planned_power_mw":300,"initial_phase_planned_area_sqft":1000000,"initial_launch_target_year":2026,"full_build_leasable_area_sqft_min_exclusive":15000000,"initial_fuel_transition":"natural gas initially; proposed later green hydrogen","grid_mode_proposed":"islanded from ERCOT"},"notes":["Body5GWversusimage6GWconflict held, no headline canonical total. CorrectedMarch21release refers priorMarch20image correction, not new project. Initial300MWincluded in full build, not extra.100percentgreenmarketing does not erase initial naturalgas or prove actual emissions. No exact current delivery or investment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html","host":"prnewswire.com","date":"2025-03-21","published":"2025-03-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Laredo · Webb · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"digital-realty-aus11-tx","state":"TX","kind":"facility","name":"Digital Realty AUS11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Travis"],"city":"Austin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/austin/aus11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.212156,"lng":-97.6957555,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"AUS11","published_address":"7500 Metro Center Drive, Austin, TX 78744","advertised_building_sqft":85500},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/austin/aus11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Austin · Travis · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"edged-dallas-irving-tx","state":"TX","kind":"facility","name":"Edged Dallas (Irving)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Irving","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Pasttargetnotcurrentopeningproof. Operatorreportofcouncilsupportnotindependentreviewedsignedpermit. Nozero-waterwhole-siteclaimfromwaterlesscooling. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edged.us/news/edged-dallas-irving","host":"edged.us","date":"2024-04-12","published":"2024-04-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.8211516,"lng":-96.9169508,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"development_announcement":"2024-04-12","operator_reported_city_council_support_date":"2024-04-11","published_address":"505 N Wildwood Drive, Irving, Texas","planned_critical_capacity_mw":24,"opening_target":"fall2024"},"notes":["Pasttargetnotcurrentopeningproof. Operatorreportofcouncilsupportnotindependentreviewedsignedpermit. Nozero-waterwhole-siteclaimfromwaterlesscooling.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edged.us/news/edged-dallas-irving","host":"edged.us","date":"2024-04-12","published":"2024-04-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Irving · Dallas · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"element-critical-austin-one-tx","state":"TX","kind":"facility","name":"Element Critical Austin One","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Travis"],"city":"Austin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator identifies AustinOne at8025NorthInterstateHwy35,Austin78753;62,300sf property and seven-acre private campus are distinct area measures. Power specification explicitly states9.5MW TOTAL UTILITY power, not criticalIT or measured load. FourMW dedicated halls and20kW/rack options are nested/configurable offerings, not additional campusMW. Closed-loop air-cooled system described as limiting evaporation, not zero water. Uptime/SLA, floodplain and certification claims remain operator descriptions; independent audit and site water meter not checked. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://elementcritical.com/data-centers/austin-data-center/","host":"elementcritical.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.3428035,"lng":-97.6961735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Operator identifies AustinOne at8025NorthInterstateHwy35,Austin78753;62,300sf property and seven-acre private campus are distinct area measures.","Power specification explicitly states9.5MW TOTAL UTILITY power, not criticalIT or measured load. FourMW dedicated halls and20kW/rack options are nested/configurable offerings, not additional campusMW.","Closed-loop air-cooled system described as limiting evaporation, not zero water. Uptime/SLA, floodplain and certification claims remain operator descriptions; independent audit and site water meter not checked.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://elementcritical.com/data-centers/austin-data-center/","host":"elementcritical.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Austin · Travis · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"energy-vault-snyder-scurry-county-tx","state":"TX","kind":"facility","name":"Energy Vault Snyder AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Scurry"],"city":"Snyder","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Powered shell is not critical IT or actual computing load. The 25 MW phase and possible 500 MW site expansion are not additive. Ten modular units are not ten campuses. A later search excerpt gives a broader target, but its original body was unavailable. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas","host":"usdatacenterprojects.com","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.7138,"lng":-100.9112,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"US Data Center Projects reports Energy Vault Snyder groundbreaking and an initial eight MW of powered shell targeted for early 2027.","independently_verified_current_operating_status":null},"notes":["Powered shell is not critical IT or actual computing load. The 25 MW phase and possible 500 MW site expansion are not additive. Ten modular units are not ten campuses. A later search excerpt gives a broader target, but its original body was unavailable.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas","host":"usdatacenterprojects.com","date":"2026-07-27","published":"2026-07-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Snyder · Scurry · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"equinix-dallas-da11-tx","state":"TX","kind":"facility","name":"Equinix Dallas DA11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Dallas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Exact named provider/street context; DA11 code and suite not independently given by carrier list. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8017196,"lng":-96.8243167,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Equinix","listed_address":"1990 N Stemmons Fwy","listed_city":"Dallas","listed_state":"TX"},"notes":["Exact named provider/street context; DA11 code and suite not independently given by carrier list.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Dallas · Dallas · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"flexential-dallas-downtown-dallas-tx","state":"TX","kind":"facility","name":"Flexential Dallas - Downtown Dallas","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Dallas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8004101,"lng":-96.8193707,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Dallas - Downtown Dallas","publisher_reported_footprint_sqft":80447,"publisher_reported_critical_power_mw":6.66,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Dallas · Dallas · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"flexential-dallas-plano-tx","state":"TX","kind":"facility","name":"Flexential Dallas - Plano","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Plano","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.007033,"lng":-96.6663507,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Dallas - Plano","publisher_reported_footprint_sqft":261425,"publisher_reported_critical_power_mw":18,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Plano · Collin · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"flexential-dallas-richardson-tx","state":"TX","kind":"facility","name":"Flexential Dallas - Richardson","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Richardson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.9948122,"lng":-96.7524974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Dallas - Richardson","publisher_reported_footprint_sqft":100807,"publisher_reported_critical_power_mw":3.75,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Richardson · Dallas · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"flexential-kaufman-county-talty-tx","state":"TX","kind":"facility","name":"Flexential Kaufman County Campus (Talty)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kaufman"],"city":"Talty","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer-issued release. These are development targets, not measured utilization or water consumption. Its DFW market and company portfolio numbers are excluded from the site record. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/flexential-to-build-new-dallas-area-data-center-campus-on-110-acres-in-kaufman-county-302836104.html","host":"prnewswire.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.689,"lng":-96.3378,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Kaufman","city":"Talty","status_as_of_source":"planned","campus_acres":110,"phase1_building_sqft":375000,"phase1_power_capacity_mw":36,"future_buildings_possible":3,"full_campus_capacity_mw_potential":108,"site_work_target":"early 2027","customer_availability_target":"late 2028","wue_target":0,"cooling_design":"closed loop"},"notes":["Developer-issued release. These are development targets, not measured utilization or water consumption. Its DFW market and company portfolio numbers are excluded from the site record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/flexential-to-build-new-dallas-area-data-center-campus-on-110-acres-in-kaufman-county-302836104.html","host":"prnewswire.com","date":"2026-07-28","published":"2026-07-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Talty · Kaufman · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"fluidstack-abernathy-tx","state":"TX","kind":"facility","name":"Fluidstack Abernathy AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hale"],"city":"Abernathy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. TeraWulf separate Abernathy sale and Hancock tenant announcement. 168MWTexas and401MWKentucky are separate projects.450Minvestment not reported sale price or total Abernathy campus capex. Signed transaction agreement does not prove later closing. Issuer reports executed Anthropic lease, but signed lease itself not inspected.19Bforecast lease revenue is neither construction investment nor tax incentive/payment.482MWKentucky utility demand remains separate from401IT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://investors.terawulf.com/news-events/press-releases/detail/142/","host":"investors.terawulf.com","date":"2026-07-06","published":"2026-07-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.84,"lng":-101.84,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"TeraWulf separate Abernathy sale and Hancock tenant announcement","fields":{"release_date":"2026-07-06","abernathy_project_critical_it_mw":168,"abernathy_jv_established_year":2025,"terawulf_stake_sale_percent":50.1,"terawulf_investment_being_monetized_usd_approx":450000000,"abernathy_transaction_stage":"definitive sale agreement, closing not observed in this source","kentucky_separate_project":{"name":"Justified Data, Hawesville","announced_lease_tenant":"Anthropic","announced_executed_lease_years":20,"critical_it_mw":401,"initial_service_target":"2027-H2","full_capacity_target":"early 2028","forecast_initial_term_contract_revenue_usd_approx":19000000000}},"notes":["168MWTexas and401MWKentucky are separate projects.450Minvestment not reported sale price or total Abernathy campus capex. Signed transaction agreement does not prove later closing. Issuer reports executed Anthropic lease, but signed lease itself not inspected.19Bforecast lease revenue is neither construction investment nor tax incentive/payment.482MWKentucky utility demand remains separate from401IT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://investors.terawulf.com/news-events/press-releases/detail/142/","host":"investors.terawulf.com","date":"2026-07-06","published":"2026-07-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Abernathy · Hale · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"fort-spunky-pacifico-energy-hood-county-tx","state":"TX","kind":"facility","name":"Fort Spunky","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hood"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Grid requests and water forecasts are not actual demand. Requested court relief is not an award. Comanche Circle water figures are separate and disputed. Hood moratorium votes failed. Round twenty's later Hill County rescission reporting takes precedence over this older account. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.texastribune.org/2026/06/02/texas-data-centers-hood-county-local-control-rural-water-power/","host":"texastribune.org","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.42,"lng":-97.78,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Texas Tribune reports Fort Spunky's concept approval was revoked after a water request was denied, followed by Pacifico litigation.","independently_verified_current_operating_status":null},"notes":["Grid requests and water forecasts are not actual demand. Requested court relief is not an award. Comanche Circle water figures are separate and disputed. Hood moratorium votes failed. Round twenty's later Hill County rescission reporting takes precedence over this older account.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.texastribune.org/2026/06/02/texas-data-centers-hood-county-local-control-rural-water-power/","host":"texastribune.org","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Hood · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"galaxy-helios-dickens-county-tx","state":"TX","kind":"facility","name":"Galaxy Helios Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dickens"],"city":"Afton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. A contractor project description does not prove readiness for service or independently define critical IT. A future gigawatt buildout is not operating capacity. Power assemblies and chillers are not extra data centers, and project area is not the entire campus. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://claycorp.com/project/galaxy-digital-helios-renovation","host":"claycorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.72,"lng":-100.84,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Clayco describes an initial Helios liquid-cooled installation rated at 133 MW and its 133,000-square-foot project scope.","independently_verified_current_operating_status":null},"notes":["A contractor project description does not prove readiness for service or independently define critical IT. A future gigawatt buildout is not operating capacity. Power assemblies and chillers are not extra data centers, and project area is not the entire campus.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://claycorp.com/project/galaxy-digital-helios-renovation","host":"claycorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Afton · Dickens · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"google-armstrong-county-tx","state":"TX","kind":"facility","name":"Goodnight Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Armstrong"],"city":"Claude","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Armstrong Goodnight county-signed owner-blank tax agreement and identity hold. Partially executed retained copy: county signed, ownerblank, so full effectiveness not established. Do not call forecast14.6Bspent,100percentalltaxexemption,orPILOTactuallycollected.530MWwholephase not400ITinferredfromhallarithmetic orcurrentenergization.2027deadlineconditional andextendable,nottargetverifiedopening. Googletenant/ownershipnotnamed;preferredGoogleArmstrongrecordneedsCrusoe/GNDC1crosswalk,notduplicatecampusautomaticmerge.75iscontractobligationnotcurrentheadcount. No signedfinalownerpage/actualabatementcommencementcertificateobserved. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Tax%20Abatement%20Agreement%202%20Phase%201.pdf","host":"co.armstrong.tx.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.973,"lng":-101.367,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Armstrong Goodnight county-signed owner-blank tax agreement and identity hold","fields":{"agreement_parties":["Armstrong County, Texas","GN DC1 LLC"],"project_name":"Goodnight Data Center Phase1","county_signature_date":"2024-11-12","owner_signature_and_date":"blank on page26","effective_date":null,"effectiveness_condition":"final signature by both parties","phase1_planned_acres_approx":350,"anticipated_buildings":4,"phase1_expected_electrical_consumption_mw_max":530,"power_basis":"whole phase electrical demand, not critical IT","proposed_each_building_data_halls":4,"proposed_each_hall_capacity_mw":25,"anticipated_initial_phase_capital_usd":14600000000,"county_eligible_property_abatement_percent":100,"abatement_calendar_years_max":10,"annual_pilot_floor_usd":5441499,"pilot_period":"10calendar years while abatement in effect","initial_commercial_operation_deadline":"2027-12-31","possible_owner_elected_extensions_years_max":5,"project_fulltime_worker_obligation":75,"obligation_worker_scope":"collective owner/affiliates/contractors/tenants, not75each","owner_notice_recipient":"Crusoe Energy Systems LLC"},"notes":["Partially executed retained copy: county signed, ownerblank, so full effectiveness not established. Do not call forecast14.6Bspent,100percentalltaxexemption,orPILOTactuallycollected.530MWwholephase not400ITinferredfromhallarithmetic orcurrentenergization.2027deadlineconditional andextendable,nottargetverifiedopening. Googletenant/ownershipnotnamed;preferredGoogleArmstrongrecordneedsCrusoe/GNDC1crosswalk,notduplicatecampusautomaticmerge.75iscontractobligationnotcurrentheadcount. No signedfinalownerpage/actualabatementcommencementcertificateobserved.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Tax%20Abatement%20Agreement%202%20Phase%201.pdf","host":"co.armstrong.tx.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Claude · Armstrong · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"google-haskell-county-tx","state":"TX","kind":"facility","name":"Google Haskell County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Haskell"],"city":"Haskell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator reports construction beganNovember2025, not completion/opening. Vendor inquiry form was not submitted; no siteMWorinvestmentamount here. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/haskell-county/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.1576,"lng":-99.7337,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"construction_groundbreaking_month":"2025-11"},"notes":["Operator reports construction beganNovember2025, not completion/opening. Vendor inquiry form was not submitted; no siteMWorinvestmentamount here.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/haskell-county/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Haskell · Haskell · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"google-meitner-pampa-tx","state":"TX","kind":"facility","name":"Google Meitner Energy Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Gray"],"city":"Pampa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The article implies an already completed Intersect acquisition; the original seller instead dates completion to March 10, 2026. A parent transaction does not prove site tenant identity. Direct and broader jobs differ, and off-grid or cooling assertions are not verified permit terms. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Transaction price is company acquisition consideration, not Pampa construction spending. This does not independently establish end tenant at Meitner. Existing grid-tied assets spun into IPX Power. Do not label all former Intersect generation/storage assets Google-owned;4.4GWsolar and8.8GWhstorage use different units and belong to described IPX portfolio.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newschannel10.com/2026/01/17/pampas-3-billion-ai-data-center-signals-new-era-growth-gray-county/","host":"newschannel10.com","date":"2026-01-16","published":"2026-01-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.tpg.com/news-and-insights/tpg-announces-completion-of-4-75-billion-sale-of-intersect-to-google-launches-ipx-power-as-independent-power-producer","host":"tpg.com","date":"2026-03-10","published":"2026-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":35.5365,"lng":-100.9609,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"KFDA reports December groundbreaking for Meitner in Pampa and three planned 750,000-square-foot buildings.","independently_verified_current_operating_status":null},"notes":["The article implies an already completed Intersect acquisition; the original seller instead dates completion to March 10, 2026. A parent transaction does not prove site tenant identity. Direct and broader jobs differ, and off-grid or cooling assertions are not verified permit terms.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newschannel10.com/2026/01/17/pampas-3-billion-ai-data-center-signals-new-era-growth-gray-county/","host":"newschannel10.com","date":"2026-01-16","published":"2026-01-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Original seller announcement dates completion of Google acquisition of Intersect digital power business to March10,2026; agreement announced December22,2025.","parent_transaction_completion_announcement_date":"2026-03-10","parent_transaction_agreement_announcement_date":"2025-12-22","sale_price_usd_excluding_assumed_debt":4750000000},"notes":["Transaction price is company acquisition consideration, not Pampa construction spending. This does not independently establish end tenant at Meitner.","Existing grid-tied assets spun into IPX Power. Do not label all former Intersect generation/storage assets Google-owned;4.4GWsolar and8.8GWhstorage use different units and belong to described IPX portfolio.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tpg.com/news-and-insights/tpg-announces-completion-of-4-75-billion-sale-of-intersect-to-google-launches-ipx-power-as-independent-power-producer","host":"tpg.com","date":"2026-03-10","published":"2026-03-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Pampa · Gray · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"google-red-oak-tx","state":"TX","kind":"facility","name":"Google Red Oak Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ellis"],"city":"Red Oak","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Texas statewide page. 40Bnot RedOak-onlybudget.2009Texasoffices/presence not openingdata-center. CampusannouncementlabelsincludePampaandWilbarger2026but do not establish exactphysicalsitecoordinates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/texas/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.5163,"lng":-96.8011,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"Texas statewide page","fields":{"red_oak_announcement_year":2023,"regional_cloud_ai_infrastructure_investment_usd":40000000000,"regional_investment_through_year":2027,"investment_scope":"Texas statewide"},"notes":["40Bnot RedOak-onlybudget.2009Texasoffices/presence not openingdata-center. CampusannouncementlabelsincludePampaandWilbarger2026but do not establish exactphysicalsitecoordinates.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/texas/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Red Oak · Ellis · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"google-wilbarger-vernon-tx","state":"TX","kind":"facility","name":"Google Wilbarger County Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wilbarger"],"city":"Vernon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Google Wilbarger construction announcement and generation scope. 7800MWcontracted generation is Texas portfolio, not campus IT or current site power.40Binvestment through2027and30Mfund are statewide scopes. Air-cooled does not mean zero domestic water. No exact service date, parcel, street address or numeric IT in this announcement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/","host":"blog.google","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.1551,"lng":-99.294,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Google Wilbarger construction announcement and generation scope","fields":{"operator_statement_date":"2026-02-24","project_county":"Wilbarger County, Texas","operator_reported_stage":"under construction","cooling_plan":"air cooling with water for critical campus operations","energy_partner":"AES"},"notes":["7800MWcontracted generation is Texas portfolio, not campus IT or current site power.40Binvestment through2027and30Mfund are statewide scopes. Air-cooled does not mean zero domestic water. No exact service date, parcel, street address or numeric IT in this announcement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/","host":"blog.google","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Vernon · Wilbarger · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"gw-ranch-pacifico-energy-pecos-county-tx","state":"TX","kind":"facility","name":"GW Ranch","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pecos"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 7.65 GW figure describes planned gas generation, not operating or critical IT demand. Permit emissions ceilings are not actual emissions. Solar MW and battery power are not energy in MWh. Future grid and produced-water options are not secured service or perpetual off-grid commitments. Original transaction and air permit remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://constructionreviewonline.com/amazon-backs-7-65-gw-gas-plant-in-texas-to-power-new-ai-data-center-campus/","host":"constructionreviewonline.com","date":"2026-08-08","published":"2026-08-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.05,"lng":-102.88,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Construction Review reports an Amazon-planned Pecos County campus at GW Ranch with Pacifico Energy generation, quoting Amazon confirmation.","independently_verified_current_operating_status":null},"notes":["The 7.65 GW figure describes planned gas generation, not operating or critical IT demand. Permit emissions ceilings are not actual emissions. Solar MW and battery power are not energy in MWh. Future grid and produced-water options are not secured service or perpetual off-grid commitments. Original transaction and air permit remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://constructionreviewonline.com/amazon-backs-7-65-gw-gas-plant-in-texas-to-power-new-ai-data-center-campus/","host":"constructionreviewonline.com","date":"2026-08-08","published":"2026-08-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Pecos · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"hut8-beacon-point-robstown-tx","state":"TX","kind":"facility","name":"Hut 8 Beacon Point AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nueces"],"city":"Robstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Initial fill is not daily water use; under 10,000 gallons per day describes local domestic demand. Lease revenue and financing are not capex. June 9 bond closing was a forecast, not an observed closing. Incentive statements conflict between the article body and fact box, so the canonical incentive field stays unknown. No identified tenant or actual commissioning date. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/calallen/beacon-point-ai-massive-data-center-planned-for-nueces-county","host":"kristv.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":27.7897,"lng":-97.6689,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KRIS reports Hut 8 Beacon Point's planned 352 MW critical IT inside a 1,000 MW AEP interconnection plan, with an initial 1.8-million-gallon cooling fill trucked from outside the county.","independently_verified_current_operating_status":null,"planned_critical_it_mw":352,"planned_interconnection_mw":1000,"initial_cooling_fill_gallons":1800000,"incentives":null},"notes":["Initial fill is not daily water use; under 10,000 gallons per day describes local domestic demand. Lease revenue and financing are not capex. June 9 bond closing was a forecast, not an observed closing. Incentive statements conflict between the article body and fact box, so the canonical incentive field stays unknown. No identified tenant or actual commissioning date.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/calallen/beacon-point-ai-massive-data-center-planned-for-nueces-county","host":"kristv.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Robstown · Nueces · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"hut8-salt-creek-culberson-tx","state":"TX","kind":"facility","name":"Hut 8 Salt Creek Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Culberson"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Hut8 original Form10-K transition report filed March28,2024, covering July1-December31,2023 with later developments. Server sent gzip-encoded PDF: raw transport retained, ordinary gzip decoding saved as a separate hashed PDF. Only cover and PDF pages8/65/124 fully read; cover/8/124 viewed. December29,2023 purchase of substation and1.9acres for$7.1M CASH CONSIDERATION; no cash paid as ofDecember31. Not whole-campus acreage, verified paid capex or total build cost. February2024 SaltCreek construction began;63MW/3.6EH/s are then-future design/conditional miner assumptions, not measured current IT or verified commissioning. Other203-page filing sections unreviewed. Ontario310MW generation and managed Ionic sites are separate. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cdn.kscope.io/4a3545ac7cd83ed5809d42e808998efa.pdf","host":"cdn.kscope.io","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.825,"lng":-103.909,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Hut8 original Form10-K transition report filed March28,2024, covering July1-December31,2023 with later developments. Server sent gzip-encoded PDF: raw transport retained, ordinary gzip decoding saved as a separate hashed PDF. Only cover and PDF pages8/65/124 fully read; cover/8/124 viewed. December29,2023 purchase of substation and1.9acres for$7.1M CASH CONSIDERATION; no cash paid as ofDecember31. Not whole-campus acreage, verified paid capex or total build cost. February2024 SaltCreek construction began;63MW/3.6EH/s are then-future design/conditional miner assumptions, not measured current IT or verified commissioning. Other203-page filing sections unreviewed. Ontario310MW generation and managed Ionic sites are separate.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://cdn.kscope.io/4a3545ac7cd83ed5809d42e808998efa.pdf","host":"cdn.kscope.io","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Culberson · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"hyperdatagrid-lufkin-angelina-county-tx","state":"TX","kind":"facility","name":"HyperDataGrid Lufkin Data Center (Former Timber Mill Site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Angelina"],"city":"Lufkin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The company's generic 20 MW, twelve-month template is not verified Lufkin capacity or timing. Rack kW is not campus MW. Parsons and the separate AmpZ paper-mill project must not be merged. Full project scope and current operation remain unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://usdatacenterprojects.com/texas/hyperdatagrid-plans-data-center-on-former-timber-mill-site-near-lufkin-texas","host":"usdatacenterprojects.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.3383,"lng":-94.7292,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"US Data Center Projects reports agreements and land clearing for HyperDataGrid's roughly 40-acre former Northern Chip Mill site near Lufkin.","independently_verified_current_operating_status":null},"notes":["The company's generic 20 MW, twelve-month template is not verified Lufkin capacity or timing. Rack kW is not campus MW. Parsons and the separate AmpZ paper-mill project must not be merged. Full project scope and current operation remain unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://usdatacenterprojects.com/texas/hyperdatagrid-plans-data-center-on-former-timber-mill-site-near-lufkin-texas","host":"usdatacenterprojects.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Lufkin · Angelina · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"iren-horizon-childress-tx","state":"TX","kind":"facility","name":"IREN Horizon  -  Childress, TX","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Childress"],"city":"Childress","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. IREN Childress whole-campus power and land. 750MWwholecampusnotHorizon-onlyphasecriticalIToractualconsumption. No datedcurrentenergizedsplit,tenantleaseorexactsiteparcel. Renewableaccessnot100percenthourlyrenewablematchingproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://iren.com/data-centers/childress","host":"iren.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.4276,"lng":-100.2046,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"IREN Childress whole-campus power and land","fields":{"operator":"IREN","campus":"Childress, Texas","campus_power_capacity_mw":750,"campus_land_acres":576,"operator_described_tenure":"freehold","operator_described_grid":"ERCOT, onsite substations owned by IREN"},"notes":["750MWwholecampusnotHorizon-onlyphasecriticalIToractualconsumption. No datedcurrentenergizedsplit,tenantleaseorexactsiteparcel. Renewableaccessnot100percenthourlyrenewablematchingproof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://iren.com/data-centers/childress","host":"iren.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Childress · Childress · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"lancium-crusoe-abilene-tx","state":"TX","kind":"facility","name":"Lancium Clean Campus (Crusoe / Stargate Site 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Taylor"],"city":"Abilene","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The interview's speculation that all workloads are ChatGPT is not confirmation. Company-reported construction workforce is not permanent employment. Cooling descriptions are attributed engineering claims, not a complete water-meter audit. Future expansion is not completed or approved infrastructure. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ktxs.com/news/local/lancium-crusoe-executives-brief-abilene-leaders-on-major-northside-investment","host":"ktxs.com","date":"2026-03-05","published":"2026-03-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.502213,"lng":-99.788717,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KTXS distinguishes Lancium's land/power infrastructure, Crusoe's data-center ownership and operation, and Oracle as customer at the Abilene campus, with eight buildings forecast through first-quarter 2027.","independently_verified_current_operating_status":null},"notes":["The interview's speculation that all workloads are ChatGPT is not confirmation. Company-reported construction workforce is not permanent employment. Cooling descriptions are attributed engineering claims, not a complete water-meter audit. Future expansion is not completed or approved infrastructure.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ktxs.com/news/local/lancium-crusoe-executives-brief-abilene-leaders-on-major-northside-investment","host":"ktxs.com","date":"2026-03-05","published":"2026-03-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Abilene · Taylor · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"lancium-fort-stockton-tx","state":"TX","kind":"facility","name":"Lancium Fort Stockton Clean Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Pecos"],"city":"Fort Stockton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. Historical completion targets not delivery evidence2026. Hundreds of millions and dozens jobs not exact values. Grid-flexible load is not proof carbon-free generation or current AI hosting.25MWis nested in325MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","host":"prnewswire.com","date":"2021-09-15","published":"2021-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.894,"lng":-102.879,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"groundbreaking_announcement":"2021-09-15","first_stage_planned_power_mw":25,"first_stage_completion_target":"2022-Q1","full_capacity_target_mw":325,"full_capacity_target_year":2022,"initial_planned_area_sqft_min_exclusive":100000,"initial_computing_use":"bitcoin mining and other high-throughput computing"},"notes":["Historical completion targets not delivery evidence2026. Hundreds of millions and dozens jobs not exact values. Grid-flexible load is not proof carbon-free generation or current AI hosting.25MWis nested in325MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","host":"prnewswire.com","date":"2021-09-15","published":"2021-09-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Fort Stockton · Pecos · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"mara-flared-gas-fleet-tx-nd","state":"TX","kind":"facility","name":"MARA Flared/Stranded-Gas Mining Fleet (TX + ND)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":[],"city":"Midland/Odessa area (representative)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.. MARAissuerMay5,2025 reports25MWgas-to-poweraggregateacrosswellheadsitesinNorthDakotaandTexas,fullyenergizedasreportedthen. Not25MWperstate,oneparcel/physicalDCorallAIIT. CheapestBTC/methanemitigationclaimsnotindependentlymeasured;hashrateEH/snotMW. SeparateunnamedOhioexpansion50MWincrementto100,200designmaximumnotgasfleet. NoexactTXNDlocationsconfirmed. Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1394/mara-announces-bitcoin-production-and-mining-operation-updates-for-april-2025","host":"ir.mara.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.87,"lng":-102.37,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-government-review-round46-2026-10-14.json","scope":"Originaloperator/issuer/government namedidentity,historicaltransaction orproposal/policycontext;notwhole-recordcurrentoperationcertification.","fields":{"named_original_context":"MARAissuerMay5,2025 reports25MWgas-to-poweraggregateacrosswellheadsitesinNorthDakotaandTexas,fullyenergizedasreportedthen. Not25MWperstate,oneparcel/physicalDCorallAIIT. CheapestBTC/methanemitigationclaimsnotindependentlymeasured;hashrateEH/snotMW. SeparateunnamedOhioexpansion50MWincrementto100,200designmaximumnotgasfleet. NoexactTXNDlocationsconfirmed."},"notes":["MARAissuerMay5,2025 reports25MWgas-to-poweraggregateacrosswellheadsitesinNorthDakotaandTexas,fullyenergizedasreportedthen. Not25MWperstate,oneparcel/physicalDCorallAIIT. CheapestBTC/methanemitigationclaimsnotindependentlymeasured;hashrateEH/snotMW. SeparateunnamedOhioexpansion50MWincrementto100,200designmaximumnotgasfleet. NoexactTXNDlocationsconfirmed.","Sharedaggregatepower/generation,unknownITbasisanddate-rolelimitationscontrol."],"sources":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1394/mara-announces-bitcoin-production-and-mining-operation-updates-for-april-2025","host":"ir.mara.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Midland/Odessa area (representative) · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"mara-granbury-hood-tx","state":"TX","kind":"facility","name":"MARA Granbury Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hood"],"city":"Granbury","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Colleen DeGuzman, TexasTribune October9,2025, clarification14:50Central, original onsite/company/county reporting: Granbury-area MARA noise dispute and then-future MitchellBend incorporation vote. No2025 election result/current2026 ordinance inferred.67% immersion conversion is company claim; resident readings and county-funded October2024 study use different protocols/locations. Report quotes study caveat that typical mine operation during monitoring could not be confirmed. No measured universal85dB breach or medical causation adopted.1.2B investment is company TEXAS-SITES total, not this mine alone. Statewide counts, legal/tax shortcuts and household equivalences not current census/legal advice. Republish copies are duplicate text, not extra sources. Not all fields, current operation, permits, exact parcel or critical IT independently verified. Original historical acoustic-study method, metric and operational/source-attribution limits.. Not current noise, causal health evidence or an applicable-law compliance judgment.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.texastribune.org/2025/10/09/texas-hood-county-crypto-noise-incorporate-city/","host":"texastribune.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://hoodcountytx.documents-on-demand.com/document/446290f6-6aa7-ef11-a428-000c29a59557/2024.11.01%20Cryptocurrency%20Mine%20Sound%20Level%20Investigation","host":"hoodcountytx.documents-on-demand.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.4427,"lng":-97.7871,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Colleen DeGuzman, TexasTribune October9,2025, clarification14:50Central, original onsite/company/county reporting: Granbury-area MARA noise dispute and then-future MitchellBend incorporation vote. No2025 election result/current2026 ordinance inferred.67% immersion conversion is company claim; resident readings and county-funded October2024 study use different protocols/locations. Report quotes study caveat that typical mine operation during monitoring could not be confirmed. No measured universal85dB breach or medical causation adopted.1.2B investment is company TEXAS-SITES total, not this mine alone. Statewide counts, legal/tax shortcuts and household equivalences not current census/legal advice. Republish copies are duplicate text, not extra sources.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.texastribune.org/2025/10/09/texas-hood-county-crypto-noise-incorporate-city/","host":"texastribune.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-original-noise-and-water-reporting-review-round86-2026-10-15.json","scope":"Original historical acoustic-study method, metric and operational/source-attribution limits.","fields":{},"notes":["Not current noise, causal health evidence or an applicable-law compliance judgment."],"sources":[{"url":"https://hoodcountytx.documents-on-demand.com/document/446290f6-6aa7-ef11-a428-000c29a59557/2024.11.01%20Cryptocurrency%20Mine%20Sound%20Level%20Investigation","host":"hoodcountytx.documents-on-demand.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Granbury · Hood · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"marathon-digital-garden-city-tx","state":"TX","kind":"facility","name":"Marathon Digital Garden City Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Glasscock"],"city":"Garden City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Agreement is not observed closing; gross 97.3 million before adjustments is not additive consideration. Site power is not critical IT demand. The article incorrectly places Ellendale in Texas in one passage; no location or outage event is transferred between the sites. Current operation remains unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theminermag.com/news/2024-03-15/marathon-bitcoin-mining-applied-digital-garden-city-acquire","host":"theminermag.com","date":"2024-03-15","published":"2024-03-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.8724,"lng":-101.4849,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Miner Mag reports Marathon's agreement to acquire Applied Digital's 200 MW Garden City mining site, with an adjusted 87.3-million-USD price and a second-quarter closing target.","independently_verified_current_operating_status":null},"notes":["Agreement is not observed closing; gross 97.3 million before adjustments is not additive consideration. Site power is not critical IT demand. The article incorrectly places Ellendale in Texas in one passage; no location or outage event is transferred between the sites. Current operation remains unverified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theminermag.com/news/2024-03-15/marathon-bitcoin-mining-applied-digital-garden-city-acquire","host":"theminermag.com","date":"2024-03-15","published":"2024-03-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Garden City · Glasscock · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"meta-el-paso-tx","state":"TX","kind":"facility","name":"Meta El Paso AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["El Paso"],"city":"El Paso","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Expansion announcement, not full energization. Completion date absent. Texas renewable projects exceeding 5000 MW are statewide generation, not campus IT. Water restoration and 2030 targets are goals, not measured annual withdrawals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/","host":"datacenters.atmeta.com","date":"2026-03-26","published":"2026-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.81,"lng":-106.55,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"planned_capacity_mw":1000,"power_basis":"not explicitly critical IT","planned_investment_usd_min_exclusive":10000000000,"operational_jobs_once_completed_min_exclusive":300,"peak_construction_jobs_min_exclusive":4000,"groundbreaking_year":2025},"notes":["Expansion announcement, not full energization. Completion date absent. Texas renewable projects exceeding 5000 MW are statewide generation, not campus IT. Water restoration and 2030 targets are goals, not measured annual withdrawals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/","host":"datacenters.atmeta.com","date":"2026-03-26","published":"2026-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · El Paso · El Paso · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"meta-fort-worth-tx","state":"TX","kind":"facility","name":"Meta Fort Worth Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tarrant"],"city":"Fort Worth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/fort-worth-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.9844048,"lng":-97.2617581,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"operator_labeled_data_center_investment_usd":1500000000,"investment_is_lower_bound":true,"investment_geographic_label":"Fort Worth, Texas","historic_groundbreaking_year":2015,"peak_construction_workers":1200,"operator_reported_operational_jobs_lower_bound":200,"local_school_nonprofit_direct_funding_usd_lower_bound":5200000,"direct_funding_county_scope":"Tarrant"},"notes":["Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/fort-worth-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Fort Worth · Tarrant · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"meta-temple-tx","state":"TX","kind":"facility","name":"Meta Temple Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bell"],"city":"Temple","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The page body retains future operational/certification language despite the completed status label. Contractor completion is not metered operation. Peak 1,200 tradespeople are not permanent employment; intended renewable matching and LEED Gold are not independently verified performance/certification. Publication/update dates are not a physical completion day. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://jedunn.com/projects/meta-temple-data-center/","host":"jedunn.com","date":"2024-09-13","published":"2024-09-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.1399225,"lng":-97.3812992,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"JE Dunn's Temple project page labels the three-building Meta campus completed and describes roughly 750,000 square feet of data-center/admin space on 386 acres and 152 MW of unspecified basis.","independently_verified_current_operating_status":null},"notes":["The page body retains future operational/certification language despite the completed status label. Contractor completion is not metered operation. Peak 1,200 tradespeople are not permanent employment; intended renewable matching and LEED Gold are not independently verified performance/certification. Publication/update dates are not a physical completion day.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://jedunn.com/projects/meta-temple-data-center/","host":"jedunn.com","date":"2024-09-13","published":"2024-09-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Temple · Bell · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"microsoft-pecos-tx","state":"TX","kind":"facility","name":"Microsoft Pecos Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Reeves"],"city":"Pecos","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity. Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions. No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/","host":"blogs.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.42,"lng":-103.49,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"announcement_date":"2026-06-22","announced_capacity_mw":2000,"capacity_basis":"Approximately2GW datacenter capacity; explicit criticalIT basis not stated.","current_verified_it_mw":null,"investment":"Multibillion dollar campus planned over five to seven years; no exact total.","construction_jobs_forecast_peak":"More than6000","permanent_jobs_forecast":"Hundreds, no exact count","initial_power_strategy":"Proposed behind-the-meter natural gas generation funded by Microsoft; later grid connection anticipated","cooling":"Planned closed-loop design; cooling initial fill distinct from all-site lifecycle use."},"notes":["Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity.","Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions.","No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/","host":"blogs.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Pecos · Reeves · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"microsoft-san-antonio-expansion-tx","state":"TX","kind":"facility","name":"Microsoft San Antonio SAT89/SAT90 Data Centers","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Medina"],"city":"Castroville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge every parcel into one building or treat land counts as operating-site counts. Original filings, abatement agreement and water service were not read. The regional water number and claimed percentage appear inconsistent and are excluded; speculative worldwide-power forecasts and the article's Binghamton geography error are not adopted. No critical IT MW established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sanantonioreport.org/medina-county-farmland-data-centers-strain/","host":"sanantonioreport.org","date":"2024-08-25","published":"2024-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":29.35,"lng":-98.88,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"San Antonio Report distinguishes Microsoft's SAT82 expansion from SAT80-1, SAT80-2 and other Medina/Bexar sites, reporting a nearly 500-million-USD filing and a county official's 15-year, 80-percent abatement description.","independently_verified_current_operating_status":null},"notes":["Do not merge every parcel into one building or treat land counts as operating-site counts. Original filings, abatement agreement and water service were not read. The regional water number and claimed percentage appear inconsistent and are excluded; speculative worldwide-power forecasts and the article's Binghamton geography error are not adopted. No critical IT MW established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sanantonioreport.org/medina-county-farmland-data-centers-strain/","host":"sanantonioreport.org","date":"2024-08-25","published":"2024-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Castroville · Medina · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"nexus-hubbard-campus-hill-county-tx","state":"TX","kind":"facility","name":"Nexus Hubbard Data Center & Power Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hill"],"city":"Hubbard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. generic state air-permit instructions hold. General Texas natural-gas generating-unit standard permit instructions, not an approved Nexus/Hubbard registration, site permit, generation capacity or IT load. Rule effective date and page modification date not project milestones. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tceq.texas.gov/permitting/air/newsourcereview/combustion/ng-egu-sp","host":"tceq.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.824001,"lng":-96.776243,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"generic state air-permit instructions hold","fields":{},"notes":["General Texas natural-gas generating-unit standard permit instructions, not an approved Nexus/Hubbard registration, site permit, generation capacity or IT load. Rule effective date and page modification date not project milestones.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tceq.texas.gov/permitting/air/newsourcereview/combustion/ng-egu-sp","host":"tceq.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Hubbard · Hill · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"peak-mining-texas-1-corpus-christi-tx","state":"TX","kind":"facility","name":"Peak Mining Texas 1 (Saxet Energy Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Nueces"],"city":"Corpus Christi","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Saxet BuildingC construction registration and alias hold. Administrative registration closed does not mean physical data center closed or mining stopped. Single building cost/area not entire mining campus. Source owner address incorrectly labels Dallas as Tennessee; that field quarantined. Registered dates not observed completion. PeakMining alias/ownership not independently established here. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023019972","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.8487,"lng":-97.4263,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Saxet BuildingC construction registration and alias hold","fields":{"architectural_barriers_registration_id":"TABS2023019972","registered_project_name":"Saxet Energy Park,Data Center BuildingC","published_site_address":"1102 McKinzie Road,BuildingC,CorpusChristi,TX78410","registered_county":"Nueces","registered_area_sqft":37813,"registered_estimated_cost_usd":1200000,"registered_scheduled_start":"2023-06-19","registered_scheduled_completion":"2023-10-27","registered_use":"data centers/mining equipment","registration_status":"Project Closed"},"notes":["Administrative registration closed does not mean physical data center closed or mining stopped. Single building cost/area not entire mining campus. Source owner address incorrectly labels Dallas as Tennessee; that field quarantined. Registered dates not observed completion. PeakMining alias/ownership not independently established here.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023019972","host":"tdlr.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Corpus Christi · Nueces · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"peak-mining-texas-2-corpus-christi-tx","state":"TX","kind":"facility","name":"Peak Mining Texas 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Nueces"],"city":"Corpus Christi","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. NorthernData originalMARannouncement datelineJanuary12,2026 00:10CET, landingpageJanuary11timezone difference. OptiontoreacquireandsellCorpusChristiHPCsite EXPIRESWITHOUTFINALIZEDTRANSACTION; notsuccessfullysoldforHPCoroperatingminestopped. Latercurrentownershipunverified. Up150Mearnoutfromminingprofits andup95%decliningnetsaleparticipation areCONTINGENTRIGHTS, notreceivedsaleprice/campuscapex. Five-yearperiodnotfive-yearlease. Separateup200Mshareholdercashpotentialbecomeszeroafterfailedtransaction, notfacilityspend. Rumbletenderconditionalnotcompletedacquisitionproof. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://northerndata.de/en/investor-relations/news/northern-data-announces-expiry-of-option-to-sell-corpus-christi-site-to-global-infrastructure-asset-management-firm","host":"northerndata.de","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":27.852,"lng":-97.421,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["NorthernData originalMARannouncement datelineJanuary12,2026 00:10CET, landingpageJanuary11timezone difference. OptiontoreacquireandsellCorpusChristiHPCsite EXPIRESWITHOUTFINALIZEDTRANSACTION; notsuccessfullysoldforHPCoroperatingminestopped. Latercurrentownershipunverified.","Up150Mearnoutfromminingprofits andup95%decliningnetsaleparticipation areCONTINGENTRIGHTS, notreceivedsaleprice/campuscapex. Five-yearperiodnotfive-yearlease. Separateup200Mshareholdercashpotentialbecomeszeroafterfailedtransaction, notfacilityspend. Rumbletenderconditionalnotcompletedacquisitionproof.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://northerndata.de/en/investor-relations/news/northern-data-announces-expiry-of-option-to-sell-corpus-christi-site-to-global-infrastructure-asset-management-firm","host":"northerndata.de","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Corpus Christi · Nueces · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"poolside-project-horizon-pecos-county-tx","state":"TX","kind":"facility","name":"Poolside Project Horizon AI Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pecos"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Paul Ciampoli, APPA October15,2025 reproduces Poolside founders public announcement:2GW campus planned in eight250MW phases on568acres; CoreWeave anchor250MW15yearlease/500MWreserved future expansion is nested in overall plan, not2750MW. Immediate40000+GPUs coming viaCoreWeave beginningDecember2025 not proved installed atHorizon. Behind-meter aero-derivative/SCR/gridbackup/BESS designs not air permits, measured emissions or energization. Source saysWestTexas, not exact Pecos parcel. Founder statement as reproduced, not APPA regulator approval or independent completed-site audit. Not all fields, current operation, permits, exact parcel or critical IT independently verified. AirStreetPress/NathanBenaich October27,2025 firsthand investor perspective explicitly discloses Poolside portfolio affiliation. Names partofLongfellowRanch, planned2GW/eightphases/250MWCoreWeave anchor. Ranchname not exact campus boundary/county certification; no signed lease/ESA/airpermit or completedphase inspected. Investor advocacy is not independent confirmation of issuerclaims. Gridbackup/generation/BESS and existingwateraccess not proof zero water or carbon.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas","host":"publicpower.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://press.airstreet.com/p/poolside-launches-project-horizon-ai-compute","host":"press.airstreet.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.8938,"lng":-102.8796,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Paul Ciampoli, APPA October15,2025 reproduces Poolside founders public announcement:2GW campus planned in eight250MW phases on568acres; CoreWeave anchor250MW15yearlease/500MWreserved future expansion is nested in overall plan, not2750MW. Immediate40000+GPUs coming viaCoreWeave beginningDecember2025 not proved installed atHorizon. Behind-meter aero-derivative/SCR/gridbackup/BESS designs not air permits, measured emissions or energization. Source saysWestTexas, not exact Pecos parcel. Founder statement as reproduced, not APPA regulator approval or independent completed-site audit.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas","host":"publicpower.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["AirStreetPress/NathanBenaich October27,2025 firsthand investor perspective explicitly discloses Poolside portfolio affiliation. Names partofLongfellowRanch, planned2GW/eightphases/250MWCoreWeave anchor. Ranchname not exact campus boundary/county certification; no signed lease/ESA/airpermit or completedphase inspected. Investor advocacy is not independent confirmation of issuerclaims. Gridbackup/generation/BESS and existingwateraccess not proof zero water or carbon.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://press.airstreet.com/p/poolside-launches-project-horizon-ai-compute","host":"press.airstreet.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Pecos · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"powerhouse-uhland-caldwell-county-tx","state":"TX","kind":"facility","name":"PowerHouse Caldwell County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caldwell"],"city":"Uhland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Alexis Kramer, Bisnow May 5, 2026: Uhland administrator directly confirms resident pushback and county pathway for PowerHouse. Proposed 500 acres within 3,600-acre Caldwell Valley park/petition details are credited to Austin Business Journal, not independently filed documents read here. Petition is not verified release approval; no MW supplied. Texas county-authority summary is reported historical context, not current legal advice or proof every permit must issue. Regional 7.8 GW/120-company-project claims not campus capacity or operating counts. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":29.87,"lng":-97.85,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Alexis Kramer, Bisnow May 5, 2026: Uhland administrator directly confirms resident pushback and county pathway for PowerHouse. Proposed 500 acres within 3,600-acre Caldwell Valley park/petition details are credited to Austin Business Journal, not independently filed documents read here. Petition is not verified release approval; no MW supplied. Texas county-authority summary is reported historical context, not current legal advice or proof every permit must issue. Regional 7.8 GW/120-company-project claims not campus capacity or operating counts.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Uhland · Caldwell · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"powerhouse-provident-grand-prairie-tx","state":"TX","kind":"facility","name":"PowerHouse Grand Prairie Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ellis"],"city":"Grand Prairie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Research targets and proof-of-concept schedules do not establish deployed technology or measured performance at this campus. Other developments and their MW are separate. The Grand Prairie and Wilmer paragraphs repeat the same size/value/schedule; original project records are needed before treating those as independently confirmed. No current IT MW or construction outcome is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/","host":"dallasinnovates.com","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.62,"lng":-97.02,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Dallas Innovates mentions a proposed 360,000-square-foot, 300-million-USD PowerHouse/Provident Grand Prairie building and 2027 completion while covering university cooling research.","independently_verified_current_operating_status":null},"notes":["Research targets and proof-of-concept schedules do not establish deployed technology or measured performance at this campus. Other developments and their MW are separate. The Grand Prairie and Wilmer paragraphs repeat the same size/value/schedule; original project records are needed before treating those as independently confirmed. No current IT MW or construction outcome is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/","host":"dallasinnovates.com","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Grand Prairie · Ellis · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"rcm-hill-project-aquila-hill-county-tx","state":"TX","kind":"facility","name":"Project Aquila","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hill"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Rescission is not project approval and is not a court ruling that law was invalid. June 4 agenda and library record are procedural evidence only; later reporting adds replacement checklist. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. County procedural context, not recorded meeting outcome or executed agreement.. Library index description does not turn agenda into rescission order. Abbott Land Holdings 270-acre C.R.3106 waiver attachment is a separate proposal; do not assign its land, escrow or obligations to RCM Hill / Aquila. No draft fee or waiver adopted as operative law. Texas Tribune secondary corroboration, not signed county order.. Requested damages are not awarded damages. Reporter federal-court location differs from county agenda; primary agenda names Waco. Scope/legality of replacement checklist not established from unsigned packet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kwtx.com/2026/06/04/hill-county-commissioners-court-rescinds-moratorium-data-center-wake-lawsuit/","host":"kwtx.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.co.hill.tx.us/upload/template/28749/docs/CC%202026/ccagenda_06042026.pdf","host":"co.hill.tx.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://lrl.texas.gov/currentissues/clips/resultsLinkclip.cfm?clipID=450110&headline=Hays+County+backs+off+data+center+pause+again+as+Texas+water+concerns+grow","host":"lrl.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.texastribune.org/2026/06/05/texas-hill-county-moratorium-rescinded-data-centers/","host":"texastribune.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.03,"lng":-97.13,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"moratorium-rescinded-reported","reported_finding":"KWTX reports unanimous June 4 rescission of Hill County moratorium after developer suit.","report_display_date":"2026-06-04","independently_verified_current_status":null},"notes":["Rescission is not project approval and is not a court ruling that law was invalid. June 4 agenda and library record are procedural evidence only; later reporting adds replacement checklist.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kwtx.com/2026/06/04/hill-county-commissioners-court-rescinds-moratorium-data-center-wake-lawsuit/","host":"kwtx.com","date":"2026-06-04","published":"2026-06-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"County procedural context, not recorded meeting outcome or executed agreement.","fields":{"meeting_scheduled":"2026-06-04","document_type":"Filed meeting agenda and draft attachments","case_number_referenced":"6:26-CV-00340","court_referenced":"Western District of Texas, Waco Division","attachment_signature_status":"Draft proclamation and separate Abbott waiver signature blocks blank."},"notes":["Library index description does not turn agenda into rescission order. Abbott Land Holdings 270-acre C.R.3106 waiver attachment is a separate proposal; do not assign its land, escrow or obligations to RCM Hill / Aquila. No draft fee or waiver adopted as operative law.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.co.hill.tx.us/upload/template/28749/docs/CC%202026/ccagenda_06042026.pdf","host":"co.hill.tx.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://lrl.texas.gov/currentissues/clips/resultsLinkclip.cfm?clipID=450110&headline=Hays+County+backs+off+data+center+pause+again+as+Texas+water+concerns+grow","host":"lrl.texas.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Texas Tribune secondary corroboration, not signed county order.","fields":{"report_date":"2026-06-05","reported_action":"Unanimous rescission June 4 and adoption of developer checklist."},"notes":["Requested damages are not awarded damages. Reporter federal-court location differs from county agenda; primary agenda names Waco. Scope/legality of replacement checklist not established from unsigned packet.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.texastribune.org/2026/06/05/texas-hill-county-moratorium-rescinded-data-centers/","host":"texastribune.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Hill · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"fermi-matador-amarillo-tx","state":"TX","kind":"facility","name":"Project Matador","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carson"],"city":"Amarillo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. Original FederalRegister91FR64702-64703/2026-20742 publishedOctober9,2026, datedOctober5/filedOctober8. NRCdraftEISforFOURPROPOSEDAP1000reactorsProjectMatadorNuclearUnits1-4inCARSONCOUNTYadjacentPantex; AmarillomarketlabelnotPotterCountyproof. Dockets05200051-54/NRC2026-0100. PreliminaryrecommendationtoissueCOLisCONTINGENTONSUCCESSFULSAFETYREVIEW, notissuedconstruction/operatinglicense/energizedreactorsorITcapacity. Applicant-preparedEISunderNRCsupervisionandagencyindependentreview; completeEISML26261A417NOTread. InitialJune17,2025application/Aug20supplement/Sep5acceptanceareseparatestages. PUBLICCOMMENTDEADLINENovember23,2026, NOtimeorphysicalhearingstated. Commentslaterconsideredifpractical; do notinventautomaticbanatmidnight. No submissions/emails/registrationperformed. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govinfo.gov/content/pkg/FR-2026-10-09/html/2026-20742.htm","host":"govinfo.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":35.396,"lng":-101.543,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["Original FederalRegister91FR64702-64703/2026-20742 publishedOctober9,2026, datedOctober5/filedOctober8. NRCdraftEISforFOURPROPOSEDAP1000reactorsProjectMatadorNuclearUnits1-4inCARSONCOUNTYadjacentPantex; AmarillomarketlabelnotPotterCountyproof. Dockets05200051-54/NRC2026-0100.","PreliminaryrecommendationtoissueCOLisCONTINGENTONSUCCESSFULSAFETYREVIEW, notissuedconstruction/operatinglicense/energizedreactorsorITcapacity. Applicant-preparedEISunderNRCsupervisionandagencyindependentreview; completeEISML26261A417NOTread. InitialJune17,2025application/Aug20supplement/Sep5acceptanceareseparatestages.","PUBLICCOMMENTDEADLINENovember23,2026, NOtimeorphysicalhearingstated. Commentslaterconsideredifpractical; do notinventautomaticbanatmidnight. No submissions/emails/registrationperformed.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.govinfo.gov/content/pkg/FR-2026-10-09/html/2026-20742.htm","host":"govinfo.