{"schema_version":1,"layer":"incentives","reviewed_on":"2026-10-26","coverage_note":"Selected state program requirements and a dated operator report. Eligibility, commitments, operator reports and independently verified outcomes have different meanings. No cost per job is calculated.","items":[{"id":"incentive-mt-class17-20261025","kind":"incentive_program","subject":"Montana Class17 facility and onsite generation classification gates","state_codes":["mt"],"scope":"Two statutory facility routes, conditional construction certification and specific generation and communications terms.","fields":{"status":{"value":"program","source_ids":["mt-data-center-law-20261025","mt-data-center-guidance-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"mt_classification_basis":{"value":"Conditional Class17 taxable valuation classification, not blanket exemption or actual tax bill","source_ids":["mt-data-center-law-20261025","mt-data-center-guidance-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"valuation_basis":{"value":"Agency calls0.9percent of market value a taxable valuation rate. Actual tax bill or savings not established by multiplying market value by0.9percent alone.","source_ids":["mt-data-center-law-20261025","mt-data-center-guidance-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"ownership_gate":{"value":"One or more buildings under single ownership on contiguous parcels; statute includes wholly owned subsidiary or parent with100percent ownership interest.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"large_facility_route":{"value":"At least300000square feet and at least150million dollars total land, improvements, personal property and software cost, with construction after June30 2017.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"expanded_facility_route":{"value":"At least25000square feet new or expanded area and at least50million dollars invested in48months, construction after January1 2019.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"construction_certification":{"value":"Before March1of first classification tax year, taxpayer may certify facility under construction will meet subsection2within two years; future certification is not completed investment.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"generation_scope":{"value":"Electrical generation and storage commencing operation after May13 2025, on facility side of utility meter and primarily used onsite included in selected definition.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"onsite_gate":{"value":"Primarily onsite means at least80percent onsite consumption on annualized kilowatt hour basis, certified annually; utility grade generation meter measures total produced kilowatt hours.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"emergency_exception":{"value":"Governor declared generation emergency suspends80percent condition for qualifying center relying on backup generation and making facility side electricity available to utility for residential and business service during emergency period.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"generation_term":{"value":"Selected electrical generation systems receive Class17rate for ten years from construction commencement, then Class13rate. Not a universal ten year term for all center property or blanket storage term determination.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"communications_term":{"value":"Dedicated owned or leased communications infrastructure construction after June30 2017and before July1 2037; ten years from construction commencement, then Class13rate.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"assessment_boundary":{"value":"Qualified center taxable property locally assessed except selected centrally assessed dedicated interstate or intrastate communications infrastructure.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"mill_boundary":{"value":"Class17property in urban renewal or targeted economic development districts remains subject to listed school and state equalization mills.","source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"guidance_boundary":{"value":"Agency short guidance lists25000square foot route; statute separately includes300000square foot route and2025onsite generation provisions.","source_ids":["mt-data-center-law-20261025","mt-data-center-guidance-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance."},"individual_classification":{"value":null,"source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance.","unknown_reason":"No individual classification, tax bill, measured generation or exact record match reviewed."},"actual_tax_savings":{"value":null,"source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance.","unknown_reason":"No individual classification, tax bill, measured generation or exact record match reviewed."},"actual_onsite_generation":{"value":null,"source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance.","unknown_reason":"No individual classification, tax bill, measured generation or exact record match reviewed."},"atlas_record_id":{"value":null,"source_ids":["mt-data-center-law-20261025"],"scope":"Conditional statutory classification context, not actual benefits, generation or eligibility for any named project.","locator":"2025MCA15 6 162 subsections1through8 and agency guidance.","unknown_reason":"No individual classification, tax bill, measured generation or exact record match reviewed."