{"schema_version":1,"layer":"incentives","reviewed_on":"2026-10-26","coverage_note":"Selected state program requirements and a dated operator report. Eligibility, commitments, operator reports and independently verified outcomes have different meanings. No cost per job is calculated.","items":[{"id":"incentive-la-equipment-framework-2026","kind":"incentive_program","subject":"Louisiana equipment exemption and framework approval boundary","state_codes":["la"],"scope":"Statutory eligibility and executive direction with future commitments and approval unknowns. Eligibility is not benefits.","fields":{"status":{"value":"program","scope":"Conditional statutory exemption and executive direction, not individual award.","locator":"StatuteB; order1through8","source_ids":["la-data-center-statute-20261024","la-data-center-tax-faq-20261024","la-executive-order26058-20261024"]},"louisiana_equipment_basis":{"value":"Statutory exemption with conditional certification and framework direction","scope":"Final approved framework and individual contract compliance not established.","locator":"Statute and order","source_ids":["la-data-center-statute-20261024","la-data-center-tax-faq-20261024","la-executive-order26058-20261024"]},"qualifying_attestation":{"value":"Operator must swear project will create at least50 new direct permanent Louisiana jobs and intends at least200 million dollars new Louisiana capital investment on or after July1 2024 and before July1 2029.","scope":"Future commitments and intent, not actual jobs or investment; two distinct conditions.","locator":"StatuteB2","source_ids":["la-data-center-statute-20261024"]},"purchase_date_gate":{"value":"Only purchases on or after July1 2024 eligible.","scope":"Purchase eligibility boundary, not a project certification or operating date.","locator":"StatuteB1b","source_ids":["la-data-center-statute-20261024"]},"tax_scope":{"value":"Eligible state and local sales and use tax purchases and specified development, construction, lease, repair, expansion and renovation expenditures.","scope":"Direct and exclusive qualified project use conditions apply. Not all purchases or every tax.","locator":"StatuteA3andB1","source_ids":["la-data-center-statute-20261024"]},"construction_boundary":{"value":"Specified construction and building materials, site assessment, engineering and design services can qualify.","scope":"Louisiana scope differs from states excluding permanently incorporated construction materials. Conditions still apply.","locator":"StatuteA3aixandB1","source_ids":["la-data-center-statute-20261024"]},"exclusions":{"value":"Office equipment and supplies, primarily sales or transportation equipment, unlisted immovable incorporated property and tangible property leased or rented one year or less are excluded.","scope":"One year or less is inclusive; no automatic exemption for short rentals.","locator":"StatuteA3b","source_ids":["la-data-center-statute-20261024"]},"agreement_terms":{"value":"Initial20 year agreement; LED may renew for an additional10 years after expiration.","scope":"Discretionary renewal, not guaranteed30 years; agreement lists eligible recipients and may add conditions.","locator":"StatuteB3","source_ids":["la-data-center-statute-20261024"]},"termination_collection":{"value":"Agreement permits termination and state or local tax collection if obligations fail or LED determines facility cannot fulfill them.","scope":"No actual recovery, violation or assessment established.","locator":"StatuteB3andB4","source_ids":["la-data-center-statute-20261024"]},"refund_interest":{"value":"Qualifying overpayment refunds are not entitled to interest under the cited provisions.","scope":"Not an actual refund, savings total or approval.","locator":"StatuteC","source_ids":["la-data-center-statute-20261024"]},"certificate_routes":{"value":"FAQ identifies facility R85010; affiliates or contractors may receive exemption letter or R85015, subcontractors R85015B.","scope":"May qualify only through applicable project and recipient conditions; no automatic contractor exemption.","locator":"DOR FAQ","source_ids":["la-data-center-tax-faq-20261024"]},"order_signed_on":{"value":"2026-06-25","scope":"Signed order26 058 controls despite redirected filename25 058.","locator":"Order4","source_ids":["la-executive-order26058-20261024"]},"framework_direction":{"value":"LED must develop contractual criteria for eligibility and continued participation, evaluate resource demand against benefits and require detailed intended compliance attestation.","scope":"Commitments are not verified cost protection, water conservation or compliance. PSC jurisdiction remains unimpaired.","locator":"Order1through5and7","source_ids":["la-executive-order26058-20261024"]},"framework_approval_clock":{"value":"Proposed criteria due within90 days of effectiveness; implementation follows if governor approves.","scope":"Elapsed deadline does not establish submission, approval or adopted final criteria.","locator":"Order6and8","source_ids":["la-executive-order26058-20261024"]},"final_framework_approval":{"value":null,"scope":"No independently reviewed approval, individual award, actual outcome or exact record adoption.","locator":"Bounded sources only","source_ids":["la-data-center-statute-20261024","la-data-center-tax-faq-20261024","la-executive-order26058-20261024"],"unknown_reason":"No independently reviewed approval, individual award, actual outcome or exact record adoption."