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Amarillo · Carson · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"galaxy-digital-mcgregor-tx","state":"TX","kind":"facility","name":"Project Merlin (Helios II)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["McLennan"],"city":"McGregor","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Current construction and IT capacity are unverified. Water is stated per building, without a whole-campus count. A noise design limit is not a measurement. Helios is separate, and utility promises are not verified contract terms. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theenergymag.com/news/2026-06-25/galaxy-digital-ai-data-center-mcgregor-texas","host":"theenergymag.com","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.44,"lng":-97.4,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"EnergyMag, citing KWTX, reports an early McGregor Project Merlin council approval and Galaxy's investment plan.","independently_verified_current_operating_status":null},"notes":["Current construction and IT capacity are unverified. Water is stated per building, without a whole-campus count. A noise design limit is not a measurement. Helios is separate, and utility promises are not verified contract terms.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theenergymag.com/news/2026-06-25/galaxy-digital-ai-data-center-mcgregor-texas","host":"theenergymag.com","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · McGregor · McLennan · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"prometheus-hyperscale-kaufman-county-tx","state":"TX","kind":"facility","name":"Prometheus Hyperscale Kaufman County Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kaufman"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Utility load is not critical IT. The story incorrectly places the Talty/Post Oak Bend area west of Dallas; no coordinates or boundary are inferred. Conduit's wider 300 MW generation plan and Prometheus' multistate gigawatt ambition are not extra campus IT. First-facility 2026 targets do not establish this site's commissioning or an executed power agreement. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.greenvillechronicle.com/s/4925/Prometheus-Hyperscale-Plans-200MW-AI-Data-Center-Campus-in-Kaufman-County.php","host":"greenvillechronicle.com","date":"2026-05-22","published":"2026-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.65,"lng":-96.36,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Greenville Chronicle reports Prometheus' Kaufman concept with up to 200 MW utility load, on-site gas and a nearby storage connection discussed by company leadership.","independently_verified_current_operating_status":null},"notes":["Utility load is not critical IT. The story incorrectly places the Talty/Post Oak Bend area west of Dallas; no coordinates or boundary are inferred. Conduit's wider 300 MW generation plan and Prometheus' multistate gigawatt ambition are not extra campus IT. First-facility 2026 targets do not establish this site's commissioning or an executed power agreement.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.greenvillechronicle.com/s/4925/Prometheus-Hyperscale-Plans-200MW-AI-Data-Center-Campus-in-Kaufman-County.php","host":"greenvillechronicle.com","date":"2026-05-22","published":"2026-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Kaufman · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"qts-irving-1-tx","state":"TX","kind":"facility","name":"QTS Irving 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Irving","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus totals, not Irving 1 building alone. Master plan does not establish six completed buildings; Texas-wide water pledge excluded from site investment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/irving/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8972479,"lng":-96.9826475,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":56,"advertised_critical_campus_mw_lower_bound":165,"master_planned_facilities":6},"notes":["Campus totals, not Irving 1 building alone. Master plan does not establish six completed buildings; Texas-wide water pledge excluded from site investment.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/irving/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Irving · Dallas · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"qts-lancium-hall-county-tx","state":"TX","kind":"facility","name":"QTS-Lancium Hall County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hall"],"city":"Turkey","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. QTS and Lancium Hall County roles and forecasts. Not10Bspent,current350QTSemployees or7000permanentjobs. No ITMWor observed opening adopted. Cooling-water claim excludes domestic use and external generation impacts. Private infrastructure funding commitment not executed municipal agreement reviewed; linkedOctober9communityagreement is a later lead. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/","host":"q.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.394,"lng":-100.8954,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"QTS and Lancium Hall County roles and forecasts","fields":{"announcement_date":"2026-07-13","planned_regional_capital_investment_usd_min_exclusive":10000000000,"expected_peak_construction_jobs_max":7000,"expected_permanent_jobs_approx":350,"permanent_jobs_scope":"QTS,maintenance,security andtenant positions combined","site_owner_infrastructure_developer":"Lancium","data_center_developer_operator":"QTS","published_location":"near Turkey, Hall County, Texas"},"notes":["Not10Bspent,current350QTSemployees or7000permanentjobs. No ITMWor observed opening adopted. Cooling-water claim excludes domestic use and external generation impacts. Private infrastructure funding commitment not executed municipal agreement reviewed; linkedOctober9communityagreement is a later lead.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/","host":"q.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Turkey · Hall · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"compass-red-oak-tx","state":"TX","kind":"facility","name":"Red Oak Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ellis"],"city":"Red Oak","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No exact vote day or executed ordinance retained. State official call for moratorium is not enacted statewide restriction. DataBank financing refers to separate company/projects. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://desototribune.com/2026/05/27/red-oak-data-center-sparks-controversy-as-expansion-moves-forward/","host":"desototribune.com","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.537981,"lng":-96.804371,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"DeSoto Tribune reports4to1 Red Oak rezoning for830-acre Compass proposal amid opposition.","independently_verified_current_operating_status":null},"notes":["No exact vote day or executed ordinance retained. State official call for moratorium is not enacted statewide restriction. DataBank financing refers to separate company/projects.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://desototribune.com/2026/05/27/red-oak-data-center-sparks-controversy-as-expansion-moves-forward/","host":"desototribune.com","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Red Oak · Ellis · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"databank-red-oak-tx","state":"TX","kind":"facility","name":"Red Oak Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ellis"],"city":"Red Oak","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not sum400MWsubstation,300MWITpotential,240MWfourcards and480MWfullprogram. Wholecampus record must be parent of individualbuildings;8buildings are futureprogram. Operator describes292-acreRedOakcampus with futureeightbuildingprogram; listedfirstfour60MWbuildings are not automatically proof240MWcommissioned. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. reposted news summary, duplicate event. Operator news summary credits the DallasMorningNews and repeats the April21construction financing event. Use the separate original operator release for facts; no second financing or project count. Updated-dateApril22is not a new project event. named source. Loan is financing, not total campus capital spent or an incentive. Combined capacity applies to first three, not each building or all eight. Fully leased is not commissioned or operating. Other company credit/securitization amounts excluded.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/dallas/red-oak-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/","host":"databank.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.5135,"lng":-96.7282,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Red Oak","campus_acres":292,"phase1_substation_mw":400,"phase1_critical_it_potential_mw_max":300,"full_program_critical_it_potential_mw":480,"listed_buildings":["DFW9","DFW10","DFW11","DFW12"],"advertised_each_building_it_mw":60,"power_basis":"design/marketing potential; commissioning not verified"},"notes":["Do not sum400MWsubstation,300MWITpotential,240MWfourcards and480MWfullprogram.","Wholecampus record must be parent of individualbuildings;8buildings are futureprogram.","Operator describes292-acreRedOakcampus with futureeightbuildingprogram; listedfirstfour60MWbuildings are not automatically proof240MWcommissioned.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/dallas/red-oak-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"reposted news summary, duplicate event","fields":{},"notes":["Operator news summary credits the DallasMorningNews and repeats the April21construction financing event. Use the separate original operator release for facts; no second financing or project count. Updated-dateApril22is not a new project event.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"construction_loan_usd":2000000000,"financed_initial_buildings":["DFW9","DFW10","DFW11"],"planned_campus_buildings":8,"initial_three_buildings_combined_area_sqft":600000,"initial_three_buildings_combined_capacity_mw":180,"power_basis":"release says power; critical IT versus gross not independently defined","initial_three_buildings_lease_status":"leased as of release"},"notes":["Loan is financing, not total campus capital spent or an incentive. Combined capacity applies to first three, not each building or all eight. Fully leased is not commissioned or operating. Other company credit/securitization amounts excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/","host":"databank.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Red Oak · Ellis · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"rellis-data-research-center-bryan-brazos-county-tx","state":"TX","kind":"facility","name":"RELLIS Data and Research Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Brazos"],"city":"Bryan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Agreement transfer does not prove closed bankruptcy acquisition or operating facility. Fifty-percent taxable-value treatment for ten years and full value for thirty more are not a40-year50-percentabatement or cash grant. Original leasehold/land tax mechanism and actual receipts remain unreviewed;700millionUSD is project scope, not paid taxes. Legal audit/order claims require original authority. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kbtx.com/2026/08/18/brazos-county-commissioners-approve-new-owner-rellis-data-center-heres-what-it-means-your-wallet/","host":"kbtx.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.6013,"lng":-96.3589,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"KBTX reports a four-zero Brazos County vote transferring RELLIS tax-agreement rights to ThisWay Global, with prior approvals reported from the university system and Bryan.","independently_verified_current_operating_status":null},"notes":["Agreement transfer does not prove closed bankruptcy acquisition or operating facility. Fifty-percent taxable-value treatment for ten years and full value for thirty more are not a40-year50-percentabatement or cash grant. Original leasehold/land tax mechanism and actual receipts remain unreviewed;700millionUSD is project scope, not paid taxes. Legal audit/order claims require original authority.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kbtx.com/2026/08/18/brazos-county-commissioners-approve-new-owner-rellis-data-center-heres-what-it-means-your-wallet/","host":"kbtx.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Bryan · Brazos · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"riot-platforms-corsicana-tx","state":"TX","kind":"facility","name":"Riot Platforms Corsicana Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Navarro"],"city":"Corsicana","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.. Cover saysMarch11,2024 but signedresolution and countyagreement signatures printOctober15,2024. Use documentrole/date, not filepath or coveralone. Resolution is visiblysigned/sealedcountyapproval and auth toexecute, not proofcompanycounterpart execution. County signatures visiblepage9; companyBy/Name/Title blankpage10, plusauthorizationdateblanks. A separatelyexecutedcounterpart couldexist but is not inthiscopy; fullyexecutedagreement remains unverified, not declaredneverexecuted/invalid. Agreementbody50%abatement ofspecifiedeligibleincrementalreal/personalproperty countyadvaloremtaxes for10years; not all taxes or automaticcashgrant. Section3.2 saysbegin2025taxyear; ExhibitDlabels2025year0/2026year1/2035year10. Schedulingmismatch unresolved; no definitiveenddate or sumoftaxsavings derived. Paragraph2.2 has minimum380Minitialbook investment/310106147taxablevalue byJanuary1,2025 and15FTEjobs bythen,140TOTALbyJanuary1,2026, withforcemajeureextension language. Bookvalue/taxablevalue/640Moldcoverproposal and estimatedcumulativeinvestment are different measures, not additive paidcapex. Conditions/default clause includesnotice/cure andpossibletermination/recapture. No compliancecertificates,actualcollections,abatementledger,recapture/defaultfinding or deliveredMWchecked. Passageoftargetdeadlines alone is not a violationfinding. Not whole record/current operating census, legal compliance or independent meter certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://navarro.easydocs.us/minutes/LinkedDir/2024/Links%202024-10-15-Regular/Item%2016%20Approve%20Resolution%20for%20Tax%20Abatement%20Navarro%20County%20and%20Riot%20Corsicana%20LLC.pdf","host":"navarro.easydocs.us","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.09,"lng":-96.47,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-originals-model-and-approval-stages-round55-2026-10-15.json","scope":"Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.","fields":{},"notes":["Cover saysMarch11,2024 but signedresolution and countyagreement signatures printOctober15,2024. Use documentrole/date, not filepath or coveralone. Resolution is visiblysigned/sealedcountyapproval and auth toexecute, not proofcompanycounterpart execution.","County signatures visiblepage9; companyBy/Name/Title blankpage10, plusauthorizationdateblanks. A separatelyexecutedcounterpart couldexist but is not inthiscopy; fullyexecutedagreement remains unverified, not declaredneverexecuted/invalid.","Agreementbody50%abatement ofspecifiedeligibleincrementalreal/personalproperty countyadvaloremtaxes for10years; not all taxes or automaticcashgrant. Section3.2 saysbegin2025taxyear; ExhibitDlabels2025year0/2026year1/2035year10. Schedulingmismatch unresolved; no definitiveenddate or sumoftaxsavings derived.","Paragraph2.2 has minimum380Minitialbook investment/310106147taxablevalue byJanuary1,2025 and15FTEjobs bythen,140TOTALbyJanuary1,2026, withforcemajeureextension language. Bookvalue/taxablevalue/640Moldcoverproposal and estimatedcumulativeinvestment are different measures, not additive paidcapex.","Conditions/default clause includesnotice/cure andpossibletermination/recapture. No compliancecertificates,actualcollections,abatementledger,recapture/defaultfinding or deliveredMWchecked. Passageoftargetdeadlines alone is not a violationfinding.","Not whole record/current operating census, legal compliance or independent meter certification."],"sources":[{"url":"https://navarro.easydocs.us/minutes/LinkedDir/2024/Links%202024-10-15-Regular/Item%2016%20Approve%20Resolution%20for%20Tax%20Abatement%20Navarro%20County%20and%20Riot%20Corsicana%20LLC.pdf","host":"navarro.easydocs.us","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Corsicana · Navarro · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"rowan-temple-tx","state":"TX","kind":"facility","name":"Rowan Project Temple","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bell"],"city":"Temple","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Temple official first-Rowan water-limit and revenue forecast summary. 4000gpd is city-described contractual domestic cap, not consumption estimate or independently read executed utility agreement.2Mone-time staged initialfill separate.7M/12Mcity tax-and-related revenue forecasts perproject not perbuilding or incentive dollars received. OtherTempleprojects require own limits; no blanket4000gpd. No current MW or opening proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.templetx.gov/community/faq__data_center_development_.php","host":"templetx.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.0982,"lng":-97.3428,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Temple official first-Rowan water-limit and revenue forecast summary","fields":{"city_reported_first_rowan_project_domestic_water_contract_cap_gallons_per_day":4000,"planned_initial_closed_loop_water_fill_gallons_approx":2000000,"city_projected_annual_city_revenue_during_abatement_usd_approx":7000000,"city_projected_annual_city_revenue_full_tax_roll_usd_approx":12000000},"notes":["4000gpd is city-described contractual domestic cap, not consumption estimate or independently read executed utility agreement.2Mone-time staged initialfill separate.7M/12Mcity tax-and-related revenue forecasts perproject not perbuilding or incentive dollars received. OtherTempleprojects require own limits; no blanket4000gpd. No current MW or opening proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.templetx.gov/community/faq__data_center_development_.php","host":"templetx.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Temple · Bell · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"sangha-renewables-ector-county-tx","state":"TX","kind":"facility","name":"Sangha Renewables Ector County Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Ector"],"city":"Odessa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported mining capacity is not independently verified critical IT, current measured load or AI hosting. The 150 MW solar farm is separate generation, not additional mining capacity. Supplemental grid power during non-solar hours is expressly included, so no claim of continuous solar-only or fully off-grid operation. Original partner agreement and current operating status were not independently examined. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bitcoinmagazine.com/news/sangha-energizes-20-bitcoin-mining","host":"bitcoinmagazine.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.8633,"lng":-102.3656,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Bitcoin Magazine reports Sangha’s announced energization and ribbon cutting for a 19.9 MW bitcoin mining facility in Ector County with TotalEnergies and Links Genco.","independently_verified_current_operating_status":null},"notes":["Reported mining capacity is not independently verified critical IT, current measured load or AI hosting. The 150 MW solar farm is separate generation, not additional mining capacity. Supplemental grid power during non-solar hours is expressly included, so no claim of continuous solar-only or fully off-grid operation. Original partner agreement and current operating status were not independently examined.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bitcoinmagazine.com/news/sangha-energizes-20-bitcoin-mining","host":"bitcoinmagazine.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Odessa · Ector · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"mara-site-mat-1177-matagorda-tx","state":"TX","kind":"facility","name":"Site MAT 1177","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Matagorda"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The purchase amount is not upfront payment or construction spending. First and second gigawatt targets in October 2027 and April 2028 are future, conditional and not critical IT demand. A Starwood partnership does not establish an executed tenant lease for the full site. The later issuer quarterly filing was found in search but its body returned 403; do not claim full original review. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cryptobriefing.com/marathon-digital-holdings-600m-texas-ai-bitcoin-campus/","host":"cryptobriefing.com","date":"2026-07-09","published":"2026-07-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":28.95,"lng":-95.97,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Crypto Briefing reports MARA's agreement concerning MAT 1177 and a Matagorda site, with up to 600 million USD of milestone-contingent consideration and a 2 GW power target.","independently_verified_current_operating_status":null},"notes":["The purchase amount is not upfront payment or construction spending. First and second gigawatt targets in October 2027 and April 2028 are future, conditional and not critical IT demand. A Starwood partnership does not establish an executed tenant lease for the full site. The later issuer quarterly filing was found in search but its body returned 403; do not claim full original review.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cryptobriefing.com/marathon-digital-holdings-600m-texas-ai-bitcoin-campus/","host":"cryptobriefing.com","date":"2026-07-09","published":"2026-07-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Matagorda · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"skybox-houston-one-tx","state":"TX","kind":"facility","name":"Skybox Houston One","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Harris"],"city":"Katy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. 1.2 MW applies to Shell’s tenant installation, NOT the entire campus or additional Skybox building capacity. Per-system 200 kW and per-rack 100 kW cooling ratings cannot be multiplied into campus IT without an examined equipment count. Warm/chilled water performance statements are vendor descriptions, not audited site PUE, annual water use or renewable supply guarantee. Metadata includes a later September 30, 2026 modification; neither proves physical installation date. Supplier case study is primary for its own installation claims, not independent certification. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.grcooling.com/customer-successes/shells-skybox-houston-one-data-center/","host":"grcooling.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":29.802893,"lng":-95.7553386,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"GRC supplier case study describes Shell’s immersion-cooled HPC deployment at Element Critical/Skybox Houston One in Katy, stating 1.2 MW of immersed compute.","independently_verified_current_operating_status":null,"supplier_reported_tenant_compute_mw":1.2,"capacity_scope":"Shell tenant installation; not entire Skybox Houston One campus"},"notes":["1.2 MW applies to Shell’s tenant installation, NOT the entire campus or additional Skybox building capacity. Per-system 200 kW and per-rack 100 kW cooling ratings cannot be multiplied into campus IT without an examined equipment count. Warm/chilled water performance statements are vendor descriptions, not audited site PUE, annual water use or renewable supply guarantee. Metadata includes a later September 30, 2026 modification; neither proves physical installation date. Supplier case study is primary for its own installation claims, not independent certification.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.grcooling.com/customer-successes/shells-skybox-houston-one-data-center/","host":"grcooling.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Katy · Harris · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"soluna-project-annie-paris-tx","state":"TX","kind":"facility","name":"Soluna Project Annie","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lamar"],"city":"Paris","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. Soluna originalMay22,2025 Annie announcement:75MWDATACENTERproject co-located114MWsolarGEN, not189MWIT. NortheastTexasregion named, exactParis/Lamarparcelunverified. SignedTERM SHEET, definitivePPA/land/ERCOTplanning stillfuture; noexecutedenergizeddelivery.773MWcompanyPIPELINEmixesoperating/construction/development, notoperatingfleet. Queryp15253redirectstoexplicitAnnieURL withsameprojectbody. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.solunacomputing.com/?post_type=news&p=15253","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6609,"lng":-95.5555,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["Soluna originalMay22,2025 Annie announcement:75MWDATACENTERproject co-located114MWsolarGEN, not189MWIT. NortheastTexasregion named, exactParis/Lamarparcelunverified. SignedTERM SHEET, definitivePPA/land/ERCOTplanning stillfuture; noexecutedenergizeddelivery.773MWcompanyPIPELINEmixesoperating/construction/development, notoperatingfleet. Queryp15253redirectstoexplicitAnnieURL withsameprojectbody.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.solunacomputing.com/?post_type=news&p=15253","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Paris · Lamar · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"soluna-project-ellen-rio-hondo-tx","state":"TX","kind":"facility","name":"Soluna Project Ellen","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cameron"],"city":"Rio Hondo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. Soluna originalApril17,2025 Ellen announcement:100MWproject TWO50MWphases included in100, co-located145MWwindGEN not245MWIT. SouthTexasregion only, preciseRioHondolocationunverified. PowerTERM SHEET/definitivePPA/land/ERCOTplanningfuture.698MWmixedcompanypipeline notinstalledcapacity; laterAnnie773includesprojectsnotincremental773new. PowerbasisnotexplicitcriticalIT. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.solunacomputing.com/news/project-ellen-term-sheet/","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":26.2373,"lng":-97.5814,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["Soluna originalApril17,2025 Ellen announcement:100MWproject TWO50MWphases included in100, co-located145MWwindGEN not245MWIT. SouthTexasregion only, preciseRioHondolocationunverified. PowerTERM SHEET/definitivePPA/land/ERCOTplanningfuture.698MWmixedcompanypipeline notinstalledcapacity; laterAnnie773includesprojectsnotincremental773new. PowerbasisnotexplicitcriticalIT.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.solunacomputing.com/news/project-ellen-term-sheet/","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Rio Hondo · Cameron · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"soluna-project-fei-childress-tx","state":"TX","kind":"facility","name":"Soluna Project Fei","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Childress"],"city":"Childress","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Soluna Fei early development and generation separation. 100FeiDCand240solargenerationnot340IT. Gladysseparateproject.1GWportfolioincludesoperating/construction/developmentnotallonline.2.8GWlongtermpowerpipelineisotherbasisnotadditionaloperatingIT. Definitivepower/landagreementsnotyetcompleteinsource. NoexactChildressparcelmatch;48MmetrictonavoidedCO2lifetimeforecastnotactualverifiedemissions. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.solunacomputing.com/news/1gw/","host":"solunacomputing.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.4262,"lng":-100.2013,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Soluna Fei early development and generation separation","fields":{"issuer":"Soluna","release_date":"2025-08-26","project":"Fei","project_region":"northern Texas","planned_data_center_capacity_mw":100,"power_basis":"planned computing/data-center capacity, not explicit critical IT","colocated_solar_generation_mw":240,"developer_stage":"land acquisition, power-contract negotiation and ERCOT planning","separate_gladys_planned_dc_mw":150,"separate_gladys_wind_generation_mw":226},"notes":["100FeiDCand240solargenerationnot340IT. Gladysseparateproject.1GWportfolioincludesoperating/construction/developmentnotallonline.2.8GWlongtermpowerpipelineisotherbasisnotadditionaloperatingIT. Definitivepower/landagreementsnotyetcompleteinsource. NoexactChildressparcelmatch;48MmetrictonavoidedCO2lifetimeforecastnotactualverifiedemissions.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.solunacomputing.com/news/1gw/","host":"solunacomputing.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Childress · Childress · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"soluna-project-grace-silverton-tx","state":"TX","kind":"facility","name":"Soluna Project Grace","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Briscoe"],"city":"Silverton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Soluna Grace pilot versus portfolio totals and timestamp limits. TimestampwithoutyearandpageartifactEDT52notcurrentOct14measurement. Grace2MWseparatefrom123MWportfolio;windgenerationnotextraIT. OtherprojecttablesreuseOperatinglabelwhileRosanarrativeindevelopment;statuslabelsnotuniversallyreliable. NoexactSilvertonsitepointorindependentRFS/certification. Sophie25MWKentuckyandDorothy50/48Texasareotherprojects,notGrace. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.solunacomputing.com/projects/","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.4692,"lng":-101.3082,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Soluna Grace pilot versus portfolio totals and timestamp limits","fields":{"issuer":"Soluna","project":"Grace","state":"Texas","published_pilot_capacity_mw":2,"capacity_basis":"AI/cloud pilot capacity, not explicit critical IT","page_status_label":"Operating","statistics_timestamp_without_year":"8/26at9:51amEDT","portfolio_header_energized_compute_mw":123,"portfolio_header_power_pipeline_gw":2.8},"notes":["TimestampwithoutyearandpageartifactEDT52notcurrentOct14measurement. Grace2MWseparatefrom123MWportfolio;windgenerationnotextraIT. OtherprojecttablesreuseOperatinglabelwhileRosanarrativeindevelopment;statuslabelsnotuniversallyreliable. NoexactSilvertonsitepointorindependentRFS/certification. Sophie25MWKentuckyandDorothy50/48Texasareotherprojects,notGrace.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.solunacomputing.com/projects/","host":"solunacomputing.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Silverton · Briscoe · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"stack-dfw01-plano-tx","state":"TX","kind":"facility","name":"STACK DFW01 (Plano)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Plano","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two named Dallas market campuses. Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.0136764,"lng":-96.6925096,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"two named Dallas market campuses","fields":{"dfw01_plano":{"advertised_total_power_mw":80,"operational_buildings":2,"expansion_capacity_mw":48},"dfw02_lancaster":{"advertised_maximum_power_mw":500,"campus_acres":193},"regional_power_mw":580,"regional_campuses":2,"regional_acres":240},"notes":["Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Plano · Collin · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"stack-dfw02-lancaster-tx","state":"TX","kind":"facility","name":"STACK DFW02 (Lancaster)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Lancaster","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two named Dallas market campuses. Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.5920798,"lng":-96.7561083,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"two named Dallas market campuses","fields":{"dfw01_plano":{"advertised_total_power_mw":80,"operational_buildings":2,"expansion_capacity_mw":48},"dfw02_lancaster":{"advertised_maximum_power_mw":500,"campus_acres":193},"regional_power_mw":580,"regional_campuses":2,"regional_acres":240},"notes":["Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/dallas-fort-worth/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Lancaster · Dallas · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"stargate-abilene-tx","state":"TX","kind":"facility","name":"Stargate Abilene","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Taylor"],"city":"Abilene","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. SarahAsch TexasStandard January26,2026 originalinterview with TexasMonthlyreporter ChristopherCollins: Abileneconstruction/YE2026target, not observedcompletedcampus. CorrectedarticleexplicitlyWITHIN CITY, notunincorporatedassumption.4M sf/1000+acres and3.5Bprojectclaimhistorical;500BnationalStargateoverlapnotAbileneprice.85%10yrpropertytaxabatement reportedagreement, originalunread/not85%alltaxes orcashgrant.6000fluctuatingconstruction/300projectedpermanentjobs not6300netpermanent.4B20yrlocalimpactmodelmethodologyunprovided, notactualcapex. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","host":"texasstandard.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.4487,"lng":-99.7331,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["SarahAsch TexasStandard January26,2026 originalinterview with TexasMonthlyreporter ChristopherCollins: Abileneconstruction/YE2026target, not observedcompletedcampus. CorrectedarticleexplicitlyWITHIN CITY, notunincorporatedassumption.4M sf/1000+acres and3.5Bprojectclaimhistorical;500BnationalStargateoverlapnotAbileneprice.85%10yrpropertytaxabatement reportedagreement, originalunread/not85%alltaxes orcashgrant.6000fluctuatingconstruction/300projectedpermanentjobs not6300netpermanent.4B20yrlocalimpactmodelmethodologyunprovided, notactualcapex.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","host":"texasstandard.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Abilene · Taylor · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"switch-the-rock-round-rock-tx","state":"TX","kind":"facility","name":"Switch: The Rock (Round Rock)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Williamson"],"city":"Round Rock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 185MWnot RoundRock-onlycapacity.60MWand500karea belong acquiredDataFoundryproperties. Announced2021sitework not currentdeliveredstatus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/","host":"switch.com","date":"2021-06-02","published":"2021-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.4880189,"lng":-97.6725256,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"historical_planned_round_rock_area_sqft_min_exclusive":1500000,"historical_site_preparation_target":"2021summer","regional_power_mw":185,"regional_power_scope":"Texas ecosystem including acquired Austin and Houston properties"},"notes":["185MWnot RoundRock-onlycapacity.60MWand500karea belong acquiredDataFoundryproperties. Announced2021sitework not currentdeliveredstatus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/","host":"switch.com","date":"2021-06-02","published":"2021-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"corporate energy context only","fields":{},"notes":["Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Round Rock · Williamson · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"tesla-cortex-2-giga-texas-austin-tx","state":"TX","kind":"facility","name":"Tesla Cortex 2.0 AI Training Cluster (Giga Texas)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Travis"],"city":"Austin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Late 2025/early 2026 operation and expansion through 2026 were forecasts, not observed current RFS. NoGPU count orMW for Cortex 2 is established. Cortex 1’s 50,000 H 100 deployment/350,000 aspiration and xAIColossus 200,000/one-million plans are separate clusters and cannot size Cortex 2 or identify its tenant contracts. Robotaxi/Optimus expected business use is not an independently verified physical capacity. Main retained body read after automated related-story selection was corrected. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://interestingengineering.com/innovation/tesla-supercomputer-cortex-2-texas","host":"interestingengineering.com","date":"2025-05-15","published":"2025-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.2223,"lng":-97.6171,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Interesting Engineering describes reported construction of Tesla Cortex 2 on the north side of GigaTexas, relying on observer/social reporting and a Teslarati account.","independently_verified_current_operating_status":null},"notes":["Late 2025/early 2026 operation and expansion through 2026 were forecasts, not observed current RFS. NoGPU count orMW for Cortex 2 is established. Cortex 1’s 50,000 H 100 deployment/350,000 aspiration and xAIColossus 200,000/one-million plans are separate clusters and cannot size Cortex 2 or identify its tenant contracts. Robotaxi/Optimus expected business use is not an independently verified physical capacity. Main retained body read after automated related-story selection was corrected.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://interestingengineering.com/innovation/tesla-supercomputer-cortex-2-texas","host":"interestingengineering.com","date":"2025-05-15","published":"2025-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Austin · Travis · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"tcdc-ector-county-tx","state":"TX","kind":"facility","name":"Texas Critical Data Centers (TCDC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ector"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Sharon TCDC historical engineering, LOI land and power stage. 235securedplus203nonbindingLOI=438POTENTIALnot438closedland.250gasgenerationnotITnoradditionalto1GWmasterplan. Power/land/fiberlettersnonbindingnotexecutedfirmcapacity. Airpermitbeingobtainednotissued;initialfeasibilitynotallregulatoryapproval. UpdatedNewErahomepage492/493acand1.4GWlaterdifferentstage,do notmergeundatedscopesasonecurrentfact. Carboncredits/digitalcertificatesnotzeroactualonsiteemissions. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sharonai.com/press-releases/sharon-ai-completes-phase-one-engineering-for-flagship-ai-data-center-campus-joint-venture-in-texas/","host":"sharonai.com","date":"2025-09-30","published":"2025-09-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.87,"lng":-102.54,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Sharon TCDC historical engineering, LOI land and power stage","fields":{"issuer":"Sharon AI","project":"Texas Critical Data Centers, Ector County, Texas","report_date":"2025-09-30","joint_venture_partner":"New Era Energy and Digital","reported_jv_ownership_percent_each":50,"already_secured_land_acres":235,"additional_land_acres_under_nonbinding_loi":203,"potential_combined_land_acres":438,"planned_power_capacity_gw":1,"power_basis":"ultimate power, not explicit IT","nonbinding_gas_generation_letter_mw":250,"generator_deployment_target_duration_months":18,"deployment_condition":"endcustomer offtake","reported_engineering_stage":"phase1complete, phase2commenced"},"notes":["235securedplus203nonbindingLOI=438POTENTIALnot438closedland.250gasgenerationnotITnoradditionalto1GWmasterplan. Power/land/fiberlettersnonbindingnotexecutedfirmcapacity. Airpermitbeingobtainednotissued;initialfeasibilitynotallregulatoryapproval. UpdatedNewErahomepage492/493acand1.4GWlaterdifferentstage,do notmergeundatedscopesasonecurrentfact. Carboncredits/digitalcertificatesnotzeroactualonsiteemissions.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sharonai.com/press-releases/sharon-ai-completes-phase-one-engineering-for-flagship-ai-data-center-campus-joint-venture-in-texas/","host":"sharonai.com","date":"2025-09-30","published":"2025-09-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Ector · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"tierpoint-dallas-tx","state":"TX","kind":"facility","name":"TierPoint Dallas","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dallas"],"city":"Dallas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.8079818,"lng":-96.8573889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":68000,"gross_area_is_lower_bound":true,"raised_floor_sqft":51000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Six 2.0 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Dallas · Dallas · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"tierpoint-dallas-allen-tx","state":"TX","kind":"facility","name":"TierPoint Dallas-Allen","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Collin"],"city":"Allen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas-allen/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.1379102,"lng":-96.657329,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":29000,"gross_area_is_lower_bound":true,"raised_floor_sqft":16000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2 MW redundant generators and one 1 MW generator","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/texas/dallas-allen/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Allen · Collin · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"tract-caldwell-valley-uhland-tx","state":"TX","kind":"facility","name":"Tract Caldwell Valley Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caldwell"],"city":"Uhland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Corrected named-site crosswalk; source does not verify PowerHouse Uhland.. Water1.5-to16.6MGDisMinnesotaproxy, notTexasdisclosure; missingreturnflowisnot100percentconsumption. Originalutilitycontract,sitepermits,currentconstructionandwaterplanunreviewed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. Automaticexcerptselectedunrelatedrealestatestory;actualmainbodyread.800jobsarefullbuildoutforecast,nothires.4GWpotentialnotadditive2plus4orcriticalIT/contractedservice. Initial360notobserveduse. Closed-loopwaterefficiencyintentionnotgallonallocation/zerowater. No-incentiverequestclaimsdatedMay2025city/countyonly,notalltimeallgovernmentawardabsence. NeighborUSD4billionPrimeprojectisnotTract/PowerHouse. USD1.7billionfundraise25GWportfolioandPhoenix20billionnotCaldwellcapex. Later2026landexpansionrequireseparatesource.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://centexdatacenters.org/projects/tract-caldwell-county","host":"centexdatacenters.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/","host":"muskin-elam.com","date":"2025-05-08","published":"2025-05-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":29.9499,"lng":-97.7889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Corrected named-site crosswalk; source does not verify PowerHouse Uhland.","fields":{"reported_context":"Tracker describes Tract Caldwell Valley land expansion inJanuary2026 toward2973acres and4GWultimate masterplan; initial360MWdesign and250MWcontracted timeline conflict in scope.","critical_it_mw":null,"verified_texas_water_use_gpd":null},"notes":["Water1.5-to16.6MGDisMinnesotaproxy, notTexasdisclosure; missingreturnflowisnot100percentconsumption. Originalutilitycontract,sitepermits,currentconstructionandwaterplanunreviewed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://centexdatacenters.org/projects/tract-caldwell-county","host":"centexdatacenters.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.","fields":{"reported_context":"Public MuskinElam syndication ofJustinSayers/AustinBusinessJournal reporting quotesTractCIO:1515acresacquired,initial360MWplanned2028,2GWconservativeandapproximately4GWconditionalonrighton-siteenergymixovertenyears. HorizontalinfrastructureestimatedUSD50-to100million;fullcapexnotreleased.","independently_verified_current_operating_status":null},"notes":["Automaticexcerptselectedunrelatedrealestatestory;actualmainbodyread.800jobsarefullbuildoutforecast,nothires.4GWpotentialnotadditive2plus4orcriticalIT/contractedservice. Initial360notobserveduse. Closed-loopwaterefficiencyintentionnotgallonallocation/zerowater. No-incentiverequestclaimsdatedMay2025city/countyonly,notalltimeallgovernmentawardabsence. NeighborUSD4billionPrimeprojectisnotTract/PowerHouse. USD1.7billionfundraise25GWportfolioandPhoenix20billionnotCaldwellcapex. Later2026landexpansionrequireseparatesource.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/","host":"muskin-elam.com","date":"2025-05-08","published":"2025-05-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Uhland · Caldwell · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"vantage-frontier-shackelford-county-tx","state":"TX","kind":"facility","name":"Vantage Frontier Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shackelford"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","host":"vantage-dc.com","date":"2025-08-19","published":"2025-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.7272,"lng":-99.2987,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_investment_usd_min_exclusive":25000000000,"planned_gpu_compute_capacity_gw":1.4,"campus_acres":1200,"planned_buildings":10,"planned_area_sqft":3700000,"construction_stage_at_release":"begun","first_building_delivery_target":"2026-H2","forecast_jobs_construction_and_operations_min_exclusive":5000},"notes":["Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","host":"vantage-dc.com","date":"2025-08-19","published":"2025-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · Shackelford · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"beacon-westline-dove-creek-san-angelo-tx","state":"TX","kind":"facility","name":"Westline Site / Dove Creek Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tom Green"],"city":"San Angelo (Tankersley area, unincorporated)","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. Will McDaniel, Concho Observer, June26,2026 report identifies Beacon/Westline and links the original TCEQ plain-language application summary. Its claim of about1177tons/year CARBON DIOXIDE conflicts with the original table, which labels1177.2 as CARBON MONOXIDE. Do not copy CO2, gasoline/coal equivalents or the internally inconsistent concrete-volume analogy. Narrative permit-will-authorize wording describes application purpose, not an issued construction permit. Expedited review and lawyer jurisdiction assertions do not establish final approval or current legal authority. Original summary is reviewed separately below. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification. Lucas Banda, San Angelo LIVE, June2,2026 original meeting report says commissioners chose NOT TO ADVANCE proposed12month Precinct4 moratorium. This is not a countywide enacted moratorium, project approval, or independent current legal opinion. Draft thresholds5MW storage/generation and1000sf data-center area were not enacted by this vote. Original minutes/road-use contract unread. Developer describes about1240buildable acres near FM2335/US67, spring/summer2027 start and2-4year construction,1200construction/300+operations-maintenance jobs. All plans/forecasts, not actual spending, hiring or delivered IT. Closed-loop, potable well and possible desalination do not mean zero water; claims of no rate effects/noise mitigation are unverified promises. Backup grid/coordination in interview differs from no-grid-reliance wording in application; no executed connection/ESA inspected. Original TCEQ-hosted public application summary, English page1 of2 visually read; Spanish page2 not read. Westline TX Holdings LLC, CN606525921, Westline2335 RN112471305; initial permit applications184380/GHGPSDTX275/PSDTX1710. Location FM2335 about0.25mi south ofUS67, Tom Green County. No exact surveyed parcel inferred. It explicitly describes submitted APPLICATION/PROPOSED annual emissions, onsite natural-gas RICE generation and diesel outage generators, with expedited PROCESSING. It is not an issued permit, current measured emissions or critical IT capacity. CO is1177.2tons/year; CO2 is NOT quantified in this table. Particulate total, PM10 andPM2.5 overlap and must not be added. SCR/oxidation systems and fuel descriptions are proposed mitigation, not inspected compliance. No PDF text/OCR extracted.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","host":"conchoobserver.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://sanangelolive.com/news/county/2026-06-02/tom-green-county-commissioners-reject-data-center-moratorium","host":"sanangelolive.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf","host":"tceq.texas.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.335,"lng":-100.478,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Will McDaniel, Concho Observer, June26,2026 report identifies Beacon/Westline and links the original TCEQ plain-language application summary. Its claim of about1177tons/year CARBON DIOXIDE conflicts with the original table, which labels1177.2 as CARBON MONOXIDE. Do not copy CO2, gasoline/coal equivalents or the internally inconsistent concrete-volume analogy.","Narrative permit-will-authorize wording describes application purpose, not an issued construction permit. Expedited review and lawyer jurisdiction assertions do not establish final approval or current legal authority. Original summary is reviewed separately below.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","host":"conchoobserver.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Lucas Banda, San Angelo LIVE, June2,2026 original meeting report says commissioners chose NOT TO ADVANCE proposed12month Precinct4 moratorium. This is not a countywide enacted moratorium, project approval, or independent current legal opinion. Draft thresholds5MW storage/generation and1000sf data-center area were not enacted by this vote. Original minutes/road-use contract unread.","Developer describes about1240buildable acres near FM2335/US67, spring/summer2027 start and2-4year construction,1200construction/300+operations-maintenance jobs. All plans/forecasts, not actual spending, hiring or delivered IT. Closed-loop, potable well and possible desalination do not mean zero water; claims of no rate effects/noise mitigation are unverified promises. Backup grid/coordination in interview differs from no-grid-reliance wording in application; no executed connection/ESA inspected.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://sanangelolive.com/news/county/2026-06-02/tom-green-county-commissioners-reject-data-center-moratorium","host":"sanangelolive.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Original TCEQ-hosted public application summary, English page1 of2 visually read; Spanish page2 not read. Westline TX Holdings LLC, CN606525921, Westline2335 RN112471305; initial permit applications184380/GHGPSDTX275/PSDTX1710. Location FM2335 about0.25mi south ofUS67, Tom Green County. No exact surveyed parcel inferred.","It explicitly describes submitted APPLICATION/PROPOSED annual emissions, onsite natural-gas RICE generation and diesel outage generators, with expedited PROCESSING. It is not an issued permit, current measured emissions or critical IT capacity. CO is1177.2tons/year; CO2 is NOT quantified in this table. Particulate total, PM10 andPM2.5 overlap and must not be added. SCR/oxidation systems and fuel descriptions are proposed mitigation, not inspected compliance. No PDF text/OCR extracted.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf","host":"tceq.texas.gov","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Texas · San Angelo (Tankersley area, unincorporated) · Tom Green · Source context reviewed","state_name":"Texas","state_path":"/texas/"},{"id":"aligned-west-jordan-ut","state":"UT","kind":"facility","name":"Aligned Salt Lake City Campus (SLC-01/02/03)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"West Jordan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Groupthreebuildingsincampus;donottripleland. General incentive eligibility is not award. No site-specificMW established. Operator listsSLC01/02/03shared55acrecampus andSLC04differentWestValleyCityaddress. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/salt-lake-city-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.5861,"lng":-111.96973,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"3333 W9000S","city":"West Jordan","campus_acres":55},"notes":["Groupthreebuildingsincampus;donottripleland.","General incentive eligibility is not award.","No site-specificMW established.","Operator listsSLC01/02/03shared55acrecampus andSLC04differentWestValleyCityaddress.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/salt-lake-city-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · West Jordan · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"aligned-west-valley-city-ut","state":"UT","kind":"facility","name":"Aligned SLC-04","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"West Valley City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The release mentions roughly 270 MW of company planned development in 2022, not the SLC-04 facility size. No exact facility MW is established. Historic completion does not independently verify current 2026 utilization. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/press-release/aligned-completes-phase-i-of-build-to-scale-salt-lake-metro-data-center/","host":"aligneddc.com","date":"2022-02-04","published":"2022-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.71498,"lng":-112.05576,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"historical_status_event":"SLC-04 first-phase completion announced","event_date":"2022-02-04"},"notes":["The release mentions roughly 270 MW of company planned development in 2022, not the SLC-04 facility size. No exact facility MW is established. Historic completion does not independently verify current 2026 utilization.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/press-release/aligned-completes-phase-i-of-build-to-scale-salt-lake-metro-data-center/","host":"aligneddc.com","date":"2022-02-04","published":"2022-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · West Valley City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"pronghorn-antelope-cedar-city-ut","state":"UT","kind":"facility","name":"Antelope Data Center (Project Antelope)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Iron"],"city":"Cedar City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Iron County Antelope discussion and outstanding water rights. Meeting minutes do not grant CUP or water withdrawal rights. Entire 640-acre parcel is not established as campus footprint. Applicant water estimates changed with projected staffing; figures are forecasts and conflict with a separately discussed example, so no single measured water figure adopted. CUP discussion is separate from any UIPA incentives and other state/federal permits. County statement about gas bills is not an independently verified rate guarantee. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://secure.utah.gov/pmn-admin/files/1431597.pdf","host":"secure.utah.gov","date":"2026-04-02","published":"2026-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.6775,"lng":-113.0619,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Iron County Antelope discussion and outstanding water rights","fields":{"meeting_date":"2026-04-02","agenda_project":"Antelope Data Center","meeting_stage":"discussion only; no action, public hearing or public comment","proposed_land_scope":"portion of a 640-acre parcel","applicant_reported_power_mode":"own natural-gas supply, not connection to local supply lines","county_reported_water_rights_status":"applicant did not yet hold water rights","potential_source_basin":"Beryl/Escalante Water Basin","required_water_rights_priority_year_max":1945},"notes":["Meeting minutes do not grant CUP or water withdrawal rights. Entire 640-acre parcel is not established as campus footprint. Applicant water estimates changed with projected staffing; figures are forecasts and conflict with a separately discussed example, so no single measured water figure adopted. CUP discussion is separate from any UIPA incentives and other state/federal permits. County statement about gas bills is not an independently verified rate guarantee.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://secure.utah.gov/pmn-admin/files/1431597.pdf","host":"secure.utah.gov","date":"2026-04-02","published":"2026-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Cedar City · Iron · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"blusky-ai-delta-millard-county-ut","state":"UT","kind":"facility","name":"BluSky AI Delta Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Millard"],"city":"Delta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. BluSky originalGlobeNewswire July29,2025 syndicatedbyManilaTimes: NONBINDINGLOI for25acres/up50MW atCreekstoneDelta. Definitive documents/closing stillfuture, expectedQ4then/late2026groundbreaking. Not completedlandpurchase/PPA/ITenergization. CreekstonebroaderDeltaGigasite notallBluSkyownedIT. Milford51.6acre/9.3MW isSEPARATEproject. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.manilatimes.net/2025/07/29/tmt-newswire/globenewswire/blusky-ai-inc-signs-letter-of-intent-to-acquire-25-acres-with-up-to-50-mw-of-capacity-in-strategic-expansion/2158223","host":"manilatimes.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.3502,"lng":-112.5766,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["BluSky originalGlobeNewswire July29,2025 syndicatedbyManilaTimes: NONBINDINGLOI for25acres/up50MW atCreekstoneDelta. Definitive documents/closing stillfuture, expectedQ4then/late2026groundbreaking. Not completedlandpurchase/PPA/ITenergization. CreekstonebroaderDeltaGigasite notallBluSkyownedIT. Milford51.6acre/9.3MW isSEPARATEproject.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.manilatimes.net/2025/07/29/tmt-newswire/globenewswire/blusky-ai-inc-signs-letter-of-intent-to-acquire-25-acres-with-up-to-50-mw-of-capacity-in-strategic-expansion/2158223","host":"manilatimes.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Delta · Millard · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"blusky-ai-milford-ut","state":"UT","kind":"facility","name":"BluSky AI Milford Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Beaver"],"city":"Milford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. BluSky originalJuly8,2025 issuer release: June30definitiveDAM power-assignment agreement9.3MWgridinterconnectedrights, paid20Mrestrictedshares; no USDvaluecomputedfromsharecount. GroundLEASE51.6acres with purchaseOPTION, two-yearinitialterm/90kannualaccruingrent, notlandpurchase. Title operational site doesnot prove AIcomputecommissioned.9.3MWcontractedpower notexplicitIT. CentralUtahheadline versusMilfordbody: noexactparcelverified. Underlyingagreements/ESA/currentloadunread; no guaranteedall-inrate fromhighlycompetitivedescription. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.manilatimes.net/2025/07/08/tmt-newswire/globenewswire/blusky-ai-inc-secures-first-site-with-93mw-to-launch-flagship-data-center-in-central-utah/2145520","host":"manilatimes.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.3936,"lng":-113.0111,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["BluSky originalJuly8,2025 issuer release: June30definitiveDAM power-assignment agreement9.3MWgridinterconnectedrights, paid20Mrestrictedshares; no USDvaluecomputedfromsharecount. GroundLEASE51.6acres with purchaseOPTION, two-yearinitialterm/90kannualaccruingrent, notlandpurchase.","Title operational site doesnot prove AIcomputecommissioned.9.3MWcontractedpower notexplicitIT. CentralUtahheadline versusMilfordbody: noexactparcelverified. Underlyingagreements/ESA/currentloadunread; no guaranteedall-inrate fromhighlycompetitivedescription.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.manilatimes.net/2025/07/08/tmt-newswire/globenewswire/blusky-ai-inc-secures-first-site-with-93mw-to-launch-flagship-data-center-in-central-utah/2145520","host":"manilatimes.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Milford · Beaver · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"blusky-ai-nephi-ut","state":"UT","kind":"facility","name":"BluSky AI Nephi SkyMod Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Juab"],"city":"Nephi","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unrelated redevelopment fund hold. CRA fund page describes hotel development incentives, not BluSky AI. No project-specific site, incentive award, construction or capacity finding adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.. LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nephi.utah.gov/690/CRA-Fund","host":"nephi.utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/","host":"gazette.com","date":"2026-03-28","published":"2026-03-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.71023,"lng":-111.83632,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unrelated redevelopment fund hold","fields":{},"notes":["CRA fund page describes hotel development incentives, not BluSky AI. No project-specific site, incentive award, construction or capacity finding adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nephi.utah.gov/690/CRA-Fund","host":"nephi.utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.","fields":{"reported_context":"Gazette quotes Nephi administrator saying four-MW project functionally approved with building permits awaiting pickup; no commissioned operation established","independently_verified_current_operating_status":null},"notes":["LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/","host":"gazette.com","date":"2026-03-28","published":"2026-03-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Nephi · Juab · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"cirrus-data-services-midvale-ut","state":"UT","kind":"facility","name":"CirrusDS View 78 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Midvale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. generic redevelopment source hold. Generic Midvale RDA history, budgets and tax-increment framework do not identify Cirrus Data Services. 1982is agency establishment, not facility opening. City offices not facility address. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.midvale.utah.gov/government/departments/redevelopment_agency/index.php","host":"midvale.utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.6111,"lng":-111.8994,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"generic redevelopment source hold","fields":{},"notes":["Generic Midvale RDA history, budgets and tax-increment framework do not identify Cirrus Data Services. 1982is agency establishment, not facility opening. City offices not facility address.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.midvale.utah.gov/government/departments/redevelopment_agency/index.php","host":"midvale.utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Midvale · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"creekstone-delta-ut","state":"UT","kind":"facility","name":"Creekstone Energy Delta Gigasite","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Millard"],"city":"Delta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 10GW ultimate company aim with integrated generation, not verified IT load or current capacity. 50percent post-performance reduction is not upfront grant or172Mpaid. Exact executed agreement and actual tax performance not reviewed. No evaporative cooling claim does not mean zero domestic water or zero emissions. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/","host":"business.utah.gov","date":"2026-04-09","published":"2026-04-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3527,"lng":-112.5777,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"government_tax_incentive_announcement":"2026-04-09","planned_investment_usd":17082408000,"investment_timeline_years":20,"expected_new_jobs":106,"tax_program":"post-performance REDTIF","announced_credit_rate_percent":50,"projected_new_state_tax_revenue_usd":344381185,"operator_full_build_capacity_goal_gw":10,"construction_start_qualified_period":"late2025"},"notes":["10GW ultimate company aim with integrated generation, not verified IT load or current capacity. 50percent post-performance reduction is not upfront grant or172Mpaid. Exact executed agreement and actual tax performance not reviewed. No evaporative cooling claim does not mean zero domestic water or zero emissions.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/","host":"business.utah.gov","date":"2026-04-09","published":"2026-04-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Delta · Millard · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"databank-granite-point-bluffdale-ut","state":"UT","kind":"facility","name":"DataBank Granite Point Campus (SLC2-SLC6)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Bluffdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical Salt Lake market, individual sections retained. 2021market blog. Substation and individual site onsite-power labels are different bases; no summed current campus load or completedSLC6inferred. SLC1downtown and GranitePoint are separate geographies. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. historical program statement only. Historical marketing explanation, not current statute review, an awarded cash benefit or evidence that all campus buildings qualify. Advertised7.25percent saving is not adopted as a current rate.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/resources/blogs/get-to-know-databanks-salt-lake-city-data-centers/","host":"databank.com","date":"2021-09-09","published":"2021-09-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.databank.com/resources/blogs/tax-incentives-add-to-attractiveness-of-databanks-salt-lake-data-centers/","host":"databank.com","date":"2021-02-02","published":"2021-02-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.48568,"lng":-111.90016,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"historical Salt Lake market, individual sections retained","fields":{"historical_granite_point_campus_acres":23,"historical_substation_capacity_mw":66,"historical_site_sections":[{"code":"SLC1","address":"179 E Social Hall Ave, Salt Lake City","area_sqft":11000,"onsite_power_mw":1},{"code":"SLC2","address":"14944 Pony Express Road, Bluffdale, UT","area_sqft":45000,"onsite_power_mw":10},{"code":"SLC3","address":"14926 Pony Express Road, Bluffdale, UT","area_sqft":53000,"onsite_power_mw":10},{"code":"SLC4","address":"14860 Pony Express Road, Bluffdale, UT","area_sqft":34000,"onsite_power_mw":9},{"code":"SLC5","address":"14870 Pony Express Road, Bluffdale, UT","area_sqft":90000,"onsite_power_mw":20}],"slc6_stage_at_source":"in development"},"notes":["2021market blog. Substation and individual site onsite-power labels are different bases; no summed current campus load or completedSLC6inferred. SLC1downtown and GranitePoint are separate geographies.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/blogs/get-to-know-databanks-salt-lake-city-data-centers/","host":"databank.com","date":"2021-09-09","published":"2021-09-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"historical program statement only","fields":{"historical_operator_tax_program_statement":"Utah2020change applied to SLC3, SLC4 and SLC5 equipment"},"notes":["Historical marketing explanation, not current statute review, an awarded cash benefit or evidence that all campus buildings qualify. Advertised7.25percent saving is not adopted as a current rate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/blogs/tax-incentives-add-to-attractiveness-of-databanks-salt-lake-data-centers/","host":"databank.com","date":"2021-02-02","published":"2021-02-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Bluffdale · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"databank-slc1-salt-lake-city-ut","state":"UT","kind":"facility","name":"DataBank SLC1 (Salt Lake City Carrier Hotel)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Salt Lake City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical Salt Lake market, individual sections retained. 2021market blog. Substation and individual site onsite-power labels are different bases; no summed current campus load or completedSLC6inferred. SLC1downtown and GranitePoint are separate geographies. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/resources/blogs/get-to-know-databanks-salt-lake-city-data-centers/","host":"databank.com","date":"2021-09-09","published":"2021-09-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.76852,"lng":-111.88585,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"historical Salt Lake market, individual sections retained","fields":{"historical_granite_point_campus_acres":23,"historical_substation_capacity_mw":66,"historical_site_sections":[{"code":"SLC1","address":"179 E Social Hall Ave, Salt Lake City","area_sqft":11000,"onsite_power_mw":1},{"code":"SLC2","address":"14944 Pony Express Road, Bluffdale, UT","area_sqft":45000,"onsite_power_mw":10},{"code":"SLC3","address":"14926 Pony Express Road, Bluffdale, UT","area_sqft":53000,"onsite_power_mw":10},{"code":"SLC4","address":"14860 Pony Express Road, Bluffdale, UT","area_sqft":34000,"onsite_power_mw":9},{"code":"SLC5","address":"14870 Pony Express Road, Bluffdale, UT","area_sqft":90000,"onsite_power_mw":20}],"slc6_stage_at_source":"in development"},"notes":["2021market blog. Substation and individual site onsite-power labels are different bases; no summed current campus load or completedSLC6inferred. SLC1downtown and GranitePoint are separate geographies.