{"state":"va","name":"Virginia","updated":"2026-10-15","checked":"2026-10-15","bounds":[-83.673,36.54,-75.244,39.465],"stats":{"projects":0,"operating":0,"facilities":104,"rule_counties":0,"moratorium_counties":0,"source_records":104,"reviewed_records":104,"status_confirmed":0,"status_unknown":104,"unreviewed_excluded":36,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":140,"manual_source_context_records":104,"published_source_context_records":104,"excluded":{"no_manual_source_review":36},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"penzance-1500-gateway-fredericksburg-va","state":"va","kind":"facility","name":"1500 Gateway Data Center (denied)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Fredericksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The denied package's proposed tax receipts, proffers and jobs were not adopted forecasts or paid benefits. No separate vote was taken on the substation finding. The old four-building scheme differs from the revised two-building proposal. Modeled noise and claimed first-in-state cooling/labor arrangements are not independently verified outcomes. A letter of intent is not a tenant lease. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.potomaclocal.com/2026/08/26/no-byte-tonight-fred-council-unplugs-23m-i-95-data-center-7-0-after-midnight-hearing/","host":"potomaclocal.com","date":"2026-08-26","published":"2026-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.301,"lng":-77.509,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Potomac Local reports two separate seven-zero denials early August 26 for Penzance's Gateway rezoning and height permit after an August 25 hearing ran past midnight.","independently_verified_current_operating_status":null,"reported_rezoning_status":"denied","reported_denial_date":"2026-08-26","separate_height_permit_status":"denied"},"notes":["The denied package's proposed tax receipts, proffers and jobs were not adopted forecasts or paid benefits. No separate vote was taken on the substation finding. The old four-building scheme differs from the revised two-building proposal. Modeled noise and claimed first-in-state cooling/labor arrangements are not independently verified outcomes. A letter of intent is not a tenant lease.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.potomaclocal.com/2026/08/26/no-byte-tonight-fred-council-unplugs-23m-i-95-data-center-7-0-after-midnight-hearing/","host":"potomaclocal.com","date":"2026-08-26","published":"2026-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Fredericksburg · Source context reviewed"},{"id":"anchorstone-58-east-data-campus-ringgold-va","state":"va","kind":"facility","name":"58 East Data Campus (Route 58 East Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pittsylvania"],"city":"Ringgold","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Article alternates up to 500 jobs and quoted about 200 full-time at build-out. No preferred exact job count or observed opening adopted. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://showcasemagazine.com/2024/11/15/permit-approved-for-ringgold-data-center-campus/","host":"showcasemagazine.com","date":"2024-11-15","published":"2024-11-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.6048,"lng":-79.2905,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported unanimous special-use approval for Anchorstone 58 East campus after rezoning.","independently_verified_current_operating_status":null},"notes":["Article alternates up to 500 jobs and quoted about 200 full-time at build-out. No preferred exact job count or observed opening adopted.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://showcasemagazine.com/2024/11/15/permit-approved-for-ringgold-data-center-campus/","host":"showcasemagazine.com","date":"2024-11-15","published":"2024-11-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ringgold · Pittsylvania · Source context reviewed"},{"id":"adp-ladysmith-data-hub-caroline-va","state":"va","kind":"facility","name":"ADP Ladysmith Data Hub","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Ruther Glen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Caroline three distinct application identities and review stages. Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.00386898862997,"lng":-77.5030262165529,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Caroline three distinct application identities and review stages","fields":{"county":"Caroline, Virginia","project_applications":[{"project":"Thornberry Data Center Campus","case":"RZ-03-2025","parcel":"84-A-1","parent_parcel_acres":1001.5,"requested_rezoning_acres":657,"address":"23202 Carneal Lane","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"ADP Ladysmith Data Hub","cases":["RZ-02-2025","SPEX-06-2025"],"parcel":"53-A-65","requested_rezoning_acres":140.38,"address":"18577 Green Road","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"Bull Church Data Center","case":"RZ-04-2024","parcel":"53-A-66","owner":"Mid Atlantic State Fund LLC","applicant":"NRD Retail LLC","location":"Bull Church Road east of I-95, adjacent to Virginia Bazaar south boundary","source_stage":"technical review; hearing date undetermined"}]},"notes":["Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ruther Glen · Caroline · Source context reviewed"},{"id":"aligned-iad-01-va","state":"va","kind":"facility","name":"Aligned IAD-01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Upstream60 MW not supplied on this source. 3 MW generator and2 MW UPS lineup ratings are not campus capacity. Current operator lists IAD-01 and IAD-02 at different Uunet addresses. Shared campus description requires building/campus grouping. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/northern-virginia-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0136079,"lng":-77.4705563,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"21890 Uunet Drive","city":"Ashburn","campus_acres":26},"notes":["Upstream60 MW not supplied on this source.","3 MW generator and2 MW UPS lineup ratings are not campus capacity.","Current operator lists IAD-01 and IAD-02 at different Uunet addresses. Shared campus description requires building/campus grouping.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/northern-virginia-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"aligned-iad-03-va","state":"va","kind":"facility","name":"Aligned IAD-03","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. HTTP200 is not substantive evidence; do not confirm operating status or capacity. The selected IAD-03 URL returns only a heading. Northern Virginia market page separately names the Sterling address. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/location/iad-03-data-center/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9886354,"lng":-77.4407776,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["HTTP200 is not substantive evidence; do not confirm operating status or capacity.","The selected IAD-03 URL returns only a heading. Northern Virginia market page separately names the Sterling address.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/location/iad-03-data-center/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"amazon-devlin-tech-park-va","state":"va","kind":"facility","name":"Amazon Devlin Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Bristow","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Land price is not total construction spending. Zoning floor allowance is not commissioned space or proof of current operations. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/","host":"virginiabusiness.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.724,"lng":-77.558,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported Amazon purchase of 188.5 acres in Devlin Technology Park closed November 5 for 700 million USD.","independently_verified_current_operating_status":null},"notes":["Land price is not total construction spending. Zoning floor allowance is not commissioned space or proof of current operations.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/","host":"virginiabusiness.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Bristow · Prince William · Source context reviewed"},{"id":"avaio-appomattox-va","state":"va","kind":"facility","name":"AVAIO Appomattox Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Appomattox"],"city":"Appomattox","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Developer tax benefit claim is a projection, not annual revenue received. No project opening, construction start or all permits established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wdbj7.com/2026/03/24/board-answers-questions-future-data-center/","host":"wdbj7.com","date":"2026-03-23","published":"2026-03-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.43,"lng":-78.8,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"WDBJ reports AVAIO proposed Appomattox campus with initial construction and partial substation work planned for 2027 to 2028.","independently_verified_current_operating_status":null},"notes":["Developer tax benefit claim is a projection, not annual revenue received. No project opening, construction start or all permits established.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wdbj7.com/2026/03/24/board-answers-questions-future-data-center/","host":"wdbj7.com","date":"2026-03-23","published":"2026-03-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Appomattox · Appomattox · Source context reviewed"},{"id":"aws-mattermeade-caroline-va","state":"va","kind":"facility","name":"AWS Mattermeade Tech Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Bowling Green","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched county landing page. Spotsylvania County generic rezoning landing page does not match Caroline County Mattermeade site. No project fields adopted. Thin navigation body and county mismatch cannot establish case, approval or exact location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/799/Rezoning-Cases","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.044,"lng":-77.3527,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"unmatched county landing page","fields":{},"notes":["Spotsylvania County generic rezoning landing page does not match Caroline County Mattermeade site. No project fields adopted. Thin navigation body and county mismatch cannot establish case, approval or exact location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/799/Rezoning-Cases","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Bowling Green · Caroline · Source context reviewed"},{"id":"bermuda-hundred-data-center-chesterfield-va","state":"va","kind":"facility","name":"Bermuda Hundred Data Center (Old Bermuda Hundred Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Chester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://opengisdata.chesterfield.gov/","host":"opengisdata.chesterfield.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.33798175,"lng":-77.39493747,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://opengisdata.chesterfield.gov/","host":"opengisdata.chesterfield.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chester · Chesterfield · Source context reviewed"},{"id":"stack-berry-hill-va","state":"va","kind":"facility","name":"Berry Hill / Southern Virginia Megasite","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pittsylvania"],"city":"Berry Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported minimum metrics $73.5 billion/2,050 jobs at $80,500 average differ from broader aspirational $100 billion over three decades/2,500 jobs in two decades; neither is already spent or employed. Proposed equipment tax $1.62 per $100 still required county vote in this source. Minimum annual $16.25 million for first 1,000 acres and possible $48.6 million for all 2,990 acres are alternative scale cases, not additive revenue or received taxes; start forecast fall 2027/2028. $1,000-per-job enterprise-zone incentive is conditional, not proof of cash awarded. Seven million gallons/day is megasite supply capability, not DC actual demand; Dan River flow/textile mill history are separate. Planned Appalachian Power agreement is not examined executed ESA. State tax-exemption budget outcome was pending; related headlines do not settle it. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/stack-100b-berry-hill-data-center-project/","host":"virginiabusiness.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.68,"lng":-79.35,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Virginia Business reports unanimous local performance-agreement approval for Stack’s proposed Berry Hill campus, with multidecade investment and job milestones.","independently_verified_current_operating_status":null},"notes":["Reported minimum metrics $73.5 billion/2,050 jobs at $80,500 average differ from broader aspirational $100 billion over three decades/2,500 jobs in two decades; neither is already spent or employed. Proposed equipment tax $1.62 per $100 still required county vote in this source. Minimum annual $16.25 million for first 1,000 acres and possible $48.6 million for all 2,990 acres are alternative scale cases, not additive revenue or received taxes; start forecast fall 2027/2028. $1,000-per-job enterprise-zone incentive is conditional, not proof of cash awarded. Seven million gallons/day is megasite supply capability, not DC actual demand; Dan River flow/textile mill history are separate. Planned Appalachian Power agreement is not examined executed ESA. State tax-exemption budget outcome was pending; related headlines do not settle it.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/stack-100b-berry-hill-data-center-project/","host":"virginiabusiness.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Berry Hill · Pittsylvania · Source context reviewed"},{"id":"blackstone-data-services-bluestone-tazewell-va","state":"va","kind":"facility","name":"Blackstone Data Services  -  Bluestone Business and Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Tazewell"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Eighteen-million-USD investment over ten years and five jobs were projections. No present operation, exact IT MW or realized spending verified. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvva.com/2024/02/16/growth-local-cryptocurrency-mining-operation-hindered-by-electricity-rates/","host":"wvva.com","date":"2024-02-16","published":"2024-02-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.26,"lng":-81.33,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WVVA reports Blackstone Bluestone opened October2022 and was holding steady amid power-rate constraints.","independently_verified_current_operating_status":null},"notes":["Eighteen-million-USD investment over ten years and five jobs were projections. No present operation, exact IT MW or realized spending verified.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvva.com/2024/02/16/growth-local-cryptocurrency-mining-operation-hindered-by-electricity-rates/","host":"wvva.com","date":"2024-02-16","published":"2024-02-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tazewell · Source context reviewed"},{"id":"amazon-blackwell-road-warrenton-va","state":"va","kind":"facility","name":"Blackwell Road Data Center (Warrenton)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Warrenton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. ProtectFauquier/CitizensForFauquier/PEC original advocacy FAQ, two pages read/viewed. Historical2022proposal/opposition context for AmazonBlackwell; URLOctober26not independently established issue date.220000sf proposal/40acre land not completed facility.40MW is AUTHORS ESTIMATE, not executed load/criticalIT; grid-CO2 calculator output not measured onsite emissions. Company1500gpd statement versus area-based7500gpd advocacy scenario are not actual consumption.28standby generators genericnoise claims not boundary measurements or a permit ruling. Article characterizes studies as flawed, not independent legal/health findings adopted. ProposedDecember2022decision not an observed current outcome. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/wp-content/uploads/warrenton-amazon-data-center-town-hall-faq-handout-10-26-22.pdf","host":"pecva.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.72948224074257,"lng":-77.78753470617198,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["ProtectFauquier/CitizensForFauquier/PEC original advocacy FAQ, two pages read/viewed. Historical2022proposal/opposition context for AmazonBlackwell; URLOctober26not independently established issue date.220000sf proposal/40acre land not completed facility.40MW is AUTHORS ESTIMATE, not executed load/criticalIT; grid-CO2 calculator output not measured onsite emissions. Company1500gpd statement versus area-based7500gpd advocacy scenario are not actual consumption.28standby generators genericnoise claims not boundary measurements or a permit ruling. Article characterizes studies as flawed, not independent legal/health findings adopted. ProposedDecember2022decision not an observed current outcome.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.pecva.org/wp-content/uploads/warrenton-amazon-data-center-town-hall-faq-handout-10-26-22.pdf","host":"pecva.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Warrenton · Fauquier · Source context reviewed"},{"id":"amazon-bridgefield-tech-center-ashburn-loudoun-va","state":"va","kind":"facility","name":"Bridgefield Tech Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Amazon GWU acquisition and Bridgefield concept stage. Propertypurchase notDCconstruction capex oroperatingopening. Universitymaycontinueprogramsforuptofiveyears,notimmediateclosure/exactleaseendday. Concept-plan by-right claim subject to disputed zoning interpretation andlengthyreview; nofinalpermit. Julyvote topreparemoratorium andexpectedSeptember15decisionnotobservedoutcome. No numericalITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. County legislative process context, not a parcel-specific approval.. No October 20 outcome exists in this review. No fixed expiry calculated. No effect on either exact parcel inferred without application-specific records.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/amazon-data-centers-gwu-ashburn/","host":"virginiabusiness.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.loudoun.gov/m/NewsFlash/home/detail/10874","host":"loudoun.gov","date":"2026-09-17","published":"2026-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.029784,"lng":-77.4744148,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Amazon GWU acquisition and Bridgefield concept stage","fields":{"company":"Amazon DataServices","project":"Bridgefield TechCenter","site":"former/currentGWUVirginiaScienceandTechnologyCampus, Ashburn, LoudounCounty, Virginia","reported_purchase_date":"2026-03-02","reported_property_acres":111,"reported_purchase_usd_approx":427300000,"concept_plan_filed_date":"2026-07-28","proposed_buildings":4,"proposed_stories":2,"proposed_combined_area_sqft_min_exclusive":800000,"reported_university_continued_use_option_years_max":5},"notes":["Propertypurchase notDCconstruction capex oroperatingopening. Universitymaycontinueprogramsforuptofiveyears,notimmediateclosure/exactleaseendday. Concept-plan by-right claim subject to disputed zoning interpretation andlengthyreview; nofinalpermit. Julyvote topreparemoratorium andexpectedSeptember15decisionnotobservedoutcome. No numericalITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/amazon-data-centers-gwu-ashburn/","host":"virginiabusiness.