},"individual_award":{"value":null,"scope":"No independently reviewed approval, individual award, actual outcome or exact record adoption.","locator":"Bounded sources only","source_ids":["la-data-center-statute-20261024","la-data-center-tax-faq-20261024","la-executive-order26058-20261024"],"unknown_reason":"No independently reviewed approval, individual award, actual outcome or exact record adoption."},"actual_tax_savings":{"value":null,"scope":"No independently reviewed approval, individual award, actual outcome or exact record adoption.","locator":"Bounded sources only","source_ids":["la-data-center-statute-20261024","la-data-center-tax-faq-20261024","la-executive-order26058-20261024"],"unknown_reason":"No independently reviewed approval, individual award, actual outcome or exact record adoption."},"actual_jobs":{"value":null,"scope":"No independently reviewed approval, individual award, actual outcome or exact record adoption.","locator":"Bounded sources only","source_ids":["la-data-center-statute-20261024","la-data-center-tax-faq-20261024","la-executive-order26058-20261024"],"unknown_reason":"No independently reviewed approval, individual award, actual outcome or exact record adoption."},"actual_resource_compliance":{"value":null,"scope":"No independently reviewed approval, individual award, actual outcome or exact record adoption.","locator":"Bounded sources only","source_ids":["la-data-center-statute-20261024","la-data-center-tax-faq-20261024","la-executive-order26058-20261024"],"unknown_reason":"No independently reviewed approval, individual award, actual outcome or exact record adoption."},"atlas_record_id":{"value":null,"scope":"No independently reviewed approval, individual award, actual outcome or exact record adoption.","locator":"Bounded sources only","source_ids":["la-data-center-statute-20261024","la-data-center-tax-faq-20261024","la-executive-order26058-20261024"],"unknown_reason":"No independently reviewed approval, individual award, actual outcome or exact record adoption."}}}],"sources":{"la-data-center-statute-20261024":{"url":"https://legis.la.gov/Legis/Law.aspx?d=1186787","checked_at":"2026-10-24T23:44:03.754824+00:00","sha256":"824a3f24f824a327f19fce147e57f06d6d3cf2548e43fe697c86b50bb63d82e5","title":"RS47 305.73 data center equipment exemption","publisher":"Louisiana State Legislature","published_on":null,"date_note":"Exact online publication day not stated.","scope":"Full substantive consolidated statute HTML text reviewed.","tier":"A","establishes_status":["program"]},"la-data-center-tax-faq-20261024":{"url":"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/","checked_at":"2026-10-24T23:43:50.033728+00:00","sha256":"b585a16f8acb930a56171a0f6b85c29f8895626069fe221d02c85c9add49c625","title":"Data center exemption certificate FAQ","publisher":"Louisiana Department of Revenue","published_on":null,"date_note":"Exact online publication day not stated.","scope":"Full substantive FAQ text reviewed; no individual certificate checked.","tier":"A","establishes_status":["program"]},"la-executive-order26058-20261024":{"url":"https://gov.louisiana.gov/news/5119","checked_at":"2026-10-24T23:49:06.444073+00:00","sha256":"9a04a36941a941ab24c303b29def067b7dc6616173ff958b383619db4c9d0915","title":"June25 2026 executive order26 058","publisher":"Office of the Governor of Louisiana","published_on":null,"date_note":"Printed order signature June25 2026 is distinct from unknown exact online publication day.","scope":"Four pages text read, signed page4 viewed. Redirect filename25 058 differs from document header26 058.","tier":"A","establishes_status":["program"]}},"details":[{"id":"incentive-la-equipment-framework-2026","html":"<article><h3>Louisiana equipment exemption and framework approval boundary</h3><p class=\"layer-scope\">Statutory eligibility and executive direction with future commitments and approval unknowns. Eligibility is not benefits.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>program<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/\">Louisiana Department of Revenue</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Conditional statutory exemption and executive direction, not individual award. Locator: StatuteB; order1through8.</p></dd><dt>Louisiana equipment basis</dt><dd>Statutory exemption with conditional certification and framework direction<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/\">Louisiana Department of Revenue</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Final approved framework and individual contract compliance not established. Locator: Statute and order.</p></dd><dt>Qualifying attestation</dt><dd>Operator must swear project will create at least50 new direct permanent Louisiana jobs and intends at least200 million dollars new Louisiana capital investment on or after July1 2024 and before July1 2029.<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Future commitments and intent, not actual jobs or investment; two distinct conditions. Locator: StatuteB2.</p></dd><dt>Purchase date gate</dt><dd>Only purchases on or after July1 2024 eligible.<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Purchase eligibility boundary, not a project certification or operating date. Locator: StatuteB1b.