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/blogs/get-to-know-databanks-salt-lake-city-data-centers/","host":"databank.com","date":"2021-09-09","published":"2021-09-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Salt Lake City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"dcpc-mona-juab-county-ut","state":"UT","kind":"facility","name":"DCPC Data Center Campus (north of Mona)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Juab"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Historical notice not hearing outcome or approved permit. Third printed identifierXB00-1412- ends with a hyphen; completeness unverified in parcel registry and no guessed suffix appended. Hearing venue is not data-center address. No ITMW, capital amount, current operating proof or researched parcel coordinate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://juabcounty.gov/notice-public-hearing-notice-conditional-use-permit-made-by-dcpc/","host":"juabcounty.gov","date":"2024-11-06","published":"2024-11-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.8895,"lng":-111.862,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"historical_public_hearing_scheduled_date":"2024-11-20","historical_public_hearing_local_time":"19:00","historical_hearing_venue":"Juab County Commission Chambers,160NMain,Nephi,Utah","applicant":"DCPC","public_parcel_identifiers_complete":["XB00-1436-1","XB00-1436-2"],"power_mode_proposed":"island power"},"notes":["Historical notice not hearing outcome or approved permit. Third printed identifierXB00-1412- ends with a hyphen; completeness unverified in parcel registry and no guessed suffix appended. Hearing venue is not data-center address. No ITMW, capital amount, current operating proof or researched parcel coordinate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://juabcounty.gov/notice-public-hearing-notice-conditional-use-permit-made-by-dcpc/","host":"juabcounty.gov","date":"2024-11-06","published":"2024-11-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Juab · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"summit-group-holdings-dog-valley-juab-county-ut","state":"UT","kind":"facility","name":"Dog Valley Data Center (McWilliams/Sperry rezone)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Juab"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Juab separate Summit rezoning recommendation and DCPC additional parcel permits. Summit vote is a recommendation, not final county rezoning, CUP, or opening. Separate DCPC permit votes must not be assigned to Summit. Developer jobs and construction timeframe are forecasts. DCPC two-building area wording is ambiguous about combined versus per-building area, so no numeric building-area field adopted. Stale Minutes 9/17/2025 heading on page 4 does not override explicit November19 cover and meeting date. Water and tax claims remain attributed proposals, not measured usage or guaranteed revenue. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf","host":"juabcounty.gov","date":"2025-11-19","published":"2025-11-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.609,"lng":-112.0136,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Juab separate Summit rezoning recommendation and DCPC additional parcel permits","fields":{"meeting_date":"2025-11-19","summit_project_applicant_representative":"Summit Group Holdings, Ryan Matthews","summit_zone_change_landowners":["Jim McWilliams","Mike Sperry"],"summit_planning_recommendation":"recommend county commission approve zone change","summit_recommendation_vote":{"for":3,"against":2},"summit_developer_forecast_permanent_jobs_min":75,"summit_developer_forecast_permanent_jobs_max":100,"summit_developer_forecast_buildout_years":"5 to 10 or longer","separate_dcpc_outcomes":[{"property":"Kay","action":"Planning Commission approved additional conditional use permit with original conditions","vote":"unanimous"},{"property":"Young Living","action":"Planning Commission approved additional conditional use permit with original conditions","vote":"unanimous"}]},"notes":["Summit vote is a recommendation, not final county rezoning, CUP, or opening. Separate DCPC permit votes must not be assigned to Summit. Developer jobs and construction timeframe are forecasts. DCPC two-building area wording is ambiguous about combined versus per-building area, so no numeric building-area field adopted. Stale Minutes 9/17/2025 heading on page 4 does not override explicit November19 cover and meeting date. Water and tax claims remain attributed proposals, not measured usage or guaranteed revenue.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf","host":"juabcounty.gov","date":"2025-11-19","published":"2025-11-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Juab · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"edgeconnex-west-valley-city-ut","state":"UT","kind":"facility","name":"EdgeConneX SLC01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"West Valley City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 500kW current offering and2MW planned are nested; no measured load or expansion delivery inferred. Anomalous SOC2Type17 source text not adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edgeconnex.com/wp-content/uploads/2024/09/Salt-Lake-City-Data-Sheet.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.69679,"lng":-111.9867,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"facility":"SLC01","published_address":"2302 South President’s Dr., SuiteA/B, West Valley City, UT84120","facility_area_sqft":25000,"raised_floor_sqft":4875,"advertised_power_kw":500,"planned_scalable_power_mw":2,"power_basis":"Source N+1 power; not independently defined as utility versus critical IT."},"notes":["500kW current offering and2MW planned are nested; no measured load or expansion delivery inferred. Anomalous SOC2Type17 source text not adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edgeconnex.com/wp-content/uploads/2024/09/Salt-Lake-City-Data-Sheet.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · West Valley City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"edged-bluffdale-ut","state":"UT","kind":"facility","name":"Edged Salt Lake City Data Center (Project Inabi)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Bluffdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical planning agenda with exact item distinction. Agenda scheduled consideration and vote, not outcome. The public-hearing label applies to a different hot-springs item, not data center item5. City Hall is meeting venue, not project site. Attachment posting2024notproject opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/sitemap/notice/876505.html","host":"utah.gov","date":"2023-12-04","published":"2023-12-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.488,"lng":-111.905,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical planning agenda with exact item distinction","fields":{"proposed_project_name":"Project Inabi Edged Data Center","site_acres":22.91,"published_site_location":"600 West Bluffdale Boulevard,14600South,Bluffdale,Utah","planning_site_plan_consideration_scheduled_date":"2023-12-06"},"notes":["Agenda scheduled consideration and vote, not outcome. The public-hearing label applies to a different hot-springs item, not data center item5. City Hall is meeting venue, not project site. Attachment posting2024notproject opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/sitemap/notice/876505.html","host":"utah.gov","date":"2023-12-04","published":"2023-12-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Bluffdale · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"fibernet-orem-ut","state":"UT","kind":"facility","name":"Fibernet Orem Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Orem","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unrelated municipal minutes source hold. OremMay14,2019minutes concern restaurant/car-dealership landexchange andother municipalRDAactions; no Fibernet/Voonamifacility match established. Cityagencyagreements not automatic datacenterincentives. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/files/498543.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.27619,"lng":-111.67595,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unrelated municipal minutes source hold","fields":{},"notes":["OremMay14,2019minutes concern restaurant/car-dealership landexchange andother municipalRDAactions; no Fibernet/Voonamifacility match established. Cityagencyagreements not automatic datacenterincentives.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/498543.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Orem · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"fiberstate-draper-ut","state":"UT","kind":"facility","name":"FiberState SLC1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Draper","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. municipal annual report crosswalk hold. DraperFY2022municipalACFRcover and textsearch do not establish Fiberstate siteidentity or incentive. Citywidefinancialaccounts notsiteinvestment,ITcapacity or operatingproof. Noabsenceclaim based only on unmatchedcompanyname. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.draperutah.gov/media/sfkbgezm/acfr-fy22-draper-city.pdf","host":"draperutah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.52478,"lng":-111.8628,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"municipal annual report crosswalk hold","fields":{},"notes":["DraperFY2022municipalACFRcover and textsearch do not establish Fiberstate siteidentity or incentive. Citywidefinancialaccounts notsiteinvestment,ITcapacity or operatingproof. Noabsenceclaim based only on unmatchedcompanyname.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.draperutah.gov/media/sfkbgezm/acfr-fy22-draper-city.pdf","host":"draperutah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Draper · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"flexential-cottonwood-heights-ut","state":"UT","kind":"facility","name":"Flexential Cottonwood","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Cottonwood Heights","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched redevelopment financial analysis hold. CanyonCentreCDAanalysis datedFebruary20,2024doesnotestablish FlexentialCottonwood orRegence data-center identity/award. Redevelopmentmodel notsite-specific certifiedincentive orpower. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/files/1088841.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.61347,"lng":-111.82565,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment financial analysis hold","fields":{},"notes":["CanyonCentreCDAanalysis datedFebruary20,2024doesnotestablish FlexentialCottonwood orRegence data-center identity/award. Redevelopmentmodel notsite-specific certifiedincentive orpower.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/1088841.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Cottonwood Heights · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"flexential-salt-lake-city-downtown-ut","state":"UT","kind":"facility","name":"Flexential Salt Lake City - Downtown","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Salt Lake City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched redevelopment context hold. Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cra.slc.gov/project-areas/","host":"cra.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7563065,"lng":-111.9548375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment context hold","fields":{},"notes":["Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cra.slc.gov/project-areas/","host":"cra.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Salt Lake City - Downtown","publisher_reported_footprint_sqft":44550,"publisher_reported_critical_power_mw":2.65,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Salt Lake City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"flexential-salt-lake-city-fair-park-ut","state":"UT","kind":"facility","name":"Flexential Salt Lake City - Fair Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Salt Lake City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched redevelopment context hold. Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rda.slc.gov/projects/north-temple-project-area/","host":"rda.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7667963,"lng":-111.9202947,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment context hold","fields":{},"notes":["Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rda.slc.gov/projects/north-temple-project-area/","host":"rda.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Salt Lake City - Fair Park","publisher_reported_footprint_sqft":22539,"publisher_reported_critical_power_mw":0.49,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false,"original_power_value":{"value":490,"unit":"kW","conversion":"490 / 1000 = 0.49 MW"}},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Salt Lake City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"flexential-salt-lake-city-lindon-ut","state":"UT","kind":"facility","name":"Flexential Salt Lake City - Lindon","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Lindon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched scanned municipal packet hold. 225pagescannedLindonMarch16,2026councilstaff/financialpacket OCRscreened; noFlexential/ViaWest/data-center match established. Agenda/annualfinancialaudit/budget schedules notsite-specific incentiveorcapacity. NoabsenceofsiteconcludedfromnonmatchingOCR. Full7MBpublicPDFrecoveredafter4MBtruncation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/files/1403855.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.332648,"lng":-111.7278754,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched scanned municipal packet hold","fields":{},"notes":["225pagescannedLindonMarch16,2026councilstaff/financialpacket OCRscreened; noFlexential/ViaWest/data-center match established. Agenda/annualfinancialaudit/budget schedules notsite-specific incentiveorcapacity. NoabsenceofsiteconcludedfromnonmatchingOCR. Full7MBpublicPDFrecoveredafter4MBtruncation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/1403855.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Lindon · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"flexential-salt-lake-city-millcreek-ut","state":"UT","kind":"facility","name":"Flexential Salt Lake City - Millcreek","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Salt Lake City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched redevelopment context hold. Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.millcreekut.gov/208/Community-Reinvestment-Agency","host":"millcreekut.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.685569,"lng":-111.8850505,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment context hold","fields":{},"notes":["Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.millcreekut.gov/208/Community-Reinvestment-Agency","host":"millcreekut.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Salt Lake City - Millcreek","publisher_reported_footprint_sqft":36000,"publisher_reported_critical_power_mw":1.92,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Salt Lake City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"flexential-salt-lake-city-south-valley-slc09-ut","state":"UT","kind":"facility","name":"Flexential Salt Lake City - South Valley (SLC09)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"West Jordan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched redevelopment context hold. Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.westjordan.utah.gov/economic-development/redevelopment/","host":"westjordan.utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.6203519,"lng":-111.986047,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment context hold","fields":{},"notes":["Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.westjordan.utah.gov/economic-development/redevelopment/","host":"westjordan.utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Salt Lake City - South Valley (SLC09)","publisher_reported_footprint_sqft":30512,"publisher_reported_critical_power_mw":1.2,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · West Jordan · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"google-eagle-mountain-ut","state":"UT","kind":"facility","name":"Google Eagle Mountain Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Eagle Mountain","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The eBay mention identifies only a company and county, so Topaz receives no named-site credit. Regional project counts derived from another map are not independent census evidence. Generation and backup equipment are not computing demand. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/","host":"grist.org","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.30935,"lng":-112.01198,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Grist reports Google Eagle Mountain delayed awaiting power, alongside regional gas and backup-generator plans.","independently_verified_current_operating_status":null},"notes":["The eBay mention identifies only a company and county, so Topaz receives no named-site credit. Regional project counts derived from another map are not independent census evidence. Generation and backup equipment are not computing demand.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/","host":"grist.org","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Eagle Mountain · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"joule-millard-county-ut","state":"UT","kind":"facility","name":"Joule Energy and Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Millard"],"city":"Holden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. AmyJoiODonoghue DeseretNews October21,2025 originalJoulefounderinterviews:4000acreMillardfamilyland/ownwaterrightsandplannedclosedloop; existingrightnotproofnewusezeroimpactorindependentallocation.1.3GW FIRSTPHASEPOWERGENERATION, notcriticalIToradditionalcampusload. Founderssaycountyconditionalusepermitunanimouslygranted; underlyingpermit/airlicense/currentcompletionnotread. Groundbreakingfutureinreportnotobserved. Amazon/Google/Oracle/OpenAI/xAIarepotentialcustomerexamplesnotconfirmedtenants. Baxtel47Utahfacilities/600MWderivativemixedbasisnotadoptedcensus. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.deseret.com/utah/2025/10/21/millard-county-data-center-to-break-ground-and-bring-promise-to-rural-utah/","host":"deseret.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.1072,"lng":-112.165,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["AmyJoiODonoghue DeseretNews October21,2025 originalJoulefounderinterviews:4000acreMillardfamilyland/ownwaterrightsandplannedclosedloop; existingrightnotproofnewusezeroimpactorindependentallocation.1.3GW FIRSTPHASEPOWERGENERATION, notcriticalIToradditionalcampusload.","Founderssaycountyconditionalusepermitunanimouslygranted; underlyingpermit/airlicense/currentcompletionnotread. Groundbreakingfutureinreportnotobserved. Amazon/Google/Oracle/OpenAI/xAIarepotentialcustomerexamplesnotconfirmedtenants. Baxtel47Utahfacilities/600MWderivativemixedbasisnotadoptedcensus.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://www.deseret.com/utah/2025/10/21/millard-county-data-center-to-break-ground-and-bring-promise-to-rural-utah/","host":"deseret.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Holden · Millard · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"lumen-ogden-ut","state":"UT","kind":"facility","name":"Lumen Ogden 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Weber"],"city":"Ogden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched RDA-area index hold. Ogden redevelopment-area table does not name Lumen or establish facility address, tax award, power, area or opening. District base/expiry years are not facility milestones. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ogdencity.gov/1216/RDA-Projects","host":"ogdencity.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.223,"lng":-111.97384,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched RDA-area index hold","fields":{},"notes":["Ogden redevelopment-area table does not name Lumen or establish facility address, tax award, power, area or opening. District base/expiry years are not facility milestones.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ogdencity.gov/1216/RDA-Projects","host":"ogdencity.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Ogden · Weber · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"lumen-salt-lake-city-ut","state":"UT","kind":"facility","name":"Lumen Salt Lake City Sites (Salt Lake 1, 2 and 4)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Salt Lake City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched redevelopment context hold. Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cra.slc.gov/project-areas/","host":"cra.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.75962,"lng":-111.8868,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment context hold","fields":{},"notes":["Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cra.slc.gov/project-areas/","host":"cra.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Salt Lake City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"meta-eagle-mountain-ut","state":"UT","kind":"facility","name":"Meta Eagle Mountain Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Eagle Mountain","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.3138,"lng":-111.9697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"groundbreaking_year":2018,"investment_usd_min":3000000000,"investment_scope":"Utah statewide","operator_reported_operational_jobs_min":300,"peak_construction_workers":1200,"local_school_nonprofit_funding_usd_min":5200000,"jobs_qualification":"operational jobs supported"},"notes":["Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Eagle Mountain · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"setsquare-nebo-north-mona-juab-county-ut","state":"UT","kind":"facility","name":"Nebo North Data Center Campus (Project Nebo)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Juab"],"city":"Mona","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. April15notice not hearing outcome or approved permit. Two parcel identifiers end with hyphens; completeness not independently resolved in parcel registry, do not append guessed digits. Meeting160NMainNephi not campus address. Exact developer alias/coordinate/MW/investment not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/","host":"juabcounty.gov","date":"2026-04-02","published":"2026-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.8605,"lng":-111.909,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"historical_hearing_scheduled_date":"2026-04-15","historical_hearing_scheduled_local_time":"19:00","applicant":"NeboNorthLLC","printed_parcel_identifiers":["XC00-2715-1","XC00-2710-","XC00-2705-"],"printed_legal_location":"Sections13and14,Township11South,Range1West,SLBM"},"notes":["April15notice not hearing outcome or approved permit. Two parcel identifiers end with hyphens; completeness not independently resolved in parcel registry, do not append guessed digits. Meeting160NMainNephi not campus address. Exact developer alias/coordinate/MW/investment not established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/","host":"juabcounty.gov","date":"2026-04-02","published":"2026-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Mona · Juab · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"nine-mile-data-myton-duchesne-county-ut","state":"UT","kind":"facility","name":"Nine Mile Data Center (Uinta Basin Data Center Project)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Duchesne"],"city":"Myton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NineMiledata-centerland-use staff report,notfinalpermit. RecommendationanddraftmotionnotPlanningCommissionvotedpermit. Solar/naturalgaspowerplantsreviewedunderseparateapplications,notincludedinthisCUPscope.18monthinactivityrule dependsactualissuance,notautomaticallyexpiryOctober2027. NoITMWorbuildingcompletioninreviewedfindingpages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf","host":"duchesne.utah.gov","date":"2026-04-02","published":"2026-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.193,"lng":-110.0568,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"NineMiledata-centerland-use staff report,notfinalpermit","fields":{"staff_findings_report_date":"2026-04-02","applicant_represented_entity":"EnergenceUtahLLC","application_complete_date":"2026-03-11","data_center_project_acres":960.32,"published_project_parcels":["00-0009-5871","00-0027-8311","00-0034-9496","00-0009-5947"],"published_location_description":"offWellsDrawRoad,southeastofBridgeland,southwestofSouthMytonBench","review_stage":"staffrecommendationforconditionaluseapproval"},"notes":["RecommendationanddraftmotionnotPlanningCommissionvotedpermit. Solar/naturalgaspowerplantsreviewedunderseparateapplications,notincludedinthisCUPscope.18monthinactivityrule dependsactualissuance,notautomaticallyexpiryOctober2027. NoITMWorbuildingcompletioninreviewedfindingpages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf","host":"duchesne.utah.gov","date":"2026-04-02","published":"2026-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Myton · Duchesne · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"novva-west-jordan-ut","state":"UT","kind":"facility","name":"Novva West Jordan Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"West Jordan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 200MWexplicitfutureutilitysubstationcapacitynotcurrentIT.1.5Mfour-phasearea not200kwhitefloor.15 to 30MWsolar separate.0.58perKWmarketinghasambiguousunitsandnotadoptedtariff.2025monthlywaterbillslistedbutnotallreviewed; nohouseholdcomparisonasmeasuredfinding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. unmatched redevelopment context hold. Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.novva.com/data-center-facilities/utah/","host":"novva.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.westjordan.utah.gov/economic-development/redevelopment/","host":"westjordan.utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.57389,"lng":-112.04576,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"campus_acres":100,"four_phase_planned_area_sqft":1500000,"planned_data_centers":4,"data_hall_white_floor_sqft":200000,"future_substation_utility_capacity_mw":200,"published_city":"West Jordan, Utah"},"notes":["200MWexplicitfutureutilitysubstationcapacitynotcurrentIT.1.5Mfour-phasearea not200kwhitefloor.15 to 30MWsolar separate.0.58perKWmarketinghasambiguousunitsandnotadoptedtariff.2025monthlywaterbillslistedbutnotallreviewed; nohouseholdcomparisonasmeasuredfinding.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.novva.com/data-center-facilities/utah/","host":"novva.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment context hold","fields":{},"notes":["Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.westjordan.utah.gov/economic-development/redevelopment/","host":"westjordan.utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · West Jordan · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"nsa-utah-data-center-bluffdale-ut","state":"UT","kind":"facility","name":"NSA Utah Data Center (Bumblehive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Bluffdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This undated descriptive source does not verify current power, capacity or a precise opening date. Estimated cost, superlative and stored-data quantities remain unverified. Its noncommercial image/prose license is not permission to reuse those assets in a commercial map; no imagery or copied descriptive text is supplied. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://clui.org/ludb/site/nsa-utah-data-center","host":"clui.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.429,"lng":-111.9327,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Center for Land Use Interpretation describes NSA's Bluffdale facility and a claimed 2014 opening, with separate total-complex and computer-space areas.","independently_verified_current_operating_status":null},"notes":["This undated descriptive source does not verify current power, capacity or a precise opening date. Estimated cost, superlative and stored-data quantities remain unverified. Its noncommercial image/prose license is not permission to reuse those assets in a commercial map; no imagery or copied descriptive text is supplied.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://clui.org/ludb/site/nsa-utah-data-center","host":"clui.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Bluffdale · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"oracle-salt-lake-city-ut","state":"UT","kind":"facility","name":"Oracle Salt Lake City","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Salt Lake City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched redevelopment context hold. Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cra.slc.gov/project-areas/","host":"cra.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.736391,"lng":-112.005741,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment context hold","fields":{},"notes":["Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cra.slc.gov/project-areas/","host":"cra.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Salt Lake City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"oracle-west-jordan-ut","state":"UT","kind":"facility","name":"Oracle West Jordan Data Center (Project Sequoia)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"West Jordan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. BriceWallace DeseretNews May19,2008 originalreport identifiesOracleWestJordan285M/200000sfproposedfacility, summergroundbreaking andearly2010RFS TARGETS, notcurrentcommissioning.100futurejobsnot2026headcount. State15M+taxrebateaward reported, localnearly10MincrementreimbursementstilltobestructuredinJuly. Theseare incentives/forecastsnotverifiedcashpaid;73.6M10yearwages/50.4M12yearstaterevenue model periodsnotcapex. No ITMW. SandyJordanCommonsotheroffice/75000globalemployeesnotWestJordanfacilityscope. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.deseret.com/2008/5/19/20253264/oracle-to-build-data-center-in-west-jordan/","host":"deseret.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.60613,"lng":-111.93952,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["BriceWallace DeseretNews May19,2008 originalreport identifiesOracleWestJordan285M/200000sfproposedfacility, summergroundbreaking andearly2010RFS TARGETS, notcurrentcommissioning.100futurejobsnot2026headcount.","State15M+taxrebateaward reported, localnearly10MincrementreimbursementstilltobestructuredinJuly. Theseare incentives/forecastsnotverifiedcashpaid;73.6M10yearwages/50.4M12yearstaterevenue model periodsnotcapex. No ITMW. SandyJordanCommonsotheroffice/75000globalemployeesnotWestJordanfacilityscope.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.deseret.com/2008/5/19/20253264/oracle-to-build-data-center-in-west-jordan/","host":"deseret.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · West Jordan · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"valar-atomics-project-beehive-price-ut","state":"UT","kind":"facility","name":"Project Beehive","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carbon"],"city":"Price","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. 456 reactors/roughly 9.6 GW are proposed NUCLEAR GENERATION, not commissioned IT capacity; thermal energy is separate. BLM completeness review is not NEPA decision, nuclear license, conveyance or construction approval. State 640 acrelease and federal 9000-plus-acreapplication are different instruments/scopes, not automatically one approved footprint. Late 2026 non-nuclear start/2028 firstreactors are developer forecasts. Withdrawn GreenRiver 10200 acres is a distinct earlier site, not Beehive’s status. Tracker 16 sites is a curated set, not an independent complete public-land census. Wyden bill was introduced, not law. Original federal/nuclear instruments and source reports were not directly reviewed here; do not treat tracker repetition as independent verification. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.resilience.org/stories/2026-10-06/9000-acre-nuclear-powered-data-center-proposed-on-public-lands-in-utah/","host":"resilience.org","date":"2026-10-06","published":"2026-10-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.5994,"lng":-110.8107,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"More Than Just Parks commentary republished by Resilience summarizes NPR/KSL reporting on Valar’s early Project Beehive federal-land application near Price and a separate state trust-land lease approval.","independently_verified_current_operating_status":null},"notes":["456 reactors/roughly 9.6 GW are proposed NUCLEAR GENERATION, not commissioned IT capacity; thermal energy is separate. BLM completeness review is not NEPA decision, nuclear license, conveyance or construction approval. State 640 acrelease and federal 9000-plus-acreapplication are different instruments/scopes, not automatically one approved footprint. Late 2026 non-nuclear start/2028 firstreactors are developer forecasts. Withdrawn GreenRiver 10200 acres is a distinct earlier site, not Beehive’s status. Tracker 16 sites is a curated set, not an independent complete public-land census. Wyden bill was introduced, not law. Original federal/nuclear instruments and source reports were not directly reviewed here; do not treat tracker repetition as independent verification.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.resilience.org/stories/2026-10-06/9000-acre-nuclear-powered-data-center-proposed-on-public-lands-in-utah/","host":"resilience.org","date":"2026-10-06","published":"2026-10-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Price · Carbon · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"qts-eagle-mountain-ut","state":"UT","kind":"facility","name":"QTS Eagle Mountain Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Eagle Mountain","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Future campus and reported construction stages, not completed operation. Cooling savings are a developer design comparison to a traditional baseline, not measured water consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. QTS proposed administrative amendment with separate CRA context. Blankvotechecklist/signaturelines do notproveadoption. TripleTailCRA1170.44acres isseparateprojectareaagenda item, not automaticallyTractdatacenterfootprintorQTSsite. QTSIparticipationpapers notproofnewFairfieldQTSIIsite. No proposedreimbursementformulaasactualpaymentor currentaward. Full132pagePDFrecoverednormally after4MBhold.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/eagle-mountain/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.utah.gov/pmn/files/1158232.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.3155,"lng":-111.9847,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"first_phase_acres_approx":193,"first_phase_buildings":5,"announced_planned_investment_usd":6000000000,"forecast_construction_jobs_lower_bound":2000,"forecast_permanent_positions_approx":100,"permanent_position_scope":"QTS, tenant and contractors","operator_reported_buildings_under_construction":[1,2,3],"completion_target_calendar_date":null,"completion_target_source_basis":"end of the year, undated page; calendar year not independently anchored"},"notes":["Future campus and reported construction stages, not completed operation. Cooling savings are a developer design comparison to a traditional baseline, not measured water consumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/eagle-mountain/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"QTS proposed administrative amendment with separate CRA context","fields":{"qts_proposed_amendment_agenda_date":"2024-08-20","qts_proposed_amendment_subject":"permitcustomerpersonalpropertytaxreimbursementdirectlytoendclients","document_status":"agenda,staffrecommendation,draftresolution andproposedamendment; executionnotestablished"},"notes":["Blankvotechecklist/signaturelines do notproveadoption. TripleTailCRA1170.44acres isseparateprojectareaagenda item, not automaticallyTractdatacenterfootprintorQTSsite. QTSIparticipationpapers notproofnewFairfieldQTSIIsite. No proposedreimbursementformulaasactualpaymentor currentaward. Full132pagePDFrecoverednormally after4MBhold.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/1158232.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Eagle Mountain · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"qts-eagle-mountain-ii-fairfield-ut","state":"UT","kind":"facility","name":"QTS Eagle Mountain II","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Fairfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. QTS preferred-site mismatch andproposed CRA-boundary amendment. PreferredrecordnamesQTSII/Fairfield,butthispacketconcernsEagleMountainexistingSweetwaterQTSproperty. Exactsitecrosswalkheld. Staffrecommendationnotvoteorfinalamendment. Historical200acreownershipscope notcurrent193acresmarketingconflict silentlycorrected. NoITMWoractualtaxrefund. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/files/1003911.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.26217,"lng":-112.093,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"QTS preferred-site mismatch andproposed CRA-boundary amendment","fields":{"source_project":"SweetwaterIndustrialParkCRA3","source_owner_operator":"QTS","source_historical_ownership_area_acres_approx":200,"proposed_cra_amendment_agenda_date":"2023-08-01"},"notes":["PreferredrecordnamesQTSII/Fairfield,butthispacketconcernsEagleMountainexistingSweetwaterQTSproperty. Exactsitecrosswalkheld. Staffrecommendationnotvoteorfinalamendment. Historical200acreownershipscope notcurrent193acresmarketingconflict silentlycorrected. NoITMWoractualtaxrefund.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/1003911.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Fairfield · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"brightnight-red-butte-newcastle-ut","state":"UT","kind":"facility","name":"Red Butte Energy and Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Iron"],"city":"Newcastle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Iron County official application and moratorium summary. Signed ordinance and precise effective/expiry not independently reviewed. Do not calculate a legal expiry from adoption. Separate Antelope June4planning review explicitly not public hearing and not Red Butte hearing. No MW or investment adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ironcountyut.gov/planning/data-center-projects","host":"ironcountyut.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.6949,"lng":-113.943,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Iron County official application and moratorium summary","fields":{"county_reported_moratorium_adoption_date":"2026-05-26","moratorium_duration_days":180,"red_butte_application_submitted_date":"2026-05-04","red_butte_application_incomplete_date":"2026-05-22","county_reported_red_butte_status":"on hold under moratorium"},"notes":["Signed ordinance and precise effective/expiry not independently reviewed. Do not calculate a legal expiry from adoption. Separate Antelope June4planning review explicitly not public hearing and not Red Butte hearing. No MW or investment adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ironcountyut.gov/planning/data-center-projects","host":"ironcountyut.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Newcastle · Iron · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"regence-salt-lake-city-ut","state":"UT","kind":"facility","name":"Regence BlueCross BlueShield Salt Lake City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Cottonwood Heights","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched redevelopment financial analysis hold. CanyonCentreCDAanalysis datedFebruary20,2024doesnotestablish FlexentialCottonwood orRegence data-center identity/award. Redevelopmentmodel notsite-specific certifiedincentive orpower. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/files/1088841.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.633117,"lng":-111.809456,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment financial analysis hold","fields":{},"notes":["CanyonCentreCDAanalysis datedFebruary20,2024doesnotestablish FlexentialCottonwood orRegence data-center identity/award. Redevelopmentmodel notsite-specific certifiedincentive orpower.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/1088841.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Cottonwood Heights · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"stratos-box-elder-ut","state":"UT","kind":"facility","name":"Stratos AI Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Box Elder"],"city":"Lucin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Stratos county project claims with forecast limits. County promotional forecasts, not audited collections, secured financing, approved environmental findings or guaranteed no-rate-increase. Permanent jobs include later businesses over decade, not quantified onsite DCjobs. Salinewater andclosedloop claims not withdrawal permits or zero ecological impacts. No current siteMW or opening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet","host":"boxeldercountyut.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5,"lng":-113.5,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Stratos county project claims with forecast limits","fields":{"county_projected_annual_tax_revenue_at_later_buildout_usd":108000000,"county_described_proposed_generation_fuel":"natural gas fromRubyPipeline","county_described_proposed_cooling_water_source":"onsite saline water andclosedloop cooling"},"notes":["County promotional forecasts, not audited collections, secured financing, approved environmental findings or guaranteed no-rate-increase. Permanent jobs include later businesses over decade, not quantified onsite DCjobs. Salinewater andclosedloop claims not withdrawal permits or zero ecological impacts. No current siteMW or opening date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet","host":"boxeldercountyut.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Lucin · Box Elder · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"summit-ridge-santaquin-ut","state":"UT","kind":"facility","name":"Summit Ridge Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Santaquin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Santaquin property-transfer notice hold. May1,2023 notice proposes transferring up to 0.69 acres of parcel32:009:0090 to Santaquin redevelopment agency for West Fields project area. It does not establish Summit Ridge data-center identity, campus footprint, incentives or completed transfer. May16,2023 scheduled meeting is not its outcome; municipal venue is not a data-center address. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.santaquin.gov/DocumentCenter/View/5806/2023-05-01_notice_of_intent_to_transfer_property_-_cdra_santaquin_final","host":"santaquin.gov","date":"2023-05-01","published":"2023-05-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.97551,"lng":-111.78521,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched Santaquin property-transfer notice hold","fields":{},"notes":["May1,2023 notice proposes transferring up to 0.69 acres of parcel32:009:0090 to Santaquin redevelopment agency for West Fields project area. It does not establish Summit Ridge data-center identity, campus footprint, incentives or completed transfer. May16,2023 scheduled meeting is not its outcome; municipal venue is not a data-center address.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.santaquin.gov/DocumentCenter/View/5806/2023-05-01_notice_of_intent_to_transfer_property_-_cdra_santaquin_final","host":"santaquin.gov","date":"2023-05-01","published":"2023-05-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Santaquin · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"zenith-tooele-valley-burmester-ut","state":"UT","kind":"facility","name":"Tooele Valley Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tooele"],"city":"Burmester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Tooele infrastructure-district entity context with data-center crosswalk held. Petition requests district formation and authority; it does not prove created district, issued bonds, data-center permit, IT capacity or operation. Annexation acreage is not campus acreage. Delaware mailing office is not Utah facility. Scanned petition OCR screened all9pages, with cover visually reviewed; do not adopt OCR land descriptions as independently surveyed points or executed debt. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://inlandportauthority.utah.gov/wp-content/uploads/Petition-for-TV-PID.pdf","host":"inlandportauthority.utah.gov","date":"2024-03-26","published":"2024-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.748,"lng":-112.674,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Tooele infrastructure-district entity context with data-center crosswalk held","fields":{"petition_date":"2024-03-26","requested_district":"TV Public Infrastructure District","petitioners":["Zenith Bolinder LLC","GSL Industrial LLC"],"petition_purpose":"financing public infrastructure within proposed district and annexation area"},"notes":["Petition requests district formation and authority; it does not prove created district, issued bonds, data-center permit, IT capacity or operation. Annexation acreage is not campus acreage. Delaware mailing office is not Utah facility. Scanned petition OCR screened all9pages, with cover visually reviewed; do not adopt OCR land descriptions as independently surveyed points or executed debt.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://inlandportauthority.utah.gov/wp-content/uploads/Petition-for-TV-PID.pdf","host":"inlandportauthority.utah.gov","date":"2024-03-26","published":"2024-03-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Burmester · Tooele · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"tract-eagle-mountain-ut","state":"UT","kind":"facility","name":"Tract Eagle Mountain Data Center Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Eagle Mountain","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. QTS proposed administrative amendment with separate CRA context. Blankvotechecklist/signaturelines do notproveadoption. TripleTailCRA1170.44acres isseparateprojectareaagenda item, not automaticallyTractdatacenterfootprintorQTSsite. QTSIparticipationpapers notproofnewFairfieldQTSIIsite. No proposedreimbursementformulaasactualpaymentor currentaward. Full132pagePDFrecoverednormally after4MBhold. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/files/1158232.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.30935,"lng":-112.01198,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"QTS proposed administrative amendment with separate CRA context","fields":{"qts_proposed_amendment_agenda_date":"2024-08-20","qts_proposed_amendment_subject":"permitcustomerpersonalpropertytaxreimbursementdirectlytoendclients","document_status":"agenda,staffrecommendation,draftresolution andproposedamendment; executionnotestablished"},"notes":["Blankvotechecklist/signaturelines do notproveadoption. TripleTailCRA1170.44acres isseparateprojectareaagenda item, not automaticallyTractdatacenterfootprintorQTSsite. QTSIparticipationpapers notproofnewFairfieldQTSIIsite. No proposedreimbursementformulaasactualpaymentor currentaward. Full132pagePDFrecoverednormally after4MBhold.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/1158232.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Eagle Mountain · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"unisys-salt-lake-city-ut","state":"UT","kind":"facility","name":"Unisys Salt Lake City","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Salt Lake City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched redevelopment context hold. Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cra.slc.gov/project-areas/","host":"cra.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.75962,"lng":-111.8868,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched redevelopment context hold","fields":{},"notes":["Generic redevelopment/project-area index does not name or establish the bound data-center facility, its ownership, eligibility, tax award, power, area or operating date. Agency/city office addresses excluded. Broad redevelopment boundary not a data-center parcel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cra.slc.gov/project-areas/","host":"cra.slc.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Salt Lake City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"university-of-utah-downtown-data-center-salt-lake-city-ut","state":"UT","kind":"facility","name":"University of Utah Downtown Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Salt Lake"],"city":"Salt Lake City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Utah archived Downtown facility occupancy chronology. Explicit archive warning says information may be outdated.1938building date is not DC opening; April2012fulloccupancy is month precision. Historic battery/generator claims not current load testing. Administrative footer not exact server address. No current IT MW, current tenant census or actual2026 operations independently established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://it.utah.edu/node4/posts/2018/october/downtown-data-center.php","host":"it.utah.edu","date":"2018-10-24","published":"2018-10-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.7466,"lng":-111.8945,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Utah archived Downtown facility occupancy chronology","fields":{"institution":"University of Utah","facility":"Downtown Data Center","article_date":"2018-10-24","reported_full_occupancy_month":"2012-04","original_building_year":1938,"historical_service":"university computing plus external tenants"},"notes":["Explicit archive warning says information may be outdated.1938building date is not DC opening; April2012fulloccupancy is month precision. Historic battery/generator claims not current load testing. Administrative footer not exact server address. No current IT MW, current tenant census or actual2026 operations independently established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://it.utah.edu/node4/posts/2018/october/downtown-data-center.php","host":"it.utah.edu","date":"2018-10-24","published":"2018-10-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Salt Lake City · Salt Lake · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"valorc3-st-george-ut","state":"UT","kind":"facility","name":"ValorC3 Saint George Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"St. George","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched scanned RDA financial packet hold. ScannedStGeorgeJune19,2025RDAagendapacket,OCRscreened24pages,doesnotestablishValorC3siteidentity oraward. Municipalbudget,land-sale proceeds andinterfundloanrepaymentnotdata-centerCAPEXoroperatingproof. Noabsenceclaim basedsolelyonnonmatchingOCR. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/files/1286199.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.10988,"lng":-113.58321,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unmatched scanned RDA financial packet hold","fields":{},"notes":["ScannedStGeorgeJune19,2025RDAagendapacket,OCRscreened24pages,doesnotestablishValorC3siteidentity oraward. Municipalbudget,land-sale proceeds andinterfundloanrepaymentnotdata-centerCAPEXoroperatingproof. Noabsenceclaim basedsolelyonnonmatchingOCR.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/1286199.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · St. George · Washington · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"volition-spanish-fork-ut","state":"UT","kind":"facility","name":"Volition Spanish Fork Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Spanish Fork","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Primary municipal proposal context plus corporate marketing limitations, not approval or current capacity.. Adopted minutes summarize a proposal discussed in work session; adopting minutes does not approve the campus. Only pages1-3 of35 reviewed for this topic. Estimated equipment value nearing USD1billion is not total project capital or committed spending. Minutes do not substantiate directory400MW or1million-squarefoot headline. OpenAI is a prospective example, not a contracted tenant. Fuel-cell gas, water recirculation, minimal emissions, reliability and Enbridge infrastructure support are presentation/discussion claims, not signed fuel contracts, permits, measured emissions or actual water records. On-site natural gas generation is not renewable by definition. Volition compute page is general company marketing, not this campus status: text alternates650times and65times gas-versus-grid reliability and says both retrofit and never-retrofitted. Do not adopt those unsourced inconsistent metrics. Provo SierraVista30-to40MW concept is separate from SpanishFork; no power or location copied between them. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/files/1430163.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://volition.eco/compute","host":"volition.eco","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.115,"lng":-111.6461,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round39-2026-10-14.json","scope":"Primary municipal proposal context plus corporate marketing limitations, not approval or current capacity.","fields":{"official_discussion_date":"2026-04-21","meeting_stage":"Work session, expressly no formal actions","equipment_value_estimate_usd_approximate":1000000000,"critical_it_mw":null,"verified_building_sqft":null,"confirmed_tenant":null,"project_approval_verified":false,"independently_verified_current_operating_status":null},"notes":["Adopted minutes summarize a proposal discussed in work session; adopting minutes does not approve the campus. Only pages1-3 of35 reviewed for this topic.","Estimated equipment value nearing USD1billion is not total project capital or committed spending. Minutes do not substantiate directory400MW or1million-squarefoot headline. OpenAI is a prospective example, not a contracted tenant.","Fuel-cell gas, water recirculation, minimal emissions, reliability and Enbridge infrastructure support are presentation/discussion claims, not signed fuel contracts, permits, measured emissions or actual water records. On-site natural gas generation is not renewable by definition.","Volition compute page is general company marketing, not this campus status: text alternates650times and65times gas-versus-grid reliability and says both retrofit and never-retrofitted. Do not adopt those unsourced inconsistent metrics.","Provo SierraVista30-to40MW concept is separate from SpanishFork; no power or location copied between them.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/1430163.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://volition.eco/compute","host":"volition.eco","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Spanish Fork · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"voonami-orem-ut","state":"UT","kind":"facility","name":"Voonami Orem Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Utah"],"city":"Orem","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unrelated municipal minutes source hold. OremMay14,2019minutes concern restaurant/car-dealership landexchange andother municipalRDAactions; no Fibernet/Voonamifacility match established. Cityagencyagreements not automatic datacenterincentives. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.utah.gov/pmn/files/498543.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.29816,"lng":-111.69443,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"unrelated municipal minutes source hold","fields":{},"notes":["OremMay14,2019minutes concern restaurant/car-dealership landexchange andother municipalRDAactions; no Fibernet/Voonamifacility match established. Cityagencyagreements not automatic datacenterincentives.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.utah.gov/pmn/files/498543.pdf","host":"utah.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Utah · Orem · Utah · Source context reviewed","state_name":"Utah","state_path":"/utah/"},{"id":"firstlight-williston-vt","state":"VT","kind":"facility","name":"FirstLight Data Center (Williston, VT)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chittenden"],"city":"Williston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. VTDigger HilaryNiles March24,2014 original report identifies FirstLight's KruppDriveWillistonfacility and plannedcapacitydoublingWITHOUTexpandingbuildingfootprint. October29,2024modifiedtimestamp isnot eventdate. Exactdoublingcompletion/currentcapacityunverified; noMWprovided. Sevenexistingemployees/noadditionaljobs and fourcompanysites are2014claims, not2026census/headcount.1994Albanycompanyfoundation/2013rebrand arenotWillistonplantopening. Fiber-miles/networkcoverage notpowerorDCfloorarea. HistoricalRiversideownership not currentownershipcertified. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vtdigger.org/2014/03/24/williston-fiber-optic-data-center-doubles-capacity/","host":"vtdigger.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.4502206,"lng":-73.1275724,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["VTDigger HilaryNiles March24,2014 original report identifies FirstLight's KruppDriveWillistonfacility and plannedcapacitydoublingWITHOUTexpandingbuildingfootprint. October29,2024modifiedtimestamp isnot eventdate. Exactdoublingcompletion/currentcapacityunverified; noMWprovided.","Sevenexistingemployees/noadditionaljobs and fourcompanysites are2014claims, not2026census/headcount.1994Albanycompanyfoundation/2013rebrand arenotWillistonplantopening. Fiber-miles/networkcoverage notpowerorDCfloorarea. HistoricalRiversideownership not currentownershipcertified.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://vtdigger.org/2014/03/24/williston-fiber-optic-data-center-doubles-capacity/","host":"vtdigger.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vermont · Williston · Chittenden · Source context reviewed","state_name":"Vermont","state_path":"/vermont/"},{"id":"powertransitions-vermont-yankee-vernon-vt","state":"VT","kind":"facility","name":"PowerTransitions Vermont Yankee Site Redevelopment (data center option)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Windham"],"city":"Vernon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The company leases rather than owns the site, and the report says plans were not finalized. A preliminary bundle of ideas is not a reactor approval, electrical service allocation or operating DC. No capacity, investment or opening date established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wcax.com/2026/06/18/talks-underway-decide-fate-vermont-yankee-plant-property/","host":"wcax.com","date":"2026-06-18","published":"2026-06-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.77889,"lng":-72.51306,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WCAX reports a selectman's account of early Power Transitions ideas for the Vermont Yankee property, including batteries, a small reactor and a data center.","independently_verified_current_operating_status":null},"notes":["The company leases rather than owns the site, and the report says plans were not finalized. A preliminary bundle of ideas is not a reactor approval, electrical service allocation or operating DC. No capacity, investment or opening date established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wcax.com/2026/06/18/talks-underway-decide-fate-vermont-yankee-plant-property/","host":"wcax.com","date":"2026-06-18","published":"2026-06-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vermont · Vernon · Windham · Source context reviewed","state_name":"Vermont","state_path":"/vermont/"},{"id":"st-albans-data-center-vt","state":"VT","kind":"facility","name":"Proposed St. Albans, VT Data Center (Unbuilt)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"St. Albans","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Alternative 8 to 12 MW or 50 MW plans are not additive, built or current load, and basis is not certified critical IT. $30 million is a quoted connection cost hurdle, not spent campus capex. Larger-scenario 1,000 construction/20 permanent jobs were forecasts. H727/S205 were bills under consideration, not adopted protections or moratoriums in this source. Other Vermont utility study locations are hypothetical and not announced campuses. Generic 140-acre/two-supermarket equivalence, Virginia 35% of worldwide centers and generic water/home comparisons have inconsistent denominators or units and are not adopted. At least three Chittenden centers/about 5 MW is an attributed partial snapshot, not a statewide exhaustive census. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vtdigger.org/2026/02/24/vermont-plugs-into-the-data-center-conversation/","host":"vtdigger.org","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.8107911,"lng":-73.0833607,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"VTDigger reports an earlier St. Albans data center effort fell through when grid/substation connection costs were estimated at about $30 million.","independently_verified_current_operating_status":null},"notes":["Alternative 8 to 12 MW or 50 MW plans are not additive, built or current load, and basis is not certified critical IT. $30 million is a quoted connection cost hurdle, not spent campus capex. Larger-scenario 1,000 construction/20 permanent jobs were forecasts. H727/S205 were bills under consideration, not adopted protections or moratoriums in this source. Other Vermont utility study locations are hypothetical and not announced campuses. Generic 140-acre/two-supermarket equivalence, Virginia 35% of worldwide centers and generic water/home comparisons have inconsistent denominators or units and are not adopted. At least three Chittenden centers/about 5 MW is an attributed partial snapshot, not a statewide exhaustive census.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vtdigger.org/2026/02/24/vermont-plugs-into-the-data-center-conversation/","host":"vtdigger.org","date":"2026-02-24","published":"2026-02-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vermont · St. Albans · Franklin · Source context reviewed","state_name":"Vermont","state_path":"/vermont/"},{"id":"tech-vault-south-burlington-vt","state":"VT","kind":"facility","name":"Tech Vault Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chittenden"],"city":"South Burlington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not presentgenerator0.8MW asITload. 39000data-center-space wording does not explicitly meanraisedfloor. Operator distinguishesUPS500kW fromdieselgenerator800kW. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.techvault.net/vermont-data-center-facility/","host":"techvault.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.4541938,"lng":-73.1417505,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"South Burlington","data_center_space_sqft":39000,"ups_capacity_mw":0.5,"generator_capacity_mw":0.8,"marketed_service":"data center and disaster recovery"},"notes":["Do not presentgenerator0.8MW asITload.","39000data-center-space wording does not explicitly meanraisedfloor.","Operator distinguishesUPS500kW fromdieselgenerator800kW.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.techvault.net/vermont-data-center-facility/","host":"techvault.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vermont · South Burlington · Chittenden · Source context reviewed","state_name":"Vermont","state_path":"/vermont/"},{"id":"uvm-vacc-south-burlington-vt","state":"VT","kind":"facility","name":"Vermont Advanced Computing Center (VACC), University of Vermont","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chittenden"],"city":"South Burlington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. UVM cluster resources without independently verified physical site. Institutional cluster specification supports compute service, not exact SouthBurlington physical data-center site. SecureCluster will-be-availableSummer2026 remains undated future-style language, not observed launch. GPU/node/RAM totals do not establish IT MW, physical buildings or opening. No exact-site current operations or critical IT capacity verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.uvm.edu/vacc/cluster-specs","host":"uvm.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.448637,"lng":-73.146839,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"UVM cluster resources without independently verified physical site","fields":{"institution":"University of Vermont","computing_service":"Vermont Advanced Computing Center","listed_clusters":["BlueMoon","IceCore","DataMountain","Secure Cluster"]},"notes":["Institutional cluster specification supports compute service, not exact SouthBurlington physical data-center site. SecureCluster will-be-availableSummer2026 remains undated future-style language, not observed launch. GPU/node/RAM totals do not establish IT MW, physical buildings or opening. No exact-site current operations or critical IT capacity verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.uvm.edu/vacc/cluster-specs","host":"uvm.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vermont · South Burlington · Chittenden · Source context reviewed","state_name":"Vermont","state_path":"/vermont/"},{"id":"penzance-1500-gateway-fredericksburg-va","state":"VA","kind":"facility","name":"1500 Gateway Data Center (denied)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Fredericksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The denied package's proposed tax receipts, proffers and jobs were not adopted forecasts or paid benefits. No separate vote was taken on the substation finding. The old four-building scheme differs from the revised two-building proposal. Modeled noise and claimed first-in-state cooling/labor arrangements are not independently verified outcomes. A letter of intent is not a tenant lease. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.potomaclocal.com/2026/08/26/no-byte-tonight-fred-council-unplugs-23m-i-95-data-center-7-0-after-midnight-hearing/","host":"potomaclocal.com","date":"2026-08-26","published":"2026-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.301,"lng":-77.509,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Potomac Local reports two separate seven-zero denials early August 26 for Penzance's Gateway rezoning and height permit after an August 25 hearing ran past midnight.","independently_verified_current_operating_status":null,"reported_rezoning_status":"denied","reported_denial_date":"2026-08-26","separate_height_permit_status":"denied"},"notes":["The denied package's proposed tax receipts, proffers and jobs were not adopted forecasts or paid benefits. No separate vote was taken on the substation finding. The old four-building scheme differs from the revised two-building proposal. Modeled noise and claimed first-in-state cooling/labor arrangements are not independently verified outcomes. A letter of intent is not a tenant lease.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.potomaclocal.com/2026/08/26/no-byte-tonight-fred-council-unplugs-23m-i-95-data-center-7-0-after-midnight-hearing/","host":"potomaclocal.com","date":"2026-08-26","published":"2026-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Fredericksburg · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"anchorstone-58-east-data-campus-ringgold-va","state":"VA","kind":"facility","name":"58 East Data Campus (Route 58 East Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pittsylvania"],"city":"Ringgold","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Article alternates up to 500 jobs and quoted about 200 full-time at build-out. No preferred exact job count or observed opening adopted. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://showcasemagazine.com/2024/11/15/permit-approved-for-ringgold-data-center-campus/","host":"showcasemagazine.com","date":"2024-11-15","published":"2024-11-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.6048,"lng":-79.2905,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported unanimous special-use approval for Anchorstone 58 East campus after rezoning.","independently_verified_current_operating_status":null},"notes":["Article alternates up to 500 jobs and quoted about 200 full-time at build-out. No preferred exact job count or observed opening adopted.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://showcasemagazine.com/2024/11/15/permit-approved-for-ringgold-data-center-campus/","host":"showcasemagazine.com","date":"2024-11-15","published":"2024-11-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ringgold · Pittsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"adp-ladysmith-data-hub-caroline-va","state":"VA","kind":"facility","name":"ADP Ladysmith Data Hub","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Ruther Glen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Caroline three distinct application identities and review stages. Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.00386898862997,"lng":-77.5030262165529,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Caroline three distinct application identities and review stages","fields":{"county":"Caroline, Virginia","project_applications":[{"project":"Thornberry Data Center Campus","case":"RZ-03-2025","parcel":"84-A-1","parent_parcel_acres":1001.5,"requested_rezoning_acres":657,"address":"23202 Carneal Lane","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"ADP Ladysmith Data Hub","cases":["RZ-02-2025","SPEX-06-2025"],"parcel":"53-A-65","requested_rezoning_acres":140.38,"address":"18577 Green Road","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"Bull Church Data Center","case":"RZ-04-2024","parcel":"53-A-66","owner":"Mid Atlantic State Fund LLC","applicant":"NRD Retail LLC","location":"Bull Church Road east of I-95, adjacent to Virginia Bazaar south boundary","source_stage":"technical review; hearing date undetermined"}]},"notes":["Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ruther Glen · Caroline · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"aligned-iad-01-va","state":"VA","kind":"facility","name":"Aligned IAD-01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Upstream60 MW not supplied on this source. 3 MW generator and2 MW UPS lineup ratings are not campus capacity. Current operator lists IAD-01 and IAD-02 at different Uunet addresses. Shared campus description requires building/campus grouping. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/northern-virginia-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0136079,"lng":-77.4705563,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"21890 Uunet Drive","city":"Ashburn","campus_acres":26},"notes":["Upstream60 MW not supplied on this source.","3 MW generator and2 MW UPS lineup ratings are not campus capacity.","Current operator lists IAD-01 and IAD-02 at different Uunet addresses. Shared campus description requires building/campus grouping.