}}}],"sources":{"mt-data-center-law-20261025":{"url":"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html","checked_at":"2026-10-25T02:18:55.583463+00:00","sha256":"8323a618a79919890429deeedec8567a0c898418144ddd6f0baf08f40ddcfd40","title":"Montana2025 MCA15 6 162 Class17","publisher":"Montana Legislature","tier":"A","published_on":null,"date_note":"Law labeled2025MCA and includes2025amendment; exact online publication day unknown.","scope":"Entire substantive section or guidance read; cross referenced class13rate and exemption statutes not reviewed.","establishes_status":["program"]},"mt-data-center-guidance-20261025":{"url":"https://revenue.mt.gov/publications/Qualified-Data-Center-Application","checked_at":"2026-10-25T02:18:54.894708+00:00","sha256":"e2998b2715c25888c29c71034b0ae72c81f306023a2ca98d6f5351043cb878ae","title":"Montana qualified data center classification guidance","publisher":"Montana Department of Revenue","tier":"A","published_on":null,"date_note":"Law labeled2025MCA and includes2025amendment; exact online publication day unknown.","scope":"Entire substantive section or guidance read; cross referenced class13rate and exemption statutes not reviewed.","establishes_status":["program"]}},"details":[{"id":"incentive-mt-class17-20261025","html":"<article><h3>Montana Class17 facility and onsite generation classification gates</h3><p class=\"layer-scope\">Two statutory facility routes, conditional construction certification and specific generation and communications terms.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>program<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.mt.gov/publications/Qualified-Data-Center-Application\">Montana Department of Revenue</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Mt classification basis</dt><dd>Conditional Class17 taxable valuation classification, not blanket exemption or actual tax bill<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.mt.gov/publications/Qualified-Data-Center-Application\">Montana Department of Revenue</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Valuation basis</dt><dd>Agency calls0.9percent of market value a taxable valuation rate. Actual tax bill or savings not established by multiplying market value by0.9percent alone.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.mt.gov/publications/Qualified-Data-Center-Application\">Montana Department of Revenue</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Ownership gate</dt><dd>One or more buildings under single ownership on contiguous parcels; statute includes wholly owned subsidiary or parent with100percent ownership interest.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Large facility route</dt><dd>At least300000square feet and at least150million dollars total land, improvements, personal property and software cost, with construction after June30 2017.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Expanded facility route</dt><dd>At least25000square feet new or expanded area and at least50million dollars invested in48months, construction after January1 2019.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Construction certification</dt><dd>Before March1of first classification tax year, taxpayer may certify facility under construction will meet subsection2within two years; future certification is not completed investment.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Generation scope</dt><dd>Electrical generation and storage commencing operation after May13 2025, on facility side of utility meter and primarily used onsite included in selected definition.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Onsite gate</dt><dd>Primarily onsite means at least80percent onsite consumption on annualized kilowatt hour basis, certified annually; utility grade generation meter measures total produced kilowatt hours.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Emergency exception</dt><dd>Governor declared generation emergency suspends80percent condition for qualifying center relying on backup generation and making facility side electricity available to utility for residential and business service during emergency period.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Generation term</dt><dd>Selected electrical generation systems receive Class17rate for ten years from construction commencement, then Class13rate. Not a universal ten year term for all center property or blanket storage term determination.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Communications term</dt><dd>Dedicated owned or leased communications infrastructure construction after June30 2017and before July1 2037; ten years from construction commencement, then Class13rate.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Assessment boundary</dt><dd>Qualified center taxable property locally assessed except selected centrally assessed dedicated interstate or intrastate communications infrastructure.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Mill boundary</dt><dd>Class17property in urban renewal or targeted economic development districts remains subject to listed school and state equalization mills.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Guidance boundary</dt><dd>Agency short guidance lists25000square foot route; statute separately includes300000square foot route and2025onsite generation provisions.<span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <span class=\"layer-source\"><a href=\"https://revenue.mt.gov/publications/Qualified-Data-Center-Application\">Montana Department of Revenue</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Individual classification</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Actual tax savings</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Actual onsite generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://mca.legmt.gov/bills/mca/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html\">Montana Legislature</a>. Source: Publication date not stated. Checked: October 25, 2026.</span> <p class=\"layer-scope\">Conditional statutory classification context, not actual benefits, generation or eligibility for any named project. Locator: 2025MCA15 6 162 subsections1through8 and agency guidance..</p></dd></dl></article>"}]}