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"County legislative process context, not a parcel-specific approval.","fields":{"september15_action":"Vote for future consideration of a resolution, not adoption of the pause.","consideration_scheduled":"2026-10-20","effective_pause_established_as_of_2026_10_14":false,"proposed_scope":"Final Board action on legislative data center and substation applications; administrative applications unaffected; submissions and Planning Commission processing continue.","potential_duration":"Up to 12 months if approved. Intended retroactivity to September 15 is conditional, not a verified effective date.","exceptions":"Grid reliability or approaching statutory decision period may be considered.","county_attorney_position":"Notice attributes opinion that a data center approval moratorium is not legal.","october6_grandfathering_outcome":null},"notes":["No October 20 outcome exists in this review. No fixed expiry calculated. No effect on either exact parcel inferred without application-specific records.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.loudoun.gov/m/NewsFlash/home/detail/10874","host":"loudoun.gov","date":"2026-09-17","published":"2026-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"bull-church-data-center-caroline-va","state":"va","kind":"facility","name":"Bull Church Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Ruther Glen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Caroline three distinct application identities and review stages. Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.00820612043225,"lng":-77.49262214339025,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Caroline three distinct application identities and review stages","fields":{"county":"Caroline, Virginia","project_applications":[{"project":"Thornberry Data Center Campus","case":"RZ-03-2025","parcel":"84-A-1","parent_parcel_acres":1001.5,"requested_rezoning_acres":657,"address":"23202 Carneal Lane","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"ADP Ladysmith Data Hub","cases":["RZ-02-2025","SPEX-06-2025"],"parcel":"53-A-65","requested_rezoning_acres":140.38,"address":"18577 Green Road","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"Bull Church Data Center","case":"RZ-04-2024","parcel":"53-A-66","owner":"Mid Atlantic State Fund LLC","applicant":"NRD Retail LLC","location":"Bull Church Road east of I-95, adjacent to Virginia Bazaar south boundary","source_stage":"technical review; hearing date undetermined"}]},"notes":["Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ruther Glen · Caroline · Source context reviewed"},{"id":"mesh-capital-cabin-field-road-data-center-campbell-va","state":"va","kind":"facility","name":"Cabin Field Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Campbell"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No formal site plan approved as of reporting. Denial did not stop all data-center use; separate Mount Athos concept not this property. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wdbj7.com/2025/11/03/data-center-could-still-be-coming-campbell-county-despite-denial-vote-supervisors/","host":"wdbj7.com","date":"2025-11-03","published":"2025-11-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3407675,"lng":-78.9909489,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"proffer-removal-denied-but-revised-concepts-possible","reported_finding":"WDBJ says supervisors rejected removing Cabin Field Road protective proffer, but staff considered three smaller concepts compliant under by-right use.","report_display_date":"2025-11-03","independently_verified_current_status":null},"notes":["No formal site plan approved as of reporting. Denial did not stop all data-center use; separate Mount Athos concept not this property.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wdbj7.com/2025/11/03/data-center-could-still-be-coming-campbell-county-despite-denial-vote-supervisors/","host":"wdbj7.com","date":"2025-11-03","published":"2025-11-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Campbell · Source context reviewed"},{"id":"aws-carters-store-tech-campus-spotsylvania-va","state":"va","kind":"facility","name":"Carter's Store Tech Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Spotsylvania","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Source discloses StackInfrastructure grant. Construction claim is dated reporting, not currentoperation or commissioning.17 sites/3696 acres includeconstruction,approved,rezoningandsiteplans, not 17 operatingcenters or DCbuildingfootprint.616/1142/1263/675 acrestatusgroups belong tocountyrollup, not either specificcampus.35 billion-dollarAmazoncountycommitment claim needs primary geographic-scope corroboration before adoption; not assigned to eachsite. Cosnerconditional 2026 COforecast andunknown taxcollectionstart do not setCarterStore/SummitRFS. General taxlegal assertions andby-right explanation are not adopted as law. NoMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","host":"fxbgadvance.com","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.1911,"lng":-77.4687,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"FredericksburgAdvance’s industry-grant-supported column reports Amazon buildingsgoingupatSummitCrossing/CarterStore/Cosner/Mattameade and countywide 17 projectsites acrossseveralstages.","independently_verified_current_operating_status":null},"notes":["Source discloses StackInfrastructure grant. Construction claim is dated reporting, not currentoperation or commissioning.17 sites/3696 acres includeconstruction,approved,rezoningandsiteplans, not 17 operatingcenters or DCbuildingfootprint.616/1142/1263/675 acrestatusgroups belong tocountyrollup, not either specificcampus.35 billion-dollarAmazoncountycommitment claim needs primary geographic-scope corroboration before adoption; not assigned to eachsite. Cosnerconditional 2026 COforecast andunknown taxcollectionstart do not setCarterStore/SummitRFS. General taxlegal assertions andby-right explanation are not adopted as law. NoMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","host":"fxbgadvance.com","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spotsylvania · Spotsylvania · Source context reviewed"},{"id":"penzance-chantilly-premier-fairfax-va","state":"va","kind":"facility","name":"Chantilly Premier","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfax"],"city":"Chantilly","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Fully leased according to the developer does not identify tenants or prove current operation. Financing is not actual spending. Earlier maximum zoning allowance differs from the approved site plan's roughly 236,000 square feet; alternate warehouse and DC designs are not additive. Historical statewide study statistics are not current facility counts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ffxnow.com/2025/10/10/developer-breaks-ground-on-100m-data-center-building-in-chantilly/","host":"ffxnow.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.8943,"lng":-77.4311,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"FFXnow reports Penzance's Chantilly Premier groundbreaking announcement and 100-million-USD financing, with delivery targeted for first-half 2027 and future users unnamed.","independently_verified_current_operating_status":null},"notes":["Fully leased according to the developer does not identify tenants or prove current operation. Financing is not actual spending. Earlier maximum zoning allowance differs from the approved site plan's roughly 236,000 square feet; alternate warehouse and DC designs are not additive. Historical statewide study statistics are not current facility counts.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ffxnow.com/2025/10/10/developer-breaks-ground-on-100m-data-center-building-in-chantilly/","host":"ffxnow.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chantilly · Fairfax · Source context reviewed"},{"id":"powerhouse-chirisa-chester-va","state":"va","kind":"facility","name":"Chirisa Technology Park  -  Richmond (Chester)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Chester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The one-GW demand and two-billion-USD plan are reported proposal figures without verified critical-IT or executed utility basis. Google Meadowville, other Google campuses, a separate 744-acre rejected planning recommendation and regional budgets must not be merged with the Chirisa project. Original approvals and the PowerHouse joint-venture/operator crosswalk remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/products/richmond-va-area-counties-split-on-data-centers","host":"govtech.com","date":"2025-12-02","published":"2025-12-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.3554,"lng":-77.4416,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"GovTech reproduces Richmond Times-Dispatch reporting on Chirisa's Meadowville proposal alongside other Richmond-region projects and policy debates.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The one-GW demand and two-billion-USD plan are reported proposal figures without verified critical-IT or executed utility basis. Google Meadowville, other Google campuses, a separate 744-acre rejected planning recommendation and regional budgets must not be merged with the Chirisa project. Original approvals and the PowerHouse joint-venture/operator crosswalk remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/products/richmond-va-area-counties-split-on-data-centers","host":"govtech.com","date":"2025-12-02","published":"2025-12-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chester · Chesterfield · Source context reviewed"},{"id":"cleanarc-ruther-glen-va","state":"va","kind":"facility","name":"CleanArc VA1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Ruther Glen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer-issued release. Grid capacity is explicitly the source basis. Future power phases, tax revenue and jobs are forecasts. Groundbreaking does not establish delivered capacity or current operating occupancy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-302621903.html","host":"prnewswire.com","date":"2025-11-20","published":"2025-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.9374,"lng":-77.4837,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-events-round3-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Caroline","construction_event":"groundbreaking","event_date":"2025-11-20","advertised_grid_capacity_mw":900,"grid_capacity_phases":[{"mw":300,"target":"2027-Q1"},{"mw":300,"target":"2030"},{"mw":300,"target":"2033-2035"}],"forecast_annual_county_tax_revenue_usd":13000000,"forecast_permanent_jobs_minimum":50},"notes":["Developer-issued release. Grid capacity is explicitly the source basis. Future power phases, tax revenue and jobs are forecasts. Groundbreaking does not establish delivered capacity or current operating occupancy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-302621903.html","host":"prnewswire.com","date":"2025-11-20","published":"2025-11-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ruther Glen · Caroline · Source context reviewed"},{"id":"cloudhq-lc3-va","state":"va","kind":"facility","name":"CloudHQ LC3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CloudHQ LC campus power conflict and LC3 scope. Headline1256MW and narrative over1.7GW conflict or have unspecified phase scope. Never assign either full-campus total to LC3 alone. Area text8,500,00SFand789.676SM malformed; canonical area held. No measured current consumption, calendar construction start or observed RFS date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cloudhq.com/campus/lc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0112123,"lng":-77.4604251,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"CloudHQ LC campus power conflict and LC3 scope","fields":{"campus":"LC","operator_campus_reference_point":{"lat":39.01015,"lon":-77.4627},"headline_total_critical_it_mw":1256,"headline_available_critical_it_mw":756,"narrative_planned_critical_it_gw_min_exclusive":1.7,"planned_campus_data_centers":14,"operator_status_description":"LC3 and LC4 under construction","canonical_lc3_critical_it_mw":null},"notes":["Headline1256MW and narrative over1.7GW conflict or have unspecified phase scope. Never assign either full-campus total to LC3 alone. Area text8,500,00SFand789.676SM malformed; canonical area held. No measured current consumption, calendar construction start or observed RFS date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cloudhq.com/campus/lc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"cloudhq-manassas-mcc-va","state":"va","kind":"facility","name":"CloudHQ Manassas MCC Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Manassas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CloudHQ MCC full-campus and phased development scope. 382MW is full campus marketing total, not each building or energized load. Narrative says over375MW rather than exact382. RFSwithin20months is undated relative interval, not calendar opening. Mid2025construction/Q32026MCC7targets have not been independently observed. Referencepoint not verified parcel centroid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cloudhq.com/campus/mcc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.7196,"lng":-77.4982,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"CloudHQ MCC full-campus and phased development scope","fields":{"campus":"MCC","operator_campus_reference_point":{"lat":38.71955,"lon":-77.49819},"campus_area_sqft":2232875,"headline_total_critical_it_mw":382,"headline_available_critical_load_mw":96,"data_centers":7,"mcc5_status_description":"siteplan approved, ready for development","mcc7_historical_target_service_quarter":"2026-Q3"},"notes":["382MW is full campus marketing total, not each building or energized load. Narrative says over375MW rather than exact382. RFSwithin20months is undated relative interval, not calendar opening. Mid2025construction/Q32026MCC7targets have not been independently observed. Referencepoint not verified parcel centroid.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cloudhq.com/campus/mcc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Manassas · Prince William · Source context reviewed"},{"id":"cologix-ash1-va","state":"va","kind":"facility","name":"Cologix ASH1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cologix Ashburn building identity and area. No numeric critical IT MW in reviewed body. Three-story area not automatically raised-floor area. Marketing readiness/efficiency descriptions not proof of current AI workloads or measured water use. Gzip corruption repaired from retained raw capture; prior corrupt record not used. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/ashburn/ash1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0179257,"lng":-77.4595164,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-discovery-review-round8-2026-10-14.json","scope":"Cologix Ashburn building identity and area","fields":{"operator_site_code":"ASH1","published_address":"21745 Beaumeade Circle, Ashburn, Virginia","operator_reported_building_area_sqft":455000,"building_stories":3,"operator_described_ownership":"Cologix owned"},"notes":["No numeric critical IT MW in reviewed body. Three-story area not automatically raised-floor area. Marketing readiness/efficiency descriptions not proof of current AI workloads or measured water use. Gzip corruption repaired from retained raw capture; prior corrupt record not used.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/ashburn/ash1/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"convergent-technology-park-remington-fauquier-va","state":"va","kind":"facility","name":"Convergent Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Remington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Case numbers COMA-24-022504,REZN-24-022505,SPEX-24-022506 are review identifiers, not approvals. Acreage categories in letter do not reconcile arithmetically; preserve printed figures without inferred allocation. Two pages visually inspected. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/wp-content/uploads/convergent-tech-park-acceptance-letter-fauquier-aug-20-2024.pdf","host":"pecva.org","date":"2024-08-20","published":"2024-08-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.55073067963831,"lng":-77.8046447409979,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Signed Fauquier staff letter accepts Convergent comprehensive-plan/rezoning/special-exception application as complete for processing.","independently_verified_current_operating_status":null},"notes":["Case numbers COMA-24-022504,REZN-24-022505,SPEX-24-022506 are review identifiers, not approvals. Acreage categories in letter do not reconcile arithmetically; preserve printed figures without inferred allocation. Two pages visually inspected.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pecva.org/wp-content/uploads/convergent-tech-park-acceptance-letter-fauquier-aug-20-2024.pdf","host":"pecva.org","date":"2024-08-20","published":"2024-08-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Remington · Fauquier · Source context reviewed"},{"id":"coresite-va1-reston-va-va","state":"va","kind":"facility","name":"CoreSite VA1 - Reston, VA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfax"],"city":"Reston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Area describes the three-facility Reston campus, not VA1 alone. Program participation statement gives no site grant, tax value, term or disbursement. Existing VA3 evidence remains separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/va1-reston-va","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9506059,"lng":-77.3645496,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_campus_gross_sqft_lower_bound":986000,"campus_facilities":3,"operator_tax_program_statement":"participating in Virginia and Illinois tax exemption programs"},"notes":["Area describes the three-facility Reston campus, not VA1 alone. Program participation statement gives no site grant, tax value, term or disbursement. Existing VA3 evidence remains separate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/va1-reston-va","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Reston · Fairfax · Source context reviewed"},{"id":"coresite-va3-reston-va-va","state":"va","kind":"facility","name":"CoreSite VA3 - Reston, VA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfax"],"city":"Reston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The VA1 page advertises a three-facility campus total of more than 986,000 square feet. Do not assign the campus total to VA1 or add it to VA3. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/va3-reston-va","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9483343,"lng":-77.3724298,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft_lower_bound":533000},"notes":["The VA1 page advertises a three-facility campus total of more than 986,000 square feet. Do not assign the campus total to VA1 or add it to VA3.