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/northern-virginia-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"aligned-iad-03-va","state":"VA","kind":"facility","name":"Aligned IAD-03","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. HTTP200 is not substantive evidence; do not confirm operating status or capacity. The selected IAD-03 URL returns only a heading. Northern Virginia market page separately names the Sterling address. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/location/iad-03-data-center/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9886354,"lng":-77.4407776,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["HTTP200 is not substantive evidence; do not confirm operating status or capacity.","The selected IAD-03 URL returns only a heading. Northern Virginia market page separately names the Sterling address.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/location/iad-03-data-center/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"amazon-devlin-tech-park-va","state":"VA","kind":"facility","name":"Amazon Devlin Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Bristow","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Land price is not total construction spending. Zoning floor allowance is not commissioned space or proof of current operations. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/","host":"virginiabusiness.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.724,"lng":-77.558,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported Amazon purchase of 188.5 acres in Devlin Technology Park closed November 5 for 700 million USD.","independently_verified_current_operating_status":null},"notes":["Land price is not total construction spending. Zoning floor allowance is not commissioned space or proof of current operations.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/","host":"virginiabusiness.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Bristow · Prince William · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"avaio-appomattox-va","state":"VA","kind":"facility","name":"AVAIO Appomattox Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Appomattox"],"city":"Appomattox","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Developer tax benefit claim is a projection, not annual revenue received. No project opening, construction start or all permits established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wdbj7.com/2026/03/24/board-answers-questions-future-data-center/","host":"wdbj7.com","date":"2026-03-23","published":"2026-03-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.43,"lng":-78.8,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"WDBJ reports AVAIO proposed Appomattox campus with initial construction and partial substation work planned for 2027 to 2028.","independently_verified_current_operating_status":null},"notes":["Developer tax benefit claim is a projection, not annual revenue received. No project opening, construction start or all permits established.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wdbj7.com/2026/03/24/board-answers-questions-future-data-center/","host":"wdbj7.com","date":"2026-03-23","published":"2026-03-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Appomattox · Appomattox · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"aws-mattermeade-caroline-va","state":"VA","kind":"facility","name":"AWS Mattermeade Tech Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Bowling Green","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched county landing page. Spotsylvania County generic rezoning landing page does not match Caroline County Mattermeade site. No project fields adopted. Thin navigation body and county mismatch cannot establish case, approval or exact location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/799/Rezoning-Cases","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.044,"lng":-77.3527,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"unmatched county landing page","fields":{},"notes":["Spotsylvania County generic rezoning landing page does not match Caroline County Mattermeade site. No project fields adopted. Thin navigation body and county mismatch cannot establish case, approval or exact location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/799/Rezoning-Cases","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Bowling Green · Caroline · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"bermuda-hundred-data-center-chesterfield-va","state":"VA","kind":"facility","name":"Bermuda Hundred Data Center (Old Bermuda Hundred Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Chester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://opengisdata.chesterfield.gov/","host":"opengisdata.chesterfield.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.33798175,"lng":-77.39493747,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://opengisdata.chesterfield.gov/","host":"opengisdata.chesterfield.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Chester · Chesterfield · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"stack-berry-hill-va","state":"VA","kind":"facility","name":"Berry Hill / Southern Virginia Megasite","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pittsylvania"],"city":"Berry Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported minimum metrics $73.5 billion/2,050 jobs at $80,500 average differ from broader aspirational $100 billion over three decades/2,500 jobs in two decades; neither is already spent or employed. Proposed equipment tax $1.62 per $100 still required county vote in this source. Minimum annual $16.25 million for first 1,000 acres and possible $48.6 million for all 2,990 acres are alternative scale cases, not additive revenue or received taxes; start forecast fall 2027/2028. $1,000-per-job enterprise-zone incentive is conditional, not proof of cash awarded. Seven million gallons/day is megasite supply capability, not DC actual demand; Dan River flow/textile mill history are separate. Planned Appalachian Power agreement is not examined executed ESA. State tax-exemption budget outcome was pending; related headlines do not settle it. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/stack-100b-berry-hill-data-center-project/","host":"virginiabusiness.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.68,"lng":-79.35,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Virginia Business reports unanimous local performance-agreement approval for Stack’s proposed Berry Hill campus, with multidecade investment and job milestones.","independently_verified_current_operating_status":null},"notes":["Reported minimum metrics $73.5 billion/2,050 jobs at $80,500 average differ from broader aspirational $100 billion over three decades/2,500 jobs in two decades; neither is already spent or employed. Proposed equipment tax $1.62 per $100 still required county vote in this source. Minimum annual $16.25 million for first 1,000 acres and possible $48.6 million for all 2,990 acres are alternative scale cases, not additive revenue or received taxes; start forecast fall 2027/2028. $1,000-per-job enterprise-zone incentive is conditional, not proof of cash awarded. Seven million gallons/day is megasite supply capability, not DC actual demand; Dan River flow/textile mill history are separate. Planned Appalachian Power agreement is not examined executed ESA. State tax-exemption budget outcome was pending; related headlines do not settle it.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/stack-100b-berry-hill-data-center-project/","host":"virginiabusiness.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Berry Hill · Pittsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"blackstone-data-services-bluestone-tazewell-va","state":"VA","kind":"facility","name":"Blackstone Data Services  -  Bluestone Business and Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Tazewell"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Eighteen-million-USD investment over ten years and five jobs were projections. No present operation, exact IT MW or realized spending verified. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvva.com/2024/02/16/growth-local-cryptocurrency-mining-operation-hindered-by-electricity-rates/","host":"wvva.com","date":"2024-02-16","published":"2024-02-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.26,"lng":-81.33,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WVVA reports Blackstone Bluestone opened October2022 and was holding steady amid power-rate constraints.","independently_verified_current_operating_status":null},"notes":["Eighteen-million-USD investment over ten years and five jobs were projections. No present operation, exact IT MW or realized spending verified.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvva.com/2024/02/16/growth-local-cryptocurrency-mining-operation-hindered-by-electricity-rates/","host":"wvva.com","date":"2024-02-16","published":"2024-02-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Tazewell · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"amazon-blackwell-road-warrenton-va","state":"VA","kind":"facility","name":"Blackwell Road Data Center (Warrenton)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Warrenton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. ProtectFauquier/CitizensForFauquier/PEC original advocacy FAQ, two pages read/viewed. Historical2022proposal/opposition context for AmazonBlackwell; URLOctober26not independently established issue date.220000sf proposal/40acre land not completed facility.40MW is AUTHORS ESTIMATE, not executed load/criticalIT; grid-CO2 calculator output not measured onsite emissions. Company1500gpd statement versus area-based7500gpd advocacy scenario are not actual consumption.28standby generators genericnoise claims not boundary measurements or a permit ruling. Article characterizes studies as flawed, not independent legal/health findings adopted. ProposedDecember2022decision not an observed current outcome. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/wp-content/uploads/warrenton-amazon-data-center-town-hall-faq-handout-10-26-22.pdf","host":"pecva.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.72948224074257,"lng":-77.78753470617198,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["ProtectFauquier/CitizensForFauquier/PEC original advocacy FAQ, two pages read/viewed. Historical2022proposal/opposition context for AmazonBlackwell; URLOctober26not independently established issue date.220000sf proposal/40acre land not completed facility.40MW is AUTHORS ESTIMATE, not executed load/criticalIT; grid-CO2 calculator output not measured onsite emissions. Company1500gpd statement versus area-based7500gpd advocacy scenario are not actual consumption.28standby generators genericnoise claims not boundary measurements or a permit ruling. Article characterizes studies as flawed, not independent legal/health findings adopted. ProposedDecember2022decision not an observed current outcome.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.pecva.org/wp-content/uploads/warrenton-amazon-data-center-town-hall-faq-handout-10-26-22.pdf","host":"pecva.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Warrenton · Fauquier · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"amazon-bridgefield-tech-center-ashburn-loudoun-va","state":"VA","kind":"facility","name":"Bridgefield Tech Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Amazon GWU acquisition and Bridgefield concept stage. Propertypurchase notDCconstruction capex oroperatingopening. Universitymaycontinueprogramsforuptofiveyears,notimmediateclosure/exactleaseendday. Concept-plan by-right claim subject to disputed zoning interpretation andlengthyreview; nofinalpermit. Julyvote topreparemoratorium andexpectedSeptember15decisionnotobservedoutcome. No numericalITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. County legislative process context, not a parcel-specific approval.. No October 20 outcome exists in this review. No fixed expiry calculated. No effect on either exact parcel inferred without application-specific records.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/amazon-data-centers-gwu-ashburn/","host":"virginiabusiness.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.loudoun.gov/m/NewsFlash/home/detail/10874","host":"loudoun.gov","date":"2026-09-17","published":"2026-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.029784,"lng":-77.4744148,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Amazon GWU acquisition and Bridgefield concept stage","fields":{"company":"Amazon DataServices","project":"Bridgefield TechCenter","site":"former/currentGWUVirginiaScienceandTechnologyCampus, Ashburn, LoudounCounty, Virginia","reported_purchase_date":"2026-03-02","reported_property_acres":111,"reported_purchase_usd_approx":427300000,"concept_plan_filed_date":"2026-07-28","proposed_buildings":4,"proposed_stories":2,"proposed_combined_area_sqft_min_exclusive":800000,"reported_university_continued_use_option_years_max":5},"notes":["Propertypurchase notDCconstruction capex oroperatingopening. Universitymaycontinueprogramsforuptofiveyears,notimmediateclosure/exactleaseendday. Concept-plan by-right claim subject to disputed zoning interpretation andlengthyreview; nofinalpermit. Julyvote topreparemoratorium andexpectedSeptember15decisionnotobservedoutcome. No numericalITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/amazon-data-centers-gwu-ashburn/","host":"virginiabusiness.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"County legislative process context, not a parcel-specific approval.","fields":{"september15_action":"Vote for future consideration of a resolution, not adoption of the pause.","consideration_scheduled":"2026-10-20","effective_pause_established_as_of_2026_10_14":false,"proposed_scope":"Final Board action on legislative data center and substation applications; administrative applications unaffected; submissions and Planning Commission processing continue.","potential_duration":"Up to 12 months if approved. Intended retroactivity to September 15 is conditional, not a verified effective date.","exceptions":"Grid reliability or approaching statutory decision period may be considered.","county_attorney_position":"Notice attributes opinion that a data center approval moratorium is not legal.","october6_grandfathering_outcome":null},"notes":["No October 20 outcome exists in this review. No fixed expiry calculated. No effect on either exact parcel inferred without application-specific records.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.loudoun.gov/m/NewsFlash/home/detail/10874","host":"loudoun.gov","date":"2026-09-17","published":"2026-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"bull-church-data-center-caroline-va","state":"VA","kind":"facility","name":"Bull Church Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Ruther Glen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Caroline three distinct application identities and review stages. Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.00820612043225,"lng":-77.49262214339025,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Caroline three distinct application identities and review stages","fields":{"county":"Caroline, Virginia","project_applications":[{"project":"Thornberry Data Center Campus","case":"RZ-03-2025","parcel":"84-A-1","parent_parcel_acres":1001.5,"requested_rezoning_acres":657,"address":"23202 Carneal Lane","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"ADP Ladysmith Data Hub","cases":["RZ-02-2025","SPEX-06-2025"],"parcel":"53-A-65","requested_rezoning_acres":140.38,"address":"18577 Green Road","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"Bull Church Data Center","case":"RZ-04-2024","parcel":"53-A-66","owner":"Mid Atlantic State Fund LLC","applicant":"NRD Retail LLC","location":"Bull Church Road east of I-95, adjacent to Virginia Bazaar south boundary","source_stage":"technical review; hearing date undetermined"}]},"notes":["Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ruther Glen · Caroline · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"mesh-capital-cabin-field-road-data-center-campbell-va","state":"VA","kind":"facility","name":"Cabin Field Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Campbell"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No formal site plan approved as of reporting. Denial did not stop all data-center use; separate Mount Athos concept not this property. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wdbj7.com/2025/11/03/data-center-could-still-be-coming-campbell-county-despite-denial-vote-supervisors/","host":"wdbj7.com","date":"2025-11-03","published":"2025-11-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3407675,"lng":-78.9909489,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"proffer-removal-denied-but-revised-concepts-possible","reported_finding":"WDBJ says supervisors rejected removing Cabin Field Road protective proffer, but staff considered three smaller concepts compliant under by-right use.","report_display_date":"2025-11-03","independently_verified_current_status":null},"notes":["No formal site plan approved as of reporting. Denial did not stop all data-center use; separate Mount Athos concept not this property.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wdbj7.com/2025/11/03/data-center-could-still-be-coming-campbell-county-despite-denial-vote-supervisors/","host":"wdbj7.com","date":"2025-11-03","published":"2025-11-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Campbell · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"aws-carters-store-tech-campus-spotsylvania-va","state":"VA","kind":"facility","name":"Carter's Store Tech Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Spotsylvania","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Source discloses StackInfrastructure grant. Construction claim is dated reporting, not currentoperation or commissioning.17 sites/3696 acres includeconstruction,approved,rezoningandsiteplans, not 17 operatingcenters or DCbuildingfootprint.616/1142/1263/675 acrestatusgroups belong tocountyrollup, not either specificcampus.35 billion-dollarAmazoncountycommitment claim needs primary geographic-scope corroboration before adoption; not assigned to eachsite. Cosnerconditional 2026 COforecast andunknown taxcollectionstart do not setCarterStore/SummitRFS. General taxlegal assertions andby-right explanation are not adopted as law. NoMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","host":"fxbgadvance.com","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.1911,"lng":-77.4687,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"FredericksburgAdvance’s industry-grant-supported column reports Amazon buildingsgoingupatSummitCrossing/CarterStore/Cosner/Mattameade and countywide 17 projectsites acrossseveralstages.","independently_verified_current_operating_status":null},"notes":["Source discloses StackInfrastructure grant. Construction claim is dated reporting, not currentoperation or commissioning.17 sites/3696 acres includeconstruction,approved,rezoningandsiteplans, not 17 operatingcenters or DCbuildingfootprint.616/1142/1263/675 acrestatusgroups belong tocountyrollup, not either specificcampus.35 billion-dollarAmazoncountycommitment claim needs primary geographic-scope corroboration before adoption; not assigned to eachsite. Cosnerconditional 2026 COforecast andunknown taxcollectionstart do not setCarterStore/SummitRFS. General taxlegal assertions andby-right explanation are not adopted as law. NoMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","host":"fxbgadvance.com","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Spotsylvania · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"penzance-chantilly-premier-fairfax-va","state":"VA","kind":"facility","name":"Chantilly Premier","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfax"],"city":"Chantilly","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Fully leased according to the developer does not identify tenants or prove current operation. Financing is not actual spending. Earlier maximum zoning allowance differs from the approved site plan's roughly 236,000 square feet; alternate warehouse and DC designs are not additive. Historical statewide study statistics are not current facility counts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ffxnow.com/2025/10/10/developer-breaks-ground-on-100m-data-center-building-in-chantilly/","host":"ffxnow.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.8943,"lng":-77.4311,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"FFXnow reports Penzance's Chantilly Premier groundbreaking announcement and 100-million-USD financing, with delivery targeted for first-half 2027 and future users unnamed.","independently_verified_current_operating_status":null},"notes":["Fully leased according to the developer does not identify tenants or prove current operation. Financing is not actual spending. Earlier maximum zoning allowance differs from the approved site plan's roughly 236,000 square feet; alternate warehouse and DC designs are not additive. Historical statewide study statistics are not current facility counts.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ffxnow.com/2025/10/10/developer-breaks-ground-on-100m-data-center-building-in-chantilly/","host":"ffxnow.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Chantilly · Fairfax · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"powerhouse-chirisa-chester-va","state":"VA","kind":"facility","name":"Chirisa Technology Park  -  Richmond (Chester)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Chester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The one-GW demand and two-billion-USD plan are reported proposal figures without verified critical-IT or executed utility basis. Google Meadowville, other Google campuses, a separate 744-acre rejected planning recommendation and regional budgets must not be merged with the Chirisa project. Original approvals and the PowerHouse joint-venture/operator crosswalk remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/products/richmond-va-area-counties-split-on-data-centers","host":"govtech.com","date":"2025-12-02","published":"2025-12-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3554,"lng":-77.4416,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"GovTech reproduces Richmond Times-Dispatch reporting on Chirisa's Meadowville proposal alongside other Richmond-region projects and policy debates.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The one-GW demand and two-billion-USD plan are reported proposal figures without verified critical-IT or executed utility basis. Google Meadowville, other Google campuses, a separate 744-acre rejected planning recommendation and regional budgets must not be merged with the Chirisa project. Original approvals and the PowerHouse joint-venture/operator crosswalk remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/products/richmond-va-area-counties-split-on-data-centers","host":"govtech.com","date":"2025-12-02","published":"2025-12-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Chester · Chesterfield · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"cleanarc-ruther-glen-va","state":"VA","kind":"facility","name":"CleanArc VA1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Ruther Glen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer-issued release. Grid capacity is explicitly the source basis. Future power phases, tax revenue and jobs are forecasts. Groundbreaking does not establish delivered capacity or current operating occupancy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-302621903.html","host":"prnewswire.com","date":"2025-11-20","published":"2025-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.9374,"lng":-77.4837,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Caroline","construction_event":"groundbreaking","event_date":"2025-11-20","advertised_grid_capacity_mw":900,"grid_capacity_phases":[{"mw":300,"target":"2027-Q1"},{"mw":300,"target":"2030"},{"mw":300,"target":"2033-2035"}],"forecast_annual_county_tax_revenue_usd":13000000,"forecast_permanent_jobs_minimum":50},"notes":["Developer-issued release. Grid capacity is explicitly the source basis. Future power phases, tax revenue and jobs are forecasts. Groundbreaking does not establish delivered capacity or current operating occupancy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-302621903.html","host":"prnewswire.com","date":"2025-11-20","published":"2025-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ruther Glen · Caroline · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"cloudhq-lc3-va","state":"VA","kind":"facility","name":"CloudHQ LC3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CloudHQ LC campus power conflict and LC3 scope. Headline1256MW and narrative over1.7GW conflict or have unspecified phase scope. Never assign either full-campus total to LC3 alone. Area text8,500,00SFand789.676SM malformed; canonical area held. No measured current consumption, calendar construction start or observed RFS date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cloudhq.com/campus/lc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0112123,"lng":-77.4604251,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"CloudHQ LC campus power conflict and LC3 scope","fields":{"campus":"LC","operator_campus_reference_point":{"lat":39.01015,"lon":-77.4627},"headline_total_critical_it_mw":1256,"headline_available_critical_it_mw":756,"narrative_planned_critical_it_gw_min_exclusive":1.7,"planned_campus_data_centers":14,"operator_status_description":"LC3 and LC4 under construction","canonical_lc3_critical_it_mw":null},"notes":["Headline1256MW and narrative over1.7GW conflict or have unspecified phase scope. Never assign either full-campus total to LC3 alone. Area text8,500,00SFand789.676SM malformed; canonical area held. No measured current consumption, calendar construction start or observed RFS date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cloudhq.com/campus/lc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"cloudhq-manassas-mcc-va","state":"VA","kind":"facility","name":"CloudHQ Manassas MCC Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Manassas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CloudHQ MCC full-campus and phased development scope. 382MW is full campus marketing total, not each building or energized load. Narrative says over375MW rather than exact382. RFSwithin20months is undated relative interval, not calendar opening. Mid2025construction/Q32026MCC7targets have not been independently observed. Referencepoint not verified parcel centroid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cloudhq.com/campus/mcc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.7196,"lng":-77.4982,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"CloudHQ MCC full-campus and phased development scope","fields":{"campus":"MCC","operator_campus_reference_point":{"lat":38.71955,"lon":-77.49819},"campus_area_sqft":2232875,"headline_total_critical_it_mw":382,"headline_available_critical_load_mw":96,"data_centers":7,"mcc5_status_description":"siteplan approved, ready for development","mcc7_historical_target_service_quarter":"2026-Q3"},"notes":["382MW is full campus marketing total, not each building or energized load. Narrative says over375MW rather than exact382. RFSwithin20months is undated relative interval, not calendar opening. Mid2025construction/Q32026MCC7targets have not been independently observed. Referencepoint not verified parcel centroid.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cloudhq.com/campus/mcc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Manassas · Prince William · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"cologix-ash1-va","state":"VA","kind":"facility","name":"Cologix ASH1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cologix Ashburn building identity and area. No numeric critical IT MW in reviewed body. Three-story area not automatically raised-floor area. Marketing readiness/efficiency descriptions not proof of current AI workloads or measured water use. Gzip corruption repaired from retained raw capture; prior corrupt record not used. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/ashburn/ash1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0179257,"lng":-77.4595164,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Cologix Ashburn building identity and area","fields":{"operator_site_code":"ASH1","published_address":"21745 Beaumeade Circle, Ashburn, Virginia","operator_reported_building_area_sqft":455000,"building_stories":3,"operator_described_ownership":"Cologix owned"},"notes":["No numeric critical IT MW in reviewed body. Three-story area not automatically raised-floor area. Marketing readiness/efficiency descriptions not proof of current AI workloads or measured water use. Gzip corruption repaired from retained raw capture; prior corrupt record not used.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/ashburn/ash1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"convergent-technology-park-remington-fauquier-va","state":"VA","kind":"facility","name":"Convergent Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Remington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Case numbers COMA-24-022504,REZN-24-022505,SPEX-24-022506 are review identifiers, not approvals. Acreage categories in letter do not reconcile arithmetically; preserve printed figures without inferred allocation. Two pages visually inspected. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/wp-content/uploads/convergent-tech-park-acceptance-letter-fauquier-aug-20-2024.pdf","host":"pecva.org","date":"2024-08-20","published":"2024-08-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.55073067963831,"lng":-77.8046447409979,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Signed Fauquier staff letter accepts Convergent comprehensive-plan/rezoning/special-exception application as complete for processing.","independently_verified_current_operating_status":null},"notes":["Case numbers COMA-24-022504,REZN-24-022505,SPEX-24-022506 are review identifiers, not approvals. Acreage categories in letter do not reconcile arithmetically; preserve printed figures without inferred allocation. Two pages visually inspected.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pecva.org/wp-content/uploads/convergent-tech-park-acceptance-letter-fauquier-aug-20-2024.pdf","host":"pecva.org","date":"2024-08-20","published":"2024-08-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Remington · Fauquier · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"coresite-va1-reston-va-va","state":"VA","kind":"facility","name":"CoreSite VA1 - Reston, VA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfax"],"city":"Reston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Area describes the three-facility Reston campus, not VA1 alone. Program participation statement gives no site grant, tax value, term or disbursement. Existing VA3 evidence remains separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/va1-reston-va","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9506059,"lng":-77.3645496,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_campus_gross_sqft_lower_bound":986000,"campus_facilities":3,"operator_tax_program_statement":"participating in Virginia and Illinois tax exemption programs"},"notes":["Area describes the three-facility Reston campus, not VA1 alone. Program participation statement gives no site grant, tax value, term or disbursement. Existing VA3 evidence remains separate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/va1-reston-va","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Reston · Fairfax · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"coresite-va3-reston-va-va","state":"VA","kind":"facility","name":"CoreSite VA3 - Reston, VA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfax"],"city":"Reston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The VA1 page advertises a three-facility campus total of more than 986,000 square feet. Do not assign the campus total to VA1 or add it to VA3. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/va3-reston-va","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9483343,"lng":-77.3724298,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft_lower_bound":533000},"notes":["The VA1 page advertises a three-facility campus total of more than 986,000 square feet. Do not assign the campus total to VA1 or add it to VA3.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/va3-reston-va","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Reston · Fairfax · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"aws-cosner-technology-campus-massaponax-va","state":"VA","kind":"facility","name":"Cosner Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Massaponax","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. TaftCoghillJr/FredericksburgFreePress June4,2026 original report names AWS CosnerTechCampus,3901MassaponaxChurchRoad, underconstruction/notyetoperable asofarticle.2023approval,329acres/1.9Msf are reported campus scopes, not exact operating floor area. CurrentOctober2026completion not observed. Article describes$72,067.80fine, commissioning emissions failures and corrective retesting. Linked8-pageoriginal copy is signed byADS but DEQsignature/date blank, with effectiveness requiringBOTHparties. Record civilcharge specified in partiallysigned copy; finalexecution/payment unknown, not independently provedpaidfine. Primary also records corrected violations, so do not omit remediation or claim allcampusongoingnoncompliance. Generic healthstudies/models cited innews were not read as original research and are NOT adopted as observed Cosner health impacts. Backupgenerator count is not ITMW; commissioning failures are not proof normalcontinuousdiesel operation. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification. All8pagesoftheDEQ-authoredCosnerconsentordercopyhostedbynewspaper readVISUALLYonly. P1Reg74288,3901MassaponaxChurchRd,permitissuedOct30,2024allowing186nonemergency+15emergencygensets. P2May31,2025commissioningfailureEG01/02/04;companyawarenessAug20,notificationAug21,followupSep2. Nointentionaldelayormisconductinferred. P3findingspermitconditions2/14/17;EG05opacity5.6%,EG066.25%runsvs5%condition;Feb16 to 17,2026retest/Apr15report/May11inspectionfoundcompliant anddocumentationcorrectedviolations. P4specifiedcivilcharge$72,067.80within30daysEFFECTIVEDATE; notreceipt/proofofpayment. P4E3ADSneitheradmitsnordeniesfindingsandagreestonotcontestinthisorder. P6E10requiresBOTHpartyexecutionforeffectiveness. P7DEQsignatureandordereddateBLANK;P8companyRobbTruedingerMay20,2026signaturevisible. Fullyexecutedcounterpart/effectivedate/paymentunknown, notassertionagencyneversignedelsewhere. NOVdateP3C7Oct25,2025vsP4E2Oct24internalconflictheld. NohiddenPDFtext/OCRextraction/DocuSigncertificateauthentication. Noall-siteongoingcompliance orhealthcausationcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"http://www.fredericksburgfreepress.com/2026/06/04/deq-issued-air-pollution-violations-on-spotsylvania-data-center-campus-in-2025/","host":"fredericksburgfreepress.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ddrqacl1jpsyp.cloudfront.net/wp-content/uploads/2026/06/04144256/ADS-Cosners-Corner-DEQ-Violation.pdf","host":"ddrqacl1jpsyp.cloudfront.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.204738259414135,"lng":-77.47623258858057,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["TaftCoghillJr/FredericksburgFreePress June4,2026 original report names AWS CosnerTechCampus,3901MassaponaxChurchRoad, underconstruction/notyetoperable asofarticle.2023approval,329acres/1.9Msf are reported campus scopes, not exact operating floor area. CurrentOctober2026completion not observed.","Article describes$72,067.80fine, commissioning emissions failures and corrective retesting. Linked8-pageoriginal copy is signed byADS but DEQsignature/date blank, with effectiveness requiringBOTHparties. Record civilcharge specified in partiallysigned copy; finalexecution/payment unknown, not independently provedpaidfine. Primary also records corrected violations, so do not omit remediation or claim allcampusongoingnoncompliance.","Generic healthstudies/models cited innews were not read as original research and are NOT adopted as observed Cosner health impacts. Backupgenerator count is not ITMW; commissioning failures are not proof normalcontinuousdiesel operation.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"http://www.fredericksburgfreepress.com/2026/06/04/deq-issued-air-pollution-violations-on-spotsylvania-data-center-campus-in-2025/","host":"fredericksburgfreepress.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["All8pagesoftheDEQ-authoredCosnerconsentordercopyhostedbynewspaper readVISUALLYonly. P1Reg74288,3901MassaponaxChurchRd,permitissuedOct30,2024allowing186nonemergency+15emergencygensets. P2May31,2025commissioningfailureEG01/02/04;companyawarenessAug20,notificationAug21,followupSep2. Nointentionaldelayormisconductinferred.","P3findingspermitconditions2/14/17;EG05opacity5.6%,EG066.25%runsvs5%condition;Feb16 to 17,2026retest/Apr15report/May11inspectionfoundcompliant anddocumentationcorrectedviolations. P4specifiedcivilcharge$72,067.80within30daysEFFECTIVEDATE; notreceipt/proofofpayment. P4E3ADSneitheradmitsnordeniesfindingsandagreestonotcontestinthisorder.","P6E10requiresBOTHpartyexecutionforeffectiveness. P7DEQsignatureandordereddateBLANK;P8companyRobbTruedingerMay20,2026signaturevisible. Fullyexecutedcounterpart/effectivedate/paymentunknown, notassertionagencyneversignedelsewhere. NOVdateP3C7Oct25,2025vsP4E2Oct24internalconflictheld. NohiddenPDFtext/OCRextraction/DocuSigncertificateauthentication. Noall-siteongoingcompliance orhealthcausationcertification.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://ddrqacl1jpsyp.cloudfront.net/wp-content/uploads/2026/06/04144256/ADS-Cosners-Corner-DEQ-Violation.pdf","host":"ddrqacl1jpsyp.cloudfront.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Massaponax · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"jk-land-cross-mill-center-leesburg-va","state":"VA","kind":"facility","name":"Cross Mill Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Leesburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.0781,"lng":-77.5575,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Piedmont Environmental Council discusses Cross Mill's rezoning and Quantum Park's future Loudoun decision while advocating a pause.","independently_verified_current_operating_status":null},"notes":["Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Leesburg · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"rck-crossroads-technology-campus-spotsylvania-va","state":"VA","kind":"facility","name":"Crossroads Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RCK Crossroads signed application, not final permit. SignedownerapplicationnotapprovedSUP;applicationnumberboxblank. McLeanandRestoncontactaddressesnotcampus. OCRcheckedagainstactualpageimage. No numeric MW, building count or operator tenant in form. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/40291/SUP-Application","host":"spotsylvania.va.us","date":"2026-03-11","published":"2026-03-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.2445,"lng":-77.4334,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"RCK Crossroads signed application, not final permit","fields":{"applicant":"RCK Digital Crossroads LLC","owner_signatory":"Sean H. Curtin","owner_signature_date":"2026-03-11","application_requested_use":"industrial data center campus and light public utilities","site_acres":633.28,"tax_map_parcels":["37-A-20","37-A-21","37-A-17D","37-A-64"],"county":"Spotsylvania, Virginia","permit_application_number":null,"permit_approval_date":null},"notes":["SignedownerapplicationnotapprovedSUP;applicationnumberboxblank. McLeanandRestoncontactaddressesnotcampus. OCRcheckedagainstactualpageimage. No numeric MW, building count or operator tenant in form.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/40291/SUP-Application","host":"spotsylvania.va.us","date":"2026-03-11","published":"2026-03-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"culpeper-brandy-station-va","state":"VA","kind":"facility","name":"Culpeper Acquisitions Brandy Station Campus (denied)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Culpeper"],"city":"Brandy Station","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Advocacy700MWto1.8GWrange is prospective estimate with undefined power basis; no current capacity. Hearing notices not outcomes; draft illustrative layout not approved site plan. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/region/culpeper/new-data-center-proposals-in-brandy-station-and-near-the-town-of-culpeper/","host":"pecva.org","date":"2024-05-30","published":"2024-05-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.5095,"lng":-77.8863,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"PEC opposition letter distinguishes Brandy Station XXTech Park request from separate Keyser Farm proposal and earlier withdrawn AttoTek.","independently_verified_current_operating_status":null},"notes":["Advocacy700MWto1.8GWrange is prospective estimate with undefined power basis; no current capacity. Hearing notices not outcomes; draft illustrative layout not approved site plan.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pecva.org/region/culpeper/new-data-center-proposals-in-brandy-station-and-near-the-town-of-culpeper/","host":"pecva.org","date":"2024-05-30","published":"2024-05-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Brandy Station · Culpeper · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"cyrusone-nva1-nva2-nva3-sterling-va","state":"VA","kind":"facility","name":"CyrusOne NVA1, NVA2 & NVA3 (Sterling)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. combined NVA1-NVA3 site offering. Source covers NVA1 throughNVA3. Combined space/power must not be copied to each building or treated as measured demand. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva1-nva3","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0259023,"lng":-77.4144697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"combined NVA1-NVA3 site offering","fields":{"combined_technical_it_space_sqft":420000,"combined_it_capacity_mw":44},"notes":["Source covers NVA1 throughNVA3. Combined space/power must not be copied to each building or treated as measured demand.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva1-nva3","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sterling · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"cyrusone-nva5-sterling-va","state":"VA","kind":"facility","name":"CyrusOne NVA5 (Sterling)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. combined NVA5 and NVA7 campus. Shared NVA5/NVA7 campus specifications. The116MW is one combined offering, not116MW per related record. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.024356,"lng":-77.4341,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"combined NVA5 and NVA7 campus","fields":{"combined_technical_it_space_sqft":1177019,"combined_it_capacity_mw":116,"separate_three_story_buildings":2},"notes":["Shared NVA5/NVA7 campus specifications. The116MW is one combined offering, not116MW per related record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sterling · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"cyrusone-nva7-sterling-va","state":"VA","kind":"facility","name":"CyrusOne NVA7 (Sterling)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. combined NVA5 and NVA7 campus. Shared NVA5/NVA7 campus specifications. The116MW is one combined offering, not116MW per related record. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0263152,"lng":-77.4340194,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"combined NVA5 and NVA7 campus","fields":{"combined_technical_it_space_sqft":1177019,"combined_it_capacity_mw":116,"separate_three_story_buildings":2},"notes":["Shared NVA5/NVA7 campus specifications. The116MW is one combined offering, not116MW per related record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sterling · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"cyrusone-nva8-sterling-va","state":"VA","kind":"facility","name":"CyrusOne NVA8 (Sterling)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Raised floor is a subset of the operator area label; no measured consumption inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-virginia-nva8","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0211789,"lng":-77.4132443,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"technical_it_space_sqft":154230,"raised_white_floor_sqft":100341,"it_capacity_mw":24},"notes":["Raised floor is a subset of the operator area label; no measured consumption inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-virginia-nva8","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sterling · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"cyrusone-vint-hill-fauquier-va","state":"VA","kind":"facility","name":"CyrusOne Vint Hill Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Vint Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Peter Cary/Piedmont Journalism Foundation, original March 11, 2024 report updated March 16. CyrusOne proposed four buildings/891,000 square feet at Vint Hill Road and Vint Hill Parkway, with site plans expected shortly; a proposed zoning vote was still future March 14. This is not the inherited 870,000 square feet reconciled or final approval. Vint Hill Corners is a separate roughly 50-acre Brookside Parkway proposal, then disputed with county staff; roughly 700,000 square feet is an estimate. Existing OVH/possible second building and Pink Panther hypothetical development are different projects. Master-association review is not county land-use approval. No current exemption or final zoning law established by this historical article. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","host":"princewilliamtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.752287510948115,"lng":-77.67347422456572,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Peter Cary/Piedmont Journalism Foundation, original March 11, 2024 report updated March 16. CyrusOne proposed four buildings/891,000 square feet at Vint Hill Road and Vint Hill Parkway, with site plans expected shortly; a proposed zoning vote was still future March 14. This is not the inherited 870,000 square feet reconciled or final approval. Vint Hill Corners is a separate roughly 50-acre Brookside Parkway proposal, then disputed with county staff; roughly 700,000 square feet is an estimate. Existing OVH/possible second building and Pink Panther hypothetical development are different projects. Master-association review is not county land-use approval. No current exemption or final zoning law established by this historical article.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","host":"princewilliamtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Vint Hill · Fauquier · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"digital-realty-iad38-va","state":"VA","kind":"facility","name":"Digital Realty IAD38","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Matched the named facility card on a regional page. Regional space summary has inconsistent imperial/metric scales and is excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0010841,"lng":-77.4772014,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"44100 Digital Loudoun Plaza, Bldg J, Ashburn, VA 20147","advertised_building_sqft":166000,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Matched the named facility card on a regional page. Regional space summary has inconsistent imperial/metric scales and is excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"digital-realty-iad44-va","state":"VA","kind":"facility","name":"Digital Realty IAD44","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad44","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9608537,"lng":-77.4913983,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"43704 Efficiency Drive, Sterling, VA 20166","advertised_building_sqft":648500,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad44","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sterling · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"digital-realty-northern-virginia-acc4-va","state":"VA","kind":"facility","name":"Digital Realty Northern Virginia ACC4","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc4","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0178592,"lng":-77.4624708,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"ACC4","published_address":"44480 Hastings Drive Ashburn, VA 20147","operator_label_total_building_size_sqft":347500},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc4","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"digital-realty-northern-virginia-acc5-va","state":"VA","kind":"facility","name":"Digital Realty Northern Virginia ACC5","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc5","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0201584,"lng":-77.4631033,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"ACC5","published_address":"44521 Hastings Drive, Ashburn, VA 20147","operator_label_total_building_size_sqft":360000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc5","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"digital-realty-northern-virginia-iad14-va","state":"VA","kind":"facility","name":"Digital Realty Northern Virginia IAD14","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad14","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0033364,"lng":-77.4870935,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"IAD14","published_address":"43791 Devin Shafron Drive, (Bldg D) Ashburn, VA 20147","operator_label_total_building_size_sqft":135000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad14","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"digital-realty-va3-va","state":"VA","kind":"facility","name":"Digital Realty VA3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfax"],"city":"Reston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Digital Realty VA3 at1780BusinessCenterDrive is not CoreSite VA3; matching facility codes across operators is not identity proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/va3","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9484941,"lng":-77.3273071,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"VA3","published_address":"1780 Business Center Drive Reston, VA 20190","operator_label_total_building_size_sqft":256000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Digital Realty VA3 at1780BusinessCenterDrive is not CoreSite VA3; matching facility codes across operators is not identity proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/va3","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Reston · Fairfax · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"dulles-cloud-south-gainesville-prince-william-va","state":"VA","kind":"facility","name":"Dulles Cloud South (Dulles South Innovation Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Planning-stage denial, not an operating-site shutdown. Industrial square footage and traffic forecasts are not commissioned server floor or measured traffic. Later official record still needed. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/","host":"potomaclocal.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.83,"lng":-77.61,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"plan-amendment-denied","reported_finding":"Potomac Local reports board denied Dulles South Comprehensive Plan Amendment on July 7, 2026.","report_display_date":"2026-07-08","independently_verified_current_status":null},"notes":["Planning-stage denial, not an operating-site shutdown. Industrial square footage and traffic forecasts are not commissioned server floor or measured traffic. Later official record still needed.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/","host":"potomaclocal.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Gainesville · Prince William · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"edgecore-culpeper-tech-zone-va","state":"VA","kind":"facility","name":"EdgeCore Culpeper Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Culpeper"],"city":"Culpeper","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Initial capacity is inside the ultimate plan. Early 2028 power delivery remains a forecast. The water-efficiency benchmark is not measured consumption, and the wider technology zone is not the owned campus. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia","host":"edgecore.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.4735,"lng":-77.96,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"EdgeCore announces a 120-acre Culpeper purchase, initially 216 MW of critical IT and potential expansion to 432 MW.","independently_verified_current_operating_status":null,"planned_initial_critical_it_mw":216,"potential_critical_it_mw":432,"planned_initial_power_delivery":"early 2028"},"notes":["Initial capacity is inside the ultimate plan. Early 2028 power delivery remains a forecast. The water-efficiency benchmark is not measured consumption, and the wider technology zone is not the owned campus.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia","host":"edgecore.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Culpeper · Culpeper · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"edgecore-shannon-hill-louisa-va","state":"VA","kind":"facility","name":"EdgeCore Shannon Hill Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Louisa"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 2025 sale announcement, last updated July 3. Purchase price, prior public utilities, grants and debt are different transactions, not development capex or a current incentive award. Claimed WUE below .01 is a design benchmark, not measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.louisacounty.gov/CivicAlerts.aspx?AID=470","host":"louisacounty.gov","date":"2025-06-24","published":"2025-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.836,"lng":-77.988,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county_announced_sale_date":"2025-06-24","property_acres":697,"property_purchase_price_usd":42000000,"county_prior_utility_infrastructure_investment_usd":29500000,"county_prior_park_purchase_usd":2600000,"county_prior_park_purchase_year":2018},"notes":["2025 sale announcement, last updated July 3. Purchase price, prior public utilities, grants and debt are different transactions, not development capex or a current incentive award. Claimed WUE below .01 is a design benchmark, not measured water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.louisacounty.gov/CivicAlerts.aspx?AID=470","host":"louisacounty.gov","date":"2025-06-24","published":"2025-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Louisa · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"equinix-ashburn-va","state":"VA","kind":"facility","name":"Equinix Ashburn Campus (DC1-DC15)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. regional hub, not one Ashburn facility. WashingtonDCmarket page covers multiple Ashburn-area IBX facilities. Resolve specific building before assigning address, MW, area or current operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0437,"lng":-77.4875,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"regional hub, not one Ashburn facility","fields":{},"notes":["WashingtonDCmarket page covers multiple Ashburn-area IBX facilities. Resolve specific building before assigning address, MW, area or current operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"equinix-dc2-va","state":"VA","kind":"facility","name":"Equinix DC2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc2","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0163894,"lng":-77.4590691,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"21715 Filigree Court Ashburn, VA 20147","colocation_area_sqft":118446},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc2","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"equinix-dc3-va","state":"VA","kind":"facility","name":"Equinix DC3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc3","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0220154,"lng":-77.460235,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"44470 Chilum Place Ashburn, VA 20147","colocation_area_sqft":67038},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc3","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"emerald-lakes-etheridge-lakes-data-center-chesapeake-va","state":"VA","kind":"facility","name":"Etheridge Lakes Data Center (Great Bridge)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesapeake (independent city)"],"city":"Chesapeake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.. ApplicationPLN-REZ-2025-002 names EtheridgeLakes/EmeraldLakeEstatesIInc and proposedA1→M1rezone of22.612acres inFentressoverlay, southwestEtheridgeManorBlvd/CentervilleTurnpike, parcel0610000000991. RecordstatusResubmittalReceived is not approvedrezone. 349458sfproposedDC +35316sfHVAC/generators =384774sftotalfootprint asapplicationstates; those are proposedarea scopes, not ITfloororMW.26.3123aclegaldescription and22.612acrezonepart differ; exactscope notcollapsed. Owner/agentmailing addresses are notfacilitystreetaddress. Application expressly calls conceptualexhibit illustrative, vestingnorights. PDFpage7 is a PRIVATE CORPORATE DIRECTORS resolution signedDecember20,2024 authorizing applicant representation ofrelatedPLN-USE-2024-054CommercePark application, not CityCouncil approval. Page18title-company signatory is not adoptedzoning. No current vote/CO/power contract evidenced bythese pages. Not whole record/current operating census, legal compliance or independent meter certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityofchesapeake.net/DocumentCenter/View/23727/PLN-REZ-2025-002---Etheridge-Lakes-Data-Centerpdf","host":"cityofchesapeake.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.68061281906499,"lng":-76.18817902157426,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-originals-model-and-approval-stages-round55-2026-10-15.json","scope":"Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.","fields":{},"notes":["ApplicationPLN-REZ-2025-002 names EtheridgeLakes/EmeraldLakeEstatesIInc and proposedA1→M1rezone of22.612acres inFentressoverlay, southwestEtheridgeManorBlvd/CentervilleTurnpike, parcel0610000000991. RecordstatusResubmittalReceived is not approvedrezone.","349458sfproposedDC +35316sfHVAC/generators =384774sftotalfootprint asapplicationstates; those are proposedarea scopes, not ITfloororMW.26.3123aclegaldescription and22.612acrezonepart differ; exactscope notcollapsed.","Owner/agentmailing addresses are notfacilitystreetaddress. Application expressly calls conceptualexhibit illustrative, vestingnorights.","PDFpage7 is a PRIVATE CORPORATE DIRECTORS resolution signedDecember20,2024 authorizing applicant representation ofrelatedPLN-USE-2024-054CommercePark application, not CityCouncil approval. Page18title-company signatory is not adoptedzoning. No current vote/CO/power contract evidenced bythese pages.","Not whole record/current operating census, legal compliance or independent meter certification."],"sources":[{"url":"https://www.cityofchesapeake.net/DocumentCenter/View/23727/PLN-REZ-2025-002---Etheridge-Lakes-Data-Centerpdf","host":"cityofchesapeake.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Chesapeake · Chesapeake (independent city) · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"flexential-richmond-ric01-02-va","state":"VA","kind":"facility","name":"Flexential Richmond (RIC01/02)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Henrico"],"city":"Richmond","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.6468902,"lng":-77.4386952,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Richmond (RIC01/02)","publisher_reported_footprint_sqft":28594,"publisher_reported_critical_power_mw":2.8,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Richmond · Henrico · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"corscale-gainesville-crossing-va","state":"VA","kind":"facility","name":"Gainesville Crossing Digital Campus (GCDC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. AffiniusCapital original projectpage identifies GainesvilleCrossingGCDC withCorscale.130acres/fivebuildings/326MWFULLBUILDOUTpower have unspecifiedITbasis, not commissionedcriticalIT. Header1,020kRSF is rentable area, not automaticallygrosssitebuildingarea. Developer saysBuilding1stabilized andBuildings1 to 3fullyleased, but lease/stabilization isnot independentmeteredoperation. Buildings2Q22026/3Q32026completion and4 to 5Q22026construction are undated-page targets; datespassingnotobservedcompletion. Introone-on-sitesubstation vs featurestwo-on-sitesubstations is internal scope/versionconflict. LEEDanticipated/WUE-PUEclaims notcertifiedmeasurements; no regiondevoidofnaturaldisastersclaim adopted. GCDC isnotPWCDigitalGateway; unrelatedwithdrawalheadline doesnotcancelthiscampus. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://affiniuscapital.com/projects/gcdc/","host":"affiniuscapital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.78,"lng":-77.62,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["AffiniusCapital original projectpage identifies GainesvilleCrossingGCDC withCorscale.130acres/fivebuildings/326MWFULLBUILDOUTpower have unspecifiedITbasis, not commissionedcriticalIT. Header1,020kRSF is rentable area, not automaticallygrosssitebuildingarea.","Developer saysBuilding1stabilized andBuildings1 to 3fullyleased, but lease/stabilization isnot independentmeteredoperation. Buildings2Q22026/3Q32026completion and4 to 5Q22026construction are undated-page targets; datespassingnotobservedcompletion. Introone-on-sitesubstation vs featurestwo-on-sitesubstations is internal scope/versionconflict. LEEDanticipated/WUE-PUEclaims notcertifiedmeasurements; no regiondevoidofnaturaldisastersclaim adopted. GCDC isnotPWCDigitalGateway; unrelatedwithdrawalheadline doesnotcancelthiscampus.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://affiniuscapital.com/projects/gcdc/","host":"affiniuscapital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Gainesville · Prince William · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"google-botetourt-greenfield-va","state":"VA","kind":"facility","name":"Google Botetourt Center at Greenfield Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Botetourt"],"city":"Daleville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County photos and grading information support physical site work, not commissioned operation. Land purchase and county contribution are separate transactions, not total data-center capital investment. No opening date established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.botetourtva.gov/1021/Google-Data-Center","host":"botetourtva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.42,"lng":-79.89,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county_construction_photo_date":"2026-10-09","grading_application_month":"2026-02","land_purchase_month":"2025-06","land_purchase_price_usd":14055406.37,"county_project_contribution_usd":4000000},"notes":["County photos and grading information support physical site work, not commissioned operation. Land purchase and county contribution are separate transactions, not total data-center capital investment. No opening date established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.botetourtva.gov/1021/Google-Data-Center","host":"botetourtva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Daleville · Botetourt · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"google-loch-midlothian-va","state":"VA","kind":"facility","name":"Google Project Loch","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Midlothian","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County article is about Bermuda Hundred, whereas this imported identifier suggests a Loch/Midlothian project. Resolve identity before merging. Virginia investment is regional, not this single campus; separate 200 MW fusion purchase is not facility load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.chesterfield.gov/m/newsflash/Home/Detail/6383","host":"chesterfield.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.454,"lng":-77.71,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county_reported_status_event":"Google has broken ground at Bermuda Hundred site","site_acres_lower_bound":300,"regional_virginia_investment_usd":9000000000,"regional_investment_target_end_year":2026},"notes":["County article is about Bermuda Hundred, whereas this imported identifier suggests a Loch/Midlothian project. Resolve identity before merging. Virginia investment is regional, not this single campus; separate 200 MW fusion purchase is not facility load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.chesterfield.gov/m/newsflash/Home/Detail/6383","host":"chesterfield.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Midlothian · Chesterfield · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"jk-land-greenlin-park-leesburg-va","state":"VA","kind":"facility","name":"Greenlin Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Leesburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. LoudounNow HannaPampaloni February20,2025 originalreport describesGreenlinPark Feb19supervisors5 to 4REZONING on83acres for1.4Msfdata-center/substationuse. Threeconceptswithtwo/three/fourbuildings are ALTERNATIVES withsameFAR, notninebuildings. Approvedrezoning notallpermits orenergizedcampus. 300MWlimit forfiveyears is reportedDEMANDceiling, notcurrentIT/certifiedservice. Three-yearenergyreporting,55ftheight,screening/noise/stormwater/waterconditions are reportedproffers, notactualcompliance. Exactmeaning/startdates require signedinstrument. Officialcomments aboutlegalauthority notindependentcurrentlegalanalysis. Publiccomments/newsletter UI untrusted, noformsubmission orpermissiontoeditinferred. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.loudounnow.com/news/300-mw-data-center-approved-south-of-leesburg/article_31050264-efb4-11ef-a1fa-c79d17f045f1.html","host":"loudounnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.064,"lng":-77.524,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["LoudounNow HannaPampaloni February20,2025 originalreport describesGreenlinPark Feb19supervisors5 to 4REZONING on83acres for1.4Msfdata-center/substationuse. Threeconceptswithtwo/three/fourbuildings are ALTERNATIVES withsameFAR, notninebuildings. Approvedrezoning notallpermits orenergizedcampus.","300MWlimit forfiveyears is reportedDEMANDceiling, notcurrentIT/certifiedservice. Three-yearenergyreporting,55ftheight,screening/noise/stormwater/waterconditions are reportedproffers, notactualcompliance. Exactmeaning/startdates require signedinstrument. Officialcomments aboutlegalauthority notindependentcurrentlegalanalysis. Publiccomments/newsletter UI untrusted, noformsubmission orpermissiontoeditinferred.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.loudounnow.com/news/300-mw-data-center-approved-south-of-leesburg/article_31050264-efb4-11ef-a1fa-c79d17f045f1.html","host":"loudounnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Leesburg · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"hunters-ridge-south-data-center-campus-spotsylvania-va","state":"VA","kind":"facility","name":"Hunters Ridge South Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Spotsylvania","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. FredericksburgFreePress August27,2025 original report says previousTuesday supervisors5 to 2approved HuntersRidgeSouth REZONING; proposedmaximum2.2Msf atCosnerDrive. Publisheddate isnotautomaticallyvotedate (TuesdaywasAugust26). Underlyingsignedminutes/proffers unread, so exactvote date notcertified fromthispass. Reported1600ftnearesthome/roadconstruction/$100kCTE/nopotablewaterproffers are commitments, notasbuiltsetbacks/paidfunds/measuredzero use. Countywide$930Minfrastructurefigure isnotHRS-specificcapex orpaidamount. Sep23jointsession scheduled, notobservedoutcome. UnrelatedHOAbond/$400k/$1.3Mdiscussion isdifferentpropertyissue, notcampusincentive. Finalpermits/CO/ITMWnotestablished. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fredericksburgfreepress.com/2025/08/27/spotsylvania-board-of-supervisors-approve-potential-2-2-million-square-foot-data-center-campus/","host":"fredericksburgfreepress.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.213,"lng":-77.482,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["FredericksburgFreePress August27,2025 original report says previousTuesday supervisors5 to 2approved HuntersRidgeSouth REZONING; proposedmaximum2.2Msf atCosnerDrive. Publisheddate isnotautomaticallyvotedate (TuesdaywasAugust26). Underlyingsignedminutes/proffers unread, so exactvote date notcertified fromthispass.","Reported1600ftnearesthome/roadconstruction/$100kCTE/nopotablewaterproffers are commitments, notasbuiltsetbacks/paidfunds/measuredzero use. Countywide$930Minfrastructurefigure isnotHRS-specificcapex orpaidamount. Sep23jointsession scheduled, notobservedoutcome. UnrelatedHOAbond/$400k/$1.3Mdiscussion isdifferentpropertyissue, notcampusincentive. Finalpermits/CO/ITMWnotestablished.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.fredericksburgfreepress.com/2025/08/27/spotsylvania-board-of-supervisors-approve-potential-2-2-million-square-foot-data-center-campus/","host":"fredericksburgfreepress.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Spotsylvania · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"hhhunt-hunting-hawk-technology-park-hanover-va","state":"VA","kind":"facility","name":"Hunting Hawk Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hanover"],"city":"Glen Allen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. 468-acre, ten-building scheme and annual tax estimates were forecasts. Exact filing receipt and later replacement not independently retained. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/developer-withdraws-hanover-data-center-campus-proposal/","host":"virginiabusiness.com","date":"2026-01-29","published":"2026-01-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.657,"lng":-77.626,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-application-withdrawn","reported_finding":"Virginia Business reports HHHunt withdrew Hunting Hawk rezoning application, announced to supervisors after planning denial recommendation.","report_display_date":"2026-01-29","independently_verified_current_status":null},"notes":["468-acre, ten-building scheme and annual tax estimates were forecasts. Exact filing receipt and later replacement not independently retained.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/developer-withdraws-hanover-data-center-campus-proposal/","host":"virginiabusiness.com","date":"2026-01-29","published":"2026-01-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Glen Allen · Hanover · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"westdulles-iron-horse-hanover-va","state":"VA","kind":"facility","name":"Iron Horse Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hanover"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Deferral is not denial or approval.2024 TownofAshland approval andHanover denial concern different jurisdictions/earlier plan; do not merge them into one current approval. Proposed 75-footheight is a requested allowance, not built condition. Other MountainRoad denial/HickoryHill approval are separate projects. Resident emissions/well-impact concerns are not measured findings. NoMW, issued utility service, current construction or laterJulyoutcome adopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/","host":"12onyourside.com","date":"2026-06-19","published":"2026-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.762,"lng":-77.44,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"WWBT reports developer-requested deferral of IronHorse’s revised 78-acre Hanover rezoning/height request, with a July 16 planning hearing expected.","independently_verified_current_operating_status":null},"notes":["Deferral is not denial or approval.2024 TownofAshland approval andHanover denial concern different jurisdictions/earlier plan; do not merge them into one current approval. Proposed 75-footheight is a requested allowance, not built condition. Other MountainRoad denial/HickoryHill approval are separate projects. Resident emissions/well-impact concerns are not measured findings. NoMW, issued utility service, current construction or laterJulyoutcome adopted.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/","host":"12onyourside.com","date":"2026-06-19","published":"2026-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Hanover · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"green-energy-ventures-king-george-technology-center-va","state":"VA","kind":"facility","name":"King George Technology Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King George"],"city":"King George","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. conditional KingGeorge proffer statement,notapproved construction. Conditionalvoluntaryproffersapplyonlyifrezoningapprovedasrequestedandappealperiodrequirementsmet; thiscopydoesnotproveapprovalorexecution.6.5Mfullmaximumincludes2.5Mphase1,not9M. Infrastructure/publicfacilitiesexcludedfromdatacenterareacap. ApplicantChantillymailingaddressnotcampus. FilenameSeptember26notdocumentSeptember29date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kinggeorgecountyva.gov/DocumentCenter/View/24172/92625-Proffers-Revised-after-Supervisor-Meeting-Clean---GEV","host":"kinggeorgecountyva.gov","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.250254083928,"lng":-77.29011580291154,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"conditional KingGeorge proffer statement,notapproved construction","fields":{"proffer_document_date":"2025-09-29","applicant":"GreenEnergyVenturesLLC","project_name":"KingGeorgeTechnologyCenter","published_tax_parcels":["21-49","21-73","22-46A","21-49A"],"proposed_data_center_building_area_sqft_max":6500000,"proposed_phase1_data_center_area_sqft_max":2500000},"notes":["Conditionalvoluntaryproffersapplyonlyifrezoningapprovedasrequestedandappealperiodrequirementsmet; thiscopydoesnotproveapprovalorexecution.6.5Mfullmaximumincludes2.5Mphase1,not9M. Infrastructure/publicfacilitiesexcludedfromdatacenterareacap. ApplicantChantillymailingaddressnotcampus. FilenameSeptember26notdocumentSeptember29date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kinggeorgecountyva.gov/DocumentCenter/View/24172/92625-Proffers-Revised-after-Supervisor-Meeting-Clean---GEV","host":"kinggeorgecountyva.gov","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · King George · King George · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"aws-lake-anna-technology-campus-louisa-va","state":"VA","kind":"facility","name":"Lake Anna Technology Campus (LATC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Louisa"],"city":"Louisa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.04763641638,"lng":-77.81682351474,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Louisa · Louisa · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"lavue-massaponax-tech-campus-spotsylvania-va","state":"VA","kind":"facility","name":"Massaponax Tech Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Massaponax","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Massaponax official case index. Application-materials index not final vote, all permits or MW. Linked proffers/GDP/TIA not read through this landing page. County contact headquarters is not campus address. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/3138/R25-0004-Massaponax-Tech-Campus","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.1869,"lng":-77.5505,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Massaponax official case index","fields":{"government_case":"R25-0004","project_name":"Massaponax Tech Campus","government_indexed_submission":"4th submission","county":"Spotsylvania, Virginia"},"notes":["Application-materials index not final vote, all permits or MW. Linked proffers/GDP/TIA not read through this landing page. County contact headquarters is not campus address.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/3138/R25-0004-Massaponax-Tech-Campus","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Massaponax · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"menlo-digital-jamestown-drive-petersburg-va","state":"VA","kind":"facility","name":"Menlo Digital Richmond Virginia Data Center (Jamestown Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Petersburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The substation and proposed computing figures are different bases, not 404 MW. By-right zoning is not all approvals, construction or commissioning. Later round-twenty-four reporting on abandoned Project Flash talks takes precedence over this story's earlier regional discussion. State-law, tax and statewide-moratorium assertions are not adopted without original legislation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterfrontier.com/site-selection/article/55395571/navigating-virginias-data-center-boom-policy-shifts-local-projects-and-future-challenges","host":"datacenterfrontier.com","date":"2026-08-05","published":"2026-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.199,"lng":-77.363,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Data Center Frontier describes Menlo Digital's proposed four-building campus on 74 acres at 2255 Jamestown Drive, with 104 MW planned through a 300 MW substation.","independently_verified_current_operating_status":null},"notes":["The substation and proposed computing figures are different bases, not 404 MW. By-right zoning is not all approvals, construction or commissioning. Later round-twenty-four reporting on abandoned Project Flash talks takes precedence over this story's earlier regional discussion. State-law, tax and statewide-moratorium assertions are not adopted without original legislation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterfrontier.com/site-selection/article/55395571/navigating-virginias-data-center-boom-policy-shifts-local-projects-and-future-challenges","host":"datacenterfrontier.com","date":"2026-08-05","published":"2026-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Petersburg · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"microsoft-boydton-bn-campus-mecklenburg-va","state":"VA","kind":"facility","name":"Microsoft Boydton Campus (BN / Azure East US)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mecklenburg"],"city":"Boydton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Source is SouthernVirginia regional fact sheet, not BN-only equipment or staffing. Upload path2021/11 does not independently prove publication day. Renewable-contract MW is not site IT demand, nor proof of hourly carbon-free operation. Water use below5% of year describes cooling use timing, not water volume. Generic no-noise/no-traffic and compliance statements are operator claims, not measured receptors, enforcement records or independent approvals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/wp-content/uploads/2021/11/Boydton-datacenter-fact-sheet.pdf","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.65969,"lng":-78.36487,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"regional_12_month_weighted_pue":1.147,"pue_period_end":"2021-07","regional_operations_staff_scope":"More than505 full-time employees and contractors across SouthernVirginia campuses, historical brochure.","regional_renewable_asset_contract_mw":[576,315],"current_site_it_mw":null},"notes":["Source is SouthernVirginia regional fact sheet, not BN-only equipment or staffing. Upload path2021/11 does not independently prove publication day.","Renewable-contract MW is not site IT demand, nor proof of hourly carbon-free operation. Water use below5% of year describes cooling use timing, not water volume.","Generic no-noise/no-traffic and compliance statements are operator claims, not measured receptors, enforcement records or independent approvals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/wp-content/uploads/2021/11/Boydton-datacenter-fact-sheet.pdf","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Boydton · Mecklenburg · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"dp-facilities-mineral-gap-wise-va","state":"VA","kind":"facility","name":"Mineral Gap Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wise"],"city":"Wise","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wise County operating-facility account versus regional energy prospects. Solar generation capacity is not critical IT. Economic-development Tier III description is not independent certification inspection. Mine-water savings exceeding 1M annually are feasibility estimates for regional prospects, not measured Mineral Gap savings. SMR exploration is not an approved operating reactor. Published equipment tax and workforce comparisons need dated legal/statistical sources before comparative rankings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Solar-generation rating not facility IT; ProjectOasis feasibility/SMR potential not commissioned campus. WiseInnovationHub not named; no manual credit for that ID. Tax incentives listed are eligibility, not awarded funding. Subsequent original decisions and current operator disclosures take precedence.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://elevatewisecounty.com/top-industries/data-centers/","host":"elevatewisecounty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.987,"lng":-82.53,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Wise County operating-facility account versus regional energy prospects","fields":{"publisher":"Wise County Economic Development","facility":"Mineral Gap","locality":"Lonesome Pine Business and Technology Park, Wise County, Virginia","reported_established_year":2017,"reported_employees_min_exclusive":20,"behind_meter_solar_mw":3.6,"solar_service_year":2023},"notes":["Solar generation capacity is not critical IT. Economic-development Tier III description is not independent certification inspection. Mine-water savings exceeding 1M annually are feasibility estimates for regional prospects, not measured Mineral Gap savings. SMR exploration is not an approved operating reactor. Published equipment tax and workforce comparisons need dated legal/statistical sources before comparative rankings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://elevatewisecounty.com/top-industries/data-centers/","host":"elevatewisecounty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Wise County economic-development page names MineralGap,2017establishment and3.6MWsolar array.","independently_verified_current_operating_status":null},"notes":["Solar-generation rating not facility IT; ProjectOasis feasibility/SMR potential not commissioned campus. WiseInnovationHub not named; no manual credit for that ID. Tax incentives listed are eligibility, not awarded funding.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://elevatewisecounty.com/top-industries/data-centers/","host":"elevatewisecounty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Wise · Wise · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"tract-mountain-road-technology-park-hanover-va","state":"VA","kind":"facility","name":"Mountain Road Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hanover"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. VPM LyndonGerman June1,2026 updatedJune3 reportsHanover4 to 3REJECTIONofMountainRoadTractrezoning, distinctfromAprilplanningrecommendation.427acresvsWTVRnearly430roundedscopes; noadditionalcampus. NewsrelativeWednesdayconsistentMay27butoriginalvoteminutesnotread; exactdaykeptuncertified. OtherHHHuntwithdrawal/differentTractAshland/Goochlandprojectsnotthisdenial. 600kgal/daywater and901Mtax2025 to 2044/350direct1100constructjobs are FORECASTSofrejectedproposal. $15Mwaterinfra/$6Mland-recreation are commitmentsnotverifiedpayments. First2029/full2036targets notactualopenings. Sourceprints900MWperday, a dimensionaluniterror; do notnormalizeintomeasuredMW/MWhorIT. Reporter/residentviewsremainattributed, notindependentlyprovenfutureharm/countywideban. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification. WTVR KelseyJones/CameronThompson originalreport corroborates4 to 3HanoverdenialWednesdaynight; metadataMay28,2026publication00:13EDT,notautomaticallyvoteday. Proposed430acres/$900M20yrtax/~1000constructionjobs are roundedforecastsofthefailedproposal, notactualspending/payments. Commitments towaterupgrades/noisestudies notperformanceproof. NewsroombodydisclosesAI-assistedplatformconversion; originaljournalistreportstillattributed. PlannedJune78acreBeaverdamcase andapprovedAshlandcampusseparate; currentcountyban notshown.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.vpm.org/news/2026-06-01/hanover-mountain-road-data-center-tract-davis-prichard-kirchner-dibble","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.wtvr.com/news/local-news/hanover-county/tract-data-center-vote-may-28-2026","host":"wtvr.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.693493,"lng":-77.53629,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["VPM LyndonGerman June1,2026 updatedJune3 reportsHanover4 to 3REJECTIONofMountainRoadTractrezoning, distinctfromAprilplanningrecommendation.427acresvsWTVRnearly430roundedscopes; noadditionalcampus. NewsrelativeWednesdayconsistentMay27butoriginalvoteminutesnotread; exactdaykeptuncertified. OtherHHHuntwithdrawal/differentTractAshland/Goochlandprojectsnotthisdenial.","600kgal/daywater and901Mtax2025 to 2044/350direct1100constructjobs are FORECASTSofrejectedproposal. $15Mwaterinfra/$6Mland-recreation are commitmentsnotverifiedpayments. First2029/full2036targets notactualopenings. Sourceprints900MWperday, a dimensionaluniterror; do notnormalizeintomeasuredMW/MWhorIT. Reporter/residentviewsremainattributed, notindependentlyprovenfutureharm/countywideban.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.vpm.org/news/2026-06-01/hanover-mountain-road-data-center-tract-davis-prichard-kirchner-dibble","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["WTVR KelseyJones/CameronThompson originalreport corroborates4 to 3HanoverdenialWednesdaynight; metadataMay28,2026publication00:13EDT,notautomaticallyvoteday. Proposed430acres/$900M20yrtax/~1000constructionjobs are roundedforecastsofthefailedproposal, notactualspending/payments. Commitments towaterupgrades/noisestudies notperformanceproof. NewsroombodydisclosesAI-assistedplatformconversion; originaljournalistreportstillattributed. PlannedJune78acreBeaverdamcase andapprovedAshlandcampusseparate; currentcountyban notshown.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.wtvr.com/news/local-news/hanover-county/tract-data-center-vote-may-28-2026","host":"wtvr.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Hanover · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"aws-north-creek-technology-campus-louisa-va","state":"VA","kind":"facility","name":"North Creek Technology Campus (NCTC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Louisa"],"city":"Louisa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.999666431819,"lng":-77.967415971191,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Louisa · Louisa · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"ntt-ashburn-va1-data-center-va","state":"VA","kind":"facility","name":"NTT Ashburn VA1 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. Floor hold:64,723 sq ft headline differs from sum72,251 sq ft of five labelled vault areas on PDF page 3. Layout may use another area definition; no single exact floor adopted. 224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/5216f5e0538b4fcfb6d47b2f299eb4db?v=89987bc7","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0227436,"lng":-77.4548911,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":12.6,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":null,"operator_published_address":"44664 Guilford Drive, Ashburn, VA 20147","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","Floor hold:64,723 sq ft headline differs from sum72,251 sq ft of five labelled vault areas on PDF page 3. Layout may use another area definition; no single exact floor adopted.","224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/5216f5e0538b4fcfb6d47b2f299eb4db?v=89987bc7","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"ntt-ashburn-va2-data-center-va","state":"VA","kind":"facility","name":"NTT Ashburn VA2 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. 224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-2-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0250127,"lng":-77.4576402,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":14,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":70000,"operator_published_address":"44610 Guilford Drive, Ashburn, VA 20147","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-2-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"ntt-ashburn-va5-data-center-va","state":"VA","kind":"facility","name":"NTT Ashburn VA5 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. 224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-5-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/0ed79ad4657c4583816795ff57bfcbd5?v=c95af5b7","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0183033,"lng":-77.472611,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":32,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":140000,"operator_published_address":"21583 Megawatt Drive, Ashburn, VA 20147","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-5-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/0ed79ad4657c4583816795ff57bfcbd5?v=c95af5b7","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"ntt-ashburn-va7-data-center-va","state":"VA","kind":"facility","name":"NTT Ashburn VA7 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. 224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va7-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/8cad209e9bd54778a6be6a8b8e5f8f40?v=889fd74f","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0160142,"lng":-77.471954,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":36,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":125000,"operator_published_address":"44371 Gigabit Plaza, Ashburn, VA 20147","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va7-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/8cad209e9bd54778a6be6a8b8e5f8f40?v=889fd74f","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"nuvu-county-drive-petersburg-va","state":"VA","kind":"facility","name":"NuVu County Drive Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Petersburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public excerpt was read; the full linked report was not. A stated 300 MW basis is unspecified and not commissioning. By-right treatment is not all permits, executed utility service or current construction. No exact approval day inferred from weeks-after wording; other Petersburg projects remain separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wtvr.com/news/local-news/tri-cities/data-center-projects-july-21-2026","host":"wtvr.com","date":"2026-07-21","published":"2026-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.193,"lng":-77.376,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WTVR's Richmond BizSense excerpt reports NuVu's first Petersburg site-plan approval in the weeks after a January announcement, on a roughly 75-acre County Drive property.","independently_verified_current_operating_status":null},"notes":["Only the public excerpt was read; the full linked report was not. A stated 300 MW basis is unspecified and not commissioning. By-right treatment is not all permits, executed utility service or current construction. No exact approval day inferred from weeks-after wording; other Petersburg projects remain separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wtvr.com/news/local-news/tri-cities/data-center-projects-july-21-2026","host":"wtvr.com","date":"2026-07-21","published":"2026-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Petersburg · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"eagle-rock-pairmont-data-center-campus-spotsylvania-va","state":"VA","kind":"facility","name":"Pairmont Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Pairmont official case identity and document index. Index links sound, fiscal and hydrogeology studies but their contents not read in this source. Case page is application-materials index, not final rezoning vote, numeric power or building permit. Filename dates not event dates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/3137/R25-0014-Pairmont-Data-Center-Campus","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.1791903850787,"lng":-77.44283210846356,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Pairmont official case identity and document index","fields":{"government_case":"R25-0014","project_name":"Pairmont Data Center Campus","government_indexed_submission":"3rd submission","county":"Spotsylvania, Virginia"},"notes":["Index links sound, fiscal and hydrogeology studies but their contents not read in this source. Case page is application-materials index, not final rezoning vote, numeric power or building permit. Filename dates not event dates.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/3137/R25-0014-Pairmont-Data-Center-Campus","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"amazon-potomac-church-fredericksburg-va","state":"VA","kind":"facility","name":"Potomac Church Technology Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stafford"],"city":"Fredericksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.staffordcountyva.gov","host":"staffordcountyva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.411322338680904,"lng":-77.4042471172777,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.staffordcountyva.gov","host":"staffordcountyva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Fredericksburg · Stafford · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"powerhouse-95-spotsylvania-va","state":"VA","kind":"facility","name":"PowerHouse 95","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Spotsylvania","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. PowerHouse hosts a DCD article republication; ReadMore points to the original DCD story. Distinguish operator-hosted reporting from a new issuer announcement. Page has no explicit article date; October2025 target is historical, not upcoming from October2026. Named PowerHouse95/PH95North campus: reported completed145acre purchase and construction start, up to800MW ACROSS THREE SUBSTATIONS and up toeight three-story buildings/3.5Msf planned. First300MW substation was TARGETED October2025; actual delivery not established. No criticalIT basis, executed service agreement or current ready-for-service established. The separate SpotsyTechno/Tributary and Amazon/HuntersRidge references are other projects; do not transfer their approvals, SCC delivery terms or capacities to PowerHouse95. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.17,"lng":-77.66,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["PowerHouse hosts a DCD article republication; ReadMore points to the original DCD story. Distinguish operator-hosted reporting from a new issuer announcement. Page has no explicit article date; October2025 target is historical, not upcoming from October2026.","Named PowerHouse95/PH95North campus: reported completed145acre purchase and construction start, up to800MW ACROSS THREE SUBSTATIONS and up toeight three-story buildings/3.5Msf planned. First300MW substation was TARGETED October2025; actual delivery not established.","No criticalIT basis, executed service agreement or current ready-for-service established. The separate SpotsyTechno/Tributary and Amazon/HuntersRidge references are other projects; do not transfer their approvals, SCC delivery terms or capacities to PowerHouse95.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Spotsylvania · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"powerhouse-abx-1-va","state":"VA","kind":"facility","name":"PowerHouse ABX-1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. PowerHouse ABX-1 delivered shell and later sale. 60MWmaximumutilitynotcriticalIToractualconsumption. Developablearea notallraisedfloor/tenantITspace. Shell/powerdeliverynotexactcustomeroperationalopeningday. Pagehasnoexactstreetmunicipalityinsavedbody;ABXcodealoneinsufficientparcel. No deed/salepriceorenergizedITcertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-abx-1","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0195992,"lng":-77.4504568,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"PowerHouse ABX-1 delivered shell and later sale","fields":{"developer":"PowerHouse","project":"ABX-1","site_acres":10,"developable_sqft":265850,"buildings":1,"stories":2,"maximum_utility_capacity_mw":60,"developer_reported_delivery_month":"2023-10","developer_reported_sale_quarter":"2024-Q4","developer_described_power_delivery":"complete"},"notes":["60MWmaximumutilitynotcriticalIToractualconsumption. Developablearea notallraisedfloor/tenantITspace. Shell/powerdeliverynotexactcustomeroperationalopeningday. Pagehasnoexactstreetmunicipalityinsavedbody;ABXcodealoneinsufficientparcel. No deed/salepriceorenergizedITcertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-abx-1","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"powerhouse-ctp-02-va","state":"VA","kind":"facility","name":"PowerHouse CTP-02","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Chester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.360586,"lng":-77.3256869,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Chester · Chesterfield · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"prince-william-digital-gateway-va","state":"VA","kind":"facility","name":"Prince William Digital Gateway","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Original court docket and withdrawal instrument not retained. Reported developer termination supported, but no general county ban or cancellation of unrelated Dulles South inferred. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","host":"wtop.com","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.8,"lng":-77.68,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"final-developer-appeal-withdrawal-reported","reported_finding":"InsideNoVa reporting via WTOP says QTS withdrew Supreme Court challenge and terminated Digital Gateway project after prior approvals were voided.","report_display_date":"2026-07-02","independently_verified_current_status":null},"notes":["Original court docket and withdrawal instrument not retained. Reported developer termination supported, but no general county ban or cancellation of unrelated Dulles South inferred.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","host":"wtop.com","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Gainesville · Prince William · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"crusoe-project-flash-franklin-va","state":"VA","kind":"facility","name":"Project Flash (Summit View Business Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Rocky Mount","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Body explicitly says no agreements or county votes occurred. Preserve abandoned-negotiations account, not formal Board denial or countywide ban. Headline overstates formal procedural evidence. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.smithmountaineagle.com/news/project-flash-initiative-shut-down-by-franklin-county-board-of-supervisors/article_27ab1925-77b5-428e-9a12-13ca0d2c3918.html","host":"smithmountaineagle.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.9979,"lng":-79.8922,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Smith Mountain Eagle quotes supervisor August16 announcement that Project Flash talks ended.","independently_verified_current_operating_status":null},"notes":["Body explicitly says no agreements or county votes occurred. Preserve abandoned-negotiations account, not formal Board denial or countywide ban. Headline overstates formal procedural evidence.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.smithmountaineagle.com/news/project-flash-initiative-shut-down-by-franklin-county-board-of-supervisors/article_27ab1925-77b5-428e-9a12-13ca0d2c3918.html","host":"smithmountaineagle.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Rocky Mount · Franklin · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"google-project-peanut-chester-va","state":"VA","kind":"facility","name":"Project Peanut","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Chester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits. USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.34629075,"lng":-77.29960686,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits.","USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Chester · Chesterfield · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"google-project-skye-midlothian-va","state":"VA","kind":"facility","name":"Project Skye","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Midlothian","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits. USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.44741159,"lng":-77.77600992,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits.","USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Midlothian · Chesterfield · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"takanock-project-tallmadge-strasburg-va","state":"VA","kind":"facility","name":"Project Tallmadge","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shenandoah"],"city":"Strasburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Expected mid 2025 site approval/May land purchase,late 2027 construction and 2030 completion were forecasts, not observed outcomes. Takanock is not necessarily the eventual builder/operator. Early 4000 gallons/day estimate and derived 1.46 million/year are the SAME scenario, not additive; statewide 6.7 million/year benchmark is not site usage. Hydrogen-ready describes future optional backup-turbine capability, not present hydrogen fuel or zero-emission generation. Near-waterless cooling is attributed planned design subject to eventual operator. No exact MW, issued air permit or signed power agreement verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nvdaily.com/nvdaily/strasburg-data-center-proposal-prompts-questions-on-water-use-hydrogen-oversight/article_de441640-97e6-528b-a0e8-74085176ceb3.html","host":"nvdaily.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.9893,"lng":-78.3589,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Northern Virginia Daily describes Takanock’s proposed 87-acre Strasburg land-entitlement project, expected to be sold to an unnamed future operator for a two-million-square-foot data center.","independently_verified_current_operating_status":null},"notes":["Expected mid 2025 site approval/May land purchase,late 2027 construction and 2030 completion were forecasts, not observed outcomes. Takanock is not necessarily the eventual builder/operator. Early 4000 gallons/day estimate and derived 1.46 million/year are the SAME scenario, not additive; statewide 6.7 million/year benchmark is not site usage. Hydrogen-ready describes future optional backup-turbine capability, not present hydrogen fuel or zero-emission generation. Near-waterless cooling is attributed planned design subject to eventual operator. No exact MW, issued air permit or signed power agreement verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nvdaily.com/nvdaily/strasburg-data-center-proposal-prompts-questions-on-water-use-hydrogen-oversight/article_de441640-97e6-528b-a0e8-74085176ceb3.html","host":"nvdaily.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Strasburg · Shenandoah · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"qts-ashburn-1-va","state":"VA","kind":"facility","name":"QTS Ashburn 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated page still uses coming-online target and under-construction label after target quarter. No automatic commissioning inference; 55 MW headline should not be added again to the DC1 specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/ashburn-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9995277,"lng":-77.4501109,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":28,"dc1_critical_power_mw_lower_bound":55,"dc2_critical_power_mw_lower_bound":22.5,"dc2_target":"2026-Q2","dc1_address":"22271 Broderick Drive, Sterling, VA 20166","dc2_address":"22280 Randolph Drive, Sterling, VA 20166","dc2_operator_described_status":"under construction"},"notes":["Undated page still uses coming-online target and under-construction label after target quarter. No automatic commissioning inference; 55 MW headline should not be added again to the DC1 specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/ashburn-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sterling · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"qts-ashburn-2-ashburn-lockridge-va","state":"VA","kind":"facility","name":"QTS Ashburn 2 (Ashburn-Lockridge)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Planned capacity wording is preserved, not labeled current operating consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/ashburn-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9959297,"lng":-77.4562445,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":24,"planned_capacity_mw_lower_bound":75,"power_basis":"current planned capacity; webpage does not separately define critical IT versus utility in this section"},"notes":["Planned capacity wording is preserved, not labeled current operating consumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/ashburn-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sterling · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"qts-richmond-1-dc1-ric1-white-oak-technology-park-va","state":"VA","kind":"facility","name":"QTS Richmond 1 DC1 (RIC1, White Oak Technology Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Henrico"],"city":"Sandston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Values describe the Richmond 1 campus, not DC1 alone. Master planned six facilities does not establish all are built. DC1/DC2/DC3 share listed address, so address-based deduplication cannot collapse all buildings or multiply campus totals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/richmond-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.4892338,"lng":-77.2474761,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":207,"critical_campus_capacity_mw":238,"master_plan_facilities":6,"campus_current_space_sqft":2300000,"published_dc1_address":"6000 Technology Blvd, Sandston, VA 23150"},"notes":["Values describe the Richmond 1 campus, not DC1 alone. Master planned six facilities does not establish all are built. DC1/DC2/DC3 share listed address, so address-based deduplication cannot collapse all buildings or multiply campus totals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/richmond-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sandston · Henrico · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"qts-white-oak-technology-park-ii-henrico-va","state":"VA","kind":"facility","name":"QTS White Oak Technology Park II (RIC5)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Henrico"],"city":"Sandston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Approximately137millionUSD is land consideration, not construction spending. Seller-to-seller transactions and earlier18millionUSD purchases are not additive to that headline total. Existing adjacent White Oak campus, its expansion and network-access point are different. Regional housing fund is not a QTS-specific grant. Utility/infrastructure2026targets are not completed service or current IT. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/qts-finishes-purchase-of-rezoned-henrico-tech-park-land/","host":"virginiabusiness.com","date":"2024-07-19","published":"2024-07-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.49,"lng":-77.27,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Virginia Business reports QTS finished acquiring the roughly622-acre White Oak Technology ParkIIsite, with a June28remaining-land transaction and a May14rezoning.","independently_verified_current_operating_status":null},"notes":["Approximately137millionUSD is land consideration, not construction spending. Seller-to-seller transactions and earlier18millionUSD purchases are not additive to that headline total. Existing adjacent White Oak campus, its expansion and network-access point are different. Regional housing fund is not a QTS-specific grant. Utility/infrastructure2026targets are not completed service or current IT.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/qts-finishes-purchase-of-rezoned-henrico-tech-park-land/","host":"virginiabusiness.com","date":"2024-07-19","published":"2024-07-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sandston · Henrico · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"quantum-park-data-center-ashburn-loudoun-va","state":"VA","kind":"facility","name":"Quantum Park Data Center Expansion","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.011,"lng":-77.464,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Piedmont Environmental Council discusses Cross Mill's rezoning and Quantum Park's future Loudoun decision while advocating a pause.","independently_verified_current_operating_status":null},"notes":["Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"pointone-remington-technology-park-fauquier-va","state":"VA","kind":"facility","name":"Remington Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Remington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the caption and short public introduction were read. Encoded premium content was not decoded. No exact approval instrument, operator, specific power or 2026 construction is established from the preview. Other Remington proposals must not inherit this campus status. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fauquier.com/localnews/most-remington-data-center-projects-still-pending/article_1ac479e7-f4db-4446-840c-d633459584bf.html","host":"fauquier.com","date":"2026-02-25","published":"2026-02-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.53,"lng":-77.8,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Fauquier Times' public caption says Remington Technology Park was the one approved campus among five nearby proposals at that historical date.","independently_verified_current_operating_status":null},"notes":["Only the caption and short public introduction were read. Encoded premium content was not decoded. No exact approval instrument, operator, specific power or 2026 construction is established from the preview. Other Remington proposals must not inherit this campus status.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fauquier.com/localnews/most-remington-data-center-projects-still-pending/article_1ac479e7-f4db-4446-840c-d633459584bf.html","host":"fauquier.com","date":"2026-02-25","published":"2026-02-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Remington · Fauquier · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"sabey-intergate-ashburn-building-a-va","state":"VA","kind":"facility","name":"Sabey Intergate.Ashburn (Building A)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. campus page with BuildingA future phase. Page also advertises85MWcampus capacity and70+MWaggregate delivered. These labels do not reconcile simply with36+54; preserve different scopes and do not sum or certify85MWIT. BuildingA2026target is not proof online. Virginia tax exemption marketing is not an individual award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sabeydatacenters.com/locations/ashburn-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0144996,"lng":-77.4799874,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"campus page with BuildingA future phase","fields":{"campus_acres":38,"campus_buildings":3,"completed_buildings_at_page":2,"completed_buildings_power_mw_min_exclusive":36,"building_a_leasable_power_mw":54,"building_a_online_earliest_target":"2026","campus_mission_critical_area_sqft":645000,"published_address":"21741 Red Rum Dr, Ashburn, VA20147"},"notes":["Page also advertises85MWcampus capacity and70+MWaggregate delivered. These labels do not reconcile simply with36+54; preserve different scopes and do not sum or certify85MWIT. BuildingA2026target is not proof online. Virginia tax exemption marketing is not an individual award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sabeydatacenters.com/locations/ashburn-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"solis-arx-progress-park-wythe-va","state":"VA","kind":"facility","name":"Solis Arx Progress Park Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wythe"],"city":"Max Meadows","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wythe county SolisArx identity and Fluidstack update. Presentation about acquisition is not independently inspected executed closing document. Data-center-ready marketing of park for decade does not establish completed facility or critical IT service. No quantitative tax award, IT MW, actual capex or exact operations date adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wytheco.org/418/Solis-Arx","host":"wytheco.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.958,"lng":-80.899,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Wythe county SolisArx identity and Fluidstack update","fields":{"agency":"Wythe County, Virginia","project":"Solis Arx / Fluidstack","location":"Progress Park","planned_tract_acres":99,"announcement_date":"2025-12-05","county_reported_fluidstack_acquisition_presentation_date":"2026-06-09","development":"multiple phases"},"notes":["Presentation about acquisition is not independently inspected executed closing document. Data-center-ready marketing of park for decade does not establish completed facility or critical IT service. No quantitative tax award, IT MW, actual capex or exact operations date adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wytheco.org/418/Solis-Arx","host":"wytheco.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Max Meadows · Wythe · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"active-infrastructure-spring-valley-tech-park-loudoun-va","state":"VA","kind":"facility","name":"Spring Valley Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SpringValley advocacy chronology and proposal scope. Conservancy advocacy page not county final decision. Recommendation distinct from Board denial. Posted July30,2026 overrides old January URL path. Smaller325acre discussion may describe different land scope; no harmonization. Forest, emissions and community-harm statements are advocacy concerns, not adjudicated violations. Fuel cells and storage not zero-emissions proof or IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. County legislative process context, not a parcel-specific approval.. No October 20 outcome exists in this review. No fixed expiry calculated. No effect on either exact parcel inferred without application-specific records.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://loudounwildlife.org/2026/01/spring-valley-technology-park/","host":"loudounwildlife.org","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.loudoun.gov/m/NewsFlash/home/detail/10874","host":"loudoun.gov","date":"2026-09-17","published":"2026-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.008,"lng":-77.523,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"SpringValley advocacy chronology and proposal scope","fields":{"project":"Spring Valley Technology Park","case":"LEGI-2024-0074","county":"Loudoun, Virginia","reported_site_acres":362,"reported_proposed_area_sqft_max":3500000,"reported_requested_substations":3,"advocacy_reported_planning_recommendation_date":"2026-07-23","advocacy_reported_recommendation":"unanimous denial recommendation"},"notes":["Conservancy advocacy page not county final decision. Recommendation distinct from Board denial. Posted July30,2026 overrides old January URL path. Smaller325acre discussion may describe different land scope; no harmonization. Forest, emissions and community-harm statements are advocacy concerns, not adjudicated violations. Fuel cells and storage not zero-emissions proof or IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://loudounwildlife.org/2026/01/spring-valley-technology-park/","host":"loudounwildlife.org","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"County legislative process context, not a parcel-specific approval.","fields":{"september15_action":"Vote for future consideration of a resolution, not adoption of the pause.","consideration_scheduled":"2026-10-20","effective_pause_established_as_of_2026_10_14":false,"proposed_scope":"Final Board action on legislative data center and substation applications; administrative applications unaffected; submissions and Planning Commission processing continue.","potential_duration":"Up to 12 months if approved. Intended retroactivity to September 15 is conditional, not a verified effective date.","exceptions":"Grid reliability or approaching statutory decision period may be considered.","county_attorney_position":"Notice attributes opinion that a data center approval moratorium is not legal.","october6_grandfathering_outcome":null},"notes":["No October 20 outcome exists in this review. No fixed expiry calculated. No effect on either exact parcel inferred without application-specific records.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.loudoun.gov/m/NewsFlash/home/detail/10874","host":"loudoun.gov","date":"2026-09-17","published":"2026-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"stack-nova-loudoun-va","state":"VA","kind":"facility","name":"STACK NVA Loudoun 144MW Hyperscale Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Planned144includesboth72buildings, not extra. Otherfeaturedworldwidesitefigures and4GW/6GWcorporatepipeline excluded. Exactopeningnotprovided. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/","host":"stackinfra.com","date":"2025-02-11","published":"2025-02-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.04,"lng":-77.49,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_campus_capacity_mw":144,"planned_buildings":2,"planned_capacity_each_building_mw":72,"power_basis":"capacity, not explicitly criticalIT","county":"Loudoun"},"notes":["Planned144includesboth72buildings, not extra. Otherfeaturedworldwidesitefigures and4GW/6GWcorporatepipeline excluded. Exactopeningnotprovided.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/","host":"stackinfra.com","date":"2025-02-11","published":"2025-02-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ashburn · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"stack-nva01a-va","state":"VA","kind":"facility","name":"STACK NVA01A","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus and its one building describe the same 17 MW, not 34 MW. Available dedicated capacity is not contracted or measured consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/northern-virginia/nva01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0046933,"lng":-77.4417399,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_critical_capacity_mw":17,"buildings":1,"campus_acres":16,"nva01a_building_sqft":180000},"notes":["Campus and its one building describe the same 17 MW, not 34 MW. Available dedicated capacity is not contracted or measured consumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/northern-virginia/nva01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sterling · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"stack-stafford-technology-campus-va","state":"VA","kind":"facility","name":"Stafford Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stafford"],"city":"Falmouth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.staffordcountyva.gov","host":"staffordcountyva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.365,"lng":-77.485,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.staffordcountyva.gov","host":"staffordcountyva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Falmouth · Stafford · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"aws-summit-crossing-tech-campus-spotsylvania-va","state":"VA","kind":"facility","name":"Summit Crossing Tech Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Massaponax","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Source discloses StackInfrastructure grant. Construction claim is dated reporting, not currentoperation or commissioning.17 sites/3696 acres includeconstruction,approved,rezoningandsiteplans, not 17 operatingcenters or DCbuildingfootprint.616/1142/1263/675 acrestatusgroups belong tocountyrollup, not either specificcampus.35 billion-dollarAmazoncountycommitment claim needs primary geographic-scope corroboration before adoption; not assigned to eachsite. Cosnerconditional 2026 COforecast andunknown taxcollectionstart do not setCarterStore/SummitRFS. General taxlegal assertions andby-right explanation are not adopted as law. NoMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","host":"fxbgadvance.com","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.18847901989237,"lng":-77.44053482811216,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"FredericksburgAdvance’s industry-grant-supported column reports Amazon buildingsgoingupatSummitCrossing/CarterStore/Cosner/Mattameade and countywide 17 projectsites acrossseveralstages.","independently_verified_current_operating_status":null},"notes":["Source discloses StackInfrastructure grant. Construction claim is dated reporting, not currentoperation or commissioning.17 sites/3696 acres includeconstruction,approved,rezoningandsiteplans, not 17 operatingcenters or DCbuildingfootprint.616/1142/1263/675 acrestatusgroups belong tocountyrollup, not either specificcampus.35 billion-dollarAmazoncountycommitment claim needs primary geographic-scope corroboration before adoption; not assigned to eachsite. Cosnerconditional 2026 COforecast andunknown taxcollectionstart do not setCarterStore/SummitRFS. General taxlegal assertions andby-right explanation are not adopted as law. NoMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","host":"fxbgadvance.com","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Massaponax · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"tac-data-centers-wythe-county-va","state":"VA","kind":"facility","name":"TAC Data Centers Wythe County Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wythe"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. Developerproposalnotapplicationapproval,localbuildingpermit,stateenvironmentalpermit,ownedlandorsignedutilityservice.765kVtransmissionvoltageisnotMWallocation. Norezoningrequirementreporteddoesnotmeanpermitexempt. Minimalwaterclaimisunspecifieddeveloperpromise,notzero/actualgallons. Nearby99acreSolisArxProgressParkprojectandotherVAprojectsseparate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://usdatacenterprojects.com/virginia/tac-data-centers-plans-gigawatt-scale-campus-in-wythe-county-virginia","host":"usdatacenterprojects.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.93,"lng":-80.86,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.","fields":{"reported_context":"USDataCenterProjects describes TACproposedWytheCounty1000acre/9-to11building/3.5-to4million-squarefootcampusover1GWplannedpower onRoggPartnershiplandnearI81/PulaskiCounty. Countyadministratorwelcomesproposal.","independently_verified_current_operating_status":null},"notes":["Developerproposalnotapplicationapproval,localbuildingpermit,stateenvironmentalpermit,ownedlandorsignedutilityservice.765kVtransmissionvoltageisnotMWallocation. Norezoningrequirementreporteddoesnotmeanpermitexempt. Minimalwaterclaimisunspecifieddeveloperpromise,notzero/actualgallons. Nearby99acreSolisArxProgressParkprojectandotherVAprojectsseparate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://usdatacenterprojects.com/virginia/tac-data-centers-plans-gigawatt-scale-campus-in-wythe-county-virginia","host":"usdatacenterprojects.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Wythe · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"thornberry-data-center-campus-caroline-va","state":"VA","kind":"facility","name":"Thornberry Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Ruther Glen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Caroline three distinct application identities and review stages. Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.885,"lng":-77.52,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Caroline three distinct application identities and review stages","fields":{"county":"Caroline, Virginia","project_applications":[{"project":"Thornberry Data Center Campus","case":"RZ-03-2025","parcel":"84-A-1","parent_parcel_acres":1001.5,"requested_rezoning_acres":657,"address":"23202 Carneal Lane","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"ADP Ladysmith Data Hub","cases":["RZ-02-2025","SPEX-06-2025"],"parcel":"53-A-65","requested_rezoning_acres":140.38,"address":"18577 Green Road","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"Bull Church Data Center","case":"RZ-04-2024","parcel":"53-A-66","owner":"Mid Atlantic State Fund LLC","applicant":"NRD Retail LLC","location":"Bull Church Road east of I-95, adjacent to Virginia Bazaar south boundary","source_stage":"technical review; hearing date undetermined"}]},"notes":["Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Ruther Glen · Caroline · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"thornburg-business-park-data-center-spotsylvania-va","state":"VA","kind":"facility","name":"Thornburg Business Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Thornburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Thornburg Business Park applicant forecast and internal job conflict. Applicantforecastsnotactualcapex/jobs/taxreceiptsorapprovedincentive.8.6Btotalincludes4.8Band3.8Bcomponents. Samepage11has216jobsinbodyand75insummary;holdcanonical. Fiscalmodelassumes20percentequipmentreplacementannually,notcontractualrevenueguarantee. Parcel63-A-27excludedretainedcommercialarea;do not add to campus. Firstsubmission/unassignedcasenumbernotfinalrezoning. SelectedPDFpages1/11/16visuallychecked;p16blankinretainedPDF,notsupportingfiscalexhibit. NoITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35424/Impact-Statement---Thornburg-Business-Park-First-Submission-236905321","host":"spotsylvania.va.us","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.127876,"lng":-77.52959,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Thornburg Business Park applicant forecast and internal job conflict","fields":{"project_name":"Thornburg Business Park","document_date":"2025-09-11","document_stage":"applicant first-submission rezoning impact statement, case number unassigned","county":"Spotsylvania, Virginia","site_acres_approx":200.35,"planned_data_center_building_area_sqft_approx":2000000,"tax_map_parcels":["63-12-E","63-12-D","63-12-C","63-A-33","63-A-32","63-A-37","76-A-5","76-A-5A","76-A-6"],"applicant_estimated_completion_cost_usd":8600000000,"estimated_computer_equipment_usd":4800000000,"estimated_buildings_fixed_equipment_usd":3800000000,"expected_operational_jobs_conflict":[216,75],"canonical_expected_jobs":null,"fiscal_forecast_first_operation_year":2028,"forecast_first_year_county_tax_usd":5400000,"forecast_2037_county_tax_usd":51700000,"forecast_2042_stable_annual_county_tax_usd":50400000},"notes":["Applicantforecastsnotactualcapex/jobs/taxreceiptsorapprovedincentive.8.6Btotalincludes4.8Band3.8Bcomponents. Samepage11has216jobsinbodyand75insummary;holdcanonical. Fiscalmodelassumes20percentequipmentreplacementannually,notcontractualrevenueguarantee. Parcel63-A-27excludedretainedcommercialarea;do not add to campus. Firstsubmission/unassignedcasenumbernotfinalrezoning. SelectedPDFpages1/11/16visuallychecked;p16blankinretainedPDF,notsupportingfiscalexhibit. NoITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35424/Impact-Statement---Thornburg-Business-Park-First-Submission-236905321","host":"spotsylvania.va.us","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Thornburg · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"thornburg-industrial-park-data-center-spotsylvania-va","state":"VA","kind":"facility","name":"Thornburg Industrial Park Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Thornburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Thornburg Industrial Park2 unsigned draft proffers. Unsigneddraftproffersarenotenactedcountyconditionsoractualnoisecompliance. Exceptionscontinuepage8;do notdescribe60dBAuniversalallconditions. One-million-sqfttransporttriggernotactualapprovedbuildingarea.200acThornburgBusinessParkand49.6826acIndustrialPark2distinctprojects,donotmergebyThornburgname. NoMW,executedapproval,paidfeesorrevenueinthisdocument. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35205/1st-Submission-Proffers-71525","host":"spotsylvania.va.us","date":"2025-06-27","published":"2025-06-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.135,"lng":-77.5208,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Thornburg Industrial Park2 unsigned draft proffers","fields":{"project_name":"Thornburg Industrial Park2","document_date":"2025-06-27","document_stage":"unsigned voluntary proffer statement, case number to be assigned","applicants":["South Roxbury Mill LLC","Grindstone VA LLC"],"county":"Spotsylvania, Virginia","site_acres_approx":49.6826,"parcel":"63-5-C1","rezoning_request":"A-2 to I-1 for data center and light public utility uses","proposed_residential_boundary_sound_limit_dba":60,"proposed_commercial_boundary_sound_limit_dba":65,"proposed_measurement_height_m":1.5,"sound_condition_timing":"analysis before final certificate of occupancy per building","owner_signature_fields":"blank on pages10and11","approved_date":null},"notes":["Unsigneddraftproffersarenotenactedcountyconditionsoractualnoisecompliance. Exceptionscontinuepage8;do notdescribe60dBAuniversalallconditions. One-million-sqfttransporttriggernotactualapprovedbuildingarea.200acThornburgBusinessParkand49.6826acIndustrialPark2distinctprojects,donotmergebyThornburgname. NoMW,executedapproval,paidfeesorrevenueinthisdocument.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35205/1st-Submission-Proffers-71525","host":"spotsylvania.va.us","date":"2025-06-27","published":"2025-06-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Thornburg · Spotsylvania · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"tract-tuckahoe-technology-park-goochland-county-va","state":"VA","kind":"facility","name":"Tuckahoe Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Goochland"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Goochland formal application versus preapplication and unresolved completeness. Development areas are not seven buildings or operating centers. County page contains preapplication and formal sections; formal submission does not equal complete application or approved CUP. Draft conditions/noise studies not enacted limits or measured compliance. October calendar has no published events, not proof future hearing cannot be added. No critical IT MW, final outcome or commissioning adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.goochlandva.us/1480/Tuckahoe-Technology-Park","host":"goochlandva.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.68,"lng":-77.68,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Goochland formal application versus preapplication and unresolved completeness","fields":{"agency":"Goochland County, Virginia","project":"Tuckahoe Technology Park","applicant":"VALCO2 Goochland LLC (Tract)","case":"CU-2026-00014","formal_cup_application_received":"2026-08-05","staff_completeness_letter_date":"2026-08-20","revision_posted_date":"2026-09-01","proposed_site_acres":871,"proposed_development_areas":7,"location":"Technology Overlay District TODWest eastern designated growth area"},"notes":["Development areas are not seven buildings or operating centers. County page contains preapplication and formal sections; formal submission does not equal complete application or approved CUP. Draft conditions/noise studies not enacted limits or measured compliance. October calendar has no published events, not proof future hearing cannot be added. No critical IT MW, final outcome or commissioning adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.goochlandva.us/1480/Tuckahoe-Technology-Park","host":"goochlandva.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Goochland · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"vantage-ashburn-ii-va2-va","state":"VA","kind":"facility","name":"Vantage Ashburn II (VA2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Page uses future tense; named campus specification not evidence every building is delivered. No exact opening inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/ashburn-ii-virginia/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.997949,"lng":-77.4302306,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"campus_acres":18,"campus_buildings":3,"planned_critical_it_mw":96,"planned_campus_area_sqft":800000,"published_address":"22435 Glenn Drive, Sterling, VA20164"},"notes":["Page uses future tense; named campus specification not evidence every building is delivered. No exact opening inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/ashburn-ii-virginia/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Sterling · Loudoun · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"vantage-stafford-va4-va","state":"VA","kind":"facility","name":"Vantage Data Centers VA4 Stafford Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stafford"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Fredericksburgregion is not municipalityassignment.782MW/8Bstatewide totals excluded. Target is future, not operating. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/","host":"vantage-dc.com","date":"2025-11-06","published":"2025-11-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.44,"lng":-77.44,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"groundbreaking_date":"2025-11-06","county":"Stafford","planned_investment_usd":2000000000,"planned_it_capacity_mw":192,"campus_acres":82,"planned_buildings":3,"planned_area_sqft_approx":929000,"first_building_opening_target":"late2027","forecast_construction_jobs":1100,"forecast_permanent_operations_jobs_min":50},"notes":["Fredericksburgregion is not municipalityassignment.782MW/8Bstatewide totals excluded. Target is future, not operating.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/","host":"vantage-dc.com","date":"2025-11-06","published":"2025-11-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Stafford · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"vint-hill-corners-fauquier-va","state":"VA","kind":"facility","name":"Vint Hill Corners","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Vint Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Peter Cary/Piedmont Journalism Foundation, original March 11, 2024 report updated March 16. CyrusOne proposed four buildings/891,000 square feet at Vint Hill Road and Vint Hill Parkway, with site plans expected shortly; a proposed zoning vote was still future March 14. This is not the inherited 870,000 square feet reconciled or final approval. Vint Hill Corners is a separate roughly 50-acre Brookside Parkway proposal, then disputed with county staff; roughly 700,000 square feet is an estimate. Existing OVH/possible second building and Pink Panther hypothetical development are different projects. Master-association review is not county land-use approval. No current exemption or final zoning law established by this historical article. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","host":"princewilliamtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.746,"lng":-77.664,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Peter Cary/Piedmont Journalism Foundation, original March 11, 2024 report updated March 16. CyrusOne proposed four buildings/891,000 square feet at Vint Hill Road and Vint Hill Parkway, with site plans expected shortly; a proposed zoning vote was still future March 14. This is not the inherited 870,000 square feet reconciled or final approval. Vint Hill Corners is a separate roughly 50-acre Brookside Parkway proposal, then disputed with county staff; roughly 700,000 square feet is an estimate. Existing OVH/possible second building and Pink Panther hypothetical development are different projects. Master-association review is not county land-use approval. No current exemption or final zoning law established by this historical article.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","host":"princewilliamtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Vint Hill · Fauquier · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"virginia-technology-park-clear-brook-frederick-va","state":"VA","kind":"facility","name":"Virginia Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Clear Brook","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Board of Supervisors decision was still scheduled for July 8. No final county rejection inferred; competing acoustic/health claims not independently adjudicated. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nvdaily.com/nvdaily/frederick-county-planners-vote-down-clear-brook-data-center-campus/article_8e6c14d9-ce6f-51fd-9c04-e46953e6b6e5.html","host":"nvdaily.com","date":"2026-06-03","published":"2026-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.2564912,"lng":-78.096111,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"planning-recommendation-against-rezoning","reported_finding":"Winchester Star reporting via Northern Virginia Daily says planning commission voted ten-zero to recommend denial of Virginia Technology Park.","report_display_date":"2026-06-03","independently_verified_current_status":null},"notes":["Board of Supervisors decision was still scheduled for July 8. No final county rejection inferred; competing acoustic/health claims not independently adjudicated.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nvdaily.com/nvdaily/frederick-county-planners-vote-down-clear-brook-data-center-campus/article_8e6c14d9-ce6f-51fd-9c04-e46953e6b6e5.html","host":"nvdaily.com","date":"2026-06-03","published":"2026-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Clear Brook · Frederick · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"sharpless-wellington-road-bristow-va","state":"VA","kind":"facility","name":"Wellington Road Data Center Campus (Sharpless)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Bristow","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This is wetlands/streams-related Corps review, not proof of every local building, utility or operating approval. Approved instrument was not obtained by reporter at publication and has not been directly reviewed here. Google affiliation is attributed to DataCenterDynamics, not an independently examined corporate filing. Neighboring Microsoft 124 acres and nearly 4 million square feet concern separate parcels and cannot be assigned to Sharpless. Existing industrial zoning does not waive all remaining permits. Historic cleanup orders and ongoing groundwater treatment are not a blanket environmental clearance. No MW or current operating certification. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html","host":"insidenova.com","date":"2024-03-08","published":"2024-03-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.746,"lng":-77.523,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"InsideNoVa reports an Army Corps official confirmed approval of Sharpless’s four-building proposal at 6201 Wellington Road on a 181-acre former military-industrial site.","independently_verified_current_operating_status":null,"operator_or_exact_site_identity_needs_crosswalk":true},"notes":["This is wetlands/streams-related Corps review, not proof of every local building, utility or operating approval. Approved instrument was not obtained by reporter at publication and has not been directly reviewed here. Google affiliation is attributed to DataCenterDynamics, not an independently examined corporate filing. Neighboring Microsoft 124 acres and nearly 4 million square feet concern separate parcels and cannot be assigned to Sharpless. Existing industrial zoning does not waive all remaining permits. Historic cleanup orders and ongoing groundwater treatment are not a blanket environmental clearance. No MW or current operating certification.