</p></dd><dt>Tax scope</dt><dd>Eligible state and local sales and use tax purchases and specified development, construction, lease, repair, expansion and renovation expenditures.<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Direct and exclusive qualified project use conditions apply. Not all purchases or every tax. Locator: StatuteA3andB1.</p></dd><dt>Construction boundary</dt><dd>Specified construction and building materials, site assessment, engineering and design services can qualify.<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Louisiana scope differs from states excluding permanently incorporated construction materials. Conditions still apply. Locator: StatuteA3aixandB1.</p></dd><dt>Exclusions</dt><dd>Office equipment and supplies, primarily sales or transportation equipment, unlisted immovable incorporated property and tangible property leased or rented one year or less are excluded.<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">One year or less is inclusive; no automatic exemption for short rentals. Locator: StatuteA3b.</p></dd><dt>Agreement terms</dt><dd>Initial20 year agreement; LED may renew for an additional10 years after expiration.<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Discretionary renewal, not guaranteed30 years; agreement lists eligible recipients and may add conditions. Locator: StatuteB3.</p></dd><dt>Termination collection</dt><dd>Agreement permits termination and state or local tax collection if obligations fail or LED determines facility cannot fulfill them.<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No actual recovery, violation or assessment established. Locator: StatuteB3andB4.</p></dd><dt>Refund interest</dt><dd>Qualifying overpayment refunds are not entitled to interest under the cited provisions.<span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not an actual refund, savings total or approval. Locator: StatuteC.</p></dd><dt>Certificate routes</dt><dd>FAQ identifies facility R85010; affiliates or contractors may receive exemption letter or R85015, subcontractors R85015B.<span class=\"layer-source\"><a href=\"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/\">Louisiana Department of Revenue</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">May qualify only through applicable project and recipient conditions; no automatic contractor exemption. Locator: DOR FAQ.</p></dd><dt>Order signed on</dt><dd>June 25, 2026<span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Signed order26 058 controls despite redirected filename25 058. Locator: Order4.</p></dd><dt>Framework direction</dt><dd>LED must develop contractual criteria for eligibility and continued participation, evaluate resource demand against benefits and require detailed intended compliance attestation.<span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Commitments are not verified cost protection, water conservation or compliance. PSC jurisdiction remains unimpaired. Locator: Order1through5and7.</p></dd><dt>Framework approval clock</dt><dd>Proposed criteria due within90 days of effectiveness; implementation follows if governor approves.<span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Elapsed deadline does not establish submission, approval or adopted final criteria. Locator: Order6and8.</p></dd><dt>Final framework approval</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/\">Louisiana Department of Revenue</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No independently reviewed approval, individual award, actual outcome or exact record adoption. Locator: Bounded sources only.</p></dd><dt>Individual award</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/\">Louisiana Department of Revenue</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No independently reviewed approval, individual award, actual outcome or exact record adoption. Locator: Bounded sources only.</p></dd><dt>Actual tax savings</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/\">Louisiana Department of Revenue</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No independently reviewed approval, individual award, actual outcome or exact record adoption. Locator: Bounded sources only.</p></dd><dt>Actual jobs</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/\">Louisiana Department of Revenue</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No independently reviewed approval, individual award, actual outcome or exact record adoption. Locator: Bounded sources only.</p></dd><dt>Actual resource compliance</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/\">Louisiana Department of Revenue</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No independently reviewed approval, individual award, actual outcome or exact record adoption. Locator: Bounded sources only.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://legis.la.gov/Legis/Law.aspx?d=1186787\">Louisiana State Legislature</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.louisiana.gov/tax-education-and-faqs/faqs/sales-tax/are-purchases-related-to-a-data-center-in-louisiana-exempt-from-sales-and-use-tax/\">Louisiana Department of Revenue</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://gov.louisiana.gov/news/5119\">Office of the Governor of Louisiana</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No independently reviewed approval, individual award, actual outcome or exact record adoption. Locator: Bounded sources only.</p></dd></dl></article>"}]}