<?xml version='1.0' encoding='utf-8'?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" version="2.0">
  <channel>
    <title>Data Centers Atlas: Ohio</title>
    <link>https://datacentersatlas.com/ohio/</link>
    <description>Dated record events and attributed concern items. Exact dates and source limits remain separate; an empty feed does not establish an absence of activity or concerns.</description>
    <language>en-us</language>
    <docs>https://www.rssboard.org/rss-specification</docs>
    <atom:link href="https://datacentersatlas.com/ohio/feed.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>News report: Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)</title>
      <link>https://datacentersatlas.com/concerns/#concern:oh-aligned-chillicothe-resource-news-2026</link>
      <description>&lt;p&gt;Scioto Post reported continued council discussion of power use, water consumption, wastewater and noise concerns about a possible data center at the former Chillicothe paper mill. The article also reported a council member describing utility staff projections; those positions are not measured impacts or an independently inspected engineering study.&lt;/p&gt;&lt;p&gt;Record status: unknown. The current disposition of these reported concerns is not established by this bounded review.&lt;/p&gt;&lt;p&gt;Event date: &lt;time datetime="2026-10-12"&gt;October 12, 2026&lt;/time&gt;&lt;/p&gt;&lt;p&gt;Source publication date: &lt;time datetime="2026-10-13"&gt;October 13, 2026&lt;/time&gt;&lt;/p&gt;&lt;p&gt;Disposition date: Not established&lt;/p&gt;&lt;p&gt;Concern sources checked: &lt;time datetime="2026-10-18"&gt;October 18, 2026&lt;/time&gt;&lt;/p&gt;&lt;p&gt;The original article identifies the October 12, 2026 council session in its embedded-video captions; October 13 is publication. Videos and audio were not reviewed. Scioto Post displays October 13, 2026. The separate identity/context article from The Post displays August 31. Publication days are distinct from the October 12 meeting.&lt;/p&gt;&lt;p&gt;Raised or recorded by Scioto Post.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;a href="https://www.thepostathens.com/article/2026/08/data-center-chillicothe-moratorium-southeast-ohio"&gt;The Post&lt;/a&gt;&lt;/li&gt;&lt;li&gt;&lt;a href="https://www.sciotopost.com/data-center-concerns-continue-in-chillicothe-council/"&gt;Scioto Post&lt;/a&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;Counts describe attributed documentation, not harm or severity. Allegations, procedural outcomes and published replies retain their separate scope.&lt;/p&gt;</description>
      <guid isPermaLink="false">urn:sha256:7daa759420c6b644e5c22c6c975cb26872d21e21aa8e1bc82fc63dfa7e5bed8b</guid>
      <category domain="https://datacentersatlas.com/concerns/#record-type">News report</category>
      <category domain="https://datacentersatlas.com/concerns/#concern-category">Power and electric rates</category>
      <category domain="https://datacentersatlas.com/concerns/#concern-category">Water use</category>
      <category domain="https://datacentersatlas.com/concerns/#concern-category">Water quality and discharge</category>
      <category domain="https://datacentersatlas.com/concerns/#concern-category">Noise</category>
    </item>
    <item>
      <title>Legal action: AWS Scioto Darby Campus</title>
      <link>https://datacentersatlas.com/concerns/#concern:oh-hilliard-fuel-cell-permit-appeal-withdrawal-2026</link>
      <description>&lt;p&gt;City of Hilliard reported withdrawing its ERAC appeal of the air permit for AEP Ohio&amp;#x27;s natural-gas fuel cells serving the AWS Scioto Darby campus. The city described a carbon-dioxide modeling review and planned later monitoring while criticizing limited local review. This records the city&amp;#x27;s account, not a court merits ruling, measured air quality, all-pollutant safety finding or AWS diesel-generator permit.&lt;/p&gt;&lt;p&gt;Record status: withdrawn. City of Hilliard reported withdrawing its own ERAC appeal. This is the city&amp;#x27;s published account, not a retained commission dismissal order, permit revocation, decision on alleged effects or proof of facility operation.&lt;/p&gt;&lt;p&gt;Event date: Not established&lt;/p&gt;&lt;p&gt;Source publication date: &lt;time datetime="2026-09-15"&gt;September 15, 2026&lt;/time&gt;&lt;/p&gt;&lt;p&gt;Disposition date: Not established&lt;/p&gt;&lt;p&gt;Concern sources checked: &lt;time datetime="2026-10-18"&gt;October 18, 2026&lt;/time&gt;&lt;/p&gt;&lt;p&gt;The city reports a November 2025 appeal filing and a later withdrawal, but the exact filing and disposition days are not established in the retained announcements. The city release displays September 15, 2026 and the retained original JSON-LD gives that publication day. The identity-context release is dated October 21, 2025. Neither is a substitute for an unverified ERAC filing day.&lt;/p&gt;&lt;p&gt;Raised or recorded by City of Hilliard.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;a href="https://hilliardohio.gov/state-law-overrides-local-review-for-aws-fuel-cell-system-in-hilliard/"&gt;City of Hilliard&lt;/a&gt;&lt;/li&gt;&lt;li&gt;&lt;a href="https://hilliardohio.gov/city-of-hilliard-ends-fuel-cell-permit-appeal-calls-for-stronger-local-input/"&gt;City of Hilliard&lt;/a&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;Counts describe attributed documentation, not harm or severity. Allegations, procedural outcomes and published replies retain their separate scope.&lt;/p&gt;</description>
      <guid isPermaLink="false">urn:sha256:15609961e251862f4c0bb09d0230ec175a23af68490cb32e180edef61b78915a</guid>
      <category domain="https://datacentersatlas.com/concerns/#record-type">Legal action</category>
      <category domain="https://datacentersatlas.com/concerns/#concern-category">Air and generators</category>
    </item>
    <item>
      <title>Dated record: Edged Columbus</title>
      <link>https://datacentersatlas.com/ohio/#edged-columbus-new-albany-oh</link>
      <description>&lt;p&gt;Recorded event date: &lt;time datetime="2025-09-10"&gt;September 10, 2025&lt;/time&gt;&lt;/p&gt;&lt;p&gt;Operator reported opening: September 11 release explicitly describes the opening celebration as yesterday; independent commissioning and all halls are not certified.&lt;/p&gt;&lt;p&gt;A recorded date retains its original source and phase scope. A scheduled date does not confirm that the event happened or permission was granted. Source-check dates are separate.&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;a href="https://edged.us/news/columbus-grand-opening"&gt;Edged US&lt;/a&gt;&lt;/li&gt;&lt;/ul&gt;</description>
      <guid isPermaLink="false">urn:sha256:1e691c718aa0e6523f32ae999fffaacea9be0a651e775aae29dafc5ea2db5c6f</guid>
      <category domain="https://datacentersatlas.com/concerns/#entry-kind">Dated record</category>
    </item>
  </channel>
</rss>