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html","host":"insidenova.com","date":"2024-03-08","published":"2024-03-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Bristow · Prince William · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"winchester-gateway-data-center-frederick-va","state":"VA","kind":"facility","name":"Winchester Gateway","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Winchester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. NVDaily republishesJackParry/TheWinchesterStar April21,2026 originalreport: FrederickHistoricResourcesAdvisoryBoard7 to 1RECOMMENDSDENIALof72acreWinchesterGatewayCUP, notfinalsupervisorsdenial. AtAppleValley/MiddleRoadsnearVA37,threephase1buildings60ftproposal; suggested45ftconditions areadvisorynotadopted. Finalplanning/supervisorsoutcome unread. 35000gal/dayseasonalprojection isapplicationwaterfigure, notmeteredconsumption. Disposalcontractor/pre-treatmentexplicitlyuncertain. OtherWinchesterGateway2acrossVA37differentproposal/entityunconfirmed; source105acrevs10acrewordinginternallyinconsistent, notcollapsed/added/newpin. Historicbattlefield/property-valueconcerns notsettledmeasuredimpacts. Secondarypublicationoriginexplicit. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nvdaily.com/nvdaily/panel-recommends-denial-of-winchester-gateway-data-center-proposal/article_228ead16-7a9b-5e08-bf16-54cd65670acc.html","host":"nvdaily.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.1442224,"lng":-78.1980384,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["NVDaily republishesJackParry/TheWinchesterStar April21,2026 originalreport: FrederickHistoricResourcesAdvisoryBoard7 to 1RECOMMENDSDENIALof72acreWinchesterGatewayCUP, notfinalsupervisorsdenial. AtAppleValley/MiddleRoadsnearVA37,threephase1buildings60ftproposal; suggested45ftconditions areadvisorynotadopted. Finalplanning/supervisorsoutcome unread.","35000gal/dayseasonalprojection isapplicationwaterfigure, notmeteredconsumption. Disposalcontractor/pre-treatmentexplicitlyuncertain. OtherWinchesterGateway2acrossVA37differentproposal/entityunconfirmed; source105acrevs10acrewordinginternallyinconsistent, notcollapsed/added/newpin. Historicbattlefield/property-valueconcerns notsettledmeasuredimpacts. Secondarypublicationoriginexplicit.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.nvdaily.com/nvdaily/panel-recommends-denial-of-winchester-gateway-data-center-proposal/article_228ead16-7a9b-5e08-bf16-54cd65670acc.html","host":"nvdaily.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Winchester · Frederick · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"wise-innovation-hub-wise-va","state":"VA","kind":"facility","name":"Wise Innovation Hub (OASIS)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wise"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator/local-reporting context; Muskie explicitly reconciles earlier Kentucky review.. Cardinal News February25,2026, updatedFebruary26, names Wise Innovation Hub LLC at LonesomePineRegionalBusiness&TechnologyPark, separate from existing MineralGap. December2025RedPostEnergy LOI is design/development intent, not final power contract or commissioned plant. Nine approximately240000sfbuildings over roughly10years as clients arrive remain a proposal. First roughly100MW gas generation inabout3years and eventual500 to 600MWGENERATION are developer forecasts, not IT load. Rough50MWperbuilding has unspecifiedloadbasis; do not add it to generation, or treat proposed20 to 30%gridexport as delivered. Park400acres/rough300available are land scopes, not a completed300acre campus. Permitting/environmental review and utility/regulatory roles remained unresolved. Jobs,3 to 5Mannualtax perbuilding and low-water claims are projections, not actual receipts/measured water. Pending2026legislative provisions are not adopted as current law. Not current operation, exact parcel, county, all-field or operating-building census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cardinalnews.org/2026/02/25/data-center-complex-with-gas-power-plant-planned-for-wise-county/","host":"cardinalnews.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.99,"lng":-82.53,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"kentucky-operator-crosswalk-and-local-stage-review-round59-2026-10-15.json","scope":"Original operator/local-reporting context; Muskie explicitly reconciles earlier Kentucky review.","fields":{},"notes":["Cardinal News February25,2026, updatedFebruary26, names Wise Innovation Hub LLC at LonesomePineRegionalBusiness&TechnologyPark, separate from existing MineralGap. December2025RedPostEnergy LOI is design/development intent, not final power contract or commissioned plant. Nine approximately240000sfbuildings over roughly10years as clients arrive remain a proposal.","First roughly100MW gas generation inabout3years and eventual500 to 600MWGENERATION are developer forecasts, not IT load. Rough50MWperbuilding has unspecifiedloadbasis; do not add it to generation, or treat proposed20 to 30%gridexport as delivered. Park400acres/rough300available are land scopes, not a completed300acre campus. Permitting/environmental review and utility/regulatory roles remained unresolved. Jobs,3 to 5Mannualtax perbuilding and low-water claims are projections, not actual receipts/measured water. Pending2026legislative provisions are not adopted as current law.","Not current operation, exact parcel, county, all-field or operating-building census certification."],"sources":[{"url":"https://cardinalnews.org/2026/02/25/data-center-complex-with-gas-power-plant-planned-for-wise-county/","host":"cardinalnews.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Wise · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"yondr-cerberus-manassas-va","state":"VA","kind":"facility","name":"Yondr Manassas Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Manassas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cerberus Yondr Manassas acquired land and future campus. Landacquisitionnotcommissioning/allpermits.72MWfuture notobservedenergization. CorporateCerberus72Bassetsnot72Bcampusinvestment. No exactparcel/streetorcapitalexpenditurefigureinreviewedannouncement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cerberus.com/media/cerberus-and-yondr-acquire-40-acres-in-northern-virginia-to-build-72mw-data-center/","host":"cerberus.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.7509,"lng":-77.4753,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Cerberus Yondr Manassas acquired land and future campus","fields":{"developers":["Cerberus","Yondr"],"announcement_date":"2026-08-03","locality":"Manassas, Virginia","acquired_site_acres":40,"planned_campus_capacity_mw":72,"power_basis":"campus capacity, not explicitly critical IT","service_target_year":2029},"notes":["Landacquisitionnotcommissioning/allpermits.72MWfuture notobservedenergization. CorporateCerberus72Bassetsnot72Bcampusinvestment. No exactparcel/streetorcapitalexpenditurefigureinreviewedannouncement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cerberus.com/media/cerberus-and-yondr-acquire-40-acres-in-northern-virginia-to-build-72mw-data-center/","host":"cerberus.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Virginia · Manassas · Source context reviewed","state_name":"Virginia","state_path":"/virginia/"},{"id":"actapio-east-wenatchee-wa","state":"WA","kind":"facility","name":"Actapio East Wenatchee Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"East Wenatchee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Permit index alone cannot establishcurrentoperation orMW. Backup-generator emissions permits are not IT-capacity authorization. Ecology index specifically linksActapioapproval18AQ-C226forEastWenatchee; this isairpermit identity, notcommissioningproof. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. state permit index with three named source contexts. State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","host":"ecology.wa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.4072423,"lng":-120.213935,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"East Wenatchee","air_approval_order":"18AQ-C226"},"notes":["Permit index alone cannot establishcurrentoperation orMW.","Backup-generator emissions permits are not IT-capacity authorization.","Ecology index specifically linksActapioapproval18AQ-C226forEastWenatchee; this isairpermit identity, notcommissioningproof.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","host":"ecology.wa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"state permit index with three named source contexts","fields":{"actapio_east_wenatchee_listed_approval_order":"18AQ-C226","microsoft_mwh_listed_approval_order":"22AQ-E035","microsoft_mwh_order_date":"2022-09-27","olympia_listed_health_impact_document_date":"2010-09-16"},"notes":["State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","host":"ecology.wa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · East Wenatchee · Douglas · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"atlas-agro-richland-data-center-campus-wa","state":"WA","kind":"facility","name":"Atlas Agro Richland Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Benton"],"city":"Richland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Richland option stage and separate fertilizer scope. Option is not land purchase or construction approval. Separate PortofBenton fertilizer plant is not same DCsite or500Mdata-centerbudget. No actual DC criticalITMW, opening, spend or paid land-sale proceeds established. Source acquisition/permit stages need original legal record; engineering agenda supplement separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Richland original agenda corrects automated approval inference. Agenda records planned consideration, not actual adopted resolution, issuedinterconnection or allcosts paid. AutomatedCivicIQsearchresult incorrectly promoted agenda to approved contract and misidentifiedCityCouncilasPublicFacilitiesDistrict; not adopted. No criticalITMW or energization proven.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/richland-oks-option-agreement-for-atlas-agro-data-center","host":"tricitiesbusinessnews.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://swagit-attachments.granicus.com/uploads/video/agenda_file/391466/2026.06.16_City_Council_Agenda__1_.pdf","host":"swagit-attachments.granicus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":46.36,"lng":-119.325,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Richland option stage and separate fertilizer scope","fields":{"company":"Atlas Agro","reported_option_approval_date":"2025-12-02","location":"2100 HornRapidsRoad, Richland, Washington","optioned_acres":275,"reported_nonrefundable_option_fee_usd":250000,"proposed_data_center_buildings":5,"proposed_each_building_sqft_approx":500000,"proposed_dc_project_cost_usd":500000000,"conditional_land_purchase_price_usd_max_exclusive":24000000,"construction_start_target_year":2027,"expected_jobs":100},"notes":["Option is not land purchase or construction approval. Separate PortofBenton fertilizer plant is not same DCsite or500Mdata-centerbudget. No actual DC criticalITMW, opening, spend or paid land-sale proceeds established. Source acquisition/permit stages need original legal record; engineering agenda supplement separate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/richland-oks-option-agreement-for-atlas-agro-data-center","host":"tricitiesbusinessnews.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Richland original agenda corrects automated approval inference","fields":{"agency":"RichlandCityCouncil, Washington","agenda_date":"2026-06-16","resolution_listed":"2026-84","agenda_item":17,"subject":"BPAengineering/procurement reimbursableagreement for L0534 and secondcostallocation agreement with AtlasAgroDataCenterLLC"},"notes":["Agenda records planned consideration, not actual adopted resolution, issuedinterconnection or allcosts paid. AutomatedCivicIQsearchresult incorrectly promoted agenda to approved contract and misidentifiedCityCouncilasPublicFacilitiesDistrict; not adopted. No criticalITMW or energization proven.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://swagit-attachments.granicus.com/uploads/video/agenda_file/391466/2026.06.16_City_Council_Agenda__1_.pdf","host":"swagit-attachments.granicus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Richland · Benton · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"aws-wallula-gap-walla-walla-wa","state":"WA","kind":"facility","name":"AWS Wallula Gap Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Walla Walla"],"city":"Wallula","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wallula Gap public application with dated county update. 134acre current application and554acre sale are different scopes, not contradictory or additive. August11operator open house explicitly not county-sponsored public hearing. Comment deadline has passed but no final decision established. Parcel identifier not a researched parcel coordinate. No site MW published here. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wwcowa.gov/government/community_development/amazon_data_center.php","host":"wwcowa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":46.0726,"lng":-118.9135,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wallula Gap public application with dated county update","fields":{"county_page_updated":"2026-10-02","application_ids":["SDP26-01","SEPA26-05"],"published_project_parcel":"310835410003","site_acres":134,"planned_data_center_buildings":3,"planned_area_per_data_center_building_sqft_approx":220000,"published_location_description":"Sundance Road between Dodd and Worden Road, about1.4miles east ofUS12","application_determined_complete_date":"2026-08-24","notice_comment_deadline":"2026-10-12","port_sale_approval_date":"2026-02-12","port_sale_acres":554},"notes":["134acre current application and554acre sale are different scopes, not contradictory or additive. August11operator open house explicitly not county-sponsored public hearing. Comment deadline has passed but no final decision established. Parcel identifier not a researched parcel coordinate. No site MW published here.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wwcowa.gov/government/community_development/amazon_data_center.php","host":"wwcowa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Wallula · Walla Walla · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"blue-fern-cle-elum-data-center-wa","state":"WA","kind":"facility","name":"Blue Fern Cle Elum Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kittitas"],"city":"Cle Elum","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Applicability to this proposal remains unresolved in article. Proposed 20 MW has no explicit critical IT basis; no exact expiration or final project determination adopted. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spokesman.com/stories/2026/aug/05/cle-elum-passed-a-data-center-ban-one-might-be-bui/","host":"spokesman.com","date":"2026-08-05","published":"2026-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.18,"lng":-120.97,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"reported-moratorium-with-vesting-question","reported_finding":"Syndicated Seattle Times reporting says Cle Elum unanimously adopted a pause; Blue Fern project may qualify under an earlier development agreement.","report_display_date":"2026-08-05","independently_verified_current_status":null},"notes":["Applicability to this proposal remains unresolved in article. Proposed 20 MW has no explicit critical IT basis; no exact expiration or final project determination adopted.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spokesman.com/stories/2026/aug/05/cle-elum-passed-a-data-center-ban-one-might-be-bui/","host":"spokesman.com","date":"2026-08-05","published":"2026-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Cle Elum · Kittitas · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"centeris-south-hill-puyallup-wa","state":"WA","kind":"facility","name":"Centeris South Hill Campus (SH1/SH2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pierce"],"city":"Puyallup","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. LeonardBauer MRSC originalprofessionalpolicy synthesis August3,2026 explicitly names CenterisPuyallup21fulltime/50-100vendorworkers. Third-party reported staffing, not netjobs/newhiring or independently auditedcurrentcount. No building-by-buildingSH1/SH2allocation/ITMW. Washington29operating10planned derivedinventoryandstateeconomicmodels notadoptedmapcensus. BESSmoratoriums notDCbans. State/NYlegal summariesnotcurrentlawcertified; source isprivateprofessionalnonprofit, notoperatororissuingregulator. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mrsc.org/stay-informed/mrsc-insight/august-2026/data-centers","host":"mrsc.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.136,"lng":-122.272,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json","scope":"Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.","fields":{},"notes":["LeonardBauer MRSC originalprofessionalpolicy synthesis August3,2026 explicitly names CenterisPuyallup21fulltime/50-100vendorworkers. Third-party reported staffing, not netjobs/newhiring or independently auditedcurrentcount. No building-by-buildingSH1/SH2allocation/ITMW.","Washington29operating10planned derivedinventoryandstateeconomicmodels notadoptedmapcensus. BESSmoratoriums notDCbans. State/NYlegal summariesnotcurrentlawcertified; source isprivateprofessionalnonprofit, notoperatororissuingregulator.","Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."],"sources":[{"url":"https://mrsc.org/stay-informed/mrsc-insight/august-2026/data-centers","host":"mrsc.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Puyallup · Pierce · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"centersquare-lynnwood-se1-wa","state":"WA","kind":"facility","name":"Centersquare Lynnwood SE1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Snohomish"],"city":"Lynnwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Provider spelling retained; source does not supply SE1 code, lease or sole-owner proof. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.841809,"lng":-122.3016653,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"CenterSquare","listed_address":"17300 Highway 99","listed_city":"Lynnwood","listed_state":"WA"},"notes":["Provider spelling retained; source does not supply SE1 code, lease or sole-owner proof.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Lynnwood · Snohomish · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"cyrusone-pnw1-quincy-wa","state":"WA","kind":"facility","name":"CyrusOne PNW1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Quincy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Additional land is for potential future development subject to power availability, not additional confirmed capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/quincy-washington","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.2334,"lng":-119.8528,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_total_it_capacity_mw":36,"technical_it_space_sqft_approx":720000},"notes":["Additional land is for potential future development subject to power availability, not additional confirmed capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/quincy-washington","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Quincy · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"dallesport-server-farm-webster-orchards-wa","state":"WA","kind":"facility","name":"Dallesport Server Farm (Webster Orchards / Williams Ranch site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Klickitat"],"city":"Dallesport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Lakeside1260MWline-load request not delivered critical IT; combined2260MWpotential not eachsite. Conditional-use process and power still needed; acquired regional14900acre-feetright not campus water consumption. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.columbiagorgenews.com/news/another-data-center/article_e81e8737-9db6-49c5-bd3e-594e8976cdd4.html","host":"columbiagorgenews.com","date":"2026-08-26","published":"2026-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.6173426,"lng":-121.179515,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Columbia Gorge News identifies separate Lakeside434-acre proposal and ScottWebster orchard Dallesport Server Farm.","independently_verified_current_operating_status":null},"notes":["Lakeside1260MWline-load request not delivered critical IT; combined2260MWpotential not eachsite. Conditional-use process and power still needed; acquired regional14900acre-feetright not campus water consumption.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.columbiagorgenews.com/news/another-data-center/article_e81e8737-9db6-49c5-bd3e-594e8976cdd4.html","host":"columbiagorgenews.com","date":"2026-08-26","published":"2026-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Dallesport · Klickitat · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"digital-fortress-lynnwood-wa","state":"WA","kind":"facility","name":"Digital Fortress Lynnwood (SEA1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Snohomish"],"city":"Lynnwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Source spells Fortess; exact street/city context, not silently corrected legal-company identity or ownership. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.8224039,"lng":-122.2896138,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Digital Fortess","listed_address":"4200 194th St SW","listed_city":"Lynnwood","listed_state":"WA"},"notes":["Source spells Fortess; exact street/city context, not silently corrected legal-company identity or ownership.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Lynnwood · Snohomish · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"digital-realty-sea1-intergate-seattle-east-bldg-4-wa","state":"WA","kind":"facility","name":"Digital Realty SEA1 (Intergate Seattle-East, Bldg 4)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King"],"city":"Tukwila","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred Seattle regional page lists SEA10 at the Westin Building, not Intergate East Building 4. No current ownership, closure or renamed identity is inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/seattle","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.4934032,"lng":-122.2888803,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred Seattle regional page lists SEA10 at the Westin Building, not Intergate East Building 4. No current ownership, closure or renamed identity is inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/seattle","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Tukwila · King · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"energizer-data-center-hoctor-road-klickitat-wa","state":"WA","kind":"facility","name":"Energizer Data Center (BPA L0493 / L0497)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Klickitat"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Exact Energizer locations are unknown. A transmission easement does not locate a data center. No site permits or construction were reported. A September moratorium motion died without a second, and possible October 20 ordinance action remains future. Regional requests are not delivered IT. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","host":"spokesman.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.7770659,"lng":-120.8128216,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Washington State Standard names Shell and Savion applications for Energizer, Energizer II and Vines Rest, plus a Lakeside proposal.","independently_verified_current_operating_status":null},"notes":["Exact Energizer locations are unknown. A transmission easement does not locate a data center. No site permits or construction were reported. A September moratorium motion died without a second, and possible October 20 ordinance action remains future. Regional requests are not delivered IT.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","host":"spokesman.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Klickitat · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"energizer-ii-data-center-goodnoe-hills-klickitat-wa","state":"WA","kind":"facility","name":"Energizer II Data Center (BPA L0702)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Klickitat"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Exact Energizer locations are unknown. A transmission easement does not locate a data center. No site permits or construction were reported. A September moratorium motion died without a second, and possible October 20 ordinance action remains future. Regional requests are not delivered IT. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","host":"spokesman.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.7754842,"lng":-120.8009807,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Washington State Standard names Shell and Savion applications for Energizer, Energizer II and Vines Rest, plus a Lakeside proposal.","independently_verified_current_operating_status":null},"notes":["Exact Energizer locations are unknown. A transmission easement does not locate a data center. No site permits or construction were reported. A September moratorium motion died without a second, and possible October 20 ordinance action remains future. Regional requests are not delivered IT.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","host":"spokesman.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Klickitat · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"equinix-se3-seattle-wa","state":"WA","kind":"facility","name":"Equinix Seattle SE3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King"],"city":"Seattle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Exact provider/street context; code SE3 and current critical IT load not independently given. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.6144229,"lng":-122.3397427,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Equinix","listed_address":"2020 5th Ave","listed_city":"Seattle","listed_state":"WA"},"notes":["Exact provider/street context; code SE3 and current critical IT load not independently given.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Seattle · King · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"equinix-se4-kent-wa","state":"WA","kind":"facility","name":"Equinix Seattle SE4","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King"],"city":"Kent","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Washington preliminary multi-beneficiary incentive evaluation. Program evaluation, not an Equinix Kent site award or power specification. Savings include2025/2026projections; benefit not causal proof.53jobs reported by recipients not independently verified by revenue department.2026law narrows future eligibility; report says before-change use only. Do not equate no new buildings using this preference with no urban data centers. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://leg.wa.gov/jlarc/taxReports/2026/data/1/report.html","host":"leg.wa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.4215254,"lng":-122.2473931,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Washington preliminary multi-beneficiary incentive evaluation","fields":{"report_status":"preliminary","report_month":"2026-07","program_scope":"urban counties King,Pierce,Snohomish","estimated_program_tax_savings_2023_2026_usd":42400000,"program_new_urban_data_centers_built_under_reviewed_preference":0},"notes":["Program evaluation, not an Equinix Kent site award or power specification. Savings include2025/2026projections; benefit not causal proof.53jobs reported by recipients not independently verified by revenue department.2026law narrows future eligibility; report says before-change use only. Do not equate no new buildings using this preference with no urban data centers.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://leg.wa.gov/jlarc/taxReports/2026/data/1/report.html","host":"leg.wa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Kent · King · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"gigawatt-east-wenatchee-wa","state":"WA","kind":"facility","name":"Giga Watt Mining Facility (former)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Douglas"],"city":"East Wenatchee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Corporate bankruptcy does not prove every building closed or identify today's operator. Liabilities and token proceeds are not facility capex. Securities allegations are not court judgments. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coindesk.com/markets/2018/11/21/bitcoin-mining-firm-giga-watt-declares-bankruptcy-owing-millions","host":"coindesk.com","date":"2018-11-21","published":"2018-11-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.3968,"lng":-120.2042,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"CoinDesk reports Giga Watt's 2018 Chapter 11 filing and historical creditor claims.","independently_verified_current_operating_status":null},"notes":["Corporate bankruptcy does not prove every building closed or identify today's operator. Liabilities and token proceeds are not facility capex. Securities allegations are not court judgments.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coindesk.com/markets/2018/11/21/bitcoin-mining-firm-giga-watt-declares-bankruptcy-owing-millions","host":"coindesk.com","date":"2018-11-21","published":"2018-11-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · East Wenatchee · Douglas · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"h5-data-centers-quincy-campus-wa","state":"WA","kind":"facility","name":"H5 Data Centers Quincy Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Quincy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Future full-buildout value is not delivered load. Lowest-cost, hydro and tax assertions require separate utility/program evidence, not the repeated old footer. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/quincy-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.2334,"lng":-119.8528,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"1711 M St NE, Quincy, WA 98848","advertised_building_sqft":240000,"full_buildout_power_mw":40,"power_basis":"full-buildout power capacity; not explicitly critical IT"},"notes":["Future full-buildout value is not delivered load. Lowest-cost, hydro and tax assertions require separate utility/program evidence, not the repeated old footer.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/quincy-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Quincy · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"h5-data-centers-seattle-denny-way-wa","state":"WA","kind":"facility","name":"H5 Data Centers Seattle","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King"],"city":"Seattle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Distinct from the nearby Westin Building mentioned for connectivity. Do not merge addresses or copy Westin size. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/seattle-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.6205,"lng":-122.3379,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"1000 Denny Way, Seattle, WA 98109","advertised_colocation_facility_sqft":293000},"notes":["Distinct from the nearby Westin Building mentioned for connectivity. Do not merge addresses or copy Westin size.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/seattle-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Seattle · King · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"krambu-newport-wa","state":"WA","kind":"facility","name":"Krambu Eastern Washington (Newport)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pend Oreille"],"city":"Newport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. Virginia Thomas, Spokane Journal of Business, February13,2020 original founder interview identifies Newport facility at240NorthUnion, distinct from Dalton Gardens HQ and Coeur dAlene office. It says UNDER CONSTRUCTION/expected running soon; publication headline thrives is not commissioned-facility evidence in2026. 2017 company formation/roughly20staff are company history, not Newport first doors/current workers. Nearly1M friends-family financing and generic3.5M versus30M construction comparison are not audited Newport capex.8.8kW is ONE SERVER example, not site MW. Hydro/filtered-air cooling and lower cost are founder assertions, no measured PUE/water/commissioning proof. Talks with JPMorgan/Navy are not executed tenant contracts. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spokanejournal.com/articles/2019-having-survived-crypto-winter-krambu-thrives","host":"spokanejournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":48.1834302,"lng":-117.0423605,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-proposals-and-pollutant-correction-round75-2026-10-15.json","scope":"Named original operator, government announcement or original reported project context.","fields":{},"notes":["Virginia Thomas, Spokane Journal of Business, February13,2020 original founder interview identifies Newport facility at240NorthUnion, distinct from Dalton Gardens HQ and Coeur dAlene office. It says UNDER CONSTRUCTION/expected running soon; publication headline thrives is not commissioned-facility evidence in2026.","2017 company formation/roughly20staff are company history, not Newport first doors/current workers. Nearly1M friends-family financing and generic3.5M versus30M construction comparison are not audited Newport capex.8.8kW is ONE SERVER example, not site MW. Hydro/filtered-air cooling and lower cost are founder assertions, no measured PUE/water/commissioning proof. Talks with JPMorgan/Navy are not executed tenant contracts.","Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."],"sources":[{"url":"https://www.spokanejournal.com/articles/2019-having-survived-crypto-winter-krambu-thrives","host":"spokanejournal.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Newport · Pend Oreille · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"lakeside-industries-dallesport-data-center-wa","state":"WA","kind":"facility","name":"Lakeside Industries Dallesport Data Center (proposed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Klickitat"],"city":"Dallesport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Exact Energizer locations are unknown. A transmission easement does not locate a data center. No site permits or construction were reported. A September moratorium motion died without a second, and possible October 20 ordinance action remains future. Regional requests are not delivered IT. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","host":"spokesman.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.6173426,"lng":-121.179515,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Washington State Standard names Shell and Savion applications for Energizer, Energizer II and Vines Rest, plus a Lakeside proposal.","independently_verified_current_operating_status":null},"notes":["Exact Energizer locations are unknown. A transmission easement does not locate a data center. No site permits or construction were reported. A September moratorium motion died without a second, and possible October 20 ordinance action remains future. Regional requests are not delivered IT.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spokesman.com/stories/2026/oct/07/rural-klickitat-county-faces-surge-in-data-center-/","host":"spokesman.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Dallesport · Klickitat · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"merkle-standard-usk-wa","state":"WA","kind":"facility","name":"Merkle Standard Usk Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Pend Oreille"],"city":"Usk","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The article's 100 megawatts of energy per year is a unit error; no current IT MW is adopted. A partnership equipment ambition, prospective 600 MW intake, possible 70 MW mill restart and reported infrastructure costs are not delivered mining capacity or DC investment. Renewable-credit and carbon-negative claims are attributed, not audited. Historical operation is not a 2026 status confirmation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cascadepbs.org/news/2022/11/tiny-eastern-wa-town-could-become-bitcoin-mining-hub/","host":"cascadepbs.org","date":"2022-11-16","published":"2022-11-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":48.3079,"lng":-117.2848,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Cascade PBS/InvestigateWest describes observed Merkle Standard cryptocurrency equipment at the former Ponderay Newsprint mill and a reported May conditional-use approval, with major expansion options still under study.","independently_verified_current_operating_status":null},"notes":["The article's 100 megawatts of energy per year is a unit error; no current IT MW is adopted. A partnership equipment ambition, prospective 600 MW intake, possible 70 MW mill restart and reported infrastructure costs are not delivered mining capacity or DC investment. Renewable-credit and carbon-negative claims are attributed, not audited. Historical operation is not a 2026 status confirmation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cascadepbs.org/news/2022/11/tiny-eastern-wa-town-could-become-bitcoin-mining-hub/","host":"cascadepbs.org","date":"2022-11-16","published":"2022-11-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Usk · Pend Oreille · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"microsoft-columbia-quincy-wa","state":"WA","kind":"facility","name":"Microsoft Columbia Data Center (Quincy)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Quincy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Regional tax receipts, water shares, utility load and industrial-alliance jobs cannot be assigned to the individual Microsoft Columbia campus. H5's acquisitions, cooling and workforce are other facilities. Resident health concerns are not causal findings. Transmission-voltage kV is not MW capacity, and proposed infrastructure is not spare power available to any new site. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spokesman.com/stories/2026/jul/26/where-agriculture-meets-technology-inside-the-smal/","host":"spokesman.com","date":"2026-07-26","published":"2026-07-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.2333,"lng":-119.8667,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Spokesman-Review reports Microsoft and other Quincy operators alongside local tax, utility-transmission and land-use debates, with Microsoft's local workforce attributed to its webpage.","independently_verified_current_operating_status":null},"notes":["Regional tax receipts, water shares, utility load and industrial-alliance jobs cannot be assigned to the individual Microsoft Columbia campus. H5's acquisitions, cooling and workforce are other facilities. Resident health concerns are not causal findings. Transmission-voltage kV is not MW capacity, and proposed infrastructure is not spare power available to any new site.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spokesman.com/stories/2026/jul/26/where-agriculture-meets-technology-inside-the-smal/","host":"spokesman.com","date":"2026-07-26","published":"2026-07-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Quincy · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"microsoft-east-wenatchee-wa","state":"WA","kind":"facility","name":"Microsoft East Wenatchee Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"East Wenatchee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. JasonTaylor KPQ December13,2022 original utility-spokesperson interviews distinguish Douglas County PUD TRANSMISSION/DISTRIBUTION from electricity bought from THIRD PARTY. Reported180MW concerns three Microsoft county buildings, not180MWITeach or allhydro fromWellsDam. Agreement January6,2023-December31,2029 asreported, actual executedcontract/commissioning/current amendments unread. One building had grandopening but was about to operate; another underconstruction. Ceremony is not energization.875UrbanIndustrialWay is substation address, not a new exact data-center parcel. Historical delivery tariff charges/kWh/kW demand are delivery components not all-in2026energy price; no unsupported rate sum. Microsoft reportedly paid substation, receipt unread. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/","host":"kpq.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.407837,"lng":-120.207723,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["JasonTaylor KPQ December13,2022 original utility-spokesperson interviews distinguish Douglas County PUD TRANSMISSION/DISTRIBUTION from electricity bought from THIRD PARTY. Reported180MW concerns three Microsoft county buildings, not180MWITeach or allhydro fromWellsDam. Agreement January6,2023-December31,2029 asreported, actual executedcontract/commissioning/current amendments unread.","One building had grandopening but was about to operate; another underconstruction. Ceremony is not energization.875UrbanIndustrialWay is substation address, not a new exact data-center parcel. Historical delivery tariff charges/kWh/kW demand are delivery components not all-in2026energy price; no unsupported rate sum. Microsoft reportedly paid substation, receipt unread.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/","host":"kpq.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · East Wenatchee · Douglas · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"microsoft-malaga-wa","state":"WA","kind":"facility","name":"Microsoft Malaga Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chelan"],"city":"Malaga","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Old first-phase forecast is not observed completion or2026 operation. Operator explicitly separates construction from operability. Three campus buildings are not three commissioned buildings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/blog/malaga-datacenter-project-overview/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.23,"lng":-120.2,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"campus_corridor":"Malaga-Alcoa Highway","first_building_construction_start_forecast":"2023-06","first_building_completion_forecast":"Early2026","additional_buildings":2,"additional_timing":"Driven by demand","historical_community_session":"2023-03-29","actual_operational_date":null},"notes":["Old first-phase forecast is not observed completion or2026 operation. Operator explicitly separates construction from operability. Three campus buildings are not three commissioned buildings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/blog/malaga-datacenter-project-overview/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Malaga · Chelan · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"microsoft-mwh-quincy-wa","state":"WA","kind":"facility","name":"Microsoft MWH Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Quincy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. state permit index with three named source contexts. State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","host":"ecology.wa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.237888,"lng":-119.8875891,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"state permit index with three named source contexts","fields":{"actapio_east_wenatchee_listed_approval_order":"18AQ-C226","microsoft_mwh_listed_approval_order":"22AQ-E035","microsoft_mwh_order_date":"2022-09-27","olympia_listed_health_impact_document_date":"2010-09-16"},"notes":["State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","host":"ecology.wa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Quincy · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"bitfarms-moses-lake-wa","state":"WA","kind":"facility","name":"Moses Lake Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grant"],"city":"Moses Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.1301,"lng":-119.2781,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Campus-level issuer context, not proof every imported plant/building ID is independently energized.","fields":{"announcement_date":"2026-05-11","quarter_ended":"2026-03-31","company_claim":"Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.","redomiciliation_parent_transaction_date":"2026-04-01"},"notes":["Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Moses Lake · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"pnnl-ai-data-center-richland-wa","state":"WA","kind":"facility","name":"PNNL AI Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Benton"],"city":"Richland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. An RFI is not site selection, a lease, a permit or an operating campus. PNNL's existing AI research center is separate from the proposed infrastructure. SMR prospects are not commissioned generation; regional market capacity and an unidentified Wallula buyer are not PNNL figures. The unrelated automatic excerpt was corrected using the retained main article. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/pnnl-data-centers","host":"tricitiesbusinessnews.com","date":"2025-05-15","published":"2025-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":46.348,"lng":-119.279,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Tri-Cities Area Journal of Business describes DOE seeking information on possible AI infrastructure at PNNL among sixteen candidate sites.","independently_verified_current_operating_status":null},"notes":["An RFI is not site selection, a lease, a permit or an operating campus. PNNL's existing AI research center is separate from the proposed infrastructure. SMR prospects are not commissioned generation; regional market capacity and an unidentified Wallula buyer are not PNNL figures. The unrelated automatic excerpt was corrected using the retained main article.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/pnnl-data-centers","host":"tricitiesbusinessnews.com","date":"2025-05-15","published":"2025-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Richland · Benton · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"apricus-rock-point-data-center-west-plains-wa","state":"WA","kind":"facility","name":"Rock Point Data Center Project","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spokane"],"city":"West Plains","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Spokane County early concept and distinct moratorium actions. Early concept is not pending permit, construction or operating site. Article reports failed planning motion to recommend moratorium, separate from postponed CountyCommission vote and SpokaneCITYmoratorium. Do not infer county ban. NearbyAvista500MWMOUproject distinct. Hydrogen and data-center resources separate. Residents water/health/noise claims are concerns; no violations inferred. No personal residential details adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spokesman.com/stories/2026/aug/02/company-proposing-massive-west-plains-data-center-/","host":"spokesman.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.621,"lng":-117.73,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Spokane County early concept and distinct moratorium actions","fields":{"project":"Apricus RockPoint","location":"11703 West MedicalLake Highway, Spokane County, Washington","reported_site_acres":514,"reported_potential_power_mw_max":1000,"power_basis":"potential data-center use described by reporting; not explicit critical IT","county_planning_director_reported_stage":"no formal project proposal under review asofJuly30meeting"},"notes":["Early concept is not pending permit, construction or operating site. Article reports failed planning motion to recommend moratorium, separate from postponed CountyCommission vote and SpokaneCITYmoratorium. Do not infer county ban. NearbyAvista500MWMOUproject distinct. Hydrogen and data-center resources separate. Residents water/health/noise claims are concerns; no violations inferred. No personal residential details adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spokesman.com/stories/2026/aug/02/company-proposing-massive-west-plains-data-center-/","host":"spokesman.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · West Plains · Spokane · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"sabey-intergate-columbia-building-b-wa","state":"WA","kind":"facility","name":"Sabey Intergate.Columbia Building B","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"East Wenatchee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Columbia campus; not each individual building. 70MWis explicitly utility campus power, not criticalITor eachB/Dbuilding. Operator5centrate claim lacks reviewed utility tariff, not adopted current customer rate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sabeydatacenters.com/locations/east-wenatchee-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.407164,"lng":-120.1875239,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Columbia campus; not each individual building","fields":{"campus_utility_power_mw":70,"buildings_on_campus_at_page":3,"additional_building_stage":"under construction","published_address":"4405 Grant Rd, East Wenatchee, WA98802"},"notes":["70MWis explicitly utility campus power, not criticalITor eachB/Dbuilding. Operator5centrate claim lacks reviewed utility tariff, not adopted current customer rate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sabeydatacenters.com/locations/east-wenatchee-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · East Wenatchee · Douglas · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"sabey-intergate-columbia-building-d-wa","state":"WA","kind":"facility","name":"Sabey Intergate.Columbia Building D","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"East Wenatchee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Columbia campus; not each individual building. 70MWis explicitly utility campus power, not criticalITor eachB/Dbuilding. Operator5centrate claim lacks reviewed utility tariff, not adopted current customer rate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sabeydatacenters.com/locations/east-wenatchee-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.4075849,"lng":-120.1915785,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Columbia campus; not each individual building","fields":{"campus_utility_power_mw":70,"buildings_on_campus_at_page":3,"additional_building_stage":"under construction","published_address":"4405 Grant Rd, East Wenatchee, WA98802"},"notes":["70MWis explicitly utility campus power, not criticalITor eachB/Dbuilding. Operator5centrate claim lacks reviewed utility tariff, not adopted current customer rate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sabeydatacenters.com/locations/east-wenatchee-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · East Wenatchee · Douglas · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"sabey-intergate-east-building-3-wa","state":"WA","kind":"facility","name":"Sabey Intergate.East Building 3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King"],"city":"Tukwila","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Seattle market campus in Tukwila, not individual east/west building. Over1Msquarefeetappliescampus. East/Westindividual base records not separately located by this campus page. MVAis apparent power, notMWorIT. Suite capacity is not campus total. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sabeydatacenters.com/locations/seattle-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.4934798,"lng":-122.2904647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Seattle market campus in Tukwila, not individual east/west building","fields":{"campus_advertised_capacity_mw":54,"power_basis":"data center power, critical IT versus gross unspecified","aggregate_redundant_feeds_mva_min_exclusive":90,"critical_suite_capacity_kw_max":1500,"published_address":"3355 35th Ave S, Tukwila, WA98168"},"notes":["Over1Msquarefeetappliescampus. East/Westindividual base records not separately located by this campus page. MVAis apparent power, notMWorIT. Suite capacity is not campus total.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sabeydatacenters.com/locations/seattle-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Tukwila · King · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"sabey-intergate-east-building-5-sdc-east-5-wa","state":"WA","kind":"facility","name":"Sabey Intergate.East Building 5 (SDC East 5)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King"],"city":"Tukwila","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Exact campus-building street context; source does not independently name East5 or distinguish legal parcel, suite and tenant boundaries. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.491986,"lng":-122.2896655,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Sabey","listed_address":"3355 S 120th Pl","listed_city":"Tukwila","listed_state":"WA"},"notes":["Exact campus-building street context; source does not independently name East5 or distinguish legal parcel, suite and tenant boundaries.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Tukwila · King · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"sabey-intergate-quincy-campus-wa","state":"WA","kind":"facility","name":"Sabey Intergate.Quincy Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Quincy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. national hub, named listing only. National locations hub only; Austin84MWstatement belongs to Austin, not Quincy. No Quincy area, MW or specific operational milestone adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sabeydatacenters.com/locations","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.247,"lng":-119.83,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"national hub, named listing only","fields":{"named_campus":"SDC Quincy"},"notes":["National locations hub only; Austin84MWstatement belongs to Austin, not Quincy. No Quincy area, MW or specific operational milestone adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sabeydatacenters.com/locations","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Quincy · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"sabey-intergate-west-building-b-wa","state":"WA","kind":"facility","name":"Sabey Intergate.West Building B","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King"],"city":"Tukwila","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Seattle market campus in Tukwila, not individual east/west building. Over1Msquarefeetappliescampus. East/Westindividual base records not separately located by this campus page. MVAis apparent power, notMWorIT. Suite capacity is not campus total. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sabeydatacenters.com/locations/seattle-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.4930744,"lng":-122.2936837,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Seattle market campus in Tukwila, not individual east/west building","fields":{"campus_advertised_capacity_mw":54,"power_basis":"data center power, critical IT versus gross unspecified","aggregate_redundant_feeds_mva_min_exclusive":90,"critical_suite_capacity_kw_max":1500,"published_address":"3355 35th Ave S, Tukwila, WA98168"},"notes":["Over1Msquarefeetappliescampus. East/Westindividual base records not separately located by this campus page. MVAis apparent power, notMWorIT. Suite capacity is not campus total.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sabeydatacenters.com/locations/seattle-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Tukwila · King · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"salcido-broadway-grant-county-wa","state":"WA","kind":"facility","name":"Salcido Broadway Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grant"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.2,"lng":-119.45,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"salcido-cashmere-cashmere-wa","state":"WA","kind":"facility","name":"Salcido Cashmere Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Chelan"],"city":"Cashmere","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.5262,"lng":-120.4692,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Cashmere · Chelan · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"salcido-columbia-wenatchee-wa","state":"WA","kind":"facility","name":"Salcido Columbia Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Chelan"],"city":"Wenatchee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.4235,"lng":-120.3103,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Wenatchee · Chelan · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"salcido-eller-douglas-county-wa","state":"WA","kind":"facility","name":"Salcido ELLER Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Douglas"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.74,"lng":-119.69,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Douglas · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"salcido-entiat-chelan-county-wa","state":"WA","kind":"facility","name":"Salcido Entiat Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Chelan"],"city":"Entiat","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.6743,"lng":-120.2093,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Entiat · Chelan · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"salcido-fortress-quincy-wa","state":"WA","kind":"facility","name":"Salcido Fortress Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grant"],"city":"Quincy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.234,"lng":-119.8528,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Quincy · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"salcido-horizon-quincy-wa","state":"WA","kind":"facility","name":"Salcido Horizon Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grant"],"city":"Quincy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.236,"lng":-119.85,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Quincy · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"salcido-pangborn-east-wenatchee-wa","state":"WA","kind":"facility","name":"Salcido Pangborn Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Douglas"],"city":"East Wenatchee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.3985,"lng":-120.2075,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · East Wenatchee · Douglas · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"salcido-wheeler-moses-lake-wa","state":"WA","kind":"facility","name":"Salcido Wheeler Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grant"],"city":"Moses Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.125,"lng":-119.285,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Moses Lake · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"stack-infrastructure-goldendale-data-center-wa","state":"WA","kind":"facility","name":"STACK Infrastructure Goldendale Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Klickitat"],"city":"Goldendale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported 958 MW interconnection request was in study phase, not executed service, commissioned critical IT or a binding power purchase. Social-profile 1 GW-plus aspiration is not separately additive capacity. Goldendale 1,200 MW is pumped-storage output, not sustained net generation or DC IT; the 80% comparison cannot prove contracted supply or annual energy. Roughly 700 acres and billions of gallons concern storage project, not automatically campus footprint or daily cooling demand. FERC hydro license and May 26 review petitions do not establish a court ruling, final DC permit or signed buyer. Owner did not disclose buyers; reporter’s inference of Stack as buyer remains attributed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site","host":"tricitiesbusinessnews.com","date":"2026-05-28","published":"2026-05-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.8213,"lng":-120.8217,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Oregon Capital Chronicle reporting republished by Tri-Cities Area Journal of Business links a potential Stack Goldendale campus to planned pumped storage and documents Yakama cultural-resource opposition and federal appeals.","independently_verified_current_operating_status":null},"notes":["Reported 958 MW interconnection request was in study phase, not executed service, commissioned critical IT or a binding power purchase. Social-profile 1 GW-plus aspiration is not separately additive capacity. Goldendale 1,200 MW is pumped-storage output, not sustained net generation or DC IT; the 80% comparison cannot prove contracted supply or annual energy. Roughly 700 acres and billions of gallons concern storage project, not automatically campus footprint or daily cooling demand. FERC hydro license and May 26 review petitions do not establish a court ruling, final DC permit or signed buyer. Owner did not disclose buyers; reporter’s inference of Stack as buyer remains attributed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site","host":"tricitiesbusinessnews.com","date":"2026-05-28","published":"2026-05-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Goldendale · Klickitat · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"tierpoint-spokane-wa","state":"WA","kind":"facility","name":"TierPoint Spokane","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spokane"],"city":"Liberty Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator page contains separate specifications for 23403 and 23017 E. Mission Avenue. Do not copy one location area or generator configuration to an undifferentiated Spokane record. Two published address sections are identity-resolution candidates, not two automatic additions to the national count. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/washington/spokane/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.6719149,"lng":-117.0959323,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"published_specification_addresses":["23403 E. Mission Avenue","23017 E. Mission Avenue"]},"notes":["Operator page contains separate specifications for 23403 and 23017 E. Mission Avenue. Do not copy one location area or generator configuration to an undifferentiated Spokane record. Two published address sections are identity-resolution candidates, not two automatic additions to the national count.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/washington/spokane/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Liberty Lake · Spokane · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"serverfarm-titan-moses-lake-wa","state":"WA","kind":"facility","name":"TiTAN (Serverfarm Moses Lake)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Moses Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Serverfarm TiTAN area, utility-unit and tariff-copy conflicts. 34MVAapparentpowernotautomatically34MWactive;tableandnarrativeunitsdiffer.22MWITseparate.163000/250000buildingareasand136000narrativerepresentunresolvedphase/scope;donotsumcurrentarea. Published0.026perKWpricehasenergyuniterror,donotrewriteperKWhorshowcurrentrate. Hydroelectric/embodiedcarbonmodeledclaimnotindependentmeasuredcert. SeattlemarketcopydoesnotrelocateMosesLakesite. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.serverfarmllc.com/moses-lake-data-center/","host":"serverfarmllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.1554,"lng":-119.25,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Serverfarm TiTAN area, utility-unit and tariff-copy conflicts","fields":{"operator":"Serverfarm","site_name":"TiTAN","locality":"Moses Lake, Washington","critical_it_mw":22,"utility_capacity_table_mva":34,"narrative_utility_power_mw":34,"published_building1_sqft":163000,"published_building2_sqft":250000,"narrative_facility_sqft":136000,"narrative_site_acres":10,"canonical_current_area_sqft":null},"notes":["34MVAapparentpowernotautomatically34MWactive;tableandnarrativeunitsdiffer.22MWITseparate.163000/250000buildingareasand136000narrativerepresentunresolvedphase/scope;donotsumcurrentarea. Published0.026perKWpricehasenergyuniterror,donotrewriteperKWhorshowcurrentrate. Hydroelectric/embodiedcarbonmodeledclaimnotindependentmeasuredcert. SeattlemarketcopydoesnotrelocateMosesLakesite.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.serverfarmllc.com/moses-lake-data-center/","host":"serverfarmllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Moses Lake · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"trammell-crow-lewis-clark-ranch-west-richland-wa","state":"WA","kind":"facility","name":"Trammell Crow Lewis & Clark Ranch Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Benton"],"city":"West Richland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Initial 500 acres growing to 1000 is ultimate footprint, not 1500.7600 acre ranch plan,3800 homes and 2600 jobs in caption are broader mixed development, not DCsite/employment. Utility cost-recovery agreements/upfront deposits explicitly DO NOT mean a campus will be built or power secured; transmission studies and supply remain hurdles.18.9 billion projects-in-process/11.5 billion pipeline are company portfolio, not site capex. Wallula land price/Atlas Agro 500 million proposal are separate projects. No MW, final permit, purchase closing or RFS verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/west-richland-data-center","host":"tricitiesbusinessnews.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":46.3046,"lng":-119.3667,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Tri-Cities Area Journal of Business reports Trammell Crow studying a West Richland data center at Lewis & Clark Ranch, with due diligence and land-sale negotiations ongoing.","independently_verified_current_operating_status":null,"utility_cost_recovery_deposit_not_power_service_contract":true},"notes":["Initial 500 acres growing to 1000 is ultimate footprint, not 1500.7600 acre ranch plan,3800 homes and 2600 jobs in caption are broader mixed development, not DCsite/employment. Utility cost-recovery agreements/upfront deposits explicitly DO NOT mean a campus will be built or power secured; transmission studies and supply remain hurdles.18.9 billion projects-in-process/11.5 billion pipeline are company portfolio, not site capex. Wallula land price/Atlas Agro 500 million proposal are separate projects. No MW, final permit, purchase closing or RFS verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tricitiesbusinessnews.com/articles/west-richland-data-center","host":"tricitiesbusinessnews.com","date":"2025-12-12","published":"2025-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · West Richland · Benton · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"vantage-quincy-wa11-wa","state":"WA","kind":"facility","name":"Vantage Quincy WA11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Quincy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. WA13delivery and resulting whole campus. WA13capacity is included in89MWcampus; not89MWforWA11and64extra.1B+investment wholecampus since2011. Utility hydro generation excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/","host":"vantage-dc.com","date":"2023-10-18","published":"2023-10-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.2501646,"lng":-119.8144903,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"WA13delivery and resulting whole campus","fields":{"wa13_delivery_announcement":"2023-10-18","wa13_area_sqft":530000,"wa13_it_capacity_mw":64,"resulting_campus_it_capacity_mw":89,"campus_acres":68,"resulting_campus_area_sqft_approx":775000,"campus_buildings":3,"operator_reported_campus_investment_usd_min_exclusive":1000000000},"notes":["WA13capacity is included in89MWcampus; not89MWforWA11and64extra.1B+investment wholecampus since2011. Utility hydro generation excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/","host":"vantage-dc.com","date":"2023-10-18","published":"2023-10-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Quincy · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"vantage-wa13-quincy-wa","state":"WA","kind":"facility","name":"Vantage WA13","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Quincy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. WA13delivery and resulting whole campus. WA13capacity is included in89MWcampus; not89MWforWA11and64extra.1B+investment wholecampus since2011. Utility hydro generation excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/","host":"vantage-dc.com","date":"2023-10-18","published":"2023-10-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":47.247,"lng":-119.83,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"WA13delivery and resulting whole campus","fields":{"wa13_delivery_announcement":"2023-10-18","wa13_area_sqft":530000,"wa13_it_capacity_mw":64,"resulting_campus_it_capacity_mw":89,"campus_acres":68,"resulting_campus_area_sqft_approx":775000,"campus_buildings":3,"operator_reported_campus_investment_usd_min_exclusive":1000000000},"notes":["WA13capacity is included in89MWcampus; not89MWforWA11and64extra.1B+investment wholecampus since2011. Utility hydro generation excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/","host":"vantage-dc.com","date":"2023-10-18","published":"2023-10-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Quincy · Grant · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"washington-state-data-center-olympia-wa","state":"WA","kind":"facility","name":"Washington State Data Center (1500 Jefferson Building)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Thurston"],"city":"Olympia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. state permit index with three named source contexts. State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","host":"ecology.wa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.0345059,"lng":-122.8945401,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"state permit index with three named source contexts","fields":{"actapio_east_wenatchee_listed_approval_order":"18AQ-C226","microsoft_mwh_listed_approval_order":"22AQ-E035","microsoft_mwh_order_date":"2022-09-27","olympia_listed_health_impact_document_date":"2010-09-16"},"notes":["State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ecology.wa.gov/air-climate/air-quality/data-centers","host":"ecology.wa.