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/va3-reston-va","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Reston · Fairfax · Source context reviewed"},{"id":"aws-cosner-technology-campus-massaponax-va","state":"va","kind":"facility","name":"Cosner Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Massaponax","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. TaftCoghillJr/FredericksburgFreePress June4,2026 original report names AWS CosnerTechCampus,3901MassaponaxChurchRoad, underconstruction/notyetoperable asofarticle.2023approval,329acres/1.9Msf are reported campus scopes, not exact operating floor area. CurrentOctober2026completion not observed. Article describes$72,067.80fine, commissioning emissions failures and corrective retesting. Linked8-pageoriginal copy is signed byADS but DEQsignature/date blank, with effectiveness requiringBOTHparties. Record civilcharge specified in partiallysigned copy; finalexecution/payment unknown, not independently provedpaidfine. Primary also records corrected violations, so do not omit remediation or claim allcampusongoingnoncompliance. Generic healthstudies/models cited innews were not read as original research and are NOT adopted as observed Cosner health impacts. Backupgenerator count is not ITMW; commissioning failures are not proof normalcontinuousdiesel operation. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification. All8pagesoftheDEQ-authoredCosnerconsentordercopyhostedbynewspaper readVISUALLYonly. P1Reg74288,3901MassaponaxChurchRd,permitissuedOct30,2024allowing186nonemergency+15emergencygensets. P2May31,2025commissioningfailureEG01/02/04;companyawarenessAug20,notificationAug21,followupSep2. Nointentionaldelayormisconductinferred. P3findingspermitconditions2/14/17;EG05opacity5.6%,EG066.25%runsvs5%condition;Feb16 to 17,2026retest/Apr15report/May11inspectionfoundcompliant anddocumentationcorrectedviolations. P4specifiedcivilcharge$72,067.80within30daysEFFECTIVEDATE; notreceipt/proofofpayment. P4E3ADSneitheradmitsnordeniesfindingsandagreestonotcontestinthisorder. P6E10requiresBOTHpartyexecutionforeffectiveness. P7DEQsignatureandordereddateBLANK;P8companyRobbTruedingerMay20,2026signaturevisible. Fullyexecutedcounterpart/effectivedate/paymentunknown, notassertionagencyneversignedelsewhere. NOVdateP3C7Oct25,2025vsP4E2Oct24internalconflictheld. NohiddenPDFtext/OCRextraction/DocuSigncertificateauthentication. Noall-siteongoingcompliance orhealthcausationcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"http://www.fredericksburgfreepress.com/2026/06/04/deq-issued-air-pollution-violations-on-spotsylvania-data-center-campus-in-2025/","host":"fredericksburgfreepress.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ddrqacl1jpsyp.cloudfront.net/wp-content/uploads/2026/06/04144256/ADS-Cosners-Corner-DEQ-Violation.pdf","host":"ddrqacl1jpsyp.cloudfront.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.204738259414135,"lng":-77.47623258858057,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["TaftCoghillJr/FredericksburgFreePress June4,2026 original report names AWS CosnerTechCampus,3901MassaponaxChurchRoad, underconstruction/notyetoperable asofarticle.2023approval,329acres/1.9Msf are reported campus scopes, not exact operating floor area. CurrentOctober2026completion not observed.","Article describes$72,067.80fine, commissioning emissions failures and corrective retesting. Linked8-pageoriginal copy is signed byADS but DEQsignature/date blank, with effectiveness requiringBOTHparties. Record civilcharge specified in partiallysigned copy; finalexecution/payment unknown, not independently provedpaidfine. Primary also records corrected violations, so do not omit remediation or claim allcampusongoingnoncompliance.","Generic healthstudies/models cited innews were not read as original research and are NOT adopted as observed Cosner health impacts. Backupgenerator count is not ITMW; commissioning failures are not proof normalcontinuousdiesel operation.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"http://www.fredericksburgfreepress.com/2026/06/04/deq-issued-air-pollution-violations-on-spotsylvania-data-center-campus-in-2025/","host":"fredericksburgfreepress.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["All8pagesoftheDEQ-authoredCosnerconsentordercopyhostedbynewspaper readVISUALLYonly. P1Reg74288,3901MassaponaxChurchRd,permitissuedOct30,2024allowing186nonemergency+15emergencygensets. P2May31,2025commissioningfailureEG01/02/04;companyawarenessAug20,notificationAug21,followupSep2. Nointentionaldelayormisconductinferred.","P3findingspermitconditions2/14/17;EG05opacity5.6%,EG066.25%runsvs5%condition;Feb16 to 17,2026retest/Apr15report/May11inspectionfoundcompliant anddocumentationcorrectedviolations. P4specifiedcivilcharge$72,067.80within30daysEFFECTIVEDATE; notreceipt/proofofpayment. P4E3ADSneitheradmitsnordeniesfindingsandagreestonotcontestinthisorder.","P6E10requiresBOTHpartyexecutionforeffectiveness. P7DEQsignatureandordereddateBLANK;P8companyRobbTruedingerMay20,2026signaturevisible. Fullyexecutedcounterpart/effectivedate/paymentunknown, notassertionagencyneversignedelsewhere. NOVdateP3C7Oct25,2025vsP4E2Oct24internalconflictheld. NohiddenPDFtext/OCRextraction/DocuSigncertificateauthentication. Noall-siteongoingcompliance orhealthcausationcertification.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://ddrqacl1jpsyp.cloudfront.net/wp-content/uploads/2026/06/04144256/ADS-Cosners-Corner-DEQ-Violation.pdf","host":"ddrqacl1jpsyp.cloudfront.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massaponax · Spotsylvania · Source context reviewed"},{"id":"jk-land-cross-mill-center-leesburg-va","state":"va","kind":"facility","name":"Cross Mill Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Leesburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.0781,"lng":-77.5575,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Piedmont Environmental Council discusses Cross Mill's rezoning and Quantum Park's future Loudoun decision while advocating a pause.","independently_verified_current_operating_status":null},"notes":["Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Leesburg · Loudoun · Source context reviewed"},{"id":"rck-crossroads-technology-campus-spotsylvania-va","state":"va","kind":"facility","name":"Crossroads Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RCK Crossroads signed application, not final permit. SignedownerapplicationnotapprovedSUP;applicationnumberboxblank. McLeanandRestoncontactaddressesnotcampus. OCRcheckedagainstactualpageimage. No numeric MW, building count or operator tenant in form. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/40291/SUP-Application","host":"spotsylvania.va.us","date":"2026-03-11","published":"2026-03-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.2445,"lng":-77.4334,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"RCK Crossroads signed application, not final permit","fields":{"applicant":"RCK Digital Crossroads LLC","owner_signatory":"Sean H. Curtin","owner_signature_date":"2026-03-11","application_requested_use":"industrial data center campus and light public utilities","site_acres":633.28,"tax_map_parcels":["37-A-20","37-A-21","37-A-17D","37-A-64"],"county":"Spotsylvania, Virginia","permit_application_number":null,"permit_approval_date":null},"notes":["SignedownerapplicationnotapprovedSUP;applicationnumberboxblank. McLeanandRestoncontactaddressesnotcampus. OCRcheckedagainstactualpageimage. No numeric MW, building count or operator tenant in form.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/40291/SUP-Application","host":"spotsylvania.va.us","date":"2026-03-11","published":"2026-03-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spotsylvania · Source context reviewed"},{"id":"culpeper-brandy-station-va","state":"va","kind":"facility","name":"Culpeper Acquisitions Brandy Station Campus (denied)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Culpeper"],"city":"Brandy Station","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Advocacy700MWto1.8GWrange is prospective estimate with undefined power basis; no current capacity. Hearing notices not outcomes; draft illustrative layout not approved site plan. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/region/culpeper/new-data-center-proposals-in-brandy-station-and-near-the-town-of-culpeper/","host":"pecva.org","date":"2024-05-30","published":"2024-05-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.5095,"lng":-77.8863,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"PEC opposition letter distinguishes Brandy Station XXTech Park request from separate Keyser Farm proposal and earlier withdrawn AttoTek.","independently_verified_current_operating_status":null},"notes":["Advocacy700MWto1.8GWrange is prospective estimate with undefined power basis; no current capacity. Hearing notices not outcomes; draft illustrative layout not approved site plan.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pecva.org/region/culpeper/new-data-center-proposals-in-brandy-station-and-near-the-town-of-culpeper/","host":"pecva.org","date":"2024-05-30","published":"2024-05-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Brandy Station · Culpeper · Source context reviewed"},{"id":"cyrusone-nva1-nva2-nva3-sterling-va","state":"va","kind":"facility","name":"CyrusOne NVA1, NVA2 & NVA3 (Sterling)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. combined NVA1-NVA3 site offering. Source covers NVA1 throughNVA3. Combined space/power must not be copied to each building or treated as measured demand. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva1-nva3","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0259023,"lng":-77.4144697,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"combined NVA1-NVA3 site offering","fields":{"combined_technical_it_space_sqft":420000,"combined_it_capacity_mw":44},"notes":["Source covers NVA1 throughNVA3. Combined space/power must not be copied to each building or treated as measured demand.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva1-nva3","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sterling · Loudoun · Source context reviewed"},{"id":"cyrusone-nva5-sterling-va","state":"va","kind":"facility","name":"CyrusOne NVA5 (Sterling)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. combined NVA5 and NVA7 campus. Shared NVA5/NVA7 campus specifications. The116MW is one combined offering, not116MW per related record. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.024356,"lng":-77.4341,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"combined NVA5 and NVA7 campus","fields":{"combined_technical_it_space_sqft":1177019,"combined_it_capacity_mw":116,"separate_three_story_buildings":2},"notes":["Shared NVA5/NVA7 campus specifications. The116MW is one combined offering, not116MW per related record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sterling · Loudoun · Source context reviewed"},{"id":"cyrusone-nva7-sterling-va","state":"va","kind":"facility","name":"CyrusOne NVA7 (Sterling)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. combined NVA5 and NVA7 campus. Shared NVA5/NVA7 campus specifications. The116MW is one combined offering, not116MW per related record. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0263152,"lng":-77.4340194,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"combined NVA5 and NVA7 campus","fields":{"combined_technical_it_space_sqft":1177019,"combined_it_capacity_mw":116,"separate_three_story_buildings":2},"notes":["Shared NVA5/NVA7 campus specifications. The116MW is one combined offering, not116MW per related record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sterling · Loudoun · Source context reviewed"},{"id":"cyrusone-nva8-sterling-va","state":"va","kind":"facility","name":"CyrusOne NVA8 (Sterling)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Raised floor is a subset of the operator area label; no measured consumption inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-virginia-nva8","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0211789,"lng":-77.4132443,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"technical_it_space_sqft":154230,"raised_white_floor_sqft":100341,"it_capacity_mw":24},"notes":["Raised floor is a subset of the operator area label; no measured consumption inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/sterling-virginia-nva8","host":"cyrusone.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sterling · Loudoun · Source context reviewed"},{"id":"cyrusone-vint-hill-fauquier-va","state":"va","kind":"facility","name":"CyrusOne Vint Hill Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Vint Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Peter Cary/Piedmont Journalism Foundation, original March 11, 2024 report updated March 16. CyrusOne proposed four buildings/891,000 square feet at Vint Hill Road and Vint Hill Parkway, with site plans expected shortly; a proposed zoning vote was still future March 14. This is not the inherited 870,000 square feet reconciled or final approval. Vint Hill Corners is a separate roughly 50-acre Brookside Parkway proposal, then disputed with county staff; roughly 700,000 square feet is an estimate. Existing OVH/possible second building and Pink Panther hypothetical development are different projects. Master-association review is not county land-use approval. No current exemption or final zoning law established by this historical article. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","host":"princewilliamtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.752287510948115,"lng":-77.67347422456572,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Peter Cary/Piedmont Journalism Foundation, original March 11, 2024 report updated March 16. CyrusOne proposed four buildings/891,000 square feet at Vint Hill Road and Vint Hill Parkway, with site plans expected shortly; a proposed zoning vote was still future March 14. This is not the inherited 870,000 square feet reconciled or final approval. Vint Hill Corners is a separate roughly 50-acre Brookside Parkway proposal, then disputed with county staff; roughly 700,000 square feet is an estimate. Existing OVH/possible second building and Pink Panther hypothetical development are different projects. Master-association review is not county land-use approval. No current exemption or final zoning law established by this historical article.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","host":"princewilliamtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vint Hill · Fauquier · Source context reviewed"},{"id":"digital-realty-iad38-va","state":"va","kind":"facility","name":"Digital Realty IAD38","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Matched the named facility card on a regional page. Regional space summary has inconsistent imperial/metric scales and is excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0010841,"lng":-77.4772014,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"44100 Digital Loudoun Plaza, Bldg J, Ashburn, VA 20147","advertised_building_sqft":166000,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Matched the named facility card on a regional page. Regional space summary has inconsistent imperial/metric scales and is excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"digital-realty-iad44-va","state":"va","kind":"facility","name":"Digital Realty IAD44","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad44","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9608537,"lng":-77.4913983,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"43704 Efficiency Drive, Sterling, VA 20166","advertised_building_sqft":648500,"current_operator_facility_listing":true},"notes":["Building size is not IT white space, measured load or occupied floor. Operator advertisement is not an independent site inspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad44","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sterling · Loudoun · Source context reviewed"},{"id":"digital-realty-northern-virginia-acc4-va","state":"va","kind":"facility","name":"Digital Realty Northern Virginia ACC4","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc4","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0178592,"lng":-77.4624708,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"ACC4","published_address":"44480 Hastings Drive Ashburn, VA 20147","operator_label_total_building_size_sqft":347500},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc4","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"digital-realty-northern-virginia-acc5-va","state":"va","kind":"facility","name":"Digital Realty Northern Virginia ACC5","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc5","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0201584,"lng":-77.4631033,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"ACC5","published_address":"44521 Hastings Drive, Ashburn, VA 20147","operator_label_total_building_size_sqft":360000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc5","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"digital-realty-northern-virginia-iad14-va","state":"va","kind":"facility","name":"Digital Realty Northern Virginia IAD14","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad14","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0033364,"lng":-77.4870935,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"IAD14","published_address":"43791 Devin Shafron Drive, (Bldg D) Ashburn, VA 20147","operator_label_total_building_size_sqft":135000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad14","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"digital-realty-va3-va","state":"va","kind":"facility","name":"Digital Realty VA3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfax"],"city":"Reston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label. Digital Realty VA3 at1780BusinessCenterDrive is not CoreSite VA3; matching facility codes across operators is not identity proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/va3","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9484941,"lng":-77.3273071,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_facility_code":"VA3","published_address":"1780 Business Center Drive Reston, VA 20190","operator_label_total_building_size_sqft":256000},"notes":["Operator-labeled total building size is retained literally. In shared carrier hotels it may refer to the operator facility/space, not the entire physical tower; no title, whole-property area or occupied IT space is independently established. No new current MW or operating inspection from this label.","Digital Realty VA3 at1780BusinessCenterDrive is not CoreSite VA3; matching facility codes across operators is not identity proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/va3","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Reston · Fairfax · Source context reviewed"},{"id":"dulles-cloud-south-gainesville-prince-william-va","state":"va","kind":"facility","name":"Dulles Cloud South (Dulles South Innovation Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Planning-stage denial, not an operating-site shutdown. Industrial square footage and traffic forecasts are not commissioned server floor or measured traffic. Later official record still needed. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/","host":"potomaclocal.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.83,"lng":-77.61,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"plan-amendment-denied","reported_finding":"Potomac Local reports board denied Dulles South Comprehensive Plan Amendment on July 7, 2026.","report_display_date":"2026-07-08","independently_verified_current_status":null},"notes":["Planning-stage denial, not an operating-site shutdown. Industrial square footage and traffic forecasts are not commissioned server floor or measured traffic. Later official record still needed.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/","host":"potomaclocal.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Gainesville · Prince William · Source context reviewed"},{"id":"edgecore-culpeper-tech-zone-va","state":"va","kind":"facility","name":"EdgeCore Culpeper Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Culpeper"],"city":"Culpeper","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Initial capacity is inside the ultimate plan. Early 2028 power delivery remains a forecast. The water-efficiency benchmark is not measured consumption, and the wider technology zone is not the owned campus. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia","host":"edgecore.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.4735,"lng":-77.96,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"EdgeCore announces a 120-acre Culpeper purchase, initially 216 MW of critical IT and potential expansion to 432 MW.","independently_verified_current_operating_status":null,"planned_initial_critical_it_mw":216,"potential_critical_it_mw":432,"planned_initial_power_delivery":"early 2028"},"notes":["Initial capacity is inside the ultimate plan. Early 2028 power delivery remains a forecast. The water-efficiency benchmark is not measured consumption, and the wider technology zone is not the owned campus.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia","host":"edgecore.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Culpeper · Culpeper · Source context reviewed"},{"id":"edgecore-shannon-hill-louisa-va","state":"va","kind":"facility","name":"EdgeCore Shannon Hill Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Louisa"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 2025 sale announcement, last updated July 3. Purchase price, prior public utilities, grants and debt are different transactions, not development capex or a current incentive award. Claimed WUE below .01 is a design benchmark, not measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.louisacounty.gov/CivicAlerts.aspx?AID=470","host":"louisacounty.gov","date":"2025-06-24","published":"2025-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.836,"lng":-77.988,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county_announced_sale_date":"2025-06-24","property_acres":697,"property_purchase_price_usd":42000000,"county_prior_utility_infrastructure_investment_usd":29500000,"county_prior_park_purchase_usd":2600000,"county_prior_park_purchase_year":2018},"notes":["2025 sale announcement, last updated July 3. Purchase price, prior public utilities, grants and debt are different transactions, not development capex or a current incentive award. Claimed WUE below .01 is a design benchmark, not measured water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.louisacounty.gov/CivicAlerts.aspx?AID=470","host":"louisacounty.gov","date":"2025-06-24","published":"2025-06-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisa · Source context reviewed"},{"id":"equinix-ashburn-va","state":"va","kind":"facility","name":"Equinix Ashburn Campus (DC1-DC15)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. regional hub, not one Ashburn facility. WashingtonDCmarket page covers multiple Ashburn-area IBX facilities. Resolve specific building before assigning address, MW, area or current operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0437,"lng":-77.4875,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"regional hub, not one Ashburn facility","fields":{},"notes":["WashingtonDCmarket page covers multiple Ashburn-area IBX facilities. Resolve specific building before assigning address, MW, area or current operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"equinix-dc2-va","state":"va","kind":"facility","name":"Equinix DC2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc2","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0163894,"lng":-77.4590691,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"21715 Filigree Court Ashburn, VA 20147","colocation_area_sqft":118446},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc2","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"equinix-dc3-va","state":"va","kind":"facility","name":"Equinix DC3","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named source. Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc3","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0220154,"lng":-77.460235,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"published_address":"44470 Chilum Place Ashburn, VA 20147","colocation_area_sqft":67038},"notes":["Space is explicitly colocation area, not the whole building. No site MW is inferred from N+1/2N power redundancy, cooling capacity or floor-load rating. Operator specification is not independent current-occupancy verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc3","host":"equinix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"emerald-lakes-etheridge-lakes-data-center-chesapeake-va","state":"va","kind":"facility","name":"Etheridge Lakes Data Center (Great Bridge)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesapeake (independent city)"],"city":"Chesapeake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.. ApplicationPLN-REZ-2025-002 names EtheridgeLakes/EmeraldLakeEstatesIInc and proposedA1→M1rezone of22.612acres inFentressoverlay, southwestEtheridgeManorBlvd/CentervilleTurnpike, parcel0610000000991. RecordstatusResubmittalReceived is not approvedrezone. 349458sfproposedDC +35316sfHVAC/generators =384774sftotalfootprint asapplicationstates; those are proposedarea scopes, not ITfloororMW.26.3123aclegaldescription and22.612acrezonepart differ; exactscope notcollapsed. Owner/agentmailing addresses are notfacilitystreetaddress. Application expressly calls conceptualexhibit illustrative, vestingnorights. PDFpage7 is a PRIVATE CORPORATE DIRECTORS resolution signedDecember20,2024 authorizing applicant representation ofrelatedPLN-USE-2024-054CommercePark application, not CityCouncil approval. Page18title-company signatory is not adoptedzoning. No current vote/CO/power contract evidenced bythese pages. Not whole record/current operating census, legal compliance or independent meter certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cityofchesapeake.net/DocumentCenter/View/23727/PLN-REZ-2025-002---Etheridge-Lakes-Data-Centerpdf","host":"cityofchesapeake.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.68061281906499,"lng":-76.18817902157426,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-originals-model-and-approval-stages-round55-2026-10-15.json","scope":"Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.","fields":{},"notes":["ApplicationPLN-REZ-2025-002 names EtheridgeLakes/EmeraldLakeEstatesIInc and proposedA1→M1rezone of22.612acres inFentressoverlay, southwestEtheridgeManorBlvd/CentervilleTurnpike, parcel0610000000991. RecordstatusResubmittalReceived is not approvedrezone.","349458sfproposedDC +35316sfHVAC/generators =384774sftotalfootprint asapplicationstates; those are proposedarea scopes, not ITfloororMW.26.3123aclegaldescription and22.612acrezonepart differ; exactscope notcollapsed.","Owner/agentmailing addresses are notfacilitystreetaddress. Application expressly calls conceptualexhibit illustrative, vestingnorights.","PDFpage7 is a PRIVATE CORPORATE DIRECTORS resolution signedDecember20,2024 authorizing applicant representation ofrelatedPLN-USE-2024-054CommercePark application, not CityCouncil approval. Page18title-company signatory is not adoptedzoning. No current vote/CO/power contract evidenced bythese pages.","Not whole record/current operating census, legal compliance or independent meter certification."],"sources":[{"url":"https://www.cityofchesapeake.net/DocumentCenter/View/23727/PLN-REZ-2025-002---Etheridge-Lakes-Data-Centerpdf","host":"cityofchesapeake.net","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chesapeake · Chesapeake (independent city) · Source context reviewed"},{"id":"flexential-richmond-ric01-02-va","state":"va","kind":"facility","name":"Flexential Richmond (RIC01/02)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Henrico"],"city":"Richmond","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.6468902,"lng":-77.4386952,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Richmond (RIC01/02)","publisher_reported_footprint_sqft":28594,"publisher_reported_critical_power_mw":2.8,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Richmond · Henrico · Source context reviewed"},{"id":"corscale-gainesville-crossing-va","state":"va","kind":"facility","name":"Gainesville Crossing Digital Campus (GCDC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. AffiniusCapital original projectpage identifies GainesvilleCrossingGCDC withCorscale.130acres/fivebuildings/326MWFULLBUILDOUTpower have unspecifiedITbasis, not commissionedcriticalIT. Header1,020kRSF is rentable area, not automaticallygrosssitebuildingarea. Developer saysBuilding1stabilized andBuildings1 to 3fullyleased, but lease/stabilization isnot independentmeteredoperation. Buildings2Q22026/3Q32026completion and4 to 5Q22026construction are undated-page targets; datespassingnotobservedcompletion. Introone-on-sitesubstation vs featurestwo-on-sitesubstations is internal scope/versionconflict. LEEDanticipated/WUE-PUEclaims notcertifiedmeasurements; no regiondevoidofnaturaldisastersclaim adopted. GCDC isnotPWCDigitalGateway; unrelatedwithdrawalheadline doesnotcancelthiscampus. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://affiniuscapital.com/projects/gcdc/","host":"affiniuscapital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.78,"lng":-77.62,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["AffiniusCapital original projectpage identifies GainesvilleCrossingGCDC withCorscale.130acres/fivebuildings/326MWFULLBUILDOUTpower have unspecifiedITbasis, not commissionedcriticalIT. Header1,020kRSF is rentable area, not automaticallygrosssitebuildingarea.","Developer saysBuilding1stabilized andBuildings1 to 3fullyleased, but lease/stabilization isnot independentmeteredoperation. Buildings2Q22026/3Q32026completion and4 to 5Q22026construction are undated-page targets; datespassingnotobservedcompletion. Introone-on-sitesubstation vs featurestwo-on-sitesubstations is internal scope/versionconflict. LEEDanticipated/WUE-PUEclaims notcertifiedmeasurements; no regiondevoidofnaturaldisastersclaim adopted. GCDC isnotPWCDigitalGateway; unrelatedwithdrawalheadline doesnotcancelthiscampus.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://affiniuscapital.com/projects/gcdc/","host":"affiniuscapital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Gainesville · Prince William · Source context reviewed"},{"id":"google-botetourt-greenfield-va","state":"va","kind":"facility","name":"Google Botetourt Center at Greenfield Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Botetourt"],"city":"Daleville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County photos and grading information support physical site work, not commissioned operation. Land purchase and county contribution are separate transactions, not total data-center capital investment. No opening date established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.botetourtva.gov/1021/Google-Data-Center","host":"botetourtva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.42,"lng":-79.89,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county_construction_photo_date":"2026-10-09","grading_application_month":"2026-02","land_purchase_month":"2025-06","land_purchase_price_usd":14055406.37,"county_project_contribution_usd":4000000},"notes":["County photos and grading information support physical site work, not commissioned operation. Land purchase and county contribution are separate transactions, not total data-center capital investment. No opening date established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.botetourtva.gov/1021/Google-Data-Center","host":"botetourtva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Daleville · Botetourt · Source context reviewed"},{"id":"google-loch-midlothian-va","state":"va","kind":"facility","name":"Google Project Loch","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Midlothian","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County article is about Bermuda Hundred, whereas this imported identifier suggests a Loch/Midlothian project. Resolve identity before merging. Virginia investment is regional, not this single campus; separate 200 MW fusion purchase is not facility load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.chesterfield.gov/m/newsflash/Home/Detail/6383","host":"chesterfield.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.454,"lng":-77.71,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county_reported_status_event":"Google has broken ground at Bermuda Hundred site","site_acres_lower_bound":300,"regional_virginia_investment_usd":9000000000,"regional_investment_target_end_year":2026},"notes":["County article is about Bermuda Hundred, whereas this imported identifier suggests a Loch/Midlothian project. Resolve identity before merging. Virginia investment is regional, not this single campus; separate 200 MW fusion purchase is not facility load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.chesterfield.gov/m/newsflash/Home/Detail/6383","host":"chesterfield.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Midlothian · Chesterfield · Source context reviewed"},{"id":"jk-land-greenlin-park-leesburg-va","state":"va","kind":"facility","name":"Greenlin Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Leesburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. LoudounNow HannaPampaloni February20,2025 originalreport describesGreenlinPark Feb19supervisors5 to 4REZONING on83acres for1.4Msfdata-center/substationuse. Threeconceptswithtwo/three/fourbuildings are ALTERNATIVES withsameFAR, notninebuildings. Approvedrezoning notallpermits orenergizedcampus. 300MWlimit forfiveyears is reportedDEMANDceiling, notcurrentIT/certifiedservice. Three-yearenergyreporting,55ftheight,screening/noise/stormwater/waterconditions are reportedproffers, notactualcompliance. Exactmeaning/startdates require signedinstrument. Officialcomments aboutlegalauthority notindependentcurrentlegalanalysis. Publiccomments/newsletter UI untrusted, noformsubmission orpermissiontoeditinferred. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.loudounnow.com/news/300-mw-data-center-approved-south-of-leesburg/article_31050264-efb4-11ef-a1fa-c79d17f045f1.html","host":"loudounnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.064,"lng":-77.524,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["LoudounNow HannaPampaloni February20,2025 originalreport describesGreenlinPark Feb19supervisors5 to 4REZONING on83acres for1.4Msfdata-center/substationuse. Threeconceptswithtwo/three/fourbuildings are ALTERNATIVES withsameFAR, notninebuildings. Approvedrezoning notallpermits orenergizedcampus.","300MWlimit forfiveyears is reportedDEMANDceiling, notcurrentIT/certifiedservice. Three-yearenergyreporting,55ftheight,screening/noise/stormwater/waterconditions are reportedproffers, notactualcompliance. Exactmeaning/startdates require signedinstrument. Officialcomments aboutlegalauthority notindependentcurrentlegalanalysis. Publiccomments/newsletter UI untrusted, noformsubmission orpermissiontoeditinferred.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.loudounnow.com/news/300-mw-data-center-approved-south-of-leesburg/article_31050264-efb4-11ef-a1fa-c79d17f045f1.html","host":"loudounnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Leesburg · Loudoun · Source context reviewed"},{"id":"hunters-ridge-south-data-center-campus-spotsylvania-va","state":"va","kind":"facility","name":"Hunters Ridge South Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Spotsylvania","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. FredericksburgFreePress August27,2025 original report says previousTuesday supervisors5 to 2approved HuntersRidgeSouth REZONING; proposedmaximum2.2Msf atCosnerDrive. Publisheddate isnotautomaticallyvotedate (TuesdaywasAugust26). Underlyingsignedminutes/proffers unread, so exactvote date notcertified fromthispass. Reported1600ftnearesthome/roadconstruction/$100kCTE/nopotablewaterproffers are commitments, notasbuiltsetbacks/paidfunds/measuredzero use. Countywide$930Minfrastructurefigure isnotHRS-specificcapex orpaidamount. Sep23jointsession scheduled, notobservedoutcome. UnrelatedHOAbond/$400k/$1.3Mdiscussion isdifferentpropertyissue, notcampusincentive. Finalpermits/CO/ITMWnotestablished. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fredericksburgfreepress.com/2025/08/27/spotsylvania-board-of-supervisors-approve-potential-2-2-million-square-foot-data-center-campus/","host":"fredericksburgfreepress.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.213,"lng":-77.482,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["FredericksburgFreePress August27,2025 original report says previousTuesday supervisors5 to 2approved HuntersRidgeSouth REZONING; proposedmaximum2.2Msf atCosnerDrive. Publisheddate isnotautomaticallyvotedate (TuesdaywasAugust26). Underlyingsignedminutes/proffers unread, so exactvote date notcertified fromthispass.","Reported1600ftnearesthome/roadconstruction/$100kCTE/nopotablewaterproffers are commitments, notasbuiltsetbacks/paidfunds/measuredzero use. Countywide$930Minfrastructurefigure isnotHRS-specificcapex orpaidamount. Sep23jointsession scheduled, notobservedoutcome. UnrelatedHOAbond/$400k/$1.3Mdiscussion isdifferentpropertyissue, notcampusincentive. Finalpermits/CO/ITMWnotestablished.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.fredericksburgfreepress.com/2025/08/27/spotsylvania-board-of-supervisors-approve-potential-2-2-million-square-foot-data-center-campus/","host":"fredericksburgfreepress.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spotsylvania · Spotsylvania · Source context reviewed"},{"id":"hhhunt-hunting-hawk-technology-park-hanover-va","state":"va","kind":"facility","name":"Hunting Hawk Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hanover"],"city":"Glen Allen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. 468-acre, ten-building scheme and annual tax estimates were forecasts. Exact filing receipt and later replacement not independently retained. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/developer-withdraws-hanover-data-center-campus-proposal/","host":"virginiabusiness.com","date":"2026-01-29","published":"2026-01-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.657,"lng":-77.626,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-application-withdrawn","reported_finding":"Virginia Business reports HHHunt withdrew Hunting Hawk rezoning application, announced to supervisors after planning denial recommendation.","report_display_date":"2026-01-29","independently_verified_current_status":null},"notes":["468-acre, ten-building scheme and annual tax estimates were forecasts. Exact filing receipt and later replacement not independently retained.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/developer-withdraws-hanover-data-center-campus-proposal/","host":"virginiabusiness.com","date":"2026-01-29","published":"2026-01-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Glen Allen · Hanover · Source context reviewed"},{"id":"westdulles-iron-horse-hanover-va","state":"va","kind":"facility","name":"Iron Horse Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hanover"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Deferral is not denial or approval.2024 TownofAshland approval andHanover denial concern different jurisdictions/earlier plan; do not merge them into one current approval. Proposed 75-footheight is a requested allowance, not built condition. Other MountainRoad denial/HickoryHill approval are separate projects. Resident emissions/well-impact concerns are not measured findings. NoMW, issued utility service, current construction or laterJulyoutcome adopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/","host":"12onyourside.com","date":"2026-06-19","published":"2026-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.762,"lng":-77.44,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"WWBT reports developer-requested deferral of IronHorse’s revised 78-acre Hanover rezoning/height request, with a July 16 planning hearing expected.","independently_verified_current_operating_status":null},"notes":["Deferral is not denial or approval.2024 TownofAshland approval andHanover denial concern different jurisdictions/earlier plan; do not merge them into one current approval. Proposed 75-footheight is a requested allowance, not built condition. Other MountainRoad denial/HickoryHill approval are separate projects. Resident emissions/well-impact concerns are not measured findings. NoMW, issued utility service, current construction or laterJulyoutcome adopted.