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Olympia · Thurston · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"westin-building-digital-realty-seattle-sea10-wa","state":"WA","kind":"facility","name":"Westin Building (Digital Realty Seattle SEA10)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King"],"city":"Seattle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.. Equinix also listed at same address. Provider presence context, not separate physical buildings or exclusive Digital Realty ownership; SEA10 code not supplied. List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service. Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort. Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically. Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred. No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.6143555,"lng":-122.3388637,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-carrier-list-address-crosswalk-round92-2026-10-15.json","scope":"Carrier-published label/address context only. Physical operating status, exclusive operator, ownership, IT load and code remain unverified by this source.","fields":{"listed_label":"Digital Realty","listed_address":"2001 6th Ave","listed_city":"Seattle","listed_state":"WA"},"notes":["Equinix also listed at same address. Provider presence context, not separate physical buildings or exclusive Digital Realty ownership; SEA10 code not supplied.","List gives no MW, actual occupancy, commissioning dates, title deeds, contracts or independent physical inspections. Listing is not a guarantee of presently deliverable service.","Coming Soon labels on Vancouver1050Pender and Watertown486Arsenal have unspecified scope; not adopted as data-center construction or commissioning statuses. Vancouver is outside the United States cohort.","Address rows can represent multiple service providers or tenants in one building. Never sum rows as distinct physical buildings or replace ownership/operator fields automatically.","Source has ZIP/name spelling inconsistencies, including LumenSunnyvale98108, QTS SantaClara98054, Cambridge02451 and DigitalFortess. Raw values retained; no postal corrections or geocodes inferred.","No issue date printed. Filename 20260206 and PDF modification metadata February6,2026 are file/version indicators, not proof of issue date, site commissioning or a field survey that day. PDF title still references November2025 spreadsheet."],"sources":[{"url":"https://www.astound.com/business/wp-content/uploads/2026/02/Astound-Business-Data-Center-List-20260206.pdf","host":"astound.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Seattle · King · Source context reviewed","state_name":"Washington","state_path":"/washington/"},{"id":"adams-fork-harless-datacenter-logan-county-wv","state":"WV","kind":"facility","name":"Adams Fork Energy Campus Data Center (Harless Industrial Park, Holden)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Logan"],"city":"Holden","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AdamsFork two proposedcampuses and modeled-energy limits. Two reportedOctober2025permits notdirectlyreviewed; no proofallDCpermits orcurrentconstruction.2457MWmayrelatepowerplantscope; do notcertifycriticalIT.4.914GWtimes8760times70percent yields30.13 million MWh,notstated29.4M,soannualenergycalculationheld. Naturalgasestimatesconditional,notactualconsumption. Ammoniaplantseparateuse,9.8GWunpermittedvisionnotadditionaloperatingcapacity. Health/economicpredictions advocacy,notadjudicatedharm. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical official public meeting notice, not issued final permits.. Harless base geography says Logan County; generic notice says Mingo. Exact permit/parcel reconciliation remains open. Old original application URL returned 404, preserved in access receipts. Do not promote advocacy generation figures to IT MW.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/","host":"ohiorivervalleyinstitute.org","date":"2026-03-13","published":"2026-03-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://dep.wv.gov/events/Pages/event.aspx?eventid=264","host":"dep.wv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.8134,"lng":-81.9822,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"AdamsFork two proposedcampuses and modeled-energy limits","fields":{"publisher":"OhioRiverValleyInstitute","separate_projects":["formerTwistedGunGolfCourse nearWharncliffe","HarlessIndustrialPark"],"reported_each_electrical_capacity_mw":2457,"power_basis":"advocacy consumption framing; original generation permits not independently inspected","reported_future_expansion_goal_gw":9.8},"notes":["Two reportedOctober2025permits notdirectlyreviewed; no proofallDCpermits orcurrentconstruction.2457MWmayrelatepowerplantscope; do notcertifycriticalIT.4.914GWtimes8760times70percent yields30.13 million MWh,notstated29.4M,soannualenergycalculationheld. Naturalgasestimatesconditional,notactualconsumption. Ammoniaplantseparateuse,9.8GWunpermittedvisionnotadditionaloperatingcapacity. Health/economicpredictions advocacy,notadjudicatedharm.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/","host":"ohiorivervalleyinstitute.org","date":"2026-03-13","published":"2026-03-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Historical official public meeting notice, not issued final permits.","fields":{"public_meeting_date":"2025-08-18","time":"18:00 to 20:00, as published; timezone not specified here","application_numbers":{"R13-3714":"Adams Fork Harless","R13-3715":"Adams Fork"},"plant_scope":"Two off-grid power generation projects. Generation capacity is not data center IT capacity.","notice_geography":"Two locations described as Mingo County by this notice.","final_permit_issued_verified":false},"notes":["Harless base geography says Logan County; generic notice says Mingo. Exact permit/parcel reconciliation remains open. Old original application URL returned 404, preserved in access receipts. Do not promote advocacy generation figures to IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dep.wv.gov/events/Pages/event.aspx?eventid=264","host":"dep.wv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Holden · Logan · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"adams-fork-wharncliffe-datacenter-mingo-county-wv","state":"WV","kind":"facility","name":"Adams Fork Energy Campus Data Center (Twisted Gun Golf Course, Wharncliffe)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mingo"],"city":"Wharncliffe","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AdamsFork two proposedcampuses and modeled-energy limits. Two reportedOctober2025permits notdirectlyreviewed; no proofallDCpermits orcurrentconstruction.2457MWmayrelatepowerplantscope; do notcertifycriticalIT.4.914GWtimes8760times70percent yields30.13 million MWh,notstated29.4M,soannualenergycalculationheld. Naturalgasestimatesconditional,notactualconsumption. Ammoniaplantseparateuse,9.8GWunpermittedvisionnotadditionaloperatingcapacity. Health/economicpredictions advocacy,notadjudicatedharm. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical official public meeting notice, not issued final permits.. Harless base geography says Logan County; generic notice says Mingo. Exact permit/parcel reconciliation remains open. Old original application URL returned 404, preserved in access receipts. Do not promote advocacy generation figures to IT MW.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/","host":"ohiorivervalleyinstitute.org","date":"2026-03-13","published":"2026-03-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://dep.wv.gov/events/Pages/event.aspx?eventid=264","host":"dep.wv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.6412,"lng":-81.9689,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"AdamsFork two proposedcampuses and modeled-energy limits","fields":{"publisher":"OhioRiverValleyInstitute","separate_projects":["formerTwistedGunGolfCourse nearWharncliffe","HarlessIndustrialPark"],"reported_each_electrical_capacity_mw":2457,"power_basis":"advocacy consumption framing; original generation permits not independently inspected","reported_future_expansion_goal_gw":9.8},"notes":["Two reportedOctober2025permits notdirectlyreviewed; no proofallDCpermits orcurrentconstruction.2457MWmayrelatepowerplantscope; do notcertifycriticalIT.4.914GWtimes8760times70percent yields30.13 million MWh,notstated29.4M,soannualenergycalculationheld. Naturalgasestimatesconditional,notactualconsumption. Ammoniaplantseparateuse,9.8GWunpermittedvisionnotadditionaloperatingcapacity. Health/economicpredictions advocacy,notadjudicatedharm.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/","host":"ohiorivervalleyinstitute.org","date":"2026-03-13","published":"2026-03-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Historical official public meeting notice, not issued final permits.","fields":{"public_meeting_date":"2025-08-18","time":"18:00 to 20:00, as published; timezone not specified here","application_numbers":{"R13-3714":"Adams Fork Harless","R13-3715":"Adams Fork"},"plant_scope":"Two off-grid power generation projects. Generation capacity is not data center IT capacity.","notice_geography":"Two locations described as Mingo County by this notice.","final_permit_issued_verified":false},"notes":["Harless base geography says Logan County; generic notice says Mingo. Exact permit/parcel reconciliation remains open. Old original application URL returned 404, preserved in access receipts. Do not promote advocacy generation figures to IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dep.wv.gov/events/Pages/event.aspx?eventid=264","host":"dep.wv.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Wharncliffe · Mingo · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"alpha-technologies-huntington-wv","state":"WV","kind":"facility","name":"Alpha Technologies Huntington Headquarters Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cabell"],"city":"Huntington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Alpha named Huntington site within three-site platform. OnlyHuntingtonpreferredIDboundhere;otherlistedlocationscontextnotnewphysicalrecords. Genericcoming-soonsectionnotclearHuntingtonstatus. Multiple-megawattgeneratorsnotnumericIToravailableutilitycapacity. No originalopeningorindependentownershipverification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://myalphainnovations.com/alpha-cloud/","host":"myalphainnovations.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.419045646836,"lng":-82.437058798916,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Alpha named Huntington site within three-site platform","fields":{"operator":"Alpha Innovations","named_sites":[{"site":"Data Center1","address":"2020 Union Carbide Drive, Building6000, South Charleston, West Virginia25303"},{"site":"Data Center2","address":"44274 Round Table Plaza, BuildingL, Ashburn, Virginia20147"},{"site":"Data Center3","address":"1125 6th Avenue, Huntington, West Virginia25701"}]},"notes":["OnlyHuntingtonpreferredIDboundhere;otherlistedlocationscontextnotnewphysicalrecords. Genericcoming-soonsectionnotclearHuntingtonstatus. Multiple-megawattgeneratorsnotnumericIToravailableutilitycapacity. No originalopeningorindependentownershipverification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://myalphainnovations.com/alpha-cloud/","host":"myalphainnovations.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Huntington · Cabell · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"alpha-technologies-south-charleston-wv","state":"WV","kind":"facility","name":"Alpha Technologies South Charleston DC01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kanawha"],"city":"South Charleston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City is described generically as Charleston, not precise South Charleston address. Multiple megawatt backup generators is not a numeric IT-load capacity. Operator describes DC1 as built at West Virginia Regional Technology Park and offers services. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://myalphainnovations.com/dc1/","host":"myalphainnovations.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.3530922,"lng":-81.6962715,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"marketed_service":"data center, colocation and cloud services","campus":"West Virginia Regional Technology Park"},"notes":["City is described generically as Charleston, not precise South Charleston address.","Multiple megawatt backup generators is not a numeric IT-load capacity.","Operator describes DC1 as built at West Virginia Regional Technology Park and offers services.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://myalphainnovations.com/dc1/","host":"myalphainnovations.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · South Charleston · Kanawha · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"penzance-bedington-berkeley-county-wv","state":"WV","kind":"facility","name":"Bedington Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berkeley"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Governor announcement. Designation threshold above 90 MW is not the project capacity. Planned private capital and jobs are not spent/actual. No-state-funding statement does not establish absence of all tax benefits. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact","host":"governor.wv.gov","date":"2026-02-26","published":"2026-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.554,"lng":-77.882,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Berkeley","district":"Falling Waters","planned_campus_acres":548,"full_buildout_capital_usd":4000000000,"full_buildout_sqft_approx":1900000,"full_buildout_critical_it_mw":600,"forecast_construction_jobs_approx":1000,"forecast_permanent_jobs":125,"designation":"High Impact Intelligence Center","state_funding_statement":"No state funding used to secure the development"},"notes":["Governor announcement. Designation threshold above 90 MW is not the project capacity. Planned private capital and jobs are not spent/actual. No-state-funding statement does not establish absence of all tax benefits.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact","host":"governor.wv.gov","date":"2026-02-26","published":"2026-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Berkeley · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"qts-kearneysville-berkeley-jefferson-wv","state":"WV","kind":"facility","name":"Berkeley/Jefferson County Data Center Campus (QTS Kearneysville)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berkeley"],"city":"Kearneysville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not assign one county's approval to the whole roughly 300-acre, two-county campus. The photo is Atlanta1 and its 278 MW is not West Virginia capacity. Parcel acquisition and nearby gas/transmission do not establish executed service or operating IT. Initial water/sewer plans are not independently reviewed utility agreements; later Jefferson outcome remains unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://observerwv.com/plan-for-data-center-complex-near-kearneysville-approved/","host":"observerwv.com","date":"2025-04-07","published":"2025-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3729,"lng":-77.8636,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Observer describes a March Berkeley County concept approval for two QTS-related parcels, while the separate Jefferson County portion had no submitted plan at publication.","independently_verified_current_operating_status":null},"notes":["Do not assign one county's approval to the whole roughly 300-acre, two-county campus. The photo is Atlanta1 and its 278 MW is not West Virginia capacity. Parcel acquisition and nearby gas/transmission do not establish executed service or operating IT. Initial water/sewer plans are not independently reviewed utility agreements; later Jefferson outcome remains unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://observerwv.com/plan-for-data-center-complex-near-kearneysville-approved/","host":"observerwv.com","date":"2025-04-07","published":"2025-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Kearneysville · Berkeley · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"blockchain-power-bens-run-tyler-county-wv","state":"WV","kind":"facility","name":"Blockchain Power Corp. Ben's Run Bitcoin Mining Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Tyler"],"city":"Bens Run","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blockchain Power WV portfolio scope and future target. Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.blockchain-power.com/","host":"blockchain-power.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4660475,"lng":-81.1071441,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Blockchain Power WV portfolio scope and future target","fields":{"operator":"Blockchain Power Corp","operator_reported_energized_wv_sites":5,"combined_mining_capacity_mw":107,"additional_sites_in_development":2,"additional_planned_capacity_mw":74,"yearend_capacity_target_mw":200,"target_year":2026,"operator_reported_technicians_hired_trained":45,"additional_2026_technician_target":24},"notes":["Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.blockchain-power.com/","host":"blockchain-power.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Bens Run · Tyler · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"blockchain-power-blacksville-monongalia-county-wv","state":"WV","kind":"facility","name":"Blockchain Power Corp. Blacksville Bitcoin Mining Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Monongalia"],"city":"Blacksville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Tax exoneration is not a cash incentive grant. Original ruling not retained; company statewide power ranges, water circulation and future staffing are not exact measured Blacksville figures. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dominionpost.com/2026/03/11/commission-approves-sizable-tax-exoneration-for-bitcoin-mining-site/","host":"dominionpost.com","date":"2026-03-11","published":"2026-03-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.7048,"lng":-80.1364,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Dominion Post reports county approved Blacksville property-tax exoneration after Office of Tax Appeals decision for 2025 assessment.","independently_verified_current_operating_status":null},"notes":["Tax exoneration is not a cash incentive grant. Original ruling not retained; company statewide power ranges, water circulation and future staffing are not exact measured Blacksville figures.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dominionpost.com/2026/03/11/commission-approves-sizable-tax-exoneration-for-bitcoin-mining-site/","host":"dominionpost.com","date":"2026-03-11","published":"2026-03-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Blacksville · Monongalia · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"blockchain-power-hazelton-preston-county-wv","state":"WV","kind":"facility","name":"Blockchain Power Corp. Hazelton Bitcoin Mining Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Preston"],"city":"Hazelton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blockchain Power WV portfolio scope and future target. Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.blockchain-power.com/","host":"blockchain-power.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.6536928,"lng":-79.5305992,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Blockchain Power WV portfolio scope and future target","fields":{"operator":"Blockchain Power Corp","operator_reported_energized_wv_sites":5,"combined_mining_capacity_mw":107,"additional_sites_in_development":2,"additional_planned_capacity_mw":74,"yearend_capacity_target_mw":200,"target_year":2026,"operator_reported_technicians_hired_trained":45,"additional_2026_technician_target":24},"notes":["Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.blockchain-power.com/","host":"blockchain-power.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Hazelton · Preston · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"blockchain-power-miracle-run-monongalia-county-wv","state":"WV","kind":"facility","name":"Blockchain Power Corp. Miracle Run Bitcoin Mining Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Monongalia"],"city":"Miracle Run","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blockchain Power WV portfolio scope and future target. Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.blockchain-power.com/","host":"blockchain-power.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.6773021,"lng":-80.267853,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Blockchain Power WV portfolio scope and future target","fields":{"operator":"Blockchain Power Corp","operator_reported_energized_wv_sites":5,"combined_mining_capacity_mw":107,"additional_sites_in_development":2,"additional_planned_capacity_mw":74,"yearend_capacity_target_mw":200,"target_year":2026,"operator_reported_technicians_hired_trained":45,"additional_2026_technician_target":24},"notes":["Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.blockchain-power.com/","host":"blockchain-power.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Miracle Run · Monongalia · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"blockchain-power-tunnelton-preston-county-wv","state":"WV","kind":"facility","name":"Blockchain Power Corp. Tunnelton Bitcoin Mining Site","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Preston"],"city":"Tunnelton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blockchain Power WV portfolio scope and future target. Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.blockchain-power.com/","host":"blockchain-power.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.3917601,"lng":-79.748395,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Blockchain Power WV portfolio scope and future target","fields":{"operator":"Blockchain Power Corp","operator_reported_energized_wv_sites":5,"combined_mining_capacity_mw":107,"additional_sites_in_development":2,"additional_planned_capacity_mw":74,"yearend_capacity_target_mw":200,"target_year":2026,"operator_reported_technicians_hired_trained":45,"additional_2026_technician_target":24},"notes":["Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.blockchain-power.com/","host":"blockchain-power.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Tunnelton · Preston · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"blockware-sunpark-boone-lincoln-county-wv","state":"WV","kind":"facility","name":"Blockware Solutions SunPark Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Boone"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Sixty MW initial phase is inside 150 MW project, not additive. Ten-million-USD company plan differs from wider mixed-use investment. Q4 2022 start was anticipated, not observed. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wchstv.com/news/local/bitcoin-mining-leader-to-build-facility-as-extension-of-former-hobet-site-project","host":"wchstv.com","date":"2022-05-25","published":"2022-05-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.083,"lng":-81.983,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"WCHS reports SEVA-issued announcement of Blockware SunPark / Hobet project, with initial phase and later total.","independently_verified_current_operating_status":null},"notes":["Sixty MW initial phase is inside 150 MW project, not additive. Ten-million-USD company plan differs from wider mixed-use investment. Q4 2022 start was anticipated, not observed.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wchstv.com/news/local/bitcoin-mining-leader-to-build-facility-as-extension-of-former-hobet-site-project","host":"wchstv.com","date":"2022-05-25","published":"2022-05-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Boone · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"citynet-bridgeport-harrison-county-wv","state":"WV","kind":"facility","name":"Citynet Bridgeport Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Harrison"],"city":"Bridgeport","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator explicitly identifies four service locations, including Bridgeport. Offices can contain a colo; locations are not automatically hyperscale campuses. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Citynet two explicitly listed WV colocation sites. PittsburghAlleghenyCenterandColumbus251NeilstonothermarketscontextnotboundWVsites. No numericITMW/area.99.999percentavailabilitymarketingnotobservedperformance. Officeco-locationdoesnotmakeentireheadquartersareaDC.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.citynet.net/network-services/data-center-colocation/","host":"citynet.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.2763943,"lng":-80.2721692,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"100 Citynet Drive","city":"Bridgeport","marketed_service":"colocation"},"notes":["Operator explicitly identifies four service locations, including Bridgeport. Offices can contain a colo; locations are not automatically hyperscale campuses.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.citynet.net/network-services/data-center-colocation/","host":"citynet.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Citynet two explicitly listed WV colocation sites","fields":{"operator":"Citynet","named_wv_sites":[{"locality":"Bridgeport","address":"100 Citynet Drive, Bridgeport, West Virginia26330","scope":"data center in corporate headquarters"},{"locality":"Charleston","address":"226 Kanawha Boulevard, Charleston, West Virginia25301","scope":"data center in Charleston office"}]},"notes":["PittsburghAlleghenyCenterandColumbus251NeilstonothermarketscontextnotboundWVsites. No numericITMW/area.99.999percentavailabilitymarketingnotobservedperformance. Officeco-locationdoesnotmakeentireheadquartersareaDC.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.citynet.net/network-services/data-center-colocation/","host":"citynet.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Bridgeport · Harrison · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"citynet-charleston-kanawha-county-wv","state":"WV","kind":"facility","name":"Citynet Charleston Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kanawha"],"city":"Charleston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Citynet two explicitly listed WV colocation sites. PittsburghAlleghenyCenterandColumbus251NeilstonothermarketscontextnotboundWVsites. No numericITMW/area.99.999percentavailabilitymarketingnotobservedperformance. Officeco-locationdoesnotmakeentireheadquartersareaDC. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.citynet.net/network-services/data-center-colocation/","host":"citynet.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.3521647,"lng":-81.6413397,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Citynet two explicitly listed WV colocation sites","fields":{"operator":"Citynet","named_wv_sites":[{"locality":"Bridgeport","address":"100 Citynet Drive, Bridgeport, West Virginia26330","scope":"data center in corporate headquarters"},{"locality":"Charleston","address":"226 Kanawha Boulevard, Charleston, West Virginia25301","scope":"data center in Charleston office"}]},"notes":["PittsburghAlleghenyCenterandColumbus251NeilstonothermarketscontextnotboundWVsites. No numericITMW/area.99.999percentavailabilitymarketingnotobservedperformance. Officeco-locationdoesnotmakeentireheadquartersareaDC.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.citynet.net/network-services/data-center-colocation/","host":"citynet.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Charleston · Kanawha · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"continent-8-west-virginia-dc1-south-charleston-wv","state":"WV","kind":"facility","name":"Continent 8 West Virginia DC1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kanawha"],"city":"South Charleston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Continent8 two distinct WV site chronologies. Petersburgannouncementnotexactfirstserviceday. Distinctgeographiesnotonecampusexpansion. PCI/gaming-cloudregulatoryclaimsnotindependentregulatorregistercheck.30USstates/100globallocations/20brandsnotbuildingcountorMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/","host":"continent8.com","date":"2024-02-26","published":"2024-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.368429,"lng":-81.69957,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Continent8 two distinct WV site chronologies","fields":{"operator":"Continent8","named_sites":[{"locality":"South Charleston, West Virginia","operator_reported_go_live_year":2018},{"locality":"Petersburg, West Virginia","opening_announced_on_or_before":"2024-02-26","partner":"Seneca Rocks Regional Development Authority"}]},"notes":["Petersburgannouncementnotexactfirstserviceday. Distinctgeographiesnotonecampusexpansion. PCI/gaming-cloudregulatoryclaimsnotindependentregulatorregistercheck.30USstates/100globallocations/20brandsnotbuildingcountorMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/","host":"continent8.com","date":"2024-02-26","published":"2024-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · South Charleston · Kanawha · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"continent-8-west-virginia-dc2-petersburg-grant-county-wv","state":"WV","kind":"facility","name":"Continent 8 West Virginia DC2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Petersburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Continent8 two distinct WV site chronologies. Petersburgannouncementnotexactfirstserviceday. Distinctgeographiesnotonecampusexpansion. PCI/gaming-cloudregulatoryclaimsnotindependentregulatorregistercheck.30USstates/100globallocations/20brandsnotbuildingcountorMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/","host":"continent8.com","date":"2024-02-26","published":"2024-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.9924886,"lng":-79.123975,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Continent8 two distinct WV site chronologies","fields":{"operator":"Continent8","named_sites":[{"locality":"South Charleston, West Virginia","operator_reported_go_live_year":2018},{"locality":"Petersburg, West Virginia","opening_announced_on_or_before":"2024-02-26","partner":"Seneca Rocks Regional Development Authority"}]},"notes":["Petersburgannouncementnotexactfirstserviceday. Distinctgeographiesnotonecampusexpansion. PCI/gaming-cloudregulatoryclaimsnotindependentregulatorregistercheck.30USstates/100globallocations/20brandsnotbuildingcountorMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/","host":"continent8.com","date":"2024-02-26","published":"2024-02-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Petersburg · Grant · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"dedispec-berkeley-springs-morgan-county-wv","state":"WV","kind":"facility","name":"Dedispec Berkeley Springs Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Morgan"],"city":"Berkeley Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Dedispec Berkeley Springs listing and old performance scope. 2016uptimenotcurrent2026performanceorSLA. AshburnconnectivitycomparisondoesnotlocateDCinVirginia. Noexactstreet,capacity,originalopeningorownershipdeedverification. Publictestdownloadsnotexercised. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dedispec.com/wvdatacenter.php","host":"dedispec.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.6267975,"lng":-78.2279514,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Dedispec Berkeley Springs listing and old performance scope","fields":{"operator":"Dedispec","advertised_locality":"Berkeley Springs, West Virginia","operator_described_use":["dedicated servers","colocation","web hosting"],"operator_historical_power_uptime_percent":99.99,"operator_historical_network_uptime_percent":99.9,"uptime_period_year":2016},"notes":["2016uptimenotcurrent2026performanceorSLA. AshburnconnectivitycomparisondoesnotlocateDCinVirginia. Noexactstreet,capacity,originalopeningorownershipdeedverification. Publictestdownloadsnotexercised.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dedispec.com/wvdatacenter.php","host":"dedispec.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Berkeley Springs · Morgan · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"fbi-cjis-division-clarksburg-harrison-county-wv","state":"WV","kind":"facility","name":"FBI Criminal Justice Information Services (CJIS) Division Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Harrison"],"city":"Clarksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. A design description does not establish whole-campus data-center floor area, power or current commissioning. The visible September 2017 article date differs from later metadata. The linked full article was not reviewed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.som.com/?p=9976","host":"som.com","date":"2017-09-18","published":"2017-09-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3257988,"lng":-80.2680771,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Architect SOM names the FBI and DOD Biometric Technology Center on the existing CJIS campus in Clarksburg.","independently_verified_current_operating_status":null},"notes":["A design description does not establish whole-campus data-center floor area, power or current commissioning. The visible September 2017 article date differs from later metadata. The linked full article was not reviewed.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.som.com/?p=9976","host":"som.com","date":"2017-09-18","published":"2017-09-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Clarksburg · Harrison · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"google-putnam-county-campus-wv","state":"WV","kind":"facility","name":"Google Putnam County Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Putnam"],"city":"Buffalo","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Google Buffalo proposed campus identity without generic-stat transfer. 688Mannualstateactivity/9supportedjobsperdirect/1000plusconstruction/examples are generic comparison scopes, not approved Buffalo campus estimates. No exact numeric IT, capex, opening date, final permit or historic-preservation clearance in reviewed project text. Claims about rate effects not independent tariff findings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://buffalowvdatacenter.com/","host":"buffalowvdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.64411,"lng":-81.956511,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Google Buffalo proposed campus identity without generic-stat transfer","fields":{"operator":"Google","project_locality":"Buffalo, Putnam County, West Virginia","developer_described_stage":"early-stage campus planning with historic-preservation coordination"},"notes":["688Mannualstateactivity/9supportedjobsperdirect/1000plusconstruction/examples are generic comparison scopes, not approved Buffalo campus estimates. No exact numeric IT, capex, opening date, final permit or historic-preservation clearance in reviewed project text. Claims about rate effects not independent tariff findings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://buffalowvdatacenter.com/","host":"buffalowvdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Buffalo · Putnam · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"grant-town-power-plant-crypto-mine-marion-county-wv","state":"WV","kind":"facility","name":"Grant Town Power Plant Cryptocurrency Mining Containers","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Marion"],"city":"Grant Town","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only public text was read. Encoded premium body was neither decoded nor adopted. Container appearance is not confirmation of mining operation, IT demand or a power agreement. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.timeswv.com/news/local_news/grant-town-power-plant-believed-to-be-mining-cryptocurrency-in-marion-county/article_a13502ed-4c9e-4589-8608-383e7b9d8bc3.html","host":"timeswv.com","date":"2026-04-16","published":"2026-04-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.560277,"lng":-80.162893,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Times West Virginian's public first paragraph says a pair of apparent cryptocurrency containers has appeared at Grant Town power plant and recalls a rejected 2022 power-purchase-agreement buyout proposal.","independently_verified_current_operating_status":null},"notes":["Only public text was read. Encoded premium body was neither decoded nor adopted. Container appearance is not confirmation of mining operation, IT demand or a power agreement.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.timeswv.com/news/local_news/grant-town-power-plant-believed-to-be-mining-cryptocurrency-in-marion-county/article_a13502ed-4c9e-4589-8608-383e7b9d8bc3.html","host":"timeswv.com","date":"2026-04-16","published":"2026-04-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Grant Town · Marion · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"hog-lick-aggregates-white-hall-marion-wv","state":"WV","kind":"facility","name":"Hog Lick Aggregates Data Center / Microgrid Proposal","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"White Hall","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. WDTV May5,2026 original reports HogLickAggregates feasibility study on277ac WhiteHall/MarionCounty WV property. Company describes preliminary study expected to take years, no development timetable. Not approved/breakingground/operating. Mine-water geothermal cooling, nearby gas power and possible carbon capture are options under study, not measuredzero-water/carbon performance or permitted plant. Adjacent I79HighTechPark NOAA supercomputing facility is separate; possible support role is not a tenant agreement or same campus. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wdtv.com/2026/05/05/local-company-proposes-data-center-marion-county/","host":"wdtv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4211977,"lng":-80.1825815,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["WDTV May5,2026 original reports HogLickAggregates feasibility study on277ac WhiteHall/MarionCounty WV property. Company describes preliminary study expected to take years, no development timetable. Not approved/breakingground/operating.","Mine-water geothermal cooling, nearby gas power and possible carbon capture are options under study, not measuredzero-water/carbon performance or permitted plant. Adjacent I79HighTechPark NOAA supercomputing facility is separate; possible support role is not a tenant agreement or same campus.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.wdtv.com/2026/05/05/local-company-proposes-data-center-marion-county/","host":"wdtv.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · White Hall · Marion · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"irs-enterprise-computing-center-kearneysville-wv","state":"WV","kind":"facility","name":"IRS Enterprise Computing Center (Martinsburg Computing Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berkeley"],"city":"Kearneysville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred response is legacy binary Office content parsed as HTML. HTTP success is not readable documentary verification. Obtain an actual readable IRS/GSA source; no fields certified here. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.irs.gov/pub/irs-procure/techexhibit1_general_loc_site_info.doc","host":"irs.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.3985849,"lng":-77.9163203,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred response is legacy binary Office content parsed as HTML. HTTP success is not readable documentary verification. Obtain an actual readable IRS/GSA source; no fields certified here.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.irs.gov/pub/irs-procure/techexhibit1_general_loc_site_info.doc","host":"irs.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Kearneysville · Berkeley · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"nscale-monarch-mason-county-wv","state":"WV","kind":"facility","name":"Monarch Compute Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mason"],"city":"Point Pleasant","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nscale Monarch date conflict, LOI and separate generation scope. HeadingOctober14andbodyMarch16datesdiffer;donotclaimalltransactionsnewOct14orchoosedatewithoutcorroboration. LOInotexecutedbindingcomputeleaseorenergization.8GWpowerpotentialand2GWgenerationnotaddedto1.35compute. State-certifiedmicrogridclaimnotcertificatedocumentinspection. MasonWVnotMasonKYandnotsameMasonlawsuit. No currentlypaidincentivesorobservedgeneration. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory","host":"nscale.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.87,"lng":-82.1,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Nscale Monarch date conflict, LOI and separate generation scope","fields":{"developer":"Nscale","project":"Monarch Compute Campus","county":"Mason County, West Virginia","page_heading_date":"2026-10-14","release_body_dateline":"2026-03-16","publication_date_conflict":true,"announced_acquisition":"American Intelligence and Power Corporation, including Monarch campus","site_acres_max":2250,"microsoft_capacity_loi_gw_max":1.35,"capacity_basis":"AI compute under letter of intent, not verified current critical IT","onsite_microgrid_potential_gw_min_exclusive":8,"first_tranche_target":"late2027","caterpillar_natural_gas_generation_target_gw":2,"generation_target_period":"2028-H1"},"notes":["HeadingOctober14andbodyMarch16datesdiffer;donotclaimalltransactionsnewOct14orchoosedatewithoutcorroboration. LOInotexecutedbindingcomputeleaseorenergization.8GWpowerpotentialand2GWgenerationnotaddedto1.35compute. State-certifiedmicrogridclaimnotcertificatedocumentinspection. MasonWVnotMasonKYandnotsameMasonlawsuit. No currentlypaidincentivesorobservedgeneration.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory","host":"nscale.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Point Pleasant · Mason · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"netl-computational-science-engineering-center-morgantown-wv","state":"WV","kind":"facility","name":"NETL Computational Science and Engineering Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Monongalia"],"city":"Morgantown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Federal laboratory source dated May 22, 2025. Expansion space for research computers is not an entire regional data-center capacity; current completion remains unverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://netl.doe.gov/node/14819","host":"netl.doe.gov","date":"2025-05-22","published":"2025-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.669344,"lng":-79.977168,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_status_event":"construction underway","planned_center_sqft":14000,"city":"Morgantown"},"notes":["Federal laboratory source dated May 22, 2025. Expansion space for research computers is not an entire regional data-center capacity; current completion remains unverified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://netl.doe.gov/node/14819","host":"netl.doe.gov","date":"2025-05-22","published":"2025-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Morgantown · Monongalia · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"noaa-environmental-security-computing-center-fairmont-wv","state":"WV","kind":"facility","name":"NOAA Environmental Security Computing Center (NESCC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Fairmont","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The readable introduction is not the full linked report. The 100-million-USD supercomputer is not construction of a new campus. Coming, announced and anticipated economic effects are not accepted commissioning or measured employment. No MW or later installation outcome is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wvpress.org/breaking-news/noaas-100m-rhea-supercomputer-coming-to-fairmont-boosting-west-virginia-tech-growth/","host":"wvpress.org","date":"2025-09-23","published":"2025-09-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.484898,"lng":-80.1426539,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WV Press reproduces a short WV News introduction about planned NOAA Rhea computing equipment at the existing Fairmont Environmental Security Computing Center.","independently_verified_current_operating_status":null},"notes":["The readable introduction is not the full linked report. The 100-million-USD supercomputer is not construction of a new campus. Coming, announced and anticipated economic effects are not accepted commissioning or measured employment. No MW or later installation outcome is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wvpress.org/breaking-news/noaas-100m-rhea-supercomputer-coming-to-fairmont-boosting-west-virginia-tech-growth/","host":"wvpress.org","date":"2025-09-23","published":"2025-09-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Fairmont · Marion · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"starwood-tamarack-west-columbia-mason-wv","state":"WV","kind":"facility","name":"Project Tamarack","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mason"],"city":"West Columbia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. State-program certification is not every construction/environmental permit, executed electricity service or operation. Twelve-billion-dollar plan and over 1,000 construction/300 permanent jobs are forecasts, not spending/employment. Governor statement about no bill increases is a policy assurance, not independent tariff or economic proof. Closed-loop cooling has no quantified consumption here. Nscale’s separate 2027 completion target is not Tamarack RFS. Mason County is West Virginia, not Kentucky. Article inconsistently refers to HB 2024 and HB 2014; legal scope requires original law, not corrected by inference. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wdtv.com/2026/09/03/starwood-digital-ventures-announces-data-center-mason-county/","host":"wdtv.com","date":"2026-09-03","published":"2026-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.9831343,"lng":-82.0634753,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"WSAZ reporting republished by WDTV says Starwood received West Virginia high-impact certification for Project Tamarack in Mason County, with announced investment and employment plans.","independently_verified_current_operating_status":null},"notes":["State-program certification is not every construction/environmental permit, executed electricity service or operation. Twelve-billion-dollar plan and over 1,000 construction/300 permanent jobs are forecasts, not spending/employment. Governor statement about no bill increases is a policy assurance, not independent tariff or economic proof. Closed-loop cooling has no quantified consumption here. Nscale’s separate 2027 completion target is not Tamarack RFS. Mason County is West Virginia, not Kentucky. Article inconsistently refers to HB 2024 and HB 2014; legal scope requires original law, not corrected by inference.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wdtv.com/2026/09/03/starwood-digital-ventures-announces-data-center-mason-county/","host":"wdtv.com","date":"2026-09-03","published":"2026-09-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · West Columbia · Mason · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"fundamental-data-ridgeline-datacenter-tucker-county-wv","state":"WV","kind":"facility","name":"Ridgeline Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tucker"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The 785 MW gas plant is generation, not IT. Statements about exclusive private supply and possible grid sales have different scopes and remain qualified. An air permit is not every site permit or proof of operation; an appeal is not vacatur. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvhighlands.org/tucker-county-data-center-ridgeline-facility/","host":"wvhighlands.org","date":"2026-01-27","published":"2026-01-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.1517,"lng":-79.4913,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"West Virginia Highlands Conservancy describes Ridgeline's reported 2025 air permit and its appeal.","independently_verified_current_operating_status":null},"notes":["The 785 MW gas plant is generation, not IT. Statements about exclusive private supply and possible grid sales have different scopes and remain qualified. An air permit is not every site permit or proof of operation; an appeal is not vacatur.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvhighlands.org/tucker-county-data-center-ridgeline-facility/","host":"wvhighlands.org","date":"2026-01-27","published":"2026-01-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Tucker · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"shady-spring-data-center-campus-raleigh-county-wv","state":"WV","kind":"facility","name":"Shady Spring Data Center Campus (Greenbrier Land Company rezoning)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Raleigh"],"city":"Shady Spring","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Recommendation was not final county rezoning. January 9 vote was future at publication; no later result assumed. Confidential company remains unidentified, and Greenbrier Land Company ownership does not establish operator identity. Eight buildings, 300-foot buffer and up to 600 jobs are submitted/attributed plans, not as-built conditions or employment. Residents’ 55 to 85 dB claims are not measured site impacts. No power or current project status certified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvva.com/2023/12/22/shady-spring-residents-up-arms-over-proposed-rezoning-wooded-area-bordering-their-neighborhoods/","host":"wvva.com","date":"2023-12-22","published":"2023-12-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.7020095,"lng":-81.0855214,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"WVVA reports Raleigh County planning board recommended rezoning of roughly 727 acres near Shady Spring by 4 to 3 after substantial resident opposition.","independently_verified_current_operating_status":null},"notes":["Recommendation was not final county rezoning. January 9 vote was future at publication; no later result assumed. Confidential company remains unidentified, and Greenbrier Land Company ownership does not establish operator identity. Eight buildings, 300-foot buffer and up to 600 jobs are submitted/attributed plans, not as-built conditions or employment. Residents’ 55 to 85 dB claims are not measured site impacts. No power or current project status certified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvva.com/2023/12/22/shady-spring-residents-up-arms-over-proposed-rezoning-wooded-area-bordering-their-neighborhoods/","host":"wvva.com","date":"2023-12-22","published":"2023-12-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Shady Spring · Raleigh · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"silicon-foundation-warwood-wheeling-ohio-county-wv","state":"WV","kind":"facility","name":"Silicon Foundation Warwood Data Center and Energy Campus (former Centre Foundry)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ohio"],"city":"Wheeling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Operator website’s initial 10 MW, next 20 to 30 MW expansion and eventual 100 MW regional hub are plans with unclear IT/gross basis; do not add all phases into 140 MW. No utility contract, energization or RFS independently verified. River access does not establish water rights or permitted withdrawal; gas access is not an issued generation permit. Headline sixth major development under a state program is not an exhaustive operating-site census. General HB2014 description is not an independently examined project eligibility/registration or blanket exemption from every law. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wvpublic.org/story/energy-environment/states-sixth-data-center-announced-near-wheeling/","host":"wvpublic.org","date":"2026-06-24","published":"2026-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.1013314,"lng":-80.7029667,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"West Virginia Public Broadcasting reports Silicon Foundation Energy purchased the former Centre Foundry site near Wheeling for a proposed phased data center/energy campus.","independently_verified_current_operating_status":null},"notes":["Operator website’s initial 10 MW, next 20 to 30 MW expansion and eventual 100 MW regional hub are plans with unclear IT/gross basis; do not add all phases into 140 MW. No utility contract, energization or RFS independently verified. River access does not establish water rights or permitted withdrawal; gas access is not an issued generation permit. Headline sixth major development under a state program is not an exhaustive operating-site census. General HB2014 description is not an independently examined project eligibility/registration or blanket exemption from every law.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wvpublic.org/story/energy-environment/states-sixth-data-center-announced-near-wheeling/","host":"wvpublic.org","date":"2026-06-24","published":"2026-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Wheeling · Ohio · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"ryan-stuart-summit-point-jefferson-county-wv","state":"WV","kind":"facility","name":"Summit Point Data Center Site (Ryan Stuart Development)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Summit Point","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. No end user is identified. The 100,000 to 130,000 gallons/day range is a preliminary developer estimate, not utility allocation or actual use. Utility voted to re-advertise an engineering-study RFP, not approve service or a data center. Proposed purple-line reuse and developer-funded infrastructure are intentions. Existing/planned 138/500/765 kV lines are voltage, not IT capacity, and proximity does not secure a power contract. Project section personally read; unrelated newsletter items are not evidence. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://observerwv.news/posts/data-center-in-summit-point-politics-not-as-usual","host":"observerwv.news","date":"2026-04-30","published":"2026-04-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.2495466,"lng":-77.9586082,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Observer Weekly reports Ryan Stuart purchased 235 acres near Summit Point on April 9 and presented early marketing plans to Charles Town Utility Board on April 29.","independently_verified_current_operating_status":null},"notes":["No end user is identified. The 100,000 to 130,000 gallons/day range is a preliminary developer estimate, not utility allocation or actual use. Utility voted to re-advertise an engineering-study RFP, not approve service or a data center. Proposed purple-line reuse and developer-funded infrastructure are intentions. Existing/planned 138/500/765 kV lines are voltage, not IT capacity, and proximity does not secure a power contract. Project section personally read; unrelated newsletter items are not evidence.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://observerwv.news/posts/data-center-in-summit-point-politics-not-as-usual","host":"observerwv.news","date":"2026-04-30","published":"2026-04-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Summit Point · Jefferson · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"uscg-operations-systems-center-kearneysville-wv","state":"WV","kind":"facility","name":"U.S. Coast Guard Operations Systems Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Kearneysville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Senator republishes a March 16, 2019 newspaper story about multiple Coast Guard offices. Four-million-dollar IT request is for the separate Martinsburg National Maritime Center, not this data center. Government hosting does not make a republished article an original facility specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.capito.senate.gov/news/in-the-news/sen-capito-us-coast-guard-commandant-visit-panhandle","host":"capito.senate.gov","date":"2019-03-16","published":"2019-03-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3953774,"lng":-77.9139105,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Senator republishes a March 16, 2019 newspaper story about multiple Coast Guard offices. Four-million-dollar IT request is for the separate Martinsburg National Maritime Center, not this data center. Government hosting does not make a republished article an original facility specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.capito.senate.gov/news/in-the-news/sen-capito-us-coast-guard-commandant-visit-panhandle","host":"capito.senate.gov","date":"2019-03-16","published":"2019-03-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Kearneysville · Jefferson · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"va-capital-region-readiness-center-martinsburg-wv","state":"WV","kind":"facility","name":"VA Capital Region Readiness Center (Martinsburg VAMC Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Berkeley"],"city":"Martinsburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Contract value is contractor-scope, not verified full campus investment or incentive.10,000 squarefeetraisedfloor is a subset, not additional building area.150 watts/squarefoot is design density, not actual critical IT or metered load. Three 2.25 MWgenerators are standby and UPSkVAis apparent-power rating; no sum or conversion becomes IT. TierIII design description is not independently checked certification.2010 is completionYEARonly;2022 publication/2026 modification metadata do not redate opening or establish present operation. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hitt.com/?p=15626","host":"hitt.com","date":"2022-07-31","published":"2022-07-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.4160546,"lng":-77.9110265,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"HITT’s contractor project page reports CRRC/VAMC Martinsburg completed in 2010, with 66,000 square-foot building and 33 million-dollar contract.","independently_verified_current_operating_status":null,"contractor_reported_completion_year":2010,"contractor_contract_usd":33000000,"contractor_reported_building_sqft":66000,"contractor_reported_raised_floor_sqft":10000,"critical_it_mw":null},"notes":["Contract value is contractor-scope, not verified full campus investment or incentive.10,000 squarefeetraisedfloor is a subset, not additional building area.150 watts/squarefoot is design density, not actual critical IT or metered load. Three 2.25 MWgenerators are standby and UPSkVAis apparent-power rating; no sum or conversion becomes IT. TierIII design description is not independently checked certification.2010 is completionYEARonly;2022 publication/2026 modification metadata do not redate opening or establish present operation.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hitt.com/?p=15626","host":"hitt.com","date":"2022-07-31","published":"2022-07-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"West Virginia · Martinsburg · Berkeley · Source context reviewed","state_name":"West Virginia","state_path":"/west-virginia/"},{"id":"viridian-apecs-janesville-wi","state":"WI","kind":"facility","name":"APECS Data Center Campus (Former GM Assembly Plant)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rock"],"city":"Janesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. LOI explicitly does not obligate city land sale or financial participation;120 daynegotiation period is not construction/RFS. Eleven-building conventional versus eight-building hyperscale layouts are alternative concepts, not 19 buildings. Up-to 800 MW is proposed demand with undefined IT/gross basis. More than 8 billioninvestment,1200 construction/600 operatingjobs and 2.05 billionstateeconomicimpact are different forecasts, not spending/employment/taxes. DNR-approved cleanup PLAN is not completed remediation. GMclosure 2008 captionversus 2009 body remains historical discrepancy, not resolved founding date. No operator or current 2026 status verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wpr.org/news/janesville-data-center-abandoned-gm-site","host":"wpr.org","date":"2025-11-11","published":"2025-11-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.66331,"lng":-89.02056,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Wisconsin Public Radio reports Janesville council approved a NONBINDING Viridian letter of intent by 5 to 2 for due diligence and negotiations on a roughly 250 acreformerGMbrownfield.","independently_verified_current_operating_status":null},"notes":["LOI explicitly does not obligate city land sale or financial participation;120 daynegotiation period is not construction/RFS. Eleven-building conventional versus eight-building hyperscale layouts are alternative concepts, not 19 buildings. Up-to 800 MW is proposed demand with undefined IT/gross basis. More than 8 billioninvestment,1200 construction/600 operatingjobs and 2.05 billionstateeconomicimpact are different forecasts, not spending/employment/taxes. DNR-approved cleanup PLAN is not completed remediation. GMclosure 2008 captionversus 2009 body remains historical discrepancy, not resolved founding date. No operator or current 2026 status verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wpr.org/news/janesville-data-center-abandoned-gm-site","host":"wpr.org","date":"2025-11-11","published":"2025-11-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Janesville · Rock · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"cascade-digital-power-hatfield-wi","state":"WI","kind":"facility","name":"Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Jackson"],"city":"Hatfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Four plant jobs include three generation workers and one IT worker, not four new mine jobs. Hydro generation and portion sold to grid are not mine IT demand; current operator/operation unknown. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wpr.org/jackson-county-home-new-cryptocurrency-mine-surprise-many-local-county-officials","host":"wpr.org","date":"2022-05-03","published":"2022-05-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.4146842,"lng":-90.7306966,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WPR describes Digital Power Optimization partnership at Hatfield hydro plant with mining already underway in2022.","independently_verified_current_operating_status":null},"notes":["Four plant jobs include three generation workers and one IT worker, not four new mine jobs. Hydro generation and portion sold to grid are not mine IT demand; current operator/operation unknown.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wpr.org/jackson-county-home-new-cryptocurrency-mine-surprise-many-local-county-officials","host":"wpr.org","date":"2022-05-03","published":"2022-05-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Hatfield · Jackson · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"cassville-grant-county-wi","state":"WI","kind":"facility","name":"Cassville Data Center Campus (Undisclosed Developer)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Cassville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Wisconsin Watch published February9,2026, modifiedApril28, reports an unnamed company considering400 to 500acres in the town ofCassville,GrantCounty, for an approximately1B proposal. This is scouting, not a closed land purchase, confirmed operator or precise approved site. One official says he was not asked for an NDA, not every official. No MW or operation date provided. Other Wisconsin campuses are separate. February10 hearing and pending legislation described in the story are historical scheduled/proposed actions, not observed final orders or current law. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wisconsinwatch.org/2026/02/wisconsin-data-center-billion-dollar-grant-county-cassville-utility-energy/","host":"wisconsinwatch.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.716,"lng":-91.007,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["Wisconsin Watch published February9,2026, modifiedApril28, reports an unnamed company considering400 to 500acres in the town ofCassville,GrantCounty, for an approximately1B proposal. This is scouting, not a closed land purchase, confirmed operator or precise approved site. One official says he was not asked for an NDA, not every official. No MW or operation date provided. Other Wisconsin campuses are separate. February10 hearing and pending legislation described in the story are historical scheduled/proposed actions, not observed final orders or current law.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://wisconsinwatch.org/2026/02/wisconsin-data-center-billion-dollar-grant-county-cassville-utility-energy/","host":"wisconsinwatch.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Cassville · Grant · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"cloverleaf-carlton-kewaunee-county-wi","state":"WI","kind":"facility","name":"Cloverleaf Carlton Data Center Site (Kewaunee County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kewaunee"],"city":"Carlton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No exact cancellation day, enacted ban or nuclear-power allocation inferred. Separate Kewaunee reactor permitting and Greenleaf withdrawal are different projects. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wisconsinwatch.org/2026/01/wisconsin-data-center-kewaunee-county-town-carlton-cloverleaf-nuclear-power/","host":"wisconsinwatch.org","date":"2026-01-21","published":"2026-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.35,"lng":-87.58,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Wisconsin Watch reports Cloverleaf and Carlton officials confirmed developer abandoned land pursuit in late2025.","independently_verified_current_operating_status":null},"notes":["No exact cancellation day, enacted ban or nuclear-power allocation inferred. Separate Kewaunee reactor permitting and Greenleaf withdrawal are different projects.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wisconsinwatch.org/2026/01/wisconsin-data-center-kewaunee-county-town-carlton-cloverleaf-nuclear-power/","host":"wisconsinwatch.org","date":"2026-01-21","published":"2026-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Carlton · Kewaunee · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"cloverleaf-wrightstown-village-wi","state":"WI","kind":"facility","name":"Cloverleaf Wrightstown Data Center Inquiry (Village of Wrightstown)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Brown"],"city":"Wrightstown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No concrete imminent project. Referendum scheduling is not its outcome or adopted moratorium; administrator legal interpretation not independently verified law. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://spectrumnews1.com/wi/milwaukee/news/2026/06/01/data-center-wrightstown-meeting","host":"spectrumnews1.com","date":"2026-05-31","published":"2026-05-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.3269,"lng":-88.1631,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Spectrum reports Wrightstown public information meeting and future nonbinding referendum after Cloverleaf inquiry.","independently_verified_current_operating_status":null},"notes":["No concrete imminent project. Referendum scheduling is not its outcome or adopted moratorium; administrator legal interpretation not independently verified law.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://spectrumnews1.com/wi/milwaukee/news/2026/06/01/data-center-wrightstown-meeting","host":"spectrumnews1.com","date":"2026-05-31","published":"2026-05-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Wrightstown · Brown · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"cyberlynk-franklin-mke1-wi","state":"WI","kind":"facility","name":"CyberLynk Franklin Data Center (MKE1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Milwaukee"],"city":"Franklin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CyberLynk Franklin facility identity. FranklinsiteinMilwaukeemarketnotMilwaukeecityparcel. No numericITMW,areaoropeningday. SOC2operatorclaimnotindependentrestrictedreportinspection. PublictestIP/speedtestroutesnotexercised. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyberlynk.net/facilities/milwaukee-datacenter/","host":"cyberlynk.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.8618895,"lng":-87.982841,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"CyberLynk Franklin facility identity","fields":{"operator":"CyberLynk","code":"MKE1","address":"10125 South52ndStreet, Franklin, Wisconsin53132","operator_described_use":"flagship hosting, voice and colocation facility"},"notes":["FranklinsiteinMilwaukeemarketnotMilwaukeecityparcel. No numericITMW,areaoropeningday. SOC2operatorclaimnotindependentrestrictedreportinspection. PublictestIP/speedtestroutesnotexercised.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyberlynk.net/facilities/milwaukee-datacenter/","host":"cyberlynk.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Franklin · Milwaukee · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"data-holdings-eau-claire-wi","state":"WI","kind":"facility","name":"Data Holdings Eau Claire Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Eau Claire"],"city":"Eau Claire","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Data Holdings Eau Claire site capacity without footer transfer. 3135WestHighlandMilwaukeefootercontactisnotEauClaireaddress. TierIII/SOCclaimsnotindependentcertifierproof. No exactstreet,openingorcurrentmeteredload. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dataholdings.com/eau-claire-data-center","host":"dataholdings.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.811349,"lng":-91.4984941,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Data Holdings Eau Claire site capacity without footer transfer","fields":{"operator":"Data Holdings","locality":"southside Eau Claire, Wisconsin","raised_floor_sqft":4000,"advertised_power_mw":1,"maximum_power_per_rack_kw":16,"power_basis":"power not explicitly critical IT"},"notes":["3135WestHighlandMilwaukeefootercontactisnotEauClaireaddress. TierIII/SOCclaimsnotindependentcertifierproof. No exactstreet,openingorcurrentmeteredload.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dataholdings.com/eau-claire-data-center","host":"dataholdings.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Eau Claire · Eau Claire · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"data-holdings-milwaukee-wi","state":"WI","kind":"facility","name":"Data Holdings Milwaukee Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Milwaukee"],"city":"Milwaukee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Data Holdings Milwaukee commissioning and building area. 46kgrossnotallraisedfloor. PUEratingnotindependentmeasuredtime-series. TierIIIplus/LEEDGoldclaimsnotindependentregisterread. No campusnumericITMW.2014yearnotexactday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dataholdings.com/milwaukee-data-center","host":"dataholdings.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.0437366,"lng":-87.9540068,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Data Holdings Milwaukee commissioning and building area","fields":{"operator":"Data Holdings","locality":"near westside Milwaukee, Wisconsin","operator_reported_commissioning_year":2014,"building_gross_sqft":46000,"building_stories":2,"advertised_rack_density_kw_max":30,"operator_published_pue":1.28},"notes":["46kgrossnotallraisedfloor. PUEratingnotindependentmeasuredtime-series. TierIIIplus/LEEDGoldclaimsnotindependentregisterread. No campusnumericITMW.2014yearnotexactday.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dataholdings.com/milwaukee-data-center","host":"dataholdings.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Milwaukee · Milwaukee · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"dpo-wisconsin-rapids-hpc-wi","state":"WI","kind":"facility","name":"DPO Wisconsin Rapids AI Computing Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wood"],"city":"Wisconsin Rapids","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Hydro utility32MWgeneration not site IT. Leaseup-to50years not ownedland; early2025target superseded by later reporting of developer departure. No current construction inferred. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Exact contract-cancellation day and original termination release not retained. PCH is a separate applicant, not proof DPO moved ahead.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://biztimes.com/data-center-developer-plans-200-million-project-in-wisconsin-rapids/","host":"biztimes.com","date":"2025-01-24","published":"2025-01-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://wiss.fm/news/2026/06/05/data-center-education-in-wisconsin-rapids","host":"wiss.fm","date":"2026-06-05","published":"2026-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.3917589,"lng":-89.8228767,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"BizTimes reproduces DPO WisconsinRapids20MWplanned AI facility with2026energization target.","independently_verified_current_operating_status":null},"notes":["Hydro utility32MWgeneration not site IT. Leaseup-to50years not ownedland; early2025target superseded by later reporting of developer departure. No current construction inferred.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://biztimes.com/data-center-developer-plans-200-million-project-in-wisconsin-rapids/","host":"biztimes.com","date":"2025-01-24","published":"2025-01-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Civic Media reports DPO cancelled its private contract in2025 and distinguishes later PCH proposal.","original_2026_opening_forecast_superseded":true},"notes":["Exact contract-cancellation day and original termination release not retained. PCH is a separate applicant, not proof DPO moved ahead.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wiss.fm/news/2026/06/05/data-center-education-in-wisconsin-rapids","host":"wiss.fm","date":"2026-06-05","published":"2026-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Wisconsin Rapids · Wood · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"edgeconnex-mad01-madison-wi","state":"WI","kind":"facility","name":"EdgeConneX Madison (MAD01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dane"],"city":"Madison","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. NoMWspecified. CabinetdensityandN+1topologynotbuildingload. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/locations/americas/madison-wi/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.0481038,"lng":-89.2982832,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MAD01","facility_area_sqft":7800,"raised_floor_sqft":2650},"notes":["NoMWspecified. CabinetdensityandN+1topologynotbuildingload.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/locations/americas/madison-wi/","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Madison · Dane · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"epic-hosting-verona-wi","state":"WI","kind":"facility","name":"Epic Hosting Verona Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dane"],"city":"Verona","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wisconsin named certificate register with scoped building descriptions. Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx","host":"revenue.wi.gov","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.98,"lng":-89.562,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wisconsin named certificate register with scoped building descriptions","fields":{"certification_register_as_of":"2025-10-31","listed_certifications":[{"entity":"Epic Hosting LLC","date":"2024-09-24","location":"Milky Way,Verona,WI","scope":"Utility Building3and additions"},{"entity":"Degas LLC","date":"2025-02-18","location":"County RoadA,Beaver Dam,WI","scope":"to be constructed"},{"entity":"Oracle America Cloud Services LLC,formerly Green Chile Ventures LLC","date":"2025-10-31","location":"Port Washington,WI","scope":"four buildings at531,533,701and723E Lake Drive"}]},"notes":["Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx","host":"revenue.wi.gov","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Verona · Dane · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"expedient-mke1-milwaukee-franklin-wi","state":"WI","kind":"facility","name":"Expedient MKE1 (Milwaukee/Franklin)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Milwaukee"],"city":"Franklin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Milwaukee-market Franklin site. Franklin is site locality within Milwaukee market.3MWgenerator capacity not critical IT. No exact original opening or current metered power established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.expedient.com/data-centers/milwaukee/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.8631424,"lng":-87.9778759,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Expedient Milwaukee-market Franklin site","fields":{"operator_code":"MKE1","published_address":"4777 W Ironwood, Franklin, WI53132","critical_it_mw":1.6,"total_area_sqft":27000,"raised_floor_sqft":10000},"notes":["Franklin is site locality within Milwaukee market.3MWgenerator capacity not critical IT. No exact original opening or current metered power established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.expedient.com/data-centers/milwaukee/","host":"expedient.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Franklin · Milwaukee · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"heartland-business-systems-little-chute-wi","state":"WI","kind":"facility","name":"Heartland Business Systems Little Chute Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Outagamie"],"city":"Little Chute","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Heartland Business Systems office index, exact DC unproven. Contactpagehas1700StephenStreetLittleChuteHQandmanybranchoffices,notexplicitdatacenteraddress. HBSDataCenterstatuslinknotopenedorexercised. Genericservicesnotexactsitecapacity/operationproof. NoHQtoDCassumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hbs.net/contact-us","host":"hbs.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.2965755,"lng":-88.2938896,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Heartland Business Systems office index, exact DC unproven","fields":{},"notes":["Contactpagehas1700StephenStreetLittleChuteHQandmanybranchoffices,notexplicitdatacenteraddress. HBSDataCenterstatuslinknotopenedorexercised. Genericservicesnotexactsitecapacity/operationproof. NoHQtoDCassumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hbs.net/contact-us","host":"hbs.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Little Chute · Outagamie · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"iscorp-mequon-mqs5-wi","state":"WI","kind":"facility","name":"ISCorp Mequon Data Center (MQS5)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ozaukee"],"city":"Mequon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ISCorp MQS5 space categories and dynamic-counter hold. 8000raisedand20000operationsareasnotnecessarilydisjointtosum28k. Contactaddressnotindependentparcelfootprint.0percentdynamiccountersnotzeroactualuptime;100percentnarrativehistoricaluptimeclaimnotindependentlyobserved. TierIIIplus/SSAE18operatorclaimsnotcertifieraudit. No numericITMWoropeningdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.iscorp.com/iscorp-facilities/","host":"iscorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.205315,"lng":-87.9243984,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"ISCorp MQS5 space categories and dynamic-counter hold","fields":{"operator":"ISCorp","code":"MQS5","locality":"north of Milwaukee, Wisconsin","raised_floor_sqft":8000,"operations_area_sqft":20000,"published_contact_address":"10325 NorthPortWashingtonRoad, Mequon, Wisconsin53092"},"notes":["8000raisedand20000operationsareasnotnecessarilydisjointtosum28k. Contactaddressnotindependentparcelfootprint.0percentdynamiccountersnotzeroactualuptime;100percentnarrativehistoricaluptimeclaimnotindependentlyobserved. TierIIIplus/SSAE18operatorclaimsnotcertifieraudit. No numericITMWoropeningdate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.iscorp.com/iscorp-facilities/","host":"iscorp.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Mequon · Ozaukee · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"menomonie-data-center-wi","state":"WI","kind":"facility","name":"Menomonie Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dunn"],"city":"Menomonie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The statement explicitly says annexation/rezoning would not guarantee construction. The proposed 75,000 gallons per day of municipal water/wastewater is not two additive withdrawals or measured operation. Closed-loop language does not mean zero water use. Working with Xcel and the PSC is not executed power service; later votes remain unobserved. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://menomonienewsnet.org/3707/city/proposed-data-center/","host":"menomonienewsnet.org","date":"2025-07-24","published":"2025-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.8769,"lng":-91.9193,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Menomonie's city administrator describes Balloonist's proposed annexation/rezoning near County Highway B and hearings scheduled for July 28 and August 4, 2025.","independently_verified_current_operating_status":null},"notes":["The statement explicitly says annexation/rezoning would not guarantee construction. The proposed 75,000 gallons per day of municipal water/wastewater is not two additive withdrawals or measured operation. Closed-loop language does not mean zero water use. Working with Xcel and the PSC is not executed power service; later votes remain unobserved.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://menomonienewsnet.org/3707/city/proposed-data-center/","host":"menomonienewsnet.org","date":"2025-07-24","published":"2025-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Menomonie · Dunn · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"meta-beaver-dam-wi","state":"WI","kind":"facility","name":"Meta Beaver Dam Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dodge"],"city":"Beaver Dam","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Once-completed forecasts. Restoration and clean-energy matching promises are not measured campus water use or delivered generation; no campusMWadopted. Donation is not government incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Wisconsin named certificate register with scoped building descriptions. Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2025/11/hello-beaver-dam/","host":"datacenters.atmeta.com","date":"2025-11-12","published":"2025-11-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx","host":"revenue.wi.gov","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.457,"lng":-88.837,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_campus_area_sqft_min_exclusive":700000,"planned_investment_usd":1000000000,"forecast_construction_jobs_approx":1000,"forecast_operational_jobs_min_exclusive":100,"energy_assistance_donation_commitment_usd":15000000,"donation_period_years":10},"notes":["Once-completed forecasts. Restoration and clean-energy matching promises are not measured campus water use or delivered generation; no campusMWadopted. Donation is not government incentive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2025/11/hello-beaver-dam/","host":"datacenters.atmeta.com","date":"2025-11-12","published":"2025-11-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wisconsin named certificate register with scoped building descriptions","fields":{"certification_register_as_of":"2025-10-31","listed_certifications":[{"entity":"Epic Hosting LLC","date":"2024-09-24","location":"Milky Way,Verona,WI","scope":"Utility Building3and additions"},{"entity":"Degas LLC","date":"2025-02-18","location":"County RoadA,Beaver Dam,WI","scope":"to be constructed"},{"entity":"Oracle America Cloud Services LLC,formerly Green Chile Ventures LLC","date":"2025-10-31","location":"Port Washington,WI","scope":"four buildings at531,533,701and723E Lake Drive"}]},"notes":["Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx","host":"revenue.wi.gov","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Beaver Dam · Dodge · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"metered-mining-hammond-wi","state":"WI","kind":"facility","name":"Metered Mining Hammond Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["St. Croix"],"city":"Hammond","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public introduction was read. Encoded premium conditions, capacity, noise and water limits were not decoded or adopted. The exact legal operator relationship to the Metered Mining baseline needs a crosswalk. A reported appeal permit is not confirmation of construction or current operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.baldwin-bulletin.com/news/board-of-appeals-approves-proposed-data-center-in-hammond/article_65becdf0-7f44-42eb-a268-0352836b7765.html","host":"baldwin-bulletin.com","date":"2026-06-19","published":"2026-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.9639,"lng":-92.4467,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Baldwin Bulletin's public introduction reports a four-one Hammond Board of Appeals permit decision for Metered North on a two-acre St. Croix Electric property, after an earlier village denial.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["Only the public introduction was read. Encoded premium conditions, capacity, noise and water limits were not decoded or adopted. The exact legal operator relationship to the Metered Mining baseline needs a crosswalk. A reported appeal permit is not confirmation of construction or current operation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.baldwin-bulletin.com/news/board-of-appeals-approves-proposed-data-center-in-hammond/article_65becdf0-7f44-42eb-a268-0352836b7765.html","host":"baldwin-bulletin.com","date":"2026-06-19","published":"2026-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Hammond · St. Croix · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"microsoft-kenosha-wi","state":"WI","kind":"facility","name":"Microsoft Kenosha Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kenosha"],"city":"Kenosha","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. We Energies regional map not Kenosha project proof. Generic service territory and customer totals do not establish a Microsoft Kenosha interconnection, contracted MW or energized campus. No exact-site utility agreement, build stage or opening evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.we-energies.com/company/area","host":"we-energies.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.537,"lng":-87.89,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"We Energies regional map not Kenosha project proof","fields":{"publisher":"We Energies","scope":"utility general service-area page"},"notes":["Generic service territory and customer totals do not establish a Microsoft Kenosha interconnection, contracted MW or energized campus. No exact-site utility agreement, build stage or opening evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.we-energies.com/company/area","host":"we-energies.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Kenosha · Kenosha · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"microsoft-mount-pleasant-wi","state":"WI","kind":"facility","name":"Microsoft Mount Pleasant Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Racine"],"city":"Mount Pleasant","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Completionnotexactcommissioningdate. Final2027fundinguseawaitsbudgetapproval; redirectedpaymentnotnewautomaticannualsiteinvestment. Do not assign550+campusemployees to eachbuilding. VillageSeptember28reportestablishesfirstbuildingcompletedSummer2026;secondconstructionexpected2028;additionalcampusplanspreliminary. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mtpleasantwi.gov/m/newsflash/home/detail/639","host":"mtpleasantwi.gov","date":"2026-09-28","published":"2026-09-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.7209,"lng":-87.9023,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Mount Pleasant","county":"Racine","first_building_completed":"2026 summer","second_building_status":"under construction","second_building_completion_forecast":"2028","campus_employees_min":550,"annual_incentive_redirect_usd":5000000,"village_share_usd":4900000,"rcedc_share_usd":100000},"notes":["Completionnotexactcommissioningdate.","Final2027fundinguseawaitsbudgetapproval; redirectedpaymentnotnewautomaticannualsiteinvestment.","Do not assign550+campusemployees to eachbuilding.","VillageSeptember28reportestablishesfirstbuildingcompletedSummer2026;secondconstructionexpected2028;additionalcampusplanspreliminary.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mtpleasantwi.gov/m/newsflash/home/detail/639","host":"mtpleasantwi.gov","date":"2026-09-28","published":"2026-09-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Mount Pleasant · Racine · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"netsonic-green-bay-wi","state":"WI","kind":"facility","name":"Netsonic Green Bay Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Brown"],"city":"Green Bay","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Netsonic available power versus service specification hold. 4MWavailableheadlineand1200A480Vservicecannotbereconciledfromreviewedtext;additionaltransformers/phases/expansionunspecified. Do nottreat4MWascurrentITorcalculateusingassumedpowerfactor.9000plusexpansionnotcurrentgrossfloor.1996companyyearnotoriginalDCopeningday. No independentmeteredloadorstreetparcelverification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.netsonic.net/datacenter.php","host":"netsonic.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.5155,"lng":-87.995,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Netsonic available power versus service specification hold","fields":{"operator":"Netsonic","locality":"Green Bay, Wisconsin","operator_described_control":"owns and operates facility","company_established_year":1996,"advertised_available_power_mw_approx":4,"published_electrical_service_amps":1200,"published_service_voltage":480,"additional_expansion_sqft_min_exclusive":9000,"canonical_current_it_mw":null},"notes":["4MWavailableheadlineand1200A480Vservicecannotbereconciledfromreviewedtext;additionaltransformers/phases/expansionunspecified. Do nottreat4MWascurrentITorcalculateusingassumedpowerfactor.9000plusexpansionnotcurrentgrossfloor.1996companyyearnotoriginalDCopeningday. No independentmeteredloadorstreetparcelverification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.netsonic.net/datacenter.php","host":"netsonic.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Green Bay · Brown · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"oppidan-beaver-dam-edge-wi","state":"WI","kind":"facility","name":"Oppidan Beaver Dam Edge Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dodge"],"city":"Beaver Dam","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Sale approval is not proof of closed conveyance, construction commencement or commissioning. The 407,340 USD figure is land price, not build cost. Nearby Meta acreage, scale and project attributes are separate. Summer construction and 2028 opening were forecasts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dailydodge.com/beaver-dam-common-council-approves-second-data-center/","host":"dailydodge.com","date":"2026-04-07","published":"2026-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.4578,"lng":-88.8373,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Daily Dodge reports an eleven-three council vote on sale of just over 14 Beaver Dam acres to Oppidan for a proposed 90,000-square-foot edge facility, targeting 2028 operation.","independently_verified_current_operating_status":null},"notes":["Sale approval is not proof of closed conveyance, construction commencement or commissioning. The 407,340 USD figure is land price, not build cost. Nearby Meta acreage, scale and project attributes are separate. Summer construction and 2028 opening were forecasts.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dailydodge.com/beaver-dam-common-council-approves-second-data-center/","host":"dailydodge.com","date":"2026-04-07","published":"2026-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Beaver Dam · Dodge · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"cambrin-project-cornmaze-town-of-beloit-wi","state":"WI","kind":"facility","name":"Project Cornmaze Data Center (Town of Beloit)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rock"],"city":"Beloit","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No applications/site plans submitted at report date. Up-to175000 USD reimburses town costs, not a grant paid to developer. Shared DNR contact with Degas does not establish Meta identity. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wpr.org/news/town-of-beloit-pre-development-agreement-develop-data-center","host":"wpr.org","date":"2026-03-05","published":"2026-03-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.5843885,"lng":-89.0215921,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WPR reports July15,2025 Cambrin predevelopment cost-recovery agreement for possible Beloit Cornmaze project.","independently_verified_current_operating_status":null},"notes":["No applications/site plans submitted at report date. Up-to175000 USD reimburses town costs, not a grant paid to developer. Shared DNR contact with Degas does not establish Meta identity.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wpr.org/news/town-of-beloit-pre-development-agreement-develop-data-center","host":"wpr.org","date":"2026-03-05","published":"2026-03-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Beloit · Rock · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"microsoft-project-nova-caledonia-wi","state":"WI","kind":"facility","name":"Project Nova Data Center Campus (Caledonia)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Racine"],"city":"Caledonia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The expected 2025 board date is not a 2026 event and is not an observed final approval. Mount Pleasant's four-billion-USD project is separate. Caledonia employment and fiscal benefits are projections. Not being in a TIF district does not independently prove the absence of all state or other incentives. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wpr.org/news/caledonia-rezoning-microsoft-data-center-wisconsin","host":"wpr.org","date":"2025-09-30","published":"2025-09-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.8210813,"lng":-87.8501324,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WPR reports a September 29 five-two Caledonia plan-commission recommendation on Microsoft's proposed 244-acre campus, with the village board expected to consider it October 14, 2025.","independently_verified_current_operating_status":null},"notes":["The expected 2025 board date is not a 2026 event and is not an observed final approval. Mount Pleasant's four-billion-USD project is separate. Caledonia employment and fiscal benefits are projections. Not being in a TIF district does not independently prove the absence of all state or other incentives.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wpr.org/news/caledonia-rezoning-microsoft-data-center-wisconsin","host":"wpr.org","date":"2025-09-30","published":"2025-09-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Caledonia · Racine · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"qts-dane-county-deforest-wi","state":"WI","kind":"facility","name":"QTS Dane County Hyperscale Campus (DeForest)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dane"],"city":"DeForest","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DeForest consolidated annexation procedure and unexecuted commitments. Procedural rejection of two petitions does not establish rejection of entire development. Proposed pre-annexation agreement not signed final award from this account. Village index contains older timelines and records throughFebruary2026; no final current outcome established.50M is pledge, not actual distribution. Conditional future approvals, sewer/service-area amendments and site plans still separate. No numeric IT MW or operating date verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.engagedeforest.com/QTS","host":"engagedeforest.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.2428,"lng":-89.3401,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"DeForest consolidated annexation procedure and unexecuted commitments","fields":{"agency":"Village of DeForest, Wisconsin","company":"QTS","land_origin":"Town of Vienna, Dane County","source_stage":"due diligence and proposed public consideration processes","two_petition_rejection_date":"2025-12-04","rejection_scope":"replace separate petitions with consolidated annexation petition","new_notice_of_intention_date":"2025-12-12","company_community_pledge_usd":50000000},"notes":["Procedural rejection of two petitions does not establish rejection of entire development. Proposed pre-annexation agreement not signed final award from this account. Village index contains older timelines and records throughFebruary2026; no final current outcome established.50M is pledge, not actual distribution. Conditional future approvals, sewer/service-area amendments and site plans still separate. No numeric IT MW or operating date verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.engagedeforest.com/QTS","host":"engagedeforest.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · DeForest · Dane · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"sos-limited-park-falls-wi","state":"WI","kind":"facility","name":"SOS Limited Park Falls Crypto Mine (Former Flambeau River Paper Mill)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Price"],"city":"Park Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Historical observed/reported operation is not a 2026 operating certification. $1 million city bridge loan and remaining $828,108 collection order concern an earlier paper-mill restart, not a new awarded crypto subsidy or recovered money. Corporate fundraising above $600 million and $5 million shareholder settlement are company-level, not site capex; settlement admitted no wrongdoing. Worker safety/visa/pay allegations, denials and attorney opinions are attributed, not court findings of site violations. Niagara/Stacyville stalled plans and partner’s uncorroborated Fort Stockton claim are distinct projects, not operating campuses. Statewide one-other-known-mine statement is not an exhaustive census. No site MW adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wisconsinwatch.org/2023/01/crypto-mine-in-park-falls-wisconsin-creates-controversy-at-former-paper-mill/","host":"wisconsinwatch.org","date":"2023-01-17","published":"2023-01-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.9305,"lng":-90.438,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Wisconsin Watch’s historical investigation documents cryptocurrency equipment and activity at SOS’s former Park Falls paper mill and an outdoor-expansion permit denial in August 2022.","independently_verified_current_operating_status":null},"notes":["Historical observed/reported operation is not a 2026 operating certification. $1 million city bridge loan and remaining $828,108 collection order concern an earlier paper-mill restart, not a new awarded crypto subsidy or recovered money. Corporate fundraising above $600 million and $5 million shareholder settlement are company-level, not site capex; settlement admitted no wrongdoing. Worker safety/visa/pay allegations, denials and attorney opinions are attributed, not court findings of site violations. Niagara/Stacyville stalled plans and partner’s uncorroborated Fort Stockton claim are distinct projects, not operating campuses. Statewide one-other-known-mine statement is not an exhaustive census. No site MW adopted.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wisconsinwatch.org/2023/01/crypto-mine-in-park-falls-wisconsin-creates-controversy-at-former-paper-mill/","host":"wisconsinwatch.org","date":"2023-01-17","published":"2023-01-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Park Falls · Price · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"stargate-port-washington-wi","state":"WI","kind":"facility","name":"Stargate Lighthouse Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ozaukee"],"city":"Port Washington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Nearly1GWis AI capacity, not exact measured utility load.4.5GWStargatepartnership and40BcombinedFrontierinvestment are broader scopes. Proposed dedicated utility rate not reviewed approved tariff; no guarantee other ratepayers unaffected. Renewable generation is separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Wisconsin named certificate register with scoped building descriptions. Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","host":"vantage-dc.com","date":"2025-10-22","published":"2025-10-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx","host":"revenue.wi.gov","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.3882,"lng":-87.8753,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"campus_name":"Lighthouse","planned_investment_usd_min_exclusive":15000000000,"planned_data_centers":4,"planned_ai_capacity_gw_approx":1,"scheduled_completion_year":2028,"total_acres":672,"development_acres":500,"regional_infrastructure_commitment_usd_min":175000000,"forecast_construction_jobs_min_exclusive":4000,"forecast_long_term_jobs_min_exclusive":1000},"notes":["Nearly1GWis AI capacity, not exact measured utility load.4.5GWStargatepartnership and40BcombinedFrontierinvestment are broader scopes. Proposed dedicated utility rate not reviewed approved tariff; no guarantee other ratepayers unaffected. Renewable generation is separate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","host":"vantage-dc.com","date":"2025-10-22","published":"2025-10-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wisconsin named certificate register with scoped building descriptions","fields":{"certification_register_as_of":"2025-10-31","listed_certifications":[{"entity":"Epic Hosting LLC","date":"2024-09-24","location":"Milky Way,Verona,WI","scope":"Utility Building3and additions"},{"entity":"Degas LLC","date":"2025-02-18","location":"County RoadA,Beaver Dam,WI","scope":"to be constructed"},{"entity":"Oracle America Cloud Services LLC,formerly Green Chile Ventures LLC","date":"2025-10-31","location":"Port Washington,WI","scope":"four buildings at531,533,701and723E Lake Drive"}]},"notes":["Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx","host":"revenue.wi.gov","date":"2026-06-25","published":"2026-06-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Port Washington · Ozaukee · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"stonebridge-pacific-columbia-county-wi","state":"WI","kind":"facility","name":"Stonebridge Pacific AI Data Center (Columbia County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Columbia"],"city":"Pacific","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Describe dormant/reportedly no follow-up, not a formally withdrawn application or legally cancelled development; developer did not explain motive. Public-meeting demand preceded silence but causation is not established. Ten-billion-dollar value,400 permanent jobs and 2027 opening came from earlier exploratory statements, not current commitments. Other Pennsylvania 15 billion/569 acres and Florida 2.6 billion/1,300 acres are distinct projects. Reported July county NDA restriction is not a data center construction ban; original policy not independently reviewed. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wisconsinwatch.org/2026/08/wisconsin-10-billion-data-center-proposal-columbia-county-town-pacific-developer/","host":"wisconsinwatch.org","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.55,"lng":-89.4,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Wisconsin Watch reports Stonebridge stopped following up on exploratory Town of Pacific discussions, with county and town officials saying there had been no further contact for months.","independently_verified_current_operating_status":null,"reported_stage":"dormant/no further contact reported; no formal withdrawal established"},"notes":["Describe dormant/reportedly no follow-up, not a formally withdrawn application or legally cancelled development; developer did not explain motive. Public-meeting demand preceded silence but causation is not established. Ten-billion-dollar value,400 permanent jobs and 2027 opening came from earlier exploratory statements, not current commitments. Other Pennsylvania 15 billion/569 acres and Florida 2.6 billion/1,300 acres are distinct projects. Reported July county NDA restriction is not a data center construction ban; original policy not independently reviewed.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wisconsinwatch.org/2026/08/wisconsin-10-billion-data-center-proposal-columbia-county-town-pacific-developer/","host":"wisconsinwatch.org","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Pacific · Columbia · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"supranet-madison-wi","state":"WI","kind":"facility","name":"SupraNet Madison Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dane"],"city":"Madison","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SupraNet Madison facility services, contact-location scope held. Companycontactaddressnotexplicitserverfacilitypoint. GenericMadisoncolocationcloudserviceswithoutnumericITMW/area/originalopening. SOC2TypeIIoperatorreportnotindependentrestrictedreportread. Noquote/pricing/currentcustomtariffadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.supranet.net/cloud-solutions/","host":"supranet.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.075033,"lng":-89.525037,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"SupraNet Madison facility services, contact-location scope held","fields":{"operator":"SupraNet","advertised_data_center_market":"Madison, Wisconsin","published_corporate_contact_address":"8000 Excelsior Drive, Suite204, Madison, Wisconsin53717"},"notes":["Companycontactaddressnotexplicitserverfacilitypoint. GenericMadisoncolocationcloudserviceswithoutnumericITMW/area/originalopening. SOC2TypeIIoperatorreportnotindependentrestrictedreportread. Noquote/pricing/currentcustomtariffadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.supranet.net/cloud-solutions/","host":"supranet.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Madison · Dane · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"tierpoint-milwaukee-wi","state":"WI","kind":"facility","name":"TierPoint Milwaukee","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Milwaukee"],"city":"Milwaukee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/wisconsin/milwaukee/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.0097937,"lng":-87.9610932,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":28000,"gross_area_is_lower_bound":true,"raised_floor_sqft":3600,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 1 MW, redundant generators and one 500 kW generator","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/wisconsin/milwaukee/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Milwaukee · Milwaukee · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"town-of-janesville-data-center-rock-county-wi","state":"WI","kind":"facility","name":"Town of Janesville Data Center Inquiry (Polzin/Fenric Roads)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rock"],"city":"Janesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KathrynLarson Spectrum May13,2026 originaltown/Countyofficialinterviews: TownofJanesville80acredevelopmentcontact NOFORMALAPPLICATION, consultingfirmunnamed. PRE-applicationnotice notpermitapplication/counterpartlease. CityofJanesvilleformerGM andTownofBeloitMetaquarry areSEPARATEproposals, notsamejurisdiction/operator. Rough100petition signatures isclerkhearsay, notvalidatedsignaturecount. No currenttenant/MW/approval/operations. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://spectrumnews1.com/wi/milwaukee/news/2026/05/13/town-of-janesville--data-center--rock-county--paul-terpstra--petition","host":"spectrumnews1.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.7158171,"lng":-89.1216592,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["KathrynLarson Spectrum May13,2026 originaltown/Countyofficialinterviews: TownofJanesville80acredevelopmentcontact NOFORMALAPPLICATION, consultingfirmunnamed. PRE-applicationnotice notpermitapplication/counterpartlease. CityofJanesvilleformerGM andTownofBeloitMetaquarry areSEPARATEproposals, notsamejurisdiction/operator. Rough100petition signatures isclerkhearsay, notvalidatedsignaturecount. No currenttenant/MW/approval/operations.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://spectrumnews1.com/wi/milwaukee/news/2026/05/13/town-of-janesville--data-center--rock-county--paul-terpstra--petition","host":"spectrumnews1.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Janesville · Rock · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"us-signal-wi01-madison-wi","state":"WI","kind":"facility","name":"US Signal WI01 Madison","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dane"],"city":"Madison","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers/wi01-madison/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.0732716,"lng":-89.3870807,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"WI01","published_address":"222 W Washington Ave, Suite1, Madison, WI53703","generator_kw":280,"ups_kw":150,"utility_kva":300,"operator_reported_year_built":1972},"notes":["Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers/wi01-madison/","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Madison · Dane · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"us-signal-wi02-fitchburg-wi","state":"WI","kind":"facility","name":"US Signal WI02 Madison (Fitchburg)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dane"],"city":"Fitchburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. operator location index only. Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.9947535,"lng":-89.42339,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"operator location index only","fields":{"named_locations":["MI01 Grand Rapids","MN01 Minneapolis","WI02 Madison"],"operator_network_data_center_count":17},"notes":["Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Fitchburg · Dane · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"pch-wi-holdings-wisconsin-rapids-wood-county-wi","state":"WI","kind":"facility","name":"Wisconsin Rapids Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wood"],"city":"Wisconsin Rapids","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City timeline says October5 council adopted recommendations including12-month development moratorium; signed ordinance/effective scope/exemptions not yet retained. City process says commission recommendation proceeds to council; do not report September16 as final countywide ban or assume October20 outcome. City says it has no legal/financial partnership or NDA with developer. Private land marketing and municipal processing are separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wirapids.gov/612/Papermill-Redevelopment","host":"wirapids.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.39,"lng":-89.82,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Field or source context only","fields":{"reported_context":"City timeline names PCH WI Holdings, PNK and DC Rapids LLC as names used for applicant submissions; September16 Planning Commission denied application, with possible Common Council action October20 still ahead.","application_date_reported_by_city":"2026-04-27","planning_commission_denial_date_reported_by_city":"2026-09-16","moratorium_approval_date_reported_by_city":"2026-10-05","common_council_possible_action_date":"2026-10-20","final_cup_outcome_verified":false},"notes":["City timeline says October5 council adopted recommendations including12-month development moratorium; signed ordinance/effective scope/exemptions not yet retained.","City process says commission recommendation proceeds to council; do not report September16 as final countywide ban or assume October20 outcome.","City says it has no legal/financial partnership or NDA with developer. Private land marketing and municipal processing are separate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wirapids.gov/612/Papermill-Redevelopment","host":"wirapids.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wisconsin · Wisconsin Rapids · Wood · Source context reviewed","state_name":"Wisconsin","state_path":"/wisconsin/"},{"id":"cleanspark-cheyenne-wy","state":"WY","kind":"facility","name":"CleanSpark Cheyenne Bitcoin Mining Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Grouped city pin is not exact parcel verification. Original75MW contracts/30MW initial site/45MW second plan are earlier stages, not additions to110MW. Land values include costs, not whole-project expenditure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-executes-75-mw-of-power-contracts-and-completes-acquisition-of-bitcoin-mining-site-in-wyoming-302212200.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.14,"lng":-104.8202,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"reported_operating_scope":"Two wholly owned immersion bitcoin mining facilities in Cheyenne, historical2025 annual report.","wyoming_combined_power_mw":110,"power_scope":"Combined state/two-site infrastructure, not one building or criticalIT.","parcel2_close":"2024-07-11","parcel1_close":"2024-09-11","adjacent_raw_land_purchase":"2024-08-07","total_wyoming_land_accounting_usd":24640000},"notes":["Grouped city pin is not exact parcel verification. Original75MW contracts/30MW initial site/45MW second plan are earlier stages, not additions to110MW. Land values include costs, not whole-project expenditure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-executes-75-mw-of-power-contracts-and-completes-acquisition-of-bitcoin-mining-site-in-wyoming-302212200.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"cogent-cheyenne-114-w-10th-wy","state":"WY","kind":"facility","name":"Cogent Cheyenne Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Available wholesale area is not totalwhite-space. Potentialaddition is not current5MWoperation. Filename2025does not establishpublicationdate. Visually inspected brochurepage2. Facility2.5MWpower,2.08MWprotectedpower andadditional2.5MW upon request must stay separate. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cogentco.com/files/docs/wholesale_colocation/Cheyenne_Wholesale_2025.pdf","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1278101,"lng":-104.8110116,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"114 W10th Street","city":"Cheyenne","total_area_sqft":32860,"available_wholesale_area_sqft":16200,"protected_power_mw":2.08,"advertised_power_mw":2.5,"expansion_power_upon_request_mw":2.5,"site_acres":1.6},"notes":["Available wholesale area is not totalwhite-space.","Potentialaddition is not current5MWoperation.","Filename2025does not establishpublicationdate.","Visually inspected brochurepage2. Facility2.5MWpower,2.08MWprotectedpower andadditional2.5MW upon request must stay separate.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cogentco.com/files/docs/wholesale_colocation/Cheyenne_Wholesale_2025.pdf","host":"cogentco.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"crypto-knight-hosting-cheyenne-wy","state":"WY","kind":"facility","name":"Crypto Knight Hosting Cheyenne Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Near3MWtransformer rating not whole-site IT or demand.60MWcounty-company reference is ambiguous, not assigned canonical capacity. Company cost/water/tariff impact claims are attributed historical statements. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cowboystatedaily.com/2025/04/02/wyoming-crypto-miner-says-tariff-threats-spiking-prices-for-equipment/","host":"cowboystatedaily.com","date":"2025-04-02","published":"2025-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.14,"lng":-104.82,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Cowboy State Daily interviews Crypto Knight about Cheyenne hosting and Happy Jack construction affected by equipment costs.","independently_verified_current_operating_status":null},"notes":["Near3MWtransformer rating not whole-site IT or demand.60MWcounty-company reference is ambiguous, not assigned canonical capacity. Company cost/water/tariff impact claims are attributed historical statements.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cowboystatedaily.com/2025/04/02/wyoming-crypto-miner-says-tariff-threats-spiking-prices-for-equipment/","host":"cowboystatedaily.com","date":"2025-04-02","published":"2025-04-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"mwtn-data-center-of-the-rockies-casper-wy","state":"WY","kind":"facility","name":"Data Center of the Rockies","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Natrona"],"city":"Casper","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Mountain West Casper rack capacity and locality. RackcapacitynotrackoccupancyorITMW. Newest/newfacilityundatednotexactopening. Retailreceptacleamperageandvoltageapplyindividualpackagesnotcampuscapacity. No exactstreet/parcelinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mwtn.net/data-centers","host":"mwtn.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.8602,"lng":-106.3355,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Mountain West Casper rack capacity and locality","fields":{"operator":"Mountain West Technologies","facility":"Data Center of the Rockies","locality":"Casper, Wyoming","advertised_rack_capacity":100},"notes":["RackcapacitynotrackoccupancyorITMW. Newest/newfacilityundatednotexactopening. Retailreceptacleamperageandvoltageapplyindividualpackagesnotcampuscapacity. No exactstreet/parcelinreviewedbody.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mwtn.net/data-centers","host":"mwtn.net","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Casper · Natrona · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"echostar-cheyenne-wy","state":"WY","kind":"facility","name":"EchoStar Cheyenne Data Center and Satellite Uplink Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming named recipient histories and planned project scopes. Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.135,"lng":-104.725,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wyoming named recipient histories and planned project scopes","fields":{"echostar_first_sales_tax_certification_year":2011,"microsoft_cheyenne_certified_campuses":3,"meta_cheyenne_first_sales_tax_certification_month":"2022-10","meta_cheyenne_reported_phase1_planned_capex_usd_approx":800000000,"meta_cheyenne_reported_phase1_expected_direct_nonconstruction_jobs":60,"prometheus_casper_planned_power_gw":1.5,"prometheus_casper_power_basis":"notexplicitIT"},"notes":["Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"etc-dc-opco-lysite-fremont-county-wy","state":"WY","kind":"facility","name":"ETC DC OpCo Lysite Data Center (\"1 MW DC Site\")","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fremont"],"city":"Lysite","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. A proposed permit is not an issued permit. The one-MW site label has an undefined basis, while horsepower is not critical IT. Allowed annual emissions are not measured emissions. The later comment-deadline outcome and primary supply remain unknown. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rivertonranger.com/news/details-emerge-on-lysite-data-center/article_c9aadf9d-dfc5-4675-a01e-ae14b0c944e5.html","host":"rivertonranger.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.285,"lng":-107.636,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Riverton Ranger describes a proposed DEQ permit for ETC DC OpCo near Lysite, covering eight emergency gas engines.","independently_verified_current_operating_status":null},"notes":["A proposed permit is not an issued permit. The one-MW site label has an undefined basis, while horsepower is not critical IT. Allowed annual emissions are not measured emissions. The later comment-deadline outcome and primary supply remain unknown.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rivertonranger.com/news/details-emerge-on-lysite-data-center/article_c9aadf9d-dfc5-4675-a01e-ae14b0c944e5.html","host":"rivertonranger.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Lysite · Fremont · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"h6-coin-newcastle-wy","state":"WY","kind":"facility","name":"H6 Coin Newcastle Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Weston"],"city":"Newcastle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming distinct recipient/type/capacity scopes. SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.85,"lng":-104.2,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wyoming distinct recipient/type/capacity scopes","fields":{"lunavi_government_described_use":"Cheyennecolocation","h6coin_government_described_use":"NewcastleBitcoinmining","prometheus_evanston_planned_power_gw":1.2,"prometheus_evanston_power_basis":"notexplicitcriticalIT","related_digital_cheyenne_planned_critical_it_mw_max":302,"related_digital_campus_acres":115,"related_digital_planned_capex_usd":1200000000,"related_digital_first_building_area_sqft":184000,"related_digital_first_building_completion_target":"late2026","related_digital_anchor_tenant":"CoreWeave"},"notes":["SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Newcastle · Weston · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"highwire-evansville-wy","state":"WY","kind":"facility","name":"Highwire Energy Partners Bitcoin Mining Facility (Evansville)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Natrona"],"city":"Evansville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The story gives no hard opening date. Historical permission and a favorable utility study do not establish present operation, executed power capacity or current IT MW. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://oilcity.news/community/2022/11/28/cryptocurrency-mining-operation-coming-to-evansville/","host":"oilcity.news","date":"2022-11-28","published":"2022-11-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.8508,"lng":-106.2735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Oil City News reports unanimous Evansville council permission for Highwire's Blackmore Road proposal and a hope to begin within a month or two.","independently_verified_current_operating_status":null},"notes":["The story gives no hard opening date. Historical permission and a favorable utility study do not establish present operation, executed power capacity or current IT MW.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://oilcity.news/community/2022/11/28/cryptocurrency-mining-operation-coming-to-evansville/","host":"oilcity.news","date":"2022-11-28","published":"2022-11-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Evansville · Natrona · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"lunavi-cheyenne-wy","state":"WY","kind":"facility","name":"Lunavi Cheyenne Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming distinct recipient/type/capacity scopes. SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.11,"lng":-104.78,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wyoming distinct recipient/type/capacity scopes","fields":{"lunavi_government_described_use":"Cheyennecolocation","h6coin_government_described_use":"NewcastleBitcoinmining","prometheus_evanston_planned_power_gw":1.2,"prometheus_evanston_power_basis":"notexplicitcriticalIT","related_digital_cheyenne_planned_critical_it_mw_max":302,"related_digital_campus_acres":115,"related_digital_planned_capex_usd":1200000000,"related_digital_first_building_area_sqft":184000,"related_digital_first_building_completion_target":"late2026","related_digital_anchor_tenant":"CoreWeave"},"notes":["SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"meta-cheyenne-wy","state":"WY","kind":"facility","name":"Meta Cheyenne Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming named recipient histories and planned project scopes. Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.099,"lng":-104.769,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wyoming named recipient histories and planned project scopes","fields":{"echostar_first_sales_tax_certification_year":2011,"microsoft_cheyenne_certified_campuses":3,"meta_cheyenne_first_sales_tax_certification_month":"2022-10","meta_cheyenne_reported_phase1_planned_capex_usd_approx":800000000,"meta_cheyenne_reported_phase1_expected_direct_nonconstruction_jobs":60,"prometheus_casper_planned_power_gw":1.5,"prometheus_casper_power_basis":"notexplicitIT"},"notes":["Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"microsoft-cheyenne-expansion-wy","state":"WY","kind":"facility","name":"Microsoft Cheyenne Mega-Campus Expansion","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming named recipient histories and planned project scopes. Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.09,"lng":-104.79,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wyoming named recipient histories and planned project scopes","fields":{"echostar_first_sales_tax_certification_year":2011,"microsoft_cheyenne_certified_campuses":3,"meta_cheyenne_first_sales_tax_certification_month":"2022-10","meta_cheyenne_reported_phase1_planned_capex_usd_approx":800000000,"meta_cheyenne_reported_phase1_expected_direct_nonconstruction_jobs":60,"prometheus_casper_planned_power_gw":1.5,"prometheus_casper_power_basis":"notexplicitIT"},"notes":["Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"ncar-wyoming-supercomputing-center-cheyenne-wy","state":"WY","kind":"facility","name":"NCAR-Wyoming Supercomputing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NCAR institution operating research facility and administrative-address separation. Institutional resource page supports facility identity and historical opening, not critical IT MW, actual 2026 load or building capex. Footer Boulder postal/shipping addresses belong UCAR administration, not Cheyenne facility coordinates. Tours are visitor access, not public access to all computing rooms. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cisl.ucar.edu/ncar-wyoming-supercomputing-center","host":"cisl.ucar.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1289,"lng":-104.8974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"NCAR institution operating research facility and administrative-address separation","fields":{"institution":"NSF NCAR","facility":"NCAR Wyoming Supercomputing Center","city":"Cheyenne, Wyoming","opened_year":2012,"visitor_center_walkin_hours":"Monday to Friday 09:00 to17:00","visitor_admission":"free","computing_room_tours":"advance booking, ninth grade and older"},"notes":["Institutional resource page supports facility identity and historical opening, not critical IT MW, actual 2026 load or building capex. Footer Boulder postal/shipping addresses belong UCAR administration, not Cheyenne facility coordinates. Tours are visitor access, not public access to all computing rooms.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cisl.ucar.edu/ncar-wyoming-supercomputing-center","host":"cisl.ucar.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"tallgrass-project-jade-cheyenne-wy","state":"WY","kind":"facility","name":"Project Tembo","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. 1.8 GW initial electrical-campus description and potential 10 GW ultimate size are not additive or independently verified critical IT/current load; expansion requires further approvals. Data campus and BFC/Cheyenne Power Hub are distinct connected projects.5000 peak construction/400 permanent jobs are forecasts. Carbon capture, hydrogen/solar options and renewable mix remain proposed or unspecified, not measured emissions or commissioned systems. Source’s statewide-generation/home equivalences mix units/denominators and are excluded. Generic closed-loop evaporation/PFAS discussion is not evidence of site discharge or contamination; no water withdrawal quantity or aquifer impact certified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyofile.com/laramie-county-approves-construction-of-what-could-become-the-largest-data-center-in-us/","host":"wyofile.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.12,"lng":-104.82,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Inside Climate News reporting republished by WyoFile describes Laramie County’s January 6 site-plan approvals for Crusoe Project Jade and adjacent Tallgrass generation, with first buildings forecast 2027.","independently_verified_current_operating_status":null},"notes":["1.8 GW initial electrical-campus description and potential 10 GW ultimate size are not additive or independently verified critical IT/current load; expansion requires further approvals. Data campus and BFC/Cheyenne Power Hub are distinct connected projects.5000 peak construction/400 permanent jobs are forecasts. Carbon capture, hydrogen/solar options and renewable mix remain proposed or unspecified, not measured emissions or commissioned systems. Source’s statewide-generation/home equivalences mix units/denominators and are excluded. Generic closed-loop evaporation/PFAS discussion is not evidence of site discharge or contamination; no water withdrawal quantity or aquifer impact certified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyofile.com/laramie-county-approves-construction-of-what-could-become-the-largest-data-center-in-us/","host":"wyofile.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"prometheus-hyperscale-evanston-wy","state":"WY","kind":"facility","name":"Prometheus Hyperscale Atlas Industrial Park Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Uinta"],"city":"Evanston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming distinct recipient/type/capacity scopes. SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.27,"lng":-110.81,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wyoming distinct recipient/type/capacity scopes","fields":{"lunavi_government_described_use":"Cheyennecolocation","h6coin_government_described_use":"NewcastleBitcoinmining","prometheus_evanston_planned_power_gw":1.2,"prometheus_evanston_power_basis":"notexplicitcriticalIT","related_digital_cheyenne_planned_critical_it_mw_max":302,"related_digital_campus_acres":115,"related_digital_planned_capex_usd":1200000000,"related_digital_first_building_area_sqft":184000,"related_digital_first_building_completion_target":"late2026","related_digital_anchor_tenant":"CoreWeave"},"notes":["SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Evanston · Uinta · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"prometheus-hyperscale-casper-wy","state":"WY","kind":"facility","name":"Prometheus Hyperscale Falls Ranch Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Converse"],"city":"Glenrock","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming named recipient histories and planned project scopes. Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":42.87,"lng":-106.15,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wyoming named recipient histories and planned project scopes","fields":{"echostar_first_sales_tax_certification_year":2011,"microsoft_cheyenne_certified_campuses":3,"meta_cheyenne_first_sales_tax_certification_month":"2022-10","meta_cheyenne_reported_phase1_planned_capex_usd_approx":800000000,"meta_cheyenne_reported_phase1_expected_direct_nonconstruction_jobs":60,"prometheus_casper_planned_power_gw":1.5,"prometheus_casper_power_basis":"notexplicitIT"},"notes":["Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Glenrock · Converse · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"ptolemy-data-systems-sheridan-wy","state":"WY","kind":"facility","name":"Ptolemy Data Systems Sheridan Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sheridan"],"city":"Sheridan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Ptolemy Sheridan historical operator brochure, power and area scopes. Actual brochure explicitly identifies Sheridan despite Douglas host. Historical operator account, not independent2026 operating verification. Backup0.5MW not critical IT. Vault1024is subset of6000, not extra building area. Brochure compliance/security claims are not independently inspected certifications. Contact address not independently checked server entrance. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityofdouglas.org/AgendaCenter/ViewFile/Item/1542?fileID=1449","host":"cityofdouglas.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.8284,"lng":-106.9711,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Ptolemy Sheridan historical operator brochure, power and area scopes","fields":{"publisher_role":"Ptolemy operator brochure hosted by City of Douglas","brochure_copyright_year":2015,"facility_city":"Sheridan, Wyoming","reported_constructed_year":2012,"reported_facility_sqft":6000,"included_high_density_vault_sqft":1024,"backup_generator_mw":0.5,"claimed_backup_fuel_hours":30,"per_rack_draw_kw_max":15,"operator_contact_address":"2910 Russell Drive, Sheridan, WY82801"},"notes":["Actual brochure explicitly identifies Sheridan despite Douglas host. Historical operator account, not independent2026 operating verification. Backup0.5MW not critical IT. Vault1024is subset of6000, not extra building area. Brochure compliance/security claims are not independently inspected certifications. Contact address not independently checked server entrance.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cityofdouglas.org/AgendaCenter/ViewFile/Item/1542?fileID=1449","host":"cityofdouglas.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Sheridan · Sheridan · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"related-digital-cheyenne-wy","state":"WY","kind":"facility","name":"Related Digital Cheyenne Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Laramie"],"city":"Cheyenne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming distinct recipient/type/capacity scopes. SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.13,"lng":-104.735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Wyoming distinct recipient/type/capacity scopes","fields":{"lunavi_government_described_use":"Cheyennecolocation","h6coin_government_described_use":"NewcastleBitcoinmining","prometheus_evanston_planned_power_gw":1.2,"prometheus_evanston_power_basis":"notexplicitcriticalIT","related_digital_cheyenne_planned_critical_it_mw_max":302,"related_digital_campus_acres":115,"related_digital_planned_capex_usd":1200000000,"related_digital_first_building_area_sqft":184000,"related_digital_first_building_completion_target":"late2026","related_digital_anchor_tenant":"CoreWeave"},"notes":["SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf","host":"wyoleg.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Cheyenne · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"site-layer-4-goshen-hole-platte-county-wy","state":"WY","kind":"facility","name":"Site Layer 4 Goshen Hole Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Platte"],"city":"Wheatland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. August 11 planning and August 20 county hearings were future at publication; no result assumed. $26 billion is attributed planned integrated development value, not spent DC capital or tax incentive. 250 to 300 permanent jobs and tax-budget effects are forecasts. Annual use compared with 25 to 30 homes/five acres of hay is an analogy with no adopted gallon denominator. Nearby Laramie River Station 18,000 gallons/MINUTE is another facility’s use, not project cooling; no direct IT MW or water permit verified. Geographic label Goshen Hole does not place this parcel in Goshen County. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cowboystatedaily.com/2026/07/13/ranchlands-near-wheatland-eyed-for-26-billion-transformational-data-center/","host":"cowboystatedaily.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":42.1,"lng":-104.71,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Cowboy State Daily reports Site Layer 4 filed rezoning for a phased data center and co-located generation campus on 5,344 acres of Lazy V Six Ranch land in Platte County near the Goshen line.","independently_verified_current_operating_status":null},"notes":["August 11 planning and August 20 county hearings were future at publication; no result assumed. $26 billion is attributed planned integrated development value, not spent DC capital or tax incentive. 250 to 300 permanent jobs and tax-budget effects are forecasts. Annual use compared with 25 to 30 homes/five acres of hay is an analogy with no adopted gallon denominator. Nearby Laramie River Station 18,000 gallons/MINUTE is another facility’s use, not project cooling; no direct IT MW or water permit verified. Geographic label Goshen Hole does not place this parcel in Goshen County.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cowboystatedaily.com/2026/07/13/ranchlands-near-wheatland-eyed-for-26-billion-transformational-data-center/","host":"cowboystatedaily.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Wheatland · Platte · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"},{"id":"truss-energy-carpenter-wy","state":"WY","kind":"facility","name":"Truss Energy Carpenter Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Laramie"],"city":"Carpenter","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Planning recommendation concerns an 800 unit/5600 person WORKER CAMP, not approval or employment for Truss data center. June 2 hearing was future for worker housing. Separate Bison Ranch 2775 acres/four 700,000 square-foot buildings cannot be assigned to Truss. Official’s combined turbine/fuel-cell description and 40,000 gallons/dayproduced water are technically ambiguous attributed concepts, not measured cooling demand or an approved generation system. No MW, tenant, land closing, permit or RFS verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cowboystatedaily.com/2026/05/18/two-more-data-centers-possible-as-laramie-county-planners-ok-massive-man-camp/","host":"cowboystatedaily.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.0461861,"lng":-104.3627365,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Cowboy State Daily reports Truss Energy made preliminary due-diligence contact about roughly 540 acres west of Carpenter, with no formal application submitted.","independently_verified_current_operating_status":null},"notes":["Planning recommendation concerns an 800 unit/5600 person WORKER CAMP, not approval or employment for Truss data center. June 2 hearing was future for worker housing. Separate Bison Ranch 2775 acres/four 700,000 square-foot buildings cannot be assigned to Truss. Official’s combined turbine/fuel-cell description and 40,000 gallons/dayproduced water are technically ambiguous attributed concepts, not measured cooling demand or an approved generation system. No MW, tenant, land closing, permit or RFS verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cowboystatedaily.com/2026/05/18/two-more-data-centers-possible-as-laramie-county-planners-ok-massive-man-camp/","host":"cowboystatedaily.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wyoming · Carpenter · Laramie · Source context reviewed","state_name":"Wyoming","state_path":"/wyoming/"}],"county_rules":{},"calendar":[],"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"stats":{"reviewed_records":1822,"states":51,"status_unknown":1775,"unreviewed_excluded":319},"coverage":{"meaning":"Only published state records are combined. State editions have different evidence depth; record counts are not a census. Kentucky uses its standalone research packet."},"attribution":{"inventory":"Compute Atlas, Edward Kubiak, CC BY 4.0","research":"Field-specific public sources linked on each record"}}