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/","host":"12onyourside.com","date":"2026-06-19","published":"2026-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hanover · Source context reviewed"},{"id":"green-energy-ventures-king-george-technology-center-va","state":"va","kind":"facility","name":"King George Technology Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["King George"],"city":"King George","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. conditional KingGeorge proffer statement,notapproved construction. Conditionalvoluntaryproffersapplyonlyifrezoningapprovedasrequestedandappealperiodrequirementsmet; thiscopydoesnotproveapprovalorexecution.6.5Mfullmaximumincludes2.5Mphase1,not9M. Infrastructure/publicfacilitiesexcludedfromdatacenterareacap. ApplicantChantillymailingaddressnotcampus. FilenameSeptember26notdocumentSeptember29date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kinggeorgecountyva.gov/DocumentCenter/View/24172/92625-Proffers-Revised-after-Supervisor-Meeting-Clean---GEV","host":"kinggeorgecountyva.gov","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.250254083928,"lng":-77.29011580291154,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"conditional KingGeorge proffer statement,notapproved construction","fields":{"proffer_document_date":"2025-09-29","applicant":"GreenEnergyVenturesLLC","project_name":"KingGeorgeTechnologyCenter","published_tax_parcels":["21-49","21-73","22-46A","21-49A"],"proposed_data_center_building_area_sqft_max":6500000,"proposed_phase1_data_center_area_sqft_max":2500000},"notes":["Conditionalvoluntaryproffersapplyonlyifrezoningapprovedasrequestedandappealperiodrequirementsmet; thiscopydoesnotproveapprovalorexecution.6.5Mfullmaximumincludes2.5Mphase1,not9M. Infrastructure/publicfacilitiesexcludedfromdatacenterareacap. ApplicantChantillymailingaddressnotcampus. FilenameSeptember26notdocumentSeptember29date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kinggeorgecountyva.gov/DocumentCenter/View/24172/92625-Proffers-Revised-after-Supervisor-Meeting-Clean---GEV","host":"kinggeorgecountyva.gov","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"King George · King George · Source context reviewed"},{"id":"aws-lake-anna-technology-campus-louisa-va","state":"va","kind":"facility","name":"Lake Anna Technology Campus (LATC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Louisa"],"city":"Louisa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.04763641638,"lng":-77.81682351474,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisa · Louisa · Source context reviewed"},{"id":"lavue-massaponax-tech-campus-spotsylvania-va","state":"va","kind":"facility","name":"Massaponax Tech Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Massaponax","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Massaponax official case index. Application-materials index not final vote, all permits or MW. Linked proffers/GDP/TIA not read through this landing page. County contact headquarters is not campus address. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/3138/R25-0004-Massaponax-Tech-Campus","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.1869,"lng":-77.5505,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Massaponax official case index","fields":{"government_case":"R25-0004","project_name":"Massaponax Tech Campus","government_indexed_submission":"4th submission","county":"Spotsylvania, Virginia"},"notes":["Application-materials index not final vote, all permits or MW. Linked proffers/GDP/TIA not read through this landing page. County contact headquarters is not campus address.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/3138/R25-0004-Massaponax-Tech-Campus","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massaponax · Spotsylvania · Source context reviewed"},{"id":"menlo-digital-jamestown-drive-petersburg-va","state":"va","kind":"facility","name":"Menlo Digital Richmond Virginia Data Center (Jamestown Drive)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Petersburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The substation and proposed computing figures are different bases, not 404 MW. By-right zoning is not all approvals, construction or commissioning. Later round-twenty-four reporting on abandoned Project Flash talks takes precedence over this story's earlier regional discussion. State-law, tax and statewide-moratorium assertions are not adopted without original legislation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterfrontier.com/site-selection/article/55395571/navigating-virginias-data-center-boom-policy-shifts-local-projects-and-future-challenges","host":"datacenterfrontier.com","date":"2026-08-05","published":"2026-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.199,"lng":-77.363,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Data Center Frontier describes Menlo Digital's proposed four-building campus on 74 acres at 2255 Jamestown Drive, with 104 MW planned through a 300 MW substation.","independently_verified_current_operating_status":null},"notes":["The substation and proposed computing figures are different bases, not 404 MW. By-right zoning is not all approvals, construction or commissioning. Later round-twenty-four reporting on abandoned Project Flash talks takes precedence over this story's earlier regional discussion. State-law, tax and statewide-moratorium assertions are not adopted without original legislation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterfrontier.com/site-selection/article/55395571/navigating-virginias-data-center-boom-policy-shifts-local-projects-and-future-challenges","host":"datacenterfrontier.com","date":"2026-08-05","published":"2026-08-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Petersburg · Source context reviewed"},{"id":"microsoft-boydton-bn-campus-mecklenburg-va","state":"va","kind":"facility","name":"Microsoft Boydton Campus (BN / Azure East US)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mecklenburg"],"city":"Boydton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Source is SouthernVirginia regional fact sheet, not BN-only equipment or staffing. Upload path2021/11 does not independently prove publication day. Renewable-contract MW is not site IT demand, nor proof of hourly carbon-free operation. Water use below5% of year describes cooling use timing, not water volume. Generic no-noise/no-traffic and compliance statements are operator claims, not measured receptors, enforcement records or independent approvals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/wp-content/uploads/2021/11/Boydton-datacenter-fact-sheet.pdf","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.65969,"lng":-78.36487,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round16-2026-10-14.json","scope":"Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.","fields":{"regional_12_month_weighted_pue":1.147,"pue_period_end":"2021-07","regional_operations_staff_scope":"More than505 full-time employees and contractors across SouthernVirginia campuses, historical brochure.","regional_renewable_asset_contract_mw":[576,315],"current_site_it_mw":null},"notes":["Source is SouthernVirginia regional fact sheet, not BN-only equipment or staffing. Upload path2021/11 does not independently prove publication day.","Renewable-contract MW is not site IT demand, nor proof of hourly carbon-free operation. Water use below5% of year describes cooling use timing, not water volume.","Generic no-noise/no-traffic and compliance statements are operator claims, not measured receptors, enforcement records or independent approvals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/wp-content/uploads/2021/11/Boydton-datacenter-fact-sheet.pdf","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Boydton · Mecklenburg · Source context reviewed"},{"id":"dp-facilities-mineral-gap-wise-va","state":"va","kind":"facility","name":"Mineral Gap Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wise"],"city":"Wise","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wise County operating-facility account versus regional energy prospects. Solar generation capacity is not critical IT. Economic-development Tier III description is not independent certification inspection. Mine-water savings exceeding 1M annually are feasibility estimates for regional prospects, not measured Mineral Gap savings. SMR exploration is not an approved operating reactor. Published equipment tax and workforce comparisons need dated legal/statistical sources before comparative rankings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Solar-generation rating not facility IT; ProjectOasis feasibility/SMR potential not commissioned campus. WiseInnovationHub not named; no manual credit for that ID. Tax incentives listed are eligibility, not awarded funding. Subsequent original decisions and current operator disclosures take precedence.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://elevatewisecounty.com/top-industries/data-centers/","host":"elevatewisecounty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.987,"lng":-82.53,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Wise County operating-facility account versus regional energy prospects","fields":{"publisher":"Wise County Economic Development","facility":"Mineral Gap","locality":"Lonesome Pine Business and Technology Park, Wise County, Virginia","reported_established_year":2017,"reported_employees_min_exclusive":20,"behind_meter_solar_mw":3.6,"solar_service_year":2023},"notes":["Solar generation capacity is not critical IT. Economic-development Tier III description is not independent certification inspection. Mine-water savings exceeding 1M annually are feasibility estimates for regional prospects, not measured Mineral Gap savings. SMR exploration is not an approved operating reactor. Published equipment tax and workforce comparisons need dated legal/statistical sources before comparative rankings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://elevatewisecounty.com/top-industries/data-centers/","host":"elevatewisecounty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Wise County economic-development page names MineralGap,2017establishment and3.6MWsolar array.","independently_verified_current_operating_status":null},"notes":["Solar-generation rating not facility IT; ProjectOasis feasibility/SMR potential not commissioned campus. WiseInnovationHub not named; no manual credit for that ID. Tax incentives listed are eligibility, not awarded funding.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://elevatewisecounty.com/top-industries/data-centers/","host":"elevatewisecounty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wise · Wise · Source context reviewed"},{"id":"tract-mountain-road-technology-park-hanover-va","state":"va","kind":"facility","name":"Mountain Road Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hanover"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. VPM LyndonGerman June1,2026 updatedJune3 reportsHanover4 to 3REJECTIONofMountainRoadTractrezoning, distinctfromAprilplanningrecommendation.427acresvsWTVRnearly430roundedscopes; noadditionalcampus. NewsrelativeWednesdayconsistentMay27butoriginalvoteminutesnotread; exactdaykeptuncertified. OtherHHHuntwithdrawal/differentTractAshland/Goochlandprojectsnotthisdenial. 600kgal/daywater and901Mtax2025 to 2044/350direct1100constructjobs are FORECASTSofrejectedproposal. $15Mwaterinfra/$6Mland-recreation are commitmentsnotverifiedpayments. First2029/full2036targets notactualopenings. Sourceprints900MWperday, a dimensionaluniterror; do notnormalizeintomeasuredMW/MWhorIT. Reporter/residentviewsremainattributed, notindependentlyprovenfutureharm/countywideban. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification. WTVR KelseyJones/CameronThompson originalreport corroborates4 to 3HanoverdenialWednesdaynight; metadataMay28,2026publication00:13EDT,notautomaticallyvoteday. Proposed430acres/$900M20yrtax/~1000constructionjobs are roundedforecastsofthefailedproposal, notactualspending/payments. Commitments towaterupgrades/noisestudies notperformanceproof. NewsroombodydisclosesAI-assistedplatformconversion; originaljournalistreportstillattributed. PlannedJune78acreBeaverdamcase andapprovedAshlandcampusseparate; currentcountyban notshown.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.vpm.org/news/2026-06-01/hanover-mountain-road-data-center-tract-davis-prichard-kirchner-dibble","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.wtvr.com/news/local-news/hanover-county/tract-data-center-vote-may-28-2026","host":"wtvr.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.693493,"lng":-77.53629,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["VPM LyndonGerman June1,2026 updatedJune3 reportsHanover4 to 3REJECTIONofMountainRoadTractrezoning, distinctfromAprilplanningrecommendation.427acresvsWTVRnearly430roundedscopes; noadditionalcampus. NewsrelativeWednesdayconsistentMay27butoriginalvoteminutesnotread; exactdaykeptuncertified. OtherHHHuntwithdrawal/differentTractAshland/Goochlandprojectsnotthisdenial.","600kgal/daywater and901Mtax2025 to 2044/350direct1100constructjobs are FORECASTSofrejectedproposal. $15Mwaterinfra/$6Mland-recreation are commitmentsnotverifiedpayments. First2029/full2036targets notactualopenings. Sourceprints900MWperday, a dimensionaluniterror; do notnormalizeintomeasuredMW/MWhorIT. Reporter/residentviewsremainattributed, notindependentlyprovenfutureharm/countywideban.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.vpm.org/news/2026-06-01/hanover-mountain-road-data-center-tract-davis-prichard-kirchner-dibble","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["WTVR KelseyJones/CameronThompson originalreport corroborates4 to 3HanoverdenialWednesdaynight; metadataMay28,2026publication00:13EDT,notautomaticallyvoteday. Proposed430acres/$900M20yrtax/~1000constructionjobs are roundedforecastsofthefailedproposal, notactualspending/payments. Commitments towaterupgrades/noisestudies notperformanceproof. NewsroombodydisclosesAI-assistedplatformconversion; originaljournalistreportstillattributed. PlannedJune78acreBeaverdamcase andapprovedAshlandcampusseparate; currentcountyban notshown.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.wtvr.com/news/local-news/hanover-county/tract-data-center-vote-may-28-2026","host":"wtvr.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hanover · Source context reviewed"},{"id":"aws-north-creek-technology-campus-louisa-va","state":"va","kind":"facility","name":"North Creek Technology Campus (NCTC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Louisa"],"city":"Louisa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.999666431819,"lng":-77.967415971191,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Louisa · Louisa · Source context reviewed"},{"id":"ntt-ashburn-va1-data-center-va","state":"va","kind":"facility","name":"NTT Ashburn VA1 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. Floor hold:64,723 sq ft headline differs from sum72,251 sq ft of five labelled vault areas on PDF page 3. Layout may use another area definition; no single exact floor adopted. 224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/5216f5e0538b4fcfb6d47b2f299eb4db?v=89987bc7","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0227436,"lng":-77.4548911,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":12.6,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":null,"operator_published_address":"44664 Guilford Drive, Ashburn, VA 20147","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","Floor hold:64,723 sq ft headline differs from sum72,251 sq ft of five labelled vault areas on PDF page 3. Layout may use another area definition; no single exact floor adopted.","224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/5216f5e0538b4fcfb6d47b2f299eb4db?v=89987bc7","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"ntt-ashburn-va2-data-center-va","state":"va","kind":"facility","name":"NTT Ashburn VA2 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. 224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-2-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0250127,"lng":-77.4576402,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":14,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":70000,"operator_published_address":"44610 Guilford Drive, Ashburn, VA 20147","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-2-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"ntt-ashburn-va5-data-center-va","state":"va","kind":"facility","name":"NTT Ashburn VA5 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. 224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-5-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/0ed79ad4657c4583816795ff57bfcbd5?v=c95af5b7","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0183033,"lng":-77.472611,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":32,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":140000,"operator_published_address":"21583 Megawatt Drive, Ashburn, VA 20147","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-5-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/0ed79ad4657c4583816795ff57bfcbd5?v=c95af5b7","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"ntt-ashburn-va7-data-center-va","state":"va","kind":"facility","name":"NTT Ashburn VA7 Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.. Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount. 224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va7-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/8cad209e9bd54778a6be6a8b8e5f8f40?v=889fd74f","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0160142,"lng":-77.471954,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round19-2026-10-14.json","scope":"Named operator facility specification, not current metered demand, permit, parcel survey or whole-record certification.","fields":{"operator_critical_it_capacity_mw":36,"power_basis":"Explicit operator critical IT load capacity, not actual used MW or energy.","publisher_advertised_data_floor_sqft":125000,"operator_published_address":"44371 Gigabit Plaza, Ashburn, VA 20147","actual_commissioning_date":null,"current_metered_demand_mw":null,"exact_parcel_or_coordinate_verified":false},"notes":["Undated HTML plus currently linked datasheet. Copyright 2023/2025 is not an exact publication day. Operator capacity is not an independently metered load or available-to-lease amount.","224 MW refers to full campus build-out across multiple centers, not an additional load at this building. Old and new PDF descriptions of number built/planned are different vintages.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va7-data-center","host":"services.global.ntt","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://dam.nttdata.com/api/public/content/8cad209e9bd54778a6be6a8b8e5f8f40?v=889fd74f","host":"dam.nttdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"nuvu-county-drive-petersburg-va","state":"va","kind":"facility","name":"NuVu County Drive Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Petersburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public excerpt was read; the full linked report was not. A stated 300 MW basis is unspecified and not commissioning. By-right treatment is not all permits, executed utility service or current construction. No exact approval day inferred from weeks-after wording; other Petersburg projects remain separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wtvr.com/news/local-news/tri-cities/data-center-projects-july-21-2026","host":"wtvr.com","date":"2026-07-21","published":"2026-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.193,"lng":-77.376,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WTVR's Richmond BizSense excerpt reports NuVu's first Petersburg site-plan approval in the weeks after a January announcement, on a roughly 75-acre County Drive property.","independently_verified_current_operating_status":null},"notes":["Only the public excerpt was read; the full linked report was not. A stated 300 MW basis is unspecified and not commissioning. By-right treatment is not all permits, executed utility service or current construction. No exact approval day inferred from weeks-after wording; other Petersburg projects remain separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wtvr.com/news/local-news/tri-cities/data-center-projects-july-21-2026","host":"wtvr.com","date":"2026-07-21","published":"2026-07-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Petersburg · Source context reviewed"},{"id":"eagle-rock-pairmont-data-center-campus-spotsylvania-va","state":"va","kind":"facility","name":"Pairmont Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Pairmont official case identity and document index. Index links sound, fiscal and hydrogeology studies but their contents not read in this source. Case page is application-materials index, not final rezoning vote, numeric power or building permit. Filename dates not event dates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/3137/R25-0014-Pairmont-Data-Center-Campus","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.1791903850787,"lng":-77.44283210846356,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Pairmont official case identity and document index","fields":{"government_case":"R25-0014","project_name":"Pairmont Data Center Campus","government_indexed_submission":"3rd submission","county":"Spotsylvania, Virginia"},"notes":["Index links sound, fiscal and hydrogeology studies but their contents not read in this source. Case page is application-materials index, not final rezoning vote, numeric power or building permit. Filename dates not event dates.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/3137/R25-0014-Pairmont-Data-Center-Campus","host":"spotsylvania.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spotsylvania · Source context reviewed"},{"id":"amazon-potomac-church-fredericksburg-va","state":"va","kind":"facility","name":"Potomac Church Technology Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stafford"],"city":"Fredericksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.staffordcountyva.gov","host":"staffordcountyva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.411322338680904,"lng":-77.4042471172777,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.staffordcountyva.gov","host":"staffordcountyva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Fredericksburg · Stafford · Source context reviewed"},{"id":"powerhouse-95-spotsylvania-va","state":"va","kind":"facility","name":"PowerHouse 95","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Spotsylvania","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. PowerHouse hosts a DCD article republication; ReadMore points to the original DCD story. Distinguish operator-hosted reporting from a new issuer announcement. Page has no explicit article date; October2025 target is historical, not upcoming from October2026. Named PowerHouse95/PH95North campus: reported completed145acre purchase and construction start, up to800MW ACROSS THREE SUBSTATIONS and up toeight three-story buildings/3.5Msf planned. First300MW substation was TARGETED October2025; actual delivery not established. No criticalIT basis, executed service agreement or current ready-for-service established. The separate SpotsyTechno/Tributary and Amazon/HuntersRidge references are other projects; do not transfer their approvals, SCC delivery terms or capacities to PowerHouse95. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.17,"lng":-77.66,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["PowerHouse hosts a DCD article republication; ReadMore points to the original DCD story. Distinguish operator-hosted reporting from a new issuer announcement. Page has no explicit article date; October2025 target is historical, not upcoming from October2026.","Named PowerHouse95/PH95North campus: reported completed145acre purchase and construction start, up to800MW ACROSS THREE SUBSTATIONS and up toeight three-story buildings/3.5Msf planned. First300MW substation was TARGETED October2025; actual delivery not established.","No criticalIT basis, executed service agreement or current ready-for-service established. The separate SpotsyTechno/Tributary and Amazon/HuntersRidge references are other projects; do not transfer their approvals, SCC delivery terms or capacities to PowerHouse95.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spotsylvania · Spotsylvania · Source context reviewed"},{"id":"powerhouse-abx-1-va","state":"va","kind":"facility","name":"PowerHouse ABX-1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. PowerHouse ABX-1 delivered shell and later sale. 60MWmaximumutilitynotcriticalIToractualconsumption. Developablearea notallraisedfloor/tenantITspace. Shell/powerdeliverynotexactcustomeroperationalopeningday. Pagehasnoexactstreetmunicipalityinsavedbody;ABXcodealoneinsufficientparcel. No deed/salepriceorenergizedITcertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-abx-1","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0195992,"lng":-77.4504568,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"PowerHouse ABX-1 delivered shell and later sale","fields":{"developer":"PowerHouse","project":"ABX-1","site_acres":10,"developable_sqft":265850,"buildings":1,"stories":2,"maximum_utility_capacity_mw":60,"developer_reported_delivery_month":"2023-10","developer_reported_sale_quarter":"2024-Q4","developer_described_power_delivery":"complete"},"notes":["60MWmaximumutilitynotcriticalIToractualconsumption. Developablearea notallraisedfloor/tenantITspace. Shell/powerdeliverynotexactcustomeroperationalopeningday. Pagehasnoexactstreetmunicipalityinsavedbody;ABXcodealoneinsufficientparcel. No deed/salepriceorenergizedITcertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-abx-1","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"powerhouse-ctp-02-va","state":"va","kind":"facility","name":"PowerHouse CTP-02","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Chester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.360586,"lng":-77.3256869,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chester · Chesterfield · Source context reviewed"},{"id":"prince-william-digital-gateway-va","state":"va","kind":"facility","name":"Prince William Digital Gateway","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Original court docket and withdrawal instrument not retained. Reported developer termination supported, but no general county ban or cancellation of unrelated Dulles South inferred. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","host":"wtop.com","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.8,"lng":-77.68,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"final-developer-appeal-withdrawal-reported","reported_finding":"InsideNoVa reporting via WTOP says QTS withdrew Supreme Court challenge and terminated Digital Gateway project after prior approvals were voided.","report_display_date":"2026-07-02","independently_verified_current_status":null},"notes":["Original court docket and withdrawal instrument not retained. Reported developer termination supported, but no general county ban or cancellation of unrelated Dulles South inferred.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","host":"wtop.com","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Gainesville · Prince William · Source context reviewed"},{"id":"crusoe-project-flash-franklin-va","state":"va","kind":"facility","name":"Project Flash (Summit View Business Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Rocky Mount","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Body explicitly says no agreements or county votes occurred. Preserve abandoned-negotiations account, not formal Board denial or countywide ban. Headline overstates formal procedural evidence. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.smithmountaineagle.com/news/project-flash-initiative-shut-down-by-franklin-county-board-of-supervisors/article_27ab1925-77b5-428e-9a12-13ca0d2c3918.html","host":"smithmountaineagle.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":36.9979,"lng":-79.8922,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Smith Mountain Eagle quotes supervisor August16 announcement that Project Flash talks ended.","independently_verified_current_operating_status":null},"notes":["Body explicitly says no agreements or county votes occurred. Preserve abandoned-negotiations account, not formal Board denial or countywide ban. Headline overstates formal procedural evidence.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.smithmountaineagle.com/news/project-flash-initiative-shut-down-by-franklin-county-board-of-supervisors/article_27ab1925-77b5-428e-9a12-13ca0d2c3918.html","host":"smithmountaineagle.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Rocky Mount · Franklin · Source context reviewed"},{"id":"google-project-peanut-chester-va","state":"va","kind":"facility","name":"Project Peanut","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Chester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits. USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.34629075,"lng":-77.29960686,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits.","USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chester · Chesterfield · Source context reviewed"},{"id":"google-project-skye-midlothian-va","state":"va","kind":"facility","name":"Project Skye","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Chesterfield"],"city":"Midlothian","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits. USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.44741159,"lng":-77.77600992,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json","scope":"Original local reporting or attributed original syndication; project and regional groups separate.","fields":{},"notes":["VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits.","USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere.","No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."],"sources":[{"url":"https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons","host":"vpm.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Midlothian · Chesterfield · Source context reviewed"},{"id":"takanock-project-tallmadge-strasburg-va","state":"va","kind":"facility","name":"Project Tallmadge","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shenandoah"],"city":"Strasburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Expected mid 2025 site approval/May land purchase,late 2027 construction and 2030 completion were forecasts, not observed outcomes. Takanock is not necessarily the eventual builder/operator. Early 4000 gallons/day estimate and derived 1.46 million/year are the SAME scenario, not additive; statewide 6.7 million/year benchmark is not site usage. Hydrogen-ready describes future optional backup-turbine capability, not present hydrogen fuel or zero-emission generation. Near-waterless cooling is attributed planned design subject to eventual operator. No exact MW, issued air permit or signed power agreement verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nvdaily.com/nvdaily/strasburg-data-center-proposal-prompts-questions-on-water-use-hydrogen-oversight/article_de441640-97e6-528b-a0e8-74085176ceb3.html","host":"nvdaily.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.9893,"lng":-78.3589,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Northern Virginia Daily describes Takanock’s proposed 87-acre Strasburg land-entitlement project, expected to be sold to an unnamed future operator for a two-million-square-foot data center.","independently_verified_current_operating_status":null},"notes":["Expected mid 2025 site approval/May land purchase,late 2027 construction and 2030 completion were forecasts, not observed outcomes. Takanock is not necessarily the eventual builder/operator. Early 4000 gallons/day estimate and derived 1.46 million/year are the SAME scenario, not additive; statewide 6.7 million/year benchmark is not site usage. Hydrogen-ready describes future optional backup-turbine capability, not present hydrogen fuel or zero-emission generation. Near-waterless cooling is attributed planned design subject to eventual operator. No exact MW, issued air permit or signed power agreement verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nvdaily.com/nvdaily/strasburg-data-center-proposal-prompts-questions-on-water-use-hydrogen-oversight/article_de441640-97e6-528b-a0e8-74085176ceb3.html","host":"nvdaily.com","date":"2025-04-24","published":"2025-04-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Strasburg · Shenandoah · Source context reviewed"},{"id":"qts-ashburn-1-va","state":"va","kind":"facility","name":"QTS Ashburn 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated page still uses coming-online target and under-construction label after target quarter. No automatic commissioning inference; 55 MW headline should not be added again to the DC1 specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/ashburn-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9995277,"lng":-77.4501109,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":28,"dc1_critical_power_mw_lower_bound":55,"dc2_critical_power_mw_lower_bound":22.5,"dc2_target":"2026-Q2","dc1_address":"22271 Broderick Drive, Sterling, VA 20166","dc2_address":"22280 Randolph Drive, Sterling, VA 20166","dc2_operator_described_status":"under construction"},"notes":["Undated page still uses coming-online target and under-construction label after target quarter. No automatic commissioning inference; 55 MW headline should not be added again to the DC1 specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/ashburn-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sterling · Loudoun · Source context reviewed"},{"id":"qts-ashburn-2-ashburn-lockridge-va","state":"va","kind":"facility","name":"QTS Ashburn 2 (Ashburn-Lockridge)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Planned capacity wording is preserved, not labeled current operating consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/ashburn-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9959297,"lng":-77.4562445,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":24,"planned_capacity_mw_lower_bound":75,"power_basis":"current planned capacity; webpage does not separately define critical IT versus utility in this section"},"notes":["Planned capacity wording is preserved, not labeled current operating consumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/ashburn-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sterling · Loudoun · Source context reviewed"},{"id":"qts-richmond-1-dc1-ric1-white-oak-technology-park-va","state":"va","kind":"facility","name":"QTS Richmond 1 DC1 (RIC1, White Oak Technology Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Henrico"],"city":"Sandston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Values describe the Richmond 1 campus, not DC1 alone. Master planned six facilities does not establish all are built. DC1/DC2/DC3 share listed address, so address-based deduplication cannot collapse all buildings or multiply campus totals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/richmond-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.4892338,"lng":-77.2474761,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":207,"critical_campus_capacity_mw":238,"master_plan_facilities":6,"campus_current_space_sqft":2300000,"published_dc1_address":"6000 Technology Blvd, Sandston, VA 23150"},"notes":["Values describe the Richmond 1 campus, not DC1 alone. Master planned six facilities does not establish all are built. DC1/DC2/DC3 share listed address, so address-based deduplication cannot collapse all buildings or multiply campus totals.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/richmond-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sandston · Henrico · Source context reviewed"},{"id":"qts-white-oak-technology-park-ii-henrico-va","state":"va","kind":"facility","name":"QTS White Oak Technology Park II (RIC5)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Henrico"],"city":"Sandston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Approximately137millionUSD is land consideration, not construction spending. Seller-to-seller transactions and earlier18millionUSD purchases are not additive to that headline total. Existing adjacent White Oak campus, its expansion and network-access point are different. Regional housing fund is not a QTS-specific grant. Utility/infrastructure2026targets are not completed service or current IT. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/qts-finishes-purchase-of-rezoned-henrico-tech-park-land/","host":"virginiabusiness.com","date":"2024-07-19","published":"2024-07-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.49,"lng":-77.27,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Virginia Business reports QTS finished acquiring the roughly622-acre White Oak Technology ParkIIsite, with a June28remaining-land transaction and a May14rezoning.","independently_verified_current_operating_status":null},"notes":["Approximately137millionUSD is land consideration, not construction spending. Seller-to-seller transactions and earlier18millionUSD purchases are not additive to that headline total. Existing adjacent White Oak campus, its expansion and network-access point are different. Regional housing fund is not a QTS-specific grant. Utility/infrastructure2026targets are not completed service or current IT.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/qts-finishes-purchase-of-rezoned-henrico-tech-park-land/","host":"virginiabusiness.com","date":"2024-07-19","published":"2024-07-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sandston · Henrico · Source context reviewed"},{"id":"quantum-park-data-center-ashburn-loudoun-va","state":"va","kind":"facility","name":"Quantum Park Data Center Expansion","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.011,"lng":-77.464,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Piedmont Environmental Council discusses Cross Mill's rezoning and Quantum Park's future Loudoun decision while advocating a pause.","independently_verified_current_operating_status":null},"notes":["Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"pointone-remington-technology-park-fauquier-va","state":"va","kind":"facility","name":"Remington Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Remington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the caption and short public introduction were read. Encoded premium content was not decoded. No exact approval instrument, operator, specific power or 2026 construction is established from the preview. Other Remington proposals must not inherit this campus status. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fauquier.com/localnews/most-remington-data-center-projects-still-pending/article_1ac479e7-f4db-4446-840c-d633459584bf.html","host":"fauquier.com","date":"2026-02-25","published":"2026-02-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.53,"lng":-77.8,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Fauquier Times' public caption says Remington Technology Park was the one approved campus among five nearby proposals at that historical date.","independently_verified_current_operating_status":null},"notes":["Only the caption and short public introduction were read. Encoded premium content was not decoded. No exact approval instrument, operator, specific power or 2026 construction is established from the preview. Other Remington proposals must not inherit this campus status.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fauquier.com/localnews/most-remington-data-center-projects-still-pending/article_1ac479e7-f4db-4446-840c-d633459584bf.html","host":"fauquier.com","date":"2026-02-25","published":"2026-02-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Remington · Fauquier · Source context reviewed"},{"id":"sabey-intergate-ashburn-building-a-va","state":"va","kind":"facility","name":"Sabey Intergate.Ashburn (Building A)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. campus page with BuildingA future phase. Page also advertises85MWcampus capacity and70+MWaggregate delivered. These labels do not reconcile simply with36+54; preserve different scopes and do not sum or certify85MWIT. BuildingA2026target is not proof online. Virginia tax exemption marketing is not an individual award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sabeydatacenters.com/locations/ashburn-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0144996,"lng":-77.4799874,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"campus page with BuildingA future phase","fields":{"campus_acres":38,"campus_buildings":3,"completed_buildings_at_page":2,"completed_buildings_power_mw_min_exclusive":36,"building_a_leasable_power_mw":54,"building_a_online_earliest_target":"2026","campus_mission_critical_area_sqft":645000,"published_address":"21741 Red Rum Dr, Ashburn, VA20147"},"notes":["Page also advertises85MWcampus capacity and70+MWaggregate delivered. These labels do not reconcile simply with36+54; preserve different scopes and do not sum or certify85MWIT. BuildingA2026target is not proof online. Virginia tax exemption marketing is not an individual award.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sabeydatacenters.com/locations/ashburn-data-center","host":"sabeydatacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"solis-arx-progress-park-wythe-va","state":"va","kind":"facility","name":"Solis Arx Progress Park Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wythe"],"city":"Max Meadows","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wythe county SolisArx identity and Fluidstack update. Presentation about acquisition is not independently inspected executed closing document. Data-center-ready marketing of park for decade does not establish completed facility or critical IT service. No quantitative tax award, IT MW, actual capex or exact operations date adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wytheco.org/418/Solis-Arx","host":"wytheco.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.958,"lng":-80.899,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Wythe county SolisArx identity and Fluidstack update","fields":{"agency":"Wythe County, Virginia","project":"Solis Arx / Fluidstack","location":"Progress Park","planned_tract_acres":99,"announcement_date":"2025-12-05","county_reported_fluidstack_acquisition_presentation_date":"2026-06-09","development":"multiple phases"},"notes":["Presentation about acquisition is not independently inspected executed closing document. Data-center-ready marketing of park for decade does not establish completed facility or critical IT service. No quantitative tax award, IT MW, actual capex or exact operations date adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wytheco.org/418/Solis-Arx","host":"wytheco.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Max Meadows · Wythe · Source context reviewed"},{"id":"active-infrastructure-spring-valley-tech-park-loudoun-va","state":"va","kind":"facility","name":"Spring Valley Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SpringValley advocacy chronology and proposal scope. Conservancy advocacy page not county final decision. Recommendation distinct from Board denial. Posted July30,2026 overrides old January URL path. Smaller325acre discussion may describe different land scope; no harmonization. Forest, emissions and community-harm statements are advocacy concerns, not adjudicated violations. Fuel cells and storage not zero-emissions proof or IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. County legislative process context, not a parcel-specific approval.. No October 20 outcome exists in this review. No fixed expiry calculated. No effect on either exact parcel inferred without application-specific records.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://loudounwildlife.org/2026/01/spring-valley-technology-park/","host":"loudounwildlife.org","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.loudoun.gov/m/NewsFlash/home/detail/10874","host":"loudoun.gov","date":"2026-09-17","published":"2026-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.008,"lng":-77.523,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"SpringValley advocacy chronology and proposal scope","fields":{"project":"Spring Valley Technology Park","case":"LEGI-2024-0074","county":"Loudoun, Virginia","reported_site_acres":362,"reported_proposed_area_sqft_max":3500000,"reported_requested_substations":3,"advocacy_reported_planning_recommendation_date":"2026-07-23","advocacy_reported_recommendation":"unanimous denial recommendation"},"notes":["Conservancy advocacy page not county final decision. Recommendation distinct from Board denial. Posted July30,2026 overrides old January URL path. Smaller325acre discussion may describe different land scope; no harmonization. Forest, emissions and community-harm statements are advocacy concerns, not adjudicated violations. Fuel cells and storage not zero-emissions proof or IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://loudounwildlife.org/2026/01/spring-valley-technology-park/","host":"loudounwildlife.org","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"County legislative process context, not a parcel-specific approval.","fields":{"september15_action":"Vote for future consideration of a resolution, not adoption of the pause.","consideration_scheduled":"2026-10-20","effective_pause_established_as_of_2026_10_14":false,"proposed_scope":"Final Board action on legislative data center and substation applications; administrative applications unaffected; submissions and Planning Commission processing continue.","potential_duration":"Up to 12 months if approved. Intended retroactivity to September 15 is conditional, not a verified effective date.","exceptions":"Grid reliability or approaching statutory decision period may be considered.","county_attorney_position":"Notice attributes opinion that a data center approval moratorium is not legal.","october6_grandfathering_outcome":null},"notes":["No October 20 outcome exists in this review. No fixed expiry calculated. No effect on either exact parcel inferred without application-specific records.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.loudoun.gov/m/NewsFlash/home/detail/10874","host":"loudoun.gov","date":"2026-09-17","published":"2026-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"stack-nova-loudoun-va","state":"va","kind":"facility","name":"STACK NVA Loudoun 144MW Hyperscale Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Ashburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Planned144includesboth72buildings, not extra. Otherfeaturedworldwidesitefigures and4GW/6GWcorporatepipeline excluded. Exactopeningnotprovided. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/","host":"stackinfra.com","date":"2025-02-11","published":"2025-02-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.04,"lng":-77.49,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_campus_capacity_mw":144,"planned_buildings":2,"planned_capacity_each_building_mw":72,"power_basis":"capacity, not explicitly criticalIT","county":"Loudoun"},"notes":["Planned144includesboth72buildings, not extra. Otherfeaturedworldwidesitefigures and4GW/6GWcorporatepipeline excluded. Exactopeningnotprovided.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/","host":"stackinfra.com","date":"2025-02-11","published":"2025-02-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ashburn · Loudoun · Source context reviewed"},{"id":"stack-nva01a-va","state":"va","kind":"facility","name":"STACK NVA01A","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus and its one building describe the same 17 MW, not 34 MW. Available dedicated capacity is not contracted or measured consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/northern-virginia/nva01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0046933,"lng":-77.4417399,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_critical_capacity_mw":17,"buildings":1,"campus_acres":16,"nva01a_building_sqft":180000},"notes":["Campus and its one building describe the same 17 MW, not 34 MW. Available dedicated capacity is not contracted or measured consumption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/northern-virginia/nva01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sterling · Loudoun · Source context reviewed"},{"id":"stack-stafford-technology-campus-va","state":"va","kind":"facility","name":"Stafford Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stafford"],"city":"Falmouth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.staffordcountyva.gov","host":"staffordcountyva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.365,"lng":-77.485,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.staffordcountyva.gov","host":"staffordcountyva.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Falmouth · Stafford · Source context reviewed"},{"id":"aws-summit-crossing-tech-campus-spotsylvania-va","state":"va","kind":"facility","name":"Summit Crossing Tech Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Massaponax","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Source discloses StackInfrastructure grant. Construction claim is dated reporting, not currentoperation or commissioning.17 sites/3696 acres includeconstruction,approved,rezoningandsiteplans, not 17 operatingcenters or DCbuildingfootprint.616/1142/1263/675 acrestatusgroups belong tocountyrollup, not either specificcampus.35 billion-dollarAmazoncountycommitment claim needs primary geographic-scope corroboration before adoption; not assigned to eachsite. Cosnerconditional 2026 COforecast andunknown taxcollectionstart do not setCarterStore/SummitRFS. General taxlegal assertions andby-right explanation are not adopted as law. NoMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","host":"fxbgadvance.com","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.18847901989237,"lng":-77.44053482811216,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"FredericksburgAdvance’s industry-grant-supported column reports Amazon buildingsgoingupatSummitCrossing/CarterStore/Cosner/Mattameade and countywide 17 projectsites acrossseveralstages.","independently_verified_current_operating_status":null},"notes":["Source discloses StackInfrastructure grant. Construction claim is dated reporting, not currentoperation or commissioning.17 sites/3696 acres includeconstruction,approved,rezoningandsiteplans, not 17 operatingcenters or DCbuildingfootprint.616/1142/1263/675 acrestatusgroups belong tocountyrollup, not either specificcampus.35 billion-dollarAmazoncountycommitment claim needs primary geographic-scope corroboration before adoption; not assigned to eachsite. Cosnerconditional 2026 COforecast andunknown taxcollectionstart do not setCarterStore/SummitRFS. General taxlegal assertions andby-right explanation are not adopted as law. NoMW/ESAverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.fxbgadvance.com/p/digital-insights-the-status-of-data","host":"fxbgadvance.com","date":"2026-01-15","published":"2026-01-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Massaponax · Spotsylvania · Source context reviewed"},{"id":"tac-data-centers-wythe-county-va","state":"va","kind":"facility","name":"TAC Data Centers Wythe County Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wythe"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. Developerproposalnotapplicationapproval,localbuildingpermit,stateenvironmentalpermit,ownedlandorsignedutilityservice.765kVtransmissionvoltageisnotMWallocation. Norezoningrequirementreporteddoesnotmeanpermitexempt. Minimalwaterclaimisunspecifieddeveloperpromise,notzero/actualgallons. Nearby99acreSolisArxProgressParkprojectandotherVAprojectsseparate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://usdatacenterprojects.com/virginia/tac-data-centers-plans-gigawatt-scale-campus-in-wythe-county-virginia","host":"usdatacenterprojects.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.93,"lng":-80.86,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round38-2026-10-14.json","scope":"Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.","fields":{"reported_context":"USDataCenterProjects describes TACproposedWytheCounty1000acre/9-to11building/3.5-to4million-squarefootcampusover1GWplannedpower onRoggPartnershiplandnearI81/PulaskiCounty. Countyadministratorwelcomesproposal.","independently_verified_current_operating_status":null},"notes":["Developerproposalnotapplicationapproval,localbuildingpermit,stateenvironmentalpermit,ownedlandorsignedutilityservice.765kVtransmissionvoltageisnotMWallocation. Norezoningrequirementreporteddoesnotmeanpermitexempt. Minimalwaterclaimisunspecifieddeveloperpromise,notzero/actualgallons. Nearby99acreSolisArxProgressParkprojectandotherVAprojectsseparate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://usdatacenterprojects.com/virginia/tac-data-centers-plans-gigawatt-scale-campus-in-wythe-county-virginia","host":"usdatacenterprojects.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wythe · Source context reviewed"},{"id":"thornberry-data-center-campus-caroline-va","state":"va","kind":"facility","name":"Thornberry Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Caroline"],"city":"Ruther Glen","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Caroline three distinct application identities and review stages. Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.885,"lng":-77.52,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Caroline three distinct application identities and review stages","fields":{"county":"Caroline, Virginia","project_applications":[{"project":"Thornberry Data Center Campus","case":"RZ-03-2025","parcel":"84-A-1","parent_parcel_acres":1001.5,"requested_rezoning_acres":657,"address":"23202 Carneal Lane","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"ADP Ladysmith Data Hub","cases":["RZ-02-2025","SPEX-06-2025"],"parcel":"53-A-65","requested_rezoning_acres":140.38,"address":"18577 Green Road","source_stage":"complete submission forwarded for review; hearing date undetermined"},{"project":"Bull Church Data Center","case":"RZ-04-2024","parcel":"53-A-66","owner":"Mid Atlantic State Fund LLC","applicant":"NRD Retail LLC","location":"Bull Church Road east of I-95, adjacent to Virginia Bazaar south boundary","source_stage":"technical review; hearing date undetermined"}]},"notes":["Different projects and parcels; do not combine all acreage or treat whole1001.5-acre Thornberry parcel as rezoning area. July23,2026hearings shown for Carmel/Haymount, not these three data-center cases. Undated live index may lag actual decisions. No project MW, all permits or new future hearing established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://co.caroline.va.us/1036/Special-Exceptions-and-Rezonings","host":"co.caroline.va.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ruther Glen · Caroline · Source context reviewed"},{"id":"thornburg-business-park-data-center-spotsylvania-va","state":"va","kind":"facility","name":"Thornburg Business Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Thornburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Thornburg Business Park applicant forecast and internal job conflict. Applicantforecastsnotactualcapex/jobs/taxreceiptsorapprovedincentive.8.6Btotalincludes4.8Band3.8Bcomponents. Samepage11has216jobsinbodyand75insummary;holdcanonical. Fiscalmodelassumes20percentequipmentreplacementannually,notcontractualrevenueguarantee. Parcel63-A-27excludedretainedcommercialarea;do not add to campus. Firstsubmission/unassignedcasenumbernotfinalrezoning. SelectedPDFpages1/11/16visuallychecked;p16blankinretainedPDF,notsupportingfiscalexhibit. NoITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35424/Impact-Statement---Thornburg-Business-Park-First-Submission-236905321","host":"spotsylvania.va.us","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.127876,"lng":-77.52959,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Thornburg Business Park applicant forecast and internal job conflict","fields":{"project_name":"Thornburg Business Park","document_date":"2025-09-11","document_stage":"applicant first-submission rezoning impact statement, case number unassigned","county":"Spotsylvania, Virginia","site_acres_approx":200.35,"planned_data_center_building_area_sqft_approx":2000000,"tax_map_parcels":["63-12-E","63-12-D","63-12-C","63-A-33","63-A-32","63-A-37","76-A-5","76-A-5A","76-A-6"],"applicant_estimated_completion_cost_usd":8600000000,"estimated_computer_equipment_usd":4800000000,"estimated_buildings_fixed_equipment_usd":3800000000,"expected_operational_jobs_conflict":[216,75],"canonical_expected_jobs":null,"fiscal_forecast_first_operation_year":2028,"forecast_first_year_county_tax_usd":5400000,"forecast_2037_county_tax_usd":51700000,"forecast_2042_stable_annual_county_tax_usd":50400000},"notes":["Applicantforecastsnotactualcapex/jobs/taxreceiptsorapprovedincentive.8.6Btotalincludes4.8Band3.8Bcomponents. Samepage11has216jobsinbodyand75insummary;holdcanonical. Fiscalmodelassumes20percentequipmentreplacementannually,notcontractualrevenueguarantee. Parcel63-A-27excludedretainedcommercialarea;do not add to campus. Firstsubmission/unassignedcasenumbernotfinalrezoning. SelectedPDFpages1/11/16visuallychecked;p16blankinretainedPDF,notsupportingfiscalexhibit. NoITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35424/Impact-Statement---Thornburg-Business-Park-First-Submission-236905321","host":"spotsylvania.va.us","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Thornburg · Spotsylvania · Source context reviewed"},{"id":"thornburg-industrial-park-data-center-spotsylvania-va","state":"va","kind":"facility","name":"Thornburg Industrial Park Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spotsylvania"],"city":"Thornburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Thornburg Industrial Park2 unsigned draft proffers. Unsigneddraftproffersarenotenactedcountyconditionsoractualnoisecompliance. Exceptionscontinuepage8;do notdescribe60dBAuniversalallconditions. One-million-sqfttransporttriggernotactualapprovedbuildingarea.200acThornburgBusinessParkand49.6826acIndustrialPark2distinctprojects,donotmergebyThornburgname. NoMW,executedapproval,paidfeesorrevenueinthisdocument. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35205/1st-Submission-Proffers-71525","host":"spotsylvania.va.us","date":"2025-06-27","published":"2025-06-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.135,"lng":-77.5208,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Thornburg Industrial Park2 unsigned draft proffers","fields":{"project_name":"Thornburg Industrial Park2","document_date":"2025-06-27","document_stage":"unsigned voluntary proffer statement, case number to be assigned","applicants":["South Roxbury Mill LLC","Grindstone VA LLC"],"county":"Spotsylvania, Virginia","site_acres_approx":49.6826,"parcel":"63-5-C1","rezoning_request":"A-2 to I-1 for data center and light public utility uses","proposed_residential_boundary_sound_limit_dba":60,"proposed_commercial_boundary_sound_limit_dba":65,"proposed_measurement_height_m":1.5,"sound_condition_timing":"analysis before final certificate of occupancy per building","owner_signature_fields":"blank on pages10and11","approved_date":null},"notes":["Unsigneddraftproffersarenotenactedcountyconditionsoractualnoisecompliance. Exceptionscontinuepage8;do notdescribe60dBAuniversalallconditions. One-million-sqfttransporttriggernotactualapprovedbuildingarea.200acThornburgBusinessParkand49.6826acIndustrialPark2distinctprojects,donotmergebyThornburgname. NoMW,executedapproval,paidfeesorrevenueinthisdocument.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.spotsylvania.va.us/DocumentCenter/View/35205/1st-Submission-Proffers-71525","host":"spotsylvania.va.us","date":"2025-06-27","published":"2025-06-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Thornburg · Spotsylvania · Source context reviewed"},{"id":"tract-tuckahoe-technology-park-goochland-county-va","state":"va","kind":"facility","name":"Tuckahoe Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Goochland"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Goochland formal application versus preapplication and unresolved completeness. Development areas are not seven buildings or operating centers. County page contains preapplication and formal sections; formal submission does not equal complete application or approved CUP. Draft conditions/noise studies not enacted limits or measured compliance. October calendar has no published events, not proof future hearing cannot be added. No critical IT MW, final outcome or commissioning adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.goochlandva.us/1480/Tuckahoe-Technology-Park","host":"goochlandva.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.68,"lng":-77.68,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Goochland formal application versus preapplication and unresolved completeness","fields":{"agency":"Goochland County, Virginia","project":"Tuckahoe Technology Park","applicant":"VALCO2 Goochland LLC (Tract)","case":"CU-2026-00014","formal_cup_application_received":"2026-08-05","staff_completeness_letter_date":"2026-08-20","revision_posted_date":"2026-09-01","proposed_site_acres":871,"proposed_development_areas":7,"location":"Technology Overlay District TODWest eastern designated growth area"},"notes":["Development areas are not seven buildings or operating centers. County page contains preapplication and formal sections; formal submission does not equal complete application or approved CUP. Draft conditions/noise studies not enacted limits or measured compliance. October calendar has no published events, not proof future hearing cannot be added. No critical IT MW, final outcome or commissioning adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.goochlandva.us/1480/Tuckahoe-Technology-Park","host":"goochlandva.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Goochland · Source context reviewed"},{"id":"vantage-ashburn-ii-va2-va","state":"va","kind":"facility","name":"Vantage Ashburn II (VA2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Sterling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Page uses future tense; named campus specification not evidence every building is delivered. No exact opening inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/ashburn-ii-virginia/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.997949,"lng":-77.4302306,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"campus_acres":18,"campus_buildings":3,"planned_critical_it_mw":96,"planned_campus_area_sqft":800000,"published_address":"22435 Glenn Drive, Sterling, VA20164"},"notes":["Page uses future tense; named campus specification not evidence every building is delivered. No exact opening inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/ashburn-ii-virginia/","host":"vantage-dc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sterling · Loudoun · Source context reviewed"},{"id":"vantage-stafford-va4-va","state":"va","kind":"facility","name":"Vantage Data Centers VA4 Stafford Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stafford"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Fredericksburgregion is not municipalityassignment.782MW/8Bstatewide totals excluded. Target is future, not operating. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/","host":"vantage-dc.com","date":"2025-11-06","published":"2025-11-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.44,"lng":-77.44,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"groundbreaking_date":"2025-11-06","county":"Stafford","planned_investment_usd":2000000000,"planned_it_capacity_mw":192,"campus_acres":82,"planned_buildings":3,"planned_area_sqft_approx":929000,"first_building_opening_target":"late2027","forecast_construction_jobs":1100,"forecast_permanent_operations_jobs_min":50},"notes":["Fredericksburgregion is not municipalityassignment.782MW/8Bstatewide totals excluded. Target is future, not operating.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/","host":"vantage-dc.com","date":"2025-11-06","published":"2025-11-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Stafford · Source context reviewed"},{"id":"vint-hill-corners-fauquier-va","state":"va","kind":"facility","name":"Vint Hill Corners","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fauquier"],"city":"Vint Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Peter Cary/Piedmont Journalism Foundation, original March 11, 2024 report updated March 16. CyrusOne proposed four buildings/891,000 square feet at Vint Hill Road and Vint Hill Parkway, with site plans expected shortly; a proposed zoning vote was still future March 14. This is not the inherited 870,000 square feet reconciled or final approval. Vint Hill Corners is a separate roughly 50-acre Brookside Parkway proposal, then disputed with county staff; roughly 700,000 square feet is an estimate. Existing OVH/possible second building and Pink Panther hypothetical development are different projects. Master-association review is not county land-use approval. No current exemption or final zoning law established by this historical article. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","host":"princewilliamtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.746,"lng":-77.664,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Peter Cary/Piedmont Journalism Foundation, original March 11, 2024 report updated March 16. CyrusOne proposed four buildings/891,000 square feet at Vint Hill Road and Vint Hill Parkway, with site plans expected shortly; a proposed zoning vote was still future March 14. This is not the inherited 870,000 square feet reconciled or final approval. Vint Hill Corners is a separate roughly 50-acre Brookside Parkway proposal, then disputed with county staff; roughly 700,000 square feet is an estimate. Existing OVH/possible second building and Pink Panther hypothetical development are different projects. Master-association review is not county land-use approval. No current exemption or final zoning law established by this historical article.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.princewilliamtimes.com/news/vint-hill-landowners-push-back-on-move-to-curb-large-data-centers/article_c22ef762-820a-5b88-bed0-3b84ac791efe.html","host":"princewilliamtimes.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vint Hill · Fauquier · Source context reviewed"},{"id":"virginia-technology-park-clear-brook-frederick-va","state":"va","kind":"facility","name":"Virginia Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Clear Brook","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Board of Supervisors decision was still scheduled for July 8. No final county rejection inferred; competing acoustic/health claims not independently adjudicated. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nvdaily.com/nvdaily/frederick-county-planners-vote-down-clear-brook-data-center-campus/article_8e6c14d9-ce6f-51fd-9c04-e46953e6b6e5.html","host":"nvdaily.com","date":"2026-06-03","published":"2026-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.2564912,"lng":-78.096111,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"planning-recommendation-against-rezoning","reported_finding":"Winchester Star reporting via Northern Virginia Daily says planning commission voted ten-zero to recommend denial of Virginia Technology Park.","report_display_date":"2026-06-03","independently_verified_current_status":null},"notes":["Board of Supervisors decision was still scheduled for July 8. No final county rejection inferred; competing acoustic/health claims not independently adjudicated.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nvdaily.com/nvdaily/frederick-county-planners-vote-down-clear-brook-data-center-campus/article_8e6c14d9-ce6f-51fd-9c04-e46953e6b6e5.html","host":"nvdaily.com","date":"2026-06-03","published":"2026-06-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Clear Brook · Frederick · Source context reviewed"},{"id":"sharpless-wellington-road-bristow-va","state":"va","kind":"facility","name":"Wellington Road Data Center Campus (Sharpless)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Bristow","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This is wetlands/streams-related Corps review, not proof of every local building, utility or operating approval. Approved instrument was not obtained by reporter at publication and has not been directly reviewed here. Google affiliation is attributed to DataCenterDynamics, not an independently examined corporate filing. Neighboring Microsoft 124 acres and nearly 4 million square feet concern separate parcels and cannot be assigned to Sharpless. Existing industrial zoning does not waive all remaining permits. Historic cleanup orders and ongoing groundwater treatment are not a blanket environmental clearance. No MW or current operating certification. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html","host":"insidenova.com","date":"2024-03-08","published":"2024-03-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.746,"lng":-77.523,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"InsideNoVa reports an Army Corps official confirmed approval of Sharpless’s four-building proposal at 6201 Wellington Road on a 181-acre former military-industrial site.","independently_verified_current_operating_status":null,"operator_or_exact_site_identity_needs_crosswalk":true},"notes":["This is wetlands/streams-related Corps review, not proof of every local building, utility or operating approval. Approved instrument was not obtained by reporter at publication and has not been directly reviewed here. Google affiliation is attributed to DataCenterDynamics, not an independently examined corporate filing. Neighboring Microsoft 124 acres and nearly 4 million square feet concern separate parcels and cannot be assigned to Sharpless. Existing industrial zoning does not waive all remaining permits. Historic cleanup orders and ongoing groundwater treatment are not a blanket environmental clearance. No MW or current operating certification.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html","host":"insidenova.com","date":"2024-03-08","published":"2024-03-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Bristow · Prince William · Source context reviewed"},{"id":"winchester-gateway-data-center-frederick-va","state":"va","kind":"facility","name":"Winchester Gateway","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Winchester","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. NVDaily republishesJackParry/TheWinchesterStar April21,2026 originalreport: FrederickHistoricResourcesAdvisoryBoard7 to 1RECOMMENDSDENIALof72acreWinchesterGatewayCUP, notfinalsupervisorsdenial. AtAppleValley/MiddleRoadsnearVA37,threephase1buildings60ftproposal; suggested45ftconditions areadvisorynotadopted. Finalplanning/supervisorsoutcome unread. 35000gal/dayseasonalprojection isapplicationwaterfigure, notmeteredconsumption. Disposalcontractor/pre-treatmentexplicitlyuncertain. OtherWinchesterGateway2acrossVA37differentproposal/entityunconfirmed; source105acrevs10acrewordinginternallyinconsistent, notcollapsed/added/newpin. Historicbattlefield/property-valueconcerns notsettledmeasuredimpacts. Secondarypublicationoriginexplicit. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nvdaily.com/nvdaily/panel-recommends-denial-of-winchester-gateway-data-center-proposal/article_228ead16-7a9b-5e08-bf16-54cd65670acc.html","host":"nvdaily.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.1442224,"lng":-78.1980384,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["NVDaily republishesJackParry/TheWinchesterStar April21,2026 originalreport: FrederickHistoricResourcesAdvisoryBoard7 to 1RECOMMENDSDENIALof72acreWinchesterGatewayCUP, notfinalsupervisorsdenial. AtAppleValley/MiddleRoadsnearVA37,threephase1buildings60ftproposal; suggested45ftconditions areadvisorynotadopted. Finalplanning/supervisorsoutcome unread.","35000gal/dayseasonalprojection isapplicationwaterfigure, notmeteredconsumption. Disposalcontractor/pre-treatmentexplicitlyuncertain. OtherWinchesterGateway2acrossVA37differentproposal/entityunconfirmed; source105acrevs10acrewordinginternallyinconsistent, notcollapsed/added/newpin. Historicbattlefield/property-valueconcerns notsettledmeasuredimpacts. Secondarypublicationoriginexplicit.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.nvdaily.com/nvdaily/panel-recommends-denial-of-winchester-gateway-data-center-proposal/article_228ead16-7a9b-5e08-bf16-54cd65670acc.html","host":"nvdaily.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Winchester · Frederick · Source context reviewed"},{"id":"wise-innovation-hub-wise-va","state":"va","kind":"facility","name":"Wise Innovation Hub (OASIS)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wise"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator/local-reporting context; Muskie explicitly reconciles earlier Kentucky review.. Cardinal News February25,2026, updatedFebruary26, names Wise Innovation Hub LLC at LonesomePineRegionalBusiness&TechnologyPark, separate from existing MineralGap. December2025RedPostEnergy LOI is design/development intent, not final power contract or commissioned plant. Nine approximately240000sfbuildings over roughly10years as clients arrive remain a proposal. First roughly100MW gas generation inabout3years and eventual500 to 600MWGENERATION are developer forecasts, not IT load. Rough50MWperbuilding has unspecifiedloadbasis; do not add it to generation, or treat proposed20 to 30%gridexport as delivered. Park400acres/rough300available are land scopes, not a completed300acre campus. Permitting/environmental review and utility/regulatory roles remained unresolved. Jobs,3 to 5Mannualtax perbuilding and low-water claims are projections, not actual receipts/measured water. Pending2026legislative provisions are not adopted as current law. Not current operation, exact parcel, county, all-field or operating-building census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cardinalnews.org/2026/02/25/data-center-complex-with-gas-power-plant-planned-for-wise-county/","host":"cardinalnews.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":36.99,"lng":-82.53,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"kentucky-operator-crosswalk-and-local-stage-review-round59-2026-10-15.json","scope":"Original operator/local-reporting context; Muskie explicitly reconciles earlier Kentucky review.","fields":{},"notes":["Cardinal News February25,2026, updatedFebruary26, names Wise Innovation Hub LLC at LonesomePineRegionalBusiness&TechnologyPark, separate from existing MineralGap. December2025RedPostEnergy LOI is design/development intent, not final power contract or commissioned plant. Nine approximately240000sfbuildings over roughly10years as clients arrive remain a proposal.","First roughly100MW gas generation inabout3years and eventual500 to 600MWGENERATION are developer forecasts, not IT load. Rough50MWperbuilding has unspecifiedloadbasis; do not add it to generation, or treat proposed20 to 30%gridexport as delivered. Park400acres/rough300available are land scopes, not a completed300acre campus. Permitting/environmental review and utility/regulatory roles remained unresolved. Jobs,3 to 5Mannualtax perbuilding and low-water claims are projections, not actual receipts/measured water. Pending2026legislative provisions are not adopted as current law.","Not current operation, exact parcel, county, all-field or operating-building census certification."],"sources":[{"url":"https://cardinalnews.org/2026/02/25/data-center-complex-with-gas-power-plant-planned-for-wise-county/","host":"cardinalnews.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wise · Source context reviewed"},{"id":"yondr-cerberus-manassas-va","state":"va","kind":"facility","name":"Yondr Manassas Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"Manassas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cerberus Yondr Manassas acquired land and future campus. Landacquisitionnotcommissioning/allpermits.72MWfuture notobservedenergization. CorporateCerberus72Bassetsnot72Bcampusinvestment. No exactparcel/streetorcapitalexpenditurefigureinreviewedannouncement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cerberus.com/media/cerberus-and-yondr-acquire-40-acres-in-northern-virginia-to-build-72mw-data-center/","host":"cerberus.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.7509,"lng":-77.4753,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Cerberus Yondr Manassas acquired land and future campus","fields":{"developers":["Cerberus","Yondr"],"announcement_date":"2026-08-03","locality":"Manassas, Virginia","acquired_site_acres":40,"planned_campus_capacity_mw":72,"power_basis":"campus capacity, not explicitly critical IT","service_target_year":2029},"notes":["Landacquisitionnotcommissioning/allpermits.72MWfuture notobservedenergization. CorporateCerberus72Bassetsnot72Bcampusinvestment. No exactparcel/streetorcapitalexpenditurefigureinreviewedannouncement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cerberus.com/media/cerberus-and-yondr-acquire-40-acres-in-northern-virginia-to-build-72mw-data-center/","host":"cerberus.com","date":"2026-08-03","published":"2026-08-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Manassas · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}